JP7486653B1 - Apparatus, method and program - Google Patents

Apparatus, method and program Download PDF

Info

Publication number
JP7486653B1
JP7486653B1 JP2023184522A JP2023184522A JP7486653B1 JP 7486653 B1 JP7486653 B1 JP 7486653B1 JP 2023184522 A JP2023184522 A JP 2023184522A JP 2023184522 A JP2023184522 A JP 2023184522A JP 7486653 B1 JP7486653 B1 JP 7486653B1
Authority
JP
Japan
Prior art keywords
power
storage battery
time
charging
period
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2023184522A
Other languages
Japanese (ja)
Inventor
耕治 工藤
健子 古謝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kansai Electric Power Co Inc
Original Assignee
Kansai Transmission and Distribution Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kansai Transmission and Distribution Inc filed Critical Kansai Transmission and Distribution Inc
Priority to JP2023184522A priority Critical patent/JP7486653B1/en
Application granted granted Critical
Publication of JP7486653B1 publication Critical patent/JP7486653B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

【課題】蓄電池を利用した電力取引市場への供出可能電力を増加させる。【解決手段】装置は、所定の時間帯が始まる以前のタイミングの時刻において取得されたSOC関連情報と、当該時刻から所定の時間帯が始まるまでの期間における蓄電池の充放電量を示す情報と、蓄電池の上限容量情報と、蓄電池の充電効率と、蓄電池の放電効率と、当該所定の時間帯の長さを示す時間情報とに基づいて、当該所定の時間帯における基準値を算出し、上限容量情報と、蓄電池の放電効率と、時間帯および期間それぞれの長さを示す時間情報とに基づいて、所定の時間帯における蓄電池の供出可能電力を算出する。【選択図】図11[Problem] To increase the power that can be provided to the power trading market using a storage battery. [Solution] The device calculates a reference value for a specified time slot based on SOC-related information acquired at a time before the start of a specified time slot, information indicating the charge/discharge amount of the storage battery in the period from that time until the start of the specified time slot, upper limit capacity information of the storage battery, the charging efficiency of the storage battery, the discharging efficiency of the storage battery, and time information indicating the length of the specified time slot, and calculates the power that can be provided by the storage battery in the specified time slot based on the upper limit capacity information, the discharging efficiency of the storage battery, and time information indicating the length of the time slot and period. [Selected Figure] Figure 11

Description

本開示は、蓄電池の電力を算出する技術に関し、特に、電力取引のために蓄電池から供出可能な電力を算出する技術に関する。 This disclosure relates to a technology for calculating the power of a storage battery, and in particular to a technology for calculating the power that can be provided from a storage battery for power trading.

特開2021-105755号公報(特許文献1)は、需給調整市場の売り入札者である調整力供出事業者の事務所等に備えられる売り入札者端末装置から、約定のために、需給調整力の供出可能量と需給調整力の供出可能時間帯を含む売り入札データが電力取引約定計算装置に転送されることを開示している。 JP 2021-105755 A (Patent Document 1) discloses that selling bid data including the available amount of supply and demand adjustment capacity and the time period during which supply and demand adjustment capacity can be provided is transferred to an electricity trading agreement calculation device from a selling bidder terminal device installed in the office of an adjustment capacity provider, which is the selling bidder in the supply and demand adjustment market, for the purpose of agreement.

特開2021-105755号公報JP 2021-105755 A

需給調整市場等の電力取引市場に蓄電池の充放電を利用して需給調整力の電力量を供出する場合、事前に予測した所内負荷や充電計画を元に供出可能量を決定し電力市場に入札する。このような電力取引市場では、実際に需給が実施される時点である実需給断面に至らないと、約定した入札量の内、調整指令によって要求される供出電力量がどれくらいであるか分からないため、蓄電池の回復充電を可能にし、また連続的な入札を可能なようにするために、供出可能電力を含む入札量を低く抑えた入札しかできないとの課題があった。特許文献1は、事前に算出された供出可能量で需給調整市場に入札する方法を記載するが、当該課題を解消する技術は提案していない。 When supplying power as supply and demand adjustment capacity to an electricity trading market such as a supply and demand adjustment market by using the charging and discharging of a storage battery, the available supply amount is determined based on the in-house load and charging plan predicted in advance, and then bid on the electricity market. In such an electricity trading market, it is not possible to know how much of the agreed bid amount is the amount of power to be supplied that is requested by the adjustment command until the actual supply and demand cross section, which is the time when supply and demand is actually implemented, is reached. Therefore, there is an issue that only bids that include available power can be made low in order to enable recovery charging of the storage battery and to enable continuous bidding. Patent Document 1 describes a method of bidding on a supply and demand adjustment market with the available supply amount calculated in advance, but does not propose any technology to solve this issue.

本開示は、上記のような課題に鑑みてなされたものであり、その目的は、蓄電池から電力取引市場へ供出可能な電力を増加させることが可能な技術を提供することである。 This disclosure has been made in consideration of the above-mentioned problems, and its purpose is to provide technology that can increase the amount of electricity that can be provided from storage batteries to the electricity trading market.

この開示のある局面に係る、蓄電池から供出可能な電力を算出する装置は、電力取引市場における取引対象期間を構成可能な1つ以上の時間帯のうち所定の時間帯について、当該所定の時間帯が始まる以前のタイミングの時刻において装置が取得した蓄電池のSOC関連情報と、当該時刻から所定の時間帯が始まるまでの期間における蓄電池の充放電量を示す情報と、蓄電池の上限容量情報と、蓄電池の充電効率と、蓄電池の放電効率と、所定の時間帯の長さを示す時間情報とに基づいて、蓄電池の所定の時間帯における基準値を算出する手段と、少なくとも、蓄電池の上限容量情報と、蓄電池の放電効率と、所定の時間帯の長さを示す時間情報と、期間の長さを示す時間情報とに基づいて、所定の時間帯における蓄電池の供出可能電力を算出する手段と、を備える。 According to one aspect of this disclosure, a device for calculating the power that can be supplied from a storage battery includes: a means for calculating a reference value for a specified time period of the storage battery based on SOC-related information of the storage battery acquired by the device at a time before the start of the specified time period among one or more time periods that can constitute a trading period in an electricity trading market, information indicating the charge/discharge amount of the storage battery in the period from the time to the start of the specified time period, upper limit capacity information of the storage battery, charging efficiency of the storage battery, discharging efficiency of the storage battery, and time information indicating the length of the specified time period; and a means for calculating the power that can be supplied from the storage battery in the specified time period based on at least the upper limit capacity information of the storage battery, discharging efficiency of the storage battery, time information indicating the length of the specified time period, and time information indicating the length of the period.

この開示の他の局面に係る、蓄電池から供出可能な電力を算出する装置は、電力取引市場における取引対象期間を構成可能な1つ以上の時間帯のうち所定の時間帯について、当該所定の時間帯が始まる以前のタイミングの時刻において装置が取得した蓄電池のSOC関連情報と、当該時刻から所定の時間帯が始まるまでの期間における蓄電池の充放電量を示す情報と、蓄電池の上限容量情報と、蓄電池の充電効率と、蓄電池の放電効率と、所定の時間帯の長さを示す時間情報とに基づいて、蓄電池の所定の時間帯における放電可能電力および基準値を算出する手段と、放電可能電力と基準値に基づいて、所定の時間帯における蓄電池の供出可能電力を算出する手段と、を備える。 In another aspect of this disclosure, a device for calculating the power that can be supplied from a storage battery includes: a means for calculating, for a specific time period among one or more time periods that can constitute a trading period in an electricity trading market, the SOC-related information of the storage battery acquired by the device at a time before the start of the specific time period, information indicating the charge/discharge amount of the storage battery during the period from the time until the start of the specific time period, the upper limit capacity information of the storage battery, the charging efficiency of the storage battery, the discharging efficiency of the storage battery, and time information indicating the length of the specific time period; and a means for calculating the supplyable power of the storage battery during the specific time period based on the dischargeable power and the reference value.

上述の開示において、所定の時間帯における基準値を算出する手段によって算出される基準値は、蓄電池の定格出力以下の電力を示す。 In the above disclosure, the reference value calculated by the means for calculating the reference value for a specified time period indicates power that is equal to or less than the rated output of the storage battery.

上述の開示において、所定の時間帯における放電可能電力および基準値を算出する手段によって算出される放電可能電力および基準値は、それぞれ、蓄電池の定格出力以下の電力を示す。 In the above disclosure, the dischargeable power and the reference value calculated by the means for calculating the dischargeable power and the reference value in a specified time period respectively indicate power that is equal to or less than the rated output of the storage battery.

上述の開示において、蓄電池の供出可能電力を算出する手段によって算出される当該供出可能電力は、蓄電池の定格出力以下の電力を示す。 In the above disclosure, the available power calculated by the means for calculating the available power of the storage battery indicates power that is equal to or less than the rated output of the storage battery.

上述の開示において、電力取引市場は、調整力を取引する需給調整市場を含み、期間における蓄電池の充放電量を示す情報は、当該期間を構成する1つ以上の時間帯それぞれについて約定された調整力を示す。 In the above disclosure, the electricity trading market includes a supply and demand adjustment market in which adjustment capacity is traded, and the information indicating the charge and discharge amount of the storage battery during a period indicates the adjustment capacity agreed upon for each of one or more time periods constituting the period.

上述の開示において、時刻は、所定の時間帯の開始前であって、且つ所定の時間帯について算出された基準値を電力取引市場に登録する期限よりも前の時刻を示す。 In the above disclosure, the time refers to a time before the start of a specific time period and before the deadline for registering the reference value calculated for the specific time period in the energy trading market.

上述の開示において、装置は、蓄電池の充放電を制御する指令を出力する指令部を、さらに備え、指令は、所定の時間帯において、当該所定の時間帯について算出された基準値と、蓄電池の複数の目的に基づく充放電電力の合算値とを用いて、蓄電池の充放電を制御する指令を含む。 In the above disclosure, the device further includes a command unit that outputs commands to control charging and discharging of the storage battery, and the commands include a command to control charging and discharging of the storage battery during a specified time period using a reference value calculated for the specified time period and a combined value of charging and discharging power based on multiple purposes of the storage battery.

上述の開示において、装置は、蓄電池の充放電を制御する指令を出力する指令部を、さらに備え、この指令は、蓄電池と、送配電事業者によって管理される電力系統を含む送配電設備装置と、の間で電力を遣り取りするための基準値と調整電力の合算値、およびアービトラージ向けの充放電電力の指令を含む蓄電池と送配電事業者によって管理される電力系統を含む送配電設備装置との間で基準値と供出可能電力の電力を遣り取りするための指令を含む。 In the above disclosure, the device further includes a command unit that outputs commands to control charging and discharging of the storage battery, and the commands include a reference value and a sum of regulated power for exchanging power between the storage battery and a power transmission and distribution equipment device including a power system managed by a power transmission and distribution business operator, and a command for charging and discharging power for arbitrage, and a command for exchanging a reference value and available power between the storage battery and a power transmission and distribution equipment device including a power system managed by a power transmission and distribution business operator.

本開示の他の局面に係る方法は、プロセッサが実施する方法であって、電力取引市場における取引対象期間を構成可能な1つ以上の時間帯のうち所定の時間帯について、当該所定の時間帯が始まる以前のタイミングの時刻において取得された蓄電池のSOC関連情報と、当該時刻から所定の時間帯が始まるまでの期間における蓄電池の充放電量を示す情報と、蓄電池の上限容量情報と、蓄電池の充電効率と、蓄電池の放電効率と、所定の時間帯の長さを示す時間情報とに基づいて、蓄電池の所定の時間帯における基準値を算出するステップと、少なくとも、蓄電池の上限容量情報と、蓄電池の放電効率と、所定の時間帯の長さを示す時間情報と、期間の長さを示す時間情報とに基づいて、所定の時間帯における蓄電池の供出可能電力を算出するステップと、を備える。 A method according to another aspect of the present disclosure is a method implemented by a processor, and includes the steps of: calculating a reference value for a specific time period of the storage battery among one or more time periods that can constitute a trading period in an electricity trading market, based on SOC-related information of the storage battery acquired at a time before the start of the specific time period, information indicating the charge/discharge amount of the storage battery in the period from the time until the start of the specific time period, upper limit capacity information of the storage battery, charging efficiency of the storage battery, discharging efficiency of the storage battery, and time information indicating the length of the specific time period; and calculating the available power of the storage battery in the specific time period, based on at least the upper limit capacity information of the storage battery, discharging efficiency of the storage battery, time information indicating the length of the specific time period, and time information indicating the length of the period.

本開示の他の局面に係る方法は、プロセッサが実施する方法であって、電力取引市場における取引対象期間を構成可能な1つ以上の時間帯のうち所定の時間帯について、当該所定の時間帯が始まる以前のタイミングの時刻において取得された蓄電池のSOC関連情報と、当該時刻から所定の時間帯が始まるまでの期間における蓄電池の充放電量を示す情報と、蓄電池の上限容量情報と、蓄電池の充電効率と、蓄電池の放電効率と、所定の時間帯の長さを示す時間情報とに基づいて、蓄電池の所定の時間帯における放電可能電力および基準値を算出するステップと、放電可能電力と基準値に基づいて、所定の時間帯における蓄電池の供出可能電力を算出するステップと、を備える。 A method according to another aspect of the present disclosure is a method implemented by a processor, and includes the steps of: calculating, for a specific time period among one or more time periods that can constitute a trading period in an electricity trading market, the dischargeable power and a reference value of the storage battery in the specific time period based on SOC-related information of the storage battery acquired at a time before the start of the specific time period, information indicating the charge/discharge amount of the storage battery in the period from the time until the start of the specific time period, upper limit capacity information of the storage battery, the charging efficiency of the storage battery, the discharging efficiency of the storage battery, and time information indicating the length of the specific time period; and calculating the supplyable power of the storage battery in the specific time period based on the dischargeable power and the reference value.

本開示の他の局面では上記に述べた方法をプロセッサに実行させるためのプログラムが提供される。 In another aspect of the present disclosure, a program is provided for causing a processor to execute the method described above.

本開示によれば、蓄電池を利用した電力取引市場への供出可能電力を増加させることが可能になる。 This disclosure makes it possible to increase the amount of electricity that can be supplied to the electricity trading market using storage batteries.

本実施の形態に係る分散電源群の制御システム構成の一例を説明する図である。1 is a diagram illustrating an example of a control system configuration for a group of distributed power sources according to an embodiment of the present invention. 本実施の形態に係るネットワークシステムを模式的に示す図である。1 is a diagram illustrating a network system according to an embodiment of the present invention. サーバ10のハードウェア構成を模式的に示す図である。FIG. 2 is a diagram illustrating a hardware configuration of the server 10. 上位制御装置30のハードウェア構成を模式的に示す図である。2 is a diagram illustrating a hardware configuration of a higher-level control device 30. FIG. 本実施の形態に係る機能構成を模式的に示す図である。FIG. 2 is a diagram illustrating a functional configuration according to the present embodiment. 本発明の実施の形態に係る取引情報195の一例を模式的に示す図である。FIG. 10 is a diagram illustrating an example of transaction information 195 according to an embodiment of the present invention. 本実施の形態による基準値と供出可能電力の算出の概念を模式的に示す図である。1 is a diagram showing a schematic diagram of a concept of calculation of a reference value and an outputtable power according to the present embodiment. FIG. 図1の蓄電システムにおける充電効率と放電効率を説明する図である。2 is a diagram illustrating charging efficiency and discharging efficiency in the power storage system of FIG. 1 . 図7の放電可能電力An+4Refの算出を模式的に示す図である。FIG. 8 is a diagram illustrating a schematic diagram of calculation of dischargeable power An+4Ref in FIG. 7 . 図7の充電可能電力Bn+4Refの算出を模式的に示す図である。FIG. 8 is a diagram illustrating the calculation of the chargeable power Bn+4Ref in FIG. 7 . 本発明の実施の形態に係る供出可能電力の算出手順を模式的に示す図である。FIG. 4 is a diagram showing a schematic diagram of a calculation procedure of the outputtable power according to the embodiment of the present invention. 本発明の実施の形態に係る供出可能電力を解析的に導出する手順を模式的に示す図である。1 is a diagram showing a schematic diagram of a procedure for analytically deriving the outputtable power according to an embodiment of the present invention. FIG. 本発明の実施の形態に係る時間ΔTの変更を説明する図である。11A and 11B are diagrams illustrating a change in time ΔT according to an embodiment of the present invention. 本発明の実施の形態に係る売り入札のパターンの一例を示す図である。FIG. 13 is a diagram showing an example of a selling bid pattern according to an embodiment of the present invention. 図14で示した入札パターンに対応した電力取引市場における処理フローを示す図である。FIG. 15 is a diagram showing a process flow in the electricity trading market corresponding to the bidding pattern shown in FIG. 14 . 図14で示した入札パターンに対応した電力取引市場における処理フローを示す図である。FIG. 15 is a diagram showing a process flow in the electricity trading market corresponding to the bidding pattern shown in FIG. 14 . 本発明の実施の形態に係るアグリゲータにおける入札計画の一例を示す図である。FIG. 13 is a diagram showing an example of a bidding plan in an aggregator according to an embodiment of the present invention. 本発明の実施の形態に係るアグリゲータにおける入札計画の一例を示す図である。FIG. 13 is a diagram showing an example of a bidding plan in an aggregator according to an embodiment of the present invention. 本発明の実施の形態に係るアグリゲータにおける入札計画の一例を示す図である。FIG. 13 is a diagram showing an example of a bidding plan in an aggregator according to an embodiment of the present invention. 本実施の形態に係る処理のフローチャートの一例を示す図である。FIG. 2 is a diagram showing an example of a flowchart of a process according to the present embodiment. 本実施の形態に係る処理のフローチャートの一例を示す図である。FIG. 2 is a diagram showing an example of a flowchart of a process according to the present embodiment.

以下、図面を参照しつつ、本発明の実施の形態を説明する。以下の説明では、同一の部材には同一の符号を付してある。それらの名称および機能も同じである。したがって、それらについての詳細な説明は繰り返さない。 Below, an embodiment of the present invention will be described with reference to the drawings. In the following description, the same components are given the same reference numerals. Their names and functions are also the same. Therefore, detailed descriptions thereof will not be repeated.

<用語>
本開示に用いられる主な用語について説明する。
<Terminology>
The main terms used in this disclosure will be explained.

「調整力」は、送配電事業者が電力供給区域の需給バランス調整を行うために必要とする需給調整の能力であり、調整力は需給調整市場から調達される。 "Adjustment capacity" is the ability of electricity transmission and distribution companies to adjust the supply and demand balance in their electricity supply areas, and adjustment capacity is procured from the supply and demand adjustment market.

そして市場から調達された調整力を実際に電力系統へ供出させるために発電所や蓄電所に指令を送る。この指令を「調整指令」と呼ぶ。つまり、調整指令は、送配電事業者が調整力を需給バランス調整のために利用するための指令である。 Then, commands are sent to power plants and storage plants to actually supply the balancing power procured from the market to the power grid. These commands are called "balancing commands." In other words, balancing commands are commands that allow power transmission and distribution operators to use balancing power to adjust the supply and demand balance.

「アグリゲーション」は、蓄電池等の調整力を提供可能な1つ以上のリソースを束ねて電力取引のために一括して制御することを指す。 "Aggregation" refers to bundling one or more resources that can provide balancing power, such as storage batteries, and controlling them collectively for the purpose of energy trading.

「アグリゲータ」は、アグリゲーションを実施する主体を指す。 "Aggregator" refers to the entity that performs aggregation.

「ブロック」は、電力取引市場における取引対象期間を構成可能な単位時間帯である。ブロックは取引する際に管理される時間帯であって所定長さを有する。 A "block" is a unit time period that can constitute a trading period in the electricity trading market. A block is a time period that is managed when trading and has a certain length.

本実施の形態では、電力取引は、入札、落札および約定を含む。需給調整市場において、需要家または蓄電所は調整力(供出可能電力(W))の売り入札をし、送配電事業者等は調整力の買い入札をし、取引市場において両入札について落札されて両者間で約定がなされると、取引が成立する。このような取引において扱われる取引情報は、例えば、供出可能電力を超えない電力(W)を示す需要家または蓄電所からの入札量と、当該入札量が示す電力を超えない電力を示す落札量と、当該落札量が示す電力を超えない電力を示す約定量との情報を含む。取引情報は、入札量として、さらに、送配電事業者からの買い入札量も含まれるが、本開示では入札量として、主に、需要家または蓄電所からの売り入札量を示す。また、ブロックでは、蓄電池について、当該ブロックについて登録された基準値に従う充電と、調整指令に応じた放電とを行う実需給が実施される。 In this embodiment, the power transaction includes bidding, winning bids, and agreements. In the supply and demand adjustment market, a consumer or a power storage plant makes a selling bid for adjustment capacity (supplyable power (W)), and a power transmission and distribution business operator or the like makes a buying bid for adjustment capacity. When both bids are won in the trading market and an agreement is made between the two parties, a transaction is concluded. The transaction information handled in such a transaction includes, for example, information on the bid amount from the consumer or power storage plant indicating power (W) that does not exceed the supplyable power, the winning bid amount indicating power that does not exceed the power indicated by the bid amount, and the contract amount indicating power that does not exceed the power indicated by the winning bid amount. The transaction information further includes the buying bid amount from the power transmission and distribution business operator as the bid amount, but in this disclosure, the bid amount mainly indicates the selling bid amount from the consumer or power storage plant. In addition, in the block, actual supply and demand is carried out for the storage battery by charging according to the reference value registered for the block and discharging according to the adjustment command.

「残容量」は、ある時間帯における蓄電池の放電可能容量(Wh:ワットアワー)を指す。 "Remaining capacity" refers to the dischargeable capacity (Wh: watt-hours) of the storage battery at a certain time.

「SOC(State Of Charge)」は、蓄電池の充電状態を表す指標である。当該指標は例えば“残容量”を含む。 "SOC (State Of Charge)" is an index that indicates the charging state of a storage battery. The index includes, for example, "remaining capacity."

「GC(ゲートクローズ)」は、ブロックの実需給の開始前の時間であって当該ブロックの基準値を市場取引サーバに登録する期限に相当する。 "GC (Gate Close)" is the time before the start of actual supply and demand for a block and corresponds to the deadline for registering the reference value for that block on the market trading server.

「供出可能電力」は、ある時間帯において蓄電池から需給調整市場に入札可能な放電可能電力(W)を指す。 "Available electricity" refers to the amount of dischargeable electricity (W) that can be bid on the supply and demand adjustment market from a storage battery during a certain period of time.

「SOC関連情報」は、蓄電池の充電状態を表す指標(SOC)の具体例をまとめたものである。SOC関連情報は、例えば、蓄電池の最大の放電可能容量(Wh)と、ある時点における放電可能容量(Wh)とから算出された算出値(%)、ある時点における放電可能容量(Wh)である残容量のみを示す値、少なくとも過去の充放電電力(W)と、充放電電流(A:アンペア)と、充放電電圧(V:ボルト)と、経過時間と、過去の充放電回数と、蓄電池の電池の劣化情報等の複数のパラメータのうちの2つ以上のパラメータまたは全てのパラメータを用いた所定演算により算出された値等を含む。 "SOC-related information" is a collection of specific examples of indicators (SOC) that represent the state of charge of a storage battery. SOC-related information includes, for example, a calculated value (%) calculated from the maximum dischargeable capacity (Wh) of the storage battery and the dischargeable capacity (Wh) at a certain point in time, a value indicating only the remaining capacity, which is the dischargeable capacity (Wh) at a certain point in time, and a value calculated by a predetermined calculation using two or more parameters or all parameters out of multiple parameters such as at least the past charging and discharging power (W), the charging and discharging current (A: amperes), the charging and discharging voltage (V: volts), the elapsed time, the number of past charging and discharging, and battery deterioration information of the storage battery.

「基準値」は、需給調整市場において調整力としての放電電力を計測する際の基準となる充電電力であり、ブロックまたは所定時間帯(例えば30分)において一定値(W)にしなければならない充電電力を示す。加えて、基準値にはエネルギーマネジメントによる充電電力等の他の使用用途による充電電力も含めることができる。なお、充電を全く行わない状況での基準値は0であり、基準値は0でも良い。 The "reference value" is the charging power that serves as the reference when measuring the discharge power as an adjustment power in the supply and demand adjustment market, and indicates the charging power that must be a constant value (W) in a block or a specified time period (e.g., 30 minutes). In addition, the reference value can also include charging power for other uses, such as charging power for energy management. The reference value in a situation where no charging is performed at all is 0, and the reference value may be 0.

「基準値計画」は、需給調整市場で取引対象となる期間(ブロック)における蓄電池の基準値に基づく充電計画値(W)または「計画出力値」(W)と同義である。 "Baseline value plan" is synonymous with the charging plan value (W) or "planned output value" (W) based on the base value of the storage battery in the period (block) that is the subject of trading in the supply and demand adjustment market.

「上限容量情報」は、蓄電池の最大の放電可能容量(Wh)を示す情報であって、放電可能な最大の残容量または定格容量(Wh)を示す情報を含む。これに限定されず、約定出力(W)×ブロック時間(hour)を示す情報を含んでもよい。 "Upper limit capacity information" is information indicating the maximum dischargeable capacity (Wh) of the storage battery, and includes information indicating the maximum remaining capacity or rated capacity (Wh) that can be discharged. It is not limited to this, and may also include information indicating the contracted output (W) x block time (hours).

「上限出力情報」は、蓄電池の最大の放電可能電力(W)、または蓄電池の最大の充電可能電力(W)を示す情報であって、放電可能な最大の電力や充電可能な最大の電力、または定格出力を示す情報を含むが、これに限定されず、ブロックについて約定出力(W)を示す情報を含んでもよい。 "Upper limit output information" is information indicating the maximum dischargeable power (W) of the storage battery or the maximum chargeable power (W) of the storage battery, and includes information indicating the maximum dischargeable power, the maximum chargeable power, or the rated output, but is not limited to this, and may also include information indicating the contracted output (W) for the block.

<開示の技術>
蓄電池等の電源を用いて需給調整市場等の電力取引市場で電力を充放電する場合は、蓄電池の充電計画等を元に、供出可能電力が事前に算出されて電力市場等に入札される。需給調整市場においては、事前に基準値計画(エネマネ計画や充電計画)を需給調整市場のシステムに登録する必要があるが、実需給に至る直前のGCまでにこの基準値計画の値は変更することができる。
<Disclosed Technology>
When charging and discharging electricity using a power source such as a storage battery in an electricity trading market such as a supply and demand adjustment market, the available electricity is calculated in advance based on the battery charging plan, etc., and is bid on the electricity market, etc. In a supply and demand adjustment market, it is necessary to register a reference value plan (energy management plan or charging plan) in advance in the supply and demand adjustment market system, but the value of this reference value plan can be changed up until the GC immediately before the actual supply and demand.

このような取引の背景のもと、本開示では、実需給の1時間以上前の直前の断面において基準値計画を変更することを前提として、需給調整市場への入札量(供出可能電力)を計算する方法を示す。また、変更後の基準値に基づき蓄電池等の電源の充電を制御する。その結果、事前に予測した(又は想定した)基準値計画に基づいた入札を行うよりも、想定の範囲内で変更する基準値に基づき蓄電池等の電源を制御することに基づいた入札を行う方が可能な入札量を増やすことができる。 In light of this trading background, this disclosure shows a method for calculating the amount of bids (supplyable electricity) to the supply and demand adjustment market, on the premise that the reference value plan is changed at the cross section immediately preceding the actual supply and demand, which is at least one hour before. In addition, charging of a power source such as a storage battery is controlled based on the changed reference value. As a result, it is possible to increase the amount of available bids by placing a bid based on controlling a power source such as a storage battery based on a reference value that is changed within an expected range, rather than placing a bid based on a reference value plan predicted (or assumed) in advance.

このように、実需給に至る直前に基準値計画等を変更することを前提として電力市場に入札できる量を増やす仕組みを以下に説明する。 Below is an explanation of the mechanism for increasing the amount of bids that can be made into the electricity market, assuming that the base value plan, etc. will be changed immediately before actual supply and demand is reached.

また、以下では、本開示が適用される電力取引市場として、需給調整市場と卸電力市場を示すが、これら電力取引市場に限定されず容量市場等様々な市場に適用してもよい。このような電力取引市場で約定される調整力には、例えば、需給調整市場における、一次調整力、二次調整力(1)、二次調整力(2)、三次調整力(1)、三次調整力(2)、及びこれらの複合商品や、余力活用電源契約での余力活用分の調整力、容量市場における、発動指令電力 、卸電力市場における買電電力(=アービトラージ充電、基準値)、売電電力(=アービトラージ放電)、などがある。 In the following, the supply and demand adjustment market and the wholesale electricity market are shown as electricity trading markets to which the present disclosure applies, but the disclosure is not limited to these electricity trading markets and may be applied to various markets such as capacity markets. The adjustment capacity agreed upon in such electricity trading markets includes, for example, primary adjustment capacity, secondary adjustment capacity (1), secondary adjustment capacity (2), tertiary adjustment capacity (1), tertiary adjustment capacity (2), and combinations of these in the supply and demand adjustment market, adjustment capacity for surplus utilization in surplus utilization power source contracts, activation command power in the capacity market, purchased electricity (= arbitrage charging, reference value) and sold electricity (= arbitrage discharge) in the wholesale electricity market, etc.

<システム>
図1は、本実施の形態に係る分散電源群の制御システム構成の一例を説明する図である。図1に示すシステムは、VPP(Virtual Power Plant)システムである。VPPシステムは、多数のエネルギーリソースを束ね、これらエネルギーリソースを制御することによって1つの発電所のように機能させる仕組みである。本実施の形態では、需要家または蓄電所の設備40に備えられた充放電可能な蓄電池50は、需給調整市場に調整力を提供する「電力調整リソース」を構成する。需要家または蓄電所の設備40を、以下では、需要家設備40と呼ぶ。
<System>
FIG. 1 is a diagram for explaining an example of a control system configuration for a group of distributed power sources according to the present embodiment. The system shown in FIG. 1 is a VPP (Virtual Power Plant) system. The VPP system is a mechanism for bundling a large number of energy resources and controlling these energy resources to function like a single power plant. In this embodiment, a chargeable and dischargeable storage battery 50 provided in a consumer or power storage facility 40 constitutes a "power adjustment resource" that provides adjustment power to the supply and demand adjustment market. The consumer or power storage facility 40 will be referred to as consumer facility 40 below.

需要家設備40は、下位制御装置20と、蓄電池50およびPCS(Power Conditioning System)23を有する蓄電システム27と、計測器22と、分電盤25と、負荷や他電源等の設備24と、上位制御装置30等と通信するためのゲートウェイ21とを備える。分電盤25には、蓄電システム27および計測器22を介して蓄電池50が接続されるとともに、設備24が接続される。また、分電盤25には、需要家設備40の外部にある計測器26を介して送配電事業者が管理する送配電のための電力系統100が接続される。計測器22と26は、電力を計測するスマートメータ等で構成される。計測器26は、需要家設備40と電力系統100との間で遣り取りする電力を計測し、蓄電システム27の直上に接続された計測器22は、蓄電池50の入出力電力を計測する。下位制御装置20は、計測器22および26からの計測値に基づき電力量を導出する等の各種処理を実施する。 The customer equipment 40 includes a lower-level control device 20, a power storage system 27 having a storage battery 50 and a PCS (Power Conditioning System) 23, a meter 22, a distribution board 25, equipment 24 such as loads and other power sources, and a gateway 21 for communicating with a higher-level control device 30, etc. The distribution board 25 is connected to the storage battery 50 via the storage system 27 and the meter 22, and to the equipment 24. The distribution board 25 is also connected to a power system 100 for power transmission and distribution managed by a power transmission and distribution company via a meter 26 located outside the customer equipment 40. The meter 22 and 26 are composed of smart meters that measure power. The meter 26 measures the power exchanged between the customer equipment 40 and the power system 100, and the meter 22 connected directly above the storage system 27 measures the input and output power of the storage battery 50. The lower-level control device 20 performs various processes, such as deriving the amount of power based on the measurements from the measuring devices 22 and 26.

蓄電システム27のPCS23は、下位制御装置20からの指令に従って蓄電池50の充電の開始/終了及び充電電力と放電の開始/終了及び放電電力とを制御する。充電において、PCS23は、電力系統100から計測器26、分電盤25および計測器22を介して供給された交流電力を直流電力に変換する。放電において、PCS23は、蓄電池50から供給された直流電力を交流電力に変換し、当該交流電力は計測器22、分電盤25および計測器26を介して電力系統100に出力される。 The PCS 23 of the power storage system 27 controls the start/end of charging and charging power of the storage battery 50 and the start/end of discharging and discharging power according to commands from the lower-level control device 20. During charging, the PCS 23 converts AC power supplied from the power grid 100 via the meter 26, distribution board 25, and meter 22 into DC power. During discharging, the PCS 23 converts DC power supplied from the storage battery 50 into AC power, which is output to the power grid 100 via the meter 22, distribution board 25, and meter 26.

需要家設備40は、SOC関連情報を取得する。ここでは、SOC関連情報として、典型的には、蓄電池50の残容量が用いられる。蓄電池50の電圧または電流は、蓄電池50の残容量と相関関係を有することに着目し、図示しない検出回路は蓄電池50の電圧または電流を測定し、測定された電圧または電流の累積情報と上記の相関関係とに基づき残容量を検出する。なお、残容量の検出方法はこれに限定されない。 The consumer equipment 40 acquires SOC-related information. Here, the remaining capacity of the storage battery 50 is typically used as the SOC-related information. Noting that the voltage or current of the storage battery 50 has a correlation with the remaining capacity of the storage battery 50, a detection circuit (not shown) measures the voltage or current of the storage battery 50 and detects the remaining capacity based on the cumulative information of the measured voltage or current and the above correlation. Note that the method of detecting the remaining capacity is not limited to this.

図1のシステムは、市場取引サーバ10Aと、送配電事業者側の中給サーバ10B(「中給」は“中央給電指令所”の略)および指令サーバ10Cと、上位制御装置30と、下位制御装置20を有した複数の需要家設備40を備える。なお、これら装置は、例えば、専用線や閉域網、インターネットを含む有線または無線の通信ネットワークを介して互いに通信する。システムが備える需要家設備40は複数台に限定されず1台以上であればよい。また、システムでは、複数の需要家設備40は電力調整リソースを互いに束ねられたアグリゲーションを構成する。これら複数の需要家設備40のうちの代表の下位制御装置20または上位制御装置30がアグリゲーションの調整力を管理するアグリゲータを担う。または、各需要家設備40の下位制御装置20が自己の調整力リソース(蓄電池50)を管理するアグリゲータとして動作してもよい。本実施の形態では、例えば、上位制御装置30が各需要家設備40の下位制御装置20と通信することにより、複数の需要家設備40は電力調整リソースが互いに束ねられたアグリゲーションのアグリゲータを担う。 The system in FIG. 1 includes a market trading server 10A, a power supply server 10B ("Central Supply" is an abbreviation for "Central Load Dispatch Center") and a command server 10C on the power transmission and distribution company side, a host control device 30, and multiple consumer equipment 40 having a lower control device 20. These devices communicate with each other via a wired or wireless communication network, such as a dedicated line, a closed network, or the Internet. The number of consumer equipment 40 in the system is not limited to multiple units, but may be one or more units. In the system, the multiple consumer equipment 40 constitute an aggregation in which power adjustment resources are bundled together. A representative lower control device 20 or upper control device 30 among the multiple consumer equipment 40 serves as an aggregator that manages the adjustment power of the aggregation. Alternatively, the lower control device 20 of each consumer equipment 40 may operate as an aggregator that manages its own adjustment power resource (storage battery 50). In this embodiment, for example, the upper control device 30 communicates with the lower control device 20 of each consumer facility 40, and the consumer facilities 40 act as aggregators for aggregations in which power adjustment resources are bundled together.

中給サーバ10Bおよび指令サーバ10Cを備える事業者は、送配電事業者であるが、上位制御装置30を備える事業者は、発電事業者または小売電気事業者等であってもよく、これらを兼ねた事業者であってもよい。これら上位制御装置30を備える事業者は、需要家設備40を有する需要家等とVPPのサービス契約を締結する。そして、各需要家設備40の下位制御装置20は、上位制御装置30を介して、蓄電池50の充放電を制御する。 The business operator equipped with the intermediate supply server 10B and the command server 10C is a power transmission and distribution business operator, but the business operator equipped with the upper control device 30 may be a power generation business operator or a retail electricity business operator, or may be a business operator that combines these functions. Business operators equipped with these upper control devices 30 enter into VPP service contracts with consumers who have consumer equipment 40. The lower control devices 20 of each consumer equipment 40 then control the charging and discharging of the storage batteries 50 via the upper control device 30.

電力市場の取引では、取引対象となる所定長さを有した単位時間帯であるブロックについて、市場で扱う商品の取引を行う。各市場サーバ10Dは、需給調整市場のサーバおよび卸電力市場のサーバ等の各種市場向けのサーバを含む。各市場サーバ10Dは、例えば、買い入札(例えば、送配電事業者からの買い入札)と、アグリゲータが保有する市場取引サーバ10Aからの売り入札(例えば、アグリゲータが契約した需要家からの調整力供出量を背景とした売り入札や、発電所からの売り入札)とを受信し、両者を合致させて約定を成立させる。送配電事業者の中給サーバ10Bおよび指令サーバ10Cは、ブロックにおいて需給バランスをとるために、当該ブロックについて約定された供出可能電力に従った調整力の調整指令を発電所や、アグリゲータの上位制御装置30へ送信する。 In electricity market transactions, products are traded in the market for blocks, which are unit time periods of a predetermined length that are the subject of transactions. Each market server 10D includes servers for various markets, such as a server for the supply and demand adjustment market and a server for the wholesale electricity market. Each market server 10D receives, for example, a buying bid (e.g., a buying bid from a power transmission and distribution company) and a selling bid (e.g., a selling bid based on the adjustment capacity supply volume from consumers contracted by the aggregator, or a selling bid from a power plant) from the market transaction server 10A held by the aggregator, and matches the two to establish a contract. In order to balance supply and demand in the block, the intermediate supply server 10B and command server 10C of the power transmission and distribution company transmit a command to adjust the adjustment capacity according to the available power supply agreed upon for the block to the power plant and the upper control device 30 of the aggregator.

需給調整市場のサーバは、後述する一次調整力、二次調整力(1)、二次調整力(2)、三次調整力(1)、三次調整力(2)等に適用することができる。なお、二次調整力(1)、二次調整力(2)、三次調整力(1)および三次調整力(2)の名称は需給調整市場の運用メニューの正式名称に対応し、これらにおける(1)および(2)は、当該正式名称ではそれぞれ、丸付き数字1および丸付き数字2で表記されるが、本明細書では丸付き数字を用いずに(1)と(2)で示す。 The supply and demand adjustment market server can be applied to the primary adjustment capacity, secondary adjustment capacity (1), secondary adjustment capacity (2), tertiary adjustment capacity (1), tertiary adjustment capacity (2), etc., which will be described later. The names secondary adjustment capacity (1), secondary adjustment capacity (2), tertiary adjustment capacity (1), and tertiary adjustment capacity (2) correspond to the official names of the supply and demand adjustment market operation menu, and (1) and (2) in these are written as circled numbers 1 and circled numbers 2, respectively, in the official names, but in this specification they are written as (1) and (2) without circled numbers.

卸電力市場のサーバは、アービトラージ(Arbitrage)取引向けのスポット市場(=1日前市場と同義)や、時間前市場を構成する。時間前市場では、実需給の直前まで、電力売電、買電、基準値向けの電力買電の取引を実施することができる。 The wholesale electricity market server comprises a spot market (synonymous with the one-day-ahead market) for arbitrage trading, and an hour-ahead market. In the hour-ahead market, electricity sales, purchases, and benchmark purchases can be traded up until just before actual supply and demand.

上位制御装置30は、各種サーバと通信するための通信回路を有したI/F(Interfaceの略)と、需要家設備40の下位制御装置20と通信するための通信回路を有したI/Fを含む。上位制御装置30は、中給サーバ10Bまたは指令サーバ10Cから受信した調整指令に基づき、各需要家設備40の下位制御装置20に制御指令を生成し送信する。下位制御装置20は、制御指令に従って蓄電池50の放電を制御する。このような蓄電池50からの放電による電力は、需給調整市場の調整力として電力系統100に供給される。これにより、送配電事業者は需給調整市場を介した調整力の約定を背景として発電所や需要家から調整力を調達でき、その結果、需給バランスを維持することができる。 The upper control device 30 includes an I/F (short for Interface) having a communication circuit for communicating with various servers, and an I/F having a communication circuit for communicating with the lower control device 20 of the consumer equipment 40. The upper control device 30 generates and transmits a control command to the lower control device 20 of each consumer equipment 40 based on the adjustment command received from the intermediate supply server 10B or the command server 10C. The lower control device 20 controls the discharge of the storage battery 50 according to the control command. The power discharged from the storage battery 50 is supplied to the power system 100 as an adjustment capacity in the supply and demand adjustment market. This allows the power transmission and distribution company to procure adjustment capacity from power plants and consumers based on the agreement of adjustment capacity via the supply and demand adjustment market, and as a result, the supply and demand balance can be maintained.

図1中の実線の矢印線は、有線または無線の通信線(通信ネットワーク)を示し、破線の矢印線は電力線を示す。太い矢印線は、電力取引における市場取引サーバ10A、上位制御装置30および需要家設備40(需要家設備40内の装置)の間の情報の主な伝送ルートを示す。 In FIG. 1, solid arrows indicate wired or wireless communication lines (communication networks), and dashed arrows indicate power lines. Thick arrows indicate the main information transmission routes between the market trading server 10A, the upper control device 30, and the customer equipment 40 (equipment within the customer equipment 40) in power trading.

<ネットワーク構成と装置構成>
図2は、本実施の形態に係るネットワークシステムを模式的に示す図である。図2の(A)は、電力市場における取引情報を通信するためのネットワークシステムを模式的に例示し、図2の(B)は、調整指令を含む需給調整のための情報を通信するためのネットワークシステムを模式的に例示する。
<Network configuration and device configuration>
Fig. 2 is a diagram showing a network system according to the present embodiment, in which (A) of Fig. 2 shows a schematic example of a network system for communicating transaction information in an electricity market, and (B) of Fig. 2 shows a schematic example of a network system for communicating information for supply and demand adjustment including an adjustment command.

図2の(A)の取引情報の通信ネットワークシステムでは、取引のためのサーバ(市場取引サーバ10Aおよび各市場サーバ10D)と、上位制御装置30とは有線または無線のネットワーク1Aに接続される。ネットワーク1Aに接続された上位制御装置30は、各需要家設備40の下位制御装置20と通信するとともに、ネットワーク1Aを介し取引のためのサーバと通信する。これら装置間では、取引情報は、例えばCSV(Comma Separated Values)ファイルの形式で転送される。このような取引情報は、各市場サーバ10DのHDD(Hard Disk Drive)154に格納される各電力取引市場についての電力取引に関する情報であって、需要家に提供可能なサービス情報164を含む。 In the transaction information communication network system of FIG. 2(A), the servers for transactions (market transaction server 10A and each market server 10D) and the upper control device 30 are connected to a wired or wireless network 1A. The upper control device 30 connected to the network 1A communicates with the lower control devices 20 of each consumer facility 40, and also communicates with the transaction server via the network 1A. Transaction information is transferred between these devices in the form of, for example, a CSV (Comma Separated Values) file. Such transaction information is information about electricity transactions for each electricity trading market stored in the HDD (Hard Disk Drive) 154 of each market server 10D, and includes service information 164 that can be provided to consumers.

図2の(B)の需給調整のための調整指令を含む情報の通信ネットワークシステムでは、調整指令を送信するサーバ(中給サーバ10Bまたは指令サーバ10C)と、上位制御装置30とは専用回線であるネットワーク1Bに接続される。ネットワーク1Bに接続された上位制御装置30は、各需要家設備40の下位制御装置20と通信するとともに、ネットワーク1Bを介し調整指令のサーバと通信する。 In the communication network system of information including adjustment commands for supply and demand adjustment in FIG. 2(B), the server that transmits the adjustment commands (intermediate supply server 10B or command server 10C) and the upper control device 30 are connected to network 1B, which is a dedicated line. The upper control device 30 connected to network 1B communicates with the lower control devices 20 of each consumer facility 40, and also communicates with the adjustment command server via network 1B.

本実施の形態では、上位制御装置30は、例えばクラウドベースのサーバに実装されるが、実装形式はこれに限定されない。また、図2では、市場取引サーバ10A、下位制御装置20および上位制御装置30は、デスクトップ型のPC(Personal Computer)に実装される形式で示されるが、これら装置の実装形式はデスクトップ型PCに限定されない。例えば、下位制御装置20は、携帯型の情報処理端末(例えば、ラップトップ型のPC、タブレット端末、またはスマートフォン等)であってもよい。以下の説明では、市場取引サーバ10A、中給サーバ10B、指令サーバ10C、および各市場サーバ10Dについて共通する説明では、サーバ10と総称する。 In this embodiment, the upper control device 30 is implemented, for example, in a cloud-based server, but the implementation format is not limited to this. Also, in FIG. 2, the market trading server 10A, the lower control device 20, and the upper control device 30 are shown implemented in a desktop PC (Personal Computer), but the implementation format of these devices is not limited to a desktop PC. For example, the lower control device 20 may be a portable information processing terminal (e.g., a laptop PC, a tablet terminal, or a smartphone). In the following explanation, the market trading server 10A, the intermediate supply server 10B, the command server 10C, and each market server 10D are collectively referred to as server 10 in the common explanation.

図3は、サーバ10のハードウェア構成を模式的に示す図である。図3に示されるように、サーバ10は、主たる構成要素として、プログラムを実行するCPU(Central Processing Unit)等のプロセッサ151と、データを不揮発的に格納するROM(Read Only Memory)152と、プロセッサ151によるプログラムの実行時の作業領域を含むとともに、プログラム実行により生成されたデータ、又は入力されたデータを揮発的に格納する領域等を含むRAM(Random Access Memory)153と、プログラムおよびデータを不揮発的に格納するHDD(Hard Disk Drive)154と、通信IF(Interface)155と、サーバ10に対する操作を受付ける入力装置156と、情報を表示するディスプレイ157と、電源回路158と、タイマ162と、外部デバイスを通信可能に接続するためのI/O(Input/Output)部163と、記憶媒体161についてデータの読み書きするR/W(Read/Write)部160を含む。これら構成要素はデータバスによって相互に接続されている。 3 is a diagram showing a schematic diagram of the hardware configuration of the server 10. As shown in FIG. 3, the server 10 includes, as main components, a processor 151 such as a CPU (Central Processing Unit) that executes a program, a ROM (Read Only Memory) 152 that stores data in a non-volatile manner, a RAM (Random Access Memory) 153 that includes a working area when the processor 151 executes the program and an area for volatilely storing data generated by the execution of the program or input data, a HDD (Hard Disk Drive) 154 that stores programs and data in a non-volatile manner, a communication IF (Interface) 155, an input device 156 that accepts operations on the server 10, a display 157 that displays information, a power circuit 158, a timer 162, an I/O (Input/Output) unit 163 for communicatively connecting an external device, and an R/W (Read/Write) unit 160 that reads and writes data from and to a storage medium 161. These components are connected to each other by a data bus.

入力装置156とディスプレイ157は、一体化されてタッチパネル159のようなデバイスとして提供されてもよい。通信IF155は、ネットワークとサーバ10の間における通信を制御するためのインターフェイス回路を含む。 The input device 156 and the display 157 may be integrated and provided as a device such as a touch panel 159. The communication IF 155 includes an interface circuit for controlling communication between the network and the server 10.

サーバ10における処理は、各ハードウェアおよびプロセッサ151により実行されるソフトウェア(プログラム)によって実現される。このようなソフトウェアは、HDD154に予め記憶されている場合がある。また、ソフトウェアは、記憶媒体161に格納されて、プログラムプロダクトとして流通している場合もある。また、ソフトウェアは、いわゆるインターネットに接続されている情報提供事業者によってダウンロード可能なプログラムプロダクトとして提供される場合もある。このようなソフトウェアは、R/W部160により記憶媒体161から読取られて、あるいは、通信IF155を介してダウンロードされた後、HDD154に一旦格納される。そのソフトウェアは、プロセッサ151によってHDD154から読出され、RAM153に実行可能なプログラムの形式で格納される。プロセッサ151は、そのプログラムを実行する。 The processing in the server 10 is realized by the various pieces of hardware and software (programs) executed by the processor 151. Such software may be pre-stored in the HDD 154. In other cases, the software is stored in the storage medium 161 and distributed as a program product. In other cases, the software is provided as a downloadable program product by an information provider connected to the Internet. Such software is read from the storage medium 161 by the R/W unit 160 or downloaded via the communication IF 155, and then temporarily stored in the HDD 154. The software is read from the HDD 154 by the processor 151 and stored in the RAM 153 in the form of an executable program. The processor 151 executes the program.

図4は、上位制御装置30のハードウェア構成を模式的に示す図である。図4に示されるように、上位制御装置30は、主たる構成要素として、プログラムを実行するCPU等のプロセッサ171と、データを不揮発的に格納するROM172と、プロセッサ171によるプログラムの実行時の作業領域を含むとともに、プログラム実行により生成されたデータ、又は入力されたデータを揮発的に格納する領域等を含むRAM173と、プログラムおよびデータを不揮発的に格納するHDD174と、通信IF175と、上位制御装置30に対する操作を受付ける入力装置176と、情報を表示するディスプレイ177と、電源回路178と、タイマ182と、記憶媒体181についてデータの読み書きするR/W部180を含む。これら構成要素はデータバスによって相互に接続されている。 Figure 4 is a diagram showing a schematic diagram of the hardware configuration of the upper control device 30. As shown in Figure 4, the upper control device 30 includes, as main components, a processor 171 such as a CPU that executes a program, a ROM 172 that stores data in a non-volatile manner, a RAM 173 that includes a working area when the processor 171 executes the program and an area for volatilely storing data generated by the execution of the program or input data, an HDD 174 that stores programs and data in a non-volatile manner, a communication IF 175, an input device 176 that accepts operations for the upper control device 30, a display 177 that displays information, a power circuit 178, a timer 182, and an R/W unit 180 that reads and writes data from and to the storage medium 181. These components are connected to each other by a data bus.

入力装置176とディスプレイ177は、一体化されてタッチパネル179のようなデバイスとして提供されてもよい。通信IF175は、上位制御装置30とGWの間における通信を制御するためのインターフェイス回路を含む。なお、上位制御装置30は、入力装置176とディスプレイ177を備えない構成であってもよい。そのような構成の場合、上位制御装置30は、外部装置に通信IF175を介して情報を転送して外部装置に情報を表示させる。このような表示のための情報は、後述するGUI部65からの表示制御データを含む。また、上位制御装置30は、当該装置に対する操作情報を外部装置から通信IF175を介して受信する。このような外部装置は、下位制御装置20を含み得る。 The input device 176 and the display 177 may be integrated and provided as a device such as a touch panel 179. The communication IF 175 includes an interface circuit for controlling communication between the upper control device 30 and the GW. The upper control device 30 may be configured without the input device 176 and the display 177. In such a configuration, the upper control device 30 transfers information to an external device via the communication IF 175 and displays the information on the external device. Such information for display includes display control data from the GUI unit 65, which will be described later. The upper control device 30 also receives operation information for the device from the external device via the communication IF 175. Such an external device may include the lower control device 20.

上位制御装置30における処理は、各ハードウェアおよびプロセッサ171により実行されるソフトウェア(プログラム)によって実現される。このようなソフトウェアは、HDD174に予め記憶されている場合がある。また、ソフトウェアは、記憶媒体181に格納されて、プログラムプロダクトとして流通している場合もある。また、ソフトウェアは、いわゆるインターネットに接続されている情報提供事業者によってダウンロード可能なプログラムプロダクトとして提供される場合もある。このようなソフトウェアは、R/W部180により記憶媒体181から読取られて、あるいは、通信IF175を介してダウンロードされた後、HDD174に一旦格納される。そのソフトウェアは、プロセッサ171によってHDD174から読出され、RAM173に実行可能なプログラムの形式で格納される。プロセッサ171は、そのプログラムを実行する。 The processing in the upper control device 30 is realized by each piece of hardware and software (programs) executed by the processor 171. Such software may be pre-stored in the HDD 174. In other cases, the software is stored in the storage medium 181 and distributed as a program product. In other cases, the software is provided as a downloadable program product by an information provider connected to the Internet. Such software is read from the storage medium 181 by the R/W unit 180 or downloaded via the communication IF 175, and then temporarily stored in the HDD 174. The software is read from the HDD 174 by the processor 171 and stored in the RAM 173 in the form of an executable program. The processor 171 executes the program.

HDD174は、OS(Operating System)等のシステムプログラム190と、システムプログラム190の下で実行されるアプリケーションプログラム197と、蓄電池50の属性および充放電に関する属性を含む属性情報194と、電力取引に関する取引情報195とを含む。アプリケーションプログラム197は、電力取引のための取引プログラムおよび蓄電池50の充放電を制御するための制御プログラム等を含む。 The HDD 174 includes a system program 190 such as an OS (Operating System), an application program 197 executed under the system program 190, attribute information 194 including attributes of the storage battery 50 and attributes related to charging and discharging, and transaction information 195 related to electricity trading. The application program 197 includes a trading program for electricity trading and a control program for controlling the charging and discharging of the storage battery 50.

属性情報194は、蓄電池50の上限容量情報、劣化情報、定格容量および定格出力等を含む。属性情報194は、さらに、後述するAD変換効率ηおよびDA効率ηdを含む。 The attribute information 194 includes upper limit capacity information, deterioration information, rated capacity, rated output, etc. of the storage battery 50. The attribute information 194 further includes an AD conversion efficiency ηC and a DA efficiency ηd, which will be described later.

取引情報195は、未約定のブロック、入札したブロックおよび約定したブロックを識別する情報を含む。また、取引情報195は、入札したブロックについての供出可能電力と入札量(=入札電力)の情報、および約定したブロックについての落札量(=約定量、約定電力)の情報を含む。取引情報195は、さらに、各ブロックについて基準値および基準値計画の情報、蓄電池50の充放電の状態(後述する「Arb放電」(W)、「Arb充電」(W)、「調整力供出」(W)等)の情報を含む。この充放電の状態は、充放電量を示す情報と関連しており、充放電の状態には、蓄電池50が充放電を停止している状態(すなわち、充電も放電(調整力供出)のいずれも実施していない状態)も含まれ得る。本実施の形態では、説明を簡単にするために、蓄電池50の充放電の状態は「Arb放電」、「Arb充電」および「調整力供出」のいずれかであるとする。 The transaction information 195 includes information for identifying uncontracted blocks, bidded blocks, and contracted blocks. The transaction information 195 also includes information on the available power and bid amount (= bid power) for the bidded blocks, and information on the successful bid amount (= contract amount, contracted power) for the contracted blocks. The transaction information 195 further includes information on the reference value and reference value plan for each block, and information on the charge/discharge state of the storage battery 50 (such as "Arb discharge" (W), "Arb charge" (W), and "adjustment power supply" (W), which will be described later). This charge/discharge state is related to information indicating the charge/discharge amount, and the charge/discharge state may include a state in which the storage battery 50 has stopped charging/discharging (i.e., a state in which neither charging nor discharging (adjustment power supply) is being performed). In this embodiment, for the sake of simplicity, the charge/discharge state of the storage battery 50 is assumed to be one of "Arb discharge", "Arb charge", and "adjustment power supply".

各市場サーバ10DのHDD154のサービス情報164の少なくとも一部が上位制御装置30に送信されることによって、HDD174に取引情報195が格納(更新)される。 At least a portion of the service information 164 in the HDD 154 of each market server 10D is sent to the upper control device 30, and the transaction information 195 is stored (updated) in the HDD 174.

図3と図4に示されるサーバ10と上位制御装置30を構成する各構成要素は、一般的な情報処理装置として提供され得る。したがって、本発明の本質的な部分は、RAM153(173)、HDD154(174)、記憶媒体161(181)に格納されたソフトウェア、あるいはネットワークを介してダウンロード可能なソフトウェアであるともいえる。なお、下位制御装置20のハードウェア構成は、図4に示す上位制御装置30のハードウェア構成に類似するから、ここでは説明は繰り返さない。 The components constituting the server 10 and the upper control device 30 shown in Figures 3 and 4 can be provided as general information processing devices. Therefore, it can be said that the essential part of the present invention is the software stored in the RAM 153 (173), the HDD 154 (174), and the storage medium 161 (181), or the software that can be downloaded via a network. Note that the hardware configuration of the lower control device 20 is similar to the hardware configuration of the upper control device 30 shown in Figure 4, so the description will not be repeated here.

図3の記憶媒体161および図4の記憶媒体181は、揮発性記憶媒体または不揮発性記憶媒体を含み、例えば、CF(登録商標、Compact Flash)、SD(登録商標、Secure Digital)等の汎用的な半導体記憶デバイス、またはフレキシブルディスク(Flexible Disk)等の磁気記憶媒体、またはCD-ROM(Compact Disk Read Only Memory)等の光学記憶媒体を含む。 The storage medium 161 in FIG. 3 and the storage medium 181 in FIG. 4 include volatile or non-volatile storage media, such as general-purpose semiconductor storage devices such as CF (registered trademark, Compact Flash) and SD (registered trademark, Secure Digital), magnetic storage media such as flexible disks, or optical storage media such as CD-ROMs (Compact Disk Read Only Memory).

<機能構成>
図5は、本実施の形態に係る機能構成を模式的に示す図である。図6は、本発明の実施の形態に係る取引情報195の一例を模式的に示す図である。図5には、上位制御装置30がアプリケーションプログラム197を実行することによって実現される主な機能を示す。これら機能は、下位制御装置20または市場取引サーバ10Aにおいて実装されてもよい。
<Functional configuration>
Fig. 5 is a diagram showing a functional configuration according to the present embodiment. Fig. 6 is a diagram showing an example of trading information 195 according to the embodiment of the present invention. Fig. 5 shows main functions realized by the upper control device 30 executing the application program 197. These functions may be implemented in the lower control device 20 or the market trading server 10A.

図5を参照して上位制御装置30は、残容量取得部51と、供出可能電力を決定する決定部52と、制御指令を出力して蓄電池50の充放電を制御する制御指令部60と、I/Fを介した通信を制御する通信制御部61と、属性情報194を管理する属性管理部62と、取引情報195の格納または更新等を管理する取引管理部63と、スケジュール管理部64と、上位制御装置30に外部とのインターフェイスを提供するGUI(Graphical User Interface)部65とを含む。GUI部65は、取引情報195を含む各種情報を可視化するための表示制御データを生成する。表示制御データに従ってディスプレイ157が制御されることにより、情報は視覚可能に出力される。 Referring to FIG. 5, the upper control device 30 includes a remaining capacity acquisition unit 51, a determination unit 52 that determines the available power, a control command unit 60 that outputs a control command to control charging and discharging of the storage battery 50, a communication control unit 61 that controls communication via the I/F, an attribute management unit 62 that manages attribute information 194, a transaction management unit 63 that manages the storage or update of transaction information 195, a schedule management unit 64, and a GUI (Graphical User Interface) unit 65 that provides the upper control device 30 with an interface with the outside. The GUI unit 65 generates display control data for visualizing various information including the transaction information 195. The display 157 is controlled according to the display control data, and the information is output in a visible manner.

決定部52は、蓄電池50による基準値とともに供出可能電力を取得する供出可能電力取得部54と、これら取得された基準値と供出可能電力を格納または取引のために送信する出力部55とを含む。供出可能電力取得部54は、蓄電池50について放電可能電力を算出する放電可能電力算出部541と、蓄電池50について充電可能出電力を算出する充電可能電力算出部542と、蓄電池50について供出可能電力を算出する供出可能電力算出部543とを含む。充電可能電力算出部542が算出する充電可能電力は基準値に相当する。 The determination unit 52 includes a supplyable power acquisition unit 54 that acquires the supplyable power together with a reference value from the storage battery 50, and an output unit 55 that stores the acquired reference value and supplyable power or transmits them for trading. The supplyable power acquisition unit 54 includes a dischargeable power calculation unit 541 that calculates the dischargeable power for the storage battery 50, a chargeable power calculation unit 542 that calculates the chargeable output power for the storage battery 50, and a supplyable power calculation unit 543 that calculates the supplyable power for the storage battery 50. The chargeable power calculated by the chargeable power calculation unit 542 corresponds to the reference value.

制御指令部60は、蓄電池50と送配電事業者によって管理される電力系統100を含む送配電設備装置との間で各ブロックについて基準値の電力と調整電力、及びアービトラージ向けの充電電力や放電電力を遣り取りするための制御指令を下位制御装置20に出力し、当該下位制御装置20に制御指令に従って蓄電池50の充放電を実施させる。 The control command unit 60 outputs control commands to the lower-level control device 20 to exchange reference power and regulated power, as well as charging and discharging power for arbitrage, for each block between the storage battery 50 and the power transmission and distribution equipment including the power system 100 managed by the power transmission and distribution business operator, and causes the lower-level control device 20 to charge and discharge the storage battery 50 in accordance with the control commands.

スケジュール管理部64は、各ブロックについて、取引に関するスケジュールを管理する。スケジュールは、各ブロックについて、入札期限を含む入札に関するスケジュールと、GCを含むスケジュールとを含む。取引に関するスケジュールは、取引情報195とともに管理されてもよい。 The schedule management unit 64 manages the schedule regarding transactions for each block. For each block, the schedule includes a schedule regarding bidding including a bidding deadline, and a schedule including GC. The schedule regarding transactions may be managed together with the transaction information 195.

ここで、本実施の形態では、需要家は、需給調整市場と卸電力市場の両方において電力取引も実施することができる。卸電力市場では、市場価格に合わせて蓄電池50を充電または放電するアービトラージ取引が実施される。このようなアービトラージ取引では、蓄電池50の状態は放電状態(Arb放電)、充電状態(Arb充電)、Arb充電およびArb放電のいずれも実施しない状態を含み得る。図6に示す取引情報195は、各ブロックBn(n=1,2,3・・・)について、当該ブロックにおける蓄電池50の充放電の状態を含む。蓄電池50の状態は、Arb放電、Arb充電および調整力供出の3種類の状態を含むが、状態の種類はこれに限定されない。例えば、状態の種類には、蓄電池50が充放電を実施しない状態が含まれてもよい。 Here, in this embodiment, consumers can also trade electricity in both the supply and demand adjustment market and the wholesale electricity market. In the wholesale electricity market, arbitrage trading is carried out in which the storage battery 50 is charged or discharged according to the market price. In such arbitrage trading, the state of the storage battery 50 may include a discharged state (Arb discharge), a charged state (Arb charge), and a state in which neither Arb charge nor Arb discharge is performed. The transaction information 195 shown in FIG. 6 includes the charge and discharge state of the storage battery 50 in each block Bn (n = 1, 2, 3, ...) for that block. The state of the storage battery 50 includes three types of states, Arb discharge, Arb charge, and adjustment power supply, but the types of states are not limited to these. For example, the types of states may include a state in which the storage battery 50 does not charge or discharge.

通信制御部61は、市場取引サーバ10A等の取引装置が属するネットワーク1Aを介し、取引情報を通信する。この通信において、通信制御部61は、取引対象の所定ブロックBについて決定された基準値の情報を、所定ブロックBの時間帯が開始する前の予め定められた時刻(GC)迄に取引装置に送信する機能と、ブロックBについての入札期限の前に算出された供出可能電力に基づいた入札量(=入札電力)を含む入札情報を入札期限までに取引装置に送信する機能と、ブロックBの開始までに当該入札情報が示す入札量に応じた落札量(=約定量、約定電力)を示す約定情報を取引装置から受信する機能等を有する。 The communication control unit 61 communicates transaction information via the network 1A to which the trading devices such as the market trading server 10A belong. In this communication, the communication control unit 61 has a function of transmitting information on the reference value determined for a specific block Bn to be traded to the trading device by a predetermined time (GC) before the start of the time slot of the specific block Bn , a function of transmitting bidding information including a bid amount (= bid power) based on the available power calculated before the bidding deadline for the block Bn to the trading device by the bidding deadline, and a function of receiving, from the trading device, contract information indicating a successful bid amount (= contract amount, contract power) corresponding to the bid amount indicated by the bidding information by the start of the block Bn .

また、通信制御部61は、中給サーバ10Bと指令サーバ10Cが属するネットワーク1Bを介し、需給調整市場の約定情報に従った調整指令を受信する機能と、蓄電池50の充放電を制御する指令を下位制御装置20に送信する機能とを有する。この制御指令は、受信した調整指令に基づく制御指令を含む。また、通信制御部61は、各市場サーバ10D、市場取引サーバ10Aが属するネットワーク1Aを介し、卸電力市場の約定情報に従った買電電力、売電電力に関する情報を受信する機能と、この売買電力情報に基づいて算出された、蓄電池50の充放電を制御する指令を下位制御装置20に送信する機能とを有する。 The communication control unit 61 also has a function to receive adjustment commands according to contract information in the supply and demand adjustment market via the network 1B to which the intermediate supply server 10B and the command server 10C belong, and a function to transmit commands to the lower-level control device 20 to control the charging and discharging of the storage battery 50. These control commands include control commands based on the received adjustment commands. The communication control unit 61 also has a function to receive information on the purchased and sold power according to contract information in the wholesale electricity market via the network 1A to which each market server 10D and the market trading server 10A belong, and a function to transmit commands to the lower-level control device 20 to control the charging and discharging of the storage battery 50, which are calculated based on the purchased and sold power information.

<基準値と供出可能電力の算出の概念>
本実施の形態では、上位制御装置30は、アグリゲータとして動作して、複数の下位制御装置20の蓄電池50を1つの調整力リソースとして扱い、当該調整力リソースについて、充放電によるブロック毎の基準値と供出可能電力を算出する。また、上位制御装置30は、各下位制御装置20の蓄電池50を、個別の調整力リソースとして扱い、各蓄電池50についてブロック毎の基準値と供出可能電力を算出するとしてもよい。
<Concept of calculating standard values and available electricity>
In this embodiment, the upper control device 30 operates as an aggregator, treats the storage batteries 50 of the multiple lower control devices 20 as one adjustment power resource, and calculates the reference value and the available power for supply for each block by charging and discharging for the adjustment power resource. The upper control device 30 may also treat the storage batteries 50 of each lower control device 20 as an individual adjustment power resource, and calculate the reference value and the available power for supply for each block for each storage battery 50.

以下に説明する概念は、需給調整市場で運用され得る一次調整力、二次調整力(1)、二次調整力(2)、三次調整力(1)、三次調整力(2)等に適用することができる。なお、二次調整力(1)、二次調整力(2)、三次調整力(1)および三次調整力(2)の名称は需給調整市場の運用メニューの正式名称に対応し、これらにおける(1)および(2)は、当該正式名称ではそれぞれ、丸付き数字1および丸付き数字2で表記されるが、本明細書では丸付き数字を用いずに(1)と(2)で示す。 The concept explained below can be applied to primary adjustment capacity, secondary adjustment capacity (1), secondary adjustment capacity (2), tertiary adjustment capacity (1), tertiary adjustment capacity (2), etc. that can be operated in the supply and demand adjustment market. Note that the names secondary adjustment capacity (1), secondary adjustment capacity (2), tertiary adjustment capacity (1) and tertiary adjustment capacity (2) correspond to the official names of the supply and demand adjustment market operation menu, and (1) and (2) in these are written as circled numbers 1 and circled numbers 2, respectively, in the official names, but in this specification they are written as (1) and (2) without circled numbers.

(基準値と供出可能電力を算出する時期)
需給調整市場における入札の対象となる所定ブロック(目標ブロック)について供出可能電力を算出するケースを説明する。本実施の形態では、所定ブロックの需給調整市場への入札電力は供出可能電力を超えないように決定されるので、所定ブロックの供出可能電力は、入札期限の前に算出される。入札電力は算出された供出可能電力以下の値を示す。入札電力を上限として需給調整市場側で決定する落札電力が増えるほど需要家側の収入が増えるため、所定ブロックにおいて蓄電池50からの放電電力について需給調整市場取引とは異なる他の用途がない場合は、所定ブロックの入札電力=所定ブロックの供出可能電力となる。
(Time to calculate standard values and available electricity)
A case will be described where the supplyable power is calculated for a specific block (target block) that is the subject of bidding in the supply and demand adjustment market. In this embodiment, the bid power for the specific block to the supply and demand adjustment market is determined so as not to exceed the supplyable power, so the supplyable power for the specific block is calculated before the bidding deadline. The bid power indicates a value equal to or less than the calculated supplyable power. The more successful bid power determined on the supply and demand adjustment market side with the bid power as the upper limit increases, the more the consumer's income increases. Therefore, if there is no other use for the discharged power from the storage battery 50 in the specific block other than the supply and demand adjustment market transaction, the bid power for the specific block = the supplyable power for the specific block.

所定ブロックの基準値を算出する時刻を時刻T1とする(厳密には、基準値を算出するために必要なSOC情報等の値の確定時刻がT1であり、基準値そのものを算出する時刻は、T1より後の時刻になる)。時刻T1は、所定ブロックの実需給開始前の時刻であって、所定ブロックの基準値の登録期限であるGCよりも前の時刻を示す。時刻T1を含む時間帯のブロックは、所定ブロックよりも先行するブロックである。時刻T1のブロックから所定ブロック開始までの各ブロックについて、蓄電池50の状態を示す情報(蓄電池の充放電量を示す情報と関連)は、各市場サーバ10Dから上位制御装置30に転送されて取引情報195としてHDD174に格納される。 The time when the reference value for the specified block is calculated is time T1 (strictly speaking, the time when the values of SOC information and the like required to calculate the reference value are confirmed is T1, and the time when the reference value itself is calculated is a time after T1). Time T1 indicates a time before the start of actual supply and demand for the specified block, and a time before GC, which is the deadline for registering the reference value for the specified block. The block of the time period including time T1 is a block that precedes the specified block. For each block from the block of time T1 to the start of the specified block, information indicating the state of the storage battery 50 (related to information indicating the charge/discharge amount of the storage battery) is transferred from each market server 10D to the upper control device 30 and stored in the HDD 174 as transaction information 195.

このような前提において、所定ブロックの供出可能電力は、所定ブロックのGCの前の時刻T1よりも前の時間において算出される。この前の時間は、運用される調整力の種類毎の入札期限よりも前の任意の時間である。より具体的には、三次調整力(2)の場合は前日入札のため所定ブロック開始日の前日の14時よりも前のタイミング、および一次調整力~三次調整力(1)の場合は週間取引のため所定ブロックの1週間前のタイミングが、それぞれ、入札期限となる。このような入札期限よりも前の任意の時間において所定ブロックの供出可能電力が算出される。 Under these assumptions, the supplyable power of a specified block is calculated at a time before the time T1 before the GC of the specified block. This previous time is any time before the bidding deadline for each type of adjustment capacity being operated. More specifically, in the case of tertiary adjustment capacity (2), the bidding deadline is before 2 p.m. on the day before the start date of the specified block because bidding is conducted the day before, and in the case of primary to tertiary adjustment capacity (1), the bidding deadline is one week before the specified block because they are traded weekly. The supplyable power of a specified block is calculated at such any time before the bidding deadline.

このように、上位制御装置30は、入札の対象となる所定ブロックについて、まず、供出可能電力を算出し、その後の入札期限までに、市場取引サーバ10Aを介して、市場サーバ10Dに入札し、その後、時刻T1において所定ブロックについて基準値を算出し、その後のGC迄に当該基準値を市場取引サーバ10Aを介して、市場サーバ10Dに登録(送信)する。 In this way, the upper control device 30 first calculates the available power for a specific block that is the subject of the bidding, submits a bid to the market server 10D via the market trading server 10A by the subsequent bidding deadline, and then calculates a reference value for the specific block at time T1, and registers (transmits) the reference value to the market server 10D via the market trading server 10A by the subsequent GC.

図7は、本実施の形態による基準値と供出可能電力の算出の概念を模式的に示す図である。図7では、時系列に連続したブロックB(n=1,2,3,・・・)の各ブロックの時間帯の長さの時間tと、ブロックBの基準値の更新周期Tが示される。図7では、更新周期Tは時間tに一致するケースを表しているが、Tとtは必ずしも一致するわけではない。 Fig. 7 is a diagram showing a concept of calculation of the reference value and the supplyable power according to this embodiment. Fig. 7 shows the time t of the time period of each block Bn (n=1, 2, 3, ...) that is consecutive in time series, and the update period T of the reference value of block Bn . Fig. 7 shows a case where the update period T coincides with the time t, but T and t do not necessarily coincide.

時間tは、計画出力値(基準値)が一定となる最小時間単位であって、例えばt=30分とする。なお、更新周期T=3時間および時間t=30分の場合、計算の簡単のためには(t=30分×6個のブロック)に相当する時間3時間の間は、計画出力値(基準値)は変わらないとする方が基準値を算出しやすいが、理論的にはt毎に基準値の値を変えても良い。各ブロックBのGCはブロックの時間帯開始(実需給開始)の1時間前であり、このGCよりも前において、各ブロックBの基準値ならびに供出可能電力が算出される。但し、T毎にしか基準値は更新できないことに注意が必要である。時系列で連続したブロックBでは、nの値が小さいほど先行するブロックを示し、nの値が大きいほど後行するブロックを示す。 Time t is the minimum time unit at which the planned output value (reference value) is constant, and for example, t = 30 minutes. In the case of an update period T = 3 hours and time t = 30 minutes, for the sake of simplicity of calculation, it is easier to calculate the reference value if the planned output value (reference value) does not change for a period of 3 hours, which corresponds to (t = 30 minutes x 6 blocks), but theoretically the reference value may be changed every t. The GC of each block Bn is one hour before the start of the block's time zone (start of actual supply and demand), and the reference value and available power for supply of each block Bn are calculated before this GC. However, it should be noted that the reference value can only be updated every T. In consecutive blocks Bn in a chronological order, a smaller value of n indicates a preceding block, and a larger value of n indicates a following block.

基準値が一定となる最小時間単位tは任意の長さの時間であって30分に限定されず、例えば15分、10分、5分等に変更されても、本概念を適用できる。 The minimum time unit t for which the reference value is constant can be any length of time and is not limited to 30 minutes. This concept can be applied even if it is changed to, for example, 15 minutes, 10 minutes, 5 minutes, etc.

図7では、入札の対象となる所定ブロックとしてブロックBn+4が示される。図7の時刻T1は、ブロックBn+4実需給開始から所定長さの時間ΔTだけ遡った時刻を示す。時刻T1における蓄電池50のSOC関連情報である残容量Bn-1SOCが示される。時間ΔTは2時間(ブロックの4個の長さの時間)である。時間ΔTは変更可能であり、これに伴い、時間ΔT内のブロックの個数が変わる。なお、時刻T1は、時間における一点を指すが、所定長さの比較的短い時間の概念も含み得る。 In FIG. 7, block B n+4 is shown as the predetermined block that is the subject of the bidding. Time T1 in FIG. 7 indicates a time going back a predetermined length of time ΔT from the start of actual supply and demand for block B n+4 . The remaining capacity B n-1 SOC, which is SOC-related information of the storage battery 50 at time T1, is shown. Time ΔT is two hours (the length of four blocks). Time ΔT is changeable, and the number of blocks within time ΔT changes accordingly. Note that time T1 refers to a point in time, but may also include the concept of a relatively short time of a predetermined length.

図7では、ブロックBn+4実需給開始前の時刻T1~T1+tの時刻の間の任意の時間(図7における黒丸の時刻)において、ブロックBn+4について供出可能電力Bn+4Bidの予測値を算出する。より具体的には、ブロックBn+4について、当該ブロックBn+4の基準値Bn+4Refを算出し、GC前に変更することを前提に、ブロックBn+4についてGCより前の任意の時間(例えば、図7における黒丸の時刻)において、供出可能電力Bn+4Bidの予測値を算出する。図7では、時刻T1は例えばブロックBの開始時刻にあたる。図7では、ブロックBn-1~ブロックBn+3の各ブロックは、既に何らか需給調整市場の商品や卸電力市場の商品等落札済み、又は何も約定されていないブロックである。 In FIG. 7, a predicted value of the supplyable power B n +4 Bid for block B n+4 is calculated at any time between times T1 and T1+t (times indicated by black circles in FIG. 7) before the start of actual supply and demand for block B n +4. More specifically, a reference value B n+ 4 Ref for block B n+4 is calculated for block B n+4 , and a predicted value of the supplyable power B n+4 Bid for block B n+4 is calculated at any time before GC (for example, at the time indicated by black circles in FIG. 7) on the premise that the reference value B n+4 Ref for block B n+4 is changed before GC. In FIG. 7, time T1 corresponds to the start time of block B n , for example. In FIG. 7, each of blocks B n-1 to B n+3 is a block for which some product in the supply and demand adjustment market or wholesale electricity market has already been sold, or for which no contract has been made.

本実施の形態では、所定ブロックの供出可能電力の更新タイミングは時間ΔTで決定されるから、誤差71は時間ΔTの期間が長いほど、または、時間ΔTにおける約定出力(ブロックBの供出可能電力BBid)が大きいほど大きくなる。誤差71は、時間ΔTにおける調整指令の回数が多いほど、または、調整指令が要求する調整力が大きいほど、大きくなる。図7の時間ΔTにおける右上がりのグラフは、時間ΔTにおいて、調整指令が全く出力されず、且つ各ブロックBで計画された基準値BRefの充電が実施されてSOCが増加する、いわゆるSOC上昇シナリオを示す。対照的に右下がりのグラフは、時間ΔTにおいて、調整指令によって約定分の最大電力が供出されて、且つ各ブロックBで計画された基準値BRefの充電が実施されてSOCが減少する、いわゆるSOC下降シナリオを示す。 In this embodiment, the update timing of the deliverable power of a given block is determined by time ΔT, so the error 71 becomes larger as the time ΔT period is longer or the contracted output (deliverable power B n Bid of block B n ) at time ΔT becomes larger. The error 71 becomes larger as the number of adjustment commands at time ΔT increases or the adjustment power required by the adjustment command increases. The graph sloping upward at time ΔT in FIG. 7 indicates a so-called SOC increase scenario in which no adjustment command is output at time ΔT and charging of the reference value B n Ref planned in each block B n is performed, resulting in an increase in SOC. In contrast, the graph sloping downward at time ΔT indicates a so-called SOC decrease scenario in which the contracted maximum power is delivered by the adjustment command and charging of the reference value B n Ref planned in each block B n is performed, resulting in a decrease in SOC.

このように時間ΔTにおいて上記の2つのシナリオが想定されるので、時間ΔTの終了時(すなわち所定ブロックBn+4の開始時)ではSOCについて誤差71が生じ、この誤差71を蓄電池50の定格容量Xから差し引いた分がブロックBn+4における供出可能量(調整力として供出可能な電力量)となる。ブロックBn+4における供出可能電力(調整力)は、式(4)に示すように、放電可能電力(An+4Ref)の絶対値と基準値(Bn+4Ref)に基づいて(例えば、放電可能電力(An+4Ref)の絶対値を基準値(Bn+4Ref)に加算して)算出される。 Since the above two scenarios are assumed during time ΔT in this way, an error 71 occurs in the SOC at the end of time ΔT (i.e., at the start of a given block B n+4 ), and the amount obtained by subtracting this error 71 from the rated capacity X of storage battery 50 becomes the supplyable amount in block B n+4 (the amount of power that can be supplied as adjustment capability). The supplyable power (adjustment capability) in block B n+4 is calculated based on the absolute value of the dischargeable power (A n+4 Ref) and the reference value (B n+4 Ref) (for example, by adding the absolute value of the dischargeable power (A n+4 Ref) to the reference value (B n+4 Ref)) as shown in equation (4).

本実施の形態では、後述するAD変換効率(=充電効率)ηcおよびDA変換効率(=放電効率)ηdを用いて、蓄電池50内部におけるSOCを扱い、また、ブロックBnの放電可能電力ARef(負値)と充電可能電力(または基準値)BRef(正値)を扱う。 In this embodiment, the SOC within the storage battery 50 is handled using the AD conversion efficiency (=charging efficiency) ηc and the DA conversion efficiency (=discharging efficiency) ηd described later, and the dischargeable power A n Ref (negative value) and chargeable power (or reference value) B n Ref (positive value) of the block Bn are also handled.

(充放電効率)
図8は、図1の蓄電システムにおける充電効率と放電効率を説明する図である。図8では、充電効率および放電効率としてAD変換効率ηcおよびDA変換効率ηdが示される。
(Charge/discharge efficiency)
Fig. 8 is a diagram for explaining the charging efficiency and discharging efficiency in the power storage system of Fig. 1. In Fig. 8, AD conversion efficiency ηc and DA conversion efficiency ηd are shown as the charging efficiency and discharging efficiency.

蓄電システム27は、PCS(PCS:Power conditioning system)23と蓄電池50とを含む。蓄電システム27は複数の蓄電池50を含んでもよい。蓄電池50は、直流電力を充放電する二次電池であり、蓄電池の種類は限定されない。例えば、蓄電池としては、リチウムイオン電池またはナトリウム硫黄電池等を含む。蓄電池は、単体の二次電池に限定されず、複数の二次電池からなるセットであってもよい。 The power storage system 27 includes a PCS (Power Conditioning System) 23 and a storage battery 50. The power storage system 27 may include multiple storage batteries 50. The storage battery 50 is a secondary battery that charges and discharges DC power, and the type of storage battery is not limited. For example, the storage battery includes a lithium ion battery or a sodium sulfur battery. The storage battery is not limited to a single secondary battery, and may be a set of multiple secondary batteries.

PCS23は、電力系統100と接続するノードを含むAC端と、蓄電池50と接続するノードを含むDC端とを含む。PCS23はAC(交流)電力とDC(直流)電力を相互に変換し出力する変換器231を含む。変換器231は、電力系統100からAC端が受けたAC電力をDC電力に変換し、変換後のDC電力を、DC端を介して蓄電池50に出力する。蓄電池50は、PCS23からのDC電力によって充電される。変換器231は、DC端が受けた蓄電池50からのDC電力をAC電力に変換し、変換後のAC電力を、AC端を介して電力系統100に出力する。AC端が受けるAC電力は例えば家庭用の200V(ボルト)およびDC端が受ける電力は蓄電池50の仕様に応じた、例えば数V~数十Vである。 The PCS 23 includes an AC end including a node connected to the power system 100, and a DC end including a node connected to the storage battery 50. The PCS 23 includes a converter 231 that converts AC (alternating current) power and DC (direct current) power and outputs the converted power. The converter 231 converts AC power received at the AC end from the power system 100 into DC power, and outputs the converted DC power to the storage battery 50 via the DC end. The storage battery 50 is charged with DC power from the PCS 23. The converter 231 converts DC power received at the DC end from the storage battery 50 into AC power, and outputs the converted AC power to the power system 100 via the AC end. The AC power received at the AC end is, for example, 200V (volts) for home use, and the power received at the DC end is, for example, several V to several tens of V depending on the specifications of the storage battery 50.

変換器231に固有の属性である出力電力/入力電力で算出される変換効率(0%<変換効率≦100%)は、AC電力をDC電力に変換する場合のAD変換効率ηcと、DC電力をAC電力に変換する場合のDA変換効率ηdとを含む。 The conversion efficiency (0% < conversion efficiency ≦ 100%) calculated by output power / input power, which is an attribute unique to converter 231, includes the AD conversion efficiency ηc when AC power is converted to DC power, and the DA conversion efficiency ηd when DC power is converted to AC power.

(放電可能電力An+4Refの算出)
図9は、図7の放電可能電力An+4Refの算出を模式的に示す図である。図9では、時刻T1においてブロックBn+4の放電可能電力An+4Refは、時間ΔT内の各ブロックBの時間tにおける、DC端の蓄電残量(SOC)の増減量を用いて算出する。より具体的には、各ブロックBにおける蓄電池50の状態(Arb放電、Arb充電、調整力供出のいずれか)に応じて、最もSOCが減少する状況を想定し、放電可能電力An+4Refは図9に示す手順で導出される。
(Calculation of Dischargeable Power A n+4 Ref)
Fig. 9 is a diagram showing a schematic diagram of calculation of dischargeable power A n+4 Ref in Fig. 7. In Fig. 9, dischargeable power A n+4 Ref of block B n+4 at time T1 is calculated using the increase or decrease in the remaining charge (SOC) at the DC end at time t of each block B n within time ΔT. More specifically, the dischargeable power A n+4 Ref is derived by the procedure shown in Fig. 9 assuming a situation in which the SOC decreases the most depending on the state of the storage battery 50 in each block B n (either Arb discharge, Arb charge, or adjustment power supply).

より具体的には、放電可能電力算出部541は、取引情報195から、時間ΔT内の各ブロックBについて蓄電池50の状態(Arb放電、Arb充電、調整力供出のいずれかの状態と、対応する約定電力)を取得し、各ブロックBについて当該ブロックの状態に基づきSOCの増減量を算出する。SOCの増減量は、ブロックBの状態がArb放電であれば図9の式91に従い算出され、Arb充電であれば図9の式92に従い算出され、調整力供出であれば図9の式93に従い算出される。なお、放電可能電力ARefは負値であるから式91に従う算出値も負値となる。また、式93の(BBid-BRef)の項は正値を想定する(この値を正値にするために、約定電力BBidは、BRefよりも大きくなるよう約定することが必要である点に注意。)。図9のブロックBについてのβn項は、式91、92および93のいずれかで定義される。 More specifically, the dischargeable power calculation unit 541 obtains the state of the storage battery 50 for each block Bn within the time ΔT (the state of either Arb discharge, Arb charge, or regulation power provision, and the corresponding contracted power) from the transaction information 195, and calculates the increase or decrease in SOC for each block Bn based on the state of the block. If the state of the block Bn is Arb discharge, the increase or decrease in SOC is calculated according to formula 91 in FIG. 9, if the state of the block Bn is Arb charge, the increase or decrease in SOC is calculated according to formula 92 in FIG. 9, and if the state of regulation power provision, the increase or decrease in SOC is calculated according to formula 93 in FIG. 9. Note that since the dischargeable power A n Ref is a negative value, the calculated value according to formula 91 is also a negative value. Also, the term (B n Bid-B n Ref) in formula 93 is assumed to be a positive value (note that in order to make this value a positive value, it is necessary to contract the contracted power B n Bid to be greater than B n Ref). The βn term for block Bn in FIG.

放電可能電力算出部541は、AC端の出力(放電可能電力)をAn+4Refの絶対値として、蓄電池50内のSOC変化を算出する方程式を図9の式94として導出する。式94の右辺の第2項は、ΔT時間における蓄電池50の充放電量を示す情報であって、当該ΔT時間を構成する1つ以上のブロックBnそれぞれについて約定された調整力、Arb放電またはArb充電の電力を示す。なお未約定のブロックが混在する場合は、当該ブロックではSOC変化が無いとすればよい。 The dischargeable power calculation unit 541 derives an equation for calculating the SOC change in the storage battery 50 as Equation 94 in Fig. 9, with the AC end output (dischargeable power) as the absolute value of A n+4 Ref. The second term on the right side of Equation 94 is information indicating the charge/discharge amount of the storage battery 50 in time ΔT, and indicates the contracted adjustment capacity, Arb discharge, or Arb charge power for each of one or more blocks Bn constituting the time ΔT. Note that if an uncontracted block is included, it is sufficient to assume that there is no SOC change in the block.

放電可能電力算出部541は、式94から放電可能電力(An+4Refの絶対値)を算出する式(1)を導出する。式(1)に従う算出値(An+4Refの絶対値)は定格出力を超えるケースが想定され得るので、放電可能電力算出部541は、式(1)に従う算出値(An+4Refの絶対値)を蓄電池50の定格出力と比較し、比較結果に基づき、小さい方を放電可能電力An+4Refと決定(算出)する。 The dischargeable power calculation unit 541 derives equation (1) for calculating the dischargeable power (absolute value of A n+4 Ref) from equation 94. Since it is possible to imagine a case in which the calculated value (absolute value of A n+4 Ref) according to equation (1) exceeds the rated output, the dischargeable power calculation unit 541 compares the calculated value (absolute value of A n+4 Ref) according to equation (1) with the rated output of the storage battery 50, and determines (calculates) the smaller one as the dischargeable power A n+4 Ref based on the comparison result.

(充電可能電力Bn+4Refの算出)
図10は、図7の充電可能電力Bn+4Refの算出を模式的に示す図である。図10では、時刻T1においてブロックBn+4の充電可能電力Bn+4Refは、時間ΔT内の各ブロックBの時間tにおける、DC端の蓄電残量(SOC)の増減量を用いて算出する。より具体的には、各ブロックBにおける蓄電池50の状態(Arb放電、Arb充電、調整力供出のいずれか)に応じて、最もSOCが増大する状況を想定し、充電可能電力Bn+4Refは図10に示す手順で導出される。充電可能電力Bn+4Refは、ブロックBn+4の基準値に相当する。
(Calculation of chargeable power B n+4 Ref)
Fig. 10 is a diagram showing a schematic diagram of calculation of the chargeable power Bn +4Ref in Fig. 7. In Fig. 10, the chargeable power Bn+ 4Ref of the block Bn+ 4 at time T1 is calculated using the increase or decrease in the remaining charge (SOC) at the DC end at time t of each block Bn within time ΔT. More specifically, the chargeable power Bn+4Ref is derived by the procedure shown in Fig. 10, assuming a situation in which the SOC increases most depending on the state of the storage battery 50 in each block Bn (either Arb discharge, Arb charge, or adjustment power supply). The chargeable power Bn +4Ref corresponds to the reference value of the block Bn +4 .

より具体的には、充電可能電力算出部542は、取引情報195から、時間ΔT内の各ブロックBについて蓄電池50の状態(Arb放電、Arb充電、調整力供出のいずれかの状態と、対応する約定電力)を取得し、各ブロックBについて当該ブロックの状態に基づきSOCの増減量を算出する。SOCの増減量は、ブロックBの状態がArb放電であれば図10の式91に従い算出され、Arb充電または調整力供出であれば図10の式92に従い算出される。なお、放電可能電力ARefは負値であるから式91に従う算出値も負値となる。また、最もSOCが増大することを想定するため、調整力供出の状態ではBBid=0とする。したがって、調整力供出時は、SOCの増減量は充電可能電力BRefのみを扱う式92に従い算出することができる。図10のブロックBについてのαn項は、式91および92のいずれかで定義される。 More specifically, the chargeable power calculation unit 542 obtains the state of the storage battery 50 for each block B n within the time ΔT (the state of either Arb discharge, Arb charge, or regulation power provision, and the corresponding contracted power) from the transaction information 195, and calculates the increase or decrease in SOC for each block B n based on the state of the block. If the state of the block B n is Arb discharge, the increase or decrease in SOC is calculated according to formula 91 in FIG. 10, and if the state of the block B n is Arb charge or regulation power provision, the increase or decrease in SOC is calculated according to formula 92 in FIG. 10. Note that since the dischargeable power A n Ref is a negative value, the calculated value according to formula 91 is also a negative value. In addition, in order to assume that the SOC increases most, B n Bid = 0 is set in the state of regulation power provision. Therefore, when regulation power is provided, the increase or decrease in SOC can be calculated according to formula 92 that handles only the chargeable power B n Ref. The αn term for the block B n in FIG. 10 is defined by either formula 91 or 92.

充電可能電力算出部542は、AC端の出力(充電可能電力)をBn+4Refとして、蓄電池50内のSOC変化を算出する方程式を図10の式95として導出する。式95の右辺の括弧内の第2項は、ΔT時間における蓄電池50の充放電量を示す情報であって、当該ΔT時間を構成する1つ以上のブロックBnそれぞれについて約定された調整力、Arb放電またはArb充電の電力を示す。なお未約定のブロックが混在する場合は、当該ブロックではSOC変化が無いとすればよい。 The chargeable power calculation unit 542 derives an equation for calculating the SOC change in the storage battery 50 as Equation 95 in Fig. 10, with the output (chargeable power) at the AC end as Bn +4Ref . The second term in parentheses on the right side of Equation 95 is information indicating the charge/discharge amount of the storage battery 50 in time ΔT, and indicates the contracted adjustment capability, Arb discharge, or Arb charge power for each of one or more blocks Bn constituting the time ΔT. Note that if an uncontracted block is included, it is sufficient to assume that there is no SOC change in the block.

充電可能電力算出部542は、式95から充電可能電力(Bn+4Ref)を算出する式(2)を導出する。式(2)に従う算出値(Bn+4Ref)は定格出力を超えるケースが想定され得るので、充電可能電力算出部542は、式(2)に従う算出値(Bn+4Ref)を蓄電池50の定格出力と比較し、比較結果に基づき、小さい方を充電可能電力Bn+4Refと決定(算出)する。 The chargeable power calculation unit 542 derives equation (2) for calculating the chargeable power (B n+4 Ref) from equation 95. Since it is possible to assume a case in which the calculated value (B n+4 Ref) according to equation (2) exceeds the rated output, the chargeable power calculation unit 542 compares the calculated value (B n+4 Ref) according to equation (2) with the rated output of the storage battery 50, and determines (calculates) the smaller one as the chargeable power B n+4 Ref based on the comparison result.

(供出可能電力Bn+4Bidの決定)
図11は、本発明の実施の形態に係る供出可能電力の算出手順を模式的に示す図である。図11の(A)は、図7に示したSOCの変化について、上昇シナリオと下降シナリオを示し(B)は算出手順を示す。ブロックBn+4の供出可能電力は、供出可能電力Bn+4Bidとして示される。
(Determination of Bid for Available Power Bn +4 )
11 is a diagram showing a schematic diagram of a calculation procedure of the supplyable power according to an embodiment of the present invention. FIG. 11A shows an increase scenario and a decrease scenario for the change in SOC shown in FIG. 7, and FIG. 11B shows the calculation procedure. The supplyable power of block B n+4 is shown as supplyable power B n+4 Bid.

ブロックBn+4の調整力の供出可能電力は、ブロックBn+4の開始時点における充電可能電力Bn+4Refを当該ブロックBn+4において計画出力値(基準値)として充電しながら調整力を供出する、として算出する。したがって、供出可能電力算出部543は、図11の式(4)に示すように、充電可能電力Bn+4Refに放電可能電力An+4Refの絶対値を足した量を算出し、この算出値と定格出力の両者を比較し、比較の結果両者のうちの小さい方を、ブロックBn+4の調整力の供出可能電力Bn+4Bidと決定する。供出可能電力Bn+4Bidは、所定ブロックBn+4の約定出力に対応し得る。 The supplyable power of the adjustment capacity of the block B n+4 is calculated by supplying the adjustment capacity while charging the chargeable power B n + 4 Ref at the start of the block B n+4 as the planned output value (reference value) in the block B n+4. Therefore, the supplyable power calculation unit 543 calculates the amount obtained by adding the absolute value of the dischargeable power A n+4 Ref to the chargeable power B n+4 Ref, as shown in formula (4) in Fig. 11, compares this calculated value with the rated output, and determines the smaller of the two as the supplyable power B n+4 Bid of the adjustment capacity of the block B n+4 . The supplyable power B n+4 Bid may correspond to the contracted output of the specified block B n+4 .

(供出可能電力の解析的な算出)
上記に述べた手順では、所定ブロックBn+4についての充電可能電力BRefと放電可能電力ARefとを算出(確定)できる時刻を、所定ブロックBn+4の時間ΔT前のブロックBの時刻T1としている。なぜなら、算出に用いるSOCは時刻T1において確定(取得)できるからである。発明者らは、このような時期的な制限がなく、所定ブロックの供出可能電力を算出(確定)できるとの知見を得た。この算出の手順を図12に示す。
(Analytical calculation of available power)
In the above-described procedure, the time at which the chargeable power B n Ref and the dischargeable power A n Ref for the specific block B n+4 can be calculated (determined) is set to time T1 of block B n, which is a time ΔT before the specific block B n +4 . This is because the SOC used for the calculation can be determined (acquired) at time T1. The inventors have found that it is possible to calculate (determine) the outputtable power of a specific block without such time restrictions. This calculation procedure is shown in FIG. 12.

図12は、本発明の実施の形態に係る供出可能電力を解析的に導出する手順を模式的に示す図である。このような解析導出においては、各ブロックBついて、全ブロックで調整力を約定している、すなわち各ブロックBの充放電の状態は「調整力供出」を示す。したがって、放電可能電力ARefを算出するためのβn項は、図12の式121((-1/ηd)(BBid-BRef)×t))で示されて、充電可能電力BRefを算出するためのα項は、図12の式122(ηcBRef×t)で示される。なお、式121の約定された調整力の(BBid-BRef)は、ブロックBについての供出可能電力と基準値の電力との差に相当する正値である。 FIG. 12 is a diagram showing a procedure for analytically deriving the supplyable power according to the embodiment of the present invention. In such analytical derivation, the adjustment power is contracted in all blocks for each block B n , that is, the charging/discharging state of each block B n indicates "adjustment power supply". Therefore, the βn term for calculating the dischargeable power A n Ref is shown by formula 121 ((-1/ηd)(B n Bid-B n Ref)×t)) in FIG. 12, and the αn term for calculating the chargeable power B n Ref is shown by formula 122 (ηcB n Ref×t) in FIG. 12. Note that the contracted adjustment power (B n Bid-B n Ref) in formula 121 is a positive value corresponding to the difference between the supplyable power for block B n and the reference value power.

所定ブロックBn+4についての供出可能電力Bn+4Bidを算出する図12の式123の右辺におけるβn項およびαn項に、それぞれ、式121および式122を代入する。このような代入後の式123から解(供出可能電力Bn+4Bid)を算出する。算出においては、ブロックBについて変数nがどのような値を示すとしても(いずれのブロックBについても)同じ供出可能電力BBidになるものとして解を求める、すなわち供出可能電力BBidの収束値を算出する。例えば、Bn+4Bid=Bn+3Bid=Bn+2Bid=Bn+1Bid=BBid=Sとして式123を解くと、値Sは、図12の式124で示される。 Equations 121 and 122 are substituted into the βn term and the αn term on the right side of equation 123 in FIG. 12, which calculates the supplyable power B n+4 Bid for a given block B n+4 . A solution (supplyable power B n+4 Bid) is calculated from equation 123 after such substitution. In the calculation, the solution is obtained assuming that the supplyable power B n Bid will be the same regardless of the value of the variable n for block B n (for any block B n ), that is, the convergence value of the supplyable power B n Bid is calculated. For example, when equation 123 is solved with B n+4 Bid=B n+3 Bid=B n+2 Bid=B n+1 Bid=B n Bid=S, the value S is expressed by equation 124 in FIG. 12.

式124の右辺の(ηη-1)は負値であるので、式124の右辺の第2項は負値となる。ここで、右辺のBn-1SOCが(Bn-1SOC=X)であるとき、当該第2項は、当該第2項が取り得る値のうち、その絶対値が最も大きな負値となるので、値S(供出可能電力S)は、値Sが取り得る値のうち最も小さい値となる。この関係に基づき、式124のBn-1SOCにXを代入して式124を解くと、図12の式(5)が導出される。 Since (η c η d -1) on the right-hand side of equation 124 is a negative value, the second term on the right-hand side of equation 124 is a negative value. Here, when B n-1 SOC on the right-hand side is (B n-1 SOC = X), the second term has the largest absolute negative value among the values that the second term can take, and therefore the value S (outputtable power S) is the smallest value among the values that the value S can take. Based on this relationship, when X is substituted for B n-1 SOC in equation 124 and equation 124 is solved, equation (5) in FIG. 12 is derived.

式(5)はブロックBについてのSOC情報、BRef、ARef、BBidの変数は含まず、式(5)における変数(周期T、定格容量Xおよび変換効率ηd)はブロックBによらず固定値である。よって、式(5)で算出される値S(供出可能電力S)は、時間ΔTの値の変化のみに依存して、すなわち時刻T1のみに依存して変化する。例えば、時刻T1が所定ブロックBn+4の開始時間に近いほど(時間ΔTが小さいほど)供出可能電力Sは大きくなる。 Equation (5) does not include variables of SOC information, BnRef , AnRef , and BnBid for block Bn , and the variables in equation (5) (period T, rated capacity X, and conversion efficiency ηd) are fixed values regardless of block Bn . Therefore, the value S (supplyable power S) calculated by equation (5) changes only depending on the change in the value of time ΔT, that is, only depending on time T1. For example, the closer time T1 is to the start time of a specific block Bn +4 (the smaller the time ΔT), the larger the supplyable power S becomes.

このように式(5)から算出される値Sによって、時刻T1はSOCが確定している時刻であるとの制限を受けることなく、所定ブロックについて市場に入札できる調整力(供出可能電力)が示される。供出可能電力算出部543は、所定ブロックBn+4の供出可能電力Bn+4Bidを式(5)に従って算出することができる。なお、Sの値は、Xの容量の大小によっても左右されることが、式(5)を見て明らかであるが、蓄電池の定格容量Xが大きい場合、Sの値が定格出力よりも大きくなる場合も想定される。その場合は、供出可能電力は定格出力にすればよい。例えば、式(5)の算出値が定格出力と比較され、比較の結果に基づき、小さい方が最終的に値S(供出可能電力S)に設定される。このように、値S(供出可能電力S)は定格出力以下の電力を示すよう設定される。 The value S calculated from the formula (5) in this way indicates the adjustment capacity (supplyable power) that can be bid on the market for the predetermined block, without being restricted that the time T1 is the time when the SOC is fixed. The supplyable power calculation unit 543 can calculate the supplyable power B n+ 4 Bid of the predetermined block B n+ 4 according to the formula (5). It is clear from the formula (5) that the value of S is also influenced by the size of the capacity of X. However, when the rated capacity X of the storage battery is large, it is also assumed that the value of S will be larger than the rated output. In that case, the supplyable power may be set to the rated output. For example, the calculated value of the formula (5) is compared with the rated output, and the smaller one is finally set as the value S (supplyable power S) based on the result of the comparison. In this way, the value S (supplyable power S) is set to indicate power equal to or less than the rated output.

また、発明者らは、供出可能電力についての次の知見も得た。より具体的には、ブロックBn-1、B、Bn+1、Bn+2およびBn+3の各ブロッの状態はArb充電またはArb放電である場合は、ブロックBn+4の開始時刻でのSOC値は、より正確に推定可能(確定可能)であり、ブロックBn+4だけなら確実に定格容量X分の電力を供出可能になる。しかし、ブロックBn+4において、調整指令の回数または調整指令で要求される実際の調整力が不明であるから、ブロックBn+5以降では供出可能電力は大幅に減少し、その減少の程度が不明になる。したがって、所定ブロックの供出可能電力は、式(5)で算出される値Sとすることが望ましい。 The inventors also obtained the following knowledge about the supplyable power. More specifically, when the state of each block of blocks B n-1 , B n , B n+1 , B n+2 , and B n+3 is Arb charging or Arb discharging, the SOC value at the start time of block B n+4 can be estimated (determined) more accurately, and only block B n+4 can supply power of the rated capacity X with certainty. However, since the number of adjustment commands or the actual adjustment power required by the adjustment command is unknown in block B n+4 , the supplyable power is significantly reduced from block B n+5 onwards, and the extent of the reduction is unknown. Therefore, it is desirable to set the supplyable power of a given block to the value S calculated by formula (5).

(時間ΔTの変更)
図13は、本発明の実施の形態に係る時間ΔT及びブロックの単位時間Tの変更を説明する図である。上記に述べた処理では、所定ブロック(目標ブロック)の基準値を更新する時期である時間ΔTを、図13のパターン1に示すようなデフォルト値(2時間)として、所定ブロックBn+4をターゲットに値が算出される。
(Change in time ΔT)
13 is a diagram for explaining changes in time ΔT and unit time T of a block according to an embodiment of the present invention. In the above-mentioned process, the time ΔT, which is the time to update the reference value of a predetermined block (target block), is set to a default value (2 hours) as shown in pattern 1 of FIG. 13, and a value is calculated with the predetermined block B n+4 as a target.

現在、市場取引システムの入札または落札の処理性能は向上し、例えば処理は自動化されてGCの直前まで処理を実施できる。したがって、時間ΔTは、このような処理性能の向上に伴って可変のパラメータとして扱うことができる。例えば、時間ΔTは、1時間前~n時間前まで、30分刻みで変更可能である。時間ΔTの変更に応じて、時間tを積算する範囲(期間の長さ)は変更される。 Currently, the processing performance of bidding or winning bids in market trading systems has improved, and processing can be automated and carried out up until just before GC. Therefore, the time ΔT can be treated as a variable parameter along with this improvement in processing performance. For example, the time ΔT can be changed in 30-minute increments from 1 hour to n hours before. The range (length of the period) over which the time t is accumulated changes according to the change in time ΔT.

調整力の供出可能電力Sを大きくするには、式(5)によれば、時間ΔTは短い方が良い。つまり、時間ΔTが長くなればなるほど調整力の供出可能電力Sは小さくなる。例えば、図13のパターン2は時間ΔTが1.5時間を示し、パターン1のΔT=2時間に比べて短くなっている。もし目標とするブロックの調整力供出時間T(=基準値を更新できる周期)が、パターン1と同じ30分ならば(図13では3時間だが)、調整力の供出可能電力Sを大きくすることができる。 According to formula (5), to increase the adjustable power output S, it is better for the time ΔT to be shorter. In other words, the longer the time ΔT, the smaller the adjustable power output S. For example, pattern 2 in FIG. 13 shows a time ΔT of 1.5 hours, which is shorter than the ΔT = 2 hours for pattern 1. If the adjustable power output time T (= the period during which the reference value can be updated) of the target block is the same 30 minutes as pattern 1 (3 hours in FIG. 13), the adjustable power output S can be increased.

また、目標とする所定ブロックにおける調整力供出の時間T(=基準値を更新できる周期)も、市場の要件に応じて、変化するパラメータである。時間Tが長い時間であるほど、式(5)に従って算出される調整力の供出可能電力Sは小さくなる。図13のパターン2は、時間Tは3時間を示し、パターン1の30分に比べて非常に長くなっており、ΔTはパターン1に比べて短い1.5時間だが、パターン2の調整力の供出可能電力Sは、トータルではパターン1に比べて小さくなる。 The time T for the targeted supply of adjustment power in a given block (= the period during which the reference value can be updated) is also a parameter that changes according to market requirements. The longer the time T, the smaller the supplyable power S of the adjustment power calculated according to formula (5). Pattern 2 in FIG. 13 shows a time T of 3 hours, which is much longer than the 30 minutes of pattern 1, and ΔT is 1.5 hours, which is shorter than pattern 1, but the supplyable power S of the adjustment power in pattern 2 is smaller in total than pattern 1.

(入札のパターン)
図14は、本発明の実施の形態に係る売り入札のパターンの一例を示す図である。図14では、需要家または蓄電所は、ブロックB~B56を入札対象期間として売り入札を実施する。1ブロックあたりの時間T=3時間、即ち基準値を更新できる周期は3時間である。図15と図16は、図14で示した入札パターンに対応した電力取引市場における処理フローを示す図である。
(Bidding Pattern)
Fig. 14 is a diagram showing an example of a selling bid pattern according to an embodiment of the present invention. In Fig. 14, a consumer or a power storage plant makes a selling bid with blocks B1 to B56 as the bidding target period. The time T per block is 3 hours, that is, the cycle in which the reference value can be updated is 3 hours. Fig. 15 and Fig. 16 are diagrams showing a processing flow in the energy trading market corresponding to the bidding pattern shown in Fig. 14.

図14において、1週間前の入札では、市場価格予測で価格が高いと考えられる商品(一次、二次(1)と(2)、三次(1)のいずれかをブロック毎に決定)と該当ブロックの組合わせに対して、需要家または蓄電所は、式(5)で算出された供出可能電力S以下での入札を実施する(図15のステップT1)。入札に対して約定されると、当該ブロックの商品が確定する。図14の約定済ブロック141は、このような確定したブロックを示す。約定済ブロック141は、例えば、ブロックB~B10、ブロックB13~B27およびブロックB34~B44を示す。 In Fig. 14, in the bidding one week in advance, for the combination of the product (primary, secondary (1) and (2), or tertiary (1) is determined for each block) that is considered to have a high price in the market price forecast and the corresponding block, the consumer or the power storage plant submits a bid at or below the available power supply S calculated by formula (5) (step T1 in Fig. 15). When a contract is made for the bid, the product of the block is confirmed. The contracted block 141 in Fig. 14 indicates such a confirmed block. The contracted block 141 indicates, for example, blocks B1 to B10 , blocks B13 to B27 , and blocks B34 to B44 .

次に、前日の入札では、需要家または蓄電所は、上記週間前の入札で未約定のブロック142に対して、三次(2)の市場価格予測を行い、価格が高いと考えられるブロックに対して、式(5)で算出された供出可能電力S以下での入札を行う(図15のステップT2)。そして時間前の入札のブロック143で基準値分を買電、価格に魅力があれば、式(1)または式(2)を用いて算出した充電量または放電量でアービトラージの充放電の入札を実施し(図16のステップT4)、式(3)を用いて算出した基準値で入札を行う(図16のステップT6)。図16のステップT3とT5では、上位制御装置30は、下位制御装置20から30分毎に蓄電池50のSOC情報を受信する。なお、SOC情報を受信する間隔は、30分に限定されず、30分よりも短い時間であってもよい。 Next, in the day-before bidding, the consumer or storage station performs a tertiary (2) market price prediction for the block 142 that was not yet agreed in the week-before bidding, and submits a bid for the block that is considered to be high-priced at or below the available power S calculated by formula (5) (step T2 in FIG. 15). Then, in the block 143 of the hour-before bidding, the consumer or storage station purchases power for the reference value, and if the price is attractive, submits an arbitrage charge/discharge bid for the charge or discharge amount calculated by formula (1) or formula (2) (step T4 in FIG. 16), and submits a bid for the reference value calculated by formula (3) (step T6 in FIG. 16). In steps T3 and T5 in FIG. 16, the upper control device 30 receives SOC information of the storage battery 50 from the lower control device 20 every 30 minutes. Note that the interval for receiving SOC information is not limited to 30 minutes, and may be shorter than 30 minutes.

(アグリゲータにおける入札計画)
図17~図19は、本発明の実施の形態に係るアグリゲータにおける入札計画の一例を示す図である。図17では、前日10時より前の卸電力市場のスポット市場へ入札可能な時刻断面では入札は困難である。より具体的には、図17のブロック1が週間商品で約定されている場合、ブロック3の開始時点でのSOCは不明であり、同様にブロック5と6についても売買電可能な電力量の値(wh)が不明であるので、入札可能な電力量を確定することができないからである。なお、前日14時より前の三次(2)へ入札可能な時刻断面では、卸電力市場の時間前市場への基準値の買電を、実施の形態で算出される供出可能電力を前提に入札する場合、ブロック3、5および6について三次(2)への入札が可能である。当日の実需給よりΔT時間前の卸電力市場の時間前市場への入札可能な時刻断面では、式(1)で算出される放電可能電力に基づいた売電入札、および式(2)で算出される充電可能電力に基づいた買電入札が可能である。
(Aggregator Bidding Plan)
17 to 19 are diagrams showing an example of a bidding plan in an aggregator according to an embodiment of the present invention. In FIG. 17, bidding is difficult in a time section where bidding is possible in the spot market of the wholesale power market before 10:00 on the previous day. More specifically, when block 1 in FIG. 17 is contracted as a weekly product, the SOC at the start of block 3 is unknown, and similarly, the value (wh) of the amount of power that can be bought and sold for blocks 5 and 6 is unknown, so the amount of power that can be bid cannot be determined. Note that, in a time section where bidding is possible in the tertiary (2) before 14:00 on the previous day, when bidding is made on the basis of the supplyable power calculated in the embodiment for the reference value of power purchase in the hourly market of the wholesale power market, bidding on the tertiary (2) is possible for blocks 3, 5, and 6. In a time section where bidding is possible in the hourly market of the wholesale power market ΔT hours before the actual supply and demand on the day, bidding for selling power based on the dischargeable power calculated by formula (1) and bidding for buying power based on the chargeable power calculated by formula (2) are possible.

図18では、本実施の形態で示した手順で算出される充放電量を用いて、前日10時より前のスポット市場での入札も想定した入札計画が示される。より具体的には、スポット市場入札を可能にするために、入札ブロックの前の時間帯において、時間前市場で式(1)の放電可能電力または式(2)の充電可能電力に基づく売買電の実施(SOC制御のため:売電微調整、買電微調整)を計画する。この想定により、前日のスポット市場における価格が高い時間帯、安い時間帯で集中的に「買電」または「売電」することが可能となる。 Figure 18 shows a bidding plan that assumes bidding in the spot market before 10:00 the previous day, using the charge/discharge amounts calculated using the procedure shown in this embodiment. More specifically, in order to enable spot market bidding, in the time period before the bidding block, plans are made to execute power buying and selling (for SOC control: fine adjustment of power selling and fine adjustment of power buying) in the time period before the bidding block in the time-ahead market based on the dischargeable power in formula (1) or the chargeable power in formula (2). This assumption makes it possible to concentrate "power buying" or "power selling" during the time periods when the price in the spot market on the previous day is high and low.

図19では、一次調整力での調整力(供出可能電力)の供出は、ブロック開始前とブロック終了後とで、SOCの値はほぼ同じという前提で、スポット市場への入札が実施される。より具体的には、図19のスポット市場での「買電」の時間帯では、SOCは例えば10%→90%に上昇させておく。また、図19のスポット市場での「売電」の時間帯では、SOCは90%→10%に減少させておく。ただし、実際は、このような一次調整力の想定(=一次調整力の供出開始前と開始後でSOCがほぼ一定になるという想定)はできず、ブロック開始前後でSOCの値は不明であり、更に、蓄電池50には充放電損失もあり、SOCは小さくなる傾向がある。 In FIG. 19, the supply of adjustment capacity (supplyable power) in the primary adjustment capacity is subject to bidding in the spot market under the assumption that the SOC value is approximately the same before and after the block starts. More specifically, in the time period for "power purchase" in the spot market in FIG. 19, the SOC is increased, for example, from 10% to 90%. Also, in the time period for "power sale" in the spot market in FIG. 19, the SOC is decreased from 90% to 10%. However, in reality, it is not possible to assume such a primary adjustment capacity (= the assumption that the SOC is approximately constant before and after the start of the supply of primary adjustment capacity), and the SOC value is unknown before and after the start of the block. Furthermore, there are also charge and discharge losses in the storage battery 50, so the SOC tends to be smaller.

<制御指令部>
上位制御装置30の制御指令部60は、蓄電池50の充放電を制御する制御指令を出力する。制御指令部60は、例えば、蓄電池50について検出される残容量を下位制御装置20から受信し、受信した残容量を目標値(=目標とする蓄電池の残容量)と比較し、それらを一致させるような制御量(充放電電力)を決定し、決定した制御量で充放電を指示する制御指令を出力する。このような制御量は、例えばフィードバック制御を利用して決定される。
<Control Command Section>
The control command unit 60 of the upper control device 30 outputs a control command to control charging and discharging of the storage battery 50. For example, the control command unit 60 receives the remaining capacity detected for the storage battery 50 from the lower control device 20, compares the received remaining capacity with a target value (= the target remaining capacity of the storage battery), determines a control amount (charging and discharging power) that makes them match, and outputs a control command to instruct charging and discharging with the determined control amount. Such a control amount is determined, for example, by using feedback control.

また、制御指令部60は、所定ブロックが始まる以前の時間帯において、蓄電池50の複数の目的(=需給調整市場における、一次調整力、二次調整力(1)、二次調整力(2)、三次調整力(1)、三次調整力(2)、及びこれらの複合商品等各種市場商品)に基づく充放電電力の合算値を算出し、算出した合算値を用いて、蓄電池50が枯渇または満充電とならないよう充放電を制御する制御指令を出力する。 In addition, the control command unit 60 calculates the total value of the charging and discharging power based on multiple purposes of the storage battery 50 (= various market products in the supply and demand adjustment market, such as primary adjustment capacity, secondary adjustment capacity (1), secondary adjustment capacity (2), tertiary adjustment capacity (1), tertiary adjustment capacity (2), and combination products of these) during the time period before the start of the specified block, and uses the calculated total value to output a control command to control the charging and discharging of the storage battery 50 so that it does not become depleted or fully charged.

また、制御指令部60は、所定ブロックにおいて、当該所定ブロックについて算出された基準値と蓄電池50の複数の目的に基づく充放電電力の合算値とを用いて、蓄電池50が枯渇または満充電とならないよう充放電を制御する制御指令を出力する。 In addition, the control command unit 60 outputs a control command for controlling charging and discharging in a specific block so that the storage battery 50 does not become depleted or fully charged, using a reference value calculated for the specific block and a combined value of the charging and discharging power based on multiple purposes of the storage battery 50.

上記に述べた複数の目的は、蓄電池50の利用目的であって、例えば蓄電池50の充放電を図1の負荷や他電源等の設備24との間の電力として遣り取りする目的(=ピークカットやピークシフト、再生可能エネルギー発電の余剰電力の吸収、発電出力の平準化等、エネルギーマネジメントの目的)を含む。さらなる利用目的としては、需給調整市場以外の卸電力市場(例:買電電力(=アービトラージ充電)、売電電力(=アービトラージ放電))や相対契約等各種契約に向けた電力の遣り取りを含む。例えば、卸電力市場の売電で約定した場合、容量市場の発動指令電源として落札された場合、および余力活用に関する契約を属地一般送配電事業者と締結した場合等では、蓄電池50を放電させて電力を提供する、もしくは、充電量を減らす等して蓄電池50が利用される。複数の目的には、これらに限定されず、他の目的が含まれてもよい。 The multiple purposes described above are the purposes for which the storage battery 50 is used, and include, for example, the purpose of exchanging the charge and discharge of the storage battery 50 with the load and other power sources in FIG. 1 as electricity (= peak cutting, peak shifting, absorbing surplus electricity from renewable energy generation, leveling out power generation output, and other energy management purposes). Further purposes of use include the exchange of electricity for various contracts such as wholesale electricity markets other than the supply and demand adjustment market (e.g., purchasing electricity (= arbitrage charging), selling electricity (= arbitrage discharging)) and bilateral contracts. For example, when an agreement is made for selling electricity in the wholesale electricity market, when a bid is made as a power source for initiating a capacity market command, or when a contract for utilizing surplus capacity is concluded with a local general electricity transmission and distribution company, the storage battery 50 is used by discharging the storage battery 50 to provide electricity, or by reducing the amount of charge, etc. The multiple purposes are not limited to these, and may include other purposes.

下位制御装置20は蓄電池50の複数の利用目的のそれぞれについて、蓄電池50の放電や充電の電力を計測し、計測電力の情報を上位制御装置30に転送する。上位制御装置30は、下位制御装置20から受信する各利用目的の電力から、複数の目的に基づく充放電電力の合算値を算出できる。例えば、制御指令部60は、合算値(kWh)と定格容量Xの差を算出し、差が一定(目標)になるように、例えばフィードバック制御によって充放電の電力(kW)を決定し、決定した電力の充放電の指令を出力する。 The lower-level control device 20 measures the charging and discharging power of the storage battery 50 for each of the multiple usage purposes of the storage battery 50 and transfers the measured power information to the upper-level control device 30. The upper-level control device 30 can calculate the total value of the charging and discharging power based on the multiple purposes from the power for each usage purpose received from the lower-level control device 20. For example, the control command unit 60 calculates the difference between the total value (kWh) and the rated capacity X, determines the charging and discharging power (kW) by, for example, feedback control so that the difference becomes constant (target), and outputs a command to charge and discharge the determined power.

<フローチャート>
図20と図21は、本実施の形態に係る処理のフローチャートの一例を示す図である。このフローチャートに従う処理は、上位制御装置30のプロセッサ171がアプリケーションプログラム197を実行することにより実現される。フローチャートを参照して、図7または図11の(A)で示した所定ブロックに入札するケースを説明する。
<Flowchart>
20 and 21 are diagrams showing examples of a flowchart of the process according to this embodiment. The process according to this flowchart is realized by the processor 171 of the upper level control device 30 executing the application program 197. With reference to the flowchart, a case of bidding on a predetermined block shown in FIG. 7 or FIG. 11(A) will be described.

図20において、プロセッサ171は、連続したブロックのうち入札対象の所定ブロックについて供出可能電力を算出する時間、すなわち時刻T1になったかを判定する(ステップS20)。時刻T1は、例えば取引情報195が示す入札のスケジュールから取得される。プロセッサ171は、時刻T1をタイマ182が計時する時間と比較し、比較結果に基づき、タイマ182が時刻T1を計時したか否かを判定する。 In FIG. 20, the processor 171 determines whether the time to calculate the available power for a specific block among the consecutive blocks that is the subject of the bid, i.e., time T1, has arrived (step S20). Time T1 is obtained, for example, from the bidding schedule indicated by the transaction information 195. The processor 171 compares time T1 with the time measured by the timer 182, and determines whether the timer 182 has measured time T1 based on the comparison result.

プロセッサ171は、時刻T1に至っていないと判定すると(ステップS20でNO)、ステップS20を繰り返すが、時刻T1に至ったと判定すると(ステップS20でYES)、時間情報を取得する(ステップS21)。この時間情報は、取引情報195から取得される時間ΔT、時間tおよび周期Tを含む。プロセッサ171は、時刻T1が属するブロックBとして、ブロックBから所定ブロック(目標ブロック)Bn+4までの各ブロックのブロック番号を取得する(ステップS22)。ブロックの番号は、時間ΔTおよび時間tに基づき取得される。例えば、ブロックB、Bn+1、Bn+2、Bn+3、Bn+4が取得される。ブロックBn-1~ブロックBn+3の各ブロックは落札済み(約定済み)または無約定のブロックである。 When the processor 171 determines that the time T1 has not yet been reached (NO in step S20), it repeats step S20, but when it determines that the time T1 has been reached (YES in step S20), it acquires time information (step S21). This time information includes the time ΔT, time t, and period T acquired from the transaction information 195. The processor 171 acquires the block numbers of each block from block B n to a predetermined block (target block) B n+4 as the block B n to which the time T1 belongs (step S22). The block numbers are acquired based on the time ΔT and the time t. For example, blocks B n , B n+1 , B n+2 , B n+3 , and B n+4 are acquired. Each block from block B n-1 to block B n+3 is a block that has been sold (contracted) or has not been contracted.

プロセッサ171は、取引情報195から、各ブロックB、Bn+1、Bn+2、Bn+3について、状態に応じた充放電量(Arb放電量、Arb充電量、調整力供出量、無約定の場合は充放電量=0)を取得する(ステップS24)。また、プロセッサ171は、属性情報194から、充放電に関する属性(定格容量X、定格出力、AD変換効率ηおよびDA変換効率ηd)を取得する(ステップS25)。 The processor 171 acquires the charge/discharge amount (Arb discharge amount, Arb charge amount, adjustment power supply amount, charge/discharge amount=0 in case of no contract) according to the state for each block Bn , Bn +1 , Bn +2, Bn+3 from the transaction information 195 (step S24). The processor 171 also acquires attributes related to charge/discharge (rated capacity X, rated output, AD conversion efficiency ηC , and DA conversion efficiency ηd) from the attribute information 194 (step S25).

プロセッサ171は、供出可能電力取得部54として、所定ブロックBn+4の供出可能電力Bn+4Bidを取得する(ステップS26)。より具体的には、プロセッサ171は、放電可能電力算出部541として、所定ブロックBn+4の放電可能電力An+4Refを算出し(ステップS27)、充電可能電力算出部542として、所定ブロックBn+4の充電可能電力Bn+4Refを決定(算出)する(ステップS30)。 The processor 171, as the supplyable power acquisition unit 54, acquires the supplyable power B n+4 Bid of the predetermined block B n+4 (step S26). More specifically, the processor 171, as the dischargeable power calculation unit 541, calculates the dischargeable power A n+4 Ref of the predetermined block B n+4 (step S27), and as the chargeable power calculation unit 542, determines (calculates) the chargeable power B n+4 Ref of the predetermined block B n+ 4 (step S30).

ステップS27では、より具体的には、放電可能電力算出部541は、各ブロックB、Bn+1、Bn+2、Bn+3についての充放電電力量のβn項を算出し(ステップS28)、βn項を用いて、所定ブロックBn+4について放電可能電力An+4Refを(式1、式上は絶対値だが簡単のため省略)に従い算出する(ステップS29)。放電可能電力算出部541は、(式1)で算出した放電可能電力を定格出力と比較し、小さい方を最終的に放電可能電力An+4Refに設定する(ステップS29a)。 In step S27, more specifically, the dischargeable power calculation unit 541 calculates the βn term of the charge/discharge power amount for each block Bn , Bn +1 , Bn +2 , Bn +3 (step S28), and calculates the dischargeable power An +4Ref for a predetermined block Bn +4 using the βn term according to (Equation 1, which is an absolute value in the equation but is omitted for simplicity) (step S29). The dischargeable power calculation unit 541 compares the dischargeable power calculated by (Equation 1) with the rated output, and finally sets the smaller one as the dischargeable power An +4Ref (step S29a).

ステップS30では、より具体的には、充電可能電力算出部542は、各ブロックB、Bn+1、Bn+2、Bn+3についての充放電電力量のα項を算出し(ステップS31)、α項を用いて、所定ブロックBn+4について充電可能電力Bn+4Ref(または基準値)を(式2)(または(式3))に従い算出する(ステップS32)。充電可能電力算出部542は、充電可能電力(または基準値)を定格出力と比較し、小さい方を最終的に充電可能電力Bn+4Refに設定する(ステップS33)。 In step S30, more specifically, the chargeable power calculation unit 542 calculates the α n term of the charge/discharge power amount for each block B n , B n+1 , B n+2 , B n+3 (step S31), and calculates the chargeable power B n+4 Ref (or reference value) for a specific block B n+4 using the α n term according to (Equation 2) (or (Equation 3)) (step S32). The chargeable power calculation unit 542 compares the chargeable power (or reference value) with the rated output, and finally sets the smaller one as the chargeable power B n+4 Ref (step S33).

供出可能電力取得部54は、放電可能電力An+4Refの絶対値と充電可能電力Bn+4Refの和を算出し、算出した値と定格出力とを比較し、比較結果に基づき、小さい方を供出可能電力Bn+4Bidに設定する(ステップS34)。 The supplyable power acquisition unit 54 calculates the sum of the absolute value of the dischargeable power A n+4 Ref and the chargeable power B n+4 Ref, compares the calculated value with the rated output, and based on the comparison result, sets the smaller one as the supplyable power B n+4 Bid (step S34).

このように、放電可能電力An+4Refの絶対値、充電可能電力Bn+4Refおよび供出可能電力Bn+4Bidは、それぞれ、対応の算出値が定格出力を超える場合は、定格出力以下の電力を示すよう設定される。 In this way, the absolute value of the dischargeable power A n+4 Ref, the chargeable power B n+4 Ref and the supplyable power B n+4 Bid are each set to indicate a power equal to or less than the rated output when the corresponding calculated value exceeds the rated output.

図21では、供出可能電力として、解析的に導出される供出可能電力Sを用いる処理が示される。図21では、プロセッサ171は、供出可能電力Sを算出するべき予め定められた時刻(例:市場取引サーバ10Aの市場入札に使用するため、供出可能電力Sの値を送信する時刻)に至っているか否かを判定し(ステップS40)、予め定められた時刻に至っていない場合は(ステップS40でNO)、ステップS40を繰り返す。プロセッサ171は、予め定められた時刻に至ったと判定すると(ステップS40でYES)、時間情報(時間ΔTおよび周期T)と属性(定格容量XおよびDA変換効率ηd、これらXやηdの値は経年劣化や蓄電システムの状態に応じて変動する可能性があり固定値ではなく変動値となる)の情報を取得し(ステップS41)、取得された情報が示す値を式(5)に設定し、式5に従って供出可能電力Sを算出する(ステップS42)。 21 shows a process in which the analytically derived supplyable power S is used as the supplyable power. In FIG. 21, the processor 171 determines whether or not a predetermined time has passed (e.g., the time to transmit the value of the supplyable power S for use in the market bidding of the market trading server 10A) at which the supplyable power S should be calculated (step S40), and if the predetermined time has not passed (NO in step S40), repeats step S40. When the processor 171 determines that the predetermined time has passed (YES in step S40), it acquires information on time (time ΔT and period T) and attributes (rated capacity X and DA conversion efficiency ηd, the values of X and ηd may vary depending on deterioration over time and the state of the power storage system and are variable values rather than fixed values) (step S41), sets the value indicated by the acquired information to formula (5), and calculates the supplyable power S according to formula 5 (step S42).

本実施の形態で示された上位制御装置30の機能は、下位制御装置20または市場取引サーバ10Aに搭載されて、下位制御装置20または市場取引サーバ10Aによって、上位制御装置30の処理が実施されてもよい。 The functions of the upper control device 30 shown in this embodiment may be installed in the lower control device 20 or the market trading server 10A, and the processing of the upper control device 30 may be performed by the lower control device 20 or the market trading server 10A.

この実施の形態では、定格出力は、蓄電システム27の状態(周囲温度を含む環境や劣化等の条件)に応じて変化する可能性がある。つまり固定値ではない。よって、その時々に蓄電池50について計測(検出)される上限出力情報を用いても良い。また、SOC関連情報や充放電効率については、必ず誤差を含むため、この誤差は、供出可能電力の算出誤差につながる。充放電効率は、充電や放電の実施コンディション(SOCのどの値のときの充放電か、等)によっても変化する。また、SOCは、充放電を繰り返すうちに計測誤差が大きくなる。よって、充放電効率は平均値を算出できるようにして、その値を使う等、SOC関連情報は、SOC値の蓄積誤差をリセットする蓄電システム27の運用を適用する等、これら誤差を考慮した上で、より誤差を低減する仕組みを適用して、これらパラメータ値を利用する必要がある。 In this embodiment, the rated output may change depending on the state of the storage system 27 (environmental conditions including ambient temperature, deterioration, etc.). In other words, it is not a fixed value. Therefore, upper limit output information measured (detected) for the storage battery 50 at each time may be used. In addition, the SOC-related information and the charge/discharge efficiency always contain errors, and this error leads to calculation errors in the available power. The charge/discharge efficiency also changes depending on the conditions under which charging and discharging are performed (such as the SOC value at which charging and discharging are performed). In addition, the measurement error of the SOC increases as charging and discharging are repeated. Therefore, it is necessary to use these parameter values by applying a mechanism that takes these errors into consideration and further reduces the errors, such as by making it possible to calculate the average value of the charge/discharge efficiency and using that value, and by applying the operation of the storage system 27 that resets the accumulated error of the SOC value for the SOC-related information.

<利点>
従来は、電源(蓄電池等)を用いて、需給調整市場等の電力市場の各商品に対する約定を前提に、電力を充放電する場合には、SOC関連情報の予測を用いた基準値計画に基づき入札量を決定する技術が提案されていた。
<Advantages>
Conventionally, when charging and discharging electricity using a power source (such as a storage battery), assuming an agreement for each product in an electricity market such as a supply and demand adjustment market, a technology has been proposed to determine the bid amount based on a reference value plan using a prediction of SOC-related information.

これに対して、本実施の形態では、所定ブロックBn+4の実需給開始前のGCより前の時刻T1において、実需給直前の放電可能電力ARefと充電可能電力BRef(基準値Bn+4Ref)が算出される。この放電可能電力ARefと充電可能電力BRefは、時刻T1~所定ブロックBn+4が開始するまでのΔT時間内の1つ以上のブロックBのそれぞれについての商品の約定に従う充放電状態(Arb放電、Arb充電、調整力供出)の充放電量(項β、項α)に基づき算出される。また、放電可能電力ARefと充電可能電力BRefは定格出力を超えない最大値として導出される。よって、ΔT時間内における基準値や約定調整力の供出余力(誤差71に相当)を確保したうえで、所定ブロックBn+4の供出可能電力Sを、できるだけ大きく確保されるように、所定ブロックBn+4における基準値Bn+4Refを計画して、GCにおいて登録または再登録することができる。 In contrast, in this embodiment, the dischargeable power A n Ref and the chargeable power B n Ref (reference value B n+4 Ref ) immediately before the actual supply and demand are calculated at time T1, which is before the GC before the start of the actual supply and demand of the specified block B n+4 . The dischargeable power A n Ref and the chargeable power B n Ref are calculated based on the charge and discharge amounts (term β n , term α n ) of the charge and discharge state (Arb discharge, Arb charge, adjustment power supply) according to the product agreement for each of one or more blocks B n within the time ΔT from time T1 to the start of the specified block B n + 4 . In addition, the dischargeable power A n Ref and the chargeable power B n Ref are derived as maximum values not exceeding the rated output. Therefore, after securing the reference value within the ΔT time and the supply margin of the contracted adjustment capacity (corresponding to error 71), the reference value B n+4 Ref in the specified block B n+ 4 can be planned and registered or re-registered in the GC so that the supplyable power S of the specified block B n+4 is secured as large as possible.

これにより、従来のようなSOC関連情報の予測を用いた基準値計画に基づき入札量を決定する方法に比べて、所定ブロックへの入札量(供出可能電力)を増やすことが可能となる。また、予測が不要で事前に供出可能電力Sを算出することができるため、週間市場や前日市場において、連続したブロックの各ブロックへの入札が可能となる。 This makes it possible to increase the amount of bids (supplyable power) for a given block compared to the conventional method of determining the amount of bids based on a reference value plan using predictions of SOC-related information. In addition, since predictions are not required and the supplyable power S can be calculated in advance, it becomes possible to bid for each block of consecutive blocks in the weekly market or the day-ahead market.

今回開示された実施の形態は、すべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は、上記した実施の形態の説明ではなくて特許請求の範囲によって示され、特許請求の範囲と均等の意味及び範囲内でのすべての変更が含まれることが意図される。 The embodiments disclosed herein should be considered to be illustrative and not restrictive in all respects. The scope of the present invention is indicated by the claims, not by the description of the embodiments above, and is intended to include all modifications within the meaning and scope of the claims.

1A,1B ネットワーク、10 サーバ、10A 市場取引サーバ、10B 中給サーバ、10C 指令サーバ、10D 市場サーバ、20 下位制御装置、21 ゲートウェイ、22,26 計測器、24 設備、25 分電盤、27 蓄電システム、30 上位制御装置、40 需要家設備、50 蓄電池、51 残容量取得部、52 決定部、54 供出可能電力取得部、55 出力部、60 制御指令部、61 通信制御部、541 放電可能電力算出部、542 充電可能電力算出部、543 供出可能電力算出部、100 電力系統、151,171 プロセッサ、153,173 RAM、156,176 入力装置、157,177 ディスプレイ、158,178 電源回路、159,179 タッチパネル、161,181 記憶媒体、162,182 タイマ、172 ROM、194 属性情報、195 取引情報、197 アプリケーションプログラム、ηc AD変換効率、ηd DA変換効率。 1A, 1B network, 10 server, 10A market trading server, 10B intermediate supply server, 10C command server, 10D market server, 20 lower control device, 21 gateway, 22, 26 measuring instrument, 24 equipment, 25 distribution board, 27 power storage system, 30 upper control device, 40 consumer equipment, 50 storage battery, 51 remaining capacity acquisition unit, 52 determination unit, 54 available power acquisition unit, 55 output unit, 60 control command unit, 61 communication control unit, 541 dischargeable power calculation unit, 542 chargeable power calculation unit, 543 available power calculation unit, 100 power system, 151, 171 processor, 153, 173 RAM, 156, 176 input device, 157, 177 display, 158, 178 power supply circuit, 159, 179 touch panel, 161, 181 Storage medium, 162, 182 timer, 172 ROM, 194 attribute information, 195 transaction information, 197 application program, ηc AD conversion efficiency, ηd DA conversion efficiency.

Claims (12)

蓄電池から供出可能な電力を算出する装置であって、
電力取引市場における取引対象期間を構成可能な1つ以上の時間帯のうち所定の時間帯について、
当該所定の時間帯が始まる以前のタイミングの時刻において前記装置が取得した前記蓄電池のSOC関連情報と、当該時刻から前記所定の時間帯が始まるまでの期間における前記蓄電池の充放電量を示す情報と、前記蓄電池の上限容量情報と、前記蓄電池の充電効率と、前記蓄電池の放電効率と、前記所定の時間帯の長さを示す時間情報とに基づいて、前記蓄電池の前記所定の時間帯における充電電力の基準値を算出する手段と、
少なくとも、前記蓄電池の前記上限容量情報と、前記蓄電池の放電効率と、前記所定の時間帯の長さを示す時間情報と、前記期間の長さを示す時間情報とに基づいて、前記所定の時間帯における前記蓄電池の供出可能電力を算出する手段と、を備える、装置。
An apparatus for calculating available power from a storage battery,
For a predetermined time period among one or more time periods that can constitute a trading period in the energy trading market,
a means for calculating a reference value of charging power of the storage battery during the specified time slot based on SOC-related information of the storage battery acquired by the device at a time before the start of the specified time slot, information indicating the charge/discharge amount of the storage battery during the period from the time acquired by the device to the start of the specified time slot, upper limit capacity information of the storage battery, charging efficiency of the storage battery, discharging efficiency of the storage battery , and time information indicating the length of the specified time slot;
An apparatus comprising: a means for calculating the output power of the storage battery during a specified time period based on at least the upper limit capacity information of the storage battery, the discharge efficiency of the storage battery, time information indicating the length of the specified time period, and time information indicating the length of the period.
蓄電池から供出可能な電力を算出する装置であって、
電力取引市場における取引対象期間を構成可能な1つ以上の時間帯のうち所定の時間帯について、
当該所定の時間帯が始まる以前のタイミングの時刻において前記装置が取得した前記蓄電池のSOC関連情報と、当該時刻から前記所定の時間帯が始まるまでの期間における前記蓄電池の充放電量を示す情報と、前記蓄電池の上限容量情報と、前記蓄電池の充電効率と、前記蓄電池の放電効率と、前記所定の時間帯の長さを示す時間情報とに基づいて、前記蓄電池の前記所定の時間帯における放電可能電力および充電電力の基準値を算出する手段と、
前記放電可能電力と前記充電電力の基準値に基づいて、前記所定の時間帯における前記蓄電池の供出可能電力を算出する手段と、を備える、装置。
An apparatus for calculating available power from a storage battery,
For a predetermined time period among one or more time periods that can constitute a trading period in the energy trading market,
a means for calculating a reference value of dischargeable power and charging power of the storage battery during the specified time slot based on SOC-related information of the storage battery acquired by the device at a time before the start of the specified time slot, information indicating the charge/discharge amount of the storage battery during the period from the time acquired by the device to the start of the specified time slot, upper limit capacity information of the storage battery, the charging efficiency of the storage battery, the discharging efficiency of the storage battery , and time information indicating the length of the specified time slot;
and a means for calculating the supplyable power of the storage battery in the specified time period based on the reference values of the dischargeable power and the charging power .
前記所定の時間帯における充電電力の基準値を算出する手段によって算出される前記充電電力の基準値は、前記蓄電池の定格出力以下の電力を示す、請求項1に記載の装置。 The device according to claim 1 , wherein the reference value of the charging power calculated by the means for calculating the reference value of the charging power in the predetermined time period indicates a power equal to or lower than a rated output of the storage battery. 前記所定の時間帯における放電可能電力および充電電力の基準値を算出する手段によって算出される前記放電可能電力および前記充電電力の基準値は、それぞれ、前記蓄電池の定格出力以下の電力を示す、請求項2に記載の装置。 The device according to claim 2 , wherein the reference values of dischargeable power and charging power calculated by the means for calculating the reference values of dischargeable power and charging power in the specified time period each indicate power that is equal to or lower than a rated output of the storage battery. 前記蓄電池の供出可能電力を算出する手段によって算出される当該供出可能電力は、前記蓄電池の定格出力以下の電力を示す、請求項1~4のいずれか1項に記載の装置。 The device according to any one of claims 1 to 4, wherein the available power calculated by the means for calculating the available power of the storage battery indicates power equal to or less than the rated output of the storage battery. 前記電力取引市場は、調整力を取引する需給調整市場を含み、
前記期間における前記蓄電池の前記充放電量を示す情報は、当該期間を構成する1つ以上の前記時間帯それぞれについて約定された前記調整力を示す、請求項1または3に記載の装置。
The electricity trading market includes a supply and demand adjustment market in which adjustment power is traded,
The device according to claim 1 or 3, wherein the information indicating the charge/discharge amount of the storage battery during the period indicates the adjustment capacity agreed upon for each of the one or more time periods constituting the period.
前記時刻は、前記所定の時間帯の開始前であって、且つ前記所定の時間帯について算出された前記充電電力の基準値を前記電力取引市場に登録する期限よりも前の時刻を示す、請求項1~4のいずれか1項に記載の装置。 The time indicates a time before the start of the specified time period and before a deadline for registering the reference value of the charging power calculated for the specified time period in the energy trading market. The device according to any one of claims 1 to 4. 前記蓄電池の充放電を制御する指令を出力する指令部を、さらに備え、
前記指令は、前記所定の時間帯において、当該所定の時間帯について算出された前記充電電力の基準値と、前記蓄電池の複数の目的に基づく充放電電力の合算値とを用いて、前記蓄電池の充放電を制御する指令を含む、請求項1~4のいずれか1項に記載の装置。
A command unit that outputs a command to control charging and discharging the storage battery,
The device according to any one of claims 1 to 4, wherein the command includes a command to control charging and discharging of the storage battery during the specified time period using a reference value of the charging power calculated for the specified time period and a combined value of charging and discharging power based on multiple purposes of the storage battery.
前記蓄電池の充放電を制御する指令を出力する指令部を、さらに備え、
前記指令は、
前記蓄電池と、送配電事業者によって管理される電力系統を含む送配電設備装置と、の間で電力を遣り取りするための前記充電電力の基準値と調整電力の合算値、およびアービトラージ向けの充放電電力の指令を含む、請求項1~4のいずれか1項に記載の装置。
A command unit that outputs a command to control charging and discharging the storage battery,
The instruction:
The storage battery and a power transmission and distribution equipment including a power system managed by a power transmission and distribution business operator, the combined value of the reference value of the charging power and the regulated power for exchanging power between the storage battery and the power transmission and distribution equipment including a power system managed by a power transmission and distribution business operator, and a command for charging and discharging power for arbitrage. The device according to any one of claims 1 to 4.
プロセッサが実施する方法であって、
電力取引市場における取引対象期間を構成可能な1つ以上の時間帯のうち所定の時間帯について、
当該所定の時間帯が始まる以前のタイミングの時刻において取得された蓄電池のSOC関連情報と、当該時刻から前記所定の時間帯が始まるまでの期間における前記蓄電池の充放電量を示す情報と、前記蓄電池の上限容量情報と、前記蓄電池の充電効率と、前記蓄電池の放電効率と、前記所定の時間帯の長さを示す時間情報とに基づいて、前記蓄電池の前記所定の時間帯における充電電力の基準値を算出するステップと、
少なくとも、前記蓄電池の上限容量情報と、前記蓄電池の放電効率と、前記所定の時間帯の長さを示す時間情報と、前記期間の長さを示す時間情報とに基づいて、前記所定の時間帯における前記蓄電池の供出可能電力を算出するステップと、を備える、方法。
1. A processor-implemented method comprising:
For a predetermined time period among one or more time periods that can constitute a trading period in the energy trading market,
calculating a reference value of the charging power of the storage battery during the specified time period based on SOC-related information of the storage battery acquired at a time before the start of the specified time period, information indicating the charge/discharge amount of the storage battery during a period from the acquired time to the start of the specified time period, upper limit capacity information of the storage battery, the charging efficiency of the storage battery, the discharging efficiency of the storage battery, and time information indicating the length of the specified time period;
A method comprising a step of calculating the output power of the storage battery during the specified time period based on at least upper limit capacity information of the storage battery, the discharge efficiency of the storage battery, time information indicating the length of the specified time period, and time information indicating the length of the period.
プロセッサが実施する方法であって、
電力取引市場における取引対象期間を構成可能な1つ以上の時間帯のうち所定の時間帯について、
当該所定の時間帯が始まる以前のタイミングの時刻において取得された蓄電池のSOC関連情報と、当該時刻から前記所定の時間帯が始まるまでの期間における前記蓄電池の充放電量を示す情報と、前記蓄電池の上限容量情報と、前記蓄電池の充電効率と、前記蓄電池の放電効率と、前記所定の時間帯の長さを示す時間情報とに基づいて、前記蓄電池の前記所定の時間帯における放電可能電力および充電電力の基準値を算出するステップと、
前記放電可能電力と前記充電電力の基準値に基づいて、前記所定の時間帯における前記蓄電池の供出可能電力を算出するステップと、を備える、方法。
1. A processor-implemented method comprising:
For a predetermined time period among one or more time periods that can constitute a trading period in the energy trading market,
calculating reference values of dischargeable power and charging power of the storage battery during the specified time slot based on SOC-related information of the storage battery acquired at a time before the start of the specified time slot, information indicating the charge/discharge amount of the storage battery during a period from the acquired time until the start of the specified time slot, upper limit capacity information of the storage battery, charging efficiency of the storage battery, discharging efficiency of the storage battery, and time information indicating the length of the specified time slot;
and calculating a supplyable power of the storage battery during the specified time period based on the reference values of the dischargeable power and the charging power .
請求項10または11に記載の方法をプロセッサに実行させるためのプログラム。 A program for causing a processor to execute the method according to claim 10 or 11.
JP2023184522A 2023-10-27 2023-10-27 Apparatus, method and program Active JP7486653B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2023184522A JP7486653B1 (en) 2023-10-27 2023-10-27 Apparatus, method and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2023184522A JP7486653B1 (en) 2023-10-27 2023-10-27 Apparatus, method and program

Publications (1)

Publication Number Publication Date
JP7486653B1 true JP7486653B1 (en) 2024-05-17

Family

ID=91067382

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2023184522A Active JP7486653B1 (en) 2023-10-27 2023-10-27 Apparatus, method and program

Country Status (1)

Country Link
JP (1) JP7486653B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112862175A (en) 2021-02-01 2021-05-28 天津天大求实电力新技术股份有限公司 Local optimization control method and device based on P2P power transaction
JP2021184682A (en) 2020-05-22 2021-12-02 株式会社東芝 Storage battery management device, storage battery management method, and storage battery management program
JP2023032358A (en) 2021-08-26 2023-03-09 Kddi株式会社 Estimation device, system, program, and method for estimating charge/discharge efficiency of storage battery
CN116308445A (en) 2022-09-09 2023-06-23 国网浙江省电力有限公司 Virtual power plant multi-mode transaction method, equipment and medium based on energy block chain

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021184682A (en) 2020-05-22 2021-12-02 株式会社東芝 Storage battery management device, storage battery management method, and storage battery management program
CN112862175A (en) 2021-02-01 2021-05-28 天津天大求实电力新技术股份有限公司 Local optimization control method and device based on P2P power transaction
JP2023032358A (en) 2021-08-26 2023-03-09 Kddi株式会社 Estimation device, system, program, and method for estimating charge/discharge efficiency of storage battery
CN116308445A (en) 2022-09-09 2023-06-23 国网浙江省电力有限公司 Virtual power plant multi-mode transaction method, equipment and medium based on energy block chain

Similar Documents

Publication Publication Date Title
Davatgaran et al. Smart distribution system management considering electrical and thermal demand response of energy hubs
Eissa First time real time incentive demand response program in smart grid with “i-Energy” management system with different resources
Ghazvini et al. Incentive-based demand response programs designed by asset-light retail electricity providers for the day-ahead market
US20170285720A1 (en) Method and system for mitigating transmission congestion via distributed computing and blockchain technology
US20150094968A1 (en) Comfort-driven optimization of electric grid utilization
US11816715B2 (en) Cloud computing smart solar configurator
JP6411247B2 (en) Power aggregator system, power trading method, and power trading program
US11196263B2 (en) Systems and methods for managing energy storing resources of an electrical power grid
US9547317B2 (en) Information processing device, information processing method, and storage medium
JP2020009334A (en) Electric power transaction platform
JP2020515222A (en) Uncertainty and flexibility matching engine for intertemporal electric energy products
JP2021149282A (en) Electric power trading assistance device, electric power trading assistance method and program
JP6117984B1 (en) Supply and demand management device, supply and demand management method, and supply and demand management program
Talari et al. The role of various market participants in blockchain business model
JP7486653B1 (en) Apparatus, method and program
KR20210085548A (en) Interactive information provision system based on demand and supplier negotiation reflecting real-time energy costs and method as the same
JP2019046467A (en) Power transaction support device and power transaction support method
JP7377392B1 (en) Apparatus, method and program
Forouli et al. AC-feasible Local Flexibility Market with Continuous Trading
Ellman et al. Customer incentives for gaming demand response baselines
WO2018181732A1 (en) Power supply control method, second provider server, and control device
Cali et al. Optimization and digitalization of power markets
JP6658064B2 (en) Power management device and power management program
Ranjbar et al. Transactive energy trading in distribution systems via privacy-preserving distributed coordination
WO2024090238A1 (en) Control-data-generating device, control method, and control program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20231102

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20231102

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240206

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240228

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240423

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240507

R150 Certificate of patent or registration of utility model

Ref document number: 7486653

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150