JPH0132339B2 - - Google Patents

Info

Publication number
JPH0132339B2
JPH0132339B2 JP10750283A JP10750283A JPH0132339B2 JP H0132339 B2 JPH0132339 B2 JP H0132339B2 JP 10750283 A JP10750283 A JP 10750283A JP 10750283 A JP10750283 A JP 10750283A JP H0132339 B2 JPH0132339 B2 JP H0132339B2
Authority
JP
Japan
Prior art keywords
column
frame
columns
construction
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP10750283A
Other languages
Japanese (ja)
Other versions
JPS59233049A (en
Inventor
Hitoshi Ide
Kenjiro Akyama
Muneki Ito
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Original Assignee
Shimizu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd filed Critical Shimizu Construction Co Ltd
Priority to JP10750283A priority Critical patent/JPS59233049A/en
Publication of JPS59233049A publication Critical patent/JPS59233049A/en
Publication of JPH0132339B2 publication Critical patent/JPH0132339B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Chemical And Physical Treatments For Wood And The Like (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Joining Of Building Structures In Genera (AREA)

Description

【発明の詳細な説明】 この発明は中低層ビルなどの躯体をなす多層架
構式構築物に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a multi-story frame structure that forms the frame of a medium- to low-rise building.

中低層ビルなどは、従来より鉄筋コンクリート
造(RC造)や鉄骨造(S造)などで建てられて
いる。RC造による建築物は長い実積があり、コ
ストも低いという長所であるが、重量が大きく、
施工に手間を要し、施工期間が長いという難点が
ある。一方、S造は軽量で施工性が良好で現場施
工期間が短いという長所があるものの変形が大き
く、鉄骨加工費用が多くなるなどの難点がある。
Medium- and low-rise buildings have traditionally been constructed using reinforced concrete (RC) or steel frame (S) structures. Buildings made of reinforced concrete have the advantage of long-term construction and low cost, but they are heavy and
The drawback is that construction is time-consuming and the construction period is long. On the other hand, S structures have the advantage of being lightweight, easy to construct, and require a short on-site construction period, but have drawbacks such as large deformation and high steel frame processing costs.

したがつて、現在は個々の建築物の種々の条件
に応じて適切な構造を選択して建設しているのが
実情であつた。
Therefore, the current reality is that buildings are constructed by selecting an appropriate structure according to the various conditions of each building.

この発明は上記事情に鑑みてなされたもので、
コストメリツトの大きいRC造と施工性の良いS
造の長所を生かし、コストダウンと施工性向上と
を同時に得ることのできる多層架構式構築物を提
供することを目的とするものである。
This invention was made in view of the above circumstances,
RC construction with great cost benefits and S with good construction properties
The purpose of the present invention is to provide a multi-layer frame structure that can reduce costs and improve workability at the same time by taking advantage of the advantages of the structure.

以下、図面を参照してこの発明を詳しく説明す
る。
Hereinafter, the present invention will be explained in detail with reference to the drawings.

第1図はこの発明の多層架構式構築物の基本構
造の一例を示すもので、図中符号1は基礎、2は
土間コンクリートである。基礎1…にはプレキヤ
ストコンクリートからなる第1層目の柱3…が立
設され、これら柱3…間には鉄骨骨組からなる第
1層の梁4…が架けわたされて、第1層の架構5
が形成されている。また、上記柱3…の柱脚はヒ
ンジ6…で基礎1…に結合されている。そして、
このような構造の架構5…が3層積み重ねられて
この例の構築物7となつている。
FIG. 1 shows an example of the basic structure of a multi-layer frame structure according to the present invention, in which reference numeral 1 indicates a foundation and 2 indicates a concrete floor. The first layer of columns 3 made of precast concrete are erected on the foundation 1, and the first layer beams 4 made of steel frame are spanned between these columns 3. frame 5
is formed. Further, the column bases of the columns 3 are connected to the foundations 1 by hinges 6. and,
Three layers of frames 5 having such a structure are stacked to form the structure 7 of this example.

このような構造の構築物7にあつては、柱3を
プレキヤストコンクリートとしたので、S造と同
じく施工性が高くなるとともに鉄骨がない分コス
トダウンが計れる。また、柱3の柱脚をヒンジ6
としたので、上層の柱3と下層の柱3との接合に
ほぞ接合等の継手構造を採用でき、柱3と梁4と
の仕口部分プレハブ化が行え、施工が容易にな
り、現場施工時間が短縮できるとともに施工の自
由度が大きくなり、例えば将来の増築の際に有利
となる。さらに、第1層の柱3の柱脚もヒンジ6
としたので、基礎1は鉛直力のみを処理すればよ
く、よつて地中梁が不要となり、これによつても
工期短縮、コストダウンが計れる。
In the structure 7 having such a structure, the pillars 3 are made of precast concrete, which improves the workability as in the case of S construction, and also reduces costs since there is no steel frame. Also, attach the base of column 3 to hinge 6.
Therefore, a joint structure such as a mortise and tenon joint can be used to connect the upper column 3 and the lower column 3, and the joint part between the column 3 and the beam 4 can be prefabricated, making construction easier and requiring less on-site construction. This saves time and increases the degree of freedom in construction, which is advantageous when building an extension in the future, for example. Furthermore, the base of the column 3 in the first layer also has a hinge 6.
Therefore, the foundation 1 only needs to handle vertical forces, thus eliminating the need for underground beams, which also shortens the construction period and reduces costs.

また、床を、デツキプレート、キーストンプレ
ートなどの床鋼板を型枠としてコンクリートを打
設したRC構造とすれば、床コンクリート打設の
ための支保工が不要となり、作業性が良好とな
り、コスト低減を計れる。
In addition, if the floor is an RC structure in which concrete is poured using floor steel plates such as deck plates and keystone plates as formwork, there is no need for shoring for floor concrete pouring, improving workability and reducing costs. can be measured.

第2図は、従来のラーメン構造の柱梁の曲げモ
ーメント図を示し、第3図は、本発明の構築物の
同じく曲げモーメント図を示すものである。この
第2図および第3図からわかるように、本発明の
構造では、柱応力が従来のラーメン構造に比べて
2倍弱となるが、一般にRC造の柱は設計応力に
対して比較的余裕があり、従来のものに比べて鉄
筋量あるいはコンクリート量を増す必要はない。
また、梁応力は従来は上下層の柱の応力の合計で
あるのに対し、この構造では下層の柱の応力のみ
が梁に伝達され、結局梁応力はどちらもほとんど
変らない。したがつて、この発明の構築物は、各
層の柱脚をヒンジとすることによつても構造上な
んら問題がないことがわかる。
FIG. 2 shows a bending moment diagram of a column and beam of a conventional rigid frame structure, and FIG. 3 shows a bending moment diagram of the structure of the present invention. As can be seen from Figures 2 and 3, in the structure of the present invention, the column stress is slightly less than twice that of the conventional rigid-frame structure, but in general, RC columns have a relatively large margin for design stress. There is no need to increase the amount of reinforcing bars or concrete compared to conventional methods.
Furthermore, whereas conventionally beam stress is the sum of the stress of the columns in the upper and lower layers, in this structure only the stress in the columns in the lower layer is transmitted to the beam, and in the end the beam stress remains almost the same in both. Therefore, it can be seen that the structure of the present invention poses no structural problems even when the column bases of each layer are used as hinges.

次に、第4図および第5図を参照して本発明の
多層架構式構築物の構築方法を説明する。まず、
第4図に示すように、上層の柱3aとなるプレキ
ヤストコンクリート柱3の周側面にあらかじめ支
保工8…を取り付けておく。そして、この柱3を
吊り込んで下層の柱3b上に載置すると同時に支
保工8…を下層の梁4…に固定し、上層柱3aの
転倒を防止する。ついで、支保工8…のターンバ
ツクルを操作し、柱3の建入れの調整を行つたの
ち、上層の柱3aと下層の柱3bとを溶接等で接
合する。このようにして上層の柱3a…を立設し
たならば、第5図に示すように、鉄骨骨組の梁4
を上記柱3…間に架けわたし、接合、固定する。
以下、同様の作業を繰り返すことにより、建方が
行われる。ついで、梁4…上に床鋼板を敷設し、
これを型枠として床コンクリートを打設して床を
形成する。
Next, a method for constructing the multilayer frame structure of the present invention will be explained with reference to FIGS. 4 and 5. first,
As shown in FIG. 4, shoring 8 is attached in advance to the peripheral side of the precast concrete column 3, which will become the upper layer column 3a. Then, this column 3 is suspended and placed on the lower layer column 3b, and at the same time, the supports 8 are fixed to the lower layer beams 4 to prevent the upper layer column 3a from falling. Next, the turnbuckles of the supports 8 are operated to adjust the erection of the columns 3, and then the upper column 3a and the lower column 3b are joined by welding or the like. Once the upper columns 3a... are erected in this way, the beams 4 of the steel frame
Stretch, connect, and fix between the pillars 3 above.
Thereafter, erection is carried out by repeating similar operations. Next, lay a floor steel plate on beam 4...
This will be used as a formwork to pour floor concrete to form the floor.

第6図ないし第15図は、この構築物の柱3と
梁4の仕口部分の設計例を示すものである。ここ
に示した仕口部分の設計例にあつては、上層柱3
aと下層柱3bとの継手にほぞ継ぎを用いたもの
で、上層柱3aの下端にほぞを、上層柱3bの上
端にはほぞ穴をそれぞれ形成し、ヒンジ支承が行
われるようになつている。
Figures 6 to 15 show design examples of the joint portion between the pillars 3 and beams 4 of this structure. In the design example of the joint part shown here, the upper column 3
A mortise and tenon joint is used for the joint between a and the lower column 3b, and a tenon is formed at the lower end of the upper column 3a and a mortise is formed at the upper end of the upper column 3b, so that hinge support is provided. .

まず、第6図ないし第8図に示した例は、下層
柱3bのほぞ穴近傍部分をRC構造としたもので
ある。上層柱3aの下端には角形鋼管9が埋設さ
れ、その一端は柱下端面より突出し、他端はPC
柱の鉄筋10…に接合されている。この角形鋼管
9内にはコンクリートが充填されて上層柱3aの
ほぞ11となつている。また、下層柱3bの上端
部は水平に縦横の4方向に張り出しており、この
張り出し部12…には梁4を接合するためのH形
鋼からなるブラケツト13…がその一端を外部に
突出させて埋設されており、これらブラケツト1
3…は、相互に鉄筋10…によつて接合されてい
る。さらに、柱3bの上端部には鋼板よりなるベ
ースプレート14が設けられている。このベース
プレート14は、その下面で先の鉄筋10…に溶
接されているとともにその上面には山形鋼を溶接
して作成した四角形の枠体15が溶接されてい
る。この枠体15の内寸は、上記角形鋼管9の外
寸よりも微かに大きくなつており、これによつて
ほぞ穴16が形成されている。
First, in the example shown in FIGS. 6 to 8, the portion near the mortise of the lower pillar 3b is made into an RC structure. A square steel pipe 9 is buried in the lower end of the upper column 3a, one end of which protrudes from the lower end surface of the column, and the other end is made of PCB.
It is joined to the reinforcing bars 10 of the column. This square steel pipe 9 is filled with concrete to form the tenon 11 of the upper pillar 3a. In addition, the upper end of the lower column 3b extends horizontally in four directions, vertically and horizontally, and a bracket 13 made of H-beam steel for joining the beam 4 is attached to this projecting portion 12 with one end projecting to the outside. These brackets 1
3... are mutually joined by reinforcing bars 10.... Further, a base plate 14 made of a steel plate is provided at the upper end of the column 3b. The base plate 14 is welded to the reinforcing bars 10 on its lower surface, and a rectangular frame 15 made by welding angle iron is welded to its upper surface. The inner dimension of this frame 15 is slightly larger than the outer dimension of the square steel pipe 9, and a mortise 16 is formed thereby.

そして、この下層柱3bのほぞ穴16に、上層
柱3aのほぞ11を差し込み、角形鋼管9と枠体
15とを溶接することにより上層柱3aと下層3
bとの接合が行われる。また、ブラツケ13…に
は、同様のH形鋼よりなる梁4が高張力ボルトな
どによつて接合されて、柱3と梁4との接合が行
われる。
Then, by inserting the tenon 11 of the upper column 3a into the mortise 16 of the lower column 3b and welding the square steel pipe 9 and the frame 15, the upper column 3a and the lower column 3
The bonding with b is performed. Furthermore, beams 4 made of similar H-shaped steel are connected to the brackets 13 using high-tensile bolts or the like, thereby connecting the columns 3 and beams 4.

なお、第7図および第8図は、ブラケツト13
(梁4)上に床鋼板17を敷設し、これにコンク
リートを打設して床を形成したところを示すもの
である。
In addition, FIGS. 7 and 8 show the bracket 13.
A floor steel plate 17 is laid on (beam 4) and concrete is poured onto it to form a floor.

第9図および第10図に示した例は、上層柱3
aのほぞ11が先の例と同様である。上層柱3b
の上端部には4ケのブラケツト13…が相互に溶
接されてプレキヤストコンクリート中に埋設され
ており、このブラケツト13…の接合部の上部に
先の例と同様の枠体15が溶接されてほぞ穴16
とされている。
In the example shown in FIGS. 9 and 10, the upper column 3
The tenon 11 of a is the same as in the previous example. Upper pillar 3b
Four brackets 13 are welded to each other and buried in precast concrete at the upper end, and a frame 15 similar to the previous example is welded to the upper part of the joint of the brackets 13. Mortise 16
It is said that

また、第11図および第12図に示した例は、
第2の例においてほぞ11をなす角形鋼管9に代
えて通常の丸形鋼管18を用い、これに伴つてほ
ぞ穴16をなす枠体15に代えて上記丸形鋼管1
8に嵌り合う丸形鋼管19を用いた点が異るとこ
ろである。
In addition, the example shown in FIGS. 11 and 12 is
In the second example, a normal round steel pipe 18 is used instead of the square steel pipe 9 forming the mortise 11, and accordingly, the above-mentioned round steel pipe 1 is used instead of the frame 15 forming the mortise 16.
The difference is that a round steel pipe 19 that fits into the tube 8 is used.

第13図および第14図に示した第4の例は、
上層柱3aのほぞ11をやや太径の棒鋼20で構
成し、ブラケツト13…の接合部分に棒鋼20を
収める凹部21を形成してほぞ穴16とし、棒鋼
20に固定リング22を通したうえ凹部21に落
し込み、凹部21にモルタルを充填したのち、固
定リング22を棒鋼20およびブラケツト13…
に溶接するものである。
The fourth example shown in FIGS. 13 and 14 is
The tenon 11 of the upper column 3a is made of a steel bar 20 with a slightly larger diameter, a recess 21 for storing the steel bar 20 is formed at the joint portion of the brackets 13 to form a mortise 16, a fixing ring 22 is passed through the steel bar 20, and the recess is formed. 21, and after filling the recess 21 with mortar, the fixing ring 22 is attached to the steel bar 20 and the bracket 13...
It is to be welded to.

第15図は、柱3と基礎1との接合部分を示す
もので、基礎1のアンカー鉄筋23…にスタツド
溶接などの手段を用いてベースプレート24が接
合されている。そして、このベースプレート24
の上面に先に示した第1の例と同様の構造を持つ
柱3下端部を載置し、角形鋼管9とベースプレー
ト14とを溶接することによつて、柱3と基礎1
とがヒンジ支承されることになる。
FIG. 15 shows a joint between the column 3 and the foundation 1, in which a base plate 24 is joined to the anchor reinforcing bars 23 of the foundation 1 by means such as stud welding. And this base plate 24
By placing the lower end of the column 3 having the same structure as the first example shown above on the upper surface and welding the square steel pipe 9 and the base plate 14, the column 3 and the foundation 1 are connected.
and will be hinge-supported.

なお、以上の例ではほぞ継手による接合例を示
したが、これに限られることはなく、要はヒンジ
支承ができるものであればどのようなものでもよ
い。
Note that although the above example shows an example of joining using a mortise-and-tenon joint, it is not limited to this, and in short, any type of joint that can be hinge-supported may be used.

以上説明したように、この発明の多層架構式構
築物は、柱をプレキヤストコンクリートで、梁を
鉄骨骨組で構成し、各層の柱脚をヒンジとしたも
のであるので、柱、梁をすべて予め工場生産して
おき、これらを施工現場に搬入して組み立てるプ
レハブ化が行え、現場施工期開の大幅な短縮が行
え、施工性が向上する。また、柱継手にほぞ継ぎ
などの接合手段が採れ、組み立て作業が容易とな
る。さらに、第1層の柱脚もヒンジとしたので、
地中梁が不要となり、工期短縮、コストダウンが
はかれる。また、柱をプレキヤストコンクリート
としたので、これによつてもコストダウンが達せ
られる。さらに、床を床鋼板を型枠としたRC造
とすれば、支保工が不要となり、作業性がさらに
向上し、一層の工期短縮、コストダウンが計れ
る。
As explained above, the multi-layer frame structure of the present invention has columns made of precast concrete, beams made of a steel frame, and the column bases of each layer are hinges, so all the columns and beams are pre-assembled at the factory. Prefabricated products can be manufactured and then transported to the construction site and assembled, which greatly shortens the on-site construction period and improves workability. In addition, joining methods such as mortise and tenon joints can be used for column joints, making assembly work easier. Furthermore, since the column base of the first layer was also hinged,
There is no need for underground beams, which shortens construction time and reduces costs. Furthermore, since the columns are made of precast concrete, cost reductions can also be achieved. Furthermore, if the floor is made of RC construction using floor steel plates as formwork, there will be no need for shoring, further improving work efficiency, further shortening the construction period and reducing costs.

よつて、この発明の構築物にあつてはコストダ
ウンと施工性向上が同時に実現できる。
Therefore, the structure of the present invention can reduce costs and improve workability at the same time.

【図面の簡単な説明】[Brief explanation of drawings]

第1図はこの発明の多層架構式構築物の基本構
造を示す概略構成図、第2図および第3図は従来
のラーメン構造およびこの発明の構築物の柱梁曲
げモーメント図、第4図および第5図はこの発明
の構築物の施工手段を示す概略説明図、第6図な
いし第15図はいずれもこの発明の構築物の柱梁
仕口部の設計例を示すもので、第6図ないし第8
図は第1の例を示し、第6図は一部断面視した側
面図、第7図および第8図は第6図の−線お
よび−線断面図、第9図および第10図
は同じく第2の例を示し、第9図は一部断面視し
た側面図、第10図は下層柱の上面図、第11図
および第12図は第3の例を示し、第11図は一
部断面視した側面図、第12図は下層柱の上面
図、第13図および第14図は第4の例を示し、
第13図は一部断面視した側面図、第14図は下
層柱の上面図、第15図は柱と基礎との接合部を
示す一部断面視した側面図である。 3……柱、4……梁、5……架構、6……ヒン
ジ、7……構築物。
FIG. 1 is a schematic configuration diagram showing the basic structure of the multi-layer frame structure of the present invention, FIGS. 2 and 3 are column and beam bending moment diagrams of the conventional rigid-frame structure and the structure of the present invention, and FIGS. 4 and 5 The figure is a schematic explanatory diagram showing the construction method of the structure of the present invention, and Figures 6 to 15 all show design examples of the column and beam joints of the structure of the present invention.
The figure shows the first example, FIG. 6 is a partially sectional side view, FIGS. 7 and 8 are sectional views taken along lines - and - in FIG. 6, and FIGS. 9 and 10 are the same. The second example is shown, FIG. 9 is a partially sectional side view, FIG. 10 is a top view of the lower column, FIGS. 11 and 12 are the third example, and FIG. 11 is a partially sectional side view. A cross-sectional side view, FIG. 12 is a top view of the lower column, FIGS. 13 and 14 show a fourth example,
FIG. 13 is a partially sectional side view, FIG. 14 is a top view of the lower column, and FIG. 15 is a partially sectional side view showing the joint between the column and the foundation. 3... Column, 4... Beam, 5... Frame, 6... Hinge, 7... Structure.

Claims (1)

【特許請求の範囲】[Claims] 1 柱をプレキヤストコンクリートで、梁を鉄骨
骨組でそれぞれを構成するとともに各層の柱脚を
ヒンジとしたことを特徴とする多層架構式構築
物。
1. A multi-layered frame structure in which the columns are made of precast concrete, the beams are made of a steel frame, and the column bases of each layer are used as hinges.
JP10750283A 1983-06-15 1983-06-15 Multilayered enclosure type building Granted JPS59233049A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10750283A JPS59233049A (en) 1983-06-15 1983-06-15 Multilayered enclosure type building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10750283A JPS59233049A (en) 1983-06-15 1983-06-15 Multilayered enclosure type building

Publications (2)

Publication Number Publication Date
JPS59233049A JPS59233049A (en) 1984-12-27
JPH0132339B2 true JPH0132339B2 (en) 1989-06-30

Family

ID=14460831

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10750283A Granted JPS59233049A (en) 1983-06-15 1983-06-15 Multilayered enclosure type building

Country Status (1)

Country Link
JP (1) JPS59233049A (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62178634A (en) * 1986-02-03 1987-08-05 株式会社フジタ Framework construction method of structure
JP3039295B2 (en) * 1994-11-18 2000-05-08 株式会社大林組 Manufacturing method of prefabricated member of mixed structure

Also Published As

Publication number Publication date
JPS59233049A (en) 1984-12-27

Similar Documents

Publication Publication Date Title
CN109339229B (en) Prefabricated assembled concrete-filled steel tube frame structure of perforation thick liquid anchor
KR101006411B1 (en) System and method for underground downward construction using concrete filled tube
JPH09209451A (en) Joint construction of up and down columns with beam and joint method
JPH11100854A (en) Building and foundation structure therefor
JP4550534B2 (en) Building basic structure
JPH0132339B2 (en)
JP2769937B2 (en) Steel tube concrete column in underground reverse driving method
JP3020343B2 (en) Column base structure using hollow tube and method of constructing the same
JPH05156654A (en) Top-down construction method
JPH01287336A (en) Steel frame reinforced concrete lamination construction
JP2592224Y2 (en) Structure of joint between RC beam and steel structure
JPH0654049B2 (en) Filled steel tubular concrete columns and method of constructing filled tubular concrete columns
JPH07103620B2 (en) Construction method for steel structure
JP2006037530A (en) Building structure skeleton and building structure making use thereof
JPH01203537A (en) Src precast beam and junction structure of column and beam
JPS6217233A (en) Foundation base column
JPH0868115A (en) Connecting structure for column/beam and construction method for underground skeleton using it
JP3125165B2 (en) Warehouse frame
JP2972956B2 (en) Column and beam joining method and its structure
JP2024074485A (en) External steel reinforcement structure for existing building
JP2578671B2 (en) Column and beam construction method
JP2669305B2 (en) Structure using covered steel tube concrete columns
JPH03293445A (en) Structure of building and construction
JP2001020297A (en) Sc-structured footing beam method for building
JP2674442B2 (en) Structure of column-beam joint of steel reinforced concrete structure