JPH01190877A - Concrete column forming method - Google Patents

Concrete column forming method

Info

Publication number
JPH01190877A
JPH01190877A JP1258588A JP1258588A JPH01190877A JP H01190877 A JPH01190877 A JP H01190877A JP 1258588 A JP1258588 A JP 1258588A JP 1258588 A JP1258588 A JP 1258588A JP H01190877 A JPH01190877 A JP H01190877A
Authority
JP
Japan
Prior art keywords
formwork
frame
concrete
scaffold
scaffolding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP1258588A
Other languages
Japanese (ja)
Other versions
JPH076281B2 (en
Inventor
Kohei Mio
三尾 興平
Shunsuke Shirai
俊輔 白井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP63012585A priority Critical patent/JPH076281B2/en
Publication of JPH01190877A publication Critical patent/JPH01190877A/en
Publication of JPH076281B2 publication Critical patent/JPH076281B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

PURPOSE:To facilitate a work to build a body and to increase a working speed, by a method wherein a scaffold and a form frame to support forms are formed separably from each other and relatively slidable, and the scaffold is lifted up during curing of concrete to perform a preparing work. CONSTITUTION:A number of frames are assembled together, and scaffolds 10 by which a plurality of sections are formed longitudinally of a body A, are so formed that they are elevatable by means of center hall jacks 2 and 2 and screw bars 3 and 3. Form frame 20 to support forms 5 and 6 is so formed that it is elevatable by means of chain blocks 4 and 4. After concrete is placed, only the scaffold 10 is lifted up by one pitch during curing of the concrete to perform a preparing work for the surroundings of the scaffold 10, e.g. connection of steel frames B1 and reinforcing bars (b), movement of center hall jacks 2. After the forms 5 and 6 at a lower stage are removed and lifted up and moved to a given position, the forms are set to place concrete.

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は、例えば橋の支柱等に使用されるコンクリート
柱を形成する工法に関する。
DETAILED DESCRIPTION OF THE INVENTION [Industrial Field of Application] The present invention relates to a construction method for forming concrete columns used, for example, as bridge supports.

[従来技術] かかる支柱を形成するには、先ず鉄骨を支柱の形状に対
応する所定の形状に組立て、その後にコンクリートを打
設する。このコンクリートと打設に際して型枠をセット
するために、従来は組立てられた鉄骨全体を包囲するよ
うな足場を組上げた後にコンクリートを打設するように
していた。
[Prior Art] To form such a support, first, a steel frame is assembled into a predetermined shape corresponding to the shape of the support, and then concrete is poured. In order to set the concrete and formwork during pouring, conventionally, scaffolding was erected to surround the entire assembled steel frame, and then concrete was poured.

しかし、組立てられた鉄骨全体を包囲するような巨大な
足場の組上げ作業は、大部分が人手によって行われるの
で人件費が高くなり、その結果、支柱を形成するコスト
が増加する。
However, the work of assembling a gigantic scaffold that surrounds the entire assembled steel frame is mostly done manually, resulting in high labor costs and, as a result, an increase in the cost of forming the supports.

これに対し、一定の長さの足場を鉄骨の上方から引き上
げて移動できるように構成し、鉄骨の一部分に型枠をセ
ットしてコンクリートを打設したのち、足場を所定距離
だけ上方に引き上げ、鉄骨の別の部分に型枠をセットし
てコンクリートを打設する技術(所謂クライミングアッ
プ工法)が提案されている。
In contrast, a scaffold of a certain length is constructed so that it can be lifted up from above the steel frame and moved, and after setting a formwork on a part of the steel frame and pouring concrete, the scaffold is pulled up a predetermined distance. A technique has been proposed in which formwork is set on another part of the steel frame and concrete is poured (the so-called climbing up method).

しかしながら、従来のクライミングアップ工法において
は、足場と型枠とが一体であったので、コンクリート養
生中は足場を引き上げることができず、従って、作業が
やりにくく、スピードが遅かった。
However, in the conventional climbing up method, the scaffolding and formwork were integrated, so the scaffolding could not be pulled up while the concrete was curing, making the work difficult and slow.

[発明の目的] 従って本発明の目的は、作業がやり易く、スピードアッ
プできるコンクリート柱形成工法を提供するにある。
[Object of the Invention] Accordingly, an object of the present invention is to provide a concrete column forming method that is easy to perform and speeds up the work.

[発明の構成] 本発明のコンクリートしら形成工法は、コンクリート柱
の躯体に沿って上下動自在な足場に案内された型枠フレ
ームに設けられた型枠を予め組立てられた鉄骨側に移動
し、該鉄骨を包囲して該型枠をセットする工程と、該セ
ットした型枠にコンクリートを打設する工程と、コンク
リート養生中に前記足場を上方に引き上げる工程と、コ
ンクリート養生後に前記セットした型枠を脱型する工程
と、前記型枠フレームを上方に引き上げる工程とを含ん
でいる。
[Structure of the Invention] The concrete shira formation method of the present invention moves the formwork provided in the formwork frame guided by the scaffolding that can move up and down along the frame of the concrete column to the side of the pre-assembled steel frame, A step of surrounding the steel frame and setting the formwork, a step of pouring concrete into the set formwork, a step of lifting the scaffolding upward during concrete curing, and a step of the set formwork after concrete curing. and a step of lifting the form frame upward.

[発明の作用効果] 本発明は、足場を逐次上方に引き上げつつコンクリート
を打設するクライミングアップ工法を改良した工法であ
り、そのため予め組立てられた鉄骨全体を包囲するよう
な巨大な足場を組み上げる必要がないという従来のクラ
イミングアップ工法の特色が生かされており、更に本発
明によれば、足場と型枠を支持する型枠フレームとを別
体にして相対的に移動可能にし、コンクリート養生中に
足場を上方に引き上げて予め足場回りの準備作業を行い
、その結果、作業をやり易くし、スピードアップするこ
とができる。
[Operations and Effects of the Invention] The present invention is an improved climbing-up method in which concrete is poured while lifting the scaffolding upward one by one. Therefore, it is not necessary to build a huge scaffolding that surrounds the entire steel frame that has been assembled in advance. The feature of the conventional climbing up construction method is that there is no climbing up, and furthermore, according to the present invention, the scaffolding and the formwork frame supporting the formwork are made separate and movable relative to each other, so that there is no need to climb up during concrete curing. The scaffolding is pulled upwards and preparation work around the scaffolding is done in advance, making the work easier and faster.

[好ましい実施の態様] 本発明の実施に際し、足場を上方に引き上げる手段とし
ては、センターホールジヤツキを用いるのが好ましい。
[Preferred Embodiment] When carrying out the present invention, it is preferable to use a center hole jack as a means for pulling the scaffold upward.

また、足場を上方に引き上げる際には、打設されたコン
クリートにレールを取付け、そのレールに沿って足場が
移動するように構成するのが好ましい。
Furthermore, when the scaffolding is pulled upward, it is preferable to attach rails to the poured concrete so that the scaffolding moves along the rails.

本発明の実施に際し、型枠フレームを上方に引き上げる
手段としては、チェンブロックを用いるのが好ましい。
In carrying out the present invention, it is preferable to use a chain block as a means for lifting the formwork frame upward.

また、型枠フレームを上方に引き上げるには、足場にレ
ールを取付け、そのレールに沿って型枠フレームが移動
するように構成するのが好ましい。
Further, in order to pull the formwork frame upward, it is preferable to attach a rail to the scaffolding and configure the formwork frame to move along the rail.

本発明の実施に際し、型枠は型枠フレームに保持用ラム
を介して支持し、型枠の移動手段には、スクリュージヤ
ツキを用いるのが好ましい。このようにすると、ジヤツ
キを操作して型枠のセット、セット時の微調整および脱
型を容易に行うことができる。
In carrying out the present invention, it is preferable that the formwork is supported by a formwork frame via a holding ram, and that a screw jack is used as a means for moving the formwork. In this way, it is possible to easily set the formwork, make fine adjustments during setting, and remove the mold by operating the jack.

本発明の実施に際し、型枠フレームの各辺を伸縮自在に
構成し、伸縮手段にはターンバックルを用いるのが好ま
しい。このようにすると、躯体断面の変化に対応するこ
とができる。
In carrying out the present invention, it is preferable that each side of the form frame is configured to be expandable and contractible, and that turnbuckles are used as the expansion and contraction means. In this way, it is possible to respond to changes in the cross section of the frame.

[実施例] 以下図面を参照して本発明の詳細な説明する。[Example] The present invention will be described in detail below with reference to the drawings.

第6図は本発明を支柱の斜めに伸びている躯体Aに実施
する装置を示している。
FIG. 6 shows a device for implementing the present invention on an obliquely extending frame A of a column.

図において装置は、躯体Aおよび鉄骨Bを包囲し、躯体
Aの傾斜面側に取付けたガイドレール1.1に案内され
センターホールジヤツキ(第1A図)2.2のゲビンデ
バー3.3により上下動されるる足場10と、足場10
内に収められ、足場1〇のレール1.1に平行なフレー
ム14.14に案内され足場に取付けたチェーンブロッ
ク(第2図)4.4により足場10に対して上下動する
型枠フレーム20と、型枠フレーム20の内方に取付け
られた型枠(第9図)、5.5および6.6とから概略
構成される。
In the figure, the device surrounds the frame A and the steel frame B, is guided by a guide rail 1.1 attached to the inclined surface side of the frame A, and is raised and lowered by a Gebindever 3.3 of a center hole jack (Figure 1A) 2.2. Scaffolding 10 to be moved and scaffolding 10
A formwork frame 20 is housed within the scaffold 10, is guided by a frame 14.14 parallel to the rail 1.1 of the scaffold 10, and is moved up and down relative to the scaffold 10 by a chain block (Fig. 2) 4.4 attached to the scaffold. and a formwork (FIG. 9) attached to the inside of the formwork frame 20, 5.5 and 6.6.

足場10は多数のフレームを組合せ躯体Aの長手方向に
複数の区画(図示の例では5区画)11a〜lieに画
成されている。それらの区画のうち、区画11a〜ll
cにはコンクリートが打設されていないが、区画lid
、11eにはコンク、リートが既に打設されている。そ
して、各区画11a〜lieには、打設されたコンクリ
ートの重さ等によって足場10が変型しないように、隣
り合うフレーム間にターンバックル12.12・・・が
張設されている。
The scaffolding 10 is formed by combining a large number of frames and is defined in the longitudinal direction of the skeleton A into a plurality of sections (5 sections in the illustrated example) 11a to 11lie. Among those sections, sections 11a-ll
No concrete has been placed in c, but the section lid
, 11e, concrete and leet have already been cast. In each of the sections 11a to 11ie, turnbuckles 12, 12, .

第7図において、レール1は全体が略■字状に形成され
、打設したコンクリートCにボルト13a、13b、1
3bにより取付けられている。足場10のフレーム14
はボルト15.15によりサドルフレーム16上に固定
され、このサドルフレーム16はローラピン17a、1
7bを介してレール1に対し移動自在に取付けられてい
る。従って、サドルフレーム16はレール1に沿って移
動し、同時に足場10がレール1に沿ってスライドする
ようになっている。
In FIG. 7, the entire rail 1 is formed into a substantially ■-shape, and bolts 13a, 13b, 1
3b. Frame 14 of scaffolding 10
is fixed on the saddle frame 16 by bolts 15.15, and this saddle frame 16 has roller pins 17a, 1
It is movably attached to the rail 1 via 7b. Therefore, the saddle frame 16 moves along the rail 1, and at the same time the scaffold 10 slides along the rail 1.

第8図〜第11図において、型枠フレーム20は、多数
のフレームにより躯体Aの垂直面がら見て長方形の2つ
のフレームD、Dをそれぞれの外側部分が同レベルにな
るように躯体Aの長手方向にづらした形状に形成されて
いる。そして、足場10のレール14.14側のフレー
ム21.21にそれぞれ突設され、レール14に係合す
るローラ23.23を介してレール14に対して移動自
在に取付けられている。従ってフレーム21はレール1
4に沿って移動し、同時に第2図に示すように、型枠フ
レーム20がレール14に沿ってスライドするようにな
っている。
In FIGS. 8 to 11, the formwork frame 20 is constructed using a large number of frames to form two rectangular frames D and D when viewed from the vertical plane of the body A, so that their outer parts are at the same level. It is formed in a shape that is shifted in the longitudinal direction. The frames 21 and 21 of the scaffold 10 on the side of the rails 14 and 14 project from each other and are movably attached to the rails 14 via rollers 23 and 23 that engage with the rails 14, respectively. Therefore, frame 21 is rail 1
4, and at the same time, the formwork frame 20 slides along the rail 14, as shown in FIG.

前記フレーム21には型枠5が取付けられ、フレームD
、Dが結合されたフレーム22には型枠6が取付けられ
ている。それら型枠5.6はそれぞれフレーム21.2
2に型枠保持用ラム24により保持され、スクリュージ
ヤツキ25により躯体Aに対し前後移動されるようにな
っている。なお、図中符号26は伸縮部材、27はター
ンバックル、28はつなぎ部材である。
The formwork 5 is attached to the frame 21, and the frame D
, D are connected to the frame 22, and a formwork 6 is attached thereto. These formworks 5.6 each have a frame 21.2
2 is held by a formwork holding ram 24, and is moved back and forth with respect to the frame A by a screw jack 25. In the figure, reference numeral 26 is an elastic member, 27 is a turnbuckle, and 28 is a connecting member.

従って第3図において、スクリュージヤツキ25.25
・・・を操作して型枠5.6を矢印方向に躯体A側に移
動し、第4図に示すように型枠をセラ1−するようにな
っている。また第5図に示すように、断面形状が長手方
向に短い躯体A1に対しては、ターンバックル27.2
7を操作し、伸縮部材26.26を収縮して型枠5.6
をセットして対応できるようになっている。
Therefore, in Figure 3, the screw jack 25.25
. . to move the formwork 5.6 in the direction of the arrow toward the frame A side, and as shown in FIG. 4, the formwork is soldered 1-. Furthermore, as shown in FIG.
7 to contract the telescopic member 26.26 and formwork 5.6.
It is now possible to respond by setting the .

次に第1A図〜第1H図を参照して実施の態様を説明す
る。
Next, embodiments will be described with reference to FIGS. 1A to 1H.

第1A図は型枠5.6内にコンクリートを打設して養生
中に、足場10をセンターホールジヤツキ2.2および
ゲビンデバー3.3により1ピツチ(図示の例では型枠
5.6の高さ)だけクライミングした状態を示している
FIG. 1A shows that while concrete is poured into the formwork 5.6 and is being cured, the scaffolding 10 is placed in one pitch (in the illustrated example, in the formwork 5.6) by means of the center hole jack 2.2 and the Gevindever 3.3. It shows the state of climbing by the height).

次いで、鉄骨B1を組立て、センターポールジヤツキ2
.2を上方の横梁7aに移設する(第1B図)。
Next, assemble the steel frame B1 and attach the center pole jack 2.
.. 2 to the upper cross beam 7a (Fig. 1B).

次いで、元の横梁7を取り外し、鉄筋すを継ぎ足ずく第
1C図)。
Next, the original cross beam 7 was removed and the reinforcing bars were added (Fig. 1C).

次いで、型枠5.6を脱型する(第1D図)。The formwork 5.6 is then demolded (FIG. 1D).

次いで 型枠フレーム10をチェーンブロック4.4に
より上方に引き上げて(第2図)、型枠5.6を上昇し
、型枠回りを清掃する(第1E図)次いで、スクリュー
ジヤツキ25.25・・・を操作し、型枠5.6を所定
位置に移動してセットする(第1F図および第4図)。
Next, the formwork frame 10 is pulled upward by the chain block 4.4 (Fig. 2), the formwork 5.6 is raised, and the area around the formwork is cleaned (Fig. 1E). ... to move and set the formwork 5.6 to a predetermined position (Fig. 1F and Fig. 4).

次いで、躯体にガイドレール1.1を継ぎ足し、型枠5
.6にコンクリートを打設する(第1G図)次いで、型
枠5.6に打設したコンクリートの養生中に、センター
ホールジヤツキ2.2およびゲビンデバー3.3により
足場10を1ピツチだはクライミングしく第1H図)、
以下逐次前記の各工程を繰り返して躯体Aを上方に築造
する。
Next, the guide rail 1.1 is added to the frame, and the formwork 5
.. 6 (Fig. 1G) Next, while the concrete poured in the formwork 5.6 is curing, the scaffolding 10 is climbed by one pitch using the center hole jack 2.2 and the Gevindever 3.3. Figure 1H)
Thereafter, the above-mentioned steps are successively repeated to build the frame A upward.

[まとめ] 以上説明したように本発明によれば、足場と型枠を支持
する型枠フレームとを別体にして相対的にスライド可能
にしたので、コンクリ−1・養生中に足場だけをクライ
ミングして足場回りの準備作業すなわち鉄骨、鉄筋の継
ぎ足しやセンターポールジヤツキの上方への移設を予め
行い、その結果、躯体の築造作業をやり易くし、スピー
ドアップすることができる。
[Summary] As explained above, according to the present invention, the scaffolding and the formwork frame supporting the formwork are separated and made relatively slidable, so that only the scaffolding can be climbed during concrete curing. Preparation work around the scaffolding, that is, adding steel frames and reinforcing bars, and moving the center pole jacks upwards can be carried out in advance, making it easier and faster to construct the frame.

【図面の簡単な説明】[Brief explanation of the drawing]

第1A図、第1B図、第1C図、第1D図、第1E図、
第1F図、第1G図、および第1H図はそれぞれ本発明
の詳細な説明する正面図、第2図は型枠フレームの上昇
の状態を説明する正面図、第3図は型枠のセット前の状
態を説明する上面図、第4図は型枠のセット後の状態を
説明する上面図、第5図は断面形状の異なる躯体に対す
る型枠のセット後の状態を説明する上面図、第6図は本
発明を実施する装置の全体を示す正面図、第7図は足場
のガイドレール回りを示す拡大断面図、第8図は型枠フ
レームの詳細を示す正面図、第9図は第8図の上面図、
第10図は第8図の側面図、第11図は型枠フレームの
ローラ回りを示す正面図である。 A・・・躯体  B・・・鉄骨  1・・・ガイドレー
ル  2・・・センターホールジヤツキ4・・・チェー
ンブロック  5.6・・・型枠  10・・・足場 
 17a、17b・・・ローラピン  20・・・型枠
フレーム  23・・・ローラ  24・・・型枠保持
用ラム25・・・スクリュージヤツキ
Figure 1A, Figure 1B, Figure 1C, Figure 1D, Figure 1E,
Figures 1F, 1G, and 1H are front views explaining the present invention in detail, Figure 2 is a front view explaining the rising state of the formwork frame, and Figure 3 is before the formwork is set. FIG. 4 is a top view illustrating the state of the formwork after it has been set; FIG. The figure is a front view showing the entire apparatus for implementing the present invention, FIG. 7 is an enlarged sectional view showing the area around the guide rail of the scaffold, FIG. 8 is a front view showing details of the formwork frame, and FIG. top view of the figure,
FIG. 10 is a side view of FIG. 8, and FIG. 11 is a front view showing the area around the rollers of the form frame. A...Structure B...Steel frame 1...Guide rail 2...Center hole jack 4...Chain block 5.6...Formwork 10...Scaffolding
17a, 17b...Roller pin 20...Form frame 23...Roller 24...Form holding ram 25...Screw jack

Claims (1)

【特許請求の範囲】[Claims] コンクリート柱の躯体に沿つて上下動自在な足場に案内
された型枠フレームに設けられた型枠を予め組立てられ
た鉄骨側に移動し、該鉄骨を包囲して該型枠をセットす
る工程と、該セットした型枠にコンクリートを打設する
工程と、コンクリート養生中に前記足場を上方に引き上
げる工程と、コンクリート養生後に前記セットした型枠
を脱型する工程と、前記型枠フレームを上方に引き上げ
る工程とを含むことを特徴とするコンクリート柱形成工
法。
a step of moving the formwork installed in the formwork frame guided by the scaffolding that can move up and down along the frame of the concrete column to the side of the pre-assembled steel frame, surrounding the steel frame and setting the formwork; , a step of pouring concrete into the set formwork, a step of lifting the scaffold upward during concrete curing, a step of removing the set formwork after concrete curing, and a step of lifting the formwork frame upward. A concrete column forming method characterized by including a lifting step.
JP63012585A 1988-01-25 1988-01-25 Concrete pillar forming equipment Expired - Fee Related JPH076281B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63012585A JPH076281B2 (en) 1988-01-25 1988-01-25 Concrete pillar forming equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63012585A JPH076281B2 (en) 1988-01-25 1988-01-25 Concrete pillar forming equipment

Publications (2)

Publication Number Publication Date
JPH01190877A true JPH01190877A (en) 1989-07-31
JPH076281B2 JPH076281B2 (en) 1995-01-30

Family

ID=11809431

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63012585A Expired - Fee Related JPH076281B2 (en) 1988-01-25 1988-01-25 Concrete pillar forming equipment

Country Status (1)

Country Link
JP (1) JPH076281B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03128154U (en) * 1990-04-09 1991-12-24
JP2010048060A (en) * 2008-08-25 2010-03-04 Shimizu Corp Construction method of structure

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101643379B1 (en) * 2015-04-13 2016-07-28 주식회사 블루폼 Mold panel assembly

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS53148140A (en) * 1977-05-31 1978-12-23 Shimizu Construction Co Ltd Apparatus for buildings silo

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS53148140A (en) * 1977-05-31 1978-12-23 Shimizu Construction Co Ltd Apparatus for buildings silo

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03128154U (en) * 1990-04-09 1991-12-24
JP2010048060A (en) * 2008-08-25 2010-03-04 Shimizu Corp Construction method of structure

Also Published As

Publication number Publication date
JPH076281B2 (en) 1995-01-30

Similar Documents

Publication Publication Date Title
JPH09310492A (en) Self elevating type form device and elevating method thereof
JP3804883B2 (en) Concrete high structure construction apparatus and concrete oblique column construction method
JP2650820B2 (en) All-weather concrete column construction slide formwork device
KR20190041189A (en) Modular work platform of a long span bridge main tower rebar and construction method using the same
JP3125652B2 (en) Bridge girder erection equipment
JPH01190877A (en) Concrete column forming method
JP3125653B2 (en) Bridge girder construction method
CN111042835A (en) Tunnel cable trench and ditch construction trolley and construction method thereof
JP3531111B2 (en) Apparatus and method for constructing tower-like structure
JP2829363B2 (en) Formwork equipment for pillar construction
JP3981469B2 (en) Construction method of concrete structure
JP2620687B2 (en) Construction method of culvert by movable formwork
JP3425352B2 (en) Self-elevating formwork device
JPH06129108A (en) Assembling device for form
CN113914232B (en) High main tower inner formwork and scaffold integrated construction system and method
CN215947905U (en) Integral type sliding turnover formwork for variable cross-section thin-wall hollow pier construction
JPS5916608B2 (en) Concrete formwork method and its equipment
JPH0681314A (en) Construction method for concrete main tower
JP3000790B2 (en) Caisson construction method and caisson construction formwork device
JPH046449Y2 (en)
JPH0128186Y2 (en)
JPS603360A (en) Construction of hollow concrete structure
JPH10169203A (en) Erecting method for structure
JPH06108415A (en) Main concrete tower constructing method
JPH07138914A (en) Method for constructing pier

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees