JP7235940B2 - Earth and sand fall protection work and its construction method - Google Patents

Earth and sand fall protection work and its construction method Download PDF

Info

Publication number
JP7235940B2
JP7235940B2 JP2019125167A JP2019125167A JP7235940B2 JP 7235940 B2 JP7235940 B2 JP 7235940B2 JP 2019125167 A JP2019125167 A JP 2019125167A JP 2019125167 A JP2019125167 A JP 2019125167A JP 7235940 B2 JP7235940 B2 JP 7235940B2
Authority
JP
Japan
Prior art keywords
concrete
slope
pillars
bottom slab
protection work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019125167A
Other languages
Japanese (ja)
Other versions
JP2021011696A (en
Inventor
正己 鈴木
Original Assignee
株式会社共生
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社共生 filed Critical 株式会社共生
Priority to JP2019125167A priority Critical patent/JP7235940B2/en
Publication of JP2021011696A publication Critical patent/JP2021011696A/en
Application granted granted Critical
Publication of JP7235940B2 publication Critical patent/JP7235940B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/23Dune restoration or creation; Cliff stabilisation

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Description

本発明は、道路際や急傾斜面の斜面下部に設置し、土砂落石を待ち受けて、保全対象となる道路や住居への流出を防ぐ土砂落石防護工及びその施工方法に関するものである。 BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a rock fall protection work that is installed near a road or in the lower part of a steep slope to wait for rock fall and prevent it from flowing into roads and houses to be protected, and to a construction method therefor.

従来、傾斜面や崖等の下部に、落石等の流出を防ぐための落石等の防護柵は知られている(特許文献1~4参照)。これらの落石等の防護柵は、いずれも上方に起立したコンクリートの擁壁部上に、複数の支柱が横幅方向に間隔をおいて設けられ、複数の支柱にわたって防護網が形成されて成る構成である。 BACKGROUND ART Conventionally, rockfall protection fences for preventing outflow of rockfall and the like are known at the bottom of slopes, cliffs, and the like (see Patent Documents 1 to 4). All of these protective fences against falling rocks, etc., consist of a concrete retaining wall erected upward, with multiple pillars placed at intervals in the width direction, and a protective net formed over the multiple pillars. be.

また、従来の図8(b)に示すような構成の土砂落石防護工45が知られている。この土砂落石防護工45は、上記特許文献1と同様に、コンクリートの擁壁部46上に、複数の支柱47が横幅方向に間隔をおいて設けられ、複数の支柱47にわたって防護網50が形成されて成る構成である。 Also known is a sediment-falling rock protection work 45 configured as shown in FIG. 8(b). As in Patent Document 1, this landslide protection work 45 has a plurality of pillars 47 provided on a concrete retaining wall 46 at intervals in the width direction, and a protective net 50 is formed over the plurality of pillars 47. It is a configuration that consists of

この土砂落石防護工45では、斜面4の下部の一部48を掘削し、コンクリートの擁壁部46を構築し、背面を砕石、栗石等で埋め戻して裏込め部49を形成している。 In this earth and rockfall protection work 45, a part 48 of the lower part of the slope 4 is excavated to build a concrete retaining wall 46, and the back surface is backfilled with crushed stone, cobblestone, or the like to form a backfill 49.

特開2008-150867号公報JP 2008-150867 A 特開2010-144432号公報JP 2010-144432 A 特開2010-248727号公報JP 2010-248727 A 特開2002-047617号公報Japanese Patent Application Laid-Open No. 2002-047617

上記特許文献1~4に示すような落石等の防護柵は、次のようにさらに改善すべき課題がある。
(1)起立したコンクリートの擁壁部の上に、支柱がその下端側が埋め込まれて起立して設けられている(起設されている)ので、山側の斜面に沿って落下してくる土砂落石は、コンクリートの擁壁部、支柱及び防護網に衝突し、道路側(道路や住居等、山側とは反対側)へ向けて衝撃力が加わる。
The protective fences for falling rocks and the like shown in Patent Documents 1 to 4 above have the following problems to be further improved.
(1) On top of the erected concrete retaining wall, the lower end of the supporting column is embedded (raised) so that it falls along the slope of the mountain. collides with concrete retaining walls, pillars, and protective nets, and impact force is applied toward the road side (the side opposite to the mountain side, such as roads and houses).

このような衝突が長年繰り返されると、コンクリートの擁壁部、支柱及び防護網のいずれも破損等が生じるおそれがある。特に、支柱については、その埋め込み部のぐらつきによって、破損や抜け等が生じる可能性がある。また、コンクリートの擁壁部は、破損するとその補修が面倒である。 If such collisions are repeated for many years, there is a risk that the concrete retaining wall, the pillars, and the protective net will all be damaged. In particular, there is a possibility that the post may be damaged or come off due to the wobble of the embedded portion. Moreover, if the concrete retaining wall is damaged, it is troublesome to repair it.

(2)落石が支柱に衝突すると、落石を止めることはできるが、特許文献1~4に示す支柱は、落石を止めることを目的とするものではなく、防護網を取り付けるためのものであり、防護網を取り付けることができる程度の比較的広い間隔で複数配置されている。 (2) When a falling rock collides with a post, it can stop the falling rock, but the posts shown in Patent Documents 1 to 4 are not intended to stop falling rocks, but to attach a protective net, A plurality of them are arranged at relatively wide intervals to the extent that a protective net can be attached.

そのために、落石の多くは、防護網で受け止めることとなるが、防護網は、崩壊土砂の衝撃を受け止め捕捉するとなると、必ずしも強度面では十分とは言えない。 For this reason, most of the falling rocks are caught by the protective net, but the protective net is not necessarily strong enough to receive and capture the impact of the collapsed sediment.

ところで、図8(b)に示す土砂落石防護工45は、コンクリートの擁壁部46と複数の支柱47に張設された防護網50によって、土砂落石を捕捉する構成であるから、上記特許文献1~4と同様の改善すべき課題がある。 By the way, the earth and rock fall protection work 45 shown in FIG. There are issues to be improved similar to 1 to 4.

また、図8(b)に示す土砂落石防護工45は、コンクリートの擁壁部46が斜面4側に切り込んで形成するために、斜面4の下部の一部48を大きく掘削しなくてはならない。 8(b), a part 48 of the lower part of the slope 4 must be largely excavated in order to form the concrete retaining wall 46 by cutting into the slope 4 side. .

そのために、切土斜面の安定を図るため保護工51が必要になるのと、コンクリートの容積も増加するので、コストが増加する。また、土砂及び落石の受け入れるポケットの容積は少なくなるという問題がある。 Therefore, the protective work 51 is required to stabilize the cut slope, and the volume of concrete increases, resulting in an increase in cost. There is also the problem that the volume of the pocket for receiving earth and sand and falling rocks is reduced.

本発明は、上記のような従来例の問題を解決する土砂落石防護工及びその施工方法を実現することを目的とし、その課題は次の点である。
(1)土砂落石防護用の支柱及び防護網を起立支持するコンクリート基礎部(本発明では「底版コンクリート」という)には、土砂落石による前方側(道路側等)への衝撃が作用しないようにする。
(2)底版コンクリート自体の強度、及び底版コンクリートへの支柱の取り付け強度を、土砂落石によって繰り返し受ける衝撃力に対する強度を高める。
(3)土砂落石を、支柱及び防護網によって役割分担して効果的に行い、防護網の破損を低減する。
(4)土砂落石防護工を設置するにあたって、設置対象である斜面の掘削量を従来技術に比べて大幅に低減することで、コンクリートの使用量、労力を少なくし、施工コストを低減する。
(5)捕捉して堆積する土砂落石の受け入れ容積を増大可能とする。その割には、支柱及び防護網から成る防護柵の高さを低くし、施工コストを低減する。
(6)堆積した土砂落石の除去作業をしやすくする。
SUMMARY OF THE INVENTION It is an object of the present invention to realize a sediment-falling rock protection work and its construction method that solves the problems of the conventional example as described above.
(1) The concrete foundations (referred to as “bottom slab concrete” in the present invention) that uprightly support the pillars and protective nets for protecting against falling rocks are designed so that impacts to the front side (road side, etc.) due to falling rocks will not act on them. do.
(2) Strengthening the strength of the bottom concrete itself and the strength of attachment of the pillars to the bottom concrete against repeated impacts caused by falling earth and rocks.
(3) To reduce damage to the protective nets by dividing the roles of the pillars and the protective nets for falling earth and rocks.
(4) To significantly reduce the amount of excavation of the slope, which is the installation target, compared to the conventional technology when installing the earth, sand, and rockfall protection work, thereby reducing the amount of concrete used, labor, and construction costs.
(5) It is possible to increase the volume of sediment that is captured and accumulated. In spite of this, the height of the protective fence consisting of the posts and the protective net will be lowered, and the construction cost will be reduced.
(6) Make it easier to remove accumulated sand and rockfalls.

本発明は上記課題を解決するために、底版コンクリートと、底版コンクリートの上に設置した防護柵と、を備えており、横幅方向に対して垂直な断面形状が逆T字型である土砂落石防護工であって、防護柵は、横幅方向に一定の間隔で起立した複数の支柱と、複数の支柱の後面に取り付けられた防護網と、を備えており、底版コンクリートは、平坦な上面と傾斜地の斜面に沿った後面を有し、横幅方向に対して垂直な断面形状が逆台形であり、底版コンクリートには、上方に開口され複数の支柱を挿入して起立して支持する複数の基礎鞘管と、横幅方向に向けて水平に配置され、複数の基礎鞘管を固定して支持する上段支持材及び下段支持材と、上段の支持材に前端部が固定され、前後方向に向けて水平に配置された複数のアンカー鉄筋と、が埋設された構成であることを特徴とする土砂落石防護工を提供する。 In order to solve the above problems, the present invention includes a bottom concrete and a protective fence installed on the bottom concrete, and has an inverted T-shaped cross-sectional shape perpendicular to the width direction. The protective fence is equipped with multiple pillars erected at regular intervals in the width direction and a protective net attached to the rear surface of the multiple pillars. The cross-sectional shape perpendicular to the width direction is an inverted trapezoid, and the bottom slab concrete has a plurality of foundation sheaths that are opened upward and are supported by inserting a plurality of pillars to stand up. A pipe, an upper support member and a lower support member that are horizontally arranged in the width direction and fix and support a plurality of basic sheath pipes, and a front end portion is fixed to the upper support member and are horizontal in the front-rear direction. To provide a sediment-falling rock protection work characterized by a configuration in which a plurality of anchor reinforcing bars arranged in an area are buried.

本発明は上記課題を解決するために、底版コンクリートと、底版コンクリートの上に設置した防護柵と、を備えており、横幅方向に対して垂直な断面形状が逆T字型である土砂落石防護工であって、防護柵は、横幅方向に一定の間隔で起立した複数の支柱と、複数の支柱の後面に取り付けられた防護網と、を備えており、底版コンクリートは、平坦な上面と傾斜地の斜面に沿った後面を有し、横幅方向に対して垂直な断面形状が逆台形であり、底版コンクリートには、上方に開口され複数の支柱を挿入して起立して支持する複数の基礎鞘管と、横幅方向に向けて水平に配置され、複数の基礎鞘管を固定して支持する上段支持材及び下段支持材と、上段の支持材に前端部が固定され、前後方向に向けて水平に配置された複数のアンカー鉄筋と、が埋設されており、上段支持材は、複数の基礎鞘管の前面に固定し、下段支持材は、複数の基礎鞘管の下端部の後面に固定しており、アンカー鉄筋は、複数の基礎鞘管のそれぞれの左右両側を横切るように配置され、基礎鞘管は、その水平断面の内側を支柱の水平断面より大きな寸法として形成され、基礎鞘管と支柱の隙間には、砂が充填されており、支柱を挿入して起立して支持し、かつ支柱を上方に抜き取り可能とする構成であることを特徴とする土砂落石防護工を提供する。 In order to solve the above problems, the present invention includes a bottom concrete and a protective fence installed on the bottom concrete, and has an inverted T-shaped cross-sectional shape perpendicular to the width direction. The protective fence is equipped with multiple pillars erected at regular intervals in the width direction and a protective net attached to the rear surface of the multiple pillars. The cross-sectional shape perpendicular to the width direction is an inverted trapezoid, and the bottom slab concrete has a plurality of foundation sheaths that are opened upward and are supported by inserting a plurality of pillars to stand up. A pipe, an upper support member and a lower support member that are horizontally arranged in the width direction and fix and support a plurality of basic sheath pipes, and a front end portion is fixed to the upper support member and are horizontal in the front-rear direction. The upper support member is fixed to the front surface of the plurality of foundation sheath pipes, and the lower support member is fixed to the rear surface of the lower end of the plurality of foundation sheath pipes. Anchor reinforcing bars are arranged to cross the left and right sides of each of a plurality of base sheath pipes. To provide a sediment/rockfall protection work characterized by a structure in which sand is filled in gaps between posts, the posts are inserted to stand up and supported, and the posts can be pulled out upward.

底版コンクリートは、複数の支柱に対応した位置に、上方に開口した複数の塩化ビニル管を備え、防護網は、複数の支柱の後面に対して支持鉄筋によって後側から支持されており、支持鉄筋は、その上部は支柱に固着された取り付け金具に係止され、その下部は、底版コンクリートに埋設した塩化ビニル管に挿入されて支持されている構成であることが好ましい。 The bottom slab concrete has a plurality of vinyl chloride pipes opening upward at positions corresponding to the plurality of pillars, and the protective net is supported from behind by supporting reinforcing bars against the rear surface of the plurality of supporting pillars. It is preferable that the upper part is locked to the mounting bracket fixed to the pillar , and the lower part is inserted and supported by the vinyl chloride pipe embedded in the bottom slab concrete.

支柱は、コンクリート充填角形鋼管であり、防護網はエキスパンドメタルであることが好ましい。 Preferably, the stanchions are concrete-filled square steel tubes and the protective mesh is expanded metal.

底版コンクリートの後面が沿う傾斜地の斜面は、傾斜地の下部を掘削して形成した下部掘削斜面であることが好ましい。 The slope of the slope along which the rear surface of the bottom slab concrete is aligned is preferably a lower excavated slope formed by excavating the lower part of the slope.

複数の支柱は、横幅方向に0.75mの間隔で配置されていることが好ましい。 It is preferable that the plurality of struts be arranged at intervals of 0.75 m in the lateral width direction.

本発明は上記課題を解決するために、底版コンクリートと、底版コンクリートの上に横幅方向に一定の間隔で起立した複数の支柱を有する防護柵と、を備えており、横幅方向に対して垂直な断面形状が逆T字型である土砂落石防護工の施工方法であって、傾斜地の下部の一部を掘削して下部掘削斜面を形成し、下部掘削斜面から前側に、コンクリートを打設して、底版コンクリートの一次打設部を形成し、一次打設部の上面に、横方向に延びる下段支持材を固定し、複数の基礎鞘管を、それぞれその下端部の後面を横方向に一定の間隔で下段支持材に固定することによって、起立して配置し、複数の基礎鞘管を、それぞれその前面を横方向に延びる上段支持材に固定し、複数の基礎鞘管のそれぞれの左右両側において、前後方向に延びるアンカー鉄筋の前端部を上段支持材に固定して配置し、一次打設部の上面に、基礎鞘管の上端までコンクリートを打設して、底版コンクリートの二次打設部を形成することで、底版コンクリートを構成し、複数の基礎鞘管に、それぞれ角形鋼管を挿入し、その後角形鋼管にコンクリートを注入して、底版コンクリートの上にコンクリート充填角形鋼管から成る複数の支柱を起立して設置し、複数の支柱の後面に防護網を張設することを特徴とする土砂落石防護工の施工方法を提供する。 In order to solve the above problems, the present invention includes a bottom concrete and a protective fence having a plurality of pillars erected at regular intervals in the width direction on the bottom concrete. A construction method for earth and rockfall protection work having an inverted T-shaped cross section, in which a part of the lower part of a slope is excavated to form a lower excavated slope, and concrete is poured forward from the lower excavated slope. , forming the primary placement part of the bottom slab concrete, fixing the lower support member extending in the horizontal direction to the upper surface of the primary placement part, and fixing the plurality of foundation sheath pipes with the rear surface of the lower end part in the horizontal direction at a constant By fixing to the lower support member at intervals, the plurality of base sheath pipes are fixed to the upper support member extending laterally at their front surfaces, and on both left and right sides of each of the plurality of base sheath pipes. , the front end of the anchor reinforcing bar extending in the front-rear direction is fixed to the upper support material, and concrete is placed on the upper surface of the primary placement part to the upper end of the foundation sheath pipe, and the secondary placement part of the bottom slab concrete is placed. By forming the bottom slab concrete, square steel pipes are inserted into a plurality of foundation sheath pipes, respectively, concrete is poured into the square steel pipes, and a plurality of columns consisting of square steel pipes filled with concrete are placed on the bottom slab concrete. To provide a construction method for a sediment and rockfall protection work characterized by erecting and installing a protective net on the rear surface of a plurality of posts.

二次打設部を形成する際に、複数の基礎鞘管の後側に、それぞれ上方に開口した状態で塩化ビニル管を埋設し、防護網を張設する際に、支持鉄筋を、その上部を複数の支柱の後部に固定した取付金具に係止させ、その下部を塩化ビニル管に挿入して、防護網を後側から支持することが好ましい。 When forming the secondary placing part, vinyl chloride pipes are buried behind a plurality of base sheath pipes with their openings upward, and when the protective net is stretched, the supporting reinforcing bars are placed on the upper part It is preferable that the protective net is supported from the rear side by engaging the metal fittings fixed to the rear portions of the plurality of pillars and inserting the lower portions thereof into the vinyl chloride pipe.

本発明によれば、上記課題を解決できるので、次のような効果が生じる。
(1)土砂落石防護用の支柱及び防護網を起立支持する底版コンクリートには、土砂落石による前方側(道路側等)への衝撃が作用しないので、耐久性が向上する。
(2)底版コンクリート自体の強度、及び底版コンクリートへの支柱の取り付け強度を、土砂落石によって繰り返しうける衝撃力に充分に耐える強度となる。
(3)土砂落石の捕捉を、支柱及び防護網によって役割分担して捕捉効果を高め、また防護網の破損を低減する。
(4)土砂落石防護工を設置するにあたって、設置対象である斜面の掘削量を従来技術に比べて大幅に低減することで、コンクリートの使用量、労力を少なくし、施工コストを低減する。
(5)捕捉して堆積する土砂落石の受け入れ容積を増大可能とする。その割には、支柱及び防護網から成る防護柵の高さを低くし施工コストが低減し、また、衝突による力及びモーメントが低減し、土砂落石に対する衝撃強度が向上する。
(6)堆積した土砂落石の除去作業をしやすくなる。
ADVANTAGE OF THE INVENTION According to this invention, since the said subject is solvable, the following effects arise.
(1) The bottom slab concrete, which uprightly supports the pillars for protecting against falling rocks and protective nets, is not subjected to impacts toward the front side (road side, etc.) due to falling rocks, so durability is improved.
(2) The strength of the bottom slab concrete itself and the strength of attachment of the pillars to the bottom slab concrete are sufficiently strong to withstand the impact force repeatedly received by falling earth and rocks.
(3) To increase the trapping effect and reduce damage to the protective net by sharing the role of catching falling earth and rocks with the pillars and the protective net.
(4) To significantly reduce the amount of excavation of the slope, which is the installation target, compared to the conventional technology when installing the earth, sand, and rockfall protection work, thereby reducing the amount of concrete used, labor, and construction costs.
(5) It is possible to increase the receiving capacity of falling sediment that is captured and accumulated. In spite of this, the height of the protective fence consisting of the posts and the protective net is lowered, the construction cost is reduced, the force and moment due to the collision are reduced, and the impact strength against falling earth and rocks is improved.
(6) It becomes easier to remove deposited sand and rocks.

本発明に係る実施例を説明する図であり、(a)土砂落石防護工の断面図であり、(b)は土砂落石防護工の実証構造の仕様を示す図である。BRIEF DESCRIPTION OF THE DRAWINGS It is a figure explaining the Example which concerns on this invention, (a) is sectional drawing of a sediment and rockfall protection work, (b) is a figure which shows the specification of the demonstration structure of a sediment and rockfall protection work. 上記実施例の土砂落石防護工について、(a)は正面図であり、(b)は平面図である。(a) is a front view and (b) is a plan view of the earth and sand fall protection work of the above embodiment. 上記実施例の土砂落石防護工の要部を説明する図であり、(a)、(b)は図1のA部を詳細に示す水平断面図と側面図であり、(c)、(d)は図1のB部を詳細に示す水平断面図と側面図である。It is a figure explaining the principal part of the earth and sand fall protection work of the said Example, (a), (b) is the horizontal sectional view and side view which show the A part of FIG. 1 in detail, (c), (d) ) is a horizontal cross-sectional view and a side view showing in detail the B portion of FIG. 上記実施例の土砂落石防護工の要部を説明する図であり、(a)、(b)は支柱とエキスパンドメタルの上部の垂直断面図とその拡大図であり、(c)、(d)は支柱等の下部の底版コンクリートへの取付を示す垂直断面図とその拡大図である。It is a figure explaining the principal part of the earth and sand fall protection work of the said Example, (a), (b) is the vertical cross-sectional view of the upper part of a support|pillar and an expanded metal, and its enlarged view, (c), (d). 3] is a vertical cross-sectional view and an enlarged view thereof showing attachment of a lower portion of a support or the like to the bottom slab concrete. [FIG. 上記実施例の土砂落石防護工について、(a)は斜め後方から見た斜視図であり、(b)は作用を説明する断面図である。(a) is a perspective view seen obliquely from the rear, and (b) is a cross-sectional view for explaining the action of the earth and sand fall protection work of the above embodiment. (a)、(b)は、上記実施例の土砂落石防護工の支持鉄筋の取り付け構造を説明する要部斜視図とその一部拡大図であり、(c)、(d)は上記実施例の土砂落石防護工の施工工程を、順次説明する図である。(a) and (b) are a main part perspective view and a partially enlarged view for explaining the attachment structure of the supporting reinforcing bars of the sediment and rockfall protection work of the above embodiment, and (c) and (d) are the above embodiment. It is a diagram for sequentially explaining the construction process of the earth and sand fall protection work. (a)~(c)は上記実施例の土砂落石防護工の施工工程を、順次説明する図である。4(a) to 4(c) are diagrams for sequentially explaining the construction steps of the earth and rock fall protection work of the above embodiment. (a)は上記実施例の土砂落石防護工について作用を説明する断面図であり、(b)は従来の土砂落石防護工を説明する図である。(a) is a cross-sectional view for explaining the action of the earth and rockfall protection work of the above embodiment, and (b) is a diagram for explaining a conventional earth and sand and rockfall protection work.

本発明に係る土砂落石防護工及びその施工方法を実施するための形態を実施例に基づき図面を参照して、以下説明する。 Embodiments for carrying out the earth and rockfall protection work and the construction method thereof according to the present invention will be described below with reference to the drawings based on embodiments.

本発明に係る土砂落石防護工及びその施工方法の実施例を、図1~8を参照して説明する。本実施例では、土砂落石防護工は、山間地や丘陵地等の急傾斜地の斜面の裾部に設置し、斜面に沿って滑り落ちてくる土砂及び落石(土砂落石)を捕捉し、斜面の下方に位置する道路、住居等へ流れ出さないようにするために設置される。 An embodiment of the earth and rockfall protection work and its construction method according to the present invention will be described with reference to FIGS. 1 to 8. FIG. In this embodiment, the sediment and rockfall protection works are installed at the foot of slopes of steep slopes such as mountainous areas and hilly areas to catch sediment and rockfalls (sedimentary rockfalls) that slide down along the slopes. It is installed to prevent it from flowing into the roads, houses, etc. located below.

本明細書及び発明(特許請求の範囲に記載の発明)では、土砂落石防護工を道路、住居側から正面視して、手前側(道路、住居側)を前方とし、傾斜地の斜面側(奥側)を後方とし、左右側(左右方向)を横幅方向と言う。 In the present specification and invention (the invention described in the scope of claims), when the earth and rock fall protection work is viewed from the road and residential side, the front side (road and residential side) is defined as the front side, and the slope side of the slope (back side) side) is referred to as the rear, and the left and right sides (horizontal direction) are referred to as the width direction.

本発明に係る土砂落石防護工1は、図1、図2に示すように、底版コンクリート2と、底版コンクリート2の上に配置した防護柵3と、を備えている。図1(a)に示すように、土砂落石防護工1の横幅方向に対して直交する垂直な断面形状は、全体としておよそ逆T字型である。 As shown in FIGS. 1 and 2, the earth and sand fall protection work 1 according to the present invention includes a bottom slab concrete 2 and a protection fence 3 arranged on the bottom slab concrete 2 . As shown in FIG. 1( a ), the vertical cross-sectional shape of the earth and rock fall protection work 1 perpendicular to the width direction is approximately an inverted T shape as a whole.

防護柵3は、傾斜地の斜面4から滑り落ちてくる土砂落石43(図8(a)参照)を捕捉し、道路、住居等の側へ流れ出さないようにする柵であり、横幅方向に一定の間隔をおり設置された複数の支柱6と、複数の支柱6にわたってその後面側に設置された防護網と、を備えている。防護網として、本発明では、エキスパンドメタル7を使用する。 The protection fence 3 is a fence that catches the sand and rockfall 43 (see FIG. 8(a)) that slides down from the slope 4 of the sloping land and prevents it from flowing out to the side of the road, residence, etc. and a protective net installed on the rear side across the plurality of struts 6. - 特許庁As a protective net, the expanded metal 7 is used in the present invention.

本実施例では、傾斜地の斜面4の下部の一部10を掘削し、下部掘削斜面11が形成されている(図1(b)、図8(a)参照)。底版コンクリート2は、図1に示すように、下部掘削斜面11から前方に向けて形成されている。 In this embodiment, a lower portion 10 of the slope 4 of the slope is excavated to form a lower excavated slope 11 (see FIGS. 1(b) and 8(a)). The bottom slab concrete 2 is formed forward from the lower excavation slope 11, as shown in FIG.

底版コンクリート2は、その後面14は傾斜地の下部掘削斜面11に沿って傾斜した面として形成されており、また、その上面15は水平な平坦な面として形成されている。底版コンクリート2の横幅方向に対して直交する垂直な断面形状は、逆台形である。 The bottom slab concrete 2 has a rear surface 14 formed as a slanted surface along the lower excavated slope 11 of the sloping ground, and an upper surface 15 formed as a horizontal flat surface. A cross-sectional shape perpendicular to the width direction of the bottom slab concrete 2 is an inverted trapezoid.

本実施例では、底版コンクリート2は、傾斜地の斜面4の下部の一部を掘削した下部掘削斜面11から前方に形成することで、底版コンクリート2の前後方向の寸法(奥行き)を、より大きくとることができるので、安定な構成とすることができ、また後記するが、その前後方向に長い上面15上を土砂落石43が移動することで、落下のエネルギーを低減し、防護柵3に対する衝突力をそぐことが可能となる(図8(a)等参照)。 In this embodiment, the bottom slab concrete 2 is formed forward from a lower excavated slope 11 obtained by excavating a part of the lower part of the slope 4 of the sloping land, so that the dimension (depth) of the bottom slab concrete 2 in the front-rear direction is increased. As will be described later, the sediment falling rock 43 moves on the upper surface 15 that is long in the front-rear direction, thereby reducing the falling energy and impacting the protective fence 3. can be removed (see FIG. 8(a), etc.).

なお、斜面4の下部前方の裾部が、前後方向に充分な幅をとれるのであれば、特に傾斜地の下部の一部10を掘削し、下部掘削斜面11を形成する必要はない。 If the front hem of the lower part of the slope 4 can have a sufficient width in the front-rear direction, it is not necessary to excavate the part 10 of the lower part of the slope to form the lower excavated slope 11 .

底版コンクリート2は、防護柵3を起立する基礎部としての役割を有するとともに、斜面4と防護柵3の間において土砂落石を受け入れるポケット(空間)16の底部としての役割も有し、さらに、その上面15において、前記したとおり土砂落石を移動させて防護柵3に対する衝突力を低減させる役割も担う。 The bottom slab concrete 2 has a role as a foundation for erecting the protective fence 3, and also has a role as a bottom of a pocket (space) 16 between the slope 4 and the protective fence 3 for receiving falling earth and rocks. As described above, the upper surface 15 also serves to reduce the force of collision against the protective fence 3 by moving falling rocks.

底版コンクリート2は、上記特許文献1~6及び図8(b)に示す従来の土砂落石防護工45のコンクリートの擁壁部46のように、斜面4に沿って落下してくる土砂落石の前方への流れを、直接受け止めて阻止し、前方に流れ出ないようにするものではないので、土砂落石によって前方への衝突力及びモーメントを受けるものではない。 The bottom slab concrete 2, like the concrete retaining wall 46 of the conventional earth and rock fall protection work 45 shown in Patent Documents 1 to 6 and FIG. Since it does not directly receive and block the flow to the front and prevent it from flowing forward, it is not subject to forward collision force and moment due to falling earth and rocks.

図1~図5に示すように、底版コンクリート2は、上方に開口し垂直に配置された複数の基礎鞘管18と、上方に開口し垂直に配置された複数の塩化ビニル管19(図4(c)、(d)参照)と、横幅方向に延び水平に配置された上段支持材20及び下段支持材21と、前後方向に延び水平に配置された複数のアンカー鉄筋22と、を埋設して備えている。 As shown in FIGS. 1 to 5, the bottom slab concrete 2 includes a plurality of base sheath pipes 18 that open upward and are arranged vertically, and a plurality of vinyl chloride pipes 19 that open upward and are arranged vertically (see FIG. 4). (c), (d)), the upper support member 20 and the lower support member 21 extending in the width direction and arranged horizontally, and the plurality of anchor reinforcing bars 22 extending in the front-rear direction and arranged horizontally are buried. are prepared.

基礎鞘管18は、支柱6を挿入して支持する役割を有し、鋼板を溶接して形成した枠材であり、複数の支柱6を立設すべき位置に対応して横幅方向に一定の間隔をおいて、複数の基礎鞘管18が、底版コンクリート2に起立して埋設される。 The base sheath tube 18 has a role of inserting and supporting the struts 6, and is a frame material formed by welding steel plates, and is fixed in the width direction corresponding to the positions where the plural struts 6 are to be erected. A plurality of base sheath pipes 18 are erected and embedded in the bottom slab concrete 2 at intervals.

基礎鞘管18は、支柱6より一回り大きな断面寸法を有し、後記する支柱6を構成する角形鋼管30と同じ角形の断面形状を有する。即ち、基礎鞘管18は、支柱6を挿入して起立して支持し、かつ支柱6を上方に抜き取り可能(挿脱可能)なように、その水平断面の内側(基礎鞘管18の内側の水平断面)を支柱6(より詳細には角形鋼管30)の水平断面より一回り大きな寸法として形成されている。なお、基礎鞘管18は、丸形断面を有する支柱6を支持する場合は、断面は丸形である。 The base sheath tube 18 has a cross-sectional dimension one size larger than that of the strut 6, and has the same rectangular cross-sectional shape as a square steel pipe 30 that constitutes the strut 6, which will be described later. That is, the basic sheath tube 18 inserts the strut 6 and supports it in an upright position. horizontal cross section) is one size larger than the horizontal cross section of the strut 6 (more specifically, the square steel pipe 30). In addition, the base sheath tube 18 has a circular cross section when supporting the strut 6 having a circular cross section.

上段支持材20及び下段支持材21は、それぞれ、例えば、L型鋼等の棒材から成る。上段支持材20は、その垂直部が図3(a)、(b)、図5(a)に示すように、基礎鞘管18の前面に当接され溶着(溶着部24)されて埋設されている。 The upper support member 20 and the lower support member 21 are each made of a bar material such as L-shaped steel. As shown in FIGS. 3(a), 3(b), and 5(a), the upper support member 20 has its vertical portion abutted and welded (welded portion 24) to the front surface of the base sheath tube 18 and embedded. ing.

後記するアンカー鉄筋22は、図3(a)、(b)に示すように、その前端が上段支持材20を貫通し、上段支持材20を挟んで2つのロックナット23を螺着することで、上段支持材20に締着されている。 As shown in FIGS. 3A and 3B, the anchor reinforcing bars 22 described later pass through the upper support member 20 at their front ends, and are screwed with two lock nuts 23 with the upper support member 20 interposed therebetween. , are fastened to the upper support member 20 .

上段支持材20は、底版コンクリート2内で基礎鞘管18を介して、支柱6を支持し、土砂落石43の衝突による支柱6に作用する衝突力F、モーメントMに対する強度を増強するとともに、底版コンクリート2の補強も行っている(図8(a)参照)。 The upper stage support member 20 supports the support column 6 via the foundation sheath pipe 18 in the bottom slab concrete 2, increases the strength against the impact force F and the moment M acting on the support column 6 due to the collision of the falling earth and rocks 43, and increases the strength against the impact force F and the moment M. The concrete 2 is also reinforced (see FIG. 8(a)).

下段支持材21は、基礎鞘管18の下端と略同じ深さに埋設して設けられており、横方向に隔設された複数の基礎鞘管18の下端部の後面に配置され、その垂直部は、図3(c)、(d)、図5(a)に示すように、複数の基礎鞘管18のそれぞれの下端部の後面に溶着(溶着部25)されている。 The lower support member 21 is buried at approximately the same depth as the lower ends of the basic sheath pipes 18, and is arranged on the rear surface of the lower ends of the plurality of laterally spaced basic sheath pipes 18, and vertically As shown in FIGS. 3(c), 3(d), and 5(a), the portions are welded (welded portions 25) to the rear surfaces of the lower end portions of the plurality of basic sheath pipes 18, respectively.

下段支持材21は、後記するが、土砂落石防護工1の施工の際、複数の基礎鞘管18を、横幅方向に一定の間隔をおいて位置決めする役割を有するとともに、底版コンクリート2の強度を増強する。 As will be described later, the lower stage support member 21 has a role of positioning the plurality of foundation sheath pipes 18 at regular intervals in the width direction during construction of the earth and rockfall protection work 1, and also increases the strength of the bottom slab concrete 2. enhance.

アンカー鉄筋22は、図2(b)に示すように、複数の支柱6それぞれに対してその左右両側に配置され、上段支持材20と略同じ深さに、底版コンクリート2内に埋設されている。アンカー鉄筋22の前端は、前記したとおり、上段支持材20に2つのロックナット23によって締着されている(図3(a)、(b)参照)。 As shown in FIG. 2(b), the anchor reinforcing bars 22 are arranged on both left and right sides of each of the plurality of columns 6, and are embedded in the bottom slab concrete 2 at approximately the same depth as the upper support members 20. . As described above, the front end of the anchor reinforcing bar 22 is fastened to the upper support member 20 with two lock nuts 23 (see FIGS. 3(a) and 3(b)).

支柱6は、従来技術で多用されているH形鋼よりも断面性能に優れ、エネルギーの吸収能力の高いコンクリート充填角形鋼管29(CFT)を使用する。コンクリート充填角形鋼管29は、角形鋼管30内にコンクリート31が充填されて成る。 The columns 6 use concrete-filled square steel tubes 29 (CFT), which have better cross-sectional performance and higher energy absorption capacity than the H-shaped steel widely used in the prior art. The concrete-filled square steel pipe 29 is formed by filling a square steel pipe 30 with concrete 31 .

具体的には、コンクリート充填角形鋼管29は、工場で製造した角形鋼管30を、土砂落石防護工1の施工現場において、底版コンクリート2に埋設された基礎鞘管18に挿入後、上方からコンクリート31を流し込んで形成する。 Specifically, the concrete-filled rectangular steel pipe 29 is obtained by inserting a factory-manufactured rectangular steel pipe 30 into the foundation sheath pipe 18 embedded in the bottom slab concrete 2 at the construction site of the earth and rock fall protection work 1, and then inserting the concrete 31 from above. to form.

コンクリート31は、角形鋼管30内に流し込むだけであり、底版コンクリート2と鉄筋等を介して結合されていないので、コンクリート充填角形鋼管29として形成された支柱6は、基礎鞘管18から容易に引き抜くことが可能である。要するに、支柱6は、基礎鞘管18に挿脱可能である。 The concrete 31 is simply poured into the rectangular steel pipe 30 and is not connected to the bottom slab concrete 2 via reinforcing bars or the like. Is possible. In short, the strut 6 can be inserted into and removed from the base sheath tube 18 .

複数の支柱6は、図2、図5に示すように、底版コンクリート2の前部の上面15に横幅方向に一定の間隔をおいて起立して設置される。一定の間隔は、本実施例では、0.75mである。この間隔は、従来の特許文献1~6等の落石防護柵3に比較して、きわめて狭い密な間隔である。 As shown in FIGS. 2 and 5, the plurality of pillars 6 are erected at regular intervals in the width direction on the upper surface 15 of the front portion of the bottom slab concrete 2 . The constant spacing is 0.75 m in this example. This interval is a very narrow and dense interval compared to the falling rock protection fences 3 of the conventional Patent Documents 1 to 6 and the like.

このように密の間隔で支柱6を設ける理由は、本発明では、支柱6は、防護網としてのエキスパンドメタル7を張設する役割もあるが、同時に、落石を衝突させて捕捉するという機能を重視して設けているからである。この点は、特許文献1~6等の落石防護柵3において、防護網を張設のために設けている支柱6の設置の目的、構成とは全く異なる。 The reason why the pillars 6 are arranged at such close intervals is that, in the present invention, the pillars 6 have the role of extending the expanded metal 7 as a protective net, but at the same time, they have the function of catching falling rocks by colliding them. This is because it is set with an emphasis on it. This point is completely different from the purpose and configuration of the pillars 6 provided for extending the protective net in the falling rock protection fences 3 of Patent Documents 1 to 6 and the like.

本実施例のように、複数の支柱6の間隔を0.75mとすると、礫径0.4m、即ち支柱6の間隔のおよそ1/2より大きい礫径の落石は、支柱6に衝突し、支柱6で捕捉される可能性が高く、それ以下の小さな落石、礫はエキスパンドメタル7で捕捉される。 As in the present embodiment, if the distance between the multiple pillars 6 is set to 0.75 m, a gravel diameter larger than 0.4 m, that is, about 1/2 of the distance between the pillars 6, collides with the pillars 6, There is a high possibility that it will be captured by the pillars 6 , and smaller fallen rocks and gravel will be captured by the expanded metal 7 .

エキスパンドメタル7は、支柱6間の阻止面を構成する防護網として使用され、上記のとおり、特に土砂、礫径の小さい小石等を捕捉する。本実施例では、エキスパンドメタル7には、メッシュ寸法EX-50×152.4の菱形形状を使用する。 The expanded metal 7 is used as a protective net forming a blocking surface between the pillars 6, and as described above, traps particularly earth and sand, pebbles with a small gravel diameter, and the like. In this embodiment, the expanded metal 7 has a rhombic shape with a mesh size of EX-50×152.4.

エキスパンドメタル7は、図2、図4、図5、図6(a)、(b)等に示すように、支柱6の後面側に当接され、支持鉄筋34によって後面側から支持される。支柱6の後面には、垂直部と水平部から成り側面視でL型の取付金具36が、ボルト35で固定されている(図4(a)、(b)、図6(a)、(b)参照)。 As shown in FIGS. 2, 4, 5, 6(a), (b), etc., the expanded metal 7 abuts on the rear side of the column 6 and is supported from the rear side by the supporting reinforcing bars 34. As shown in FIG. On the rear surface of the column 6, an L-shaped mounting bracket 36 consisting of a vertical portion and a horizontal portion is fixed with bolts 35 (Figs. 4(a), (b), 6(a), ( b) see).

支持鉄筋34は、その上端部は、図4(a)、(b)、図6(a)、(b)に示すように、取付金具36に形成された係止孔に挿入されて係止されており、その下端部は、図4(c)、(d)、図6(a)に示すように、底版コンクリート2に埋設された塩化ビニル管19に挿入されて支持されている。 The upper ends of the supporting rebars 34 are inserted and locked into locking holes formed in the mounting brackets 36 as shown in FIGS. 4(c), (d), and FIG. 6(a), the lower end thereof is inserted into and supported by a vinyl chloride pipe 19 embedded in the bottom slab concrete 2. As shown in FIGS.

(施工方法)
以上の構成から成る土砂落石防護工1の施工方法を、施工工程を模式的に示す図6(b)、(c)及び図7(a)~(c)等を参照して、順次説明する。
(Construction method)
The construction method of the earth and rock fall protection work 1 having the above configuration will be described in order with reference to FIGS. .

まず、図8(a)に示すように、傾斜地の斜面4の下部の一部10を掘削し下部掘削斜面11を形成し、下部掘削斜面11の前側に、図8(a)に示すような底版コンクリート2を形成する。 First, as shown in FIG. 8(a), a part 10 of the lower part of the slope 4 of the slope is excavated to form a lower excavated slope 11, and on the front side of the lower excavated slope 11, as shown in FIG. A bottom slab concrete 2 is formed.

底版コンクリート2の施工工程の詳細は次のとおりである。底版コンクリート2を形成するには、一次と二次の2回に分けてコンクリートを打設する。一次打設によって、図6(c)に示すように、水平で平坦なコンクリートから成る一次打設部41を形成する。 The details of the construction process of the bottom slab concrete 2 are as follows. To form the bottom slab concrete 2, the concrete is placed in two steps, primary and secondary. By primary placement, a horizontal and flat primary placement portion 41 made of concrete is formed as shown in FIG. 6(c).

次に、一次打設部41の上面における基礎鞘管18の設置位置に墨出しを行い、下段支持材21を配置して、下段支持材21をアンカープラグ(図示せず)によって一次打設部41に固定する。 Next, the installation position of the basic sheath pipe 18 on the upper surface of the primary placing part 41 is marked, the lower supporting member 21 is placed, and the lower supporting member 21 is attached to the primary placing part by an anchor plug (not shown). 41.

次に、基礎鞘管18の下端部の後面を、下段支持材21の垂直部に当接させて溶着(溶着部25)する(図3(c)、(d)参照)。これによって、図6(d)に示すように、一次打設部41上に、複数の基礎鞘管18を横幅方向に間隔をおいて起設する。なお、上記溶着の際に、基礎鞘管18の取付高さ及び鉛直度を調整する。 Next, the rear surface of the lower end portion of the base sheath tube 18 is welded (welded portion 25) in contact with the vertical portion of the lower support member 21 (see FIGS. 3(c) and 3(d)). As a result, as shown in FIG. 6(d), a plurality of base sleeve pipes 18 are erected on the primary placing portion 41 at intervals in the width direction. It should be noted that the mounting height and verticality of the base sheath pipe 18 are adjusted during the welding.

一次打設部41と基礎鞘管18の底面(下端)に隙間がある場合は、固練りのモルタル等で隙間をふさぎ、コンクリートの二次打設に際して、コンクリートが隙間から基礎鞘管18内に入らないようにする。その理由は、コンクリートが基礎鞘管18内に入ると、基礎鞘管18内に挿入する支柱6の高さにバラツキが生じるからである。 If there is a gap between the primary placing portion 41 and the bottom surface (lower end) of the foundation sheath pipe 18, the gap is closed with hard-mixed mortar or the like, and the concrete flows into the foundation sheath pipe 18 through the clearance when the concrete is placed for the second time. do not enter. The reason for this is that when concrete enters the base sheath pipe 18, the height of the struts 6 inserted into the base sheath pipe 18 varies.

次に、アンカー鉄筋22を配置する高さに合わせ、上段支持材20を、複数の基礎鞘管18の前面に溶着(溶着部24)する。そして、上段支持材20の左右両側面に沿って、図7(a)に示すようにアンカー鉄筋22を配置し、その前端を、前記したとおり2つのロックナット23で上段支持材20に締着する(図3(a)、(b)参照)。なお、塩化ビニル管19は、複数の基礎鞘管18の後面側に配置しておく。 Next, the upper supporting member 20 is welded (welded portion 24 ) to the front surfaces of the plurality of base sheath pipes 18 according to the height at which the anchor reinforcing bars 22 are arranged. 7(a), anchor reinforcing bars 22 are arranged along the left and right side surfaces of the upper support member 20, and the front ends thereof are fastened to the upper support member 20 with two lock nuts 23 as described above. (see FIGS. 3(a) and 3(b)). In addition, the vinyl chloride pipe 19 is arranged on the rear surface side of the plurality of basic sheath pipes 18 .

次に、一次打設部41上に、コンクリートの二次打設部42の打設を行う。この二次の打設においては、基礎鞘管18の上端の高さの位置まで、コンクリートを打設する。これによって、図7(b)に示すように、複数の基礎鞘管18及び塩化ビニル管19(図7(b)では図示せず)が上端に開口する底版コンクリート2が形成される。 Next, a secondary concrete placing portion 42 is placed on the primary placing portion 41 . In this secondary placing, concrete is placed up to the height of the upper end of the base sheath tube 18 . As a result, as shown in FIG. 7(b), the bottom slab concrete 2 is formed with a plurality of base sheath pipes 18 and vinyl chloride pipes 19 (not shown in FIG. 7(b)) opening at the upper end.

次に、複数の角形鋼管30を、それぞれ複数の基礎鞘管18に挿入して、図7(c)に示すように、底版コンクリート2上に間隔をおいて起設する。前記のとおり、基礎鞘管18は角形鋼管30が容易に挿入できるように、角形鋼管30より断面積が一回り大きく形成されているので、両者の間には若干の隙間32が生じる(図4(c)、(d)参照)。この隙間32には、砂を充填することで、角形鋼管30のぐらつきを抑制することができる。 Next, a plurality of square steel pipes 30 are inserted into a plurality of foundation sheath pipes 18, respectively, and erected on the bottom slab concrete 2 at intervals, as shown in FIG. 7(c). As described above, the base sheath pipe 18 is formed to have a cross-sectional area one size larger than that of the square steel pipe 30 so that the square steel pipe 30 can be easily inserted, so that a slight gap 32 is formed between them (Fig. 4). (c), (d) reference). By filling the gap 32 with sand, the square steel pipe 30 can be prevented from wobbling.

次に、底版コンクリート2上に起設した複数の角形鋼管30に、それぞれ上方からコンクリートを流し込み、コンクリート充填角形鋼管29から成る支柱6を底版コンクリート2上に挿脱自在に起設する。 Next, concrete is poured into each of the square steel pipes 30 erected on the bottom concrete 2 from above, and the pillars 6 made of concrete-filled square steel pipes 29 are erected on the bottom concrete 2 so as to be freely insertable and removable.

なお、角形鋼管30にコンクリートを流し込む前に、角形鋼管30の底部に、角形鋼管30の断面と同形かつ一回り小さなプラスチック等の板を配置しておくと、コンクリートが、底版コンクリート2に接合しにくいので、支柱6を挿脱自在にし易い。 Before pouring the concrete into the square steel pipe 30, if a plate such as plastic having the same shape as the cross section of the square steel pipe 30 and being slightly smaller than the square steel pipe 30 is placed at the bottom of the square steel pipe 30, the concrete will join the bottom slab concrete 2. Therefore, it is easy to make the post 6 freely insertable and detachable.

次に、複数の支柱6にわたって、複数の支柱6の後面にエキスパンドメタル7を当接して張設する。そして、図4(a)、(b)、図6(b)に示すように、複数の支柱6の上端部の後面に、それぞれ取付金具36の垂直部37をボルト・ナット35で固定する。 Next, the expanded metal 7 is stretched across the plurality of struts 6 in contact with the rear surfaces of the plurality of struts 6 . Then, as shown in FIGS. 4A, 4B, and 6B, the vertical portions 37 of the mounting brackets 36 are fixed to the rear surfaces of the upper end portions of the plurality of struts 6 with bolts and nuts 35, respectively.

次に、図4(a)~(d)、図6(a)、(b)に示すように、支持鉄筋34を、取付金具36の水平部に形成された係止孔に上方から挿通し係止させ、さらに下端部は塩化ビニル管19に挿入する。これによって、支持鉄筋34によって、エキスパンドメタル7を複数の支柱6の後面側から支持した状態で張設することができる。 Next, as shown in FIGS. 4(a) to 4(d), 6(a), and 6(b), the supporting reinforcing bars 34 are inserted from above into locking holes formed in the horizontal portion of the mounting bracket 36. It is locked and the lower end is inserted into the vinyl chloride pipe 19 . As a result, the expanded metal 7 can be stretched while being supported from the rear surface side of the plurality of columns 6 by the supporting reinforcing bars 34 .

なお、複数のエキスパンドメタル7を、図2(a)、(b)に示すように、横幅方向に螺旋状の連結コイル40によって順次接続すれば、土砂落石防護工1の横幅の全長にわたって張設することが可能となる。 As shown in FIGS. 2(a) and 2(b), if a plurality of expanded metals 7 are connected in sequence by spiral connecting coils 40 in the horizontal direction, they can be stretched over the entire horizontal width of the landslide protection work 1. It becomes possible to

即ち、互いに隣接するエキスパンドメタル7の接続部において、それぞれのメッシュを通して、螺旋状の連結コイル40を回転させながら通して巻き付ける。これにより、図2(a)、(b)に示すように、螺旋状の連結コイル40に、互いに隣接するエキスパンドメタル7のそれぞれのメッシュが、上下の幅方向全体にわたって係合され、互いに接続される。 That is, at the joints of the expanded metals 7 adjacent to each other, the helical connecting coils 40 are wound while rotating through the respective meshes. As a result, as shown in FIGS. 2(a) and 2(b), the meshes of the expanded metals 7 adjacent to each other are engaged with the spiral connecting coil 40 over the entire upper and lower width directions, and are connected to each other. be.

なお、横幅方向に互いに隣接するエキスパンドメタルを螺旋状の連結コイルによって接続する技術は、周知の接続手段(例えば、本願出願人の特許第471042号公報参照)である。 The technique of connecting the expanded metals adjacent to each other in the width direction by means of a helical connecting coil is known connecting means (see, for example, Japanese Patent No. 471042 filed by the present applicant).

以上は、土砂落石防護工1の施工方法であるが、本発明によれば、図8(b)に示す従来の土砂落石防護工45に比較して、傾斜地の斜面4の下部の一部10の掘削量は少なく、また底版コンクリート2は、上方に向けて起立するような擁壁構造ではない。 The construction method for the earth and rock fall protection work 1 has been described above. The amount of excavation is small, and the bottom slab concrete 2 is not a retaining wall structure that rises upward.

従って、施工に要するコンクリート量、労力が少なくなってコストが低減可能となり、また、底版コンクリート2自体は、土砂落石43によって前方への衝突力F及びモーメントMを受けないので、損傷を低減することができる。 Therefore, the amount of concrete and labor required for construction can be reduced, making it possible to reduce the cost, and the bottom slab concrete 2 itself is not subject to the forward collision force F and moment M caused by the falling earth and sand 43, so that damage can be reduced. can be done.

(作用)
以上のとおりの構成の本発明に係る土砂落石防護工1の作用について、以下説明する。図8(a)に示すように、斜面4に沿って落下して来た土砂落石43は、底版コンクリート2の上を前方に移動して、防護柵3に衝突して捕捉され、ポケット16内に堆積する。
(Action)
The operation of the falling earth and rock protection work 1 according to the present invention configured as above will be described below. As shown in FIG. 8( a ), falling earth and rocks 43 falling along the slope 4 move forward on the bottom slab concrete 2 , collide with the protective fence 3 , are captured, and enter the pocket 16 . deposited on

土砂落石防護工1は、断面形状が逆台形の底版コンクリート2を設けることで、特許文献1~6及び図8(b)に示す従来例に比較すると、斜面4と防護柵3の間に距離(図1(b)の間隔e参照)が充分とれるので、その間を土砂落石43が、底版コンクリート2の上で移動することで、落下によるエネルギーが消費され、また上面15との摩擦損失等によって、防護柵3への衝突力Fはそがれて低減する。 The earth and rockfall protection work 1 is provided with a bottom slab concrete 2 having an inverted trapezoidal cross-sectional shape. (Refer to the interval e in FIG. 1(b)) is sufficient, so that the falling earth and sand 43 moves on the bottom concrete 2 in the interval, and the energy due to the fall is consumed and also due to the friction loss with the upper surface 15. , the impact force F on the protective fence 3 is reduced.

前記したとおり、防護柵3の支柱6の間隔を0.75mとすると、そのおおよそ1/2の大きさより大きい礫径の落石は、支柱6に衝突して捕捉される可能性が高く、それ以下の礫や土砂はエキスパンドメタル7によって捕捉される。 As mentioned above, if the distance between the supports 6 of the protective fence 3 is 0.75 m, then there is a high possibility that falling rocks with a gravel diameter larger than about half the size will collide with the supports 6 and be captured. The pebbles and earth and sand are captured by the expanded metal 7.

そのために、大きい礫径の落石がエキスパンドメタル7に衝突するようなことが低減し、エキスパンドメタル7の破損が抑制される。支柱6は、H形鋼よりも断面性能に優れ、エネルギーの吸収能力の高いコンクリート充填角形鋼管29を使用するので、破損しにくい。 Therefore, falling rocks with large gravel diameters are less likely to collide with the expanded metal 7, and damage to the expanded metal 7 is suppressed. The strut 6 uses a concrete-filled rectangular steel pipe 29 that has a cross-sectional performance superior to that of H-shaped steel and a high energy absorption capacity, so it is less likely to break.

また、土砂落石が支柱6に衝突すると、図5(b)に示すように、支柱6には前方への衝撃力F及びモーメントMが作用するが、支柱6は、その下部が基礎鞘管18内で支持され、しかも、基礎鞘管18を介して上段支持材20及びアンカー鉄筋22等によって支持補強されているので、支柱6及び基礎鞘管18は、ぐらついたり、破損したりすることが抑制される。 5(b), a forward impact force F and a moment M act on the column 6. However, the lower portion of the column 6 is the foundation sheath tube 18. In addition, since it is supported and reinforced by the upper support member 20 and the anchor reinforcing bars 22 and the like via the base sheath pipe 18, the strut 6 and the base sheath pipe 18 are prevented from wobbling or breaking. be done.

なお、前記したとおり角形鋼管30と基礎鞘管18の間の隙間32に、砂を充填しておくと、砂が緩衝材となって、支柱6に作用する衝撃力F及びモーメントMを吸収することが可能となる。 As described above, if the gap 32 between the square steel pipe 30 and the base sheath pipe 18 is filled with sand, the sand acts as a buffer material and absorbs the impact force F and moment M acting on the column 6. becomes possible.

また、上記のとおり隙間32にセメント等を充填することなく、砂を充填しているので、メインテナンス等に際して、支柱6を基礎鞘管18から引き抜く際に、引き抜き易いという相乗的な効果が生じる。 In addition, since the gap 32 is not filled with cement or the like but filled with sand as described above, a synergistic effect is produced in that the support column 6 can be easily pulled out from the base sheath tube 18 during maintenance or the like.

支柱6及び基礎鞘管18に衝撃力Fが加わり、またそれが繰り返されると、底版コンクリート2における、基礎鞘管18の周囲に衝撃力Fが伝達され、底版コンクリート2自体に衝撃破壊(パンチング破壊)が生じやすい。 When the impact force F is applied to the pillar 6 and the foundation sheath pipe 18 and is repeated, the impact force F is transmitted around the foundation sheath pipe 18 in the bottom slab concrete 2, and the bottom slab concrete 2 itself is subjected to impact destruction (punching destruction). ) is likely to occur.

しかしながら、本発明では、上段支持材20及びアンカー鉄筋22は、基礎鞘管18に当接及び近接して配置されているので、落石の衝突によって、支柱6及び基礎鞘管18に衝撃力Fが加わっても、衝撃破壊は抑制される。 However, in the present invention, since the upper supporting members 20 and the anchor reinforcing bars 22 are arranged in contact with and close to the base sheath pipe 18, impact force F is applied to the pillars 6 and the base sheath pipe 18 by the impact of falling rocks. Even if it is added, the impact fracture is suppressed.

ところで、本発明に係る土砂落石防護工1は、図8(a)等に示すように、斜面4の下部の一部10を掘削して形成した下部掘削斜面11まで、奥行き方向に広げて底版コンクリート2が形成されており、その前部に防護柵3を起立されており、断面が全体として逆T字型の形状である。 By the way, as shown in FIG. 8A and the like, the earth and rock fall protection work 1 according to the present invention extends in the depth direction to the lower excavated slope 11 formed by excavating a part 10 of the lower part of the slope 4, and the bottom slab is extended in the depth direction. Concrete 2 is formed, and a protective fence 3 is erected in front of it, and the cross section as a whole has an inverted T shape.

従って、図8(a)等に示すように、斜面4の前方に、底版コンクリート2の平坦な上面15を底部とし、防護柵3まで広いスペースを確保することができるので、土砂落石43の堆積用のポケット16の容積が大きくなり、特許文献1~6及び図8(b)に示す従来例に比較して、より大きな堆積量の土砂落石43を堆積可能となる。 Therefore, as shown in FIG. 8A and the like, a wide space can be secured up to the protective fence 3 with the flat upper surface 15 of the bottom slab concrete 2 as the bottom in front of the slope 4, so that the sedimentation of fallen rocks 43 is prevented. The volume of the pocket 16 is increased, so that a larger amount of sediment 43 can be accumulated compared to the conventional examples shown in Patent Documents 1 to 6 and FIG. 8(b).

このように、斜面4の前方に、底版コンクリート2を介して防護柵3まで広いスペースを確保することができるので、土砂落石防護工1の高さ、即ち底版コンクリート2の底から防護柵3までの高さ(図1(b)のb+dに相当)を抑えることが可能となる。 In this way, a wide space can be secured in front of the slope 4 up to the protective fence 3 via the bottom concrete 2, so the height of the earth and rock fall protection work 1, that is, from the bottom of the bottom concrete 2 to the protective fence 3 (corresponding to b+d in FIG. 1(b)) can be suppressed.

そのために、図8(b)に示すような従来の土砂落石防護工に比較して、コンクリートの使用量を含め、材料費等が低減でき、また底版コンクリート2を施工するために傾斜地の斜面4の下部の一部10の掘削量も低減できるので、施工作業が簡単となり、施工に係る労力等も低減でき、設置のためのコストが大幅に低減できる。 For this reason, compared with the conventional sediment and rockfall protection work as shown in FIG. Since the excavation amount of the part 10 of the lower part of the can also be reduced, the construction work can be simplified, the labor involved in the construction can be reduced, and the cost for installation can be greatly reduced.

さらに、支柱6は基礎鞘管18に挿脱可能な構成であるので、土砂落石防護工1で捕捉し底版コンクリート2上に堆積した土砂落石43の除去作業が容易となる。即ち、除去作業に際しては、支柱6からエキスパンドメタル7を取り外し、クレーン等の重機により、支柱6を基礎鞘管18から引き抜けばよい。 Furthermore, since the post 6 is configured to be insertable into and detachable from the foundation sheath pipe 18, it becomes easy to remove the sediment rock fall 43 caught by the sediment rock fall protection work 1 and accumulated on the bottom slab concrete 2. That is, when removing, the expanded metal 7 is removed from the column 6, and the column 6 is pulled out from the base sheath tube 18 by a heavy machine such as a crane.

そして、底版コンクリート2上に堆積した土砂落石43を、ショベルカー、ホイルローダ等の重機で除去することができる。特に、土砂落石43が堆積する底部となる底版コンクリート2の上面15は、道路側まで全体として平坦な面であり、従来の土砂落石防護工45のように、コンクリートの擁壁部等の障害物や窪みがないので、上記重機による除去作業がきわめてし易くなる。 Then, the earth and sand falling rock 43 deposited on the bottom slab concrete 2 can be removed by heavy machinery such as an excavator and a wheel loader. In particular, the upper surface 15 of the bottom slab concrete 2, which is the bottom on which the earth and sand fall 43 is deposited, is a flat surface as a whole up to the road side. Since there are no dents, the removal work by the heavy machinery is extremely easy.

除去作業後、土砂落石防護工1を使用状態に戻すためには、重機を使用して支柱6を基礎鞘管18に挿入して底版コンクリート2上に起設し、支柱6にエキスパンドメタル7を張設すればよい。 After the removal work, in order to restore the sediment and rock fall protection work 1 to a usable state, a heavy machine is used to insert the support 6 into the foundation sheath pipe 18 and erect it on the bottom slab concrete 2 , and the expanded metal 7 is attached to the support 6 . It should be stretched.

このように支柱6を底版コンクリート2から引き抜いたり、挿入したりする作業では、上段支持材20、下段支持材21及びアンカー鉄筋22等には手を付けたりしないので、作業が容易であり、土砂落石防護工1の強度が変更されたりすることはない。 In the work of pulling out and inserting the pillars 6 from the bottom slab concrete 2 in this manner, the work is easy because the upper support member 20, the lower support member 21, the anchor reinforcing bars 22, etc. are not touched. The strength of the rockfall protection work 1 is not changed.

また、支柱6は基礎鞘管18に挿脱可能な構成であり、支柱6の補修や取り換えが容易にできるので、土砂落石防護工1について、長年にわたって、維持、管理し易くなる。 In addition, since the post 6 can be inserted into and removed from the foundation sheath pipe 18, and the post 6 can be easily repaired or replaced, the earth and rock fall protection work 1 can be easily maintained and managed for many years.

(実証構造)
本発明者は、本発明に係る土砂落石防護工1を検討するために、土砂落石防護工1を実証的に構築した。本発明に係る土砂落石防護工1のイメージ及び具体的な構成等をより明確するために、実証的に構築した土砂落石防護工1の仕様等について、図1(b)を参照して説明する。
(Demonstration structure)
The present inventor empirically constructed the landslide protection work 1 in order to examine the landslide protection work 1 according to the present invention. In order to clarify the image and specific configuration of the landslide protection work 1 according to the present invention, the specifications etc. of the landslide protection work 1 empirically constructed will be described with reference to FIG. 1(b). .

各部の寸法は、底版コンクリート2の底部の前後方向の長さa=2m、高さb=1.7m、基礎鞘管18の長さc=1m、支柱6の底版コンクリート2の上面15からの長さd=2.6m、底版コンクリート2の奥端と支柱6の間の間隔e=2.3m、斜面4傾斜の角度θ=50°、底版コンクリート2の底部からの高さ=30mである。 The dimensions of each part are the length of the bottom of the bottom slab concrete 2 in the front-rear direction a = 2 m, the height b = 1.7 m, the length of the base sheath pipe 18 c = 1 m, and the length of the support 6 from the top surface 15 of the bottom slab concrete 2. The length d = 2.6 m, the distance e between the back end of the bottom slab concrete 2 and the support 6 = 2.3 m, the inclination angle θ of the slope 4 = 50°, and the height from the bottom of the bottom slab concrete 2 = 30 m. .

基礎鞘管18は、断面寸法が225mm×225mm、厚さ3.2mmであり、支柱6を構成するコンクリート充填角形鋼管29の角形鋼管30は、断面寸法が200mm×200mm、厚さが6.0mmである。支柱6は、横幅方向に0.75m間隔で設置した。 The basic sheath pipe 18 has a cross-sectional dimension of 225 mm×225 mm and a thickness of 3.2 mm, and the square steel pipe 30 of the concrete-filled square steel pipe 29 constituting the support 6 has a cross-sectional dimension of 200 mm×200 mm and a thickness of 6.0 mm. is. The struts 6 were installed at intervals of 0.75 m in the width direction.

斜面4の掘削量は0.7m /m(単位横幅当たり)で、土砂落石を堆積可能なポケット16の容量は、9m /mである。工事に要したコンクリート使用体積量は、4.1m /mである。これらの結果、実証的に構築した土砂落石防護工1は、同等の規模の従来の土砂落石防護工1(仕様等は明記しないが、構成は図8(b)参照)に対して、工事費が約18%縮減した。 The excavation amount of the slope 4 is 0.7 m 3 /m (per unit width), and the capacity of the pocket 16 capable of depositing sand and rockfall is 9 m 3 /m. The volume of concrete used for construction is 4.1 m 3 /m. As a result, the empirically constructed landslide protection work 1 has a construction cost of was reduced by about 18%.

以上、本発明に係る土砂落石防護工及びその施工方法を実施するための形態を実施例に基づいて説明したが、本発明はこのような実施例に限定されるものではなく、特許請求の範囲に記載された技術的事項の範囲内でいろいろな実施例があることは言うまでもない。 As described above, the embodiment for carrying out the sediment and rockfall protection work and the construction method thereof according to the present invention has been described based on the embodiments, but the present invention is not limited to such embodiments, and the scope of claims is as follows. Needless to say, there are various embodiments within the scope of the technical matters described in .

本発明に係る土砂落石防護工及びその施工方法は上記のような構成であるから、山間地、丘陵地等において、傾斜地の斜面の裾側に道路、住居等が存在する環境等に適用可能である。また、土石流に対する応急対策工としても適用可能である。 Since the sediment and rock fall protection work and construction method thereof according to the present invention are configured as described above, they can be applied to environments such as mountainous areas and hilly areas where roads, houses, etc. be. It can also be applied as an emergency countermeasure against debris flows.

1 土砂落石防護工
2 底版コンクリート
3 防護柵
4 傾斜地の斜面
6 支柱
7 エキスパンドメタル
10 傾斜地の斜面の下部の一部
11 下部掘削斜面
14 底版コンクリートの後面
15 底版コンクリートの上面
16 ポケット
18 基礎鞘管
19 塩化ビニル管
20 上段支持材
21 下段支持材
22 アンカー鉄筋
23 ロックナット
24 上段支持材と基礎鞘管の溶着部
25 下段支持材と基礎鞘管の溶着部
29 コンクリート充填角形鋼管
30 角形鋼管
31 コンクリート充填角形鋼管のコンクリート
32 基礎鞘管と支柱の隙間
34 支持鉄筋
35 ボルト・ナット
36 取付金具
40 連結コイル
41 底版コンクリートの一次打設部
42 底版コンクリートの二次打設部
43 土砂岩石
45 土砂落石防護工の従来例
46 擁壁部
47 支柱
48 係止地の斜面の下部の一部
49 擁壁部の裏込め部
50 防護網
51 保護工
1 Earth and rock fall protection work
2 Bottom slab concrete
3 Protective fence
4 slope of slope
6 struts
7 Expanded metal
10 Part of the lower part of the slope of the slope
11 lower excavation slope
14 Rear side of bottom slab concrete
15 Upper surface of bottom slab concrete
16 pockets
18 Basic sheath tube
19 vinyl chloride pipe
20 upper support
21 lower support
22 Anchor reinforcing bar 23 Lock nut 24 Welded portion between upper support member and base sheath pipe 25 Welded portion between lower support member and base sheath pipe
29 Concrete-filled square steel pipes
30 square steel pipe
31 Concrete filled square steel pipe concrete
32 Gap between base sheath tube and strut
34 supporting rebar
35 bolts and nuts
36 Mounting bracket
40 Connection coil 41 Primary placing part of bottom slab concrete 42 Second placing part of bottom slab concrete 43 Sediment rock 45 Conventional example of sediment and rockfall protection work 46 Retaining wall part 47 Post 48 Part of the lower part of the slope of the anchorage site 49 Retaining Wall backfill 50 Protective net 51 Protective work

Claims (8)

底版コンクリートと、底版コンクリートの上に設置した防護柵と、を備えており、横幅方向に対して垂直な断面形状が逆T字型である土砂落石防護工であって、
防護柵は、横幅方向に一定の間隔で起立した複数の支柱と、複数の支柱の後面に取り付けられた防護網と、を備えており、
底版コンクリートは、平坦な上面と傾斜地の斜面に沿った後面を有し、横幅方向に対して垂直な断面形状が逆台形であり、
底版コンクリートには、上方に開口され複数の支柱を挿入して起立して支持する複数の基礎鞘管と、横幅方向に向けて水平に配置され、複数の基礎鞘管を固定して支持する上段支持材及び下段支持材と、上段の支持材に前端部が固定され、前後方向に向けて水平に配置された複数のアンカー鉄筋と、が埋設された構成であることを特徴とする土砂落石防護工。
A sediment-falling rock protection work comprising a bottom concrete and a protective fence installed on the bottom concrete, and having an inverted T-shaped cross-sectional shape perpendicular to the width direction,
The protective fence comprises a plurality of pillars erected at regular intervals in the width direction, and a protective net attached to the rear surface of the plurality of pillars,
The bottom slab concrete has a flat upper surface and a rear surface along the slope of the slope, and has an inverted trapezoidal cross-sectional shape perpendicular to the width direction,
In the bottom slab concrete, there are multiple foundation sheath pipes that are opened upwards and insert multiple pillars to stand up and support them. A sediment/rockfall protection characterized by having a configuration in which a support member, a lower support member, and a plurality of anchor reinforcing bars whose front ends are fixed to the upper support member and are horizontally arranged in the front-rear direction are embedded. engineering.
底版コンクリートと、底版コンクリートの上に設置した防護柵と、を備えており、横幅方向に対して垂直な断面形状が逆T字型である土砂落石防護工であって、
防護柵は、横幅方向に一定の間隔で起立した複数の支柱と、複数の支柱の後面に取り付けられた防護網と、を備えており、
底版コンクリートは、平坦な上面と傾斜地の斜面に沿った後面を有し、横幅方向に対して垂直な断面形状が逆台形であり、
底版コンクリートには、上方に開口され複数の支柱を挿入して起立して支持する複数の基礎鞘管と、横幅方向に向けて水平に配置され、複数の基礎鞘管を固定して支持する上段支持材及び下段支持材と、上段の支持材に前端部が固定され、前後方向に向けて水平に配置された複数のアンカー鉄筋と、が埋設されており、
上段支持材は、複数の基礎鞘管の前面に固定し、下段支持材は、複数の基礎鞘管の下端部の後面に固定しており、
アンカー鉄筋は、複数の基礎鞘管のそれぞれの左右両側を横切るように配置され、
基礎鞘管は、その水平断面の内側を支柱の水平断面より大きな寸法として形成され、基礎鞘管と支柱の隙間には、砂が充填されており、支柱を挿入して起立して支持し、かつ支柱を上方に抜き取り可能とする構成であることを特徴とする土砂落石防護工。
A sediment-falling rock protection work comprising a bottom concrete and a protective fence installed on the bottom concrete, and having an inverted T-shaped cross-sectional shape perpendicular to the width direction,
The protective fence comprises a plurality of pillars erected at regular intervals in the width direction, and a protective net attached to the rear surface of the plurality of pillars,
The bottom slab concrete has a flat upper surface and a rear surface along the slope of the slope, and has an inverted trapezoidal cross-sectional shape perpendicular to the width direction,
In the bottom slab concrete, there are multiple foundation sheath pipes that are opened upwards and insert multiple pillars to stand up and support them. A support member, a lower support member, and a plurality of anchor reinforcing bars whose front ends are fixed to the upper support member and are horizontally arranged in the front-rear direction are embedded,
The upper supporting member is fixed to the front surface of the plurality of basic sheath pipes, the lower supporting member is fixed to the rear surface of the lower end of the plurality of basic sheath pipes,
Anchor reinforcing bars are arranged to cross both left and right sides of each of the plurality of foundation sheath pipes,
The inner side of the horizontal cross section of the base sheath pipe is formed to be larger than the horizontal cross section of the support, and the gap between the base sheath pipe and the support is filled with sand. A sediment-falling rock protection work characterized in that it has a structure in which the support can be pulled out upward.
底版コンクリートは、複数の支柱に対応した位置に、上方に開口した複数の塩化ビニル管を埋設して備え、
防護網は、複数の支柱の後面に対して支持鉄筋によって後側から支持されており、
支持鉄筋は、その上部は支柱に固着された取り付け金具に係止され、その下部は、塩化ビニル管に挿入されて支持されている構成であることを特徴とする請求項1又は2に記載の土砂落石防護工。
The bottom slab concrete is equipped with a plurality of vinyl chloride pipes that open upward at positions corresponding to the plurality of pillars.
The protective net is supported from the rear by support rebar against the rear surface of the multiple columns,
3. The structure according to claim 1 or 2, wherein the upper portion of the supporting reinforcing bar is engaged with a mounting bracket fixed to the column , and the lower portion thereof is inserted into the vinyl chloride pipe and supported. Sediment and rockfall protection work.
支柱は、コンクリート充填角形鋼管であり、防護網はエキスパンドメタルであることを特徴とする請求項1~3のいずれかに記載の土砂落石防護工。 4. The sediment/rockfall protection work according to any one of claims 1 to 3, wherein the pillars are concrete-filled rectangular steel pipes, and the protective nets are expanded metal. 底版コンクリートの後面が沿う傾斜地の斜面は、傾斜地の下部を掘削して形成した下部掘削斜面であることを特徴とする請求項1~4のいずれかに記載の土砂落石防護工。 5. The sediment/rockfall protection work according to any one of claims 1 to 4, wherein the slope of the slope along which the rear surface of the bottom slab concrete is formed is a lower excavated slope formed by excavating the lower part of the slope. 複数の支柱は、横幅方向に1.0m以下の間隔で配置されていることを特徴とする請求項1~5のいずれかに記載の土砂落石防護工。 The sediment and rock fall protection work according to any one of claims 1 to 5, wherein the plurality of pillars are arranged at intervals of 1.0 m or less in the width direction. 底版コンクリートと、底版コンクリートの上に横幅方向に一定の間隔で起立した複数の支柱を有する防護柵と、を備えており、横幅方向に対して垂直な断面形状が逆T字型である土砂落石防護工の施工方法であって、
傾斜地の下部の一部を掘削して下部掘削斜面を形成し、下部掘削斜面から前側に、コンクリートを打設して、底版コンクリートの一次打設部を形成し、
一次打設部の上面に、横方向に延びる下段支持材を固定し、
複数の基礎鞘管を、それぞれその下端部の後面を横方向に一定の間隔で下段支持材に固定することによって、起立して配置し、
複数の基礎鞘管を、それぞれその前面を横方向に延びる上段支持材に固定し、
複数の基礎鞘管のそれぞれの左右両側において、前後方向に延びるアンカー鉄筋の前端部を上段支持材に固定して配置し、
一次打設部の上面に、基礎鞘管の上端までコンクリートを打設して、底版コンクリートの二次打設部を形成することで、底版コンクリートを構成し、
複数の基礎鞘管に、それぞれ角形鋼管を挿入し、その後角形鋼管にコンクリートを注入して、底版コンクリートの上にコンクリート充填角形鋼管から成る複数の支柱を起立して設置し、
複数の支柱の後面に防護網を張設することを特徴とする土砂落石防護工の施工方法。
It is equipped with a bottom slab concrete and a protective fence having a plurality of pillars erected at regular intervals in the width direction on the bottom slab concrete, and has an inverted T-shaped cross section perpendicular to the width direction. A protective work construction method,
Excavating a part of the lower part of the slope to form a lower excavated slope, pouring concrete forward from the lower excavated slope to form a primary placing portion of the bottom concrete,
A lower support member extending in the horizontal direction is fixed to the upper surface of the primary placement part,
A plurality of base sheath pipes are erected by fixing the rear surface of each lower end portion to the lower support member at regular intervals in the lateral direction, and
fixing a plurality of base sheath pipes to upper support members extending laterally at their front surfaces;
The front ends of the anchor reinforcing bars extending in the front-rear direction are fixed to the upper support member on both left and right sides of each of the plurality of foundation sheath pipes, and
The bottom slab concrete is constructed by placing concrete on the upper surface of the primary casting part up to the upper end of the foundation sheath pipe to form the secondary placing part of the bottom slab concrete,
Square steel pipes are inserted into each of the plurality of foundation sheath pipes, concrete is then poured into the square steel pipes, and multiple pillars made of concrete-filled square steel pipes are erected on the bottom slab concrete,
A method for constructing a sediment and rockfall protection work, characterized in that a protective net is laid on the rear surface of a plurality of pillars.
二次打設部を形成する際に、複数の基礎鞘管の後側に、それぞれ上方に開口した状態で塩化ビニル管を埋設し、
防護網を張設する際に、支持鉄筋を、その上部を複数の支柱の後部に固定した取付金具に係止させ、その下部を塩化ビニル管に挿入して、防護網を後側から支持することを特徴とする請求項7に記載の土砂落石防護工の施工方法。
When forming the secondary placing part, the vinyl chloride pipe is buried behind the plurality of basic sheath pipes with each opening upward,
When the protective net is stretched, the upper part of the supporting reinforcing bar is locked to the mounting bracket fixed to the rear part of a plurality of posts, and the lower part is inserted into the vinyl chloride pipe to support the protective net from the rear side. 8. The construction method for the earth and rockfall protection work according to claim 7, characterized in that:
JP2019125167A 2019-07-04 2019-07-04 Earth and sand fall protection work and its construction method Active JP7235940B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019125167A JP7235940B2 (en) 2019-07-04 2019-07-04 Earth and sand fall protection work and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019125167A JP7235940B2 (en) 2019-07-04 2019-07-04 Earth and sand fall protection work and its construction method

Publications (2)

Publication Number Publication Date
JP2021011696A JP2021011696A (en) 2021-02-04
JP7235940B2 true JP7235940B2 (en) 2023-03-09

Family

ID=74226338

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019125167A Active JP7235940B2 (en) 2019-07-04 2019-07-04 Earth and sand fall protection work and its construction method

Country Status (1)

Country Link
JP (1) JP7235940B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6925684B1 (en) * 2021-03-05 2021-08-25 株式会社プロテックエンジニアリング Standing structure of columns

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004156336A (en) 2002-11-07 2004-06-03 Kanto Regional Development Bureau Ministry Of Land Infrastructure & Transport Falling-stone protective temporary-work method and component
JP2006225879A (en) 2005-02-15 2006-08-31 Nippon Steel Metal Prod Co Ltd Wire rope type rock-fall prevention fence
JP2009114743A (en) 2007-11-07 2009-05-28 Maeda Kosen Co Ltd Falling stone protective facility
JP2010144432A (en) 2008-12-18 2010-07-01 Raiteku:Kk Guard fence and method for repairing the same
JP2011032689A (en) 2009-07-30 2011-02-17 Purotekku Engineering:Kk Post structure of guard body
JP2017095893A (en) 2015-11-19 2017-06-01 東京製綱株式会社 Guard fence

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2543327B2 (en) * 1994-04-22 1996-10-16 憲士 中山 Retaining wall structure and retaining wall construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004156336A (en) 2002-11-07 2004-06-03 Kanto Regional Development Bureau Ministry Of Land Infrastructure & Transport Falling-stone protective temporary-work method and component
JP2006225879A (en) 2005-02-15 2006-08-31 Nippon Steel Metal Prod Co Ltd Wire rope type rock-fall prevention fence
JP2009114743A (en) 2007-11-07 2009-05-28 Maeda Kosen Co Ltd Falling stone protective facility
JP2010144432A (en) 2008-12-18 2010-07-01 Raiteku:Kk Guard fence and method for repairing the same
JP2011032689A (en) 2009-07-30 2011-02-17 Purotekku Engineering:Kk Post structure of guard body
JP2017095893A (en) 2015-11-19 2017-06-01 東京製綱株式会社 Guard fence

Also Published As

Publication number Publication date
JP2021011696A (en) 2021-02-04

Similar Documents

Publication Publication Date Title
US7699558B2 (en) Anti-ram system and method of installation
US20090035061A1 (en) Removable Bollard System and Method of Installation
CN107869351B (en) A kind of method of high narrow type large size solution cavity Cavity treatment security protection
JP4690781B2 (en) Rock fall prevention fence
US20150016883A1 (en) Post footing
JP5779734B1 (en) Shock absorber
JP7235940B2 (en) Earth and sand fall protection work and its construction method
JP4190360B2 (en) Masonry wall reinforcement structure and method
JP2007177467A (en) Debris flow blocking work and its construction method
JP6268698B2 (en) Protective body and its construction method
KR101701220B1 (en) Road expansion structure and construction method thereof
KR102497458B1 (en) Cip Retaining Reinforcing Structure and Method Constructing the Same
JP3216357U (en) Reinforcing structure for supporting fence post
CN113699996B (en) Foundation pit earthwork excavation method
JP6997250B2 (en) dam
JP2001032231A (en) Lattice type installation material, wave absorbing structure using it, hume pipe used for the structure, and construction method of wave absorbing structure
CN210737555U (en) Underground pipeline in-situ protection mechanism for foundation pit supporting system
CN111962556A (en) Permanent temporary combined retaining wall structure rapidly assembled on site and construction method
JP2003313852A (en) Steel frame weir bank
JP7084712B2 (en) Steel foundation members for road guard fences, road guard fences, and their construction methods
KR101114521B1 (en) Base block for supporting revetment block and constructing method
JP5427463B2 (en) Protective levee body and construction method of protective dam body
CN215925986U (en) Protection architecture under influence of adjacent underground works of existing tunnel
JP7475097B1 (en) Protective fence
CN109098205A (en) People's air defense underpass and its construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220318

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20221213

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230110

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230113

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230131

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230202

R150 Certificate of patent or registration of utility model

Ref document number: 7235940

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150