JP7163931B2 - Determination device, determination method and determination program - Google Patents

Determination device, determination method and determination program Download PDF

Info

Publication number
JP7163931B2
JP7163931B2 JP2019568912A JP2019568912A JP7163931B2 JP 7163931 B2 JP7163931 B2 JP 7163931B2 JP 2019568912 A JP2019568912 A JP 2019568912A JP 2019568912 A JP2019568912 A JP 2019568912A JP 7163931 B2 JP7163931 B2 JP 7163931B2
Authority
JP
Japan
Prior art keywords
data
determination
unit
power generation
generation unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019568912A
Other languages
Japanese (ja)
Other versions
JPWO2019150779A1 (en
Inventor
剛史 下口
勲 後藤
晃太郎 谷村
麻由 近藤
洋行 池上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Electric Industries Ltd
Original Assignee
Sumitomo Electric Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Electric Industries Ltd filed Critical Sumitomo Electric Industries Ltd
Publication of JPWO2019150779A1 publication Critical patent/JPWO2019150779A1/en
Application granted granted Critical
Publication of JP7163931B2 publication Critical patent/JP7163931B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02SGENERATION OF ELECTRIC POWER BY CONVERSION OF INFRARED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, e.g. USING PHOTOVOLTAIC [PV] MODULES
    • H02S50/00Monitoring or testing of PV systems, e.g. load balancing or fault identification
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00002Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by monitoring
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • Y04S10/123Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving renewable energy sources
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/30State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge

Landscapes

  • Photovoltaic Devices (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明は、判定装置、判定方法および判定プログラムに関する。
この出願は、2018年2月1日に出願された日本出願特願2018-16736号を基礎とする優先権を主張し、その開示のすべてをここに取り込む。
The present invention relates to a determination device, a determination method, and a determination program.
This application claims priority based on Japanese Patent Application No. 2018-16736 filed on February 1, 2018, and incorporates all of its disclosure herein.

特開2012-205078号公報(特許文献1)には、以下のような太陽光発電用監視システムが開示されている。すなわち、太陽光発電用監視システムは、複数の太陽電池パネルからの出力を集約して電力変換装置に送り込む太陽光発電システムについて、前記太陽電池パネルの発電状況を監視する太陽光発電用監視システムであって、前記複数の太陽電池パネルからの出力電路が集約された場所に設けられ、各太陽電池パネルの発電量を計測する計測装置と、前記計測装置に接続され、前記計測装置による発電量の計測データを送信する機能を有する下位側通信装置と、前記下位側通信装置から送信される前記計測データを受信する機能を有する上位側通信装置と、前記上位側通信装置を介して前記太陽電池パネルごとの前記計測データを収集する機能を有する管理装置とを備える。前記管理装置は、前記各太陽電池パネルについての、同一時点における発電量の差に基づいて異常の有無を判定するか、または前記各太陽電池パネルについての、所定期間の発電量の最大値又は積算値に基づいて異常の有無を判定する。 Japanese Patent Laying-Open No. 2012-205078 (Patent Document 1) discloses a monitoring system for photovoltaic power generation as follows. That is, the monitoring system for photovoltaic power generation is a monitoring system for photovoltaic power generation that monitors the power generation status of the solar cell panels in a photovoltaic power generation system in which outputs from a plurality of solar cell panels are aggregated and sent to a power conversion device. a measuring device for measuring the amount of power generated by each solar panel provided at a place where the output lines from the plurality of solar panels are aggregated; and a measuring device connected to the measuring device for measuring the amount of power generated by the measuring device. A lower communication device having a function of transmitting measurement data, a higher communication device having a function of receiving the measurement data transmitted from the lower communication device, and the solar panel via the higher communication device. and a management device having a function of collecting the measurement data for each. The management device determines the presence or absence of an abnormality based on the difference in the amount of power generation at the same time for each solar panel, or the maximum value or integration of the amount of power generation for a predetermined period for each solar panel The presence or absence of abnormality is determined based on the value.

特開2012-205078号公報JP 2012-205078 A

(1)本開示の判定装置は、太陽電池パネルを含む発電部を備える太陽光発電システムに用いられる判定装置であって、前記発電部の出力の計測結果に基づくデータを取得する取得部と、前記取得部によって取得された前記データに基づいて、前記データの時間的な粒度を粗くした1または複数のデータを生成する生成部と、前記取得部によって取得された前記データおよび前記生成部によって生成された前記1または複数のデータのうち、長さの異なる期間にわたる複数のデータであって異なる粒度の複数のデータから、それぞれ異なる基準を用いて前記発電部に関する異常を判定する判定部とを備える。 (1) A determination device of the present disclosure is a determination device used in a photovoltaic power generation system including a power generation unit including a solar cell panel, the acquisition unit acquiring data based on measurement results of the output of the power generation unit; a generating unit that generates one or a plurality of pieces of data obtained by coarsening the temporal granularity of the data based on the data obtained by the obtaining unit; and the data obtained by the obtaining unit and the generating unit. a judgment unit that judges an abnormality related to the power generation unit using different criteria from a plurality of data over different periods of time and having different granularities from among the one or more data that has been obtained. .

(5)本開示の判定方法は、判定装置において用いられる判定方法であって、太陽電池パネルを含む発電部の出力の計測結果に基づくデータを取得するステップと、取得した前記データに基づいて、前記データの時間的な粒度を粗くした1または複数のデータを生成するステップと、取得した前記データおよび生成した前記1または複数のデータのうち、長さの異なる期間にわたる複数のデータであって異なる粒度の複数のデータから、それぞれ異なる基準を用いて前記発電部に関する異常を判定するステップとを含む。 (5) A determination method of the present disclosure is a determination method used in a determination device, and includes a step of acquiring data based on a measurement result of the output of a power generation unit including a solar panel, and based on the acquired data, generating one or more pieces of data obtained by coarsening the temporal granularity of the data; and determining an abnormality related to the power generation unit from a plurality of granular data using different criteria.

(6)本開示の判定プログラムは、判定装置において用いられる判定プログラムであって、コンピュータを、太陽電池パネルを含む発電部の出力の計測結果に基づくデータを取得する取得部と、前記取得部によって取得された前記データに基づいて、前記データの時間的な粒度を粗くした1または複数のデータを生成する生成部と、前記取得部によって取得された前記データおよび前記生成部によって生成された前記1または複数のデータのうち、長さの異なる期間にわたる複数のデータであって異なる粒度の複数のデータから、それぞれ異なる基準を用いて前記発電部に関する異常を判定する判定部、として機能させるためのプログラムである。 (6) A determination program of the present disclosure is a determination program used in a determination device, and an acquisition unit that acquires data based on a measurement result of the output of a power generation unit including a solar cell panel, and the acquisition unit. a generation unit that generates one or a plurality of pieces of data obtained by roughening the temporal granularity of the data based on the acquired data; and the data acquired by the acquisition unit and the one generated by the generation unit. Alternatively, a program for functioning as a judgment unit that judges an abnormality related to the power generation unit using different criteria from a plurality of data over different periods of time and having different granularities among a plurality of data. is.

本開示の一態様は、このような特徴的な処理部を備える判定装置として実現され得るだけでなく、判定装置の一部または全部を実現する半導体集積回路として実現され得る。 One aspect of the present disclosure can be implemented not only as a determination device including such a characteristic processing unit, but also as a semiconductor integrated circuit that implements part or all of the determination device.

また、本開示の一態様は、このような特徴的な処理部を備える監視システムとして実現され得るだけでなく、かかる特徴的な処理をコンピュータに実行させるためのプログラムとして実現され得る。また、本開示の一態様は、このような特徴的な処理部を備える監視システムとして実現され得るだけでなく、かかる特徴的な処理をステップとする方法として実現され得る。また、本発明は、監視システムの一部または全部を実現する半導体集積回路として実現され得る。 Further, one aspect of the present disclosure can be implemented not only as a monitoring system including such a characteristic processing unit, but also as a program for causing a computer to execute such characteristic processing. In addition, one aspect of the present disclosure can be implemented not only as a monitoring system including such a characteristic processing unit, but also as a method including steps of such characteristic processing. Also, the present invention can be implemented as a semiconductor integrated circuit that implements part or all of the monitoring system.

図1は、本発明の実施の形態に係る太陽光発電システムの構成を示す図である。FIG. 1 is a diagram showing the configuration of a photovoltaic power generation system according to an embodiment of the present invention. 図2は、本発明の実施の形態に係るPCSユニットの構成を示す図である。FIG. 2 is a diagram showing the configuration of the PCS unit according to the embodiment of the invention. 図3は、本発明の実施の形態に係る集電ユニットの構成を示す図である。FIG. 3 is a diagram showing the configuration of the current collecting unit according to the embodiment of the invention. 図4は、本発明の実施の形態に係る太陽電池ユニットの構成を示す図である。FIG. 4 is a diagram showing the configuration of a solar cell unit according to an embodiment of the invention. 図5は、本発明の実施の形態に係る監視システムの構成を示す図である。FIG. 5 is a diagram showing the configuration of the monitoring system according to the embodiment of the invention. 図6は、本発明の実施の形態に係る監視システムにおける監視装置の構成を示す図である。FIG. 6 is a diagram showing the configuration of a monitoring device in the monitoring system according to the embodiment of the invention. 図7は、本発明の実施の形態に係る監視システムにおける判定装置の構成を示す図である。FIG. 7 is a diagram showing the configuration of the determination device in the monitoring system according to the embodiment of the invention. 図8は、本発明の実施の形態に係る監視システムにおける判定装置が保持する監視情報の一例を示す図である。FIG. 8 is a diagram showing an example of monitoring information held by the determination device in the monitoring system according to the embodiment of the present invention. 図9は、異常と判定される10分毎データの一例を示す図である。FIG. 9 is a diagram showing an example of 10-minute data determined to be abnormal. 図10は、異常と判定される1日毎データの一例を示す図である。FIG. 10 is a diagram showing an example of daily data determined to be abnormal. 図11は、本発明の実施の形態に係る判定装置が発電部に関する異常判定を行う際の動作手順を定めたフローチャートである。FIG. 11 is a flow chart defining an operation procedure when the determination device according to the embodiment of the present invention performs abnormality determination regarding the power generation unit.

近年、太陽光発電システムを監視して異常を判別するための技術が開発されている。 In recent years, techniques have been developed for monitoring photovoltaic power generation systems and determining abnormalities.

[本開示が解決しようとする課題]
このような特許文献1に記載の技術を超えて、太陽光発電システムの異常判定を向上させることが可能な技術が望まれる。
[Problems to be Solved by the Present Disclosure]
A technique capable of improving abnormality determination of a photovoltaic power generation system beyond the technique described in Patent Literature 1 is desired.

本開示は、上述の課題を解決するためになされたもので、その目的は、太陽光発電システムの異常判定を向上させることが可能な判定装置、判定方法および判定プログラムを提供することである。 The present disclosure has been made to solve the above-described problems, and an object thereof is to provide a determination device, a determination method, and a determination program capable of improving abnormality determination of a photovoltaic power generation system.

[本開示の効果]
本開示によれば、太陽光発電システムの異常判定を向上させることができる。
[Effect of the present disclosure]
According to the present disclosure, it is possible to improve abnormality determination of a photovoltaic power generation system.

[本願発明の実施形態の説明]
最初に、本発明の実施形態の内容を列記して説明する。
[Description of Embodiments of the Present Invention]
First, the contents of the embodiments of the present invention will be listed and explained.

(1)本発明の実施の形態に係る判定装置は、太陽電池パネルを含む発電部を備える太陽光発電システムに用いられる判定装置であって、前記発電部の出力の計測結果に基づくデータを取得する取得部と、前記取得部によって取得された前記データに基づいて、前記データの時間的な粒度を粗くした1または複数のデータを生成する生成部と、前記取得部によって取得された前記データおよび前記生成部によって生成された前記1または複数のデータのうち、長さの異なる期間にわたる複数のデータであって異なる粒度の複数のデータから、それぞれ異なる基準を用いて前記発電部に関する異常を判定する判定部とを備える。 (1) A determination device according to an embodiment of the present invention is a determination device used in a photovoltaic power generation system including a power generation unit including a solar cell panel, and acquires data based on a measurement result of the output of the power generation unit. a generating unit that generates one or a plurality of pieces of data obtained by coarsening temporal granularity of the data based on the data obtained by the obtaining unit; the data obtained by the obtaining unit; Abnormalities related to the power generation unit are determined using different criteria from a plurality of data having different granularities and having different lengths of time among the one or more data generated by the generation unit. and a determination unit.

このような構成により、比較的短期間にわたる計測値の異常および比較的長期間にわたる計測値の異常を判定することができる。これにより、複数種類の期間での異常が判定され、多様な異常判定を行うことが可能になることにより、たとえば、短期間では計測値の変化がなく長期間にわたる計測結果を確認することにより変化が確認できるような異常を検知することできる。さらに、長期間わたる計測結果では、データの粒度が粗くなることにより捉えることができない短期間での計測値の変化も、短期間にわたる計測結果を確認することにより検知することができる。したがって、太陽光発電システムの異常判定を向上させることができる。 With such a configuration, it is possible to determine an abnormality in the measured value over a relatively short period of time and an abnormality in the measured value over a relatively long period of time. As a result, it is possible to judge anomalies in multiple types of time periods, making it possible to make a variety of anomaly judgments. It is possible to detect anomalies that can be confirmed by Furthermore, short-term changes in measured values that cannot be captured in long-term measurement results due to coarse data granularity can be detected by checking short-term measurement results. Therefore, it is possible to improve the abnormality determination of the photovoltaic power generation system.

(2)好ましくは、前記判定部は、3つ以上の前記基準を用いて前記発電部に関する異常を判定する。 (2) Preferably, the judging section judges an abnormality related to the power generating section using three or more of the criteria.

このような構成により、さらに長期間にわたる計測値の異常を判定することができ、より多様な異常判定を行うことができる。 With such a configuration, it is possible to determine anomalies in measured values over a longer period of time, and to perform a wider variety of anomaly determinations.

(3)好ましくは、各前記基準を用いて判定される前記異常の種類が異なる。 (3) Preferably, the type of abnormality determined using each criterion is different.

このような構成により、ダイオード解放故障および経年劣化等、太陽光発電におけるより多様な異常を判定することができる。 With such a configuration, it is possible to determine a wider variety of abnormalities in photovoltaic power generation, such as diode open failures and aging deterioration.

(4)好ましくは、前記判定装置は、さらに、前記判定部によって判定された前記異常を通知する通知部を備え、各前記基準を用いて判定される前記異常の通知内容が異なる。 (4) Preferably, the determination device further includes a notification unit that notifies the abnormality determined by the determination unit, and notification contents of the abnormality determined using each criterion are different.

このような構成により、いずれの基準を用いて判断された異常であるかを通知内容によって判断することができるため、たとえば、緊急度または重要度に応じた保守対応を行うことができる。 With such a configuration, it is possible to determine from the content of the notification which criterion is used to determine whether the abnormality is an abnormality. Therefore, for example, it is possible to perform maintenance according to the degree of urgency or importance.

(5)本発明の実施の形態に係る判定方法は、判定装置において用いられる判定方法であって、太陽電池パネルを含む発電部の出力の計測結果に基づくデータを取得するステップと、取得した前記データに基づいて、前記データの時間的な粒度を粗くした1または複数のデータを生成するステップと、取得した前記データおよび生成した前記1または複数のデータのうち、長さの異なる期間にわたる複数のデータであって異なる粒度の複数のデータから、それぞれ異なる基準を用いて前記発電部に関する異常を判定するステップとを含む。 (5) A determination method according to an embodiment of the present invention is a determination method used in a determination device, comprising a step of acquiring data based on a measurement result of an output of a power generation unit including a solar cell panel; Based on the data, generating one or more data obtained by roughening the temporal granularity of the data; and determining an abnormality related to the power generation unit from a plurality of data having different granularities using different criteria.

このような構成により、比較的短期間にわたる計測値の異常および比較的長期間にわたる計測値の異常を判定することができる。これにより、複数種類の期間での異常が判定され、多様な異常判定を行うことができる。したがって、太陽光発電システムの異常判定を向上させることができる。 With such a configuration, it is possible to determine an abnormality in the measured value over a relatively short period of time and an abnormality in the measured value over a relatively long period of time. As a result, it is possible to determine anomalies in a plurality of types of periods, and to perform a variety of anomaly determinations. Therefore, it is possible to improve the abnormality determination of the photovoltaic power generation system.

(6)本発明の実施の形態に係る判定プログラムは、判定装置において用いられる判定プログラムであって、コンピュータを、太陽電池パネルを含む発電部の出力の計測結果に基づくデータを取得する取得部と、前記取得部によって取得された前記データに基づいて、前記データの時間的な粒度を粗くした1または複数のデータを生成する生成部と、前記取得部によって取得された前記データおよび前記生成部によって生成された前記1または複数のデータのうち、長さの異なる期間にわたる複数のデータであって異なる粒度の複数のデータから、それぞれ異なる基準を用いて前記発電部に関する異常を判定する判定部、として機能させるためのプログラムである。 (6) A determination program according to an embodiment of the present invention is a determination program used in a determination device, and includes a computer, an acquisition unit that acquires data based on the measurement result of the output of a power generation unit that includes a solar cell panel. , a generation unit that generates one or more pieces of data obtained by coarsening the temporal granularity of the data based on the data acquired by the acquisition unit; and the data acquired by the acquisition unit and the generation unit: a judgment unit that judges an abnormality related to the power generation unit using different criteria from a plurality of pieces of data of different granularities that are over periods of different lengths, among the generated one or more pieces of data; It's a program that makes it work.

このような構成により、比較的短期間にわたる計測値の異常および比較的長期間にわたる計測値の異常を判定することができる。これにより、複数種類の期間での異常が判定され、多様な異常判定を行うことができる。したがって、太陽光発電システムの異常判定を向上させることができる。 With such a configuration, it is possible to determine an abnormality in the measured value over a relatively short period of time and an abnormality in the measured value over a relatively long period of time. As a result, it is possible to determine anomalies in a plurality of types of periods, and to perform a variety of anomaly determinations. Therefore, it is possible to improve the abnormality determination of the photovoltaic power generation system.

以下、本発明の実施の形態について図面を用いて説明する。なお、図中同一または相当部分には同一符号を付してその説明は繰り返さない。また、以下に記載する実施の形態の少なくとも一部を任意に組み合わせてもよい。 BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will be described below with reference to the drawings. The same or corresponding parts in the drawings are denoted by the same reference numerals, and the description thereof will not be repeated. Moreover, at least part of the embodiments described below may be combined arbitrarily.

[太陽光発電システムの構成]
図1は、本発明の実施の形態に係る太陽光発電システムの構成を示す図である。
[Configuration of photovoltaic power generation system]
FIG. 1 is a diagram showing the configuration of a photovoltaic power generation system according to an embodiment of the present invention.

図1を参照して、太陽光発電システム401は、4つのPCS(Power Conditioning Subsystem)ユニット80と、キュービクル6とを備える。キュービクル6は、銅バー73を含む。 Referring to FIG. 1 , solar power generation system 401 includes four PCS (Power Conditioning Subsystem) units 80 and cubicles 6 . Cubicle 6 includes copper bars 73 .

図1では、4つのPCSユニット80を代表的に示しているが、さらに多数または少数のPCSユニット80が設けられてもよい。 Although four PCS units 80 are representatively shown in FIG. 1, more or fewer PCS units 80 may be provided.

図2は、本発明の実施の形態に係るPCSユニットの構成を示す図である。 FIG. 2 is a diagram showing the configuration of the PCS unit according to the embodiment of the invention.

図2を参照して、PCSユニット80は、4つの集電ユニット60と、PCS(電力変換装置)8とを備える。PCS8は、銅バー7と、電力変換部9とを含む。 Referring to FIG. 2, PCS unit 80 includes four power collection units 60 and PCS (power converter) 8 . PCS 8 includes copper bar 7 and power converter 9 .

図2では、4つの集電ユニット60を代表的に示しているが、さらに多数または少数の集電ユニット60が設けられてもよい。 FIG. 2 representatively shows four collector units 60, but more or fewer collector units 60 may be provided.

図3は、本発明の実施の形態に係る集電ユニットの構成を示す図である。 FIG. 3 is a diagram showing the configuration of the current collecting unit according to the embodiment of the invention.

図3を参照して、集電ユニット60は、4つの太陽電池ユニット74と、集電箱71とを含む。集電箱71は、銅バー72を有する。 Referring to FIG. 3 , current collection unit 60 includes four solar cell units 74 and current collection box 71 . A current collection box 71 has a copper bar 72 .

図3では、4つの太陽電池ユニット74を代表的に示しているが、さらに多数または少数の太陽電池ユニット74が設けられてもよい。 FIG. 3 representatively shows four solar cell units 74, but more or fewer solar cell units 74 may be provided.

図4は、本発明の実施の形態に係る太陽電池ユニットの構成を示す図である。 FIG. 4 is a diagram showing the configuration of a solar cell unit according to an embodiment of the invention.

図4を参照して、太陽電池ユニット74は、4つの発電部78と、接続箱76とを含む。発電部78は、太陽電池パネルを有する。接続箱76は、銅バー77を有する。 Referring to FIG. 4 , solar cell unit 74 includes four power generation units 78 and junction box 76 . The power generation unit 78 has a solar cell panel. Junction box 76 has copper bars 77 .

図4では、4つの発電部78を代表的に示しているが、さらに多数または少数の発電部78が設けられてもよい。 Although four power generation units 78 are representatively shown in FIG. 4, more or less power generation units 78 may be provided.

発電部78は、この例では4つの太陽電池パネル79A,79B,79C,79Dが直列接続されたストリングである。以下、太陽電池パネル79A,79B,79C,79Dの各々を、太陽電池パネル79とも称する。 The power generation unit 78 is a string in which four solar panels 79A, 79B, 79C, and 79D are connected in series in this example. Each of the solar cell panels 79A, 79B, 79C, and 79D is also referred to as a solar cell panel 79 hereinafter.

図4では、4つの太陽電池パネル79を代表的に示しているが、さらに多数または少数の太陽電池パネル79が設けられてもよい。 Although four solar panels 79 are representatively shown in FIG. 4, more or fewer solar panels 79 may be provided.

太陽光発電システム401では、複数の発電部78からの出力ラインおよび集約ラインすなわち電力線がそれぞれキュービクル6に電気的に接続される。 In the photovoltaic power generation system 401 , output lines and aggregate lines, that is, power lines, from the plurality of power generation units 78 are electrically connected to the cubicle 6 respectively.

より詳細には、発電部78の出力ライン1は、発電部78に接続された第1端と、銅バー77に接続された第2端とを有する。各出力ライン1は、銅バー77を介して集約ライン5に集約される。銅バー77は、たとえば接続箱76の内部に設けられている。 More specifically, the output line 1 of the power generation section 78 has a first end connected to the power generation section 78 and a second end connected to the copper bar 77 . Each output line 1 is aggregated into an aggregate line 5 via a copper bar 77 . Copper bar 77 is provided inside junction box 76, for example.

発電部78は、太陽光を受けると、受けた太陽光のエネルギーを直流電力に変換し、変換した直流電力を出力ライン1へ出力する。 Upon receiving sunlight, the power generation unit 78 converts the energy of the received sunlight into DC power and outputs the converted DC power to the output line 1 .

図3および図4を参照して、集約ライン5は、対応の太陽電池ユニット74における銅バー77に接続された第1端と、銅バー72に接続された第2端とを有する。各集約ライン5は、銅バー72を介して集約ライン2に集約される。銅バー72は、たとえば集電箱71の内部に設けられている。 3 and 4, aggregate line 5 has a first end connected to copper bar 77 in a corresponding solar cell unit 74 and a second end connected to copper bar 72 . Each aggregate line 5 is aggregated into an aggregate line 2 via a copper bar 72 . Copper bar 72 is provided, for example, inside collector box 71 .

図1~図4を参照して、太陽光発電システム401では、上述のように複数の発電部78からの各出力ライン1が集約ライン5に集約され、各集約ライン5が集約ライン2に集約され、各集約ライン2が集約ライン4に集約され、各集約ライン4がキュービクル6に電気的に接続される。 1 to 4, in solar power generation system 401, each output line 1 from a plurality of power generation units 78 is aggregated into aggregate line 5, and each aggregate line 5 is aggregated into aggregate line 2, as described above. , each aggregated line 2 is aggregated into an aggregated line 4 , and each aggregated line 4 is electrically connected to a cubicle 6 .

より詳細には、各集約ライン2は、対応の集電ユニット60における銅バー72に接続された第1端と、銅バー7に接続された第2端とを有する。PCS8において、内部ライン3は、銅バー7に接続された第1端と、電力変換部9に接続された第2端とを有する。 More specifically, each aggregate line 2 has a first end connected to the copper bar 72 of the corresponding current collecting unit 60 and a second end connected to the copper bar 7 . In PCS 8 , internal line 3 has a first end connected to copper bar 7 and a second end connected to power converter 9 .

PCS8において、電力変換部9は、たとえば、各発電部78において発電された直流電力を出力ライン1、銅バー77、集約ライン5、銅バー72、集約ライン2、銅バー7および内部ライン3経由で受けると、受けた直流電力を交流電力に変換して集約ライン4へ出力する。 In the PCS 8, the power conversion unit 9, for example, outputs the DC power generated in each power generation unit 78 via the output line 1, the copper bar 77, the aggregate line 5, the copper bar 72, the aggregate line 2, the copper bar 7 and the internal line 3. , it converts the received DC power into AC power and outputs it to the aggregation line 4 .

集約ライン4は、電力変換部9に接続された第1端と、銅バー73に接続された第2端とを有する。 Aggregate line 4 has a first end connected to power converter 9 and a second end connected to copper bar 73 .

キュービクル6において、各PCS8における電力変換部9から各集約ライン4へ出力された交流電力は、銅バー73を介して系統へ出力される。 In the cubicle 6 , the AC power output from the power converter 9 in each PCS 8 to each aggregate line 4 is output to the grid via the copper bar 73 .

[監視システム301の構成]
図5は、本発明の実施の形態に係る監視システムの構成を示す図である。
[Configuration of monitoring system 301]
FIG. 5 is a diagram showing the configuration of the monitoring system according to the embodiment of the invention.

図5を参照して、太陽光発電システム401は、監視システム301を備える。監視システム301は、判定装置101と、複数の監視装置111と、収集装置151とを含む。 Referring to FIG. 5 , solar power generation system 401 includes monitoring system 301 . The monitoring system 301 includes a determination device 101 , a plurality of monitoring devices 111 and a collection device 151 .

図5では、1つの集電ユニット60に対応して設けられた4つの監視装置111を代表的に示しているが、さらに多数または少数の監視装置111が設けられてもよい。また、監視システム301は、1つの収集装置151を備えているが、複数の収集装置151を備えてもよい。 FIG. 5 representatively shows four monitoring devices 111 provided corresponding to one current collecting unit 60, but more or fewer monitoring devices 111 may be provided. Also, the monitoring system 301 includes one collection device 151 , but may include a plurality of collection devices 151 .

監視システム301では、子機である監視装置111におけるセンサの情報が、収集装置151へ定期的または不定期に伝送される。 In the monitoring system 301, sensor information in the monitoring device 111, which is a child device, is transmitted to the collecting device 151 regularly or irregularly.

監視装置111は、たとえば集電ユニット60に設けられている。より詳細には、監視装置111は、4つの太陽電池ユニット74にそれぞれ対応して4つ設けられている。各監視装置111は、たとえば、対応の出力ライン1および集約ライン5に電気的に接続されている。 The monitoring device 111 is provided in the current collecting unit 60, for example. More specifically, four monitoring devices 111 are provided corresponding to the four solar cell units 74, respectively. Each monitoring device 111 is, for example, electrically connected to a corresponding output line 1 and aggregate line 5 .

監視装置111は、対応の太陽電池ユニット74における各出力ライン1の電流をセンサにより計測する。また、監視装置111は、対応の太陽電池ユニット74における各出力ライン1の電圧をセンサにより計測する。 The monitoring device 111 measures the current of each output line 1 in the corresponding solar cell unit 74 using a sensor. Also, the monitoring device 111 measures the voltage of each output line 1 in the corresponding solar cell unit 74 using a sensor.

収集装置151は、たとえばPCS8の近傍に設けられている。より詳細には、収集装置151は、PCS8に対応して設けられ、信号線46を介して銅バー7に電気的に接続されている。 The collection device 151 is provided near the PCS8, for example. More specifically, the collection device 151 is provided corresponding to the PCS 8 and electrically connected to the copper bar 7 via the signal line 46 .

監視装置111および収集装置151は、集約ライン2,5を介して電力線通信(PLC:Power Line Communication)を行うことにより情報の送受信を行う。 The monitoring device 111 and the collection device 151 transmit and receive information by performing power line communication (PLC: Power Line Communication) via the integrated lines 2 and 5 .

より詳細には、各監視装置111は、対応の出力ラインの電流および電圧の計測結果を示す監視情報を送信する。収集装置151は、各監視装置111の計測結果を収集する。 More specifically, each monitoring device 111 transmits monitoring information indicating current and voltage measurements of the corresponding output line. The collection device 151 collects measurement results of each monitoring device 111 .

[監視装置111の構成]
図6は、本発明の実施の形態に係る監視システムにおける監視装置の構成を示す図である。図6では、出力ライン1、集約ライン5および銅バー77がより詳細に示されている。
[Configuration of monitoring device 111]
FIG. 6 is a diagram showing the configuration of a monitoring device in the monitoring system according to the embodiment of the invention. In FIG. 6 output line 1, aggregate line 5 and copper bar 77 are shown in more detail.

図6を参照して、出力ライン1は、プラス側出力ライン1pと、マイナス側出力ライン1nとを含む。集約ライン5は、プラス側集約ライン5pと、マイナス側集約ライン5nとを含む。銅バー77は、プラス側銅バー77pと、マイナス側銅バー77nとを含む。 Referring to FIG. 6, output line 1 includes a plus side output line 1p and a minus side output line 1n. Aggregate line 5 includes a plus side aggregate line 5p and a minus side aggregate line 5n. Copper bars 77 include plus side copper bars 77p and minus side copper bars 77n.

図示しないが、図3に示す集電箱71における銅バー72は、プラス側集約ライン5pおよびマイナス側集約ライン5nにそれぞれ対応して、プラス側銅バー72pおよびマイナス側銅バー72nを含む。 Although not shown, copper bars 72 in current collection box 71 shown in FIG. 3 include plus side copper bars 72p and minus side copper bars 72n corresponding to plus side aggregate line 5p and minus side aggregate line 5n, respectively.

プラス側出力ライン1pは、対応の発電部78に接続された第1端と、プラス側銅バー77pに接続された第2端とを有する。マイナス側出力ライン1nは、対応の発電部78に接続された第1端と、マイナス側銅バー77nに接続された第2端とを有する。 The plus side output line 1p has a first end connected to the corresponding power generation section 78 and a second end connected to the plus side copper bar 77p. The negative output line 1n has a first end connected to the corresponding power generation section 78 and a second end connected to the negative copper bar 77n.

プラス側集約ライン5pは、プラス側銅バー77pに接続された第1端と、集電箱71におけるプラス側銅バー72pに接続された第2端とを有する。マイナス側集約ライン5nは、マイナス側銅バー77nに接続された第1端と、集電箱71におけるマイナス側銅バー72nに接続された第2端とを有する。 The plus side aggregate line 5 p has a first end connected to the plus side copper bar 77 p and a second end connected to the plus side copper bar 72 p in the current collection box 71 . The negative aggregate line 5n has a first end connected to the negative copper bar 77n and a second end connected to the negative copper bar 72n in the collector box 71 .

監視装置111は、検出処理部11と、4つの電流センサ16と、電圧センサ17と、通信部14とを備える。なお、監視装置111は、出力ライン1の数に応じて、さらに多数または少数の電流センサ16を備えてもよい。 The monitoring device 111 includes a detection processing unit 11 , four current sensors 16 , a voltage sensor 17 and a communication unit 14 . Note that the monitoring device 111 may have more or less current sensors 16 depending on the number of output lines 1 .

監視装置111は、たとえば、発電部78の近傍に設けられている。具体的には、監視装置111は、たとえば、計測対象の出力ライン1が接続された銅バー77が設けられた接続箱76の内部に設けられている。なお、監視装置111は、接続箱76の外部に設けられてもよい。 Monitoring device 111 is provided, for example, near power generation unit 78 . Specifically, the monitoring device 111 is provided, for example, inside a connection box 76 provided with a copper bar 77 to which the output line 1 to be measured is connected. Note that the monitoring device 111 may be provided outside the connection box 76 .

監視装置111は、たとえば、プラス側集約ライン5pおよびマイナス側集約ライン5nとそれぞれプラス側電源線26pおよびマイナス側電源線26nを介して電気的に接続されている。以下、プラス側電源線26pおよびマイナス側電源線26nの各々を、電源線26とも称する。 Monitoring device 111 is, for example, electrically connected to plus-side aggregate line 5p and minus-side aggregate line 5n via plus-side power supply line 26p and minus-side power supply line 26n, respectively. Each of the plus-side power supply line 26p and the minus-side power supply line 26n is also referred to as a power supply line 26 hereinafter.

各監視装置111は、対応の発電部78に関する計測結果を示す監視情報を、自己および収集装置151に接続される電力線を介して送信する。 Each monitoring device 111 transmits monitoring information indicating the measurement result of the corresponding power generation unit 78 via the power line connected to itself and the collecting device 151 .

詳細には、監視装置111における通信部14は、集約ラインを介した電力線通信を、複数の監視装置111の計測結果を収集する収集装置151と行うことが可能である。より詳細には、通信部14は、集約ライン2,5経由で情報を送受信することが可能である。具体的には、通信部14は、電源線26および集約ライン2,5を介して収集装置151と電力線通信を行う。 Specifically, the communication unit 14 in the monitoring device 111 can perform power line communication via an aggregate line with the collection device 151 that collects the measurement results of the plurality of monitoring devices 111 . More specifically, the communication section 14 can transmit and receive information via the aggregate lines 2 and 5 . Specifically, the communication unit 14 performs power line communication with the collection device 151 via the power line 26 and the aggregate lines 2 and 5 .

検出処理部11は、たとえば、対応の出力ライン1の電流および電圧の計測結果を示す監視情報を所定時間ごとに作成するように設定されている。 The detection processing unit 11 is set, for example, to create monitoring information indicating the measurement results of the current and voltage of the corresponding output line 1 at predetermined time intervals.

電流センサ16は、出力ライン1の電流を計測する。より詳細には、電流センサ16は、たとえば、ホール素子タイプの電流プローブである。電流センサ16は、監視装置111の図示しない電源回路から受けた電力を用いて、対応のマイナス側出力ライン1nを通して流れる電流を6秒ごとに計測し、計測結果を示す信号を検出処理部11へ出力する。なお、電流センサ16は、プラス側出力ライン1pを通して流れる電流を計測してもよい。 A current sensor 16 measures the current in the output line 1 . More specifically, the current sensor 16 is, for example, a Hall element type current probe. The current sensor 16 uses the power received from the power supply circuit (not shown) of the monitoring device 111 to measure the current flowing through the corresponding negative output line 1n every 6 seconds, and sends a signal indicating the measurement result to the detection processing unit 11. Output. The current sensor 16 may measure the current flowing through the plus side output line 1p.

電圧センサ17は、出力ライン1の電圧を計測する。より詳細には、電圧センサ17は、プラス側銅バー77pおよびマイナス側銅バー77n間の電圧を6秒ごとに計測し、計測結果を示す信号を検出処理部11へ出力する。 A voltage sensor 17 measures the voltage of the output line 1 . More specifically, the voltage sensor 17 measures the voltage between the positive side copper bar 77p and the negative side copper bar 77n every 6 seconds, and outputs a signal indicating the measurement result to the detection processing section 11 .

検出処理部11は、電流センサ16および電圧センサ17からそれぞれ受けた信号の示す計測結果、対応の電流センサ16のID(以下、電流センサIDとも称する。)、電圧センサ17のID(以下、電圧センサIDとも称する。)、および自己の監視装置111のID(以下、監視装置IDとも称する。)を含む監視情報を作成する。 The detection processing unit 11 obtains the measurement results indicated by the signals received from the current sensor 16 and the voltage sensor 17, the ID of the corresponding current sensor 16 (hereinafter also referred to as the current sensor ID), and the ID of the voltage sensor 17 (hereinafter referred to as the voltage sensor ID). (also referred to as a sensor ID) and the ID of its own monitoring device 111 (hereinafter also referred to as a monitoring device ID).

検出処理部11は、送信元IDが自己の監視装置IDであり、送信先IDが収集装置151のIDであり、データ部分が監視情報である監視情報パケットを作成する。そして、検出処理部11は、作成した監視情報パケットを通信部14へ出力する。なお、検出処理部11は、監視情報パケットにシーケンス番号を含めてもよい。 The detection processing unit 11 creates a monitoring information packet in which the source ID is the monitoring device ID of itself, the destination ID is the ID of the collection device 151, and the data portion is the monitoring information. The detection processing unit 11 then outputs the created monitoring information packet to the communication unit 14 . Note that the detection processing unit 11 may include a sequence number in the monitoring information packet.

通信部14は、検出処理部11から受ける監視情報パケットを収集装置151へ送信する。 The communication unit 14 transmits the monitoring information packet received from the detection processing unit 11 to the collection device 151 .

再び図5を参照して、収集装置151は、集約ライン2,5経由で情報を送受信することが可能である。具体的には、収集装置151は、たとえば、信号線46および集約ライン2,5を介して監視装置111と電力線通信を行い、監視情報パケットを複数の監視装置111から受信する。 Referring again to FIG. 5, collection device 151 is capable of transmitting and receiving information via aggregation lines 2 and 5 . Specifically, the collection device 151 performs power line communication with the monitoring device 111 via the signal line 46 and the aggregation lines 2 and 5, and receives monitoring information packets from the plurality of monitoring devices 111, for example.

収集装置151は、カウンタおよび記憶部を有しており、監視装置111から監視情報パケットを受信すると、受信した監視情報パケットから監視情報を取得するとともに、カウンタにおけるカウント値を受信時刻として取得する。そして、収集装置151は、受信時刻を監視情報に含めた後、図示しない記憶部に当該監視情報を保存する。 The collection device 151 has a counter and a storage unit, and upon receiving a monitoring information packet from the monitoring device 111, acquires the monitoring information from the received monitoring information packet and acquires the count value of the counter as the reception time. After including the reception time in the monitoring information, the collection device 151 saves the monitoring information in a storage unit (not shown).

[判定装置の構成および動作]
図7は、本発明の実施の形態に係る監視システムにおける判定装置の構成を示す図である。
[Configuration and Operation of Determination Device]
FIG. 7 is a diagram showing the configuration of the determination device in the monitoring system according to the embodiment of the invention.

図7を参照して、判定装置101は、判定部81と、生成部82と、通信処理部(通知部)84と、記憶部85と、取得部86とを備える。 Referring to FIG. 7 , determination device 101 includes determination unit 81 , generation unit 82 , communication processing unit (notification unit) 84 , storage unit 85 , and acquisition unit 86 .

判定装置101における記憶部85には、たとえば、管理対象の監視装置111のIDすなわち監視装置IDが登録されている。また、記憶部85には、監視装置IDと当該監視装置IDを有する監視装置111に含まれる各センサのIDすなわち電流センサIDおよび電圧センサIDとの対応関係R1が登録されている。 For example, the ID of the monitoring device 111 to be managed, that is, the monitoring device ID, is registered in the storage unit 85 of the determination device 101 . Further, in the storage unit 85, a correspondence relationship R1 between the monitoring device ID and the ID of each sensor included in the monitoring device 111 having the monitoring device ID, that is, the current sensor ID and the voltage sensor ID is registered.

判定装置101は、たとえばサーバであり、監視情報を収集装置151から定期的に取得し、取得した監視情報を処理する。なお、判定装置101は、たとえば収集装置151に内蔵される構成であってもよい。 The determination device 101 is, for example, a server, periodically acquires monitoring information from the collecting device 151, and processes the acquired monitoring information. Note that the determination device 101 may be configured to be built in the collection device 151, for example.

より詳細には、判定装置101における通信処理部84は、ネットワークを介して、収集装置151等の他の装置と情報の送受信を行う。 More specifically, the communication processing unit 84 in the determination device 101 transmits and receives information to and from other devices such as the collection device 151 via the network.

通信処理部84は、指定された日毎処理タイミング、たとえば毎日の午前0時において監視情報収集処理を行う。なお、判定装置101を収集装置151に内蔵する構成にすれば、より短い間隔で監視情報を容易に収集することができる。 The communication processing unit 84 performs the monitoring information collection process at a designated daily processing timing, for example, at midnight every day. If the determination device 101 is incorporated in the collection device 151, monitoring information can be easily collected at shorter intervals.

より詳細には、通信処理部84は、日毎処理タイミングが到来すると、記憶部85に登録されている各監視装置IDを参照し、参照した各監視装置IDに対応し、日毎処理タイミングの24時間前から当該日毎処理タイミングまで(以下、処理日とも称する。)に属する受信時刻を含む監視情報を要求するための監視情報要求を収集装置151へ送信する。 More specifically, when the daily processing timing arrives, the communication processing unit 84 refers to each monitoring device ID registered in the storage unit 85, corresponds to each of the referenced monitoring device IDs, and stores the data within 24 hours of the daily processing timing. A monitoring information request is sent to the collection device 151 for requesting monitoring information including the reception times belonging to the previous to the daily processing timing (hereinafter also referred to as processing day).

収集装置151は、判定装置101から監視情報要求を受信すると、受信した監視情報要求に従って、監視情報要求の内容を満足する1または複数の監視情報を判定装置101へ送信する。 When the monitoring information request is received from the determination device 101, the collection device 151 transmits one or more pieces of monitoring information satisfying the content of the monitoring information request to the determination device 101 according to the received monitoring information request.

図8は、本発明の実施の形態に係る監視システムにおける判定装置が保持する監視情報の一例を示す図である。 FIG. 8 is a diagram showing an example of monitoring information held by the determination device in the monitoring system according to the embodiment of the present invention.

図8を参照して、通信処理部84は、監視情報要求の応答として収集装置151から1または複数の監視情報を受信すると、受信した各監視情報を記憶部85に保存するとともに、処理完了通知を取得部86へ出力する。 Referring to FIG. 8, when communication processing unit 84 receives one or a plurality of pieces of monitoring information from collecting device 151 as a response to the monitoring information request, communication processing unit 84 saves each piece of received monitoring information in storage unit 85 and sends a processing completion notification. is output to the acquisition unit 86 .

取得部86は、発電部78の出力の計測結果に基づく計測データを取得する。 The acquisition unit 86 acquires measurement data based on the measurement result of the output of the power generation unit 78 .

より詳細には、たとえば、取得部86は、通信処理部84から処理完了通知を受けると、記憶部85に登録されている対応関係R1を参照し、監視情報に含まれるある1分間における複数の電流値および複数の電圧値を記憶部85から取得し、電流センサIDごとに、取得した電流値および電圧値を乗じて発電電力を算出し、計測データとして生成部82へ出力する。 More specifically, for example, upon receiving a processing completion notification from the communication processing unit 84, the acquisition unit 86 refers to the correspondence R1 registered in the storage unit 85, and obtains a plurality of data in one minute included in the monitoring information. A current value and a plurality of voltage values are obtained from the storage unit 85, and the generated power is calculated by multiplying the obtained current value and voltage value for each current sensor ID, and output to the generation unit 82 as measurement data.

生成部82は、取得部86によって取得された計測データに基づいて、当該計測データの時間的な粒度を粗くしたデータ、すなわち、ある期間における計測データに基づくデータであって当該計測データと比べて発電電力等の要素値間の時間の間隔を大きくしたデータを生成する。 Based on the measurement data acquired by the acquisition unit 86, the generation unit 82 generates data obtained by coarsening the temporal granularity of the measurement data, that is, data based on the measurement data in a certain period and compared with the measurement data. Generate data with increased time intervals between element values such as generated power.

より詳細には、生成部82は、たとえば、取得部86が計測データとして取得した1分間の各発電電力、すなわち10回分の発電電力の平均値Mを算出し、記憶部85に保存するとともに、判定部81へ出力する。 More specifically, the generating unit 82, for example, calculates the average value M of the generated power for 1 minute acquired by the acquiring unit 86 as the measurement data, that is, the average value M of the generated power for 10 times, stores it in the storage unit 85, Output to determination unit 81 .

取得部86および生成部82は、記憶部85に保存されている次の1分間における各発電電力に対して同様の処理を行う。そして、取得部86および生成部82は、1日分の発電電力に対して当該処理を繰り返すことにより、電流センサIDごとの、1日分の平均値M(以下、1分毎データとも称する。)を生成する。 The acquisition unit 86 and the generation unit 82 perform the same processing on each generated power for the next one minute stored in the storage unit 85 . Then, the acquisition unit 86 and the generation unit 82 repeat the processing for the generated power for one day, thereby obtaining the average value M for one day (hereinafter also referred to as minute data) for each current sensor ID. ).

なお、生成部82は、生成した各平均値Mに対応する1日分の計測データを記憶部85から削除してもよい。 Note that the generation unit 82 may delete the measurement data for one day corresponding to each generated average value M from the storage unit 85 .

また、取得部86は、たとえば、対応関係R1を参照し、生成部82によって生成された電流センサIDごとの1分毎データを記憶部85から計測データとして取得し、生成部82へ出力する。 Acquisition unit 86 also refers to correspondence relationship R<b>1 , for example, acquires the 1-minute data for each current sensor ID generated by generation unit 82 from storage unit 85 as measurement data, and outputs the data to generation unit 82 .

そして、生成部82は、たとえば、取得部86から受けた1分毎データから、10分間隔の平均値Mをたとえば1日分選択し、選択した各平均値Mを時系列に並べた10分毎データを生成して記憶部85に保存するとともに、判定部81へ出力する。 Then, the generation unit 82 selects, for example, one day's average values M at 10-minute intervals from the minute-by-minute data received from the acquisition unit 86, and arranges the selected average values M in chronological order for 10 minutes. Each data is generated and stored in the storage unit 85 and output to the determination unit 81 .

なお、生成部82は、生成した10分毎データに対応する1分毎データを記憶部85から削除してもよい。 Note that the generation unit 82 may delete from the storage unit 85 the 1-minute data corresponding to the generated 10-minute data.

また、取得部86は、たとえば、対応関係R1を参照し、生成部82によって生成された電流センサIDごとの10分毎データを1年分選択し、選択した各10分毎データを記憶部85から計測データとして取得し、生成部82へ出力する。 Further, for example, the acquisition unit 86 refers to the correspondence relationship R1, selects the 10-minute data for each current sensor ID generated by the generation unit 82 for one year, and stores the selected 10-minute data in the storage unit 85. is acquired as measurement data from and output to the generation unit 82 .

そして、生成部82は、たとえば、取得部86から受けた各10分毎データから、1日のうちで発電電力が最大値を示すデータをたとえば1年分選択し、選択した各最大値を時系列に並べた1日毎データを生成して記憶部85に保存するとともに、判定部81へ出力する。 Then, generation unit 82 selects, for example, one year's worth of data indicating the maximum value of generated power in one day from each 10-minute data received from acquisition unit 86, and selects each selected maximum value for each hour. The daily data arranged in series is generated and stored in the storage unit 85 and output to the determination unit 81 .

なお、生成部82は、たとえば、生成した1日毎データの期間に対応する1年のうちの最初の日以前の10分毎データを記憶部85から削除してもよい。 Note that generation unit 82 may delete from storage unit 85, for example, the 10-minute data before the first day of the year corresponding to the period of the generated daily data.

また、生成部82は、たとえば、1年分の10分毎データに基づいて1日毎データを新たに生成する構成に限らず、生成済の1日毎データを更新する構成であってもよい。 Further, the generation unit 82 is not limited to the configuration of newly generating daily data based on the 10-minute data for one year, for example, and may be configured to update the generated daily data.

より詳細には、取得部86は、処理日の10分毎データを記憶部85から取得して生成部82へ出力する。また、取得部86は、たとえば、生成部82により生成または更新された1日毎データを記憶部85から取得して生成部82へ出力する。 More specifically, the acquisition unit 86 acquires the 10-minute data on the processing day from the storage unit 85 and outputs the data to the generation unit 82 . Acquisition unit 86 also acquires, for example, daily data generated or updated by generation unit 82 from storage unit 85 and outputs the data to generation unit 82 .

生成部82は、取得部86から受けた1日毎データにおける最初の日の最大値を削除し、取得部86から受けた処理日の10分毎データの示す発電電力のうちの最大値を選択し、選択した最大値を当該1日毎データに追加することにより当該1日毎データを更新し、更新後の1日毎データを記憶部85に保存する。 The generation unit 82 deletes the maximum value of the first day in the daily data received from the acquisition unit 86, and selects the maximum value of the generated power indicated by the 10-minute data of the processing day received from the acquisition unit 86. , the selected maximum value is added to the daily data to update the daily data, and the updated daily data is stored in the storage unit 85 .

以下、計測データ、1分毎データ、10分毎データおよび1日毎データの各々を、判定データとも称する。 Hereinafter, each of the measurement data, the 1-minute data, the 10-minute data, and the 1-day data will also be referred to as determination data.

判定部81は、長さの異なる期間にわたる判定データからそれぞれ異なる基準を用いて発電部78に関する異常を判定する。判定部81は、各基準において異なる粒度の判定データを用いる。たとえば、判定部81は、3つ以上の基準を用いて発電部78に関する異常を判定する。たとえば、各基準を用いて判定される異常の種類は異なる。 The determination unit 81 determines an abnormality in the power generation unit 78 using different criteria from determination data over periods of different lengths. The determination unit 81 uses determination data with different granularity for each criterion. For example, determination unit 81 determines an abnormality in power generation unit 78 using three or more criteria. For example, the types of anomalies determined using each criterion are different.

具体的には、たとえば、太陽電池パネル79を接続する配線が断線したり、太陽電池パネル79の発熱により内部配線が断線したりする場合、計測データに基づいて算出された平均値Mは、直前の平均値Mと比べて急激に低下する。 Specifically, for example, when the wiring connecting the solar panel 79 is broken, or the internal wiring is broken due to heat generated by the solar panel 79, the average value M calculated based on the measurement data decreases sharply compared to the average value M of .

判定部81は、第1の基準を用いて、このような短期間における平均値Mの急激な低下を異常と判定する。 Using the first criterion, the determination unit 81 determines that such a sudden drop in the average value M in a short period of time is abnormal.

第1の基準は、たとえば、平均値Mが直前の平均値Mと比べて所定値以上低下したか否かである。 The first criterion is, for example, whether or not the average value M has decreased from the previous average value M by a predetermined value or more.

判定部81は、第1の基準を用いて、平均値Mが前回算出した平均値Mと比べて所定値以上低下した場合、対応の発電部78が異常であると判定し、異常である旨の情報(以下、第1異常情報とも称する。)を通信処理部84へ出力する。 Using the first criterion, the determination unit 81 determines that the corresponding power generation unit 78 is abnormal when the average value M is lower than the average value M calculated last time by a predetermined value or more, and that the abnormality is present. information (hereinafter also referred to as first abnormality information) to the communication processing unit 84 .

図9は、異常と判定される10分毎データの一例を示す図である。図9において、横軸は時間を示し、縦軸は発電電力を示す。 FIG. 9 is a diagram showing an example of 10-minute data determined to be abnormal. In FIG. 9, the horizontal axis indicates time, and the vertical axis indicates generated power.

図9を参照して、グラフD1は、終日晴天であった1日の発電部78の発電電力を示し、グラフD2は、午前中が曇天であった1日の発電部78の発電電力を示し、グラフD3は、午後が曇天であった1日の発電部78の発電電力を示す。このように、天気等の影響により発電部78が十分に発電できない時間帯がある場合、発電部78の発電電力は、グラフD2およびD3に示すように晴天時の発電電力と比べて低下する。 Referring to FIG. 9, graph D1 shows the power generated by power generation unit 78 on a day when the weather was fine all day, and graph D2 shows the power generated by power generation unit 78 on a day when it was cloudy in the morning. , and graph D3 show the power generated by the power generation unit 78 on a day when it was cloudy in the afternoon. In this way, when there is a period of time when the power generation unit 78 cannot generate sufficient power due to the weather or the like, the power generated by the power generation unit 78 is lower than the power generated under fine weather, as shown in graphs D2 and D3.

判定部81は、第2の基準を用いて、このような1日のある時間帯における発電電力の低下を異常と判定する。 Using the second criterion, the determination unit 81 determines that such a decrease in generated power during a certain time period of the day is abnormal.

第2の基準は、たとえば、機械学習たとえばk-meansによる10分毎データのクラスタリングの結果を用いた、グラフD2が分類されたクラスタまたはグラフD3が分類されたクラスタに10分毎データが分類されるか否かである。 The second criterion is, for example, whether the 10-minute data is classified into the cluster in which the graph D2 is classified or the cluster in which the graph D3 is classified, using the result of clustering the 10-minute data by machine learning, such as k-means. or not.

判定部81は、第2の基準を用いて、グラフD2が分類されたクラスタまたはグラフD3が分類されたクラスタに10分毎データが分類された場合、対応の発電部78が異常であると判定し、異常である旨の情報(以下、第2異常情報とも称する。)を通信処理部84へ出力する。 Using the second criterion, when the 10-minute data is classified into the cluster into which the graph D2 is classified or into the cluster into which the graph D3 is classified, the determination unit 81 determines that the corresponding power generation unit 78 is abnormal. Then, information to the effect that there is an abnormality (hereinafter also referred to as second abnormality information) is output to the communication processing unit 84 .

このように、クラスタリングの結果を用いることにより、たとえば、ある時間帯における発電電力の低下を検知することができるため、異常の原因の推定に活用することができる。たとえば、終日晴天であった1日の発電部78の発電電力が図9に示すグラフD2またはグラフD3であった場合、それぞれ、午前または午後の発電電力の低下は、日影の影響等が考えられる。 In this way, by using the clustering results, it is possible to detect, for example, a decrease in the generated power during a certain time period, so that the results can be utilized for estimating the cause of an abnormality. For example, if the power generated by the power generation unit 78 on a day with fine weather is graph D2 or graph D3 shown in FIG. be done.

図10は、異常と判定される1日毎データの一例を示す図である。図10において、横軸は時間を示し、縦軸は発電電力を示す。グラフY1は、発電部78が1年間で発電する理想的な発電電力を示し、グラフY2は、ある1年間における発電部78の発電電力を示す。 FIG. 10 is a diagram showing an example of daily data determined to be abnormal. In FIG. 10, the horizontal axis indicates time, and the vertical axis indicates generated power. A graph Y1 shows the ideal power generated by the power generation unit 78 in one year, and a graph Y2 shows the power generated by the power generation unit 78 in one year.

図10を参照して、発電部78の発電電力は、たとえば、太陽電池パネル79の経年劣化、太陽電池パネル79における配線の半田の高抵抗化、または太陽電池パネル79の内部への水分の侵入等により、徐々に低下する場合がある。 Referring to FIG. 10, the power generated by power generation unit 78 is reduced, for example, by deterioration of solar cell panel 79 over time, increase in resistance of solder of wiring in solar cell panel 79, or penetration of moisture into solar cell panel 79 . etc., it may gradually decrease.

判定部81は、第3の基準を用いて、このように発電電力が徐々に低下する状態を異常と判定する。 Using the third criterion, the determination unit 81 determines that such a state in which the generated power gradually decreases is abnormal.

第3の基準は、たとえば、発電電力が、所定期間K1において、自己の発電部78の過去の発電電力に基づいて設定された閾値TH1以上低下しているか否かである。なお、閾値TH1は、所定期間K1における他の発電部78の発電電力の低下量に基づいて設定されてもよい。 The third criterion is, for example, whether or not the generated power has decreased by a threshold TH1 or more set based on the past generated power of its own power generation unit 78 in a predetermined period K1. Note that the threshold TH1 may be set based on the amount of decrease in the power generated by the other power generation units 78 during the predetermined period K1.

判定部81は、発電電力が所定期間K1たとえば1年間で閾値TH1以上低下している場合、対応の発電部78を異常であると判定し、異常である旨の情報(以下、第3異常情報とも称する。)を通信処理部84へ出力する。 When the generated power has decreased by a threshold value TH1 or more in a predetermined period K1, for example, one year, the determination unit 81 determines that the corresponding power generation unit 78 is abnormal, and provides information indicating the abnormality (hereinafter referred to as third abnormality information ) is output to the communication processing unit 84 .

通信処理部84は、判定部81によって判定された異常を通知する。たとえば、各基準を用いて判定させる異常の通知内容は異なる。 The communication processing unit 84 notifies the abnormality determined by the determination unit 81 . For example, the abnormality notification contents to be determined using each criterion are different.

より詳細には、通信処理部84は、判定部81から受けた第1異常情報、第2異常情報および第3異常情報を、たとえば、e-mail等の形式にしてネットワーク経由でサーバ等の外部の装置へ送信する。各異常情報は、たとえば、異常の度合いがレベルにより区別される場合、異なるレベルを示す。 More specifically, the communication processing unit 84 sends the first anomaly information, the second anomaly information, and the third anomaly information received from the determination unit 81 to an external device such as a server via a network in a format such as e-mail. device. Each piece of anomaly information indicates a different level, for example, when the degree of anomaly is distinguished by level.

なお、取得部86は、監視情報に含まれる複数の電流値および複数の電圧値に基づいて、発電電力を計測データとして算出する構成に限らず、監視情報に含まれる複数の電流値を計測データとして取得する構成であってもよい。 Note that the acquisition unit 86 is not limited to the configuration in which the generated power is calculated as measurement data based on the plurality of current values and the plurality of voltage values included in the monitoring information, and the plurality of current values included in the monitoring information is used as the measurement data. It may be configured to be acquired as

この場合、たとえば、生成部82は、取得部86が取得した1分間の各電流値、すなわち10回分の電流値の平均値Mを算出する。 In this case, for example, the generation unit 82 calculates the average value M of the current values acquired by the acquisition unit 86 for 1 minute, that is, the current values for 10 times.

また、取得部86は、監視情報に含まれる複数の電流値および複数の電圧値に基づいて、発電電力を計測データとして算出する構成に限らず、監視情報に含まれる複数の電圧値を計測データとして取得する構成であってもよい。 In addition, the acquisition unit 86 is not limited to the configuration in which the generated power is calculated as measurement data based on the plurality of current values and the plurality of voltage values included in the monitoring information, and the plurality of voltage values included in the monitoring information is used as the measurement data. It may be configured to be acquired as

この場合、たとえば、生成部82は、取得部86が取得した1分間の各電圧値、すなわち10回分の電圧値の平均値Mを算出する。 In this case, for example, the generation unit 82 calculates the average value M of the voltage values acquired by the acquisition unit 86 for 1 minute, that is, the voltage values for 10 times.

また、第1基準、第2基準および第3基準を用いて異常を判定する期間は、それぞれ、1分、1日および1年に限らず、10分、1時間および1週間等であってもよい。 Further, the period for judging abnormality using the first, second and third criteria is not limited to 1 minute, 1 day and 1 year, but may be 10 minutes, 1 hour and 1 week. good.

[動作の流れ]
監視システム301における各装置は、コンピュータを備え、当該コンピュータにおけるCPU等の演算処理部は、以下のフローチャートの各ステップの一部または全部を含むプログラムを図示しないメモリからそれぞれ読み出して実行する。これら複数の装置のプログラムは、それぞれ、外部からインストールすることができる。これら複数の装置のプログラムは、それぞれ、記録媒体に格納された状態で流通する。
[Flow of operation]
Each device in the monitoring system 301 includes a computer, and an arithmetic processing unit such as a CPU in the computer reads out from a memory (not shown) a program including part or all of each step in the following flowcharts and executes the program. Programs for these multiple devices can each be installed from the outside. Programs for these devices are stored in recording media and distributed.

図11は、本発明の実施の形態に係る判定装置が発電部に関する異常判定を行う際の動作手順を定めたフローチャートである。 FIG. 11 is a flow chart defining an operation procedure when the determination device according to the embodiment of the present invention performs abnormality determination regarding the power generation unit.

図11を参照して、まず、判定装置101は、太陽電池パネルを含む発電部78の出力の計測結果を含む監視情報を受信する(ステップS101)。 Referring to FIG. 11, first, determination device 101 receives monitoring information including measurement results of the output of power generation unit 78 including a solar cell panel (step S101).

次に、判定装置101は、受信した監視情報を蓄積する(ステップS102)。 Next, the determination device 101 accumulates the received monitoring information (step S102).

次に、判定装置101は、蓄積した監視情報に含まれる計測結果に基づく計測データを取得する(ステップS103)。 Next, the determination device 101 acquires measurement data based on the measurement results included in the accumulated monitoring information (step S103).

次に、判定装置101は、取得した計測データに基づいて、計測データの時間的な粒度を粗くした1分毎データを生成して蓄積する(ステップS104)。 Next, the determination device 101 generates and accumulates minute-by-minute data obtained by coarsening the temporal granularity of the measurement data based on the acquired measurement data (step S104).

次に、判定装置101は、取得した計測データから第1の基準を用いて発電部78に関する異常を判定する(ステップS105)。 Next, the determination device 101 determines an abnormality related to the power generation unit 78 from the acquired measurement data using the first criterion (step S105).

判定装置101は、発電部78が異常であると判定した場合(ステップ105でYES)、第1異常情報をサーバへ送信する(ステップS106)。 When determining that the power generation unit 78 is abnormal (YES in step 105), the determination device 101 transmits first abnormality information to the server (step S106).

次に、判定装置101は、生成した1分毎データに基づいて、1分毎データの時間的な粒度を粗くした10分毎データを生成して蓄積する(ステップS107)。 Next, based on the generated 1-minute data, the determination device 101 generates and accumulates 10-minute data obtained by coarsening the temporal granularity of the 1-minute data (step S107).

一方、判定装置101は、発電部78が正常であると判定した場合(ステップS105でNO)、生成した1分毎データに基づいて、1分毎データの時間的な粒度を粗くした10分毎データを生成して蓄積する(ステップS107)。 On the other hand, if the determination device 101 determines that the power generation unit 78 is normal (NO in step S105), based on the generated 1-minute data, the 10-minute Data is generated and stored (step S107).

次に、判定装置101は、10分毎データから第2の基準を用いて発電部78に関する異常を判定する(ステップS108)。 Next, the determination device 101 determines an abnormality related to the power generation unit 78 from the 10-minute data using the second criterion (step S108).

次に、判定装置101は、発電部78が異常であると判定した場合(ステップS108でYES)、第2異常情報をサーバへ送信する(ステップS109)。 Next, when determining that the power generation unit 78 is abnormal (YES in step S108), the determination device 101 transmits second abnormality information to the server (step S109).

次に、判定装置101は、生成した10分毎データに基づいて、10分毎データの時間的な粒度を粗くした1日毎データを生成して蓄積する(ステップS110)。 Next, based on the generated 10-minute data, the determination device 101 generates and accumulates daily data obtained by coarsening the temporal granularity of the 10-minute data (step S110).

一方、判定装置101は、発電部78が正常であると判定した場合(ステップS108でNO)、10分毎データの時間的な粒度を粗くした1日毎データを生成して蓄積する(ステップS110)。 On the other hand, when determining that the power generation unit 78 is normal (NO in step S108), the determining device 101 generates and accumulates daily data obtained by coarsening the temporal granularity of the 10-minute data (step S110). .

次に、判定装置101は、1日毎データから第3の基準を用いて発電部78に関する異常を判定する(ステップS111)。 Next, the determination device 101 determines an abnormality related to the power generation unit 78 from the daily data using the third criterion (step S111).

次に、判定装置101は、発電部78が異常であると判定した場合(ステップS111でYES)、第3異常情報をサーバへ送信する(ステップS112)。 Next, when determining that the power generation unit 78 is abnormal (YES in step S111), the determination device 101 transmits third abnormality information to the server (step S112).

次に、判定装置101は、新たな監視情報を受信するまで待機する(ステップS101)。 Next, the determination device 101 waits until new monitoring information is received (step S101).

一方、判定装置101は、発電部78が正常である判定した場合(ステップS111でNO)、新たな監視情報を受信するまで待機する(ステップS101)。 On the other hand, when determining that the power generation unit 78 is normal (NO in step S111), the determination device 101 waits until new monitoring information is received (step S101).

なお、本発明の実施の形態に係る判定装置では、3つ以上の基準を用いて発電部78に関する異常を判定する構成であるしたが、これに限定するものではない。判定装置101は、2つの基準を用いて発電部78に関する異常を判定する構成であってもよい。 In addition, although the determination device according to the embodiment of the present invention is configured to determine an abnormality related to the power generation unit 78 using three or more criteria, the configuration is not limited to this. The determination device 101 may be configured to determine an abnormality related to the power generation section 78 using two criteria.

また、本発明の実施の形態に係る判定装置では、第1の基準を用いて判定される異常の種類および通知内容と、第2の基準を用いて判定される異常の種類および通知内容とは、それぞれ異なる構成であるとしたが、これに限定するものではない。第1の基準を用いて判定される異常の種類および通知内容と、第2の基準を用いて判定される異常の種類および通知内容とは、それぞれ同一であってもよい。 Further, in the determination device according to the embodiment of the present invention, the abnormality type and notification content determined using the first criterion and the abnormality type and notification content determined using the second criterion are , have different configurations, but are not limited to this. The abnormality type and notification content determined using the first criterion may be the same as the abnormality type and notification content determined using the second criterion.

ところで、特許文献1に記載の技術を超えて、太陽光発電システムの異常判定を向上させることが可能な技術が望まれる。 By the way, there is a demand for a technique capable of improving abnormality determination of a photovoltaic power generation system beyond the technique described in Patent Literature 1.

本発明の実施の形態に係る判定装置では、取得部86は、発電部78の出力の計測結果に基づく計測データを取得する。生成部82は、取得部86によって取得された計測データに基づいて、計測データの時間的な粒度を粗くした1または複数の判定データを生成する。判定部81は、取得部86によって取得された計測データおよび生成部82によって生成された1または複数の判定データのうち、長さの異なる期間にわたる複数のデータであって異なる粒度の複数のデータから、それぞれ異なる基準を用いて発電部78に関する異常を判定する。 In the determination device according to the embodiment of the present invention, the acquisition section 86 acquires measurement data based on the measurement results of the output of the power generation section 78 . Based on the measurement data acquired by the acquisition unit 86, the generation unit 82 generates one or a plurality of determination data obtained by coarsening the temporal granularity of the measurement data. The determination unit 81 selects a plurality of pieces of data over different lengths of time from among the measurement data acquired by the acquisition unit 86 and one or a plurality of pieces of determination data generated by the generation unit 82 from a plurality of pieces of data with different granularities. , and determine an abnormality related to the power generation unit 78 using different criteria.

このような構成により、比較的短期間にわたる計測値の異常および比較的長期間にわたる計測値の異常を判定することが可能になる。これにより、複数種類の期間での異常が判定され、多様な異常判定を行うことが可能になることにより、たとえば、短期間では計測値の変化がなく長期間にわたる計測結果を確認することにより変化が確認できるような異常を検知することできる。さらに、長期間わたる計測結果では、データの粒度が粗くなることにより捉えることができない短期間での計測値の変化も、短期間にわたる計測結果を確認することにより検知することができる。 With such a configuration, it becomes possible to determine an abnormality in the measured value over a relatively short period of time and an abnormality in the measured value over a relatively long period of time. As a result, it is possible to judge anomalies in multiple types of time periods, making it possible to make a variety of anomaly judgments. It is possible to detect anomalies that can be confirmed by Furthermore, short-term changes in measured values that cannot be captured in long-term measurement results due to coarse data granularity can be detected by checking short-term measurement results.

したがって、本発明の実施の形態に係る判定装置では、太陽光発電システムの異常判定を向上させることができる。 Therefore, with the determination device according to the embodiment of the present invention, it is possible to improve the abnormality determination of the photovoltaic power generation system.

また、本発明の実施の形態に係る判定装置では、判定部81は、3つ以上の基準を用いて発電部78に関する異常を判定する。 In addition, in the determination device according to the embodiment of the present invention, determination unit 81 determines abnormality related to power generation unit 78 using three or more criteria.

このような構成により、さらに長期間にわたる計測値の異常を判定することができ、より多様な異常判定を行うことができる。 With such a configuration, it is possible to determine anomalies in measured values over a longer period of time, and to perform a wider variety of anomaly determinations.

また、本発明の実施の形態に係る判定装置では、各基準を用いて判定される異常の種類が異なる。 Moreover, in the determination device according to the embodiment of the present invention, the type of abnormality determined using each criterion is different.

このような構成により、ダイオード解放故障および経年劣化等、太陽光発電におけるより多様な異常を判定することができる。 With such a configuration, it is possible to determine a wider variety of abnormalities in photovoltaic power generation, such as diode open failures and aging deterioration.

また、本発明の実施の形態に係る判定装置では、通信処理部84は、判定部81によって判定された異常を通知する。そして、各基準を用いて判定される異常の通知内容が異なる。 Further, in the determination device according to the embodiment of the present invention, the communication processing section 84 notifies the abnormality determined by the determination section 81 . Then, the content of notification of abnormality determined using each criterion is different.

このような構成により、いずれの基準を用いて判断された異常であるかを通知内容によって判断することができるため、たとえば、緊急度または重要度に応じた保守対応を行うことができる。 With such a configuration, it is possible to determine from the content of the notification which criterion is used to determine whether the abnormality is an abnormality. Therefore, for example, it is possible to perform maintenance according to the degree of urgency or importance.

また、本発明の実施の形態に係る判定方法では、まず、太陽電池パネル79を含む発電部78の出力の計測結果に基づく計測データデータを取得する。次に、取得した計測データに基づいて、計測データの時間的な粒度を粗くした1または複数の判定データを生成する。次に、取得した計測データおよび生成した1または複数の判定データのうち、長さの異なる期間にわたる複数のデータであって異なる粒度の複数のデータから、それぞれ異なる基準を用いて発電部78に関する異常を判定する。 Moreover, in the determination method according to the embodiment of the present invention, first, measurement data based on the measurement result of the output of the power generation section 78 including the solar cell panel 79 is obtained. Next, based on the acquired measurement data, one or a plurality of judgment data are generated by coarsening the temporal granularity of the measurement data. Next, out of the acquired measurement data and the generated one or more determination data, a plurality of data over different lengths of time and having different granularities are used to detect an abnormality in the power generation unit 78 using different criteria. judge.

このような構成により、比較的短期間にわたる計測値の異常および比較的長期間にわたる計測値の異常を判定することができる。これにより、複数種類の期間での異常が判定され、多様な異常判定を行うことができる。 With such a configuration, it is possible to determine an abnormality in the measured value over a relatively short period of time and an abnormality in the measured value over a relatively long period of time. As a result, it is possible to determine anomalies in a plurality of types of periods, and to perform a variety of anomaly determinations.

したがって、本発明の実施の形態に係る判定方法では、太陽光発電システムの異常判定を向上させることができる。 Therefore, with the determination method according to the embodiment of the present invention, it is possible to improve the abnormality determination of the photovoltaic power generation system.

上記実施の形態は、すべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は、上記説明ではなく請求の範囲によって示され、請求の範囲と均等の意味および範囲内でのすべての変更が含まれることが意図される。 The above-described embodiments should be considered as illustrative in all respects and not restrictive. The scope of the present invention is indicated by the scope of the claims rather than the above description, and is intended to include all changes within the meaning and scope equivalent to the scope of the claims.

以上の説明は、以下に付記する特徴を含む。
[付記1]
太陽電池パネルを含む発電部を備える太陽光発電システムに用いられる判定装置であって、
前記発電部の出力の計測結果に基づくデータを取得する取得部と、
前記取得部によって取得された前記データに基づいて、前記データの時間的な粒度を粗くした1または複数のデータを生成する生成部と、
前記取得部によって取得された前記データおよび前記生成部によって生成された前記1または複数のデータのうち、長さの異なる期間にわたる複数のデータであって異なる粒度の複数のデータから、それぞれ異なる基準を用いて前記発電部に関する異常を判定する判定部とを備え、
前記発電部は、複数の太陽電池パネルが直列接続されたストリングであり、
前記発電部の出力は、前記発電部の発電電力、電流または電圧である、判定装置。
The above description includes the features appended below.
[Appendix 1]
A determination device used in a photovoltaic power generation system comprising a power generation unit including a solar panel,
an acquisition unit that acquires data based on a measurement result of the output of the power generation unit;
a generation unit that generates one or more pieces of data obtained by coarsening the temporal granularity of the data based on the data acquired by the acquisition unit;
Different criteria are obtained from a plurality of data of different granularities and of a plurality of data over different lengths of the data acquired by the acquisition unit and the one or more data generated by the generation unit. and a determination unit that determines an abnormality related to the power generation unit using
The power generation unit is a string in which a plurality of solar panels are connected in series,
The determination device, wherein the output of the power generation unit is power, current, or voltage generated by the power generation unit.

1 出力ライン
2,4,5 集約ライン
3 内部ライン
6 キュービクル
7 銅バー
8 PCS
9 電力変換部
11 検出処理部
14 通信部
16 電流センサ
17 電圧センサ
26 電源線
46 信号線
60 集電ユニット
71 集電箱
72,73,77 銅バー
74 太陽電池ユニット
76 接続箱
78 発電部
79 太陽電池パネル
80 PCSユニット
81 判定部
82 生成部
84 通信処理部(通知部)
85 記憶部
86 取得部
101 判定装置
111 監視装置
151 収集装置
301 監視システム
401 太陽光発電システム
1 output line 2,4,5 aggregate line 3 internal line 6 cubicle 7 copper bar 8 PCS
9 power conversion unit 11 detection processing unit 14 communication unit 16 current sensor 17 voltage sensor 26 power supply line 46 signal line 60 current collection unit 71 current collection box 72, 73, 77 copper bar 74 solar cell unit 76 connection box 78 power generation unit 79 sun Battery panel 80 PCS unit 81 Determination unit 82 Generation unit 84 Communication processing unit (notification unit)
85 storage unit 86 acquisition unit 101 determination device 111 monitoring device 151 collection device 301 monitoring system 401 solar power generation system

Claims (8)

太陽電池パネルを含む発電部を備える太陽光発電システムに用いられる判定装置であって、
前記発電部の出力の計測結果に基づくデータを取得する取得部と、
前記取得部によって取得された前記データに基づいて、前記データの時間的な粒度を粗くした1または複数のデータを生成する生成部と、
前記取得部によって取得された前記データおよび前記生成部によって生成された前記1または複数のデータのうち、長さの異なる期間にわたる複数のデータであって異なる粒度の複数のデータである複数の判定データから、それぞれ異なる基準を用いて前記発電部に関する異常を判定する判定部とを備え、
前記判定部は、前記複数の判定データのうちの第1の判定データの、機械学習によるクラスタリングを行った結果において、前記第1の判定データが所定のクラスタに分類されるか否かである前記基準を用いて、前記発電部に関する異常を判定する、判定装置。
A determination device used in a photovoltaic power generation system comprising a power generation unit including a solar panel,
an acquisition unit that acquires data based on a measurement result of the output of the power generation unit;
a generating unit that generates one or a plurality of pieces of data obtained by coarsening temporal granularity of the data based on the data obtained by the obtaining unit;
A plurality of determination data, which are a plurality of data over periods of different lengths and have different granularities, among the data acquired by the acquisition unit and the one or more data generated by the generation unit and a determination unit that determines an abnormality related to the power generation unit using different criteria ,
The determination unit determines whether or not the first determination data of the plurality of determination data is classified into a predetermined cluster as a result of clustering the first determination data by machine learning. A determination device that determines an abnormality related to the power generation unit using a reference .
前記判定部は、前記複数の判定データのうちの第2の判定データの、過去の前記第2の判定データと比べた低下量が所定値以上であるか否かである前記基準を用いて、前記発電部に関する異常を判定する、請求項1に記載の判定装置。The determination unit uses the criterion, which is whether or not the amount of decrease in the second determination data among the plurality of determination data compared to the past second determination data is equal to or greater than a predetermined value, 2. The determination device according to claim 1, which determines an abnormality related to said power generation unit. 前記判定部は、前記複数の判定データのうちの第3の判定データの所定期間における低下量が、過去の前記第3の判定データに基づいて設定された閾値以上であるか否かである前記基準を用いて、前記発電部に関する異常を判定する、請求項1または請求項2に記載の判定装置。The determination unit determines whether or not the amount of decrease in the third determination data in the predetermined period of time of the plurality of determination data is equal to or greater than a threshold value set based on the past third determination data. 3. The determination device according to claim 1, wherein a reference is used to determine an abnormality related to said power generation unit. 前記判定部は、3つ以上の前記基準を用いて前記発電部に関する異常を判定する、請求項1から請求項3のいずれか1項に記載の判定装置。 4. The determination device according to any one of claims 1 to 3 , wherein the determination unit determines abnormality related to the power generation unit using three or more of the criteria. 各前記基準を用いて判定される前記異常の種類が異なる、請求項1から請求項4のいずれか1項に記載の判定装置。 The determination device according to any one of claims 1 to 4, wherein types of said abnormality determined using each of said criteria are different. 前記判定装置は、さらに、
前記判定部によって判定された前記異常を通知する通知部を備え、
各前記基準を用いて判定される前記異常の通知内容が異なる、請求項1から請求項のいずれか1項に記載の判定装置。
The determination device further
A notification unit that notifies the abnormality determined by the determination unit,
The determination device according to any one of claims 1 to 5 , wherein notification contents of said abnormality determined using each of said criteria are different.
判定装置において用いられる判定方法であって、
太陽電池パネルを含む発電部の出力の計測結果に基づくデータを取得するステップと、
取得した前記データに基づいて、前記データの時間的な粒度を粗くした1または複数のデータを生成するステップと、
取得した前記データおよび生成した前記1または複数のデータのうち、長さの異なる期間にわたる複数のデータであって異なる粒度の複数のデータである複数の判定データから、それぞれ異なる基準を用いて前記発電部に関する異常を判定するステップとを含み、
前記異常を判定するステップにおいては、前記複数の判定データのうちの第1の判定データの、機械学習によるクラスタリングを行った結果において、前記第1の判定データが所定のクラスタに分類されるか否かである前記基準を用いて、前記発電部に関する異常を判定する、判定方法。
A determination method used in a determination device,
a step of obtaining data based on measurement results of the output of a power generation unit including a solar cell panel;
generating one or more pieces of data obtained by coarsening the temporal granularity of the data based on the acquired data;
From among the acquired data and the generated one or more data, the power generation is performed using different criteria from a plurality of determination data, which are a plurality of data over periods of different lengths and a plurality of data with different granularities. and determining an abnormality related to the part ,
In the step of determining the abnormality, whether or not the first determination data of the plurality of determination data is classified into a predetermined cluster as a result of clustering the first determination data by machine learning. A determination method , wherein an abnormality related to the power generation unit is determined using the criterion that is :
判定装置において用いられる判定プログラムであって、
コンピュータを、
太陽電池パネルを含む発電部の出力の計測結果に基づくデータを取得する取得部と、
前記取得部によって取得された前記データに基づいて、前記データの時間的な粒度を粗くした1または複数のデータを生成する生成部と、
前記取得部によって取得された前記データおよび前記生成部によって生成された前記1または複数のデータのうち、長さの異なる期間にわたる複数のデータであって異なる粒度の複数のデータである複数の判定データから、それぞれ異なる基準を用いて前記発電部に関する異常を判定する判定部、
として機能させるためのプログラムであり、
前記判定部は、前記複数の判定データのうちの第1の判定データの、機械学習によるクラスタリングを行った結果において、前記第1の判定データが所定のクラスタに分類されるか否かである前記基準を用いて、前記発電部に関する異常を判定する、判定プログラム。
A determination program used in a determination device,
the computer,
an acquisition unit that acquires data based on the measurement result of the output of the power generation unit including the solar cell panel;
a generation unit that generates one or more pieces of data obtained by coarsening the temporal granularity of the data based on the data acquired by the acquisition unit;
A plurality of determination data, which are a plurality of data over periods of different lengths and have different granularities, among the data acquired by the acquisition unit and the one or more data generated by the generation unit from, a determination unit that determines an abnormality related to the power generation unit using different criteria,
It is a program for functioning as
The determination unit determines whether or not the first determination data of the plurality of determination data is classified into a predetermined cluster as a result of clustering the first determination data by machine learning. A judgment program for judging an abnormality related to the power generation unit using a criterion .
JP2019568912A 2018-02-01 2018-12-13 Determination device, determination method and determination program Active JP7163931B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2018016736 2018-02-01
JP2018016736 2018-02-01
PCT/JP2018/045861 WO2019150779A1 (en) 2018-02-01 2018-12-13 Determination device, determination method, and determination program

Publications (2)

Publication Number Publication Date
JPWO2019150779A1 JPWO2019150779A1 (en) 2021-01-28
JP7163931B2 true JP7163931B2 (en) 2022-11-01

Family

ID=67478033

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019568912A Active JP7163931B2 (en) 2018-02-01 2018-12-13 Determination device, determination method and determination program

Country Status (3)

Country Link
JP (1) JP7163931B2 (en)
DE (1) DE112018006999T5 (en)
WO (1) WO2019150779A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023095387A1 (en) * 2021-11-29 2023-06-01 住友電気工業株式会社 Determination device and determination method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013172597A (en) 2012-02-22 2013-09-02 Sekisui Chem Co Ltd Production of electricity management system of photovoltaic power generation device
JP2013258796A (en) 2012-06-11 2013-12-26 Toyota Motor Corp Deterioration diagnostic device of power generation system utilizing natural energy
JP2015079833A (en) 2013-10-16 2015-04-23 株式会社スカイテクノロジー State estimation apparatus
JP2016220493A (en) 2015-05-26 2016-12-22 東京電力ホールディングス株式会社 Power generation situation discrimination method for photovoltaic power generation system, and device therefor

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013172597A (en) 2012-02-22 2013-09-02 Sekisui Chem Co Ltd Production of electricity management system of photovoltaic power generation device
JP2013258796A (en) 2012-06-11 2013-12-26 Toyota Motor Corp Deterioration diagnostic device of power generation system utilizing natural energy
JP2015079833A (en) 2013-10-16 2015-04-23 株式会社スカイテクノロジー State estimation apparatus
JP2016220493A (en) 2015-05-26 2016-12-22 東京電力ホールディングス株式会社 Power generation situation discrimination method for photovoltaic power generation system, and device therefor

Also Published As

Publication number Publication date
JPWO2019150779A1 (en) 2021-01-28
WO2019150779A1 (en) 2019-08-08
DE112018006999T5 (en) 2020-10-15

Similar Documents

Publication Publication Date Title
US9520826B2 (en) Solar cell module efficacy monitoring system and monitoring method therefor
JP7188399B2 (en) Determination device, photovoltaic power generation system, determination method and determination program
US20060162772A1 (en) System and method for monitoring photovoltaic power generation systems
US20210313928A1 (en) Method and apparatus for determining key performance photovoltaic characteristics using sensors from module-level power electronics
WO2013136850A1 (en) Information processing apparatus, abnormality detecting method, program, and solar power generation system
WO2014141498A1 (en) Solar power system, anomaly determination processing device, anomaly determination processing method, and program
Ventura et al. Development of models for on-line diagnostic and energy assessment analysis of PV power plants: The study case of 1 MW Sicilian PV plant
CN108599724A (en) A kind of photovoltaic module on-line monitoring system and monitoring method
JP6756188B2 (en) Power generation status judgment device, power generation status judgment method and judgment program
JP2014056859A (en) Solar cell fault diagnostic device, solar cell fault diagnostic method, solar cell fault diagnostic system and computer program
JP7163931B2 (en) Determination device, determination method and determination program
JP5461722B1 (en) Method and information processing apparatus for diagnosing soundness of photovoltaic power generation apparatus
JP7095734B2 (en) Judgment device, photovoltaic system and judgment method
JP7207401B2 (en) Determination device, weather information processing device, determination method, and weather information processing method
JP7056674B2 (en) Monitoring system, analysis device and judgment method
JP7173128B2 (en) GENERATING UNIT RELOCATION EQUIPMENT AND OPERATION PROCESSING METHOD
JP7226338B2 (en) Monitoring device and judgment method
WO2019123883A1 (en) Determining device, solar power generation system, determining method, and determining program
CN106018931A (en) Voltage qualification rate monitoring method and system
WO2023095387A1 (en) Determination device and determination method
JP2023009777A (en) Determination device and determination method
JP2023009783A (en) Determination device and determination method
WO2023203843A1 (en) Power generation state determination device, power generation state determination method, and determination program
JP6619185B2 (en) Photovoltaic power generation diagnostic system and diagnostic method
JP2019200075A (en) Monitoring device, determination device, monitoring method and determination method

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210726

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210726

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220920

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20221003

R150 Certificate of patent or registration of utility model

Ref document number: 7163931

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150