JP7330052B2 - Tunnel repair method and repair equipment - Google Patents

Tunnel repair method and repair equipment Download PDF

Info

Publication number
JP7330052B2
JP7330052B2 JP2019185824A JP2019185824A JP7330052B2 JP 7330052 B2 JP7330052 B2 JP 7330052B2 JP 2019185824 A JP2019185824 A JP 2019185824A JP 2019185824 A JP2019185824 A JP 2019185824A JP 7330052 B2 JP7330052 B2 JP 7330052B2
Authority
JP
Japan
Prior art keywords
formwork
tunnel
section
repair
lining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019185824A
Other languages
Japanese (ja)
Other versions
JP2021059932A (en
Inventor
義幸 植村
誠 宇田
崇 杉田
孝仁 舟橋
雅彦 小林
猛彦 佐藤
Original Assignee
鉄建建設株式会社
株式会社東宏
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 鉄建建設株式会社, 株式会社東宏 filed Critical 鉄建建設株式会社
Priority to JP2019185824A priority Critical patent/JP7330052B2/en
Publication of JP2021059932A publication Critical patent/JP2021059932A/en
Priority to JP2023129271A priority patent/JP7481554B2/en
Application granted granted Critical
Publication of JP7330052B2 publication Critical patent/JP7330052B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

本発明は、供用中のトンネルの内面を改修するトンネル改修工法及び改修装置に関する。 TECHNICAL FIELD The present invention relates to a tunnel repairing method and apparatus for repairing the inner surface of a tunnel in service.

供用中のトンネルの中には、構築後の期間が経過し、内面を覆工するコンクリート覆工部の耐久性が低下し、改修を要するトンネルが多数あり、さまざまな改修工法が提案されている。例えば、特許文献1に記載の改修工法は、トンネル延長方向に沿って移動自在な門型台車に、剥離除去装置とセントルとを搭載し、これらの各装置を作動させることにより、改修コンクリート層を連続的に形成するものである。 Among the tunnels in service, there are many tunnels in need of repair due to the deterioration of the durability of the concrete lining that lines the inner surface due to the passage of time since construction, and various repair methods have been proposed. . For example, in the repair method described in Patent Document 1, a detachment removal device and a center are mounted on a portal carriage that is movable along the extension direction of the tunnel, and by operating these devices, the repair concrete layer is removed. It is formed continuously.

しかしながら、このような改修工法では、供用中のトンネルの通行を規制して、施工する必要があった。また、夜間のみを通行止めとし、通行量の多い日中は規制解除して施工する場合であっても、トンネル延長が長く、坑口から施工箇所までの距離が遠いと、門型台車を施工箇所まで搬入する、あるいは施工終了時に門型台車を搬出するのに時間を要する。そのため、限られた施工時間の中で門型台車を移動させる時間によって、施工時間が少なくなり、工期が長くなるといった問題があった。 However, in such a repair construction method, it was necessary to carry out construction while regulating the passage of tunnels in service. In addition, even if the tunnel is closed only at night and the restrictions are lifted during the daytime when the traffic volume is high, if the length of the tunnel is long and the distance from the tunnel mouth to the construction site is long, a gate-type trolley will be used to reach the construction site. It takes time to carry in or to carry out the gate type cart when the construction is completed. Therefore, there is a problem that the construction time is reduced and the construction period is lengthened due to the time required to move the gantry cart within the limited construction time.

特開2002-38891号公報JP-A-2002-38891

そこで本発明は、供用中のトンネルであっても、車両などの通行体を安全に通行させながら施工できるトンネル改修工法及び改修装置を提供することを目的とする。 SUMMARY OF THE INVENTION Accordingly, it is an object of the present invention to provide a tunnel repairing method and a repairing apparatus that can be carried out while allowing vehicles and other vehicles to safely pass through even if the tunnel is in service.

この発明は、トンネル用の改修装置の型枠部を、供用中のトンネルの覆工部に対する内部側に所定間隔を隔てて配置し、前記覆工部と前記型枠部との間に改修材を打設して、トンネル内面を改修するトンネル改修工法であって、前記トンネルの幅方向における半断面のうち一方の半断面に対して、半断面の前記覆工部に対応する弧状に形成された前記型枠部を配置するとともに、 他方の半断面に、通行体が内部を通行できる防護部を配置し、前記防護部に、トンネル延長方向に走行可能な走行部が設けられるとともに、前記型枠部を支持するとともに、トンネル延長方向に走行可能な台車部が設けられ、前記防護部と前記台車部とが前記幅方向に連結されたことを特徴とする。 In the present invention, a form part of a tunnel repair device is arranged inside a lining part of a tunnel in service at a predetermined interval, and a repair material is placed between the lining part and the form part. A tunnel repairing method for repairing the inner surface of a tunnel by placing a In addition to arranging the above-mentioned formwork part, on the other half section , a protection part that allows a passage to pass through the inside is arranged. A carriage is provided that supports the frame and is capable of traveling in the direction of extension of the tunnel, and the protective section and the carriage are connected in the width direction.

また、この発明は、供用中のトンネルの覆工部の内面側に改修材を打設して、トンネル内面を改修するためのトンネル用の改修装置であって、前記トンネルの幅方向における半断面のうち一方の半断面に対して配置され、半断面の前記覆工部に対応する弧状に形成された型枠部と、他方の半断面に配置され、通行体が内部を通行できる防護部とで構成され、前記防護部に、トンネル延長方向に走行可能な走行部が設けられるとともに、前記型枠部を支持するとともに、トンネル延長方向に走行可能な台車部が設けられ、前記防護部と前記台車部とが前記幅方向に連結されたことを特徴とする。 Further, the present invention is a tunnel repairing device for repairing the inner surface of a tunnel by placing a repairing material on the inner surface side of the lining part of a tunnel in service, the half section in the width direction of the tunnel. A formwork part arranged in one half section and formed in an arc corresponding to the lining part of the half section, and a protective part arranged in the other half section and allowing a passage to pass through the inside The protection section is provided with a traveling section that can travel in the tunnel extension direction, and a truck section that supports the formwork section and can travel in the tunnel extension direction, and the protection section and the The bogie portion is connected in the width direction .

上記改修は、覆工部の内面側において所定の厚み分を切削後、流動性の高いコンクリートやモルタルなどの改修材を打設して改修する打ち替えや、覆工部の内面側に改修材を打設して改修する増し打ちなどを含むものとする。
前記トンネルは、クラウン形状、あるいは馬蹄形状などの内面が曲面状となる断面形状であってもよい。
The above repair can be done by cutting a predetermined thickness on the inner surface of the lining and then pouring a repair material such as concrete or mortar with high fluidity. It shall include additional driving etc.
The tunnel may have a cross-sectional shape with a curved inner surface such as a crown shape or a horseshoe shape.

前記半断面は、正確にトンネル断面を幅方向に二分割したものだけでなく、一方の半断面が他方の半断面に比べて大きくてもよいし、型枠部と防護部とが干渉しなければ、一方の半断面と他方の半断面とが幅方向に重複してもよい。 The half-sections are not limited to those obtained by dividing the tunnel section into two parts in the width direction. One half-section may be larger than the other half-section. For example, one half section and the other half section may overlap in the width direction.

上述の半断面の前記覆工部の対応する弧状は、半断面を超える弧長さの弧状であってもよいし、半断面に対応する弧長さの弧状あるいは半断面より短い弧長さの弧状であってもよい。
前記改修材は、流動性の高いコンクリート、モルタル、あるいは樹脂など、強度などの所要性能を満足するものであればよい。
The corresponding arc of the lining portion of the half section described above may be an arc with an arc length greater than the half section, an arc with an arc length corresponding to the half section, or an arc with an arc length shorter than the half section. It may be arcuate.
The repair material may be concrete, mortar, or resin having high fluidity, as long as it satisfies required performance such as strength.

この発明により、供用中のトンネルであっても、車両などの通行体を安全に通行させながら施工することができる。
詳述すると、供用中のトンネルの覆工部に対する内部側に所定間隔を隔てて配置する型枠部が、前記トンネルの幅方向における半断面のうち一方の半断面に対応する弧状に形成されるとともに、他方の半断面に、通行体が内部を通行できる防護部が配置される。
According to this invention, even in a tunnel in service, it is possible to construct the tunnel while allowing vehicles and other vehicles to safely pass through it.
More specifically, the formwork part, which is placed inside the lining part of the tunnel in service at a predetermined interval, is formed in an arc shape corresponding to one of the half cross-sections in the width direction of the tunnel. At the same time, on the other half section, a protection section is arranged through which the passage can pass.

そのため、トンネルの一方の半断面で施工し、他方の半断面を通行体が通行することができる。また、他方の半断面を通行する通行体は防護部の内部を通行するため、一方の断面で行われる施工に対して防護部で防護されながら安全に通行することができる。 Therefore, construction can be performed on one half section of the tunnel, and pedestrians can pass through the other half section. In addition, since the pedestrian passing through the other half section passes through the inside of the protective section, it can pass safely while being protected by the protective section against the construction performed on the one section.

また、前記防護部に、トンネル延長方向に走行可能な走行部が設けられるとともに、前記型枠部を支持するとともに、トンネル延長方向に走行可能な台車部が設けられ、前記防護部と前記台車部とが前記幅方向に連結されているため、一方の半断面における施工に伴って、トンネル延長方向に型枠部を、前記防護部とともに、移動させて改修することができる。Further, the protective section is provided with a traveling section capable of traveling in the direction of extension of the tunnel, and is provided with a truck section capable of traveling in the direction of extension of the tunnel while supporting the formwork section. are connected in the width direction, it is possible to repair by moving the formwork along with the protective section in the extension direction of the tunnel along with construction in one half section.

この発明の態様として、前記防護部が、前記型枠部に対して、トンネル延長方向に長くてもよい。
前記防護部が、前記型枠部に対して、トンネル延長方向の一方側にのみ長くてもよいが、両方に長いほうが好ましい。
As an aspect of the present invention, the protection portion may be longer in the tunnel extending direction than the formwork portion.
The protective portion may be longer than the formwork on only one side in the direction of extension of the tunnel, but it is preferable that it is longer on both sides.

この発明により、他方の半断面をより安全に通行体を通行させながら、一方の半断面の改修を施工することができる。
詳述すると、前記防護部が、前記型枠部に対して、トンネル延長方向に長いため、防護部の内部を通行する通行体は、一方の半断面に配置された型枠部における施工の範囲を超えて防護部で防護され、他方の半断面をより安全に通行体を通行させながら、一方の半断面の改修を施工することができる。
According to this invention, one half-section can be repaired while the other half-section is allowed to pass through more safely.
More specifically, since the protection section is longer than the formwork in the direction of extension of the tunnel, the pedestrian passing through the protection section is within the construction range of the formwork arranged in one half section. One half-section can be repaired while the other half-section is protected by a protective section beyond .

またこの発明の態様として、前記防護部に設けられた対抗部によって、打設する前記改修材から前記型枠部に作用する圧力に抗してもよい。
この発明により、防護部を介して、打設する前記改修材から前記型枠部に作用する圧力に対抗することができる。したがって、改修材の打設圧力によって型枠部が移動したりすることを防止できる。
なお、対抗部は、半断面に対応する弧状の型枠部に対してトンネル幅方向のみならず、幅方向に加えて上向きの圧力や上向きの圧力に対抗してもよい。
Further, as a mode of the present invention, a countering portion provided in the protective portion may resist pressure acting on the formwork portion from the repair material to be placed.
According to the present invention, it is possible to resist the pressure acting on the formwork from the repair material to be placed through the protective section. Therefore, it is possible to prevent the formwork from moving due to the placing pressure of the repair material.
In addition, the opposing portion may oppose not only the tunnel width direction but also the upward pressure or upward pressure against the arc-shaped form portion corresponding to the half-section.

またこの発明の態様として、前記覆工部から支持部で前記型枠部を支持してもよい。
この発明により、支持部を介して、覆工部から型枠部を支持するため、打設する前記改修材から前記型枠部に作用する圧力に対抗することができる。したがって、改修材の打設圧力によって型枠部が移動したりすることを防止できる。
Further, as an aspect of the present invention, the form part may be supported by a support part from the lining part.
According to this invention, since the form part is supported from the lining part via the supporting part, it is possible to resist the pressure acting on the form part from the repair material to be placed. Therefore, it is possible to prevent the formwork from moving due to the placing pressure of the repair material.

前記支持部は、覆工部に設置したアンカーボルトなどの引き抜き力に対抗して、型枠部を支持することができるものである。また、前記支持部は、型枠部の一部を支持してもよいし、全体にわたって支持してもよい。 The support portion can support the formwork portion against the pulling force of an anchor bolt or the like installed in the lining portion. Moreover, the support part may support a part of the formwork part, or may support the entirety of the formwork part.

またこの発明の態様として、弧状に形成された前記型枠部は、複数の型枠構成部と、該型枠構成部同士を枢動する枢動部とで構成し、折り畳み可能に構成されてもよい。
この発明により、型枠部を折り畳んでコンパクト化することができ、改修装置を容易に移動することができる。
Further, as an aspect of the present invention, the formwork part formed in an arc shape is composed of a plurality of formwork-constituting parts and a pivoting part for pivoting the formwork-constituting parts, and is configured to be foldable. good too.
According to the present invention, the form part can be folded to be compact, and the refurbishing device can be easily moved.

またこの発明の態様として、前記型枠構成部は、上下方向に移動可能に支持された型枠構成主部と、前記枢動部により前記型枠構成主部に対して枢動可能に連結された型枠構成従部とで構成し、前記型枠構成従部を、前記型枠構成主部に対して所定の枢動位置に移動させる移動部が設けられてもよい。 Further, as an aspect of the present invention, the formwork-constituting portion includes a formwork-constituting main portion supported so as to be movable in the vertical direction, and is pivotably connected to the formwork-constituting main portion by the pivoting portion. A moving part may be provided for moving the slave formwork part to a predetermined pivot position with respect to the main formwork part.

この発明により、折り畳み可能に構成された型枠部を、型枠としての所望の形状に確実に形成することができる。
詳述すると、上下方向に移動可能に支持された型枠構成主部に対して、枢動部によって枢動可能に連結された型枠構成従部を移動部により所定の枢動位置に移動させるため、折り畳み可能に構成された型枠部を、型枠としての所望の形状に確実に形成できるとともに、型枠部を覆工部に対して所望の位置に配置することができる。
According to the present invention, it is possible to reliably form the foldable formwork into a desired shape as the formwork.
More specifically, the slave formwork section, which is pivotably connected by the pivoting section, is moved to a predetermined pivot position by the moving section with respect to the main formwork section supported so as to be vertically movable. Therefore, the foldable formwork can be reliably formed into a desired shape as a formwork, and the formwork can be arranged at a desired position with respect to the lining part.

またこの発明の態様として、前記枢動部により前記型枠構成主部に対して前記型枠構成従部を折り畳んで、前記型枠部を、前記防護部とともに、トンネル坑内を移動してもよい。
この発明により、前記枢動部により前記型枠構成従部を折り畳んだ前記型枠部を、前記防護部とともに、トンネル坑内をトンネル延長方向に移動することで、効率よく、且つ安全に施工することができる。
Further, as an aspect of the present invention, the secondary formwork section may be folded with respect to the main formwork section by the pivoting section, and the formwork section may be moved in the tunnel shaft together with the protective section. .
According to the present invention, by moving the formwork part in which the formwork-constituting follower part is folded by the pivoting part together with the protective part in the tunnel extension direction, construction can be efficiently and safely carried out. can be done.

本発明により、供用中のトンネルであっても、車両などの通行体を安全に通行させながら施工できるトンネル改修工法及び改修装置を提供することができる。 ADVANTAGE OF THE INVENTION According to the present invention, it is possible to provide a tunnel repairing method and a repairing device that can be constructed while allowing vehicles and other vehicles to pass safely even in a tunnel that is in service.

トンネル内部に改修装置を設置した状態の正面図。A front view of a state in which the repair device is installed inside the tunnel. 図1におけるA-A断面図。AA sectional view in FIG. 改修装置の側面図。Side view of the refurbishment device. ツマ部の拡大図。Enlarged view of the tab. トンネル改修工法のフローチャート。Flowchart of the tunnel repair method. トンネル改修工法における状態説明図。State explanatory drawing in a tunnel repair construction method. トンネル改修工法における状態説明図。State explanatory drawing in a tunnel repair construction method. トンネル改修工法における状態説明図。State explanatory drawing in a tunnel repair construction method. トンネル改修工法における状態説明図。State explanatory drawing in a tunnel repair construction method.

この発明の一実施形態を、図1乃至図9とともに説明する。
図1はトンネル内部に改修装置10を設置した状態の正面図を示し、図2は図1におけるA-A断面図を示し、図3は改修装置10の側面図を示し、図4はツマ部の拡大図を示し、図5はトンネル改修工法のフローチャートを示している。
An embodiment of the invention will be described with reference to FIGS. 1 to 9. FIG.
1 shows a front view of a state in which the repair device 10 is installed inside the tunnel, FIG. 2 shows a sectional view along line AA in FIG. 1, FIG. 3 shows a side view of the repair device 10, and FIG. , and FIG. 5 shows a flow chart of the tunnel repair work method.

図6乃至図9はトンネル改修工法における状態説明図を示している。詳しくは、図6(a)は改修前のトンネル1の正面図を示し、図6(a)は改修終了後のトンネル1の正面図を示している。 6 to 9 show state explanatory diagrams in the tunnel repair work method. Specifically, FIG. 6(a) shows a front view of the tunnel 1 before repair, and FIG. 6(a) shows a front view of the tunnel 1 after repair.

また、図7(a)は往路の覆工切削後のトンネル1の正面図を示し、図7(b)はトンネル1における往路の施工箇所に改修装置10を移動させる状態の正面図を示している。また、図8(a)はトンネル1における往路の施工箇所に改修装置10を設置した状態の正面図を示し、図8(b)は往路の施工箇所にコンクリートを打設した状態の正面図を示している。 FIG. 7(a) shows a front view of the tunnel 1 after cutting the lining of the forward route, and FIG. 7(b) shows a front view of a state in which the repair device 10 is moved to the construction site of the forward route in the tunnel 1. there is FIG. 8(a) shows a front view of a state in which the repair device 10 is installed at the construction site of the outbound route in the tunnel 1, and FIG. 8(b) is a front view of a state in which concrete is placed at the construction site of the outbound route. showing.

また、図9(a)は復路の覆工切削後のトンネル1の正面図を示し、図9(b)はトンネル1における復路の施工箇所に改修装置10を移動させる状態の正面図を示している。
なお、図1における左右方向を幅方向Wとするとともに、上下方向を高さ方向Hとし、図2における左右方向を奥行き方向Lとしている。
9(a) shows a front view of the tunnel 1 after cutting the lining on the return trip, and FIG. 9(b) shows a front view of the state where the repair device 10 is moved to the construction site on the return trip in the tunnel 1. there is
1 is the width direction W, the up-down direction is the height direction H, and the left-right direction in FIG.

改修装置10はトンネル1の内面のコンクリート覆工2の内面側の所定厚さ分を流動性の高いコンクリートで打ち替えてトンネル1を改修する装置である。
トンネル1は、図1に示すように断面クラウン形状であり、内面がコンクリート覆工2で覆われており、内部に二車線の道路が設けられた道路トンネルである。なお、トンネル1は馬蹄形状など断面形状であってもよいし、片側一車線の対面通行の道路が設けられていてもよい。
The repairing device 10 is a device for repairing the tunnel 1 by replacing the concrete lining 2 on the inner surface of the tunnel 1 by a predetermined thickness on the inner surface side with highly fluid concrete.
As shown in FIG. 1, the tunnel 1 is a road tunnel having a crown-shaped cross section, an inner surface covered with a concrete lining 2, and a two-lane road provided inside. The tunnel 1 may have a cross-sectional shape such as a horseshoe shape, or may be provided with a two-way road with one lane in each direction.

コンクリート覆工2の耐久性が低下し、改修を要するトンネル1に対し、改修装置10を用いたトンネル改修工法では、トンネル1を内面側から所定厚み分の切削し、切削箇所に流動性高いコンクリートを打設して打ち替え覆工部3を構築する、いわゆる打ち替え工法である。
なお、コンクリート覆工2は、吹き付けコンクリート、鉄筋コンクリート、あるいは無筋コンクリートなどであってもよい。
For a tunnel 1 that requires repair due to a decrease in the durability of the concrete lining 2, the tunnel repair method using the repair device 10 cuts the tunnel 1 from the inner surface by a predetermined thickness, and places the cut portion in highly fluid concrete. It is a so-called replacement construction method in which the replacement lining part 3 is constructed by placing.
The concrete lining 2 may be shotcrete, reinforced concrete, plain concrete, or the like.

改修工法に用いられる改修装置10は、断面クラウン状のトンネル1における幅方向Wの半分である半断面のうち施工側の半断面内に配置されるセントル20と、他方側の半断面内に配置されるプロテクタ30とで構成されている。
なお、以下において、断面クラウン状のトンネル1における半断面のうち施工側の半断面を施工側半断面Xといい、他方側の半断面を通行側半断面Yという。
The repairing device 10 used in the repairing method includes a center 20 arranged in a half section on the construction side of a half section that is half of the width direction W of the tunnel 1 having a crown-shaped cross section, and a center 20 arranged in the half section on the other side. It is composed of a protector 30 that is
In the following description, of the half sections of the crown-shaped tunnel 1, the construction side half section is referred to as construction side half section X, and the other side half section is referred to as passage side half section Y.

施工側半断面X(あるいは通行側半断面Y)に配置されるセントル20は、正面視略井型形状の本体部21と、本体部21における上方からコンクリート覆工2の側の側方に亘って設けられた型枠部22とで構成されている。
本体部21は、トンネル1の道路面5に設けられた仮設レール6上を転動する車輪211を下端に設けられた柱217と、梁213及び上部柱215a,215bとで構成された正面視略井型形状のフレーム状であり、奥行き方向Lに所定の長さで形成されている。なお、柱217、及び上部柱215a,215bは幅方向Wに所定間隔を隔てて2本配置されている。
The center 20 arranged in the construction-side half-section X (or the traffic-side half-section Y) includes a body portion 21 having a substantially well-shaped shape when viewed from the front, and a side of the concrete lining 2 side from above the body portion 21. It is composed of a formwork part 22 provided at the same time.
The main body 21 is composed of a pillar 217 provided at its lower end with a wheel 211 rolling on a temporary rail 6 provided on the road surface 5 of the tunnel 1, a beam 213, and upper pillars 215a and 215b. It has a substantially I-shaped frame shape and is formed with a predetermined length in the depth direction L. As shown in FIG. Two columns 217 and two upper columns 215a and 215b are arranged in the width direction W with a predetermined interval therebetween.

また、本体部21は、車輪211の上方の柱217には高さ方向Hに伸縮可能な高さ調整部212が設けられ、上方の梁213にステージ214が形成されている。また、梁213には、コンクリート覆工2の弧状に併せた高さの上部柱215a,215bが上方に向かって延びるように設けられている。 The main body 21 is provided with a height adjusting portion 212 that can be expanded and contracted in the height direction H on a pillar 217 above the wheel 211 , and a stage 214 is formed on the beam 213 above. Also, the beam 213 is provided with upper pillars 215a and 215b having a height corresponding to the arc shape of the concrete lining 2 so as to extend upward.

なお、梁213は、2本の上部柱215のうちコンクリート覆工2の側の上部柱215aよりコンクリート覆工2に向かって延びており、その端部から上部柱215a,215bの上端を通るように、後述する第1型枠構成部221を支持している。 The beam 213 extends toward the concrete lining 2 from the upper pillar 215a on the side of the concrete lining 2 among the two upper pillars 215, and passes through the upper ends of the upper pillars 215a and 215b. , supports a first mold forming part 221, which will be described later.

また、上部柱215bの基部には、後述する第2型枠構成部222を伸縮支持する第1ジャッキ216と、後述するプロテクタ30と伸縮可能に連結する連結ジャッキ41とが設けられている。さらに、2本の柱217のうちコンクリート覆工2の側の柱217に設けた高さ調整部212から側方に延びるととともに、後述する第3型枠構成部223の下端に連結された第2ジャッキ218が設けられている。 The base of the upper column 215b is provided with a first jack 216 for telescopically supporting a second mold forming part 222 described later, and a connecting jack 41 telescopically connected to the protector 30 described later. Further, the second column extends laterally from the height adjusting portion 212 provided on the column 217 on the side of the concrete lining 2 among the two columns 217, and is connected to the lower end of the third form forming portion 223, which will be described later. 2 jacks 218 are provided.

型枠部22は、第1型枠構成部221、型枠構成部222,223と、型枠構成部同士を枢動可能に連結する枢動連結部224とで構成している。
第1型枠構成部221は、上述したように梁213に支持され、断面クラウン状のトンネル1における幅方向Wの半分である半断面のうち斜め上方(図1に示す往路を施工する場合は左斜め上、図9(b)に示す復路を施工する場合は右斜め上)の内面に対応する弧状である。
The formwork section 22 is composed of a first formwork constituent section 221, formwork constituent sections 222 and 223, and a pivot connection section 224 that pivotably connects the formwork constituent sections.
The first formwork forming part 221 is supported by the beams 213 as described above, and is diagonally upward in a half section that is half of the width direction W of the tunnel 1 having a crown-shaped cross section (when constructing the outward path shown in FIG. 1, It is an arc shape corresponding to the inner surface of the upper left diagonally and the inner surface of the upper right diagonally when constructing the return path shown in FIG. 9B).

第2型枠構成部222は、第1型枠構成部221の上端に対して枢動連結部224を介して枢動可能に連結され、断面クラウン状のトンネル1における半断面のうち天端の内面に対応するとともに、第1型枠構成部221に比べて約1/5程度の弧長の弧状である。 The second formwork-forming part 222 is pivotably connected to the upper end of the first formwork-forming part 221 via a pivotal connection part 224, and is the top end of the half section of the tunnel 1 having a crown-shaped cross section. It corresponds to the inner surface and has an arc shape with an arc length of about 1/5 of that of the first mold forming part 221 .

また、第2型枠構成部222は、枢動連結部224が連結された側の端部と反対側の端部に上述の第1ジャッキ216が連結されている。そのため、第2型枠構成部222は、第1ジャッキ216が伸長して第1型枠構成部221に対して展開状態に枢動し、第1ジャッキ216が縮短して第1型枠構成部221に対して折り畳み状態に枢動する。 In addition, the first jack 216 is connected to the end of the second mold forming part 222 opposite to the end to which the pivotal connection part 224 is connected. As a result, the second mold form forming part 222 is pivoted to the unfolded state with respect to the first form forming part 221 with the first jack 216 extended, and the first jack 216 is contracted and the first form forming part 222 is opened. 221 to the folded state.

さらに、第2型枠構成部222は、図2において破線で図示するように、型枠部22で形成する打設空間4に対してコンクリートを打設するための打設口225が、奥行き方向Lに所定間隔を隔てて複数設けられている。また、第2型枠構成部222は、コンクリート覆工2に設けたアンカーボルト7によって固定できるように構成されている。 Furthermore, as shown by the dashed line in FIG. A plurality of them are provided in L at predetermined intervals. In addition, the second formwork component 222 is configured to be fixed by the anchor bolts 7 provided on the concrete lining 2 .

第3型枠構成部223は、第1型枠構成部221の下端に対して枢動連結部224を介して枢動可能に連結され、断面クラウン状のトンネル1における半断面のうち側方の内面に対応するとともに、第1型枠構成部221に比べて約2/3倍程度の弧長の弧状である。 The third mold forming part 223 is pivotably connected to the lower end of the first mold forming part 221 via a pivot connecting part 224, and is a lateral portion of the half section of the tunnel 1 having a crown-shaped cross section. It corresponds to the inner surface and has an arc shape with an arc length of about 2/3 times that of the first mold forming part 221 .

また、第3型枠構成部223は、枢動連結部224が連結された側の端部と反対側となる下端部に上述の第2ジャッキ218が連結されている。そのため、第3型枠構成部223は、第2ジャッキ218が伸長して第1型枠構成部221に対して展開状態に枢動し、第2ジャッキ218が縮短して第1型枠構成部221に対して折り畳み状態に枢動する。
また、第3型枠構成部223は、コンクリート覆工2に設けたアンカーボルト7によって固定できるように構成されている。
In addition, the above-described second jack 218 is connected to the lower end portion of the third mold forming portion 223 opposite to the end portion to which the pivotal connection portion 224 is connected. As a result, the third mold form forming part 223 is pivoted to the unfolded state with respect to the first form forming part 221 with the second jack 218 extended, and the second jack 218 is contracted and the first form form forming part 223 is opened. 221 to the folded state.
In addition, the third formwork component 223 is configured to be fixed by the anchor bolts 7 provided on the concrete lining 2 .

このように構成された型枠部22は、ジャッキ216,218を伸長して型枠構成部222,223を展開状態とすることで、断面クラウン状のトンネル1における幅方向Wの半分である半断面の内面に対応する弧状を形成することができる。 By extending the jacks 216 and 218 to open the formwork components 222 and 223, the formwork 22 configured in this way is half the width direction W of the tunnel 1 having a crown shape in cross section. An arc corresponding to the inner surface of the cross section can be formed.

このように構成されたセントル20は、図2に示すように、奥行き方向Lにおいて所定の長さで形成している。具体的には、セントル20は、型枠部22を用いてコンクリートを打設する1回分、つまり施工の1スパン分の長さで形成している。
また、セントル20における奥行き方向Lの両側には、ステージ214と同じ高さの作業台24が設けられている(図1では図示省略)。
The center 20 configured in this way is formed with a predetermined length in the depth direction L, as shown in FIG. Specifically, the center 20 is formed with a length for one time of pouring concrete using the formwork 22, that is, for one span of construction.
In addition, on both sides of the center 20 in the depth direction L, workbenches 24 having the same height as the stage 214 are provided (not shown in FIG. 1).

プロテクタ30は、幅方向Wの梁32と、梁32の両端から下方に延びる柱33とで構成する門型枠31を奥行き方向Lに所定間隔を隔てて複数配置し、門型枠31同士とを連結梁34(図3)で連結して、内部に通行空間30Xが形成される略トンネル形状を構成している。
柱33の下端には、トンネル1の道路面5に設けられた仮設レール6上を転動する車輪35が設けられている。
The protector 30 has a plurality of gate frames 31, which are composed of beams 32 extending in the width direction W and columns 33 extending downward from both ends of the beams 32, arranged at predetermined intervals in the depth direction L. are connected by connecting beams 34 (FIG. 3) to form a substantially tunnel shape in which a passage space 30X is formed.
Wheels 35 that roll on temporary rails 6 provided on the road surface 5 of the tunnel 1 are provided at the lower ends of the pillars 33 .

また、梁32の幅方向Wの外側には、幅方向Wの外側に向かって、つまりセントル20とは反対側に向かって伸縮する固定ジャッキ36が設けられている。
このように構成されたプロテクタ30は、セントル20に比べて、奥行き方向Lの両側に延伸されるように、3倍程度の奥行き方向Lの長さで形成されている。
A fixed jack 36 is provided on the outside of the beam 32 in the width direction W so as to expand and contract outward in the width direction W, that is, toward the side opposite to the center 20 .
The protector 30 configured in this manner is formed with a length in the depth direction L that is about three times as long as the center 20 so as to extend to both sides in the depth direction L. As shown in FIG.

また、このように構成されたセントル20とプロテクタ30とは、連結ジャッキ41,42とで幅方向Wに連結されている。
具体的には、セントル20における梁213の幅方向Wにおける内側の端部とプロテクタ30の梁32の幅方向Wにおける内側の端部とを連結ジャッキ41により高さ方向Hに枢動可能に連結している。
Further, the center 20 and protector 30 configured in this way are connected in the width direction W by connecting jacks 41 and 42 .
Specifically, the inner end of the beam 213 of the center 20 in the width direction W and the inner end of the beam 32 of the protector 30 in the width direction W are connected by the connecting jack 41 so as to be pivotable in the height direction H. are doing.

また、セントル20における2本の柱217の幅方向Wにおける内側の柱217に設けられた高さ調整部212と、プロテクタ30における2本の柱33の幅方向Wにおける内側の柱33とを連結ジャッキ42により連結している。 Also, the height adjusting portion 212 provided on the inner pillar 217 in the width direction W of the two pillars 217 in the center 20 and the inner pillar 33 in the width direction W of the two pillars 33 in the protector 30 are connected. They are connected by a jack 42 .

続いて、セントル20とプロテクタ30とを連結ジャッキ41,42によって連結して構成した改修装置10を用いたトンネル1の改修工法について、以下で説明する。
トンネル1の改修工法の流れについて説明する前に、型枠部22によって、コンクリート覆工2との間に形成される打設空間4の開放された端部(以下においてツマ部という)を塞ぐツマ型枠50について、図4に基づいて説明する。
Next, a repairing method for the tunnel 1 using the repairing device 10 configured by connecting the center 20 and the protector 30 with the connecting jacks 41 and 42 will be described below.
Before explaining the flow of the repairing method of the tunnel 1, the formwork 22 closes the open end of the placement space 4 formed between the concrete lining 2 (hereinafter referred to as the lug). The formwork 50 will be described with reference to FIG.

打設済みの打ち替え覆工部3に対して型枠部22を設置した状態の奥行き方向Lの縦断面図である図4に示すように、ツマ型枠50は、打設空間4を形成する型枠部22における奥行き方向Lの施工方向先端側に対して設けられる。 As shown in FIG. 4, which is a vertical cross-sectional view in the depth direction L of a state in which the formwork 22 is installed in the placed replacement lining 3, the top formwork 50 forms the placement space 4. It is provided on the front end side of the construction direction in the depth direction L of the formwork portion 22 .

具体的には、上述したように、施工側半断面X(あるいは通行側半断面Y)のコンクリート覆工2に対応する弧状の型枠部22によって形成された打設空間4は、径外側はコンクリート覆工2が存在し、施工方向の後方は打設済みの打ち替え覆工部3が存在する。そのため、打設空間4は、径外側、施工方向の後方及び径内側は囲まれているものの、施工方向の前方が開放されているため、ツマ型枠50によって閉塞する。 Specifically, as described above, the placement space 4 formed by the arc-shaped formwork 22 corresponding to the concrete lining 2 of the construction-side half-section X (or the traffic-side half-section Y) has a radially outer side of A concrete lining 2 exists, and a replacement lining part 3 that has already been placed exists behind in the construction direction. Therefore, although the casting space 4 is surrounded on the radially outer side, the rear side in the construction direction, and the radially inner side, the front side in the construction direction is open, and is closed by the garnish formwork 50 .

具体的には、ツマ型枠50は、型枠部22の施工方向の前方端部に設けられ、径方向に延びるツマ壁51と、ツマ壁51を型枠部22に固定するツマ壁固定部52と、型枠部22の径外面とツマ壁51とで構成される角部に配置される面取り部53とで構成している。 Specifically, the top frame 50 is provided at the front end portion of the form portion 22 in the construction direction, and includes a top wall 51 extending in the radial direction and a top wall fixing portion for fixing the top wall 51 to the form portion 22. 52 and a chamfered portion 53 arranged at a corner formed by the radial outer surface of the mold portion 22 and the top wall 51 .

このように構成されたツマ壁51をツマ壁固定部52によって型枠部22に固定することで、径外側、施工方向の後方及び径内側、並びに施工方向の前方の断面方向におけるすべてが囲まれた打設空間4を形成することができる。 By fixing the top wall 51 configured in this way to the formwork 22 by the top wall fixing part 52, all of the radial outer side, the rear side in the construction direction, the radial inner side, and the front side in the construction direction are enclosed. It is possible to form a further placing space 4.

改修装置10を用いたトンネル1の改修工法では、図6(a)に示す断面クラウン状のトンネル1におけるコンクリート覆工2の内面を所定厚みで切削し、図6(b)に示すように、打ち替え覆工部3に打ち替えて改修する工法である。 In the repairing method of the tunnel 1 using the repairing device 10, the inner surface of the concrete lining 2 in the tunnel 1 having a crown-shaped cross section shown in FIG. In this construction method, the lining part 3 is re-hit and repaired.

そして、改修装置10を用いたトンネル1の改修工法では、トンネル1の幅方向Wの半断面である通行側半断面Y(あるいは施工側半断面X)に通行車両Zを通行させながら、施工側半断面X(あるいは通行側半断面Y)で施工する工法である。なお、以下の詳細な説明では、先に往路側の半断面を施工してから、復路を施工するものとして説明するが、復路を先に施工してもよい。 In the repairing method of the tunnel 1 using the repairing device 10, while the passing vehicle Z is allowed to pass through the passing side half section Y (or the construction side half section X) which is the half section in the width direction W of the tunnel 1, the construction side In this construction method, half section X (or half section Y on the traffic side) is used. In the following detailed description, it is assumed that the half-section of the forward route is constructed first, and then the return route is constructed, but the return route may be constructed first.

具体的には、まず、トンネル1の坑外で改修装置10を組み付け(ステップs1)、トンネル1内部であるトンネル坑内1Xに搬入する(ステップs2)。
そして、図7(a)に示すように、往路側の半断面を施工側半断面Xとし、施工側半断面Xにおける1スパン分のコンクリート覆工2における内面側の一部を所定厚みで切削する(ステップs3)。コンクリート覆工2の切削は、図示省略するコンクリート切削装置によってトンネル内部側から切削する。このとき、コンクリート覆工2は、打ち替えられた打ち替え覆工部3の所定強度が確保できる厚みで切削される。
Specifically, first, the repair device 10 is assembled outside the tunnel 1 (step s1), and carried into the tunnel pit 1X inside the tunnel 1 (step s2).
Then, as shown in FIG. 7( a ), the forward side half section is defined as the construction side half section X, and a part of the inner surface side of the concrete lining 2 for one span in the construction side half section X is cut to a predetermined thickness. (step s3). The concrete lining 2 is cut from the inner side of the tunnel by a concrete cutting device (not shown). At this time, the concrete lining 2 is cut to a thickness that ensures the predetermined strength of the replaced lining portion 3 .

そして、トンネル坑外で組み付けられた改修装置10をトンネル坑内1Xの施工箇所まで移動させる(ステップs4)。
具体的には、図7(b)に示すように、トンネル1の道路面5に仮設レール6を敷設し、敷設された仮設レール6上を車輪211、車輪35を転動させて改修装置10を施工箇所まで移動させる。このとき、改修装置10におけるセントル20の型枠部22を折り畳み状態で移動させる。
Then, the repair device 10 assembled outside the tunnel is moved to the construction site inside the tunnel 1X (step s4).
Specifically, as shown in FIG. 7B, a temporary rail 6 is laid on the road surface 5 of the tunnel 1, and the wheels 211 and 35 are rolled on the laid temporary rail 6 to to the construction site. At this time, the formwork part 22 of the center 20 in the repairing device 10 is moved in a folded state.

詳しくは、図7(b)に示すように、ジャッキ216,218を縮短して第1型枠構成部221に対して型枠構成部222,223を枢動させて型枠部22を折り畳み状態とし、この状態で改修装置10を移動させる。 Specifically, as shown in FIG. 7(b), the jacks 216 and 218 are shortened to pivot the formwork components 222 and 223 with respect to the first formwork component 221, thereby folding the formwork 22. , and the repairing device 10 is moved in this state.

施工箇所まで移動した改修装置10の型枠部22を展開するとともに固定し、さらには改修装置10を固定する(ステップs5)。
具体的には、図8(a)に示すように、高さ調整部212を伸長して、梁213で支持された第1型枠構成部221をコンクリート覆工2に対して所定間隔を隔てた位置に配置する。そして、ジャッキ216,218を伸長して第1型枠構成部221に対して型枠構成部222,223を枢動させて型枠部22を展開状態とする。この状態で、コンクリート覆工2に設けたアンカーボルト7で型枠構成部222,223を固定する。
The formwork 22 of the repair device 10 moved to the construction site is deployed and fixed, and the repair device 10 is further fixed (step s5).
Specifically, as shown in FIG. 8(a), the height adjusting portion 212 is extended, and the first formwork forming portion 221 supported by the beams 213 is spaced apart from the concrete lining 2 by a predetermined distance. position. Then, the jacks 216 and 218 are extended to pivot the formwork constituent parts 222 and 223 with respect to the first formwork constituent part 221 so that the formwork part 22 is set in the unfolded state. In this state, the formwork components 222 and 223 are fixed with the anchor bolts 7 provided on the concrete lining 2 .

このように、展開した型枠部22では、第1型枠構成部221がコンクリート覆工2に対して所定の間隔を隔てた位置に配置されるとともに、型枠構成部222,223がコンクリート覆工2に設けたアンカーボルト7で固定される。そのため、型枠部22とコンクリート覆工2との間に所定の厚さを有する空間である打設空間4が形成される。 In this manner, in the unfolded formwork 22, the first formwork-constituting part 221 is arranged at a position spaced apart from the concrete lining 2 by a predetermined distance, and the formwork-constituting parts 222 and 223 are arranged in the concrete lining. It is fixed with an anchor bolt 7 provided in the work 2. Therefore, a placement space 4 that is a space having a predetermined thickness is formed between the formwork 22 and the concrete lining 2 .

さらに、通行側半断面Yに配置されたプロテクタ30とセントル20とを連結する連結ジャッキ41,42、さらには、プロテクタ30に設けられた固定ジャッキ36を伸長して、打設空間4に打設する生コンクリートの打設圧力に抗するように、改修装置10を固定する。
なお、このように、トンネル坑内1Xにおいて固定された改修装置10において、通行側半断面Yに配置されたプロテクタ30の通行空間30Xには、通行車両Zを通行させることができる。
Furthermore, the connecting jacks 41 and 42 that connect the protector 30 and the center 20 arranged in the passage-side half section Y, and the fixed jack 36 provided on the protector 30 are extended, and the driving is performed in the driving space 4. The repairing device 10 is fixed so as to resist the placing pressure of ready-mixed concrete.
In this manner, in the repairing device 10 fixed in the tunnel pit 1X, the passing vehicle Z can pass through the passing space 30X of the protector 30 arranged in the passing-side half-section Y.

また、第1型枠構成部221がコンクリート覆工2に対して所定の位置に配置され、型枠構成部222,223がコンクリート覆工2に設けたアンカーボルト7で固定されて打設空間4を形成する型枠部22に対してツマ型枠50を設置する(図4参照:ステップs6)。 In addition, the first formwork constituent part 221 is placed at a predetermined position with respect to the concrete lining 2, and the formwork constituent parts 222 and 223 are fixed by the anchor bolts 7 provided in the concrete lining 2 to form the placing space 4. A top formwork 50 is installed on the formwork part 22 forming the (see FIG. 4: step s6).

上述のように、改修装置10がトンネル坑内1Xにおいて固定され、展開状態の型枠部22がアンカーボルト7で固定された状態で、打設口225から打設空間4に生コンクリートを打設する(ステップs7)。なお、打設空間4に打設して打ち替え覆工部3を構成するコンクリートしては、繊維補強コンクリートなどの流動性及び強度の高いコンクリートを打設する。 As described above, ready-mixed concrete is cast into the casting space 4 from the casting port 225 in a state in which the repair device 10 is fixed in the tunnel pit 1X and the formwork 22 in the unfolded state is fixed by the anchor bolts 7. (step s7). As the concrete that is placed in the placement space 4 to form the replacement lining portion 3, concrete having high fluidity and strength, such as fiber-reinforced concrete, is placed.

上述のように、打設口225から生コンクリートを打設すると、型枠部22には生コンクリートの打設圧力が作用する。そして、型枠部22を支持する本体部21にも、型枠部22を介して生コンクリートの打設圧力が作用する。しかしながら、型枠部22は本体部21に支持されるとともに、アンカーボルト7によってコンクリート覆工2から支持されているため、型枠部22が生コンクリートの打設圧力によって変形することを防止できる。 As described above, when the ready-mixed concrete is placed from the pouring port 225 , the formwork 22 is subjected to the placing pressure of the ready-mixed concrete. The pouring pressure of the ready-mixed concrete also acts on the body portion 21 that supports the formwork 22 through the formwork 22 . However, since the formwork 22 is supported by the main body 21 and supported from the concrete lining 2 by the anchor bolts 7, it is possible to prevent the formwork 22 from being deformed by the pouring pressure of the ready-mixed concrete.

打設空間4に打設したコンクリートに一定の強度が発生し、打ち替え覆工部3が構成されるまで養生し(ステップs8)、養生後、打ち替え覆工部3に対して型枠部22を脱型する(ステップs9)。具体的には、まず、ツマ型枠50を撤去する。そして、コンクリート覆工2に設けたアンカーボルト7による型枠構成部222,223の固定を解消するとともに、少なくともプロテクタ30に設けられた固定ジャッキ36を縮短して、改修装置10の固定を解消する。 The concrete placed in the placing space 4 is cured until a certain strength is generated and the replacement lining portion 3 is formed (step s8). 22 is demolded (step s9). Specifically, first, the top formwork 50 is removed. Then, the anchor bolts 7 provided on the concrete lining 2 are fixed to the formwork constituent parts 222 and 223, and at least the fixing jacks 36 provided on the protector 30 are shortened to remove the fixation of the repair device 10. .

また、ジャッキ216,218を縮短して第1型枠構成部221に対して型枠構成部222,223を枢動させて型枠部22を折り畳み状態とし、高さ調整部212を縮短して、打ち替え覆工部3に対して型枠部22を下降させる。 In addition, the jacks 216 and 218 are shortened to pivot the formwork components 222 and 223 with respect to the first formwork component 221 to fold the formwork 22, and the height adjustment part 212 is shortened. , the mold part 22 is lowered with respect to the replacement lining part 3 .

このように、ステップs3乃至ステップs9を1サイクルとし、1サイクルの施工が終了し、往路における改修範囲の未施工箇所があると(ステップs10:No)、ステップs3に戻り次の施工箇所を施工する。 In this way, steps s3 to s9 constitute one cycle, and when one cycle of construction is completed and there is an unconstructed portion in the repair range on the outward route (step s10: No), the process returns to step s3 and the next construction portion is constructed. do.

往路における改修範囲のすべての施工が完了すると(ステップs10:Yes)、施工側半断面Xと通行側半断面Yとを入れ替えて、復路の施工を行う(ステップs11:Yes)。このとき、幅方向Wの左側が施工側半断面Xであり、右側が通行側半断面Yであった往路での施工に対して、図9(a)に示すように、施工側半断面Xと通行側半断面Yとが左右入れ替わり、幅方向Wの右側が施工側半断面Xとなり、左側が通行側半断面Yとなる。 When all construction work in the repair range on the outbound route is completed (step s10: Yes), the half-section X on the construction side and the half-section Y on the traffic side are exchanged, and construction on the return route is carried out (step s11: Yes). At this time, as shown in FIG. and the traffic-side half-section Y are interchanged left and right, and the right side in the width direction W becomes the construction-side half-section X, and the left side becomes the traffic-side half-section Y.

具体的には、トンネル坑内1Xから改修装置10を搬出し、図9(b)に示すように、復路における施工側半断面Xにセントル20が配置され、通行側半断面Yにプロテクタ30が配置されるように改修装置10を配置する。そして、上述のステップs3乃至ステップs10までを繰り返し、復路の改修範囲に対して施工する。復路の改修範囲のすべてが施工されると(ステップs11:No)、コンクリート覆工2の内面側に打ち替え覆工部3が形成され、図5(b)に示すように、トンネル1の改修は完了する。 Specifically, the repair device 10 is carried out from the tunnel pit 1X, and as shown in FIG. Position the refurbishment device 10 so that it is Then, the steps s3 to s10 described above are repeated, and construction is performed on the repair range on the return trip. When the entire repair range of the return route is constructed (step s11: No), the replacement lining part 3 is formed on the inner surface side of the concrete lining 2, and the tunnel 1 is repaired as shown in FIG. is completed.

上述のトンネル改修工法は、トンネル用の改修装置10の型枠部22を、供用中のトンネル1のコンクリート覆工2に対する内部側に所定間隔を隔てて配置し、コンクリート覆工2と型枠部22との間の打設空間4にコンクリートを打設して、トンネル1内面を改修する工法である。そして、トンネル1の幅方向Wにおける半断面のうち施工側半断面X(あるいは通行側半断面Y)に対して、半断面のコンクリート覆工2の対応する弧状に形成された型枠部22を配置するとともに、通行側半断面Y(あるいは施工側半断面X)に、通行車両Zが通行空間30Xを通行できるプロテクタ30を配置している。 In the tunnel repairing method described above, the formwork 22 of the tunnel repairing device 10 is arranged inside the concrete lining 2 of the tunnel 1 in service at a predetermined interval, and the concrete lining 2 and the formwork 22, concrete is placed in the placement space 4 to repair the inner surface of the tunnel 1. Then, of the half sections in the width direction W of the tunnel 1, the formwork 22 formed in an arc shape corresponding to the half section of the concrete lining 2 with respect to the construction side half section X (or the traffic side half section Y). In addition, a protector 30 is arranged on the traffic-side half-section Y (or construction-side half-section X) to allow the passing vehicle Z to pass through the traffic space 30X.

また、上述の改修装置10は、供用中のトンネル1のコンクリート覆工2の内面側にコンクリートを打設して、トンネル1内面を改修するためのトンネル用の装置である。そして、トンネル1の幅方向Wにおける半断面のうち施工側半断面X(あるいは通行側半断面Y)に対して配置され、半断面のコンクリート覆工2の対応する弧状に形成された型枠部22と、通行側半断面Y(あるいは施工側半断面X)に配置され、通行車両Zが通行空間30Xを通行できるプロテクタ30とで構成されている。そのため、供用中のトンネル1であっても、車両などの通行車両Zを安全に通行させながら施工することができる。 Further, the repairing device 10 described above is a tunnel device for repairing the inner surface of the tunnel 1 by placing concrete on the inner surface side of the concrete lining 2 of the tunnel 1 in service. Then, the formwork part arranged in the construction side half section X (or the traffic side half section Y) of the half section in the width direction W of the tunnel 1 and formed in an arc shape corresponding to the concrete lining 2 of the half section 22, and a protector 30 arranged on the traffic-side half-section Y (or construction-side half-section X) and allowing the traffic vehicle Z to pass through the traffic space 30X. Therefore, even if the tunnel 1 is in service, construction work can be performed while the passing vehicle Z such as a vehicle is allowed to pass safely.

詳述すると、供用中のトンネル1のコンクリート覆工2に対する内部側に所定間隔を隔てて配置する型枠部22が、トンネル1の幅方向Wにおける半断面のうち施工側半断面X(あるいは通行側半断面Y)に対応する弧状に形成される。また、通行側半断面Y(あるいは施工側半断面X)に、通行車両Zが通行空間30Xを通行できるプロテクタ30が配置される。 More specifically, the formwork 22, which is placed on the inner side of the concrete lining 2 of the tunnel 1 in service at a predetermined interval, is located in the construction side half section X (or the passage It is formed in an arc shape corresponding to the side half section Y). In addition, a protector 30 is arranged on the traffic-side half-section Y (or the construction-side half-section X) so that the traffic vehicle Z can pass through the traffic space 30X.

そのため、トンネル1の施工側半断面X(あるいは通行側半断面Y)で施工し、通行側半断面Y(あるいは施工側半断面X)を通行車両Zが通行することができる。また、通行側半断面Y(あるいは施工側半断面X)を通行する通行車両Zはプロテクタ30の通行空間30Xを通行するため、施工側半断面X(あるいは通行側半断面Y)で行われる施工に対してプロテクタ30で防護されながら安全に通行することができる。 Therefore, it is possible to construct the tunnel 1 with the construction side half section X (or the traffic side half section Y), and the passing vehicle Z can pass through the traffic side half section Y (or the construction side half section X). In addition, since the passing vehicle Z passing through the passage-side half-section Y (or the construction-side half-section X) passes through the passage space 30X of the protector 30, the construction performed in the construction-side half-section X (or the passage-side half-section Y) It is possible to pass safely while being protected by the protector 30 against.

また、プロテクタ30が、型枠部22に対して、奥行き方向Lに長いため、通行側半断面Y(あるいは施工側半断面X)をより安全に通行車両Zを通行させながら、施工側半断面X(あるいは通行側半断面Y)の改修を施工することができる。 In addition, since the protector 30 is long in the depth direction L with respect to the formwork 22, the traffic side half section Y (or the construction side half section X) is allowed to pass through more safely while the construction side half section is allowed to pass through. X (or traffic-side half-section Y) can be repaired.

詳述すると、プロテクタ30が、型枠部22に対して、奥行き方向Lに長い。そのため、プロテクタ30の通行空間30Xを通行する通行車両Zは、施工側半断面X(あるいは通行側半断面Y)に配置された型枠部22における施工の範囲を超えてプロテクタ30で防護される。したがって、通行側半断面Y(あるいは施工側半断面X)をより安全に通行車両Zを通行させながら、施工側半断面X(あるいは通行側半断面Y)の改修を施工することができる。 Specifically, the protector 30 is long in the depth direction L with respect to the mold part 22 . Therefore, the passing vehicle Z passing through the passage space 30X of the protector 30 is protected by the protector 30 beyond the construction range of the formwork 22 arranged in the construction-side half-section X (or the passage-side half-section Y). . Therefore, the construction-side half-section X (or the traffic-side half-section Y) can be repaired while allowing the traffic Z to pass through the traffic-side half-section Y (or the construction-side half-section X) more safely.

また、プロテクタ30に、奥行き方向Lに走行可能な車輪35が設けられ、型枠部22を支持するとともに、奥行き方向Lに走行可能な本体部21が設けられている。また、プロテクタ30と本体部21とが幅方向Wに連結されているため、施工側半断面X(あるいは通行側半断面Y)における施工に伴って、奥行き方向Lに型枠部22を、プロテクタ30とともに、移動させて改修することができる。 Further, the protector 30 is provided with wheels 35 that can travel in the depth direction L, supports the formwork 22 , and has a body portion 21 that can travel in the depth direction L. In addition, since the protector 30 and the body portion 21 are connected in the width direction W, the formwork portion 22 is moved in the depth direction L along with the construction in the construction side half section X (or the passage side half section Y). 30 can be moved and modified.

また、プロテクタ30に設けられた固定ジャッキ36によって、打設するコンクリートから型枠部22に作用する圧力に抗するため、プロテクタ30を介して、コンクリートの打設圧力によって型枠部22が移動したりすることを防止できる。 In addition, since the fixed jacks 36 provided in the protector 30 resist the pressure acting on the formwork 22 from the concrete to be placed, the formwork 22 is moved by the concrete placing pressure via the protector 30. can be prevented.

また、コンクリート覆工2からアンカーボルト7で型枠部22を支持しているため、アンカーボルト7を介して、打設するコンクリートから型枠部22に作用する圧力に対抗することができる。したがって、コンクリートの打設圧力によって型枠部22が移動したりすることを防止できる。 In addition, since the formwork 22 is supported by the anchor bolts 7 from the concrete lining 2 , the pressure acting on the formwork 22 from the concrete to be poured can be resisted via the anchor bolts 7 . Therefore, it is possible to prevent the formwork 22 from moving due to the concrete placing pressure.

また、弧状に形成された型枠部22は、第1型枠構成部221,第2型枠構成部222及び第3型枠構成部223と、型枠構成部同士を枢動する枢動連結部224とで構成し、折り畳み可能に構成されている。そのため、型枠部22を折り畳んでコンパクト化することができ、改修装置10を容易に移動することができる。 In addition, the formwork part 22 formed in an arc shape includes a first formwork-forming part 221, a second formwork-forming part 222, a third formwork-forming part 223, and a pivotal connection for pivoting the formwork-forming parts. 224 and configured to be foldable. Therefore, the mold part 22 can be folded to be compact, and the repairing device 10 can be easily moved.

詳述すると、型枠部22は、高さ方向Hに移動可能に支持された第1型枠構成部221と、枢動連結部224により第1型枠構成部221に対して枢動可能に連結された第2型枠構成部222及び第3型枠構成部223とで構成している。 More specifically, the formwork part 22 is pivotable with respect to the first formwork-constituting part 221 by a first formwork-constituting part 221 supported so as to be movable in the height direction H, and a pivot connection part 224 . It is composed of a second formwork forming part 222 and a third formwork forming part 223 which are connected to each other.

また、型枠部22の型枠構成部222,223を、第1型枠構成部221に対して所定の枢動位置に移動させるジャッキ216,218が設けられているため、折り畳み可能に構成された型枠部22を、型枠としての所望の形状に確実に形成することができる。 In addition, since jacks 216 and 218 are provided for moving the formwork forming portions 222 and 223 of the formwork portion 22 to predetermined pivotal positions with respect to the first formwork forming portion 221, it is configured to be foldable. The mold part 22 can be reliably formed into a desired shape as a mold.

また、高さ方向Hに移動可能に支持された第1型枠構成部221に対して、枢動連結部224によって枢動可能に連結された型枠構成部222,223をジャッキ216,218により所定の枢動位置に移動させる。そのため、折り畳み可能に構成された型枠部22を、型枠としての所望の形状に確実に形成できる。さらに、型枠部22をコンクリート覆工2に対して所望の位置に配置することができる。 Also, the formwork components 222 and 223 , which are pivotably connected to the first formwork component 221 supported movably in the height direction H, by the jacks 216 and 218 are connected to each other by the pivotal connection 224 . Move to a predetermined pivot position. Therefore, the formwork part 22 configured to be foldable can be reliably formed into a desired shape as a formwork. Furthermore, the formwork 22 can be arranged at a desired position with respect to the concrete lining 2 .

また、枢動連結部224により第1型枠構成部221に対して型枠構成部222,223を折り畳んで、型枠部22を、プロテクタ30とともに、トンネル坑内1Xを移動することで、効率よく、且つ安全に施工することができる。 In addition, the formwork constituent parts 222 and 223 are folded with respect to the first formwork constituent part 221 by the pivotal connecting part 224, and the formwork part 22 and the protector 30 are moved in the tunnel pit 1X in an efficient manner. and can be constructed safely.

この発明の構成と、上述の実施形態との対応において、この発明の改修装置は改修装置10に対応し、
以下同様に、
型枠部は型枠部22に対応し、
トンネルはトンネル1に対応し、
覆工部はコンクリート覆工2に対応し、
改修材はコンクリートに対応し、
幅方向は幅方向Wに対応し、
一方の半断面は施工側半断面X(あるいは通行側半断面Y)に対応し、
他方の半断面は通行側半断面Y(あるいは施工側半断面X)に対応し、
通行体は通行車両Zに対応し、
内部は通行空間30Xに対応し、
防護部はプロテクタ30に対応し、
トンネル延長方向は奥行き方向Lに対応し、
走行部は車輪35に対応し、
台車部は本体部21に対応し、
対抗部は固定ジャッキ36に対応し、
支持部はアンカーボルト7に対応し、
型枠構成部は第1型枠構成部221,型枠構成部222,223に対応し、
枢動部は枢動連結部224に対応し、
上下方向は高さ方向Hに対応し、
型枠構成主部は第1型枠構成部221に対応し、
型枠構成従部は型枠構成部222,223に対応し、
移動部はジャッキ216,218に対応し、
トンネル坑内はトンネル坑内1Xに対応するが、この発明は、上述の実施形態の構成のみに限定されるものではなく、多くの実施の形態を得ることができる。
In correspondence with the configuration of the present invention and the above-described embodiments, the repair device of the present invention corresponds to the repair device 10,
and so on,
The formwork part corresponds to the formwork part 22,
Tunnel corresponds to Tunnel 1,
The lining part corresponds to concrete lining 2,
The repair material corresponds to concrete,
The width direction corresponds to the width direction W,
One half-section corresponds to the construction-side half-section X (or the traffic-side half-section Y),
The other half-section corresponds to the traffic-side half-section Y (or construction-side half-section X),
The passing object corresponds to the passing vehicle Z,
The interior corresponds to the passage space 30X,
The protective part corresponds to the protector 30,
The tunnel extension direction corresponds to the depth direction L,
The running part corresponds to the wheel 35,
The carriage part corresponds to the main body part 21,
The opposing part corresponds to the fixed jack 36,
The support part corresponds to the anchor bolt 7,
The formwork constituent parts correspond to the first formwork constituent part 221 and the formwork constituent parts 222 and 223,
The pivot corresponds to the pivot connection 224,
The vertical direction corresponds to the height direction H,
The formwork-constituting main part corresponds to the first formwork-constituting part 221,
The formwork-constituting secondary parts correspond to the formwork-constituting parts 222 and 223,
The moving part corresponds to the jacks 216, 218,
The inside of the tunnel pit corresponds to the inside of the tunnel 1X, but the present invention is not limited only to the configurations of the above-described embodiments, and many embodiments can be obtained.

例えば、上述の説明では、コンクリート覆工2の内面側において所定の厚み分を切削後、コンクリートを打設して打ち替えて改修したが、コンクリート覆工2の内面側にコンクリートを打設して増し打ちして改修してもよい。 For example, in the above description, after cutting a predetermined thickness on the inner surface side of the concrete lining 2, concrete is cast and replaced for repair. You can refurbish it by adding more shots.

またトンネル1は、クラウン形状、あるいは馬蹄形状などの内面が曲面状となる断面形状であってもよい。 Further, the tunnel 1 may have a cross-sectional shape having a curved inner surface such as a crown shape or a horseshoe shape.

上述の説明では、改修材として流動性及び強度の高いコンクリートを打設したが、流動性の高い無収縮モルタルなどのモルタルや樹脂など、強度などの所要性能を満足するものを用いてもよい。 In the above description, high-fluidity and high-strength concrete was cast as the repair material, but mortar such as non-shrinking mortar with high fluidity, resin, etc., which satisfy the required performance such as strength may be used.

アンカーボルト7をコンクリート覆工2に設置したが、引き抜き力に対抗して、型枠部22を支持することができれば,セットアンカーやカットアンカーなど別の構成であってもよい。 Although the anchor bolts 7 are installed in the concrete lining 2, other configurations such as set anchors and cut anchors may be used as long as the formwork 22 can be supported against the pull-out force.

1…トンネル
1X…トンネル坑内
2…コンクリート覆工
7…アンカーボルト
10…改修装置
21…本体部
22…型枠部
30…プロテクタ
30X…通行空間
35…車輪
36…固定ジャッキ
216…第1ジャッキ
218…第2ジャッキ
221…第1型枠構成部
222…第2型枠構成部
223…第3型枠構成部
224…枢動連結部
H…高さ方向
L…奥行き方向
W…幅方向
X…施工側半断面
Y…被施工側半断面
Z…通行車両
1 Tunnel 1X Tunnel pit 2 Concrete lining 7 Anchor bolt 10 Repair device 21 Main body 22 Formwork 30 Protector 30X Traffic space 35 Wheel 36 Fixed jack 216 First jack 218 2nd jack 221... 1st frame constituent part 222... 2nd form form constituent part 223... 3rd form form constituent part 224... Pivoting connection part H... Height direction L... Depth direction W... Width direction X... Construction side Half-section Y: Half-section on side to be constructed Z: Passing vehicle

Claims (12)

トンネル用の改修装置の型枠部を、供用中のトンネルの覆工部に対する内部側に所定間隔を隔てて配置し、
前記覆工部と前記型枠部との間に改修材を打設して、トンネル内面を改修するトンネル改修工法であって、
前記トンネルの幅方向における半断面のうち一方の半断面に対して、半断面の前記覆工部に対応する弧状に形成された前記型枠部を配置するとともに、
他方の半断面に、通行体が内部を通行できる防護部を配置し、
前記防護部に、トンネル延長方向に走行可能な走行部が設けられるとともに、
前記型枠部を支持するとともに、トンネル延長方向に走行可能な台車部が設けられ、
前記防護部と前記台車部とが前記幅方向に連結された
トンネル改修工法。
Arranging the formwork of the tunnel repair equipment on the inner side of the lining of the tunnel in service at a predetermined interval,
A tunnel repairing method for repairing the inner surface of a tunnel by placing a repairing material between the lining and the formwork,
Arranging the formwork part formed in an arc shape corresponding to the lining part of the half-section on one of the half-sections in the width direction of the tunnel,
On the other half section, a protective section is placed to allow the passage of objects to pass through ,
The protective portion is provided with a traveling portion capable of traveling in the direction of extension of the tunnel,
A carriage that supports the formwork and can travel in the direction of extension of the tunnel is provided,
The protective portion and the carriage portion are connected in the width direction
Tunnel repair method.
前記防護部が、前記型枠部に対して、トンネル延長方向に長い
請求項1に記載のトンネル改修工法。
2. The tunnel repairing method according to claim 1, wherein the protection section is longer than the formwork section in the tunnel extension direction.
前記防護部に設けられた対抗部によって、打設する前記改修材から前記型枠部に作用する圧力に抗する
請求項1又は2に記載のトンネル改修工法。
The counter part provided in the protection part resists the pressure acting on the form part from the repair material to be placed.
The tunnel repairing method according to claim 1 or 2 .
前記覆工部から支持部で前記型枠部を支持する
請求項1乃至のうちいずれかに記載のトンネル改修工法。
4. The tunnel repairing method according to any one of claims 1 to 3 , wherein the formwork is supported by support portions from the lining portion.
弧状に形成された前記型枠部は、複数の型枠構成部と、該型枠構成部同士を枢動する枢動部とで構成し、折り畳み可能に構成された
請求項1乃至のうちいずれかに記載のトンネル改修工法。
5. Among any of claims 1 to 4 , wherein the arc-shaped formwork section is composed of a plurality of formwork-constituting parts and a pivoting part for pivoting the formwork-constituting parts, and is configured to be foldable. The tunnel repair method according to any one of the above.
前記型枠構成部は、
上下方向に移動可能に支持された型枠構成主部と、
前記枢動部により前記型枠構成主部に対して枢動可能に連結された型枠構成従部とで構成し、
前記型枠構成従部を、前記型枠構成主部に対して所定の枢動位置に移動させる移動部が設けられた
請求項に記載のトンネル改修工法。
The formwork constituent part is
a formwork-constituting main part supported so as to be vertically movable;
a formwork component slave part pivotably connected to the formwork component main part by the pivot part;
6. A tunnel repairing method according to claim 5 , further comprising a moving part for moving the formwork subordinate part to a predetermined pivot position with respect to the formwork main part.
前記枢動部により前記型枠構成主部に対して前記型枠構成従部を折り畳んで、前記型枠部を、前記防護部とともに、トンネル坑内を移動する
請求項に記載のトンネル改修工法。
7. The tunnel repairing method according to claim 6 , wherein the secondary formwork part is folded with respect to the main formwork part by the pivoting part, and the formwork part is moved in the tunnel shaft together with the protective part.
供用中のトンネルの覆工部の内面側に改修材を打設して、トンネル内面を改修するためのトンネル用の改修装置であって、
前記トンネルの幅方向における半断面のうち一方の半断面に対して配置され、半断面の前記覆工部に対応する弧状に形成された型枠部と、
他方の半断面に配置され、通行体が内部を通行できる防護部とで構成され
前記防護部に、トンネル延長方向に走行可能な走行部が設けられるとともに、
前記型枠部を支持するとともに、トンネル延長方向に走行可能な台車部が設けられ、
前記防護部と前記台車部とが前記幅方向に連結された
改修装置。
A tunnel repair device for repairing the inner surface of a tunnel by placing a repair material on the inner surface of the lining of a tunnel in service,
a formwork part arranged in one of the half-sections of the tunnel in the width direction and formed in an arc shape corresponding to the lining part of the half-section;
It is arranged in the other half cross section and consists of a protective part that allows the passage to pass through the inside ,
The protective portion is provided with a traveling portion capable of traveling in the direction of extension of the tunnel,
A carriage that supports the formwork and can travel in the direction of extension of the tunnel is provided,
The protective portion and the carriage portion are connected in the width direction
refurbishment equipment.
前記防護部が、前記型枠部に対して、トンネル延長方向に長い
請求項に記載の改修装置。
9. A refurbishment device according to claim 8 , wherein said protection section is longer than said formwork section in the direction of extension of the tunnel.
前記防護部に、打設する前記改修材から前記型枠部に作用する圧力に抗する対抗部が設けられた
請求項又はに記載の改修装置。
10. The repairing device according to claim 8 or 9 , wherein the protection part is provided with a countering part that resists the pressure acting on the form part from the repairing material to be placed.
弧状に形成された前記型枠部は、複数の型枠構成部と、該型枠構成部同士を枢動する枢動部とで構成し、折り畳み可能に構成した
請求項乃至10のうちいずれかに記載の改修装置。
11. Any one of claims 8 to 10 , wherein said formwork part formed in an arc shape is composed of a plurality of formwork constituent parts and a pivoting part for pivoting said formwork constituent parts, and is foldable. refurbishment device according to
前記型枠構成部は、
上下方向に移動可能に支持された型枠構成主部と、
前記枢動部により前記型枠構成主部に対して枢動可能に連結された型枠構成従部とで構成し、
前記型枠構成従部を、前記型枠構成主部に対して所定の枢動位置に移動させる移動部が設けられた
請求項11に記載の改修装置。
The formwork constituent part is
a formwork-constituting main part supported so as to be vertically movable;
a formwork component slave part pivotably connected to the formwork component main part by the pivot part;
12. Refurbishment device according to claim 11 , further comprising a moving part for moving the slave formwork part to a predetermined pivot position relative to the main formwork part.
JP2019185824A 2019-10-09 2019-10-09 Tunnel repair method and repair equipment Active JP7330052B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2019185824A JP7330052B2 (en) 2019-10-09 2019-10-09 Tunnel repair method and repair equipment
JP2023129271A JP7481554B2 (en) 2019-10-09 2023-08-08 Tunnel repair method and repair equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019185824A JP7330052B2 (en) 2019-10-09 2019-10-09 Tunnel repair method and repair equipment

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2023129271A Division JP7481554B2 (en) 2019-10-09 2023-08-08 Tunnel repair method and repair equipment

Publications (2)

Publication Number Publication Date
JP2021059932A JP2021059932A (en) 2021-04-15
JP7330052B2 true JP7330052B2 (en) 2023-08-21

Family

ID=75379820

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2019185824A Active JP7330052B2 (en) 2019-10-09 2019-10-09 Tunnel repair method and repair equipment
JP2023129271A Active JP7481554B2 (en) 2019-10-09 2023-08-08 Tunnel repair method and repair equipment

Family Applications After (1)

Application Number Title Priority Date Filing Date
JP2023129271A Active JP7481554B2 (en) 2019-10-09 2023-08-08 Tunnel repair method and repair equipment

Country Status (1)

Country Link
JP (2) JP7330052B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113969534A (en) * 2021-09-22 2022-01-25 固原市凯达公路工程有限公司 Comprehensive isolation belt for road construction

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001280059A (en) 2000-03-30 2001-10-10 Kumagai Gumi Co Ltd Widening method and repairing method for tunnel, and protector used therefor
JP2016037793A (en) 2014-08-08 2016-03-22 株式会社大林組 Repair and reinforcement method for existing tunnel

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0455118Y2 (en) * 1987-03-20 1992-12-24

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001280059A (en) 2000-03-30 2001-10-10 Kumagai Gumi Co Ltd Widening method and repairing method for tunnel, and protector used therefor
JP2016037793A (en) 2014-08-08 2016-03-22 株式会社大林組 Repair and reinforcement method for existing tunnel

Also Published As

Publication number Publication date
JP2021059932A (en) 2021-04-15
JP2023138680A (en) 2023-10-02
JP7481554B2 (en) 2024-05-10

Similar Documents

Publication Publication Date Title
JP5767558B2 (en) Mobile formwork apparatus and lining concrete construction method
CN104594918B (en) Split integrated underground passage steel mold plate trolley and construction method thereof
JP6720072B2 (en) Mobile formwork device
JP6000889B2 (en) Mobile formwork apparatus and lining concrete construction method
JP7481554B2 (en) Tunnel repair method and repair equipment
JP7166424B2 (en) Gantry cart used for secondary lining method of telescopic center type tunnel
JP5484983B2 (en) Method for assembling and dismantling bridge moving work device
JP7125056B2 (en) Tunnel repair method
KR101187282B1 (en) Railway bridge constructing method using 2 post type abutment structure
CN112726442A (en) Construction method of large-span thin-wall concrete sound barrier pouring trolley
CN107100648B (en) Auxiliary facility and method for tunnel plain concrete lining construction
CN217298623U (en) Cast-in-place reinforced concrete detachable combined guardrail and construction device
JP2017137700A (en) Repairing device of existing waterway and its repairing method
JPH06185106A (en) Installing cart and installing method for culvert
JP4673699B2 (en) Bridge construction method, bridge superstructure and deployment device
KR100347912B1 (en) Tunneling Plant
JP7185567B2 (en) Bridge pier repair method
JP7248258B2 (en) Tunnel repair method
JP7003376B2 (en) Construction method of structure
KR100970959B1 (en) Method for Construction of Extension Culvert in State Guarantying Footway and Driveway
KR101653559B1 (en) Method of repairing railway
JP2004278230A (en) Method of constructing grade separation of roads, and pier connection structure
JP7423564B2 (en) Bogie running path and concrete placement method
JP7499672B2 (en) Deck replacement method
JP4233025B2 (en) How to construct a three-dimensional intersection

Legal Events

Date Code Title Description
RD01 Notification of change of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7426

Effective date: 20191211

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20191211

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200207

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220926

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230425

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20230428

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230623

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230718

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230808

R150 Certificate of patent or registration of utility model

Ref document number: 7330052

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150