JP7159041B2 - power converter - Google Patents

power converter Download PDF

Info

Publication number
JP7159041B2
JP7159041B2 JP2018245629A JP2018245629A JP7159041B2 JP 7159041 B2 JP7159041 B2 JP 7159041B2 JP 2018245629 A JP2018245629 A JP 2018245629A JP 2018245629 A JP2018245629 A JP 2018245629A JP 7159041 B2 JP7159041 B2 JP 7159041B2
Authority
JP
Japan
Prior art keywords
processing unit
value
voltage
terminal
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018245629A
Other languages
Japanese (ja)
Other versions
JP2020108274A (en
Inventor
恭大 金子
卓郎 新井
裕史 児山
洋一 森島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Toshiba Infrastructure Systems and Solutions Corp
Original Assignee
Toshiba Corp
Toshiba Infrastructure Systems and Solutions Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp, Toshiba Infrastructure Systems and Solutions Corp filed Critical Toshiba Corp
Priority to JP2018245629A priority Critical patent/JP7159041B2/en
Publication of JP2020108274A publication Critical patent/JP2020108274A/en
Application granted granted Critical
Publication of JP7159041B2 publication Critical patent/JP7159041B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects

Landscapes

  • Inverter Devices (AREA)

Description

本発明の実施形態は、電力変換装置に関する。 TECHNICAL FIELD Embodiments of the present invention relate to power converters.

近年、電力系統に連系される太陽光発電装置や蓄電装置、風力発電装置などの再生可能エネルギーが増加している。これに伴い、電力系統の総発電量に占める再生可能エネルギーに基づく電力量の割合も増加している。 2. Description of the Related Art In recent years, renewable energy such as solar power generation devices, power storage devices, and wind power generation devices that are connected to power systems is increasing. Along with this, the proportion of power generated by renewable energy in the total power generation of the power system is also increasing.

再生可能エネルギーに基づく電力を出力する装置を電力系統に連系するときには、電力変換器が用いられる。例えば、系統送電線の事故などによる一過性の系統擾乱が起きたときに、電力変換器が一斉に解列したり出力低下が継続したりすると、系統全体の電圧や周波数に悪影響を与える恐れがある。そのため、電力系統で発生する瞬時電圧低下(瞬低)や周波数変動などの系統擾乱に対しては、運転を継続あるいは一時的に電力変換器の出力を停止し、電圧復帰後に即座に出力を復帰する機能(FRT:Fault Ride Through)が求められる。日本国内では、例えば系統連系規程JEAC9701-2016において、系統連系する電力変換器が遵守すべきFRT要件について規定されている。 A power converter is used when connecting a device that outputs power based on renewable energy to a power system. For example, if power converters disconnect all at once or their output continues to drop when a transient system disturbance occurs due to an accident on a grid transmission line, etc., the voltage and frequency of the entire system may be adversely affected. There is Therefore, in response to system disturbances such as instantaneous voltage drop (instantaneous sag) and frequency fluctuation that occur in the power system, operation is continued or the output of the power converter is temporarily stopped, and the output is immediately restored after the voltage is restored. A function (FRT: Fault Ride Through) is required. In Japan, for example, grid interconnection regulations JEAC9701-2016 stipulate FRT requirements to be complied with by grid-connected power converters.

系統連系する電力変換器は交流(AC)ラインに挿入されたACリアクトルを備えると。瞬時電圧低下が発生すると、電圧低下の度合いに応じてACリアクトルに過大な電圧が印加され、ACリアクトルの容量や、印加される電圧の大きさ、電圧が印加される時間に応じて、ACラインやスイッチング素子に電流が流れる。このときスイッチング素子の劣化や破損を招くほどの大電流が流れた場合には、安全性が確保できるまで電力変換器を停止させて電力系統から解列する必要がある。電力変換器が電力系統から解列した場合、電力変換器の出力が復帰するまでの時間が長くなり、系統連系規程のFRT要件を遵守することができない可能性がある。したがって、FRT要件を遵守するためには、電力系統にて瞬時電圧低下が発生したことを高速に検知し、電力変換器の出力を一時的に停止することでACラインに流れる過電流を極力抑制し、電力系統から電力変換器が解列することを回避する必要がある。 A grid-connected power converter includes an AC reactor inserted in an alternating current (AC) line. When an instantaneous voltage drop occurs, an excessive voltage is applied to the AC reactor according to the degree of the voltage drop, and depending on the capacity of the AC reactor, the magnitude of the applied voltage, and the time during which the voltage is applied, the AC line may and switching elements. At this time, if a large current that causes deterioration or damage to the switching element flows, it is necessary to stop the power converter and disconnect it from the power system until safety can be ensured. When the power converter is disconnected from the power system, it takes a long time to restore the output of the power converter, and there is a possibility that the FRT requirements of the grid interconnection regulations cannot be complied with. Therefore, in order to comply with the FRT requirements, it is necessary to quickly detect the occurrence of a momentary voltage drop in the power system and temporarily stop the output of the power converter to suppress the overcurrent flowing in the AC line as much as possible. and avoid disconnection of the power converter from the power system.

一方で、近年、ACリアクトルの小型化、低コスト化を目的として、連系インピーダンスを低減可能な回路技術が開発されている。例えば、交流側の電圧波形を多段化するマルチレベル変換器(MMC:Modular Multi-level Converter)や中性点クランプ方式のマルチレベル変換器、フライングキャパシタ方式のマルチレベル変換器などや、SiCやGaNなどの半導体を用いたスイッチング素子を備え、交流側の電圧を高周波化する高周波コンバータなどは、連系インピーダンスを低減可能な回路である。これら連系インピーダンスが小さい回路を含む装置では、瞬時電圧低下時にACラインに流れる電流が大きくなるため、瞬時電圧低下時の過電流をさらに高速に検出することが必要となる。 On the other hand, in recent years, for the purpose of miniaturization and cost reduction of AC reactors, circuit technology capable of reducing interconnection impedance has been developed. For example, a multi-level converter (MMC: Modular Multi-level Converter) that multistages the voltage waveform on the AC side, a neutral point clamp type multi-level converter, a flying capacitor type multi-level converter, etc., SiC or GaN A high-frequency converter or the like that includes a switching element using a semiconductor such as a high-frequency converter that converts the voltage on the AC side to a high frequency is a circuit that can reduce interconnection impedance. In a device including a circuit with a small interconnection impedance, the current flowing through the AC line increases during an instantaneous voltage drop, so it is necessary to detect an overcurrent at an instantaneous voltage drop at a higher speed.

特開2013-78207号公報JP 2013-78207 A 特開2017-163777号公報JP 2017-163777 A

本発明の実施形態は上記事情を鑑みて成されたものであって、電力系統の瞬時電圧低下時に電力変換器の出力を一時的に停止し、瞬時電圧低下による過電流を抑制可能な電力変換装置を提供することを目的とする。 An embodiment of the present invention has been made in view of the above circumstances, and is a power converter capable of suppressing overcurrent due to an instantaneous voltage drop by temporarily stopping the output of a power converter when an instantaneous voltage drop occurs in a power system. The purpose is to provide an apparatus.

実施形態による電力変換装置は、電力系統と電気的に接続する交流端子と、直流負荷と電気的に接続する正側直流端子および負側直流端子と、ゲート信号に基づいて動作するスイッチング素子を少なくとも1つ含むアーム変換器と、を備え、前記正側直流端子と前記負側直流端子との間に2つの前記アーム変換器を直列に接続し、2つの前記アーム変換器間と前記交流端子とを電気的に接続した相変換器を少なくとも1つと、を備え、交流電力と直流電力を互いに変換する電力変換部と、前記相変換器の複数の前記スイッチング素子の動作を制御するための操作量を演算する第1演算処理部と、前記操作量に応じた前記ゲート信号を生成し、前記電力変換部に送信するゲート信号生成部と、前記電力系統にて瞬時電圧低下が生じたことを検知する瞬低検知処理部と、を備えた第2演算処理部と、前記交流端子もしくは前記アーム変換器に流れる電流値を取得し、第2演算処理部へ送信する電流検出部と、を備え、前記瞬低検知処理部は、前記電流値が予め設定された範囲を逸脱したときに、前記電流値の時間変化率があらかじめ設定された範囲を逸脱したか否かに基づいて前記電力系統で瞬時電圧低下が発生したか否か判断し、前記電力系統で瞬時電圧低下が発生したと判断したときに、前記電力変換部の出力を停止する前記ゲート信号を生成し、前記電力変換部の出力を停止した旨を示す信号を前記第1演算処理部へ送信する。 A power conversion device according to an embodiment includes at least an AC terminal electrically connected to a power system, a positive side DC terminal and a negative side DC terminal electrically connected to a DC load, and a switching element that operates based on a gate signal. an arm converter including one, wherein two said arm converters are connected in series between said positive DC terminal and said negative DC terminal, and between said two said arm converters and said AC terminal; a power converter for converting alternating current power and direct current power to each other; and a manipulated variable for controlling the operation of the plurality of switching elements of the phase converter. a gate signal generator that generates the gate signal corresponding to the manipulated variable and transmits it to the power conversion unit; and detects that an instantaneous voltage drop has occurred in the power system. a momentary sag detection processing unit, and a current detection unit that acquires a current value flowing through the AC terminal or the arm converter and transmits it to the second processing unit, When the current value deviates from a preset range, the momentary sag detection processing unit detects an instantaneous voltage drop in the electric power system based on whether the time rate of change of the current value deviates from a preset range. It is determined whether or not a voltage drop has occurred, and when it is determined that an instantaneous voltage drop has occurred in the power system, the gate signal for stopping the output of the power conversion unit is generated, and the output of the power conversion unit is reduced. A signal indicating the stop is transmitted to the first arithmetic processing unit.

図1は、一実施形態の電力変換装置の構成例を概略的に示すブロック図である。FIG. 1 is a block diagram schematically showing a configuration example of a power converter according to one embodiment. 図2Aは、図1に示す電力変換装置の電流センサおよび電流検出部の他の構成例を概略的に示す図である。2A is a diagram schematically showing another configuration example of the current sensor and the current detection unit of the power converter shown in FIG. 1; FIG. 図2Bは、図1に示す電力変換装置の電圧センサおよび電圧検出部の他の構成例を概略的に示す図である。2B is a diagram schematically showing another configuration example of the voltage sensor and the voltage detection unit of the power converter shown in FIG. 1; FIG. 図3は、第1実施形態の電力変換装置における瞬低検知処理部の動作の一例を説明するためのフローチャートである。FIG. 3 is a flowchart for explaining an example of the operation of the voltage sag detection processing unit in the power converter of the first embodiment. 図4は、一実施形態の電力変換装置にて電力変換部の出力を停止する際の第2演算処理部の動作タイミングの一例を示す図である。FIG. 4 is a diagram illustrating an example of operation timing of the second arithmetic processing unit when stopping the output of the power conversion unit in the power conversion device of one embodiment. 図5は、一実施形態の電力変換装置において、出力停止状態から出力を復帰するときの動作の一例を説明するためのフローチャートである。FIG. 5 is a flowchart for explaining an example of the operation of the power conversion device of one embodiment when the output is restored from the output stop state. 図6は、電力系統にて瞬時電圧低下が発生し所定時間経過後の残電圧が20%以上であるときに、一実施形態の電力変換装置の出力を復帰する動作の一例を概略的に示す図である。FIG. 6 schematically shows an example of the operation of restoring the output of the power conversion device of one embodiment when an instantaneous voltage drop occurs in the power system and the residual voltage after the elapse of a predetermined time is 20% or more. It is a diagram. 図7は、電力系統にて瞬時電圧低下が発生し所定時間経過後の残電圧が20%未満であるときに、一実施形態の電力変換装置の出力を復帰する動作の一例を概略的に示す図である。FIG. 7 schematically shows an example of the operation of restoring the output of the power conversion device of one embodiment when an instantaneous voltage drop occurs in the power system and the residual voltage after the elapse of a predetermined time is less than 20%. It is a diagram. 図8は、電力系統にて瞬時電圧低下が発生したときの、一実施形態の電力変換装置の動作のシミュレーション結果の一例を示す図である。FIG. 8 is a diagram showing an example of a simulation result of the operation of the power converter according to one embodiment when an instantaneous voltage drop occurs in the power system. 図9は、第2実施形態の電力変換装置の構成例を概略的に示すブロック図である。FIG. 9 is a block diagram schematically showing a configuration example of a power converter according to the second embodiment. 図10は、第2実施形態の電力変換装置にて電力系統の瞬時電圧低下を検知したときの第2演算処理部の動作の一例を説明するための図である。FIG. 10 is a diagram for explaining an example of the operation of the second arithmetic processing unit when an instantaneous voltage drop in the power system is detected in the power converter of the second embodiment. 図11は、第2実施形態の電力変換装置にて、交流電圧の検出値と、瞬低検知処理部の演算2により得られる信号との一例を示す図である。FIG. 11 is a diagram showing an example of the detected value of the AC voltage and the signal obtained by the calculation 2 of the momentary sag detection processing unit in the power converter of the second embodiment.

以下、実施形態の電力変換装置について図面を参照して説明する。
図1は、一実施形態の電力変換装置の構成例を概略的に示すブロック図である。
本実施形態の電力変換装置100は、電力変換部10と、第1演算処理部12と、第2演算処理部13と、電流センサ14と、電流検出部15と、電圧センサ16と、電圧検出部17と、を備えている。
なお、電流センサ14と、電圧センサ16とは、電力変換装置100の外部に設けられても構わない。
Hereinafter, a power conversion device of an embodiment will be described with reference to the drawings.
FIG. 1 is a block diagram schematically showing a configuration example of a power converter according to one embodiment.
The power conversion device 100 of the present embodiment includes a power conversion unit 10, a first arithmetic processing unit 12, a second arithmetic processing unit 13, a current sensor 14, a current detection unit 15, a voltage sensor 16, a voltage detection a portion 17;
Note that the current sensor 14 and the voltage sensor 16 may be provided outside the power converter 100 .

電力変換部10は、交流端子NACと、正側直流端子NDCPと負側直流端子NDCNと、少なくとも1つの相変換器11と、を備えている。本実施形態において、電力変換部10は、直流電力と交流電力とを相互に変換する回路であって、三相交流系統と接続される場合、U相、V相、および、W相に対応する3つの相変換器11を備えている。 The power converter 10 includes an AC terminal NAC, a positive DC terminal NDCP, a negative DC terminal NDCN, and at least one phase converter 11 . In this embodiment, the power conversion unit 10 is a circuit that mutually converts DC power and AC power, and when connected to a three-phase AC system, corresponds to U phase, V phase, and W phase It has three phase converters 11 .

交流端子NACは、交流ラインを介して電力系統1と電気的に接続される。
正側直流端子NDCPと負側直流端子NDCNは、図示しない直流負荷と電気的に接続可能である。なお、正側直流端子NDCPと負側直流端子NDCNには、直流負荷として太陽光発電装置や、蓄電装置、風力発電装置を接続することができる。
AC terminal NAC is electrically connected to power system 1 via an AC line.
The positive side DC terminal NDCP and the negative side DC terminal NDCN can be electrically connected to a DC load (not shown). Note that a solar power generation device, a power storage device, and a wind power generation device can be connected as DC loads to the positive DC terminal NDCP and the negative DC terminal NDCN.

相変換器11は、2レベル電力変換器又はマルチレベル電力変換器であって、アーム変換器A1、A2と、交流ラインに挿入されるACリアクトル、またはアーム変換器A1、A2に直列接続されるバッファリアクトル(図示せず)と、を備えている。アーム変換器A1、A2のぞれぞれは、図示しないスイッチング素子を少なくとも1つ備えている。
ACリアクトル、またはバッファリアクトルは、交流端子NAC交流ラインに連系インピーダンスを形成する。
The phase converter 11 is a two-level power converter or a multi-level power converter, and is connected in series with the arm converters A1 and A2 and an AC reactor inserted in the AC line or the arm converters A1 and A2. and a buffer reactor (not shown). Each of the arm converters A1 and A2 has at least one switching element (not shown).
The AC reactor, or buffer reactor, forms a grid impedance on the AC terminal NAC AC line.

スイッチング素子は、例えば、MOSFET(半導体電界効果トランジスタ:Metal-Oxide Semiconductor Field-Effect Transistor)、IGBT(絶縁ゲートバイポーラトランジスタ:Insulated Gate Bipolar Transistor)、IEGT(電流注入促進型絶縁ゲートトランジスタ:Injection Enhanced Gate Transistor)などを採用することが可能である。複数のスイッチング素子は、後述する第2演算処理部13から供給されるゲート信号に基づいて動作する。 Switching elements include, for example, MOSFET (Metal-Oxide Semiconductor Field-Effect Transistor), IGBT (Insulated Gate Bipolar Transistor), IEGT (Injection Enhanced Gate Transistor). ) can be adopted. The plurality of switching elements operate based on gate signals supplied from the second arithmetic processing section 13, which will be described later.

電流センサ14は、例えば、ホール素子やシャント抵抗を用いるものを採用することができる。電流センサ14は、電力変換部10の交流端子NACと電力系統1との間に電気的に接続された交流ラインに取り付けられ、電力変換部10の交流端子NACに流れる電流を検出する。 The current sensor 14 can employ, for example, a Hall element or a shunt resistor. Current sensor 14 is attached to an AC line electrically connected between AC terminal NAC of power conversion unit 10 and power system 1 and detects current flowing through AC terminal NAC of power conversion unit 10 .

電流センサ14は、相変換器11のスイッチング素子に流れる電流を検出可能な構成であれば上記構成に限定されるものではない。電流センサ14は、電力変換部10内の交流ラインに取り付けられ、交流端子NACに流れる電流を検出してもよく、相変換器11のアーム変換器A1、A2に流れる電流を検出するように構成されてもよい。 The current sensor 14 is not limited to the above configuration as long as it can detect the current flowing through the switching element of the phase converter 11 . The current sensor 14 is attached to the AC line in the power converter 10 and may detect the current flowing through the AC terminal NAC, and is configured to detect the current flowing through the arm converters A1 and A2 of the phase converter 11. may be

図2Aは、図1に示す電力変換装置の電流センサおよび電流検出部の他の構成例を概略的に示す図である。
図2Aに示す例では、電流センサ14は、アーム変換器A1と交流端子NACとの間と、アーム変換器A2と交流端子NACとの間とに取り付けられている。このように電流センサ14を取り付けることにより、アーム変換器A1に流れる電流iarmpと、アーム変換器A2に流れる電流iarmnとを検出することが可能である。
2A is a diagram schematically showing another configuration example of the current sensor and the current detection unit of the power converter shown in FIG. 1; FIG.
In the example shown in FIG. 2A, current sensors 14 are mounted between arm transducer A1 and AC terminal NAC and between arm transducer A2 and AC terminal NAC. By attaching the current sensor 14 in this way, it is possible to detect the current i armp flowing through the arm transducer A1 and the current i armn flowing through the arm transducer A2.

電流検出部15は、電流センサ14にて検出された電流値(若しくは電流相当値)を受信する。電流検出部15は、電流センサ14から受信した信号のノイズを除去するためのフィルタ処理や振幅調整を行い、検出した電流値を出力することができる。 The current detection unit 15 receives the current value (or current equivalent value) detected by the current sensor 14 . The current detection unit 15 can perform filtering and amplitude adjustment for removing noise from the signal received from the current sensor 14 and output the detected current value.

電圧センサ16は、交流端子NACの電圧を検出する。電圧センサ16は、例えばアース電位などの基準電位に基づいて、交流端子NACの電圧(対地間電圧)を検出することができる。電力変換部10が複数の相変換器11を備える場合には、電圧センサ16は相電圧を検出してもよく、交流端子NACと電力系統1との間に電気的に接続された複数の交流ラインの線間電圧を検出してもよい。
図2Bは、図1に示す電力変換装置の電圧センサおよび電圧検出部の他の構成例を概略的に示す図である。
図2Bに示す例では、電圧センサ16は、複数の交流ライン(例えばU相およびV相)のそれぞれの電圧を取得し、いずれかの電圧を基準とした線間電圧V12を電圧検出部17へ出力する。
Voltage sensor 16 detects the voltage of AC terminal NAC. Voltage sensor 16 can detect the voltage (voltage to ground) of AC terminal NAC based on a reference potential such as ground potential. When the power conversion unit 10 includes a plurality of phase converters 11, the voltage sensor 16 may detect phase voltages, and a plurality of alternating currents electrically connected between the alternating current terminal NAC and the power system 1 may be detected. A line-to-line voltage may be detected.
2B is a diagram schematically showing another configuration example of the voltage sensor and the voltage detection unit of the power converter shown in FIG. 1; FIG.
In the example shown in FIG. 2B, the voltage sensor 16 obtains voltages of each of a plurality of AC lines (for example, U-phase and V-phase), and the voltage detection unit 17 detects the line voltage V 12 based on one of the voltages. Output to

電圧検出部17は、電圧センサ16にて検出された電圧値(若しくは電圧相当値)の振幅を調整し、交流電圧の検出値X5を第1演算処理部12へ出力する。本実施形態では、検出値X5は、第1演算処理部12のA/D変換器(図示せず)に入力される。なお、交流電圧の検出値X5は、電圧センサ16で検出された値に準じた値である。 The voltage detection unit 17 adjusts the amplitude of the voltage value (or voltage equivalent value) detected by the voltage sensor 16 and outputs a detection value X<b>5 of AC voltage to the first arithmetic processing unit 12 . In this embodiment, the detected value X5 is input to an A/D converter (not shown) of the first arithmetic processing section 12 . Note that the AC voltage detection value X5 is a value according to the value detected by the voltage sensor 16 .

第1演算処理部12は、例えば交流端子NACおよび直流側の電圧および電流の値を取得し、電力変換部10の各相変換器11に対する出力指令値など、スイッチング素子の動作を制御するための操作量X1を演算し、第2演算処理部13へ出力する。第1演算処理部12は、例えば、電流制御又は電圧制御を行う機能(図示せず)を備え、スイッチング素子の動作を制御するための各種操作量を演算することが可能である。
なお、第1演算処理部12は、例えば、交流端子NACおよび直流側の電圧および電流の値を検出するセンサと検出回路とを備えていてもよく、第2演算処理部13を介して検出値を取得してもよく、電力変換装置100の外部から検出値を取得してもよい。
The first arithmetic processing unit 12 acquires, for example, the voltage and current values of the AC terminal NAC and the DC side, and outputs command values for each phase converter 11 of the power conversion unit 10, etc., for controlling the operation of the switching elements. The manipulated variable X1 is calculated and output to the second calculation processing section 13 . The first arithmetic processing unit 12 has, for example, a function (not shown) that performs current control or voltage control, and can calculate various manipulated variables for controlling the operation of the switching element.
In addition, the first arithmetic processing unit 12 may include, for example, a sensor and a detection circuit for detecting the voltage and current values of the AC terminal NAC and the DC side, and the detected value may be acquired, or the detected value may be acquired from outside the power conversion device 100 .

第1演算処理部12は、例えば、CPU(central processing unit)やMPU(micro processing unit)などのプロセッサと、プロセッサにより実行されるプログラムが記録されるメモリ(図示せず)と、を備えている。 The first arithmetic processing unit 12 includes, for example, a processor such as a CPU (central processing unit) or MPU (micro processing unit), and a memory (not shown) in which programs executed by the processor are recorded. .

第2演算処理部13は、少なくとも1つのプログラマブルロジックデバイス(PLD:Programmable Logic Device)を含む演算部131と、A/D変換器132と、メモリ13Mと、を備えている。 The second arithmetic processing unit 13 includes an arithmetic unit 131 including at least one programmable logic device (PLD: Programmable Logic Device), an A/D converter 132, and a memory 13M.

演算部131は、例えば、数ns~数十nsのクロック周期で高速に演算処理を行うことが可能な回路として設定された集積回路である。第2演算処理部13のプログラマブルロジックデバイスとしては、例えばFPGA(Field Programmable Gate Arrays)を採用することができる。 The arithmetic unit 131 is an integrated circuit that is set as a circuit capable of performing arithmetic processing at high speed with a clock cycle of, for example, several nanoseconds to several tens of nanoseconds. For example, FPGAs (Field Programmable Gate Arrays) can be employed as programmable logic devices of the second arithmetic processing unit 13 .

A/D変換器132は、電流検出部15から出力された値を受信し、デジタル信号に変換して演算部131へ出力する。本実施形態において、例えば、A/D変換器132の変換処理時間は1μs程度である。 The A/D converter 132 receives the value output from the current detection unit 15 , converts it into a digital signal, and outputs the digital signal to the calculation unit 131 . In this embodiment, for example, the conversion processing time of the A/D converter 132 is about 1 μs.

演算部131は、例えば、ゲート信号生成部131Aと、過電流・瞬低検知処理部131Bと、を備えている。
ゲート信号生成部131Aは、第1演算処理部12から出力された操作量X1に従って、複数の相変換器11のスイッチング素子を制御するゲート信号X2を生成する。ゲート信号X2の算出には、例えば、PWM(パルス幅変調:Pulse Width Modulation)により、操作量X1を満たすゲート信号X2を算出することができる。なお、ゲート信号生成部131Aにおいてゲート信号X2を生成する際には、操作量X1に応じたゲート信号X2を算出可能であれば上記方法以外の方法も採用可能であって、例えば、ベクトル制御やルックアップテーブルを用いてゲート信号X2を算出する方法を用いることが可能である。
The calculation unit 131 includes, for example, a gate signal generation unit 131A and an overcurrent/sag detection processing unit 131B.
The gate signal generator 131A generates gate signals X2 for controlling the switching elements of the plurality of phase converters 11 according to the manipulated variables X1 output from the first arithmetic processor 12 . For calculation of the gate signal X2, for example, the gate signal X2 that satisfies the operation amount X1 can be calculated by PWM (Pulse Width Modulation). When the gate signal X2 is generated in the gate signal generation unit 131A, a method other than the above method can be adopted as long as the gate signal X2 can be calculated according to the operation amount X1. A method of calculating the gate signal X2 using a lookup table can be used.

過電流・瞬低検知処理部131は、ゲート信号生成部131Aにてゲート信号X2を算出する処理と同時に、複数の相変換器11のスイッチング素子に流れる電流(若しくは交流端子NACに流れる電流)の検出値X3を利用して、電力系統1における瞬時電圧低下の有無を検知するための演算を行う。なお、本実施形態において、同時に行われる処理とは、A/D変換器132における変換処理の一周期内に行われる処理であり、変換処理一周期とは例えば1μs周期である。 The overcurrent/instantaneous voltage drop detection processing unit 131 performs the process of calculating the gate signal X2 in the gate signal generation unit 131A, and at the same time, detects the current flowing through the switching elements of the plurality of phase converters 11 (or the current flowing through the AC terminal NAC). Using the detected value X3, calculation is performed to detect the presence or absence of an instantaneous voltage drop in the power system 1. FIG. In the present embodiment, simultaneous processing means processing performed within one cycle of conversion processing in the A/D converter 132, and one conversion processing cycle is, for example, a 1 μs cycle.

過電流・瞬低検知処理部131B は、電力系統1における瞬時電圧低下を検知したときに、電力変換部10の出力を停止させるゲート信号X2を生成して電力変換部10へ送信する。また、過電流・瞬低検知処理部131Bは、電力系統1における瞬時電圧低下を検知したときに、第1演算処理部12に出力停止動作開始信号X4を送信する。 The overcurrent/instantaneous voltage drop detection processing unit 131B generates a gate signal X2 for stopping the output of the power conversion unit 10 and transmits the gate signal X2 to the power conversion unit 10 when an instantaneous voltage drop in the power system 1 is detected. Further, the overcurrent/instantaneous voltage drop detection processing unit 131B transmits an output stop operation start signal X4 to the first arithmetic processing unit 12 when detecting an instantaneous voltage drop in the power system 1 .

演算部131は、電力系統1における瞬時電圧低下が検知されたときに、電力変換部10へ出力するゲート信号X2の値を、ゲート信号生成部131Aの出力値から過電流・瞬低検知処理部131Bの出力値へ切り替えることが可能である。また、電力系統1が瞬時電圧低下から復帰したときに、電力変換部10へ出力するゲート信号X2の値を、過電流・瞬低検知処理部131Bの出力値からゲート信号生成部131Aの出力値へ切り替えることが可能である。 When an instantaneous voltage drop in the power system 1 is detected, the calculation unit 131 determines the value of the gate signal X2 to be output to the power conversion unit 10 from the output value of the gate signal generation unit 131A. It is possible to switch to the output value of 131B. Further, when the power system 1 recovers from the instantaneous voltage drop, the value of the gate signal X2 to be output to the power conversion unit 10 is changed from the output value of the overcurrent/instantaneous voltage drop detection processing unit 131B to the output value of the gate signal generation unit 131A. It is possible to switch to

図3は、第1実施形態の電力変換装置における瞬低検知処理部の動作の一例を説明するためのフローチャートである。
最初に、過電流・瞬低検知処理部131Bは、A/D変換器132から、複数のアーム変換器A1、A2に流れる電流(若しくは交流端子NACに流れる電流)の検出値X3を取得する。検出値X3を取得する周期は、A/D変換器132の変換周期に合わせることが望ましい。過電流・瞬低検知処理部131Bは、このとき取得した検出値X3をメモリ13Mに記録する。(ステップS1)
FIG. 3 is a flowchart for explaining an example of the operation of the voltage sag detection processing unit in the power converter of the first embodiment.
First, the overcurrent/sag detection processing unit 131B acquires from the A/D converter 132 the detection value X3 of the current flowing through the arm transducers A1 and A2 (or the current flowing through the AC terminal NAC). It is desirable that the period for acquiring the detected value X3 be matched with the conversion period of the A/D converter 132 . The overcurrent/sag detection processing unit 131B records the detection value X3 acquired at this time in the memory 13M. (Step S1)

続いて、過電流・瞬低検知処理部131Bは、瞬時電圧低下の判定と出力停止に係る演算とを開始する。過電流・瞬低検知処理部131Bは、後述するステップS3-S5とステップS6とを並列に行う。(ステップS2)
まず、過電流・瞬低検知処理部131Bにて、検出値X3の時間変化率を算出する処理(演算1)(ステップS6)について説明する。
Subsequently, the overcurrent/instantaneous voltage drop detection processing unit 131B starts determination of an instantaneous voltage drop and calculation related to output stoppage. The overcurrent/sag detection processing unit 131B performs steps S3 to S5 and step S6, which will be described later, in parallel. (Step S2)
First, the process (calculation 1) (step S6) for calculating the time rate of change of the detected value X3 in the overcurrent/sag detection processing unit 131B will be described.

過電流・瞬低検知処理部131Bは、メモリ13Mに記録された一周期前の検出値X3と、検出値X3の現在値とを比較して、検出値X3の時間変化率(例えば単位時間当たりの検出値X3の変化量[A/s])を算出することができる。なお、検出値X3の時間変化率を算出する方法は、微分演算であればよく、上記方法に限定されるものではない。また、過電流・瞬低検知処理部131Bは、検出値X3の高周波ノイズを除去するために、時間変化率の算出前に、検出値X3をフィルタ処理しても良い。 The overcurrent/instantaneous voltage drop detection processing unit 131B compares the detected value X3 of one cycle before recorded in the memory 13M with the current value of the detected value X3, and calculates the time rate of change of the detected value X3 (for example, per unit time ) can be calculated. Note that the method for calculating the time rate of change of the detected value X3 is not limited to the above method as long as it is a differential operation. In addition, the overcurrent/instantaneous voltage drop detection processing unit 131B may filter the detection value X3 before calculating the time change rate in order to remove high-frequency noise from the detection value X3.

次に、過電流・瞬低検知処理部131Bは、算出した検出値X3の時間変化率があらかじめ設定した上限値を超過したか、あるいは、あらかじめ設定した下限値より低下したかを判定する。ここで用いられる上限値と下限値は、定常運転時に検出値X3が変動する範囲よりも外側にあることが望ましい。 Next, the overcurrent/instantaneous voltage drop detection processing unit 131B determines whether the calculated rate of change with time of the detection value X3 exceeds a preset upper limit value or falls below a preset lower limit value. The upper limit value and lower limit value used here are preferably outside the range in which the detected value X3 fluctuates during steady operation.

過電流・瞬低検知処理部131Bは、例えば、初期値ゼロのカウンタnを備え、検出値X3の時間変化率が上限値を超過するか下限値よりも低下した(判定結果が正である)ときにカウンタnの値を繰り上げ、検出値X3の時間変化率が下限値以上であり、かつ上限値以下である(判定結果が負である)ときにカウンタnの値を0にリセットする。過電流・瞬低検知処理部131Bは、カウンタnの値をメモリ13Mに記録する。なお、カウンタnの初期値はゼロに限定されるものではない。また、過電流・瞬低検知処理部131Bは、検出値X3の時間変化率が上限値を超過するか下限値よりも低下した(判定結果が正である)ときにカウンタnの値を繰り下げてもよい。(ステップS6) The overcurrent/instantaneous voltage drop detection processing unit 131B includes, for example, a counter n with an initial value of zero, and the time rate of change of the detection value X3 exceeds the upper limit value or falls below the lower limit value (the determination result is positive). When the time rate of change of the detected value X3 is equal to or higher than the lower limit value and equal to or lower than the upper limit value (determination result is negative), the value of the counter n is reset to 0. The overcurrent/sag detection processing unit 131B records the value of the counter n in the memory 13M. Note that the initial value of the counter n is not limited to zero. In addition, the overcurrent/instantaneous voltage drop detection processing unit 131B reduces the value of the counter n when the time rate of change of the detected value X3 exceeds the upper limit value or falls below the lower limit value (the determination result is positive). good too. (Step S6)

次に、過電流・瞬低検知処理部131Bにおける、過電流の判定および出力停止の処理(ステップS3-S5)について説明する。
過電流・瞬低検知処理部131Bは、検出値X3があらかじめ設定した上限値以上であるか、あらかじめ設定した下限値以下であるかを判定し(予め設定された範囲を超えたか否か判定し)、過電流であるか否か判断する。(ステップS3)
なお、上記ステップS3にて用いる上限値と下限値は、電力変換装置100が電力系統1から解列されないように複数のアーム変換器に流れる電流(若しくは交流端子NACに流れる電流)が過大になる前に電力変換部10の出力を停止できるように設定される。連系インピーダンスが低い電力変換器では、瞬時電圧低下発生から電力変換部10の出力を停止するまでの時間が、第1演算処理部12の演算周期以下となる場合がある。
Next, the process of overcurrent determination and output stop (steps S3 to S5) in the overcurrent/sag detection processing unit 131B will be described.
The overcurrent/instantaneous voltage drop detection processing unit 131B determines whether the detected value X3 is equal to or greater than a preset upper limit value or equal to or less than a preset lower limit value (determines whether or not it exceeds a preset range). ), and determine whether there is an overcurrent. (Step S3)
Note that the upper limit value and the lower limit value used in step S3 are set so that the current flowing through the arm converters (or the current flowing through the AC terminal NAC) is excessive so that the power conversion device 100 is not disconnected from the power grid 1. It is set so that the output of the power conversion unit 10 can be stopped before. In a power converter with a low interconnection impedance, the time from the occurrence of an instantaneous voltage drop until the output of the power conversion unit 10 is stopped may be equal to or less than the calculation cycle of the first calculation processing unit 12 .

ステップS3にて、過電流・瞬低検知処理部131Bは、検出値X3が上限値よりも大きい又は下限値よりも小さいときに過電流であると判断し(ステップS3の判定結果を正とし)、ステップS4を実行する。ステップS4では、メモリ13Mに記録されたカウンタnの値、すなわち、直前の演算周期において上述のステップS6にて算出されたカウンタnの値と、あらかじめ設定した任意の数Nと比較する。 In step S3, the overcurrent/instantaneous voltage drop detection processing unit 131B determines that there is an overcurrent when the detected value X3 is greater than the upper limit value or less than the lower limit value (the determination result in step S3 is positive). , step S4 is executed. In step S4, the value of the counter n recorded in the memory 13M, that is, the value of the counter n calculated in the above-described step S6 in the immediately preceding calculation cycle is compared with an arbitrary number N set in advance.

例えば、メモリ13Mに記録されたカウンタnの値が任意の数N以上のとき、瞬低検知処理部131Bは、電力系統1にて瞬時電圧低下が発生している判断し(ステップS4の判定結果を正とし)、メモリ13Mに記録されたカウンタnの値が任意の数N未満であるとき、電力系統1にて瞬時電圧低下が発生していないと判断する。
なお、上記ステップS6にて、瞬低検知処理部131Bが、検出値X3の時間変化率が上限値を超過するか下限値よりも低下したときにカウンタnの値を繰り下げるときには、例えば、メモリ13Mに記録されたカウンタnの値が任意の数N以下のとき、過電流・瞬低検知処理部131Bは、電力系統1にて瞬時電圧低下が発生している判断し、メモリ13Mに記録されたカウンタnの値が任意の数Nより大きいとき、電力系統1にて瞬時電圧低下が発生していないと判断する。
For example, when the value of the counter n recorded in the memory 13M is an arbitrary number N or more, the instantaneous voltage drop detection processing unit 131B determines that an instantaneous voltage drop has occurred in the power system 1 (determination result of step S4 is positive), and when the value of the counter n recorded in the memory 13M is less than an arbitrary number N, it is determined that an instantaneous voltage drop has not occurred in the power system 1 .
In step S6, when the momentary sag detection processing unit 131B decreases the value of the counter n when the time rate of change of the detected value X3 exceeds the upper limit value or falls below the lower limit value, for example, the memory 13M When the value of the counter n recorded in is equal to or less than an arbitrary number N, the overcurrent/instantaneous voltage drop detection processing unit 131B determines that an instantaneous voltage drop has occurred in the power system 1, and the value is recorded in the memory 13M. When the value of the counter n is greater than an arbitrary number N, it is determined that the instantaneous voltage drop has not occurred in the power system 1 .

なお、本実施形態では、ここで用いる任意の数Nとしては、例えば「3」を選択したものとして説明する。任意の数Nとして「3」を選択したときには、過電流・瞬低検知処理部131BのステップS6にて、3周期連続で検出値X3の時間変化率が上限値を超えるもしくは下限値より低下したときに、ステップS4にて、電力系統1で瞬時電圧低下が発生していると判断することとなる。 In addition, in this embodiment, it is assumed that, for example, "3" is selected as the arbitrary number N used here. When "3" is selected as the arbitrary number N, the time rate of change of the detected value X3 exceeds the upper limit value or falls below the lower limit value for three consecutive cycles in step S6 of the overcurrent/sag detection processing unit 131B. Occasionally, in step S4, it will be determined that an instantaneous voltage drop has occurred in the power system 1 .

例えば、任意の数Nを「1」や「2」とした場合は、任意の数Nを「3」としたときよりも高速に瞬時電圧低下の判定結果を得られる。一方で、任意の数Nを小さくするときには、検出値X3に含まれるノイズ等による誤判定の可能性を考慮すべきである。上記のように、任意の数Nは、瞬時電圧低下検出に要する時間と、誤判定の可能性とを考慮して決定されることが望ましい。
すなわち、上述のステップS4とステップS6とは、過電流・瞬低検知処理部131Bにおける瞬時電圧低下の誤判定を防止するための処理である。
For example, when the arbitrary number N is set to "1" or "2", the determination result of the instantaneous voltage drop can be obtained faster than when the arbitrary number N is set to "3". On the other hand, when reducing the arbitrary number N, the possibility of erroneous determination due to noise or the like contained in the detected value X3 should be considered. As described above, the arbitrary number N is desirably determined in consideration of the time required to detect the instantaneous voltage drop and the possibility of erroneous determination.
That is, the steps S4 and S6 described above are processes for preventing an erroneous determination of an instantaneous voltage drop in the overcurrent/instantaneous voltage drop detection processing section 131B.

ステップS4にて、電力系統1で瞬時電圧低下が発生していると判断したときに、ステップS5を実行する。ステップS5では過電流・瞬低検知処理部131B電力変換部10の出力を停止させる。過電流・瞬低検知処理部131Bは、複数の相変換器11のスイッチング素子を強制的にオフするゲート信号X2を生成して電力変換部10へ出力してもよく、スイッチング素子に流れる電流がゼロとなるゲート信号X2を生成して電力変換部10へ出力してもよい。 When it is determined in step S4 that an instantaneous voltage drop has occurred in the power system 1, step S5 is executed. In step S5, the output of the overcurrent/sag detection processing unit 131B power conversion unit 10 is stopped. The overcurrent/instantaneous voltage drop detection processing unit 131B may generate a gate signal X2 that forcibly turns off the switching elements of the plurality of phase converters 11 and output the gate signal X2 to the power conversion unit 10. A gate signal X<b>2 that becomes zero may be generated and output to the power conversion unit 10 .

なお、過電流・瞬低検知処理部131Bにて、電力系統1で瞬時電圧低下が発生していると判断されたときに、演算部131は、電力変換部10へ出力する値を、ゲート信号生成部131Aから出力されるゲート信号X2から過電流・瞬低検知処理部131Bから出力されるゲート信号X2へ切り替えることができる。 Note that when the overcurrent/instantaneous voltage drop detection processing unit 131B determines that an instantaneous voltage drop has occurred in the power system 1, the calculation unit 131 outputs the value to be output to the power conversion unit 10 as a gate signal. The gate signal X2 output from the generation unit 131A can be switched to the gate signal X2 output from the overcurrent/instantaneous voltage drop detection processing unit 131B.

過電流・瞬低検知処理部131Bまた、ステップ5では、電力変換部10の出力を停止したことを示す出力停止動作開始信号X4を第1演算処理部12へ送信する。出力停止動作開始信号X4は、例えば、一定時間ハイ状態を継続するパルス信号であってもよく、ワンショットの信号であってもよい。 In step 5, the overcurrent/instantaneous voltage drop detection processing unit 131B also transmits to the first arithmetic processing unit 12 an output stop operation start signal X4 indicating that the output of the power conversion unit 10 has been stopped. The output stop operation start signal X4 may be, for example, a pulse signal that remains high for a certain period of time, or a one-shot signal.

第1演算処理部12は、第2演算処理部13から出力停止動作開始信号X4を受信したときに、例えば、電力変換部10から出力される交流電流の指令値がゼロとする操作量X1を出力する。また、第1演算処理部12は、各種の電流や電圧の制御に用いる積分器をリセットしてもよい。
なお、演算部131は、例えば、第2演算処理部13において出力を復帰すると判断されるまで、電力変換部10の出力を停止した状態を保持する。
When the first arithmetic processing unit 12 receives the output stop operation start signal X4 from the second arithmetic processing unit 13, for example, the operation amount X1 that makes the command value of the alternating current output from the power conversion unit 10 zero. Output. Also, the first arithmetic processing unit 12 may reset an integrator used for controlling various currents and voltages.
Note that the calculation unit 131 maintains the state in which the output of the power conversion unit 10 is stopped until, for example, the second calculation processing unit 13 determines that the output is restored.

過電流・瞬低検知処理部131Bは、ステップS3にて過電流でない(検出値X3が下限値以上であり上限値以下である)と判断したとき、および、上記ステップS5-S6が終了した後、演算を終了する。(ステップS7)
過電流・瞬低検知処理部131Bは、所定の演算周期にて上記ステップS1-S7を周期的に行う。なお、過電流・瞬低検知処理部131Bにて行われる一連の処理(ステップS1-S7)の演算周期は、A/D変換器132での変換周期以上であり、例えば1μs程度である。
When the overcurrent/instantaneous voltage drop detection processing unit 131B determines in step S3 that there is no overcurrent (the detection value X3 is equal to or greater than the lower limit value and equal to or less than the upper limit value), and after steps S5 and S6 are completed, , terminate the operation. (Step S7)
The overcurrent/instantaneous voltage drop detection processing unit 131B periodically performs the steps S1 to S7 in a predetermined calculation cycle. The calculation cycle of the series of processes (steps S1 to S7) performed by the overcurrent/sag detection processing unit 131B is equal to or longer than the conversion cycle of the A/D converter 132, for example, about 1 μs.

図4は、一実施形態の電力変換装置にて電力系統1の瞬時電圧低下を検知したときの第2演算処理部13の動作の一例を説明するための図である。
ここでは、電力変換装置100の通常運転時に、電力系統1における瞬時電圧低下が発生した場合について説明する。
FIG. 4 is a diagram for explaining an example of the operation of the second arithmetic processing unit 13 when an instantaneous voltage drop in the power system 1 is detected in the power converter of one embodiment.
Here, a case where an instantaneous voltage drop occurs in the power system 1 during normal operation of the power converter 100 will be described.

電力変換装置100の通常運転時において、例えば、複数の交流端子NACもしくはアーム変換器A1、A2に流れる電流は、電流Iのようにリプルを含む波形となる。なお、電流Iのリプル周期は、第1演算処理部12の演算周期となる。第1演算処理部12の演算周期は、例えば、数十μsから数百μsである。 During normal operation of the power converter 100, for example, the current flowing through the AC terminals NAC or the arm converters A1 and A2 has a waveform such as the current I that includes ripples. Note that the ripple cycle of the current I is the computation cycle of the first computation processing unit 12 . The calculation cycle of the first calculation processing unit 12 is, for example, several tens of microseconds to several hundred microseconds.

電力系統1において瞬時電圧低下が発生した直後から電流Iは上昇し始める。連系インピーダンスが低い電力変換装置100では、電力系統1の瞬時電圧低下発生時に生じる電流Iの変化率は、通常運転時のリプルの変化率よりも著しく大きく、例えばリプルの10倍程度にもなり得る。 Immediately after an instantaneous voltage drop occurs in the power system 1, the current I begins to rise. In the power conversion device 100 with low interconnection impedance, the rate of change of the current I that occurs when an instantaneous voltage drop occurs in the power system 1 is significantly larger than the rate of change of the ripple during normal operation, for example, about 10 times the ripple. obtain.

例えば、電力変換部10の連系インピーダンスが100μHであって、電力系統1における瞬時電圧低下により交流電圧が低下し、連系インピーダンスに163Vの電圧が印加されると、瞬時電圧低下発生後の電流Iの変化率は1μsあたりおよそ1.6Aとなる。 For example, when the interconnection impedance of the power conversion unit 10 is 100 μH, the AC voltage drops due to the instantaneous voltage drop in the power system 1, and a voltage of 163 V is applied to the interconnection impedance, the current after the instantaneous voltage drop occurs The rate of change of I is approximately 1.6 A per μs.

上記の場合、第1演算処理部12の演算周期を例えば50μsとすると、一演算周期間に、スイッチング素子に流れる電流が80A上昇することとなる。この電流上昇を許容するために、電流耐量の大きいスイッチング素子を用いると、電力変換装置100の製造コストが増加する。電力変換装置100の製造コストを抑えるために、スイッチング周期(第1演算処理部12の演算周期)よりも短い時間で、できるだけ早く電力変換器の出力を停止することが望ましい。 In the above case, if the calculation cycle of the first calculation processing unit 12 is set to 50 μs, for example, the current flowing through the switching element increases by 80 A during one calculation cycle. If a switching element with a large current resistance is used to allow this current rise, the manufacturing cost of the power conversion device 100 will increase. In order to reduce the manufacturing cost of the power converter 100, it is desirable to stop the output of the power converter as soon as possible in a time shorter than the switching cycle (calculation cycle of the first arithmetic processing unit 12).

また、例えば、電流Iの通常運転時のピーク値が略30Aであって、スイッチングデバイスの保護のために電力変換部10を停止し、電力系統1から電力変換部10を解列するロックアウトレベルを50Aであるとする。このとき、FRT要件を満足し、電力系統1の瞬時電圧低下が発生したときに電力変換装置100の運転を継続するためには、瞬時電圧低下から10μs程度の間に電力変換部10の出力を停止しなければならない。 Further, for example, when the peak value of the current I during normal operation is approximately 30 A, the lockout level at which the power conversion unit 10 is stopped to protect the switching device and the power conversion unit 10 is disconnected from the power system 1 be 50A. At this time, in order to satisfy the FRT requirements and continue the operation of the power conversion device 100 when an instantaneous voltage drop occurs in the power system 1, the output of the power conversion unit 10 must be changed within about 10 μs after the instantaneous voltage drop. must stop.

図4では、電力系統1にて瞬時電圧低下が発生した時点および発生時以降の電流Iについて、時間軸を拡大して更に示している。ここでは、電流Iと、検出値X3と、検出値X3の時間変化率ΔIと、第2演算処理部13のステップS3-S6での判定結果の一例とを示している。また、この例では、第2演算処理部13における演算周期を1μsとしている。 In FIG. 4 , the time axis is further shown with an enlarged time axis for the current I at and after the occurrence of the momentary voltage drop in the electric power system 1 . Here, an example of the current I, the detected value X3, the time change rate ΔI of the detected value X3, and the determination results in steps S3 to S6 of the second arithmetic processing section 13 are shown. Also, in this example, the calculation cycle in the second calculation processing unit 13 is set to 1 μs.

なお、電流検出部15から出力される検出値X3は、センサやフィルタ処理による遅れを含むため、実際の電流値よりも低く検出されることを考慮して、前述のステップS3にて用いる上限値と下限値とを設定することが望ましい。 Note that the detection value X3 output from the current detection unit 15 includes a delay due to the sensor and filter processing, so it is detected lower than the actual current value. and a lower limit.

電力系統1にて瞬時電圧低下が発生すると、電流Iが上昇し始め、これに遅れて検出値X3が上昇し始める。その結果、図4に示す例では、電力系統1にて瞬時電圧低下が発生してから4μs後にはじめて、検出値X3の時間変化率ΔIが予め設定された上限値を超え、ステップS6にてカウンタnの値が加算される。その後、検出値X3の時間変化率ΔIは上限値を超えている間、カウンタnの値が演算周期毎に加算される。 When an instantaneous voltage drop occurs in power system 1, current I begins to rise, and after this, detected value X3 begins to rise. As a result, in the example shown in FIG. 4, the time rate of change ΔI of the detected value X3 exceeds the preset upper limit value for the first time 4 μs after the momentary voltage drop occurs in the electric power system 1, and the counter in step S6 The value of n is added. After that, while the time rate of change ΔI of the detected value X3 exceeds the upper limit value, the value of the counter n is added in each calculation cycle.

ステップS3では、検出値X3の値が予め設定された上限値を超えたときに、過電流であると判断される(判断結果が正(=1)となる)。図4に示す例では、電力系統1にて瞬時電圧低下が発生してから略6μs後にステップS3にて過電流であると判断される。 In step S3, when the detected value X3 exceeds a preset upper limit value, it is determined that there is an overcurrent (the determination result is positive (=1)). In the example shown in FIG. 4, it is determined that there is an overcurrent in step S3 approximately 6 μs after an instantaneous voltage drop occurs in the power system 1 .

なお、電力変換装置の運転条件や系統擾乱の条件により、ステップS3の判定結果が正(=1)となるタイミングと、ステップS6の判定結果が正(=1)となるタイミングは前後する可能性がある。 Note that the timing when the determination result of step S3 becomes positive (=1) and the timing when the determination result of step S6 becomes positive (=1) may vary depending on the operating conditions of the power conversion device and the system disturbance conditions. There is

ステップS3の判定結果が正となると、第2演算処理部13はステップS4の処理へ進む。図4に示す例のようにステップS4において、任意の数Nが例えば「5」と設定されている場合、第2演算処理部13は、ステップS4においてカウンタnの値が5回連続で加算されたときに、瞬時電圧低下と判断することとなる(判定結果が正(=1)となる)。 When the determination result of step S3 is positive, the second arithmetic processing section 13 proceeds to the process of step S4. As in the example shown in FIG. 4, when the arbitrary number N is set to, for example, "5" in step S4, the second arithmetic processing unit 13 adds the value of the counter n five times in succession in step S4. , it is determined that there is an instantaneous voltage drop (the determination result is positive (=1)).

ステップS4にて瞬時電圧低下であると判断されると、第2演算処理部13はステップS5の処理へ進み、電力変換部10の出力が停止される(例えば、ステップS5にて出力停止処理フラグが正(=1)となる)。
図4に示す例では、電力系統1にて瞬時電圧低下が発生してから電力変換部10の出力が停止されるまでに要する時間は、8μs程度となる。
When it is determined that there is an instantaneous voltage drop in step S4, the second arithmetic processing unit 13 proceeds to the process of step S5, and the output of the power conversion unit 10 is stopped (for example, the output stop processing flag is positive (=1)).
In the example shown in FIG. 4, the time required from when the instantaneous voltage drop occurs in the power system 1 until the output of the power converter 10 is stopped is about 8 μs.

本実施形態では、第2演算処理部13の演算周期は第1演算処理部12の演算周期よりも短く、例えば1μsである。これにより、第2演算処理部13は、電力系統1における瞬時電圧低下の発生直後、数μsの間に電力変換部10の出力停止動作を行うことが可能であり、電流Iの増加を抑制することができる。 In this embodiment, the calculation cycle of the second calculation processing unit 13 is shorter than the calculation cycle of the first calculation processing unit 12, and is 1 μs, for example. As a result, the second arithmetic processing unit 13 can stop the output of the power conversion unit 10 for several μs immediately after the momentary voltage drop occurs in the power system 1, thereby suppressing an increase in the current I. be able to.

また、通常運転時にステップS6における判定の結果が正(=1)とならないように上限値および下限値を設定することにより、電力系統の常時電圧変動や検出系のノイズなどの影響で、通常運転時にステップS3で過電流を検出してしまったとしても、ステップSS4における判定結果が正(=1)となることはない。したがって、本実施形態の電力変換装置100によれば、通常運転時に過電流の誤検出がなくなり、不要な出力停止動作を回避することができる。 In addition, by setting the upper and lower limits so that the result of the determination in step S6 is not positive (=1) during normal operation, normal operation can Even if an overcurrent is detected in step S3, the determination result in step SS4 will not be positive (=1). Therefore, according to the power conversion device 100 of the present embodiment, erroneous detection of overcurrent is eliminated during normal operation, and unnecessary output stop operation can be avoided.

次に、電力変換部10の出力が停止された状態から、出力を復帰する際の電力変換装置100の動作の一例について説明する。
図5は、一実施形態の電力変換装置において、出力停止状態から出力を復帰するときの動作の一例を説明するためのフローチャートである。
Next, an example of the operation of the power conversion device 100 when the output of the power conversion unit 10 is restored from the state in which the output is stopped will be described.
FIG. 5 is a flowchart for explaining an example of the operation of the power conversion device of one embodiment when the output is restored from the output stop state.

本実施形態において、交流端子NACにおける交流電圧は、第1演算処理部12にて取得することができる。第1演算処理部12では、取得した交流端子NACにおける交流電圧を用いて、電力変換部10の出力を復帰する際の処理を行う。例えば、第2演算処理部13において、交流端子NACにおける交流電圧を取得可能であるときには、第2演算処理部13にて、出力を復帰する際の処理を行うことも可能である。 In this embodiment, the AC voltage at the AC terminal NAC can be obtained by the first arithmetic processing unit 12 . The first arithmetic processing unit 12 performs processing for restoring the output of the power conversion unit 10 using the acquired AC voltage at the AC terminal NAC. For example, when the second arithmetic processing unit 13 can acquire the AC voltage at the AC terminal NAC, the second arithmetic processing unit 13 can perform processing for restoring the output.

最初に、第1演算処理部12は、出力復帰制御を開始する。第1演算処理部12が出力復帰制御を開始するタイミングは、例えば、図3に示すステップS6によって第1演算処理部12が出力停止動作開始信号X4を受信してから、一定時間t1だけ経過した時とする。ここで、一定時間t1とは、系統連系規程のFRT要件を満足するように設定される時間であれば良く、例えば20msである。(ステップS10) First, the first arithmetic processing unit 12 starts output restoration control. The timing at which the first arithmetic processing unit 12 starts the output restoration control is, for example, when the first arithmetic processing unit 12 receives the output stop operation start signal X4 in step S6 shown in FIG. Time. Here, the fixed time t1 may be a time set so as to satisfy the FRT requirements of the grid interconnection regulations, and is, for example, 20 ms. (Step S10)

なお、第1演算処理部12が出力復帰制御を開始するタイミングは、FRT要件を満足できればよく、第1演算処理部12が出力停止動作開始信号X4を受信した後の、交流端子NACにおける交流電圧のゼロクロスのタイミングや、制御演算の初端や終端、PWM制御に用いるキャリア波など周期的な波形の変化点や山谷、エッジなど、特徴的となる時点を利用しても良い。 The timing at which the first arithmetic processing unit 12 starts the output restoration control may satisfy the FRT requirements. It is also possible to use characteristic points such as the timing of the zero crossing of , the beginning and end of control calculation, and the points of change, ridges and valleys, and edges of periodic waveforms such as carrier waves used for PWM control.

続いて、第1演算処理部12は、交流端子NACにおける交流電圧の振幅を算出する。振幅の算出方法としては、PLL(Phase Locked Loop)処理を用いるほか、交流電圧の最大値から演算することができる。(ステップS11) Subsequently, the first arithmetic processing unit 12 calculates the amplitude of the AC voltage at the AC terminal NAC. As a method for calculating the amplitude, in addition to using PLL (Phase Locked Loop) processing, it can be calculated from the maximum value of the AC voltage. (Step S11)

続いて、第1演算処理部12は、ステップS11にて算出した交流電圧の振幅から、交流電圧の残電圧が20%以上か否かを判定する。なお、判定基準は必ずしも20%でなくともよい。電力変換部10の出力を復帰できる範囲で判定基準を下げて、例えば10%としてもよい。(ステップS12) Subsequently, the first arithmetic processing unit 12 determines whether or not the residual voltage of the AC voltage is 20% or more from the amplitude of the AC voltage calculated in step S11. Note that the criterion for determination does not necessarily have to be 20%. The determination criterion may be lowered within a range in which the output of the power conversion unit 10 can be restored, for example, 10%. (Step S12)

ステップS12にて、交流電圧の残電圧が20%以上であると判断したとき(判定結果が正(=1)であるとき)、第1演算処理部12は、図3のステップS6にて電力変換部10の出力を停止した状態を解除し、出力を復帰させる。第1演算処理部12は、例えば、交流電流の指令値をゼロもしくは出力停止時の状態から、出力可能な最大値まで増加させる。電力変換部10の出力可能な最大値は、例えば、電力変換部10の出力を停止する直前の交流電流の指令値に、交流電圧の残電圧[%]を乗じることにより算出されてもよく、交流電圧の残電圧を入力として、入力された残電圧[%]に応じた交流電流の指令値を出力するルックアップテーブルを用いて算出されてもよい。 When it is determined in step S12 that the residual voltage of the AC voltage is 20% or more (when the determination result is positive (=1)), the first arithmetic processing unit 12 determines that the power The state in which the output of the conversion unit 10 is stopped is released, and the output is restored. For example, the first arithmetic processing unit 12 increases the command value of the alternating current from zero or the state when the output is stopped to the maximum value that can be output. The maximum value that can be output from the power conversion unit 10 may be calculated, for example, by multiplying the command value of the AC current immediately before stopping the output of the power conversion unit 10 by the residual voltage [%] of the AC voltage. It may be calculated using a lookup table that outputs an AC current command value corresponding to the input residual voltage [%] with the residual voltage of the AC voltage as an input.

また、第1演算処理部12は、電力変換部10の出力を復帰する際の交流電流の指令値を、FRT要件を満足する範囲で徐々に増加させてもよい。例えば、処理S13の開始から0.1秒かけて交流電流の指令値を増加させる。(ステップS13) Moreover, the first arithmetic processing unit 12 may gradually increase the command value of the alternating current when restoring the output of the power conversion unit 10 within a range that satisfies the FRT requirements. For example, the AC current command value is increased over 0.1 second from the start of processing S13. (Step S13)

ステップS13が終了すると、第1演算処理部12は、出力復帰制御を終了する。(ステップS20)
ステップS12にて、交流電圧の残電圧が20%以上でないと判断したとき(判定結果が正(=1)でないとき)、第1演算処理部12は、カウンタmをゼロにセットする。なお、第1演算処理部12は、ステップS10やステップS11の直前直後にステップS14を行ってもよい。(ステップS14)
When step S13 ends, the first arithmetic processing unit 12 ends the output restoration control. (Step S20)
When it is determined in step S12 that the residual voltage of the AC voltage is not 20% or more (when the determination result is not positive (=1)), the first arithmetic processing section 12 sets the counter m to zero. Note that the first arithmetic processing unit 12 may perform step S14 immediately before and after step S10 or step S11. (Step S14)

以下に説明するステップS15-S19では、第1演算処理部12は、電力系統1の電圧が瞬時電圧低下発生前の状態に復帰するまで電力変換部10の出力を復帰させずに待機するための処理を行う。第1演算処理部12は、電力系統1の電圧が一定時間の間(例えばカウンタmが所定の値以上となるまでに要する時間)に復帰しなければ、異常と判断して電力変換部10の出力を停止した状態を継続する。 In steps S15 to S19 described below, the first arithmetic processing unit 12 waits without restoring the output of the power conversion unit 10 until the voltage of the power system 1 returns to the state before the momentary voltage drop occurred. process. If the voltage of the power system 1 does not recover within a certain period of time (for example, the time required for the counter m to reach or exceed a predetermined value), the first arithmetic processing unit 12 determines that there is an abnormality, and the power conversion unit 10 Continue the state in which the output is stopped.

ステップS14の後、第1演算処理部12は、電力系統1の電圧が復帰したか否かを判定する。
第1演算処理部12は、例えば、電力系統1にて瞬時電圧低下が発生する直前の交流電圧の振幅をメモリ(図示せず)に記憶しておき、ステップS11にて算出した交流電圧の振幅とメモリに記憶された値との差が所定の値未満であるときに、電力系統1の電圧が復帰したと判定する(判定結果を正(=1)とする)。(ステップS15)
After step S14, the first arithmetic processing unit 12 determines whether or not the voltage of the power system 1 has recovered.
For example, the first arithmetic processing unit 12 stores in a memory (not shown) the amplitude of the AC voltage immediately before an instantaneous voltage drop occurs in the electric power system 1, and the amplitude of the AC voltage calculated in step S11. and the value stored in the memory is less than a predetermined value, it is determined that the voltage of the power system 1 has recovered (the determination result is positive (=1)). (Step S15)

ステップS15において電力系統1の電圧が復帰したと判定したときに、第1演算処理部12は、電力変換部10の出力を停止した状態を解除し、出力を復帰する。出力を復帰する方法としては、例えば交流電流の指令値をゼロから瞬時電圧低下発生前の値まで増加させることが考えられる。出力復帰時の交流電流の指令値は、FRT要件を満足する範囲で徐々に増加させても良い。この場合、第1演算処理部12は、例えばステップS16の開始時点から0.1秒かけて交流電流の指令値を増加させる。(ステップS16) When it is determined in step S15 that the voltage of the power system 1 has been restored, the first arithmetic processing unit 12 cancels the state in which the output of the power conversion unit 10 is stopped, and restores the output. As a method of restoring the output, for example, it is conceivable to increase the command value of the alternating current from zero to the value before the occurrence of the momentary voltage drop. The AC current command value at the time of output recovery may be gradually increased within a range that satisfies the FRT requirements. In this case, the first arithmetic processing unit 12 increases the command value of the alternating current over 0.1 second from the start time of step S16, for example. (Step S16)

ステップS16が終了すると、第1演算処理部12は、出力復帰制御を終了する。(ステップS20)
ステップS15において電力系統1の電圧が復帰していないと判断したときに、第1演算処理部12は、カウンタmをカウントアップする(m=m+1とする)。(ステップS17)
When step S16 ends, the first arithmetic processing unit 12 ends the output restoration control. (Step S20)
When it is determined in step S15 that the voltage of the power system 1 has not recovered, the first arithmetic processing unit 12 counts up the counter m (m=m+1). (Step S17)

続いて、第1演算処理部12は、カウンタmの値があらかじめ設定した任意の数Mより大きいか否か判定する。(ステップS18)
ここで任意の数Mは、例えば、電力変換部10が出力復帰する必要がある場合の瞬時電圧低下の継続時間を考慮して設定されることが望ましい。例えば、0.3秒以下の瞬時電圧低下に対して電力変換部10が出力復帰する必要があれば、カウンタmのカウントアップを開始してから少なくとも0.3秒経過してから、カウンタmの値が任意の数Mより大きくなるように(ステップS18にて判定結果が正(=1)となるように)任意の数Mが設定されることが望ましい。
Subsequently, the first arithmetic processing unit 12 determines whether or not the value of the counter m is greater than an arbitrary number M set in advance. (Step S18)
Here, the arbitrary number M is desirably set in consideration of, for example, the duration of the instantaneous voltage drop when the power converter 10 needs to restore the output. For example, if the power conversion unit 10 needs to restore output for an instantaneous voltage drop of 0.3 seconds or less, the counter m An arbitrary number M is preferably set so that the value is greater than the arbitrary number M (so that the determination result in step S18 is positive (=1)).

ステップS18にてカウンタmが任意の数M以下であると判断されると、第1演算処理部12は、交流端子NACにおける交流電圧の振幅を算出する。(ステップS19)
続いて、第1演算処理部12は、次の制御周期を待ってから、前述のステップS15以降の処理を繰り返す。
When it is determined in step S18 that the counter m is equal to or less than the arbitrary number M, the first arithmetic processing unit 12 calculates the amplitude of the AC voltage at the AC terminal NAC. (Step S19)
Subsequently, after waiting for the next control cycle, the first arithmetic processing unit 12 repeats the processes after step S15 described above.

ステップS18にてカウンタmが任意の数Mより大きいと判断されると、第1演算処理部12は、出力復帰制御を終了する(ステップS20)。この場合、電力変換部10の出力停止状態が維持される。 When it is determined in step S18 that the counter m is larger than the arbitrary number M, the first arithmetic processing section 12 terminates the output restoration control (step S20). In this case, the output stop state of the power conversion unit 10 is maintained.

図6は、電力系統にて瞬時電圧低下が発生し所定時間経過後の残電圧が20%以上であるときに、一実施形態の電力変換装置の出力を復帰する動作の一例を概略的に示す図である。
電力系統1にて瞬時電圧低下が発生したとき、第2演算処理部13は、例えば、図3に示すフローに従って電力変換部10の出力を停止する。
FIG. 6 schematically shows an example of the operation of restoring the output of the power conversion device of one embodiment when an instantaneous voltage drop occurs in the power system and the residual voltage after the elapse of a predetermined time is 20% or more. It is a diagram.
When an instantaneous voltage drop occurs in the power system 1, the second arithmetic processing unit 13 stops the output of the power conversion unit 10 according to the flow shown in FIG. 3, for example.

第1演算処理部12は、第2演算処理部13から出力停止動作開始信号X4を受信してから一定時間t1経過したタイミングT1にて、出力復帰制御を開始する。時間t1は、例えば20msである。 The first arithmetic processing unit 12 starts output restoration control at a timing T1 after a certain time t1 has elapsed since receiving the output stop operation start signal X4 from the second arithmetic processing unit 13 . Time t1 is, for example, 20 ms.

図6に示す例では、電力系統1の残電圧が20%以上であるため、第1演算処理部12は、例えば、図5のステップS13を実行し、電力変換部10の出力交流電流の指令値を残電圧に応じた値まで増加させて、電力変換部10の出力を復帰し始める。 In the example shown in FIG. 6, since the residual voltage of the power system 1 is 20% or higher, the first arithmetic processing unit 12 executes, for example, step S13 in FIG. The value is increased to a value corresponding to the residual voltage, and the output of the power converter 10 starts to recover.

その後、電力系統1の電圧が復帰すると、交流端子NACの電圧に応じて電力変換部10の出力交流電流の指令値が上昇し、電力変換部10の出力も徐々に復帰していく。第1演算処理部12は、電力系統1にて瞬時電圧低下が発生した直前の出力まで電力変換部10の出力が復帰すると(タイミングT2)、出力復帰制御を終了する。 After that, when the voltage of power system 1 recovers, the command value of the output AC current of power conversion unit 10 increases according to the voltage of AC terminal NAC, and the output of power conversion unit 10 gradually recovers. When the output of the power conversion unit 10 is restored to the output just before the momentary voltage drop occurred in the power system 1 (timing T2), the first arithmetic processing unit 12 ends the output restoration control.

図7は、電力系統にて瞬時電圧低下が発生し所定時間経過後の残電圧が20%未満であるときに、一実施形態の電力変換装置の出力を復帰する動作の一例を概略的に示す図である。
電力系統1にて瞬時電圧低下が発生したとき、第2演算処理部13は、例えば、図3に示すフローに従って電力変換部10の出力を停止する。
FIG. 7 schematically shows an example of the operation of restoring the output of the power conversion device of one embodiment when an instantaneous voltage drop occurs in the power system and the residual voltage after the elapse of a predetermined time is less than 20%. It is a diagram.
When an instantaneous voltage drop occurs in the power system 1, the second arithmetic processing unit 13 stops the output of the power conversion unit 10 according to the flow shown in FIG. 3, for example.

第1演算処理部12は、第2演算処理部13から出力停止動作開始信号X4を受信してから一定時間t2経過したタイミングT3にて、出力復帰制御を開始する。時間t2は、例えば20msである。
図7に示す例では、電力系統1の残電圧が20%未満であるため、第1演算処理部12は、図5のステップS14-S19を実行し、交流端子NACの電圧が復帰するまで電力変換部10の出力を停止した状態を維持させる。
The first arithmetic processing unit 12 starts the output restoration control at a timing T3 after a certain time t2 has passed after receiving the output stop operation start signal X4 from the second arithmetic processing unit 13 . Time t2 is, for example, 20 ms.
In the example shown in FIG. 7, since the residual voltage of the power system 1 is less than 20%, the first arithmetic processing unit 12 executes steps S14 to S19 in FIG. A state in which the output of the conversion unit 10 is stopped is maintained.

交流端子NACの電圧が復帰すると、上述のステップS19により電圧復帰後の交流電圧の振幅が算出される。第1演算処理部12は、算出後の電圧振幅に基づいてステップS15にて交流電圧が復帰したと判断すると、ステップS16により、電力系統1にて瞬時電圧低下が発生する直前の値まで、電力変換部10の出力を復帰させる動作を開始する。この例では、第1演算処理部12は、電力変換部10の出力電流の指令値を徐々に増加させ、電力変換部10の出力を徐々に復帰させている。 When the voltage of the AC terminal NAC recovers, the amplitude of the AC voltage after the voltage recovery is calculated in step S19 described above. When the first arithmetic processing unit 12 determines that the AC voltage has recovered in step S15 based on the voltage amplitude after calculation, in step S16, the electric power is reduced to the value immediately before the instantaneous voltage drop occurs in the power system 1. An operation to restore the output of the conversion unit 10 is started. In this example, the first arithmetic processing unit 12 gradually increases the command value for the output current of the power conversion unit 10 and gradually restores the output of the power conversion unit 10 .

図8は、電力系統にて瞬時電圧低下が発生したときの、一実施形態の電力変換装置の動作のシミュレーション結果の一例を示す図である。
ここでは、電力変換装置100が通常運転時に、電力系統1にて残電圧0%の瞬時電圧低下が略50ms間継続したときのシミュレーション結果の一例を示す。
FIG. 8 is a diagram showing an example of a simulation result of the operation of the power converter according to one embodiment when an instantaneous voltage drop occurs in the power system.
Here, an example of a simulation result when the power converter 100 is in normal operation and the instantaneous voltage drop of 0% residual voltage continues for about 50 ms in the power system 1 is shown.

図8に示すシミュレーション結果によれば、電力系統1にて瞬時電圧低下が発生した直後、即座に電力変換部10の出力が停止している。これにより、複数のアーム変換器A1、A2に流れる電流若しくは交流端子NACに流れる電流もゼロとなる。 According to the simulation result shown in FIG. 8, the output of the power converter 10 stops immediately after the momentary voltage drop occurs in the electric power system 1 . As a result, the current flowing through the arm converters A1 and A2 or the current flowing through the AC terminal NAC also becomes zero.

その後、電力系統1の残電圧が0%である間は、電力変換部10の出力が停止した状態が維持されている。電力系統1の電圧が復帰した後、所定時間経過後、第1演算処理部12における交流電圧振幅の演算結果に反映され、交流電圧の振幅が100%に復帰したと判断されると、電力変換部10の出力電流の指令値が徐々に瞬時電圧低下発生の直前の値まで戻る。これに応じて、電力変換部10の出力も徐々に復帰し、電力変換部10の出力電流が瞬時電圧低下発生前の振幅まで復帰している。 After that, while the remaining voltage of the power system 1 is 0%, the state in which the output of the power conversion unit 10 is stopped is maintained. After a predetermined time has passed after the voltage of the power system 1 is restored, it is reflected in the calculation result of the AC voltage amplitude in the first arithmetic processing unit 12, and when it is determined that the amplitude of the AC voltage has returned to 100%, the power conversion The command value of the output current of the unit 10 gradually returns to the value immediately before the occurrence of the momentary voltage drop. Accordingly, the output of the power conversion unit 10 also gradually recovers, and the output current of the power conversion unit 10 recovers to the amplitude before the occurrence of the momentary voltage drop.

上記のように、本実施形態の電力変換装置100によれば、電力系統1にて瞬時電圧低下が発生したときに、電力変換部10の出力を停止し、瞬時電圧低下による過電流を抑制することが可能である。
また、本実施形態の電力変換装置100によれば、検出値にノイズが重畳したときに、過電流を誤検出することがなく、不要に電力変換部10の出力が停止することを回避することができる。
すなわち、本実施形態の電力変換装置100によれば、電力変換器の出力を一時的に停止し、瞬時電圧低下による過電流を抑制可能な電力変換装置を提供することができる。
As described above, according to the power conversion device 100 of the present embodiment, when an instantaneous voltage drop occurs in the power system 1, the output of the power conversion unit 10 is stopped, and overcurrent due to the instantaneous voltage drop is suppressed. It is possible.
Further, according to the power conversion device 100 of the present embodiment, when noise is superimposed on the detection value, an overcurrent is not erroneously detected, and unnecessary stoppage of the output of the power conversion unit 10 can be avoided. can be done.
That is, according to the power conversion device 100 of the present embodiment, it is possible to provide a power conversion device capable of temporarily stopping the output of the power converter and suppressing overcurrent due to an instantaneous voltage drop.

次に、第2実施形態の電力変換装置について図面を参照して詳細に説明する。
なお、以下の説明において、上述の第1実施形態と同様の構成については、同一の符号を付して説明を省略する。
Next, the power conversion device of the second embodiment will be described in detail with reference to the drawings.
In addition, in the following description, the same reference numerals are given to the same configurations as in the above-described first embodiment, and the description thereof will be omitted.

図9は、第2実施形態の電力変換装置の構成例を概略的に示すブロック図である。
本実施形態の電力変換装置100は、電圧検出部17から出力される検出値X5が第2演算処理部13へ更に入力されている。
FIG. 9 is a block diagram schematically showing a configuration example of a power converter according to the second embodiment.
In the power conversion device 100 of the present embodiment, the detection value X5 output from the voltage detection section 17 is further input to the second arithmetic processing section 13 .

電圧センサ16は、交流端子NACの電圧を検出する。電力変換部10が複数の相変換器11を備える場合には、電圧センサ16は相電圧を検出してもよく、例えば図2Bに示すように、交流端子NACと電力系統1との間に電気的に接続された複数の交流ラインの線間電圧を検出してもよい。 Voltage sensor 16 detects the voltage of AC terminal NAC. When the power conversion unit 10 includes a plurality of phase converters 11, the voltage sensor 16 may detect phase voltages, for example, as shown in FIG. Line voltages of a plurality of alternating current lines that are physically connected may be detected.

電圧検出部17は、電圧センサ16にて検出された電圧値(若しくは電圧相当値)の振幅を調整し、交流電圧の検出値X5を第1演算処理部12および第2演算処理部13へ出力する。検出値X5は、第1演算処理部12のA/D変換部(図示せず)と第2演算処理部13のA/D変換器132とに入力される。なお、交流電圧の検出値X5は、電圧センサ16で検出された値に準じた値である。 The voltage detection unit 17 adjusts the amplitude of the voltage value (or voltage equivalent value) detected by the voltage sensor 16, and outputs the detected AC voltage value X5 to the first arithmetic processing unit 12 and the second arithmetic processing unit 13. do. The detected value X5 is input to the A/D conversion section (not shown) of the first arithmetic processing section 12 and the A/D converter 132 of the second arithmetic processing section 13 . Note that the AC voltage detection value X5 is a value according to the value detected by the voltage sensor 16 .

図10は、第2実施形態の電力変換装置にて電力系統の瞬時電圧低下を検知したときの第2演算処理部の動作の一例を説明するための図である。
本実施形態の電力変換装置では、第2演算処理部13の過電流・瞬低検知処理部131Bは、上述の第1実施形態におけるステップS6に代えてステップS8を行い、ステップS4に代えてステップS9を行う。
FIG. 10 is a diagram for explaining an example of the operation of the second arithmetic processing unit when an instantaneous voltage drop in the power system is detected in the power converter of the second embodiment.
In the power conversion device of the present embodiment, the overcurrent/sag detection processing unit 131B of the second arithmetic processing unit 13 performs step S8 instead of step S6 in the above-described first embodiment, and performs step S8 instead of step S4. S9 is performed.

最初に、過電流・瞬低検知処理部131Bは、A/D変換器132から、電流の検出値X3と、電圧の検出値X5とを取得する。検出値X3および検出値X5を取得する周期は、A/D変換器132の変換周期に合わせることが望ましい。過電流・瞬低検知処理部131Bは、このとき取得した検出値X3および検出値X5をメモリ13Mに記録する。(ステップS1)
続いて、過電流・瞬低検知処理部131Bは、瞬時電圧低下の判定と出力停止に係る演算とを開始する。過電流・瞬低検知処理部131Bは、後述するステップS3、S9、S5とステップS8とを並列に行う。(ステップS2)
First, the overcurrent/sag detection processing unit 131B acquires the current detection value X3 and the voltage detection value X5 from the A/D converter 132 . It is desirable that the period for obtaining the detection value X3 and the detection value X5 should match the conversion period of the A/D converter 132 . The overcurrent/instantaneous voltage drop detection processing unit 131B records the detection value X3 and the detection value X5 acquired at this time in the memory 13M. (Step S1)
Subsequently, the overcurrent/instantaneous voltage drop detection processing unit 131B starts determination of an instantaneous voltage drop and calculation related to output stoppage. The overcurrent/instantaneous voltage drop detection processing unit 131B performs steps S3, S9, S5 and step S8, which will be described later, in parallel. (Step S2)

過電流・瞬低検知処理部131Bは、交流電圧を利用した演算2を行う。ここでは、過電流・瞬低検知処理部131Bは、各相における検出値X5の絶対値を演算する。続いて、過電流・瞬低検知処理部131Bは、各相における検出値X5の絶対値の総和を演算する。(ステップS8)
図11は、第2実施形態の電力変換装置にて、交流電圧の検出値と、瞬低検知処理部の演算2により得られる信号との一例を示す図である。
The overcurrent/instantaneous voltage drop detection processing unit 131B performs calculation 2 using the AC voltage. Here, the overcurrent/sag detection processing unit 131B calculates the absolute value of the detection value X5 in each phase. Subsequently, the overcurrent/instantaneous voltage drop detection processing unit 131B calculates the sum of the absolute values of the detection value X5 in each phase. (Step S8)
FIG. 11 is a diagram showing an example of the detected value of the AC voltage and the signal obtained by the calculation 2 of the momentary sag detection processing unit in the power converter of the second embodiment.

上記演算2にて得られた信号は、電力変換装置100の通常運転時には、交流端子NACの電圧の振幅のルート2倍(約1.7倍)から2倍の間で脈動する信号となる。したがって、電力系統1にて瞬時電圧低下が発生すると、演算2にて得られる信号は、通常運転時の値よりも顕著に値が低下することとなる。 The signal obtained by the above calculation 2 is a signal that pulsates between the root twice (approximately 1.7 times) and twice the amplitude of the voltage of the AC terminal NAC during normal operation of the power converter 100 . Therefore, when an instantaneous voltage drop occurs in the power system 1, the value of the signal obtained by the calculation 2 is significantly lower than the value during normal operation.

図11に示す例では、交流端子NACの電圧の振幅を1puとしたとき、演算2により得られる信号は、電力系統1にて瞬時電圧低下が発生する前には1.7puから2puの間で脈動しており、電力系統1にて瞬時電圧低下が発生した後には0puまで低下する。 In the example shown in FIG. 11, when the amplitude of the voltage at the AC terminal NAC is 1 pu, the signal obtained by the calculation 2 is between 1.7 pu and 2 pu before an instantaneous voltage drop occurs in the power system 1. It pulsates, and after an instantaneous voltage drop occurs in the power system 1, it drops to 0 pu.

次に、過電流・瞬低検知処理部131Bにおける、過電流と瞬時電圧低下の判定および出力停止の処理(ステップS3、S9、S5)について説明する。
過電流・瞬低検知処理部131Bは、上述の第1実施形態と同様に、ステップS3の処理を行う。
Next, the process (steps S3, S9, S5) of determining an overcurrent and an instantaneous voltage drop and stopping the output in the overcurrent/instantaneous voltage drop detection processing unit 131B will be described.
The overcurrent/instantaneous voltage drop detection processing unit 131B performs the processing of step S3 as in the above-described first embodiment.

ステップS3で過電流であると判定された場合には、ステップS9の処理を行う。ステップS9では、過電流・瞬低検知処理部131BステップS8にて得られた演算結果により電力系統1にて瞬時電圧低下が発生しているか否か判断する。 If it is determined in step S3 that there is an overcurrent, the process of step S9 is performed. In step S9, the overcurrent/instantaneous voltage drop detection processing unit 131B determines whether an instantaneous voltage drop has occurred in the power system 1 based on the calculation result obtained in step S8.

過電流・瞬低検知処理部131BステップS9では、上述の演算2により得られた信号の値と、予め設定した閾値とを比較する。ここで用いる閾値は、例えば、交流端子NACの交流電圧の振幅の略1.6倍とすることができる。 In step S9 of the overcurrent/instantaneous voltage drop detection processing unit 131B, the value of the signal obtained by the calculation 2 described above is compared with a preset threshold value. The threshold used here can be, for example, approximately 1.6 times the amplitude of the AC voltage at the AC terminal NAC.

過電流・瞬低検知処理部131B上記ステップS8において、演算2により得られた信号が所定の閾値(例えば1.6pu)以下であるときに電力系統1にて瞬時電圧低下が発生したと判断し、演算2により得られた信号が所定の閾値より大きければ電力系統1にて瞬時電圧低下が発生していないと判断する。(ステップS9) The overcurrent/instantaneous voltage drop detection processing unit 131B determines that an instantaneous voltage drop has occurred in the power system 1 when the signal obtained by the calculation 2 is equal to or less than a predetermined threshold value (for example, 1.6 pu) in step S8 above. , and if the signal obtained by the calculation 2 is larger than a predetermined threshold value, it is determined that an instantaneous voltage drop has not occurred in the electric power system 1 . (Step S9)

ステップS4およびステップS9にて電力系統1にて瞬時電圧低下が発生していると判断したときに、過電流・瞬低検知処理部131Bは、上述の第1実施形態のステップS5と同様に、電力変換部10の出力を停止させる。(ステップS5) When it is determined in steps S4 and S9 that an instantaneous voltage drop has occurred in the power system 1, the overcurrent/instantaneous voltage drop detection processing unit 131B performs the same steps as in step S5 of the first embodiment described above. The output of the power converter 10 is stopped. (Step S5)

第1演算処理部12は、第2演算処理部13から出力停止動作開始信号X4を受信したときに、例えば、電力変換部10から出力される交流電流の指令値をゼロとする操作量X1を出力する。また、第1演算処理部12は、各種の電流や電圧の制御に用いる積分器をリセットしてもよい。
なお、演算部131は、例えば、第2演算処理部13において出力を復帰すると判断されるまで、電力変換部10の出力を停止した状態を保持する。
When the first arithmetic processing unit 12 receives the output stop operation start signal X4 from the second arithmetic processing unit 13, for example, the operation amount X1 that sets the command value of the alternating current output from the power conversion unit 10 to zero. Output. Also, the first arithmetic processing unit 12 may reset an integrator used for controlling various currents and voltages.
Note that the calculation unit 131 maintains the state in which the output of the power conversion unit 10 is stopped until, for example, the second calculation processing unit 13 determines that the output is restored.

過電流・瞬低検知処理部131Bは、ステップS3にて過電流でない(検出値X3が下限値以上であり上限値以下である)と判断したとき、または上記ステップS9にて電力系統1にて瞬時電圧低下が発生していないと判断したとき、および、上記ステップS5、S8が終了した後、演算を終了する。(ステップS7)
過電流・瞬低検知処理部131Bは、所定の演算周期にて上記ステップS1-S9を周期的に行う。なお、過電流・瞬低検知処理部131Bにて行われる一連の処理(ステップS1-S9)の演算周期は、A/D変換器132での変換周期に依存し、例えば1μs程度である。
When the overcurrent/instantaneous voltage drop detection processing unit 131B determines that there is no overcurrent in step S3 (the detected value X3 is equal to or greater than the lower limit value and equal to or less than the upper limit value), or in step S9, the power system 1 When it is determined that an instantaneous voltage drop has not occurred and after steps S5 and S8 are finished, the calculation is finished. (Step S7)
The overcurrent/instantaneous voltage drop detection processing unit 131B periodically performs the steps S1 to S9 at a predetermined calculation cycle. The calculation cycle of the series of processes (steps S1 to S9) performed by the overcurrent/sag detection processing unit 131B depends on the conversion cycle of the A/D converter 132, and is, for example, about 1 μs.

本実施形態の電力変換装置100は、上記構成以外は上述の第1実施形態と同様である。なお、本実施形態において、電力変換部10の出力停止状態から出力を復帰するときの動作(例えば図5に示す)は、第1演算処理部12にて行われてもよく、第2演算処理部13にて行われてもよい。いずれの場合であっても上述の第1実施形態と同様の効果を得ることができる。 The power conversion device 100 of this embodiment is the same as that of the above-described first embodiment except for the above configuration. Note that in the present embodiment, the operation (for example, shown in FIG. 5) when the output of the power conversion unit 10 is restored from the output stop state may be performed by the first arithmetic processing unit 12, and the second arithmetic processing It may be performed in the unit 13. In either case, the same effects as those of the above-described first embodiment can be obtained.

本実施形態の電力変換装置100によれば、上述の第1実施形態と同様に、電力系統1にて瞬時電圧低下が発生したときに、速やかに電力変換部10の出力を停止することが可能である。また、本実施形態では、過電流・瞬低検知処理部131BにおいてステップS8とステップS9を更に行うことにより、電力系統1において瞬時電圧低下が発生したことをより素早く検知することができる。 According to the power conversion device 100 of the present embodiment, as in the first embodiment described above, when an instantaneous voltage drop occurs in the power system 1, it is possible to quickly stop the output of the power conversion unit 10. is. Further, in the present embodiment, by further performing steps S8 and S9 in the overcurrent/instantaneous voltage drop detection processing unit 131B, it is possible to more quickly detect that an instantaneous voltage drop has occurred in the electric power system 1. FIG.

また、本実施形態の電力変換装置100によれば、検出値にノイズが重畳したときに、過電流を誤検出することがなく、不要に電力変換部10の出力が停止されることを回避することができる。
すなわち、本実施形態の電力変換装置100によれば、電力系統1の瞬時電圧低下が発生したときに電力変換器の出力を一時的に停止し、瞬時電圧低下による過電流を抑制することができる。
In addition, according to the power conversion device 100 of the present embodiment, when noise is superimposed on the detection value, an overcurrent is not erroneously detected, and the output of the power conversion unit 10 is prevented from being stopped unnecessarily. be able to.
That is, according to the power converter 100 of the present embodiment, when an instantaneous voltage drop occurs in the power system 1, the output of the power converter is temporarily stopped, and overcurrent due to the instantaneous voltage drop can be suppressed. .

なお、上記第2実施形態の電力変換装置100において、ステップS8における演算2にて、交流端子NACの交流電圧の時間変化率を算出し、その絶対値を演算してもよい。この場合にも、演算2の演算結果は、電力変換装置100の通常運転時よりも、電力系統1にて瞬時電圧低下が発生したときに顕著に変化する信号となる。なお、交流端子NACの交流電圧の時間変化率を算出する前に、検出値X5に含まれる高周波のノイズを除去するためのフィルタ処理を施してもよい。 In addition, in the power conversion device 100 of the second embodiment, the time change rate of the AC voltage at the AC terminal NAC may be calculated in the calculation 2 in step S8, and the absolute value thereof may be calculated. Also in this case, the calculation result of the calculation 2 becomes a signal that changes more significantly when an instantaneous voltage drop occurs in the power system 1 than when the power conversion device 100 is in normal operation. Filtering may be performed to remove high-frequency noise included in the detection value X5 before calculating the time rate of change of the AC voltage of the AC terminal NAC.

このように上記ステップS8において、演算2にて検出値X5の時間変化率を演算した場合にも、ステップS9であらかじめ設定した閾値と比較することにより、閾値以下となったときに瞬時電圧低下があったことを検知可能となる。なお、検出値X5の時間変化率と比較する閾値は、例えば、10V/μsと設定することができる。 Thus, even when the time rate of change of the detected value X5 is calculated in the calculation 2 in the above step S8, by comparing with the preset threshold value in step S9, an instantaneous voltage drop occurs when the value becomes equal to or less than the threshold value. It becomes possible to detect that there has been. A threshold value to be compared with the rate of change over time of the detected value X5 can be set to 10 V/μs, for example.

本発明のいくつかの実施形態を説明したが、これらの実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。これら新規な実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。これら実施形態やその変形は、発明の範囲や要旨に含まれるとともに、特許請求の範囲に記載された発明とその均等の範囲に含まれる。
例えば、上述の第1実施形態の電力変換装置において、第2演算処理部13が電圧検出部17から検出値X5を受信可能なように構成され、過電流・瞬低検知処理部131Bは、電圧値の検出値X5の絶対値の総和を計算し、この絶対値の総和があらかじめ設定した閾値以下となったときに、電力系統1にて瞬時電圧低下が発生したと判断してもよい。その場合であっても、上述の第1実施形態および第2実施形態と同様の効果を得ることができる。
また、過電流・瞬低検知処理部131Bは、交流電圧の検出値X5の時間変化率を演算し、時間変化率があらかじめ設定した範囲を逸脱したときに、前記電力系統で瞬時電圧低下が発生したと判断してもよい。その場合であっても、上述の第1実施形態および第2実施形態と同様の効果を得ることができる。
While several embodiments of the invention have been described, these embodiments have been presented by way of example and are not intended to limit the scope of the invention. These novel embodiments can be implemented in various other forms, and various omissions, replacements, and modifications can be made without departing from the scope of the invention. These embodiments and modifications thereof are included in the scope and gist of the invention, and are included in the scope of the invention described in the claims and equivalents thereof.
For example, in the power converter of the first embodiment described above, the second arithmetic processing unit 13 is configured to be able to receive the detection value X5 from the voltage detection unit 17, and the overcurrent/instantaneous voltage drop detection processing unit 131B detects the voltage It may be determined that an instantaneous voltage drop has occurred in the power system 1 by calculating the sum of the absolute values of the detected value X5 and when the sum of the absolute values becomes equal to or less than a preset threshold value. Even in that case, the same effects as those of the above-described first and second embodiments can be obtained.
In addition, the overcurrent/instantaneous voltage drop detection processing unit 131B calculates the time rate of change of the detected value X5 of the AC voltage, and when the time rate of change deviates from a preset range, an instantaneous voltage drop occurs in the power system. You can judge that you did. Even in that case, the same effects as those of the above-described first and second embodiments can be obtained.

1…電力系統、10…電力変換部、11…相変換器、12…第1演算処理部、13…第2演算処理部、13M…メモリ、131…演算部、131A…ゲート信号生成部、131B…瞬低検知処理部、132…A/D変換器、14…電流センサ、15…電流検出部、16…電圧センサ、17…電圧検出部、100…電力変換装置、NAC…交流端子、NDCP…正側直流端子、NDCN…負側直流端子、A1、A2…アーム変換器。 REFERENCE SIGNS LIST 1 power system 10 power converter 11 phase converter 12 first arithmetic processor 13 second arithmetic processor 13M memory 131 calculator 131A gate signal generator 131B 132 A/D converter 14 Current sensor 15 Current detector 16 Voltage sensor 17 Voltage detector 100 Power converter NAC AC terminal NDCP Positive side DC terminal, NDCN... Negative side DC terminal, A1, A2... Arm converter.

Claims (10)

電力系統と電気的に接続する交流端子と、直流負荷と電気的に接続する正側直流端子および負側直流端子と、ゲート信号に基づいて動作するスイッチング素子を少なくとも1つ含むアーム変換器と、を備え、前記正側直流端子と前記負側直流端子との間に2つの前記アーム変換器を直列に接続し、2つの前記アーム変換器間と前記交流端子とを電気的に接続した相変換器を少なくとも1つと、を備え、交流電力と直流電力を互いに変換する電力変換部と、
前記相変換器の複数の前記スイッチング素子の動作を制御するための操作量を演算する第1演算処理部と、
前記操作量に応じた前記ゲート信号を生成し、前記電力変換部に送信するゲート信号生成部と、前記電力系統にて瞬時電圧低下が生じたことを検知する瞬低検知処理部と、を備えた第2演算処理部と、
前記交流端子もしくは前記アーム変換器に流れる電流値を取得し、第2演算処理部へ送信する電流検出部と、を備え、
前記瞬低検知処理部は、前記電流値が予め設定された範囲を逸脱したときに、前記電流値の時間変化率があらかじめ設定された範囲を逸脱したか否かに基づいて前記電力系統で瞬時電圧低下が発生したか否か判断し、前記電力系統で瞬時電圧低下が発生したと判断したときに、前記電力変換部の出力を停止する前記ゲート信号を生成し、前記電力変換部の出力を停止した旨を示す信号を前記第1演算処理部へ送信することを特徴とする電力変換装置。
an AC terminal electrically connected to a power system, a positive DC terminal and a negative DC terminal electrically connected to a DC load, and an arm converter including at least one switching element that operates based on a gate signal; wherein the two arm converters are connected in series between the positive side DC terminal and the negative side DC terminal, and the phase conversion in which the two arm converters and the AC terminal are electrically connected a power conversion unit that converts AC power and DC power to each other;
a first arithmetic processing unit that calculates an operation amount for controlling the operation of the plurality of switching elements of the phase converter;
a gate signal generation unit that generates the gate signal corresponding to the operation amount and transmits the gate signal to the power conversion unit; a second arithmetic processing unit;
a current detection unit that acquires a current value flowing through the AC terminal or the arm converter and transmits it to a second arithmetic processing unit;
When the current value deviates from a preset range, the momentary sag detection processing unit detects an instantaneous voltage drop in the electric power system based on whether the time rate of change of the current value deviates from a preset range. It is determined whether or not a voltage drop has occurred, and when it is determined that an instantaneous voltage drop has occurred in the power system, the gate signal for stopping the output of the power conversion unit is generated, and the output of the power conversion unit is reduced. A power converter, characterized in that it transmits a signal indicating that it has stopped to the first arithmetic processing unit.
前記瞬低検知処理部は初期値が所定値のカウンタを備え、前記交流端子もしくは前記アーム変換器に流れる電流の時間変化率が予め設定された範囲を逸脱したときに前記カウンタの値を加算若しくは減算し、前記カウンタの値が所定の範囲を逸脱したときに前記電力系統で瞬時電圧低下が発生したと判断することを特徴とする、請求項1に記載の電力変換装置。 The momentary sag detection processing unit has a counter whose initial value is a predetermined value, and adds or adds the value of the counter when the time rate of change of the current flowing through the AC terminal or the arm converter deviates from a preset range. 2. The power converter according to claim 1, wherein said power system judges that an instantaneous voltage drop has occurred in said electric power system when the value of said counter deviates from a predetermined range. 電力系統と電気的に接続する交流端子と、直流負荷と電気的に接続する正側直流端子および負側直流端子と、ゲート信号に基づいて動作するスイッチング素子を少なくとも1つ含むアーム変換器と、を備え、前記正側直流端子と前記負側直流端子との間に2つの前記アーム変換器を直列に接続し、2つの前記アーム変換器間と前記交流端子とを電気的に接続した相変換器を少なくとも1つと、を備え、交流電力と直流電力を互いに変換する電力変換部と、
前記相変換器の複数の前記スイッチング素子の動作を制御するための操作量を演算する第1演算処理部と、
前記操作量に応じた前記ゲート信号を生成し、前記電力変換部に送信するゲート信号生成部と、前記電力系統にて瞬時電圧低下が生じたことを検知する瞬低検知処理部と、を備えた第2演算処理部と、
前記交流端子もしくは前記アーム変換器に流れる電流値を取得し前記第2演算処理部へ送信する電流検出部と、を備え
前記交流端子における対地間電圧、若しくは、複数の前記相変換器の前記交流端子と接続された交流ライン間に印加される電圧の値を取得し前記第2演算処理部に送信する電圧検出部を有し、
前記瞬低検知処理部は、前記電流値が予め設定された範囲を逸脱したときに、前記電圧値の絶対値の総和を計算し、前記絶対値の総和があらかじめ設定した閾値以下となったときに、前記電力系統にて瞬時電圧低下が発生したと判断することを特徴とする電力変換装置。
an AC terminal electrically connected to a power system, a positive DC terminal and a negative DC terminal electrically connected to a DC load, and an arm converter including at least one switching element that operates based on a gate signal; wherein the two arm converters are connected in series between the positive side DC terminal and the negative side DC terminal, and the phase conversion in which the two arm converters and the AC terminal are electrically connected a power conversion unit that converts AC power and DC power to each other;
a first arithmetic processing unit that calculates an operation amount for controlling the operation of the plurality of switching elements of the phase converter;
a gate signal generation unit that generates the gate signal corresponding to the operation amount and transmits the gate signal to the power conversion unit; a second arithmetic processing unit;
a current detection unit that acquires a current value flowing through the AC terminal or the arm converter and transmits the value to the second arithmetic processing unit; a voltage detection unit that acquires the value of the voltage applied between the AC lines connected to the terminals and transmits the value to the second arithmetic processing unit;
The momentary sag detection processing unit calculates the sum of the absolute values of the voltage values when the current value deviates from a preset range, and when the sum of the absolute values becomes equal to or less than a preset threshold value. (2) a power conversion apparatus, wherein it is determined that an instantaneous voltage drop has occurred in the electric power system;
前記交流端子における対地間電圧、若しくは、複数の前記相変換器の前記交流端子と接続された交流ライン間に印加される電圧の値を取得し前記第2演算処理部に送信する電圧検出部を有し、
前記瞬低検知処理部は、前記電圧値の絶対値の総和を計算し、前記絶対値の総和があらかじめ設定した閾値以下となったときに、前記電力系統にて瞬時電圧低下が発生したと判断することを特徴とする、請求項1または請求項2記載の電力変換装置。
a voltage detection unit that acquires the value of the voltage to ground at the AC terminal or the value of the voltage applied between the AC lines connected to the AC terminals of the plurality of phase converters and transmits the value to the second arithmetic processing unit; have
The instantaneous voltage drop detection processing unit calculates the sum of the absolute values of the voltage values, and determines that an instantaneous voltage drop has occurred in the power system when the sum of the absolute values becomes equal to or less than a preset threshold. 3. The power converter according to claim 1 or 2, characterized in that:
電力系統と電気的に接続する交流端子と、直流負荷と電気的に接続する正側直流端子および負側直流端子と、ゲート信号に基づいて動作するスイッチング素子を少なくとも1つ含むアーム変換器と、を備え、前記正側直流端子と前記負側直流端子との間に2つの前記アーム変換器を直列に接続し、2つの前記アーム変換器間と前記交流端子とを電気的に接続した相変換器を少なくとも1つと、を備え、交流電力と直流電力を互いに変換する電力変換部と、
前記相変換器の複数の前記スイッチング素子の動作を制御するための操作量を演算する第1演算処理部と、
前記操作量に応じた前記ゲート信号を生成し、前記電力変換部に送信するゲート信号生成部と、前記電力系統にて瞬時電圧低下が生じたことを検知する瞬低検知処理部と、を備えた第2演算処理部と、
前記交流端子もしくは前記アーム変換器に流れる電流値を取得し前記第2演算処理部へ送信する電流検出部と、を備え
前記交流端子における対地間電圧、若しくは、複数の前記相変換器の前記交流端子と接続された交流ライン間に印加される電圧の値を取得し前記第2演算処理部に送信する電圧検出部と、を有し、
前記瞬低検知処理部は、前記電流値が予め設定された範囲を逸脱したときに、前記電圧値の時間変化率を演算し、前記電圧値の時間変化率があらかじめ設定した範囲を逸脱したときに、前記電力系統で瞬時電圧低下が発生したと判断する電力変換装置。
an AC terminal electrically connected to a power system, a positive DC terminal and a negative DC terminal electrically connected to a DC load, and an arm converter including at least one switching element that operates based on a gate signal; wherein the two arm converters are connected in series between the positive side DC terminal and the negative side DC terminal, and the phase conversion in which the two arm converters and the AC terminal are electrically connected a power conversion unit that converts AC power and DC power to each other;
a first arithmetic processing unit that calculates manipulated variables for controlling operations of the plurality of switching elements of the phase converter;
a gate signal generation unit that generates the gate signal corresponding to the operation amount and transmits the gate signal to the power conversion unit; a second arithmetic processing unit;
a current detection unit that acquires a current value flowing through the AC terminal or the arm converter and transmits the value to the second arithmetic processing unit; a voltage detection unit that acquires the value of the voltage applied between the AC lines connected to the terminals and transmits the value to the second arithmetic processing unit;
The momentary sag detection processing unit calculates a time rate of change of the voltage value when the current value deviates from a preset range, and calculates a time rate of change of the voltage value when the time rate of change of the voltage value deviates from the preset range. and a power converter that determines that an instantaneous voltage drop has occurred in the power system.
前記交流端子における対地間電圧、若しくは、複数の前記相変換器の前記交流端子と接続された交流ライン間に印加される電圧値を取得し前記第2演算処理部に送信する電圧検出部を有し、
前記瞬低検知処理部は、前記電圧値の時間変化率を演算し、前記電圧値の時間変化率があらかじめ設定した範囲を逸脱したときに、前記電力系統で瞬時電圧低下が発生したと判断することを特徴とする、請求項1または請求項2記載の電力変換装置。
a voltage detection unit that acquires a voltage to ground at the AC terminal or a voltage value applied between AC lines connected to the AC terminals of the plurality of phase converters and transmits the voltage to the second processing unit; death,
The voltage sag detection processing unit calculates a time rate of change of the voltage value, and determines that an instantaneous voltage sag has occurred in the electric power system when the time rate of change of the voltage value deviates from a preset range. 3. The power converter according to claim 1 or 2, characterized by:
前記交流端子における対地間電圧、若しくは、複数の前記相変換器の前記交流端子と接続された交流ライン間に印加される電圧値を取得し前記第1演算処理部に送信する電圧検出部、を有し、
前記第1演算処理部は、前記電力変換部の出力を停止した旨を示す信号を受信してから所定時間経過後の前記電力系統の残電圧が所定の閾値以上であるとき、前記電力変換部の出力を前記電力系統の残電圧に応じた値に復帰させることを特徴とする、請求項1乃至請求項6のいずれか1項記載の電力変換装置。
a voltage detection unit that acquires the voltage to ground at the AC terminal or the voltage value applied between the AC lines connected to the AC terminals of the plurality of phase converters and transmits the voltage to the first arithmetic processing unit; have
When the residual voltage of the electric power system after a predetermined time has passed since receiving a signal indicating that the output of the power conversion unit has been stopped is equal to or higher than a predetermined threshold, the first arithmetic processing unit detects that the power conversion unit 7. The power converter according to any one of claims 1 to 6, wherein the output of is restored to a value corresponding to the residual voltage of said power system.
前記交流端子における対地間電圧、若しくは、複数の前記相変換器の前記交流端子と接続された交流ライン間に印加される電圧値を取得し前記第1演算処理部に送信する電圧検出部、を有し、
前記第1演算処理部は、前記電力変換部の出力を停止した旨を示す信号を受信してから所定時間経過後の前記電力系統の残電圧が所定の閾値未満であるとき、前記電力系統の電圧が復帰した後に、前記電力変換部の出力を瞬時電圧低下発生前の出力まで復帰させることを特徴とする、請求項1乃至請求項7のいずれか1項記載の電力変換装置。
a voltage detection unit that acquires the voltage to ground at the AC terminal or the voltage value applied between the AC lines connected to the AC terminals of the plurality of phase converters and transmits the voltage to the first arithmetic processing unit; have
When the residual voltage of the electric power system after a lapse of a predetermined time from receiving the signal indicating that the output of the power conversion unit is stopped is less than a predetermined threshold, the first arithmetic processing unit 8. The power converter according to any one of claims 1 to 7, wherein after the voltage is restored, the output of the power converter is restored to the output before the momentary voltage drop occurred.
前記第2演算処理部の演算周期は、前記第1演算処理部よりも短い周期で演算することが可能であることを特徴とする、請求項1乃至請求項8のいずれか1項記載の電力変換装置。 The electric power according to any one of claims 1 to 8, characterized in that the calculation cycle of the second calculation processing unit is shorter than that of the first calculation processing unit. conversion device. 前記第2演算処理部は、プログラマブルロジックデバイスを備えることを特徴とする、請求項9記載の電力変換装置。 10. The power converter according to claim 9, wherein said second arithmetic processing unit comprises a programmable logic device.
JP2018245629A 2018-12-27 2018-12-27 power converter Active JP7159041B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018245629A JP7159041B2 (en) 2018-12-27 2018-12-27 power converter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018245629A JP7159041B2 (en) 2018-12-27 2018-12-27 power converter

Publications (2)

Publication Number Publication Date
JP2020108274A JP2020108274A (en) 2020-07-09
JP7159041B2 true JP7159041B2 (en) 2022-10-24

Family

ID=71450992

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018245629A Active JP7159041B2 (en) 2018-12-27 2018-12-27 power converter

Country Status (1)

Country Link
JP (1) JP7159041B2 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015171253A (en) 2014-03-07 2015-09-28 オムロン株式会社 Controller, power converter, power supply system, and program
JP2016119772A (en) 2014-12-19 2016-06-30 三菱電機株式会社 System interconnection inverter

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3267130B2 (en) * 1995-12-11 2002-03-18 富士電機株式会社 PWM control self-excited rectifier

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015171253A (en) 2014-03-07 2015-09-28 オムロン株式会社 Controller, power converter, power supply system, and program
JP2016119772A (en) 2014-12-19 2016-06-30 三菱電機株式会社 System interconnection inverter

Also Published As

Publication number Publication date
JP2020108274A (en) 2020-07-09

Similar Documents

Publication Publication Date Title
CN108702089B (en) Converter device
KR101202925B1 (en) An apparatus for controlling inrush currents and method thereof
US10644614B2 (en) Conversion device having a control unit for detecting arm short-circuit
US11424694B2 (en) Method for controlling shutdown wave blocking of multilevel inverter circuit and application thereof
US9000734B2 (en) Method and arrangement for operating a wind turbine converter
JP2011092003A (en) Method for protecting matrix converter and protecting apparatus therefor
US20200203943A1 (en) Intelligent tri-mode solid state circuit breakers
CN106160624B (en) System and method for multi-phase buffer circuit
CN107370389B (en) For overcoming the power conversion system and its operating method of abnormal grid condition
US20190190403A1 (en) System-connected inverter device and method for operating same
WO2019133939A1 (en) Semiconductor topologies and devices for soft starting and active fault protection of power converters
US11201566B2 (en) Switch protection
US10312795B2 (en) Inverter device capable of suppressing overcurrent without increasing a load and operation control method
WO2018193527A1 (en) Overcurrent detection circuit and power conversion device
EP3958452B1 (en) Neutral-point-clamped three-level circuit and control method
JP2019022313A (en) Power conversion device
JP7159041B2 (en) power converter
JP6385269B2 (en) Grid-connected inverter device
JP6455719B2 (en) Uninterruptible power supply system
US20220385204A1 (en) Power Conversion Device and Press Apparatus
US11394200B2 (en) Device and method for coupling two DC grids
JP4217897B2 (en) PWM cycloconverter and input voltage detection method thereof
US11070142B2 (en) Power conversion device with control of switching element based on current detection
CN114914887B (en) Three-phase overcurrent detection protection system and overcurrent protection equipment applied to APF
JP2009207294A (en) Overvoltage protection device for voltage drive type semiconductor element

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20211011

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220816

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220913

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20221012

R150 Certificate of patent or registration of utility model

Ref document number: 7159041

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150