JP7297344B1 - CONCRETE FORM EQUIPMENT COMPONENT UNIT, CONCRETE FORM EQUIPMENT CONVEYING METHOD, CONCRETE FORM EQUIPMENT CONSTRUCTION METHOD, AND CONCRETE FORM EQUIPMENT DISASSEMBLY METHOD - Google Patents

CONCRETE FORM EQUIPMENT COMPONENT UNIT, CONCRETE FORM EQUIPMENT CONVEYING METHOD, CONCRETE FORM EQUIPMENT CONSTRUCTION METHOD, AND CONCRETE FORM EQUIPMENT DISASSEMBLY METHOD Download PDF

Info

Publication number
JP7297344B1
JP7297344B1 JP2022185600A JP2022185600A JP7297344B1 JP 7297344 B1 JP7297344 B1 JP 7297344B1 JP 2022185600 A JP2022185600 A JP 2022185600A JP 2022185600 A JP2022185600 A JP 2022185600A JP 7297344 B1 JP7297344 B1 JP 7297344B1
Authority
JP
Japan
Prior art keywords
members
tunnel
concrete
constituent
structural
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022185600A
Other languages
Japanese (ja)
Other versions
JP2024074456A (en
Inventor
実 土田
Original Assignee
島工業Hd株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 島工業Hd株式会社 filed Critical 島工業Hd株式会社
Priority to JP2022185600A priority Critical patent/JP7297344B1/en
Application granted granted Critical
Publication of JP7297344B1 publication Critical patent/JP7297344B1/en
Publication of JP2024074456A publication Critical patent/JP2024074456A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/56Reuse, recycling or recovery technologies of vehicles

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

Figure 0007297344000001

【課題】トンネル建設の工期を短縮すること。
【解決手段】トンネルの内部に覆工コンクリートを成形するために用いられるコンクリート型枠装置は、トンネルの幅方向の両側に設置される側壁と、その両側壁の上部間に架設される橋架部とが設けられたガントリを備える。そのガントリの上部に覆工コンクリートを成形するためのフォームが支持される。コンクリート型枠装置の構築に際しては、組立順序が連続するとともに、一方向に延びる壁部材151と、ガントリ上部を構成する桁材14とを連結部材によって並設状態で連結して構成部材ユニットを構成する。この構成部材ユニットがトラックTR1によって搬送される。
【選択図】図12

Figure 0007297344000001

An object of the present invention is to shorten the construction period for tunnel construction.
A concrete formwork device used to mold lining concrete inside a tunnel includes side walls installed on both sides in the width direction of the tunnel, and a bridge section built between the upper parts of the both side walls. provided with a gantry. A form for casting lining concrete is supported on top of the gantry. When constructing the concrete formwork apparatus, the assembling order is continuous, and the component unit is configured by connecting the wall member 151 extending in one direction and the beam member 14 forming the upper part of the gantry in parallel with the connecting member. do. This component unit is transported by the track TR1.
[Selection drawing] Fig. 12

Description

本発明は、トンネルの覆工コンクリートを成形するためのコンクリート型枠装置に関するものである。特に、本発明は、コンクリート型枠装置の構成部材ユニット、コンクリート型枠装置の搬送方法、コンクリート型枠装置の構築方法及びコンクリート型枠装置の解体方法に関するものである。 TECHNICAL FIELD The present invention relates to a concrete formwork apparatus for forming lining concrete for tunnels. In particular, the present invention relates to a component unit of a concrete formwork apparatus, a method of transporting the concrete formwork apparatus, a method of constructing the concrete formwork apparatus, and a method of dismantling the concrete formwork apparatus.

例えば、特許文献1~3には、コンクリート型枠装置を用いてトンネルの覆工コンクリートを効率的に打設するようにした構築方法が開示されている。 For example, Patent Literatures 1 to 3 disclose a construction method in which a concrete formwork device is used to efficiently cast tunnel lining concrete.

特開2009-209657号公報JP 2009-209657 A 特開2014-202040号公報JP 2014-202040 A 特開2020-176400号公報Japanese Patent Application Laid-Open No. 2020-176400

特許文献1~3の技術においては、トンネルの覆工コンクリートを効率的に打設するということについて言及されている。しかし、特許文献1~3の技術においては、覆工コンクリートの打設だけではなく、コンクリート型枠装置の構成部材のトンネル内への搬入等の工程も含めて、トンネル建設工事の効率化を目指すものとは言い難い。例えば、コンクリート型枠装置のトンネル建設現場に対する同装置の構成部材の搬入において、従来は、同じ形状の部材をひとまとめにしてコンクリート型枠装置の構築予定位置の近くの位置まで運んで、その位置の地面に降ろす。そして、その地面上で、各種の部材を組立てて、より大きな構成部材とする。そして、その構成部材によってコンクリート型枠装置を構築する。 The techniques of Patent Documents 1 to 3 refer to efficient placement of tunnel lining concrete. However, the techniques of Patent Documents 1 to 3 aim to improve the efficiency of tunnel construction work, including not only the placement of lining concrete but also the process of carrying the constituent members of the concrete formwork device into the tunnel. Hard to say. For example, when carrying the components of a concrete formwork apparatus to a tunnel construction site, conventionally, members of the same shape are collectively transported to a position near the planned construction position of the concrete formwork apparatus, and then placed at that position. drop it on the ground. Then, on the ground, various members are assembled to form a larger component. Then, a concrete formwork device is constructed from the constituent members.

従って、狭いトンネル内であっても、広いエリアが部材置き場や、部材組立てエリアとして占拠される。さらには、組立てられた構成部材の仮置場も必要になる。このため、長期間にわたって作業車両や作業人員のトンネル内の通行や移動が規制されることになる。その結果、トンネルの建設工期が長くなる。 Therefore, even in a narrow tunnel, a wide area is occupied as a material storage area or a material assembly area. Furthermore, a temporary storage site for the assembled components is also required. For this reason, for a long period of time, work vehicles and workers are restricted from passing and moving in the tunnel. As a result, the construction period of the tunnel is lengthened.

本発明のコンクリート型枠装置の構成部材ユニットにおいては、トンネルの幅方向の両側に設置される側壁と、その両側壁の上部間に架設される橋架部とを備えたガントリの上部に、前記トンネルの覆工コンクリートを成形するためのフォームを支持するコンクリート型枠装置において、前記コンクリート型枠装置を構成する複数の構成部材は、一方向に揃えたうえ、組立順序に従う組合わせの設置状態で連結部材によって連結され、前記連結部材は、第1連結部材と、第2連結部材と、を備え、前記複数の構成部材は、複数の第1構成部材と、前記複数の第1構成部材よりも組立順序が後である複数の第2構成部材とを備え、前記複数の第1構成部材は、前記第1連結部材によって連結されることにより第1構成部材ユニットを構成し、前記複数の第2構成部材は、前記第2連結部材によって連結されることにより第2構成部材ユニットを構成することを特徴とする。 In the structural member unit of the concrete formwork apparatus of the present invention, above the gantry provided with the side walls installed on both sides in the width direction of the tunnel and the bridge section constructed between the upper parts of the both side walls, the tunnel In the concrete formwork device for supporting the form for forming the lining concrete of (1), the plurality of constituent members constituting the concrete formwork device are arranged in one direction and connected in a combination installation state according to the order of assembly. connected by a member, said connecting member comprising a first connecting member and a second connecting member, said plurality of components being more assembled than said plurality of first components and said plurality of first components; a plurality of second constituent members whose order is later, wherein the plurality of first constituent members are connected by the first connecting member to form a first constituent member unit; and the plurality of second constituent members The members are characterized by constituting a second component member unit by being connected by the second connecting member.

以上の構成部材ユニットにおいては、一方向に延びる複数の構成部材を並設状態で連結することによって、構成部材が嵩張ることなく、安定状態となる。このため、構成部材ユニットをトラックの荷台に安定した起立状態で積載することができるので、構成部材ユニットを適切に搬送できる。そして、トンネルの建設現場においては、構成部材の組立順序に従ってクレーンによって吊上げるとともに、そのまま組立予定位置に荷降ろしすれば、構成部材の組立を容易かつ短時間で行うことができる。従って、構成部材をトンネル内の地面に仮置きしたり、その仮置き位置から組立位置に移動させたりする必要がないので、作業車両等の移動規制の時間を短くできる。その結果、構成部材の組立時間が短くなることと相まって、トンネル建設の工期を短縮できる。 In the structural member unit described above, a plurality of structural members extending in one direction are connected side by side, so that the structural members are not bulky and can be in a stable state. Therefore, the component units can be stably loaded on the bed of the truck in an upright state, so that the component units can be transported appropriately. At the construction site of the tunnel, the components can be assembled easily and in a short time by lifting them up with a crane according to the order of assembling the components and unloading them to the planned assembly position. Therefore, there is no need to temporarily place the constituent members on the ground in the tunnel or to move them from the temporary placement position to the assembly position, so that the time required for movement regulation of the work vehicle or the like can be shortened. As a result, the construction period for tunnel construction can be shortened together with the shortened assembly time of the constituent members.

本発明のコンクリート型枠装置の搬送方法においては、トンネルの幅方向の両側に設置される側壁と、その両側壁の上部間に架設される橋架部とを備えたガントリの上部に、前記トンネルの覆工コンクリートを成形するためのフォームを支持するコンクリート型枠装置において、一方向に延びる複数の構成部材のうち複数の第1構成部材を第1連結部材によって連結することにより第1構成部材ユニットを構成し、前記複数の構成部材のうち、前記複数の第1構成部材よりも組立順序が後である複数の第2構成部材を第2連結部材によって連結することにより第2構成部材ユニットを構成し、前記第1構成部材ユニットを、前記複数の第1構成部材の長さ方向がトラックの荷台の前後方向に沿うように前記荷台に積載した状態で搬送し、前記第2構成部材ユニットを、前記複数の第2構成部材の長さ方向がトラックの荷台の前後方向に沿うように前記荷台に積載した状態で搬送することを特徴とする。 In the method of transporting the concrete formwork apparatus of the present invention, a gantry having side walls installed on both sides in the width direction of the tunnel and a bridge section constructed between the upper parts of the both side walls is provided with the tunnel. In a concrete formwork apparatus for supporting a form for molding lining concrete, a first component unit is formed by connecting a plurality of first component members out of a plurality of component members extending in one direction with a first connecting member. and, among the plurality of constituent members, a second constituent member unit is constituted by connecting a plurality of second constituent members that are assembled later than the plurality of first constituent members with a second connecting member. , the first component unit is conveyed in a state of being loaded on the bed of the truck such that the longitudinal direction of the plurality of first components is along the front-rear direction of the bed of the truck; It is characterized in that the plurality of second constituent members are conveyed while being loaded on the loading platform of the truck such that the longitudinal direction of the plurality of second structural members extends along the longitudinal direction of the loading platform of the truck.

本発明のコンクリート型枠装置の搬送方法においては、構成部材を荷台のスペースを有効利用して荷台からはみ出ることなく積載できる。そして、前記のように、構成部材の搬送に際して、積載された構成部材を起立状態で安定させることができる。また、構成部材が型枠装置として組付ける順序に従ってトラック荷台に積載される。従って、構成部材をトラック荷台から組付け位置にクレーンで吊って移動するだけで、その構成部材を型枠装置の所要箇所に組けることができる。このため、型枠装置の構築を短時間で効率的に実行できる。よって、トンネル建設の工期を短縮できる。 In the conveying method of the concrete formwork apparatus of the present invention, the constituent members can be loaded without protruding from the loading platform by effectively utilizing the space of the loading platform. Further, as described above, when the structural members are transported, the stacked structural members can be stabilized in an upright state. Also, the constituent members are loaded onto the truck bed according to the order in which they are assembled as a formwork device. Therefore, the structural member can be assembled at the desired location of the formwork apparatus simply by moving the structural member from the truck bed to the installation position by hanging it with a crane. Therefore, the construction of the formwork device can be executed efficiently in a short period of time. Therefore, the construction period for tunnel construction can be shortened.

本発明のコンクリート型枠装置の構築方法においては、トンネルの幅方向の両側に設置される側壁と、その両側壁の上部間に架設される橋架部とを備えたガントリの上部に、前記トンネルの覆工コンクリートを成形するためのフォームを支持するコンクリート型枠装置の構築方法において、一方向に延びる複数の構成部材のうち複数の第1構成部材を第1連結部材によって連結することにより構成した第1構成部材ユニットを前記トンネルの建設現場に搬送し、前記複数の構成部材のうち、前記複数の第1構成部材よりも組立順序が後である複数の第2構成部材を第2連結部材によって連結することにより構成した第2構成部材ユニットを前記トンネルの建設現場に搬送し、前記トンネルの建設現場において前記第1構成部材ユニットから前記複数の第1構成部材を分離した後に、前記第2構成部材ユニットから前記複数の第2構成部材を分離して前記コンクリート型枠装置を構築することを特徴とする。 In the method of constructing the concrete formwork apparatus of the present invention, a gantry having side walls installed on both sides in the width direction of the tunnel and a bridge section constructed between the upper parts of the both side walls is provided with the tunnel. In a method for constructing a concrete formwork apparatus for supporting a form for molding lining concrete, a first component formed by connecting a plurality of first component members among a plurality of component members extending in one direction by a first connection member. One structural member unit is transported to the construction site of the tunnel, and among the plurality of structural members, a plurality of second structural members whose assembly order is later than the plurality of first structural members are connected by a second connecting member. to the construction site of the tunnel, and at the construction site of the tunnel , after separating the plurality of first components from the first component unit, the second The concrete forming apparatus is constructed by separating the plurality of second constituent members from the constituent member unit .

従って、以上のコンクリート型枠装置の構築方法においては、前記のように、構成部材が嵩張ることなく、安定状態となるため、構成部材ユニットをトラックの荷台に安定した起立状態で積載することができる。そして、トンネルの建設現場においては、構成部材をその組立順序に従って荷降ろしできる。よって、構成部材の仮置きや、その仮置き位置から組立位置への移動等が不要になるため、トンネル建設の工期を短縮できる。 Therefore, in the method for constructing the concrete formwork apparatus described above, the constituent members are not bulky and are in a stable state, so that the constituent member units can be stably loaded on the bed of the truck in an upright state. . At the construction site of the tunnel, the components can then be unloaded according to their order of assembly. Therefore, it is not necessary to temporarily place the constituent members or to move them from the temporary placement position to the assembly position, thereby shortening the construction period for tunnel construction.

本発明のコンクリート型枠装置の解体方法においては、トンネルの幅方向の両側に設置される側壁と、その両側壁の上部間に架設される橋架部とを備えたガントリの上部に、前記トンネルの覆工コンクリートを成形するためのフォームを支持するコンクリート型枠装置において、一方向に延びる複数の構成部材のうち複数の第2構成部材を分割した後に、前記複数の第2構成部材を分解順に従って第2連結部材によって連結することにより第2構成部材ユニットを構成し、前記複数の構成部材のうち、前記複数の第2構成部材よりも分解順序が後である複数の第1構成部材を分解した後に、前記複数の第1構成部材を分解順に従って第1連結部材によって連結することにより第1構成部材ユニットを構成することを特徴とする。 In the method for dismantling a concrete formwork apparatus according to the present invention, a gantry having side walls installed on both sides in the width direction of the tunnel and a bridge section constructed between the upper parts of the both side walls is provided with the tunnel. In a concrete formwork apparatus for supporting a form for molding lining concrete, after dividing a plurality of second constituent members out of a plurality of constituent members extending in one direction, the plurality of second constituent members are separated according to the order of disassembly. A second structural member unit is formed by connecting with a second connecting member, and among the plurality of structural members, a plurality of first structural members whose disassembly order is later than the plurality of second structural members are disassembled . The first structural member unit is constructed by connecting the plurality of first structural members by a first connecting member in the disassembled order later .

以上のコンクリート型枠装置の解体方法においては、構成部材をその分解順序に従ってクレーンによってトラックの荷台に積載できる。そして、一方向に延びる複数の構成部材を並設状態で連結することによって、構成部材が嵩張ることなく、安定状態となる。このため、構成部材の分解を短時間でできるとともに、構成部材ユニットをトラックによって適切に撤去できる。そして、撤去の際には、構成部材をトンネル内の地面に仮置きしたり、その仮置き位置からトラックの荷台に移動させたりする必要がないので、作業車両の移動規制の時間を短くできる。その結果、構成部材の分解時間が短くなることと相まって、トンネル建設の工期を短縮できる。 In the method for dismantling the concrete formwork apparatus described above, the constituent members can be loaded onto the bed of the truck by the crane according to the order of disassembly. By connecting a plurality of structural members extending in one direction in parallel, a stable state can be achieved without bulky structural members. Therefore, the constituent members can be disassembled in a short time, and the constituent member units can be appropriately removed by the track. When removing, it is not necessary to temporarily place the constituent members on the ground in the tunnel or move them from the temporary placement position to the bed of the truck. As a result, the construction period for tunnel construction can be shortened, coupled with shortening the disassembly time of the constituent members.

本発明は、トンネル建設の工期を短縮できる効果を有する。 ADVANTAGE OF THE INVENTION This invention has the effect of being able to shorten the work period of tunnel construction.

第1実施形態のコンクリート型枠装置を示す正断面図。BRIEF DESCRIPTION OF THE DRAWINGS Front sectional drawing which shows the concrete formwork apparatus of 1st Embodiment. 図1のコンクリート型枠装置を示す側面図。The side view which shows the concrete formwork apparatus of FIG. 脚部材の設置状態を示す正面図。The front view which shows the installation state of a leg member. 図3の状態を示す側面図。FIG. 4 is a side view showing the state of FIG. 3; ガントリ,メインビーム等の組立状態を示す正面図。FIG. 2 is a front view showing an assembled state of a gantry, main beams, and the like; 図5の状態を示す側面図。The side view which shows the state of FIG. 天フォームの組付状態を示す正面図。The front view which shows the assembly|attachment state of a top form. ガントリを上昇させた状態を示す正面図。The front view which shows the state which raised the gantry. 壁部材の配置状態を示す簡略図。A simplified diagram showing an arrangement state of a wall member. 壁部材,桁材,メインビーム等を示す斜視図。The perspective view which shows a wall member, a beam member, a main beam, etc. FIG. 台梁,メインビーム,サブビーム,中央足場等を示す斜視図。The perspective view which shows a platform beam, a main beam, a sub-beam, a central scaffolding, etc. FIG. 第1位置に設置される脚部材,桁材等よりなる構成部材ユニットを第1トラックに積載した状態を示す斜視図。FIG. 4 is a perspective view showing a state in which a structural member unit including leg members, girders, and the like installed at a first position is loaded on a first truck; 図12の構成部材ユニットを図12とは異なる位置から見た斜視図。FIG. 13 is a perspective view of the component unit of FIG. 12 viewed from a position different from that of FIG. 12; 図12の構成部材ユニットを図12及び図13とは異なる位置から見た斜視図。FIG. 14 is a perspective view of the component unit of FIG. 12 viewed from a position different from that of FIGS. 12 and 13; 第2位置に設置される脚部材,桁材等よりなる構成部材ユニットを第2トラックに積載した状態を示す斜視図。FIG. 11 is a perspective view showing a state in which the structural member units including leg members, beam members and the like installed at the second position are loaded on the second truck; 図15の構成部材ユニットを図15とは異なる位置から見た斜視図。FIG. 16 is a perspective view of the component unit of FIG. 15 viewed from a position different from that of FIG. 15; 第3位置に設置される脚部材,桁材等よりなる構成部材ユニットを第3トラックに積載した状態を示す斜視図。The perspective view which shows the state which loaded the structural member unit which consists of a leg member, a girder, etc. which are installed in a 3rd position on a 3rd track|truck. 図17の構成部材ユニットを図17とは異なる位置から見た斜視図。FIG. 18 is a perspective view of the component unit of FIG. 17 viewed from a position different from that of FIG. 17; 第4位置に設置される脚部材,桁材等よりなる構成部材ユニットを第4トラックに積載した状態を示す斜視図。The perspective view which shows the state which loaded the structural member unit which consists of a leg member, a beam member, etc. which are installed in a 4th position on a 4th track|truck. 図19の構成部材ユニットを図19とは異なる位置から見た斜視図。FIG. 20 is a perspective view of the component unit of FIG. 19 viewed from a position different from that of FIG. 19; 中央足場,メインビーム及びサブビーム等よりなる構成部材ユニットを第5トラックに積載した状態を示す斜視図。FIG. 11 is a perspective view showing a state in which structural member units including a central scaffold, main beams, sub beams, etc. are loaded on a fifth truck; 図21の構成部材ユニットを図21とは異なる方向から見た斜視図。FIG. 22 is a perspective view of the component unit of FIG. 21 viewed from a direction different from that of FIG. 21; 図21の構成部材ユニットの分解斜視図。FIG. 22 is an exploded perspective view of the component unit of FIG. 21; 図21の構成ユニットの正面図。FIG. 22 is a front view of the constituent unit of FIG. 21; 2基の中央足場及び4基の台梁,メインビーム及びサブビーム等よりなる構成部材ユニットを第6トラックに積載した状態を示す斜視図。FIG. 11 is a perspective view showing a state in which structural member units composed of two central scaffolds, four beams, main beams, sub-beams, etc. are loaded on a sixth truck; (a)~(f)は、脚部材及び桁材の組付け過程を示す簡略図。(a) to (f) are simplified diagrams showing the assembly process of leg members and beam members. (a)~(d)は、台梁,メインビーム,サブビームの組付け過程を示す簡略図。(a) to (d) are simplified diagrams showing the process of assembling the pedestal, main beam, and sub-beam. 第2実施形態のコンクリート型枠装置を示す正断面図。Front sectional drawing which shows the concrete formwork apparatus of 2nd Embodiment. 脚部材,桁材,中央足場等の構成部材の組付け状態を示す斜視図。The perspective view which shows the assembly|attachment state of structural members, such as a leg member, a beam member, and a center scaffolding. 桁材及び中央足場を示す斜視図。The perspective view which shows a girder material and a central scaffolding. 桁材を重ねた状態を示す斜視図。The perspective view which shows the state which piled up the girder material. 脚部材,桁材等よりなる構成部材ユニットをトラックに積載した状態を示す斜視図。FIG. 4 is a perspective view showing a state in which a structural member unit made up of leg members, beam members, etc. is loaded on a truck; 図30の桁材及び中央足場を図32とは異なる方向から見た斜視図。The perspective view which looked at the girder material of FIG. 30, and the center scaffold from the direction different from FIG. 図30の桁材及び中央足場の正面図。Figure 31 is a front view of the girder and central scaffolding of Figure 30; 重ねた桁材を壁部材の上面間に架設した状態を示す側面図。The side view which shows the state which built the girder material which overlapped between the upper surfaces of a wall member. 中央足場を展開した状態を示す側面図。The side view which shows the state which expanded the central scaffold. (a)~(f)は、桁材の組付け過程を示す簡略図。(a) to (f) are simplified diagrams showing the assembling process of the girders.

以下、本発明を具体化した実施形態を図面に基づいて説明する。
(第1実施形態)
まず、第1実施形態を図1~図27の図面に基づいて説明する。第1実施形態は、大断面のトンネルにおいて実施する場合に適するものである。
Embodiments embodying the present invention will be described below with reference to the drawings.
(First embodiment)
First, the first embodiment will be described with reference to FIGS. 1 to 27. FIG. The first embodiment is suitable for implementation in large-section tunnels.

〈コンクリート型枠装置11の構成及び覆工コンクリートCの打設方法〉
図1~図11を中心に、前記コンクリート型枠装置(以下、型枠装置という)11の構成及び覆工コンクリートCの打設方法を説明する。
<Construction of Concrete Formwork Device 11 and Method of Casting Lining Concrete C>
1 to 11, the configuration of the concrete formwork device (hereinafter referred to as the formwork device) 11 and the method of placing the lining concrete C will be described.

図1に示すように、覆工コンクリートCを成形するための型枠装置11は、トンネルTNの地面S上の左右一対の平行なレールR上に、トンネルTNの延長方向に沿って移動可能に支持される。本実施形態においては、トンネルTNの幅方向である図1の左右方向を左右とする。また、図2の左右方向であって、トンネルTNの延長方向を前後方向とする。この場合、トンネルTNの入口側を前方、奥側を後方とする。 As shown in FIG. 1, a formwork device 11 for forming the lining concrete C is movable along the extension direction of the tunnel TN on a pair of left and right parallel rails R on the ground S of the tunnel TN. Supported. In the present embodiment, the horizontal direction in FIG. 1, which is the width direction of the tunnel TN, is left and right. Also, the direction in which the tunnel TN extends, which is the left-right direction in FIG. 2, is defined as the front-rear direction. In this case, the entrance side of the tunnel TN is the front side, and the back side is the rear side.

図1に示すように、型枠装置11はガントリ12を備えている。このガントリ12は、左右一対の側壁としての装置脚13と、その装置脚13の上端間に架設された橋架部を構成する左右方向に長い前後4枚の桁材14とを備えている。各桁材14はトンネル延長方向において相互間隔を隔てている。図1,図10及び図11に示すように、装置脚13は、一方向であるトンネル延長方向に延びる側壁15と、左右の側壁15の前後両端の下部に設けられた脚足16とよりなる。左右の側壁15は、それぞれトンネル延長方向に長い一対の壁部材151が前後に連結されて構成されている。脚足16の下端には、前記レールR上を転動する車輪17が設けられている。 As shown in FIG. 1, the formwork device 11 has a gantry 12 . The gantry 12 has device legs 13 as a pair of left and right side walls, and four front and rear girders 14 that are long in the left-right direction and constitute a bridge portion constructed between the upper ends of the device legs 13 . Each girder 14 is spaced apart from each other in the direction of extension of the tunnel. As shown in FIGS. 1, 10 and 11, the device legs 13 are composed of side walls 15 extending in one direction, that is, the direction of extension of the tunnel, and legs 16 provided below the front and rear ends of the left and right side walls 15. . The left and right side walls 15 are configured by connecting a pair of wall members 151 that are long in the direction of extension of the tunnel in the front-rear direction. Wheels 17 that roll on the rail R are provided at the lower ends of the legs 16 .

図1及び図9に示すように、壁部材151の左右両側面には、大きめの内部ステー18及び小さめの外部ステー19が2枚ずつ設けられている。これらのステー18,19は、各桁材14の下部に位置して、壁部材151とともに、桁材14からの荷重を受承する。図9,図10及び図12に示すように、内部ステー18は、ヒンジ23を介して壁部材151に支持されており、壁部材151から突出して、前記荷重を受承する突出位置と、壁部材151に沿う折りたたみ位置とに回動可能である。なお、図10は、折りたたみ状態の内部ステー18を表しているが、この内部ステー18は、桁材14が架設される際には、後述のアウトリガージャッキ37の部分の内部ステー18を除いて折りたたみ位置から突出位置に配置される。 As shown in FIGS. 1 and 9 , two large internal stays 18 and two small external stays 19 are provided on both left and right side surfaces of the wall member 151 . These stays 18 and 19 are positioned below each girder 14 and receive the load from the girder 14 together with the wall member 151 . As shown in FIGS. 9, 10 and 12, the inner stay 18 is supported by the wall member 151 via the hinge 23, protrudes from the wall member 151, receives the load, and extends from the wall. It is pivotable along member 151 to a folded position. Although FIG. 10 shows the inner stay 18 in a folded state, the inner stay 18 is folded when the girder 14 is erected except for the inner stay 18 at the portion of the outrigger jacks 37 which will be described later. It is placed in a protruding position from the position.

図1及び図12に示すように、壁部材151の上部外側面には、工事作業者のための側部足場20が設けられている。前後の桁材14間において、左右の壁部材151間には工事作業者のための橋架部を構成する中央足場22が架設されている。 As shown in FIGS. 1 and 12, the upper outer surface of the wall member 151 is provided with a side scaffolding 20 for construction workers. Between the front and rear girders 14 and between the left and right wall members 151, a central scaffolding 22 that constitutes a bridge for construction workers is constructed.

図1,図10及び図11に示すように、桁材14の上面には、柱材25,26を介して前後方向に長い前後一対で、かつ左右一対のメインビーム27が立てられている。左右のメインビーム27の下面間には左右方向に長い台梁29が両端部上面の突部28において連結されている。左右のメインビーム27間において、桁材14上及び台梁29の上面には前後方向に長い前後一対で、かつ左右一対のサブビーム31が下面の突部30において連結されている。サブビーム31の上面には前後に相互間隔をおいて複数の柱材32が立てられている。 As shown in FIGS. 1, 10 and 11, a pair of front and rear main beams 27 and a pair of left and right main beams 27 are erected on the upper surface of the girder 14 via pillars 25 and 26. Between the lower surfaces of the left and right main beams 27, a platform beam 29 elongated in the left-right direction is connected at projections 28 on the upper surfaces of both ends. Between the left and right main beams 27, a pair of front and rear sub-beams 31 long in the front-rear direction and a pair of left and right sub-beams 31 are connected to the upper surfaces of the beams 14 and the beams 29 at projections 30 on the lower surface. A plurality of pillars 32 are erected on the upper surface of the sub-beam 31 at intervals in the front-rear direction.

本実施形態においては、壁部材151,桁材14,メインビーム27,台梁29,サブビーム31,中央足場22が構成部材である。
図1及び図2に示すように、メインビーム27及び柱材32の上端には天フォーム33が支持されている。この天フォーム33は前後方向に合計7枚並べられる。各天フォーム33の両端には側フォーム34が連結されるとともに、各側フォーム34の下端には下部フォーム35が連結されている。天フォーム33,側フォーム34及び下部フォーム35によってアーチ状の全体フォーム(以下、フォームという)36が形成されている。
In this embodiment, the wall members 151, the beam members 14, the main beams 27, the girders 29, the sub-beams 31, and the central scaffolding 22 are constituent members.
As shown in FIGS. 1 and 2, a top form 33 is supported on the upper ends of the main beams 27 and the pillars 32 . A total of seven top foams 33 are arranged in the front-rear direction. Both ends of each top form 33 are connected to side forms 34 , and lower ends of each side form 34 are connected to lower forms 35 . The top foam 33 , the side foams 34 and the lower foam 35 form an arch-shaped overall foam (hereinafter referred to as foam) 36 .

そして、図1に示すように、フォーム36と、トンネルTNの内壁面との間に覆工コンクリートCが打設されるとともに、フォーム36によってその覆工コンクリートCの内周面が成形される。 Then, as shown in FIG. 1 , the lining concrete C is placed between the form 36 and the inner wall surface of the tunnel TN, and the inner peripheral surface of the lining concrete C is formed by the form 36 .

〈型枠装置11の構築方法その1及び解体方法〉
型枠装置11は、以下の手順で構築される。
図3,図4及び図9に示すように、左右の側壁15は、前後各一対の壁部材151が相互に連結された状態でトンネルTNの幅方向の両側位置に起立状態で設置される。この場合、本実施形態においては、壁部材151は、トンネルTNの奥側から、図9に示す第1~第4位置P1~P4の順序に従って設置される。このとき、側壁15のトンネル中央側の前後両端に位置するように、壁部材151の端部にはそれぞれアウトリガージャッキ(以下、ジャッキという)37が取付けられている。このジャッキ37は地面S上に位置して、側壁15の起立を補助する。また、図3に示すように、壁部材151の下端部の両側には、前記ジャッキ37とともに壁部材151の起立を補助する補助脚38が取付けられる。
<Construction Method 1 and Dismantling Method of Formwork Device 11>
The formwork device 11 is constructed by the following procedure.
As shown in FIGS. 3, 4 and 9, the left and right side walls 15 are erected on both sides of the tunnel TN in the width direction with the front and rear wall members 151 connected to each other. In this case, in this embodiment, the wall member 151 is installed in the order of the first to fourth positions P1 to P4 shown in FIG. 9 from the deep side of the tunnel TN. At this time, outrigger jacks (hereinafter referred to as jacks) 37 are attached to the ends of the wall members 151 so as to be positioned at both front and rear ends of the side walls 15 on the tunnel center side. This jack 37 is positioned on the ground S and assists the side wall 15 to stand up. As shown in FIG. 3, on both sides of the lower end of the wall member 151, auxiliary legs 38 are attached together with the jacks 37 to assist the wall member 151 to stand up.

なお、壁部材151が第1~第4位置P1~P4に設置されるまでは、内部ステー18は折りたたみ状態にされる。そして、壁部材151の設置後に、上部構造材からの荷重を受承するために、内部ステー18は突出位置に回動される。ただし、ジャッキ37が壁部材151に取付けられた場合には、ジャッキ37と内部ステー18との干渉を避けるために、壁部材151の設置後であっても、ジャッキ37と近接する位置の内部ステー18は折りたたみ状態に維持される。この場合、ジャッキ37が上部構造材からの荷重を受承する。そして、ジャッキ37の撤去後に、内部ステー18は突出位置に回動される。 Note that the inner stay 18 is folded until the wall member 151 is installed at the first to fourth positions P1 to P4. Then, after the wall member 151 is installed, the inner stay 18 is rotated to the projecting position in order to receive the load from the upper structural member. However, when the jack 37 is attached to the wall member 151, in order to avoid interference between the jack 37 and the inner stay 18, even after the wall member 151 is installed, the inner stay at a position close to the jack 37 is fixed. 18 remains folded. In this case, the jack 37 receives the load from the superstructure. After the jack 37 is removed, the internal stay 18 is rotated to the projecting position.

本実施形態において、型枠装置11の壁部材151等の部材は、ボルト(図示しない)やナット(図示しない)を用いて部材相互に着脱可能に取付けられる。また、型枠装置11の構成部材に対する前記ジャッキ37,補助脚38,連結部材を構成する後述の各部材は、同じくボルトやナットを用いて着脱可能に取付けられる。 In this embodiment, members such as the wall members 151 of the formwork device 11 are detachably attached to each other using bolts (not shown) and nuts (not shown). The jacks 37, the auxiliary legs 38, and the later-described respective members constituting the connecting members for the constituent members of the formwork device 11 are also detachably attached using bolts and nuts.

次に、図5,図6及び図10に示すように、壁部材151,内部ステー18,突出位置の外部ステー19及びジャッキ37上に位置するように、壁部材151よりなる側壁15間に合計4基の桁材14が前後方向において相互間隔を有するように架設される。そして、図11に示すように、前後の各桁材14間に位置するように、左右の側壁15間に中央足場22が架設される。次いで、トンネルTNの延長方向に延びるように、メインビーム27が柱材25,26を介して桁材14上に支持される。 Next, as shown in FIGS. 5, 6 and 10, the wall member 151, the inner stay 18, the outer stay 19 at the protruding position, and the side wall 15 formed of the wall member 151 are positioned on the jack 37. Four girders 14 are installed so as to have mutual intervals in the front-rear direction. Then, as shown in FIG. 11, a central scaffold 22 is constructed between the left and right side walls 15 so as to be positioned between the front and rear girders 14 . Next, a main beam 27 is supported on the girder 14 via pillars 25 and 26 so as to extend in the direction of extension of the tunnel TN.

その後、図5,図6及び図11に示すように、左右のメインビーム27の下面間に台梁29がその突部28において連結される。台梁29は合計8基であって、トンネルTNの幅方向に延びるとともに、それらは前後方向に相互間隔を隔てて配置される。次いで、メインビーム27間の位置において、サブビーム31がその下面の突部30を介して桁材14上に支持される。また、台梁29がその上面の突部28を介してそのサブビーム31に連結される。 After that, as shown in FIGS. 5, 6 and 11, a bridge 29 is connected at its projection 28 between the lower surfaces of the left and right main beams 27 . A total of eight platform beams 29 extend in the width direction of the tunnel TN and are spaced apart from each other in the longitudinal direction. Next, at a position between the main beams 27, the sub-beams 31 are supported on the girders 14 via the protrusions 30 on their lower surfaces. Also, the platform beam 29 is connected to the sub-beam 31 via the protrusion 28 on its upper surface.

以上のようにして、ガントリ12が構成される。
次いで、図7及び図11に示すように、サブビーム31上に柱材32が立てられる。そして、柱材32の上端及びメインビーム27の上面に合計7枚の天フォーム33が支持される。その後、図8に示すように、ジャッキ37が伸長される。このため、型枠装置11全体が上昇される。そして、装置脚13の下端に脚足16が連結されるとともに、その脚足16の車輪17がレールR上に位置する。この状態で、天フォーム33に側フォーム34及び下部フォーム35が連結される。従って、覆工コンクリートCを成形するためのフォーム36が構成される。脚足16が取付けられた後は、ジャッキ37は不要になるため、ジャッキ37は収縮されて、側壁15から分離され、次いで撤去される。これとともに、折りたたまれていた内部ステー18が荷重を受承する突出位置に配置される。なお、補助脚38は、桁材14が架設された後において、適当時期に側壁15から分離されて撤去される。
The gantry 12 is configured as described above.
Next, as shown in FIGS. 7 and 11, pillars 32 are erected on the sub-beams 31 . A total of seven ceiling forms 33 are supported on the upper ends of the pillars 32 and the upper surfaces of the main beams 27 . After that, as shown in FIG. 8, the jack 37 is extended. Therefore, the entire formwork device 11 is raised. A leg 16 is connected to the lower end of the device leg 13, and a wheel 17 of the leg 16 is positioned on the rail R. In this state, the side foam 34 and the lower foam 35 are connected to the top foam 33 . Accordingly, a form 36 for molding the lining concrete C is constructed. Since the jacks 37 are no longer needed after the legs 16 are attached, the jacks 37 are retracted and separated from the side walls 15 and then removed. Along with this, the folded inner stay 18 is arranged at the projecting position for receiving the load. The auxiliary leg 38 is separated from the side wall 15 and removed at an appropriate time after the girders 14 are installed.

型枠装置11の解体においては、前述した構築時とは逆順の作業が実行される。
〈型枠装置11の構成部材のトラックへの積載方法及び搬送方法〉
次に、型枠装置11の主要な構成部材よりなる構成部材ユニットのトラックに対する積載方法及びトラックによる搬送方法について説明する。
In dismantling the formwork device 11, the work is performed in the reverse order of the construction described above.
<Method of loading and transporting the constituent members of the formwork device 11 onto the truck>
Next, a description will be given of a method of loading the structural member units comprising the main structural members of the formwork apparatus 11 onto the truck and a method of transporting the structural member units by the truck.

主要な構成部材よりなる構成部材ユニットの積載及び搬送に際して、本実施形態においては、6台のトラックを用いる。これらのトラックを第1~第6トラックTR1~TR6とする。 Six trucks are used in this embodiment for loading and transporting the component unit consisting of the main components. These tracks are referred to as first to sixth tracks TR1 to TR6.

図12~図14に示すように、第1トラックTR1の荷台TCには、トンネルTN内の奥部の一側の第1位置P1内に設置される1基の壁部材151と、1基の桁材14とが積載される。この積載状態では、壁部材151及び桁材14は、それらの長さ方向が第1トラックTR1の長さ方向に沿うように配置される。壁部材151の側面上部には側部足場20が取付けられている。壁部材151には、ジャッキ37がその背面において連結されている。また、壁部材151の両側面にはそれぞれ複数の補助脚38が取付けられている。壁部材151はジャッキ37及び補助脚38によって起立できる。 As shown in FIGS. 12 to 14, the loading platform TC of the first truck TR1 includes one wall member 151 installed in a first position P1 on one side of the inner part of the tunnel TN, and one wall member 151. The girder material 14 is loaded. In this loaded state, the wall member 151 and the beam member 14 are arranged such that their lengthwise directions are along the lengthwise direction of the first track TR1. A side scaffolding 20 is attached to the upper side of the wall member 151 . A jack 37 is connected to the back surface of the wall member 151 . A plurality of auxiliary legs 38 are attached to both side surfaces of the wall member 151, respectively. The wall member 151 can be erected by the jacks 37 and the auxiliary legs 38 .

壁部材151はアーム24が第1トラックTR1の後ろ側になるように積載される。壁部材151及び桁材14の第1トラックTR1への積載状態において、その壁部材151及び桁材14の下面間の複数位置は金具である連結バー52により連結される。連結バー52は、壁部材151及び桁材14の合計厚さ(左右方向の寸法)より長くなっている。壁部材151の内部ステー18は、ボルト止めされる保持金具53によって折りたたみ状態に保持される。壁部材151の外部ステー19の側面と桁材14の上面とは、複数位置において連結金具54によって連結されている。 The wall member 151 is loaded so that the arm 24 is on the rear side of the first track TR1. When the wall member 151 and the beam member 14 are loaded on the first truck TR1, a plurality of positions between the lower surfaces of the wall member 151 and the beam member 14 are connected by connecting bars 52, which are metal fittings. The connecting bar 52 is longer than the total thickness (horizontal dimension) of the wall member 151 and the beam member 14 . The inner stay 18 of the wall member 151 is held in a folded state by a holding metal fitting 53 bolted. The side surface of the outer stay 19 of the wall member 151 and the upper surface of the beam member 14 are connected by connecting fittings 54 at a plurality of positions.

従って、図12に示すように、壁部材151及び桁材14は、連結バー52,保持金具53及び連結金具54によって並設状態に保持されるとともに、安定した状態で第1トラックTR1の荷台TCに対して第1トラックTR1の前後方向に延びた状態で積載される。連結バー52は、荷台TC上における起立状態の壁部材151及び桁材14の脚として機能する。 Therefore, as shown in FIG. 12, the wall member 151 and the beam member 14 are held side by side by the connecting bar 52, the holding metal fittings 53, and the connecting metal fittings 54, and are stably mounted on the bed TC of the first truck TR1. are loaded while extending in the front-rear direction of the first track TR1. The connecting bar 52 functions as legs of the upright wall member 151 and the beam member 14 on the loading platform TC.

図15及び図16に示すように、第2トラックTR2には、トンネルTN内の第2位置P2内に設置される1基の壁部材151と、桁材14とがそれらの長さ方向が第2トラックTR2の長さ方向に沿うように積載される。この場合においても、アーム24は第2トラックTR2の後ろ側にされる。壁部材151においては、前記と同様に、内部ステー18が折りたたまれるとともに、側部足場20が取付けられている。また、同様に、壁部材151には、ジャッキ37及び補助脚38が連結されるとともに、壁部材151及び桁材14はそれらの複数位置の下面間が連結バー52によって連結されるとともに、上部間が連結金具54によって連結されている。 As shown in FIGS. 15 and 16, the second track TR2 has a wall member 151 installed in the second position P2 inside the tunnel TN and a girder 14 which are arranged in the longitudinal direction. It is loaded along the length direction of two tracks TR2. Also in this case, the arm 24 is positioned behind the second track TR2. In the wall member 151, the inner stay 18 is folded and the side scaffolding 20 is attached in the same manner as described above. Similarly, a jack 37 and an auxiliary leg 38 are connected to the wall member 151, and the wall member 151 and the beam member 14 are connected by connecting bars 52 between their lower surfaces at a plurality of positions, and between their upper surfaces. are connected by a connecting fitting 54 .

第2トラックTR2において、桁材14の側面には、その側面に沿って延びるように1基の台梁29設置される。その台梁29は、その両端部において止め金具55により桁材14に対して連結される。 On the second track TR2, one platform beam 29 is installed on the side surface of the girder member 14 so as to extend along the side surface. The beam 29 is connected to the girder 14 by fasteners 55 at both ends thereof.

そして、壁部材151,桁材14及び台梁29は、連結バー52,連結金具54及び止め金具55によって並設状態に保持されるとともに、安定した状態で第2トラックTR2の荷台TCに積載される。この状態で、壁部材151,桁材14及び台梁29は、第2トラックTR2の前後方向に延びる。 The wall member 151, the girder 14 and the platform beam 29 are held side by side by the connecting bar 52, the connecting fitting 54 and the fastener 55, and are stably loaded on the loading platform TC of the second truck TR2. be. In this state, the wall member 151, the girder 14 and the platform beam 29 extend in the longitudinal direction of the second track TR2.

図17及び図18に示すように、第3トラックTR3においては、第2トラックTR2に積載される壁部材151,桁材14及び台梁29と同じ組合わせの壁部材151,桁材14及び台梁29が積載される。従って、壁部材151,桁材14及び台梁29は、同じ連結バー52,連結金具54及び止め金具55を用いて連結される。ただし、第3トラックTR3においては、壁部材151のアーム24が第3トラックTR3の前方を向くように壁部材151,桁材14及び台梁29が荷台TCに積載される。従って、壁部材151,桁材14及び台梁29は、荷台TC上において、並設状態に保持されるとともに、安定した状態に維持される。この状態で、壁部材151,桁材14及び台梁29は、第3トラックTR3の前後方向に延びる。 As shown in FIGS. 17 and 18, in the third truck TR3, the wall member 151, the beam member 14, and the platform are combined in the same manner as the wall member 151, the beam member 14, and the beam 29 loaded on the second truck TR2. Beams 29 are loaded. Therefore, the wall member 151, the beam 14 and the beam 29 are connected using the same connecting bar 52, connecting fitting 54 and fastener 55. As shown in FIG. However, in the third truck TR3, the wall member 151, the girder 14 and the platform beam 29 are loaded on the loading platform TC so that the arm 24 of the wall member 151 faces the front of the third truck TR3. Therefore, the wall member 151, the beam member 14 and the platform beam 29 are maintained in parallel and in a stable state on the loading platform TC. In this state, the wall member 151, the girder 14 and the platform beam 29 extend in the longitudinal direction of the third track TR3.

図19及び図20に示すように、第4トラックTR4においては、第1トラックTR1に積載される壁部材151及び桁材14と同じ組合わせの壁部材151及び桁材14が同じ連結バー52及び連結金具54を用いて連結される。ただし、第4トラックTR4においては、壁部材151のアーム24が第4トラックTR4の前方を向くように壁部材151及び桁材14が荷台TCに積載される。従って、壁部材151及び桁材14は、荷台TC上において、並設状態に保持されるとともに、安定した状態に維持される。この状態で、壁部材151及び桁材14は、第4トラックTR4の前後方向に延びる。 As shown in FIGS. 19 and 20, in the fourth truck TR4, the wall members 151 and the beam members 14 of the same combination as the wall members 151 and the beam members 14 loaded on the first truck TR1 are the same connecting bars 52 and It is connected using a connecting fitting 54 . However, in the fourth truck TR4, the wall member 151 and the beam member 14 are loaded on the loading platform TC so that the arm 24 of the wall member 151 faces the front of the fourth truck TR4. Therefore, the wall member 151 and the beam member 14 are held side by side on the loading platform TC and maintained in a stable state. In this state, the wall member 151 and the beam member 14 extend in the front-rear direction of the fourth track TR4.

以上のようにして、壁部材151,桁材14及び台梁29よりなる構成部材ユニットが搬送される。各壁部材151は、第1~第4トラックTR1~TR4がトンネルTN内にバックで進入した場合、トンネルTN内に設置される向きと同じ向きで第1~第4トラックTR1~TR4に積載される。 As described above, the structural member unit composed of the wall member 151, the beam member 14 and the platform beam 29 is transported. When the first to fourth tracks TR1 to TR4 enter the tunnel TN in reverse, the wall members 151 are loaded on the first to fourth tracks TR1 to TR4 in the same direction as they are installed in the tunnel TN. be.

図21~図23に示すように、第5トラックTR5においては、下から順に、一対のサブビーム31,同じく一対のメインビーム27,1基の中央足場22及び一対の台梁29がそれらの長さ方向が第5トラックTR5の前後方向に沿うように積層されている。両サブビーム31間には前後一対の足場板41が固定されている。足場板41の上面には、図示しないが、複数の柱材32が収容状態で載置されており、それらはワイヤ(図示しない)によって足場板41に対して結束されている。また、足場板41の上下両側面の少なくとも一方には、チャック(図示しない)を介して配管42が支持されている。この配管42はスラリー状態の覆工コンクリートCを圧送する経路となるものである。メインビーム27は、それらの上面を背中合わせにした横倒し状態で並べられている。 As shown in FIGS. 21 to 23, in the fifth track TR5, a pair of sub-beams 31, a pair of main beams 27, a central scaffolding 22 and a pair of platform beams 29 are arranged in order from the bottom. The layers are stacked along the front-rear direction of the fifth track TR5. A pair of front and rear scaffolding boards 41 are fixed between the sub-beams 31 . Although not shown, a plurality of pillars 32 are placed on the upper surface of the scaffolding board 41 in an accommodated state, and they are bound to the scaffolding board 41 by wires (not shown). A pipe 42 is supported on at least one of the upper and lower side surfaces of the scaffold board 41 via a chuck (not shown). This pipe 42 serves as a route for pumping the lining concrete C in a slurry state. The main beams 27 are arranged side by side with their upper surfaces facing each other.

中央足場22は、複数の窓口43を有する足場枠44と、窓口43を覆うように取付けられた足場板45とよりなる。
台梁29は、中央足場22の左右両側の上面において長さ方向を前後方向に沿わせた横倒し状態で載置されている。
The central scaffolding 22 consists of a scaffolding frame 44 having a plurality of windows 43 and a scaffolding board 45 attached to cover the windows 43. - 特許庁
The platform beams 29 are placed on the upper surfaces of the left and right sides of the central scaffolding 22 in a sideways state with the length direction along the front-rear direction.

図22~図24に示すように、両サブビーム31の上面間には1本の連結金具51が架設状態で取付けられている。また、両サブビーム31の上面間には一対の幅止め金具59が架設状態で取付けられており、この幅止め金具59の上面に一対のメインビーム27が背中合わせ状態で、かつ幅止め金具59の両端の起立片48間に把持されている。幅止め金具59は下面に一対の脚を有しており、この幅止め金具59によってサブビーム31とメインビーム27との間に上下間隔が設けられている。メインビーム27の上面には一対の連結金具58が取付けられており、この連結金具58の上面に中央足場22の足場枠44が取付けられている。 As shown in FIGS. 22 to 24, one connecting fitting 51 is attached between the upper surfaces of both sub-beams 31 in a suspended state. A pair of width stoppers 59 are mounted between the upper surfaces of the two sub-beams 31 in a bridged state. is gripped between the upstanding pieces 48 of the . The width stopper 59 has a pair of legs on the lower surface, and the width stopper 59 provides a vertical gap between the sub-beam 31 and the main beam 27 . A pair of connecting metal fittings 58 are attached to the upper surface of the main beam 27 , and the scaffold frame 44 of the central scaffolding 22 is attached to the upper surface of the connecting metal fittings 58 .

図21~図23に示すように、台梁29の両端には把持金具56が取付けられており、この把持金具56は中央足場22の足場枠44の両側を把持している。把持金具56と近接する位置において、左右の台梁29間には一対の連結金具57が介在状態で取付けられている。この連結金具57と把持金具56とによって台梁29が中央足場22の両側位置において保持されている。そして、前記のように、サブビーム31,メインビーム27,中央足場22及び台梁29が、下から順に積層されるとともに、それらは長さ方向を第5トラックTR5の前後方向に沿わせた状態で並設されている。 As shown in FIGS. 21 to 23, gripping metal fittings 56 are attached to both ends of the platform beam 29, and the gripping metal fittings 56 grip both sides of the scaffolding frame 44 of the central scaffolding 22. As shown in FIGS. A pair of connecting metal fittings 57 are interposed between the left and right platform beams 29 at positions close to the gripping metal fittings 56 . The support girders 29 are held on both sides of the central scaffolding 22 by the connecting metal fittings 57 and the gripping metal fittings 56 . As described above, the sub-beam 31, main beam 27, central scaffolding 22, and platform beam 29 are stacked in this order from the bottom, with their lengths along the longitudinal direction of the fifth track TR5. are arranged side by side.

図25に示すように、第6トラックTR6に積載される構成部材及びその積載方法は、第5トラックTR5に対する積載方法とほぼ同様である。ただし、第6トラックTR6においては、2基の中央足場22が重ねられている。また、上部側の中央足場22には2対の合計4基の台梁29が重ねられている。台梁29間の2本の連結金具57は、左右各2段の台梁29間をともに連結する。また、把持金具56は上下2段の台梁29を把持するとともに、上下2段の中央足場22を把持するように、高さの高いものが使用される。 As shown in FIG. 25, the components loaded on the sixth track TR6 and the loading method thereof are substantially the same as the loading method for the fifth track TR5. However, in the sixth track TR6, two central scaffolds 22 are overlapped. Two pairs of four girders 29 in total are superimposed on the central scaffolding 22 on the upper side. The two connecting metal fittings 57 between the platform beams 29 connect the two stages of the platform beams 29 on the left and right sides together. Further, the gripping metal fittings 56 having a high height are used so as to grip the upper and lower two stages of the platform beams 29 and to grip the upper and lower two stages of the central scaffolding 22 .

以上のようにして、第1~第6トラックTR1~TR6に積載された型枠装置11の構成部材は、その第1~第6トラックTR1~TR6によって、トンネルTNの建設現場まで搬送される。第1~第6トラックTR1~TR6は、後ろ向きで後退する(バック)することによってトンネルTN内の荷降ろし位置に進入される。そして、第1~第6トラックTR1~TR6によって、4基の壁部材151,4基の桁材14,4基のメインビーム27,4基のサブビーム31,8基の台梁29等の構成部材よりなる構成部材ユニットが搬送される。 As described above, the constituent members of the formwork apparatus 11 loaded on the first to sixth trucks TR1 to TR6 are transported to the construction site of the tunnel TN by the first to sixth trucks TR1 to TR6. The first to sixth trucks TR1 to TR6 enter the unloading position in the tunnel TN by backing up. By the first to sixth tracks TR1 to TR6, constituent members such as four wall members 151, four girder members 14, four main beams 27, four sub beams 31, eight beams 29, etc. A component unit is conveyed.

〈型枠装置11の構築方法その2〉
すなわち、第1~第6トラックTR1~TR6はトンネル建設現場における型枠装置11の構築位置の近傍である荷降ろし位置に進入される。そして、第1~第6トラックTR1~TR6の荷台TCに積載された型枠装置11の構成部材がクレーンによって吊られることによって、型枠装置11における組立順序に従って他の構成部材から分離される。そして、その構成部材はクレーンによって型枠装置11の構築位置に移載されて、型枠装置11の構築に供される。
<Construction Method 2 of Formwork Device 11>
That is, the first to sixth trucks TR1 to TR6 enter the unloading position near the construction position of the formwork device 11 at the tunnel construction site. The constituent members of the formwork device 11 loaded on the loading platforms TC of the first to sixth trucks TR1 to TR6 are separated from other constituent members according to the order of assembly in the formwork device 11 by being lifted by a crane. Then, the constituent members are transferred to the construction position of the formwork device 11 by a crane and provided for construction of the formwork device 11 .

前記連結バー52を含む各種の金具51,53,54,55,56,57,58,59は構成部材に対してボルトやナットを用いて着脱可能に取付けられている。これらの連結バー52及び各種の金具51,53,54,55,56,57,58,59は、連結部材を構成する。そして、第1~第6トラックTR1~TR6の荷台TC上における型枠装置11の構成部材を荷降ろしする場合は、前記連結バー52及び各種の金具51,53,54,55,56,57,58,59が構成部材から外される。あるいは、構成部材が連結バー52や金具51,53,54,55,56,57,58,59から外される。 Various metal fittings 51, 53, 54, 55, 56, 57, 58, 59 including the connecting bar 52 are detachably attached to constituent members using bolts and nuts. These connecting bars 52 and various metal fittings 51, 53, 54, 55, 56, 57, 58, 59 constitute connecting members. When unloading the constituent members of the formwork device 11 on the loading platform TC of the first to sixth trucks TR1 to TR6, the connecting bar 52 and various metal fittings 51, 53, 54, 55, 56, 57, 58, 59 are removed from the components. Alternatively, the components are removed from the connecting bar 52 and fittings 51 , 53 , 54 , 55 , 56 , 57 , 58 , 59 .

まず、第1トラックTR1を前記荷降ろし位置に進入させる。そして、ジャッキ37及び補助脚38を有する壁部材151をその設置位置である図9及び図26(a)に示すトンネル奥側の第1位置P1に移動させて、同位置P1に設置する。このとき、第1トラックTR1の桁材14は第1トラックTR1の荷台TC上において連結バー52によって起立状態に保持される。 First, the first truck TR1 is moved into the unloading position. Then, the wall member 151 having the jack 37 and the auxiliary leg 38 is moved to the first position P1 on the inner side of the tunnel shown in FIGS. At this time, the girder 14 of the first truck TR1 is held in an upright state by the connecting bar 52 on the loading platform TC of the first truck TR1.

次いで、第1トラックTR1を待機位置に後退させるとともに、それと交代で第2トラックTR2を荷降ろし位置に進入させる。そして、図26(b)に示すように、壁部材151をその設置位置であるトンネル奥側の第2位置P2に移動させて、同位置P2に設置する。引続き、第2トラックTR2上の桁材14を第1位置P1及び第2位置P2の壁部材151間に架設する。さらに、第2トラックTR2上の台梁29を壁部材151の奥側の端部間に架設状態で仮置きする。 Next, the first truck TR1 is retracted to the standby position, and the second truck TR2 is alternately moved to the unloading position. Then, as shown in FIG. 26(b), the wall member 151 is moved to the second position P2 on the back side of the tunnel, which is the installation position, and installed at the same position P2. Subsequently, the girder 14 on the second track TR2 is constructed between the wall members 151 at the first position P1 and the second position P2. Further, the platform beam 29 on the second track TR2 is temporarily placed in a bridged state between the rear end portions of the wall member 151 .

次に、空荷の第2トラックTR2を建設現場から後退させるとともに、第1トラックTR1を荷降ろし位置に再度進入させる。そして、図26(c)に示すように、第1トラックTR1の荷台TCに残っていた桁材14を第1,第2位置P1,P2間の壁部材151間に架設させる。 Next, the empty second truck TR2 is withdrawn from the construction site, and the first truck TR1 is caused to enter the unloading position again. Then, as shown in FIG. 26(c), the girders 14 remaining on the loading platform TC of the first truck TR1 are constructed between the wall members 151 between the first and second positions P1 and P2.

その後、空荷の第1トラックTR1を建設現場から後退させる。次いで、第3トラックTR3を荷降ろし位置に進入させる。そして、前記と同様にして、図26(d)に示すように、第3位置P3に対して壁部材151を設置するとともに、その壁部材151を第1位置P1の壁部材151に連結する。その後、第3トラックTR3を待機位置に後退させるとともに、第4トラックTR4を荷降ろし位置に進入させる。そして、図26(e)に示すように、トンネル入口側の第4位置P4に壁部材151を設置するとともに、その壁部材151を第2位置P2の壁部材151と連結する。 Thereafter, the empty first truck TR1 is withdrawn from the construction site. Next, the third truck TR3 is moved into the unloading position. Then, in the same manner as described above, as shown in FIG. 26(d), the wall member 151 is installed at the third position P3, and the wall member 151 is connected to the wall member 151 at the first position P1. After that, the third truck TR3 is retracted to the standby position, and the fourth truck TR4 is advanced to the unloading position. Then, as shown in FIG. 26(e), the wall member 151 is installed at the fourth position P4 on the tunnel entrance side, and the wall member 151 is connected to the wall member 151 at the second position P2.

次いで、第4トラックTR4の桁材14を第3位置P3及び第4位置P4の壁部材151間に架設する。次いで、空荷の第4トラックTR4を建設現場から後退させる。そして、第3トラックTR3を荷降ろし位置に再度進入させて、図26(f)に示すように、第3トラックTR3の荷台TCに残っていた桁材14を第3位置P3,第4位置P4の壁部材151間に架設する。また、第3トラックTR3に残っていた台梁29を壁部材151の入り口側の端部間に仮置きする。 Next, the girder 14 of the fourth track TR4 is constructed between the wall members 151 at the third position P3 and the fourth position P4. The empty fourth truck TR4 is then withdrawn from the construction site. Then, the third truck TR3 is caused to enter the unloading position again, and as shown in FIG. between the wall members 151 of . In addition, the platform beam 29 remaining on the third track TR3 is temporarily placed between the ends of the wall members 151 on the entrance side.

そして、空荷の第3トラックTR3を建設現場から後退させる。
次いで、構成部材ユニットを積載した第5トラックTR5を荷降ろし位置に進入させる。そして、第5トラックTR5の中央足場22を図27(a)に示すように、トンネル奥側の桁材14間における壁部材151間に架設する。中央足場22には、台梁29が載せられている。次いで、第5トラックTR5を待機位置に後退させて第6トラックTR6を荷降ろし位置に進入させる。そして、図27(b)に示すように、第6トラックTR6の台梁29が載せられた2基の中央足場22を桁材14間におけるトンネル入口側の2箇所の壁部材151間に並設状態で架設する。
Then, the empty third truck TR3 is retreated from the construction site.
Next, the fifth truck TR5 loaded with the component units is moved into the unloading position. Then, as shown in FIG. 27(a), the central scaffolding 22 of the fifth track TR5 is erected between the wall members 151 between the girders 14 on the back side of the tunnel. A platform beam 29 is placed on the central scaffold 22 . Next, the fifth truck TR5 is retracted to the standby position, and the sixth truck TR6 is advanced to the unloading position. Then, as shown in FIG. 27(b), two central scaffolds 22 on which the platform girders 29 of the sixth track TR6 are placed are arranged side by side between the two wall members 151 on the tunnel entrance side between the girder members 14. erected in the state

その後、各中央足場22上の台梁29間の連結金具57を外して、中央足場22上の台梁29を組付け位置と対応する所定位置に移動させる。
次に、図27(c)に示すように、第6トラックTR6の両メインビーム27をトンネル奥側において前後の桁材14間に前後方向に延びるように架設する。さらに、サブビーム31をトンネル奥側におけるメインビーム27間であって、前後の桁材14間に架設する。
After that, the connecting metal fittings 57 between the girders 29 on each central scaffold 22 are removed, and the girders 29 on the central scaffold 22 are moved to predetermined positions corresponding to the assembling positions.
Next, as shown in FIG. 27(c), both main beams 27 of the sixth track TR6 are constructed so as to extend in the longitudinal direction between the front and rear girders 14 on the deep side of the tunnel. Furthermore, the sub-beams 31 are installed between the main beams 27 on the innermost side of the tunnel and between the front and rear girders 14 .

次に、空荷の第6トラックTR6を建設現場から後退させるとともに、第5トラックTR5を荷降ろし位置に進入させて、トンネル入り口側において、前記と同様に、メインビーム27及びサブビーム31を桁材14間に架設する。最後に、空荷の第5トラックTR5をトンネル建設現場から後退させる。 Next, the empty sixth truck TR6 is retreated from the construction site, and the fifth truck TR5 is advanced to the unloading position. Installed between 14 Finally, the empty fifth truck TR5 is withdrawn from the tunnel construction site.

そして、図27(d)に示すように、各台梁29を図11に示す起立状態にして、メインビーム27及びサブビーム31の下面に連結する。次いで、各サブビーム31上に柱材32を立てる。 Then, as shown in FIG. 27(d), each platform 29 is placed in the upright state shown in FIG. Next, a pillar member 32 is erected on each sub-beam 31 .

このようにしたら、柱材32及びメインビーム27上に天フォーム33を支持する。次いで、ジャッキ37によりガントリ12を上昇させて、車輪17を有する脚足16を装置脚13に対して取付ける。このようにしたら、天フォーム33に側フォーム34を、側フォーム34に下部フォーム35を連結する。 After doing so, the ceiling form 33 is supported on the pillars 32 and the main beams 27 . Next, the gantry 12 is raised by the jacks 37 and the legs 16 having the wheels 17 are attached to the device legs 13 . After doing so, the side foam 34 is connected to the top foam 33 and the lower foam 35 is connected to the side foam 34 .

このようにして、型枠装置11を構築することができる。
型枠装置11の解体は、構築時とは逆の手順で実行される。すなわち、サブビーム31,メインビーム27,中央足場22,桁材14,壁部材151等の構成部材を分解するとともに、その分解された構成部材を分解順に従って並設して構成部材ユニットを構成する。そして、その構成部材ユニットを前記のように第1~第6トラックTR1~TR6に積載してトンネルTN内から搬出する。
In this manner, the formwork device 11 can be constructed.
The dismantling of the formwork device 11 is performed in the reverse order of the construction. That is, the constituent members such as the sub-beam 31, the main beam 27, the central scaffolding 22, the girders 14, the wall member 151, etc. are disassembled, and the disassembled constituent members are arranged side by side in order of disassembly to form a constituent member unit. Then, the constituent member units are loaded on the first to sixth tracks TR1 to TR6 as described above and carried out from the tunnel TN.

(第1実施形態の効果)
本実施形態においては、以下の効果がある。
(1)型枠装置11を構成する壁部材151,桁材14,メインビーム27,台梁29,サブビーム31等の構成部材が、第1~第6トラックTR1~TR6の荷台TCに対して、その荷台TCの前後方向に沿う姿勢で積載される。つまり、壁部材151,桁材14,メインビーム27,台梁29,サブビーム31等の構成部材は、その長さ方向が第1~第6トラックTR1~TR6の前後方向に延びた状態で並設される。従って、それらの構成部材を、荷台TCのスペースを有効利用して荷台TCからはみ出ることなく積載できるため、構成部材を容易にトラック搬送することができる。
(Effect of the first embodiment)
This embodiment has the following effects.
(1) The wall member 151, the girder 14, the main beam 27, the girders 29, the sub-beams 31, etc. that make up the formwork device 11 are placed against the loading platforms TC of the first to sixth trucks TR1 to TR6, It is loaded in a posture along the front-rear direction of the loading platform TC. That is, the constituent members such as the wall member 151, the beam member 14, the main beam 27, the girders 29, and the sub-beams 31 are arranged side by side with their longitudinal directions extending in the longitudinal direction of the first to sixth tracks TR1 to TR6. be done. Therefore, since these constituent members can be loaded without protruding from the cargo bed TC by effectively utilizing the space of the cargo bed TC, the constituent members can be easily transported by truck.

(2)構成部材の搬送に際して、積載された構成部材である壁部材151,桁材14,台梁29を連結バー52によって連結状態で起立させるとともに、その起立状態でさらに構成部材どうしを連結金具54等によって連結する。従って、構成部材を安定してトラック搬送することができるため、構成部材どうしの衝突や、構成部材の倒伏等を防止できる。 (2) When transporting the constituent members, the stacked constituent members such as the wall member 151, the beam member 14, and the platform beam 29 are erected in a connected state by the connecting bar 52, and in the erected state, the constituent members are further connected to each other by connecting metal fittings. 54 or the like. Therefore, since the constituent members can be stably transported by track, it is possible to prevent the constituent members from colliding with each other and from falling over.

(3)構成部材を型枠装置11として組付ける順序に従って、しかも組付ける向きでトラック荷台TCに積載する。従って、構成部材をトラック荷台TCから組付け位置にクレーンで吊って移動するだけで、その構成部材を型枠装置11の所要箇所に組けることができる。このため、型枠装置11の構築を短時間で効率的に実行できる。よって、トンネル建設の工期を短縮できる。しかも、構成部材をその組付けに際して、その構成部材を地面S上に仮置きしたり、地面S上で構成部材を組上げるための部材どうしを組付けたりする必要がない。従って、他の作業車両の通行や、物品の移動が規制されることを抑制することができる。 (3) The constituent members are loaded on the truck bed TC according to the order of assembling as the formwork device 11 and in the assembling direction. Therefore, the constituent member can be assembled at the desired location of the formwork device 11 simply by moving the constituent member from the truck bed TC to the assembly position by hanging it with a crane. Therefore, the construction of the formwork device 11 can be efficiently executed in a short time. Therefore, the construction period for tunnel construction can be shortened. Moreover, when assembling the constituent members, it is not necessary to temporarily place the constituent members on the ground S or to assemble members for assembling the constituent members on the ground S. Therefore, it is possible to prevent the traffic of other work vehicles and the movement of articles from being restricted.

(4)型枠装置11の解体に際しても、構成部材その分解順序に従ってクレーンで吊ってトラック荷台TCに積載できる。そして、構築時と同様に一方向に延びる複数の構成部材を並設状態で連結することによって、構成部材が嵩張ることなく、安定状態となる。そして、撤去の際には、構成部材をトンネルTN内の地面Sに仮置きしたりする必要がないので、作業車両の移動規制の時間を短くできる。その結果、トンネル建設の工期を短縮できる。 (4) When the formwork device 11 is dismantled, it can be lifted by a crane and loaded on the truck bed TC in accordance with the dismantling order of the constituent members. Then, by connecting a plurality of structural members extending in one direction in a side-by-side manner as in the case of construction, a stable state can be achieved without the structural members becoming bulky. In addition, since there is no need to temporarily place the constituent members on the ground S in the tunnel TN at the time of removal, the time required for movement regulation of the work vehicle can be shortened. As a result, the construction period for tunnel construction can be shortened.

(第2実施形態)
次に、本発明の第2実施形態を第1実施形態と異なる部分を中心にして図28以下の図面に基づいて説明する。
(Second embodiment)
Next, a second embodiment of the present invention will be described with reference to FIG. 28 and subsequent drawings, focusing on the portions different from the first embodiment.

〈型枠装置11の構成〉
第2実施形態は、小断面のトンネルTNにおいて実施する場合に適する。本実施形態の型枠装置11においては、図28及び図29に示すように、メインビーム27,サブビーム31及び台梁29が設けられていない。そして、天フォーム33を支持する柱材32は桁材14の上面に立てられる。また、台梁29に代えて、天フォーム33の下部側を支持する保持部材71が桁材14の両端面に設けられている。
<Configuration of formwork device 11>
The second embodiment is suitable for implementation in tunnels TN of small cross-section. In the formwork device 11 of this embodiment, as shown in FIGS. 28 and 29, the main beam 27, the sub-beam 31 and the girders 29 are not provided. A column material 32 supporting the top form 33 is erected on the upper surface of the girder material 14 . Further, holding members 71 for supporting the lower side of the top form 33 are provided on both end faces of the girder member 14 instead of the platform beam 29 .

図29に示すように、第2実施形態における型枠装置11において、桁材14は、狭い前後間隔で8基設けられており、桁材14間において左右の壁部材151間に架設された中央足場22は、幅の狭いものが2枚並設されている。この中央足場22は、後述のように桁材14に支持されている。 As shown in FIG. 29, in the formwork device 11 according to the second embodiment, eight girders 14 are provided at narrow front-to-rear intervals. Two narrow scaffolds 22 are arranged side by side. This central scaffolding 22 is supported by beam members 14 as will be described later.

図35及び図36に示すように、桁材14は、トンネル奥側から順に第1~第8ポジションQ1~Q8に設置される。そして、桁材14には、第1~第3桁材14A~14Cの3種類が設けられている。図30,図31及び図35(これらの図において第1~第3桁材14A~14Cは重ねられている)に示すように、第1桁材14Aは、4基であって、中央足場22を有しない。第2桁材14Bは3基であって、その前後両側面に中央足場22が下端においてヒンジ72を介して起伏回動可能に支持されている。第3桁材14Cは1基であって、その一側面に中央足場22が下端においてヒンジ72を介して起伏回動可能に支持されている。そして、中央足場22は、下方に回動されることによって、左右の壁部材151間の架設位置に配置される。 As shown in FIGS. 35 and 36, the girders 14 are installed at first to eighth positions Q1 to Q8 in order from the innermost side of the tunnel. The girders 14 are provided with three types of first to third girders 14A to 14C. As shown in FIGS. 30, 31 and 35 (in which the first to third girders 14A to 14C are superimposed), there are four first girders 14A, and the central scaffold 22 does not have There are three second girders 14B, and central scaffoldings 22 are supported on both front and rear sides thereof at their lower ends via hinges 72 so as to be able to rotate up and down. There is one third girder member 14C, and the central scaffolding 22 is supported on one side surface thereof via a hinge 72 at its lower end so as to be able to rotate up and down. Then, the central scaffold 22 is arranged at the installation position between the left and right wall members 151 by rotating downward.

〈構成部材の搬送方法及び型枠装置11の構築方法〉
図32~図34は、第1,第3桁材14A,14Cの搬送状態を示すものである。この搬送状態では、第3桁材14Cの中央足場22が第3桁材14Cの側面に沿うように起立状態にされるとともに、保持金具60の取付けによってその状態に保持される。また、第3桁材14Cを下にして、その上面に第1桁材14Aが重ねられるとともに、第1桁材14Aが連結金具61の取付けによって第3桁材14Cから落下しないように連結される。保持金具60及び連結金具61は連結部材を構成する。
<Method for Conveying Components and Method for Constructing Formwork Device 11>
32 to 34 show how the first and third girders 14A and 14C are conveyed. In this conveying state, the central scaffolding 22 of the third girder member 14C is placed in an upright state along the side surface of the third girder member 14C, and is held in that state by attachment of the holding metal fittings 60. As shown in FIG. In addition, the first girder member 14A is superimposed on the upper surface of the third girder member 14C with the third girder member 14C facing downward, and the first girder member 14A is connected to the third girder member 14C by attaching a connecting fitting 61 so as not to fall off. . The holding metal fitting 60 and the connecting metal fitting 61 constitute a connecting member.

図31及び図35に示すように、搬送時において、第1桁材14Aは、第2桁材14Bとも組合わされて、第2桁材14B上に重ねられる。この場合、第2桁材14Bの両中央足場22は前記と同様に起立状態にされるとともに、保持金具60によってその状態に維持される。また、上下の第1,第2桁材14A,14Bも連結金具61によって連結される。 As shown in FIGS. 31 and 35, during transportation, the first girder member 14A is also combined with the second girder member 14B and stacked on the second girder member 14B. In this case, both central scaffoldings 22 of the second beam member 14B are placed in the upright state in the same manner as described above, and are maintained in that state by the holding metal fittings 60. As shown in FIG. The upper and lower first and second girders 14A and 14B are also connected by connecting fittings 61. As shown in FIG.

前記連結金具61及び保持金具60は、第1~第3桁材14A~14C及び中央足場22が壁部材151間に架設される際に外される。
図31及び図32に示すように、これらの第1桁材14Aと第2桁材14Bとの組合わせを2枚の中央足場22を有する双板桁材ユニット141とする。第1桁材14Aと第3桁材14Cとの組合わせを1枚の中央足場22を有する単板桁材ユニット142とする。そして、双板桁材ユニット141が3基、単板桁材ユニット142が1基形成される。合計4基の桁材ユニット141,142は、それぞれ1基の壁部材151と組合わされて搬送される。
The connecting fittings 61 and the holding fittings 60 are removed when the first to third girders 14A to 14C and the central scaffolding 22 are erected between the wall members 151. As shown in FIG.
As shown in FIGS. 31 and 32, the combination of these first girder members 14A and second girder members 14B is a double plate girder unit 141 having two central scaffolds 22. As shown in FIGS. A combination of the first girder member 14A and the third girder member 14C is defined as a single plate girder unit 142 having one central scaffolding 22 . Three double plate girder units 141 and one single plate girder unit 142 are formed. A total of four girder units 141 and 142 are combined with one wall member 151 and transported.

従って、本実施形態においては、桁材ユニット141,142及び壁部材151の搬送には、4台のトラックTRが用いられる。各トラックTRにはそれぞれ1基の壁部材151が積載される。そして、1台目,3台目及び4台目のトラックTRには壁部材151と双板桁材ユニット141との組合わせが積載される。2台目のトラックTRには壁部材151と単板桁材ユニット142との組合わせが積載される。 Therefore, in this embodiment, four trucks TR are used for transporting the beam units 141 and 142 and the wall member 151 . One wall member 151 is loaded on each track TR. Combinations of the wall member 151 and the double plate beam unit 141 are loaded on the first, third and fourth trucks TR. A combination of the wall member 151 and the single plate beam unit 142 is loaded on the second truck TR.

そして、図32~図34に示すように、桁材ユニット141,142及び壁部材151の搬送に際しては、壁部材151と各桁材ユニット141,142とは、ほぼ平行になるように並設される。この状態で、それらの底面間が連結バー52の取付けによって連結状態に保持される。また、壁部材151と各桁材ユニット141,142の上端部との間が連結金具54によって連結される。このため、壁部材151と各桁材14A~14Cとは、並設状態で、かつ安定した起立状態の構成部材ユニットになる。従って、本実施形態においては、壁部材151,桁材14A,14C及び中央足場22が主要な構成部材である。構成部材ユニットがトラックTRの荷台TCに積載されると、壁部材151及び各桁材14A~14Cは、トラックTRの前後方向に沿って延びる。壁部材151及び桁材ユニット141,142と、それらを連結する連結バー52及び連結金具54とは、壁部材151及び桁材ユニット141,142を荷台TCから降ろす際に外される。 As shown in FIGS. 32 to 34, when the beam units 141 and 142 and the wall members 151 are transported, the wall members 151 and the beam units 141 and 142 are arranged side by side so as to be substantially parallel. be. In this state, the connecting bar 52 is attached between the bottom surfaces thereof to maintain a connected state. Also, the wall member 151 and the upper ends of the beam units 141 and 142 are connected by connecting fittings 54 . Therefore, the wall member 151 and the girders 14A to 14C form a structural member unit that is arranged side by side and is in a stable standing state. Therefore, in this embodiment, the wall member 151, the girders 14A and 14C, and the central scaffolding 22 are main constituent members. When the component unit is loaded on the loading platform TC of the truck TR, the wall member 151 and the girders 14A to 14C extend along the longitudinal direction of the truck TR. The wall member 151 and the beam units 141, 142, and the connecting bar 52 and the connecting fitting 54 connecting them are removed when the wall member 151 and the beam units 141, 142 are unloaded from the loading platform TC.

型枠装置11の構築に際しては、最初に、トンネルTN内に第1桁材14A及び第2桁材14Bよりなる双板桁材ユニット141と壁部材151とを積載した1台目のトラックTRを荷降ろし位置に進入させる。そして、図37(a)に示すように、壁部材151をクレーンによって地面Sに荷降ろしをしてトンネル奥側の第1位置P1に設置する。 When constructing the formwork device 11, first, the first truck TR loaded with the double plate girder unit 141 consisting of the first girder 14A and the second girder 14B and the wall member 151 is loaded into the tunnel TN. Approach the unloading position. Then, as shown in FIG. 37(a), the wall member 151 is unloaded onto the ground S by a crane and installed at the first position P1 on the inner side of the tunnel.

次いで、1台目のトラックTRを待機位置に後退させて、第1桁材14A及び第3桁材14Cの単板桁材ユニット142と壁部材151とを積載した2台目のトラックTRを荷降ろし位置に進入させる。そして、図37(b)に示すように、壁部材151をトンネル奥側の第2位置P2に設置する。また、図35及び図36に示すように、単板桁材ユニット142をクレーンによって荷降ろしをして壁部材151間の第2ポジションQ2に架設する。そして、中央足場22を下方に展開して左右の壁部材151間に架設する。また、第1桁材14Aを第3桁材14Cから分離して、その第1桁材14Aを第1ポジションQ1位置において左右の壁部材151間に架設する。なお、図37(a)~(f)においては中央足場22の図示を省略している。また、図30~図36においては、第1~第3桁材14A~14Cの厚さを誇張して描いている。 Next, the first truck TR is retracted to the standby position, and the second truck TR loaded with the single plate girder unit 142 of the first girder member 14A and the third girder member 14C and the wall member 151 is loaded. Enter the unloading position. Then, as shown in FIG. 37(b), the wall member 151 is installed at the second position P2 on the inner side of the tunnel. Further, as shown in FIGS. 35 and 36, the single plate beam unit 142 is unloaded by a crane and erected at the second position Q2 between the wall members 151. As shown in FIGS. Then, the central scaffolding 22 is deployed downward and constructed between the left and right wall members 151 . Also, the first girder member 14A is separated from the third girder member 14C, and the first girder member 14A is installed between the left and right wall members 151 at the first position Q1. 37(a) to (f), illustration of the central scaffolding 22 is omitted. 30 to 36, the thicknesses of the first to third beam members 14A to 14C are exaggerated.

次いで、空荷の2台目のトラックTRを建設現場から後退させるとともに、1台目のトラックTRを再度荷降ろし位置に進入させて、1台目のトラックTRに積載された双板桁材ユニット141を第3ポジションQ3に架設する。そして、両側の中央足場22を下方に展開するとともに、第1桁材14Aを第2桁材14Bから分離して、その第1桁材14Aを第4ポジションQ4に架設する。 Next, the empty second truck TR is retreated from the construction site, and the first truck TR is moved to the unloading position again, and the double plate girder unit loaded on the first truck TR is 141 is installed at the third position Q3. Then, the central scaffolds 22 on both sides are extended downward, the first girder member 14A is separated from the second girder member 14B, and the first girder member 14A is erected at the fourth position Q4.

次いで、空荷になった2台目のトラックTRを建設現場から後退させて、3台目のトラックTRを荷降ろし位置に進入させるとともに、3台目のトラックTRに積載された壁部材151を第3位置P3に設置する。 Next, the empty second truck TR is retreated from the construction site, the third truck TR is moved to the unloading position, and the wall members 151 loaded on the third truck TR are removed. Installed at the third position P3.

次いで、3台目のトラックTRを待機位置に後退させて、4台目のトラックTRを荷降ろし位置に進入させる。そして、4台目のトラックTRに積載された壁部材151を第4位置P4に設置するとともに、双板桁材ユニット141を第3位置P3及び第4位置P4の壁部材151間における第5ポジションQ5に架設する。そして、両側の中央足場22を下方に展開するとともに、第1桁材14Aを第2桁材14Bから分離して、その第1桁材14Aを第6ポジションQ6に移動する。 Next, the third truck TR is retreated to the standby position, and the fourth truck TR is advanced to the unloading position. Then, the wall member 151 loaded on the fourth truck TR is installed at the fourth position P4, and the double plate beam unit 141 is placed at the fifth position between the wall member 151 at the third position P3 and the fourth position P4. Installed on Q5. Then, the central scaffolds 22 on both sides are deployed downward, the first girder member 14A is separated from the second girder member 14B, and the first girder member 14A is moved to the sixth position Q6.

次いで、空荷になった4台目のトラックTRを建設現場から後退させて、3台目のトラックTRを再度荷降ろし位置に進入させる。そして、3台目のトラックTRに積載された双板桁材ユニット141を第7ポジションQ7に架設する。次いで、両側の中央足場22を下方に展開するとともに、第1桁材14Aを第2桁材14Bから分離して、その第1桁材14Aを第8ポジションQ8に架設する。空荷になった第4トラックTR4は建設現場から後退する。 Next, the empty fourth truck TR is retreated from the construction site, and the third truck TR is moved to the unloading position again. Then, the double plate beam unit 141 loaded on the third truck TR is erected at the seventh position Q7. Next, the central scaffolds 22 on both sides are deployed downward, the first girder members 14A are separated from the second girder members 14B, and the first girder members 14A are erected at the eighth position Q8. The empty fourth truck TR4 retreats from the construction site.

その後、各桁材14の左右両端に天フォーム33を支持するための保持部材71が取付けられる。
そして、桁材14A~14Cの上面に保持部材71及び柱材32を介して天フォーム33が支持されることに続いて、壁部材151よりなる側壁15がジャッキ37によって上昇される。この状態で側壁15の下側に脚足16が組付けられて、ガントリ12が構成される。さらに、天フォーム33の両側に側フォーム34及び下部フォーム35が組付けられる。以上のようにして、型枠装置11が構築される。
After that, holding members 71 for supporting the top form 33 are attached to the left and right ends of each beam member 14 .
After the ceiling form 33 is supported on the upper surfaces of the girders 14A to 14C via the holding members 71 and the pillars 32, the side walls 15 made up of the wall members 151 are raised by the jacks 37. In this state, the legs 16 are attached to the lower side of the side walls 15 to construct the gantry 12 . Further, side foams 34 and lower foams 35 are attached to both sides of the top foam 33 . The formwork device 11 is constructed as described above.

型枠装置11の解体及び撤去は、解体時と逆の手順で遂行される。すなわち、桁材14,壁部材151等の構成部材を分解するとともに、その分解された構成部材を分解順に従って並設して構成部材ユニットを構成する。そして、その構成部材ユニットを前記のようにトラックTRに積載して搬出する。 Dismantling and removal of the formwork device 11 are performed in the reverse order of dismantling. That is, the structural members such as the girders 14 and the wall members 151 are disassembled, and the disassembled structural members are arranged side by side in order of disassembly to form a structural member unit. Then, the component unit is loaded on the truck TR and carried out as described above.

(第2実施形態の効果)
第2実施形態においても第1実施形態と同様な効果を得ることができる。
そして、第2実施形態においては、前記第1実施形態の効果に加えて以下の効果を得ることができる。
(Effect of Second Embodiment)
The same effect as in the first embodiment can also be obtained in the second embodiment.
In the second embodiment, the following effects can be obtained in addition to the effects of the first embodiment.

(1)桁材14が8基であっても、その桁材14は2基ずつ重ねて搬送される。また、中央足場22が第2,第3桁材14B,14Cにヒンジ連結されている。さらに、メインビーム27及びサブビーム31が不要である。このため、中央足場22,メインビーム27及びサブビーム31を運搬するためのトラックTRが不要になる。従って、型枠装置11の構成部材を搬送するためのトラックTRの台数を減らすことができる。 (1) Even if the number of girder members 14 is eight, the girder members 14 are conveyed two by two. A central scaffolding 22 is hinged to the second and third girders 14B and 14C. Furthermore, the main beam 27 and sub-beams 31 are not required. Therefore, the truck TR for transporting the central scaffold 22, the main beam 27 and the sub-beams 31 becomes unnecessary. Therefore, the number of trucks TR for transporting the constituent members of the formwork device 11 can be reduced.

(2)2基の第1~第3桁材14A~14Cが重ねられた桁材ユニット141,142を搬送した後に、そのまま壁部材151上に移動させる。従って、第1~第3桁材14A~14Cを嵩張ることなく搬送できる。そして、上部側の第1桁材14Aを所定位置に移動させるようにした。これによって、桁材14A~14Cを1基ずつトラックTRか上から移動させる必要がなくなるため、クレーンの負担を軽減できるとともに、作業効率を向上できる。 (2) After transporting the girder unit 141 and 142 in which the two first to third girder members 14A to 14C are stacked, they are moved onto the wall member 151 as they are. Therefore, the first to third beam members 14A to 14C can be transported without being bulky. Then, the first girder member 14A on the upper side is moved to a predetermined position. This eliminates the need to move the girders 14A to 14C one by one from the truck TR or above, thereby reducing the load on the crane and improving work efficiency.

(3)桁材ユニット141,142が壁部材151上に設置された状態において移動される第1桁材14Aが中央足場22を有しない軽量のものであるため、その移動を容易に行うことができる。また、クレーンのブームを伸長させることによって側壁15の最奥部に置かれる単板桁材ユニット142の中央足場22は1枚だけであるので、軽量である。そのため、単板桁材ユニット142移動させるクレーンの負担をさらに軽減できる。 (3) Since the first girder 14A, which is moved while the girder units 141 and 142 are installed on the wall member 151, is lightweight and does not have the central scaffolding 22, it can be easily moved. can. Moreover, since only one central scaffolding 22 of the single plate girder unit 142 is placed at the innermost part of the side wall 15 by extending the boom of the crane, it is lightweight. Therefore, the load on the crane for moving the single plate girder unit 142 can be further reduced.

(変更例)
本発明は、前記第1,第2実施形態に限定されるものではなく、以下のような態様で具体化することもできる。この場合、両実施形態及び変更例は、発明の趣旨を逸脱しない範囲内で相互に組合わせることができる。
(Change example)
The present invention is not limited to the first and second embodiments, and can be embodied in the following modes. In this case, both embodiments and modifications can be combined with each other without departing from the scope of the invention.

・前記両実施形態において、連結金具54や止め金具55に代えて、ワイヤやチェーン等の索を用いること。
・型枠装置11の前後位置に設置される張出し足場等の型枠装置11の他の構成部材を搬送時に壁部材151と別体にするとともに、連結金具を用いて、第1,第2実施形態の構成部材に対して連結して運搬すること。
- In both the above-described embodiments, instead of the connecting metal fittings 54 and the stopper metal fittings 55, a cable such as a wire or a chain is used.
・Other structural members of the formwork device 11, such as overhanging scaffolds installed at the front and rear positions of the formwork device 11, are separated from the wall member 151 during transportation, and using connecting fittings, the first and second implementations Conveying by connecting to the components of the form.

・前記第1,第2実施形態において、壁部材151,桁材14,中央足場22,メインビーム27,台梁29,サブビーム31のうちの少なくともひとつの構成部材と、その構成部材とは別の構成部材とを組合わせて構成部材ユニットとすること。 - In the first and second embodiments, at least one of the wall member 151, the beam member 14, the central scaffolding 22, the main beam 27, the beam 29, and the sub-beam 31, and another Combining constituent members to form a constituent member unit.

・前記第1,第2実施形態の構成部材ユニットに代えて、壁部材151,桁材14,中央足場22,メインビーム27,台梁29,サブビーム31のうちの少なくともふたつの構成部材の組み合わせによる構成部材ユニットとすること。例えば、桁材14,メインビーム27,サブビーム31の組合わせの構成部材ユニット等、前記第1,第2実施形態の構成部材ユニットとは異なる構成部材の組合わせの構成部材ユニットとすること。 A combination of at least two of the wall member 151, beam 14, central scaffolding 22, main beam 27, pedestal 29, and sub-beam 31 instead of the structural member units of the first and second embodiments. To be a component unit. For example, the structural member unit may be a combination of structural members different from the structural member units of the first and second embodiments, such as a structural member unit of a combination of the girders 14, the main beams 27, and the sub-beams 31.

・起立状態の壁部材151,桁材14等の構成部材の脚として機能する連結バー52を省略すること。従って、前記構成部材は、連結金具54や止め金具55によって他の構成部材と連結された状態で起立される構成部材ユニットとなる。この構成部材ユニットは、前記第1,第2実施形態の構成部材ユニットと同様に、トラックTRの荷台TCに積載されるとともに、搬送される。 o Omission of the connection bar 52 functioning as legs of the upright wall members 151, beam members 14, and other structural members. Therefore, the constituent member becomes a constituent member unit which is erected while being connected to other constituent members by the connecting metal fittings 54 and the fasteners 55 . This structural member unit is loaded and conveyed on the loading platform TC of the truck TR in the same manner as the structural member units of the first and second embodiments.

(他の技術的思想)
前記第2実施形態から把握される技術的思想は以下の通りである。
(A)トンネルの幅方向の両側に設置される側壁と、その両側壁の上部間に架設される複数の桁材とを備えたガントリの上部に、トンネルの覆工コンクリートを成形するためのフォームを支持するコンクリート型枠装置において、
前記桁材には、隣接する桁材間において前記側壁間に架設される足場を起伏可能に支持したコンクリート型枠装置。
(Other technical ideas)
The technical ideas understood from the second embodiment are as follows.
(A) A form for forming tunnel lining concrete on the upper part of a gantry provided with side walls installed on both sides in the width direction of the tunnel and a plurality of girders installed between the upper parts of the both side walls. In a concrete formwork device supporting
A concrete formwork device in which scaffolds erected between the side walls between adjacent girders are supported on the girders so as to be able to rise and fall.

このコンクリート型枠装置においては、足場が桁材に支持されているため、コンクリート型枠装置の構築や解体に際して桁材を搬送すればよい。つまり、足場を単体で搬送する必要はない。従って、コンクリート型枠装置の構築及び解体を効率よく短時間で行うことができる。しかも、足場が起伏自在であるため、足場を使用しない搬送時等において、その足場を起立状態にすれば、邪魔になることはない。このため、前記の構築及び解体をさらに効率よく行うことができる。 In this concrete formwork apparatus, since the scaffolding is supported by the girder members, the girder materials can be conveyed when constructing or dismantling the concrete formwork apparatus. In other words, there is no need to transport the scaffolding alone. Therefore, it is possible to efficiently construct and dismantle the concrete formwork apparatus in a short time. In addition, since the scaffolding can be raised and lowered, it does not become an obstacle when the scaffolding is placed in an upright state during transport or the like when the scaffolding is not used. Therefore, the construction and dismantling can be performed more efficiently.

(B)トンネルの幅方向の両側に設置される側壁と、その両側壁の上部間に架設される複数の桁材とを備えたガントリの上部に、トンネルの覆工コンクリートを成形するためのフォームを支持するコンクリート型枠装置において、
隣接する桁材間において前記側壁間に架設される足場を起伏可能に支持した桁材と、前記足場を有しない桁材とを隣接配置したコンクリート型枠装置。
(B) A form for forming tunnel lining concrete on the upper part of a gantry provided with side walls installed on both sides in the width direction of the tunnel and a plurality of girders installed between the upper parts of the both side walls. In a concrete formwork device supporting
A concrete formwork apparatus in which a girder supporting a scaffolding constructed between said side walls between adjacent girder members so as to be able to rise and fall and a girder without said scaffolding are arranged adjacent to each other.

このように構成したコンクリート型枠装置においては、足場を有しない桁材を足場を有する桁材の上に重ねることによって、搬送される桁材の数を実質的に減らすことができる。従って、コンクリート型枠装置の構築及び解体に際して、搬送される桁材の数を少なくできるため、型枠装置の構築及び解体の作業を効率よく実行できる。 In the concrete formwork apparatus configured in this way, the number of girders to be transported can be substantially reduced by stacking the girders without scaffolding on the girders with scaffolding. Therefore, since the number of girders to be transported can be reduced when constructing and dismantling the concrete formwork apparatus, the work of constructing and dismantling the formwork apparatus can be carried out efficiently.

(C)前記技術的思想(B)項に記載のコンクリート型枠装置において、
複数の前記桁材を同方向に延びるように重ねた状態で前記側壁間に架設した後に、前記足場を側壁間に架設されるように展開し、次いで上部側の前記桁材を前記側壁間の他の位置に架設するコンクリート型枠装置の構築方法。
(C) In the concrete formwork device according to the technical idea (B) section,
After a plurality of girders are laid between the side walls so as to extend in the same direction, the scaffolding is unfolded so as to be laid between the side walls, and then the upper girders are placed between the side walls. A method for constructing a concrete formwork device erected at another position.

以上の構築方法においては、搬送される桁材の数を実質的に減らすことができる。従って、コンクリート型枠装置の構築及び解体に際して、搬送される桁材の数を少なくできるとともに、搬送トラックと構築位置との間の型枠の移動回数を少なくできるため、構築及び解体の作業を効率よく実行できる。 In the construction method described above, the number of girders to be transported can be substantially reduced. Therefore, when constructing and dismantling the concrete formwork apparatus, the number of girders to be transported can be reduced, and the number of movements of the formwork between the transport truck and the construction position can be reduced, so that the construction and dismantling work can be efficiently performed. well executed.

(D)足場を有する桁材の上に足場を有しない桁材を重ねた状態で、桁材を側壁上に搬送し、次いで足場を展開した後に、足場を有しない桁材を移動して、足場を有する桁材間に配置する前記(C)項に記載のコンクリート型枠装置の構築方法。 (D) In a state where the girder without scaffolding is superimposed on the girder with scaffolding, the girder without scaffolding is conveyed onto the side wall, and after the scaffolding is deployed, the girder without scaffolding is moved, The method for constructing a concrete formwork apparatus according to the above item (C), which is arranged between girders having scaffolding.

従って、足場を有する桁材間に対して足場を有しない桁材を小さな力で移動させることができる。 Therefore, the girder without scaffolding can be moved with a small force with respect to the girder with scaffolding.

11…コンクリート型枠装置
12…ガントリ
13…装置脚
15…側壁
22…中央足場
27…メインビーム
29…台梁
33…天フォーム
36…フォーム
151…壁部材
51…連結金具
52…連結バー
53…保持金具
54…連結金具
55…止め金具
56…把持金具
57…連結金具
58…連結金具
59…幅止め金具
60…保持金具
61…連結金具
C…覆工コンクリート
S…地面
TC…荷台
TN…トンネル
TR…トラック
DESCRIPTION OF SYMBOLS 11... Concrete formwork apparatus 12... Gantry 13... Apparatus leg 15... Side wall 22... Central scaffolding 27... Main beam 29... Beam 33... Ceiling form 36... Form 151... Wall member 51... Connection fitting 52... Connection bar 53... Holding Metal fittings 54 Connecting metal fittings 55 Fastening metal fittings 56 Grasping metal fittings 57 Connecting metal fittings 58 Connecting metal fittings 59 Width stopping metal fittings 60 Holding metal fittings 61 Connecting metal fittings C Lining concrete S Ground TC Bed TN Tunnel TR truck

Claims (7)

トンネルの幅方向の両側に設置される側壁と、その両側壁の上部間に架設される橋架部とを備えたガントリの上部に、前記トンネルの覆工コンクリートを成形するためのフォームを支持するコンクリート型枠装置において、
前記コンクリート型枠装置を構成する複数の構成部材は、一方向に揃えたうえ、組立順序に従う組合わせの設置状態で連結部材によって連結され、
前記連結部材は、第1連結部材と、第2連結部材と、を備え、
前記複数の構成部材は、複数の第1構成部材と、前記複数の第1構成部材よりも組立順序が後である複数の第2構成部材とを備え、
前記複数の第1構成部材は、前記第1連結部材によって連結されることにより第1構成部材ユニットを構成し、
前記複数の第2構成部材は、前記第2連結部材によって連結されることにより第2構成部材ユニットを構成するコンクリート型枠装置の構成部材ユニット。
Concrete for supporting the form for forming the tunnel lining concrete above the gantry, which has side walls installed on both sides in the width direction of the tunnel and a bridge part built between the upper parts of the both side walls. In formwork equipment,
The plurality of structural members constituting the concrete formwork apparatus are aligned in one direction and connected by connecting members in a combination installation state according to the assembly order,
The connecting member includes a first connecting member and a second connecting member,
The plurality of constituent members includes a plurality of first constituent members and a plurality of second constituent members whose assembly order is later than the plurality of first constituent members,
The plurality of first structural members constitute a first structural member unit by being connected by the first connecting member,
A constituent member unit of a concrete form apparatus, wherein the plurality of second constituent members are connected by the second connecting member to form a second constituent member unit.
前記第1連結部材が前記複数の第1構成部材を起立させるための脚の機能を有する請求項1に記載のコンクリート型枠装置の構成部材ユニット。 2. The structural member unit of a concrete form apparatus according to claim 1 , wherein said first connecting member has a leg function for erecting said plurality of first structural members. 前記ガントリは、前記トンネルの幅方向に延びて前記両側壁の上部間に架設される中央足場と、前記橋架部及び前記中央足場のにおいてトンネル延長方向に延びるように設けられるビームとを備え、
前記複数の第1構成部材は、前記側壁及び前記橋架部を含み、
前記複数の第2構成部材は、前記中央足場及び前記ビームを含む請求項1に記載のコンクリート型枠装置の構成部材ユニット。
The gantry includes a central scaffold that extends in the width direction of the tunnel and is constructed between the upper portions of the side walls, and a beam that extends in the tunnel extension direction above the bridge and the central scaffold. ,
The plurality of first constituent members includes the sidewall and the bridge,
2. The concrete form apparatus component unit of claim 1, wherein said plurality of second components comprises said central scaffolding and said beam .
前記ガントリは、前記トンネルの幅方向に延びる台梁と、レール上を転動する車輪が下端に設けられた脚部と、を備え、 The gantry includes a platform beam extending in the width direction of the tunnel, and a leg having a wheel at its lower end that rolls on the rail,
前記側壁は、前記側壁の起立を補助するとともに前記側壁を昇降可能であるジャッキを取り付け可能であり、かつ、前記ジャッキにより上昇した状態で前記脚部を下端に連結可能である請求項1~請求項3のうち何れか一項に記載のコンクリート型枠装置の構成部材ユニット。 1 to claim 1, wherein the side wall can be attached with a jack that assists the side wall to stand up and allows the side wall to move up and down, and the leg can be connected to the lower end in a state of being lifted by the jack. Item 4. The component unit for a concrete formwork apparatus according to any one of Item 3.
トンネルの幅方向の両側に設置される側壁と、その両側壁の上部間に架設される橋架部とを備えたガントリの上部に、前記トンネルの覆工コンクリートを成形するためのフォームを支持するコンクリート型枠装置において、
一方向に延びる複数の構成部材のうち複数の第1構成部材を第1連結部材によって連結することにより第1構成部材ユニットを構成し、前記複数の構成部材のうち、前記複数の第1構成部材よりも組立順序が後である複数の第2構成部材を第2連結部材によって連結することにより第2構成部材ユニットを構成し、前記第1構成部材ユニットを、前記複数の第1構成部材の長さ方向がトラックの荷台の前後方向に沿うように前記荷台に積載した状態で搬送し、前記第2構成部材ユニットを、前記複数の第2構成部材の長さ方向がトラックの荷台の前後方向に沿うように前記荷台に積載した状態で搬送するコンクリート型枠装置の搬送方法。
Concrete for supporting the form for forming the tunnel lining concrete above the gantry, which has side walls installed on both sides in the width direction of the tunnel and a bridge part built between the upper parts of the both side walls. In formwork equipment,
A first structural member unit is configured by connecting a plurality of first structural members among a plurality of structural members extending in one direction with a first connecting member, and the plurality of first structural members among the plurality of structural members A second component unit is configured by connecting a plurality of second component members whose assembly order is later than that of the first component member by a second connection member, and the first component member unit is formed by the length of the plurality of first component members . The second component unit is transported in a state of being loaded on the cargo bed so that the longitudinal direction is along the front-rear direction of the cargo bed of the truck, and the second component unit is transported so that the length direction of the plurality of second component members is the front-rear direction of the cargo bed of the truck. A method of transporting a concrete formwork device that transports a concrete formwork device loaded on the loading platform so as to follow .
トンネルの幅方向の両側に設置される側壁と、その両側壁の上部間に架設される橋架部とを備えたガントリの上部に、前記トンネルの覆工コンクリートを成形するためのフォームを支持するコンクリート型枠装置の構築方法において、
一方向に延びる複数の構成部材のうち複数の第1構成部材を第1連結部材によって連結することにより構成した第1構成部材ユニットを前記トンネルの建設現場に搬送し、前記複数の構成部材のうち、前記複数の第1構成部材よりも組立順序が後である複数の第2構成部材を第2連結部材によって連結することにより構成した第2構成部材ユニットを前記トンネルの建設現場に搬送し、
記トンネルの建設現場において前記第1構成部材ユニットから前記複数の第1構成部材を分離した後に、前記第2構成部材ユニットから前記複数の第2構成部材を分離して前記コンクリート型枠装置を構築するコンクリート型枠装置の構築方法。
Concrete for supporting the form for forming the tunnel lining concrete above the gantry, which has side walls installed on both sides in the width direction of the tunnel and a bridge part built between the upper parts of the both side walls. In the construction method of the formwork device,
A first structural member unit configured by connecting a plurality of first structural members among a plurality of structural members extending in one direction with a first connecting member is transported to the construction site of the tunnel, and among the plurality of structural members, transporting a second structural member unit configured by connecting a plurality of second structural members whose assembly order is later than that of the plurality of first structural members with a second connecting member to a construction site of the tunnel;
At the construction site of the tunnel , after separating the plurality of first constituent members from the first constituent member unit, the plurality of second constituent members are separated from the second constituent member unit to form the concrete formwork. A method of constructing a concrete formwork apparatus for constructing a
トンネルの幅方向の両側に設置される側壁と、その両側壁の上部間に架設される橋架部とを備えたガントリの上部に、前記トンネルの覆工コンクリートを成形するためのフォームを支持するコンクリート型枠装置において、
一方向に延びる複数の構成部材のうち複数の第2構成部材を分割した後に、前記複数の第2構成部材を分解順に従って第2連結部材によって連結することにより第2構成部材ユニットを構成し、前記複数の構成部材のうち、前記複数の第2構成部材よりも分解順序が後である複数の第1構成部材を分解した後に、前記複数の第1構成部材を分解順に従って第1連結部材によって連結することにより第1構成部材ユニットを構成するコンクリート型枠装置の解体方法。
Concrete for supporting the form for forming the tunnel lining concrete above the gantry, which has side walls installed on both sides in the width direction of the tunnel and a bridge part built between the upper parts of the both side walls. In formwork equipment,
After dividing a plurality of second constituent members out of a plurality of constituent members extending in one direction, a second constituent member unit is configured by connecting the plurality of second constituent members with a second connecting member in the order of disassembly, After disassembling the plurality of first constituent members among the plurality of constituent members whose disassembly order is later than the plurality of second constituent members, the plurality of first constituent members are disassembled according to the disassembly order by a first connecting member. A method for dismantling a concrete formwork device that is connected to form a first component unit.
JP2022185600A 2022-11-21 2022-11-21 CONCRETE FORM EQUIPMENT COMPONENT UNIT, CONCRETE FORM EQUIPMENT CONVEYING METHOD, CONCRETE FORM EQUIPMENT CONSTRUCTION METHOD, AND CONCRETE FORM EQUIPMENT DISASSEMBLY METHOD Active JP7297344B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022185600A JP7297344B1 (en) 2022-11-21 2022-11-21 CONCRETE FORM EQUIPMENT COMPONENT UNIT, CONCRETE FORM EQUIPMENT CONVEYING METHOD, CONCRETE FORM EQUIPMENT CONSTRUCTION METHOD, AND CONCRETE FORM EQUIPMENT DISASSEMBLY METHOD

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022185600A JP7297344B1 (en) 2022-11-21 2022-11-21 CONCRETE FORM EQUIPMENT COMPONENT UNIT, CONCRETE FORM EQUIPMENT CONVEYING METHOD, CONCRETE FORM EQUIPMENT CONSTRUCTION METHOD, AND CONCRETE FORM EQUIPMENT DISASSEMBLY METHOD

Related Child Applications (2)

Application Number Title Priority Date Filing Date
JP2023092335A Division JP7497090B2 (en) 2023-06-05 Constituent unit of concrete formwork device, method for transporting concrete formwork device, method for constructing concrete formwork device, and method for dismantling concrete formwork device
JP2023092334A Division JP7497089B2 (en) 2023-06-05 Constituent unit of concrete formwork device, method for transporting concrete formwork device, method for constructing concrete formwork device, and method for dismantling concrete formwork device

Publications (2)

Publication Number Publication Date
JP7297344B1 true JP7297344B1 (en) 2023-06-26
JP2024074456A JP2024074456A (en) 2024-05-31

Family

ID=86900456

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022185600A Active JP7297344B1 (en) 2022-11-21 2022-11-21 CONCRETE FORM EQUIPMENT COMPONENT UNIT, CONCRETE FORM EQUIPMENT CONVEYING METHOD, CONCRETE FORM EQUIPMENT CONSTRUCTION METHOD, AND CONCRETE FORM EQUIPMENT DISASSEMBLY METHOD

Country Status (1)

Country Link
JP (1) JP7297344B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11869829B2 (en) 2009-01-05 2024-01-09 Amkor Technology Singapore Holding Pte. Ltd. Semiconductor device with through-mold via

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009209657A (en) * 2008-03-06 2009-09-17 Taisei Corp Lining form frame and construction method for lining form
JP2014202040A (en) * 2013-04-09 2014-10-27 鹿島建設株式会社 Movable type form device
JP2015094167A (en) * 2013-11-13 2015-05-18 鹿島建設株式会社 Concrete placing method
JP2020176400A (en) * 2019-04-16 2020-10-29 株式会社Ihi建材工業 Tunnel lining method
JP2022168317A (en) * 2022-06-29 2022-11-07 有限会社 伊藤 Support frame of concrete formwork device, piling method of support frame, and construction method of support frame
JP2022172410A (en) * 2022-09-20 2022-11-15 有限会社 伊藤 Standing table for the components of the concrete formwork device, component unit of concrete formwork device, conveying method of component unit of concrete formwork device, construction method of concrete formwork device, and dismantling method of concrete formwork device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009209657A (en) * 2008-03-06 2009-09-17 Taisei Corp Lining form frame and construction method for lining form
JP2014202040A (en) * 2013-04-09 2014-10-27 鹿島建設株式会社 Movable type form device
JP2015094167A (en) * 2013-11-13 2015-05-18 鹿島建設株式会社 Concrete placing method
JP2020176400A (en) * 2019-04-16 2020-10-29 株式会社Ihi建材工業 Tunnel lining method
JP2022168317A (en) * 2022-06-29 2022-11-07 有限会社 伊藤 Support frame of concrete formwork device, piling method of support frame, and construction method of support frame
JP2022172410A (en) * 2022-09-20 2022-11-15 有限会社 伊藤 Standing table for the components of the concrete formwork device, component unit of concrete formwork device, conveying method of component unit of concrete formwork device, construction method of concrete formwork device, and dismantling method of concrete formwork device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11869829B2 (en) 2009-01-05 2024-01-09 Amkor Technology Singapore Holding Pte. Ltd. Semiconductor device with through-mold via

Similar Documents

Publication Publication Date Title
JP5671373B2 (en) Bridge removal method and new construction method
JP7346246B2 (en) Heavy object moving method using heavy object moving device and heavy object moving device
CN107013045B (en) Loading platform
IL114850A (en) Crane for modular bridge construction
JP7297344B1 (en) CONCRETE FORM EQUIPMENT COMPONENT UNIT, CONCRETE FORM EQUIPMENT CONVEYING METHOD, CONCRETE FORM EQUIPMENT CONSTRUCTION METHOD, AND CONCRETE FORM EQUIPMENT DISASSEMBLY METHOD
JP2024074456A (en) Constituent unit of concrete formwork device, method for transporting concrete formwork device, method for constructing concrete formwork device, and method for dismantling concrete formwork device
JP7497089B2 (en) Constituent unit of concrete formwork device, method for transporting concrete formwork device, method for constructing concrete formwork device, and method for dismantling concrete formwork device
JP7497090B2 (en) Constituent unit of concrete formwork device, method for transporting concrete formwork device, method for constructing concrete formwork device, and method for dismantling concrete formwork device
JP7231297B2 (en) Erecting stand for constituent members of concrete formwork device, constituent member unit of concrete formwork device, method of transporting constituent member unit of concrete formwork device, method of constructing concrete formwork device, and method of dismantling concrete formwork device
JP2009121145A (en) Overhanging erection machine and overhang erection method
JP2024074755A (en) Constituent unit of concrete formwork device, method for transporting concrete formwork device, method for constructing concrete formwork device, and method for dismantling concrete formwork device
JP2024074756A (en) Constituent unit of concrete formwork device, method for transporting concrete formwork device, method for constructing concrete formwork device, and method for dismantling concrete formwork device
AU2011202176B2 (en) Bearer Arrangement
JP6520533B2 (en) Overhead crane support device and load receiving member
JP5820605B2 (en) Building construction method
KR100928341B1 (en) Crane lifting frame using truss member
JP3448520B2 (en) Panel for narrow carry-in path and method of erection
JPH05311617A (en) Construction method for elevated structure
JP7330411B2 (en) Floor slab moving method and floor slab moving device
JP7376138B2 (en) How to assemble foam in Center
JP7331504B2 (en) A load suspension unit and a moving object equipped with a load suspension unit
JP5322506B2 (en) Heavy material transport system and transport method
JP7292750B2 (en) How to assemble and dismantle the center
JP5071697B1 (en) Pipe vent structure
JPH09184309A (en) Timbering

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20221125

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20221125

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20221220

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230217

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230307

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230410

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230509

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230607

R150 Certificate of patent or registration of utility model

Ref document number: 7297344

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150