JP7404215B2 - Cost budget and actual management device, cost budget and actual management method, and cost budget and actual management program - Google Patents
Cost budget and actual management device, cost budget and actual management method, and cost budget and actual management program Download PDFInfo
- Publication number
- JP7404215B2 JP7404215B2 JP2020173587A JP2020173587A JP7404215B2 JP 7404215 B2 JP7404215 B2 JP 7404215B2 JP 2020173587 A JP2020173587 A JP 2020173587A JP 2020173587 A JP2020173587 A JP 2020173587A JP 7404215 B2 JP7404215 B2 JP 7404215B2
- Authority
- JP
- Japan
- Prior art keywords
- cost
- production number
- data
- classification
- actual
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000007726 management method Methods 0.000 title claims description 113
- 238000004519 manufacturing process Methods 0.000 claims description 264
- 238000012545 processing Methods 0.000 claims description 46
- 238000000034 method Methods 0.000 claims description 38
- 230000008569 process Effects 0.000 claims description 29
- 239000000463 material Substances 0.000 claims description 21
- 238000003860 storage Methods 0.000 claims description 21
- 230000002776 aggregation Effects 0.000 claims description 19
- 238000004220 aggregation Methods 0.000 claims description 19
- 238000013461 design Methods 0.000 claims description 18
- 238000004364 calculation method Methods 0.000 claims description 17
- 230000010365 information processing Effects 0.000 claims description 10
- 238000010276 construction Methods 0.000 claims description 5
- 230000008439 repair process Effects 0.000 claims description 5
- 239000000047 product Substances 0.000 description 20
- 238000010586 diagram Methods 0.000 description 11
- 238000012423 maintenance Methods 0.000 description 10
- 238000004891 communication Methods 0.000 description 8
- 230000004044 response Effects 0.000 description 8
- 230000006870 function Effects 0.000 description 6
- 239000013070 direct material Substances 0.000 description 5
- 238000004590 computer program Methods 0.000 description 4
- 239000013071 indirect material Substances 0.000 description 4
- 230000004931 aggregating effect Effects 0.000 description 3
- 238000012946 outsourcing Methods 0.000 description 3
- 230000003287 optical effect Effects 0.000 description 2
- 238000007792 addition Methods 0.000 description 1
- 239000006227 byproduct Substances 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
Images
Landscapes
- Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
本発明は、原価予実管理装置、原価予実管理方法、及び原価予実管理プログラムに関する。 The present invention relates to a cost budget and actual management device, a cost budget and actual management method, and a cost budget and actual management program.
例えば、大型機械の製造を行う業界では個別原価管理を行う企業が多く、発生する直接費に対して間接費を計算して予定原価を算出し、実際発生原価と対比して原価の予実を管理している。原価の予実管理を行うシステムとして、例えば、特許文献1がある。 For example, in the industry that manufactures large machinery, many companies conduct individual cost management, calculating indirect costs against the direct costs that occur to calculate the planned costs, and then managing the estimated costs by comparing them with the actual costs. are doing. For example, there is Patent Document 1 as a system that performs budget and actual cost management.
しかしながら、上記特許文献1では、間接費を細分化して計上することで原価予実管理を高精度に行うことに関して何等記載されていない。 However, Patent Document 1 does not describe anything about performing cost budget and actual management with high precision by subdividing and recording indirect costs.
本発明は、上記に鑑みてなされたものであって、間接費を細分化して計上することで原価予実管理を高精度に行うことが可能な原価予実管理装置、原価予実管理方法、及び原価予実管理プログラムを提供することを目的とする。 The present invention has been made in view of the above, and provides a cost budget and actual management device, a cost budget and actual management method, and a cost budget and actual management method that can perform cost budget and actual management with high accuracy by subdividing and recording indirect costs. The purpose is to provide a management program.
上述した課題を解決し、目的を達成するために、本発明は、記憶部及び制御部を備えた原価予実管理装置であって、前記記憶部には、製番分類、製番管理部門、及び製番原価科目毎に、間接費率を設定したマスタが格納されており、前記制御部は、各種データについて、製番、製番分類、製番管理部門、製番原価科目、及び原価を含む直接費データを入力する入力手段と、前記直接費データを製番分類、製番管理部門、製番原価科目毎に原価を集約し、集約した原価に、前記マスタから製番分類、製番管理部門、及び製番原価科目をキーとして取得した間接費率を乗算して間接費データを算出する原価計算処理手段と、前記直接費データ及び前記間接費データを含む予定原価データについて、所定分類の仕訳を作成する仕訳作成手段と、実際発生原価を取得し、前記予定原価データと取得した実際発生原価について、前記所定分類の原価差額集計表を作成する原価差額集計手段と、を備えている。 In order to solve the above-mentioned problems and achieve the objects, the present invention provides a cost budget and actual management device that includes a storage unit and a control unit, and the storage unit stores product number classification, product number management department, and A master in which indirect cost rates are set is stored for each manufacturing number cost item, and the control unit stores various data including manufacturing number, manufacturing number classification, manufacturing number management department, manufacturing number cost item, and cost. An input means for inputting direct cost data, and the direct cost data is aggregated by production number classification, production number management department, and production number cost item, and the aggregated costs are transferred from the master to production number classification and production number management. A cost calculation processing means that calculates indirect cost data by multiplying the obtained indirect cost rate using the department and manufacturing number cost item as a key, and a predetermined classification of the planned cost data including the direct cost data and the indirect cost data. The apparatus includes a journal creation means for creating a journal entry, and a cost difference aggregation means for acquiring actual costs and creating a cost difference summary table for the predetermined classification with respect to the planned cost data and the acquired actual costs.
また、本発明の一態様によれば、前記製番分類は、製品製番、試作製番、修理製番、経費製番、及び工事製番を含むことにしてもよい。 According to one aspect of the present invention, the production number classification may include a product production number, a trial production number, a repair production number, an expense production number, and a construction production number.
また、本発明の一態様によれば、製番管理部門は、製造部と設計部を含むことにしてもよい。 Further, according to one aspect of the present invention, the product number management department may include a manufacturing department and a design department.
また、本発明の一態様によれば、前記製番原価科目は、直接労務費、材料費、及び外注加工費を含むことにしてもよい。 According to one aspect of the present invention, the production number cost items may include direct labor costs, material costs, and outsourced processing costs.
また、本発明の一態様によれば、前記所定分類は、製番管理部門、製番、及び製番分類を含むことにしてもよい。 Further, according to one aspect of the present invention, the predetermined classification may include a production number management department, a production number, and a production number classification.
また、本発明の一態様によれば、前記各種データは、仕入、出庫、及び作業実績のデータを含むことにしてもよい。 Further, according to one aspect of the present invention, the various data may include data on purchasing, shipping, and work results.
また、上述した課題を解決し、目的を達成するために、本発明は、記憶部及び制御部を備えた情報処理装置で実行される原価予実管理方法であって、前記記憶部には、製番分類、製番管理部門、及び製番原価科目毎に、間接費率を設定したマスタが格納されており、前記制御部において実行される、各種データについて、製番、製番分類、製番管理部門、製番原価科目、及び原価を含む直接費データを入力する入力工程と、前記直接費データを製番分類、製番管理部門、製番原価科目毎に原価を集約し、集約した原価に、前記マスタから製番分類、製番管理部門、及び製番原価科目をキーとして取得した間接費率を乗算して間接費データを算出する原価計算処理工程と、前記直接費データ及び前記間接費データを含む予定原価データについて、所定分類の仕訳を作成する仕訳作成工程と、実際発生原価を取得し、前記予定原価データと取得した実際発生原価について、前記所定分類の原価差額集計表を作成する原価差額集計工程と、を含むことを特徴とする。 Further, in order to solve the above-mentioned problems and achieve the objects, the present invention provides a cost budget and actual management method executed by an information processing device including a storage unit and a control unit, the storage unit including a manufacturing unit. A master record in which indirect cost rates are stored is stored for each number classification, production number management department, and production number cost item. An input process of inputting direct cost data including management department, manufacturing number cost item, and cost, and aggregating the direct cost data by manufacturing number classification, manufacturing number management department, and manufacturing number cost item, and generating the aggregated cost. a cost calculation processing step of calculating indirect cost data by multiplying the data by the indirect cost rate obtained from the master using the production number classification, production number management department, and production number cost item as keys; A journal entry creation process that creates journal entries for predetermined classifications for scheduled cost data including expense data, obtains actual incurred costs, and creates a cost difference summary table for the predetermined classifications for the planned cost data and the acquired actual costs. The method is characterized in that it includes a step of calculating the cost difference.
また、上述した課題を解決し、目的を達成するために、本発明は、制御部及び記憶部を備えた情報処理装置に実行させるための原価予実管理プログラムであって、前記記憶部には、製番分類、製番管理部門、及び製番原価科目毎に、間接費率を設定したマスタが格納されており、前記制御部において、各種データについて、製番、製番分類、製番管理部門、製番原価科目、及び原価を含む直接費データを入力する入力工程と、前記直接費データを製番分類、製番管理部門、製番原価科目毎に原価を集約し、集約した原価に、前記マスタから製番分類、製番管理部門、及び製番原価科目をキーとして取得した間接費率を乗算して間接費データを算出する原価計算処理工程と、前記直接費データ及び前記間接費データを含む予定原価データについて、所定分類の仕訳を作成する仕訳作成工程と、実際発生原価を取得し、前記予定原価データと取得した実際発生原価について、前記所定分類の原価差額集計表を作成する原価差額集計工程と、を実行するための原価予実管理プログラムであることを特徴とする。 Further, in order to solve the above-mentioned problems and achieve the objects, the present invention provides a cost budget and actual management program to be executed by an information processing device including a control unit and a storage unit, the storage unit including: A master record in which indirect cost rates are stored is stored for each production number classification, production number management department, and production number cost item. , an input step of inputting direct cost data including manufacturing number cost items and costs, and aggregating the direct cost data by manufacturing number classification, manufacturing number management department, and manufacturing number cost items, and converting the direct cost data into aggregated costs. a cost calculation processing step of calculating indirect cost data by multiplying the indirect cost rate obtained from the master using the production number classification, production number management department, and production number cost item as keys; and the direct cost data and the indirect cost data. A journal entry creation process that creates a journal entry of a predetermined classification for the planned cost data including the above, and a cost of obtaining the actual incurred costs and creating a cost difference summary table of the predetermined classification for the planned cost data and the acquired actual costs. The present invention is characterized by being a cost budget and actual management program for executing a difference aggregation process.
本発明によれば、間接費を細分化して計上することで原価予実管理を高精度に行うことが可能になるという効果を奏する。 According to the present invention, it is possible to carry out cost budget and actual management with high accuracy by subdividing and recording indirect costs.
本発明の実施形態を図面に基づいて詳細に説明する。なお、本発明は本実施形態により限定されるものではない。 Embodiments of the present invention will be described in detail based on the drawings. Note that the present invention is not limited to this embodiment.
[1:概要]
例えば、大型機械の製造を行う業界では個別原価管理を行う企業が多く、発生する直接費に対して間接費を計算して予定原価を算出し、実際発生原価と対比して原価の予実を管理している。
[1: Overview]
For example, in the industry that manufactures large machinery, many companies conduct individual cost management, calculating indirect costs against the direct costs that occur to calculate the planned costs, and then managing the estimated costs by comparing them with the actual costs. are doing.
しかしながら、従来、予定原価の計算において、部門毎の一定比率であったため、会計システム側で手仕訳を行う必要があり、担当者の作業負担が大きかった。また、予定原価の精度が低いため、予実の差が大きく乖離していた。 However, in the past, when calculating planned costs, a fixed ratio was used for each department, which required manual entry on the accounting system side, which placed a heavy workload on the person in charge. Additionally, due to the low accuracy of planned costs, there was a large discrepancy between the actual and planned costs.
そこで、本実施の形態では、間接費を細分化して計上することで原価予実管理を高精度に行う。具体的には、直接費に対して、予めマスタ設定した間接費比率(例えば、製番分類、製番原価科目、及び製番管理部門毎に設定した間接費率)を掛けて、間接費の予定原価を計算し、計算した予定原価を会計システムと連携し、実際発生原価と対比して原価の予実管理を実現する。 Therefore, in this embodiment, cost budget and actual management is performed with high precision by subdividing and recording indirect costs. Specifically, direct costs are multiplied by indirect cost ratios set in advance as a master (for example, indirect cost rates set for each production number classification, production number cost item, and production number management department) to calculate the indirect costs. Calculate the planned costs, link the calculated planned costs with the accounting system, and compare them with the actual costs to achieve budget and actual cost management.
これにより、製番分類、製番管理部門、及び製番原価科目毎に間接費を計上し、予定原価と実際発生原価の予実管理をより高い精度で行うことが可能となる。また、手作業による間接費の計上が不要となり、担当者の負担を軽減することが可能となる。 This allows indirect costs to be recorded for each production number classification, production number management department, and production number cost item, making it possible to perform budget and actual management of planned costs and actual costs with higher accuracy. Additionally, manual accounting of indirect costs is no longer necessary, reducing the burden on the person in charge.
本発明は、例えば、個別原価管理を行う大型機械製造など個別受注製造の業界などにおいて有用である。 The present invention is useful, for example, in industries where individual orders are manufactured, such as large machine manufacturing, where individual cost management is performed.
[2.構成]
本実施形態に係る原価予実管理装置の構成の一例について、図1を参照して説明する。図1は、原価予実管理装置の構成の一例を示すブロック図である。
[2. composition]
An example of the configuration of the cost budget and actual management device according to the present embodiment will be described with reference to FIG. 1. FIG. 1 is a block diagram showing an example of the configuration of a cost budget/actual management device.
原価予実管理装置100は、市販のデスクトップ型パーソナルコンピュータである。なお、原価予実管理装置100は、デスクトップ型パーソナルコンピュータのような据置型情報処理装置に限らず、市販されているノート型パーソナルコンピュータ、PDA(Personal Digital Assistants)、スマートフォン、タブレット型パーソナルコンピュータなどの携帯型情報処理装置であってもよい。
The cost budget/
原価予実管理装置100は、制御部102と通信インターフェース部104と記憶部106と入出力インターフェース部108と、を備えている。原価予実管理装置100が備えている各部は、任意の通信路を介して通信可能に接続されている。
The cost budget/
通信インターフェース部104は、ルータ等の通信装置及び専用線等の有線又は無線の通信回線を介して、原価予実管理装置100をネットワーク300に通信可能に接続する。通信インターフェース部104は、他の装置と通信回線を介してデータを通信する機能を有する。ここで、ネットワーク300は、原価予実管理装置100と、サーバ200や端末400・・・とを相互に通信可能に接続する機能を有し、例えばインターネットやLAN(Local Area Network)等である。端末400・・・は、経理担当者、購買担当者、及び製造担当者等が使用する端末装置である。経理担当者、購買担当者、及び製造担当者等は、端末400・・・を使用して、原価予実管理装置100とデータ通信を行うことができ、例えば、原価予実管理装置100にデータの入力(マスタの設定、仕入入力、出庫入力、作業実績入力、実際発生原価入力等)等が可能になっている。
The
入出力インターフェース部108には、入力装置112及び出力装置114が接続されている。出力装置114には、モニタ(家庭用テレビを含む)の他、スピーカやプリンタを用いることができる。入力装置112には、キーボード、マウス、及びマイクの他、マウスと協働してポインティングデバイス機能を実現するモニタを用いることができる。なお、以下では、出力装置114をモニタ114とし、入力装置112をキーボード112またはマウス112として記載する場合がある。
An
記憶部106には、各種のデータベース、テーブル、及びファイルなどが格納される。記憶部106には、OS(Operating System)と協働してCPU(Central Processing Unit)に命令を与えて各種処理を行うためのコンピュータプログラムが記録される。記憶部106として、例えば、RAM(Random Access Memory)・ROM(Read Only Memory)等のメモリ装置、ハードディスクのような固定ディスク装置、フレキシブルディスク、及び光ディスク等を用いることができる。
The
また、記憶部106は、間接費率マスタ106aと、製番分類マスタ106bと、データファイル106cとを備えている。
The
間接費率マスタ106aは、製番分類、製番管理部門、及び製番原価科目(直接費の種類)毎に、間接費の種類とその間接費率を設定するためのマスタであり、すなわち、間接費を細分化して設定するためのマスタである。間接費率マスタ106aは、製番分類、製番管理部門、対象の製番原価科目(直接費の種類)、製番原価科目(間接費の種類)、及び間接費率を関連づけて登録したテーブル等で構成されている(図2参照)。
The indirect
製番分類マスタ106bは、製番を分類したマスタであり、例えば、試作製番、修理製番、経費製番、工事製番が登録されている(図2参照)。
The production
データファイル106cは、仕入入力データ、出庫入力データ、作業実績入力データ等の直接費データ(予定直接費)、間接費データ(予定間接費)、仕訳データ、原価差異額集計表等の各種データを格納するためのファイルである。 The data file 106c contains various data such as direct cost data (planned direct costs) such as purchasing input data, shipping input data, and work performance input data, indirect cost data (planned indirect costs), journal data, and a cost variance summary table. This is a file for storing.
制御部102は、原価予実管理装置100を統括的に制御するCPU等である。制御部102は、OS等の制御プログラム・各種の処理手順等を規定したプログラム・所要データなどを格納するための内部メモリを有し、格納されているこれらのプログラムに基づいて種々の情報処理を実行する。制御部102は、機能概念的に、マスタメンテ部102aと、仕入入力部102bと、出庫入力部102cと、作業実績入力部102dと、原価計算処理部102eと、仕訳連携処理部102fと、会計システム(原価差額集計部)102gと、を備えている。
The control unit 102 is a CPU or the like that controls the cost budget/
マスタメンテ部102aは、間接費率マスタ106a及び製番分類マスタ106bのデータの追加・削除・変更等の編集を行うためのものである。
The
仕入入力部102bは、データ種類「仕入」、製番、製番分類、製番原価科目、製番管理部門、及び原価を含む仕入入力データを入力してデータファイル106cに格納する。
The purchase input unit 102b inputs purchase input data including data type "purchase", product number, product number classification, product number cost item, product number management department, and cost, and stores it in the
出庫入力部102cは、データ種類「出庫」、製番、製番分類、製番原価科目、製番管理部門、及び原価を含む出庫入力データを入力してデータファイル106cに格納する。
The warehousing input unit 102c inputs warehousing input data including the data type "warehousing", production number, production number classification, production number cost item, production number management department, and cost, and stores it in the
作業実績入力部102dは、データ種類「作業実績」、製番、製番分類、製番原価科目、製番管理部門、原価を含む作業実績入力データを入力してデータファイル106cに格納する。
The work record input unit 102d inputs work record input data including data type "work record", production number, production number classification, production number cost item, production number management department, and cost, and stores it in the
仕入入力データ、出庫入力データ、及び作業実績入力データを総称して直接費データと称し、仕入入力部102b、出庫入力部102c、及び作業実績入力部102dは、直接費データを入力する入力手段を構成する。 Purchase input data, warehousing input data, and work record input data are collectively referred to as direct cost data, and the purchase input section 102b, warehousing input section 102c, and work record input section 102d are inputs for inputting direct cost data. constitute means.
原価計算処理部102eは、直接費データについて、製番分類、製番管理部門、製番原価科目毎に原価を集約(集計)し、集約した原価に、間接費率マスタ106aから製番分類、製番管理部門、及び製番原価科目をキーとして取得した間接費率を乗算して間接費データを算出して、データファイル106cに格納する。
The cost calculation processing unit 102e aggregates (totalizes) the costs for each production number classification, production number management department, and production number cost item for the direct cost data, and adds the production number classification, production number classification, Indirect cost data is calculated by multiplying the obtained indirect cost rate using the manufacturing number management department and manufacturing number cost item as keys, and stores it in the
仕訳連携処理部102fは、会計システム(原価差額集計部)102gと連携して、直接費データ及び間接費データを含む予定原価データについて、所定分類の仕訳を作成して、データファイル106cに格納する。
The journal coordination processing unit 102f collaborates with the accounting system (cost difference aggregation unit) 102g to create journal entries of predetermined classifications for the planned cost data including direct cost data and indirect cost data, and stores them in the
会計システム(原価差額集計部)102gは、実際発生原価を取得し、予定原価データと取得した実際発生原価について、所定分類の原価差額集計表を作成して、データファイル106cに格納する。
The accounting system (cost difference aggregation unit) 102g acquires the actual costs, creates a cost difference aggregation table of predetermined classifications for the planned cost data and the acquired actual costs, and stores it in the
製番分類は、製品製番、試作製番、修理製番、経費製番、及び工事製番を含んでいてもよい。製番管理部門は、製造部と設計部を含んでいてもよい。製番原価科目(直接費の種類)は、直接労務費、材料費、及び外注加工費を含んでいてもよい。製番原価科目(間接費の種類)は、間接労務費、間接経費、間接材料費を含んでいてもよい。所定分類は、製番管理部門、製番、及び製番分類を含んでいてもよい。 The production number classification may include a product production number, a trial production number, a repair production number, an expense production number, and a construction production number. The production number management department may include a manufacturing department and a design department. The production number cost item (type of direct cost) may include direct labor cost, material cost, and outsourced processing cost. The production number cost item (type of indirect cost) may include indirect labor cost, indirect cost, and indirect material cost. The predetermined classification may include a production number management department, a production number, and a production number classification.
[3.具体例]
図1~図4を参照して、本実施の形態における原価予実管理装置100の処理の具体例を説明する。まず、図2~図4は、本実施の形態における原価予実管理装置100の制御部102の処理の具体例を説明するための図である。以下の説明では、金額の単位は全て「千円」とし、その表記を省略する。
[3. Concrete example]
A specific example of the processing of the cost budget and
(マスタメンテ処理)
図2において、マスタメンテ部102aは、マスタメンテ処理を実行する(ステップS1)。具体的には、マスタメンテ処理では、マスタメンテ部102aは、例えば、経理担当者の端末400のリクエストに応じて端末400にマスタメンテ画面を提供し、マスタメンテ画面上での経理担当者の端末400の操作等に応じて、間接費率マスタ106aや製番分類マスタ106bのデータの設定を行う。
(Master maintenance processing)
In FIG. 2, the
図2(A)は、間接費率マスタ106aの登録例を示す図である。図2(A)に示す間接費率マスタ106aの例では、1行目は、製番分類「製品製番」、製番管理部門「製造部」、製番原価科目「間接労務費」、対象製番原価科目「直接労務費」、間接費率「2.0%」、2行目は、製番分類「製品製番」、製番管理部門「製造部」、製番原価科目「間接経費」、対象製番原価科目「材料費、外注加工費」、間接費率「3.0%」が登録されている。
FIG. 2(A) is a diagram showing a registration example of the indirect
3行目は、製番分類「試作製番」、製番管理部門「設計部」、製番原価科目「間接労務費」、対象製番原価科目「直接労務費」、間接費率「2.0%」、4行目は、製番分類「試作製番」、製番管理部門「設計部」、製番原価科目「間接経費」、対象製番原価科目「材料費、外注加工費」、間接費率「4.0%」が登録されている。 The third line contains the production number classification "Prototype Production Number", the production number management department "Design Department", the production number cost item "Indirect Labor Cost", the target production number cost item "Direct Labor Cost", and the indirect cost rate "2. 0%'', the fourth line is the production number classification ``Prototype production number'', the production number management department ``Design department'', the production number cost item ``Indirect expenses'', the target production number cost item ``Material cost, outsourced processing cost'', An indirect cost rate of "4.0%" is registered.
図2(B)は、製番分類マスタ106bの登録例を示す図である。図2(B)に示す製番分類マスタ106bの例では、試作製番、修理製番、経費製番、工事製番が登録されている。
FIG. 2(B) is a diagram showing an example of registration of the product
(直接費データ入力処理(仕入入力処理、出庫入力処理、作業実績入力処理)
図3において、仕入入力部102bは、仕入入力処理を実行する(ステップS2)。具体的には、仕入入力処理では、例えば、仕入入力部102bは、購買担当者の端末400のリクエストに応じて端末400に仕入入力画面を提供し、仕入入力画面上での購買担当者の端末400の操作等に応じて、仕入入力データを入力してデータファイル106cに格納する。
(Direct cost data input process (purchase input process, shipping input process, work record input process)
In FIG. 3, the purchase input unit 102b executes a purchase input process (step S2). Specifically, in the purchase input process, for example, the purchase input unit 102b provides a purchase input screen to the terminal 400 in response to a request from the purchasing person on the terminal 400, and performs the purchase on the purchase input screen. In response to the operation of the terminal 400 by the person in charge, purchase input data is input and stored in the
出庫入力部102cは、出庫入力処理を実行する(ステップS3)。具体的には、出庫入力処理では、出庫入力部102cは、例えば、購買担当者の端末400のリクエストに応じて端末400に出荷入力画面を提供し、出荷入力画面上での購買担当者の端末400の操作等に応じて、出庫入力データを入力してデータファイル106cに格納する。
The warehousing input unit 102c executes warehousing input processing (step S3). Specifically, in the warehousing input process, the warehousing input unit 102c provides a shipping input screen to the terminal 400 in response to a request from the purchasing person's terminal 400, and displays the shipping input screen on the purchasing person's terminal on the shipping input screen. In response to the operation of 400, etc., shipping input data is input and stored in the
作業実績入力部102dは、作業実績入力処理を実行する(ステップS4)。具体的には、作業実績入力処理では、作業実績入力部102dは、例えば、製造担当者の端末400のリクエストに応じて端末400に製造実績入力画面を提供し、製造実績入力画面上での製造担当者の端末400の操作等に応じて、作業実績入力データを入力してデータファイル106cに格納する。 The work record input unit 102d executes a work record input process (step S4). Specifically, in the work performance input process, the work performance input unit 102d provides a manufacturing performance input screen to the terminal 400 in response to a request from the manufacturing staff on the terminal 400, and performs the manufacturing process on the manufacturing performance input screen. Work record input data is inputted and stored in the data file 106c in response to the operator's operation of the terminal 400.
図3(A)は、各入力処理より計上される直接費データ(原価明細)の一例を示す図である。図3(A)において、1行目は、データ種類「仕入」、製番「F1010095」、製番分類「製品製番」、製番原価科目「材料費」、製番管理部門「製造部」、原価「1,000」、2行目は、データ種類「仕入」、製番「F9010002」、製番分類「試作製番」、製番原価科目「外注加工費」、製番管理部門「設計部」、原価「1,500」、3行目は、データ種類「仕入」、製番「F9010002」、製番分類「試作製番」、製番原価科目「材料費」、製番管理部門「設計部」、原価「2,000」、4行目は、データ種類「出庫」、製番「F1010095」、製番分類「製品製番」、製番原価科目「材料費」製番管理部門「製造部」、原価「1,000」となっている。 FIG. 3A is a diagram showing an example of direct cost data (cost details) recorded by each input process. In Figure 3 (A), the first line contains the data type "Purchase", the production number "F1010095", the production number classification "Product production number", the production number cost item "Material cost", and the production number management division "Manufacturing department". ", cost "1,000", the second line is data type "purchase", production number "F9010002", production number classification "prototype production number", production number cost item "outsourcing processing cost", production number management department "Design Department", cost "1,500", the third line is data type "purchase", production number "F9010002", production number classification "prototype production number", production number cost item "material cost", production number Management department "Design Department", cost "2,000", the fourth line is data type "shipping", production number "F1010095", production number classification "product production number", production number cost item "material cost" production number The management department is ``Manufacturing Department,'' and the cost is ``1,000.''
5行目は、データ種類「出庫」、製番「F9010002」、製番分類「試作製番」、製番原価科目「材料費」、製番管理部門「設計部」、原価「1,000」、6行目は、データ種類「出庫」、製番「F9010002」、製番分類「試作製番」、製番原価科目「材料費」、製番管理部門「設計部」、原価「1,500」、7行目は、データ種類「作業実績」、製番「F9010002」、製番分類「試作製番」、製番原価科目「直接労務費」、製番管理部門「設計部」、原価「5,000」となっている。 The fifth line is the data type "Issuance", the production number "F9010002", the production number classification "prototype production number", the production number cost item "material cost", the production number management department "design department", and the cost "1,000". , the 6th line contains the data type "Issuance", the production number "F9010002", the production number classification "prototype production number", the production number cost item "material cost", the production number management department "design department", and the cost "1,500 ", the 7th line contains the data type "Work results", the production number "F9010002", the production number classification "Prototype production number", the production number cost item "Direct labor cost", the production number management department "Design department", and the cost " 5,000.”
(原価計算処理)
原価計算処理部102eは、原価計算処理を実行する(ステップS5)。具体的には、原価計算処理では、原価計算処理部102eは、直接費データ(仕入入力データ、出庫入力データ、作業実績入力データ)について、製番、製番分類、製番管理部門、及び製番原価科目(直接費の種類)毎に原価を集計し、製番分類、製番管理部門、及び製番原価科目(直接費の種類)をキーとして間接費率マスタ106aから間接費率を取得して直接費の原価に乗算することで、間接費を算出する。
(Cost accounting process)
The cost calculation processing unit 102e executes cost calculation processing (step S5). Specifically, in the cost calculation process, the cost calculation processing unit 102e calculates the production number, production number classification, production number management department, and The costs are totaled for each manufacturing number cost item (direct cost type), and the indirect cost rate is calculated from the indirect
図3(B)は、原価計算過程を示しており、直接費の原価に間接費率を乗算したものを示している。図3(B)において、1行目は、図3(A)の1行目と4行目を集計し、製番分類「製品製番」、製番原価科目「材料費」、製番管理部門「製造部」をキーとして、図2(A)の間接費率マスタ106aから間接費率「3.0%」を取得し、製番「F1010095」、製番分類「製品製番」、製番原価科目「材料費」、製番管理部門「製造部」、原価「2,000」×間接費率「3.0%」となっている。
FIG. 3(B) shows the cost calculation process, and shows the cost of direct costs multiplied by the indirect cost rate. In Figure 3 (B), the first line is the sum of the first and fourth lines in Figure 3 (A), manufacturing number classification "product manufacturing number", manufacturing number cost item "material cost", manufacturing number management Using the department "Manufacturing Department" as a key, obtain the indirect cost rate "3.0%" from the indirect
2行目は、図3(A)の2行目に対応しており、製番分類「試作製番」、製番原価科目「外注加工費」、製番管理部門「設計部」をキーとして、図2(A)の0間接費率マスタ106aから間接費率「4.0%」を取得し、製番「F9010002」、製番分類「試作製番」、製番原価科目「外注加工費」、製番管理部門「設計部」、原価「1,500」×間接費率「4.0%」となっている。
The second line corresponds to the second line in Figure 3 (A), and uses the production number classification "Prototype production number", production number cost item "Outsourced processing cost", and production number management department "Design department" as keys. , obtain the indirect cost rate "4.0%" from the 0 indirect
3行目は、図3(A)の3行目、5行目、6行目を集計し、製番分類「試作製番」、製番原価科目「材料費」、製番管理部門「設計部」をキーとして、図2(A)の間接費率マスタ106aから間接費率「4.0%」を取得し、製番「F9010002」、製番分類「試作製番」、製番原価科目「材料費」、製番管理部門「設計部」、原価「4,500」×間接費率「4.0%」となっている。
The 3rd line summarizes the 3rd, 5th, and 6th lines in Figure 3 (A), and includes the production number classification "Prototype production number", the production number cost item "Material cost", and the production number management department "Design". Using "Department" as a key, obtain the indirect cost rate "4.0%" from the indirect
4行目は、図3(A)の7行目に対応しており、製番分類「試作製番」、製番原価科目「直接労務費」、製番管理部門「設計部」をキーとして、図2(A)の間接費率マスタ106aから間接費率「2.0%」を取得し、製番「F9010002」、製番分類「試作製番」、製番原価科目「直接労務費」、製番管理部門「設計部」、原価「5,000」×間接費率「2.0%」となっている。
The 4th line corresponds to the 7th line in Figure 3 (A), and uses the production number classification "prototype production number", production number cost item "direct labor cost", and production number management department "design department" as keys. , obtain the indirect cost rate "2.0%" from the indirect
図4(C)は、間接費の原価計算結果を示しており、間接費率マスタ106aを参照して、製番及び製番原価科目(間接費の種類)毎に、間接費を集計した結果を示している。1行目は、製番「F1010095」、製番原価科目「間接経費」、製造間接費「60」、2行目は、製番「F9010002」、製番原価科目「間接経費」、製造間接費「240」、3行目は、製番「F9010002」、製番原価科目「間接労務費」、製造間接費「100」となっている。
Figure 4 (C) shows the cost calculation results for indirect costs, which are the results of aggregating indirect costs for each manufacturing number and manufacturing number cost item (type of indirect costs) with reference to the indirect
図4(D)は、図3(A)と図4(C)を纏めたもので、製番毎の直接費と間接費の内訳を示している。 FIG. 4(D) is a summary of FIG. 3(A) and FIG. 4(C), and shows the breakdown of direct costs and indirect costs for each product number.
(仕訳連携処理)
仕訳連携処理部102fは、仕訳連携処理を実行する(ステップS6)。具体的には、仕訳連携処理では、仕訳連携処理部102fは、会計システム(原価差額集計部)102gと連携して、予定原価データ(直接費データと間接費データ)について、所定分類(例えば、部門毎)の仕訳を作成して、データファイル106cに格納する。
(Journal linkage processing)
The journal coordination processing unit 102f executes journal coordination processing (step S6). Specifically, in the journal coordination process, the journal coordination processing unit 102f cooperates with the accounting system (cost difference aggregation unit) 102g to classify the planned cost data (direct cost data and indirect cost data) into predetermined classifications (for example, A journal entry for each department is created and stored in the
図4(E)は、製造部と設計部の仕訳の例を示している。製造部については、材料費「2,000」/仮勘定(直接材料費予定額)「2,000」、外注加工費「0」/仮勘定(直接経費予定額)「0」、間接経費「60」/仮勘定(間接経費予定額)「60」、直接労務費「0」/仮勘定(直接労務費予定額)「0」、間接労務費「0」/仮勘定(間接労務費予定額)「0」となっている。 FIG. 4(E) shows an example of journal entries for the manufacturing department and the design department. For the manufacturing department, material cost "2,000" / suspense account (direct material cost estimate) "2,000", outsourcing processing cost "0" / suspense account (direct expense schedule) "0", indirect expense " 60'' / suspense account (planned amount of indirect expenses) ``60'', direct labor cost ``0'' / suspense account (planned amount of direct labor expenses) ``0'', indirect labor cost ``0'' / suspense account (planned amount of indirect labor costs) ) is “0”.
設計部については、材料費「4,500」/仮勘定(直接材料費予定額)「4,500」、外注加工費「1,500」/仮勘定(直接経費予定額)「1,500」、間接経費「240」/仮勘定(間接経費予定額)「240」、直接労務費「5,000」/仮勘定(直接労務費予定額)「5,000」、間接労務費「100」/仮勘定(間接労務費予定額)「100」となっている。 For the design department, material cost: ``4,500'' / suspense account (planned direct material cost) ``4,500''; outsourcing processing cost: ``1,500'' / suspense account (planned direct expense amount): ``1,500'' , Indirect expenses "240" / Suspense account (planned amount of indirect expenses) "240", Direct labor costs "5,000" / Suspense account (planned amount of direct labor costs) "5,000", Indirect labor costs "100" / Suspense account (planned amount of indirect labor costs) is ``100''.
(原価差額集計処理)
会計システム(原価差額集計部)102gは、原価差額集計処理を実行する(ステップS7)。具体的には、原価差額集計処理では、会計システム(原価差額集計部)102gは、実際発生原価(例えば、材料費実際発生額、労務費実際発生額、経費実際発生額)を取得し、予定原価と実際発生原価に基づいて、所定分類毎(例えば、部門毎)の原価差額集計表を作成して、データファイル106cに格納する。なお、会計システム(原価差額集計部)102gでは、例えば、経理担当者の端末400のリクエストに応じて端末400に実際発生原価入力画面を提供し、実際発生原価入力画面上での経理担当者の端末400の操作等に応じて、実際発生原価を入力してもよい。
(Cost difference calculation process)
The accounting system (cost difference aggregation unit) 102g executes cost difference aggregation processing (step S7). Specifically, in the cost difference aggregation process, the accounting system (cost difference aggregation unit) 102g obtains the actual costs (for example, the actual amount of material costs, the actual amount of labor costs, and the actual amount of expenses) and calculates the actual costs. Based on the cost and the actual cost, a cost difference summary table for each predetermined classification (for example, each department) is created and stored in the
図4(F)は、部門別の原価差額集計表の一例を示す図である。材料費原価差異=材料費実際発生額-(直接材料費予定額+間接材料費予定額)、労務費原価差異=労務費実際発生額-(直接労務費予定額+間接労務費予定額)、経費原価差異=経費実際発生額-(直接経費予定額+間接経費予定額)で算出することができる。 FIG. 4(F) is a diagram showing an example of a cost difference summary table for each department. Material cost variance = actual material cost incurred - (planned direct material cost + planned indirect material cost), labor cost variance = actual labor cost incurred - (planned direct labor cost + planned indirect labor cost), It can be calculated as: Expense cost difference = Actual amount of expenses - (Planned amount of direct expenses + Planned amount of indirect expenses).
製番管理部門「製造部」については、材料費実際発生額「2,000」、直接材料費予定額「2,000」、間接材料費予定額「0」、材料費原価差異「0」、労務費実際発生額「0」、直接労務費予定額「0」、間接労務費予定額「0」、労務費原価差異「0」、経費実際発生額「50」、直接経費予定額「0」、間接経費予定額「60」、経費原価差異「-10」となっている。 For the production number management department "Manufacturing Department", the actual material cost incurred is "2,000", the planned direct material cost is "2,000", the planned indirect material cost is "0", the material cost difference is "0", Actual amount of labor costs incurred ``0'', planned amount of direct labor costs ``0'', planned amount of indirect labor costs ``0'', labor cost cost variance ``0'', amount of actual expenses incurred ``50'', planned amount of direct costs ``0'' , the planned amount of indirect expenses is "60", and the cost difference of expenses is "-10".
製番管理部門「設計部」については、材料費実際発生額「4,600」、直接材料費予定額「4,500」、間接材料費予定額「0」、材料費原価差異「100」、労務費実際発生額「5,000」、直接労務費予定額「5,000」、間接労務費予定額「100」、労務費原価差異「-100」、経費実際発生額「1,740」、直接経費予定額「1,500」、間接経費予定額「240」、経費原価差異「0」となっている。なお、ここでは、部門別で集計しているが、製番別や製番分類別に集計してもよい。 For the production number control department "Design Department", the actual material cost incurred is "4,600", the planned direct material cost is "4,500", the planned indirect material cost is "0", the material cost difference is "100", Actual amount of labor costs incurred: ``5,000''; Planned amount of direct labor costs: ``5,000''; Planned amount of indirect labor costs: ``100''; Labor cost cost variance: ``-100''; Actual amount of expenses incurred: ``1,740''; The planned direct expenses amount is "1,500," the planned indirect expenses amount is "240," and the expense cost variance is "0." Note that although the numbers are aggregated by department here, they may be aggregated by product number or product number classification.
以上説明したように、本実施の形態によれば、製番分類、製番管理部門、及び製番原価科目毎に、間接費率を設定した間接費率マスタ106aと、各種データについて、製番、製番分類、製番管理部門、製番原価科目、及び原価を含む直接費データを入力する入力手段(仕入入力部102b、出庫入力部102c、作業実績入力部102d)と、前記直接費データについて、製番分類、製番管理部門、製番原価科目毎に原価を集約し、集約した原価に、間接費率マスタ106aから製番分類、製番管理部門、及び製番原価科目をキーとして取得した間接費率を乗算して間接費データを算出する原価計算処理部102eと、前記直接費データ及び前記間接費データを含む予定原価データについて、所定分類の仕訳を作成する仕訳連携処理部102fと、実際発生原価を取得し、前記予定原価データと取得した実際発生原価について、前記所定分類の原価差額集計表を作成する会計システム(原価差額集計部)102gと、を備えているので、間接費を細分化して計上することで原価予実管理を高精度に行うことが可能となる。
As explained above, according to the present embodiment, the indirect
[4.他の実施形態]
本発明は、上述した実施形態以外にも、特許請求の範囲に記載した技術的思想の範囲内において種々の異なる実施形態にて実施されてよいものである。
[4. Other embodiments]
In addition to the embodiments described above, the present invention may be implemented in various different embodiments within the scope of the technical idea described in the claims.
例えば、実施形態において説明した各処理のうち、自動的に行われるものとして説明した処理の全部または一部を手動的に行うこともでき、あるいは、手動的に行われるものとして説明した処理の全部または一部を公知の方法で自動的に行うこともできる。 For example, among the processes described in the embodiments, all or part of the processes described as being performed automatically can be performed manually, or all of the processes described as being performed manually can be performed manually. Alternatively, some of the steps can be performed automatically using known methods.
また、本明細書中や図面中で示した処理手順、制御手順、具体的名称、各処理の登録データや検索条件等のパラメータを含む情報、画面例、データベース構成については、特記する場合を除いて任意に変更することができる。 In addition, unless otherwise specified, information including processing procedures, control procedures, specific names, parameters such as registered data and search conditions for each process, screen examples, and database configurations shown in this specification and drawings are included. It can be changed arbitrarily.
また、原価予実管理装置100に関して、図示の各構成要素は機能概念的なものであり、必ずしも物理的に図示の如く構成されていることを要しない。
Further, regarding the cost budget/
例えば、原価予実管理装置100が備える処理機能、特に制御部にて行われる各処理機能については、その全部または任意の一部を、CPUおよび当該CPUにて解釈実行されるプログラムにて実現してもよく、また、ワイヤードロジックによるハードウェアとして実現してもよい。尚、プログラムは、本実施形態で説明した処理を情報処理装置に実行させるためのプログラム化された命令を含む一時的でないコンピュータ読み取り可能な記録媒体に記録されており、必要に応じて原価予実管理装置100に機械的に読み取られる。すなわち、ROMまたはHDD(Hard Disk Drive)などの記憶部などには、OSと協働してCPUに命令を与え、各種処理を行うためのコンピュータプログラムが記録されている。このコンピュータプログラムは、RAMにロードされることによって実行され、CPUと協働して制御部を構成する。
For example, the processing functions provided by the cost budget and
また、このコンピュータプログラムは、原価予実管理装置100に対して任意のネットワークを介して接続されたアプリケーションプログラムサーバに記憶されていてもよく、必要に応じてその全部または一部をダウンロードすることも可能である。
Further, this computer program may be stored in an application program server connected to the cost budget/
また、本実施形態で説明した処理を実行するためのプログラムを、一時的でないコンピュータ読み取り可能な記録媒体に格納してもよく、また、プログラム製品として構成することもできる。ここで、この「記録媒体」とは、メモリーカード、USB(Universal Serial Bus)メモリ、SD(Secure Digital)カード、フレキシブルディスク、光磁気ディスク、ROM、EPROM(Erasable Programmable Read Only Memory)、EEPROM(登録商標)(Electrically Erasable and Programmable Read Only Memory)、CD-ROM(Compact Disk Read Only Memory)、MO(Magneto-Optical disk)、DVD(Digital Versatile Disk)、および、Blu-ray(登録商標) Disc等の任意の「可搬用の物理媒体」を含むものとする。 Further, a program for executing the processing described in this embodiment may be stored in a non-temporary computer-readable recording medium, or may be configured as a program product. Here, this "recording medium" includes a memory card, a USB (Universal Serial Bus) memory, an SD (Secure Digital) card, a flexible disk, a magneto-optical disk, a ROM, an EPROM (Erasable Programmable Read Only Memory), and an EEPR. OM (registration) Trademark) (Electrically Erasable and Programmable Read Only Memory), CD-ROM (Compact Disk Read Only Memory), MO (Magneto-Optical disk), DVDs (Digital Versatile Discs), Blu-ray (registered trademark) Discs, etc. shall include any “portable physical medium”.
また、「プログラム」とは、任意の言語または記述方法にて記述されたデータ処理方法であり、ソースコードまたはバイナリコード等の形式を問わない。なお、「プログラム」は必ずしも単一的に構成されるものに限られず、複数のモジュールやライブラリとして分散構成されるものや、OSに代表される別個のプログラムと協働してその機能を達成するものをも含む。なお、実施形態に示した各装置において記録媒体を読み取るための具体的な構成および読み取り手順ならびに読み取り後のインストール手順等については、周知の構成や手順を用いることができる。 Further, a "program" is a data processing method written in any language or writing method, and does not matter in the form of source code or binary code. Note that a "program" is not necessarily limited to a unitary structure, but may be distributed as multiple modules or libraries, or may work together with separate programs such as an OS to achieve its functions. Including things. Note that well-known configurations and procedures can be used for the specific configuration and reading procedure for reading the recording medium in each device shown in the embodiments, and the installation procedure after reading.
記憶部に格納される各種のデータベース等は、RAM、ROM等のメモリ装置、ハードディスク等の固定ディスク装置、フレキシブルディスク、及び、光ディスク等のストレージ手段であり、各種処理やウェブサイト提供に用いる各種のプログラム、テーブル、データベース、及び、ウェブページ用ファイル等を格納する。 The various databases stored in the storage unit are storage means such as memory devices such as RAM and ROM, fixed disk devices such as hard disks, flexible disks, and optical disks, and are used for various processing and website provision. Stores programs, tables, databases, web page files, etc.
また、原価予実管理装置100は、既知のパーソナルコンピュータまたはワークステーション等の情報処理装置として構成してもよく、また、任意の周辺装置が接続された当該情報処理装置として構成してもよい。また、原価予実管理装置100は、当該装置に本実施形態で説明した処理を実現させるソフトウェア(プログラムまたはデータ等を含む)を実装することにより実現してもよい。
Further, the cost budget and
更に、装置の分散・統合の具体的形態は図示するものに限られず、その全部または一部を、各種の付加等に応じてまたは機能負荷に応じて、任意の単位で機能的または物理的に分散・統合して構成することができる。すなわち、上述した実施形態を任意に組み合わせて実施してもよく、実施形態を選択的に実施してもよい。 Furthermore, the specific form of dispersion and integration of devices is not limited to what is shown in the diagram, and all or part of them can be functionally or physically divided into arbitrary units according to various additions or functional loads. It can be configured in a distributed/integrated manner. That is, the embodiments described above may be implemented in any combination, or the embodiments may be implemented selectively.
100 原価予実管理装置
102 制御部
102a マスタメンテ部
102b 仕入入力部
102c 出庫入力部
102d 作業実績入力部
102e 原価計算処理部
102f 仕訳連携処理部
102g 会計システム(原価差額集計部)
104 通信インターフェース部
106 記憶部
106a 間接費率マスタ
106b 製番分類マスタ
106c データファイル
108 入出力インターフェース部
112 入力装置
114 出力装置
200 サーバ
300 ネットワーク
400 端末
100 Cost budget and actual management device 102
104
Claims (8)
前記記憶部には、
製番分類、製番管理部門、及び製番原価科目毎に、間接費率を設定したマスタが格納されており、
前記制御部は、
各種データについて、製番、製番分類、製番管理部門、製番原価科目、及び原価を含む直接費データを入力する入力手段と、
前記直接費データを製番分類、製番管理部門、製番原価科目毎に原価を集約し、集約した原価に、前記マスタから製番分類、製番管理部門、及び製番原価科目をキーとして取得した間接費率を乗算して間接費データを算出する原価計算処理手段と、
前記直接費データ及び前記間接費データを含む予定原価データについて、所定分類の仕訳を作成する仕訳作成手段と、
実際発生原価を取得し、前記予定原価データと取得した実際発生原価について、前記所定分類の原価差額集計表を作成する原価差額集計手段と、
を備えたことを特徴とする原価予実管理装置。 A cost budget and actual management device comprising a storage unit and a control unit,
In the storage unit,
A master record with indirect cost rates set for each production number classification, production number management department, and production number cost item is stored.
The control unit includes:
Input means for inputting direct cost data including production number, production number classification, production number management department, production number cost item, and cost regarding various data;
The above direct cost data is aggregated by production number classification, production number management department, and production number cost item, and the aggregated costs are calculated from the master using the production number classification, production number management department, and production number cost item as keys. a cost calculation processing means for calculating indirect cost data by multiplying the obtained indirect cost rate;
Journal creation means for creating a journal entry of a predetermined classification for the scheduled cost data including the direct cost data and the indirect cost data;
A cost difference aggregation means that obtains actual costs and creates a cost difference summary table for the predetermined classification based on the planned cost data and the obtained actual costs;
A cost budget and actual management device characterized by comprising:
前記記憶部には、
製番分類、製番管理部門、及び製番原価科目毎に、間接費率を設定したマスタが格納されており、
前記制御部において実行される、
各種データについて、製番、製番分類、製番管理部門、製番原価科目、及び原価を含む直接費データを入力する入力工程と、
前記直接費データを製番分類、製番管理部門、製番原価科目毎に原価を集約し、集約した原価に、前記マスタから製番分類、製番管理部門、及び製番原価科目をキーとして取得した間接費率を乗算して間接費データを算出する原価計算処理工程と、
前記直接費データ及び前記間接費データを含む予定原価データについて、所定分類の仕訳を作成する仕訳作成工程と、
実際発生原価を取得し、前記予定原価データと取得した実際発生原価について、前記所定分類の原価差額集計表を作成する原価差額集計工程と、
を含むことを特徴とする原価予実管理方法。 A cost budget and actual management method executed by an information processing device including a storage unit and a control unit, the method comprising:
In the storage unit,
A master record with indirect cost rates set for each production number classification, production number management department, and production number cost item is stored.
executed in the control unit,
Regarding various data, an input step of inputting direct cost data including production number, production number classification, production number management department, production number cost item, and cost;
The above direct cost data is aggregated by production number classification, production number management department, and production number cost item, and the aggregated costs are calculated from the master using the production number classification, production number management department, and production number cost item as keys. a cost calculation process of calculating indirect cost data by multiplying the obtained indirect cost rate;
a journal entry creation step of creating a journal entry of a predetermined classification for the scheduled cost data including the direct cost data and the indirect cost data;
a cost difference aggregation step of acquiring actual incurred costs and creating a cost difference aggregation table for the predetermined classification with respect to the planned cost data and the acquired actual costs;
A cost budget and actual management method characterized by including the following.
前記記憶部には、
製番分類、製番管理部門、及び製番原価科目毎に、間接費率を設定したマスタが格納されており、
前記制御部において、
各種データについて、製番、製番分類、製番管理部門、製番原価科目、及び原価を含む直接費データを入力する入力工程と、
前記直接費データを製番分類、製番管理部門、製番原価科目毎に原価を集約し、集約した原価に、前記マスタから製番分類、製番管理部門、及び製番原価科目をキーとして取得した間接費率を乗算して間接費データを算出する原価計算処理工程と、
前記直接費データ及び前記間接費データを含む予定原価データについて、所定分類の仕訳を作成する仕訳作成工程と、
実際発生原価を取得し、前記予定原価データと取得した実際発生原価について、前記所定分類の原価差額集計表を作成する原価差額集計工程と、
を実行するための原価予実管理プログラム。 A cost budget and actual management program to be executed by an information processing device including a control unit and a storage unit,
In the storage unit,
A master record with indirect cost rates set for each production number classification, production number management department, and production number cost item is stored.
In the control section,
Regarding various data, an input step of inputting direct cost data including production number, production number classification, production number management department, production number cost item, and cost;
The above direct cost data is aggregated by production number classification, production number management department, and production number cost item, and the aggregated costs are calculated from the master using the production number classification, production number management department, and production number cost item as keys. a cost calculation process of calculating indirect cost data by multiplying the obtained indirect cost rate;
a journal entry creation step of creating a journal entry of a predetermined classification for the scheduled cost data including the direct cost data and the indirect cost data;
a cost difference aggregation step of acquiring actual incurred costs and creating a cost difference aggregation table for the predetermined classification with respect to the planned cost data and the acquired actual costs;
A cost budget and actual management program for executing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2023208907A JP2024015351A (en) | 2020-03-17 | 2023-12-12 | Cost budget/actual management device, cost budget/actual management method, and cost budget/actual management program |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2020046420 | 2020-03-17 | ||
JP2020046420 | 2020-03-17 |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2023208907A Division JP2024015351A (en) | 2020-03-17 | 2023-12-12 | Cost budget/actual management device, cost budget/actual management method, and cost budget/actual management program |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2021149926A JP2021149926A (en) | 2021-09-27 |
JP7404215B2 true JP7404215B2 (en) | 2023-12-25 |
Family
ID=77849170
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2020173587A Active JP7404215B2 (en) | 2020-03-17 | 2020-10-14 | Cost budget and actual management device, cost budget and actual management method, and cost budget and actual management program |
JP2023208907A Pending JP2024015351A (en) | 2020-03-17 | 2023-12-12 | Cost budget/actual management device, cost budget/actual management method, and cost budget/actual management program |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2023208907A Pending JP2024015351A (en) | 2020-03-17 | 2023-12-12 | Cost budget/actual management device, cost budget/actual management method, and cost budget/actual management program |
Country Status (1)
Country | Link |
---|---|
JP (2) | JP7404215B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7296510B1 (en) | 2022-07-27 | 2023-06-22 | 株式会社オービック | Business support device, business support method, and business support program |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004213236A (en) | 2002-12-27 | 2004-07-29 | Hitachi Ltd | Cost accounting method in medical institution, business form of cost accounting result, cost accounting program, and output method of business form |
JP2004258717A (en) | 2003-02-24 | 2004-09-16 | Toyo Business Engineering Corp | Cost management system and method |
JP2017091508A (en) | 2015-11-05 | 2017-05-25 | 株式会社オービック | Project accounting management device, project accounting management method, and project accounting management program |
-
2020
- 2020-10-14 JP JP2020173587A patent/JP7404215B2/en active Active
-
2023
- 2023-12-12 JP JP2023208907A patent/JP2024015351A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004213236A (en) | 2002-12-27 | 2004-07-29 | Hitachi Ltd | Cost accounting method in medical institution, business form of cost accounting result, cost accounting program, and output method of business form |
JP2004258717A (en) | 2003-02-24 | 2004-09-16 | Toyo Business Engineering Corp | Cost management system and method |
JP2017091508A (en) | 2015-11-05 | 2017-05-25 | 株式会社オービック | Project accounting management device, project accounting management method, and project accounting management program |
Non-Patent Citations (1)
Title |
---|
岩橋 秀年,第1回 企業の競争力を支える基幹システムの導入,工場管理,日刊工業新聞社,2015年01月01日,Vol.61 No.1,pp.113-118 |
Also Published As
Publication number | Publication date |
---|---|
JP2021149926A (en) | 2021-09-27 |
JP2024015351A (en) | 2024-02-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2024015351A (en) | Cost budget/actual management device, cost budget/actual management method, and cost budget/actual management program | |
JP7085304B2 (en) | Cost calculator, cost calculation method and cost calculation program | |
JP6798856B2 (en) | Amount calculation device, amount calculation method and amount calculation program | |
JP7481541B2 (en) | Information generating device, information generating program, and information generating method | |
JP2021047912A (en) | Work completion control device, work completion control method, and work completion control program | |
JP7197989B2 (en) | Progress rate calculation device, progress rate calculation method, and progress rate calculation program | |
JP7389849B2 (en) | Information processing device, information processing method, and information processing program | |
JP7093267B2 (en) | Data generator, data generation method and data generation program | |
JP7240100B2 (en) | Proportion calculation device, proportion calculation method, and proportion calculation program | |
JP6927771B2 (en) | Sales management equipment, sales management methods, and sales management programs | |
JP2018112988A (en) | Journaling preparation device, journaling preparation method, and journaling preparation program | |
JP7470000B2 (en) | Profit and Loss Management Simulation Device, Profit and Loss Management Simulation Method, and Profit and Loss Management Simulation Program | |
JP7377229B2 (en) | Cost allocation devices, cost allocation methods and cost allocation programs | |
JP7505998B2 (en) | Budget data generation device, budget data generation method, and budget data generation program | |
JP7300431B2 (en) | Productivity Index Calculation Device, Productivity Index Calculation Method, and Productivity Index Calculation Program | |
JP6853705B2 (en) | Usage content management device, usage content management method, and usage content management program | |
JP7498066B2 (en) | Information processing device, information processing method, and information processing program | |
JP2018120295A (en) | Indirect cost calculation device, indirect cost calculation method, and indirect cost calculation program | |
JP2018124748A (en) | Security management device, security management method, and security management program | |
JP7065704B2 (en) | Calculation device, calculation method and calculation program | |
JP6947507B2 (en) | Profit management equipment, profit management methods, and profit management programs | |
JP2024044063A (en) | Income and expenditure management device, income and expenditure management method, and income and expenditure management program | |
JP2021140717A (en) | Inspection-scheduled data generation device, inspection-scheduled data generation method, and inspection-scheduled data generation program | |
JP2021144344A (en) | Cost output device, cost output method, and cost output program | |
JP2021140737A (en) | Information processing device, information processing method and information processing program |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20221215 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20231006 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20231114 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20231213 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 7404215 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |