JPH0143086B2 - - Google Patents

Info

Publication number
JPH0143086B2
JPH0143086B2 JP7640180A JP7640180A JPH0143086B2 JP H0143086 B2 JPH0143086 B2 JP H0143086B2 JP 7640180 A JP7640180 A JP 7640180A JP 7640180 A JP7640180 A JP 7640180A JP H0143086 B2 JPH0143086 B2 JP H0143086B2
Authority
JP
Japan
Prior art keywords
formwork
waterway
formworks
concrete
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP7640180A
Other languages
Japanese (ja)
Other versions
JPS573906A (en
Inventor
Koichi Hirata
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Metal Products Co Ltd
Original Assignee
Nippon Steel Metal Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Metal Products Co Ltd filed Critical Nippon Steel Metal Products Co Ltd
Priority to JP7640180A priority Critical patent/JPS573906A/en
Publication of JPS573906A publication Critical patent/JPS573906A/en
Publication of JPH0143086B2 publication Critical patent/JPH0143086B2/ja
Granted legal-status Critical Current

Links

Description

【発明の詳細な説明】 本発明は、水路を築造する為の型枠装置に係
り、詳しくは走行移動してカーブのある水路の左
右両側壁を築造していく水路型枠装置に関するも
のである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a formwork device for constructing a waterway, and more particularly to a waterway formwork device that travels and moves to build both left and right walls of a curved waterway. .

従来の水路を築造する装置は、左右両側壁のコ
ンクリート打設を終つて、次のコンクリート打設
個所に移動する際、左右両側壁の内外の型枠をク
レーンで吊り上げて移動するか、解体して運搬し
なければならないので、甚だ作業性が悪かつた。
With conventional waterway construction equipment, when moving to the next concrete placement site after placing concrete on both left and right walls, the formwork inside and outside the left and right walls must be lifted up by a crane and moved or dismantled. As the material had to be transported by hand, the workability was extremely poor.

このようなことから近時、レール上を走行可能
になした門型架構の左右両側部に、水路の左右両
側壁の内・外面型枠を吊垂した水路型枠装置が開
発され、使用されている。
For this reason, a waterway formwork device has recently been developed and used, in which the inner and outer formwork of the left and right side walls of the waterway are suspended from the left and right sides of a gate-shaped structure that can run on rails. ing.

然し乍ら、この水路型枠装置は、真直ぐな水路
の築造の場合は良いが、カーブのある水路の築造
は不可能である。従つて、カーブのある水路の左
右両側壁の築造の際には、在来のように型枠をそ
の都度組立て、コンクリート打設が終つて養生期
間が過ぎると、解体して次のコンクリート打設場
所へ運搬して再び組立てていたので、甚だ施工能
率が悪かつた。
However, although this channel formwork device is suitable for constructing straight channels, it is not possible to construct curved channels. Therefore, when constructing the left and right walls of a curved waterway, the formwork is assembled each time as in the conventional method, and after the concrete pouring is completed and the curing period has passed, it is dismantled and used for the next concrete pouring. The construction efficiency was extremely poor because the parts had to be transported to different locations and reassembled.

本発明はかかる実情に鑑みなされたものであ
り、築造しようとする水路がカーブしていても走
行移動でき、しかも左右両側壁の内・外面型枠を
水路のカーブに沿つてセツトしてコンクリート打
設を行なうことができ、コンクリート打設後はそ
の左右両側壁の内・外面型枠を取外して走行移動
し、他の養生期間終了後の左右両側壁の内・外面
型枠を取付けて次のコンクリート打設場所に走行
移動できるようにした水路型枠装置を提供せんと
するものである。
The present invention has been developed in view of the above circumstances, and it is possible to move even if the waterway to be constructed is curved, and the inner and outer formwork of the left and right walls are set along the curve of the waterway and concrete is poured. After pouring concrete, the inner and outer formwork of the left and right walls are removed and the vehicle is moved, and after another curing period, the inner and outer formwork of the left and right walls are installed and the next step is carried out. It is an object of the present invention to provide a waterway formwork device that can be moved to a concrete placement site.

以下本発明による水路型枠装置の一実施例を図
によつて説明すると、第1,2,3図において1
は予め施工された水路の底盤で、2はその底盤1
上に敷設されたレール、3はこのレール2上に走
行可能に設けられた本発明の水路型枠装置であ
る。この水路型枠装置3は、架台4の前後端部に
ボギー台車5を配設して成るボギー車6にてカー
ブのあるレール2上においても走行できるように
してあり、ボギー車6の架台4上の前後両端部に
は左右両側に支持柱7を立設してあり、この前後
両端部の支持柱7間には縦架構8をジヤツキ9に
て昇降可能に架設してある。この縦架構8の長手
方向には所要の間隔を存して、本例では縦架構8
の前部と後部に各1本、中間部に2本の左右両外
側方に突出するH形鋼を横倒しにした横架材10
を固設してあり、各横架材10の左右両側部には
夫々一対のギヤードトロリー11を走行可能に設
けてある。各一対のギヤードトロリー11には水
路の側壁をコンクリート打設する為の内面型枠1
2と外面型枠13がその前後端及び中間位置にて
着脱可能且つ回動可能に吊垂支持してある。左右
の内面型枠12の上部と前記横架材10の中間部
との間にサポートジヤツキ14を張設し、また左
右の内面型枠12の下部と前記ボギー車6の架台
4上の通し材4aとの間にサポートジヤツキ14
を張設し、さらに左右の外面型枠13の上部と前
記横架材10の端部との間にサポートジヤツキ1
4を張設してある。前記各サポートジヤツキ14
の内、横架材10と結合するサポートジヤツキ1
4はその結合位置を移動調整できるように、横架
材10に多数のボルト穴を一定間隔に穿設してあ
る。
Hereinafter, one embodiment of the waterway formwork apparatus according to the present invention will be explained with reference to the drawings.
is the bottom plate of the waterway that has been constructed in advance, and 2 is the bottom plate 1 of the waterway constructed in advance.
The rail 3 laid on top is the waterway formwork device of the present invention that is movable on this rail 2. This waterway formwork device 3 is configured so that it can run even on curved rails 2 with a bogie car 6 which has bogie carts 5 arranged at the front and rear ends of a pedestal 4. Support columns 7 are erected on both the left and right sides at both the front and rear ends, and a vertical frame 8 is installed between the support columns 7 at both the front and rear ends so that it can be raised and lowered by a jack 9. A required interval is provided in the longitudinal direction of this vertical frame 8, and in this example, the vertical frame 8
Horizontal structural member 10 made by laying down H-beams, one each at the front and rear, and two in the middle, protruding outward on both the left and right sides.
A pair of geared trolleys 11 are movably provided on both left and right sides of each horizontal member 10. Each pair of geared trolleys 11 has an inner formwork 1 for pouring concrete into the side walls of the waterway.
2 and an external formwork 13 are suspended and supported in a removable and rotatable manner at their front and rear ends and intermediate positions. A support jack 14 is stretched between the upper part of the left and right inner formworks 12 and the middle part of the horizontal member 10, and a through member is provided between the lower part of the left and right inner formworks 12 and the frame 4 of the bogie 6. Support jack 14 between 4a
Further, support jacks 1 are provided between the upper portions of the left and right external formworks 13 and the ends of the horizontal members 10.
4 is attached. Each of the support jacks 14
Among them, the support jack 1 connected to the horizontal member 10
4 has a large number of bolt holes drilled at regular intervals in the horizontal member 10 so that the joint position thereof can be moved and adjusted.

前記内面型枠12及び外面型枠13の第4図に
示す横方向の各単位型枠12a間及び13a間に
は夫々屈曲し得る可撓型枠15及び15′を配設
してあり、内面型枠12の端部と外面型枠13の
端部との間にはコンクリート打設時妻型枠16を
配するものであり、この妻型枠16には内面型枠
12及び外面型枠13のカーブに対応させて夫々
の型枠12,13にボルト結合する為に離心円の
ボルト穴17を設けてある。また妻型枠16の内
側には水路の側壁の継手部を形成する凹溝18を
設けてある。
Flexible forms 15 and 15', which can be bent, are arranged between the unit formworks 12a and 13a in the horizontal direction shown in FIG. 4 of the inner formwork 12 and the outer formwork 13, respectively. A gable formwork 16 is placed between the end of the formwork 12 and the outer formwork 13 during concrete pouring, and the gable formwork 16 includes the inner formwork 12 and the outer formwork 13. Eccentric bolt holes 17 are provided for bolt connection to the respective formworks 12 and 13 in correspondence with the curves of the molds. Further, on the inside of the gable form 16, a groove 18 is provided which forms a joint part of the side wall of the water channel.

尚、図示せぬが縦架構8及び横架材10には作
業足場が設けられ、ボギー車6の架台4及び縦架
構8には適宜吊り梯子が設けられている。
Although not shown, work scaffolds are provided on the vertical frame 8 and the horizontal frame 10, and hanging ladders are appropriately provided on the mount 4 of the bogie 6 and the vertical frame 8.

次に上述の如く構成された本発明の水路型枠装
置3によつてカーブする水路の側壁を築造する場
合について説明する。先ず第1図に示す如く予め
施工された水路の底盤1上に敷設せるカーブした
レール2上を、水路型枠装置3を走行させて所要
の位置で停止した後、ジヤツキ9にて縦架構8を
所要の高さ位置に位置せしめる。次に第2図に示
す如く各横架材10の左右両側部の一対のギヤー
ドトロリー11に吊垂支持された内面型枠12と
外面型枠13を各サポートジヤツキ14にて押出
し、ギヤードトロリー11にて走行させて所要の
位置に移動する。次いで左右両側の内面型枠12
と外面型枠13の間隔を保持すべく縦端太材12
b,13bの上端間に幅止め19を張架し、縦端
太材12b,13bの中高部間及び下端間にはセ
パレーター20を介在して木コーン21及びフオ
ームタイ22を張架する。次に内面型枠12の各
単位型枠と横端太材12c,12dとの間に第4
図に示す如くキヤンバー23、通し角端太材24
を圧装し、また外面型枠13の各単位型枠と横端
太材13c,13dとの間にキヤンバー23、通
し角端太材24を圧装し、内・外面型枠12,1
3の各単位型枠間の可撓型枠15,15′を屈曲
させて、内・外面型枠12,13全体を鉄筋を配
した築造しようとする水路の側壁のカーブに沿わ
せる。然る後左右両側の内・外面型枠12,13
の端部間を塞ぐべく妻型枠16を配し、内・外面
型枠12,13の端部のボルト穴と妻型枠16の
離心円のボルト穴17とにボルトに挿通し、ナツ
トにて締付け固定する。そして妻型枠16の外面
と内外の横端太材12c,12d,13c,13
dの端部間に張架した幅止め25との間に通し角
端太材24、キヤンバー23を圧装して、妻型枠
16を押える。また妻型枠16の内側の凹溝18
内には止水板26を配設する。
Next, a case will be described in which a side wall of a curved waterway is constructed using the waterway formwork apparatus 3 of the present invention configured as described above. First, as shown in FIG. 1, the waterway formwork device 3 is run on a curved rail 2 laid on the bottom plate 1 of the waterway that has been constructed in advance, and after stopping at a required position, the vertical frame 8 is moved using jacks 9. position at the required height. Next, as shown in FIG. 2, the inner formwork 12 and the outer formwork 13 suspended and supported by a pair of geared trolleys 11 on the left and right sides of each horizontal member 10 are pushed out by each support jack 14, and the geared trolley 11 to run and move to the required position. Next, the inner formwork 12 on both the left and right sides
In order to maintain the distance between the outer formwork 13 and the outer formwork 13,
A width stopper 19 is stretched between the upper ends of the thick vertical members 12b and 13b, and a wooden cone 21 and a form tie 22 are stretched between the middle and lower ends of the thick vertical members 12b and 13b with a separator 20 interposed therebetween. Next, a fourth
As shown in the figure, a camber 23, a square end piece 24
In addition, a camber 23 and a through square end member 24 are pressed between each unit formwork of the external formwork 13 and the horizontal thick members 13c and 13d, and the inner and outer formworks 12 and 1 are pressed together.
The flexible formworks 15 and 15' between the unit formworks 3 are bent to make the entire inner and outer formworks 12 and 13 follow the curve of the side wall of the waterway to be constructed, which is equipped with reinforcing bars. After that, inner and outer formwork 12, 13 on both left and right sides
A gable formwork 16 is arranged to close the space between the ends of the gable formwork 16, and the bolts are inserted into the bolt holes at the ends of the inner and outer formworks 12 and 13 and the bolt holes 17 on the eccentric circle of the gable formwork 16, and the nuts are inserted into the bolt holes. Tighten and secure. And the outer surface and inner and outer side thick members 12c, 12d, 13c, 13 of the gable formwork 16.
The gable formwork 16 is held down by pressing the square end material 24 and the camber 23 between the width stopper 25 stretched between the ends of d. Also, the groove 18 inside the gable formwork 16
A water stop plate 26 is disposed inside.

かように本発明の水路型枠装置3をセツトした
ならば、内部にコンクリート27を打設し、翌日
固化したならば、左右両側の内・外面型枠12,
13からサポートジヤツキ14の一端を取外し、
内・外面型枠12,13の上端をギヤードトロリ
ー11から取外し、ギヤードトロリー11を横架
材10上を夫々内側方或いは外側方に走行移動さ
せた上でジヤツキ9にて縦架構8を所要の高さま
で上昇させ、然る後ボギー車4を次のコンクリー
ト打設位置、つまり本発明の水路型枠装置におけ
る1回のコンクリート打設長さの間隔を置いた位
置に走行移動し、ジヤツキ9にて縦架構8を所要
の高さまで下降し、ここで新たに各ギヤードトロ
リー11に左右の内・外面型枠12,13を吊垂
支持し、且つその内・外面型枠12,13に各サ
ポートジヤツキ14の一端を結合する。そして
内・外面型枠12,13を前述と同様に鉄筋を配
した築造しようとする側壁のカーブに沿わせてセ
ツトし、且つ妻型枠16も前述の如くセツトし、
その内側の凹溝18内に止水板26を配して、
内・外面型枠12,13内にコンクリート27を
打設する。
Once the waterway formwork device 3 of the present invention has been set up in this way, concrete 27 is cast inside, and when it hardens the next day, the inner and outer formwork 12 on both the left and right sides,
Remove one end of the support jack 14 from 13,
The upper ends of the inner and outer formworks 12 and 13 are removed from the geared trolley 11, and the geared trolley 11 is moved inwardly or outwardly on the horizontal members 10, respectively, and then the vertical frame 8 is moved to the required position using the jacks 9. After that, the bogie car 4 is moved to the next concrete placement position, that is, a position at an interval equal to the length of one concrete placement in the waterway formwork apparatus of the present invention, and the jack 9 The vertical frame 8 is lowered to the required height, and the left and right inner and outer formworks 12 and 13 are newly suspended from each geared trolley 11, and each support gear is attached to the inner and outer formworks 12 and 13. Connect one end of the lug 14. Then, the inner and outer formwork 12 and 13 are set along the curve of the side wall to be constructed with reinforcing bars in the same manner as described above, and the end formwork 16 is also set as described above.
A water stop plate 26 is arranged in the inner groove 18,
Concrete 27 is placed inside the inner and outer formworks 12 and 13.

以後前記工程を繰返して、第5図に示す如く水
路の側壁を間欠的に○イ、○ロ、○ハ、○ニとコンクリ

ト打設を行なう。この間に最初にコンクリート打
設したイの部分の側壁の養生期間が終了するの
で、内・外面型枠12,13を取外した水路型枠
装置をニの部分からイの部分に走行移動し、ジヤ
ツキ9にて縦架構8を所要の高さまで下降し、各
ギヤードトロリー11にイの部分の側壁の内・外
面型枠12,13を吊垂支持し、各サポートジヤ
ツキ14の一端を内・外面型枠12,13に結合
する。そして内・外面型枠12,13の横端太材
の端部間の幅止め25を取外し、該部分のキヤン
バー23、通し角端太材24を取外して、妻型枠
16を脱型する。また内・外面型枠12,13の
縦端太材の上端間の幅止め19を取外し、中高部
間及び下端間のセパレーター20、木コーン2
1、フオームタイ22等を内外面型枠12,13
から解放する。次に各サポートジヤツキ14を短
縮して内・外面型枠12,13をその吊垂支持点
を中心に回動させて脱型すると共に、ギヤードト
ロリー11を横架材10上を走行させて内・外面
型枠12,13を側壁の内側方及び外側方に移動
させる。次いで水路型枠装置3をコンクリート養
生中のロ、ハ、ニの部分の内・外面型枠12,1
3を避けてレール2上を走行させ、コンクリート
打設したニの部分より先方の1回のコンクリート
打設長さの間隔をおいた位置に移動し、ここで
内・外面型枠12,13及び架台4上に載せて運
搬してきた妻型枠16を、前述の如くカーブさせ
て配設した鉄筋に沿つてセツトし、妻型枠16の
内側の凹溝18内に止水板26を配し、内・外面
型枠12,13内にコンクリート27を打設す
る。
Thereafter, the above-mentioned process is repeated, and concrete is poured intermittently on the side walls of the waterway in the order of ○A, ○B, ○C, and ○D, as shown in FIG. During this time, the curing period for the side wall of the part A, where the concrete was poured first, has finished, so the waterway formwork device from which the inner and outer formwork 12 and 13 have been removed is moved from the part D to the part A, and the jacking is completed. At step 9, the vertical frame 8 is lowered to the required height, and the inner and outer formwork 12 and 13 of the side wall of the section A are suspended from each geared trolley 11, and one end of each support jack 14 is attached to the inner and outer side walls. It is connected to the formworks 12 and 13. Then, the width stopper 25 between the ends of the horizontal end pieces of the inner and outer formworks 12 and 13 is removed, the camber 23 and the through square end pieces 24 are removed, and the end formwork 16 is demolded. Also, remove the width stopper 19 between the upper ends of the vertical thick materials of the inner and outer formworks 12 and 13, and remove the separator 20 between the middle and high parts and between the lower ends, and the wooden cone 2.
1. Connect the form ties 22, etc. to the inner and outer formwork 12, 13
Free from. Next, each support jack 14 is shortened and the inner and outer formworks 12 and 13 are rotated around their hanging support points to remove the mold, and the geared trolley 11 is run on the horizontal member 10. The inner and outer formworks 12 and 13 are moved inward and outward of the side wall. Next, the waterway formwork device 3 is used to form the inner and outer formworks 12 and 1 of parts B, C, and D during concrete curing.
3, run on the rail 2, and move to a position ahead of the part 2 where the concrete was poured, at an interval equal to the length of one concrete pouring, and here, the inner and outer formworks 12, 13 and The gable form 16 carried on the frame 4 is set along the curved reinforcing bars as described above, and the water stop plate 26 is placed in the groove 18 inside the gable form 16. , concrete 27 is placed inside the inner and outer formworks 12 and 13.

次に内・外面型枠12,13をサポートジヤツ
キ14、ギヤードトロリー11から切離して水路
型枠装置3を先にコンクリート打設したロの部分
に走行移動し、該部分の側壁の内・外面型枠1
2,13を結合して、該内・外面型枠12,13
及び妻型枠16を取外す。そして水路型枠装置3
をイの部分の側壁とロの部分の側壁との間に走行
移動し、このロ′の部分で内・外面型枠12,1
3をセツトしてコンクリート27を打設する。
Next, the inner and outer formworks 12 and 13 are separated from the support jack 14 and the geared trolley 11, and the waterway formwork device 3 is moved to the part B where concrete was poured first, and the inner and outer surfaces of the side walls of the part are moved. Formwork 1
2 and 13 to form the inner and outer formworks 12 and 13.
and remove the gable formwork 16. and waterway formwork device 3
is moved between the side wall of the part A and the side wall of the part B, and the inner and outer formworks 12 and 1 are moved in the part B'.
3 and pour concrete 27.

以後同様の手順にてハの部分の脱型、ハ′の部
分のコンクリート打設、ニの部分の脱型、ニ′の
部分のコンクリート打設、イ′の部分の脱型、
イ′の部分のコンクリート打設、ロ′の部分の脱
型、ロ″の部分のコンクリート打設、ハ′の部分の
脱型、ハ″の部分のコンクリート打設、ニ′の部分
の脱型、ニ″の部分のコンクリート打設を行なつ
ていく。
After that, follow the same procedure to demold part C, place concrete in part C', demold part 2, pour concrete in part D', demold part A',
Concrete pouring for part A', demolding for part B', pouring concrete for part B'', demolding for part C', pouring concrete for part C'', demolding for part D' , Concrete pouring will be carried out on the 2″ section.

尚、上記実施例は内・外面型枠4組を順次繰返
し使用して側壁のコンクリート打設を行なつてい
く場合であるが、これに限るものではない。
In the above embodiment, the four sets of inner and outer formwork are sequentially and repeatedly used to place concrete for the side walls, but the present invention is not limited to this.

また上記実施例は、カーブのある水路の側壁を
築造する場合であるが、勿論真直ぐな水路の側壁
を築造する場合にも本発明の水路型枠装置は使用
できるものである。この場合、内・外面型枠1
2,13の各単位型枠間の可撓型枠15,15′
の変形を防ぐ為に前後の横端太材12c,12d
及び13c,13d間にプレートを連結したり、
可撓型枠15,15′の外側において横端太材と
の間にキヤンバーや通し角端太材を圧装したりす
ると良い。
Furthermore, although the above embodiments are for constructing the side walls of a curved waterway, the waterway formwork apparatus of the present invention can of course also be used for constructing the sidewalls of a straight waterway. In this case, the inner and outer formwork 1
Flexible formwork 15, 15' between each unit formwork 2, 13
To prevent deformation of the
and connecting a plate between 13c and 13d,
It is preferable to press a camber or a square end member between the flexible formwork 15, 15' and the horizontal end member.

以上の説明で判るように本発明の水路型枠装置
は、左右両側の内・外面型枠の脱型をジヤツキで
行ない、ギヤードトロリーにて内面型枠、外面型
枠を夫々内側方、外側方に寄せるので、側壁のコ
ンクリート打設場所に走行移動する際、その移動
途中にコンクリート養生中の型枠があつても何ら
支障なく走行移動できる。
As can be seen from the above description, the waterway formwork apparatus of the present invention uses jacks to remove the inner and outer formwork on both the left and right sides, and then uses a geared trolley to remove the inner and outer formwork from the inner and outer sides, respectively. Therefore, when traveling to the concrete placement site for the side wall, even if there is a formwork that is curing concrete on the way, it can be moved without any problem.

また本発明の水路型枠装置は、ボギー車にて走
行移動するので、カーブ地点でも何ら支障なく走
行移動できる。
Furthermore, since the waterway formwork apparatus of the present invention is moved by a bogie, it can be moved even at curved points without any problems.

さらに本発明の水路型枠装置は、内・外面型枠
の横方向の各単位型枠間に可撓型枠が配され、し
かも内・外面型枠の端部間に配される妻型枠には
内面型枠と外面型枠との結合位置を調整できるよ
うに離心円のボルト穴が設けられているので、カ
ーブのある水路の側壁を築造する為の型枠を簡単
にセツトしてコンクリート打設を行なうことがで
きる。
Further, in the waterway formwork apparatus of the present invention, a flexible formwork is arranged between each unit formwork in the lateral direction of the inner and outer formworks, and a gable formwork is arranged between the ends of the inner and outer formworks. The is equipped with eccentric bolt holes to adjust the joining position of the inner formwork and the outer formwork, so it is easy to set the formwork for constructing the side wall of a curved waterway and add concrete. Pouring can be carried out.

さらに本発明の水路型枠装置は、内・外面型
枠、妻型枠の着脱が容易であるので、コンクリー
ト打設後これらを取外して次のコンクリート打設
場所に移動し、新たに内・外面型枠、妻型枠をセ
ツトしてコンクリート打設を行なうことを順次行
なうことができる。従つてコンクリート養生期間
中水路型枠装置を遊休させることなく使用でき
て、水路の築造を能率良く行なうことができ、工
期を短縮できる等の優れた効果がある。
Furthermore, the channel formwork device of the present invention allows for easy installation and removal of the inner/outer formwork and gable formwork, so after concrete is poured, these can be removed and moved to the next concrete placement site, and new inner/outer formwork can be installed. It is possible to sequentially set the formwork and gable formwork and pour concrete. Therefore, the waterway formwork device can be used without being left idle during the concrete curing period, and the waterway construction can be carried out efficiently, resulting in excellent effects such as shortening the construction period.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明による水路型枠装置の概略平面
図、第2図はコンクリート打設時の本発明の水路
型枠装置の拡大正面図、第3図は本発明の水路型
枠装置の前半部の側面図、第4図は内・外面型枠
及び妻型枠のセツト状態を示す拡大要部平面図、
第5図は本発明の水路型枠装置によりカーブした
水路の側壁を築造していく順序を示す図である。 1……水路の底盤、2……レール、3……水路
型枠装置、4……架台、5……ボギー台車、6…
…ボギー車、7……支持柱、8……縦架構、9…
…ジヤツキ、10……横架材、11……ギヤード
トロリー、12……内面型枠、13……外面型
枠、14……サポートジヤツキ、15,15′…
…可撓型枠、16……妻型枠、17……離心円の
ボルト穴、18……凹溝、19……幅止め、20
……セパレーター、21……木コーン、22……
フオームタイ、23……キヤンバー、24……通
し角端太材、25……幅止め、26……止水板、
27……コンクリート。
FIG. 1 is a schematic plan view of the waterway formwork device according to the present invention, FIG. 2 is an enlarged front view of the waterway formwork device of the present invention during concrete pouring, and FIG. 3 is the first half of the waterway formwork device according to the present invention. Fig. 4 is an enlarged plan view of the main part showing the set state of the inner/outer formwork and the end formwork;
FIG. 5 is a diagram showing the order in which side walls of a curved waterway are constructed using the waterway formwork apparatus of the present invention. 1... Bottom plate of the waterway, 2... Rail, 3... Waterway formwork device, 4... Frame, 5... Bogie truck, 6...
...Bogie car, 7... Support column, 8... Vertical frame, 9...
...Jacket, 10...Horizontal member, 11...Geared trolley, 12...Inner formwork, 13...Outer formwork, 14...Support jack, 15, 15'...
... Flexible formwork, 16 ... End formwork, 17 ... Eccentric bolt hole, 18 ... Concave groove, 19 ... Width stop, 20
... Separator, 21 ... Wood cone, 22 ...
Form tie, 23...camber, 24...through square end piece, 25...width stopper, 26...water stop plate,
27...Concrete.

Claims (1)

【特許請求の範囲】[Claims] 1 ボギー車上の前後端部に支持柱を立設し、こ
の前後の支持柱間に縦架構を昇降可能に設け、縦
架構の長手方向には所要の間隔を存して左右両外
側方に突出する横架材を固設し、各構架材の左右
両側部には夫々一対のギヤードトロリーを走行可
能に設けてその一対のギヤードトロリーに水路の
側壁の内面型枠と外面型枠を着脱可能に吊垂支持
し、左右の内面型枠の上部と下部には前記横架材
及びボギー車との間でサポートジヤツキを設け、
左右の外面型枠の上部には横架材の端部との間で
サポートジヤツキを設け、前記内面型枠及び外面
型枠の横方向の各単位型枠間には可撓型枠を配
し、内面型枠と外面型枠の端部間には横方向の取
付位置調整可能な離心円を有する妻型枠を設けて
成る水路型枠装置。
1 Support columns are erected at the front and rear ends of the bogie, and a vertical frame is installed between the front and rear support columns so that it can be raised and lowered, and the vertical frame projects outwardly on both the left and right sides at a required interval in the longitudinal direction. A pair of geared trolleys are installed on the left and right sides of each structural member so that they can run, and the inner formwork and outer formwork of the side wall of the waterway can be attached and detached to the pair of geared trolleys. Suspended support is provided, and support jacks are provided at the upper and lower parts of the left and right inner formworks between the horizontal members and the bogie car,
A support jack is provided at the upper part of the left and right external formworks between the ends of the horizontal members, and a flexible formwork is arranged between each unit formwork in the horizontal direction of the internal formwork and the external formwork. A channel formwork device comprising a gable formwork having an eccentric circle whose attachment position in the lateral direction can be adjusted between the ends of the inner formwork and the outer formwork.
JP7640180A 1980-06-06 1980-06-06 Formwork device for aqueduct Granted JPS573906A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7640180A JPS573906A (en) 1980-06-06 1980-06-06 Formwork device for aqueduct

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7640180A JPS573906A (en) 1980-06-06 1980-06-06 Formwork device for aqueduct

Publications (2)

Publication Number Publication Date
JPS573906A JPS573906A (en) 1982-01-09
JPH0143086B2 true JPH0143086B2 (en) 1989-09-19

Family

ID=13604250

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7640180A Granted JPS573906A (en) 1980-06-06 1980-06-06 Formwork device for aqueduct

Country Status (1)

Country Link
JP (1) JPS573906A (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101153044B1 (en) 2009-07-15 2012-06-04 박병옥 Manufacturing method of concrete waterway
US8852066B2 (en) * 2012-08-06 2014-10-07 Nippon Steel Hardfacing Co., Ltd. Hearth roll having high Mn build-up resistance
CN103526697B (en) * 2013-10-24 2015-07-15 郑州新大方重工科技有限公司 Self-propelled movable formwork for construction of double-rectangle water conservancy aqueduct
CN104195990B (en) * 2014-09-16 2016-03-30 葛洲坝集团第一工程有限公司 Large span U-shaped aqueduct circumferential reinforcement mounting method
CN104895014B (en) * 2015-05-28 2016-08-24 神州建设集团有限公司 A kind of construction method of high-altitude long-span cast-in-place arcading aqueduct supporting die system
CN109371851B (en) * 2018-12-20 2023-11-24 张勇 Groove making machine with multiple bottom die head cover supporting frames
CN109736271A (en) * 2019-01-04 2019-05-10 杜国相 A kind of novel aqueduct construction method

Also Published As

Publication number Publication date
JPS573906A (en) 1982-01-09

Similar Documents

Publication Publication Date Title
US3847341A (en) Collapsible interior form for a monolithic structure
JPH0143086B2 (en)
CN214497202U (en) Strutting arrangement is used in construction of steel-concrete composite beam decking
KR200298104Y1 (en) Mobile form for forming concrete box on construction work
CN110924323A (en) Culvert template trolley
JP3701078B2 (en) Road slab construction method
CN112681162A (en) Construction method for movable split mounting type light formwork cast-in-situ box culvert
US3451108A (en) Movable concrete form with a pair of endless flexible mats
CN112411406A (en) Light truss type porous box culvert template system and construction method
JPH05311617A (en) Construction method for elevated structure
JPS63194070A (en) Execution of culvert by moving type mold frame
CN216809621U (en) Integrated universal hydraulic T-beam template
CN215289775U (en) Early-dismantling formwork system for cast-in-place culvert
CN214497236U (en) Light truss type porous box culvert template system
JPH05195513A (en) Lining work car for arch bridge
KR200267831Y1 (en) Movable Steel Form for Constructing Culvert
CN115419258A (en) Standardized template for beam connection
CN114319141A (en) Integrated universal hydraulic T-beam template
CN114875955A (en) Installation device for overlong concrete linear retaining wall template and construction method thereof
JPH0314327Y2 (en)
CN114941426A (en) Construction method of single-side wall formwork trolley with mechanical demolding device
CN117721777A (en) Assembled composite floor slab and construction method thereof
CN117468505A (en) Assembled template trolley for frame structure construction and construction method thereof
JPH0256450B2 (en)
JPH0352811Y2 (en)