JP7120971B2 - Switch failure detection device - Google Patents

Switch failure detection device Download PDF

Info

Publication number
JP7120971B2
JP7120971B2 JP2019133780A JP2019133780A JP7120971B2 JP 7120971 B2 JP7120971 B2 JP 7120971B2 JP 2019133780 A JP2019133780 A JP 2019133780A JP 2019133780 A JP2019133780 A JP 2019133780A JP 7120971 B2 JP7120971 B2 JP 7120971B2
Authority
JP
Japan
Prior art keywords
switch
switches
current
microcomputer
failure detection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019133780A
Other languages
Japanese (ja)
Other versions
JP2021018138A (en
Inventor
淳 ▲高▼橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yazaki Corp
Original Assignee
Yazaki Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yazaki Corp filed Critical Yazaki Corp
Priority to JP2019133780A priority Critical patent/JP7120971B2/en
Priority to EP20185672.1A priority patent/EP3767316B1/en
Priority to US16/929,391 priority patent/US11300618B2/en
Priority to CN202010693374.1A priority patent/CN112240975B/en
Publication of JP2021018138A publication Critical patent/JP2021018138A/en
Application granted granted Critical
Publication of JP7120971B2 publication Critical patent/JP7120971B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Description

本発明のスイッチの故障検出装置に関する。 The present invention relates to a switch failure detection device.

上述したスイッチの故障検出装置としては、例えば、特許文献1に記載されたものが知られている。特許文献1のスイッチの故障検出装置は、電流経路を複数に分岐する複数の分岐経路が設けられ、複数の分岐経路に各々スイッチが設けられている。そして、これら複数のスイッチを制御するマイクロコンピュータ(マイコン)が、複数のスイッチをオン制御した後、順番に一定期間だけオフ制御し、このときの分岐経路に流れる電流に基づいて複数のスイッチの故障を検出している。 As a switch failure detection device described above, for example, one described in Patent Document 1 is known. The switch failure detection device of Patent Document 1 is provided with a plurality of branch paths that branch a current path into a plurality of branches, and a switch is provided in each of the plurality of branch paths. A microcomputer that controls these switches turns on the switches and then turns them off for a certain period of time. is detected.

特開2019-66364号公報JP 2019-66364 A

上述した従来技術には、電流経路を2つの分岐経路に分岐する例が記載されている。この例によれば、電流経路に大電流が流れる場合、2つの分岐経路に交互に大電流が流れるため、ノイズが発生する。また、大電流通電中にオンしているスイッチの数が2つから1つに半減するため、スイッチに2倍の電流が集中することとなり、スイッチへの負担が懸念される。そこで、ノイズの低減及びスイッチの負担低減を図るために、分岐経路の数を増やすことが考えられる。しかしながら、分岐経路の数を増やすと電流経路に流れる電流が少ないときに1分岐経路の電流が小さくなってしまう。その場合は、電流検出精度が悪くなり、精度よくスイッチの故障を検出することができない、という問題が生じる。 The above-mentioned prior art describes an example of branching a current path into two branch paths. According to this example, when a large current flows through the current path, the large currents alternately flow through the two branch paths, causing noise. In addition, since the number of switches that are turned on during the passage of a large current is halved from two to one, twice as much current is concentrated on the switches, and there is concern about the load on the switches. Therefore, it is conceivable to increase the number of branch paths in order to reduce noise and reduce the load on the switches. However, when the number of branch paths is increased, the current in one branch path becomes small when the current flowing in the current path is small. In that case, the current detection accuracy deteriorates, and a problem arises that the failure of the switch cannot be detected with high accuracy.

本発明は、上述した事情に鑑みてなされたものであり、その目的は、大電流時にノイズ低減及びスイッチの負担低減を図ると共に、小電流時でも精度よくスイッチの故障を検出することができるスイッチの故障検出装置を提供することにある。 SUMMARY OF THE INVENTION The present invention has been made in view of the above-described circumstances, and its object is to reduce noise and reduce the load on the switch when a large current flows, and to detect a failure of the switch with high accuracy even when a small current flows. The purpose of the present invention is to provide a fault detection device for

前述した目的を達成するために、本発明に係るスイッチの故障検出装置は、下記[1]~[3]を特徴としている。
[1]
電流経路を3つ以上に分岐する複数の分岐経路上に各々設けられた複数のスイッチと、
前記複数の分岐経路に各々流れる電流を検出する電流検出部と、
前記複数のスイッチの1つをオフ制御し、残りをオン制御すると共に、前記オフ制御する前記複数のスイッチの1つを順次切り替える第1スイッチ制御部と、
前記複数のスイッチの1つをオン制御し、残りをオフ制御すると共に、前記オン制御する前記複数のスイッチの1つを順次切り替える第2スイッチ制御部と、
前記第1、第2スイッチ制御部による故障検出対象となる前記スイッチのオフ制御中及びオン制御中の各々において、前記故障検出対象となる前記スイッチが設けられた前記分岐経路上の前記電流検出部により検出される前記電流に基づいて前記故障検出対象となる前記スイッチのオン故障を検出する故障検出部と、
前記複数のスイッチの全てをオン制御し、全ての前記スイッチが通電されていることが判定されると全ての前記電流検出部により検出された前記電流値を合計して前記電流経路に流れる電流を求め、前記求めた前記電流経路に流れる電流が所定の電流値より大きいときは前記第1スイッチ制御部による制御を実行させ、前記電流経路に流れる電流が前記所定の電流値より小さいときは前記第2スイッチ制御部による制御を実行させる制御部と、を備えた、
スイッチの故障検出装置であること。
[2]
[1]に記載のスイッチの故障検出装置であって、
前記第2スイッチ制御部は、前記オン制御するスイッチを切り替える際に、切り替え前にオン制御している前記スイッチをオフ制御するタイミングと同時に、次の前記スイッチをオン制御する、
スイッチの故障検出装置であること。
[3]
[1]に記載のスイッチの故障検出装置であって、
前記第2スイッチ制御部は、前記オン制御するスイッチを切り替える際に、切り替え前にオン制御している前記スイッチをオフ制御するよりも前に、次の前記スイッチをオン制御する、
スイッチの故障検出装置であること。
In order to achieve the above object, a switch failure detection device according to the present invention is characterized by the following [1] to [3].
[1]
a plurality of switches each provided on a plurality of branch paths that branch the current path into three or more;
a current detection unit that detects a current flowing through each of the plurality of branch paths;
a first switch control unit that turns off one of the plurality of switches, turns on the rest of the plurality of switches, and sequentially switches one of the plurality of switches to be turned off;
a second switch control unit that turns on one of the plurality of switches, turns off the rest, and sequentially switches one of the plurality of switches to be turned on;
The current detection unit on the branch path provided with the switch subject to failure detection during each of OFF control and ON control of the switch subject to failure detection by the first and second switch control units. a failure detection unit that detects an ON failure of the switch to be the failure detection target based on the current detected by
all of the plurality of switches are controlled to be ON, and when it is determined that all of the switches are energized, the current values detected by all the current detection units are summed to determine the current flowing through the current path; When the obtained current flowing through the current path is larger than a predetermined current value, control by the first switch control unit is executed, and when the current flowing through the current path is smaller than the predetermined current value, the first switch control unit A control unit that executes control by the 2-switch control unit,
It must be a switch failure detection device.
[2]
The switch failure detection device according to [1],
When switching the switch to be on-controlled, the second switch control unit turns on the next switch at the same time as the timing of off-controlling the switch that is on-controlled before switching.
It must be a switch failure detection device.
[3]
The switch failure detection device according to [1],
When switching the switch to be on-controlled, the second switch control unit on-controls the next switch before off-controlling the switch that is on-controlled before switching.
It must be a switch failure detection device.

上記[1]の構成のスイッチの故障検出装置によれば、電流経路に流れる電流が大きいときは第1スイッチ制御部による制御を実行する。第1スイッチ制御部は、複数のスイッチのうち1つをオフ制御して、残りをオン制御し、オフ制御するスイッチを順次切り替える制御であり、大電流時にスイッチのオフ制御に応じた電流変動を低減して、ノイズの低減及びスイッチの負担低減を図ることができる。また、電流経路に流れる電流が小さいときは第2スイッチ制御部による制御を実行する。第2スイッチ制御部は、複数のスイッチのうち1つをオン制御して、残りをオフ制御し、オン制御するスイッチを順次切り替える制御であり、小電流時にスイッチのオフに応じた電流変動を大きくして、スイッチの故障検出精度を向上させることができる。 According to the switch failure detection device having the configuration [1] above, when the current flowing through the current path is large, the control by the first switch control section is executed. The first switch control unit turns off one of the plurality of switches, turns on the rest of the switches, and sequentially switches the switches to be turned off. can be reduced to reduce noise and reduce the load on the switch. Further, when the current flowing through the current path is small, the control by the second switch control section is executed. The second switch control unit turns on one of the plurality of switches, turns off the rest, and sequentially switches the switches to be turned on. As a result, the failure detection accuracy of the switch can be improved.

上記[2]の構成のスイッチの故障検出装置によれば、第2スイッチ制御部は、オン制御するスイッチを切り替える際に、切り替え前にオン制御しているスイッチをオフ制御するタイミングと同時に、次のスイッチをオン制御する。これにより、スイッチの故障検出を迅速に行うことができる。 According to the switch failure detection device having the configuration [2] above, when switching the switch to be on-controlled, the second switch control unit performs off-control timing for the switch that is on-controlled before the switching, at the same time as the following: to turn on the switch. As a result, failure detection of the switch can be performed quickly.

上記[3]の構成のスイッチの故障検出装置によれば、第2スイッチ制御部は、オン制御するスイッチを切り替える際に、切り替え前にオン制御しているスイッチをオフ制御するよりも前に、次のスイッチをオン制御する。これにより、安定して電流を供給することができる。 According to the switch failure detection device having the configuration [3] above, when switching the switch to be on-controlled, the second switch control unit, prior to off-controlling the switch that is on-controlled before switching, Turns on the following switches. Thereby, current can be stably supplied.

本発明によれば、大電流時にノイズ低減及びスイッチの負担低減を図ると共に、小電流時でも精度よくスイッチの故障を検出することができるスイッチの故障検出装置を提供することができる。 According to the present invention, it is possible to provide a switch failure detection device capable of reducing noise and reducing the load on a switch when a large current flows, and capable of accurately detecting a switch failure even when a small current flows.

以上、本発明について簡潔に説明した。更に、以下に説明される発明を実施するための形態(以下、「実施形態」という。)を添付の図面を参照して通読することにより、本発明の詳細は更に明確化されるであろう。 The present invention has been briefly described above. Furthermore, the details of the present invention will be further clarified by reading the following detailed description of the invention (hereinafter referred to as "embodiment") with reference to the accompanying drawings. .

図1は、本発明のスイッチの故障検出装置を組み込んだ車両用電源供給装置の一実施形態を示す回路図である。FIG. 1 is a circuit diagram showing an embodiment of a vehicle power supply device incorporating a switch failure detection device according to the present invention. 図2は、図1に示す電流検出部の一例を示す回路図である。FIG. 2 is a circuit diagram showing an example of a current detector shown in FIG. 1; 図3(A)は、大電流が流れている場合のスイッチQ1~Q6のオンオフ制御のタイムチャートであり、図3(B)は、小電流が流れている場合のスイッチQ1~Q6のオンオフ制御のタイムチャートである。FIG. 3A is a time chart of on/off control of the switches Q1 to Q6 when a large current is flowing, and FIG. 3B is a time chart of on/off control of the switches Q1 to Q6 when a small current is flowing. is a time chart. 図4は、図1に示すマイコンの処理手順を示すフローチャートである。FIG. 4 is a flow chart showing the processing procedure of the microcomputer shown in FIG. 図5は、図1に示すマイコンの始動前点検処理手順を示すフローチャートである。FIG. 5 is a flow chart showing a pre-start inspection processing procedure of the microcomputer shown in FIG. 図6は、図1に示すマイコンの大電流用の故障診断処理手順を示すフローチャートである。FIG. 6 is a flow chart showing a fault diagnosis processing procedure for large current of the microcomputer shown in FIG. 図7は、図1に示すマイコンの小電流用の故障診断処理手順を示すフローチャートである。FIG. 7 is a flow chart showing a fault diagnosis processing procedure for a small current of the microcomputer shown in FIG. 図8は、他の実施形態における小電流が流れている場合のスイッチQ1~Q6のオンオフ制御のタイムチャートである。FIG. 8 is a time chart of on/off control of the switches Q1 to Q6 when a small current is flowing in another embodiment.

本発明に関する具体的な実施形態について、各図を参照しながら以下に説明する。 Specific embodiments relating to the present invention will be described below with reference to each drawing.

図1は、本発明のスイッチの故障検出装置を組み込んだ車両用電源供給装置1の一実施形態を示す回路図である。図1に示す車両用電源供給装置1は、車両に搭載されたメインバッテリ11と、サブバッテリ12と、を備えている。 FIG. 1 is a circuit diagram showing an embodiment of a vehicle power supply device 1 incorporating a switch failure detection device of the present invention. A vehicle power supply device 1 shown in FIG. 1 includes a main battery 11 and a sub-battery 12 mounted on a vehicle.

メインバッテリ11は、例えば、鉛バッテリなどの安価なバッテリから構成され、スタータST、オルタネータALTや負荷Lo1に接続されている。サブバッテリ12は、例えば、リチウムイオン、ニッケル水素バッテリなどの高性能のバッテリから構成され、負荷Lo2に接続されている。 The main battery 11 is composed of, for example, an inexpensive battery such as a lead battery, and is connected to the starter ST, alternator ALT, and load Lo1. The sub-battery 12 is composed of, for example, a high-performance battery such as a lithium-ion or nickel-metal hydride battery, and is connected to the load Lo2.

上記メインバッテリ11及びサブバッテリ12間の電流経路L0は、6つに分岐され、6つの分岐経路L1~L6が設けられている。この分岐経路L1~L6には、切替モジュール13(スイッチの故障検出装置)が設けられている。切替モジュール13は、6つの分岐経路L1~L6上にそれぞれ設けられた複数のスイッチQ1~Q6と、複数の分岐経路L1~L6に各々流れる電流I1~I6に応じた電流検出信号SG1~SG6を出力する電流検出部14と、マイクロコンピュータ(以下、マイコン)15と、を備えている。マイコン15は、第1スイッチ制御部、第2スイッチ制御部、故障検出部、制御部として機能する。 A current path L0 between the main battery 11 and the sub-battery 12 is branched into six, and six branch paths L1 to L6 are provided. Switching modules 13 (switch failure detection devices) are provided on the branch paths L1 to L6. The switching module 13 outputs current detection signals SG1 to SG6 according to the currents I1 to I6 respectively flowing through the plurality of switches Q1 to Q6 respectively provided on the six branch paths L1 to L6 and the plurality of branch paths L1 to L6. A current detection unit 14 for output and a microcomputer (hereinafter referred to as a microcomputer) 15 are provided. The microcomputer 15 functions as a first switch control section, a second switch control section, a failure detection section, and a control section.

スイッチQ1~Q6は各々、電解効果トランジスタから構成されている。複数の電流検出部14は各々、図2に示すように、シャント抵抗14Aと、シャント抵抗14Aの両端電圧を増幅する差動増幅器14Bと、を備えている。シャント抵抗14Aは、図1に示すように、分岐経路L1~L6上にそれぞれ設けられている。分岐経路L1~L6上に各々設けられたシャント抵抗14Aは、スイッチQ1~Q6と直列接続されている。差動増幅器14Bは、シャント抵抗14Aの両端がそれぞれ入力され、シャント抵抗14Aの両端電圧を増幅して、分岐経路L1~L6に流れる電流I1~I6に応じた電流検出信号SG1~SG6としてマイコン15に供給する。 Each of the switches Q1-Q6 consists of a field effect transistor. Each of the plurality of current detection units 14 includes a shunt resistor 14A and a differential amplifier 14B that amplifies the voltage across the shunt resistor 14A, as shown in FIG. The shunt resistors 14A are provided on the branch paths L1 to L6, respectively, as shown in FIG. The shunt resistors 14A provided on the branch paths L1-L6 are connected in series with the switches Q1-Q6. The differential amplifier 14B receives both ends of the shunt resistor 14A, amplifies the voltage across the shunt resistor 14A, and outputs current detection signals SG1 to SG6 corresponding to the currents I1 to I6 flowing through the branch paths L1 to L6 as current detection signals SG1 to SG6 to the microcomputer 15. supply to

マイコン15は、車両用電源供給装置1全体の制御を司り、CPU、ROM、RAMなどから構成される周知のマイクロコンピュータである。マイコン15は、スイッチQ1~Q6のゲートに接続され、ゲート信号を供給してスイッチQ1~Q6のオンオフを制御する。また、マイコン15は、後述する電流検出信号SG1~SG6の初期値SG1~SG6を記憶するメモリ15Aを有している。 The microcomputer 15 is a well-known microcomputer that controls the vehicle power supply device 1 as a whole and is composed of a CPU, a ROM, a RAM, and the like. The microcomputer 15 is connected to the gates of the switches Q1-Q6 and supplies gate signals to control the on/off of the switches Q1-Q6. The microcomputer 15 also has a memory 15A for storing initial values SG1 0 to SG6 0 of current detection signals SG1 to SG6, which will be described later.

マイコン15は、例えば、サブバッテリ12を回生充電させたい場合など、メインバッテリ11及びサブバッテリ12を接続する必要があるときに、スイッチQ1~Q6の全部をオン制御する。マイコン15は、スイッチQ1~Q6をオン制御すると、スイッチQ1~Q6の故障を検出する故障診断を行う。 The microcomputer 15 turns on all of the switches Q1 to Q6 when the main battery 11 and the sub-battery 12 need to be connected, for example, when the sub-battery 12 is to be regeneratively charged. When the microcomputer 15 turns on the switches Q1 to Q6, the microcomputer 15 performs failure diagnosis to detect failures of the switches Q1 to Q6.

次に、スイッチQ1~Q6の故障検出原理について説明する。まず、スイッチQ1~Q6をオンすると、スイッチQ1~Q6を通って分岐経路L1~L6に電流I1~I6が流れる。マイコン15が、スイッチQ1~Q6をオフ制御し、正常にスイッチQ1~Q6がオフすると、分岐経路L1~L6に流れる電流I1~I6が遮断され0Aとなる。これに対して、スイッチQ1~Q6に固着故障が発生していた場合、マイコン15が、スイッチQ1~Q6をオフ制御しても、スイッチQ1~Q6がオフできずに、分岐経路L1~L6には同じ電流値の電流I1~I6が流れ続ける。本実施形態のマイコン15は、スイッチQ1~Q6を順次オフしたときに電流I1~I6に変動があるか否かを判定して、その分岐経路L1~L6に設けたスイッチQ1~Q6の故障を検出する。 Next, the principle of failure detection of the switches Q1-Q6 will be described. First, when the switches Q1-Q6 are turned on, the currents I1-I6 flow through the switches Q1-Q6 to the branch paths L1-L6. The microcomputer 15 turns off the switches Q1 to Q6, and when the switches Q1 to Q6 are normally turned off, the currents I1 to I6 flowing through the branch paths L1 to L6 are interrupted and become 0A. On the other hand, if a sticking failure occurs in the switches Q1 to Q6, even if the microcomputer 15 turns off the switches Q1 to Q6, the switches Q1 to Q6 cannot be turned off, and the branch paths L1 to L6 are switched. , currents I1 to I6 of the same current value continue to flow. The microcomputer 15 of this embodiment determines whether or not there is a change in the currents I1 to I6 when the switches Q1 to Q6 are sequentially turned off, and detects failures of the switches Q1 to Q6 provided in the branch paths L1 to L6. To detect.

次に、マイコン15が実行する故障診断時におけるスイッチQ1~Q6のオンオフ制御について説明する。本実施形態では、マイコン15は、電流経路Loに流れる電流I0が大電流の場合と、小電流の場合と、でスイッチQ1~Q6のオンオフ制御を切り替える。 Next, on/off control of the switches Q1 to Q6 at the time of failure diagnosis executed by the microcomputer 15 will be described. In this embodiment, the microcomputer 15 switches ON/OFF control of the switches Q1 to Q6 depending on whether the current I0 flowing through the current path Lo is large or small.

まず、電流I0が大電流の場合のオンオフ制御について説明する。この場合、マイコン15は、図3(A)に示すように、メインバッテリ11及びサブバッテリ12を接続する必要があると判断すると、複数のスイッチQ1~Q6を全てオン制御する。次に、マイコン15は、複数のスイッチQ1~Q6の全てをオン制御した状態から複数のスイッチQ1~Q6を一つずつ順番に第1所定時間T1だけオフ制御する。即ち、マイコン15は、複数のスイッチQ1~Q6のうち1つをオフ制御して、残りの5つをオン制御すると共に、オフ制御する複数のスイッチQ1~Q6の1つを順次切り替える。よって、電流経路L0に流れる電流I0は、6つの分岐経路L1~L6のうち5つに分岐されて流れる。 First, on/off control when the current I0 is a large current will be described. In this case, when the microcomputer 15 determines that it is necessary to connect the main battery 11 and the sub-battery 12 as shown in FIG. 3A, it turns on all of the switches Q1 to Q6. Next, the microcomputer 15 sequentially turns off the plurality of switches Q1 to Q6 one by one from the state in which all of the plurality of switches Q1 to Q6 are turned on for the first predetermined time T1. That is, the microcomputer 15 turns off one of the plurality of switches Q1 to Q6, turns on the remaining five switches, and sequentially switches one of the plurality of switches Q1 to Q6 to be turned off. Therefore, the current I0 flowing through the current path L0 is branched into five of the six branch paths L1 to L6.

これにより、大電流時は、スイッチQ1~Q6をオンオフしたときの電流変動を、電流I0×1/5~0Aの範囲に低減することができる。本実施形態の上記電流変動は、2つの分岐経路L1、L2で電流経路L0を分岐した場合の電流変動に比べて約1/3に抑えることができる。これにより、ノイズの低減及びスイッチQ1~Q6の負担低減を図ることができる。 As a result, when the current is large, the current fluctuation when the switches Q1 to Q6 are turned on and off can be reduced to the range of the current I0×1/5 to 0A. The current fluctuation in the present embodiment can be suppressed to about one-third of the current fluctuation when the current path L0 is branched into the two branch paths L1 and L2. As a result, noise can be reduced and the load on the switches Q1 to Q6 can be reduced.

また、本実施形態では、マイコン15は、オフ制御するスイッチQ1~Q6を切り替える際に、切り替え前にオフ制御しているスイッチQ1~Q6をオン制御した後に、次のスイッチをオフ制御する。即ち、前の順番のスイッチQ1~Q6をオン制御してから次の順番のスイッチQ1~Q6をオフ制御するまでの間に全てのスイッチQ1~Q6がオンする期間が設けられる。 Further, in the present embodiment, when switching the switches Q1 to Q6 to be off-controlled, the microcomputer 15 turns on the switches Q1 to Q6 that are off-controlled before switching, and then off-controls the next switch. In other words, there is a period during which all the switches Q1 to Q6 are turned on between when the switches Q1 to Q6 in the previous order are controlled to be ON and before the switches Q1 to Q6 in the next order are controlled to be OFF.

次に、電流I0が小電流の場合のオンオフ制御について説明する。この場合、マイコン15は、図3(B)に示すように、メインバッテリ11及びサブバッテリ12を接続する必要があると判断すると、複数のスイッチQ1~Q6を全てオン制御する。次に、マイコン15は、スイッチQ1を第2所定時間T2だけオン制御して、残りのスイッチQ2~Q6をオフ制御する。その後、マイコン15は、スイッチQ2~Q6を一つずつ順番に第2所定時間T2だけオフ制御する。即ち、マイコン15は、複数のスイッチQ1~Q6のうち1つをオン制御して、残りの5つをオフ制御すると共に、オン制御するスイッチQ1~Q6の1つを順次切り替える。よって、電流経路Loに流れる電流I0は、6つの分岐経路L1~L6のうち1つのみに流れる。 Next, on/off control when the current I0 is small will be described. In this case, when the microcomputer 15 determines that it is necessary to connect the main battery 11 and the sub-battery 12 as shown in FIG. 3B, it turns on all of the switches Q1 to Q6. Next, the microcomputer 15 turns on the switch Q1 for a second predetermined time T2 and turns off the remaining switches Q2 to Q6. After that, the microcomputer 15 sequentially turns off the switches Q2 to Q6 one by one for the second predetermined time T2. That is, the microcomputer 15 turns on one of the plurality of switches Q1 to Q6, turns off the remaining five, and sequentially switches one of the switches Q1 to Q6 to be turned on. Therefore, the current I0 flowing through the current path Lo flows through only one of the six branch paths L1 to L6.

これにより、小電流時は、スイッチQ1~Q6をオンオフしたときの電流変動を、電流I0~0Aの範囲に大きくすることができ、スイッチQ1~Q6の故障検出精度を向上させることができる。 As a result, when the current is small, the current fluctuation when the switches Q1 to Q6 are turned on and off can be increased within the range of current I0 to 0 A, and the failure detection accuracy of the switches Q1 to Q6 can be improved.

また、本実施形態では、マイコン15は、オン制御するスイッチQ1~Q6を切り替える際に、切り替え前にオン制御しているスイッチQ1~Q6をオフ制御するタイミングと同時に、次のスイッチQ1~Q6をオン制御する。 Further, in the present embodiment, when switching the switches Q1 to Q6 to be on-controlled, the microcomputer 15 switches the next switches Q1 to Q6 at the timing of off-controlling the switches Q1 to Q6 that are on-controlled before switching. ON control.

次に、上記概略で説明した車両用電源供給装置1の詳細な動作について図4のフローチャートを参照して説明する。まず、マイコン15は、イグニッション(IG)スイッチがオフの期間に、電流検出部14から出力される電流検出信号SG1~SG6を取り込み、初期値SG1~SG6としてメモリ15Aに記憶する始動前点検を行う(ステップS1)。また、IGスイッチがオンの期間(車両が走行して、バッテリ11、12が通電される期間)、マイコン15は、スイッチQ1~Q6の故障診断を行う(ステップS2~S9)。 Next, the detailed operation of the vehicle power supply device 1 outlined above will be described with reference to the flowchart of FIG. First, the microcomputer 15 takes in the current detection signals SG1 to SG6 output from the current detection unit 14 while the ignition (IG) switch is off, and stores them in the memory 15A as initial values SG1 0 to SG6 0 . (step S1). In addition, while the IG switch is on (while the vehicle is running and the batteries 11 and 12 are energized), the microcomputer 15 diagnoses the switches Q1-Q6 (steps S2-S9).

上記ステップS1の始動前点検の詳細について図5を参照して説明する。まず、マイコン15は、全てのスイッチQ1~Q6をオフする(ステップS11)。これにより、分岐経路L1~L6に流れる電流I1~I6は0Aとなる。次に、マイコン15は、分岐経路L1~L6に各々設けられた電流検出部14から出力される電流検出信号SG1~SG6を取り込む(ステップS12)。その後、マイコン15は、取り込んだ各電流検出信号SG1~SG6を電流検出部14毎の初期値SG1~SG6として記憶して(ステップS13)、処理を終了する。 Details of the pre-start inspection in step S1 will be described with reference to FIG. First, the microcomputer 15 turns off all the switches Q1 to Q6 (step S11). As a result, the currents I1 to I6 flowing through the branch paths L1 to L6 become 0A. Next, the microcomputer 15 takes in the current detection signals SG1 to SG6 output from the current detection units 14 respectively provided on the branch paths L1 to L6 (step S12). Thereafter, the microcomputer 15 stores the received current detection signals SG1 to SG6 as initial values SG1 0 to SG6 0 for each current detection section 14 (step S13), and terminates the process.

マイコン15は、IGスイッチがオンされると、メインバッテリ11及びサブバッテリ12の接続が必要か否かを判定する(図4のステップS2)。接続が必要であると判定すると(ステップS2でY)、マイコン15は、全てのスイッチQ1~Q6をオンして(ステップS3)、メインバッテリ11及びサブバッテリ12を接続する。次に、マイコン15は、全ての電流検出信号SG1~SG6を取り込む(ステップS4)。マイコン15は、ステップS4で取り込んだ電流検出信号SG1~SG6をオン制御中の電流検出信号SG1onL~SG6onLとしてメモリ15Aに一時的に記憶させる。 When the IG switch is turned on, the microcomputer 15 determines whether it is necessary to connect the main battery 11 and the sub-battery 12 (step S2 in FIG. 4). When determining that connection is necessary (Y in step S2), the microcomputer 15 turns on all the switches Q1 to Q6 (step S3) to connect the main battery 11 and sub-battery 12 to each other. Next, the microcomputer 15 takes in all current detection signals SG1 to SG6 (step S4). The microcomputer 15 temporarily stores the current detection signals SG1 to SG6 fetched in step S4 in the memory 15A as the current detection signals SG1 onL to SG6 onL during ON control.

その後、マイコン15は、電流検出信号SG1onL~SG6onLとメモリ15Aに記憶された初期値SG1~SG6とを比較して、分岐経路L1~L6に通電があるか否かを判定する(ステップS5)。 After that, the microcomputer 15 compares the current detection signals SG1 onL to SG6 onL with the initial values SG1 0 to SG6 0 stored in the memory 15A to determine whether or not the branch paths L1 to L6 are energized ( step S5).

ステップS5において、マイコン15は、SG1onL≒SG1、SG2onL≒SG2、SG3onL≒SG3、SG4onL≒SG4、SG5onL≒SG5、SG6onL≒SG6の少なくとも一つでも該当すれば、スイッチQ1~Q6がオンできずに分岐経路L1~L6が通電されていない(=電流I1~I6の少なくとも1つが0A)と判定する。詳細には、マイコン15は、SGnonL≦(SGn+所定値)の場合に、SGnonL≒SGnと判定する(nは1~6の任意の整数)。 In step S5, the microcomputer 15 determines whether at least one of SG1 onL ≈SG1 0 , SG2 onL ≈SG2 0 , SG3 onL ≈SG3 0 , SG4 onL ≈SG4 0 , SG5 onL ≈SG5 0 and SG6 onL ≈SG6 0 is applicable. For example, it is determined that the switches Q1 to Q6 cannot be turned on and the branch paths L1 to L6 are not energized (=at least one of the currents I1 to I6 is 0 A). Specifically, when SGn onL ≤ (SGn 0 + predetermined value), the microcomputer 15 determines that SGn onL ≈SGn 0 (n is any integer from 1 to 6).

マイコン15は、分岐経路L1~L6の何れか1つでも通電されていないと判定すると(ステップS5でN)、警告信号を出力して(ステップS6)、処理を終了する。図示しないメータが、警告信号を受信すると、スイッチQ1~Q6がオフのまま固着され、オンできないオフ故障である旨を報知する。 When the microcomputer 15 determines that any one of the branch paths L1 to L6 is not energized (N in step S5), it outputs a warning signal (step S6) and terminates the process. When the meter (not shown) receives the warning signal, the switches Q1 to Q6 are stuck in the off state and notify that there is an off failure in which the switches Q1 to Q6 cannot be turned on.

一方、マイコン15は、分岐経路L1~L6の全部が通電されていると判定すると(ステップS5でY)、電流検出信号SG1~SG6の合計値から電流I0として求める。そして、マイコン15は、求めた電流I0が例えば6Aより大きい大電流であれば(ステップS7でN)、図3(A)に示すように、スイッチQ1~Q6を制御して故障を検出する大電流用の故障診断を行う(ステップS8)。これに対して、マイコン15は、電流I0が例えば6A以下の小電流であれば(ステップS7でY)、図3(B)に示すように、スイッチQ1~Q6を制御して故障をする小電流用の故障診断を行う(ステップS9)。 On the other hand, when the microcomputer 15 determines that all of the branch paths L1 to L6 are energized (Y in step S5), the current I0 is obtained from the total value of the current detection signals SG1 to SG6. Then, if the obtained current I0 is a large current larger than, for example, 6 A (N in step S7), the microcomputer 15 controls the switches Q1 to Q6 to detect a failure as shown in FIG. Fault diagnosis for current is performed (step S8). On the other hand, if the current I0 is a small current of, for example, 6 A or less (Y in step S7), the microcomputer 15 controls the switches Q1 to Q6 as shown in FIG. A failure diagnosis for current is performed (step S9).

上記大電流用の故障診断処理の詳細について図6を参照して説明する。まず、マイコン15は、スイッチQ1を第1所定時間T1だけオフ制御して、再びオン制御する(ステップS801)。スイッチQ1以外のスイッチQ2~Q6はオンを保持する。マイコン15は、ステップS801でオフ制御している間に電流検出部14から出力される電流検出信号SG1を取り込み、オフ制御中の電流検出信号SG1offLとしてメモリ15A内に一時的に記憶させる。 Details of the fault diagnosis process for the large current will be described with reference to FIG. First, the microcomputer 15 turns off the switch Q1 for a first predetermined time T1 and turns it on again (step S801). The switches Q2 to Q6 other than the switch Q1 are kept on. The microcomputer 15 takes in the current detection signal SG1 output from the current detection unit 14 during off control in step S801, and temporarily stores it in the memory 15A as the current detection signal SG1 offL during off control.

次に、マイコン15は、メモリ15Aに記憶されたオン制御中の電流検出信号SG1onL及び初期値SG1の比較と、オフ制御中の電流検出信号SG1offL及び初期値SG1の比較と、に基づいて、スイッチQ1の故障を検出する(ステップS802)。 Next, the microcomputer 15 compares the current detection signal SG1 onL during ON control and the initial value SG1 0 stored in the memory 15A, and compares the current detection signal SG1 offL during OFF control and the initial value SG1 0 . Based on this, the failure of the switch Q1 is detected (step S802).

ステップS802において、マイコン15は、SG1onL>SG1かつSG1offL≒SG1であれば、スイッチQ1のオフによって電流I1が変動していると判定し、スイッチQ1は正常であると判定する。また、マイコン15は、SG1onL>SG1かつSG1offL>SG1であれば、スイッチQ1がオフできずに電流I1が変動していないと判定し、スイッチQ1の故障を検出する。詳細には、マイコン15は、SG1onL、SG1offL>(SG1+所定値)の場合に、SG1onL、SG1offL>SG1と判定し、SG1offL≦(SG1+所定値)の場合に、SG1offL≒SG1と判定する。 In step S802, if SG1 onL >SG1 0 and SG1 offL ≈SG1 0 , the microcomputer 15 determines that the current I1 fluctuates due to the switch Q1 being turned off, and determines that the switch Q1 is normal. If SG1 onL >SG1 0 and SG1 offL >SG1 0 , the microcomputer 15 determines that the switch Q1 cannot be turned off and the current I1 does not fluctuate, and detects a failure of the switch Q1. Specifically, the microcomputer 15 determines SG1 onL and SG1 offL > SG1 0 when SG1 onL and SG1 offL > (SG1 0 + predetermined value), and determines SG1 offL ≤ (SG1 0 + predetermined value). , SG1 offL ≈SG1 0 .

マイコン15は、スイッチQ1の故障を検出すると(ステップS802でY)、診断信号を出力した後(ステップS814)、ステップS813に進む。図示しないメータが、診断信号を受信すると、スイッチQ1~Q6がオンのまま固着され、オフできないオン故障である旨を報知する。 When the microcomputer 15 detects the failure of the switch Q1 (Y in step S802), it outputs a diagnostic signal (step S814), and then proceeds to step S813. When the meter (not shown) receives the diagnostic signal, the switches Q1 to Q6 are stuck in the on state and notify that there is an on failure in which the switches Q1 to Q6 cannot be turned off.

マイコン15は、スイッチQ1が正常であると判定すると(ステップS802でN)、次のステップS803~S812に進み、スイッチQ2~Q6をこの順番で一つずつオフ制御して、スイッチQ2~Q6のオン故障診断を行う。スイッチQ2~Q6のオン故障診断については、上述したスイッチQ1のオン故障診断についての説明中の「1」を「2」~「6」に置き換えたものと同じであり、詳細な説明は省略する。 When the microcomputer 15 determines that the switch Q1 is normal (N in step S802), it proceeds to the next steps S803 to S812, turns off the switches Q2 to Q6 one by one in this order, and turns off the switches Q2 to Q6. Perform on-failure diagnosis. The on-failure diagnosis of the switches Q2 to Q6 is the same as the above description of the on-failure diagnosis of the switch Q1, except that "1" is replaced with "2" to "6", so detailed description is omitted. .

マイコン15は、全てのスイッチQ1~Q6が正常であると判定されると(ステップS812でN)、次のステップS813に進む。ステップS813において、マイコン15は、全てのスイッチQ1~Q6をオンして、再びステップS801に戻る。この大電流用の故障診断処理は、メインバッテリ11及びサブバッテリ12の接続が不要と判断されるまで繰り返し行われる。 When the microcomputer 15 determines that all the switches Q1 to Q6 are normal (N in step S812), it proceeds to the next step S813. In step S813, the microcomputer 15 turns on all the switches Q1 to Q6, and returns to step S801. This fault diagnosis processing for large current is repeatedly performed until it is determined that the connection between the main battery 11 and the sub-battery 12 is unnecessary.

次に、上記小電流の故障診断の詳細について図7を参照して説明する。マイコン15は、スイッチQ1をオン制御して、残りのスイッチQ2~Q6についてはオフ制御する(ステップS901)。マイコン15は、スイッチQ1をオン制御してから、第2所定時間T2経過するとスイッチQ1をオフ制御すると同時に、スイッチQ2をオン制御する。また、マイコン15は、ステップS901でスイッチQ1をオン制御及びオフ制御している間それぞれに電流検出部14から出力される電流検出信号SG1を取り込み、オン制御中の電流検出信号SG1onS、オフ制御中の電流検出信号SG1offSとしてメモリ15A内に一時的に記憶させる。 Next, the details of the failure diagnosis of the small current will be described with reference to FIG. The microcomputer 15 turns on the switch Q1 and turns off the remaining switches Q2 to Q6 (step S901). After turning on the switch Q1, the microcomputer 15 turns off the switch Q1 and turns on the switch Q2 when the second predetermined time T2 elapses. Further, the microcomputer 15 captures the current detection signal SG1 output from the current detection unit 14 while the switch Q1 is on-controlled and off-controlled in step S901, and the current detection signal SG1 onS during on-control and off-control temporarily stored in the memory 15A as the current detection signal SG1 offS .

次に、マイコン15は、メモリ15Aに記憶されたオン制御中の電流検出信号SG1onS及び初期値SG1の比較と、オフ制御中の電流検出信号SG1offS及び初期値SG1の比較と、に基づいて、スイッチQ1の故障を検出する(ステップS902)。 Next, the microcomputer 15 compares the current detection signal SG1 onS during ON control and the initial value SG1 0 stored in the memory 15A, and compares the current detection signal SG1 OFFS during OFF control and the initial value SG1 0 . Based on this, the failure of the switch Q1 is detected (step S902).

ステップS902において、マイコン15は、SG1onS>SG1かつSG1offS≒SG1であれば、スイッチQ1のオフによって電流I1が変動していると判定し、スイッチQ1は正常であると判定する。また、マイコン15は、SG1onS>SG1かつSG1offS>SG1であれば、スイッチQ1がオフできずに電流I1が変動していないと判定し、スイッチQ1の故障を検出する。詳細には、マイコン15は、SG1onS、SG1offS>(SG1+所定値)の場合に、SG1onS、SG1offS>SG1と判定し、SG1offS≦(SG1+所定値)の場合に、SG1offS≒SG1と判定する。 In step S902, if SG1 onS >SG1 0 and SG1 offS ≈SG1 0 , the microcomputer 15 determines that the current I1 fluctuates due to the turning off of the switch Q1, and determines that the switch Q1 is normal. If SG1 onS >SG1 0 and SG1 offS >SG1 0 , the microcomputer 15 determines that the switch Q1 cannot be turned off and the current I1 does not fluctuate, and detects a failure of the switch Q1. Specifically, the microcomputer 15 determines SG1 onS and SG1 offS > SG1 0 when SG1 onS and SG1 offS > (SG1 0 + predetermined value), and determines SG1 offS ≤ (SG1 0 + predetermined value). , SG1 offS ≈SG1 0 .

マイコン15は、スイッチQ1の故障を検出すると(ステップS902でY)、診断信号を出力して(ステップS914)、処理を終了する。図示しないメータが、診断信号を受信すると、スイッチQ1~Q6がオンのまま固着され、オフできないオン故障である旨を報知する。 When the microcomputer 15 detects the failure of the switch Q1 (Y in step S902), it outputs a diagnostic signal (step S914) and terminates the process. When the meter (not shown) receives the diagnostic signal, the switches Q1 to Q6 are stuck in the on state and notify that there is an on failure in which the switches Q1 to Q6 cannot be turned off.

マイコン15は、スイッチQ1が正常であると判定すると(ステップS902でN)、次のステップS903~S912に進み、スイッチQ2~Q6をこの順番で一つずつオフ制御して、スイッチQ2~Q6のオン故障診断を行う。スイッチQ2~Q6のオン故障については、スイッチQ1のオン故障についての説明中の「1」を「2」~「6」に置き換えればよく、詳細な説明は省略する。 When the microcomputer 15 determines that the switch Q1 is normal (N in step S902), it proceeds to the next steps S903 to S912, turns off the switches Q2 to Q6 one by one in this order, and turns off the switches Q2 to Q6. Perform on-failure diagnosis. As for the on-failures of the switches Q2 to Q6, "1" in the description of the on-failure of the switch Q1 can be replaced with "2" to "6", and a detailed description will be omitted.

マイコン15は、全てのスイッチQ1~Q6が正常であると判定されると(ステップS912でN)、ステップS913に進み全てのスイッチQ1~Q6をオンして、再びステップS901に戻る。この大電流用の故障診断処理は、メインバッテリ11及びサブバッテリ12の接続が不要と判断されるまで繰り返し行われる。 When the microcomputer 15 determines that all the switches Q1 to Q6 are normal (N in step S912), the microcomputer 15 proceeds to step S913, turns on all the switches Q1 to Q6, and returns to step S901. This fault diagnosis processing for large current is repeatedly performed until it is determined that the connection between the main battery 11 and the sub-battery 12 is unnecessary.

上述した実施形態によれば、マイコン15は、電流経路L0に流れる電流I0が大きいときは図3(A)に示すスイッチQ1~Q6の制御を実行する。即ち、マイコン15は、大電流用の故障診断時に、複数のスイッチQ1~Q6のうち1つをオフ制御して、残りをオン制御し、オフ制御するスイッチQ1~Q5を順次切り替える制御を行い、大電流時にスイッチQ1~Q6のオフ制御に応じた電流変動を低減して、ノイズの低減及びスイッチQ1~Q6の負担低減を図ることができる。また、電流経路L0に流れる電流が小さいときは図3(B)に示すスイッチQ1~Q6の制御を実行する。即ち、マイコン15は、小電流用の故障診断時に、複数のスイッチQ1~Q6のうち1つをオン制御して、残りをオフ制御し、オン制御するスイッチQ1~Q6を順次切り替える制御を行い、小電流時にスイッチQ1~Q6のオフに応じた電流変動を大きくして、スイッチQ1~Q6の故障検出精度を向上させることができる。 According to the embodiment described above, the microcomputer 15 controls the switches Q1 to Q6 shown in FIG. 3A when the current I0 flowing through the current path L0 is large. That is, the microcomputer 15 turns off one of the plurality of switches Q1 to Q6, turns on the rest of the plurality of switches Q1 to Q6, and sequentially switches the switches Q1 to Q5, which are turned off, when diagnosing a fault for a large current. It is possible to reduce noise and reduce the load on the switches Q1 to Q6 by reducing the current fluctuation according to the off control of the switches Q1 to Q6 when the current is large. When the current flowing through the current path L0 is small, the switches Q1 to Q6 shown in FIG. 3B are controlled. That is, the microcomputer 15 turns on one of the plurality of switches Q1 to Q6, turns off the rest of the plurality of switches Q1 to Q6, and sequentially switches the switches Q1 to Q6 to be turned on when diagnosing a failure for a small current. When the current is small, it is possible to increase the current fluctuation corresponding to the turning off of the switches Q1 to Q6, thereby improving the failure detection accuracy of the switches Q1 to Q6.

また、上述した実施形態によれば、マイコン15は、小電流用の故障診断時にオン制御するスイッチQ1~Q6を切り替える際に、切り替え前にオン制御しているスイッチQ1~Q6をオフ制御するタイミングと同時に、次のスイッチをオン制御する。これにより、スイッチQ1~Q6の故障検出を迅速に行うことができる。 Further, according to the above-described embodiment, when the microcomputer 15 switches the switches Q1 to Q6 that are controlled to be ON during failure diagnosis for small currents, the timing for OFF-controlling the switches Q1 to Q6 that are controlled to be ON before switching is At the same time, the next switch is turned on. As a result, failure detection of the switches Q1 to Q6 can be performed quickly.

なお、本発明は、上述した実施形態に限定されるものではなく、適宜、変形、改良、等が可能である。その他、上述した実施形態における各構成要素の材質、形状、寸法、数、配置箇所、等は本発明を達成できるものであれば任意であり、限定されない。 It should be noted that the present invention is not limited to the above-described embodiments, and can be modified, improved, etc. as appropriate. In addition, the material, shape, size, number, location, etc. of each component in the above-described embodiment are arbitrary and not limited as long as the present invention can be achieved.

例えば、図8に示すように、マイコン15は、小電流用の故障診断時にオン制御するスイッチQ1~Q6を切り替える際に、切り替え前にオン制御しているスイッチQ1~Q6をオフ制御するよりも前に、次のスイッチQ1~Q6をオン制御するようにしてもよい。これにより、安定して電流を供給することができる。 For example, as shown in FIG. 8, when the microcomputer 15 switches the switches Q1 to Q6 that are controlled to be ON during failure diagnosis for a small current, rather than turning off the switches Q1 to Q6 that are controlled to be ON before switching. The next switches Q1 to Q6 may be controlled to be ON before. Thereby, current can be stably supplied.

また、上述した実施形態によれば、電流経路L0を6つの分岐経路L1~L6に分岐していたが、これに限ったものではない。電流経路L0は、3つ以上に分岐されていればよい。 Further, according to the above-described embodiment, the current path L0 is branched into the six branch paths L1 to L6, but the present invention is not limited to this. The current path L0 may be branched into three or more.

また、上述した実施形態によれば、電流検出部14としては、シャント抵抗14Aを用いたものが採用されていたが、これに限ったものではない。電流検出部14としては、電流が検出できるものであればよく、磁気センサを用いたものを採用してもよい。 Further, according to the above-described embodiment, the current detector 14 employs the shunt resistor 14A, but the present invention is not limited to this. As the current detector 14, any device that can detect a current may be used, and a device using a magnetic sensor may be employed.

また、上述した実施形態によれば、故障検出装置は、バッテリ11、12間に設けられたスイッチQ1、Q2の故障を検出していたが、これに限ったものではない。バッテリ11、12と負荷Lo1、Lo2との間に設けられるスイッチの故障検出に用いてもよい。 Further, according to the above-described embodiment, the failure detection device detects failure of the switches Q1 and Q2 provided between the batteries 11 and 12, but it is not limited to this. It may be used for failure detection of switches provided between the batteries 11, 12 and the loads Lo1, Lo2.

ここで、上述した本発明に係るスイッチの故障検出装置の実施形態の特徴をそれぞれ以下[1]~[3]に簡潔に纏めて列記する。
[1]
電流経路(L0)を3つ以上に分岐する複数の分岐経路(L1~L6)上に各々設けられた複数のスイッチ(Q1~Q6)と、
前記複数の分岐経路(L1~L6)に各々流れる電流(I1~I6)を検出する電流検出部(14)と、
前記複数のスイッチ(Q1~Q6)の1つをオフ制御し、残りをオン制御すると共に、前記オフ制御する前記複数のスイッチ(Q1~Q6)の1つを順次切り替える第1スイッチ制御部(15)と、
前記複数のスイッチ(Q1~Q6)の1つをオン制御し、残りをオフ制御すると共に、前記オン制御する前記複数のスイッチ(Q1~Q6)の1つを順次切り替える第2スイッチ制御部(15)と、
前記第1、第2スイッチ制御部(15)による前記スイッチ(Q1~Q6)の制御中に、前記複数の電流検出部(14)により検出される前記電流(I1~I6)に基づいて前記スイッチ(Q1~Q6)の故障を検出する故障検出部(15)と、
前記電流経路(L0)に流れる電流が大きいときは前記第1スイッチ制御部(15)による制御を実行させ、前記電流経路(L0)に流れる電流が小さいときは前記第2スイッチ制御部(15)による制御を実行させる制御部(15)と、を備えた、
スイッチの故障検出装置(13)。
[2]
[1]に記載のスイッチの故障検出装置(13)であって、
前記第2スイッチ制御部(15)は、前記オン制御するスイッチ(Q1~Q6)を切り替える際に、切り替え前にオン制御している前記スイッチ(Q1~Q6)をオフ制御するタイミングと同時に、次の前記スイッチ(Q1~Q6)をオン制御する、
スイッチの故障検出装置(13)。
[3]
[1]に記載のスイッチの故障検出装置(13)であって、
前記第2スイッチ制御部(15)は、前記オン制御するスイッチを切り替える際に、切り替え前にオン制御している前記スイッチ(Q1~Q6)をオフ制御するよりも前に、次の前記スイッチ(Q1~Q6)をオン制御する、
スイッチの故障検出装置(13)。
Here, the features of the embodiments of the switch failure detection device according to the present invention described above are briefly summarized in [1] to [3] below.
[1]
a plurality of switches (Q1 to Q6) respectively provided on a plurality of branch paths (L1 to L6) branching the current path (L0) into three or more;
a current detection unit (14) for detecting currents (I1 to I6) respectively flowing through the plurality of branch paths (L1 to L6);
A first switch control unit (15 )When,
A second switch control unit (15 )When,
While the switches (Q1 to Q6) are controlled by the first and second switch control sections (15), the switches are controlled based on the currents (I1 to I6) detected by the plurality of current detection sections (14). a failure detection unit (15) for detecting failures of (Q1 to Q6);
When the current flowing through the current path (L0) is large, the control by the first switch control section (15) is executed, and when the current flowing through the current path (L0) is small, the second switch control section (15) A control unit (15) that executes control by
A switch failure detection device (13).
[2]
A switch failure detection device (13) according to [1],
When switching the switches (Q1 to Q6) to be on-controlled, the second switch control unit (15) controls the switches (Q1 to Q6) that are on-controlled before switching to be off-controlled at the same time as the following: ON-control the switches (Q1 to Q6) of
A switch failure detection device (13).
[3]
A switch failure detection device (13) according to [1],
When switching the switches to be on-controlled, the second switch control unit (15) controls the next switch ( Q1 to Q6) on-control,
A switch failure detection device (13).

13 切替モジュール(スイッチの故障検出装置)
14 電流検出部
15 マイコン(第1スイッチ制御部、第2スイッチ制御部、故障検出部、制御部)
I1~I6 電流
L0 電流経路
L1~L6 分岐経路
Q1~Q6 スイッチ
13 switching module (switch failure detection device)
14 current detection unit 15 microcomputer (first switch control unit, second switch control unit, failure detection unit, control unit)
I1 to I6 current L0 current path L1 to L6 branch path Q1 to Q6 switch

Claims (3)

電流経路を3つ以上に分岐する複数の分岐経路上に各々設けられた複数のスイッチと、
前記複数の分岐経路に各々流れる電流を検出する電流検出部と、
前記複数のスイッチの1つをオフ制御し、残りをオン制御すると共に、前記オフ制御する前記複数のスイッチの1つを順次切り替える第1スイッチ制御部と、
前記複数のスイッチの1つをオン制御し、残りをオフ制御すると共に、前記オン制御する前記複数のスイッチの1つを順次切り替える第2スイッチ制御部と、
前記第1、第2スイッチ制御部による故障検出対象となる前記スイッチのオフ制御中及びオン制御中の各々において、前記故障検出対象となる前記スイッチが設けられた前記分岐経路上の前記電流検出部により検出される前記電流に基づいて前記故障検出対象となる前記スイッチのオン故障を検出する故障検出部と、
前記複数のスイッチの全てをオン制御し、全ての前記スイッチが通電されていることが判定されると全ての前記電流検出部により検出された前記電流値を合計して前記電流経路に流れる電流を求め、前記求めた前記電流経路に流れる電流が所定の電流値より大きいときは前記第1スイッチ制御部による制御を実行させ、前記電流経路に流れる電流が前記所定の電流値より小さいときは前記第2スイッチ制御部による制御を実行させる制御部と、を備えた、
スイッチの故障検出装置。
a plurality of switches each provided on a plurality of branch paths that branch the current path into three or more;
a current detection unit that detects a current flowing through each of the plurality of branch paths;
a first switch control unit that turns off one of the plurality of switches, turns on the rest of the plurality of switches, and sequentially switches one of the plurality of switches to be turned off;
a second switch control unit that turns on one of the plurality of switches, turns off the rest, and sequentially switches one of the plurality of switches to be turned on;
The current detection unit on the branch path provided with the switch subject to failure detection during each of OFF control and ON control of the switch subject to failure detection by the first and second switch control units. a failure detection unit that detects an ON failure of the switch to be the failure detection target based on the current detected by
all of the plurality of switches are controlled to be ON, and when it is determined that all of the switches are energized, the current values detected by all the current detection units are summed to determine the current flowing through the current path; When the obtained current flowing through the current path is larger than a predetermined current value, control by the first switch control unit is executed, and when the current flowing through the current path is smaller than the predetermined current value, the first switch control unit A control unit that executes control by the 2-switch control unit,
Switch failure detection device.
請求項1に記載のスイッチの故障検出装置であって、
前記第2スイッチ制御部は、前記オン制御するスイッチを切り替える際に、切り替え前にオン制御している前記スイッチをオフ制御するタイミングと同時に、次の前記スイッチをオン制御する、
スイッチの故障検出装置。
The switch failure detection device according to claim 1,
When switching the switch to be on-controlled, the second switch control unit turns on the next switch at the same time as the timing of off-controlling the switch that is on-controlled before switching.
Switch failure detection device.
請求項1に記載のスイッチの故障検出装置であって、
前記第2スイッチ制御部は、前記オン制御するスイッチを切り替える際に、切り替え前にオン制御している前記スイッチをオフ制御するよりも前に、次の前記スイッチをオン制御する、
スイッチの故障検出装置。
The switch failure detection device according to claim 1,
When switching the switch to be on-controlled, the second switch control unit on-controls the next switch before off-controlling the switch that is on-controlled before switching.
Switch failure detection device.
JP2019133780A 2019-07-19 2019-07-19 Switch failure detection device Active JP7120971B2 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
JP2019133780A JP7120971B2 (en) 2019-07-19 2019-07-19 Switch failure detection device
EP20185672.1A EP3767316B1 (en) 2019-07-19 2020-07-14 Switch failure detection device
US16/929,391 US11300618B2 (en) 2019-07-19 2020-07-15 Switch failure detection device
CN202010693374.1A CN112240975B (en) 2019-07-19 2020-07-17 Switch fault detection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019133780A JP7120971B2 (en) 2019-07-19 2019-07-19 Switch failure detection device

Publications (2)

Publication Number Publication Date
JP2021018138A JP2021018138A (en) 2021-02-15
JP7120971B2 true JP7120971B2 (en) 2022-08-17

Family

ID=74565978

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019133780A Active JP7120971B2 (en) 2019-07-19 2019-07-19 Switch failure detection device

Country Status (1)

Country Link
JP (1) JP7120971B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20240106249A1 (en) * 2021-02-25 2024-03-28 Panasonic Energy Co., Ltd. Battery pack failure diagnostic method and battery pack

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2843837A1 (en) 2013-08-28 2015-03-04 Airbus Operations GmbH Solid state power controller and method for monitoring a solid state power controller

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7016658B2 (en) * 2017-10-03 2022-02-07 矢崎総業株式会社 Switch failure detector

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2843837A1 (en) 2013-08-28 2015-03-04 Airbus Operations GmbH Solid state power controller and method for monitoring a solid state power controller

Also Published As

Publication number Publication date
JP2021018138A (en) 2021-02-15

Similar Documents

Publication Publication Date Title
CN107643490B (en) Battery monitoring system
JP7016658B2 (en) Switch failure detector
JP5526965B2 (en) Power supply control device and failure detection method
US9267992B2 (en) Switch failure diagnosis device and electric storage apparatus
CN112240975B (en) Switch fault detection device
JP6156689B2 (en) Switch failure diagnosis device and switch failure diagnosis method
US10901036B2 (en) Assembled battery monitoring system
US20130257444A1 (en) Device and Method for the Redundant Determination of a Battery Current Flowing Through the Poles of a Battery
US4845377A (en) Circuit arrangement for the actuation of a safety system
JP6539618B2 (en) Battery monitoring system
CN111465866A (en) Sensor fault detection using paired sample correlations
JP7120971B2 (en) Switch failure detection device
KR20190139251A (en) Power supply device and power supply monitoring method for the control unit
JP7381235B2 (en) Switch failure detection device
JP2023009548A (en) Power control device and semiconductor failure detection method
JP2006209470A (en) Input module
US11408917B2 (en) Redundant current-measuring arrangement with detection of interruptions of an electric circuit
JP2010276572A (en) Failure diagnostic device of voltage sensor
US20240183911A1 (en) Anomaly detection apparatus and anomaly detection method
US11762036B2 (en) Control device for a vehicle
US20240272219A1 (en) Insulation Resistance Measuring Device and Battery System Including the Same
JP5637978B2 (en) A / D converter
JP4924877B2 (en) Analog output device
JPWO2023007557A5 (en)
RU2580476C1 (en) Control signal generating apparatus (embodiment 2)

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210318

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220228

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220308

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220413

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220802

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220804

R150 Certificate of patent or registration of utility model

Ref document number: 7120971

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350