JPH02132236A - Column and beam joint section unit - Google Patents

Column and beam joint section unit

Info

Publication number
JPH02132236A
JPH02132236A JP63283896A JP28389688A JPH02132236A JP H02132236 A JPH02132236 A JP H02132236A JP 63283896 A JP63283896 A JP 63283896A JP 28389688 A JP28389688 A JP 28389688A JP H02132236 A JPH02132236 A JP H02132236A
Authority
JP
Japan
Prior art keywords
column
beam joint
joint section
steel
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP63283896A
Other languages
Japanese (ja)
Other versions
JPH0751802B2 (en
Inventor
Tadaaki Nagahama
長浜 忠明
Kaoru Yokoi
薫 横井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP63283896A priority Critical patent/JPH0751802B2/en
Publication of JPH02132236A publication Critical patent/JPH02132236A/en
Publication of JPH0751802B2 publication Critical patent/JPH0751802B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

PURPOSE:To reduce the cost of a column and beam joint section unit by forming concrete filling holes in a piercing section of a steelwork which pierces through a column and beam joint section member, and by forming a through-hole through which a columnar main brace arranged on the joint section member pierces. CONSTITUTION:Concrete is placed while the connecting end part of a beam framework 3 and the connecting ends of upper and lower end braces 6, 4 being left as it is, so as to form a beam joint section member 8. Further, a steel framework column 21 is made to pierce through the beam joint section 8 so as to be incorporated with the latter, and concrete filling holes 23 are formed in the periphery of the steel framework column 21. Further, a through-hole 23 for allowing a columnar main brace to pierce therethrough is formed in the column and beam joint section member 8.

Description

【発明の詳細な説明】 《産業上の利用分野》 本発明は、柱・梁仕口部分の施工を簡単かつ適切に行な
うことができる柱争梁仕口部ユニットに関するものであ
る。
DETAILED DESCRIPTION OF THE INVENTION <<Industrial Application Field>> The present invention relates to a column-to-beam joint part unit that can easily and appropriately construct a pillar-to-beam joint part.

《従来の技術》 従来SRC造の施工は、柱,梁,床スラブの全ての鉄骨
,鉄筋を現場にて組立て、次いで型枠を取付けコンクリ
ートを打設するか、あるいは工場等で製造されたPC柱
やPC梁等を現場にて組込む等により行われていた。
<Conventional technology> Conventional SRC construction involves assembling all the steel frames and reinforcing bars for columns, beams, and floor slabs on site, then attaching formwork and pouring concrete, or using PC manufactured in a factory, etc. This was done by installing columns, PC beams, etc. on site.

このうちPC梁は、第10図に示すように、上面にスタ
ーラップ2の上端部を突出した半PC梁1が主流となっ
ている(例えば、特公昭53−21204号公報等参照
)。
Among these, the predominant type of PC beam is a semi-PC beam 1 having the upper end of the stirrup 2 protruding from the upper surface, as shown in FIG. 10 (see, for example, Japanese Patent Publication No. 53-21204).

この半PC梁1は、H形梁鉄骨3の両端部、下端筋4の
両端部及びスターラップ2の上端部を露出させるように
コンクリートを打設して製造される。
This half-PC beam 1 is manufactured by pouring concrete so that both ends of the H-shaped beam steel frame 3, both ends of the lower reinforcement 4, and the upper end of the stirrup 2 are exposed.

梁鉄骨3の両端部は図示しない鉄骨柱との接合に用いら
れ、下端筋4の両端部は接続(アンカー)筋として他の
半PC梁の接続(アンカー)筋との接合に用いられ、ス
ターラップ2の上端部は床スラブとの取合部として用い
られる。すなわち現場にて、梁鉄骨3の両端部が鉄骨柱
と接合され、スターラップ2の上端部に梁上端筋や床ス
ラブ筋が挿入され、他の半PC梁の接続(アンカー)筋
との接合等を行った後、型枠を取付け、その後コンクリ
ートが打設されてこの半PC梁1と柱や床スラブとの作
業が成されるのである。
Both ends of the beam steel frame 3 are used to connect with a steel column (not shown), and both ends of the lower end reinforcement 4 are used as connection (anchor) reinforcements to connect with the connection (anchor) reinforcement of other semi-PC beams, The upper end of the wrap 2 is used as a joint with the floor slab. That is, at the site, both ends of the steel beam 3 are connected to the steel column, beam top reinforcement and floor slab reinforcement are inserted into the upper end of the stirrup 2, and connection (anchor) reinforcement of other semi-PC beams is connected. After performing these steps, the formwork is installed, and then concrete is poured to connect the semi-PC beam 1 to the columns and floor slab.

《発明が解決しようとする課題》 上記のように従来の半PC梁1の場合、部材応力の集中
する柱・梁接合部が現場打ちコンクリートで合成される
ため、この合成部分の品質を確保する上で、高品質・高
コストのコンクリートの使用や、ボイド発生を防止する
ための細心のコンクリート打設作業、あるいは高強度・
高コストの鉄筋の多数の使用等を余儀なくされていた。
[Problem to be solved by the invention] As mentioned above, in the case of the conventional semi-PC beam 1, the column-beam joint where member stress is concentrated is composited with cast-in-place concrete, so it is necessary to ensure the quality of this composite part. The use of high-quality, high-cost concrete, meticulous concrete pouring work to prevent voids, and high-strength and
This necessitated the use of a large number of high-cost reinforcing bars.

しかも現場におけるスターラップ2への梁上端筋の挿入
や結束、鉄骨柱との接合等、煩雑な作業を残すのみなら
ず、柱・梁接合部の型枠作業も極めて煩雑であり、工期
の長期化の一因ともなっていた。
Moreover, not only is there still complicated work to be done on site, such as inserting and bundling the beam top end reinforcement into the stirrup 2, and joining it to the steel column, but also the formwork work at the column-beam joint is extremely complicated, resulting in a long construction period. It was also a contributing factor to the

一方、本出願人により第11図に示す構成のPC部材が
既に提案されている(特開昭62−6034号公報)。
On the other hand, the present applicant has already proposed a PC member having the configuration shown in FIG. 11 (Japanese Unexamined Patent Publication No. 62-6034).

このPC部材10は、梁の一部11と柱の一部12とが
工場にて一体にプレキャストされて柱・梁接合部(仕口
部)9として形成されたもので、現場施工において、予
め立設された柱主筋を接合部9に穿設されている貫通孔
13に挿通し、梁上・下端筋4,6を他のPC部材の梁
上・下端筋と接続すると共に、梁の一部11に穿設され
ている貫通孔14にスラブ筋を挿通するものである。
In this PC member 10, a part 11 of a beam and a part 12 of a column are precast together in a factory to form a column-beam joint (shiguchi part) 9. Insert the erected column main reinforcement into the through hole 13 drilled in the joint 9, connect the beam upper and lower end reinforcements 4 and 6 to the beam upper and lower end reinforcements of other PC members, and The slab reinforcement is inserted into a through hole 14 drilled in the portion 11.

このように、本出願人の提案に係るPC部材10は、柱
・梁接合部9がプレキャストされているため、前述の従
来の半PC梁1における柱・梁接合部の品質上の問題、
煩雑な型枠取付作業等の問題を解決することができるが
、このような接合部分の作業を更に改善できる方策の案
出が望まれる。
As described above, in the PC member 10 proposed by the present applicant, the column-beam joint 9 is precast, so there are no problems with the quality of the column-beam joint in the conventional semi-PC beam 1 described above.
Although problems such as complicated formwork installation work can be solved, it is desirable to devise a method that can further improve the work of such joint parts.

本発明は、以上の諸点に鑑み、先提案に係るPC部材を
更に発展させて、柱・梁接合部の品質を向上しつつ簡単
且つ適切な作業を実施できる柱・梁仕口部ユニットを提
案することを目的としてなされたものである。
In view of the above points, the present invention further develops the previously proposed PC member and proposes a column/beam joint unit that can improve the quality of the column/beam joint and perform simple and appropriate work. It was done for the purpose of

《課題を解決するための手段》 本発明は、上記目的を達成するために、柱・梁仕口部を
構成すると共にその端部から梁鉄骨及び梁鉄筋の接続端
部が突出されて、全体がプレキャスト化された柱・梁接
合部部材と、柱・梁接合部部材にこれを貫通させて一体
的に設けられた鉄骨柱と、柱・粱接合部部材の鉄骨柱の
貫通部に形成されたコンクリート充填用孔と、柱・梁接
合部部材に配設され柱主筋が挿通される貫通孔とを備え
たことを特徴とする。
<<Means for Solving the Problems>> In order to achieve the above object, the present invention constitutes a column/beam joint part, and the connecting ends of the beam steel frame and the beam reinforcing bars protrude from the ends thereof, so that the entire structure is is formed in the precast column-beam joint member, the steel column that is integrally provided by penetrating the column-beam joint member, and the penetrating part of the steel column of the column-beam joint member. The present invention is characterized by comprising a concrete filling hole and a through-hole provided in the column-beam joint member through which the column main reinforcement is inserted.

《作 用》 本発明のユニットは、柱・梁接合部部材に一体的に設け
られた鉄骨柱が適宜他の鉄骨柱に接合されると共に、端
部から突出された梁鉄骨及び梁鉄筋の接続端部が、同様
な構成でなる他のユニットの梁鉄骨及び梁鉄筋との接合
に寄与する。また柱・梁接合部部材の貫通孔が、既に現
場に立設された柱主筋の柱・梁接合部部材への挿入に利
用される。
<<Function>> In the unit of the present invention, the steel column provided integrally with the column-beam joint member is appropriately connected to other steel columns, and the beam steel and beam reinforcing bars protruding from the end are connected. The end portions contribute to connection with beam steel frames and beam reinforcing bars of other units having a similar configuration. In addition, the through-hole of the column-beam joint member is used for inserting the column main reinforcement already erected at the site into the column-beam joint member.

従って、本発明にあってはユニットを所望数準備し、現
場に予め立設されている柱主筋を貫通孔に通し、梁鉄骨
同士並びに上・下端筋同士を接合して所望寸法に組立て
、この梁部における接合部分に型枠を取付けてコンクリ
ートの現場打ちを行う。
Therefore, in the present invention, a desired number of units are prepared, the main column reinforcements erected in advance on the site are passed through the through holes, and the beam steel frames and the upper and lower end reinforcements are joined to each other and assembled to desired dimensions. Formwork is attached to the joints of the beams and concrete is poured on-site.

このように本発明のユニットは、部材応力の集中する柱
・梁接合部を予め工場等でプレキャストしておき、接続
部の梁等を現場打ちコンクリートで合成するようにした
ものである。
As described above, in the unit of the present invention, the column/beam joint where member stress is concentrated is precast in advance at a factory, etc., and the beam etc. of the joint is composited with cast-in-place concrete.

また、本発明ユニットの柱・梁接合部部材のコンクリー
ト充填用孔は、下部柱部分へのコンクリート打設の際に
コンクリート等のグラウト材がグラウトされて、柱・梁
接合部のコンクリート充填度も充分なものとする。
In addition, the concrete filling hole of the column-beam joint member of the unit of the present invention is grouted with a grouting material such as concrete when concrete is poured into the lower column part, and the degree of concrete filling of the column-beam joint is also reduced. be sufficient.

《実 施 例》 第1図(A),(B)は本発明ユニットの一実施例を示
し、第1図(A)が斜視図、第1図(B)が平面図であ
る。
<<Embodiment>> FIGS. 1(A) and 1(B) show an embodiment of the unit of the present invention, with FIG. 1(A) being a perspective view and FIG. 1(B) being a plan view.

本発明は基本的には、柱・梁仕口部を構成すると共にそ
の端部から梁鉄骨3及び梁鉄筋4,6の接続端部が突出
されて、全体がプレキャスト化された柱・梁接合部部材
8と、柱・梁接合部部材8にこれを貫通させて一体的に
設けられた鉄骨柱21と、柱・梁接合部部材8の鉄骨柱
21の貫通部に形成されたコンクリート充填用孔22と
、柱・梁接合部部材8に配設され柱主筋が挿通される貫
通孔23とを備えて構成される。
Basically, the present invention consists of a column-beam joint, in which the connecting ends of the beam steel frame 3 and the beam reinforcing bars 4 and 6 protrude from the end of the column-beam joint part, and the column-beam joint is entirely precast. 8, a steel column 21 that is integrally provided through the column-beam joint member 8, and a concrete-filled concrete column formed in the penetrating portion of the steel column 21 of the column-beam joint member 8. It is configured to include a hole 22 and a through hole 23 which is disposed in the column/beam joint member 8 and through which the column main reinforcement is inserted.

図示例にあっては柱・梁接合部部材8は、梁の一部をも
形成するように水平三方向に張出した丁字形状に形成さ
れ、柱・梁接合部部材8の各端部を成すこれら張出し部
分10からはそれぞれ梁鉄骨3及び梁鉄筋たる上・下端
筋4,6が突出されると共に、柱と梁が集合する柱・梁
接合部分(仕口部)に1本の鉄骨柱21が一体的に設け
られている。
In the illustrated example, the column-beam joint member 8 is formed in a T-shape that extends in three horizontal directions so as to also form a part of the beam, and forms each end of the column-beam joint member 8. A beam steel frame 3 and upper and lower end reinforcements 4 and 6, which are beam reinforcements, respectively protrude from these overhanging portions 10, and one steel column 21 is provided at the column-beam joint (joint part) where the columns and beams gather. are integrally provided.

具体的には、梁鉄骨3の接続端部及び上・下端筋6,4
の接続端部を残してコンクリートを打込み、柱・梁接合
部部材8を構成する。
Specifically, the connection end of the beam steel frame 3 and the upper and lower end reinforcements 6, 4
Concrete is poured leaving the connecting end of , and the column-beam joint member 8 is constructed.

また接合部部材8には、鉄骨柱21周囲にコンクリート
を打設するために、これに一体的に設けられる鉄骨柱2
1の周囲にコンクリート充填用孔22を設ける。
In addition, in order to pour concrete around the steel frame column 21, the joint member 8 includes a steel column 2 that is integrally provided with the steel frame column 21.
A concrete filling hole 22 is provided around the hole 1.

本例では、図示するように、鉄骨柱21として4本の丁
字形鋼を、それらのウェップを集合させて接合させて一
体化したものを用いており、コンクリート充填用孔22
は、これら接合部分を取り囲むように円形に形成された
孔部で構成されている。
In this example, as shown in the figure, four pieces of T-shaped steel are used as the steel column 21, and their webs are assembled and joined to form an integrated structure, and the concrete filling hole 22
is composed of a circular hole that surrounds these joints.

また、柱・梁接合部部材8には、柱主筋挿通用の貫通孔
23を設ける。本実施例では、張出し部分10の基部側
の矩形部分の四隅に、図示されない柱主筋の配筋に対応
させて2個づつ設けている。
Further, the column/beam joint member 8 is provided with a through hole 23 for insertion of the column main reinforcement. In this embodiment, two reinforcements are provided at each of the four corners of the rectangular portion on the base side of the overhanging portion 10, corresponding to the arrangement of column main reinforcements (not shown).

更に、接合部部材8の張出し部分10の側面には、第2
図及び第3図に示す態様若しくは第4図及び第5図に示
す態様で、床スラブ取合部24,25が突設されている
Further, on the side surface of the overhanging portion 10 of the joint member 8, a second
Floor slab joining parts 24 and 25 are provided in a protruding manner in the manner shown in FIGS. 3 and 3 or in the manner shown in FIGS. 4 and 5.

先ず、床スラブ取合部24は、第2図,第4図に示すよ
うに、L形金物をH形梁鉄骨3の上下両フランジ間に嵌
め込み、L形金物の水平部先端が張出し部分10の側面
下部から突出するように構成されている。なお、張出し
部分10から突出されたL型金物の水平部先端にはボル
ト穴24aが穿設されている。
First, as shown in FIGS. 2 and 4, the floor slab connecting part 24 is made by fitting an L-shaped metal piece between the upper and lower flanges of the H-shaped beam steel frame 3, so that the horizontal end of the L-shaped metal piece is attached to the overhanging part 10. It is configured to protrude from the lower side of the Note that a bolt hole 24a is bored at the tip of the horizontal portion of the L-shaped metal fitting protruding from the overhanging portion 10.

また、図示は省略するが、L形金物とH形梁鉄骨3とは
、ボルト・ナットや溶接等により固定してもよい。
Further, although not shown, the L-shaped hardware and the H-shaped beam steel frame 3 may be fixed using bolts, nuts, welding, or the like.

次に、床スラブ取合部25は、第3図,第5図に示すよ
うに、L形鉄筋25aと直線状の鉄筋25bを、L形鉄
筋25aの先端が張出し部分10の側面中央部からやや
下部に、直線状の鉄筋25bの先端が張出し部分10の
側面下部に、各々突出するようにしたものである。
Next, as shown in FIG. 3 and FIG. At a slightly lower portion, the tips of linear reinforcing bars 25b are arranged to protrude to the lower side of the overhanging portion 10, respectively.

なおこの場合も図示は省略するが、L形鉄筋25a,直
線状の鉄筋25bとH形梁鉄骨3とは、ボルト・ナット
や溶接等により固定してもよい。
Although not shown in the drawings in this case, the L-shaped reinforcing bars 25a, the linear reinforcing bars 25b, and the H-shaped beam steel frame 3 may be fixed using bolts and nuts, welding, or the like.

以上の態様で床スラブ取合部24,25を突設する場合
は、第2図〜第5図に示すように、梁の下方に床スラブ
26を施工する所謂逆梁方式となるが、床スラブ取合部
24,25を第6図〜第9図のように張出し部分10の
側面上部に突設させて梁の上方に床スラブ26を施工す
る通常の梁方式とすることもできる。
When the floor slab connecting parts 24 and 25 are installed protrudingly in the above manner, as shown in FIGS. 2 to 5, the so-called reverse beam method is used in which the floor slab 26 is constructed below the beam. It is also possible to use a normal beam method in which the slab connecting parts 24 and 25 are provided protrudingly from the upper side of the overhanging portion 10 as shown in FIGS. 6 to 9, and the floor slab 26 is constructed above the beam.

以上のように構成される本発明ユニットは、現場におい
て、既に立設されている柱主筋を貫通孔23に挿入し、
梁鉄骨3の各接続端部及び上・下端筋4.6の各接続端
部を、同様な構成でなる他のユニットの梁鉄骨並びに上
・下端筋に接合することで組込まれ、その後床スラブの
施工や柱部へのコンクリート打設が行われる。そして、
この柱下部へのコンクリート打設の際には、コンクリー
ト充填用孔22からグラウトが行われ、柱・梁接合部部
材8周辺のコンクリート充填度も充分なものとなる。
The unit of the present invention configured as described above inserts the column main reinforcement that has already been erected into the through hole 23 at the site,
It is assembled by joining each connection end of the beam steel frame 3 and each connection end of the upper and lower end reinforcements 4.6 to the beam steel frame and upper and lower end reinforcements of other units with a similar configuration, and then the floor slab is assembled. construction and pouring concrete into the pillars. and,
When pouring concrete into the lower part of the column, grouting is carried out through the concrete filling hole 22, and the degree of concrete filling around the column-beam joint member 8 is also sufficient.

なお、以上の実施例では、概略丁字形の本発明ユニット
を示したが、概略L字形のユニットとすることもできる
し、直線状のユニットとすることもでき、あるいは4つ
の張出し部分を鉄骨柱を中心として直交させるように構
成して十字形のユニットとすることもでき、更に5つ以
上の張出し部分を構成して各種形状のユニットとするこ
ともできる。
In the above embodiments, a roughly T-shaped unit of the present invention has been shown, but it can also be a roughly L-shaped unit, a linear unit, or the four overhanging parts can be formed from steel columns. It is also possible to form a cross-shaped unit by arranging the two parts to be perpendicular to each other with the two parts at the center, or to form units of various shapes by forming five or more overhanging parts.

《発明の効果》 以上詳述した本発明ユニットにおいては、次のような効
果を奏することができる。
<<Effects of the Invention>> The unit of the present invention described in detail above can have the following effects.

(1)柱・梁接合部部材は工場にてプレキャストされて
いるため、接合部分(仕口部)の品質が向上する。この
ため、従来不可欠であった高品質・高コストのコンクリ
ートの使用や、無ボイドでのコンクリート打設作業、あ
るいは高強度・高コストの鉄筋の多数使用等は、必要と
されず、材料費や工事費を大幅に低減できる。
(1) Since the column/beam joint parts are precast at the factory, the quality of the joint parts (joint parts) is improved. For this reason, the use of high-quality, high-cost concrete, void-free concrete pouring work, and the use of large numbers of high-strength, high-cost reinforcing bars, which were previously essential, are no longer necessary, and material costs are reduced. Construction costs can be significantly reduced.

(2)柱・梁接合部部材にコンクリート充填用孔を備え
たので、柱・梁接合部のコンクリート充填度も充分なも
のとすることができると共に、品質良好なSRC構造を
提供することができる。
(2) Since the column-beam joint member is provided with a hole for concrete filling, the degree of concrete filling of the column-beam joint can be made sufficient, and an SRC structure with good quality can be provided. .

(3)現場における作業は大幅に単純化し、かつ減少す
るため、工期を大幅に短縮できる。
(3) Since the work on site is greatly simplified and reduced, the construction period can be significantly shortened.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明の好適な一実施例を示し、第1図(A)
は斜視図、第1図(B)は平面図、第2図〜第5図は床
スラブ取合部の例を示す断面図、第6図〜第9図は床ス
ラブ取合部の他の例を示す断面図、第10図は従来の半
PC梁を示す斜視図、第11図は先提案のPC部材を示
す斜視図である。 3・・・・・・・・・梁鉄骨 4,6・・・梁鉄筋(上・下端筋) 8・・・・・・・・・柱・梁接合部部材21・・・・・
・鉄骨柱 22・・・・・・コンクリート充填用孔23・・・・・
・貫通孔
FIG. 1 shows a preferred embodiment of the present invention, and FIG.
is a perspective view, FIG. 1(B) is a plan view, FIGS. 2 to 5 are cross-sectional views showing examples of floor slab joints, and FIGS. 6 to 9 are views of other floor slab joints. FIG. 10 is a sectional view showing an example, FIG. 10 is a perspective view showing a conventional half PC beam, and FIG. 11 is a perspective view showing a previously proposed PC member. 3...Beam steel frames 4, 6...Beam reinforcing bars (upper and lower end reinforcements) 8...Column/beam joint member 21...
・Steel column 22... Concrete filling hole 23...
・Through hole

Claims (1)

【特許請求の範囲】[Claims] 柱・梁仕口部を構成すると共にその端部から梁鉄骨及び
梁鉄筋の接続端部が突出されて、全体がプレキャスト化
された柱、梁接合部部材と、該柱・梁接合部部材にこれ
を貫通させて一体的に設けられた鉄骨柱と、上記柱・梁
接合部部材の上記鉄骨柱の貫通部に形成されたコンクリ
ート充填用孔と、上記柱・梁接合部部材に配設され柱主
筋が挿通される貫通孔とを備えたことを特徴とする柱・
梁仕口部ユニット。
Column and beam joint members that constitute a column and beam joint part and have connection ends of the beam steel frame and beam reinforcing bars protrude from the ends thereof and are entirely precast, and the column and beam joint members. A steel column integrally provided through this, a concrete filling hole formed in the penetrating portion of the steel column of the column-beam joint member, and a concrete filling hole provided in the column-beam joint member. A column characterized by having a through hole through which a column main reinforcement is inserted.
Liang joint unit.
JP63283896A 1988-11-11 1988-11-11 Prefabricated unit made of steel reinforced concrete Expired - Lifetime JPH0751802B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63283896A JPH0751802B2 (en) 1988-11-11 1988-11-11 Prefabricated unit made of steel reinforced concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63283896A JPH0751802B2 (en) 1988-11-11 1988-11-11 Prefabricated unit made of steel reinforced concrete

Publications (2)

Publication Number Publication Date
JPH02132236A true JPH02132236A (en) 1990-05-21
JPH0751802B2 JPH0751802B2 (en) 1995-06-05

Family

ID=17671585

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63283896A Expired - Lifetime JPH0751802B2 (en) 1988-11-11 1988-11-11 Prefabricated unit made of steel reinforced concrete

Country Status (1)

Country Link
JP (1) JPH0751802B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6383557B2 (en) * 2014-04-07 2018-08-29 株式会社竹中工務店 Fall prevention wall

Also Published As

Publication number Publication date
JPH0751802B2 (en) 1995-06-05

Similar Documents

Publication Publication Date Title
JPH02136444A (en) Construction of composite structure consisting of precast reinforced concrete column and steel structural beam
JPH11100854A (en) Building and foundation structure therefor
JP2927402B2 (en) Column-beam joint structure of concrete building
JPH02132236A (en) Column and beam joint section unit
JPH06185111A (en) Precast concrete beam and column and construction method of earthquake-proof wall using them
JPH02272125A (en) Method of connecting steel-framed reinforced precast concrete column and steel-framed beam
JP2972962B2 (en) Connection structure
JPH0366878A (en) Construction method for precast column and beam and precast anti-seismic wall
JPH10280541A (en) Frame of mixed structure and constructing method of the frame
JPH0715183B2 (en) Connection structure of precast steel concrete columns
JPH09177240A (en) Precast ferro-concrete beam and its installing method
JPH0732706Y2 (en) Reinforcement structure of precast reinforced concrete columns and crossed steel frames for joining steel beams
JPH06299718A (en) Construction of wall, floor in atomic power plant and wall slab thereof
JP2893406B2 (en) Precast concrete beam-column joining method
JP3125165B2 (en) Warehouse frame
JP2973009B2 (en) Connection method between synthetic steel beams and steel bars or steel reinforced concrete columns
JP2023149166A (en) Reinforcement connection part structure for existing frame member
JPH0480169B2 (en)
JPH0823148B2 (en) Drop-in steel column base
JPS6254943B2 (en)
JPH0443521Y2 (en)
JPH02236328A (en) Construction method for super-highrice building
JP2554535B2 (en) Steel beam / reinforced concrete column composite construction method
JPH0732642Y2 (en) Beam-column joint structure
JPH10131353A (en) Precast reinforced concrete made continuous layer earthquake resisting wall