JP7096468B1 - Anti-scattering net tension structure and anti-scattering net tension method - Google Patents

Anti-scattering net tension structure and anti-scattering net tension method Download PDF

Info

Publication number
JP7096468B1
JP7096468B1 JP2021137469A JP2021137469A JP7096468B1 JP 7096468 B1 JP7096468 B1 JP 7096468B1 JP 2021137469 A JP2021137469 A JP 2021137469A JP 2021137469 A JP2021137469 A JP 2021137469A JP 7096468 B1 JP7096468 B1 JP 7096468B1
Authority
JP
Japan
Prior art keywords
hook portion
rail
rail member
moving member
wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021137469A
Other languages
Japanese (ja)
Other versions
JP2023031773A (en
Inventor
匠 ▲高▼橋
Original Assignee
椿建設株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 椿建設株式会社 filed Critical 椿建設株式会社
Priority to JP2021137469A priority Critical patent/JP7096468B1/en
Application granted granted Critical
Publication of JP7096468B1 publication Critical patent/JP7096468B1/en
Publication of JP2023031773A publication Critical patent/JP2023031773A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

Figure 0007096468000001

【課題】簡便かつ効率的に設置および移動が可能な飛散防止ネットの張り構造等を提供する。
【解決手段】長手方向が上下方向になるように足場に取付けられるレール部材と、上端部の近傍に備えられる第1のフック部と、前記第1のフック部に比べて前記上端部から遠い位置に備えられる第2のフック部とを有し、前記レール部材に沿って前記長手方向に移動する移動部材と、前記第1のフック部に引っ掛けられ、前記第1のフック部から前記第2のフック部へ向かって引っ張られて前記移動部材に固定され、飛散防止ネットが取り付けられるワイヤーと、を有する飛散防止ネットの張り構造。
【選択図】図1

Figure 0007096468000001

PROBLEM TO BE SOLVED: To provide an upholstery structure of a shatterproof net which can be easily and efficiently installed and moved.
SOLUTION: A rail member attached to a scaffold so that the longitudinal direction is in the vertical direction, a first hook portion provided in the vicinity of the upper end portion, and a position far from the upper end portion as compared with the first hook portion. A moving member that has a second hook portion provided in the rail member and moves in the longitudinal direction along the rail member, and is hooked on the first hook portion and is hooked on the first hook portion to the second hook portion. A tension structure of a shatterproof net having a wire that is pulled toward a hook portion and fixed to the moving member to which a shatterproof net is attached.
[Selection diagram] Fig. 1

Description

特許法第30条第2項適用 令和3年5月7日に飛散防止ネットの張り構造を、東京都中央区の解体工事現場にて試験的に使用。Application of Article 30, Paragraph 2 of the Patent Law On May 7, 1991, the tension structure of the shatterproof net was used on a trial basis at the demolition work site in Chuo-ku, Tokyo.

本発明は、建物の解体時等における瓦礫等の飛散防止ネットの張り構造および飛散防止ネットの張り方法に関する。 The present invention relates to a structure for stretching a shatterproof net such as rubble and a method for stretching a shatterproof net when a building is dismantled.

建物の解体などを行う際には、解体時に生じる瓦礫などが、解体現場の周辺に飛散しないように、飛散防止ネットを張って作業を行うことにより、作業の安全性を高めることができる。瓦礫の飛散防止ネットとしては、解体対象となる建物の側面部分にネットを張るだけでなく、現場の上方にもネットを張ることにより、解体対象の建物の上方に飛散する瓦礫が発生した場合にも、現場の上方からの瓦礫の飛散を防止し、より高い安全性を確保できる。 When dismantling a building, the safety of the work can be improved by putting up a shatterproof net so that the debris generated during the demolition does not scatter around the demolition site. As a net to prevent the scattering of rubble, not only the net is put on the side part of the building to be demolished, but also the net is put on the upper part of the site, so that the rubble scattered above the building to be demolished is generated. However, it is possible to prevent the scattering of debris from above the site and ensure higher safety.

ここで、解体対象となる建物の側面部分にネットを張ることは、たとえば建物の側面に設ける足場などに飛散防止ネットを取り付けることにより、比較的容易に行うことができる。しかしながら、解体対象となる建物の上方にネットを張ることは、ネットを引っ掛ける対象(ワイヤーなど)を解体対象となる建物の上方部分に設ける必要があり、側面にネットを張る場合ほど簡単に行うことができない。 Here, it is relatively easy to put a net on the side surface portion of the building to be demolished, for example, by attaching a shatterproof net to a scaffolding provided on the side surface of the building. However, to put a net above the building to be demolished, it is necessary to provide a target to hook the net (wire etc.) in the upper part of the building to be demolished, and it is easier to put a net on the side. I can't.

解体対象となる建物の上方部分にネットを張る従来技術としては、解体対象となる建物の最上階の床材に支柱を設け、その支柱にワイヤーを架け渡し、ネットを張る方法が提案されている。また、床材に支柱の通過穴を形成し、支柱の固定部分を通過穴に通すことにより、支柱を階下に移動させる技術も提案されている。 As a conventional technique for putting a net on the upper part of a building to be demolished, a method has been proposed in which a pillar is provided on the floor material of the top floor of the building to be demolished, a wire is hung on the pillar, and a net is put up. .. In addition, a technique has been proposed in which a support hole is formed in the floor material and the fixed portion of the support is passed through the passage hole to move the support downstairs.

特開2019-127809号公報Japanese Unexamined Patent Publication No. 2019-127809

しかしながら、建物の床材に支柱を設置する技術では、床材との固定部分のみで支柱を支える必要があるため、固定部分を堅固に構成する必要があり、解体時の一時的な設置であることを考えると、支柱の設置作業に多くの時間と労力を要する問題がある。また、支柱を階下に移動させる作業も、支柱の重量なども考えるとかなりの手間であり、より簡便かつ効率的に設置および移動が可能な飛散防止ネットの張り構造が求められていた。 However, in the technique of installing columns on the floor material of a building, it is necessary to support the columns only by the fixed part with the floor material, so it is necessary to firmly configure the fixed part, which is a temporary installation at the time of dismantling. Considering this, there is a problem that it takes a lot of time and effort to install the columns. In addition, the work of moving the columns downstairs is also a considerable effort considering the weight of the columns, and there has been a demand for a shatterproof net tension structure that can be installed and moved more easily and efficiently.

本発明は、このような課題を解決するためになされたものであり、より簡便かつ効率的に設置および移動が可能な飛散防止ネットの張り構造等を提供する。 The present invention has been made to solve such a problem, and provides a stretch structure of a shatterproof net that can be installed and moved more easily and efficiently.

本発明に係る飛散防止ネットの張り構造は、
長手方向が上下方向になるように足場に取付けられるレール部材と、
上端部の近傍に備えられる第1のフック部と、前記第1のフック部に比べて前記上端部から遠い位置に備えられる第2のフック部とを有し、前記レール部材に沿って前記長手方向に移動する移動部材と、
前記第1のフック部に引っ掛けられ、前記第1のフック部から前記第2のフック部へ向かって引っ張られて前記移動部材に固定され、飛散防止ネットが取り付けられるワイヤーと、を有する。
The tension structure of the shatterproof net according to the present invention is
A rail member that is attached to the scaffold so that the longitudinal direction is up and down,
It has a first hook portion provided in the vicinity of the upper end portion and a second hook portion provided at a position farther from the upper end portion than the first hook portion, and has the longitudinal length along the rail member. Moving members that move in the direction and
It has a wire that is hooked on the first hook portion, pulled from the first hook portion toward the second hook portion, fixed to the moving member, and to which a shatterproof net is attached.

本発明に係る飛散防止ネットの張り構造は、足場に取り付けられるレール部材と、レール部材に沿って移動する移動部材を有し、飛散防止ネットが取り付けられるワイヤーは、第1のフック部と第2のフック部を介して移動部材に固定される。このような飛散防止ネットの張り構造では、移動部材がレール部材に沿って移動することにより、ワイヤーおよびワイヤーに取り付けられた飛散防止ネットを容易に上下方向に移動させることができる。また、レール部材は、足場に取り付けられるため、床材に立てる支柱に比べて、固定構造を簡略化することができ、設置が容易である。また、ワイヤーを固定する移動部材が、レール部材に対して容易に移動可能であるため、ワイヤーおよびネットを張った状態のまま、これらを移動部材ごと移動させることも可能である。 The tension structure of the shatterproof net according to the present invention has a rail member attached to the scaffold and a moving member moving along the rail member, and the wire to which the shatterproof net is attached includes a first hook portion and a second hook portion. It is fixed to the moving member via the hook portion of. In such an anti-scattering net tension structure, the moving member moves along the rail member, so that the wire and the anti-scattering net attached to the wire can be easily moved in the vertical direction. Further, since the rail member is attached to the scaffolding, the fixing structure can be simplified and the installation is easy as compared with the support column standing on the floor material. Further, since the moving member for fixing the wire can be easily moved with respect to the rail member, it is also possible to move the moving member together with the wire and the net in a stretched state.

また、たとえば、前記レール部材は、前記長手方向に直交する第1方向に開口し、前記移動部材の少なくとも一部を移動可能に収容する外溝部が形成されている外管部と、前記外管部と前記足場とを連結する連結部と、を有してもよい。 Further, for example, the rail member has an outer pipe portion that opens in a first direction orthogonal to the longitudinal direction and has an outer groove portion that movably accommodates at least a part of the moving member, and the outer pipe portion. It may have a connecting portion for connecting the portion and the scaffold.

このようなレール部材は、軽量かつ十分な強度を有し、確実に移動部材を移動可能に保持することが可能である。また、足場との着脱も容易である。 Such a rail member is lightweight, has sufficient strength, and can reliably hold the moving member in a movable manner. In addition, it is easy to attach and detach from the scaffolding.

また、たとえば、前記レール部材は、前記長手方向に直交する第1方向に開口し、前記移動部材の少なくとも一部を移動可能に収容する外溝部が形成されている外管部と、前記外管部と前記足場とを連結する連結部と、前記外管部の一方の端部に設けられ前記外管部の他方の端部が挿入可能な鞘管部と、を有する複数のレール単位を、上下方向に連結してなる。 Further, for example, the rail member has an outer pipe portion that opens in a first direction orthogonal to the longitudinal direction and has an outer groove portion that movably accommodates at least a part of the moving member, and the outer pipe portion. A plurality of rail units having a connecting portion connecting the portion and the scaffold, and a sheath pipe portion provided at one end of the outer pipe portion and into which the other end of the outer pipe portion can be inserted. It is connected in the vertical direction.

レール部材が、複数のレール単位を上下方向に連結してなることにより、レール部材の搬送が容易である。また、鞘管部を有することにより、容易かつ確実な連結が可能である。また、最上部のレール単位を外して、最下部のレール単位の下に付けるなどして、必要な部分に必要な長さのレール部材を、容易に設置することができる。 Since the rail member is formed by connecting a plurality of rail units in the vertical direction, the rail member can be easily transported. Further, by having the sheath tube portion, easy and reliable connection is possible. Further, by removing the uppermost rail unit and attaching it under the lowermost rail unit, a rail member having a required length can be easily installed in a required portion.

また、たとえば、前記移動部材は、前記外溝部に移動可能に収容される内管部を有し、前記第1のフック部と前記第2のフック部とは前記内管部に取り付けられており前記内管部と伴に前記長手方向に移動可能であってもよい。 Further, for example, the moving member has an inner pipe portion movably accommodated in the outer groove portion, and the first hook portion and the second hook portion are attached to the inner pipe portion. It may be movable in the longitudinal direction together with the inner tube portion.

内管部を有する移動部材は、単純で良好な強度を有する構造を実現できる。 The moving member having an inner pipe portion can realize a structure having a simple and good strength.

また、たとえば、前記内管部には、前記長手方向に直交し前記第1方向とは反対方向である第2方向に開口する内溝部が形成されていてもよい。 Further, for example, the inner pipe portion may be formed with an inner groove portion that is orthogonal to the longitudinal direction and opens in a second direction opposite to the first direction.

このような内溝部を有する内管部は、軽量で良好な強度を有する構造を実現できる。また、内溝部の開口方向と外溝部の開口方向を逆方向とすることにより、移動部材の移動時に、第1のフック部や第2のフック部が外管部に干渉したり、連結部が内管部に干渉したりする問題を防止できる。 The inner pipe portion having such an inner groove portion can realize a structure that is lightweight and has good strength. Further, by making the opening direction of the inner groove portion and the opening direction of the outer groove portion opposite to each other, the first hook portion and the second hook portion may interfere with the outer pipe portion or the connecting portion may interfere with the movement of the moving member. It is possible to prevent the problem of interfering with the inner pipe.

また、たとえば、前記第1のフック部は、前記ワイヤーを引っ掛ける滑車を有してもよい。 Further, for example, the first hook portion may have a pulley for hooking the wire.

第1のフック部が滑車を有することにより、ワイヤーを更に適切な張力で張ることが可能となる。また、ワイヤーが第1のフック部との接触部分で摩耗・損傷する問題を防止できる。 Since the first hook portion has a pulley, the wire can be further stretched with an appropriate tension. Further, it is possible to prevent the problem that the wire is worn or damaged at the contact portion with the first hook portion.

また、たとえば、前記第2のフック部は、前記ワイヤーを引張する巻き上げ機を有してもよい。 Further, for example, the second hook portion may have a winding machine for pulling the wire.

第2のフック部が巻き上げ機を有することにより、ワイヤーを更に適切な張力で張ることが可能となる。 By having the winding machine in the second hook portion, it becomes possible to stretch the wire with a more appropriate tension.

本発明に係る飛散防止ネットの張り方法は、
長手方向が上下方向になるように足場にレール部材を取り付ける工程と、
上端部の近傍に備えられる第1のフック部と、前記第1のフック部に比べ前記上端部から遠い位置に備えられる第2のフック部とを有する移動部材を、前記レール部材に沿って前記長手方向に移動可能にセットする工程と、
前記第1のフック部に引っ掛けた後、前記第1のフック部から前記第2のフック部に向かって引っ張ってワイヤーを前記移動部材に固定する工程と、
前記ワイヤーに飛散防止ネットを取り付ける工程と、を有する。
The method of stretching the shatterproof net according to the present invention is as follows.
The process of attaching the rail member to the scaffold so that the longitudinal direction is up and down,
A moving member having a first hook portion provided in the vicinity of the upper end portion and a second hook portion provided at a position farther from the upper end portion than the first hook portion is formed along the rail member. The process of setting it so that it can be moved in the longitudinal direction,
A step of hooking the wire to the first hook portion and then pulling the wire from the first hook portion toward the second hook portion to fix the wire to the moving member.
It has a step of attaching a shatterproof net to the wire.

このような飛散防止ネットの張り方法によれば、より簡便かつ効率的に設置および移動が可能な形態で飛散防止ネットを張ることができる。 According to such a method of stretching the shatterproof net, the shatterproof net can be stretched in a form that can be installed and moved more easily and efficiently.

また、たとえば、前記レール部材を前記足場に取り付ける工程は、前記長手方向に直交する第1方向に開口し前記移動部材の少なくとも一部を移動可能に収容する外溝部が形成されている1つの外管部と、前記外管部と前記足場とを連結する連結部と、前記外管部の一方の端部に設けられ前記外管部の他方の端部が挿入可能な鞘管部と、を有する複数のレール単位を、前記鞘管部を介して連結する工程を含んでもよい。 Further, for example, in the step of attaching the rail member to the scaffold, one outer groove portion is formed which is open in a first direction orthogonal to the longitudinal direction and movably accommodates at least a part of the moving member. A pipe portion, a connecting portion connecting the outer pipe portion and the scaffold, and a sheath pipe portion provided at one end of the outer pipe portion and into which the other end of the outer pipe portion can be inserted. A step of connecting a plurality of rail units having a plurality of rail units via the sheath tube portion may be included.

このようなレール部材は、レール単位に分離した状態で容易に解体現場に搬送し、迅速に組み立てて必要な場所(足場の上方部分など)に設置することができる。また、外溝部を有する外管部を有するレール単位は、軽量かつ良好な強度を奏する。 Such rail members can be easily transported to the dismantling site in a state of being separated into rail units, quickly assembled, and installed at a required place (such as the upper part of the scaffold). Further, the rail unit having the outer pipe portion having the outer groove portion is lightweight and exhibits good strength.

また、たとえば、上下方向に連結する複数の前記レール単位のうち、最上部の前記レール単位を取り外し、上下方向に連結する複数の前記レール単位のうち最下部の前記レール単位に、取り外した前記レール単位における前記外管部の前記他方の端部を、前記鞘管部を介して連結するレール移動工程を含んでもよい。 Further, for example, among the plurality of rail units connected in the vertical direction, the uppermost rail unit is removed, and the rail unit removed from the lowermost rail unit among the plurality of rail units connected in the vertical direction is removed. A rail moving step may be included in which the other end of the outer tube portion in the unit is connected via the sheath tube portion.

このような飛散防止ネットの張り方法によれば、容易にレール部材の位置を変更し、移動部材の位置を変えるための準備作業を、迅速に行うことができる。 According to such a method of tensioning the shatterproof net, the position of the rail member can be easily changed, and the preparatory work for changing the position of the moving member can be quickly performed.

また、たとえば、前記移動部材は、前記外溝部に前記長手方向に移動可能に収容される内管部を有し、前記第1のフック部と前記第2のフック部とは前記内管部に取り付けられており、前記第1のフック部と前記第2のフック部とを、前記内管部と伴に、前記レール部材に沿って下方に移動させる工程を含んでもよい。 Further, for example, the moving member has an inner pipe portion movably accommodated in the outer groove portion in the longitudinal direction, and the first hook portion and the second hook portion are housed in the inner pipe portion. It may include a step of moving the first hook portion and the second hook portion downward along the rail member together with the inner pipe portion.

このような飛散防止ネットの張り方法によれば、ワイヤーおよびネットを張った状態のまま、内管部を移動させることで、迅速かつ容易に飛散防止ネットの高さ方向の位置を変更することができる。 According to such a method of stretching the shatterproof net, the position of the shatterproof net in the height direction can be changed quickly and easily by moving the inner pipe portion while the wire and the net are stretched. can.

図1は、本発明の第1実施形態に係る飛散防止ネットの張り構造の全体像を示す概念図である。FIG. 1 is a conceptual diagram showing an overall image of the tension structure of the shatterproof net according to the first embodiment of the present invention. 図2は、図1に示す飛散防止ネットの張り構造の部分拡大図である。FIG. 2 is a partially enlarged view of the tension structure of the shatterproof net shown in FIG. 図3は、図2に示す飛散防止ネットの張り構造の一部をさらに拡大した部分拡大図である。FIG. 3 is a partially enlarged view of a part of the tension structure of the shatterproof net shown in FIG. 2. 図4は、図2に示す飛散防止ネットの張り構造の一部を異なる方向から見た部分拡大図である。FIG. 4 is a partially enlarged view of a part of the tension structure of the shatterproof net shown in FIG. 2 as viewed from different directions. 図5は、図1に示す飛散防止ネットの張り構造におけるレール部材のレール単位を有する外観図である。FIG. 5 is an external view having a rail unit of a rail member in the tension structure of the shatterproof net shown in FIG. 図6は、図1に示す飛散防止ネットの張り構造における内管部と、内管部に取り付けられる第1および第2のフック部の一部とを示す外観図である。FIG. 6 is an external view showing an inner pipe portion in the tension structure of the shatterproof net shown in FIG. 1 and a part of the first and second hook portions attached to the inner pipe portion. 図7は、図1に示す飛散防止ネットの張り構造における外管部および鞘管部を示す外観図である。FIG. 7 is an external view showing an outer tube portion and a sheath tube portion in the tension structure of the shatterproof net shown in FIG. 図8は、図1に示す飛散防止ネットの張り構造におけるレール部材と移動部材の形状を表す断面図である。FIG. 8 is a cross-sectional view showing the shapes of the rail member and the moving member in the tension structure of the shatterproof net shown in FIG. 図9は、複数のレール単位の連結構造を示す部分拡大図である。FIG. 9 is a partially enlarged view showing a connection structure of a plurality of rail units. 図10は、内管部を示す外観図である。FIG. 10 is an external view showing an inner pipe portion. 図11は、図1に示す飛散防止ネットの張り構造を上方から見た概念図である。FIG. 11 is a conceptual diagram of the tension structure of the shatterproof net shown in FIG. 1 as viewed from above. 図12は、本発明の第2実施形態に係る飛散防止ネットの張り構造におけるレール部材と移動部材の一部を示す部分拡大図である。FIG. 12 is a partially enlarged view showing a part of a rail member and a moving member in the tension structure of the shatterproof net according to the second embodiment of the present invention. 図13は、図12に示すレール部材および移動部材を、図12とは異なる方向から見た外観図である。FIG. 13 is an external view of the rail member and the moving member shown in FIG. 12 as viewed from a direction different from that in FIG. 図14は、図12に示す飛散防止ネットの張り構造におけるレール部材と移動部材の形状を表す断面図である。FIG. 14 is a cross-sectional view showing the shapes of the rail member and the moving member in the tension structure of the shatterproof net shown in FIG. 図15は、飛散防止ネットの移動方法を説明するための概念図である。FIG. 15 is a conceptual diagram for explaining a method of moving the shatterproof net.

以下、実施形態を挙げて本発明を説明する。ただし、本発明の技術的範囲は、以下に述べるような実施形態のみに限定されるものではない。 Hereinafter, the present invention will be described with reference to embodiments. However, the technical scope of the present invention is not limited to the embodiments described below.

第1実施形態
図1は、本発明の第1実施形態に係る飛散防止ネットの張り構造10の全体像を示す概念図である。なお、図1では、飛散防止ネットの張り構造10の全体構成を視認しやすくするために、飛散防止ネット60そのものについては、表示していない。飛散防止ネット60については、図11を用いて後述する。
1st Embodiment FIG. 1 is a conceptual diagram which shows the whole image of the tension structure 10 of the shatterproof net which concerns on 1st Embodiment of this invention. In FIG. 1, the shatterproof net 60 itself is not shown in order to make it easier to visually recognize the overall configuration of the shatterproof net tension structure 10. The shatterproof net 60 will be described later with reference to FIG.

図1に示すように、飛散防止ネットの張り構造10は、建物64の解体現場等において用いられる。飛散防止ネットの張り構造10では、図1に示すように、解体対象である建物64の最上部から上方に所定の距離オフセットした位置にワイヤー50を張った後、図11に示すように、ワイヤー50の間に飛散防止ネット60を掛けることにより、飛散防止ネット60を設置する。図11に示すように、飛散防止ネット60は、解体対象である建物64の上方を覆うように設置され、建物64の上方から瓦礫などが飛散することを効果的に防止することができる。 As shown in FIG. 1, the shatterproof net tension structure 10 is used at a demolition site of a building 64 or the like. In the shatterproof net tension structure 10, as shown in FIG. 1, the wire 50 is stretched upward from the top of the building 64 to be demolished at a position offset by a predetermined distance, and then the wire is stretched as shown in FIG. The shatterproof net 60 is installed by hanging the shatterproof net 60 between the 50s. As shown in FIG. 11, the shatterproof net 60 is installed so as to cover the upper part of the building 64 to be demolished, and can effectively prevent debris and the like from scattering from the upper part of the building 64.

図1に示すように、飛散防止ネットの張り構造10では、建物64の外周に設けられる足場54の間にワイヤー50を張り、飛散防止ネット60を引っ掛ける場所を形成する。これにより、飛散防止ネット60が過剰に下方に垂れ下がることを防止し、重機68などが配置される解体作業スペースを確保する。 As shown in FIG. 1, in the shatterproof net tension structure 10, a wire 50 is stretched between scaffolds 54 provided on the outer periphery of the building 64 to form a place for hooking the shatterproof net 60. This prevents the shatterproof net 60 from hanging excessively downward, and secures a dismantling work space in which heavy machinery 68 and the like are arranged.

なお、図11に示す例では、2本のワイヤー50により1枚の飛散防止ネット60を張っているが、飛散防止ネットの張り構造10としてはこれに限定されない。たとえば、解体対象の投影面積が広い場合などには、たとえば図11に示す2本のワイヤー50から略等距離の位置に、さらに2本のワイヤー50を追加し、合計4本のワイヤー50に、2枚の飛散防止ネットを張ることができる。また、解体対象の投影面積がさらに広い場合には、ワイヤー50の本数をさらに増やすことにより、下方への垂れ下がりを防止しつつ、飛散防止ネット60を張ることができる。 In the example shown in FIG. 11, one shatterproof net 60 is stretched by two wires 50, but the stretch structure 10 of the shatterproof net is not limited to this. For example, when the projected area of the object to be dismantled is large, for example, two wires 50 are added at positions approximately equidistant from the two wires 50 shown in FIG. 11, and a total of four wires 50 are added. Two shatterproof nets can be set up. When the projected area of the object to be dismantled is further large, the number of wires 50 can be further increased to prevent the shattering prevention net 60 from hanging downward.

図1に示すように、飛散防止ネットの張り構造10では、ワイヤー50と、ワイヤー50の端部を固定する移動部材30およびレール部材20を有する。移動部材30およびレール部材20は、ワイヤー50の両端に対応するように2組設けられるが、2組の移動部材30およびレール部材20は、互いに同様の構造を有し、略対称に設けられるものである。したがって、飛散防止ネットの張り構造10の説明では、主としてワイヤー50の一方の端部を固定する移動部材30およびレール部材20(図1右側)についてのみ説明を行い、ワイヤー50の他方の端部を固定する移動部材30およびレール部材20(図1左側)については、説明を省略する。 As shown in FIG. 1, the tension structure 10 of the shatterproof net has a wire 50, a moving member 30 for fixing an end portion of the wire 50, and a rail member 20. Two sets of the moving member 30 and the rail member 20 are provided so as to correspond to both ends of the wire 50, but the two sets of the moving member 30 and the rail member 20 have similar structures to each other and are provided substantially symmetrically. Is. Therefore, in the description of the tension structure 10 of the shatterproof net, only the moving member 30 and the rail member 20 (right side in FIG. 1) for fixing one end of the wire 50 will be mainly described, and the other end of the wire 50 will be described. The description of the moving member 30 and the rail member 20 (left side in FIG. 1) to be fixed will be omitted.

図2は、図1に示す飛散防止ネットの張り構造10の右側部分を拡大して表示した部分拡大図である。ただし、ワイヤー50の一部については、図示を省略している。図2に示すように、飛散防止ネットの張り構造10は、足場54に取付けられるレール部材20と、レール部材20に沿ってレール部材20の長手方向に沿って移動する移動部材30と、移動部材30に端部が固定されるワイヤー50を有する。 FIG. 2 is a partially enlarged view showing an enlarged right side portion of the tension structure 10 of the shatterproof net shown in FIG. 1. However, the illustration of a part of the wire 50 is omitted. As shown in FIG. 2, the tension structure 10 of the shatterproof net includes a rail member 20 attached to the scaffold 54, a moving member 30 that moves along the rail member 20 along the longitudinal direction of the rail member 20, and a moving member. It has a wire 50 whose end is fixed to 30.

図2に示すように、レール部材20は、足場54の上端付近に設けられる。また、レール部材20は、長手方向が足場54の上下方向に沿うように、足場54に取り付けられる。また、レール部材20は、足場54の上端付近にのみ、たとえば枠組足場(1段が1600~1800mm)の上から3段~4段分程度の範囲に設けることができ、それより下方の足場54には、レール部材20を設けなくてもよい。なお、レール部材20の足場54への取付位置および取付手順については、後ほど詳述する。 As shown in FIG. 2, the rail member 20 is provided near the upper end of the scaffold 54. Further, the rail member 20 is attached to the scaffold 54 so that the longitudinal direction is along the vertical direction of the scaffold 54. Further, the rail member 20 can be provided only near the upper end of the scaffold 54, for example, in a range of about 3 to 4 steps from the top of the framework scaffold (1 step is 1600 to 1800 mm), and the scaffold 54 below it. It is not necessary to provide the rail member 20 in the above. The mounting position and mounting procedure of the rail member 20 on the scaffold 54 will be described in detail later.

図3は、図2に示す飛散防止ネットの張り構造10の一部をさらに拡大した部分拡大図である。図2および図3に示すように、レール部材20は、複数のレール単位21を、上下方向に連結してなる。図2に示す実施形態において、レール部材20は、4つのレール単位21を上下方向に連結して構成されるが、レール部材20に含まれるレール単位21の数は特に限定されない。 FIG. 3 is a partially enlarged view of a part of the tension structure 10 of the shatterproof net shown in FIG. 2. As shown in FIGS. 2 and 3, the rail member 20 is formed by connecting a plurality of rail units 21 in the vertical direction. In the embodiment shown in FIG. 2, the rail member 20 is configured by connecting four rail units 21 in the vertical direction, but the number of rail units 21 included in the rail member 20 is not particularly limited.

図5は、レール部材20を構成する1つのレール単位21を拡大して表示した概略斜視図である。図5に示すように、レール単位21は、外管部24と、連結部28と、鞘管部27とを有する。外管部24には、レール部材20の長手方向に直交する第1方向X1(建物64の内側方向または足場54の方向とは逆方向(図3参照))に開口する外溝部25が形成されている。 FIG. 5 is a schematic perspective view showing an enlarged view of one rail unit 21 constituting the rail member 20. As shown in FIG. 5, the rail unit 21 has an outer pipe portion 24, a connecting portion 28, and a sheath pipe portion 27. The outer pipe portion 24 is formed with an outer groove portion 25 that opens in a first direction X1 (inward direction of the building 64 or in a direction opposite to the direction of the scaffold 54 (see FIG. 3)) orthogonal to the longitudinal direction of the rail member 20. ing.

図4は、図3に示す飛散防止ネットの張り構造10を、レール部材20の長手方向に直交する第1方向X1側(建物64の内側)から見た概略図である。図4に示すように、レール部材20を構成するレール単位21の外溝部25は、移動部材30の少なくとも一部を移動可能に収容する。レール部材20では、各レール単位21の外溝部25が上下方向に繋がっており、移動部材30は、1つのレール単位21の外溝部25から、下方の他の1つのレール単位21の外溝部25へ、スライドして移動することができる。 FIG. 4 is a schematic view of the shatterproof net tension structure 10 shown in FIG. 3 as viewed from the first direction X1 side (inside the building 64) orthogonal to the longitudinal direction of the rail member 20. As shown in FIG. 4, the outer groove portion 25 of the rail unit 21 constituting the rail member 20 movably accommodates at least a part of the moving member 30. In the rail member 20, the outer groove portion 25 of each rail unit 21 is connected in the vertical direction, and the moving member 30 has the outer groove portion 25 of one rail unit 21 below from the outer groove portion 25 of one rail unit 21. Can be slid to move.

図5に示すように、外管部24には連結部28が取り付けられている。連結部28は、クランプ28aと、クランプ28aを外溝部25の溝底部26に形成される貫通孔26a(図7参照)に固定するクランプ固定ナット28bとを有する。図3に示すように、クランプ28aが足場54を把持することにより、外管部24が足場54に連結される。連結部28がクランプ28aを有することにより、レール部材20を構成するレール単位21を、容易に足場54に対して着脱することができる。ただし、連結部28としては、図3および図5に示すようなクランプ28aを有するもののみには限定されない。 As shown in FIG. 5, a connecting portion 28 is attached to the outer pipe portion 24. The connecting portion 28 has a clamp 28a and a clamp fixing nut 28b for fixing the clamp 28a to the through hole 26a (see FIG. 7) formed in the groove bottom portion 26 of the outer groove portion 25. As shown in FIG. 3, the clamp 28a grips the scaffold 54, so that the outer pipe portion 24 is connected to the scaffold 54. Since the connecting portion 28 has the clamp 28a, the rail unit 21 constituting the rail member 20 can be easily attached to and detached from the scaffold 54. However, the connecting portion 28 is not limited to the one having the clamp 28a as shown in FIGS. 3 and 5.

また、図5に示す例では、1つのレール単位21が2つの連結部28を備えているが、レール単位21が有する連結部28の数は、1つであってもよく、3つ以上であってもよい。なお、図5では、クランプ28aの姿勢が、図3に示す足場54への連結時とは異なる状態になっているが、クランプ28aは、クランプ固定ナット28bを緩めれば、容易に姿勢を変えることができる。 Further, in the example shown in FIG. 5, one rail unit 21 includes two connecting portions 28, but the number of connecting portions 28 included in the rail unit 21 may be one or three or more. There may be. In FIG. 5, the posture of the clamp 28a is different from that at the time of connection to the scaffold 54 shown in FIG. 3, but the posture of the clamp 28a can be easily changed by loosening the clamp fixing nut 28b. be able to.

図5に示すように、外管部24の一方の端部24a(下方側の端部)には、他のレール単位21の外管部24の他方の端部24b(上方側の端部)が挿入可能な鞘管部27が設けられている。 As shown in FIG. 5, one end 24a (lower end) of the outer pipe portion 24 has the other end 24b (upper end) of the outer pipe portion 24 of the other rail unit 21. Is provided with a sheath tube portion 27 into which the sheath tube portion 27 can be inserted.

図7(a)は、レール単位21の外管部24および鞘管部27を側方から見た平面図であり、図7(b)は外管部24および鞘管部27を第1方向X1とは反対方向である第2方向X2(建物64の外側方向または足場54の方向(図3参照))から見た平面図であり、図7(c)は外管部24および鞘管部27を下方から見た平面図である。なお、図7(a)~図7(c)では、図5に示すレール単位21の連結部28については、図示していない。 FIG. 7 (a) is a plan view of the outer pipe portion 24 and the sheath pipe portion 27 of the rail unit 21 as viewed from the side, and FIG. 7 (b) shows the outer pipe portion 24 and the sheath pipe portion 27 in the first direction. It is a plan view seen from the second direction X2 (outside direction of a building 64 or the direction of a scaffold 54 (see FIG. 3)) which is the direction opposite to X1, and FIG. 7 (c) shows the outer pipe part 24 and the sheath pipe part. 27 is a plan view of 27 as viewed from below. In FIGS. 7 (a) to 7 (c), the connecting portion 28 of the rail unit 21 shown in FIG. 5 is not shown.

図7(a)~図7(c)から理解できるように、外管部24は、略C字状の断面を有しており、いわゆるリップ溝形鋼と呼ばれる形状である。鞘管部27は、外管部24の一方の端部24aに、一方の端部24aの外周を包むように接続されている。鞘管部27の一部は、外管部24の一方の端部24aから下方に突出しており、図3、図4および図7に示すように、鞘管部27における下方に突出した部分に、下方に接続する他のレール単位21における外管部24の他方の端部24bが挿入される。 As can be understood from FIGS. 7 (a) to 7 (c), the outer pipe portion 24 has a substantially C-shaped cross section and has a shape called a so-called lip channel steel. The sheath tube portion 27 is connected to one end portion 24a of the outer tube portion 24 so as to wrap the outer circumference of the one end portion 24a. A part of the sheath tube portion 27 projects downward from one end portion 24a of the outer tube portion 24, and as shown in FIGS. 3, 4, and 7, the portion of the sheath tube portion 27 protruding downward. , The other end 24b of the outer pipe portion 24 in the other rail unit 21 connected downward is inserted.

図5に示すように、鞘管部27は、外管部24と同様に第1方向に開口する溝部を有し、外管部24より長手方向の長さが短いリップ溝形鋼の形状を有するが、鞘管部27の形状としては、これのみには限定されず、レール単位21を連結する他の形状であってもかまわない。 As shown in FIG. 5, the sheath tube portion 27 has a groove portion that opens in the first direction like the outer tube portion 24, and has a shape of a lip channel steel having a length shorter in the longitudinal direction than the outer tube portion 24. However, the shape of the sheath tube portion 27 is not limited to this, and may be another shape connecting the rail unit 21.

図7(b)に示すように、外管部24における第2方向X2側の管壁である溝底部26には、複数の貫通孔26aが所定の間隔で形成されている。貫通穴26aには、図5に示す連結部28を取り付けることが可能である。また、図7(a)に示すように、外管部24の管壁のうち第1方向X1および長手方向に直交する側壁には、側方貫通孔24cが形成されている。 As shown in FIG. 7B, a plurality of through holes 26a are formed at predetermined intervals in the groove bottom portion 26 which is a pipe wall on the second direction X2 side in the outer pipe portion 24. The connecting portion 28 shown in FIG. 5 can be attached to the through hole 26a. Further, as shown in FIG. 7A, a side through hole 24c is formed in the side wall of the outer pipe portion 24 which is orthogonal to the first direction X1 and the longitudinal direction.

図9は、2つのレール単位21の接続部分を拡大して表示した飛散防止ネットの張り構造10の部分拡大図である。図9に示すように、外管部24の側方貫通孔24cには、後述する移動部材30の移動を止めるストッパー29を取り付けることができる。図9に示すストッパー29は、ボルトおよびナットで構成されるが、ストッパー29としては、移動部材30の移動を止められるものであれば特に限定されない。 FIG. 9 is a partially enlarged view of the tension structure 10 of the shatterproof net in which the connection portion of the two rail units 21 is enlarged and displayed. As shown in FIG. 9, a stopper 29 for stopping the movement of the moving member 30, which will be described later, can be attached to the side through hole 24c of the outer pipe portion 24. The stopper 29 shown in FIG. 9 is composed of a bolt and a nut, but the stopper 29 is not particularly limited as long as it can stop the movement of the moving member 30.

図2に示すように、移動部材30は、上端部30aの近傍に備えられる第1のフック部32と、第1のフック部32に比べて上端部30aから遠い位置に備えられる第2のフック部34とを有し、レール部材20に沿って上下方向に移動することができる。 As shown in FIG. 2, the moving member 30 has a first hook portion 32 provided in the vicinity of the upper end portion 30a and a second hook provided at a position farther from the upper end portion 30a than the first hook portion 32. It has a portion 34 and can move in the vertical direction along the rail member 20.

図3および図4に示すように、移動部材30は、レール部材20の外溝部25に移動可能に収容される内管部36を有する。第1のフック部32と、第2のフック部34とは、内管部36に取り付けられており、内管部36と伴にレール部材20の長手方向(上下方向)に移動可能である。 As shown in FIGS. 3 and 4, the moving member 30 has an inner pipe portion 36 movably accommodated in the outer groove portion 25 of the rail member 20. The first hook portion 32 and the second hook portion 34 are attached to the inner pipe portion 36, and can move together with the inner pipe portion 36 in the longitudinal direction (vertical direction) of the rail member 20.

図6は、移動部材30が有する内管部36と、内管部36に取付けれる丸環32a、34aを示す概略図である。また、図10(a)は、内管部36を第1方向側から見た平面図であり、図10(b)は、内管部36を下方から見た平面図である。図6および図10に示すように、内管部36は、外管部24と同様に、略C字状の断面を有しており、いわゆるリップ溝形鋼と呼ばれる形状である。 FIG. 6 is a schematic view showing the inner pipe portion 36 of the moving member 30 and the circular rings 32a and 34a attached to the inner pipe portion 36. Further, FIG. 10A is a plan view of the inner pipe portion 36 viewed from the first direction side, and FIG. 10B is a plan view of the inner pipe portion 36 viewed from below. As shown in FIGS. 6 and 10, the inner pipe portion 36 has a substantially C-shaped cross section like the outer pipe portion 24, and has a shape called a so-called lip channel steel.

図10(b)に示すように、内管部36には、内溝部37が形成されている。図8は、図3に示す断面線に沿う飛散防止ネットの張り構造10の断面図であり、長手方向に直交する断面を示している。図8に示すように、内管部36の内溝部37は、長手方向とは直交し第1方向X1とは反対方向である第2方向X2(足場54の方向)に開口する。すなわち、内管部36の内溝部37は、外管部24の外溝部25とは反対方向に開口する。 As shown in FIG. 10B, an inner groove portion 37 is formed in the inner pipe portion 36. FIG. 8 is a cross-sectional view of the tension structure 10 of the shatterproof net along the cross-sectional line shown in FIG. 3, showing a cross-sectional view orthogonal to the longitudinal direction. As shown in FIG. 8, the inner groove portion 37 of the inner pipe portion 36 opens in the second direction X2 (direction of the scaffold 54) which is orthogonal to the longitudinal direction and opposite to the first direction X1. That is, the inner groove portion 37 of the inner pipe portion 36 opens in the direction opposite to the outer groove portion 25 of the outer pipe portion 24.

図8に示すように、内溝部37が第2方向X2に開口していることにより、外管部24の溝底部26に設けられるクランプ固定ナット28bが、内管部36の移動を妨げる問題を防止できる。図10(b)に示すように、内管部36の第1方向X1側の管壁である溝底部38には、複数の貫通孔38aが所定の間隔で形成されている。内管部36の溝底部38に形成される貫通孔38aには、図6に示すように、第1のフック部32の一部である丸環32aや、第2のフック部34の一部である丸環34aなどを取り付けることができる。 As shown in FIG. 8, since the inner groove portion 37 is open in the second direction X2, the clamp fixing nut 28b provided at the groove bottom portion 26 of the outer pipe portion 24 has a problem of hindering the movement of the inner pipe portion 36. Can be prevented. As shown in FIG. 10B, a plurality of through holes 38a are formed at predetermined intervals in the groove bottom portion 38 which is the pipe wall on the first direction X1 side of the inner pipe portion 36. As shown in FIG. 6, the through hole 38a formed in the groove bottom portion 38 of the inner pipe portion 36 has a circular ring 32a which is a part of the first hook portion 32 and a part of the second hook portion 34. A circular ring 34a or the like can be attached.

図3、図4および図8から理解できるように、飛散防止ネットの張り構造10では、移動部材30の内管部36が、レール部材20の外溝部25の内部をスライドして上下方向に移動可能である。また、図8に示すように、内管部24の溝底部38に固定する第1のフック部32や第2のフック部34は、開口を介して外管部24の外溝部25の外部に露出している。そのため、移動部材30の移動時において、第1のフック部32や第2のフック部34がレール部材20に引っ掛かる問題を防止し、移動部材30の円滑な移動を実現する。なお、図8では、図3における巻き上げ機35や足場54については図示していない。 As can be understood from FIGS. 3, 4 and 8, in the shatterproof net tension structure 10, the inner pipe portion 36 of the moving member 30 slides inside the outer groove portion 25 of the rail member 20 and moves in the vertical direction. It is possible. Further, as shown in FIG. 8, the first hook portion 32 and the second hook portion 34 fixed to the groove bottom portion 38 of the inner pipe portion 24 are located outside the outer groove portion 25 of the outer pipe portion 24 through the openings. It is exposed. Therefore, when the moving member 30 is moved, the problem that the first hook portion 32 and the second hook portion 34 are caught on the rail member 20 is prevented, and the moving member 30 is smoothly moved. Note that FIG. 8 does not show the winding machine 35 and the scaffolding 54 in FIG.

図3および図4に示すように、第1のフック部32は、丸環32aと、ワイヤー50を引っ掛ける滑車33とを有する。第1のフック部32が滑車33を有することにより、ワイヤー50を引く際の摩擦抵抗が軽減され、ワイヤー50をより適切なテンションで張ることができる。また、滑車33を用いることで、ワイヤー50の摩耗も防止できる。 As shown in FIGS. 3 and 4, the first hook portion 32 has a circular ring 32a and a pulley 33 for hooking the wire 50. Since the first hook portion 32 has the pulley 33, the frictional resistance when pulling the wire 50 is reduced, and the wire 50 can be stretched with a more appropriate tension. Further, by using the pulley 33, it is possible to prevent the wire 50 from being worn.

図6に示すように、丸環32aは、内管部36の溝底部38に固定される。また、図3に示すように、滑車33は、丸環32aに繋いで取付けられる。 As shown in FIG. 6, the circular ring 32a is fixed to the groove bottom portion 38 of the inner pipe portion 36. Further, as shown in FIG. 3, the pulley 33 is connected to and attached to the circular ring 32a.

図3および図4に示すように、第2のフック部34は、丸環34aと、ワイヤー50を引張する巻き上げ機35を有する。巻き上げ機35としては、特に限定されないが、レバーブロック(登録商標)や、レバーホイストなどの手動式の巻き上げ機や、電動ウインチのような電動式の巻き上げ機を用いることができるが、特に限定されない。第2のフック部34が巻き上げ機35を有することにより、ワイヤー50を更に適切な張力で張ることができる。 As shown in FIGS. 3 and 4, the second hook portion 34 has a circular ring 34a and a winding machine 35 for pulling the wire 50. The hoist 35 is not particularly limited, but a lever block (registered trademark), a manual hoist such as a lever hoist, and an electric hoist such as an electric winch can be used, but the hoist is not particularly limited. .. By having the winding machine 35 in the second hook portion 34, the wire 50 can be further stretched with an appropriate tension.

図6に示すように、丸環34aは、内管部36の溝底部38に固定される。また、図3に示すように、巻き上げ機35は、丸環34aに繋がれる。また、図3に示すように、巻き上げ機35には、留め具52を介してワイヤー50の端部が接続される。 As shown in FIG. 6, the circular ring 34a is fixed to the groove bottom portion 38 of the inner pipe portion 36. Further, as shown in FIG. 3, the winding machine 35 is connected to the circular ring 34a. Further, as shown in FIG. 3, the end portion of the wire 50 is connected to the winding machine 35 via the fastener 52.

図3に示すように、ワイヤー50は、第1のフック部32に引っ掛けられ、第1のフック部32から第2のフック部34へ向かって引っ張られて移動部材30に固定される。また、図11に示すように、ワイヤー50には、飛散防止ネット60が、複数のフック(不図示)などを介して取り付けられる。ワイヤー50に取付けられる飛散防止ネット60の材質としては、特に限定されないが、軽量で強度の高い樹脂材料が好ましく、たとえば、ナイロン、ポリエステル、ポリプロピレン、ポロ塩化ビニルなどが挙げられる。また、飛散防止ネット60としては、難燃剤で基材をコーティングしたものも好ましい。 As shown in FIG. 3, the wire 50 is hooked on the first hook portion 32, pulled from the first hook portion 32 toward the second hook portion 34, and fixed to the moving member 30. Further, as shown in FIG. 11, a shatterproof net 60 is attached to the wire 50 via a plurality of hooks (not shown) or the like. The material of the shatterproof net 60 attached to the wire 50 is not particularly limited, but a lightweight and high-strength resin material is preferable, and examples thereof include nylon, polyester, polypropylene, and polyvinyl chloride. Further, as the shatterproof net 60, one coated with a base material with a flame retardant is also preferable.

次に、図1に示す飛散防止ネットの張り構造10を用いた飛散防止ネットの張り方向について説明する。飛散防止ネットの張り構造10を用いて飛散防止ネット60を張る場合、まず、図1に示すように、レール部材20を足場54に取付ける。この際、レール部材20は、長手方向が上下方向になるように、足場54の上端付近に取付けられる。 Next, the tensioning direction of the shatterproof net using the shatterproof net tension structure 10 shown in FIG. 1 will be described. When the shatterproof net 60 is stretched using the shatterproof net tension structure 10, the rail member 20 is first attached to the scaffold 54 as shown in FIG. At this time, the rail member 20 is attached near the upper end of the scaffold 54 so that the longitudinal direction is the vertical direction.

たとえば、レール部材20は、図5に示すようにレール単位21に分解して、解体現場に搬送される。図1に示すレール部材20は、足場54の上端側から下方側へ、4本のレール単位21を連結して構成される。レール単位21の足場54への固定は、図3に示すように、連結部28のクランプ28aを足場54に固定することにより行われる。さらに、固定したレール単位21の下方の鞘管部27に、次のレール単位21における外管部24の他方の端部24b(上端側)を差し込むことにより、複数のレール単位21を、鞘管部27を介して繋ぐことにより、1つのレール部材20を形成する。 For example, the rail member 20 is disassembled into rail units 21 and transported to a dismantling site as shown in FIG. The rail member 20 shown in FIG. 1 is configured by connecting four rail units 21 from the upper end side to the lower side of the scaffold 54. As shown in FIG. 3, the rail unit 21 is fixed to the scaffold 54 by fixing the clamp 28a of the connecting portion 28 to the scaffold 54. Further, by inserting the other end portion 24b (upper end side) of the outer pipe portion 24 in the next rail unit 21 into the sheath pipe portion 27 below the fixed rail unit 21, a plurality of rail units 21 can be connected to the sheath pipe portion 21. By connecting via the portion 27, one rail member 20 is formed.

レール部材20を構成するために連結されるレール単位21の数は、特に限定されない。ただし、足場54に形成されるレール部材20の全長(上下方向の長さ)は、後述する移動部材30の全長(上下方向長さ)より長いことが好ましく、移動部材30の全長より、少なくともレール単位21一本分以上長いことが、移動部材30の円滑な移動を行うために好ましい。 The number of rail units 21 connected to form the rail member 20 is not particularly limited. However, the total length (vertical length) of the rail member 20 formed on the scaffold 54 is preferably longer than the total length (vertical length) of the moving member 30 described later, and at least the rail is longer than the total length of the moving member 30. It is preferable that the unit is as long as one unit or more in order to smoothly move the moving member 30.

つぎに、図4に示すように、足場54に形成したレール部材20に移動部材30を取り付ける。移動部材30のレール部材20への取り付けは、レール部材20における外管部24の外溝部25に対して、上端側から移動部材30における内管部36(図6参照)を挿入することにより、行うことができる。この際、図9に示すように、レール部材20の所定の位置にストッパー29を設置しておく。これにより、上端側から外溝部25に挿入された内管部36の下端は、ストッパー29に接触して停止し、図3に示すように、移動部材30が所定の位置にセットされる。なお、この際、移動部材30は、ストッパー29を外せば、下方に移動可能な状態である。また、図3に示す滑車33の丸環32aへの取り付けや、巻き上げ機35の丸環34aへの取り付けは、移動部材30の内管部36が、外溝部25の所定位置にセットされた後に、行うことができる。 Next, as shown in FIG. 4, the moving member 30 is attached to the rail member 20 formed on the scaffold 54. The moving member 30 is attached to the rail member 20 by inserting the inner pipe portion 36 (see FIG. 6) of the moving member 30 into the outer groove portion 25 of the outer pipe portion 24 of the rail member 20 from the upper end side. It can be carried out. At this time, as shown in FIG. 9, the stopper 29 is installed at a predetermined position of the rail member 20. As a result, the lower end of the inner pipe portion 36 inserted into the outer groove portion 25 from the upper end side comes into contact with the stopper 29 and stops, and as shown in FIG. 3, the moving member 30 is set at a predetermined position. At this time, the moving member 30 is in a state where it can be moved downward by removing the stopper 29. Further, the pulley 33 shown in FIG. 3 is attached to the circular ring 32a and the winding machine 35 is attached to the circular ring 34a after the inner pipe portion 36 of the moving member 30 is set at a predetermined position of the outer groove portion 25. ,It can be carried out.

上述したレール部材20および移動部材30の設置は、図11に示すように飛散防止ネット60を張る場合には、足場54の4か所で行われる。 The rail member 20 and the moving member 30 described above are installed at four locations of the scaffold 54 when the shatterproof net 60 is stretched as shown in FIG.

次に、図2に示すように、移動部材30の第1フック部32に含まれる滑車33にワイヤー50を引っ掛けた後、ワイヤー50の端部を、留め具52等を介して第2のフック部34に含まれる巻き上げ機35に連結する。図1に示すように、ワイヤー50の他方の端部についても、別のレール部材20にセットされた移動部材30に対して、同様に連結される。 Next, as shown in FIG. 2, after hooking the wire 50 on the pulley 33 included in the first hook portion 32 of the moving member 30, the end portion of the wire 50 is hooked to the second hook via the fastener 52 or the like. It is connected to the winding machine 35 included in the unit 34. As shown in FIG. 1, the other end of the wire 50 is similarly connected to the moving member 30 set in another rail member 20.

次に、図3に示す巻き上げ機35を用いて、第1のフック部32から第2のフック部34に向かってワイヤー50を巻き上げて引っ張ることにより、適切なテンションでワイヤー50が張られた状態で、ワイヤー50が移動部材30に固定される。 Next, using the winding machine 35 shown in FIG. 3, the wire 50 is wound and pulled from the first hook portion 32 toward the second hook portion 34, so that the wire 50 is stretched with an appropriate tension. The wire 50 is fixed to the moving member 30.

次に、足場54の間に張られたワイヤー50に対して、図11に示す飛散防止ネット60を取り付けることにより、飛散防止ネットの張り構造10を形成することができる。 Next, by attaching the shatterproof net 60 shown in FIG. 11 to the wire 50 stretched between the scaffolds 54, the stretch structure 10 of the shatterproof net can be formed.

次に、飛散防止ネットの張り構造10における飛散防止ネット60の移動のさせ方について説明する。 Next, a method of moving the shatterproof net 60 in the tension structure 10 of the shatterproof net will be described.

図1に示す飛散防止ネットの張り構造10は、例えば建物64の上層部分の解体が終わった後に、飛散防止ネット60の位置を、下方に移動させることができる。飛散防止ネット60を下方に移動させる場合、移動部材30を移動させたい位置に、現在移動部材30の移動を阻止しているストッパー29(図3参照)とは別のストッパー29を、レール部材20に対して追加しておく。 In the shatterproof net tension structure 10 shown in FIG. 1, for example, the position of the shatterproof net 60 can be moved downward after the dismantling of the upper portion of the building 64 is completed. When moving the shatterproof net 60 downward, a stopper 29 different from the stopper 29 (see FIG. 3) currently blocking the movement of the moving member 30 is placed at the position where the moving member 30 is desired to be moved. Add to.

移動先にストッパー29を追加したのち、図3および図9に示すように現在移動部材30の移動を阻止しているストッパー29を、レール部材20から引き抜く。これにより、図3に示すように、内管部36に取付けられている第1のフック部32と第2のフック部34とは、内管部36と伴に、レール部材20に沿って下方に移動する。 After adding the stopper 29 to the moving destination, the stopper 29 currently blocking the movement of the moving member 30 is pulled out from the rail member 20 as shown in FIGS. 3 and 9. As a result, as shown in FIG. 3, the first hook portion 32 and the second hook portion 34 attached to the inner pipe portion 36 are lowered along the rail member 20 together with the inner pipe portion 36. Move to.

図15(a)は、上述した移動部材30をレール部材20に沿って下方に移動させる工程を示す概念図である。図15(a)に示すように、ワイヤー50の端部が固定されている移動部材30は、ストッパー29(図3参照)を引き抜かれることにより、矢印71で示すように下方に移動し、内管部36が下方に設けられる次のストッパーに衝突して停止することにより、所定の位置で停止する。 FIG. 15A is a conceptual diagram showing a process of moving the above-mentioned moving member 30 downward along the rail member 20. As shown in FIG. 15 (a), the moving member 30 to which the end of the wire 50 is fixed moves downward as shown by the arrow 71 by pulling out the stopper 29 (see FIG. 3). When the pipe portion 36 collides with the next stopper provided below and stops, the pipe portion 36 stops at a predetermined position.

この際、ワイヤー50の両端を固定する2つの移動部材30は、略同時に移動させることが、移動時にワイヤー50への過剰な負荷が生じる問題を防止する観点から好ましい。これにより、ワイヤー50および飛散防止ネット60を張った状態のまま、飛散防止ネット60の位置を、下方に移動させることができる。また、図11に示されるように、飛散防止ネット60の4隅に対応する4か所の移動部材30を、同時に移動させることは、移動時に飛散防止ネット60への過剰な負荷が生じる問題を防止する観点から好ましい。 At this time, it is preferable to move the two moving members 30 that fix both ends of the wire 50 substantially at the same time from the viewpoint of preventing the problem that an excessive load is generated on the wire 50 during the movement. As a result, the position of the shatterproof net 60 can be moved downward while the wire 50 and the shatterproof net 60 are stretched. Further, as shown in FIG. 11, moving the four moving members 30 corresponding to the four corners of the shatterproof net 60 at the same time causes a problem that an excessive load is generated on the shatterproof net 60 at the time of movement. It is preferable from the viewpoint of prevention.

次に、図15(a)において矢印72で示すように、レール部材20を移動させるレール移動工程を行う。レール移動工程では、上下方向に連結する複数のレール単位21のうち、最上部のレール単位21を足場54および下方のレール単位21から取り外す。さらに、上下方向に連結する複数のレール単位21のうち最下部のレール単位21に、取り外したレール単位21における外管部24の他方の端部24b(図7参照)を、鞘管部27を介して連結する。 Next, as shown by the arrow 72 in FIG. 15A, a rail moving step of moving the rail member 20 is performed. In the rail moving step, of the plurality of rail units 21 connected in the vertical direction, the uppermost rail unit 21 is removed from the scaffolding 54 and the lower rail unit 21. Further, the other end portion 24b (see FIG. 7) of the outer pipe portion 24 in the removed rail unit 21 is attached to the lowermost rail unit 21 among the plurality of rail units 21 connected in the vertical direction, and the sheath pipe portion 27 is attached. Connect through.

これにより、図15(b)に示すように、移動部材30が移動することにより不要になったレール部材20の上端部分が足場54から取り外されるとともに、移動部材30の次の移動に備えて、レール部材20を下方に延ばすことができる。なお、図15(b)に示す足場54の上端部分は、上述したレール移動工程の後に取り外される。 As a result, as shown in FIG. 15B, the upper end portion of the rail member 20 that is no longer needed due to the movement of the moving member 30 is removed from the scaffold 54, and the moving member 30 is prepared for the next movement. The rail member 20 can be extended downward. The upper end portion of the scaffold 54 shown in FIG. 15B is removed after the rail moving step described above.

このような飛散防止ネット60の張り方法によれば、建物64の解体状況に応じて、容易に飛散防止ネット60の高さを変更することが可能であり、解体工事を安全かつ効率的に行うことが可能となる。なお、図3に示すように、移動部材30の内管部36の長さは、レール単位21の長さ(1本分の長さ)より長くすることが、レール部材20におけるレール単位21の連結部分を、内管部36が挿通することにより補強して、安全性を高める観点から好ましい。ただし、内管部36は、レール単位21より短くても構わない。 According to such a method of stretching the shatterproof net 60, the height of the shatterproof net 60 can be easily changed according to the dismantling situation of the building 64, and the dismantling work can be performed safely and efficiently. It becomes possible. As shown in FIG. 3, the length of the inner pipe portion 36 of the moving member 30 should be longer than the length of the rail unit 21 (the length of one rail unit) of the rail unit 21 of the rail member 20. It is preferable from the viewpoint of enhancing safety by reinforcing the connecting portion by inserting the inner pipe portion 36. However, the inner pipe portion 36 may be shorter than the rail unit 21.

第2実施形態
図12は、第2実施形態に係る飛散防止ネットの張り構造110におけるレール部材120および移動部材130の一部を示す部分拡大図である。第2実施形態に係る飛散防止ネットの張り構造110は、レール部材120における外溝部125の形状や、移動部材130が内管部36ではなく第1のキャスター部136および第2のキャスター部137等を有する点で、第1実施形態に係る飛散防止ネットの張り構造10とは異なるが、その他の点では、飛散防止ネットの張り構造10と同様である。第2実施形態に係る飛散防止ネットの張り構造110の説明は、飛散防止ネットの張り構造10との相違点を中心に行い、飛散防止ネットの張り構造10との共通点については、説明を省略する。
The second embodiment FIG. 12 is a partially enlarged view showing a part of the rail member 120 and the moving member 130 in the tension structure 110 of the shatterproof net according to the second embodiment. In the shatterproof net tension structure 110 according to the second embodiment, the shape of the outer groove portion 125 in the rail member 120 and the moving member 130 are not the inner pipe portion 36 but the first caster portion 136 and the second caster portion 137. It is different from the shatterproof net tension structure 10 according to the first embodiment in that it has, but is the same as the shatterproof net tension structure 10 in other respects. The description of the shatterproof net tension structure 110 according to the second embodiment will focus on the differences from the shatterproof net tension structure 10, and the common points with the shatterproof net tension structure 10 will be omitted. do.

図12に示すように、飛散防止ネットの張り構造110は、図3に示す飛散防止ネットの張り構造10と同様、ワイヤー50の端部を固定する移動部材130と、レール部材20を有する。図12にでは図示していないが、移動部材130の丸環132aには、図3に示す滑車33を取り付けることができ、丸環134aには、図3に示す巻き上げ機35を取り付けることができる。したがって、図12に示す飛散防止ネットの張り構造110についても、第1実施形態に係る飛散防止ネットの張り構造10と同様に、ワイヤー50を設置し解体対象である建物64の上方を覆う飛散防止ネット60を張ることができる(図11参照)。 As shown in FIG. 12, the shatterproof net tension structure 110 has a moving member 130 for fixing the end of the wire 50 and a rail member 20, similar to the shatterproof net tension structure 10 shown in FIG. Although not shown in FIG. 12, the pulley 33 shown in FIG. 3 can be attached to the circular ring 132a of the moving member 130, and the winding machine 35 shown in FIG. 3 can be attached to the circular ring 134a. .. Therefore, as for the shatterproof net tension structure 110 shown in FIG. 12, the wire 50 is installed to cover the upper part of the building 64 to be demolished, as in the shatterproof net tension structure 10 according to the first embodiment. A net 60 can be set up (see FIG. 11).

図12に示すように、レール部材120は、図2に示すレール部材20と同様に、複数のレール単位121を上下方向に連結して形成される。レール部材120を構成するレール単位121は、外管部124および連結部28を有するが、レール単位21のような鞘管部27を有しない。各レール単位121は、略コの字状の断面を有する溝形鋼形状のレール連結部227を用いて、上下に連結される。また、各レール単位121は、クランプ28a(図14参照)等を有する連結部28により、足場54に固定される。 As shown in FIG. 12, the rail member 120 is formed by connecting a plurality of rail units 121 in the vertical direction in the same manner as the rail member 20 shown in FIG. The rail unit 121 constituting the rail member 120 has an outer pipe portion 124 and a connecting portion 28, but does not have a sheath pipe portion 27 like the rail unit 21. Each rail unit 121 is vertically connected by using a channel steel-shaped rail connecting portion 227 having a substantially U-shaped cross section. Further, each rail unit 121 is fixed to the scaffold 54 by a connecting portion 28 having a clamp 28a (see FIG. 14) and the like.

図14は、図12に示すレール部材20および移動部材30の長手方向に垂直な断面による断面図である。図14に示すように、レール部材20の外管部124には、第1方向X1(建物側)に開口する外溝部125が形成されている。外溝部125の内部には、後述する移動部材130の第1のキャスター部136および第2のキャスター部137が、長手方向に移動可能に収容される。 FIG. 14 is a cross-sectional view of the rail member 20 and the moving member 30 shown in FIG. 12 in a cross section perpendicular to the longitudinal direction. As shown in FIG. 14, the outer pipe portion 124 of the rail member 20 is formed with an outer groove portion 125 that opens in the first direction X1 (building side). Inside the outer groove portion 125, the first caster portion 136 and the second caster portion 137 of the moving member 130, which will be described later, are accommodated so as to be movable in the longitudinal direction.

外溝部125の溝底部126には、連結部28がクランプ固定ナット28bを用いて固定される。外管部124は、内部に2つの平行なレールを有するハンガーレールのような断面形状を有するが、外管部124の断面形状としては、図14に示すもののみには限定されない。 A connecting portion 28 is fixed to the groove bottom portion 126 of the outer groove portion 125 by using a clamp fixing nut 28b. The outer pipe portion 124 has a cross-sectional shape like a hanger rail having two parallel rails inside, but the cross-sectional shape of the outer pipe portion 124 is not limited to that shown in FIG.

図12に示すように、移動部材130は、上端部の近傍に備えられる第1のフック部132および第1のキャスター部136と、下端部に近い位置に備えられる第2のフック部134および第2のキャスター部137と、第1のキャスター部136と第2のキャスター部137とを連結するキャスター連結材138とを有する。 As shown in FIG. 12, the moving member 130 includes a first hook portion 132 and a first caster portion 136 provided near the upper end portion, and a second hook portion 134 and a second hook portion 134 provided near the lower end portion. It has a caster portion 137 of 2, and a caster connecting member 138 that connects the first caster portion 136 and the second caster portion 137.

図14に示すように、第2のキャスター部137は、外溝部125の内部を回転しながら移動する車輪を有する。第2のキャスター部137には、第2のフック部34の一部である丸環34aが連結している。第2のキャスター部137と丸環34aとは、外溝部125の開口を通る軸部によって繋がっている。図12に示す第1のキャスター部136と丸環32aについても、第2のキャスター部137および丸環34aと同様の構造である。 As shown in FIG. 14, the second caster portion 137 has wheels that move while rotating inside the outer groove portion 125. A circular ring 34a, which is a part of the second hook portion 34, is connected to the second caster portion 137. The second caster portion 137 and the circular ring 34a are connected by a shaft portion passing through the opening of the outer groove portion 125. The first caster portion 136 and the circular ring 32a shown in FIG. 12 have the same structure as the second caster portion 137 and the circular ring 34a.

図13は、図12に示すレール部材120および移動部材130を、第1方向側(建物側)から見た外観図である。図13に示すように、移動部材130における第1のキャスター部136と第2のキャスター部137とは、キャスター連結材138によって連結されている。これにより、第1のキャスター部136、第2のキャスター部137およびキャスター連結材138は、一体となって上下動することができる。図13に示すキャスター連結材138は、図14に示すように、第1および第2のキャスター部136、137において外溝部125の開口を通る軸部を連結しており、キャスター連結材138は、外管部124に形成される外溝部125の外に配置されている。ただし、キャスター連結材138の構成としてはこれのみには限定されず、外溝部125の内部で第1のキャスター部136と第2のキャスター部137とを連結するものであってもよい。 FIG. 13 is an external view of the rail member 120 and the moving member 130 shown in FIG. 12 as viewed from the first direction side (building side). As shown in FIG. 13, the first caster portion 136 and the second caster portion 137 of the moving member 130 are connected by a caster connecting member 138. As a result, the first caster portion 136, the second caster portion 137, and the caster connecting member 138 can be integrally moved up and down. As shown in FIG. 14, the caster connecting material 138 shown in FIG. 13 connects the shaft portions of the first and second caster portions 136 and 137 through the opening of the outer groove portion 125, and the caster connecting material 138 connects the caster connecting material 138. It is arranged outside the outer groove portion 125 formed in the outer pipe portion 124. However, the configuration of the caster connecting member 138 is not limited to this, and the first caster portion 136 and the second caster portion 137 may be connected inside the outer groove portion 125.

図14に示すように、移動部材130は、第1および第2のキャスター部137の車輪が、外管部124の内部で回転することにより、外管部124の長手方向に沿って円滑に移動することが可能である。なお、図12に示すように、移動部材130の移動は、図3に示す移動部材30と同様に、外管部124に取付けられるストッパー29により規制される。 As shown in FIG. 14, the moving member 130 smoothly moves along the longitudinal direction of the outer pipe portion 124 by rotating the wheels of the first and second caster portions 137 inside the outer pipe portion 124. It is possible to do. As shown in FIG. 12, the movement of the moving member 130 is regulated by the stopper 29 attached to the outer pipe portion 124, similarly to the moving member 30 shown in FIG.

図12から図14に示す第2実施形態に係る飛散防止ネットの張り構造110は、第1実施形態に係る飛散防止ネットの張り構造10との共通点については、飛散防止ネットの張り構造10と同様の効果を奏する。 The shatterproof net tension structure 110 according to the second embodiment shown in FIGS. 12 to 14 has in common with the shatterproof net tension structure 10 according to the first embodiment, with respect to the shatterproof net tension structure 10. It has the same effect.

以上、本発明に係る飛散防止ネットの張り構造および飛散防止ネットの張り方法について、実施形態を挙げて説明したが、本発明に係る飛散防止ネットの張り構造等は、上述した実施形態のみに限定されるものではない。たとえば、上述した実施形態では、レール部材20、120は、複数のレール単位21、121を連結して構成されるが、レール部材は足場に形成されるものであればどのような構造であってもよい。 Although the structure of the shatterproof net and the method of tensioning the shatterproof net according to the present invention have been described above with reference to embodiments, the structure of the shatterproof net according to the present invention is limited to the above-described embodiment. It is not something that will be done. For example, in the above-described embodiment, the rail members 20 and 120 are configured by connecting a plurality of rail units 21 and 121, but the rail members have any structure as long as they are formed on the scaffold. May be good.

たとえば、レール部材は、移動部材の少なくとも一部を移動可能に収容する外溝部が形成されている一本の外管部を、連結部を用いて足場に連結して構成されるものであっても構わない。また、レール部材に用いる外管部は、足場とは反対方向である第1方向に開口する外溝部が形成されているもののみには限定されず、移動部材が移動可能なレールとして機能するものであれば、ガイドレール、リップ付きガイドレール、I型鋼その他の断面形状を有するものであってもよい。また、レール単位21の鞘管部27は、レール単位21の上端部に設けられていてもよい。 For example, the rail member is configured by connecting a single outer pipe portion having an outer groove portion that movably accommodates at least a part of the moving member to a scaffold using a connecting portion. It doesn't matter. Further, the outer pipe portion used for the rail member is not limited to the one in which the outer groove portion that opens in the first direction opposite to the scaffold is formed, and the outer pipe portion functions as a movable rail for the moving member. If it is, it may have a guide rail, a guide rail with a lip, an I-shaped steel, or any other cross-sectional shape. Further, the sheath tube portion 27 of the rail unit 21 may be provided at the upper end portion of the rail unit 21.

また、移動部材30、130についても、内管部36によるスライド移動や、第1および第2のキャスター部136、137による回転移動のみには限定されず、レール部材20、120に沿って長手方向に移動する構造であれば、他の構造を採用することも可能である。 Further, the moving members 30 and 130 are not limited to the sliding movement by the inner pipe portion 36 and the rotational movement by the first and second caster portions 136 and 137, and are not limited to the rotational movement along the rail members 20 and 120 in the longitudinal direction. It is also possible to adopt another structure as long as it is a structure that moves to.

60…飛散防止ネット
10、110…飛散防止ネットの張り構造
20、120…レール部材
21、121…レール単位
24、124…外管部
24a…一方の端部
24b…他方の端部
24c、124c…側方貫通孔
25、125…外溝部
27…鞘管部
28…連結部
28a…クランプ
28b…クランプ固定ナット
29…ストッパー
X1…第1方向
30、130…移動部材
30a…上端部
30b…下端部
32、132…第1のフック部
34、134…第2のフック部
32a、34a、132a、134a…丸環
32b…丸環固定ナット
33…滑車
35…巻き上げ機
36…内管部
37…内溝部
26、38、126…溝底部
26a、38a…貫通穴
X2…第2方向
50…ワイヤー
52…留め具
54…足場
64…建物
68…重機
71…矢印
227…レール連結部
136…第1のキャスター部
137…第2のキャスター部
138…キャスター連結材
60 ... Scattering prevention net 10, 110 ... Scattering prevention net tension structure 20, 120 ... Rail members 21, 121 ... Rail units 24, 124 ... Outer pipe portion 24a ... One end 24b ... The other end 24c, 124c ... Side through holes 25, 125 ... Outer groove 27 ... Sheath tube 28 ... Connecting part 28a ... Clamp 28b ... Clamp fixing nut 29 ... Stopper X1 ... First direction 30, 130 ... Moving member 30a ... Upper end 30b ... Lower end 32 , 132 ... 1st hook part 34, 134 ... 2nd hook part 32a, 34a, 132a, 134a ... Round ring 32b ... Round ring fixing nut 33 ... Pulley 35 ... Winding machine 36 ... Inner pipe part 37 ... Inner groove part 26 , 38, 126 ... Groove bottom 26a, 38a ... Through hole
X2 ... Second direction 50 ... Wire 52 ... Fastener 54 ... Scaffolding 64 ... Building 68 ... Heavy equipment 71 ... Arrow 227 ... Rail connecting part 136 ... First caster part 137 ... Second caster part 138 ... Caster connecting material

Claims (11)

長手方向が上下方向になるように足場に取付けられるレール部材と、
上端部の近傍に備えられる第1のフック部と、前記第1のフック部に比べて前記上端部から遠い位置に備えられる第2のフック部とを有し、前記レール部材に沿って前記長手方向に移動する移動部材と、
前記第1のフック部に引っ掛けられ、前記第1のフック部から前記第2のフック部へ向かって引っ張られて前記移動部材に固定され、飛散防止ネットが取り付けられるワイヤーと、を有し、
前記レール部材は、前記移動部材の上端が前記レール部材の上端より上方に突出せず、前記移動部材の下端が前記レール部材の下端より下方に突出しない状態で、前記ワイヤーの張力により前記第1のフック部が前記第2のフック部に対して前記長手方向に直交する第1方向側に引っ張られる力に抗して前記移動部材を保持する飛散防止ネットの張り構造。
A rail member that is attached to the scaffold so that the longitudinal direction is up and down,
It has a first hook portion provided in the vicinity of the upper end portion and a second hook portion provided at a position farther from the upper end portion than the first hook portion, and has the longitudinal length along the rail member. Moving members that move in the direction and
It has a wire that is hooked on the first hook portion, pulled from the first hook portion toward the second hook portion, fixed to the moving member, and to which a shatterproof net is attached.
The first rail member is provided by the tension of the wire in a state where the upper end of the moving member does not protrude upward from the upper end of the rail member and the lower end of the moving member does not protrude downward from the lower end of the rail member. A tension structure of a shatterproof net that holds the moving member against a force in which the hook portion is pulled toward the first direction side orthogonal to the longitudinal direction with respect to the second hook portion .
前記レール部材は、前記第1方向に開口し、前記移動部材の内管部を移動可能に収容する外溝部が形成されている外管部と、前記外管部と前記足場とを連結する連結部と、を有する請求項1に記載の飛散防止ネットの張り構造。The rail member has an outer pipe portion that opens in the first direction and has an outer groove portion that movably accommodates the inner pipe portion of the moving member, and a connection that connects the outer pipe portion and the scaffold. The tension structure of the shatterproof net according to claim 1, which has a portion and a portion. 前記第1のフック部と前記第2のフック部とは前記内管部に取り付けられており前記内管部と伴に前記長手方向に移動可能である請求項2に記載の飛散防止ネットの張り構造。 The tension of the shatterproof net according to claim 2, wherein the first hook portion and the second hook portion are attached to the inner pipe portion and can move in the longitudinal direction together with the inner pipe portion. structure. 長手方向が上下方向になるように足場に取付けられるレール部材と、
上端部の近傍に備えられる第1のフック部と、前記第1のフック部に比べて前記上端部から遠い位置に備えられる第2のフック部とを有し、前記レール部材に沿って前記長手方向に移動する移動部材と、
前記第1のフック部に引っ掛けられ、前記第1のフック部から前記第2のフック部へ向かって引っ張られて前記移動部材に固定され、飛散防止ネットが取り付けられるワイヤーと、を有し、
前記レール部材は、前記長手方向に直交する第1方向に開口し、前記移動部材の少なくとも一部を移動可能に収容する外溝部が形成されている外管部と、前記外管部と前記足場とを連結する連結部と、前記外管部の一方の端部に設けられ前記外管部の他方の端部が内側に挿入可能であって前記第1方向に開口し前記外溝部の開口を露出させ前記第1のフック部および前記第2のフック部が上下方向に通過可能な溝部が形成される鞘管部と、を有する複数のレール単位を、上下方向に連結してなる飛散防止ネットの張り構造。
A rail member that is attached to the scaffold so that the longitudinal direction is up and down,
It has a first hook portion provided in the vicinity of the upper end portion and a second hook portion provided at a position farther from the upper end portion than the first hook portion, and has the longitudinal length along the rail member. Moving members that move in the direction and
It has a wire that is hooked on the first hook portion, pulled from the first hook portion toward the second hook portion, fixed to the moving member, and to which a shatterproof net is attached.
The rail member is opened in a first direction orthogonal to the longitudinal direction, and has an outer pipe portion formed with an outer groove portion that movably accommodates at least a part of the moving member, and the outer pipe portion and the scaffold. The connecting portion connecting the two and the outer pipe portion provided at one end of the outer pipe portion and the other end of the outer pipe portion can be inserted inward and opened in the first direction to open the outer groove portion. A shatterproof net formed by connecting a plurality of rail units having an exposed first hook portion and a sheath tube portion having a groove portion through which the second hook portion can pass in the vertical direction in the vertical direction. Tension structure.
長手方向が上下方向になるように足場に取付けられるレール部材と、
上端部の近傍に備えられる第1のフック部と、前記第1のフック部に比べて前記上端部から遠い位置に備えられる第2のフック部とを有し、前記レール部材に沿って前記長手方向に移動する移動部材と、
前記第1のフック部に引っ掛けられ、前記第1のフック部から前記第2のフック部へ向かって引っ張られて前記移動部材に固定され、飛散防止ネットが取り付けられるワイヤーと、を有し、
前記レール部材は、前記長手方向に直交する第1方向に開口し、前記移動部材の少なくとも一部を移動可能に収容する外溝部が形成されている外管部と、前記外管部と前記足場とを連結する連結部と、を有し、
前記移動部材は、前記外溝部に移動可能に収容される内管部を有し、前記第1のフック部と前記第2のフック部とは前記内管部に取り付けられており前記内管部と伴に前記長手方向に移動可能であり、
前記内管部には、前記長手方向に直交し前記第1方向とは反対方向である第2方向に開口する内溝部が形成されている飛散防止ネットの張り構造。
A rail member that is attached to the scaffold so that the longitudinal direction is up and down,
It has a first hook portion provided in the vicinity of the upper end portion and a second hook portion provided at a position farther from the upper end portion than the first hook portion, and has the longitudinal length along the rail member. Moving members that move in the direction and
It has a wire that is hooked on the first hook portion, pulled from the first hook portion toward the second hook portion, fixed to the moving member, and to which a shatterproof net is attached.
The rail member has an outer pipe portion that is opened in a first direction orthogonal to the longitudinal direction and has an outer groove portion that movably accommodates at least a part of the moving member, and the outer pipe portion and the scaffold. Has a connecting portion that connects and
The moving member has an inner pipe portion that is movably accommodated in the outer groove portion, and the first hook portion and the second hook portion are attached to the inner pipe portion, and the inner pipe portion is attached. It is movable in the longitudinal direction with
A shatterproof net tension structure in which an inner groove portion is formed in the inner pipe portion, which is orthogonal to the longitudinal direction and opens in a second direction opposite to the first direction.
前記第1のフック部は、前記ワイヤーを引っ掛ける滑車を有する請求項1から請求項5までのいずれかに記載の飛散防止ネットの張り構造。 The tension structure of the shatterproof net according to any one of claims 1 to 5, wherein the first hook portion has a pulley for hooking the wire. 前記第2のフック部は、前記ワイヤーを引張する巻き上げ機を有する請求項1から請求項6までのいずれかに記載の飛散防止ネットの張り構造。 The tension structure of the shatterproof net according to any one of claims 1 to 6, wherein the second hook portion has a winding machine for pulling the wire. 長手方向が上下方向になるように足場にレール部材を取り付ける工程と、
上端部の近傍に備えられる第1のフック部と、前記第1のフック部に比べ前記上端部から遠い位置に備えられる第2のフック部とを有する移動部材を、前記レール部材に沿って前記長手方向に移動可能にセットする工程と、
前記第1のフック部に引っ掛けた後、前記第1のフック部から前記第2のフック部に向かって引っ張ってワイヤーを前記移動部材に固定する工程と、
前記ワイヤーに飛散防止ネットを取り付ける工程と、を有し、
前記セットする工程では、前記レール部材は、前記移動部材の上端が前記レール部材の上端より上方に突出せず、前記移動部材の下端が前記レール部材の下端より下方に突出しない状態で、前記移動部材を収容し、前記固定する工程では、前記レール部材は、前記ワイヤーの張力により前記第1のフック部が前記第2のフック部に対して前記長手方向に直交する第1方向側に引っ張られる力に抗して前記移動部材を保持する飛散防止ネットの張り方法。
The process of attaching the rail member to the scaffold so that the longitudinal direction is up and down,
A moving member having a first hook portion provided in the vicinity of the upper end portion and a second hook portion provided at a position farther from the upper end portion than the first hook portion is formed along the rail member. The process of setting it so that it can be moved in the longitudinal direction,
A step of hooking the wire to the first hook portion and then pulling the wire from the first hook portion toward the second hook portion to fix the wire to the moving member.
It has a process of attaching a shatterproof net to the wire.
In the setting step, the rail member moves in a state where the upper end of the moving member does not protrude upward from the upper end of the rail member and the lower end of the moving member does not protrude downward from the lower end of the rail member. In the step of accommodating and fixing the member, the rail member is pulled toward the first direction side where the first hook portion is orthogonal to the second hook portion in the longitudinal direction by the tension of the wire. A method of tensioning an anti-scattering net that holds the moving member against force .
長手方向が上下方向になるように足場にレール部材を取り付ける工程と、
上端部の近傍に備えられる第1のフック部と、前記第1のフック部に比べ前記上端部から遠い位置に備えられる第2のフック部とを有する移動部材を、前記レール部材に沿って前記長手方向に移動可能にセットする工程と、
前記第1のフック部に引っ掛けた後、前記第1のフック部から前記第2のフック部に向かって引っ張ってワイヤーを前記移動部材に固定する工程と、
前記ワイヤーに飛散防止ネットを取り付ける工程と、を有し、
前記レール部材を前記足場に取り付ける工程は、前記長手方向に直交する第1方向に開口し前記移動部材の少なくとも一部を移動可能に収容する外溝部が形成されている1つの外管部と、前記外管部と前記足場とを連結する連結部と、前記外管部の一方の端部に設けられ前記外管部の他方の端部が内側に挿入可能な鞘管部と、を有する複数のレール単位を、前記鞘管部を介して連結する工程を含み、
前記鞘管部には、前記第1方向に開口し前記外溝部の開口を露出させ前記第1のフック部および前記第2のフック部が上下方向に通過可能な溝部が形成されている飛散防止ネットの張り方法。
The process of attaching the rail member to the scaffold so that the longitudinal direction is up and down,
A moving member having a first hook portion provided in the vicinity of the upper end portion and a second hook portion provided at a position farther from the upper end portion than the first hook portion is formed along the rail member. The process of setting it so that it can be moved in the longitudinal direction,
A step of hooking the wire to the first hook portion and then pulling the wire from the first hook portion toward the second hook portion to fix the wire to the moving member.
It has a process of attaching a shatterproof net to the wire.
The step of attaching the rail member to the scaffold includes one outer pipe portion having an outer groove portion that is open in a first direction orthogonal to the longitudinal direction and movably accommodates at least a part of the moving member. A plurality of connecting portions for connecting the outer tube portion and the scaffold, and a sheath tube portion provided at one end of the outer tube portion and into which the other end of the outer tube portion can be inserted inward. Including the step of connecting the rail units of the above via the sheath tube portion.
The sheath tube portion is formed with a groove portion that opens in the first direction to expose the opening of the outer groove portion and allows the first hook portion and the second hook portion to pass in the vertical direction. How to stretch the net.
上下方向に連結する複数の前記レール単位のうち、最上部の前記レール単位を取り外し、上下方向に連結する複数の前記レール単位のうち最下部の前記レール単位に、取り外した前記レール単位における前記外管部の前記他方の端部を、前記鞘管部を介して連結するレール移動工程を含む請求項9に記載の飛散防止ネットの張り方法。 Of the plurality of rail units connected in the vertical direction, the uppermost rail unit is removed, and the lowermost rail unit among the plurality of rail units connected in the vertical direction is the outside of the removed rail unit. The method for tensioning a shatterproof net according to claim 9, further comprising a rail moving step of connecting the other end of the pipe portion via the sheath pipe portion. 前記移動部材は、前記外溝部に前記長手方向に移動可能に収容される内管部を有し、前記第1のフック部と前記第2のフック部とは前記内管部に取り付けられており、前記第1のフック部と前記第2のフック部とを、前記内管部と伴に、前記レール部材に沿って下方に移動させる工程を含む請求項9または請求項10に記載の飛散防止ネットの張り方法。
The moving member has an inner pipe portion that is movably accommodated in the outer groove portion in the longitudinal direction, and the first hook portion and the second hook portion are attached to the inner pipe portion. The scattering prevention according to claim 9 or 10, further comprising a step of moving the first hook portion and the second hook portion downward along the rail member together with the inner pipe portion. How to stretch the net.
JP2021137469A 2021-08-25 2021-08-25 Anti-scattering net tension structure and anti-scattering net tension method Active JP7096468B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021137469A JP7096468B1 (en) 2021-08-25 2021-08-25 Anti-scattering net tension structure and anti-scattering net tension method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021137469A JP7096468B1 (en) 2021-08-25 2021-08-25 Anti-scattering net tension structure and anti-scattering net tension method

Publications (2)

Publication Number Publication Date
JP7096468B1 true JP7096468B1 (en) 2022-07-06
JP2023031773A JP2023031773A (en) 2023-03-09

Family

ID=82319577

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021137469A Active JP7096468B1 (en) 2021-08-25 2021-08-25 Anti-scattering net tension structure and anti-scattering net tension method

Country Status (1)

Country Link
JP (1) JP7096468B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001140474A (en) 1999-11-11 2001-05-22 Taisei Corp Curing apparatus
KR101669614B1 (en) 2016-09-21 2016-10-27 주식회사 홍익기술단 Carbonation Depth Measurement Device for Safety Diagnosis of Reinforced Concrete Structure Using Belt
JP2018040169A (en) 2016-09-08 2018-03-15 大成建設株式会社 Scattering prevention device
JP2020190142A (en) 2019-05-23 2020-11-26 株式会社村上工業 Upper scattering prevention curing system and upper scattering prevention curing method in dismantlement of multilayer stage building

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5755871Y2 (en) * 1978-06-14 1982-12-02
US4534446A (en) * 1983-12-20 1985-08-13 Pujol Barcons Salvador Movable walkway system of use in the construction industry
JPH0743366Y2 (en) * 1990-09-12 1995-10-09 株式会社竹中工務店 Mobile safety net erection device
JPH1150666A (en) * 1997-07-31 1999-02-23 Tatsuo Ono Device for stretching sheet
EP1731692A1 (en) * 2005-06-08 2006-12-13 de Leeuw, Petrus Johannes Lambertus Stiffened scaffold system with optimal application possibilities

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001140474A (en) 1999-11-11 2001-05-22 Taisei Corp Curing apparatus
JP2018040169A (en) 2016-09-08 2018-03-15 大成建設株式会社 Scattering prevention device
KR101669614B1 (en) 2016-09-21 2016-10-27 주식회사 홍익기술단 Carbonation Depth Measurement Device for Safety Diagnosis of Reinforced Concrete Structure Using Belt
JP2020190142A (en) 2019-05-23 2020-11-26 株式会社村上工業 Upper scattering prevention curing system and upper scattering prevention curing method in dismantlement of multilayer stage building

Also Published As

Publication number Publication date
JP2023031773A (en) 2023-03-09

Similar Documents

Publication Publication Date Title
KR101991907B1 (en) Gang form safety apparatus with integrated safety hook
JP2006230443A (en) Method for attaching protective net to steel tower
JP6312109B1 (en) Safety device for temporary scaffold
JP7096468B1 (en) Anti-scattering net tension structure and anti-scattering net tension method
KR20190113468A (en) Gang form falling prevention apparatus with locker
JP6452995B2 (en) Installation method of construction sheet and equipment used for this method
JP4921810B2 (en) Elevator installation apparatus and installation method using the same
JP2007138416A (en) Climbing construction method of external protective unit
JP6452007B1 (en) Unloading aid, brake aid
JPH0769585A (en) Crane boom assembly
KR102276294B1 (en) Safety devices for preventing fall of gang form
JP2009108557A (en) Method of constructing guard net and fall prevention structure using guard net
JP4491110B2 (en) Elevator rope hanging method
KR101254502B1 (en) Semi-auto shackle
JP6312223B2 (en) Unloading aid
JP2016023021A (en) Column lifting tool and method of using the same
KR20110014358A (en) Gang form comprising safe net
KR100945240B1 (en) Worker Falling Prevention Door of Gang Form
JP3630596B2 (en) How to hang an elevator rope
JP2019031902A (en) Unloading auxiliary tool, brake auxiliary tool and unloading method
CN113833289B (en) Shed frame anti-falling system and construction method thereof
CN216042794U (en) Lifting type external overhanging protective net
JP5797459B2 (en) Method for stretching net between poles and hanging jig used for the method
JP6788282B2 (en) Large tent
JP5444150B2 (en) Leading handrail device with curing net

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210830

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20210830

A80 Written request to apply exceptions to lack of novelty of invention

Free format text: JAPANESE INTERMEDIATE CODE: A80

Effective date: 20210922

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20211207

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220207

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220301

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220502

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220524

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220601

R150 Certificate of patent or registration of utility model

Ref document number: 7096468

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111