JP7102251B2 - Installation structure of concrete panels on the slope of the embankment - Google Patents

Installation structure of concrete panels on the slope of the embankment Download PDF

Info

Publication number
JP7102251B2
JP7102251B2 JP2018120414A JP2018120414A JP7102251B2 JP 7102251 B2 JP7102251 B2 JP 7102251B2 JP 2018120414 A JP2018120414 A JP 2018120414A JP 2018120414 A JP2018120414 A JP 2018120414A JP 7102251 B2 JP7102251 B2 JP 7102251B2
Authority
JP
Japan
Prior art keywords
slope
vertical beam
beam member
concrete
embankment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018120414A
Other languages
Japanese (ja)
Other versions
JP2020002550A (en
Inventor
敦史 一之瀬
貴之 大原
隆 中川
秀行 佐佐木
均 浅野
誠 請川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toda Corp
Original Assignee
Toda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toda Corp filed Critical Toda Corp
Priority to JP2018120414A priority Critical patent/JP7102251B2/en
Publication of JP2020002550A publication Critical patent/JP2020002550A/en
Application granted granted Critical
Publication of JP7102251B2 publication Critical patent/JP7102251B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Description

本発明は、堤防の法面を覆うコンクリートパネルの設置構造に関する。 The present invention relates to an installation structure of a concrete panel covering a slope of an embankment.

従来より、海や河川などの護岸の法面に、プレキャストコンクリートからなる被覆ブロックを布設する工事が行われている。従来の工事は、例えば、堤防法面にコンクリートなどによって下地を造成した後、この下地の上面にコンクリート打設用の空間を確保しながら複数の被覆ブロックを覆い、被覆ブロックと下地との間にコンクリートを打設することにより行われていた。 Conventionally, construction work has been carried out to lay a covering block made of precast concrete on the slope of a revetment such as the sea or river. In the conventional construction, for example, after creating a base with concrete on the slope of the embankment, a plurality of covering blocks are covered while securing a space for placing concrete on the upper surface of the base, and between the covering blocks and the base. It was done by placing concrete.

このような従来の方法として、下記特許文献1には、下地を造成する工程と、コンクリートブロックを吊り上げて前記下地の表面に沿った所定の位置に仮配置する工程と、前記下地と前記コンクリートブロックとの間に配置されたジャッキによって前記コンクリートブロックの高さ位置を調整する工程と、高さ位置を調整した後のコンクリートブロックと下地の表面との間に配置された長さ調整の可能なスペーサによって前記コンクリートブロックを仮受けする工程と、仮受けされたコンクリートブロックから前記ジャッキを取り除く工程と、前記コンクリートブロックと前記下地との間の空間に生コンクリートを流し込む工程と、を含んでなるものが開示されている。 As such a conventional method, the following Patent Document 1 describes a step of creating a base, a step of lifting a concrete block and temporarily arranging it at a predetermined position along the surface of the base, and the base and the concrete block. The step of adjusting the height position of the concrete block by the jack placed between the concrete block and the length-adjustable spacer placed between the concrete block and the surface of the base after adjusting the height position. A step of temporarily receiving the concrete block, a step of removing the jack from the temporarily received concrete block, and a step of pouring ready-mixed concrete into the space between the concrete block and the base are included. It is disclosed.

また、下記特許文献2では、上述の特許文献1記載の方法に関する課題、すなわち(1)コンクリートブロック各々に対してその全体のレベルを調整しなければならないため、設置に時間が掛かってしまう、(2)下地との所定間隔を確保した上で、隣接するコンクリートブロック同士の上面を整列させることは容易ではない、などを解決することを目的として、法面に均しコンクリートを布設する工程と、第1法面コンクリートブロックの下面と前記均しコンクリートの上面との間に所定の空間を保持した状態で、第1法面コンクリートブロックを前記均しコンクリート上に支持する工程と、前記第1の所定空間に生コンクリートを流し込む工程とを備えた方法が開示されている。 Further, in the following Patent Document 2, the problem related to the method described in the above-mentioned Patent Document 1, that is, (1) it is necessary to adjust the overall level of each concrete block, so that it takes time to install the concrete block (1). 2) The process of laying leveled concrete on the slope and the process of laying concrete on the slope for the purpose of solving the problem that it is not easy to align the upper surfaces of adjacent concrete blocks after securing a predetermined distance from the base. A step of supporting the first slope concrete block on the leveled concrete while holding a predetermined space between the lower surface of the first slope concrete block and the upper surface of the leveled concrete, and the first step. A method including a step of pouring ready-mixed concrete into a predetermined space is disclosed.

また、下記特許文献3には、断面形状が略I型であり、かつ間隔をおいて透孔が形成された長尺の縦梁部材を、該梁部材が上下方向となるように間隔をおいて基礎ブロックに当接させて設置し、さらに表面部材と裏面部材を複数の中継部材で連結してなる被覆ブロックを護岸の法面上に該被覆ブロックの両端部が前記縦梁部材の上に載置されるように並設し、前記被覆ブロックの複数の中継部材の間に形成された空間中に生コンクリートを打設する方法が開示されている。 Further, in Patent Document 3 below, long vertical beam members having a substantially I-shaped cross section and having through holes formed at intervals are spaced so that the beam members are in the vertical direction. A covering block formed by contacting the foundation block with the foundation block and connecting the front surface member and the back surface member with a plurality of relay members is placed on the slope of the shore, and both ends of the covering block are placed on the vertical beam member. A method is disclosed in which ready-mixed concrete is placed side by side so as to be placed in a space formed between a plurality of relay members of the covering block.

更に、下記特許文献4には、法面に被覆ブロックを設置して法面との間に胴込め空間を設け、胴込め空間にコンクリートを投入し、被覆ブロックを多段にして護岸を構築する方法が開示されている。 Further, in Patent Document 4 below, a method of installing a covering block on a slope, providing a space for embedding between the slope and the slope, putting concrete into the space for embedding, and constructing a revetment by making the covering block in multiple stages. Is disclosed.

特開平6-294107号公報Japanese Unexamined Patent Publication No. 6-294107 特開2004-218348号公報Japanese Unexamined Patent Publication No. 2004-218348 特開2006-104820号公報Japanese Unexamined Patent Publication No. 2006-104820 特開2014-31672号公報Japanese Unexamined Patent Publication No. 2014-31672

しかしながら、上記特許文献1、2記載の方法では、法面に均しコンクリートを布設する必要があり、作業に時間を要し、施工効率が悪くなる。また、上記特許文献2記載の方法では、均しコンクリートの上面に、第1法面コンクリートブロックの高さ調整を行うレベル調整具が支持されるため、均しコンクリートの表面に大きな不陸があると仕上がりの品質及び見栄えを低下させるおそれがあり、ある程度の精度で表面を均しておく必要があるため、この作業に手間と時間を要する。また、上記特許文献3記載の方法でも同様に、法面に基礎栗石などを敷設し、その上に被覆ブロックを並設しているため、基礎栗石などの下地の表面を均す必要があり、その作業に手間がかかる。 However, in the methods described in Patent Documents 1 and 2, it is necessary to lay leveling concrete on the slope, which takes time for the work and deteriorates the construction efficiency. Further, in the method described in Patent Document 2, since the level adjuster for adjusting the height of the first slope concrete block is supported on the upper surface of the leveled concrete, there is a large unevenness on the surface of the leveled concrete. This work takes time and effort because the quality and appearance of the finished product may be deteriorated and the surface must be leveled with a certain degree of accuracy. Further, also in the method described in Patent Document 3 above, since the foundation chestnut stone or the like is laid on the slope and the covering block is arranged side by side on the slope, it is necessary to level the surface of the foundation chestnut stone or the like. The work takes time and effort.

更に、上記特許文献4記載の発明では、法面に被覆ブロックを直接設置しているため、被覆ブロックの表面が均一な高さとなるように、法面を予め精度よく整地しておく必要があり、その作業に多大な労力を要していた。 Further, in the invention described in Patent Document 4, since the covering block is directly installed on the slope, it is necessary to accurately level the slope in advance so that the surface of the covering block has a uniform height. , The work required a great deal of effort.

そこで本発明の主たる課題は、法面の整地や均しコンクリートを不要とし、施工作業を簡略化するとともに、コンクリートパネルの高さ調整を簡単にし、仕上がりの品質及び見栄えを向上させた堤防法面における被覆ブロックの設置構造を提供することにある。 Therefore, the main subject of the present invention is an embankment slope that eliminates the need for leveling and leveling concrete on the slope, simplifies the construction work, simplifies the height adjustment of the concrete panel, and improves the quality and appearance of the finished product. It is to provide the installation structure of the covering block in.

上記課題を解決するために請求項1に係る本発明として、上端部が堤防法面から突出した状態で、堤防法面の上下方向及び水平方向にそれぞれ間隔を空けて複数配置された柱部材と、堤防法面の上下方向に沿って配設され、前記柱部材の上端部を相互に連結する縦梁部材と、堤防法面の水平方向に沿って配設され、前記柱部材を相互に連結する横梁部材と、前記縦梁部材に固定され、前記柱部材、縦梁部材及び横梁部材を覆うとともに、堤防法面を覆うように設置されたコンクリートパネルと、前記コンクリートパネルと堤防法面との間に充填された現場打ちコンクリートとにより構成され、
前記縦梁部材の設置高さが調整自在となっており、
前記柱部材の上端部に部材長手方向に沿って長い切欠き部が形成され、前記柱部材と縦梁部材とが、前記切欠き部に挿通されるボルトで固定され、前記縦梁部材の設置高さの調整が、前記切欠き部における前記ボルトの固定位置を任意に変化させることにより行うことができるようになっていることを特徴とする堤防法面におけるコンクリートパネルの設置構造が提供される。
In order to solve the above problem, as the present invention according to claim 1, a plurality of pillar members are arranged at intervals in the vertical direction and the horizontal direction of the embankment slope with the upper end portion protruding from the embankment slope. , A vertical beam member that is arranged along the vertical direction of the embankment slope and connects the upper ends of the pillar members to each other, and a vertical beam member that is arranged along the horizontal direction of the embankment slope and connects the pillar members to each other. A concrete panel fixed to the vertical beam member and installed so as to cover the pillar member, the vertical beam member and the horizontal beam member and also to cover the levee slope, and the concrete panel and the levee slope. Consists of cast-in-place concrete filled in between
The installation height of the vertical beam member is adjustable .
A long notch is formed at the upper end of the column member along the longitudinal direction of the member, and the column member and the vertical beam member are fixed by bolts inserted into the notch, and the vertical beam member is installed. Provided is an installation structure of a concrete panel on an embankment slope, characterized in that height adjustment can be performed by arbitrarily changing the fixing position of the bolt in the notch. ..

上記請求項1記載の発明では、堤防法面に複数の柱部材を配置するとともに、これらの柱部材が縦梁部材及び横梁部材によって連結されたフレーム構造を構築し、その上面を覆うとともに、堤防法面を覆うようにコンクリートパネルを設置し、前記コンクリートパネルと堤防法面との間に現場打ちコンクリートを充填することによって堤防法面の被覆構造が構成されている。このように、堤防法面に直接的に柱部材が設置されているため、法面の整地や均しコンクリートが不要となり、施工作業が簡略化できる。 In the invention according to claim 1, a plurality of column members are arranged on the slope of the embankment, and a frame structure in which these column members are connected by a vertical beam member and a cross beam member is constructed to cover the upper surface thereof and the embankment. A concrete panel is installed so as to cover the slope, and cast-in-place concrete is filled between the concrete panel and the levee slope to form a covering structure of the levee slope. In this way, since the pillar members are installed directly on the slope of the embankment, it is not necessary to level the slope or level concrete, and the construction work can be simplified.

また、前記縦梁部材の設置高さが調整自在となっているため、コンクリートパネルを設置する前に、予め縦梁部材の設置高さを調整しておき、この高さ調整された縦梁部材にコンクリートパネルを固定することによって、コンクリートパネルが高さ調整された状態で設置できるようになっている。このため、1枚ずつコンクリートパネルの高さ調整を行う手間がなくなり、コンクリートパネルの高さ調整が簡単にできるとともに、仕上がりの品質及び見栄えが向上できるようになる。 Further, since the installation height of the vertical beam member is adjustable, the installation height of the vertical beam member is adjusted in advance before installing the concrete panel, and the height-adjusted vertical beam member is adjusted. By fixing the concrete panel to, the concrete panel can be installed in a height-adjusted state. Therefore, it is not necessary to adjust the height of the concrete panels one by one, the height of the concrete panels can be easily adjusted, and the quality and appearance of the finished product can be improved.

上記請求項記載の発明は、縦梁部材の設置高さ調整機構についての具体例であって、前記柱部材の上端部に部材長手方向に沿って長い切欠き部が形成され、前記柱部材と縦梁部材とが、前記切欠き部に挿通されるボルトで固定されている。これによって、前記切欠き部に対するボルトの固定位置を調整することにより、簡単に縦梁部材の高さが調整できるので、この縦梁部材に固定されるコンクリートパネルの高さ調整が簡単にでき、仕上がりの品質及び見栄えが向上するようなる。 The invention according to claim 1 is a specific example of an installation height adjusting mechanism for a vertical beam member, in which a long notch is formed at the upper end of the column member along the longitudinal direction of the member, and the column member is described. And the vertical beam member are fixed by bolts inserted into the notch. As a result, the height of the vertical beam member can be easily adjusted by adjusting the fixing position of the bolt with respect to the notch portion, so that the height of the concrete panel fixed to the vertical beam member can be easily adjusted. The quality and appearance of the finished product will be improved.

請求項に係る本発明として、前記縦梁部材に部材長手方向に沿って長い長孔が形成され、前記ボルトが前記長孔に挿通されることにより、前記縦梁部材の部材長手方向に沿った位置調整が自在となっている請求項記載の堤防法面におけるコンクリートパネルの設置構造が提供される。 According to the second aspect of the present invention, a long elongated hole is formed in the vertical beam member along the longitudinal direction of the member, and the bolt is inserted into the elongated hole in the longitudinal direction of the member. Provided is the installation structure of the concrete panel on the slope of the embankment according to claim 1 , wherein the position can be freely adjusted.

上記請求項記載の発明では、縦梁部材の部材長手方向に沿った設置位置の調整が行えるように、前記縦梁部材に部材長手方向に沿って長い長孔を形成し、この長孔に前記ボルトを挿通して柱部材と固定している。 In the invention according to claim 2 , a long elongated hole is formed in the vertical beam member along the longitudinal direction of the member so that the installation position of the vertical beam member can be adjusted along the longitudinal direction of the member. The bolt is inserted and fixed to the pillar member.

請求項に係る本発明として、前記柱部材の下端部が堤防法面に埋め込まれている請求項1、2いずれかに記載の堤防法面におけるコンクリートパネルの設置構造が提供される。 The present invention according to claim 3 provides an installation structure of a concrete panel on the embankment slope according to any one of claims 1 and 2 , wherein the lower end portion of the pillar member is embedded in the embankment slope.

上記請求項記載の発明では、柱部材の下端部を直接堤防法面に埋め込むことにより、柱部材を堤防法面に固定している。この場合、柱部材、縦梁部材及び横梁部材は、現場で組み立てが行われる。 In the invention according to claim 3 , the column member is fixed to the embankment slope by directly embedding the lower end portion of the column member in the embankment slope. In this case, the column member, the vertical beam member, and the horizontal beam member are assembled on site.

請求項に係る本発明として、前記柱部材は、下端部が堤防法面に埋め込まれ上端部が堤防法面から突出した埋め込み支持部材に固定されている請求項1、2いずれかに記載の堤防法面におけるコンクリートパネルの設置構造が提供される。 The present invention according to claim 4 , wherein the pillar member is fixed to an embedded support member whose lower end is embedded in the embankment slope and whose upper end is projected from the embankment slope, according to any one of claims 1 and 2 . An installation structure of concrete panels on the levee slope is provided.

上記請求項記載の発明では、堤防法面に予め埋め込み支持部材を設けておき、この埋め込み支持部材に柱部材を固定することにより、柱部材を前記埋め込み支持部材を介して堤防法面に固定している。この場合、柱部材、縦梁部材及び横梁部材は、現場で組み立ててもよいし、予め工場等で組み立てておき、ユニット化されたものを現場に持ち込んで、柱部材を前記埋め込み支持部材に固定してもよい。 In the invention according to claim 4 , an embedded support member is provided in advance on the embankment slope, and the column member is fixed to the embedded support member to fix the column member to the embankment slope via the embedded support member. is doing. In this case, the column member, the vertical beam member, and the horizontal beam member may be assembled at the site, or assembled in advance at a factory or the like, and the unitized one is brought to the site to fix the column member to the embedded support member. You may.

請求項に係る本発明として、前記コンクリートパネルの下面に先端が屈折した略L形の取付金具が突設され、前記取付金具の先端屈折部とコンクリートパネル下面との間に前記縦梁部材が嵌合され、前記取付金具の先端屈折部と前記縦梁部材との間に楔部材が打ち込まれることにより前記コンクリートパネルが前記縦梁部材に固定されている請求項1~いずれかに記載の堤防法面におけるコンクリートパネルの設置構造が提供される。 According to the fifth aspect of the present invention, a substantially L-shaped mounting bracket having a bent tip is projected from the lower surface of the concrete panel, and the vertical beam member is formed between the tip bending portion of the mounting bracket and the lower surface of the concrete panel. The invention according to any one of claims 1 to 4 , wherein the concrete panel is fixed to the vertical beam member by being fitted and driving a wedge member between the tip bending portion of the mounting bracket and the vertical beam member. An installation structure of concrete panels on the slope of the embankment is provided.

上記請求項記載の発明は、コンクリートパネルを縦梁部材に固定する構造の具体例であり、コンクリートパネルの下面に略L形の取付金具が突設され、この取付金具の先端屈折部とコンクリートパネル下面との間に縦梁部材を嵌合した状態で、前記取付金具の先端屈折部と前記縦梁部材との間に楔部材を打ち込むことにより固定している。前記楔部材を打ち込むことによってコンクリートパネルが縦梁部材に簡単に固定できるので、施工作業が簡略化できるとともに、楔部材の打込み量に応じてコンクリートパネルの設置高さを微調整することができる。 The invention according to claim 5 is a specific example of a structure for fixing a concrete panel to a vertical beam member. A substantially L-shaped mounting bracket is projected from the lower surface of the concrete panel, and the tip bending portion of the mounting bracket and concrete. With the vertical beam member fitted between the lower surface of the panel, the vertical beam member is fixed by driving the wedge member between the tip bending portion of the mounting bracket and the vertical beam member. Since the concrete panel can be easily fixed to the vertical beam member by driving the wedge member, the construction work can be simplified and the installation height of the concrete panel can be finely adjusted according to the driving amount of the wedge member.

以上詳説のとおり本発明によれば、法面の整地や均しコンクリートが不要となり、施工作業が簡略化できるとともに、コンクリートパネルの高さ調整が簡単にでき、仕上がりの品質及び見栄えが向上できるようになる。 As described in detail above, according to the present invention, it is not necessary to level the slope or leveled concrete, the construction work can be simplified, the height of the concrete panel can be easily adjusted, and the quality and appearance of the finished product can be improved. become.

本発明に係る設置構造1を示す堤防法面の断面図である。It is sectional drawing of the embankment slope which shows the installation structure 1 which concerns on this invention. 設置構造1を示す斜視図である。It is a perspective view which shows the installation structure 1. 柱部材4を示す、(A)は正面図、(B)は上面図である。The pillar member 4 is shown, (A) is a front view, and (B) is a top view. 縦梁部材5を示す、(A)は正面図、(B)は(A)のB-B線矢視図である。A vertical beam member 5 is shown, (A) is a front view, and (B) is a view taken along the line BB of (A). 柱部材4と縦梁部材5との連結構造を示す、(A)は正面図、(B)は(A)のB-B線矢視図である。The connecting structure of the column member 4 and the vertical beam member 5 is shown, (A) is a front view, and (B) is a view taken along the line BB of (A). 変形例に係る柱部材4と縦梁部材5との連結構造を示す、(A)は正面図、(B)は(A)のB-B線矢視図である。A connection structure between the column member 4 and the vertical beam member 5 according to the modified example is shown, (A) is a front view, and (B) is a view taken along the line BB of (A). コンクリートパネル7の側面図である。It is a side view of the concrete panel 7. コンクリートパネル7と縦梁部材5との固定部分の拡大図である。It is an enlarged view of the fixed part of the concrete panel 7 and the vertical beam member 5. コンクリートパネル7、7同士の係合部を拡大した側面図である。It is an enlarged side view of the engaging part between concrete panels 7, 7. 施工方法(その1)を示す堤防法面の断面図である。It is sectional drawing of the embankment slope which shows the construction method (the 1). 施工方法(その2)を示す堤防法面の断面図である。It is sectional drawing of the embankment slope which shows the construction method (the 2). 施工方法(その3)を示す堤防法面の断面図である。It is sectional drawing of the embankment slope which shows the construction method (the 3). 変形例に係る設置構造1Aを示す堤防法面の断面図である。It is sectional drawing of the embankment slope which shows the installation structure 1A which concerns on the modification. (A)は埋め込み支持部材20の正面図、(B)は柱部材4の正面図である。(A) is a front view of the embedded support member 20, and (B) is a front view of the pillar member 4. 埋め込み支持部材20と柱部材4との連結構造を示す、(A)は正面図、(B)は側面図である。A connection structure between the embedded support member 20 and the pillar member 4 is shown, (A) is a front view, and (B) is a side view. 他の形態例に係る設置構造1Bを示す斜視図である。It is a perspective view which shows the installation structure 1B which concerns on another form example.

以下、本発明の実施の形態について図面を参照しながら詳述する。 Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.

本発明に係る設置構造1は、図1に示されるように、堤防法面2の保護のため、表面を覆う被覆コンクリートの設置に係るものである。堤防法面2としては、勾配が1:2.0~3.0の緩斜面であるのが好ましいが、これより勾配が大きな斜面にも適用可能である。 As shown in FIG. 1, the installation structure 1 according to the present invention relates to the installation of coated concrete covering the surface for protection of the levee slope 2. The embankment slope 2 is preferably a gentle slope with a slope of 1: 2.0 to 3.0, but it can also be applied to a slope having a slope larger than this.

本設置構造1は、図1及び図2に示されるように、上端部が堤防法面2から突出した状態で、堤防法面2の上下方向及び水平方向にそれぞれ間隔を空けて複数配置された柱部材4、4…と、堤防法面2の上下方向に沿って配設され、前記柱部材4、4…の上端部を相互に連結する縦梁部材5と、堤防法面2の水平方向に沿って配設され、前記柱部材4、4…を相互に連結する横梁部材6と、前記縦梁部材5に固定され、前記柱部材4、縦梁部材5及び横梁部材6を覆うとともに、堤防法面2を覆うように設置されたコンクリートパネル7と、前記コンクリートパネル7と堤防法面2との間に充填された現場打ちコンクリート8とにより構成されている。そして、本設置構造1では、前記縦梁部材5の設置高さが調整自在となっている。 As shown in FIGS. 1 and 2, a plurality of the present installation structures 1 are arranged at intervals in the vertical direction and the horizontal direction of the embankment slope 2 in a state where the upper end portion protrudes from the embankment slope 2. Column members 4, 4 ... Are arranged along the vertical direction of the embankment slope 2, and the vertical beam members 5 that connect the upper ends of the column members 4, 4, ... To each other, and the embankment slope 2 in the horizontal direction. A cross beam member 6 that is arranged along the above columns and connects the pillar members 4, 4, ... To each other, and is fixed to the vertical beam member 5 to cover the pillar member 4, the vertical beam member 5, and the cross beam member 6. It is composed of a concrete panel 7 installed so as to cover the embankment slope 2 and cast-in-place concrete 8 filled between the concrete panel 7 and the embankment slope 2. In the main installation structure 1, the installation height of the vertical beam member 5 is adjustable.

このように、本設置構造1では、堤防法面2に直接的に柱部材4が設置され、その柱部材4の堤防法面2から突出した上端部に、コンクリートパネル7が固定される縦梁部材5が配設されているため、堤防法面の整地や均しコンクリートが不要となり、施工作業が簡略化できる。すなわち、堤防法面の表面にジャッキなどを設置してコンクリートパネルの高さ位置を調整する場合、ジャッキによる高さ位置の調整精度を向上させるため、堤防法面の整地や、均しコンクリートによる下地処理を行う必要があるのに対して、本設置構造1では、柱部材4に固定される縦梁部材5の設置高さを調整することによってコンクリートパネル7の高さ調整が行われるため、堤防法面2の不陸がコンクリートパネル7の設置高さに全く影響を与えない構造になっている。 As described above, in the present installation structure 1, the column member 4 is directly installed on the embankment slope 2, and the concrete panel 7 is fixed to the upper end portion of the column member 4 protruding from the embankment slope 2. Since the member 5 is arranged, it is not necessary to level the ground on the slope of the embankment or leveling concrete, and the construction work can be simplified. That is, when a jack or the like is installed on the surface of the levee slope to adjust the height position of the concrete panel, in order to improve the adjustment accuracy of the height position by the jack, the levee slope is leveled or the groundwork is made of leveled concrete. In contrast to this installation structure 1, the height of the concrete panel 7 is adjusted by adjusting the installation height of the vertical beam member 5 fixed to the pillar member 4, so that the embankment is embanked. The structure is such that the unevenness of the slope 2 does not affect the installation height of the concrete panel 7 at all.

また、本設置構造1では縦梁部材5の設置高さが調整自在となっているため、コンクリートパネル7を設置する前に、予め縦梁部材5の設置高さを調整しておき、この高さ調整された縦梁部材5にコンクリートパネル7を固定することによって、コンクリートパネル7が高さ調整された状態で設置できるようになっている。したがって、設置高さが調整自在とされた縦梁部材5の高さ調整を行えば、この縦梁部材5にコンクリートパネル7を取り付けるだけで自然とコンクリートパネル7の高さ調整が成されるので、1枚ずつコンクリートパネルの高さ調整を行う手間がなくなり、施工作業が簡略化できるとともに、仕上がりの品質及び見栄えが向上できるようになる。 Further, since the installation height of the vertical beam member 5 is adjustable in the main installation structure 1, the installation height of the vertical beam member 5 is adjusted in advance before installing the concrete panel 7. By fixing the concrete panel 7 to the adjusted vertical beam member 5, the concrete panel 7 can be installed in a height-adjusted state. Therefore, if the height of the vertical beam member 5 whose installation height is adjustable is adjusted, the height of the concrete panel 7 can be naturally adjusted simply by attaching the concrete panel 7 to the vertical beam member 5. The trouble of adjusting the height of the concrete panels one by one is eliminated, the construction work can be simplified, and the quality and appearance of the finished product can be improved.

以下、さらに前記設置構造1について詳細に説明すると、
前記柱部材4としては、山形鋼、溝形鋼、H形鋼などの形綱、丸棒や角棒などの鋼棒など、公知の鋼材を用いることができる。図1に示される実施形態例では山形鋼で構成されている。また、後述するように、前記柱部材4として、上下方向に伸縮可能なジャッキなどを用いてもよい。
Hereinafter, the installation structure 1 will be described in more detail.
As the column member 4, known steel materials such as angle steel, channel steel, shaped steel such as H-shaped steel, and steel rod such as round bar and square bar can be used. In the embodiment shown in FIG. 1, it is made of angle steel. Further, as will be described later, as the pillar member 4, a jack or the like that can be expanded and contracted in the vertical direction may be used.

前記柱部材4は、図1に示されるように、堤防法面2の傾斜角に関係なく、部材長手方向がほぼ鉛直方向となるように立設するのが好ましいが、堤防法面2に対して垂直方向または所定の角度を有する方向に立設してもよい。 As shown in FIG. 1, the pillar member 4 is preferably erected so that the longitudinal direction of the member is substantially vertical regardless of the inclination angle of the levee slope 2, but the levee member 4 is erected with respect to the levee slope 2. It may be erected vertically or in a direction having a predetermined angle.

前記柱部材4は、図2に示されるように、堤防法面2の上下方向及び水平方向に沿ってそれぞれほぼ等間隔に複数配置されている。隣り合う柱部材4、4の間隔は任意であるが、コンクリートパネル7の大きさに合わせたピッチとするのが好ましい。 As shown in FIG. 2, a plurality of the pillar members 4 are arranged at substantially equal intervals along the vertical direction and the horizontal direction of the embankment slope 2. The distance between the adjacent column members 4 and 4 is arbitrary, but it is preferable that the pitch matches the size of the concrete panel 7.

前記柱部材4には、当該柱部材4に固定される縦梁部材5の設置高さを調整するための設置高さ調整機構が備えられている。これにより、柱部材4に対する縦梁部材5の設置高さが調整自在となり、コンクリートパネル7の高さ調整が容易に行えるようになる。図1に示される実施形態例において、前記設置高さ調整機構は、図3に示されるように、前記柱部材4の上端部に部材長手方向に沿って長い切欠き部10が形成されるとともに、図5に示されるように、前記柱部材4と縦梁部材5とが、前記切欠き部10に挿通されるボルト11で固定されることにより構成されている。縦梁部材5の設置高さの調整は、前記切欠き部10におけるボルト11の固定位置を任意に変化させることにより行うことができる。 The column member 4 is provided with an installation height adjusting mechanism for adjusting the installation height of the vertical beam member 5 fixed to the column member 4. As a result, the installation height of the vertical beam member 5 with respect to the column member 4 can be adjusted, and the height of the concrete panel 7 can be easily adjusted. In the embodiment shown in FIG. 1, in the installation height adjusting mechanism, as shown in FIG. 3, a long notch 10 is formed at the upper end of the pillar member 4 along the longitudinal direction of the member. As shown in FIG. 5, the column member 4 and the vertical beam member 5 are fixed by a bolt 11 inserted into the notch portion 10. The installation height of the vertical beam member 5 can be adjusted by arbitrarily changing the fixing position of the bolt 11 in the notch portion 10.

前記切欠き部10は、山形鋼からなる柱部材4において、L形に屈曲した2つの辺のうち一方の辺、具体的には堤防法面2の上下方向に沿って配置される辺の部材短手方向の中央部に、上端縁から部材長手方向に沿って所定の長さで形成されている。 The notch portion 10 is a member of a pillar member 4 made of angle steel, which is one side of two L-shaped bent sides, specifically, a side member arranged along the vertical direction of the embankment slope 2. It is formed in the central portion in the lateral direction with a predetermined length from the upper end edge along the longitudinal direction of the member.

図1に示される実施形態例では、前記柱部材4は、下端部が堤防法面2に埋め込まれ、上端部が堤防法面2から突出することにより、直接堤防法面2に固定されている。本実施形態例では、柱部材4の下端部が堤防法面2に埋め込まれて直接固定されているため、堤防法面2の整地や均しコンクリートなどの施工が不要となり、施工作業が簡略化できる。 In the embodiment shown in FIG. 1, the column member 4 is directly fixed to the embankment slope 2 by embedding the lower end portion in the embankment slope 2 and projecting the upper end portion from the embankment slope 2. .. In the present embodiment, since the lower end portion of the column member 4 is embedded in the embankment slope 2 and directly fixed, it is not necessary to level the embankment slope 2 or to perform leveling concrete, which simplifies the construction work. can.

次いで、前記縦梁部材5について説明すると、前記縦梁部材5としては、山形鋼、溝形鋼、H形鋼などの形綱、丸棒や角棒などの鋼棒など、公知の鋼材を用いることができる。本実施形態例では、図4に示されるように、山形鋼で構成されている。また、後述するように、コンクリート製の梁材を用いることもできる。 Next, the vertical beam member 5 will be described. As the vertical beam member 5, known steel materials such as angle steel, channel steel, shaped steel such as H-shaped steel, and steel rod such as round bar and square bar are used. be able to. In this embodiment, as shown in FIG. 4, it is made of angle steel. Further, as will be described later, a concrete beam material can also be used.

前記縦梁部材5は、図2に示されるように、堤防法面2の上下方向に沿うとともに水平方向にほぼ等間隔で、堤防法面2とほぼ平行して又は堤防法面2に対して所定の角度で複数配置されている。堤防法面2の上下方向とは、水平方向と直交する堤防法面2の法肩と法尻とを結ぶ方向である。 As shown in FIG. 2, the vertical beam member 5 is provided along the vertical direction of the embankment slope 2 and at substantially equal intervals in the horizontal direction, substantially parallel to the embankment slope 2 or with respect to the embankment slope 2. A plurality of them are arranged at a predetermined angle. The vertical direction of the embankment slope 2 is a direction connecting the slope and the tail of the embankment slope 2 orthogonal to the horizontal direction.

前記縦梁部材5は、堤防法面2の上下方向に沿って間隔を空けて複数配置された柱部材4、4…の上端部を相互に連結している。これにより、前記縦梁部材5は、堤防法面2の上方にコンクリート充填用の空間を空けた状態で配置されるようになる。 The vertical beam member 5 connects the upper ends of a plurality of column members 4, 4, ... Arranged at intervals along the vertical direction of the embankment slope 2 to each other. As a result, the vertical beam member 5 is arranged with a space for filling concrete above the embankment slope 2.

前記縦梁部材5には、前記柱部材4に対する固定用の前記ボルト11が挿通される開孔が部材長手方向に沿って所定の間隔で複数形成されている。 The vertical beam member 5 is formed with a plurality of openings through which the bolts 11 for fixing to the column member 4 are inserted at predetermined intervals along the longitudinal direction of the member.

前記縦梁部材5に形成される開孔は、図4に示されるように、部材長手方向に沿って長い長孔12であるのが好ましい。これにより、この長孔12にボルト11を挿通して柱部材4に固定する際、縦梁部材5の部材長手方向に沿った位置調整がしやすくなる。 As shown in FIG. 4, the opening formed in the vertical beam member 5 is preferably an elongated hole 12 long along the longitudinal direction of the member. As a result, when the bolt 11 is inserted into the elongated hole 12 and fixed to the column member 4, the position of the vertical beam member 5 can be easily adjusted along the longitudinal direction of the member.

図6に示されるように、前記縦梁部材5を柱部材4に固定する際の設置作業を容易化するため、前記柱部材4に、縦梁部材5を支持可能な支持部13を設けるのが好ましい。前記支持部13を設けることにより、支持部13の上に縦梁部材5を仮置きした状態で、ボルト11による固定作業を行うことができるので、縦梁部材5の高さ調整がより一層簡単にできるようになる。前記支持部13は、山形鋼などの鋼材が用いられ、柱部材4の所定位置に、縦梁部材5の設置角度に応じた傾斜角で溶接等の接合手段によって固設されている。なお、前記支持部13を設けた場合、前記縦梁部材5の位置決めが容易にできるため、縦梁部材5に形成される前記ボルト11を挿通するための開孔は、必ずしも長孔12にする必要はなく、円形でも構わない。 As shown in FIG. 6, in order to facilitate the installation work when fixing the vertical beam member 5 to the column member 4, the column member 4 is provided with a support portion 13 capable of supporting the vertical beam member 5. Is preferable. By providing the support portion 13, the height adjustment of the vertical beam member 5 can be made even easier because the fixing work can be performed by the bolt 11 in a state where the vertical beam member 5 is temporarily placed on the support portion 13. You will be able to. A steel material such as angle steel is used for the support portion 13, and the support portion 13 is fixed at a predetermined position of the column member 4 by a joining means such as welding at an inclination angle corresponding to the installation angle of the vertical beam member 5. When the support portion 13 is provided, the vertical beam member 5 can be easily positioned. Therefore, the opening for inserting the bolt 11 formed in the vertical beam member 5 is not necessarily a long hole 12. It does not have to be circular and may be circular.

前記横梁部材6としては、山形鋼、溝形鋼、H形鋼などの形綱、丸棒や角棒などの鋼棒など、公知の鋼材を用いることができる。図1に示される実施形態例では山形鋼で構成されている。 As the cross beam member 6, known steel materials such as angle steel, channel steel, shaped steel such as H-shaped steel, and steel rod such as round bar and square bar can be used. In the embodiment shown in FIG. 1, it is made of angle steel.

前記横梁部材6は、図2に示されるように、堤防法面2の水平方向に沿って間隔を空けて複数配置された柱部材4、4…を相互に連結するように配置されている。柱部材4に対する固定位置は、前記縦梁部材5より下方側であれば任意である。前記縦梁部材5と横梁部材6とによって、図2に示されるように、平面視で、長方形又は正方形のマス目が上下方向及び水平方向に沿ってそれぞれ複数形成されるようになる。 As shown in FIG. 2, the cross beam members 6 are arranged so as to connect a plurality of column members 4, 4, ... Arranged at intervals along the horizontal direction of the embankment slope 2 to each other. The fixed position with respect to the column member 4 is arbitrary as long as it is below the vertical beam member 5. As shown in FIG. 2, the vertical beam member 5 and the horizontal beam member 6 form a plurality of rectangular or square squares in the vertical and horizontal directions, respectively, in a plan view.

次いで、前記コンクリートパネル7は、図2及び図7に示されるように、プレキャストコンクリート製の略長方形の平面形状からなる平板であり、長手方向を堤防法面2の水平方向、短手方向を堤防法面2の上下方向に向けて配置されている。 Next, as shown in FIGS. 2 and 7, the concrete panel 7 is a flat plate made of precast concrete and having a substantially rectangular planar shape, with the longitudinal direction being the horizontal direction of the embankment slope 2 and the lateral direction being the embankment. It is arranged so as to face the slope 2 in the vertical direction.

前記コンクリートパネル7は、薄型軽量化されたものを用いるのが好ましく、作業員が一人で持ち運び可能な重さ、又は小型の揚重機で吊り上げ可能な重さ、具体的には100kg以下、好ましくは20kg以下とするのが好ましい。従来のプレキャストコンクリートからなる被覆ブロックは2t(トン)程度の重量のものが多く、設置には大型の揚重機を要していた。一方、本設置構造1では、薄型軽量化されたコンクリートパネル7を用いているため、設置時に大型の揚重機が不要となり、橋下など上空制限のある場所でも施工が可能となる。コンクリートパネル7の具体的な大きさとしては、平面形状が300~700×800~1200mm程度で、厚さが30~50mm程度とするのが好ましい。 The concrete panel 7 is preferably thin and lightweight, and has a weight that can be carried by an operator alone or a weight that can be lifted by a small lifting machine, specifically 100 kg or less, preferably 100 kg or less. It is preferably 20 kg or less. Most of the conventional covering blocks made of precast concrete weigh about 2 tons (tons), and a large lifting machine is required for installation. On the other hand, in the present installation structure 1, since the thin and lightweight concrete panel 7 is used, a large lifting machine is not required at the time of installation, and the construction can be performed even in a place where the sky is restricted such as under a bridge. As a specific size of the concrete panel 7, it is preferable that the plane shape is about 300 to 700 × 800 to 1200 mm and the thickness is about 30 to 50 mm.

前記コンクリートパネル7は、外周の側面に、隣接するコンクリートパネル7の側面と嵌合する凹部又は凸部からなる嵌合部14が形成されている。前記嵌合部14は、隣接するコンクリートパネル7、7同士で凹部と凸部が嵌合することにより、コンクリートパネル7、7同士を接合するためのものである。前記嵌合部14は、図示例ではコンクリートパネル7の側面の全長に亘って形成されているが、所定の間隔を空けて数カ所程度設けるようにしてもよい。 The concrete panel 7 is formed with a fitting portion 14 formed of a concave portion or a convex portion that fits with the side surface of the adjacent concrete panel 7 on the outer peripheral side surface. The fitting portion 14 is for joining the concrete panels 7 and 7 by fitting the concave portion and the convex portion between the adjacent concrete panels 7 and 7. In the illustrated example, the fitting portions 14 are formed over the entire length of the side surface of the concrete panel 7, but may be provided at several locations at predetermined intervals.

前記コンクリートパネル7の下面には、該コンクリートパネル7を縦梁部材5に固定するための、先端が屈折した断面略L形の取付金具15を突設するのが好ましい。前記取付金具15は、コンクリートパネル7の短手方向に沿うとともに、長手方向に間隔を空けた左右対称の位置に少なくとも2本設けられている。断面略L形に形成された屈折する2辺のうちの一辺は、側辺側がコンクリートパネル7に埋設され固定されている。他の一辺は、コンクリートパネル7の下面から所定の高さだけ突出した位置で、コンクリートパネル7の下面とほぼ平行する先端屈折部16を形成している。1枚のコンクリートパネル7に設けられた複数の取付金具15、15は、先端がいずれも同じ方向に屈折するように配置されている。 On the lower surface of the concrete panel 7, it is preferable to project a mounting bracket 15 having a substantially L-shaped cross section with a bent tip for fixing the concrete panel 7 to the vertical beam member 5. At least two mounting brackets 15 are provided along the lateral direction of the concrete panel 7 and at symmetrical positions spaced apart from each other in the longitudinal direction. One of the two refracting sides formed in a substantially L-shaped cross section is fixed by embedding the side side in the concrete panel 7. The other side forms a tip refracting portion 16 substantially parallel to the lower surface of the concrete panel 7 at a position protruding from the lower surface of the concrete panel 7 by a predetermined height. The plurality of mounting brackets 15 and 15 provided on one concrete panel 7 are arranged so that their tips are all bent in the same direction.

前記コンクリートパネル7を縦梁部材5に固定するには、図8に示されるように、前記取付金具15の先端屈折部16とコンクリートパネル7の下面との間に縦梁部材5を嵌合するとともに、前記取付金具15の先端屈折部16と縦梁部材5との間に楔部材17を打ち込むことにより行うのが好ましい。前記楔部材17は、コンクリートパネル7を縦梁部材5に沿って順次固定する際に、既設側の端縁及び新設側の端縁の両方から打ち込むようにしてもよいが、既設側はコンクリートパネル7の側面に形成された嵌合部14の凹凸を嵌合させることにより固定を図り、新設側の端縁のみから楔部材17を打ち込むことによってコンクリートパネル7を縦梁部材5に固定するようにしてもよい。 In order to fix the concrete panel 7 to the vertical beam member 5, as shown in FIG. 8, the vertical beam member 5 is fitted between the tip refracting portion 16 of the mounting bracket 15 and the lower surface of the concrete panel 7. At the same time, it is preferable to drive the wedge member 17 between the tip refracting portion 16 of the mounting bracket 15 and the vertical beam member 5. When the concrete panel 7 is sequentially fixed along the vertical beam member 5, the wedge member 17 may be driven from both the edge on the existing side and the edge on the new side, but the existing side is a concrete panel. Fixing is achieved by fitting the unevenness of the fitting portion 14 formed on the side surface of 7, and the concrete panel 7 is fixed to the vertical beam member 5 by driving the wedge member 17 only from the edge on the new installation side. You may.

このように、前記楔部材17を打ち込むことによってコンクリートパネル7が縦梁部材5に固定できるため、固定作業が大幅に簡略化できる。また、前記楔部材17の打込み量に応じて、コンクリートパネル7の表面の高さを微調整できるので、表面の高さ調整がより一層容易になる。 In this way, the concrete panel 7 can be fixed to the vertical beam member 5 by driving the wedge member 17, so that the fixing work can be greatly simplified. Further, since the height of the surface of the concrete panel 7 can be finely adjusted according to the driving amount of the wedge member 17, the height of the surface can be adjusted more easily.

隣り合うコンクリートパネル7、7の側面同士を前記嵌合部14で嵌合させる際、図9に示されるように、(A)凹凸の嵌合部内に沿って、又は(B)隣り合うコンクリートパネル7、7の下面側の境界線に沿って、シール部材18を配置することにより、現場打ちコンクリート8の打設時にコンクリートパネル7、7の接合部から現場打ちコンクリート8が漏れるのを防止するのが好ましい。前記シール部材18は、ゴムやシリコンなどの樹脂材によって構成された防水部材である。 When the side surfaces of the adjacent concrete panels 7 and 7 are fitted to each other by the fitting portion 14, as shown in FIG. 9, (A) along the uneven fitting portion, or (B) adjacent concrete panels By arranging the sealing member 18 along the boundary line on the lower surface side of the concrete panels 7 and 7, it is possible to prevent the cast-in-place concrete 8 from leaking from the joint portion of the concrete panels 7 and 7 when the cast-in-place concrete 8 is placed. Is preferable. The seal member 18 is a waterproof member made of a resin material such as rubber or silicon.

次に、上記設置構造1の施工方法について説明する。先ずはじめに、図10に示されるように、上端部を堤防法面2から突出した状態で、堤防法面2の上下方向及び水平方向にそれぞれ間隔を空けて複数の柱部材4、4…を設置する。前記柱部材4は、小型の杭打ち機などを用いて下端部が堤防法面2に埋め込まれる。 Next, the construction method of the installation structure 1 will be described. First, as shown in FIG. 10, a plurality of pillar members 4, 4, ... Are installed at intervals in the vertical direction and the horizontal direction of the embankment slope 2 with the upper end portion protruding from the embankment slope 2. do. The lower end of the pillar member 4 is embedded in the embankment slope 2 by using a small pile driver or the like.

図11に示されるように、前記柱部材4の所定位置に、高さ調整しながら縦梁部材5を固定するとともに、横梁部材6を固定する。これらの固定にはボルト・ナットを用いることにより、溶接作業を不要とするのが好ましい。 As shown in FIG. 11, the vertical beam member 5 is fixed at a predetermined position of the column member 4 while adjusting the height, and the horizontal beam member 6 is fixed. It is preferable to use bolts and nuts for fixing these to eliminate the need for welding work.

次いで、図12に示されるように前記縦梁部材5にコンクリートパネル7を設置する。このコンクリートパネル7の固定には前述の楔部材17を用いることにより、溶接作業を不要とするのが好ましい。 Next, the concrete panel 7 is installed on the vertical beam member 5 as shown in FIG. It is preferable to eliminate the need for welding work by using the wedge member 17 described above for fixing the concrete panel 7.

しかる後、図1に示されるように、コンクリートパネル7と堤防法面2との間に現場打ちコンクリート8を充填して完了する。 After that, as shown in FIG. 1, cast-in-place concrete 8 is filled between the concrete panel 7 and the embankment slope 2 to complete the process.

次に、上記設置構造1の変形例について説明する。変形例に係る設置構造1Aでは、図13に示されるように、前記柱部材4が、下端部が堤防法面2に埋め込まれ上端部が堤防法面2から突出した埋め込み支持部材20に固定されている。すなわち、前記柱部材4は、前記埋め込み支持部材20を介して堤防法面2に固定されている。 Next, a modified example of the installation structure 1 will be described. In the installation structure 1A according to the modified example, as shown in FIG. 13, the pillar member 4 is fixed to the embedded support member 20 whose lower end is embedded in the embankment slope 2 and whose upper end is projected from the embankment slope 2. ing. That is, the pillar member 4 is fixed to the embankment slope 2 via the embedded support member 20.

前記埋め込み支持部材20には、図14(A)に示されるように、上端に部材長手方向に沿って長い切欠き部21が形成されている。また、柱部材4の下端部には、同図14(B)に示されるように、固定ボルトが挿通可能な開孔22が1箇所又は部材長手方向に沿って複数箇所形成されている。前記埋め込み支持部材20に柱部材4を固定するには、埋め込み支持部材20の切欠き部12及び柱部材4の開孔22に固定ボルト23を挿通し、ナットで固定する。前記固定ボルト23を切欠き部21の任意の位置で固定することにより、柱部材4の設置高さの調整が可能となり、この柱部材4の上端部に固定された縦梁部材5の設置高さの調整もできるようになる。 As shown in FIG. 14A, the embedded support member 20 is formed with a long notch 21 at the upper end along the longitudinal direction of the member. Further, as shown in FIG. 14B, the lower end portion of the pillar member 4 is formed with one opening hole 22 through which the fixing bolt can be inserted or a plurality of opening holes 22 along the longitudinal direction of the member. In order to fix the pillar member 4 to the embedded support member 20, a fixing bolt 23 is inserted into the notch 12 of the embedded support member 20 and the opening 22 of the pillar member 4 and fixed with a nut. By fixing the fixing bolt 23 at an arbitrary position of the notch portion 21, the installation height of the column member 4 can be adjusted, and the installation height of the vertical beam member 5 fixed to the upper end portion of the column member 4 can be adjusted. You will also be able to adjust the height.

本設置構造1Aでは、埋め込み支持部材20と柱部材4との間で高さ調整が行えるため、柱部材4、縦梁部材5及び横梁部材6を工場等で予め組み立てておき、ユニット化された柱及び梁部材を、前記埋め込み支持部材20に対して、設置高さを調整しつつ固定するようにしてもよい。これにより、堤防法面2での施工作業が簡略化できる。 In the present installation structure 1A, since the height can be adjusted between the embedded support member 20 and the column member 4, the column member 4, the vertical beam member 5, and the horizontal beam member 6 are assembled in advance at a factory or the like and unitized. The columns and beam members may be fixed to the embedded support member 20 while adjusting the installation height. As a result, the construction work on the levee slope 2 can be simplified.

〔他の形態例〕
図16に示されるように、前記横梁部材6として、複数のアンカーボルト24、24…によって堤防法面2に固定されるH形鋼を用いるとともに、前記縦梁部材5として、コンクリート製の梁材を用い、前記柱部材4として、下端が前記横梁部材6の上面に固定されるとともに、上端に縦梁部材5が支持される、上下方向に伸縮可能なジャッキを用いることにより、前記ジャッキ(柱部材4)の伸縮により縦梁部材5の設置高さが調整自在とした設置構造1Bとすることも可能である。
[Examples of other forms]
As shown in FIG. 16, as the cross beam member 6, H-shaped steel fixed to the embankment slope 2 by a plurality of anchor bolts 24, 24 ... Is used, and as the vertical beam member 5, a concrete beam material is used. By using a jack (column) that can be expanded and contracted in the vertical direction, the lower end of which is fixed to the upper surface of the cross beam member 6 and the vertical beam member 5 is supported at the upper end of the pillar member 4. It is also possible to form an installation structure 1B in which the installation height of the vertical beam member 5 can be adjusted by expanding and contracting the member 4).

コンクリート製の梁材からなる縦梁部材5にコンクリートパネル7を接合するには、接着剤によるか、縦梁部材5またはコンクリートパネル7にナットを埋設しておきボルトで固定するのが好ましい。 In order to join the concrete panel 7 to the vertical beam member 5 made of a concrete beam material, it is preferable to use an adhesive or to embed a nut in the vertical beam member 5 or the concrete panel 7 and fix it with bolts.

1・1A・1B…設置構造、2…堤防法面、4…柱部材、5…縦梁部材、6…横梁部材、7…コンクリートパネル、8…現場打ちコンクリート、10…切欠き部、11…ボルト、12…長孔、13…支持部、14…嵌合部、15…取付金具、16…先端屈折部、17…楔部材、20…支持部材、21…切欠き部、22…開孔、23…固定ボルト 1.1A / 1B ... Installation structure, 2 ... Embankment slope, 4 ... Pillar member, 5 ... Vertical beam member, 6 ... Horizontal beam member, 7 ... Concrete panel, 8 ... Cast-in-place concrete, 10 ... Notch, 11 ... Bolt, 12 ... long hole, 13 ... support part, 14 ... fitting part, 15 ... mounting bracket, 16 ... tip bending part, 17 ... wedge member, 20 ... support member, 21 ... notch part, 22 ... opening hole, 23 ... Fixing bolt

Claims (5)

上端部が堤防法面から突出した状態で、堤防法面の上下方向及び水平方向にそれぞれ間隔を空けて複数配置された柱部材と、堤防法面の上下方向に沿って配設され、前記柱部材の上端部を相互に連結する縦梁部材と、堤防法面の水平方向に沿って配設され、前記柱部材を相互に連結する横梁部材と、前記縦梁部材に固定され、前記柱部材、縦梁部材及び横梁部材を覆うとともに、堤防法面を覆うように設置されたコンクリートパネルと、前記コンクリートパネルと堤防法面との間に充填された現場打ちコンクリートとにより構成され、
前記縦梁部材の設置高さが調整自在となっており、
前記柱部材の上端部に部材長手方向に沿って長い切欠き部が形成され、前記柱部材と縦梁部材とが、前記切欠き部に挿通されるボルトで固定され、前記縦梁部材の設置高さの調整が、前記切欠き部における前記ボルトの固定位置を任意に変化させることにより行うことができるようになっていることを特徴とする堤防法面におけるコンクリートパネルの設置構造。
With the upper end protruding from the embankment slope, a plurality of pillar members are arranged at intervals in the vertical and horizontal directions of the embankment slope, and the pillars are arranged along the vertical direction of the embankment slope. A vertical beam member that connects the upper ends of the members to each other, a horizontal beam member that is arranged along the horizontal direction of the slope of the embankment and connects the pillar members to each other, and a column member that is fixed to the vertical beam member. It is composed of a concrete panel installed so as to cover the vertical beam member and the horizontal beam member and also to cover the embankment slope, and cast-in-place concrete filled between the concrete panel and the embankment slope.
The installation height of the vertical beam member is adjustable .
A long notch is formed at the upper end of the column member along the longitudinal direction of the member, and the column member and the vertical beam member are fixed by bolts inserted into the notch, and the vertical beam member is installed. A structure for installing a concrete panel on an embankment slope, characterized in that the height can be adjusted by arbitrarily changing the fixing position of the bolt in the notch .
前記縦梁部材に部材長手方向に沿って長い長孔が形成され、前記ボルトが前記長孔に挿通されることにより、前記縦梁部材の部材長手方向に沿った位置調整が自在となっている請求項記載の堤防法面におけるコンクリートパネルの設置構造。 A long elongated hole is formed in the vertical beam member along the longitudinal direction of the member, and the bolt is inserted into the elongated hole, so that the position of the vertical beam member can be freely adjusted along the longitudinal direction of the member. Installation structure of concrete panels on the slope of the embankment according to claim 1 . 前記柱部材の下端部が堤防法面に埋め込まれている請求項1、2いずれかに記載の堤防法面におけるコンクリートパネルの設置構造。 The structure for installing a concrete panel on the levee slope according to any one of claims 1 and 2, wherein the lower end portion of the pillar member is embedded in the levee slope. 前記柱部材は、下端部が堤防法面に埋め込まれ上端部が堤防法面から突出した埋め込み支持部材に固定されている請求項1、2いずれかに記載の堤防法面におけるコンクリートパネルの設置構造。 The structure for installing a concrete panel on the levee slope according to any one of claims 1 and 2 , wherein the lower end of the pillar member is embedded in the levee slope and the upper end is fixed to the embedded support member protruding from the levee slope. .. 前記コンクリートパネルの下面に先端が屈折した略L形の取付金具が突設され、前記取付金具の先端屈折部とコンクリートパネル下面との間に前記縦梁部材が嵌合され、前記取付金具の先端屈折部と前記縦梁部材との間に楔部材が打ち込まれることにより前記コンクリートパネルが前記縦梁部材に固定されている請求項1~いずれかに記載の堤防法面におけるコンクリートパネルの設置構造。 A substantially L-shaped mounting bracket having a bent tip is projected onto the lower surface of the concrete panel, and the vertical beam member is fitted between the tip bending portion of the mounting bracket and the lower surface of the concrete panel, and the tip of the mounting bracket is fitted. The concrete panel installation structure on the embankment slope according to any one of claims 1 to 4 , wherein the concrete panel is fixed to the vertical beam member by driving a wedge member between the bending portion and the vertical beam member. ..
JP2018120414A 2018-06-26 2018-06-26 Installation structure of concrete panels on the slope of the embankment Active JP7102251B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018120414A JP7102251B2 (en) 2018-06-26 2018-06-26 Installation structure of concrete panels on the slope of the embankment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018120414A JP7102251B2 (en) 2018-06-26 2018-06-26 Installation structure of concrete panels on the slope of the embankment

Publications (2)

Publication Number Publication Date
JP2020002550A JP2020002550A (en) 2020-01-09
JP7102251B2 true JP7102251B2 (en) 2022-07-19

Family

ID=69099217

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018120414A Active JP7102251B2 (en) 2018-06-26 2018-06-26 Installation structure of concrete panels on the slope of the embankment

Country Status (1)

Country Link
JP (1) JP7102251B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7436214B2 (en) 2019-03-29 2024-02-21 デンカ株式会社 Phosphor powders, composites and light emitting devices

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002212966A (en) 2001-01-17 2002-07-31 Shinkoo Corporation:Kk Construction method for earth retaining wall with landscape
JP2005155310A (en) 2003-10-28 2005-06-16 Joji Yamashita Retaining-wall building material
JP2006083571A (en) 2004-09-15 2006-03-30 Maruei Concrete Industries Co Ltd Revetment reinforcing method by using concrete panels

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS439893Y1 (en) * 1964-12-26 1968-04-30
JPS4742883Y1 (en) * 1967-04-06 1972-12-26
JPS4968504A (en) * 1972-11-08 1974-07-03
JPS60109422A (en) * 1983-11-16 1985-06-14 Furii Kogyo Kk Stabilization work for slope
US4728225A (en) * 1985-02-11 1988-03-01 Schnabel Foundation Company Method of rehabilitating a waterfront bulkhead
JP3594658B2 (en) * 1994-09-05 2004-12-02 広利 増田 Construction method of concrete body surface and concrete formwork used for it
JP3550002B2 (en) * 1997-08-19 2004-08-04 タカムラ総業株式会社 Remaining formwork

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002212966A (en) 2001-01-17 2002-07-31 Shinkoo Corporation:Kk Construction method for earth retaining wall with landscape
JP2005155310A (en) 2003-10-28 2005-06-16 Joji Yamashita Retaining-wall building material
JP2006083571A (en) 2004-09-15 2006-03-30 Maruei Concrete Industries Co Ltd Revetment reinforcing method by using concrete panels

Also Published As

Publication number Publication date
JP2020002550A (en) 2020-01-09

Similar Documents

Publication Publication Date Title
US8056299B2 (en) Foundation construction for superstructures
JP2007070859A (en) Base isolation construction method and base isolation structure of building
JP2007182741A (en) Differentially settled foundation correcting and reinforcing method by underpinning
JP5337276B1 (en) Seismic isolation device support unit for reverse driving method and construction method of seismic isolation structure using the same
US8286398B2 (en) Monopour form
JP7102251B2 (en) Installation structure of concrete panels on the slope of the embankment
JP2011006849A (en) Method for constructing foundation
JP7189001B2 (en) How to construct the foundation of a building
JP2015031105A (en) Retaining wall structure and construction method of retaining wall
CN112096096B (en) Positioning device for embedded steel plate and construction method thereof
JP2813605B2 (en) Construction foundation and construction method
JP3700119B2 (en) Pillar construction method
JPH116122A (en) Weed control panel for slope protection and laying method therefor
JPH10140582A (en) Aseismatic foundation and construction method thereof
JP7492402B2 (en) Wall structure and construction method for wall structure
JP2979122B2 (en) How to install anchor bolts for seismic isolation devices
JP4122924B2 (en) Seismic isolation method for existing structures
KR200389527Y1 (en) Retaining wall using sheet pile and composite pile
JP6871723B2 (en) How to build precast formwork and foundation structure
JP3567387B2 (en) How to build an underground skeleton
JP2023103666A (en) Shed and construction method thereof
JPH0384165A (en) Execution of setting of anchor bolt and setting apparatus therefor
KR20230110120A (en) Furring strip mounting method for enhanced safety and structure of the same
JP2015117518A (en) Temporary earth retaining device and construction method for earth retaining structure
JP2022163464A (en) support structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210531

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220318

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220330

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220526

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220701

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220706

R150 Certificate of patent or registration of utility model

Ref document number: 7102251

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150