Renovation method of frame, scaffolding structure and outer wall Download PDF

Info

Publication number
JP7314431B1
JP7314431B1 JP2023020644A JP2023020644A JP7314431B1 JP 7314431 B1 JP7314431 B1 JP 7314431B1 JP 2023020644 A JP2023020644 A JP 2023020644A JP 2023020644 A JP2023020644 A JP 2023020644A JP 7314431 B1 JP7314431 B1 JP 7314431B1
Authority
JP
Japan
Prior art keywords
wall
frame
scaffolding
steel pipe
new
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2023020644A
Other languages
Japanese (ja)
Other versions
JP2024031753A (en
Inventor
幹雄 上野
大介 花井
Original Assignee
株式会社メタル建材
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社メタル建材 filed Critical 株式会社メタル建材
Application granted granted Critical
Publication of JP7314431B1 publication Critical patent/JP7314431B1/en
Publication of JP2024031753A publication Critical patent/JP2024031753A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Finishing Walls (AREA)

Abstract

【課題】既存外壁の上に新規外壁を敷設するリフォーム作業を、足場強度が高い状態で行う。【解決手段】所定のフレームを用いた外壁のリフォーム方法であって、前記鋼管用ナットのドリルを前記既存外壁の下地に差し込んで固定する第1工程と、前記鋼管用ナットが前記天面開口部に対応した位置に配設されるように、前記底面フレームを前記既存外壁に設置する第2工程と、前記底面フレームの長手方向における両端部を固定する第3工程と、前記天面フレームにおける前記天面開口部を避けた面に前記新規外壁を固定する第4工程と、を有することを特徴とする外壁のリフォーム方法。【選択図】図2A renovation work for laying a new outer wall on top of an existing outer wall is carried out in a state where the scaffold strength is high. A method for reforming an outer wall using a predetermined frame, comprising: a first step of inserting a drill of the steel pipe nut into the base of the existing outer wall to fix the steel pipe nut; a second step of installing the bottom frame on the existing outer wall so that the bottom frame is disposed at a position corresponding to the above; a third step of fixing both ends of the bottom frame in the longitudinal direction; and a fourth step of fixing the new outer wall to a surface avoiding the top opening. [Selection drawing] Fig. 2

Description

本発明は、既存外壁の上に新規外壁を重ねて敷設するリフォームに関わる技術である。 The present invention is a technique related to renovation in which a new outer wall is laid on top of an existing outer wall.

住宅の外壁は、住宅内部を紫外線や雨風から守る役割を果たしている。周知の通り、外壁は、経年劣化するため、一定年数が経過すると、住宅に隣接した位置に足場を設け、リフォームが実施される。足場とは、建物の高い所に塗装、部材の取り付け又は取り外し作業をする際に、作業者を作業個所に接近させて作業させるために設ける仮設の作業床、通路及びこれらを支持する仮設物のことである。 The outer wall of a house plays a role in protecting the inside of the house from ultraviolet rays and wind and rain. As is well known, since the outer wall deteriorates with time, after a certain number of years, scaffolding is provided adjacent to the house and renovation is carried out. Scaffolding refers to temporary work floors, passages, and temporary structures that support these items to allow workers to approach the work site when painting, installing or removing members in high places of a building.

代表的な足場として、くさび緊結式足場、単管足場が知られている。
くさび緊結式足場とは、一定間隔で緊結部が設けられた鋼管を支柱にして、手すりや踏板などの部材を緊結部に通して固定し、腕木で支えることによって組み立てられる足場のことである。ハンマーを使用して容易に組み立てることができるため、組み立てや解体に時間がかからないなどのメリットがある。
単管足場とは、鋼管で作られた単管をクランプ等の基本部材によって接続することによって、組み立てられた足場のことである。くさび緊結式足場と比較して、単管をクランプ、ボルトで連結する方式であるため、設計の自由度が高い等のメリットがある。
As representative scaffolds, wedge binding scaffolds and single-tube scaffolds are known.
Wedge-tied scaffolding is a type of scaffolding that is assembled by using steel pipes with ties at regular intervals as pillars. Since it can be easily assembled using a hammer, it has the advantage of not taking time to assemble and dismantle.
A single pipe scaffold is a scaffold assembled by connecting single pipes made of steel pipes with basic members such as clamps. Compared to wedge-tightened scaffolding, this system connects single pipes with clamps and bolts, so there are advantages such as a high degree of freedom in design.

ここで、労働安全衛生規則第570条には、事業者に課せられる鋼管足場の適合条件が規定されており、同条第5号には、一側足場、本足場又は張出し足場であるものにあってては、(イ)~(ハ)に定めるところにより、壁つなぎ又は控えを設ける旨規定されている。
(イ)単管足場の場合、垂直方向及び水平方向にそれぞれ5m及び5.5m以内の間隔を設けること。わく組足場(高さが5メール未満のものを除く。)の場合、垂直方向及び水平方向にそれぞれ9m及び8m以内の間隔を設けること。
(ロ)鋼管、丸太等の材料を用いて、堅固のものとすること。
(ハ)引張材と圧縮材とで構成されているものであるときは、引張材と圧縮材との間隔は、1m以内とすること。
Here, Article 570 of the Ordinance on Industrial Safety and Health stipulates the conformity conditions for steel pipe scaffolding imposed on business operators, and Item 5 of the same article stipulates that for one-sided scaffolding, main scaffolding or overhanging scaffolding, wall ties or braces shall be provided according to the provisions of (a) to (c).
(b) In the case of single-tube scaffolding, the vertical and horizontal distances shall be within 5m and 5.5m, respectively. In the case of framed scaffolding (excluding those less than 5 meters in height), the vertical and horizontal intervals shall be within 9m and 8m respectively.
(b) Use materials such as steel pipes, logs, etc., and make them solid.
(c) When it is composed of tension members and compression members, the distance between the tension members and compression members shall be within 1m.

近年、既存外壁の上から、新規外壁を上張りする重ね張り工法による外壁のリフォームが着目されている。当該重ね張り工法においても、当然のことながら上述の労働安全衛生規則第570条の遵守が求められる。 In recent years, attention has been focused on remodeling exterior walls using the overlapping construction method, in which a new exterior wall is overlaid on top of an existing exterior wall. Even in the layered construction method, as a matter of course, observance of the above-mentioned Industrial Safety and Health Ordinance Article 570 is required.

特開2010-203138号公報Japanese Unexamined Patent Application Publication No. 2010-203138 特開2006-249817号公報JP 2006-249817 A

足場の強度を確保する方法として、円盤状の振れ止めを既存外壁に圧接させることが知られている。しかしながら、この方法では、重ね張り工法によって新規外壁を取り付ける際に、振れ止めを新規外壁に強く圧接させることができないため、足場の強度低下が懸念される。
したがって、重ね張り工法を用いて新規外壁を設置する際に、労働安全衛生規則第570条に規定されている足場強度を維持させる工法が求められている。また、外壁のリフォームは、所定周期で複数回実施されることが予測されるため、各リフォーム時に作業者が行う作業の簡素化が求められている。
As a method for ensuring the strength of scaffolding, it is known to press a disc-shaped steady rest against the existing outer wall. However, in this method, when a new outer wall is installed by the overlapping construction method, the anti-vibration cannot be strongly pressed against the new outer wall, so there is a concern that the strength of the scaffolding will decrease.
Therefore, there is a demand for a construction method that maintains the scaffolding strength prescribed in Article 570 of the Industrial Safety and Health Regulations when installing a new outer wall using the overlapping construction method. In addition, since it is expected that the exterior wall will be reformed a plurality of times in a predetermined period, there is a demand for simplification of the work performed by the worker at each reform.

上記課題を解決するために、本願発明に係るフレームは、(1)既存外壁の上に新規外壁を重ねて敷設するリフォームの際に、前記既存外壁と前記新規外壁との間に設置されるフレームであって、鋼管用ナット又は足場つなぎボルトを挿通するための天面開口部が形成され、前記新規外壁に固定される天面フレームと、前記既存外壁に設置される底面フレームと、前記天面フレーム及び前記底面フレームを繋ぐ側フレームと、を有することを特徴とするフレーム。 In order to solve the above-described problems, the frame according to the present invention is (1) a frame that is installed between the existing outer wall and the new outer wall during renovation work in which the new outer wall is laid on top of the existing outer wall, the frame comprising: a top frame fixed to the new outer wall, a bottom frame installed on the existing outer wall, and a side frame connecting the top frame and the bottom frame.

(2)さらに、前記底面フレームの端部に形成される返しフレームを有することを特徴とする上記(1)に記載のフレーム。 (2) The frame according to (1) above, further comprising return frames formed at the ends of the bottom frame.

(3)前記返しフレームは、L字状に折れ曲がっていることを特徴とする上記(2)に記載のフレーム。 (3) The frame according to (2) above, wherein the return frame is bent in an L shape.

(4)上記(1)乃至(3)のうちいずれか一つに記載のフレームと、前記既存外壁の下地に差し込まれるドリルを先端に有する前記鋼管用ナットと、を含み、前記鋼管用ナットは、前記新規外壁よりも前記既存外壁に近接した位置に配設されていることを特徴とする足場構造。 (4) A scaffolding structure comprising: the frame according to any one of (1) to (3) above; and the steel pipe nut having at its tip a drill to be inserted into the base of the existing outer wall, wherein the steel pipe nut is located closer to the existing outer wall than the new outer wall.

(5)上記(1)乃至(3)のうちいずれか一つに記載のフレームを有し、前記鋼管用ナットは、前記既存外壁に沿って延びるナット平板部を有しており、前記ナット平板部は、前記鋼管用ナットを挟んだ両側に第1の締結孔を有しており、前記鋼管用ナットは、前記新規外壁よりも前記既存外壁に近接した位置に配設されていることを特徴とする足場構造。 (5) A scaffolding structure comprising the frame according to any one of (1) to (3) above, wherein the steel pipe nut has a nut plate portion extending along the existing outer wall, the nut plate portion has a first fastening hole on both sides of the steel pipe nut, and the steel pipe nut is disposed closer to the existing outer wall than the new outer wall.

(6)前記ナット平板部は、前記鋼管用ナットの直下に第2の締結孔を有していることを特徴とする上記(5)に記載の足場構造。 (6) The scaffolding structure according to (5) above, wherein the nut plate portion has a second fastening hole directly below the steel pipe nut.

(7)上記(1)乃至(3)のうちいずれか一つに記載のフレームを用いた外壁のリフォーム方法であって、前記鋼管用ナットのドリルを前記既存外壁の下地に差し込んで固定する固定工程、又は、前記鋼管用ナットのナット平板部を前記既存外壁に固定する固定工程のうちいずれかを実施する第1工程と、前記天面開口部が前記鋼管用ナットに対応した位置に配設されるように、前記底面フレームを前記既存外壁に設置する第2工程と、前記底面フレームの長手方向における両端部を固定する第3工程と、前記天面フレームにおける前記天面開口部を避けた面に前記新規外壁を固定する第4工程と、を有することを特徴とする外壁のリフォーム方法。 (7) The exterior wall reforming method using the frame according to any one of the above (1) to (3), comprising: a first step of performing either a fixing step of inserting a drill of the steel pipe nut into the base of the existing outer wall and fixing it, or a fixing step of fixing the nut plate portion of the steel pipe nut to the existing outer wall; and a fourth step of fixing the new outer wall to a surface of the top surface frame avoiding the top surface opening.

(8)前記第1工程は、前記下地に差し込まれた前記鋼管用ナットに足場つなぎボルトを締結して足場を固定する工程を有しており、さらに、前記第2工程の前に、前記鋼管用ナット及び前記足場つなぎボルトの締結を一時的に解除する工程と、前記第3工程の後、前記第4工程の前に前記鋼管用ナット及び前記足場つなぎボルトを再び締結する工程と、
を有することを特徴とする上記(7)に記載の外壁のリフォーム方法。
(8) The first step includes a step of fastening a scaffolding connecting bolt to the steel pipe nut inserted into the base to fix the scaffolding, and further, before the second step, temporarily releasing the fastening of the steel pipe nut and the scaffolding connecting bolt, and after the third step and before the fourth step, fastening the steel pipe nut and the scaffolding connecting bolt again;
The method for remodeling an outer wall according to the above (7), characterized by comprising:

(9)前記第4工程において、前記天面開口部を挟んだ一方側に第1の新規外壁を固定し、他方側に第2の新規外壁を固定することを特徴とする上記(7)に記載の外壁のリフォーム方法。 (9) The exterior wall renovation method according to (7) above, wherein in the fourth step, a first new exterior wall is fixed to one side of the top face opening, and a second new exterior wall is fixed to the other side.

(10)前記第1の新規外壁及び前記第2の新規外壁の間の目地部に対応する位置に、前記鋼管用ナットは配設されていることを特徴とする上記(9)に記載の外壁のリフォーム方法。 (10) The outer wall reforming method according to (9) above, wherein the steel pipe nut is disposed at a position corresponding to a joint between the first new outer wall and the second new outer wall.

(11)前記第3工程において、住宅の横架材に対して、前記底面フレームの長手方向における両端部を固定することを特徴とする上記(7)に記載の外壁のリフォーム方法。 (11) The exterior wall remodeling method according to (7) above, wherein in the third step, both ends of the bottom frame in the longitudinal direction are fixed to horizontal members of the house.

(12)前記フレームの長手方向は、住宅の高さ方向に対応していることを特徴とする上記(7)に記載の外壁のリフォーム方法。 (12) The exterior wall renovation method according to (7) above, wherein the longitudinal direction of the frame corresponds to the height direction of the house.

(13)上記(4)に記載の足場構造を用いた外壁のリフォーム方法であって、前記新規外壁よりも前記既存外壁に近接した位置に配設されている前記鋼管用ナットに対して、足場を固定するための足場つなぎボルトを締結することによって足場を固定し、新規外壁の再リフォームを行うことを特徴とするリフォーム方法。 (13) A method of remodeling an outer wall using the scaffolding structure described in (4) above, wherein the scaffolding is fixed by fastening a scaffolding connecting bolt for fixing the scaffolding to the steel pipe nut disposed at a position closer to the existing outer wall than the new outer wall, and the new outer wall is remodeled.

(14)上記(5)に記載の足場構造を用いた外壁のリフォーム方法であって、前記新規外壁よりも前記既存外壁に近接した位置に配設されている前記鋼管用ナットに対して、足場を固定するための足場つなぎボルトを締結することによって足場を固定し、新規外壁の再リフォームを行うことを特徴とするリフォーム方法。 (14) The method of remodeling an outer wall using the scaffolding structure described in (5) above, wherein the scaffolding is fixed by fastening a scaffolding connecting bolt for fixing the scaffolding to the steel pipe nut disposed at a position closer to the existing outer wall than the new outer wall, and the new outer wall is remodeled.

(15)上記(4)に記載の足場構造を用いたリフォーム方法であって、前記新規外壁よりも前記既存外壁に近接した位置に配設されている前記鋼管用ナットに対して、足場を固定するための足場つなぎボルトを締結することによって足場を固定し、リフォームを行うことを特徴とするリフォーム方法。 (15) A reforming method using the scaffolding structure described in (4) above, wherein the scaffolding is fixed to the steel pipe nut arranged at a position closer to the existing outer wall than the new outer wall by tightening a scaffolding connecting bolt for fixing the scaffolding, and the reforming method is characterized by carrying out the reforming.

(16)上記(5)に記載の足場構造を用いたリフォーム方法であって、前記新規外壁よりも前記既存外壁に近接した位置に配設されている前記鋼管用ナットに対して、足場を固定するための足場つなぎボルトを締結することによって足場を固定し、リフォームを行うことを特徴とするリフォーム方法。 (16) A remodeling method using the scaffolding structure described in (5) above, wherein the scaffolding is fixed to the steel pipe nut disposed at a position closer to the existing outer wall than the new outer wall by fastening a scaffolding connecting bolt for fixing the scaffolding, and the remodeling method is characterized by carrying out the remodeling.

本発明のフレームを用いることによって、既存外壁の上に新規外壁を敷設するリフォーム作業を、足場強度が高い状態で行うことができる。 By using the frame of the present invention, it is possible to carry out renovation work for laying a new outer wall on top of an existing outer wall while the scaffold strength is high.

既存外壁の一部における断面図である。It is a sectional view in a part of existing outer wall. 既存外壁の上に新規外壁を敷設した直後の状態を示している。It shows the state immediately after laying the new outer wall on the existing outer wall. 鋼管用ナットの基端側の平面図である。It is a top view of the base end side of the nut for steel pipes. フレームの斜視図である(一部省略)。It is a perspective view of a frame (partially omitted). 外壁のリフォーム方法の工程図である(既存外壁に穴をあける)。It is process drawing of the reform method of an outer wall (a hole is made in the existing outer wall). 外壁のリフォーム方法の工程図である(鋼管用ナットを取り付ける)。It is process drawing of the reforming method of an outer wall (attaching the nut for steel pipes). 外壁のリフォーム方法の工程図である(フレーム等を取り付ける)。It is process drawing of the reform method of an outer wall (a frame etc. are attached). 外壁のリフォーム方法の工程図である(隣接する新規外壁の隙間を封止する)。FIG. 4 is a process diagram of a method for reforming an outer wall (sealing gaps between adjacent new outer walls); フレームの取り付け位置を示す図である。It is a figure which shows the attachment position of a flame|frame. 変形例1に係る鋼管用ナットの配設位置を示している。FIG. 10 shows the arrangement position of the steel pipe nut according to Modification 1. FIG. 変形例2に係るフレームの断面図である。FIG. 11 is a cross-sectional view of a frame according to Modification 2; 変形例4に係るフレームの断面図である。FIG. 11 is a cross-sectional view of a frame according to Modification 4; 変形例5に係るフレームの断面図である。FIG. 11 is a cross-sectional view of a frame according to modification 5; 変形例6に係る鋼管用ナット及びナット平板部の斜視図である。FIG. 11 is a perspective view of a steel pipe nut and a nut plate portion according to Modification 6; 変形例6に係る鋼管用ナット及びナット平板部の配設位置を示している。FIG. 12 shows the arrangement positions of the steel pipe nut and the nut flat plate portion according to Modification 6. FIG.

本実施形態の外壁のリフォーム方法は、既存外壁の上に胴縁を配設し、この胴縁の上から新規外壁を設置する重ね張り工法に適用することができる。重ね張り工法によれば、胴縁によって既存外壁と新規外壁との間に通気層が形成されるため、通気性を高めることができる。
図1は、本実施形態の外壁のリフォーム方法が適用される既存外壁の一部における断面図である。X軸、Y軸及びZ軸は互いに直交する三軸であり、これらの定義は他の図面においても同様である。同図を参照して、既存外壁11は、住宅の外面に沿って配設されており、下地12を挟んで構造フレーム13に取り付けられている。なお、構造フレーム13には、一例として軽量鉄骨若しくは木材が用いられる。
The exterior wall reforming method of the present embodiment can be applied to a stacking construction method in which a furring strip is provided on an existing exterior wall and a new exterior wall is installed over the furring strip. According to the overlapping construction method, a ventilation layer is formed between the existing outer wall and the new outer wall by furring strips, so that ventilation can be improved.
FIG. 1 is a cross-sectional view of a portion of an existing outer wall to which the outer wall reforming method of this embodiment is applied. The X-axis, Y-axis and Z-axis are three axes orthogonal to each other, and these definitions are the same in other drawings. Referring to the figure, the existing outer wall 11 is arranged along the outer surface of the house and attached to the structural frame 13 with the foundation 12 interposed therebetween. A lightweight steel frame or wood is used for the structural frame 13 as an example.

図2は、図1の既存外壁に対して重ね張り工法によるリフォームを実施した直後の状態(足場つなぎボルトを取り外す前の状態)を示している。鋼管用ナット24の先端には、ドリル21が設けられている。ドリル21及び鋼管用ナット24は一体的に設けられている。ドリル21の先端には刃部21Aが形成されており、刃部21Aを除いたドリル21の外周面には、ネジ部21Bが形成されている。ドリル21は、下地12及び構造フレーム13を貫通して、既存外壁11の板厚方向に延びており、不図示のインパクトドライバーで打ち込むことによって、構造フレーム13に固定される。ドリル21の基端側には、下地12の平面方向に沿って延びる平板状の座金23が形成されている。 FIG. 2 shows the state (before removing the scaffolding connecting bolts) immediately after the existing outer wall of FIG. A drill 21 is provided at the tip of the steel pipe nut 24 . The drill 21 and the steel pipe nut 24 are integrally provided. A blade portion 21A is formed at the tip of the drill 21, and a screw portion 21B is formed on the outer peripheral surface of the drill 21 excluding the blade portion 21A. The drill 21 penetrates the foundation 12 and the structural frame 13 and extends in the plate thickness direction of the existing outer wall 11, and is fixed to the structural frame 13 by driving it with an impact driver (not shown). A plate-shaped washer 23 extending along the planar direction of the substrate 12 is formed on the base end side of the drill 21 .

既存外壁11には、鋼管用ナット24が収められる貫通開口部11Aが形成されている。ここで、「収められる」とは、鋼管用ナット24の全体が貫通開口部11Aに収容されることだけを必ずしも意味するものではなく、図2に図示するように一部が収納される場合も含まれる。 The existing outer wall 11 is formed with a through opening 11A in which the steel pipe nut 24 is accommodated. Here, "housed" does not necessarily mean that the entire steel pipe nut 24 is housed in the through opening 11A, but also includes the case where a part of it is housed as illustrated in FIG.

既存外壁11には、木造工法、RC造及びS造等の建築技術を用いて建築された、窯業系のサイディング外壁、金属系のサイディング外壁、金属外壁、タイル外壁、モルタル外壁が含まれる。 The existing exterior walls 11 include ceramic-based siding exterior walls, metal-based siding exterior walls, metal exterior walls, tile exterior walls, and mortar exterior walls constructed using construction techniques such as wooden construction methods, RC construction, and S construction.

鋼管用ナット24には、六角ナットなど公知のナットを用いることができる。図3は、鋼管用ナット24の基端側の平面図である。同図を参照して、鋼管用ナット24の中心には、有底筒状のナットネジ溝部24Aが形成されている。詳細については、後述するが、このナットネジ溝部24Aに対して足場つなぎボルト25が締結される。 A known nut such as a hexagonal nut can be used as the steel pipe nut 24 . FIG. 3 is a plan view of the base end side of the steel pipe nut 24. FIG. Referring to the figure, a nut screw groove portion 24A having a cylindrical shape with a bottom is formed at the center of the steel pipe nut 24. As shown in FIG. Although the details will be described later, the scaffolding connecting bolt 25 is fastened to the nut screw groove portion 24A.

既存外壁11と新規外壁27との間には、複数の曲げ部を有するフレーム30が設けられている。図4は、フレームの斜視図である。ただし、Z軸方向におけるフレーム30の途中を省略して図示する。同図における波線は、省略を意味する。フレーム30は、天面フレーム31、側フレーム32、底面フレーム33、第1返しフレーム34及び第2返しフレーム35からなる。第1フレーム34及び第2返しフレーム35によって、特許請求の範囲の記載の「返しフレーム」が構成される。フレーム30は、金属板に対して曲げ加工を施すことによって製造することができる。ここで、「返しフレーム」とは、底面フレーム33の端部から立ち上がるように形成されたフレームを意味し、立ち上がり方向は垂直に限られない。本実施形態では、「返しフレーム」を第1返しフレーム34及び第2返しフレーム35からなる二段構成としたが、本発明はこれに限るものではなく、一段又はn段(ただしnは3以上の整数)であってもよい。 A frame 30 having a plurality of bends is provided between the existing outer wall 11 and the new outer wall 27 . FIG. 4 is a perspective view of the frame. However, the middle portion of the frame 30 in the Z-axis direction is omitted in the illustration. A wavy line in the figure means omission. The frame 30 includes a top frame 31 , side frames 32 , bottom frame 33 , first return frame 34 and second return frame 35 . The first frame 34 and the second return frame 35 constitute a "return frame" described in the claims. The frame 30 can be manufactured by bending a metal plate. Here, the "returned frame" means a frame that rises from the end of the bottom frame 33, and the rising direction is not limited to vertical. In the present embodiment, the "return frame" has a two-stage structure consisting of the first return frame 34 and the second return frame 35, but the present invention is not limited to this, and may be one stage or n stages (where n is an integer of 3 or more).

天面フレーム31は、Z軸方向(言い換えると、住宅の高さ方向)に延びており、新規外壁27の内面に接触している。天面フレーム31の略中心には天面開口部31Aが形成されており、この天面開口部31Aを挿通して、フレーム30の内部に向かって足場つなぎボルト25が延びている。つまり、鋼管用ナット24のナットネジ溝部24Aと天面開口部31Aは、X軸方向から視たときに重なる位置に配設されている。 The top frame 31 extends in the Z-axis direction (in other words, the height direction of the house) and contacts the inner surface of the new outer wall 27 . A top surface opening 31A is formed substantially at the center of the top surface frame 31, and a scaffold connecting bolt 25 extends toward the inside of the frame 30 through the top surface opening 31A. That is, the nut screw groove portion 24A of the steel pipe nut 24 and the top surface opening portion 31A are arranged at positions that overlap each other when viewed from the X-axis direction.

新規外壁27は、ビス28によってフレーム30の天面フレーム31に対してビス止められている。すなわち、天面開口部31Aを挟んだY軸方向における一方側に新規外壁27(第1の新規外壁に相当する)が配設され、他方側に別の新規外壁27(第2の新規外壁に相当する)が配設されている。 The new outer wall 27 is screwed to the top frame 31 of the frame 30 with screws 28 . That is, a new outer wall 27 (corresponding to a first new outer wall) is arranged on one side in the Y-axis direction across the top opening 31A, and another new outer wall 27 (corresponding to a second new outer wall) is arranged on the other side.

側フレーム32は、左右一対であり、それぞれ天面フレーム31のY軸方向における端部からX軸方向に向かって延びている。したがって、天面フレーム31及び側フレーム32によって、コの字状の空間が形成され、この空間の内部に鋼管用ナット24の上部が収められている。 The side frames 32 are a pair of left and right side frames, and each extend in the X-axis direction from the end of the top frame 31 in the Y-axis direction. Therefore, a U-shaped space is formed by the top frame 31 and the side frames 32, and the upper portion of the steel pipe nut 24 is accommodated inside this space.

底面フレーム33は、左右一対であり、それぞれ側フレーム32のX軸方向における端部を始端として、Y軸方向に延びている。底面フレーム33は、既存外壁11の外面に接触している。底面フレーム33のZ軸方向における両端部には、ハッチングで示す取り付け部33Aが設けられている。
第1返しフレーム34は、底面フレーム33の端部から側フレーム32と対向するように配設されており、X軸方向における寸法が側フレーム32よりも小さく設定されている。第2返しフレーム35は、第1返しフレーム34の端部において、底面フレーム33と対向するように配設されており、Y軸方向における寸法が底面フレーム33よりも小さく設定されている。
したがって、第2返しフレーム35は、新規外壁27及び側フレーム32から離隔した位置に配設されている。
The bottom frame 33 is a pair of left and right bottom frames, each extending in the Y-axis direction starting from the end of the side frame 32 in the X-axis direction. The bottom frame 33 is in contact with the outer surface of the existing outer wall 11 . Attachment portions 33A indicated by hatching are provided at both ends of the bottom frame 33 in the Z-axis direction.
The first return frame 34 is arranged so as to face the side frame 32 from the end of the bottom frame 33 , and its dimension in the X-axis direction is set smaller than the side frame 32 . The second return frame 35 is arranged at the end of the first return frame 34 so as to face the bottom frame 33 , and its dimension in the Y-axis direction is set smaller than that of the bottom frame 33 .
Therefore, the second return frame 35 is arranged at a position separated from the new outer wall 27 and the side frame 32 .

新規外壁27には、例えば、金属系のサイディング材、窯業系サイディング材を用いることができる。金属系のサイディング材として、例えば、55質量%アルミ・亜鉛合金メッキ鋼板の背面側に断熱材及びアルミ箔をこの順序で積層したサイディング材を用いることができる。金属系のサイディング材は、重量が軽いため、外壁の保持重量を小さくすることができる。 For the new outer wall 27, for example, a metal-based siding material or a ceramic-based siding material can be used. As the metallic siding material, for example, a siding material obtained by laminating a heat insulating material and an aluminum foil in this order on the back side of a 55% by mass aluminum/zinc alloy plated steel sheet can be used. Since the metallic siding material is light in weight, the weight of the outer wall to be held can be reduced.

胴縁41は、木材又は金属からなり、上述した通り、既存外壁11と新規外壁27との間に通気層を形成するために配設される。胴縁41と既存外壁11との間には、防水シート14を介在させてもよい。防水シート14と鋼管用ナット24との間には、隙間が形成されており、当該隙間は止水材26によって閉塞されている。止水材26には、例えばコーキング材を用いることができる。
なお、既存外壁11と構造フレーム13との間にも、胴縁42が配設されている。
The furring strip 41 is made of wood or metal and is arranged to form a ventilation layer between the existing outer wall 11 and the new outer wall 27 as described above. A waterproof sheet 14 may be interposed between the furring strip 41 and the existing outer wall 11 . A gap is formed between the waterproof sheet 14 and the steel pipe nut 24 , and the gap is closed with a water stop material 26 . A caulking material, for example, can be used for the water stop material 26 .
A furring strip 42 is also provided between the existing outer wall 11 and the structural frame 13 .

次に、図2、図5乃至図8を参照しながら、リフォームの手順について説明する。図5を参照して、既存外壁11に対して所定間隔毎に貫通開口部11Aを形成する。後述するように、貫通開口部11Aの略中心に対応する位置に足場つなぎボルト25は配設される。足場つなぎボルト25の配置間隔については、労働安全衛生規則第570条の定めにしたがう必要がある。したがって、貫通開口部11Aについても、労働安全衛生規則第570条の規定を考慮して形成位置が定められる。なお、図面では、簡略化のため、一か所の貫通開口部11Aのみ図示する。 Next, referring to FIGS. 2 and 5 to 8, the reform procedure will be described. Referring to FIG. 5, through openings 11A are formed in the existing outer wall 11 at predetermined intervals. As will be described later, the scaffold connecting bolt 25 is arranged at a position substantially corresponding to the center of the through opening 11A. The arrangement intervals of the scaffolding connecting bolts 25 must comply with Article 570 of the Ordinance on Industrial Safety and Health. Therefore, the formation position of the through opening 11A is also determined in consideration of the provisions of Article 570 of the Ordinance on Industrial Safety and Health. In addition, in drawing, only 11 A of penetration opening parts are shown in figure for simplification.

図6を参照して、不図示のインパクトドライバーに対して銅管用ナット24を装着した後、ドリル21を貫通開口部11A内の下地12の上面に押し当て、インパクトドライバーを駆動する。インパクトドライバーを駆動することによって、下地12に穴が形成される。インパクトドライバーを更に駆動すると、ドリル21が下地12及び構造フレーム13を貫通して、構造フレーム13の下面から突出する。そして、座金23が下地12の上面に当接したら、インパクトドライバーの駆動を停止する。これにより、ドリル21及び鋼管用ナット24を、構造フレーム13に対して固定することができる。なお、後述する変形例6では、ドリル21がないため、ナット平板部125(図14,図15参照)を既存外壁11に締結することによって、鋼管用ナット124を設置する(詳細については、後述する)。鋼管用ナット24の設置後に、足場つなぎボルト25を鋼管用ナット24に締結することによって、一段目の足場を固定する。なお、二段目以降の足場についても、同様の工程によって、固定する。 Referring to FIG. 6, after the copper pipe nut 24 is attached to the impact driver (not shown), the drill 21 is pressed against the upper surface of the substrate 12 in the through opening 11A, and the impact driver is driven. A hole is formed in the substrate 12 by driving the impact driver. Further driving of the impact driver causes the drill 21 to penetrate the substrate 12 and the structural frame 13 and protrude from the underside of the structural frame 13 . Then, when the washer 23 comes into contact with the upper surface of the base 12, the driving of the impact driver is stopped. This allows the drill 21 and the steel pipe nut 24 to be fixed to the structural frame 13 . In Modification 6, which will be described later, since there is no drill 21, a steel pipe nut 124 is installed by fastening a nut flat plate portion 125 (see FIGS. 14 and 15) to the existing outer wall 11 (details will be described later). After the steel pipe nuts 24 are installed, the scaffolding on the first stage is fixed by fastening the scaffold connecting bolts 25 to the steel pipe nuts 24 . Note that scaffolds on the second and subsequent stages are also fixed by the same process.

足場つなぎボルト25及び鋼管用ナット24の締結を一旦解除し、既存外壁11の上に、防水シート14及び止水材26を敷設する(図7参照)。すなわち、防水シート14に穴をあけ、この穴から鋼管用ナット24が露出するように、防水シート14を敷設するともに、防水シート14と鋼管用ナット24との隙間に止水材26を配設して、閉塞する。防水シート14及び止水材26の敷設後に足場つなぎボルト25及び鋼管用ナット24を再び締結する。次に、フレーム30の天面フレーム31に天面開口部31Aを形成する。なお、天面開口部31Aは、予め形成しておいてもよい。
再び、足場つなぎボルト25及び鋼管用ナット24の締結を一旦解除し、X軸方向視において、天面開口部31Aと鋼管用ナット24のナットネジ溝部24A(図3参照)とが重なるように位置合わせし、既存外壁11に接する底面フレーム33の取り付け部33Aを、所定の位置に固定するとともに、固定後に足場つなぎボルト25及び鋼管用ナット24を再び締結する。図7は、その直後の状態を示している。
The fastening of the scaffolding connecting bolts 25 and the steel pipe nuts 24 is temporarily released, and the waterproof sheet 14 and the water stop material 26 are laid on the existing outer wall 11 (see FIG. 7). That is, a hole is made in the waterproof sheet 14, the waterproof sheet 14 is laid so that the steel pipe nut 24 is exposed from the hole, and a water stop material 26 is arranged in the gap between the waterproof sheet 14 and the steel pipe nut 24 to close the gap. After laying the waterproof sheet 14 and the water stop material 26, the scaffolding connecting bolts 25 and the steel pipe nuts 24 are fastened again. Next, the top surface opening 31A is formed in the top surface frame 31 of the frame 30 . Note that the top surface opening 31A may be formed in advance.
Again, the fastening of the scaffolding connecting bolt 25 and the steel pipe nut 24 is once released, and when viewed in the X-axis direction, the top opening 31A and the nut screw groove 24A (see FIG. 3) of the steel pipe nut 24 are aligned so that they overlap each other. FIG. 7 shows the state immediately after that.

図9は、フレーム30の取り付け位置(上述の所定の位置に相当する)を示す図である。フレーム30は、Z軸方向に長尺に形成されており、階高(一般的に3m弱程度)に対応する間隔で配設された横架材400に対して、取り付け部33Aが固定される(つまり、フレーム30のZ軸方向における寸法は、3m弱程度である)。これにより、フレーム30は、長手方向両端部が固定された2点支持構造となる。なお、フレーム30の固定手段には、例えば、ビスを用いることができる。
本実施形態では、第1返しフレーム34及び第2返しフレーム35を形成することによって、フレーム30の剛性が高められているため、長尺部材の2点支持構造において一般的に懸念されるフレームの撓みを抑制することができる。
また、第1返しフレーム34及び第2返しフレーム35が協働することによって、水を落水させる効果が発現される。これにより、漏水を抑制することができる。
ここで、単管足場を構築する場合、垂直方向5.5m以内、かつ、水平方向5m以内に足場つなぎを固定する必要がある。この点を踏まえて、図示例では、上側のフレーム30にだけ鋼管用ナット24を配設し、下側のフレーム30には鋼管用ナット24を配設していない。なお、枠組み足場の場合、垂直方向9m以内、かつ、水平方向8m以内に足場つなぎを固定する必要があり、足場の種別に応じて、求められる鋼管用ナット24の配設間隔が異なる。したがって、鋼管用ナット24は、全てのフレーム30に配設する必要はなく、足場の種別に応じて、適宜の位置に配設すればよい。
FIG. 9 is a diagram showing the attachment position of the frame 30 (corresponding to the predetermined position described above). The frame 30 is elongated in the Z-axis direction, and the mounting portion 33A is fixed to the horizontal members 400 arranged at intervals corresponding to the floor height (generally about 3 m) (that is, the dimension of the frame 30 in the Z-axis direction is about 3 m). As a result, the frame 30 has a two-point support structure in which both ends in the longitudinal direction are fixed. Screws, for example, can be used as means for fixing the frame 30 .
In this embodiment, since the rigidity of the frame 30 is increased by forming the first return frame 34 and the second return frame 35, it is possible to suppress the bending of the frame, which is generally a concern in the two-point support structure for long members.
Further, the cooperation of the first return frame 34 and the second return frame 35 produces an effect of letting water fall. Thereby, water leakage can be suppressed.
Here, when constructing a single-pipe scaffold, it is necessary to fix scaffolding tethers within 5.5 m in the vertical direction and within 5 m in the horizontal direction. Based on this point, in the illustrated example, the steel pipe nut 24 is provided only on the upper frame 30 and the steel pipe nut 24 is not provided on the lower frame 30 . In the case of frame scaffolding, it is necessary to fix scaffolding tethers within 9m in the vertical direction and within 8m in the horizontal direction. Therefore, the steel pipe nuts 24 need not be arranged on all the frames 30, and may be arranged at appropriate positions according to the type of scaffolding.

再び図2を参照して、新規外壁27を設置する。具体的には、新規外壁27をフレーム30の天面フレーム31及び胴縁41に対してビス28によってビス止め、固定する。なお、新規外壁27のビス止め位置には凹部が形成されており、この凹部にビス28がビス止められる。ただし、ビスではなく、引っかけ金具を用いて、新規外壁27を固定してもよい。本実施形態によれば、鋼管用ナット24に締結された足場つなぎボルト25によって、足場が強固に支持されるため、安全性が高い状態で新規外壁27を設置することができる。また、新規外壁27を設置する際に、足場つなぎボルト25を締結するために新規外壁27に穴を形成する必要がないため、新規外壁27の品質劣化(例えば、錆の発生等)を防止することができる。すなわち、図2に図示するように、鋼管用ナット24は、Y軸方向において隣り合う新規外壁(つまり、第1の新規外壁及び第2の新規外壁)の目地部に対応する位置に配設されているため、新規外壁27に穴を形成する必要がなく、新規外壁27の品質劣化(例えば、錆の発生等)を防止することができる。 Referring again to FIG. 2, a new outer wall 27 is installed. Specifically, the new outer wall 27 is screwed and fixed to the top frame 31 and furring strip 41 of the frame 30 with screws 28 . A recess is formed at the screwing position of the new outer wall 27, and a screw 28 is screwed into this recess. However, the new outer wall 27 may be fixed using hook fittings instead of screws. According to this embodiment, the scaffolding is firmly supported by the scaffolding connecting bolts 25 fastened to the steel pipe nuts 24, so that the new outer wall 27 can be installed in a highly safe state. Also, when installing the new outer wall 27, it is not necessary to form a hole in the new outer wall 27 for fastening the scaffolding connecting bolt 25, so quality deterioration (for example, rust generation) of the new outer wall 27 can be prevented. That is, as shown in FIG. 2, the steel pipe nut 24 is disposed at a position corresponding to the joint portion of the new outer wall (that is, the first new outer wall and the second new outer wall) adjacent in the Y-axis direction. Therefore, there is no need to form a hole in the new outer wall 27, and quality deterioration (for example, rusting) of the new outer wall 27 can be prevented.

新規外壁27の設置後に、銅管用ナット24及び足場つなぎボルト25の締結を解除して、隣接する新規外壁27の隙間を埋める仕上げ処理を行う。仕上げ処理の方法は、特に限定しないが、例えば、図8に図示するように、隣接する新規外壁27の隙間にハット型の化粧板51を設置するとともに、この化粧板51に対して止水材52を充填する方法を用いることができる。 After the new outer wall 27 is installed, the fastening of the copper pipe nuts 24 and the scaffolding connecting bolts 25 is released, and finishing processing is performed to fill the gaps between the adjacent new outer walls 27 . The method of finishing treatment is not particularly limited, but for example, as shown in FIG.

このように本実施形態の工法によれば、新規外壁27の内側に鋼管用ナット24を残すことができる。したがって、新規外壁27の内側に残った鋼管用ナット24を利用して、次のリフォームを行うこともできる。すなわち、化粧板51及び止水材52を取り除き、新規外壁27の内側に残った鋼管用ナット24に再び足場つなぎボルト25を締結することにより、再リフォームを行うことができる。これにより労働安全衛生規則に準拠した、強度が担保された安全性の高い足場を利用して、新規外壁の再リフォームを行うことができる。再リフォームには、既存の新規外壁27を新しい新規外壁27に張り替えること、既存の新規外壁27を残しながら、新規外壁27を補修することなどが含まれる。また、新規外壁27の内側に残った鋼管用ナット24は、足場を必要とする他のリフォーム工事(例えば、屋根の補修等その他の住宅のリフォーム工事)の際にも、利用することができる。 Thus, according to the construction method of this embodiment, the steel pipe nut 24 can be left inside the new outer wall 27 . Therefore, the steel pipe nuts 24 remaining inside the new outer wall 27 can be used for the next reform. That is, the decorative plate 51 and the water stop material 52 are removed, and the scaffolding connecting bolts 25 are fastened again to the steel pipe nuts 24 remaining inside the new outer wall 27, whereby the remodeling can be performed. As a result, it is possible to renovate new external walls using scaffolding that is strong and highly safe and conforms to occupational safety and health regulations. The remodeling includes replacing the existing new outer wall 27 with a new new outer wall 27, repairing the new outer wall 27 while leaving the existing new outer wall 27, and the like. In addition, the steel pipe nuts 24 left inside the new outer wall 27 can also be used in other renovation work that requires scaffolding (for example, other house renovation work such as roof repair).

(変形例1)
上述の実施形態では、既存外壁11に鋼管用ナット24を収容する貫通開口部11Aを形成したが、本発明はこれに限るものではなく、図10に図示するように、貫通開口部11Aを省略してもよい。この場合、フレーム30の天面フレーム31には、鋼管用ナット24を挿通するための天面開口部31Aが形成される。
ただし、実施形態で説明した図2の足場構造を採用したほうが、新規外壁27の仕上げ作業の自由度は高まる。
(Modification 1)
In the above-described embodiment, the existing outer wall 11 is formed with the through opening 11A for accommodating the steel pipe nut 24, but the present invention is not limited to this, and the through opening 11A may be omitted as shown in FIG. In this case, the top surface frame 31 of the frame 30 is formed with a top surface opening 31A through which the steel pipe nut 24 is inserted.
However, adopting the scaffold structure of FIG.

(変形例2)
上述の実施形態では、第1返しフレーム34及び第2返しフレーム35からなるフレーム30の返しをL字状に形成したが、本発明はこれに限るものではない。例えば、図11に図示するように、第1返しフレーム34及び第2フレーム35の角度αを0°以上180°未満の範囲で適宜変更してもよい。
(Modification 2)
In the above-described embodiment, the return of the frame 30 composed of the first return frame 34 and the second return frame 35 is formed in an L shape, but the present invention is not limited to this. For example, as shown in FIG. 11, the angle α of the first return frame 34 and the second frame 35 may be appropriately changed within the range of 0° or more and less than 180°.

(変形例3)
上述の実施形態では、底面フレーム33を平板状に形成したが、本発明はこれに限るものではなく、リブを形成してもよい。底面フレーム33にリブを形成することにより、フレーム30の剛性を更に高めることができる。
(Modification 3)
In the above-described embodiment, the bottom frame 33 is formed in a flat plate shape, but the present invention is not limited to this, and ribs may be formed. By forming ribs on the bottom frame 33, the rigidity of the frame 30 can be further increased.

(変形例4)
図12に図示するように、側フレーム32及び返しフレーム36をテーパ状に配設してもよい。側フレーム32は、フレーム30の幅を拡大させる方向に傾斜している。返しフレーム36は、上述の実施形態とは異なる一段構成であり、フレーム30の幅を拡大させる方向に傾斜している。この構成によれば、フレーム30の重な合わせ性及び運搬性を向上させることができる。
(Modification 4)
As shown in FIG. 12, the side frames 32 and return frames 36 may be tapered. The side frames 32 are inclined in the direction of increasing the width of the frame 30 . The return frame 36 has a single-stage structure different from that of the above-described embodiment, and is inclined in a direction to increase the width of the frame 30 . According to this configuration, stackability and transportability of the frame 30 can be improved.

(変形例5)
図13に図示するように、フレーム30を天面フレーム31、側フレーム32及び底面フレーム33から構成し、第1返しフレーム34及び第2返しフレーム35を省略してもよい。なお、本変形例5における側フレーム32は、図示するように天面フレーム31に対して垂直に配設してもよいし、テーパ状に配設してもよい。また、底面フレーム33にリブを形成して、剛性を高めてもよい。
(Modification 5)
As shown in FIG. 13, the frame 30 may be composed of a top frame 31, a side frame 32 and a bottom frame 33, and the first return frame 34 and the second return frame 35 may be omitted. The side frame 32 in Modification 5 may be arranged perpendicularly to the top frame 31 as shown in the figure, or may be arranged in a tapered shape. Further, ribs may be formed on the bottom frame 33 to increase rigidity.

(変形例6)
上述の実施形態では、鋼管用ナット24の先端にドリル21が設けられているが、本変形例6の鋼管用ナット124にはドリルが設けられていない。また、本変形例6の鋼管用ナット124の下端部には、ナット平板部125が設けられている。図14は、鋼管用ナット124及びナット平板部125の斜視図である。図15は、図10に対応しており、本変形例6に係る鋼管用ナット124及びナット平板部125の配設位置を示している。
(Modification 6)
In the above-described embodiment, the drill 21 is provided at the tip of the steel pipe nut 24, but the steel pipe nut 124 of Modification 6 is not provided with the drill. A nut flat plate portion 125 is provided at the lower end portion of the steel pipe nut 124 of Modification 6. As shown in FIG. 14 is a perspective view of the steel pipe nut 124 and the nut plate portion 125. FIG. FIG. 15 corresponds to FIG. 10 and shows the arrangement positions of the steel pipe nut 124 and the nut plate portion 125 according to the sixth modification.

これらの図を参照して、鋼管用ナット124及びナット平板部125は一体的に形成されており、ナット平板部125は既存外壁11に沿って配設されている。ナット平板部125は、平面視長方形に形成されており、長辺がZ軸方向(以下、長手方向ともいう)に対応しており、短辺がY軸方向(以下、短手方向ともいう)に対応している。鋼管用ナット124は、ナット平板部125の略真中に配設されており、鋼管用ナット124の内周面には、足場つなぎボルト25を締結するためのネジ溝が切られている。 Referring to these figures, the steel pipe nut 124 and the nut flat plate portion 125 are integrally formed, and the nut flat plate portion 125 is arranged along the existing outer wall 11 . The nut flat plate portion 125 is formed in a rectangular shape in plan view, with long sides corresponding to the Z-axis direction (hereinafter also referred to as the longitudinal direction) and short sides corresponding to the Y-axis direction (hereinafter also referred to as the short direction). The steel pipe nut 124 is arranged substantially in the middle of the nut plate portion 125 , and the inner peripheral surface of the steel pipe nut 124 is threaded for fastening the scaffolding connecting bolt 25 .

ナット平板部125には、第1の締結孔125A及び第2の締結孔125Bが形成されている。第1の締結孔125Aは、鋼管用ナット124を挟んだ左右両側に形成されており、ナット平板部125の長手方向(Z軸方向)に沿って、互い違いとなる位置に形成されている。ただし、第1の締結孔125Aは、ナット平板部125の長手方向(Z軸方向)に沿って、一直線上に並ぶ位置に形成してもよい。本変形例では、鋼管用ナット124の左側2か所、右側2か所に第1の締結孔125Aを形成したが、本発明はこれに限るものではなく、左側及び右側のそれぞれ1か所に形成してもよいし、3か所以上に形成してもよい。第2の締結孔125Bは、鋼管用ナット124の直下、言い換えると、平面視において鋼管用ナット124の内側の略中央に形成されている。 The nut flat plate portion 125 is formed with a first fastening hole 125A and a second fastening hole 125B. The first fastening holes 125A are formed on both left and right sides of the steel pipe nut 124, and are formed at staggered positions along the longitudinal direction (Z-axis direction) of the nut flat plate portion 125. However, the first fastening holes 125A may be formed at positions aligned along the longitudinal direction (Z-axis direction) of the nut flat plate portion 125 . In this modification, the first fastening holes 125A are formed in two places on the left side and two places on the right side of the steel pipe nut 124, but the present invention is not limited to this, and may be formed in one place on each of the left side and the right side, or may be formed in three or more places. The second fastening hole 125B is formed directly below the steel pipe nut 124, in other words, substantially at the center inside the steel pipe nut 124 in plan view.

各第1の締結孔125A及び第2の締結孔125Bには、ビス126が締結されている。図15には、第2の締結孔125Bに締結されたビス126を図示している。各ビス126は、略同じ長さに形成されており、既存外壁11及び構造フレーム13を貫通して、室内側に延びている。なお、既存外壁11と構造フレーム13との間に下地12が介在している領域にビス126が締結された場合、ビス126は、既存外壁11、下地12及び構造フレーム13を貫通して、室内側に延びる。 A screw 126 is fastened to each of the first fastening holes 125A and the second fastening holes 125B. FIG. 15 illustrates the screw 126 fastened to the second fastening hole 125B. Each screw 126 has substantially the same length, penetrates the existing outer wall 11 and the structural frame 13, and extends into the room. When the screws 126 are fastened to the area where the base 12 is interposed between the existing outer wall 11 and the structural frame 13, the screws 126 penetrate the existing outer wall 11, the base 12 and the structural frame 13 and extend into the room.

本変形例6の構成によれば、鋼管用ナット124がナット平板部125を介して複数のビス126によって既存外壁11に締結固定されるため、足場つなぎボルト25の保持力を高めることができる。 According to the configuration of Modification 6, the steel pipe nut 124 is fastened and fixed to the existing outer wall 11 by a plurality of screws 126 via the nut plate portion 125, so that the holding force of the scaffolding connecting bolt 25 can be increased.

なお、第2の締結孔125Bは省略してもよい。この場合、ナット平板部125は、第1の締結孔125Aに締結されたビス126のみによって固定される。ただし、この構成であっても、上述の実施形態に記載したドリル21のみで固定する方法よりも、足場つなぎボルト25の保持力を高めることができる。 Note that the second fastening hole 125B may be omitted. In this case, the nut plate portion 125 is fixed only by the screws 126 fastened to the first fastening holes 125A. However, even with this configuration, it is possible to increase the holding force of the scaffolding connecting bolt 25 as compared with the method of fixing only with the drill 21 described in the above-described embodiment.

11 既存外壁
12 下地
13 構造フレーム
14 防水シート
21 ドリル
21A 刃部
21B ネジ部
23 座金
24 鋼管用ナット
25 足場つなぎボルト
26 52 止水材
27 新規外壁
28 ビス
30 フレーム
31 天面フレーム
31A 天面開口部
32 側フレーム
33 底面フレーム
34 第1返しフレーム
35 第2返しフレーム
36 返しフレーム
41 42 胴縁
51 化粧板
124 鋼管用ナット
125 ナット平板部
125A 第1の締結孔
125B 第2の締結孔
126 ビス
11 Existing outer wall 12 Base 13 Structural frame 14 Waterproof sheet 21 Drill 21A Blade 21B Threaded portion 23 Washer 24 Steel pipe nut 25 Scaffold connection bolt 26 52 Water stop material 27 New outer wall 28 Screw 30 Frame 31 Top frame 31A Top opening 32 Side frame 33 Bottom frame 34 First return frame 35 Second return frame 36 Return frame 41 42 Trunk Edge 51 Decorative plate 124 Steel pipe nut 125 Nut plate portion 125A First fastening hole 125B Second fastening hole 126 Screw

Claims (12)

既存外壁と新規外壁との間にフレームを設置して外壁のリフォームを行う外壁のリフォーム方法であって、
前記フレームは、鋼管用ナット又は足場つなぎボルトを挿通するための天面開口部が形成され、前記新規外壁に固定される天面フレームと、前記既存外壁に設置される底面フレームと、前記天面フレーム及び前記底面フレームを繋ぐ側フレームと、を有し、
前記鋼管用ナットのドリルを前記既存外壁の下地に差し込んで固定する固定工程、又は、前記鋼管用ナットのナット平板部を前記既存外壁に固定する固定工程のうちいずれかを実施する第1工程と、
前記天面開口部が前記鋼管用ナットに対応した位置に配設されるように、前記底面フレームを前記既存外壁に設置する第2工程と、
前記底面フレームの長手方向における両端部を固定する第3工程と、
前記天面フレームにおける前記天面開口部を避けた面に前記新規外壁を固定する第4工程と、
を有することを特徴とする外壁のリフォーム方法。
A method of remodeling an exterior wall by installing a frame between an existing exterior wall and a new exterior wall to renovate the exterior wall, comprising :
The frame has a top surface opening for inserting a steel pipe nut or scaffolding connecting bolt, and includes a top surface frame fixed to the new outer wall, a bottom frame installed on the existing outer wall, and a side frame connecting the top frame and the bottom frame,
a first step of performing either a fixing step of inserting a drill of the steel pipe nut into the base of the existing outer wall and fixing it, or a fixing step of fixing the nut plate portion of the steel pipe nut to the existing outer wall;
a second step of installing the bottom frame on the existing outer wall so that the top surface opening is disposed at a position corresponding to the steel pipe nut;
a third step of fixing both ends in the longitudinal direction of the bottom frame;
a fourth step of fixing the new outer wall to a surface of the top surface frame that avoids the top surface opening;
A method for remodeling an outer wall, comprising:
前記フレームは、前記底面フレームの端部に形成される返しフレームを有することを特徴とする請求項1に記載の外壁のリフォーム方法。2. The method of remodeling an outer wall according to claim 1, wherein said frame has a return frame formed at the end of said bottom frame. 前記返しフレームは、L字状に折れ曲がっていることを特徴とする請求項2に記載の外壁のリフォーム方法。3. The method of remodeling an outer wall according to claim 2, wherein the return frame is bent in an L shape. 前記第1工程は、前記下地に差し込まれた前記鋼管用ナットに足場つなぎボルトを締結して足場を固定する工程を有しており、
さらに、前記第2工程の前に、前記鋼管用ナット及び前記足場つなぎボルトの締結を一時的に解除する工程と、
前記第3工程の後、前記第4工程の前に前記鋼管用ナット及び前記足場つなぎボルトを再び締結する工程と、
を有することを特徴とする請求項1乃至3のうちいずれか一つに記載の外壁のリフォーム方法。
The first step includes a step of fixing a scaffolding by fastening a scaffolding connecting bolt to the steel pipe nut inserted into the base,
Furthermore, a step of temporarily releasing the fastening of the steel pipe nut and the scaffolding connecting bolt before the second step;
a step of re-fastening the steel pipe nut and the scaffolding connecting bolt after the third step and before the fourth step;
The method for remodeling an outer wall according to any one of claims 1 to 3, characterized by comprising:
前記第4工程において、前記天面開口部を挟んだ一方側に第1の新規外壁を固定し、他方側に第2の新規外壁を固定することを特徴とする請求項1乃至3のうちいずれか一つに記載の外壁のリフォーム方法。 4. The outer wall renovation method according to any one of claims 1 to 3, wherein in the fourth step, a first new outer wall is fixed to one side of the top face opening, and a second new outer wall is fixed to the other side. 前記第1の新規外壁及び前記第2の新規外壁の間の目地部に対応する位置に、前記鋼管用ナットは配設されていることを特徴とする請求項に記載の外壁のリフォーム方法。 6. The method of reforming an outer wall according to claim 5 , wherein said steel pipe nut is disposed at a position corresponding to a joint portion between said first new outer wall and said second new outer wall. 前記第3工程において、住宅の横架材に対して、前記底面フレームの長手方向における両端部を固定することを特徴とする請求項1乃至3のうちいずれか一つに記載の外壁のリフォーム方法。 4. The method of remodeling an outer wall according to claim 1, wherein in the third step, both ends of the bottom frame in the longitudinal direction are fixed to horizontal members of the house. 前記フレームの長手方向は、住宅の高さ方向に対応していることを特徴とする請求項1乃至3のうちいずれか一つに記載の外壁のリフォーム方法。 4. The exterior wall renovation method according to claim 1 , wherein the longitudinal direction of the frame corresponds to the height direction of the house. 足場構造を用いた外壁のリフォーム方法であって、
前記足場構造は、フレーム及び鋼管用ナットを含み、
前記フレームは、既存外壁の上に新規外壁を重ねて敷設するリフォームの際に、前記既存外壁と前記新規外壁との間に設置されるフレームであって、前記鋼管用ナット又は足場つなぎボルトを挿通するための天面開口部が形成され、前記新規外壁に固定される天面フレームと、前記既存外壁に設置される底面フレームと、前記天面フレーム及び前記底面フレームを繋ぐ側フレームと、を有し、
前記鋼管用ナットは、前記既存外壁の下地に差し込まれるドリルを先端に有し、かつ、前記新規外壁よりも前記既存外壁に近接した位置に配設され、
前記鋼管用ナットに対して、足場を固定するための前記足場つなぎボルトを締結することによって足場を固定し、新規外壁の再リフォームを行うことを特徴とするリフォーム方法。
A method for remodeling an outer wall using a scaffolding structure,
The scaffolding structure includes a frame and nuts for steel pipes,
The frame is a frame installed between the existing outer wall and the new outer wall during renovation in which the new outer wall is laid on top of the existing outer wall, and is provided with a top surface opening for inserting the steel pipe nut or scaffolding connecting bolt, and is fixed to the new outer wall.
The steel pipe nut has a drill at its tip that is inserted into the base of the existing outer wall, and is arranged at a position closer to the existing outer wall than the new outer wall,
A remodeling method, wherein the scaffolding is fixed by fastening the scaffolding connecting bolts for fixing the scaffolding to the steel pipe nuts, and the new outer wall is re-reformed.
足場構造を用いた外壁のリフォーム方法であって、
前記足場構造は、フレーム及び鋼管用ナットを含み、
前記フレームは、既存外壁の上に新規外壁を重ねて敷設するリフォームの際に、前記既存外壁と前記新規外壁との間に設置されるフレームであって、前記鋼管用ナット又は足場つなぎボルトを挿通するための天面開口部が形成され、前記新規外壁に固定される天面フレームと、前記既存外壁に設置される底面フレームと、前記天面フレーム及び前記底面フレームを繋ぐ側フレームと、を有し、
前記鋼管用ナットは、前記既存外壁に沿って延びるナット平板部を有し、かつ、前記新規外壁よりも前記既存外壁に近接した位置に配設されており、
前記ナット平板部は、前記鋼管用ナットを挟んだ両側に第1の締結孔を有しており、
前記鋼管用ナットに対して、足場を固定するための前記足場つなぎボルトを締結することによって足場を固定し、新規外壁の再リフォームを行うことを特徴とするリフォーム方法。
A method for remodeling an outer wall using a scaffolding structure,
The scaffolding structure includes a frame and nuts for steel pipes,
The frame is a frame installed between the existing outer wall and the new outer wall during renovation in which the new outer wall is laid on top of the existing outer wall, and is provided with a top surface opening for inserting the steel pipe nut or scaffolding connecting bolt, and is fixed to the new outer wall.
The steel pipe nut has a nut plate portion extending along the existing outer wall, and is arranged at a position closer to the existing outer wall than the new outer wall,
The nut flat plate portion has first fastening holes on both sides of the steel pipe nut,
A remodeling method, wherein the scaffolding is fixed by fastening the scaffolding connecting bolts for fixing the scaffolding to the steel pipe nuts, and the new outer wall is re-reformed.
足場構造を用いたリフォーム方法であって、
前記足場構造は、フレーム及び鋼管用ナットを含み、
前記フレームは、既存外壁の上に新規外壁を重ねて敷設するリフォームの際に、前記既存外壁と前記新規外壁との間に設置されるフレームであって、前記鋼管用ナット又は足場つなぎボルトを挿通するための天面開口部が形成され、前記新規外壁に固定される天面フレームと、前記既存外壁に設置される底面フレームと、前記天面フレーム及び前記底面フレームを繋ぐ側フレームと、を有し、
前記鋼管用ナットは、前記既存外壁の下地に差し込まれるドリルを先端に有し、かつ、前記新規外壁よりも前記既存外壁に近接した位置に配設され、
前記鋼管用ナットに対して、足場を固定するための前記足場つなぎボルトを締結することによって足場を固定し、リフォームを行うことを特徴とするリフォーム方法。
A renovation method using a scaffolding structure,
The scaffolding structure includes a frame and nuts for steel pipes,
The frame is a frame installed between the existing outer wall and the new outer wall during renovation in which the new outer wall is laid on top of the existing outer wall, and is provided with a top surface opening for inserting the steel pipe nut or scaffolding connecting bolt, and is fixed to the new outer wall.
The steel pipe nut has a drill at its tip that is inserted into the base of the existing outer wall, and is arranged at a position closer to the existing outer wall than the new outer wall,
A remodeling method comprising fixing the scaffolding by tightening the scaffolding connecting bolts for fixing the scaffolding to the steel pipe nuts, and performing the remodeling.
足場構造を用いたリフォーム方法であって、
前記足場構造は、フレーム及び鋼管用ナットを含み、
前記フレームは、既存外壁の上に新規外壁を重ねて敷設するリフォームの際に、前記既存外壁と前記新規外壁との間に設置されるフレームであって、前記鋼管用ナット又は足場つなぎボルトを挿通するための天面開口部が形成され、前記新規外壁に固定される天面フレームと、前記既存外壁に設置される底面フレームと、前記天面フレーム及び前記底面フレームを繋ぐ側フレームと、を有し、
前記鋼管用ナットは、前記既存外壁に沿って延びるナット平板部を有し、かつ、前記新規外壁よりも前記既存外壁に近接した位置に配設されており、
前記ナット平板部は、前記鋼管用ナットを挟んだ両側に第1の締結孔を有しており、
前記鋼管用ナットに対して、足場を固定するための前記足場つなぎボルトを締結することによって足場を固定し、リフォームを行うことを特徴とするリフォーム方法。

A renovation method using a scaffolding structure,
The scaffolding structure includes a frame and nuts for steel pipes,
The frame is a frame installed between the existing outer wall and the new outer wall during renovation in which the new outer wall is laid on top of the existing outer wall, and is provided with a top surface opening for inserting the steel pipe nut or scaffolding connecting bolt, and is fixed to the new outer wall.
The steel pipe nut has a nut plate portion extending along the existing outer wall, and is arranged at a position closer to the existing outer wall than the new outer wall,
The nut flat plate portion has first fastening holes on both sides of the steel pipe nut,
A renovation method comprising fixing the scaffolding by tightening the scaffolding connecting bolts for fixing the scaffolding to the steel pipe nuts, and performing the renovation.

JP2023020644A 2022-08-25 2023-02-14 Renovation method of frame, scaffolding structure and outer wall Active JP7314431B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2022133788 2022-08-25
JP2022133788 2022-08-25

Publications (2)

Publication Number Publication Date
JP7314431B1 true JP7314431B1 (en) 2023-07-25
JP2024031753A JP2024031753A (en) 2024-03-07

Family

ID=87428109

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2023020644A Active JP7314431B1 (en) 2022-08-25 2023-02-14 Renovation method of frame, scaffolding structure and outer wall

Country Status (1)

Country Link
JP (1) JP7314431B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015064047A (en) 2013-09-25 2015-04-09 積水化学工業株式会社 Metal fitting for fixture and its method of application
JP2015190135A (en) 2014-03-27 2015-11-02 大和ハウス工業株式会社 Fixture for scaffold tie members
JP2021143531A (en) 2020-03-12 2021-09-24 トヨタホーム株式会社 Building girth part structure
JP2022057487A (en) 2020-09-30 2022-04-11 ニチハ株式会社 Auxiliary member for wall material, wall structure, and wall material construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015064047A (en) 2013-09-25 2015-04-09 積水化学工業株式会社 Metal fitting for fixture and its method of application
JP2015190135A (en) 2014-03-27 2015-11-02 大和ハウス工業株式会社 Fixture for scaffold tie members
JP2021143531A (en) 2020-03-12 2021-09-24 トヨタホーム株式会社 Building girth part structure
JP2022057487A (en) 2020-09-30 2022-04-11 ニチハ株式会社 Auxiliary member for wall material, wall structure, and wall material construction method

Also Published As

Publication number Publication date
JP2024031753A (en) 2024-03-07

Similar Documents

Publication Publication Date Title
US9428902B1 (en) Bracket for multi-story buildings
US9181716B1 (en) System for mounting elongated panels to a substructure
KR101615126B1 (en) Outer insulation system and installation method of outer wall using it
JP7314431B1 (en) Renovation method of frame, scaffolding structure and outer wall
KR100655890B1 (en) Drywall system and its construction method using panel type steel plates
JP6666677B2 (en) Refractory cladding and columns with refractory cladding
JP5603530B2 (en) Renovation structure of existing outer wall
JP5461279B2 (en) building
JP5321974B2 (en) Brick wall seismic structure for brick building
JP6389376B2 (en) Ceiling board mounting apparatus, ceiling structure using the same, and construction method therefor
JP4217249B2 (en) Containment structure of beam steel frame and ceiling material in roof repair ceiling
KR101447359B1 (en) Method for installing ALC panel to concrete slab using insert channel
KR20100135348A (en) Iron frame preceding installation method for construction and structure of supre multistoried building elevator
JP2011226185A (en) Brick masonry structure
JP2021004494A (en) Fireproof structure of beam and its construction method
JP6997947B2 (en) Installation structure of stud material
JP7193368B2 (en) roof panel
JP7206805B2 (en) Thermal insulation structure of building and its construction method
JP7401377B2 (en) wooden building floor panels
JP7213089B2 (en) Corner cover and installation structure for external corner post and corner cover
JP7100378B2 (en) Height-adjustable external seismic retrofitting device
JP5427059B2 (en) Corner wall panel mounting method and structure
JP7036647B2 (en) Waterproof sheet repair structure and waterproof sheet repair method
JP2007100470A (en) Construction method of rebuilding into house with rooftop
JP5010361B2 (en) Large wall panel installation structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230313

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20230313

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230530

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230608

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230620

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230712

R150 Certificate of patent or registration of utility model

Ref document number: 7314431

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150