JPH02139430A - Method for exchanging bobbin of spinning frame - Google Patents

Method for exchanging bobbin of spinning frame

Info

Publication number
JPH02139430A
JPH02139430A JP29324088A JP29324088A JPH02139430A JP H02139430 A JPH02139430 A JP H02139430A JP 29324088 A JP29324088 A JP 29324088A JP 29324088 A JP29324088 A JP 29324088A JP H02139430 A JPH02139430 A JP H02139430A
Authority
JP
Japan
Prior art keywords
bobbin
full
spindle
tube
spinning machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP29324088A
Other languages
Japanese (ja)
Other versions
JP2546359B2 (en
Inventor
Kazuya Yoshimine
吉嶺 一矢
Eigo Kajiura
梶浦 永吾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Industries Corp
Original Assignee
Toyoda Automatic Loom Works Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyoda Automatic Loom Works Ltd filed Critical Toyoda Automatic Loom Works Ltd
Priority to JP63293240A priority Critical patent/JP2546359B2/en
Publication of JPH02139430A publication Critical patent/JPH02139430A/en
Application granted granted Critical
Publication of JP2546359B2 publication Critical patent/JP2546359B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)
  • Spinning Or Twisting Of Yarns (AREA)

Abstract

PURPOSE:To surely shorten the stopping time of a spinning frame for the bobbin-exchange operation by putting an empty bobbin on an intermediate peg in the stop of a machine frame and making the machine to a state to enable the start of taking-off of a full bobbin from a spindle. CONSTITUTION:During the operation of a spinning frame, the bobbin-exchange operation of a simultaneous bobbin exchanger is started by a full-bobbin signal of the spinning frame, the empty bobbin on a transfer apparatus under a spindle row is transferred to an intermediate peg, the spinning frame is set in the full- bobbin stop operation stage by a full-bobbin stop operation starting signal, a top-bunch winding and a tail-yarn winding are carried out, the machine frame is stopped and a lappet is inverted. The bobbin-exchanger is restarted simultaneous to the stop of the machine frame, the full bobbin is pulled out of the spindle and put on a peg, an empty bobbin pulled out of the intermediate peg is put on the spindle 1, a doffing bar is lifted and immediately the machine frame is restarted.

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明はリング精紡機、リング撚糸機等の紡機の管替方
法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION [Industrial Application Field] The present invention relates to a tube changing method for spinning machines such as ring spinning machines and ring twisting machines.

[従来の技術] 近年、紡績工場における自動化が進み、リング精紡機、
リング撚糸機等の紡機においては満管にともなう玉揚げ
及び新たな空ボビンをスピンドルに挿入する管替作業が
管替装置により自動的に行われるようになっている。管
替装置としては作業を必要とする機台に沿って移動して
一錘ずつあるいは複数錘ずつ管替作業を行う移動式の管
替装置と、各紡a機台毎に装備されな全錘一斉式の管替
装置とがある。全錘一斉式の管替装置としては例えば特
公昭48−30970号公報に開示された装置のように
、紡態機台のスピンドル列の下方にスピンドルピッチと
同一ピッチでペッグが突設されたコンベヤ装置を設ける
とともに:1ンベヤ装置とスピンドル列との間にスピン
ドルピッチと同一ピッチで中間ペックが突設された受台
を設け、スピンドルピッチと同一ピッチで配置されたボ
ビン把持装置を備えたドツフィングバーをパンタグラフ
機構によりスピンドル列とコンベヤ装置との間を昇降変
位させるとともにパンタグラフ機構全体を紡nR台に接
近する位置と離間する位置とに傾動I7T能に構成した
装置が開示されている。この管替装置による管替作業は
次の3段階の動作により行われる。■コンベヤ装置上の
空ホビンを受台上の中間ペッグへ移し替える。■スピン
ドル上の満ボビンをコンベヤ装置のペッグ上に移し替え
る。
[Conventional technology] In recent years, automation in spinning factories has progressed, and ring spinning machines,
In a spinning machine such as a ring twisting machine, doffing when the bobbin is full and a tube change operation such as inserting a new empty bobbin into the spindle are automatically performed by a tube change device. The pipe changing device is a mobile pipe changing device that moves along the machine that requires work and performs pipe changing work one spindle at a time or multiple spindles at a time; There is also a simultaneous pipe switching device. An example of an all-spindle simultaneous pipe changing device is a conveyor in which pegs are protruded below the spindle rows of a spinning machine table at the same pitch as the spindle pitch, such as the device disclosed in Japanese Patent Publication No. 48-30970. In addition to providing a device: 1. A dotting machine equipped with a pedestal from which intermediate pecks protrude at the same pitch as the spindle pitch is provided between the conveyor device and the spindle row, and a bobbin gripping device arranged at the same pitch as the spindle pitch. A device is disclosed in which a bar is moved up and down between a spindle row and a conveyor device by a pantograph mechanism, and the entire pantograph mechanism is tilted to a position approaching and away from a spinning R table. The pipe changing operation by this pipe changing device is performed through the following three steps. ■Transfer the empty hobbin on the conveyor device to the intermediate peg on the pedestal. ■Transfer the full bobbin on the spindle onto the peg of the conveyor device.

■受台上の空ボビンをスピンドル上へ移し替える。■Transfer the empty bobbin on the cradle onto the spindle.

前記管替方法では第1段階の作業すなわちコンベヤ装置
上から受台上への空ボビンの移し替え作業は紡Rv1台
の運転中にも行うことができるが、第2.3段階の作業
は188台停止中でなければ行うことはできない。すな
わち、第2.3段階の作業中は紡機機台の運転が必ず停
止される。
In the tube change method described above, the first stage of work, that is, the work of transferring empty bobbins from the conveyor device to the pedestal, can be performed even while one spinning Rv unit is in operation, but the second and third stages of work are carried out at 188. This cannot be done unless the machine is stopped. That is, the operation of the spinning frame is always stopped during the work in steps 2 and 3.

一方、近年特にリング精紡機においては機台の高速化が
指向され、スピンドルの最高回転速度が20000rp
mに達するものもあ、る。このようにスピンドルの回転
速度が高速化された場合には管糸1本当りに巻取る糸の
量を少なくするスモールパッケージ化が図られている。
On the other hand, in recent years, especially in ring spinning machines, there has been a trend towards higher speed machines, and the maximum rotational speed of the spindle has increased to 20,000 rpm.
Some reach m. In this way, when the rotational speed of the spindle is increased, small packages are being created in which the amount of yarn to be wound per yarn is reduced.

そして、機台の高速化とスモールパッケージ化のため満
管までの時間が短くなって機台の満管停止にともなう管
替作業の回数が増大し、管替作業のための紡機機台の停
止時間が紡R機台の稼動効率に大きく影響ず乙ようにな
りつつある。
Furthermore, due to the speeding up of machines and the use of smaller packages, the time until full tubes has become shorter, resulting in an increase in the number of pipe changes required when the machine stops when the machine is full. It is becoming more and more common that time does not significantly affect the operating efficiency of the spinning R machine.

−4,管替装置による管替を行う場合、管替後の再起動
時に糸を空ボビンに自動的に巻付けることができるよう
に、ローラバートに連なる糸がトラベラに通ったままス
ピンドルに接続していることが要求される。この要求を
満たずため及びワインダニ程における口出しを容易にす
るため、満管に1′f−う機台停止時にはパンチ巻及び
尻糸巻形成のためリングレールが所定の満管停止動作を
行うようになっている。そして、機台停止時間を短縮す
るため、従来第11,5図に示すように満管停止動作開
始信号あるいは満管信号により管替装置の作動を開始し
する方法が実施されている。
-4. When changing the tube using a tube changing device, connect the yarn connected to the roller bart to the spindle while passing through the traveler so that the yarn can be automatically wound around the empty bobbin when restarting after changing the tube. are required to do so. In order to meet this requirement and to facilitate the opening during the wind mite process, the ring rail performs a predetermined full-tube stop operation to form punch winding and tail winding when the machine is stopped at 1'f when the tube is full. It has become. In order to shorten the machine stop time, conventionally a method has been implemented in which the operation of the tube switching device is started by a full tube stop operation start signal or a full tube signal, as shown in FIGS. 11 and 5.

[発明が解決しようとする課題] ところが、前記第4図に示すもY東方法では管替装置の
作動開始時期と紡機機台の満管停止動作の開始時期とが
同時であるため、管替装置の作動による空ボビンの中間
ペッグへの挿入が完了する前に紡lRn台が完全に停止
する。一方、第5図に示す方法では、紡機機台の満管停
止動作開始信号は満管信号発信後リングレールが所定位
置まで降下した時点で発信されるため、管替装置は紡機
機台の作動開始前に作動が開始される。しかし、満管信
号はリングレールが巻取りのための昇降過程のどの位置
にあるときに発せられるかは不定である。
[Problems to be Solved by the Invention] However, in the Y-East method shown in FIG. The spinning machine stops completely before the device operation completes the insertion of the empty bobbin into the intermediate peg. On the other hand, in the method shown in Fig. 5, the signal to start the spinning machine stand's full spindle stop operation is sent when the ring rail has descended to a predetermined position after the full spindle signal is sent, so the tube change device operates the spinning machine stand. The operation is started before the start. However, it is uncertain at what position the ring rail is in the ascending and descending process for winding when the full tube signal is generated.

満管信号がリングレールの上昇開始のときに発せられれ
ば、紡機機台の停止前に管替装置の作動による空ボビン
の中間ペッグへの挿入が完了するが、満管信号がリング
レールの下降時の後半に発せられた場合には管替装置の
作動による空ボビンの中間ペッグへの挿入が完了する前
に紡機機台が完全に停止する。すなわち、前記従来方法
では紡機機台が停止した状態で管替装置による満ボビン
の玉揚げを待つ時間が長く(20秒程度)なり、その分
紡機機台の停止時間が長くなる。この待ち時間は紡RR
台の停止時間の1〜2割を占める。
If the full bobbin signal is issued when the ring rail starts to rise, the tube changing device will complete the insertion of the empty bobbin into the intermediate peg before the spinning machine table stops, but the full bobbin signal will cause the ring rail to start descending. If it is issued later in the day, the spinning frame will come to a complete stop before the operation of the tube changing device completes the insertion of the empty bobbin into the intermediate peg. That is, in the conventional method, it takes a long time (approximately 20 seconds) to wait for the pipe changing device to doff a full bobbin with the spinning machine stand stopped, and the stopping time of the spinning machine stand increases accordingly. This waiting time is
It accounts for 10-20% of the machine's downtime.

紡81機台の停止前に管替装置の作動による空ボビンの
中間ペッグへの挿入を確実に完了させる方法として、ボ
ビンが9分玉近くになったときに発せられる満管予告信
号に上り管替装置の作動を開始する方法が考えられる。
As a method to ensure that the insertion of an empty bobbin into the intermediate peg by operating the tube changing device is completed before the spinning machine 81 is stopped, the upstream tube is activated in response to the full bobbin warning signal that is issued when the bobbin is close to 9 minutes. One possible method is to start the operation of the replacement device.

この場合には管替装置の作動による空ボビンの中間ペッ
グへの挿入は機台停止前に確実に完了し、管替装置はボ
ビン把持装置を備えたドツフィングバーが満ボビンの把
持準備のため最上昇位置で待機する。ところが、紡機で
は巻始め及び巻終りのときに糸切れが発生し易く、ドツ
フィングバーが満ボビンの把持準備のため最上昇位置で
待機していると、作業者による糸切れ修復作業がし難い
という問題がある。
In this case, the tube changing device operates to ensure that the empty bobbin is inserted into the intermediate peg before the machine stops. Wait at the highest position. However, in spinning machines, thread breaks tend to occur at the beginning and end of winding, and when the dotting bar is waiting at its highest position in preparation for gripping a full bobbin, it is difficult for the operator to repair the thread breakage. There is a problem.

本発明は前記の問題点に鴛みてなされたものであって、
その目的は管替作業のための紡機機台の停止時間をでき
るだけ短縮することができる紡機の管替方法を提供する
ことにある。
The present invention has been made in view of the above problems, and includes:
The purpose is to provide a method for changing pipes of a spinning machine that can reduce the downtime of a spinning machine stand for pipe changing work as much as possible.

[課題を解決するための手段] 前記の目的を達成するため本発明においては。[Means to solve the problem] In order to achieve the above object, the present invention.

紡機のスピンドル列の下方に移送装置を配設し、スピン
ドル列と移送装置との間にボビン挿入用の中間べ・フグ
を所定ピッチで設け、ボビン把持装置を備えた全錘−斎
戒の管替装置により前記中間ペッグを介して前記移送装
置上に配置された空ボビンとスピンドル上の満ボビンと
の交換作業を行う紡機の管替方法において、紡機運転中
に紡機の満管信号で前記管替装置の管替動作を開始し、
前記満管信号発信から満管停止時におけるパンチ巻形成
のためのリングレールの動作を開始する満管停止動作開
始信号を発信するまでの時間を、リングレールの昇降回
数が1回より多く数回以下となるように設定し、紡機が
停止する前に前記管替装置による前記中間ペッグへの空
ボビンの挿入が完了するようにした。
A transfer device is disposed below the spindle row of the spinning machine, and between the spindle row and the transfer device intermediate bevels and puffers for bobbin insertion are provided at a predetermined pitch, and a full-spindle-to-sleep pipe change is provided with a bobbin gripping device. In the spinning machine tube change method in which an empty bobbin placed on the transfer device is exchanged with a full bobbin on the spindle via the intermediate peg by a device, the tube change is performed in response to a full bobbin signal from the spinning machine during operation of the spinning machine. Start the pipe switching operation of the device,
The time from the generation of the full tube signal to the generation of the full tube stop operation start signal that starts the operation of the ring rail for punch winding formation when the full tube is stopped is set so that the ring rail is raised and lowered several times more than once. The following settings were made so that the insertion of the empty bobbin into the intermediate peg by the tube changing device was completed before the spinning machine stopped.

[作用] 本発明では紡機運転中に紡機の満管信号で全錘−斎戒の
管替装置が管替動作を開始し、スピンドル列の下方に配
置された移送装置上の空ボビンの中間ペッグ上への移し
替えが行われる。そして、前記満管信号発信から巻取の
ためのリングレールの昇降動が1回より多く数回以下行
われた後、満管停止時におけるパンチ巻形成のためのリ
ングレールの動作を開始する満管停止動作開始信号が発
信される。管替装置による前記中間ペッグへの空ボビン
の挿入作業は機台停止前に確実に完了し、管替装置は満
ボビンの抜き取りのための待機状態で機台の停止を待つ
、従って、機台停止とともに管替装置の再起動が可能と
なり、紡am台が再起動されるまでの機台停止時間が短
縮される。又、管替装置が満ボビンの抜き取りのための
待機状態となった後、リングレールが昇降動する回数は
わずかなため糸切れ修復作業の邪魔になることはほとん
どない。
[Function] In the present invention, during operation of the spinning machine, the full-spindle-to-sleep pipe switching device starts the pipe switching operation in response to the full pipe signal of the spinning machine, and the empty bobbin on the transfer device disposed below the spindle row is transferred onto the intermediate peg. A transfer takes place. Then, after the ring rail has been raised and lowered for winding from the generation of the full tube signal more than once and several times, the operation of the ring rail for punch winding when the full tube is stopped is started. A pipe stop operation start signal is transmitted. The work of inserting an empty bobbin into the intermediate peg by the tube changing device is surely completed before the machine stops, and the tube changing device waits for the machine to stop in a standby state to remove the full bobbin. The pipe changing device can be restarted upon stopping, and the time during which the spinning machine is stopped until the spinning machine is restarted is shortened. Further, after the tube changing device is in a standby state for removing a full bobbin, the ring rail moves up and down only a few times, so it hardly interferes with the thread breakage repair work.

[実施例] 以下、本発明をリング精紡機に具体化した一実施例を第
1〜3図に従って説明する。
[Example] Hereinafter, an example in which the present invention is embodied in a ring spinning machine will be described with reference to FIGS. 1 to 3.

多数のスピンドル1が一定ピッチで配設されたスピンド
ルレール2の下方には第3図に示すように、ペッグトレ
イ3を利用してボビンの移送を行う公知(例えば特開昭
63−145438号公報)のボビン移送装置4が配設
されている。スピンドルレール2の前側には支持バー5
がスピンドルレール2に沿って延設され、支持バー5の
上面にはスピンドルピッチと同ピツチで中間ペッグ6が
突設されている。又、精紡機機台には公知の構成の全錘
−斎戒の管替装置7が装備されている。
As shown in FIG. 3, below a spindle rail 2 in which a large number of spindles 1 are arranged at a constant pitch, a peg tray 3 is used to transfer bobbins (for example, Japanese Patent Laid-Open No. 145438/1983). A bobbin transfer device 4 is provided. A support bar 5 is installed on the front side of the spindle rail 2.
is extended along the spindle rail 2, and an intermediate peg 6 is provided protruding from the upper surface of the support bar 5 at the same pitch as the spindle pitch. Further, the spinning frame frame is equipped with a full-spindle-to-sleep tube changing device 7 of a known configuration.

管替装置7はスピンドルピッチと同一ピッチでボビン把
持部が配設されたボビン把持装置8を備えたドツフィン
グバー9がいわゆるパンタグラフ機構10により昇降動
されるとともに、支軸11を中心にパンタグラフasi
o全体が揺動可能に構成され、シリンダ12の作動によ
り支持ブラケット13が支軸11を中心に回動されてパ
ンタグラフa梢10全体が支軸11を中心に揺動され、
ドツフィングバー9が精紡sea台に接近する位置と離
間する位置とに移動配置可能に構成されている。
In the tube changing device 7, a dotting bar 9 equipped with a bobbin gripping device 8 in which a bobbin gripping portion is arranged at the same pitch as the spindle pitch is moved up and down by a so-called pantograph mechanism 10, and a pantograph asi is moved around a spindle 11.
The entire pantograph a is configured to be swingable, and the support bracket 13 is rotated around the support shaft 11 by the operation of the cylinder 12, and the entire pantograph a treetop 10 is swung around the support shaft 11.
The dotting bar 9 is configured to be movable between a position approaching and a position away from the spinning sea table.

次に前記のように構成された装置による管替方法を説明
する。精紡機機台の運転中に空ボビンEが挿入されたペ
ッグトレイ3がボビン移送装置4上のスピンドル1と対
応する位置に搬入される。
Next, a pipe switching method using the apparatus configured as described above will be explained. During operation of the spinning frame frame, the peg tray 3 into which empty bobbins E are inserted is carried to a position corresponding to the spindle 1 on the bobbin transfer device 4.

精紡a機台の運転が継続されて満管信号が発せられると
、管替装置7が作動されるとともにタイマがカウントを
開始する。管替装置7の作動により、第2図(a)に示
すようにペッグトレイ3上の空ボビンEがボビン把持装
v18に把持されてペッグ3a上から抜き上げられる。
When the spinning machine A continues to operate and a full pipe signal is issued, the pipe switching device 7 is activated and the timer starts counting. By the operation of the tube changing device 7, the empty bobbin E on the peg tray 3 is gripped by the bobbin gripping device v18 and pulled out from above the peg 3a, as shown in FIG. 2(a).

そして、ドツフィングバー9の移動によりスピンドル1
と対応する位置に配置された中間へラグ6上に空ボビン
Eが挿入される0次いで、ボビン把持装置8による空ボ
ビンEの把持が開放された後、第2図(b)に示すよう
にボビン把持装[8が満ボビンFの頂部と対応する前方
位置まで上昇移動された状態で管替装置7の作動が一時
中断され、管替装Wt、7はその状態で精紡am台が停
止してラベットが反転されるのを待つ。
Then, by moving the dotting bar 9, the spindle 1
Then, after the empty bobbin E is released from the bobbin gripping device 8, as shown in FIG. 2(b). The operation of the tube changing device 7 is temporarily interrupted when the bobbin gripping device [8 is moved upward to the front position corresponding to the top of the full bobbin F, and the spinning am stand is stopped in this state. and wait for the rabbet to be reversed.

一方、カウント開始からリングレールが1回昇降動する
のに必要な所定時間経過後、タイマがりイムアップし、
その後リングレールが所定位!まで降下してリミットス
イッチ(図示せず)がONとなると、満管停止動作開始
信号が発信される。
On the other hand, after the predetermined time required for the ring rail to move up and down once from the start of counting, the timer times up.
After that, the ring rail is in place! When the limit switch (not shown) is turned on, a full tube stop operation start signal is sent.

この信号に基づき精紡n機台が満管停止動作に入り、ト
ップパンチ巻、尻糸巻が行われた後リングレールが所定
位置に到達した時点で機台が完全に停止するとともにラ
ベットが反転される。満管停止動作開始信号が発信され
るのは、管替装置7の作動が開始されてからリングレー
ルが1回昇降動するのに必要な所定時間経過後である。
Based on this signal, the spinning machine enters a full tube stop operation, and after top punch winding and tail winding are performed, the machine stops completely when the ring rail reaches the specified position, and the rabbet is reversed. Ru. The full pipe stop operation start signal is transmitted after a predetermined time period required for the ring rail to move up and down once has elapsed since the operation of the pipe changing device 7 was started.

従って、精紡機機台が停止するまでに、管替装置7は空
ボビンEを中間ペッグ6に挿入した後、満ボビンFの引
き抜き準備のためドツフィングバー9を最上昇位置に移
動する動作が確実に完了し、その状態で精紡fi機台の
停止を待つ。
Therefore, before the spinning machine frame stops, the tube changing device 7 has inserted the empty bobbin E into the intermediate peg 6, and then moved the dotting bar 9 to the highest position in preparation for pulling out the full bobbin F. Once completed, wait for the spinning fi machine to stop.

精紡機機台の停止及びラベット反転が完了して玉揚げ可
能な状態となると、待機状態にあった管替装置7が再起
動され、第2図(c)に示すようにボビン把持装′f1
8が直ちに満ボビンFの頂部と対応する位置に移動され
るとともに、満ボビンFがボビン把持装置8に把持され
てスピンドル1がら抜き取られる0次いでボビン把持装
置8がスピンドルレール2の下方に移動されて第2図(
d)に示すように、満ボビンFがボビン移送装置4のペ
ッグ3aに挿入される6次に再びボビン把持装置8が中
間ペッグ6に挿入された空ボビンEと対応する位置まで
移動され、第2図(e)に示すように中間ペッグ6がら
空ボビンEが引き抜かれた後、第2図(f)に示すよう
に空ボビンEがスピンドル1に挿入される。そして、ボ
ビン把持装置8による空ボビンEの把持解除後、ボビン
把持装置8は上方へ移動された後スピンドル1の真上位
置から後退移動され、第2図(a )に示すように48
機位置に復帰して管替作業が完了する。精紡機機台はボ
ビン把持装′w、8が空ボビンEの把持を解除後、上昇
した時点で直ちに再起動される。
When the spinning frame frame has been stopped and the rabbet has been reversed, and the doffing is possible, the pipe changing device 7, which has been in a standby state, is restarted, and the bobbin gripping device 'f1 is changed as shown in FIG. 2(c).
8 is immediately moved to a position corresponding to the top of the full bobbin F, and the full bobbin F is gripped by the bobbin gripping device 8 and extracted from the spindle 1. Next, the bobbin gripping device 8 is moved below the spindle rail 2. Figure 2 (
As shown in d), the full bobbin F is inserted into the peg 3a of the bobbin transfer device 4. Next, the bobbin gripping device 8 is moved again to the position corresponding to the empty bobbin E inserted into the intermediate peg 6. After the empty bobbin E is pulled out from the intermediate peg 6 as shown in FIG. 2(e), the empty bobbin E is inserted into the spindle 1 as shown in FIG. 2(f). After the bobbin gripping device 8 releases its grip on the empty bobbin E, the bobbin gripping device 8 is moved upward and then moved backward from the position directly above the spindle 1, so that the bobbin gripping device 8 is moved upward and then moved backward from the position directly above the spindle 1, so that the bobbin gripping device 8 is moved upward, and then moved backward from the position directly above the spindle 1, so that the bobbin gripping device 8 is moved upward, and then moved backward from the position directly above the spindle 1, so that the bobbin gripping device 8 is moved upward and then moved backward from the position directly above the spindle 1.
After returning to the machine position, the pipe change work is completed. The spinning frame frame is immediately restarted when the bobbin gripping device 'w, 8 lifts up after releasing its grip on the empty bobbin E.

すなわち、管替作業時に精紡R機台1が停止するのは、
満ボビンFをスピンドル1からボビン移送装置4のペッ
グ3aに移し替える作業と、中間ペッグ6上の空ボビン
Eをスピンドル1に挿入するとともにボビン把持装置8
が空ボビンEの頂部上方へ移動する間となり、満管に伴
う管替作業のために精紡a機台が停止する時間が短縮さ
れる。
In other words, the reason why the spinning R machine 1 stops during pipe change work is as follows.
Transferring the full bobbin F from the spindle 1 to the peg 3a of the bobbin transfer device 4, and inserting the empty bobbin E on the intermediate peg 6 into the spindle 1, as well as the bobbin gripping device 8.
This is the period during which the spinning machine A is moved above the top of the empty bobbin E, and the time during which the spinning machine A is stopped for the pipe changing operation accompanying the full bobbin E is shortened.

なお、本発明は前記実施例に限定されるものではなく、
例えば、タイマの設定時間をリングレールが数回昇降動
できる時間としたり、ボビン移送装置4としてペッグト
レイ3を使用する装置に代えてスピンドルピッチと同一
・ピッチでペッグが突設されたベルトコンベヤを採用し
たり、管替装置7としてパンタグラフ機構を支軸11を
中心に揺動可能な構成とする代わりに特公昭51−24
008号公報に開示された装置のようにパンタグラフR
横の駆動軸を紡機機台の幅方向に往復動させてパンタグ
ラフ機構全体をスピンドル列に対して接近、離間可能と
する構成を採用してもよい、又、管替方法として本願出
願人が先に提案した(特願昭63−209166号)、
スピンドルピッチの1/2の間隔で中間ペッグを突設し
たバーをスピンドルレールに沿って往復動可能に配設し
、スピンドルから引き抜がれな満ボビンFを−H前記中
間ペッグに挿入し、その状態で中間ペッグがら空ボビン
を引き抜いてスピンドルに挿入し、その後満ボビンFを
ボビン移送装置に受は渡す方法を採用してもよい、又、
リング撚糸機に適用してもよい。
Note that the present invention is not limited to the above embodiments,
For example, the timer is set to a time that allows the ring rail to move up and down several times, and instead of using a peg tray 3 as the bobbin transfer device 4, a belt conveyor with protruding pegs at the same pitch as the spindle is used. Or, instead of making the pantograph mechanism swingable around the support shaft 11 as the pipe changing device 7,
Pantograph R like the device disclosed in 008 publication
It is also possible to adopt a configuration in which the horizontal drive shaft is reciprocated in the width direction of the spinning machine table so that the entire pantograph mechanism can approach and move away from the spindle row. (Patent Application No. 63-209166),
A bar with protruding intermediate pegs at intervals of 1/2 of the spindle pitch is arranged so as to be reciprocally movable along the spindle rail, and a full bobbin F that cannot be pulled out from the spindle is inserted into the -H intermediate pegs, In this state, the empty bobbin may be pulled out from the intermediate peg and inserted into the spindle, and then the full bobbin F may be transferred to the bobbin transfer device.
It may also be applied to a ring twisting machine.

[発明の効果] 以上詳述したように本発明によれば、満管に伴う機台停
止の際、機台が停止してラベヴトが反転されてスピンド
ルからの満ボビンの引き抜き作業を開始できる状態とな
るまでに、管替装置は空ボビンの中間ペッグへの挿入を
確実に完了するとともに、スピンドルからの満ボビンの
引き抜き作業を開始できる待機状態となるので、従来と
異なり機台が停止した状態で管替装置による空ボビンの
中間ペッグへの挿入完了を待つということがなく、紡f
i機台の停止時間を確実に短縮でき機台の稼動効率が向
上する。又、管替装置が満ボビンの抜き取りのための待
機状態となった後、リングレールが昇降動する回数はわ
ずかなため糸切れ修復作業の邪魔になることはほとんど
ない。
[Effects of the Invention] As detailed above, according to the present invention, when the machine is stopped due to a full bobbin, the machine is stopped and the Labevt is reversed so that the work of pulling out the full bobbin from the spindle can be started. By this time, the tube changing device has completed the insertion of the empty bobbin into the intermediate peg, and is in a standby state where it can start pulling out the full bobbin from the spindle, so unlike in the past, the machine is stopped. There is no need to wait for the tube changer to complete inserting the empty bobbin into the intermediate peg, and the spinning
The stop time of the i-machine can be reliably shortened and the operating efficiency of the machine can be improved. Further, after the tube changing device is in a standby state for removing a full bobbin, the ring rail moves up and down only a few times, so it hardly interferes with the thread breakage repair work.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は機台停止時の機台及び管替装置の運転状況を示
すダイヤグラム、第2図(a)〜(0)は管替作業を示
す概略側面図、第3図は管替装置の側面図、第4図は従
来の管替方法を示すダイヤグラム、第5図は別の従来の
管替方法を示すダイヤグラムである。 スピンドル1、ボビン移送装置4、中間ペッグ6、管替
装T1.7、ボビン把持装置8、ドツフィングバー9、
パンタグラフamto、空ボビンE、満ボビンF。 特許出願人  株式会社 豊田自動aav作所代 理 
人  弁理士 恩田博宣 第 図(a) 第 2 図(b) 日 第 2 図(C) 日 第 図(d) 第 図(e) 第 図(f) 第 図(q) ρ 第 図 第 図
Figure 1 is a diagram showing the operating status of the machine and pipe switching equipment when the machine is stopped, Figures 2 (a) to (0) are schematic side views showing pipe switching work, and Figure 3 is a diagram of the pipe switching equipment. The side view and FIG. 4 are diagrams showing a conventional pipe changing method, and FIG. 5 is a diagram showing another conventional pipe changing method. Spindle 1, bobbin transfer device 4, intermediate peg 6, tube changing device T1.7, bobbin gripping device 8, dotting bar 9,
Pantograph amto, empty bobbin E, full bobbin F. Patent applicant: Toyota Automobile Co., Ltd. AAV Manufacturing Agency
Person Patent Attorney Hironobu Onda Diagram (a) Diagram 2 (b) Diagram 2 (C) Diagram (d) Diagram (e) Diagram (f) Diagram (q) ρ Diagram Diagram

Claims (1)

【特許請求の範囲】[Claims] 1、紡機のスピンドル列の下方に移送装置を配設し、ス
ピンドル列と移送装置との間にボビン挿入用の中間ペッ
グを所定ピッチで設け、ボビン把持装置を備えた全錘一
斉式の管替装置により前記中間ペッグを介して前記移送
装置上に配置された空ボビンとスピンドル上の満ボビン
との交換作業を行う紡機の管替方法において、紡機運転
中に紡機の満管信号で前記管替装置の管替動作を開始し
、前記満管信号発信から満管停止時におけるパンチ巻形
成のためのリングレールの動作を開始する満管停止動作
開始信号を発信するまでの時間を、リングレールの昇降
回数が1回より多く数回以下となるように設定し、紡機
が停止する前に前記管替装置による前記中間ペッグへの
空ボビンの挿入が完了するようにした紡機の管替方法。
1. A transfer device is disposed below the spindle row of the spinning machine, intermediate pegs for bobbin insertion are provided at a predetermined pitch between the spindle row and the transfer device, and all-spindle simultaneous tube change is equipped with a bobbin gripping device. In the spinning machine tube change method in which an empty bobbin placed on the transfer device is exchanged with a full bobbin on the spindle via the intermediate peg by a device, the tube change is performed in response to a full bobbin signal from the spinning machine during operation of the spinning machine. The time from when the pipe change operation of the device is started and when the full pipe signal is sent to when the full pipe stop operation start signal that starts the operation of the ring rail for punch winding formation when the full pipe is stopped is determined by the ring rail. A method for changing a tube for a spinning machine, wherein the number of times of lifting and lowering is set to be more than one time and not more than several times, and the tube changing device completes insertion of an empty bobbin into the intermediate peg before the spinning machine stops.
JP63293240A 1988-11-19 1988-11-19 How to replace the spinning machine Expired - Fee Related JP2546359B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63293240A JP2546359B2 (en) 1988-11-19 1988-11-19 How to replace the spinning machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63293240A JP2546359B2 (en) 1988-11-19 1988-11-19 How to replace the spinning machine

Publications (2)

Publication Number Publication Date
JPH02139430A true JPH02139430A (en) 1990-05-29
JP2546359B2 JP2546359B2 (en) 1996-10-23

Family

ID=17792249

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63293240A Expired - Fee Related JP2546359B2 (en) 1988-11-19 1988-11-19 How to replace the spinning machine

Country Status (1)

Country Link
JP (1) JP2546359B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115142158A (en) * 2021-03-30 2022-10-04 合肥松宝科技有限公司 Full silk section of thick bamboo collecting device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115142158A (en) * 2021-03-30 2022-10-04 合肥松宝科技有限公司 Full silk section of thick bamboo collecting device
CN115142158B (en) * 2021-03-30 2023-09-15 合肥松宝科技有限公司 Full silk section of thick bamboo collection equipment

Also Published As

Publication number Publication date
JP2546359B2 (en) 1996-10-23

Similar Documents

Publication Publication Date Title
US4899531A (en) Method and apparatus for automatic exchange of roving bobbins of a ring spinning machine
JPS59187631A (en) Apparatus for performing pulling-off of bobbin from bobbin creel and attachment thereof to said creel provided above ring fine spinning frame
JPH0314925B2 (en)
CN106241507B (en) Spinning-in device and spinning-in method of automatic bobbin winder
US4196575A (en) Method for transfer of a fiber roving from a completed bobbin package to an empty tube on a spinning preparatory machine
US3394539A (en) Autodoffing machine in a ring spinning machine
EP1524230B1 (en) Travelling service device for open-end spinning units of open-end spinning machines
JPH02160929A (en) Ring spinning repeating machine
US3344593A (en) Doffing machine
JPH02139430A (en) Method for exchanging bobbin of spinning frame
JP2545945B2 (en) Method and device for replacing a spinning machine
US5280699A (en) Method and apparatus for disposing an end of a roving bobbin for intake into the drafting device of a textile spinning machine
US5170617A (en) Method and apparatus for producing packages
CN208455141U (en) A kind of automatic tube ejector of Air texturing machines
ES353598A1 (en) Methods and apparatus for servicing textile machines
JPH0742030A (en) Roving change method in fine spinning machine and device thereof
US4843809A (en) Method of automatically exchanging spinning bobbin tubes in a spinning machine
JP3161382B2 (en) Automatic doffing device for spinning machines
JPH08100335A (en) Simultaneous cop-change of fine spinning frame
JPS63160975A (en) Textile machine
EP0387009A2 (en) Yarn piecing method and yarn piecing apparatus
US5095690A (en) Method and device for exchange of full thread packages
JPH0585669A (en) Automatic switching device for winder
JPH08268646A (en) Roving leading method and device for roving changer
JP2580978B2 (en) Doffing method of winding device that performs step winding

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees