JPH0343201A - Manufacture of concrete product and apparatus therefor - Google Patents

Manufacture of concrete product and apparatus therefor

Info

Publication number
JPH0343201A
JPH0343201A JP18134689A JP18134689A JPH0343201A JP H0343201 A JPH0343201 A JP H0343201A JP 18134689 A JP18134689 A JP 18134689A JP 18134689 A JP18134689 A JP 18134689A JP H0343201 A JPH0343201 A JP H0343201A
Authority
JP
Japan
Prior art keywords
concrete
curing
micrometers
formwork
temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP18134689A
Other languages
Japanese (ja)
Inventor
Takeshi Imoto
井本 武
Tetsutsugu Yamano
山野 哲嗣
Yoshikazu Nakanishi
美一 中西
Kazuaki Ukita
和明 浮田
Mitsuhiro Ishii
石井 光裕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shikoku Research Institute Inc
Original Assignee
Shikoku Research Institute Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shikoku Research Institute Inc filed Critical Shikoku Research Institute Inc
Priority to JP18134689A priority Critical patent/JPH0343201A/en
Publication of JPH0343201A publication Critical patent/JPH0343201A/en
Pending legal-status Critical Current

Links

Landscapes

  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

PURPOSE:To heat uniformly the inside, and curing the concrete product in a short time without the occurrence of cracks by pouring a fluidizing state concrete into mold frames and carrying out pre-curing therefor, and applying electromagnetic waves in the far infrared ray region of a specific wave length from the upper part of the concrete. CONSTITUTION:Mold frames 4 are washed and then applied with a separating material, and a fluidized state concrete is poured thereinto. The mold frames 4 are vibrated by a vibrator so as to compact the concrete and remove air bubbles therefrom, thereafter, pre-curing is conducted for a predetermined time. As a conveyor 2 is driven, concrete plates 6 pass through under bank of infrared ray heaters 5 in order to be irradiated by electromagnetic waves in an infrared ray region of from 2.5mm micrometers to 20 micrometers in its wave length. For instance, the heating in a curing bath 3 is so set that the temperature in a furnace will become 80 degrees centigrade which is the highest heating temperature. After the hating through the highest heating temperature, the mold frames 4 are transported out of the curing bath 3 and brush finish is performed for the concrete plates 6, after that, the concrete plates 6 are natural-cured by the natural radiation.

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は、コンクリート板、コンクリート柱、コンクリ
ートブロック等のコンクリート製品の製造方法及びその
装置に関する。
DETAILED DESCRIPTION OF THE INVENTION (Field of Industrial Application) The present invention relates to a method and apparatus for manufacturing concrete products such as concrete plates, concrete columns, and concrete blocks.

(従来の技術〉 従来、コンクリート板、コンクリート柱、コンクリート
ブロック等のコンクリート製品の製造方法には、蒸気養
生を用いるものが知られている。
(Prior Art) Conventionally, methods for producing concrete products such as concrete plates, concrete columns, and concrete blocks using steam curing are known.

この蒸気養生のための装置では、コンクリートを打設す
る型枠を載置する養生ベツドの下部に蒸Z供給室が設け
られ、蒸気供給室内に蒸気を供給するバイブが配設され
、養生ベツド上に筒状に形成された前記型枠が配設され
ている。コンクリートを養生する場合には、型枠内に流
動状態のコンクリートを打設した後に前養生を行なって
型枠上部にシートをかぶせ、パイプを介して蒸気供給室
に蒸気を供給することにより養生ヘッドf:;4:I熱
し始め、養生に適した最高温度に至るまで温度と界司配
が適切になるように加熱し、最高温度収態に達した後温
度下降勾配を緩やかにして徐々に冷却するように蒸気の
供給量を制御し、所定温度に冷却された後に蒸気の供給
を停止して自然養生する方法等が採られている。
In this steam curing device, a steam Z supply chamber is provided at the bottom of the curing bed on which the formwork for pouring concrete is placed, and a vibrator for supplying steam is disposed inside the steam supply chamber. The formwork formed into a cylindrical shape is disposed. When curing concrete, pre-curing is performed after pouring concrete in a fluid state in a formwork, covering the top of the formwork with a sheet, and supplying steam to the steam supply chamber through a pipe to set up the curing head. f:;4:I Start heating, heat until the temperature and boundary control are appropriate until the maximum temperature suitable for curing is reached, and after reaching the maximum temperature convergence, gradually cool down by slowing down the temperature gradient. A method has been adopted in which the amount of steam supplied is controlled so that the temperature is cooled to a predetermined temperature, and then the supply of steam is stopped to allow natural curing.

(!明が解決しようとする課yi> しかしながら、このような従来のコンクリート製品の養
生方法では、養生ベツドを蒸気で一旦加熱することによ
り加熱された養生ベツドの熱温をコンクリートに熱伝導
させるために、コンクリートの加熱効率が低いという課
題があると共に、コンクリートの上部と下部とにおいて
加熱温度の不均一状態が生じる結果、コンクリートの収
縮が不均一となり、コンクリート板にクラックが生じ易
いという課題がある。
(! Issues that Ming is trying to solve yi> However, in such conventional curing methods for concrete products, the curing bed is once heated with steam to transfer the thermal temperature of the heated curing bed to the concrete. In addition, there is a problem that the heating efficiency of concrete is low, and as a result of uneven heating temperature between the upper and lower parts of the concrete, the concrete shrinks unevenly and cracks are likely to occur in the concrete plate. .

(課題を解決するための手段) 上記課題を解決するために、本発明の請求項1にかかる
コンクリート製品の製造方法は、型枠内に流動状態のコ
ンクリートを打設して前養生した後、養生室内にその型
枠を搬入しつつ、前記養生室内にて前記コンクリートの
上方から波長2.5マイクロメートル〜20マイクロメ
ートルの遠赤外線領域の電磁波を照射することを特徴と
する。
(Means for Solving the Problems) In order to solve the above problems, a method for manufacturing a concrete product according to claim 1 of the present invention includes pouring concrete in a fluid state in a formwork and pre-curing it, and then The method is characterized in that, while the formwork is carried into the curing chamber, electromagnetic waves in the far infrared region with a wavelength of 2.5 micrometers to 20 micrometers are irradiated from above the concrete in the curing chamber.

又、本発明の請求項2にかかるコンクリート製品の製造
装置は、流動状態のコンクリートを打設するための型枠
を設け、養生室の前記型枠の上方に、波長2.5マイク
ロメートル〜20マイクロメートルの遠赤外線領域の電
磁波を照射する一個乃至複数個の遠赤外線ヒータを配設
したことを特徴とする。
Further, the concrete product manufacturing apparatus according to claim 2 of the present invention is provided with a formwork for pouring concrete in a fluid state, and has a wavelength of 2.5 micrometers to 20 micrometers above the formwork in the curing chamber. It is characterized by disposing one or more far-infrared heaters that emit electromagnetic waves in the far-infrared region of micrometers.

(作 用) 本発明の請求項1にかかるコンクリート製品の製造方法
によれば、打設後のコンクリートは骨材、セメント類の
他に多量の水分を含んでおり、セメントでは波長3マイ
クロメートル、6マイクロメードル、9マイクロメート
ル以上の遠赤外線領域の電m波を良く吸収する性質を有
し、骨材としての砂れき等に含まれる石英は2.75マ
イクロメートル及び5マイクロメートル以上の箇所で熱
を良く吸収し、水は波長3マイクロメートル、6マイク
ロメードル、15マイクロメートルの1M、磁波を良く
吸収するので、型枠内に打設されたコンクリートに波長
2.5マイクロメートル〜20マイクロメートルの電磁
波を照射すると、コンクリートの表面及び内部に遠赤外
線領域の電磁波が浸透し、セメントの水和反応が促進さ
れる。これによって、コンクリート製品の内部が均一に
加熱され、クラックを生じさせることなくコンクリート
製品を短時間で養生出来る。
(Function) According to the method for producing concrete products according to claim 1 of the present invention, concrete after pouring contains a large amount of water in addition to aggregate and cement, and cement has a wavelength of 3 micrometers, It has the property of absorbing radio m waves in the far infrared region of 6 micrometres and 9 micrometers or more, and quartz contained in gravel as an aggregate heats up at points of 2.75 micrometers and 5 micrometers or more. Water absorbs 1M wavelengths of 3 micrometers, 6 micrometers, 15 micrometers, and magnetic waves well, so water with wavelengths of 2.5 micrometers to 20 micrometers is applied to concrete placed in the formwork. When irradiated with electromagnetic waves, electromagnetic waves in the far infrared region penetrate into the surface and inside of concrete, promoting the hydration reaction of cement. As a result, the inside of the concrete product is heated uniformly, and the concrete product can be cured in a short time without causing cracks.

又、本発明の請求項2のコンクリート製品の製造装置に
よれば、上記の他に型枠内のコンクリートに遠赤外線を
照射しながら、コンクリートを打設した型枠を搬送する
コンベアi構と組み合わせることにより、コンクリート
製品の大ffi養生が可能となる。
Further, according to the concrete product manufacturing apparatus of claim 2 of the present invention, in addition to the above, it is combined with a conveyor i structure that conveys the formwork in which concrete is poured while irradiating the concrete in the formwork with far infrared rays. This enables large ffi curing of concrete products.

(実施例) 以下、本発明の実施例にかかるコンクリート製品のSJ
造方法及びその装置を図面に基づいて説明する。
(Example) Hereinafter, SJ of concrete products according to examples of the present invention
The manufacturing method and its apparatus will be explained based on the drawings.

第1図は、本実施例にかかるコンクリート板の製造装置
を示すもので、この製造’A 221は、コンベア2と
、トンネル状の養生槽3(養生室)と、底部のある1状
の型枠4と、複数個の遠赤外線ヒータ5とを備えている
FIG. 1 shows a concrete plate manufacturing apparatus according to this embodiment. It includes a frame 4 and a plurality of far-infrared heaters 5.

コンベア2は、ギアードモータによって駆動されるチェ
ーン駆動形式のエンドレスタイプのものが用いられ、そ
の長さは約23 、8m、幅は約1.8m、高さは約0
.7mとされており、養生[3の内部を通っている。コ
ンベア2の上部には厚さ10センチメートル以下のコン
クリート板6を形成するための型枠4が複数個配設され
ている。型枠4は例えば、縦75cm、横75cm、厚
み5cmの矩形の形状を有しており、コンベアの一端に
順次載せて打設、バイブレーション、前養生の養生室に
移動される機構になっている。
The conveyor 2 is a chain-driven endless type conveyor driven by a geared motor, and its length is approximately 23.8 m, width is approximately 1.8 m, and height is approximately 0.0 m.
.. It is said to be 7m long and passes through the inside of the curing [3]. A plurality of formworks 4 for forming concrete plates 6 having a thickness of 10 cm or less are arranged above the conveyor 2. The formwork 4 has, for example, a rectangular shape with a length of 75 cm, a width of 75 cm, and a thickness of 5 cm, and has a mechanism in which it is sequentially placed on one end of a conveyor and moved to a curing room for pouring, vibration, and pre-curing. .

コンベア2の養生層3の上流側には流動状態のコンクリ
ートを型枠4内に流し込むための図示しないポンプと、
型枠4内のコンクリートを締め固めるとともにコンクリ
ートから空気泡を除去するためのバイブレータ(図示省
略)とが設けられている。養生槽3の下流側にはハケ仕
上げを行なう仕上げ装置(図示省略)が設けられている
。養生槽3は、幅1勺1.8m、高さ約1.4m、長さ
約10.5a+の鉄骨骨組み構造で形成され、外をに断
熱材として50mmのグラスウ−ルが設けられている。
On the upstream side of the curing layer 3 of the conveyor 2, there is a pump (not shown) for pouring concrete in a fluid state into the formwork 4;
A vibrator (not shown) is provided for compacting the concrete in the formwork 4 and removing air bubbles from the concrete. A finishing device (not shown) for brush finishing is provided downstream of the curing tank 3. The curing tank 3 is formed of a steel frame structure with a width of 1.8 m, a height of about 1.4 m, and a length of about 10.5 m, and a 50 mm glass wool is provided on the outside as a heat insulating material.

養生槽3内には12灯の遠赤外線ヒータ5が配設されて
いる。この遠赤外線ヒータ5は養生槽3内に配設された
温度センサー(図示せず)からの温度情報に基づいて自
vJ調整される。
Twelve far-infrared heaters 5 are arranged inside the curing tank 3. The far-infrared heater 5 has its self-vJ adjusted based on temperature information from a temperature sensor (not shown) provided in the curing tank 3.

遠赤外線ヒータ5のヒータ8風は1.IKwとされ、遠
赤外線ヒータ5の型枠4内のコンクリートの表面からの
高さは25σ、30an、35cmと変えることが出来
るようになっている。
The heater 8 wind of the far infrared heater 5 is 1. IKw, and the height of the far infrared heater 5 from the surface of the concrete in the formwork 4 can be changed to 25σ, 30an, and 35cm.

次に、本発明の実施例にかかるコンクリート製品の製造
方法について説明する。
Next, a method for manufacturing a concrete product according to an embodiment of the present invention will be described.

先ず、組立て済みの型枠4を洗浄した後、型枠4に、1
1 iff材を塗布し、型枠4内に配筋を行い、水、砂
れき等を含んだ流動状態のコンクリートを打設する。コ
ンクリートを打設した型枠4をバイブレータにより振動
させ、コンクリートを締め固めると共に、コンクリート
内の空気泡を除く、バイブレータによる振動後、所定時
間前養生を行なう、前養生後、コンベア2上にコンクリ
ートの入った型枠4を配設し、コンベア2を駆動する。
First, after cleaning the assembled formwork 4, apply 1 to the formwork 4.
1. IF material is applied, reinforcement is placed in the formwork 4, and concrete in a fluid state containing water, gravel, etc. is poured. The formwork 4 in which the concrete has been poured is vibrated by a vibrator to compact the concrete and remove air bubbles in the concrete.After the vibration by the vibrator, pre-curing is performed for a predetermined period of time.After pre-curing, the concrete is placed on the conveyor 2. The filled formwork 4 is placed and the conveyor 2 is driven.

このときコンベア2の搬送速度は一つのコンクリート板
6が4分〜5分で一つの遠赤外線ヒータ5の下を通過す
るように設定し、一つのコンクリート板6を12個の遠
赤外線ヒータ5の下を通過させて平均60分で加熱養生
できるようにする。又、遠赤外線ヒータ5とコンクリー
ト表面の距離は、30cmに保持する0本実施例での養
生槽3における加熱は炉内の温度が最高加熱温度80度
Cになるように設定しである。最高加熱温度による加熱
後、型枠4を養生槽3から搬出してコンクリート板6に
ハケ仕上げを行なってからコンクリート板6を自然放熱
により自然養生する。
At this time, the conveyance speed of the conveyor 2 is set so that one concrete plate 6 passes under one far-infrared heater 5 in 4 to 5 minutes, and one concrete plate 6 is passed under one far-infrared heater 5 in 4 to 5 minutes. The material can be heated and cured in an average of 60 minutes by passing it through the bottom. The distance between the far infrared heater 5 and the concrete surface is maintained at 30 cm.Heating in the curing tank 3 in this embodiment is set so that the temperature inside the furnace reaches a maximum heating temperature of 80 degrees Celsius. After heating at the maximum heating temperature, the formwork 4 is taken out from the curing tank 3, the concrete plate 6 is brushed, and then the concrete plate 6 is naturally cured by natural heat radiation.

又、ハケ仕上げ後の自然養生についてもこの製造装!f
1を併設することによって打設から脱型に至るまでのコ
ンクリート板の連続生産が可能と、なる。
Also, this manufacturing method also allows for natural curing after brushing! f
1 will enable continuous production of concrete plates from pouring to demolding.

第3図〜第6図は、この養生方法によりコンクリート板
6を実験的に養生した結果を示したものである。第3図
は、この試験に用いた製造装置1の概略構成を示したも
ので、このときの試験に用いた養生槽3の大きさは長さ
I Loan、幅110a+1、高さ900I11であ
り、コンクリート板6の大きさは縦75CI11、横7
5cm、厚さ5CI11であった。遠赤外線ヒータ5は
350Wのものを5個準備し、5個の遠赤外線ヒータ5
については、打設したコンクリートの4隅と中央部の上
方20cmの位置に均一の間隔で配設した。各々の遠赤
外線ヒータ5には100vの電圧を加えた。加熱温度に
ついてはコンクリート板6のほぼ中央部上方の炉内の温
度と、コンクリート板6の略中央内部の温度を測定した
。この試験結果によれば、5個の遠赤外線ヒータ5を点
灯して遠赤外線をコンクリート板6に3.5時間照射す
ると、コンクリート板6は最高加熱温度である略80度
Cに達した(第4図参照)、尚、第4図に於てA′はコ
ンクリート板6の」二部の温度変化を示し、A2はコン
クリート板6の下部の温度変化を示し、破線Bはコンク
リート板6の中央部のすぐ上の養生槽3内の温度変化を
示している。コンクリート板6の温度が最高加熱温度に
到達した後、遠赤外線ヒタ5の点灯を止め、自然放熱さ
せると、コンクリド板6の6然放烈を間知して30分?
1過後には、型枠4をコンクリート板6から外すこと℃
τ出来る圧縮強度は55Kg/cz2 となり、その後
自然放?5を24時間季1けると、コンクリート板6の
圧縮強度は略100kg/cm”に達した(第5図参照
)、又、コンクリート板6の加熱養生開始後28日経過
後の圧縮強度は235kg/c−に達し、破壊加重は1
340kgに達した。更に。
3 to 6 show the results of experimental curing of concrete plate 6 using this curing method. FIG. 3 shows a schematic configuration of the manufacturing apparatus 1 used in this test, and the dimensions of the curing tank 3 used in this test were length I Loan, width 110a+1, and height 900I11. The size of the concrete board 6 is 75CI11 in length and 7 in width.
It was 5 cm and 5CI11 thick. Five far infrared heaters 5 of 350W are prepared;
They were placed at uniform intervals at the four corners and 20 cm above the center of the poured concrete. A voltage of 100 V was applied to each far-infrared heater 5. Regarding the heating temperature, the temperature inside the furnace above the approximately central portion of the concrete plate 6 and the temperature inside approximately the center of the concrete plate 6 were measured. According to the test results, when the five far-infrared heaters 5 were turned on and the concrete plate 6 was irradiated with far-infrared rays for 3.5 hours, the concrete plate 6 reached the maximum heating temperature of approximately 80 degrees C (No. 4), and in FIG. 4, A' indicates the temperature change in the second part of the concrete plate 6, A2 indicates the temperature change in the lower part of the concrete plate 6, and the broken line B indicates the temperature change in the lower part of the concrete plate 6. It shows the temperature change in the curing tank 3 immediately above the section. After the temperature of the concrete board 6 reached the maximum heating temperature, the far-infrared heater 5 was turned off and the heat was allowed to radiate naturally, and the concrete board 6 suddenly radiated heat for about 30 minutes.
After 1 hour, remove the formwork 4 from the concrete plate 6.
τThe compressive strength that can be achieved is 55Kg/cz2, and then it releases naturally? When the concrete plate 6 was heated for 24 hours, the compressive strength of the concrete plate 6 reached approximately 100 kg/cm (see Fig. 5), and the compressive strength of the concrete plate 6 after 28 days from the start of heat curing was 235 kg/cm. c- is reached, and the failure weight is 1
It reached 340kg. Furthermore.

製品の外観にクラックは生じなかった。尚、かかるコン
クリート板6を加熱養生するに要した熱量は3784K
calであり4.4Kwの電力を要した。
No cracks were observed in the appearance of the product. The amount of heat required to heat and cure the concrete plate 6 was 3784K.
cal, and required 4.4Kw of power.

一方、第6図に示すように、蒸気養生の場合、:ンクリ
ート板が最高加熱温度69度Cに達するには4.5時間
を要し、型枠の取り外し可能な圧縮強度55kg/cm
”を得る状態までに至る時間は、8.5時間を要し、コ
ンクリート板の加熱養生開始後28日経過後の圧縮強度
は157kg/cm2であった。又、そのときの破壊加
重は970kgであった。コンクリート板の外観にはク
ラックが発生した。蒸気養生によりコンクリート板を加
熱養生するに必要な熱量は9960kcalであり、燃
糾としてのブタン830リツトルを要した。
On the other hand, as shown in Figure 6, in the case of steam curing, it takes 4.5 hours for the concrete plate to reach the maximum heating temperature of 69 degrees C, and the removable compressive strength of the formwork is 55 kg/cm.
It took 8.5 hours to reach the state of ``. Cracks occurred on the exterior of the concrete plate.The amount of heat required to heat and cure the concrete plate by steam curing was 9,960 kcal, and 830 liters of butane was required as combustion.

以上述べたように、本実施例にかかるコンクリート製品
の製造方法及びその装置によれば、蒸′At美生に比較
して、コンクリート板6の加2q養生を11始してから
型枠取り外し可能な圧縮強度が得られるまでに要する時
間を短縮できると共に、コンクリート板6の製品品質と
しての圧縮強度を向上でき、クラックを減少させること
が出来、更に、加熱養生に要する熱量を少なくできると
いう効果を得ることが出来る。
As described above, according to the concrete product manufacturing method and its apparatus according to the present embodiment, the formwork can be removed after the concrete plate 6 has been cured for 11 hours, compared to the steaming method. It is possible to shorten the time required to obtain a suitable compressive strength, improve the compressive strength as a product quality of the concrete plate 6, reduce cracks, and further reduce the amount of heat required for heat curing. You can get it.

(発明の効果) 本発明にかかるコンクリート製品の製造方法及びその製
造装置は、以上説明した構成から明らかなように、コン
クリート製品の加熱養生開始後型枠からコンクリート製
品を取り外すこと、が可能な圧縮強度が得られるに至る
までの時間を短縮できるほか、コンクリート製品の製品
品質としての圧縮強度を向上できるるとともにクラック
を減少させることが出来るほか1、加熱養生に要する熱
量を少なくできる。
(Effects of the Invention) As is clear from the configuration described above, the concrete product manufacturing method and its manufacturing apparatus according to the present invention are capable of compaction that allows the concrete product to be removed from the formwork after the start of heating and curing of the concrete product. In addition to shortening the time it takes to obtain strength, it also improves the compressive strength of concrete products, reduces cracks, and reduces the amount of heat required for heat curing.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明の実施例にかかるコンクリート板の製造
装置の概略構成図、 第2図は第1図の製造装置の圧縮強度変化の状態を表わ
したグラフ、 第3図は本発明にかかるコンクリートの製造方法に基づ
いてコンクリート板を試験製造したときの試験装置の概
略構成図、 第4図は第3図の試験装置の遠赤外線養生における温度
変化を表わしたグラフ、 第5図は第3図の遠赤外線養生によるコンクリート板の
圧縮強度変化を表わすグラフ、 第6図は第3図の遠赤外線養生によるコンクリート板の
試験結果と蒸気養生によるコンクリート板の試験結果と
を比較した表図である。 1・・・コンクリート板の製造装置 2・・・コンベア 3・・・養生槽(養生室) 4・・・型枠 5・・・遠赤外線ヒータ
FIG. 1 is a schematic configuration diagram of a concrete plate manufacturing apparatus according to an embodiment of the present invention, FIG. 2 is a graph showing the state of change in compressive strength of the manufacturing apparatus of FIG. 1, and FIG. 3 is a diagram of the present invention. A schematic configuration diagram of the test equipment used to test-manufacture concrete plates based on the concrete manufacturing method; Figure 4 is a graph showing temperature changes during far-infrared curing of the test equipment in Figure 3; Figure 6 is a graph showing the change in compressive strength of the concrete plate due to far infrared curing as shown in Figure 3. Figure 6 is a table comparing the test results of the concrete plate cured with far infrared rays and the test results of the concrete plate cured with steam as shown in Figure 3. . 1... Concrete board manufacturing equipment 2... Conveyor 3... Curing tank (curing room) 4... Formwork 5... Far infrared heater

Claims (2)

【特許請求の範囲】[Claims] (1)コンクリート板、コンクリート柱、コンクリート
ブロック等のコンクリート製品の製造方法に於て、 型枠内に流動状態のコンクリートを打設して前養生した
後、前記コンクリートの上方から波長2.5マイクロメ
ートル〜20マイクロメートルの遠赤外線領域の電磁波
を照射することを特徴とするコンクリート製品の製造方
法。
(1) In the manufacturing method of concrete products such as concrete plates, concrete columns, concrete blocks, etc., after pouring concrete in a fluid state in a formwork and pre-curing, a beam of 2.5 microns at a wavelength of 2.5 microns is applied from above the concrete. A method for producing a concrete product, characterized by irradiating electromagnetic waves in the far infrared range of 1.2 to 20 micrometers.
(2)コンクリート板、コンクリート柱、コンクリート
ブロック等のコンクリート製品を形成する養生室内に流
動状態のコンクリートを打設するための型枠を設け、前
記養生室の型枠の上方に、波長2.5マイクロメートル
〜20マイクロメートルの遠赤外線領域の電磁波を照射
する遠赤外線ヒータを配設したことを特徴とするコンク
リート製品の製造装置。
(2) A formwork for pouring concrete in a fluid state is provided in a curing chamber for forming concrete products such as concrete plates, concrete columns, concrete blocks, etc., and above the formwork of the curing chamber, a wavelength 2.5 1. An apparatus for producing concrete products, characterized in that it is equipped with a far-infrared heater that irradiates electromagnetic waves in the far-infrared region of micrometers to 20 micrometers.
JP18134689A 1989-07-12 1989-07-12 Manufacture of concrete product and apparatus therefor Pending JPH0343201A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18134689A JPH0343201A (en) 1989-07-12 1989-07-12 Manufacture of concrete product and apparatus therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18134689A JPH0343201A (en) 1989-07-12 1989-07-12 Manufacture of concrete product and apparatus therefor

Publications (1)

Publication Number Publication Date
JPH0343201A true JPH0343201A (en) 1991-02-25

Family

ID=16099099

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18134689A Pending JPH0343201A (en) 1989-07-12 1989-07-12 Manufacture of concrete product and apparatus therefor

Country Status (1)

Country Link
JP (1) JPH0343201A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009027813A3 (en) * 2007-08-31 2009-06-18 Danish Concrete Technology Hol Process for curing and drying reinforced concrete

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5023402A (en) * 1973-07-02 1975-03-13

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5023402A (en) * 1973-07-02 1975-03-13

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009027813A3 (en) * 2007-08-31 2009-06-18 Danish Concrete Technology Hol Process for curing and drying reinforced concrete

Similar Documents

Publication Publication Date Title
CN109624064A (en) A kind of concrete closed guard gate quick molding method and device
JPS58136404A (en) Method and device for heating continuous strand-shaped conductive material
PT2747967E (en) Vacuum vibration press for forming engineered composite stone slabs
JPH0343201A (en) Manufacture of concrete product and apparatus therefor
CN105133747B (en) Cement foamed wall body structure, manufacture craft
JPH0345577A (en) Curing method of concrete and curing device therefor
JPH0691626A (en) Curing method for concrete secondary product
JPH02303651A (en) Method for molding hollow ceramic core
DE58901043D1 (en) METHOD FOR PRODUCING LATEX FOAM.
SU476993A1 (en) The method of forming bulk concrete elements
RU2103234C1 (en) Concrete mix, method for manufacturing concrete articles from concrete mix and process line for manufacturing said articles
CA2403926C (en) Method and device for vulcanizing shaped bodies from rubber mixtures
JPH07139170A (en) Method and equipment for drying concrete
JPH08217572A (en) Method for curing concrete product and production of concrete product using the method
JP3014399B2 (en) Heat curing method of high temperature curing type fiber reinforced plastic
JP2639532B2 (en) How to cure castable refractories
JP2591242Y2 (en) Microwave heating equipment
SU698961A1 (en) Method of producing decorative concrete articles
SU643339A1 (en) Method of making decorative concrete articles
US1521316A (en) Apparatus for producing concrete castings
RU2106244C1 (en) Concrete product manufacture method
SU674910A1 (en) Method of making concrete and reinforced-concrete articles with voids
JP2530997B2 (en) Lightweight concrete manufacturing equipment
JPH08323730A (en) Manufacture of cement molding
SU1162617A2 (en) Apparatus for continuous vulcanization of elongated articles