JPH03159886A - Door transport device - Google Patents

Door transport device

Info

Publication number
JPH03159886A
JPH03159886A JP1299389A JP29938989A JPH03159886A JP H03159886 A JPH03159886 A JP H03159886A JP 1299389 A JP1299389 A JP 1299389A JP 29938989 A JP29938989 A JP 29938989A JP H03159886 A JPH03159886 A JP H03159886A
Authority
JP
Japan
Prior art keywords
door
hanger
pallet
line
transfer device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP1299389A
Other languages
Japanese (ja)
Inventor
Shinichi Ikeda
伸一 池田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Honda Motor Co Ltd
Original Assignee
Honda Motor Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Honda Motor Co Ltd filed Critical Honda Motor Co Ltd
Priority to JP1299389A priority Critical patent/JPH03159886A/en
Publication of JPH03159886A publication Critical patent/JPH03159886A/en
Pending legal-status Critical Current

Links

Landscapes

  • Automobile Manufacture Line, Endless Track Vehicle, Trailer (AREA)

Abstract

PURPOSE:To simplify the line for car assembly by coupling transfer devices of a door removing process, assembly process, and processes situated on the way, constituting a door transport device of said car assembly line, through a hanger device which simultaneously transports a plurality of pallets as one set whereon doors for one car are placed. CONSTITUTION:A door transport line l tying together transfer device 1-4 of different processes is constituted from a hanger device 5. Hanger of this device 5 accepts four empty pallets P loaded on the left and right and at the front and rear, and they are moved to a door removing process S1 to reach an empty pallet transferring device 1a of the No.1 transfer device 1. The pallet P is introduced to the door removing process S1 by an elevating/sinking device 6. Meantime the removed doors are placed on the pallet P, and doors for one car are as a set placed upon the hanger device 5 to be forwarded to the next stage. This method of transporting the doors for one car simultaneously allows making the line simple and small.

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は、例えば車両組立ライン等において、メインラ
イン上のドア取外し工程で車体からドアを取り外して該
ドアをドア搬送ラインに移送し、このトア搬送ラインに
接続するドア小組ライン上でドア部品等を組み付けると
ともに、小組の完了したドアをメインライン上のドア取
付工程に移送するようなドア搬送装置において、ドア1
Il!送ラインの簡素化、一元化を図った搬送装置に関
する。
Detailed Description of the Invention (Industrial Application Field) The present invention is directed to, for example, a vehicle assembly line, in which a door is removed from a vehicle body in a door removal process on the main line, and the door is transferred to a door conveyance line. In a door conveyance device that assembles door parts, etc. on a door subassembly line connected to a tor conveyance line, and also transports the doors after completion of subassembly to the door installation process on the main line, the door 1
Il! This invention relates to a conveyance device that simplifies and unifies a conveyance line.

(従来の技術) 従来例えば車両の組立ライン等において塗装工程等の後
、一旦車体に取り付けたドアを取り外して、ドアにドア
小組品を組み付け、再び車体に取り付けるような作業工
程が踏まれることがあり、この際取り外したドアを車体
側のメインラインとは別のドア搬送ラインで搬送して作
業を行ない、その後再びメインラインに合流させて車体
側に取り付けることとなるが、ドア搬送ラインでドアを
搬送するような搬送装置として、例えば特開昭59−5
7075号や特開昭61−119479号のような装置
が知られている。
(Prior Art) Conventionally, for example, on a vehicle assembly line, after a painting process, etc., a door that has been attached to a vehicle body is removed, a small door assembly is assembled to the door, and the door is reattached to the vehicle body. At this time, the removed door must be transported on a door transport line that is separate from the main line on the vehicle body side, and then rejoined to the main line and attached to the vehicle body. For example, as a conveying device for conveying
Devices such as No. 7075 and Japanese Unexamined Patent Publication No. 119479/1988 are known.

そして前者の特開昭59−57075号の場合は、トア
取外しステーションで取外したドアを左右の各ドアハン
ガに載置して夫々専用のドア搬送ラインによって搬送し
、組み付けの終えたドアを同様な態様でトア取付ステー
ションまで搬送した後、空状態のドアハンガを1本の返
送用ラインを用いて、ドア取外しステーションまで返送
しようとしている。
In the case of the former Japanese Patent Application Laid-Open No. 59-57075, the door removed at the door removal station is placed on each left and right door hanger and transported by a dedicated door transport line, and the assembled door is transferred in the same manner. After transporting the empty door hanger to the door installation station, the empty door hanger is to be returned to the door removal station using a single return line.

又後者の特開昭61−119479号の場合は、ドア取
外しステーションで取外したドアをフロアコンヘアで構
威されるドア小組ラインに送り込み、小組の終えたドア
をフロアコンベアからドアハンガに移載してドア取付ス
テーションまて搬送しようとしている。
In the case of the latter, JP-A No. 61-119479, the door removed at the door removal station is sent to a door subassembly line configured by a floor conveyor, and the assembled door is transferred from the floor conveyor to a door hanger. The door mounting station is about to be transported.

(発明が解決しようとする課題) しかし従来のドア搬送装置の場合、上述した2例をも含
め取外したドアの搬送ラインが左右夫々別個に構成され
、各ラインごとにドアハンガが必要とされることから、
搬送装置が大掛りとなり、スペース上又は設備コスト上
問題があった。
(Problem to be Solved by the Invention) However, in the case of conventional door conveyance devices, including the two examples mentioned above, the conveyance lines for the removed doors are configured separately for the left and right, and a door hanger is required for each line. from,
The transport device was large-scale, which caused problems in terms of space and equipment costs.

又、後名の特開昭61−119479号の場合には、フ
ロアコンベアからトアハンガに移載する際、トアとトア
ハンガの位置決めにかなりの精度を持たせないとうまく
移載出来ないおそれがあった。
In addition, in the case of the later-named Japanese Patent Application Laid-Open No. 61-119479, when transferring from the floor conveyor to the toa hanger, there was a risk that the transfer would not be successful unless the positioning of the toa and toa hanger was made with great precision. .

(課題を解扶するための手段) かかる諜題を解決するため、本発明はドア取外し工程で
車体から取外したドアをドア組付工程に搬送し、次いで
このドアを車体に取り付けるためドア取付工程まで搬送
するようにしたドア搬送装置において、昇降装置を備え
た第1移載装置と第4移載装置を夫々ドア取外し工程と
ドア取付工程に設けるとともに、その中間部のドア組付
工程の前後に第2、第3各移載装置を設けた。そして、
これら第1移載装置から第2、第3移載装置を経由して
第4移載装置に向けてトア搬送ラインを形威するととも
に、このドア搬送ラインのハンガ装置は、車体1台分の
ドアが夫々載置される複数のパレッI一を1セットとし
て同時に搬送するように構成した。
(Means for Solving the Problem) In order to solve this problem, the present invention transports the door removed from the vehicle body in the door removal process to the door assembly process, and then performs a door installation process to attach the door to the vehicle body. In a door conveyance device configured to convey up to 2nd and 3rd transfer devices were installed. and,
A tor transport line is formed from these first transfer devices to the fourth transfer device via the second and third transfer devices, and the hanger device of this door transfer line is designed to handle the load for one car body. A plurality of pallets on which doors are respectively placed are configured to be conveyed simultaneously as one set.

(作用〉 ドア取外し工程で取り外されたドアは、第1移載装置と
昇降装置によってドア搬送ラインのハンガ装置に載置さ
れる。このハンガ装置は、車体1台分すなわち2ドアの
場合であれば左右2枚のドア、4ドアの場合であれば左
右前後4枚のドアを車路のドア搬送ラインに沿って搬送
し、ドア組付工程の前の第2移載装置で、例えばフロア
コンベア等のドア小組ラインに移載してドア部品の組付
けを行なう。
(Operation) The door removed in the door removal process is placed on the hanger device of the door conveyance line by the first transfer device and the lifting device. For example, two doors on the left and right, and in the case of four doors, four doors on the left, right, front, and back are transported along the door transport line in the roadway. The door components are then transferred to a door subassembly line such as a factory, etc., where door parts are assembled.

次いで第3移載装置によって再びハンガ装置に移載して
、車路のドア搬送ラインでドア取付工程の第4移載装置
に向けて搬送する。このためドア搬送ラインの小型化、
簡素化が可能となり、又ドアとハンガ装置との位置決め
の簡素化が図れる。
Next, it is transferred to the hanger device again by the third transfer device, and is transferred to the fourth transfer device for the door installation process on the door transfer line in the roadway. For this reason, the door conveyance line is downsized,
Simplification is possible, and the positioning of the door and the hanger device can be simplified.

(実施例) 本発明のドア搬送装置の実施例について添付した図面に
基づき説明する。
(Example) An example of the door conveyance device of the present invention will be described based on the attached drawings.

第1図は本発明のドア搬送装置の全般を示す説明図、第
2図は第1移載装置の平面図、第3図は第2図のI+1
方向から見た移載装置の正面拡大図、第4図は第2図の
IV方向から見た移載装置の側面拡大図である。
Fig. 1 is an explanatory diagram showing the general structure of the door conveyance device of the present invention, Fig. 2 is a plan view of the first transfer device, and Fig. 3 is I+1 in Fig. 2.
FIG. 4 is an enlarged side view of the transfer device as seen from direction IV in FIG. 2.

本発明のドア搬送装置は第1図に示すように、図中一点
鎖線のメインラインLから搬送されてくる車両のドアを
、ドア取外し工程S1で取外し、車体はそのままメイン
ラインL上を搬送するとともに、ドアは取外し工程S1
に設けた第1移載装置1の昇降装置によってドア搬送ラ
インAに送り込むよう構威している。
As shown in FIG. 1, the door conveyance device of the present invention removes the door of a vehicle conveyed from the main line L indicated by a dashed dotted line in the figure in a door removal step S1, and conveys the vehicle body as it is on the main line L. At the same time, the door is removed in step S1.
The elevating device of the first transfer device 1 provided at the door is arranged to send the materials to the door conveyance line A.

このドア搬送ラインAは、第1図中実線で示すように、
メインラインLより一段と高い位置に構成され、搬路の
途中に設けられたドア組付け工程としてのドア小組ライ
ンS2の前後の第2移載装置2及び第3移載装置3を経
由して、ドア取付工程S3に設けられ且つ昇降装置を備
えた第4移載装置4に接続し、その後周回経路を辿って
再び第1移載装置1に至るよう循環経路とされている。
This door conveyance line A, as shown by the solid line in FIG.
Via the second transfer device 2 and the third transfer device 3 before and after the door subassembly line S2, which is configured at a position higher than the main line L and is provided in the middle of the conveyance path for the door assembly process, It is connected to the fourth transfer device 4 provided in the door attachment step S3 and equipped with a lifting device, and then follows a circular route to reach the first transfer device 1 again.

このトア搬送ライン℃には、トアか載置されるパレット
Pを一纏めにして搬送するためのハンガ装置5か設けら
れ、本実施例のパレットは4ドアの車両用に構成されて
4つのパレットPが1セットとされている。
A hanger device 5 is provided on the tor conveyance line ℃ for conveying the pallets P placed on the tor all at once, and the pallet of this embodiment is configured for a four-door vehicle, is considered to be one set.

第1移載装置1には、第2図に示すように搬送ライン℃
に沿って前後方向に一対の移載装置1a.1bが設けら
れ、これら各移載装置1a1bは同一構成とされるとと
もに、この前後の移載装置1a,Ib間には一対の昇降
装置6.6が左右に分離して設けられている。そしてこ
の構成は第1図に示す第4移載装置4の場合も同様であ
り、つまり前後の移載装置4a,4bの間に昇降装置7
,7が配設されている。
The first transfer device 1 has a transfer line ℃ as shown in FIG.
A pair of transfer devices 1a. 1b is provided, and each of these transfer devices 1a1b has the same configuration, and a pair of lifting devices 6.6 are separately provided on the left and right between the front and rear transfer devices 1a and Ib. This configuration is the same in the case of the fourth transfer device 4 shown in FIG.
, 7 are arranged.

又、第2移載装置2、第3移載装置3の構成は、第1、
第4移載装置1,4の各移載装置Ia.lb,4a,4
bの構威と同一であり、以下これら各移載装置1a,I
b,2,3,4a,4bについて、第1移載装置1の一
方側の装置1aを代表例として説明する。
Further, the configurations of the second transfer device 2 and the third transfer device 3 are as follows:
Each transfer device Ia of the fourth transfer devices 1 and 4. lb, 4a, 4
The structure is the same as that of section b, and hereinafter each of these transfer devices 1a and I
b, 2, 3, 4a, and 4b will be explained using the device 1a on one side of the first transfer device 1 as a representative example.

この移載装置1aはトア搬送ライン℃中央のハンガ装置
5から4枚の空パレットPを受け取り、左右に2枚づつ
分離して第2図に示す搬送ローラ24上に移送し、この
搬送ローラ24によって次の昇降装置6まて送るように
している。そして4枚の各パレットPを同時に搬送ロー
ラ24に向けて移送するため、同じ構成の移載ユニット
が4体配設されている。
This transfer device 1a receives four empty pallets P from the hanger device 5 at the center of the tor conveyance line °C, separates them into two on the left and right, and transfers them onto the conveyance rollers 24 shown in FIG. Then, the next lifting device 6 is sent. In order to simultaneously transport the four pallets P toward the transport rollers 24, four transfer units having the same configuration are provided.

この移載装置1aは、第3図及び第4図に示すように、
基台11上に水平に設けられた昇降シリンダユニット1
2と、この昇降シリンダユニット】2に連結される前後
各一対の昇降カム板13,13・・・を備え、この昇降
カム板13は、基台11側に取り付けられたローラ14
上に設けられるとともに、上面に傾斜面が形成され、こ
の上面にクロスパー15端面のローラ16が支持されて
いる。そしてこのクロスパー15はトア搬送ライン℃と
平行な方向に複数設けられ、又クロスパー15両端部に
は一対のレール17.17がクロスパー15と直交方向
に取り付4Jられている。又このレール17の幅方向中
間部には一対ガイトローラ18,18が設けられ、これ
らガイドローラ18.18は、基台11に立設されたガ
イト部材19のガイド部19aを挟み込んで上下に摺動
自在とされている。
This transfer device 1a, as shown in FIGS. 3 and 4,
Lifting cylinder unit 1 installed horizontally on a base 11
2 and this elevating cylinder unit] 2, each pair of elevating cam plates 13, 13, front and rear are connected to the elevating cylinder unit.
An inclined surface is formed on the upper surface, and a roller 16 at the end surface of the cross spar 15 is supported on this upper surface. A plurality of cross pars 15 are provided in a direction parallel to the tor conveyance line °C, and a pair of rails 17 and 17 are attached to both ends of the cross par 15 in a direction perpendicular to the cross pars 15. Also, a pair of guide rollers 18, 18 are provided at the middle part of the rail 17 in the width direction, and these guide rollers 18, 18 slide up and down while sandwiching the guide portion 19a of the guide member 19 erected on the base 11. It is said to be free.

又このレール17上には台車2oが設けられており、こ
の合車2oは、レール17端部の駆動部21によってレ
ール17上面の凹溝内を走行自在となるよう構成してい
る。この駆動部21による台車20の走行駆動は、例え
ばレール17の両端部に設けた一対のスプロケット22
a,22bに無端状のチェン等を巻装して駆動伝達を行
なう。
Further, a truck 2o is provided on this rail 17, and this combination truck 2o is configured to be able to run freely in a groove on the upper surface of the rail 17 by a drive section 21 at the end of the rail 17. The traveling drive of the truck 20 by the drive unit 21 is achieved by, for example, a pair of sprockets 22 provided at both ends of the rail 17.
An endless chain or the like is wound around a and 22b to perform drive transmission.

又この台車20の上面には、複数のピン20aを設けて
後述するパレットPの係合孔に係合させるようにしてい
る。
Further, a plurality of pins 20a are provided on the upper surface of this cart 20 so as to be engaged with engagement holes of a pallet P, which will be described later.

こうして構成したレール17は、昇降シリンダユニット
12の作動で摺動ずる昇降カム板13によって昇降自在
とされることになる。
The rail 17 configured in this way can be raised and lowered by the lifting cam plate 13 that slides by the operation of the lifting cylinder unit 12.

レール17の外端部側の、前述の搬送ローラ24は、第
3図に示すように基台11に立設される支持台23上に
設けられ、ローラ軸に設けられたスブロケット24aに
は、下方の駆動源25のスブロケット25aに巻装され
る不図示のチェンが接続されて、この駆動源25の作動
によって回転するようにしている。又その他の各搬送ロ
ーラ24間にも不図示の伝達機構で駆動カが伝達される
The aforementioned conveyance roller 24 on the outer end side of the rail 17 is provided on a support stand 23 erected on the base 11 as shown in FIG. 3, and a subrocket 24a provided on the roller shaft has a A chain (not shown) that is wound around the subrocket 25a of the lower drive source 25 is connected and rotated by the operation of the drive source 25. The driving force is also transmitted between the other conveying rollers 24 by a transmission mechanism (not shown).

この左右の搬送ローラ24,24の下流側には、一対の
昇降装置6.6が設けられており、以下昇降装置6につ
いて第5図から第7図を用いて説明する。
A pair of elevating and lowering devices 6.6 are provided downstream of the left and right conveyance rollers 24, 24, and the elevating and lowering devices 6 will be described below with reference to FIGS. 5 to 7.

尚、第5図は、昇降装置6の拡大平面図であり、第6図
は第5図のV1方向から見た正面図、第7図は第5図の
■方向から見た側面図である。
5 is an enlarged plan view of the lifting device 6, FIG. 6 is a front view seen from the V1 direction in FIG. 5, and FIG. 7 is a side view seen from the ■ direction in FIG. .

この昇降装置6は、既述のように上方高位置のドア搬送
ライン℃と、その下方のドア取外し工程S1との間で昇
降動自在となり、空パレットPを下方に降下させて取外
したドアを載置し、次いでドアを搭載したパレットPを
上昇させて上方のドア搬送ライン立に送り込むよう構成
されてぃこのため前述の支持台23上の搬送ローラ24
から側方に離間して支柱31が立設され、この支柱31
を昇降動自在な昇降体32が設けられている。すなわち
断面矩形状の支柱31の対向一辺側の両側面には、張り
出し状のガイド部31aが垂直方向に沿って設けられ、
昇降体32は、3つのガイドローラ33,33.34で
構成される上下左右各一対の係合部35を、このガイド
部31aに係合させて不図示の駆動装置によって昇降動
自在とされている。
As described above, this lifting device 6 is movable up and down between the door conveyance line ℃ at a high position above and the door removal process S1 below, and lowers the empty pallet P downward to remove the removed door. The pallet P loaded with the door is then raised and sent to the upper door conveyance line.
A pillar 31 is erected laterally apart from the pillar 31.
An elevating body 32 that can be moved up and down is provided. That is, an overhanging guide portion 31a is provided along the vertical direction on both sides of the opposite side of the support 31 having a rectangular cross section.
The elevating body 32 is movable up and down by a drive device (not shown) by engaging a pair of upper, lower, left, and right engaging portions 35 formed by three guide rollers 33, 33, and 34 with the guide portion 31a. There is.

又、この昇降体32には、搬送方向と直交方向に延出す
る4木の受材36が設けられ、この受材36上面のレー
ル部36aを摺動自在な摺動部材37には、2木づつ連
結する連結部材39が設けられて、夫々の進退動用シリ
ンダユニット38,38のシリンダロッド38a,38
a先端が結着されている。そしてこのシリンダユニット
38の伸動によって延出した摺動部材37先端は、前述
の搬送ローラ24の位置まで入り込むことか出来るよう
に、搬送ローラ24とその下方の支持台23には第5図
に示ずような切欠部40を設げている。又、摺動部材3
7の先端側上面には、後述するパレットPの係合孔に係
合させるためのピン37aを突設している。
Further, this elevating body 32 is provided with a four-wood receiving material 36 extending in a direction perpendicular to the conveying direction, and a sliding member 37 that can freely slide on a rail portion 36a on the upper surface of this receiving material 36 has two A connecting member 39 is provided that connects the cylinder rods 38a, 38 of the cylinder units 38, 38 for advancing and retracting, respectively.
a The tip is tied. The tip of the sliding member 37 extended by the extension of the cylinder unit 38 is attached to the conveying roller 24 and the support base 23 below it, as shown in FIG. A notch 40 as shown is provided. Moreover, the sliding member 3
A pin 37a for engaging with an engagement hole of a pallet P, which will be described later, is provided on the upper surface of the tip end side of the pallet 7 in a protruding manner.

方、下方のトア取外し工程S1にも、メインラインLを
挟んで両側に支持台42とローラ43が設けられており
、この支持台42と支柱31との関係位置は、上方の支
持台23支柱31との関係位置と同じ位置となって、前
記切欠部40と同様な切欠部も設けられている。
On the other hand, in the lower tor removal step S1, a support stand 42 and a roller 43 are provided on both sides of the main line L, and the relative position of this support stand 42 and the support column 31 is the same as that of the upper support stand 23 support stand 43. A cutout similar to the cutout 40 is also provided at the same position relative to the cutout 31.

次にドア搬送ライン℃に構成されるハンガ装置5につい
て、第3図及び第8図を用いて説明する。尚、第8図は
ハンガ装置の側面図である。
Next, the hanger device 5 configured in the door conveyance line ℃ will be explained using FIG. 3 and FIG. 8. Incidentally, FIG. 8 is a side view of the hanger device.

ハンガ装置5は、トア搬送ライン℃に沿って上方高位に
設けられた断面I形のハンガレール52と、このハンガ
レール52を走行する前後一対のトアハンガ53.53
からなり、これらドアハンガ53には、複数の搬送ロー
ラ54.54・・・が設けられている。この搬送ローラ
54は、ローラ軸1l をハウジング55に軸受されて、ハンガレール52上面
上を転勤可能となり、所定の一ケ所には駆動装置56が
連結されている。又ハウジング55には各懸吊部57が
設けられ、一方のドアハンガ53の一対の懸吊部57.
57間に横杆58が配設されるとともに、横杆58の前
後には各縦杆59,59が取り付けられている。
The hanger device 5 includes a hanger rail 52 with an I-shaped cross section that is provided at a high position above along the tor conveyance line ℃, and a pair of front and rear tor hangers 53, 53 that run on the hanger rail 52.
These door hangers 53 are provided with a plurality of transport rollers 54, 54, . . . . The conveyance roller 54 has a roller shaft 1l supported by a housing 55, so that it can be moved on the upper surface of the hanger rail 52, and is connected to a drive device 56 at one predetermined location. Further, the housing 55 is provided with respective hanging portions 57, and one of the door hangers 53 has a pair of hanging portions 57.
A horizontal rod 58 is disposed between the horizontal rods 57, and vertical rods 59, 59 are attached to the front and rear of the horizontal rod 58.

そして2本の縦杆59,59の下端側には、パレットP
を支えるためのパレット受部材60が設けられ、このパ
レット受部材60は、第3図に示すようにハンガレール
52を挟んで両側に各一対設けられるとともに、ハンガ
レール52から遠のき側は夫々開放された枠体として構
成されている。又、パレット受部材60にはその上面に
パレットPの係合孔に係合するピン60aが突設されて
いる。更に前後のドアハンガ53の間には、連合杆61
が架け渡されており、1つの駆動装置56によって前後
2つ及び左右各2つ計4つのパレットPを同時に搬送出
来るよう構威している6 次にトアを載置せしめるパレットPについて、第9図及
び第10図を用いて説明する。
And on the lower end side of the two vertical rods 59, 59, there is a pallet P.
A pair of pallet receiving members 60 are provided for supporting the hanger rail 52, and as shown in FIG. It is structured as a body. Further, the pallet receiving member 60 has a pin 60a protruding from its upper surface which engages with the engagement hole of the pallet P. Furthermore, between the front and rear door hangers 53, there is a combination rod 61.
6. Next, regarding the pallet P on which the tor will be placed, a 9th This will be explained using FIG.

尚、第9図はフロントドア搬送用のパレットP1、第1
0図はリアドア搬送用のパレットP2を示し、各A図は
平面図、各B図は側面図、各CD図は夫々左右正面図で
ある。
In addition, Fig. 9 shows the pallet P1 and the first pallet for front door transportation.
Figure 0 shows a pallet P2 for rear door transportation, each figure A is a plan view, each figure B is a side view, and each figure CD is a left and right front view, respectively.

フロントドア用パレットP1は、第9図に示すように基
板71上に設けられた2ケ所の支え部材72 73でド
ア下端部を支え、前方のトアヒンジ側を保持する保持部
材74と、後方側を保持する保持装置75との計4ケ所
でドアを保持するよう構成している。
As shown in FIG. 9, the front door pallet P1 supports the lower end of the door with two supporting members 72 and 73 provided on the base plate 71, and has a holding member 74 that holds the front door hinge side and a rear side holding member 74 that holds the front door hinge side. The door is held at a total of four locations including a holding device 75 for holding the door.

このうち後方側の保持装置75は、基板71側のレール
部71aに摺動自在に取り付けた取付部材76と、この
取付部材76に枢着される揺動アーム77を備え、この
揺動アーム77と取付部材76との間にリンク機構78
を介装して、揺動アーム77の上方前面側に上下2つの
弾性部材79を介して連結するL型プレート80を揺動
自在としている。そしてこのL型プレート80の側方に
は、トア端部を保持する保持部材81が設りられている
。又このリンク機構78の前方には、取付部材76上に
ストッパ部材82が配設されて、リンク機構78の動き
を規制している。
Of these, the rear holding device 75 includes a mounting member 76 slidably attached to the rail portion 71a on the board 71 side, and a swinging arm 77 pivotally mounted to the mounting member 76. A link mechanism 78 is provided between the mounting member 76 and the mounting member 76.
An L-shaped plate 80 connected to the upper front side of the swing arm 77 via two upper and lower elastic members 79 is made swingable. A holding member 81 for holding the toe end is provided on the side of this L-shaped plate 80. Further, in front of the link mechanism 78, a stopper member 82 is disposed on the mounting member 76 to restrict movement of the link mechanism 78.

このパレートPの基板71には、移載装置1aの台車2
0のピン20aに係合する係合孔91と、ハンガ装置5
1のパレート受部材60のビン60aに係合する保合孔
92が穿設されている。
On the board 71 of this Pareto P, there is a dolly 2 of the transfer device 1a.
0 and the hanger device 5.
A retaining hole 92 that engages with the pin 60a of the first Pareto receiving member 60 is bored.

そして前者の係合孔91は、昇降装置6の摺動部材37
のピン37aにも係合されることとなる。
The former engagement hole 91 is connected to the sliding member 37 of the lifting device 6.
It is also engaged with the pin 37a.

リアドア用パレットP2は、第10図に示すようにフロ
ントドア用パレットP1とほぼ同一構威てあり、フロン
トドア用パレットP1の保持装置75がスライド式に構
成されているのに比較して、基板71に固定されている
点のみが異なる。
The rear door pallet P2 has almost the same structure as the front door pallet P1, as shown in FIG. The only difference is that it is fixed at 71.

以上のような構成による本ドア搬送装置の作動の概要は
次のとおりである。
An outline of the operation of the present door conveyance device having the above configuration is as follows.

第1図のドア搬送ライン℃を矢示方向に走行し、右方か
ら搬送されるトアハンガ53には、左右前後計4枚の空
パレットPが搭載されており、第1移載装置lの空パレ
ット移載用の移載装置1aに到達ずる。
A total of four empty pallets P are mounted on the toe hanger 53, which runs in the direction of the arrow in the door conveyance line ℃ in Fig. 1 and is conveyed from the right side. It reaches the transfer device 1a for pallet transfer.

この移載装置1aでは、第3図、第4図に示すように、
レール17が下方に降下しており、又、レール17上の
台車20は、ドアハンガ53側の中央部寄りに移動して
待機している。(尚、第3図、第4図では説明上パレッ
トP上にドアを載置した状態を示している。)そして空
パレットPが到着すると、昇降シリンダユニット12が
作動して、昇降カム板13によってレール17を上昇さ
せ、台車20上面のビン20aを空パレットPの係合孔
91に嵌め込んで係合させる。
In this transfer device 1a, as shown in FIGS. 3 and 4,
The rail 17 has descended downward, and the cart 20 on the rail 17 has moved toward the center on the door hanger 53 side and is waiting. (For the sake of explanation, FIGS. 3 and 4 show the door placed on the pallet P.) When the empty pallet P arrives, the lifting cylinder unit 12 is activated, and the lifting cam plate 13 is activated. to raise the rail 17 and fit the bins 20a on the upper surface of the cart 20 into the engagement holes 91 of the empty pallet P to engage them.

このため空パレットPは、ドアハンガ53下部のパレッ
ト受部材60から離脱して持ち上げられることとなり、
第4図の状態から第11図の状態となる。
Therefore, the empty pallet P is separated from the pallet receiving member 60 at the bottom of the door hanger 53 and lifted.
The state shown in FIG. 4 changes to the state shown in FIG. 11.

次いで第3図に示す駆動部21によって台車20はレー
ル17上を走行し、空パレットPを左15 右に分離移送する。そして台車20が搬送ローラ24の
位置まで達すると、再び昇降シリンダユニット12の作
動によってレール17が下降し、空パレットPは搬送ロ
ーラ24上に載置される。
Next, the cart 20 is moved on the rails 17 by the drive unit 21 shown in FIG. 3, and the empty pallet P is separated and transferred from the left 15 to the right. When the cart 20 reaches the position of the transport roller 24, the rail 17 is lowered by the operation of the lifting cylinder unit 12 again, and the empty pallet P is placed on the transport roller 24.

こうして搬送ローラ24上に送られた空パレットPは、
第1昇降装置6に送られて、下方のドア取外し工程S1
に送り込まれる。すなわち第5図、第6図に示すように
、昇降装置6の昇降体32は上昇位置で且つシリンダユ
ニット38は伸長状態となって、摺動部材37を搬送ロ
ーラ24下方で待機させており、空パレットPが移送さ
れてくると、昇降体32が更に上動し、摺動部材37上
面のピン37aを空パレットPの係合孔91に嵌め込ん
で保持し搬送ローラ24から受け取る。次いでシリンダ
ユニット38が退勤しつつ昇降体32が下降し、再びシ
リンダユニット38を伸動させて、空パレットPを下方
のローラ43上に載置する。
The empty pallet P thus sent onto the transport roller 24 is
Sent to the first lifting device 6, lower door removal step S1
sent to. That is, as shown in FIGS. 5 and 6, the elevating body 32 of the elevating device 6 is in the raised position, the cylinder unit 38 is in the extended state, and the sliding member 37 is waiting below the conveying roller 24, When the empty pallet P is transferred, the elevating body 32 further moves upward, and the pins 37a on the upper surface of the sliding member 37 are fitted into the engagement holes 91 of the empty pallet P to be held and received from the conveyance rollers 24. Next, as the cylinder unit 38 retires, the elevating body 32 descends, and the cylinder unit 38 is extended again to place the empty pallet P on the rollers 43 below.

このパレットP上には、ドア取外し工程S1で取り外さ
れたドアが載置される。すなわちフロントドアは第9図
に示すフロントドア用パレットP1に、リアドアは第1
0図に示すリアドア用パレットP2の支え部材72.7
3上に夫々載置され、保持部材74と保持装置75とで
前後に挟みつけてドアを保持する。
On this pallet P, the door removed in the door removal step S1 is placed. That is, the front door is placed on the front door pallet P1 shown in FIG. 9, and the rear door is placed on the first pallet P1 shown in FIG.
Support member 72.7 of rear door pallet P2 shown in Figure 0
3, and are sandwiched back and forth between a holding member 74 and a holding device 75 to hold the door.

搭載が終えると、このパレットPは昇降装置6によって
上記手順の逆順を辿って再び上昇し、上段の搬送ローラ
24上に載置されて、次の移載装置1bに移送される。
When the loading is completed, the pallet P is raised again by the lifting device 6 in the reverse order of the above procedure, placed on the upper conveyance roller 24, and transferred to the next transfer device 1b.

移載装置1bでは、第3図に示すレール17上の台車2
0が搬送ローラ24側の下方で待機しており、又、中央
のハンガレール52には、空ハンガ53が待機している
。モしてトアを搭載したパレットPが到達するとレール
17が上動して、台車20側にパレットPが移載され、
この台車20によってトアハンガ53まて移送した後、
ドアハンガ53上に搭載する。この際ドアハンガ53と
パレットPの係合は、ドアハンガ53のパレット受部材
60のピン60aとパレットPの係合孔92により行な
う。
In the transfer device 1b, the cart 2 on the rail 17 shown in FIG.
0 is waiting below the conveyance roller 24 side, and an empty hanger 53 is waiting on the hanger rail 52 in the center. When the pallet P carrying the tor arrives, the rail 17 moves up and the pallet P is transferred to the trolley 20 side.
After transporting the toahanga 53 using this trolley 20,
It is mounted on the door hanger 53. At this time, the door hanger 53 and the pallet P are engaged with each other by the pin 60a of the pallet receiving member 60 of the door hanger 53 and the engagement hole 92 of the pallet P.

ドアハンガ53は第8図に示す駆動装置56によって自
走し、第1図の第2移載装置2に向う。
The door hanger 53 is self-propelled by a drive device 56 shown in FIG. 8, and heads toward the second transfer device 2 shown in FIG.

この第2移載装置2と第3移載装置3の間にはドア小組
ラインS2が設けられており、第1移載装置1aと同様
な構成の第2移載装置2によって各ドアのパレットPを
左右に分離し、このパレットPを例えばフロアコンベア
によって移送しつつドア部品の組付けを行なう。又この
間、空のドアハンガ53は中央のハンガレール52によ
って第3移載装置3まで搬送して待機させておく。
A door assembly line S2 is provided between the second transfer device 2 and the third transfer device 3, and a pallet of each door is moved by the second transfer device 2 having the same configuration as the first transfer device 1a. The pallet P is separated into left and right parts, and the door parts are assembled while the pallet P is transported by, for example, a floor conveyor. During this time, the empty door hanger 53 is transported to the third transfer device 3 by the central hanger rail 52 and kept on standby.

ドア小組の完了したパレットPが第3移載装置3に達す
ると、再び同様の手順でトアハンガ53上に一纏めにし
て搭載し、第4移載装置4に搬送する。
When the pallets P for which the door subassembly has been completed reach the third transfer device 3, they are loaded all together on the tor hanger 53 again in the same procedure and transported to the fourth transfer device 4.

第4移載装置4の構成も第1移載装置1の構成と同様で
あり、すなわち移載装置4aで左右のパレットPを分離
移送した後、昇降装置7で下方のドア取付工程S3に送
り込み、車体へのドアの取り付けを行なうとともに、空
パレットPは再び上方の空ハンガ53に返送し、第1移
載装置1に向けて回送する。
The configuration of the fourth transfer device 4 is also similar to the configuration of the first transfer device 1, that is, after the left and right pallets P are separated and transferred by the transfer device 4a, they are sent to the lower door installation step S3 by the lifting device 7. , the door is attached to the vehicle body, and the empty pallet P is again returned to the empty hanger 53 above and forwarded toward the first transfer device 1.

(発明の効果) 以上のように本発明のドア搬送装置は、一木のラインで
ドア搬送ラインを構成し、車一台分のドア、すなわち2
トアの場合は左右2枚のドア、4ドアの場合は左右前後
4枚のドアを1基のドアハンガで同時に搬送するよう構
威したため、ドア搬送ラインの小型化、簡素化が可能と
なり、又ドアをトアハンガに搭載する際にも、両者の位
置決め機構が容易に且つ簡易に構威できる。
(Effects of the Invention) As described above, the door conveyance device of the present invention configures the door conveyance line with a single line, and has two doors for one car.
In the case of a door, two doors on the left and right, and in the case of a four-door, four doors on the left, right and front are conveyed at the same time using one door hanger, making it possible to downsize and simplify the door conveyance line. Even when mounting the toe hanger on the toe hanger, the positioning mechanisms for both can be easily and simply configured.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明のドア搬送装置全般を示す説明図、第2
図は第1移載装置の平面図、第3図、第4図は移載装置
の拡大図を示し、第3図は第2図の■方向から見た正面
図、第4図は第2図のIV方向から見た側面図、第5図
から第7図は昇降装置の拡大図を示し、第5図は平面図
、第6図は第5図のV1方向から見た正面図、第7図は
第5図の■19 方向から見た側面図、第8図はハンガ装置を示す側面図
、第9図、第10図はパレットを示し、第9図はフロン
トドア用パレット、第10図はリアドア用パレット、第
11図は移載装置の側面視からの作用図である。 尚同図中、1は第1移載装置、2は第2移載装置、3は
第3移載装置、4は第4移載装置、5はハンガ装置、6
.7は昇降装置、17はレール、20は台車、24は搬
送ローラ、32は昇降体、37は摺動部材、52はハン
ガレール、53はドアハンガ、S1はドア取外し工程、
S2はドア小組ライン、S3はドア取付工程、Pはパレ
ット、Lはメインライン、文はドア搬送ラインを示す。
FIG. 1 is an explanatory diagram showing the general door conveyance device of the present invention, and FIG.
The figure shows a plan view of the first transfer device, FIGS. 3 and 4 show enlarged views of the transfer device, FIG. 3 is a front view seen from the ■ direction in FIG. FIGS. 5 to 7 are enlarged views of the lifting device, FIG. 5 is a plan view, FIG. 6 is a front view as seen from the V1 direction in FIG. 5, and FIG. Figure 7 is a side view of Figure 5 as seen from direction 19, Figure 8 is a side view of the hanger device, Figures 9 and 10 are pallets, Figure 9 is a front door pallet, Figure 10 is The figure shows a rear door pallet, and FIG. 11 is a side view of the transfer device. In the figure, 1 is the first transfer device, 2 is the second transfer device, 3 is the third transfer device, 4 is the fourth transfer device, 5 is the hanger device, and 6
.. 7 is a lifting device, 17 is a rail, 20 is a trolley, 24 is a conveyance roller, 32 is a lifting body, 37 is a sliding member, 52 is a hanger rail, 53 is a door hanger, S1 is a door removal process,
S2 indicates the door subassembly line, S3 indicates the door installation process, P indicates the pallet, L indicates the main line, and text indicates the door conveyance line.

Claims (1)

【特許請求の範囲】[Claims] ドア取外し工程で車体からドアを取り外し、ドア組付工
程でこのドアにドア部品を組み付けた後ドア取付工程で
再度車体にドアを取り付けるようにしたドア搬送用のド
ア搬送装置において、この搬送装置は、前記ドア取外し
工程に設けられ且つ昇降装置を備えた第1移載装置と、
前記ドア組付工程を挟んで設けられた第2、第3各移載
装置と、前記ドア取付工程に設けられ且つ昇降装置を備
えた第4移載装置と、これら第1、第2、第3、第4各
移載装置を結んで搬路を形成するドア搬送ラインのハン
ガ装置とからなり、このハンガ装置は、車体1台分のド
アが夫々載置される複数のパレットを1セットとして同
時に搬送するよう構成したことを特徴とするドア搬送装
置。
In a door transport device for transporting doors, which removes the door from the vehicle body in the door removal process, assembles door parts to this door in the door assembly process, and then reinstalls the door on the vehicle body in the door installation process, this transportation device is , a first transfer device provided in the door removal process and equipped with a lifting device;
A second and third transfer device provided on both sides of the door assembly process, a fourth transfer device provided in the door installation process and equipped with a lifting device, and these first, second and third transfer devices. 3. 4th: It consists of a hanger device for a door transport line that connects each transfer device to form a transport path, and this hanger device consists of a set of multiple pallets on which doors for one car body are placed, respectively. A door conveyance device characterized in that it is configured to convey at the same time.
JP1299389A 1989-11-17 1989-11-17 Door transport device Pending JPH03159886A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1299389A JPH03159886A (en) 1989-11-17 1989-11-17 Door transport device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1299389A JPH03159886A (en) 1989-11-17 1989-11-17 Door transport device

Publications (1)

Publication Number Publication Date
JPH03159886A true JPH03159886A (en) 1991-07-09

Family

ID=17871925

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1299389A Pending JPH03159886A (en) 1989-11-17 1989-11-17 Door transport device

Country Status (1)

Country Link
JP (1) JPH03159886A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004018333A1 (en) * 2002-08-22 2004-03-04 Dürr Automotion Gmbh Conveying device and method for conveying a workpiece from a first to a second conveying level
US7600329B2 (en) 2004-11-23 2009-10-13 Durr Systems Gmbh Drier
JP2009248734A (en) * 2008-04-04 2009-10-29 Sakura:Kk Vehicular door attachment/detachment apparatus
US7959770B2 (en) 2004-12-22 2011-06-14 Durr Systems Gmbh Electrocoating plant
US8268150B2 (en) 2006-11-23 2012-09-18 Durr Systems Gmbh Workpiece carrier for conveying a workpiece to be painted
JP2012218698A (en) * 2011-04-14 2012-11-12 Honda Motor Co Ltd Vehicle body assembly line and method for assembling vehicle body
JP2012224095A (en) * 2011-04-14 2012-11-15 Honda Motor Co Ltd Method and device for carrying door in vehicle body assembly line
US8732980B2 (en) 2006-06-30 2014-05-27 Dürr Systems GmbH Drier module for a drier

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004018333A1 (en) * 2002-08-22 2004-03-04 Dürr Automotion Gmbh Conveying device and method for conveying a workpiece from a first to a second conveying level
US7600329B2 (en) 2004-11-23 2009-10-13 Durr Systems Gmbh Drier
US7959770B2 (en) 2004-12-22 2011-06-14 Durr Systems Gmbh Electrocoating plant
US8732980B2 (en) 2006-06-30 2014-05-27 Dürr Systems GmbH Drier module for a drier
US8268150B2 (en) 2006-11-23 2012-09-18 Durr Systems Gmbh Workpiece carrier for conveying a workpiece to be painted
JP2009248734A (en) * 2008-04-04 2009-10-29 Sakura:Kk Vehicular door attachment/detachment apparatus
JP2012218698A (en) * 2011-04-14 2012-11-12 Honda Motor Co Ltd Vehicle body assembly line and method for assembling vehicle body
JP2012224095A (en) * 2011-04-14 2012-11-15 Honda Motor Co Ltd Method and device for carrying door in vehicle body assembly line
US9156509B2 (en) 2011-04-14 2015-10-13 Honda Motor Co., Ltd. Door transportation method in vehicle body assembly line and door transportation device in vehicle body assembly line

Similar Documents

Publication Publication Date Title
JP5255906B2 (en) Synchronous conveyance device and synchronous conveyance method for undercarriage parts to vehicle body
KR100641909B1 (en) Sample-conveying system having mobile unit
US6959801B2 (en) Conveyance apparatus
JPH03159886A (en) Door transport device
JPH1045257A (en) Cargo handling device
JPH0457553B2 (en)
JP4696963B2 (en) Work transfer device
JP2573699B2 (en) Transport equipment using self-propelled bodies
JP3839211B2 (en) Work transfer device
JPH0243127A (en) Feeding device for lower parts in vehicular assembly line
JP6644819B2 (en) Transfer work equipment
JP4062590B2 (en) Hanger for transporting suspended objects
JPH0213516A (en) Positioning device for car body carrying hanger
JPH084977B2 (en) Carrying jig loading / receiving device in automobile assembly line
JP7002173B2 (en) Transfer device
JPS5844043Y2 (en) Carriage transfer structure from the elevator to the main conveyor in a cart circulation system
JP2006232022A (en) Mounting device and mounting method
JP4190979B2 (en) Transfer device and transfer method
JP3104452B2 (en) Transfer equipment
JPS62216878A (en) Body transport device on car assembly line
JPS6124506Y2 (en)
JPS63247179A (en) Assembly device for vehicle
JPH05685A (en) Door delivery apparatus between car body conveyor and door conveyor
JPH057229B2 (en)
JP2001341834A (en) Gas container transfer device