JP7159387B1 JP2021069542A JP2021069542A JP7159387B1 JP 7159387 B1 JP7159387 B1 JP 7159387B1 JP 2021069542 A JP2021069542 A JP 2021069542A JP 2021069542 A JP2021069542 A JP 2021069542A JP 7159387 B1 JP7159387 B1 JP 7159387B1
Authority
JP
Japan
Prior art keywords
mast
steel tower
height
crane
climbing crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021069542A
Other languages
Japanese (ja)
Other versions
JP2022165430A (en
Inventor
俊志 水野
旭 門馬
彰吾 矢内
Original Assignee
東光電気工事株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 東光電気工事株式会社 filed Critical 東光電気工事株式会社
Priority to JP2021069542A priority Critical patent/JP7159387B1/en
Application granted granted Critical
Publication of JP7159387B1 publication Critical patent/JP7159387B1/en
Publication of JP2022165430A publication Critical patent/JP2022165430A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

【課題】従来に比べて簡易に低コストで鉄塔建設を行うことのできる鉄塔建設工法を提供する。【解決手段】十字状に延在し中央部にマスト設置部が設けられたアウトリガーと、アウトリガーのマスト設置部に配設され高さを変更可能とされたマストと、マストの上部に支持されたクレーン本体とを有するクライミングクレーンを、マストの高さを第1マスト高として鉄塔建設領域の外側に配設する工程と、クライミングクレーンで鉄塔材を吊り上げて鉄塔を第1の鉄塔高さまで組み立てる第1組み立て工程と、マストの高さを第1マスト高より高い第2マスト高に設定するとともに、鉄塔との間にマストを支えるマスト支えを配設するマスト高さ設定工程と、クライミングクレーンで鉄塔材を吊り上げて鉄塔を第1の鉄塔高さより高い第2の鉄塔高さまで組み立てる第2組み立て工程と、を具備している。【選択図】図1A steel tower construction method capable of constructing a steel tower more easily and at a lower cost than in the past is provided. [Solution] An outrigger extending in a cross shape and provided with a mast installation part in the center, a mast arranged in the mast installation part of the outrigger so that the height can be changed, and a mast supported on the upper part of the mast a step of arranging a climbing crane having a crane body outside a steel tower construction area with a mast height of a first mast height; An assembly process, a mast height setting process in which the height of the mast is set to a second mast height higher than the first mast height, and a mast support that supports the mast is arranged between the steel tower and a steel tower material with a climbing crane and a second assembling step of lifting the steel tower to a second steel tower height higher than the first steel tower height. [Selection drawing] Fig. 1

Description

特許法第30条第2項適用 一般社団法人 日本電気協会新聞部発行電気新聞 令和3年3月17日付,第7面Application of Article 30, Paragraph 2 of the Patent Act Denki Shimbun published by the Japan Electric Association Newspaper Department, March 17, 2021, page 7

本発明は、外付けクライミングクレーンを用いた鉄塔建設工法に関する。 The present invention relates to a steel tower construction method using an external climbing crane.

従来から、電線を架設するための鉄塔建設工事が全国各地で行われている。鉄塔建設工事では、鉄塔を支えるためのコンクリート製の鉄塔用基礎を建設する基礎工事を行った後、この鉄塔用基礎の上に鉄塔を組み立てる鉄塔組み立て工事を行う。この鉄塔組み立て工事では、クレーン等を用いて鉄塔を構成する鉄塔材を持ち上げる必要がある。 2. Description of the Related Art Conventionally, steel tower construction work for erecting electric wires has been carried out all over the country. In the steel tower construction work, after performing the foundation work for constructing a concrete steel tower foundation for supporting the steel tower, the steel tower assembly work is performed to assemble the steel tower on the steel tower foundation. In this steel tower assembly work, it is necessary to lift the steel tower materials that constitute the steel tower using a crane or the like.

この鉄塔組み立て工事では、従来クライミングクレーンを鉄塔内の中央付近に配設し、鉄塔用基礎上にクライミングクレーンを支持して鉄塔材を吊り上げる工法が用いられている。この工法によれば、鉄塔用基礎上にクライミングクレーンを支持できるため、クレーン支持のためのクレーン用基礎を別に設ける必要がないという利点がある。しかしながら、この工法では、鉄塔工事用の専用のクライミングクレーンが必要になる。 In this steel tower assembly work, a method of conventionally arranging a climbing crane near the center of the steel tower and supporting the climbing crane on the steel tower foundation to lift the steel tower material is used. According to this construction method, since the climbing crane can be supported on the steel tower foundation, there is an advantage that it is not necessary to separately provide a crane foundation for supporting the crane. However, this construction method requires a dedicated climbing crane for steel tower construction.

また、鉄塔の外にクライミングクレーンを支持するためのコンクリート製のクレーン用基礎を設け、このクレーン用基礎の上にクライミングクレーンを設けることによって、鉄塔の外にクライミングクレーンを配設して外付けクライミングクレーンで鉄塔材を吊り上げる工法も提案されている(例えば、特許文献1参照。)。 In addition, by providing a concrete crane base for supporting a climbing crane outside the steel tower and providing a climbing crane on top of this crane base, the climbing crane can be arranged outside the steel tower for external climbing. A method of lifting a steel tower material with a crane has also been proposed (see Patent Document 1, for example).

しかしながら、上記のように鉄塔の外にクライミングクレーンを支持するためのコンクリート製のクレーン用基礎を設けた場合、鉄塔の組み立てが終了した後、このクレーン用基礎を撤去する必要がある。このクレーン用基礎を設けるためには大量のコンクリートや鉄筋等が必要となり、また、この大量のコンクリート等を撤去するためには多大な労力とコストを要する。このため、従来現実にはこのような工法は用いられていない。 However, when a concrete crane foundation for supporting a climbing crane is provided outside the steel tower as described above, it is necessary to remove this crane foundation after the steel tower is assembled. A large amount of concrete, reinforcing bars, and the like are required to provide the foundation for the crane, and much labor and cost are required to remove the large amount of concrete and the like. For this reason, such a construction method has not been used in the conventional practice.

特許第2579715号公報Japanese Patent No. 2579715

上記のように、従来の鉄塔建設工法では、クライミングクレーンを鉄塔内の中央付近に配設し、鉄塔用基礎上にクライミングクレーンを支持する方法が採られている。しかしながら、この工法では、鉄塔工事用の専用のクライミングクレーンが必要になり、また、鉄塔用基礎の工事用に別のクレーンが必要になったりするという課題があった。また、外付けクライミングクレーンを用いようとすると、クレーン用基礎の建設とその撤去が必要になるという課題があった。 As described above, the conventional steel tower construction method employs a method of disposing a climbing crane near the center of the steel tower and supporting the climbing crane on the steel tower foundation. However, in this construction method, there is a problem that a dedicated climbing crane for steel tower construction is required, and another crane is required for steel tower foundation construction. In addition, when an external climbing crane is used, there is a problem that it is necessary to construct and remove a foundation for the crane.

本発明は、上述した従来の事情に対処してなされたもので、その目的は、従来に比べて簡易に低コストで鉄塔建設を行うことのできる外付けクライミングクレーンを用いた鉄塔建設工法を提供することにある。 The present invention has been made in response to the above-mentioned conventional circumstances, and its object is to provide a steel tower construction method using an external climbing crane that enables steel tower construction to be performed more easily and at a lower cost than conventional methods. to do.

本発明の外付けクライミングクレーンを用いた鉄塔建設工法は、鉄塔を建設する鉄塔建設工法であって、十字状に延在し中央部にマスト設置部が設けられたアウトリガーと、前記アウトリガーの前記マスト設置部に配設され高さを変更可能とされたマストと、前記マストの上部に支持されたクレーン本体とを有するクライミングクレーンを、前記マストの高さを第1マスト高として前記鉄塔の建設領域の外側に配設する工程と、前記クライミングクレーンで鉄塔材を吊り上げて前記鉄塔を第1の鉄塔高さまで組み立てる第1組み立て工程と、前記マストの高さを前記第1マスト高より高い第2マスト高に設定するとともに、前記鉄塔との間に前記マストを支えるマスト支えを配設するマスト高さ設定工程と、前記クライミングクレーンで鉄塔材を吊り上げて前記鉄塔を第1の鉄塔高さより高い第2の鉄塔高さまで組み立てる第2組み立て工程と、を具備し、前記アウトリガーは、前記マスト設置部と、前記マスト設置部から十字状に延在するように設置される柱状部と、前記柱状部の最外側に設けられ地面に立設される脚部を有するフロート部とを具備し、建設する前記鉄塔の高さによって連結する前記柱状部の数を変更し、当該アウトリガーの長さ変更することを特徴とする。 A steel tower construction method using an external climbing crane of the present invention is a steel tower construction method for constructing a steel tower, comprising an outrigger extending in a cross shape and provided with a mast installation part in the center, and the mast of the outrigger. A climbing crane having a mast whose height is changeable at an installation portion and a crane body supported on the upper part of the mast is constructed in the construction area of the steel tower with the height of the mast being the first mast height. a first assembling step of hoisting the pylon material by the climbing crane to assemble the pylon to a first pylon height; and a second mast higher than the height of the first mast. a mast height setting step of setting a mast height to a height and arranging a mast support for supporting the mast between the steel tower and the steel tower; and a second assembling step of assembling to a height of a steel tower , wherein the outrigger includes the mast installation portion, a columnar portion installed so as to extend in a cross shape from the mast installation portion, and the highest point of the columnar portion. and a float portion having legs provided on the outside and standing on the ground, and the number of the columnar portions to be connected is changed according to the height of the steel tower to be constructed, and the length of the outrigger is changed. and

本発明の外付けクライミングクレーンを用いた鉄塔建設工法によれば、従来に比べて簡易に低コストで鉄塔建設を行うことができる。 According to the steel tower construction method using the external climbing crane of the present invention, the steel tower can be constructed more easily and at a lower cost than in the past.

実施形態に係る外付けクライミングクレーンを用いた鉄塔建設工法を説明するための図。FIG. 4 is a diagram for explaining a steel tower construction method using an external climbing crane according to the embodiment; アウトリガーの概略構成を模式的に示す平面図。The top view which shows typically a schematic structure of an outrigger. アウトリガーの概略構成を模式的に示す側面図。The side view which shows typically schematic structure of an outrigger. 傾斜地に対応したアウトリガーの概略構成を模式的に示す側面図。The side view which shows typically the schematic structure of the outrigger corresponding to a slope. 性能制御装置の構成を示す図。The figure which shows the structure of a performance control apparatus.

以下、図面を参照して、実施形態に係る外付けクライミングクレーンを用いた鉄塔建設工法について説明する。 Hereinafter, a steel tower construction method using an external climbing crane according to an embodiment will be described with reference to the drawings.

図1は、実施形態に係る外付けクライミングクレーンを用いた鉄塔建設工法の工程を説明するための図である。 FIG. 1 is a diagram for explaining steps of a steel tower construction method using an external climbing crane according to an embodiment.

図1に示すように、本実施形態の外付けクライミングクレーンを用いた鉄塔建設工法では、先ず鉄塔用基礎200を設置し、この鉄塔用基礎200の上に鉄塔201を組み立てる。 As shown in FIG. 1 , in the steel tower construction method using the external climbing crane of the present embodiment, first, a steel tower foundation 200 is installed, and a steel tower 201 is assembled on the steel tower foundation 200 .

図1(a)に示すように、本実施形態の外付けクライミングクレーンを用いた鉄塔建設工法では、アウトリガー(ベースフレーム)110と、アウトリガー110のマスト設置部111(図2参照。)に配設され高さを変更可能とされたマスト120と、マスト120の上部に支持されたクレーン本体130とを有するクライミングクレーン100を、マストの高さを第1マスト高として鉄塔201が建設される領域に隣接した外側の領域に配設する。換言すれば、鉄塔用基礎200の上ではなく、その外側の領域に、アウトリガー110にて支持されたクライミングクレーン100を配設する。 As shown in FIG. 1A, in the steel tower construction method using the external climbing crane of this embodiment, the outrigger (base frame) 110 and the mast installation portion 111 of the outrigger 110 (see FIG. 2) A climbing crane 100 having a mast 120 whose height can be changed and a crane body 130 supported on the upper part of the mast 120 is installed in an area where a steel tower 201 is constructed with the first mast height being the height of the mast. Arranged in adjacent outer regions. In other words, the climbing crane 100 supported by the outriggers 110 is arranged not on the pylon foundation 200 but on the outside thereof.

1本のマスト120の高さは、例えば、4-5メートル程度であり、第1マスト高としては、例えば、マスト120を1本設置した高さ等とされる。クレーン本体130及びマスト120としては、例えばビル建設等に使用されるタワークレーン等を適用することができる。なお、このように鉄塔201が建設される領域の外側の領域にクライミングクレーン100を配設した後、このクライミングクレーン100を用いて鉄塔用基礎200を建設することもできる。 The height of one mast 120 is, for example, about 4 to 5 meters, and the first mast height is, for example, the height of one mast 120 installed. As the crane main body 130 and the mast 120, for example, a tower crane or the like used for building construction or the like can be applied. After the climbing crane 100 is installed in the area outside the area where the steel tower 201 is constructed, the climbing crane 100 can be used to construct the steel tower foundation 200 .

クレーン本体130は、例えば、旋回体、ジブ、巻上ウインチ、巻上ロープ、フック等のクレーンが有する周知の機構を具備する。また、ジブ長さを複数種(本実施形態では、17.8メートル、24.4メートル、31メートルの3種)に設定可能とされており、建設する鉄塔201の高さによって選択する。 The crane main body 130 includes well-known mechanisms of cranes such as a revolving body, a jib, a hoisting winch, a hoisting rope, and a hook. In addition, the jib length can be set to a plurality of types (three types of 17.8 meters, 24.4 meters, and 31 meters in this embodiment), which is selected according to the height of the steel tower 201 to be constructed.

図2は、上記したアウトリガー110の平面図であり、図3は側面図である。図2に示すように、アウトリガー110は、十字状に延在し中央部にマスト設置部111が設けられている。すなわち、アウトリガー110は、中央部に設けられたマスト設置部111から十字状に4本の柱状部が外側に向けて延在する構造となっている。各柱状部は、マスト設置部111側から順に、第1柱状部112a、第2柱状部112b、第3柱状部112cと、3つの柱状部に分けられており、最外側に地面に立設される脚部を有するフロート部113が設けられている。 FIG. 2 is a plan view of the outrigger 110 described above, and FIG. 3 is a side view. As shown in FIG. 2, the outrigger 110 extends in a cross shape and has a mast installation portion 111 at the center. That is, the outrigger 110 has a structure in which four cross-shaped pillars extend outward from a mast installation portion 111 provided in the center. Each columnar portion is divided into three columnar portions, namely, a first columnar portion 112a, a second columnar portion 112b, and a third columnar portion 112c, in order from the mast installation portion 111 side. A float 113 is provided having legs that extend downward.

第1柱状部112a、第2柱状部112b、第3柱状部112c及びフロート部113は、着脱自在とされており、必要に応じてアウトリガー110の柱状部の長さを変更できる構造となっている。すなわち、マスト設置部111の外周に、第1柱状部112aのみを設けて第1柱状部112aの外側にフロート部113を設けた構成の場合が最短の長さになる。また、マスト設置部111の外周に、第1柱状部112aと第2柱状部112bを設けて第2柱状部112bの外側にフロート部113を設けた構成の場合が中間の長さになる。そして、マスト設置部111の外周に、第1柱状部112aと第2柱状部112bと第3柱状部112cを設けて第3柱状部112cの外側にフロート部113を設けた構成の場合が最長の長さになる(図2、図3に示した場合)。各マスト設置部111、第1柱状部112a、第2柱状部112b、第3柱状部112c及びフロート部113の接続部は、例えば、フランジジョイント方式等の接続方式を使用することができる。 The first columnar portion 112a, the second columnar portion 112b, the third columnar portion 112c, and the float portion 113 are detachable, and the length of the columnar portion of the outrigger 110 can be changed as necessary. . That is, the length is the shortest when only the first columnar portion 112a is provided on the outer periphery of the mast installation portion 111 and the float portion 113 is provided outside the first columnar portion 112a. In addition, in the case of the configuration in which the first columnar portion 112a and the second columnar portion 112b are provided on the outer periphery of the mast installation portion 111 and the float portion 113 is provided outside the second columnar portion 112b, the length is intermediate. The longest is the configuration in which the first columnar portion 112a, the second columnar portion 112b, and the third columnar portion 112c are provided on the outer circumference of the mast installation portion 111, and the float portion 113 is provided on the outside of the third columnar portion 112c. length (in the case shown in FIGS. 2 and 3). The connecting portions of the mast installation portion 111, the first columnar portion 112a, the second columnar portion 112b, the third columnar portion 112c, and the float portion 113 can use, for example, a connection method such as a flange joint method.

上記のようなアウトリガー110の柱状部の長さの変更は、建設する鉄塔201の高さ等によって変更する。アウトリガー110の柱状部の長さは、例えば、最短の場合隣接するフロート部113とフロート部113との距離が4メートル(4メートル四方)、中間長さの場合6メートル(6メートル四方)、最長の場合8メートル(8メートル四方)等とすることができる。 The change in the length of the columnar portion of the outrigger 110 as described above is changed depending on the height of the steel tower 201 to be constructed. As for the length of the columnar portion of the outrigger 110, for example, the distance between adjacent float portions 113 is 4 meters (4 meters square) at the shortest, 6 meters (6 meters square) at the intermediate length, and 6 meters (6 meters square) at the longest. In the case of 8 meters (8 meters square), etc.

また、図4に示すように、アウトリガー110の柱状部は、傾斜地に設置できるように、曲折した形状に設定できるようになっている。例えば、図4に示す例では、マスト設置部111と第1柱状部112aとの間に所望の角度を有するブラケット112d、112eを介挿し、フロート部113も第2柱状部112bに角度を持って固定することによって、図4中左側が右側より高い傾斜地に、アウトリガー110を配設することができるようになっている。 Further, as shown in FIG. 4, the columnar portion of the outrigger 110 can be set in a curved shape so that it can be installed on a slope. For example, in the example shown in FIG. 4, brackets 112d and 112e having a desired angle are inserted between the mast installation portion 111 and the first columnar portion 112a, and the float portion 113 is also inclined to the second columnar portion 112b. By fixing the outriggers 110, the outriggers 110 can be installed on slopes where the left side in FIG. 4 is higher than the right side.

次に、図1(b)に示すように、クライミングクレーン100で鉄塔材を吊り上げて鉄塔201を第1の鉄塔高さまで組み立てる第1組み立て工程を実施する。この第1の鉄塔高さは、後述するマスト支え121を設置することのできる高さとすることが好ましい。この第1組み立て工程では、クライミングクレーン100の高さが低いので、ジブの反対側にカウンターウェートを設けてもよい。 Next, as shown in FIG. 1(b), a first assembling process is performed in which the steel tower material is lifted by the climbing crane 100 and the steel tower 201 is assembled to the first steel tower height. The first steel tower height is preferably a height at which a mast support 121, which will be described later, can be installed. In this first assembly step, since the height of the climbing crane 100 is low, a counterweight may be provided on the opposite side of the jib.

この後、図1(c)に示すように、マスト120の高さを第1マスト高より高い第2マスト高に設定するとともに、鉄塔201との間にマスト120を支えるマスト支え121を配設するマスト高さ設定工程を行う。図1(c)に示す例では、第2マスト高は、マスト120を3本追加し、合計4本分の高さとなっている。追加するマスト120は、クライミングクレーン100で吊り上げ、現在のマスト120の頂部に吊り上げたマスト120を固定し、クレーン本体130を上昇させる。 After that, as shown in FIG. 1(c), the height of the mast 120 is set to a second mast height higher than the first mast height, and a mast support 121 supporting the mast 120 is arranged between the mast 120 and the steel tower 201. mast height setting process. In the example shown in FIG. 1(c), the second mast height is the height of four masts in total, with the addition of three masts 120 . The additional mast 120 is lifted by the climbing crane 100, the lifted mast 120 is fixed to the top of the current mast 120, and the crane body 130 is lifted.

次に、図1(d)に示すように、第2マスト高としたクライミングクレーン100で鉄塔材を吊り上げて鉄塔201を第1の鉄塔高さより高い第2の鉄塔高さまで組み立てる第2組み立て工程を行う。上記のマスト高さ設定工程と、組み立て工程は、建設する鉄塔201の高さにより、必要に応じて複数回繰り返す。図1に示す例では、図1(e)に示すように、第2マスト高よりも高い第3マスト高にまでマスト高さを設定している。図1(e)に示す例では、第3マスト高は、さらに2本のマスト120を追加し、合計6本のマスト120の高さとなるように設定している。そして、この第3マスト高とした状態でクライミングクレーン100で鉄塔材を吊り上げて鉄塔201を第2の鉄塔高さより高い第3の鉄塔高さまで組み立てる第3組み立て工程を行う。なお、クライミングクレーンを鉄塔201の中央部に配置する従来の工法では、マスト120の高さを鉄塔201の高さより高くしなければならないが、本実施形態の工法では、ジブの高さがあるので、マスト120の高さを鉄塔201の高さより低い高さとすることができる。 Next, as shown in FIG. 1(d), a second assembling step is performed in which the steel tower material is lifted by the climbing crane 100 having the second mast height, and the steel tower 201 is assembled to a second steel tower height higher than the first steel tower height. conduct. The mast height setting process and the assembling process described above are repeated multiple times as necessary depending on the height of the steel tower 201 to be constructed. In the example shown in FIG. 1, as shown in FIG. 1(e), the mast height is set to a third mast height higher than the second mast height. In the example shown in FIG. 1(e), the height of the third mast is set to the height of six masts 120 in total by adding two more masts 120. In the example shown in FIG. Then, with the third mast height, the climbing crane 100 lifts the pylon material to assemble the pylon 201 to a third pylon height higher than the second pylon height, thereby performing a third assembling step. In the conventional construction method in which the climbing crane is arranged at the center of the steel tower 201, the height of the mast 120 must be higher than the height of the steel tower 201, but in the construction method of the present embodiment, the height of the jib is , the height of the mast 120 can be made lower than the height of the steel tower 201 .

そして、所定の高さの鉄塔201の組み立てが終了すると、クライミングクレーン100を撤去する(図1(f))。この場合、クライミングクレーン100は、アウトリガー110の上に配設されており、コンクリート製のクレーン用基礎等は用いていないため、多量のコンクリートを掘り起こして撤去するなどの工程を必要とすることなく、容易にクライミングクレーン100の撤去を行うことができる。 Then, when the steel tower 201 having a predetermined height is assembled, the climbing crane 100 is removed (FIG. 1(f)). In this case, the climbing crane 100 is arranged on the outriggers 110 and does not use a concrete crane base or the like. The climbing crane 100 can be easily removed.

上記の鉄塔建設工程において、クライミングクレーン100の性能(吊り能力)をその高さによって切り換えることが好ましい。例えば、一番高さの低い第1マスト高の場合は、最大性能、例えば55t・mとして例えば地上25mまでの鉄塔201の組み立てを行う。また、第1マスト高より高さが高くなった場合、例えば、第2マスト高(マスト4本)、第3マスト高(マスト6本)の場合は、最大性能より低い性能、例えば20t・mとして鉄塔201の組み立てを行う。 In the steel tower construction process described above, it is preferable to switch the performance (hanging capacity) of the climbing crane 100 according to its height. For example, in the case of the first mast height, which is the lowest, the steel tower 201 is assembled up to 25 m above the ground with the maximum performance, for example, 55 t·m. In addition, when the height is higher than the first mast height, for example, when the second mast height (4 masts) and the third mast height (6 masts), the performance is lower than the maximum performance, for example, 20 t m As a result, the steel tower 201 is assembled.

これによって、最大性能のままでは高さの高い場合自立できなくなったり、鉄塔201への荷重が大きくなり過ぎる等の影響を避けることができる。また、高さが低い場合は、最大性能とすることによって、鉄塔用基礎200を建設するのに必要な性能を得ることができる。また、クレーンの性能は、上記した55t・m、20t・mの他、その中間の36t・m、さらに性能を抑制した10t・mとすることもできる。 As a result, it is possible to avoid such influences that the steel tower 201 becomes unable to stand on its own when the height is high, and the load on the steel tower 201 becomes too large with the maximum performance. Moreover, when the height is low, the performance necessary for constructing the steel tower foundation 200 can be obtained by maximizing the performance. In addition, the performance of the crane can be set to 36 t.m in the middle in addition to the above-mentioned 55 t.m and 20 t.m, or 10 t.m with further suppressed performance.

上記のようなクライミングクレーン100の性能(吊り能力)の切り替えは、例えば、図5に示す性能制御装置300によって行うことができる。性能制御装置300は、高さ入力部301と、高さと許容性能との関係を記憶する記憶部302と、高さ入力部301に入力された高さから記憶部302内に記憶された許容性能を読み出して、クレーン制御装置に出力してその性能を制御するクレーン性能制御部303とを具備している。このような構成の性能制御装置300は、例えば、CPU、メモリー等を具備したコンピューターシステム及びこのコンピューターシステムにインストールされたプログラム等によって実現することができる。 The switching of the performance (hanging capacity) of the climbing crane 100 as described above can be performed by, for example, a performance control device 300 shown in FIG. The performance control device 300 includes a height input unit 301, a storage unit 302 that stores the relationship between the height and the allowable performance, and the allowable performance stored in the storage unit 302 based on the height input to the height input unit 301. and a crane performance control unit 303 for outputting to the crane control device to control its performance. The performance control device 300 having such a configuration can be realized by, for example, a computer system equipped with a CPU, a memory, etc., and programs installed in this computer system.

高さ入力部301には、地上からの高さに関する情報が、例えば、図示しない高さ計測器からの計測信号や、作業員による手入力によって入力される。高さ入力部301に入力された高さ情報は、クレーン性能制御部303に送られる。クレーン性能制御部303は、入力された高さ情報によって記憶部302に記憶された許容性能、例えば、最大性能の55t・m、性能を落とした20t・m等を読み出し、これをクレーン制御装置に出力する。クレーン制御装置は、この入力された許容性能の範囲でクレーンの動作を制御する。このようにクレーン性能制御部303によって、クレーン作業を行う高さ毎にクレーン性能が安全に作業できる範囲に制限される。 Information about the height from the ground is input to the height input unit 301 by, for example, a measurement signal from a height measuring device (not shown) or manual input by an operator. Height information input to the height input unit 301 is sent to the crane performance control unit 303 . The crane performance control unit 303 reads the permissible performance stored in the storage unit 302 according to the input height information, for example, the maximum performance of 55 t·m, the reduced performance of 20 t·m, etc., and sends it to the crane control device. Output. The crane control device controls the operation of the crane within the input allowable performance range. In this manner, the crane performance control unit 303 limits the crane performance to a safe work range for each height at which crane work is performed.

以上、本発明のいくつかの実施形態を説明したが、これらの実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。これら新規な実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。これら実施形態やその変形は、発明の範囲や要旨に含まれるとともに、特許請求の範囲に記載された発明とその均等の範囲に含まれる。 Although several embodiments of the invention have been described above, these embodiments are presented by way of example and are not intended to limit the scope of the invention. These novel embodiments can be implemented in various other forms, and various omissions, replacements, and modifications can be made without departing from the scope of the invention. These embodiments and modifications thereof are included in the scope and gist of the invention, and are included in the scope of the invention described in the claims and equivalents thereof.

100……クライミングクレーン、110……アウトリガー、111……マスト設置部、112a……第1柱状部、112b……第2柱状部、112c……第3柱状部、112d……ブラケット、112e……ブラケット、113……フロート部、120……マスト、121……マスト支え、130……クレーン本体、200……鉄塔用基礎、201……鉄塔、300……性能制御装置、301……高さ入力部、302……記憶部、303……クレーン性能制御部。 100... climbing crane, 110... outrigger, 111... mast installation part, 112a... first columnar part, 112b... second columnar part, 112c... third columnar part, 112d... bracket, 112e... Bracket 113 Float part 120 Mast 121 Mast support 130 Crane body 200 Steel tower foundation 201 Steel tower 300 Performance control device 301 Height input Section 302... Storage section 303... Crane performance control section.

Claims (3)

鉄塔を建設する鉄塔建設工法であって、
十字状に延在し中央部にマスト設置部が設けられたアウトリガーと、前記アウトリガーの前記マスト設置部に配設され高さを変更可能とされたマストと、前記マストの上部に支持されたクレーン本体とを有するクライミングクレーンを、前記マストの高さを第1マスト高として前記鉄塔の建設領域の外側に配設する工程と、
前記クライミングクレーンで鉄塔材を吊り上げて前記鉄塔を第1の鉄塔高さまで組み立てる第1組み立て工程と、
前記マストの高さを前記第1マスト高より高い第2マスト高に設定するとともに、前記鉄塔との間に前記マストを支えるマスト支えを配設するマスト高さ設定工程と、
前記クライミングクレーンで鉄塔材を吊り上げて前記鉄塔を第1の鉄塔高さより高い第2の鉄塔高さまで組み立てる第2組み立て工程と、
を具備し
前記アウトリガーは、前記マスト設置部と、前記マスト設置部から十字状に延在するように設置される柱状部と、前記柱状部の最外側に設けられ地面に立設される脚部を有するフロート部とを具備し、建設する前記鉄塔の高さによって連結する前記柱状部の数を変更し、当該アウトリガーの長さ変更する
ことを特徴とする外付けクライミングクレーンを用いた鉄塔建設工法。
A steel tower construction method for constructing a steel tower,
An outrigger extending in a cross shape and provided with a mast installation part in the center, a mast arranged in the mast installation part of the outrigger so that the height can be changed, and a crane supported on the top of the mast disposing a climbing crane having a main body outside a construction area of the tower with the height of the mast as a first mast height;
a first assembling step of assembling the steel tower to a first steel tower height by lifting the steel tower material with the climbing crane;
A mast height setting step of setting the height of the mast to a second mast height higher than the first mast height and disposing a mast support for supporting the mast between the mast and the steel tower;
a second assembling step of lifting the steel tower material with the climbing crane and assembling the steel tower to a second steel tower height higher than the first steel tower height;
and
The outrigger has a mast installation portion, a columnar portion installed so as to extend in a cross shape from the mast installation portion, and a leg provided on the outermost side of the columnar portion and standing on the ground. and changing the number of the columnar parts to be connected depending on the height of the steel tower to be constructed, and changing the length of the outrigger
A steel tower construction method using an external climbing crane characterized by:
請求項1に記載の外付けクライミングクレーンを用いた鉄塔建設工法であって、
前記マストの高さを前記第2マスト高より高い第3マスト高に設定するマスト高さ設定工程と、
前記クライミングクレーンで鉄塔材を吊り上げて前記鉄塔を第2の鉄塔高さより高い第3の鉄塔高さまで組み立てる第3組み立て工程を、
さらに具備したことを特徴とする外付けクライミングクレーンを用いた鉄塔建設工法。
A steel tower construction method using the external climbing crane according to claim 1,
a mast height setting step of setting the height of the mast to a third mast height higher than the second mast height;
a third assembling step of lifting the steel tower material with the climbing crane and assembling the steel tower to a third steel tower height higher than the second steel tower height;
A steel tower construction method using an external climbing crane, further comprising:
請求項1又は2に記載の外付けクライミングクレーンを用いた鉄塔建設工法であって、
前記第1組み立て工程と、前記第2組み立て工程とによって、前記クレーン本体の性能を性能制御装置により切り替え、前記第2組み立て工程では、前記第1組み立て工程より前記クレーン本体の性能を抑制する
ことを特徴とする外付けクライミングクレーンを用いた鉄塔建設工法。
A steel tower construction method using the external climbing crane according to claim 1 or 2,
The performance of the crane body is switched by a performance control device between the first assembly process and the second assembly process, and the performance of the crane body is suppressed in the second assembly process from that in the first assembly process.
A steel tower construction method using an external climbing crane characterized by:
JP2021069542A 2021-04-16 2021-04-16 Steel tower construction method using an external climbing crane Active JP7159387B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021069542A JP7159387B1 (en) 2021-04-16 2021-04-16 Steel tower construction method using an external climbing crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021069542A JP7159387B1 (en) 2021-04-16 2021-04-16 Steel tower construction method using an external climbing crane

Publications (2)

Publication Number Publication Date
JP7159387B1 true JP7159387B1 (en) 2022-10-24
JP2022165430A JP2022165430A (en) 2022-11-01

Family

ID=83721060

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021069542A Active JP7159387B1 (en) 2021-04-16 2021-04-16 Steel tower construction method using an external climbing crane

Country Status (1)

Country Link
JP (1) JP7159387B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61165471A (en) * 1985-01-18 1986-07-26 石川島播磨重工業株式会社 Iron tower construction method and climbing crane used therein
US5018630A (en) * 1988-11-21 1991-05-28 Mcghie James R High-capacity lift crane assembly
JPH05286694A (en) * 1992-04-07 1993-11-02 Kanden Kogyo Kk Construction method and crane for assembling external type steel tower
JP2008150159A (en) * 2006-12-18 2008-07-03 Koshihara:Kk Jib crane

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61165471A (en) * 1985-01-18 1986-07-26 石川島播磨重工業株式会社 Iron tower construction method and climbing crane used therein
US5018630A (en) * 1988-11-21 1991-05-28 Mcghie James R High-capacity lift crane assembly
JPH05286694A (en) * 1992-04-07 1993-11-02 Kanden Kogyo Kk Construction method and crane for assembling external type steel tower
JP2008150159A (en) * 2006-12-18 2008-07-03 Koshihara:Kk Jib crane

Also Published As

Publication number Publication date
JP2022165430A (en) 2022-11-01

Similar Documents

Publication Publication Date Title
KR102529595B1 (en) Apparatus for lifting heavy loads
CN204644884U (en) High pier over-form construction reinforced bar installs mobile stock
US10392233B2 (en) Crane tower
JP7159387B1 (en) Steel tower construction method using an external climbing crane
US3732655A (en) Suspended building construction
JP2018150089A (en) Operation method of tower crane
JPH1077749A (en) Roof constructing method for tower-shaped structure
JP2018044318A (en) Construction method of silo roof section, and silo roof structure
CN210976318U (en) Beam string mounting structure of spoke type beam string structure roof
CN112412152B (en) Construction method of underslung derrick-free variable-section rectangular chimney support system
JPH10205430A (en) Construction method for wind power generator
JPH06323503A (en) Assembling method for large size suspension type boiler
KR200195457Y1 (en) A supporting apparatus for tower crane
JPH09195497A (en) Elevatable scaffold
JP4352219B2 (en) Crane equipment
JP2000192551A (en) Construction method for large span frame
CN211871227U (en) Light crane is installed and is hoisted on floor
JPH0718743A (en) Construction method for large span domelike roof
JP6814717B2 (en) How to install horizontal members and how to build a building frame
CN218667143U (en) Bridge pier column reinforcing bar installation auxiliary stand
CN217923118U (en) Mast-type lifting equipment
JP7388883B2 (en) Crane basic structure
JP2004250144A (en) Supporting method of climbing tower crane
JP2005029364A6 (en) Crane equipment
JP2022063396A (en) Construction method for substructure formed by lifting structure on foundation work

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20210416

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210528

A80 Written request to apply exceptions to lack of novelty of invention

Free format text: JAPANESE INTERMEDIATE CODE: A80

Effective date: 20210510

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220705

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20220819

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220819

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220920

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20221012

R150 Certificate of patent or registration of utility model

Ref document number: 7159387

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150