JP7082392B2 - Parts supply equipment - Google Patents

Parts supply equipment Download PDF

Info

Publication number
JP7082392B2
JP7082392B2 JP2017240592A JP2017240592A JP7082392B2 JP 7082392 B2 JP7082392 B2 JP 7082392B2 JP 2017240592 A JP2017240592 A JP 2017240592A JP 2017240592 A JP2017240592 A JP 2017240592A JP 7082392 B2 JP7082392 B2 JP 7082392B2
Authority
JP
Japan
Prior art keywords
projection
bolt
transport path
path
supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017240592A
Other languages
Japanese (ja)
Other versions
JP2019107654A (en
Inventor
猛志 古田
紗季 山下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Keylex Corp
Original Assignee
Keylex Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Keylex Corp filed Critical Keylex Corp
Priority to JP2017240592A priority Critical patent/JP7082392B2/en
Publication of JP2019107654A publication Critical patent/JP2019107654A/en
Application granted granted Critical
Publication of JP7082392B2 publication Critical patent/JP7082392B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Automatic Assembly (AREA)

Description

本発明は、溶接装置に対して、溶接部品を供給するための部品供給装置に関する技術分野に属する。 The present invention belongs to the technical field relating to a parts supply device for supplying welded parts to a welding device.

従来より、例えば、自動車の車体構成部材にプロジェクションボルト等の溶接部品を接合するためのプロジェクション溶接では、ワークの溶接位置に溶接部品を供給するための部品供給装置が用いられる。 Conventionally, for example, in projection welding for joining a welded part such as a projection bolt to a vehicle body component of an automobile, a parts supply device for supplying the welded part to a welded position of a work has been used.

例えば、特許文献1には、溶接ボルト用パーツフィーダから供給された溶接ボルト(溶接部品)を、ワークの溶接位置に配送するためのチャック(ガイド装置)と、溶接ボルト用パーツフィーダからチャックに溶接部品を送る供給ホースとを備えている。 For example, Patent Document 1 describes a chuck (guide device) for delivering a welding bolt (welded part) supplied from a welding bolt parts feeder to a welding position of a work, and welding from a welding bolt parts feeder to the chuck. It is equipped with a supply hose for sending parts.

特開2016-107332号公報Japanese Unexamined Patent Publication No. 2016-107332

ところで、通常、ワークに接合されるプロジェクションボルト等の溶接部品は、目的毎に異なる形状のものが用いられる。例えば、プロジェクションボルトについては、軸長や軸直径が異なるものが用いられ、プロジェクションナットについては、内径や高さの異なるものが用いられる。このため、部品供給装置が1種類の部品しか供給できない場合、形状の異なる溶接部品毎に部品供給装置を設置しなければならず、コストが嵩むとともに設置スペースが必要となってしまう。また、1種類の溶接部品をワークの対応する溶接位置に全て接合し終えた後に、別の溶接部品をワークの対応する溶接位置に溶接するという手順を踏まなければならず、作業効率の低下を招くおそれがある。 By the way, usually, welded parts such as projection bolts to be joined to a work have different shapes for each purpose. For example, projection bolts having different shaft lengths and shaft diameters are used, and projection nuts having different inner diameters and heights are used. Therefore, when the parts supply device can supply only one type of parts, the parts supply device must be installed for each welded part having a different shape, which increases the cost and requires the installation space. In addition, after all one type of welded part has been joined to the corresponding welded position of the work, another welded part must be welded to the corresponding welded position of the work, which reduces work efficiency. There is a risk of inviting.

本発明は、斯かる点に鑑みてなされたものであり、その目的とするところは、形状の異なる複数の溶接部品から所望の溶接部品を選択的に供給可能にして、低コストでスペースを節約できるとともに、作業効率を向上させることが可能な部品供給装置を提供することにある。 The present invention has been made in view of these points, and an object of the present invention is to enable selectively supplying a desired welded part from a plurality of welded parts having different shapes, thereby saving space at low cost. It is an object of the present invention to provide a component supply device capable of improving work efficiency.

上記課題を解決するために、第1の発明では、ワークとプロジェクションボルトとをプロジェクション溶接によって接合する溶接装置を対象として、上記プロジェクションボルトを上記ワークの溶接位置へ案内するガイド装置と、上記ガイド装置に上記プロジェクションボルトを選択して供給するための選択装置と、上記ガイド装置及び上記選択装置の作動制御をする制御装置とを備え、上記ガイド装置は、上記プロジェクションボルトを受け取り保持するボルト保持部を有するチャックを有し、上記選択装置は、上記プロジェクションボルトが搬送される複数の搬送路であって、該搬送路毎に予め定められた、特定の軸長のプロジェクションボルトを搬送しかつ各搬送路同士では異なる軸長のプロジェクションボルトを搬送するように構成された複数の搬送路と、該複数の搬送路のうち選択された搬送路と連通可能に構成されかつ該選択された搬送路により搬送される上記プロジェクションボルトを上記ガイド装置に供給するための供給路と、を有し、上記制御装置は、軸長がそれぞれ異なる複数のプロジェクションボルトのうちから選択された所望のプロジェクションボルトを上記ガイド装置に供給すべく、上記選択された所望のプロジェクションボルトを搬送する搬送路と上記供給路とを連通させ、上記ボルト保持部は、上記プロジェクションボルトの軸長に関わらず、該プロジェクションボルトの先端部が上記ボルト保持部の下端部に位置した状態で、該プロジェクションボルトの軸部を保持することを特徴とする。 In order to solve the above problems, in the first invention, a guide device for guiding the projection bolt to the welding position of the work and a guide device for the welding device for joining the work and the projection bolt by projection welding, and the guide device for guiding the projection bolt to the welding position of the work. The guide device includes a selection device for selecting and supplying the projection bolt , and a control device for controlling the operation of the guide device and the selection device. The guide device has a bolt holding unit that receives and holds the projection bolt. The selection device has a chuck, and the selection device is a plurality of transport paths through which the projection bolts are transported, and transports projection bolts having a specific axial length predetermined for each transport path and transports each transport path. A plurality of transport paths configured to transport projection bolts having different axial lengths from each other and a transport path configured to be communicable with a selected transport path among the plurality of transport paths and transported by the selected transport path. The control device has a supply path for supplying the projection bolts to the guide device, and the control device uses the guide device with a desired projection bolt selected from a plurality of projection bolts having different shaft lengths . In order to supply the bolt, the transport path for transporting the selected desired projection bolt is communicated with the supply path, and the bolt holding portion has the tip of the projection bolt regardless of the axial length of the projection bolt. It is characterized in that the shaft portion of the projection bolt is held in a state of being located at the lower end portion of the bolt holding portion .

第2の発明では、第1の発明において、上記選択装置は、上記複数の搬送路のうち選択された搬送路と連通する連通路を有する可動部と、上記選択された搬送路と上記連通路とが連通するように該可動部を変位させるための変位装置と、を更に有し、上記供給路は、上記連通路を介して上記選択された搬送路と連通するように構成され、上記制御装置は、上記選択された搬送路と上記連通路が連通するように上記変位装置を作動させることを特徴とする。 In a second aspect of the invention, in the first invention, the selection device comprises a movable portion having a communication passage communicating with a selected transportation path among the plurality of transportation paths, and the selected transportation path and the communication passage. Further having a displacement device for displacing the movable portion so as to communicate with the above-mentioned supply passage, the supply passage is configured to communicate with the above-selected transport passage through the above-mentioned communication passage, and the above-mentioned control. The device is characterized in that the displacement device is operated so that the selected transport path and the communication path communicate with each other.

第3の発明は、第2の発明において、複数の開孔部が一列に並んで形成された有孔ブロックを更に備え、上記複数の搬送路は、上記可動部の上記連通路と連通する側の端部が、上記複数の開孔部が並ぶ列方向に並ぶように、上記有孔ブロックの各開孔部にそれぞれ連結されており、上記連通路は、上記有孔ブロックの各開孔部を介して各搬送路と連通し、上記変位装置は、上記可動部を上記列方向に変位させて、上記選択された搬送路が連結された上記開孔部と上記連通路とを連通させることで、上記選択された搬送路と上記連通路とを連通させるように構成されていることを特徴とする。 The third invention further includes, in the second invention, a perforated block in which a plurality of opened portions are formed side by side in a row, and the plurality of transport paths are on the side communicating with the said communication passage of the movable portion. Is connected to each of the perforated blocks of the perforated block so that the ends of the perforated blocks are lined up in a row direction in which the plurality of perforated portions are lined up. The displacement device displaces the movable portion in the row direction to communicate with the opening portion to which the selected transport path is connected and the communication passage. It is characterized in that it is configured to communicate the selected transport path and the continuous passage.

第4の発明は、ワークと溶接部品とをプロジェクション溶接によって接合する溶接装置に対して、上記溶接部品を供給するための部品供給装置を対象として、上記溶接部品を上記ワークの溶接位置へ案内するガイド装置と、円柱形をなしかつ複数の開孔部が中心軸周りに形成された有孔ブロックと、上記ガイド装置に上記溶接部品を選択して供給するための選択装置と、上記ガイド装置及び上記選択装置の作動制御をする制御装置とを備え、上記選択装置は、上記溶接部品が搬送される複数の搬送路であって、該搬送路毎に予め定められた、特定の形状の溶接部品を搬送しかつ各搬送路同士では異なる形状の溶接部品を搬送するように構成された複数の搬送路と、該複数の搬送路のうち選択された搬送路と連通可能に構成されかつ該選択された搬送路により搬送される溶接部品を上記ガイド装置に供給するための供給路と、上記複数の搬送路のうち選択された搬送路と連通する連通路を有する可動部と、上記選択された搬送路と上記連通路とが連通するように該可動部を変位さ
せるための変位装置と、を有し、上記供給路は、上記連通路を介して上記選択された搬送路と連通するように構成され、上記複数の搬送路は、上記可動部の上記連通路と連通する側の端部が、上記有孔ブロックの各開孔部にそれぞれ連結されており、上記可動部は、上記有孔ブロックと同軸に配置された円柱形をなし、上記変位装置は、上記可動部を上記中心軸回りに回転させて、上記選択された搬送路が連結された上記開孔部と上記連通路とを連通させることで、上記選択された搬送路と上記連通路とを連通させるように構成されており、上記制御装置は、形状がそれぞれ異なる複数の溶接部品のうちから選択された所望の溶接部品を上記ガイド装置に供給すべく、上記選択された搬送路と上記連通路が連通するように上記変位装置を作動させる。
The fourth invention guides the welded part to the welding position of the work, targeting the part supply device for supplying the welded part to the welding device for joining the work and the welded part by projection welding. A guide device, a perforated block having a cylindrical shape and having a plurality of holes formed around the central axis, a selection device for selecting and supplying the welded parts to the guide device, the guide device, and the guide device. The selection device includes a control device for controlling the operation of the selection device, and the selection device is a plurality of transfer paths to which the welded parts are conveyed, and the welded parts having a specific shape predetermined for each transfer path. , And each of the transport paths is configured to be communicable with and selected from a plurality of transport paths configured to transport welded parts having different shapes and a transport path selected from the plurality of transport paths. A supply path for supplying the welded parts transported by the transport path to the guide device, a movable portion having a communication path communicating with the transport path selected from the plurality of transport paths, and the selected transport path. It has a displacement device for displacing the movable portion so that the road and the communication passage communicate with each other, and the supply passage is configured to communicate with the selected transport passage through the communication passage. In the plurality of transport paths, the end portion of the movable portion on the side communicating with the continuous passage is connected to each open portion of the perforated block, and the movable portion is the perforated block. The displacement device has a cylindrical shape arranged coaxially with the above, and the above-mentioned displacement device rotates the above-mentioned movable portion around the above-mentioned central axis to communicate the above-mentioned open portion to which the above-selected transport path is connected and the above-mentioned communication passage. The control device is configured to communicate the selected transport path and the communication path, and the control device selects a desired welded part selected from a plurality of welded parts having different shapes. In order to supply the guide device, the displacement device is operated so that the selected transport path and the communication path communicate with each other.

第1の発明によると、選択装置は、溶接部品を搬送する複数の搬送路と、各搬送路からガイド装置に溶接部品を供給する供給路とを有し、複数の搬送路は、搬送路毎に予め定められた、特定の形状の溶接部品を搬送しかつ各搬送路同士では異なる形状の溶接部品を搬送するように構成されている。また、制御装置は、形状がそれぞれ異なる複数の溶接部品のうちから選択された所望の溶接部品をガイド装置に供給すべく、選択された所望の溶接部品を搬送する搬送路と上記供給路とを連通させるように構成されている。このため、所望の溶接部品を搬送する搬送路を選択して、当該搬送路と供給路とを連通させれば、所望の溶接部品をガイド装置に供給することができる。そして、ガイド装置により、所望の溶接部品がワークの溶接位置へ配送される。したがって、形状の異なる複数の溶接部品から所望の溶接部品を選択的に供給可能にすることができる。これにより、複数の部品供給装置を設ける必要がなくなるため、コストを削減でき、スペースも節約できる。 According to the first invention, the selection device has a plurality of transport paths for transporting the welded parts and a supply path for supplying the welded parts from each transport path to the guide device, and the plurality of transport paths are for each transport path. It is configured to transport welded parts having a specific shape and to transport welded parts having different shapes between the transport paths. Further, the control device provides a transport path and the supply path for transporting the selected desired welded parts in order to supply the desired welded parts selected from the plurality of welded parts having different shapes to the guide device. It is configured to communicate. Therefore, if a transport path for transporting a desired welded component is selected and the transport path and the supply path are communicated with each other, the desired welded component can be supplied to the guide device. Then, the desired welded part is delivered to the welded position of the work by the guide device. Therefore, it is possible to selectively supply a desired welded part from a plurality of welded parts having different shapes. As a result, it is not necessary to provide a plurality of component supply devices, so that the cost can be reduced and the space can be saved.

また、第1の発明によると、作業効率を向上させるという効果をより適切に発揮することができる。すなわち、プロジェクションボルトは、主に軸長及び軸直径の違いによって分けられる。このうち特に軸長は、1つのワークでも溶接箇所に応じて細かく分けられる。したがって、搬送路毎に軸長の異なるプロジェクションボルトを搬送され、可動部と変位装置とによって、所望の軸長のプロジェクションボルトを適宜供給できるようにしておけば、作業効率を向上させるという効果が適切に発揮される。Further, according to the first invention, the effect of improving work efficiency can be more appropriately exhibited. That is, the projection bolts are mainly classified according to the difference in shaft length and shaft diameter. Of these, the shaft length is particularly finely divided according to the welded portion even for one work. Therefore, if projection bolts having different shaft lengths are transported for each transport path and projection bolts having a desired shaft length can be appropriately supplied by the movable part and the displacement device, the effect of improving work efficiency is appropriate. It is demonstrated in.

第2の発明によると、所望の溶接部品を搬送する搬送路を選択して、当該搬送路と連通路とが連通するように可動部を変位させれば、所望の溶接部品をガイド装置に供給することができる。また、可動部を変位させるための変位装置の動作は制御装置によって制御されるため、変位装置による可動部の変位は自動で行うことが可能である。このため、作業効率を向上させることもできる。したがって、より効率的に、形状の異なる複数の溶接部品から所望の溶接部品を供給可能にすることができる。 According to the second invention, if a transport path for transporting a desired welded component is selected and the movable portion is displaced so that the transport path and the communication path communicate with each other, the desired welded component is supplied to the guide device. can do. Further, since the operation of the displacement device for displacing the movable portion is controlled by the control device, the displacement of the movable portion by the displacement device can be automatically performed. Therefore, work efficiency can be improved. Therefore, it is possible to more efficiently supply a desired welded part from a plurality of welded parts having different shapes.

第3の発明によると、複数の搬送路における、可動部の連通路と連通する側の端部が、有孔ブロックの複数の開孔部の列方向に並ぶため、変位装置は可動部を該列方向に変位させるだけでよくなる。このため、変位装置の構成及び制御装置による変位装置の制御を簡単にすることができる。これにより、作業効率を一層向上させることができる According to the third invention, since the end portions of the plurality of transport paths on the side communicating with the communication passage of the movable portion are lined up in the row direction of the plurality of opened portions of the perforated block, the displacement device has the movable portion. All you have to do is displace it in the row direction. Therefore, the configuration of the displacement device and the control of the displacement device by the control device can be simplified. This makes it possible to further improve work efficiency .

本発明の実施形態1に係る部品供給装置を備えるプロジェクション溶接装置の構成を示す斜視図である。It is a perspective view which shows the structure of the projection welding apparatus which comprises the component supply apparatus which concerns on Embodiment 1 of this invention. プロジェクション溶接装置の上部電極及び下部電極の側面図である。It is a side view of the upper electrode and the lower electrode of a projection welding apparatus. 図2のIII-III線相当の断面図である。It is sectional drawing corresponding to line III-III of FIG. 選択装置の構成を示す概略図である。It is a schematic diagram which shows the structure of a selection device. ボルト供給装置のチャックの構成を示す斜視図である。It is a perspective view which shows the structure of the chuck of a bolt supply device. チャックのボルト保持部の構成を示す断面図である。It is sectional drawing which shows the structure of the bolt holding part of a chuck. 軸長の異なるプロジェクションボルトをボルト保持部で受けた状態を示す断面図である。It is sectional drawing which shows the state which received the projection bolt of a different shaft length by a bolt holding part. プロジェクション溶接装置の制御系を示す概略図である。It is a schematic diagram which shows the control system of a projection welding apparatus. プロジェクションボルトをワークに接合させる場合であって、ガイドピンがワークの孔部に挿通された状態を示す図である。It is a figure which shows the state which the guide pin is inserted into the hole part of a work in the case of joining a projection bolt to a work. 図9の状態からガイドピンがプロジェクションボルトを受けた状態を示す図である。It is a figure which shows the state which the guide pin received a projection bolt from the state of FIG. 図10の状態から上部電極がプロジェクションボルトを下側に押し込む状態を示す図である。It is a figure which shows the state which the upper electrode pushes a projection bolt downward from the state of FIG. 図11の状態からプロジェクションボルトがワークに当接した状態を示す図である。It is a figure which shows the state which the projection bolt came into contact with a work from the state of FIG. 図12の状態からチャックが退避して、通電を開始した状態を示す図である。It is a figure which shows the state which the chuck retracted from the state of FIG. 12, and started the energization. 実施形態2に係る部品供給装置の選択装置の構成を示す概略図である。It is a schematic diagram which shows the structure of the selection apparatus of the component supply apparatus which concerns on Embodiment 2. FIG.

以下、本発明の実施形態を図面に基づいて詳細に説明する。尚、以下の好ましい実施形態の説明は、本質的に例示に過ぎない。 Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. It should be noted that the following description of the preferred embodiment is essentially merely an example.

(実施形態1)
図1は、本発明の実施形態1に係る部品供給装置としてのボルト供給装置40を備えるプロジェクション溶接装置1を概略的に示す。このプロジェクション溶接装置1は、ワークW(図9等参照)に対してプロジェクションナット及びプロジェクションボルト90(図6等参照)を、プロジェクション溶接により接合するためのプロジェクション溶接装置である。
(Embodiment 1)
FIG. 1 schematically shows a projection welding device 1 including a bolt supply device 40 as a component supply device according to the first embodiment of the present invention. This projection welding device 1 is a projection welding device for joining a projection nut and a projection bolt 90 (see FIG. 6 and the like) to a work W (see FIG. 9 and the like) by projection welding.

図1に示すように、プロジェクション溶接装置1は、変位可能なアーム11を有するロボット10と、溶接装置本体20と、プロジェクションナットを供給するためのナット供給装置30と、プロジェクションボルト90を供給するためのボルト供給装置40と、ロボット10、溶接装置本体20、ナット供給装置30、及びボルト供給装置40を作動制御する制御装置100(図8参照)と、を有している。 As shown in FIG. 1, the projection welding device 1 supplies a robot 10 having a displaceable arm 11, a welding device main body 20, a nut supply device 30 for supplying a projection nut, and a projection bolt 90. It has a bolt supply device 40, a robot 10, a welding device main body 20, a nut supply device 30, and a control device 100 (see FIG. 8) that controls the operation of the bolt supply device 40.

ロボット10は、互いに回動可能に連結された3つのアーム11と、基台12とを有する多関節の産業用ロボットである。3つのアーム11は、基端が基台12に接続された基台側アーム11aと、先端に溶接装置本体20が保持された本体側アーム11bと、基台側アーム11aの先端部と本体側アーム11bの基端側とを連結する中間アーム11cとで構成されている。基台12は、工場の床面等に設置されており、これによりプロジェクション溶接装置1が工場の床面等に対して固定される。 The robot 10 is an articulated industrial robot having three arms 11 rotatably connected to each other and a base 12. The three arms 11 include a base side arm 11a whose base end is connected to the base 12, a main body side arm 11b in which a welding device main body 20 is held at the tip, and a tip portion and a main body side of the base side arm 11a. It is composed of an intermediate arm 11c that connects the base end side of the arm 11b. The base 12 is installed on the floor surface of the factory or the like, whereby the projection welding device 1 is fixed to the floor surface or the like of the factory.

基台側アーム11aは、鉛直方向に延びる軸周りに回動可能に上記基台12と接続されている。基台側アーム11aが上記軸周りに回動したときには、溶接装置本体20ごと各アーム11が水平方向に回動するようになっている。 The base side arm 11a is rotatably connected to the base 12 around an axis extending in the vertical direction. When the base side arm 11a rotates around the axis, each arm 11 rotates in the horizontal direction together with the welding apparatus main body 20.

基台側アーム11aの先端部と中間アーム11cの長手方向の一端部、及び、本体側アーム11bの基端部と中間アーム11cの上記長手方向の他端部とは、水平方向に延びる軸13周りに回動可能にそれぞれ連結されている。溶接装置本体20は、本体側アーム11b及び中間アーム11cを上記軸13周りに回動させることにより、鉛直方向の軸及び軸13の両方に直交する方向に進退させることができる。 The tip of the base side arm 11a and one end in the longitudinal direction of the intermediate arm 11c, and the base end of the main body side arm 11b and the other end of the intermediate arm 11c in the longitudinal direction are shafts 13 extending in the horizontal direction. They are rotatably connected around each other. By rotating the main body side arm 11b and the intermediate arm 11c around the shaft 13, the welding device main body 20 can move forward and backward in a direction orthogonal to both the vertical axis and the shaft 13.

尚、以下の説明では、軸13の延びる方向を左右方向、鉛直方向の軸及び軸13の両方に直交する方向を前後方向という。また、前後方向については、溶接装置本体20が基台12から離れる側を前側、溶接装置本体20が基台12に近づく側を後側という。 In the following description, the extending direction of the axis 13 is referred to as a left-right direction, and the direction orthogonal to both the vertical axis and the axis 13 is referred to as a front-back direction. Further, in the front-rear direction, the side where the welding device main body 20 is away from the base 12 is called the front side, and the side where the welding device main body 20 is close to the base 12 is called the rear side.

溶接装置本体20は、上部電極50と、該上部電極50を昇降させる上側シリンダ51と、下部電極60とを有している。 The welding apparatus main body 20 has an upper electrode 50, an upper cylinder 51 for raising and lowering the upper electrode 50, and a lower electrode 60.

〈上部電極〉
上部電極50は、図1に示すように、上側シリンダ51ごと支持機構を介して、本体側アーム11bの先端に保持されている。支持機構は、上側シリンダ51を支持する上側支持部22と、該上側支持部22から下側に延びた後で前側に向かって延びる、側面視略L字状の下側支持部23とを有している。下側支持部23の先端部には、上記下部電極60(厳密には後述する下部電極ホルダ61)を挟持して保持する下側保持部23aが設けられている。
<Upper electrode>
As shown in FIG. 1, the upper electrode 50 is held at the tip of the main body side arm 11b via a support mechanism together with the upper cylinder 51. The support mechanism has an upper support portion 22 that supports the upper cylinder 51, and a lower support portion 23 having a substantially L-shaped side view that extends downward from the upper support portion 22 and then extends toward the front side. is doing. At the tip of the lower support portion 23, a lower holding portion 23a for sandwiching and holding the lower electrode 60 (strictly speaking, a lower electrode holder 61 described later) is provided.

上部電極50は、図1及び図2に示すように、上部電極ホルダ52の下側端部に保持されている。上部電極ホルダ52の上端側の部分は、上側シリンダ51内に臨んでいる。上部電極50は、この上部電極ホルダ52が上側シリンダ51によって昇降されることによって、昇降されるようになっている。 As shown in FIGS. 1 and 2, the upper electrode 50 is held at the lower end portion of the upper electrode holder 52. The upper end side portion of the upper electrode holder 52 faces the inside of the upper cylinder 51. The upper electrode 50 is moved up and down by the upper electrode holder 52 being moved up and down by the upper cylinder 51.

上側シリンダ51は、流体圧シリンダであって、油圧や空気圧を利用して上部電極50を昇降させる。図示は省略するが、上側シリンダ51内には、上部電極50を上側に向かって付勢するための付勢部材が配設されている。上側シリンダ51内に流体が供給されていない状態では、上部電極50は上記付勢部材の付勢力により上側に向かって移動(つまり上昇)された状態となる一方、上側シリンダ51内に流体が供給されて、該流体による流体圧が上記付勢部材の付勢力に打ち勝つ力を発生させる流体圧になったときに、上部電極50が下側に向かって移動(つまり下降)されるようになっている。 The upper cylinder 51 is a fluid pressure cylinder, and the upper electrode 50 is moved up and down by using hydraulic pressure or pneumatic pressure. Although not shown, an urging member for urging the upper electrode 50 upward is provided in the upper cylinder 51. When the fluid is not supplied to the upper cylinder 51, the upper electrode 50 is moved (that is, raised) upward by the urging force of the urging member, while the fluid is supplied to the upper cylinder 51. Then, when the fluid pressure due to the fluid becomes a fluid pressure that generates a force that overcomes the urging force of the urging member, the upper electrode 50 is moved (that is, lowered) downward. There is.

〈下部電極〉
下部電極60は、図3に示すように、下部電極ホルダ61を有している。下部電極ホルダ61は円筒状をなしており、筒軸方向が上下方向になるように延びている。下部電極ホルダ61の筒内には後述するガイドピン80が昇降可能に挿通されている。
<Lower electrode>
As shown in FIG. 3, the lower electrode 60 has a lower electrode holder 61. The lower electrode holder 61 has a cylindrical shape and extends so that the axial direction of the cylinder is in the vertical direction. A guide pin 80, which will be described later, is inserted into the cylinder of the lower electrode holder 61 so as to be able to move up and down.

下部電極60は、下部電極ホルダ61の上側端部に載置された電極ソケット62と、該電極ソケット62に上側から覆い被さるように嵌着された電極チップ63とを有している。電極ソケット62及び電極チップ63は共に、上記ガイドピン80が挿通される貫通孔を有している。該貫通孔の中心は下部電極ホルダ61の筒軸上に位置している。貫通孔の径は、下部電極ホルダ61の内径と同等の径に設定されている。 The lower electrode 60 has an electrode socket 62 placed on the upper end of the lower electrode holder 61, and an electrode tip 63 fitted so as to cover the electrode socket 62 from above. Both the electrode socket 62 and the electrode tip 63 have a through hole through which the guide pin 80 is inserted. The center of the through hole is located on the cylinder axis of the lower electrode holder 61. The diameter of the through hole is set to the same diameter as the inner diameter of the lower electrode holder 61.

下部電極ホルダ61は、図3に示すように、その下側端部がホルダベース64に保持されている。このホルダベース64の下側の部分には、上記ガイドピン80を昇降させるための下側シリンダ65が設けられている。この下側シリンダ65はエアシリンダで構成されている。下側シリンダ65には、該下側シリンダ65内に空気を供給するためのエア供給通路65aが設けられている。 As shown in FIG. 3, the lower end of the lower electrode holder 61 is held by the holder base 64. A lower cylinder 65 for raising and lowering the guide pin 80 is provided in the lower portion of the holder base 64. The lower cylinder 65 is composed of an air cylinder. The lower cylinder 65 is provided with an air supply passage 65a for supplying air into the lower cylinder 65.

また、図2及び図3に示すように、下部電極ホルダ61の下側寄りでかつホルダベース64よりも上側の部分には、プロジェクション溶接時に下部電極60を冷却する冷却水を供給するための冷却水供給部66と、下部電極60を冷却した後の冷却水を排出するための冷却水排出部67とが設けられている。冷却水供給部66及び冷却水排出部67は、ぞれぞれ、下部電極ホルダ61の径方向の外側に向かって真っ直ぐ延びた後、該径方向の外側に向かって下側に傾斜して延びている。図示は省略しているが、冷却水供給部66及び冷却水排出部67には、ウォータポンプ等で構成された冷却水供給装置と接続されるホースが接続される。該冷却水供給装置から冷却水供給部66を介して供給された冷却水は、下部電極ホルダ61内を流れて、プロジェクション溶接中の下部電極60を冷却した後、冷却水排出部67を通って冷却水供給装置に流入するようになっている。 Further, as shown in FIGS. 2 and 3, cooling for supplying cooling water for cooling the lower electrode 60 at the time of projection welding to the portion near the lower side of the lower electrode holder 61 and above the holder base 64. A water supply unit 66 and a cooling water discharge unit 67 for discharging the cooling water after cooling the lower electrode 60 are provided. The cooling water supply unit 66 and the cooling water discharge unit 67 each extend straight toward the outside of the lower electrode holder 61 in the radial direction, and then extend downward at an angle toward the outside in the radial direction. ing. Although not shown, a hose connected to a cooling water supply device composed of a water pump or the like is connected to the cooling water supply unit 66 and the cooling water discharge unit 67. The cooling water supplied from the cooling water supply device via the cooling water supply unit 66 flows in the lower electrode holder 61, cools the lower electrode 60 during projection welding, and then passes through the cooling water discharge unit 67. It is designed to flow into the cooling water supply device.

下部電極ホルダ61の筒内には、図3に示すように、ワークWとプロジェクションナット、及び、ワークWとプロジェクションボルト90との位置決めをするための昇降可能なガイドピン80と、該ガイドピン80をつなぎネジ68を介して保持するための爪部材69と、上側端部につなぎネジ68が締結されかつ下側端部が下側シリンダ65のシリンダロッド65bと接続された樹脂ロッド70とが挿通されている。 In the cylinder of the lower electrode holder 61, as shown in FIG. 3, a liftable guide pin 80 for positioning the work W and the projection nut, and the work W and the projection bolt 90, and the guide pin 80 are provided. A claw member 69 for holding the screw 68 via the connecting screw 68 and a resin rod 70 having the connecting screw 68 fastened to the upper end portion and the lower end portion connected to the cylinder rod 65b of the lower cylinder 65 are inserted. Has been done.

〈ガイドピン〉
ガイドピン80は、図3に示すように、下部電極ホルダ61の筒軸方向に延びるロッド部81と、該ロッド部81における該ロッド部81の軸方向の上側の端部に設けられかつプロジェクションナットを受けるナット受け部82と、該ナット受け部82の上側に設けられかつプロジェクションボルト90を受けるボルト受け部83とを有している。
<guide pin>
As shown in FIG. 3, the guide pin 80 is provided at the rod portion 81 extending in the tubular axial direction of the lower electrode holder 61 and the axially upper end portion of the rod portion 81 of the rod portion 81 and is a projection nut. It has a nut receiving portion 82 for receiving the nut, and a bolt receiving portion 83 provided on the upper side of the nut receiving portion 82 and receiving the projection bolt 90.

ガイドピン80のロッド部81は、図3に示すように、下部電極ホルダ61の内径よりも僅かに小さい径で上下に延びる大径部81aと、大径部81aから径方向の内側に窪んだ窪み部81bが形成された中間部81cと、中間部81cにおける最小径よりも大径でかつ大径部81aよりも小径でかつ上下方向に延びる小径部81dと、小径部81dの下端から下側に向かって縮径するように延びた縮径部81eとを有している。図3に示すように、中間部81cは大径部81aの下側に形成され、小径部81dは中間部81cの下側に形成されている。縮径部81eの下端部は、つなぎネジ68に載置されている。ロッド部81の大径部81a、中間部81c、小径部81d、及び縮径部81eは同軸に形成されている。 As shown in FIG. 3, the rod portion 81 of the guide pin 80 has a large diameter portion 81a extending vertically with a diameter slightly smaller than the inner diameter of the lower electrode holder 61 and a concave portion inward in the radial direction from the large diameter portion 81a. An intermediate portion 81c in which the recessed portion 81b is formed, a small diameter portion 81d having a diameter larger than the minimum diameter in the intermediate portion 81c and a smaller diameter than the large diameter portion 81a and extending in the vertical direction, and a small diameter portion 81d below the lower end of the small diameter portion 81d. It has a diameter-reduced portion 81e extending so as to reduce the diameter toward. As shown in FIG. 3, the intermediate portion 81c is formed on the lower side of the large diameter portion 81a, and the small diameter portion 81d is formed on the lower side of the intermediate portion 81c. The lower end of the reduced diameter portion 81e is placed on the connecting screw 68. The large diameter portion 81a, the intermediate portion 81c, the small diameter portion 81d, and the reduced diameter portion 81e of the rod portion 81 are formed coaxially.

ガイドピン80のナット受け部82は、内径の異なる複数種類のプロジェクションナットを受け取り可能なように、ロッド部81の軸方向の上側から下側に向かって段形状をなしている。具体的には、ナット受け部82は、ロッド部81の大径部81aよりも径が小さい円柱体で構成された第1ナット受け部82aと、該第1ナット受け部82aよりも径が小さい円柱体で構成された第2ナット受け部82bとを有し、第2ナット受け部82bが第1ナット受け部82aの上側に位置するように配設されて構成されている。さらに詳しくは、ロッド部81の大径部81aの上端から、上記第1ナット受け部82aがロッド部81の軸方向の上側に向かって延びており、該第1ナット受け部82aの上端から、上記第2ナット受け部82bが上記軸方向の上側に向かって延びている。 The nut receiving portion 82 of the guide pin 80 has a stepped shape from the upper side to the lower side in the axial direction of the rod portion 81 so that a plurality of types of projection nuts having different inner diameters can be received. Specifically, the nut receiving portion 82 has a diameter smaller than that of the first nut receiving portion 82a formed of a cylindrical body having a diameter smaller than that of the large diameter portion 81a of the rod portion 81 and the first nut receiving portion 82a. It has a second nut receiving portion 82b made of a cylindrical body, and is configured so that the second nut receiving portion 82b is located above the first nut receiving portion 82a. More specifically, the first nut receiving portion 82a extends from the upper end of the large diameter portion 81a of the rod portion 81 toward the upper side in the axial direction of the rod portion 81, and from the upper end of the first nut receiving portion 82a. The second nut receiving portion 82b extends upward in the axial direction.

第1ナット受け部82a及び第2ナット受け部82bは、どちらもロッド部81と同軸に形成されている。つまり、ロッド部81、第1ナット受け部82a、及び第2ナット受け部82bは同軸になっている。 Both the first nut receiving portion 82a and the second nut receiving portion 82b are formed coaxially with the rod portion 81. That is, the rod portion 81, the first nut receiving portion 82a, and the second nut receiving portion 82b are coaxial.

第1ナット受け部82aの径及び第2ナット受け部82bの径は、ワークWに接合されるプロジェクションナットの内径に応じて設定される。例えば、ワークWに接合させるプロジェクションナットとして、内径が7mm程度のナットと5mm程度のナットとがある場合には、第1ナット受け部82aの径は7mmよりも小さい径(例えば6.8mm)に設定される一方、第2ナット受け部82bの径は5mmよりも小さい径(例えば4.8mm)に設定される。 The diameter of the first nut receiving portion 82a and the diameter of the second nut receiving portion 82b are set according to the inner diameter of the projection nut joined to the work W. For example, when the projection nut to be joined to the work W includes a nut having an inner diameter of about 7 mm and a nut having an inner diameter of about 5 mm, the diameter of the first nut receiving portion 82a is smaller than 7 mm (for example, 6.8 mm). On the other hand, the diameter of the second nut receiving portion 82b is set to a diameter smaller than 5 mm (for example, 4.8 mm).

第1ナット受け部82aの高さ及び第2ナット受け部82bの高さは、ワークWに接合されるプロジェクションナットの高さに応じて設定されている。 The height of the first nut receiving portion 82a and the height of the second nut receiving portion 82b are set according to the height of the projection nut joined to the work W.

上記ボルト受け部83は、図3に示すように、ナット受け部82を構成する複数の円柱体のうち最も上側に位置する円柱体から、下部電極ホルダ61の筒軸方向の上側に突出した突起により構成されている。より具体的には、ボルト受け部83は、第2ナット受け部82bの径方向の中心から上記筒軸方向の上側に向かって突出した円錐状又は円錐台状の突起で構成されている。 As shown in FIG. 3, the bolt receiving portion 83 is a protrusion protruding upward in the tubular axial direction of the lower electrode holder 61 from the cylindrical body located on the uppermost side among the plurality of cylindrical bodies constituting the nut receiving portion 82. It is composed of. More specifically, the bolt receiving portion 83 is composed of a conical or truncated cone-shaped protrusion protruding from the radial center of the second nut receiving portion 82b toward the upper side in the tubular axis direction.

ボルト受け部83を構成する円錐又は円錐台の最大径(第2ナット受け部82bとの結合部分の径)は、図3に示すように、第2ナット受け部82bの径よりも小さい。 As shown in FIG. 3, the maximum diameter of the cone or the truncated cone constituting the bolt receiving portion 83 (the diameter of the joint portion with the second nut receiving portion 82b) is smaller than the diameter of the second nut receiving portion 82b.

ボルト受け部83は、ナット受け部82と同軸に構成されている。このため、ロッド部81、ナット受け部82(第1ナット受け部82a及び第2ナット受け部82b)、及びボルト受け部83は同軸になっている。 The bolt receiving portion 83 is configured coaxially with the nut receiving portion 82. Therefore, the rod portion 81, the nut receiving portion 82 (the first nut receiving portion 82a and the second nut receiving portion 82b), and the bolt receiving portion 83 are coaxial.

ガイドピン80は、図3に示すように、爪部材69によって軸方向及び径方向に保持された状態で、つなぎネジ68の上に設置されている。爪部材69は、本実施形態1では四つ爪で構成されている。爪部材69は、つなぎネジ68と係合したネジ側係合部69aと、ガイドピン80の窪み部81bとそれぞれ係合する4つの爪部69bと、ネジ側係合部69aと各爪部69bとを連結する連結部69cとを有している。ネジ側係合部69aは、つなぎネジ68の軸方向の一部を周方向に覆うような円筒状をなしている。4つの連結部69cは、ネジ側係合部69aの周方向に等間隔に並んでおり、これにより、4つの爪部69bも該周方向に等間隔に並んでいる。 As shown in FIG. 3, the guide pin 80 is installed on the connecting screw 68 in a state of being held in the axial direction and the radial direction by the claw member 69. In the first embodiment, the claw member 69 is composed of four claws. The claw member 69 includes a screw side engaging portion 69a engaged with the connecting screw 68, four claw portions 69b engaging with the recessed portion 81b of the guide pin 80, a screw side engaging portion 69a, and each claw portion 69b. It has a connecting portion 69c and a connecting portion 69c for connecting the above. The screw-side engaging portion 69a has a cylindrical shape that covers a part of the connecting screw 68 in the axial direction in the circumferential direction. The four connecting portions 69c are arranged at equal intervals in the circumferential direction of the screw side engaging portion 69a, whereby the four claw portions 69b are also arranged at equal intervals in the circumferential direction.

爪部材69の連結部69cはそれぞれ弾性部材によって構成されており、爪部69bがガイドピン80の窪み部81bと係合した状態では、各連結部69cは、その弾性力によって、各爪部69bをガイドピン80の径方向の内側に向かって、窪み部81bに押し付けるようになっている。これにより、ガイドピン80が軸方向及び径方向に保持される。つまり、ガイドピン80は、爪部材69の連結部69cの弾性力によって軸方向及び径方向に保持される。 Each of the connecting portions 69c of the claw member 69 is composed of an elastic member, and in a state where the claw portion 69b is engaged with the recessed portion 81b of the guide pin 80, each connecting portion 69c is caused by the elastic force of each claw portion 69b. Is pressed against the recess 81b toward the inside of the guide pin 80 in the radial direction. As a result, the guide pin 80 is held in the axial direction and the radial direction. That is, the guide pin 80 is held in the axial direction and the radial direction by the elastic force of the connecting portion 69c of the claw member 69.

上述のように、各爪部69bをガイドピン80の径方向の内側に向かって、窪み部81bに押し付けることで、爪部材69がガイドピン80を保持するようになっているため、爪部材69のガイドピン80に対する保持力は、軸方向の保持力が径方向の保持力よりも弱くなる。このため、ガイドピン80を下部電極ホルダ61に対して上側に引っ張ったときには、ガイドピン80は下部電極ホルダ61から抜き出されるようになっている。これにより、ガイドピン80を交換する必要が生じた場合には、ガイドピン80を下部電極ホルダ61から取り外すことができる。また、ガイドピン80のロッド部81の下側端部には、縮径部81eが形成されているため、ガイドピン80を容易に下部電極ホルダ61に取り付けることもできる。よって、ガイドピン80の交換を容易に行うことができる。 As described above, by pressing each claw portion 69b against the recessed portion 81b toward the inside of the guide pin 80 in the radial direction, the claw member 69 holds the guide pin 80, and thus the claw member 69. As for the holding force with respect to the guide pin 80, the holding force in the axial direction is weaker than the holding force in the radial direction. Therefore, when the guide pin 80 is pulled upward with respect to the lower electrode holder 61, the guide pin 80 is pulled out from the lower electrode holder 61. As a result, when it becomes necessary to replace the guide pin 80, the guide pin 80 can be removed from the lower electrode holder 61. Further, since the reduced diameter portion 81e is formed at the lower end portion of the rod portion 81 of the guide pin 80, the guide pin 80 can be easily attached to the lower electrode holder 61. Therefore, the guide pin 80 can be easily replaced.

図3に示すように、爪部材69は、下部電極ホルダ61の径方向において、該下部電極ホルダ61の筒内に収まるようになっている。下側シリンダ65によってガイドピン80が昇降したときには、爪部材69も、下部電極ホルダ61の筒内や電極ソケット62の貫通孔を通って昇降する。 As shown in FIG. 3, the claw member 69 is adapted to fit inside the cylinder of the lower electrode holder 61 in the radial direction of the lower electrode holder 61. When the guide pin 80 is moved up and down by the lower cylinder 65, the claw member 69 also moves up and down through the cylinder of the lower electrode holder 61 and the through hole of the electrode socket 62.

上記樹脂ロッド70は、上述したように、上側端部につなぎネジ68が締結されている。これにより、樹脂ロッド70は、つなぎネジ68及び爪部材69を介して、ガイドピン80を保持した状態となっている。 As described above, the resin rod 70 has a connecting screw 68 fastened to the upper end portion. As a result, the resin rod 70 is in a state of holding the guide pin 80 via the connecting screw 68 and the claw member 69.

また、上述したように、樹脂ロッド70の下側端部はシリンダロッド65bと接続されている。下側シリンダ65に空気が供給されてシリンダロッド65bが上昇したときには、樹脂ロッド70も該シリンダロッド65bと共に上昇する。そして、樹脂ロッド70が上昇することで、樹脂ロッド70に保持されたガイドピン80が上昇する。一方で、下側シリンダ65から空気が排出されてシリンダロッド65bが下降したときには、樹脂ロッド70も下降して、樹脂ロッド70と共にガイドピン80が下降する。 Further, as described above, the lower end portion of the resin rod 70 is connected to the cylinder rod 65b. When air is supplied to the lower cylinder 65 and the cylinder rod 65b rises, the resin rod 70 also rises together with the cylinder rod 65b. Then, as the resin rod 70 rises, the guide pin 80 held by the resin rod 70 rises. On the other hand, when air is discharged from the lower cylinder 65 and the cylinder rod 65b is lowered, the resin rod 70 is also lowered, and the guide pin 80 is lowered together with the resin rod 70.

樹脂ロッド70の下側端は、図3に示すように、ガイドピン80に下向きの力が加えられていない無負荷状態では、ホルダベース64の底部から浮いた状態になっている。詳しくは、本実施形態1では、下側シリンダ65内には、常に一定量の空気が供給されるようになっており、この一定量の空気に基づく力によって、シリンダロッド65b及び樹脂ロッド70が上側に上昇して、該樹脂ロッド70がホルダベース64の底部から浮いた状態となる。これにより、ガイドピン80に下向きの力が加えられていない無負荷状態では、図3に示すように、ガイドピン80のナット受け部82及びボルト受け部83の全体及びロッド部81の一部は、電極チップ63を貫通して、該電極チップ63よりも上側に位置した状態となる。 As shown in FIG. 3, the lower end of the resin rod 70 is in a state of floating from the bottom of the holder base 64 in a no-load state in which a downward force is not applied to the guide pin 80. Specifically, in the first embodiment, a constant amount of air is always supplied into the lower cylinder 65, and the cylinder rod 65b and the resin rod 70 are generated by the force based on the constant amount of air. It rises upward and the resin rod 70 floats from the bottom of the holder base 64. As a result, in a no-load state in which no downward force is applied to the guide pin 80, as shown in FIG. 3, the entire nut receiving portion 82 and the bolt receiving portion 83 of the guide pin 80 and a part of the rod portion 81 are removed. , It penetrates the electrode tip 63 and is located above the electrode tip 63.

下側シリンダ65には、樹脂ロッド70の位置を検出するための位置センサ101(図8参照)が設けられている。 The lower cylinder 65 is provided with a position sensor 101 (see FIG. 8) for detecting the position of the resin rod 70.

〈ナット供給装置〉
ナット供給装置30は、図1に示すように、ナットシューター31とナットガイド装置32とを備えている。ナットシューター31は、ナット供給部33とナット待機部34とを有している。ナット供給部33は、図示を省略するナット供給源とチューブなどの接続具によって接続されている。ナットガイド装置32は、ガイド筒35と、該ガイド筒35内に挿入されたナット供給ロッド(図示省略)と、該ナット供給ロッドを進退可能に駆動するエアシリンダ(図示省略)とを有している。
<Nut supply device>
As shown in FIG. 1, the nut supply device 30 includes a nut shooter 31 and a nut guide device 32. The nut shooter 31 has a nut supply unit 33 and a nut standby unit 34. The nut supply unit 33 is connected to a nut supply source (not shown) by a connector such as a tube. The nut guide device 32 has a guide cylinder 35, a nut supply rod inserted into the guide cylinder 35 (not shown), and an air cylinder (not shown) that drives the nut supply rod to move forward and backward. There is.

上記ナット供給源からナット供給部33を介して送られたプロジェクションナットは、ナット待機部34内で待機する。ナット待機部34内にプロジェクションナットが待機した状態で、上記エアシリンダが駆動すると、上記ナット供給ロッドがナット待機部34内に待機しているプロジェクションナットを保持して、上記ガイドピン80に向かって進んでいく。その後、上記プロジェクションナットは、ガイドピン80のナット受け部82で受け止められる。このようにして、プロジェクションナットがナット供給装置30からガイドピン80の位置に供給される。 The projection nut sent from the nut supply source via the nut supply unit 33 stands by in the nut standby unit 34. When the air cylinder is driven while the projection nut is waiting in the nut standby portion 34, the nut supply rod holds the projection nut waiting in the nut standby portion 34 and faces the guide pin 80. Go ahead. After that, the projection nut is received by the nut receiving portion 82 of the guide pin 80. In this way, the projection nut is supplied from the nut supply device 30 to the position of the guide pin 80.

本実施形態1では、図1に示すように、ナット供給装置30が2台設けられている。この2台のナット供給装置30は、それぞれ異なる内径のプロジェションナットを供給する。ナット供給装置30自体の構成は、2台とも同じ構成である。 In the first embodiment, as shown in FIG. 1, two nut supply devices 30 are provided. The two nut supply devices 30 supply projection nuts having different inner diameters. The configuration of the nut supply device 30 itself is the same for both units.

〈ボルト供給装置〉
ボルト供給装置40は、図1に示すように、ボルトシューター41と、ボルトガイド装置42とを備えている。ボルト供給装置40はまた、プロジェクションボルト90が貯留されたボルト供給源47を備えており、ボルトシューター41は該ボルト供給源47と接続されている。
<Bolt supply device>
As shown in FIG. 1, the bolt supply device 40 includes a bolt shooter 41 and a bolt guide device 42. The bolt supply device 40 also includes a bolt supply source 47 in which the projection bolt 90 is stored, and the bolt shooter 41 is connected to the bolt supply source 47.

ボルト供給源47は、ボルトガイド装置42に所望の軸長のプロジェクションボルト90を供給するための選択装置71を有している。 The bolt supply source 47 has a selection device 71 for supplying the projection bolt 90 having a desired shaft length to the bolt guide device 42.

選択装置71は、図4に示すように、複数の搬送路72と、複数の搬送路72のうち選択された搬送路72と連通する連通路74を有する可動部73と、可動部73を変位させるためのシリンダ75(変位装置)と、ボルトガイド装置42の後述するチャック43(図5参照)に、選択された搬送路72により搬送されるプロジェクションボルト90を供給するための供給路48とを有している。 As shown in FIG. 4, the selection device 71 displaces the movable portion 73 having a plurality of transport paths 72 and a communication passage 74 communicating with the selected transport path 72 among the plurality of transport paths 72, and the movable portion 73. A cylinder 75 (displacement device) for causing the cylinder 75 (displacement device) and a supply path 48 for supplying the projection bolt 90 conveyed by the selected transfer path 72 to the chuck 43 (see FIG. 5) described later of the bolt guide device 42. Have.

搬送路72は、本実施形態1では4つあり、4つの搬送路72は、それぞれプロジェクションボルト90を搬送する搬送路である。4つの搬送路72では、搬送路72毎に予め定められた、特定の軸長のプロジェクションボルト90が搬送されかつ各搬送路72同士では異なる軸長のプロジェクションボルト90が搬送されている。つまり、1つの搬送路72では、同じ軸長のプロジェクションボルト90が搬送されている一方、搬送路72同士では、異なる軸長のプロジェクションボルト90が搬送されている。より詳しくは、4つの搬送路72を図4の左側から、第1搬送路72a、第2搬送路72b、第3搬送路72c、第4搬送路72dとして、第1搬送路72aでは最も軸長の短いプロジェクションボルト90が搬送され、第2搬送路72bでは、第1搬送路72aで搬送されるプロジェクションボルト90よりも軸長の長いプロジェクションボルト90が搬送され、第3搬送路72cでは、第2搬送路72bで搬送されるプロジェクションボルト90よりも軸長の長いプロジェクションボルト90が搬送され、第4搬送路72dでは、最も軸長が長いプロジェクションボルト90が搬送されている。各搬送路72の一端は後述する有孔ブロック76の各開孔部76aにそれぞれ連結されている。一方で、各搬送路72の他端は、各軸長のプロジェクションボルト90が軸長毎に分けて貯留されたボルト貯留部(図示省略)や、軸長の異なる複数種類のプロジェクションボルト90を、軸長毎に選別して、それぞれの搬送路72に送る選別装置(図示省略)にそれぞれ接続されている。各搬送路72は、チューブなどによって構成されている。以下の説明では、各搬送路を区別するときには、第1搬送路72a~第4搬送路72dといい、各搬送路を区別しないときには、単に搬送路72という。尚、各搬送路72の他端が上記ボルト貯留部にそれぞれ接続されている場合には、該ボルト貯留部は、搬送路72の数、すなわち、プロジェクションボルト90の種類数に対応して、4つ設けられる。 In the first embodiment, there are four transport paths 72, and each of the four transport paths 72 is a transport path for transporting the projection bolt 90. In the four transport paths 72, projection bolts 90 having a specific shaft length, which are predetermined for each transport path 72, are transported, and projection bolts 90 having different shaft lengths are transported between the transport paths 72. That is, the projection bolts 90 having the same shaft length are conveyed in one transport path 72, while the projection bolts 90 having different shaft lengths are conveyed between the transport paths 72. More specifically, the four transport paths 72 are designated as the first transport path 72a, the second transport path 72b, the third transport path 72c, and the fourth transport path 72d from the left side of FIG. 4, and have the longest axial length in the first transport path 72a. In the second transport path 72b, the projection bolt 90 having a longer shaft length than the projection bolt 90 conveyed in the first transport path 72a is conveyed, and in the third transport path 72c, the second projection bolt 90 is conveyed. A projection bolt 90 having a longer shaft length than the projection bolt 90 conveyed in the transport path 72b is conveyed, and a projection bolt 90 having the longest shaft length is conveyed in the fourth transport path 72d. One end of each transport path 72 is connected to each opening portion 76a of the perforated block 76 described later. On the other hand, at the other end of each transport path 72, a bolt storage portion (not shown) in which projection bolts 90 of each shaft length are stored separately for each shaft length, and a plurality of types of projection bolts 90 having different shaft lengths are stored. It is connected to a sorting device (not shown) that sorts by shaft length and sends it to each transport path 72. Each transport path 72 is composed of a tube or the like. In the following description, when each transport path is distinguished, it is referred to as a first transport path 72a to a fourth transport path 72d, and when each transport path is not distinguished, it is simply referred to as a transport path 72. When the other end of each transport path 72 is connected to the bolt storage section, the bolt storage section corresponds to the number of transport paths 72, that is, the number of types of projection bolts 90. There will be one.

各搬送路72における、可動部73の連通路74と連通する側の端部(以下、連通路側端部という)は、有孔ブロック76の開孔部76aにそれぞれ連結されている。 In each transport path 72, the end portion of the movable portion 73 on the side communicating with the communication passage 74 (hereinafter referred to as the communication passage side end portion) is connected to the opening portion 76a of the perforated block 76.

有孔ブロック76は、長手方向が水平方向になるような直方体状のブロック体に、その短手方向に貫通する複数(本実施形態1では4つ)の開孔部76aが形成されている。有孔ブロック76の各開孔部76aは一列に並んで形成されている。詳しくは、有孔ブロック76の長手方向、すなわち水平方向に並んで形成されている。これにより、図4に示すように、4つの搬送路72は、上記連通路側端部が水平方向(有孔ブロック76の長手方向)に並ぶように、有孔ブロック76の各開孔部76aにそれぞれ連結される。 In the perforated block 76, a plurality of (four in the first embodiment) opening portions 76a penetrating in the lateral direction thereof are formed in a rectangular parallelepiped block body whose longitudinal direction is horizontal. The opened portions 76a of the perforated block 76 are formed side by side in a row. Specifically, the perforated blocks 76 are formed side by side in the longitudinal direction, that is, in the horizontal direction. As a result, as shown in FIG. 4, the four transport paths 72 are provided with the perforated blocks 76a so that the end portions on the side of the communication passage are aligned in the horizontal direction (longitudinal direction of the perforated block 76). Are connected to each.

可動部73は、箱状のブロック体で構成されており、シリンダ75のシリンダロッド75aの先端が結合されている。可動部73には、シリンダロッド75aの進退方向(有孔ブロック76の長手方向と一致)及び上下方向に直交する方向に貫通する貫通孔(図4に点線で示す)が設けられており、該貫通孔によって連通路74が形成されている。可動部73の有孔ブロック76側の面は、該有孔ブロック76の搬送路72側とは反対側の面と接触している。シリンダ75が稼働したときには、可動部73は有孔ブロック76に対して摺動しながら変位する。尚、有孔ブロック76の搬送路72側とは反対側の部分には、可動部73が水平方向(有孔ブロック76の長手方向)に適切に変位できるように、ガイド部が形成されていてもよい。 The movable portion 73 is composed of a box-shaped block body, and the tip of the cylinder rod 75a of the cylinder 75 is connected to the movable portion 73. The movable portion 73 is provided with a through hole (shown by a dotted line in FIG. 4) penetrating in the advancing / retreating direction of the cylinder rod 75a (corresponding to the longitudinal direction of the perforated block 76) and in the direction orthogonal to the vertical direction. A communication passage 74 is formed by the through hole. The surface of the movable portion 73 on the perforated block 76 side is in contact with the surface of the perforated block 76 on the side opposite to the transport path 72 side. When the cylinder 75 operates, the movable portion 73 is displaced while sliding with respect to the perforated block 76. A guide portion is formed on the portion of the perforated block 76 opposite to the transport path 72 side so that the movable portion 73 can be appropriately displaced in the horizontal direction (longitudinal direction of the perforated block 76). May be good.

連通路74は、その横断面積が開孔部76aの横断面積に対して、同じか又は大きくなるように形成されている。 The communication passage 74 is formed so that its cross-sectional area is the same as or larger than the cross-sectional area of the opening portion 76a.

シリンダ75は、流体圧シリンダであって、油圧や空気圧を利用してシリンダロッド75aと、オイルや空気等の流体が供給されて、シリンダロッド75aを進退させるための流体圧を発生させる流体圧発生部75bとを有している。図4に示すように、シリンダロッド75aは、有孔ブロック76の長手方向(ここでは、水平方向)に対して平行に延びている。これにより、流体圧発生部75b内に流体が供給されて、シリンダロッド75aが移動するときには、シリンダロッド75aの先端に結合された可動部73は水平方向に変位する。つまり、シリンダ75は、可動部73を水平方向に変位させるように構成されている。 The cylinder 75 is a fluid pressure cylinder, and a fluid pressure is generated by supplying a cylinder rod 75a and a fluid such as oil or air by using hydraulic pressure or pneumatic pressure to generate a fluid pressure for advancing or retreating the cylinder rod 75a. It has a portion 75b. As shown in FIG. 4, the cylinder rod 75a extends parallel to the longitudinal direction (here, the horizontal direction) of the perforated block 76. As a result, when the fluid is supplied into the fluid pressure generating portion 75b and the cylinder rod 75a moves, the movable portion 73 coupled to the tip of the cylinder rod 75a is displaced in the horizontal direction. That is, the cylinder 75 is configured to displace the movable portion 73 in the horizontal direction.

シリンダ75の流体圧発生部75b内には、第1搬送路72a~第4搬送路72dのうち選択された搬送路が連結された開孔部76aと可動部73の連通路74とが連通するように、流体が供給される。具体的には、例えば、4つの搬送路72のうち第2搬送路72bが選択されて、第2搬送路72bと可動部73の連通路74とを連通させるときには、第2搬送路72bが連結された開孔部76aと連通路74とが連通する程度に、可動部73を有孔ブロック76の長手方向に変位させるような量の流体がシリンダ75に供給される。これにより、当該開孔部76aと連通路74とが連通したときには、第2搬送路72bと連通路74とが連通する。そして、第2搬送路72bと連通路74とが連通した後には、他の搬送路72a,72c,72dが選択されるまで、第2搬送路72bと連通路74との連通状態を維持できるように、シリンダ75の流体圧発生部75b内に流体が供給される。このことから、シリンダ75は、可動部73を開孔部76aの列方向(有孔ブロック76の長手方向)に変位させて、選択された搬送路72が連結された開孔部76aと連通路74とを連通させることで、選択された搬送路72と連通路74とを連通させるように構成されている。尚、シリンダ75に供給される流体の量は、制御装置100によって制御されている。 In the fluid pressure generating portion 75b of the cylinder 75, the opening portion 76a to which the selected transport path from the first transport path 72a to the fourth transport path 72d is connected and the communication passage 74 of the movable portion 73 communicate with each other. As such, the fluid is supplied. Specifically, for example, when the second transport path 72b is selected from the four transport paths 72 and the second transport path 72b and the communication passage 74 of the movable portion 73 are communicated with each other, the second transport path 72b is connected. An amount of fluid that displaces the movable portion 73 in the longitudinal direction of the perforated block 76 is supplied to the cylinder 75 to such an extent that the opened hole portion 76a and the communication passage 74 communicate with each other. As a result, when the opening portion 76a and the communication passage 74 communicate with each other, the second transport path 72b and the communication passage 74 communicate with each other. Then, after the second transport path 72b and the communication passage 74 communicate with each other, the communication state between the second transport path 72b and the communication passage 74 can be maintained until another transport path 72a, 72c, 72d is selected. The fluid is supplied into the fluid pressure generating portion 75b of the cylinder 75. For this reason, the cylinder 75 displaces the movable portion 73 in the row direction of the perforated portion 76a (longitudinal direction of the perforated block 76), and communicates with the perforated portion 76a to which the selected transport path 72 is connected. By communicating with 74, the selected transport path 72 and the communication passage 74 are configured to communicate with each other. The amount of fluid supplied to the cylinder 75 is controlled by the control device 100.

供給路48は、図4に示すように、可動部73の連通路74における有孔ブロック76とは反対側の端部に連結されている。これにより、供給路48は連通路74及び有孔ブロック76の開孔部76aを介して各搬送路72と連通可能になっている。 As shown in FIG. 4, the supply path 48 is connected to the end of the movable portion 73 in the communication passage 74 opposite to the perforated block 76. As a result, the supply passage 48 can communicate with each transport passage 72 via the communication passage 74 and the opening portion 76a of the perforated block 76.

供給路48の連通路74とは反対側の端部は、ボルトシューター41に連結されており、搬送路72で搬送されたプロジェクションボルト90は、有孔ブロック76の開孔部76a、可動部73の連通路74、及び供給路48を介してボルトシューター41に送られ、該ボルトシューター41からボルトガイド装置42のチャック43(図5参照)に供給される。供給路48は、チューブ等によって構成されている。 The end of the supply path 48 on the opposite side of the communication passage 74 is connected to the bolt shooter 41, and the projection bolt 90 conveyed by the transfer path 72 has the open portion 76a and the movable portion 73 of the perforated block 76. It is sent to the bolt shooter 41 through the communication passage 74 and the supply path 48, and is supplied from the bolt shooter 41 to the chuck 43 (see FIG. 5) of the bolt guide device 42. The supply path 48 is composed of a tube or the like.

ボルトガイド装置42は、プロジェクションボルト90を受け取り保持するためのチャック43と、チャック43をガイドピン80の位置まで案内するロッド44aが挿入されたガイド筒44と、該ロッドを進退可能に駆動するエアシリンダ(図示省略)とを有している。 The bolt guide device 42 includes a chuck 43 for receiving and holding the projection bolt 90, a guide cylinder 44 into which a rod 44a for guiding the chuck 43 to the position of the guide pin 80 is inserted, and an air that drives the rod so as to be able to move forward and backward. It has a cylinder (not shown).

上記チャック43は、一対のチャックレバー43aが、それぞれ水平方向に回動可能に構成されている。図5に示すように、各チャックレバー43aは、スプリング49により互いに近づく方向に付勢されており、各チャックレバー43aに負荷がかけられていない無負荷状態では、水平方向に当接した状態になっている。一方で、チャックレバー43aに、該チャックレバー43a同士が離れる方向に、スプリング49の付勢力に打ち勝つような力が加えられたときには、チャックレバー43aは互いに離れる方向に移動する。 The chuck 43 is configured such that a pair of chuck levers 43a can each rotate in the horizontal direction. As shown in FIG. 5, each chuck lever 43a is urged toward each other by a spring 49, and in a no-load state in which no load is applied to each chuck lever 43a, the chuck levers 43a are in a state of being in contact with each other in the horizontal direction. It has become. On the other hand, when a force is applied to the chuck lever 43a so as to overcome the urging force of the spring 49 in the direction in which the chuck levers 43a are separated from each other, the chuck levers 43a move in the direction in which they are separated from each other.

上記チャック43の先端側(反ロッド44a側)の部分には、図5及び図6に示すように、カップ状のボルト保持部45が形成されている。ボルト保持部45は、一対のチャックレバー43aが協働して構成されかつ上下方向に貫通する断面円形の貫通孔46を有している。より具体的には、一対のチャックレバー43aには、貫通孔46の半割がそれぞれ形成されており、一対のチャックレバー43aが互いに接した状態では、1つの貫通孔46が形成されるようになっている。 As shown in FIGS. 5 and 6, a cup-shaped bolt holding portion 45 is formed on a portion of the chuck 43 on the tip end side (anti-rod 44a side). The bolt holding portion 45 has a through hole 46 having a circular cross section, which is configured by a pair of chuck levers 43a in cooperation with each other and penetrates in the vertical direction. More specifically, half of the through holes 46 are formed in each of the pair of chuck levers 43a, and one through hole 46 is formed when the pair of chuck levers 43a are in contact with each other. It has become.

ボルト保持部45における貫通孔46を構成する部分は、図6に示すように、下側に向かって縮径するように傾斜したテーパー部45aと、該テーパー部45aの下側端から上下方向に均一な径で延びるストレート部45bと、ストレート部45bの下端に設けられかつ該ストレート部45bから内側に突出した内側突出部45cとを有している。 As shown in FIG. 6, the portion of the bolt holding portion 45 that constitutes the through hole 46 includes a tapered portion 45a that is inclined so as to reduce the diameter toward the lower side, and a portion that is vertically inclined from the lower end of the tapered portion 45a. It has a straight portion 45b extending with a uniform diameter and an inner protruding portion 45c provided at the lower end of the straight portion 45b and protruding inward from the straight portion 45b.

テーパー部45aの内径の最大値D1(上端の内径)は、図6に示すように、プロジェクションボルト90の頭部91の径DHよりも大きい。一方で、テーパー部45aの内径の最小値D2(ストレート部45bとの境界部分の内径)は、プロジェクションボルト90の頭部91の径DHよりも小さくかつプロジェクションボルト90の軸部92の径DSよりも僅かに大きい。ストレート部45bの内径は、テーパー部45aの内径の最小値D2と同等である。 As shown in FIG. 6, the maximum value D1 (inner diameter of the upper end) of the inner diameter of the tapered portion 45a is larger than the diameter DH of the head 91 of the projection bolt 90. On the other hand, the minimum value D2 (inner diameter of the boundary portion with the straight portion 45b) of the inner diameter of the tapered portion 45a is smaller than the diameter DH of the head 91 of the projection bolt 90 and from the diameter DS of the shaft portion 92 of the projection bolt 90. Is also slightly larger. The inner diameter of the straight portion 45b is equivalent to the minimum value D2 of the inner diameter of the tapered portion 45a.

図6に示すように、内側突出部45cにおける貫通孔46の径方向の内側の面は、下側に向かって上記径方向の内側に傾斜したテーパー面46aになっている。内側突出部45cの内径の最小値D3は、プロジェクションボルト90の軸部92の径DSよりも僅かに小さい。 As shown in FIG. 6, the radial inner surface of the through hole 46 in the inner protrusion 45c is a tapered surface 46a inclined inward in the radial direction toward the lower side. The minimum value D3 of the inner diameter of the inner protrusion 45c is slightly smaller than the diameter DS of the shaft portion 92 of the projection bolt 90.

ストレート部45bは、図6に示すように、プロジェクションボルト90の軸部92を保持する軸部保持部を構成している。内側突出部45cは、プロジェクションボルト90の先端部93を保持する先端保持部を構成している。 As shown in FIG. 6, the straight portion 45b constitutes a shaft portion holding portion that holds the shaft portion 92 of the projection bolt 90. The inner protruding portion 45c constitutes a tip holding portion that holds the tip portion 93 of the projection bolt 90.

ボルト保持部45がプロジェクションボルト90の先端部93を受けるように構成されていることにより、プロジェクションボルト90の軸長が異なっていたとしても、ボルト保持部45に保持された状態では、プロジェクションボルト90の先端部93は、必ず内側突出部45cの高さ位置に位置することになる。つまり、図7(a)に示すように、軸長が図6のプロジェクションボルト90よりも短い場合や、図7(b)に示すように、軸長が図6のプロジェクションボルト90よりも長い場合でも、プロジェクションボルト90の先端部93は、内側突出部45cの高さ位置に位置することになる。このことから、内側突出部45cは、プロジェクションボルト90の軸長に関わらず、該プロジェクションボルト90の先端部93を受け取り保持可能な先端保持部となっている。 Since the bolt holding portion 45 is configured to receive the tip portion 93 of the projection bolt 90, even if the axial length of the projection bolt 90 is different, the projection bolt 90 is held by the bolt holding portion 45. The tip portion 93 of the above is always located at the height position of the inner protruding portion 45c. That is, when the shaft length is shorter than the projection bolt 90 of FIG. 6 as shown in FIG. 7 (a), or when the shaft length is longer than the projection bolt 90 of FIG. 6 as shown in FIG. 7 (b). However, the tip portion 93 of the projection bolt 90 is located at the height position of the inner protruding portion 45c. For this reason, the inner protruding portion 45c is a tip holding portion capable of receiving and holding the tip portion 93 of the projection bolt 90 regardless of the axial length of the projection bolt 90.

ボルト供給装置40では、ボルトシューター41から供給されたプロジェクションボルト90をチャック43のボルト保持部45で保持した後、上記エアシリンダが駆動されて、上記ロッドが上記ガイドピン80に向かって進んでいく。その後、上記プロジェクションボルト90は、チャック43に保持されたまま、ガイドピン80のボルト受け部83で受け止められる。 In the bolt supply device 40, after the projection bolt 90 supplied from the bolt shooter 41 is held by the bolt holding portion 45 of the chuck 43, the air cylinder is driven and the rod advances toward the guide pin 80. .. After that, the projection bolt 90 is received by the bolt receiving portion 83 of the guide pin 80 while being held by the chuck 43.

プロジェクションボルト90には、その先端部93に頭部91側に向かって凹んだ係合凹部94が形成されており、図10~図12に示すように、ガイドピン80のボルト受け部83は、プロジェクションボルト90の係合凹部94と係合することで、該プロジェクションボルト90を受け止める。また、プロジェクションボルト90の頭部91の軸部92側には、図10~図12に示すように、ワークWに対して溶接される溶接部95が予め形成されている。 The projection bolt 90 is formed with an engaging recess 94 recessed toward the head 91 side at the tip portion 93 thereof, and as shown in FIGS. 10 to 12, the bolt receiving portion 83 of the guide pin 80 has a bolt receiving portion 83. By engaging with the engaging recess 94 of the projection bolt 90, the projection bolt 90 is received. Further, as shown in FIGS. 10 to 12, a welded portion 95 to be welded to the work W is formed in advance on the shaft portion 92 side of the head portion 91 of the projection bolt 90.

〈制御系〉
制御装置100は、ロボット10に作動信号を出力して、溶接装置本体20をワークWの溶接位置に移動させる。
<Control system>
The control device 100 outputs an operation signal to the robot 10 to move the welding device main body 20 to the welding position of the work W.

制御装置100は、ナット供給装置30に作動信号を出力して、ナットガイド装置32のエアシリンダを駆動させて、プロジェクションナットをガイドピン80の位置に供給する。 The control device 100 outputs an operation signal to the nut supply device 30 to drive the air cylinder of the nut guide device 32 to supply the projection nut to the position of the guide pin 80.

制御装置100は、ボルト供給装置40に作動信号を出力して、軸長がそれぞれ異なる複数のプロジェクションボルト90のうちから選択された所望の軸長のプロジェクションボルト90をボルトガイド装置42に供給すべく、選択された所望の軸長のプロジェクションボルト90を搬送する搬送路72と供給路48とを連通させる。具体的には、選択装置71の可動部73の連通路74が、選択された所望の搬送路72と連通するように、シリンダ75内に流体を供給させる。 The control device 100 outputs an operation signal to the bolt supply device 40 to supply the projection bolt 90 having a desired shaft length selected from a plurality of projection bolts 90 having different shaft lengths to the bolt guide device 42. , The transport path 72 for transporting the projection bolt 90 of the selected desired axial length and the supply path 48 are communicated with each other. Specifically, the fluid is supplied into the cylinder 75 so that the communication passage 74 of the movable portion 73 of the selection device 71 communicates with the selected desired transport path 72.

制御装置100は、ボルト供給装置40に作動信号を出力して、上記可動部73の連通路74が上記所望の搬送路72と連通した後、ボルト供給源47から所望の軸長のプロジェクションボルト90をボルトシューター41に供給する。 The control device 100 outputs an operation signal to the bolt supply device 40, and after the communication passage 74 of the movable portion 73 communicates with the desired transport path 72, the projection bolt 90 having a desired shaft length from the bolt supply source 47. Is supplied to the bolt shooter 41.

制御装置100は、ボルト供給装置40に作動信号を出力して、ボルトシューター41からチャック43のボルト保持部45にプロジェクションボルト90を供給した後、ボルトガイド装置42の上記エアシリンダを駆動させて、プロジェクションボルト90をガイドピン80の位置に供給する。 The control device 100 outputs an operation signal to the bolt supply device 40, supplies the projection bolt 90 from the bolt shooter 41 to the bolt holding portion 45 of the chuck 43, and then drives the air cylinder of the bolt guide device 42. The projection bolt 90 is supplied to the position of the guide pin 80.

制御装置100は、上側シリンダ51に作動信号を出力して、上部電極50を昇降させる。また、制御装置100は、上部電極50及び下部電極60に作動信号を出力して、上部電極50と下部電極60との間で通電させる。 The control device 100 outputs an operation signal to the upper cylinder 51 to raise and lower the upper electrode 50. Further, the control device 100 outputs an operation signal to the upper electrode 50 and the lower electrode 60 to energize between the upper electrode 50 and the lower electrode 60.

制御装置100は、位置センサ101の検出結果から樹脂ロッド70の昇降量を算出する。制御装置100は、位置センサ101から算出した樹脂ロッド70の昇降量に基づいて、現在供給されているプロジェクションナット又はプロジェクションボルト90が、所望の規格のものであるか否かを判定する。 The control device 100 calculates the amount of elevation of the resin rod 70 from the detection result of the position sensor 101. The control device 100 determines whether or not the projection nut or projection bolt 90 currently supplied is of a desired standard based on the amount of elevation of the resin rod 70 calculated from the position sensor 101.

〈プロジェクションボルトの溶接〉
次に、プロジェクション溶接装置1によって、ワークWにプロジェクションボルト90を接合する際の動作について説明する。尚、以下の説明では、プロジェクションボルト90の軸部92の径が、ガイドピン80の第1ナット受け部82aよりも小さくかつ第2ナット受け部82bの径よりも大きい場合、つまり、ワークWの孔部Hの径が、ガイドピン80の第1ナット受け部82aよりも小さくかつ第2ナット受け部82bの径よりも大きい場合について説明する。ワークWは、例えば鋼板で構成されており、図示を省略するワーク搬送装置によって搬送される。
<Welding of projection bolts>
Next, the operation when the projection bolt 90 is joined to the work W by the projection welding device 1 will be described. In the following description, when the diameter of the shaft portion 92 of the projection bolt 90 is smaller than the diameter of the first nut receiving portion 82a of the guide pin 80 and larger than the diameter of the second nut receiving portion 82b, that is, the work W. A case where the diameter of the hole H is smaller than the diameter of the first nut receiving portion 82a of the guide pin 80 and larger than the diameter of the second nut receiving portion 82b will be described. The work W is made of, for example, a steel plate, and is conveyed by a work transfer device (not shown).

先ず、ワークWが搬送されて、ワークWをガイドピン80の上側に配置して、ワークWの孔部Hとガイドピン80との大まかな位置合わせを行う。この位置合わせは、ロボット10によって行うことができる。 First, the work W is conveyed, the work W is arranged on the upper side of the guide pin 80, and the hole H of the work W and the guide pin 80 are roughly aligned. This alignment can be performed by the robot 10.

次に、ワークWを下部電極60に向かって移動させて、孔部Hにガイドピン80を挿通させる。このとき、ワークWに形成されている孔部Hの径が、ガイドピン80の第1ナット受け部82aよりも小さくかつ第2ナット受け部82bの径よりも大きいため、図9に示すように、ガイドピン80の第1ナット受け部82aは、上記孔部Hを貫通せずに、ガイドピン80の第2ナット受け部82b及びボルト受け部83のみが上記孔部Hを貫通した状態となる。ワークWにおける孔部Hの周囲の部分は、第1ナット受け部82aの上側端に載置する。ワークWにおける孔部Hの周囲の部分が、第1ナット受け部82aの上側端に載置した状態となるため、図9に示すように、ガイドピン80のボルト受け部83がワークWの孔部Hを貫通した段階では、下部電極60の電極チップ63とワークWの下側の面との間には隙間が形成される。 Next, the work W is moved toward the lower electrode 60, and the guide pin 80 is inserted through the hole H. At this time, since the diameter of the hole H formed in the work W is smaller than the diameter of the first nut receiving portion 82a of the guide pin 80 and larger than the diameter of the second nut receiving portion 82b, as shown in FIG. The first nut receiving portion 82a of the guide pin 80 does not penetrate the hole H, but only the second nut receiving portion 82b and the bolt receiving portion 83 of the guide pin 80 penetrate the hole H. .. The portion around the hole H in the work W is placed on the upper end of the first nut receiving portion 82a. Since the portion around the hole H in the work W is placed on the upper end of the first nut receiving portion 82a, the bolt receiving portion 83 of the guide pin 80 is the hole in the work W as shown in FIG. At the stage of penetrating the portion H, a gap is formed between the electrode tip 63 of the lower electrode 60 and the lower surface of the work W.

次いで、ボルト供給装置40が作動される。ボルト供給源47からボルトシューター41を介して、チャック43のボルト保持部45にプロジェクションボルト90が供給される。供給されたプロジェクションボルト90は、図6、図7、図9及び図10に示すように、先端部93が内側突出部45cによって受け止め保持され、軸部92の先端寄りの部分がストレート部45bで保持される。 The bolt supply device 40 is then activated. The projection bolt 90 is supplied from the bolt supply source 47 to the bolt holding portion 45 of the chuck 43 via the bolt shooter 41. As shown in FIGS. 6, 7, 9 and 10, the supplied projection bolt 90 has a tip portion 93 received and held by an inner protrusion 45c, and a portion of the shaft portion 92 near the tip end is a straight portion 45b. Be retained.

続いて、プロジェクションボルト90をボルト保持部45で保持した後、上記エアシリンダが駆動されて、上記ロッドが上記ガイドピン80に向かって進んでいき、ガイドピン80の位置にプロジェクションボルト90が供給される。プロジェクションボルト90は、図10に示すように、チャック43のボルト保持部45に保持された状態で供給される。ガイドピン80のボルト受け部83は、プロジェクションボルト90の係合凹部94と係合して、当該プロジェクションボルト90を受け止める。これにより、プロジェクションボルト90が、ワークWの孔部Hの近傍(詳しくは直上)に配置される。 Subsequently, after the projection bolt 90 is held by the bolt holding portion 45, the air cylinder is driven, the rod advances toward the guide pin 80, and the projection bolt 90 is supplied to the position of the guide pin 80. Cylinder. As shown in FIG. 10, the projection bolt 90 is supplied while being held by the bolt holding portion 45 of the chuck 43. The bolt receiving portion 83 of the guide pin 80 engages with the engaging recess 94 of the projection bolt 90 to receive the projection bolt 90. As a result, the projection bolt 90 is arranged in the vicinity (specifically, directly above) the hole H of the work W.

ガイドピン80の位置にプロジェクションボルト90が供給された後、上側シリンダ51が駆動されて、上部電極50が下側に移動される(下降される)。上部電極50は、図11に示すように、供給されたプロジェクションボルト90の頭部91と当接した後も更に下側に移動される。これにより、ワークW及びプロジェクションボルト90ごと、ガイドピン80が下部電極ホルダ61の筒軸方向の下側に押し下げられる。 After the projection bolt 90 is supplied to the position of the guide pin 80, the upper cylinder 51 is driven and the upper electrode 50 is moved (lowered) to the lower side. As shown in FIG. 11, the upper electrode 50 is further moved downward even after being in contact with the head 91 of the supplied projection bolt 90. As a result, the guide pin 80 is pushed down together with the work W and the projection bolt 90 toward the lower side in the tubular axis direction of the lower electrode holder 61.

詳しくは、上側シリンダ51により、上部電極50が下部電極60に向かって移動されると、プロジェクションボルト90の先端部93が内側突出部45cのテーパー面46aを押圧する。テーパー面46aを押圧する押圧力は、該テーパー面46aによって水平方向の力に変換され、この変換された水平方向の力によって、チャック43の一対のチャックレバー43aが僅かに離れる。これにより、プロジェクションボルト90の先端部93及び軸部92が、下側に向かって移動される。ワークWは、ガイドピン80が下部電極ホルダ61の筒軸方向の下側に押し下げられることによって、ガイドピン80と共に下側に移動する。 Specifically, when the upper electrode 50 is moved toward the lower electrode 60 by the upper cylinder 51, the tip portion 93 of the projection bolt 90 presses the tapered surface 46a of the inner protruding portion 45c. The pressing force for pressing the tapered surface 46a is converted into a horizontal force by the tapered surface 46a, and the converted horizontal force slightly separates the pair of chuck levers 43a of the chuck 43. As a result, the tip portion 93 and the shaft portion 92 of the projection bolt 90 are moved downward. The work W moves downward together with the guide pin 80 by pushing the guide pin 80 downward in the tubular axis direction of the lower electrode holder 61.

その後、プロジェクションボルト90の頭部91が、ボルト保持部45のテーパー部45aと当接すると、該頭部91がテーパー部45aを押圧する。テーパー部45aを押圧する押圧力は、該テーパー部45aによって水平方向の力に変換され、この変換された水平方向の力によって、チャック43の一対のチャックレバー43aが互いに離れるように変位する。これにより、図12に示すように、上部電極50が更に下側に移動できるよう
になる。そして、ワークWの孔部Hにプロジェクションボルト90の先端部93及び軸部92が挿通されて、プロジェクションボルト90(特に、プロジェクションボルト90の溶接部95)が、ワークWの上側の面と当接する。
After that, when the head 91 of the projection bolt 90 comes into contact with the tapered portion 45a of the bolt holding portion 45, the head 91 presses the tapered portion 45a. The pressing force for pressing the tapered portion 45a is converted into a horizontal force by the tapered portion 45a, and the converted horizontal force causes the pair of chuck levers 43a of the chuck 43 to be displaced from each other. As a result, as shown in FIG. 12, the upper electrode 50 can be further moved downward. Then, the tip portion 93 and the shaft portion 92 of the projection bolt 90 are inserted into the hole portion H of the work W, and the projection bolt 90 (particularly, the welded portion 95 of the projection bolt 90) comes into contact with the upper surface of the work W. ..

このように、一対のチャックレバー43aは、ボルト保持部45にプロジェクションボルト90が保持された状態で、該プロジェクションボルト90が上部電極50の下側への移動により加圧されることで、互いに離れるように変位する。 In this way, the pair of chuck levers 43a are separated from each other by the projection bolt 90 being pressed by the downward movement of the upper electrode 50 while the projection bolt 90 is held by the bolt holding portion 45. Displace like.

プロジェクションボルト90とワークWの上側の面とが当接した後は、図13に示すように、チャック43が退避する。このとき、チャック43は無負荷状態となるため、上記スプリング49の付勢力により、一対のチャックレバー43aが互いに当接した状態になる。 After the projection bolt 90 and the upper surface of the work W come into contact with each other, the chuck 43 retracts as shown in FIG. At this time, since the chuck 43 is in a no-load state, the pair of chuck levers 43a are in contact with each other due to the urging force of the spring 49.

上側シリンダ51は、プロジェクションボルト90が、ワークWの上側の面と当接して、チャック43が退避した後も、更に上部電極50を下側に移動させようとする。この上部電極50の下側への進出動作により、プロジェクションボルト90がワークW側に加圧される。下部電極60の電極チップ63は、下部電極ホルダ61上に載置され、該下部電極ホルダ61は、溶接装置本体20の下側支持部23に支持されているため、ワークWを下側に移動しないように支持して、上部電極50からの加圧力を受ける。下部電極60は、上部電極50からの加圧力に対する反力でもってワークWをプロジェクションボルト90側に加圧する。これにより、ワークW及びプロジェクションボルト90が、上部電極50と下部電極60との間に加圧挟持される。 The upper cylinder 51 tries to further move the upper electrode 50 downward even after the projection bolt 90 comes into contact with the upper surface of the work W and the chuck 43 retracts. The projection bolt 90 is pressurized to the work W side by the operation of advancing to the lower side of the upper electrode 50. Since the electrode tip 63 of the lower electrode 60 is placed on the lower electrode holder 61 and the lower electrode holder 61 is supported by the lower support portion 23 of the welding apparatus main body 20, the work W is moved downward. It is supported so as not to be subjected to the pressing force from the upper electrode 50. The lower electrode 60 pressurizes the work W toward the projection bolt 90 by the reaction force against the pressing force from the upper electrode 50. As a result, the work W and the projection bolt 90 are pressurized and sandwiched between the upper electrode 50 and the lower electrode 60.

そして、上部電極50と下部電極60との間に、ワークWとプロジェクションボルト90とを挟んだ状態(加圧挟持した状態)で、上部電極50と下部電極60との間で通電が実行されて、上部電極50と下部電極60との間に、プロジェクション溶接のための接合電流が流される。接合電流が流れている間も、上部電極50によるプロジェクションボルト90の加圧は継続される。この接合電流及び上記加圧によって、ワークWの上側の面とプロジェクションボルト90の溶接部95との接触部分が軟化して、該溶接部95が加圧方向(つまり、下側)に潰れていく。このとき、ワークWの上側の面とプロジェクションボルト90の溶接部95とに塑性流動が発生して、急速な拡散接合がなされる。これにより、プロジェクションボルト90がワークWに接合される。 Then, energization is executed between the upper electrode 50 and the lower electrode 60 in a state where the work W and the projection bolt 90 are sandwiched between the upper electrode 50 and the lower electrode 60 (a state in which the projection bolt 90 is held under pressure). , A junction current for projection welding is passed between the upper electrode 50 and the lower electrode 60. The pressurization of the projection bolt 90 by the upper electrode 50 is continued while the joining current is flowing. Due to this joining current and the pressurization, the contact portion between the upper surface of the work W and the welded portion 95 of the projection bolt 90 is softened, and the welded portion 95 is crushed in the pressurizing direction (that is, the lower side). .. At this time, a plastic flow is generated between the upper surface of the work W and the welded portion 95 of the projection bolt 90, and rapid diffusion joining is performed. As a result, the projection bolt 90 is joined to the work W.

以上のようにして、ワークWとプロジェクションボルト90とがプロジェクション溶接によって接合される。 As described above, the work W and the projection bolt 90 are joined by projection welding.

以上のように、本実施形態1によると、選択装置71は、プロジェクションボルト90を搬送する複数の搬送路72と、各搬送路72からボルトガイド装置42にプロジェクションボルト90を供給する供給路48とを有し、複数の搬送路72は、搬送路72毎に予め定められた、特定の軸長のプロジェクションボルト90を搬送しかつ各搬送路72同士では異なる軸長のプロジェクションボルト90を搬送するように構成されている。制御装置100は、軸長がそれぞれ異なる複数のプロジェクションボルト90のうちから選択された所望の軸長のプロジェクションボルト90をボルトガイド装置42に供給すべく、選択された所望の軸長のプロジェクションボルト90を搬送する搬送路72と供給路48とを連通させる。このため、所望の軸長のプロジェクションボルト90を搬送する搬送路72を選択して、当該搬送路72と供給路48とを連通させれば、所望の軸長のプロジェクションボルト90をボルトガイド装置42に供給することができる。そして、ボルトガイド装置42により、所望の軸長のプロジェクションボルト90がワークWの溶接位置へ配送される。したがって、形状の異なる複数の溶接部品から所望の溶接部品を選択的に供給可能にすることができる。よって、複数の部品供給装置を設ける必要がなくなるため、コ
ストを削減でき、スペースも節約できる。
As described above, according to the first embodiment, the selection device 71 includes a plurality of transport paths 72 for transporting the projection bolts 90 and a supply path 48 for supplying the projection bolts 90 from each transport path 72 to the bolt guide device 42. The plurality of transport paths 72 convey projection bolts 90 having a specific shaft length predetermined for each transport path 72, and each transport path 72 conveys projection bolts 90 having different shaft lengths. It is configured in. The control device 100 controls the projection bolt 90 having a desired shaft length selected so as to supply the projection bolt 90 having a desired shaft length selected from the plurality of projection bolts 90 having different shaft lengths to the bolt guide device 42. The transport path 72 and the supply path 48 are communicated with each other. Therefore, if a transport path 72 for transporting the projection bolt 90 having a desired shaft length is selected and the transport path 72 and the supply path 48 are communicated with each other, the projection bolt 90 having the desired shaft length can be used as the bolt guide device 42. Can be supplied to. Then, the projection bolt 90 having a desired shaft length is delivered to the welding position of the work W by the bolt guide device 42. Therefore, it is possible to selectively supply a desired welded part from a plurality of welded parts having different shapes. Therefore, since it is not necessary to provide a plurality of component supply devices, the cost can be reduced and the space can be saved.

特に、本実施形態1では、選択装置71は、搬送路72と連通される連通路74を有する可動部73を有する。このため、所望の軸長のプロジェクションボルト90を搬送する搬送路72を選択して、当該搬送路72と連通路74とが連通するように可動部73を変位させれば、所望の軸長のプロジェクションボルト90をボルトガイド装置42に供給することができる。したがって、より効率的に、形状の異なる複数の溶接部品から所望の溶接部品を供給可能にすることができる。また、シリンダ75の動作は制御装置100によって制御されるため、シリンダ75による可動部73の変位は自動で行うことが可能である。このため、作業効率を向上させることもできる。 In particular, in the first embodiment, the selection device 71 has a movable portion 73 having a communication passage 74 that communicates with the transport path 72. Therefore, if a transport path 72 for transporting the projection bolt 90 having a desired shaft length is selected and the movable portion 73 is displaced so that the transport path 72 and the communication passage 74 communicate with each other, the desired shaft length can be obtained. The projection bolt 90 can be supplied to the bolt guide device 42. Therefore, it is possible to more efficiently supply a desired welded part from a plurality of welded parts having different shapes. Further, since the operation of the cylinder 75 is controlled by the control device 100, the displacement of the movable portion 73 by the cylinder 75 can be automatically performed. Therefore, work efficiency can be improved.

さらに、上述の実施形態1では、複数の開孔部76aが一列に並んで形成された有孔ブロック76を備え、複数の搬送路72は、可動部73の連通路74と連通する側の開孔が、複数の孔部76aが並ぶ列方向(水平方向)に並ぶように、有孔ブロック76の各開孔部76aにそれぞれ連結されている。これにより、有孔ブロック76に、複数の搬送路72における可動部73の連通路74と連通する側の端部が上記列方向に並ぶため、シリンダ75は可動部73を上記列方向に変位させるだけでよくなる。このため、シリンダ75の構成及び制御装置100によるシリンダ75の制御を簡単にすることができる。これにより、作業効率を一層向上させることができる。 Further, in the above-described first embodiment, the perforated block 76 in which the plurality of perforated portions 76a are formed side by side in a row is provided, and the plurality of transport paths 72 are opened on the side communicating with the communication passage 74 of the movable portion 73. The holes are connected to each opening portion 76a of the perforated block 76 so that the holes are arranged in a row direction (horizontal direction) in which the plurality of hole portions 76a are lined up. As a result, the end portions of the perforated block 76 on the side communicating with the communication passage 74 of the movable portion 73 in the plurality of transport paths 72 are arranged in the row direction, so that the cylinder 75 displaces the movable portion 73 in the row direction. Just get better. Therefore, the configuration of the cylinder 75 and the control of the cylinder 75 by the control device 100 can be simplified. This makes it possible to further improve work efficiency.

(実施形態2)
以下、本発明の実施形態2について、図面を参照しながら詳細に説明する。尚、以下の説明において上記実施形態1と共通の部分については、同じ符号を付して、その詳細な説明を省略する。
(Embodiment 2)
Hereinafter, Embodiment 2 of the present invention will be described in detail with reference to the drawings. In the following description, the parts common to the first embodiment are designated by the same reference numerals, and detailed description thereof will be omitted.

本実施形態2は、選択装置171の構成が上記実施形態1とは異なる。図14に示すように、本実施形態2の選択装置171は、複数の搬送路172と、複数の搬送路172のうち選択された搬送路172と連通する連通路174を有する可動部173と、可動部173を回転変位させるための回転装置175(変位装置)と、ボルトガイド装置42のチャック43に、選択された搬送路172により搬送されるプロジェクションボルト90を供給するための供給路148とを有している。 In the second embodiment, the configuration of the selection device 171 is different from that of the first embodiment. As shown in FIG. 14, the selection device 171 of the second embodiment includes a movable portion 173 having a plurality of transport paths 172 and a communication passage 174 that communicates with the transport path 172 selected from the plurality of transport paths 172. A rotating device 175 (displacement device) for rotationally displacing the movable portion 173, and a supply path 148 for supplying the projection bolt 90 conveyed by the selected transfer path 172 to the chuck 43 of the bolt guide device 42. Have.

搬送路172は、本実施形態2でも上記実施形態1と同様に、搬送路172は4つあり、4つの搬送路172は、それぞれプロジェクションボルト90を搬送する搬送路である。4つの搬送路172では、搬送路172毎に予め定められた、特定の軸長のプロジェクションボルト90が搬送されかつ各搬送路172同士では異なる軸長のプロジェクションボルト90が搬送されている。以下の説明では、4つの搬送路172を、図14の上側から時計回りに、第1搬送路172a、第2搬送路172b、第3搬送路172c、第4搬送路172dとして説明することがある。各搬送路172は、チューブなどによって構成されている。 Similar to the first embodiment, the transport path 172 has four transport paths 172, and each of the four transport paths 172 is a transport path for transporting the projection bolt 90. In the four transport paths 172, projection bolts 90 having a specific shaft length, which are predetermined for each transport path 172, are transported, and projection bolts 90 having different shaft lengths are transported between the transport paths 172. In the following description, the four transport paths 172 may be described as the first transport path 172a, the second transport path 172b, the third transport path 172c, and the fourth transport path 172d in the clockwise direction from the upper side of FIG. .. Each transport path 172 is composed of a tube or the like.

各搬送路172における、可動部173の連通路174と連通する側の端部(以下、連通路側端部という)は、有孔ブロック176の開孔部176aにそれぞれ連結されている。 In each transport path 172, the end portion of the movable portion 173 on the side communicating with the communication passage 174 (hereinafter referred to as the communication passage side end portion) is connected to the opening portion 176a of the perforated block 176.

有孔ブロック176は、円柱状のブロック体に、その軸方向に貫通する複数(本実施形態2では4つ)の開孔部176aが形成されている。有孔ブロック176の各開孔部176aは周方向に等間隔に並んで形成されている。これにより、図14に示すように、4つの搬送路172は、上記連通路側端部が有孔ブロック176の周方向に等間隔に並ぶように、有孔ブロック176の各開孔部176aにそれぞれ連結される。有孔ブロック176
の搬送路172側とは反対側の部分には、軸部177が有孔ブロック176と同軸になるように、該有孔ブロック176の軸方向に沿って延びている。軸部177は、有孔ブロック176と一体でもよく、別体でもよい。
In the perforated block 176, a plurality of (four in the second embodiment) opening portions 176a penetrating in the axial direction thereof are formed in the columnar block body. The perforated blocks 176a are formed so as to be arranged at equal intervals in the circumferential direction. As a result, as shown in FIG. 14, the four transport paths 172 are provided in the perforated blocks 176a so that the end portions on the side of the communication passage are arranged at equal intervals in the circumferential direction of the perforated block 176. Each is connected. Perforated block 176
A shaft portion 177 extends along the axial direction of the perforated block 176 so as to be coaxial with the perforated block 176 in the portion opposite to the transport path 172 side. The shaft portion 177 may be integrated with the perforated block 176 or may be a separate body.

可動部173は、有孔ブロック176と同径の円柱体で構成されている。可動部173は、有孔ブロック176と同軸になるように、有孔ブロック176の搬送路172側とは反対側の面と接触して配置されている。可動部173には、その軸方向に貫通する貫通孔が設けられており、該貫通孔によって連通路174が形成されている。連通路174の径方向における位置は、有孔ブロック176の開孔部176aの径方向の位置に対応している。可動部173と有孔ブロック176とは軸部177によって連結されている。可動部173は、軸部177周りに回転可能に該軸部177に支持されている。図示は省略しているが、可動部173の外周面にはギヤ歯が形成されている。 The movable portion 173 is composed of a cylindrical body having the same diameter as the perforated block 176. The movable portion 173 is arranged in contact with the surface of the perforated block 176 on the side opposite to the transport path 172 side so as to be coaxial with the perforated block 176. The movable portion 173 is provided with a through hole penetrating in the axial direction thereof, and the communication passage 174 is formed by the through hole. The radial position of the communication passage 174 corresponds to the radial position of the opening portion 176a of the perforated block 176. The movable portion 173 and the perforated block 176 are connected by a shaft portion 177. The movable portion 173 is rotatably supported by the shaft portion 177 around the shaft portion 177. Although not shown, gear teeth are formed on the outer peripheral surface of the movable portion 173.

連通路174は、上記実施形態1と同様に、その横断面積が開孔部176aの横断面積に対して、同じか又は大きくなるように形成されている。 Similar to the first embodiment, the communication passage 174 is formed so that its cross-sectional area is the same as or larger than the cross-sectional area of the opening portion 176a.

回転装置175には、可動部173の外周面のギヤ歯と噛み合うギヤ歯を有するギヤ(図示省略)と、該ギヤを回転させるためのモータ(図示省略)とが収容されている。回転装置175は、上記ギヤを回転させることで可動部173を軸部177周りに回転させる。上記モータは正方向及び逆方向の両方に回転可能なモータである。このため、可動部173は、図14に示すように、時計回りおよび反時計回りの両方に回転可能である。 The rotating device 175 accommodates a gear (not shown) having gear teeth that mesh with the gear teeth on the outer peripheral surface of the movable portion 173, and a motor (not shown) for rotating the gear. The rotating device 175 rotates the movable portion 173 around the shaft portion 177 by rotating the gear. The motor is a motor that can rotate in both the forward direction and the reverse direction. Therefore, the movable portion 173 can rotate both clockwise and counterclockwise as shown in FIG.

回転装置175は、第1搬送路172a~第4搬送路172dのうち選択された搬送路が連結された開孔部176aと可動部173の連通路174とが連通するように、可動部173を回転変位させる。具体的には、例えば、4つの搬送路172のうち第2搬送路172bが選択されて、第2搬送路172bと可動部173の連通路174とを連通させるときには、回転装置175は、第2搬送路172bが連結された開孔部176aと連通路174とが連通する程度に、可動部173を回転させる。これにより、当該開孔部176aと連通路174とが連通したときには、第2搬送路172bと連通路174とが連通する。そして、第2搬送路172bと連通路174とが連通した後には、他の搬送路172a,172c,172dが選択されるまで、上記モータの作動が停止されて、第2搬送路172bと連通路174との連通状態を維持される。回転装置175の上記モータの作動は、制御装置100によって制御されている。 The rotating device 175 provides a movable portion 173 so that the opening portion 176a to which the selected transport path selected from the first transport path 172a to the fourth transport path 172d is connected and the communication passage 174 of the movable portion 173 communicate with each other. Rotately displace. Specifically, for example, when the second transport path 172b is selected from the four transport paths 172 and the second transport path 172b and the communication passage 174 of the movable portion 173 are communicated with each other, the rotating device 175 is the second. The movable portion 173 is rotated to such an extent that the opening portion 176a to which the transport path 172b is connected and the communication passage 174 communicate with each other. As a result, when the opening portion 176a and the communication passage 174 communicate with each other, the second transport path 172b and the communication passage 174 communicate with each other. Then, after the second transport path 172b and the communication passage 174 communicate with each other, the operation of the motor is stopped until the other transport paths 172a, 172c, 172d are selected, and the second transport path 172b and the communication passage 172b are communicated with each other. The communication state with 174 is maintained. The operation of the motor of the rotating device 175 is controlled by the control device 100.

供給路148は、図14に示すように、可動部173の連通路174における有孔ブロック176とは反対側の端部に連結されている。これにより、供給路148は連通路174及び有孔ブロック176の開孔部176aを介して各搬送路172と連通可能になっている。図示を省略しているが、供給路148の連通路174側とは反対側の端部は、上記実施形態1と同様にボルトシューター41に接続されている。 As shown in FIG. 14, the supply path 148 is connected to the end of the movable portion 173 in the communication passage 174 opposite to the perforated block 176. As a result, the supply passage 148 can communicate with each transport passage 172 via the communication passage 174 and the opening portion 176a of the perforated block 176. Although not shown, the end of the supply path 148 on the side opposite to the communication passage 174 side is connected to the bolt shooter 41 as in the first embodiment.

このような構成の選択装置171であっても、所望の軸長のプロジェクションボルト90を搬送する搬送路172を選択して、当該搬送路172と供給路148とを連通させれば、所望の軸長のプロジェクションボルト90をボルトガイド装置42に供給することができる。 Even with the selection device 171 having such a configuration, if a transport path 172 for transporting the projection bolt 90 having a desired shaft length is selected and the transport path 172 and the supply path 148 are communicated with each other, the desired shaft is formed. A long projection bolt 90 can be supplied to the bolt guide device 42.

したがって、本実施形態2の構成であっても、形状の異なる複数の溶接部品から所望の溶接部品を選択的に供給可能にすることができる。よって、複数の部品供給装置を設ける必要がなくなるため、コストを削減でき、スペースも節約できる。 Therefore, even with the configuration of the second embodiment, it is possible to selectively supply a desired welded part from a plurality of welded parts having different shapes. Therefore, since it is not necessary to provide a plurality of component supply devices, the cost can be reduced and the space can be saved.

また、本実施形態2の選択装置171では、有孔ブロック176の開孔部176aが1つの軸周りに形成されるため、複数の搬送路172を出来る限り狭い領域に集めることができる。これにより、選択装置171の構成をコンパクトにすることができる。 Further, in the selection device 171 of the second embodiment, since the opening portion 176a of the perforated block 176 is formed around one axis, a plurality of transport paths 172 can be collected in as narrow a region as possible. As a result, the configuration of the selection device 171 can be made compact.

(その他の実施形態)
本発明は、上記実施形態に限られるものではなく、請求の範囲の主旨を逸脱しない範囲で代用が可能である。
(Other embodiments)
The present invention is not limited to the above embodiment, and can be substituted as long as it does not deviate from the gist of the claims.

例えば、上述の実施形態1及び2では、複数の搬送路72で搬送される溶接部品としてプロジェクションボルト90を採用して、複数の搬送路72が、軸長がそれぞれ異なる複数のプロジェクションボルト90を、同じ軸長のプロジェクションボルト90毎に分けて搬送するように構成されている場合について説明した。しかし、これに限らず、上記溶接部品としてプロジェクションナットを採用して、複数の搬送路72が、搬送路72毎に予め定められた、特定の高さのプロジェクションナットを搬送しかつ各搬送路72同士では異なる高さのプロジェクションナットを搬送するように構成されていてもよい。この場合、上記ナット供給源で、高さの異なる複数種類のプロジェクションナットから所望の高さのプロジェクションナットを供給することができるようになるため、ナット供給装置30を1台にまとめることができる。 For example, in the above-described first and second embodiments, the projection bolt 90 is adopted as a welded part conveyed by the plurality of transport paths 72, and the plurality of transport paths 72 have a plurality of projection bolts 90 having different shaft lengths. The case where the projection bolts 90 having the same shaft length are separately conveyed is described. However, the present invention is not limited to this, and the projection nuts are adopted as the welded parts, and the plurality of transport paths 72 transport the projection nuts having a specific height predetermined for each transport path 72 and each transport path 72. They may be configured to carry projection nuts of different heights. In this case, since the nut supply source can supply the projection nuts of a desired height from a plurality of types of projection nuts having different heights, the nut supply device 30 can be integrated into one unit.

また、ナット供給源及びボルト供給源47の両方に上述のような選択装置を配置するようにしてもよい。 Further, the selection device as described above may be arranged in both the nut supply source and the bolt supply source 47.

さらに、上述の実施形態1及び2では、搬送路72,172は4つであったが、これに限らず、搬送路72,172は、5つ以上であってもよいし、3つ以下であってもよい。 Further, in the above-described embodiments 1 and 2, the number of transport paths 72 and 172 is four, but the number of transport paths 72 and 172 is not limited to four, and the number of transport paths 72 and 172 may be five or more, or three or less. There may be.

また、上述の実施形態1では、可動部73を変位させることで、選択された搬送路72と供給路48とを連通させるように構成されていたが、これに限らず、可動部73を設けずに、供給路48の位置を固定して、有孔ブロック76を変位させることで、選択された搬送路72と供給路48とを連通させるように構成されていてもよい。 Further, in the above-described first embodiment, the movable portion 73 is displaced so that the selected transport path 72 and the supply path 48 communicate with each other, but the present invention is not limited to this, and the movable portion 73 is provided. Instead, the position of the supply path 48 may be fixed and the perforated block 76 may be displaced so that the selected transfer path 72 and the supply path 48 communicate with each other.

さらに、上述の実施形態2では、可動部173と回転装置175のギヤとの噛み合いにより可動部173を回転変位させていたが、これに限らず、可動部173にギヤ歯を形成せずに、回転装置175に可動部173との間で摩擦力を発生させるようなローラと該ローラを回転させるモータとを設けて、ローラと可動部173との間の摩擦力でもって、可動部173を回転可能にしてもよい。さらには、可動部173にギヤ歯を形成せずに、有孔ブロック176内にモータを配置して、該モータのモータ軸を可動部173と同軸になるように該可動部173に連結させることで、可動部173を回転可能にしてもよい。この場合、モータが回転装置175に相当し、モータ軸が軸部177に相当することになる。 Further, in the above-described second embodiment, the movable portion 173 is rotationally displaced by the engagement between the movable portion 173 and the gear of the rotating device 175, but the present invention is not limited to this, and the movable portion 173 is not formed with gear teeth. The rotating device 175 is provided with a roller that generates a frictional force between the movable portion 173 and a motor that rotates the roller, and the movable portion 173 is rotated by the frictional force between the roller and the movable portion 173. It may be possible. Further, the motor is arranged in the perforated block 176 without forming gear teeth on the movable portion 173, and the motor shaft of the motor is connected to the movable portion 173 so as to be coaxial with the movable portion 173. Then, the movable portion 173 may be made rotatable. In this case, the motor corresponds to the rotating device 175, and the motor shaft corresponds to the shaft portion 177.

また、上述の実施形態1及び2では、1台のプロジェクション溶接装置1で、ワークWに形成された孔部Hの1つに、プロジェクションナット又はプロジェクションボルト90を接合していたが、プロジェクション溶接装置1は複数台あってもよい。このとき、ワークWに孔部Hが複数形成されている場合には、複数台のプロジェクション溶接装置1によって、複数荷所の孔部Hに同時にプロジェクション溶接を行うようにすることができる。 Further, in the above-described first and second embodiments, the projection nut or the projection bolt 90 is joined to one of the holes H formed in the work W by one projection welding apparatus 1. There may be a plurality of 1s. At this time, when a plurality of holes H are formed in the work W, it is possible to simultaneously perform projection welding on the holes H of a plurality of loading points by using a plurality of projection welding devices 1.

さらに、上述の実施形態1及び2では、溶接装置本体20は、ロボット10に保持されていたが、ロボット10に保持されず、工場の床面等に固定されていてもよい。つまり、プロジェクション溶接装置1は定置型の溶接装置でもよい。 Further, in the above-described first and second embodiments, the welding apparatus main body 20 is held by the robot 10, but is not held by the robot 10 and may be fixed to the floor surface of the factory or the like. That is, the projection welding device 1 may be a stationary welding device.

上述の実施形態は単なる例示に過ぎず、本発明の範囲を限定的に解釈してはならない。
本発明の範囲は請求の範囲によって定義され、請求の範囲の均等範囲に属する変形や変更は、全て本発明の範囲内のものである。
The above embodiments are merely examples, and the scope of the present invention should not be construed in a limited manner.
The scope of the present invention is defined by the scope of the claims, and all modifications and modifications belonging to the equivalent scope of the claims are within the scope of the present invention.

本発明は、例えば、自動車製造ラインにおいて、自動車の車体構成部材と溶接部品とをプロジェクション溶接によって接合する溶接装置に対して、溶接部品を供給するための部品供給装置として有用である。 The present invention is useful, for example, as a component supply device for supplying welded parts to a welding device that joins a vehicle body component of an automobile and a welded part by projection welding in an automobile production line.

1 プロジェクション溶接装置
30 ナット供給装置(部品供給装置)
32 ナットガイド装置(ガイド装置)
40 ボルト供給装置(部品供給装置)
42 ボルトガイド装置(ガイド装置)
48、148 供給路
71、171 選択装置
72、172 搬送路
73、173 可動部
74、174 連通路
75 シリンダ(変位装置)
76 有孔ブロック
76a 開孔部
90 プロジェクションボルト(溶接部品)
100 制御装置
175 回転装置(変位装置)
W ワーク
1 Projection welding device 30 Nut supply device (parts supply device)
32 Nut guide device (guide device)
40 volt supply device (parts supply device)
42 Volt guide device (guide device)
48, 148 Supply path 71, 171 Selection device 72, 172 Transport path 73, 173 Movable part 74, 174 consecutive passage 75 Cylinder (displacement device)
76 Perforated block 76a Perforated part 90 Projection bolt (welded part)
100 Control device 175 Rotating device (displacement device)
W work

Claims (4)

ワークとプロジェクションボルトとをプロジェクション溶接によって接合する溶接装置に対して、上記プロジェクションボルトを供給するための部品供給装置であって、
上記プロジェクションボルトを上記ワークの溶接位置へ案内するガイド装置と、
上記ガイド装置に上記プロジェクションボルトを選択して供給するための選択装置と、
上記ガイド装置及び上記選択装置の作動制御をする制御装置とを備え、
上記ガイド装置は、上記プロジェクションボルトを受け取り保持するボルト保持部を有するチャックを有し、
上記選択装置は、上記プロジェクションボルトが搬送される複数の搬送路であって、該搬送路毎に予め定められた、特定の軸長のプロジェクションボルトを搬送しかつ各搬送路同士では異なる軸長のプロジェクションボルトを搬送するように構成された複数の搬送路と、該複数の搬送路のうち選択された搬送路と連通可能に構成されかつ該選択された搬送路により搬送される上記プロジェクションボルトを上記ガイド装置に供給するための供給路と、を有し、
上記制御装置は、軸長がそれぞれ異なる複数のプロジェクションボルトのうちから選択された所望のプロジェクションボルトを上記ガイド装置に供給すべく、上記選択された所望のプロジェクションボルトを搬送する搬送路と上記供給路とを連通させ、
上記ボルト保持部は、上記プロジェクションボルトの軸長に関わらず、該プロジェクションボルトの先端部が上記ボルト保持部の下端部に位置した状態で、該プロジェクションボルトの軸部を保持することを特徴とする部品供給装置。
A component supply device for supplying the projection bolt to a welding device that joins a work and a projection bolt by projection welding.
A guide device that guides the projection bolt to the welding position of the work, and
A selection device for selecting and supplying the projection bolt to the guide device, and
It is equipped with a control device for controlling the operation of the guide device and the selection device.
The guide device has a chuck having a bolt holding portion that receives and holds the projection bolt.
The selection device is a plurality of transport paths through which the projection bolts are transported, and transports projection bolts having a specific axial length predetermined for each transport path and has different axial lengths between the transport paths. The projection bolts that are configured to communicate with a plurality of transport paths configured to convey the projection bolts and the transport path selected from the plurality of transport paths and are conveyed by the selected transport path are described above. Has a supply path for supplying to the guide device,
The control device has a transport path and a supply path for transporting the desired projection bolt selected from among a plurality of projection bolts having different shaft lengths so as to supply the desired projection bolt to the guide device. And communicate with
The bolt holding portion is characterized in that the shaft portion of the projection bolt is held in a state where the tip end portion of the projection bolt is located at the lower end portion of the bolt holding portion regardless of the shaft length of the projection bolt. Parts supply device.
請求項1の部品供給装置において、
上記選択装置は、上記複数の搬送路のうち選択された搬送路と連通する連通路を有する可動部と、上記選択された搬送路と上記連通路とが連通するように該可動部を変位させるための変位装置と、を更に有し、
上記供給路は、上記連通路を介して上記選択された搬送路と連通するように構成され、
上記制御装置は、上記選択された搬送路と上記連通路が連通するように上記変位装置を作動させることを特徴とする部品供給装置。
In the parts supply device of claim 1,
The selection device displaces the movable portion having a communication passage that communicates with the selected transport passage among the plurality of transport paths, and the movable portion so that the selected transport path and the communication passage communicate with each other. Further has a displacement device for
The supply path is configured to communicate with the selected transport path through the communication passage.
The control device is a component supply device, characterized in that the displacement device is operated so that the selected transport path and the communication path communicate with each other.
請求項2に記載の部品供給装置において、
複数の開孔部が一列に並んで形成された有孔ブロックを更に備え、
上記複数の搬送路は、上記可動部の上記連通路と連通する側の端部が、上記複数の開孔部が並ぶ列方向に並ぶように、上記有孔ブロックの各開孔部にそれぞれ連結されており、
上記連通路は、上記有孔ブロックの各開孔部を介して各搬送路と連通し、
上記変位装置は、上記可動部を上記列方向に変位させて、上記選択された搬送路が連結された上記開孔部と上記連通路とを連通させることで、上記選択された搬送路と上記連通路とを連通させるように構成されていることを特徴とする部品供給装置。
In the parts supply device according to claim 2,
Further provided with a perforated block formed by arranging a plurality of openings in a row.
The plurality of transport paths are connected to each of the perforated blocks of the perforated block so that the ends of the movable portion on the side communicating with the communication passage are arranged in the row direction in which the plurality of perforated portions are lined up. Has been done
The communication passage communicates with each transport path through each opening portion of the perforated block.
The displacement device displaces the movable portion in the row direction to communicate the opening portion to which the selected transport path is connected and the communication passage, whereby the selected transport path and the communication path are communicated with each other. A parts supply device characterized in that it is configured to communicate with a communication passage.
ワークと溶接部品とをプロジェクション溶接によって接合する溶接装置に対して、上記溶接部品を供給するための部品供給装置であって、
上記溶接部品を上記ワークの溶接位置へ案内するガイド装置と、
円柱形をなしかつ複数の開孔部が中心軸周りに形成された有孔ブロックと、
上記ガイド装置に上記溶接部品を選択して供給するための選択装置と、
上記ガイド装置及び上記選択装置の作動制御をする制御装置とを備え、
上記選択装置は、上記溶接部品が搬送される複数の搬送路であって、該搬送路毎に予め定められた、特定の形状の溶接部品を搬送しかつ各搬送路同士では異なる形状の溶接部品を搬送するように構成された複数の搬送路と、該複数の搬送路のうち選択された搬送路と連通可能に構成されかつ該選択された搬送路により搬送される溶接部品を上記ガイド装置に供給するための供給路と、上記複数の搬送路のうち選択された搬送路と連通する連通路を有する可動部と、上記選択された搬送路と上記連通路とが連通するように該可動部を変位させるための変位装置と、を有し、
上記供給路は、上記連通路を介して上記選択された搬送路と連通するように構成され、
上記複数の搬送路は、上記可動部の上記連通路と連通する側の端部が、上記有孔ブロックの各開孔部にそれぞれ連結されており、
上記可動部は、上記有孔ブロックと同軸に配置された円柱形をなし、
上記変位装置は、上記可動部を上記中心軸回りに回転させて、上記選択された搬送路が連結された上記開孔部と上記連通路とを連通させることで、上記選択された搬送路と上記連通路とを連通させるように構成されており、
上記制御装置は、形状がそれぞれ異なる複数の溶接部品のうちから選択された所望の溶接部品を上記ガイド装置に供給すべく、上記選択された搬送路と上記連通路が連通するように上記変位装置を作動させることを特徴とする部品供給装置。
It is a parts supply device for supplying the above-mentioned welded parts to a welding device for joining a work and a welded part by projection welding.
A guide device that guides the welded parts to the welded position of the workpiece,
A perforated block that is cylindrical and has multiple perforations formed around the central axis.
A selection device for selecting and supplying the welded parts to the guide device, and
It is equipped with a control device for controlling the operation of the guide device and the selection device.
The selection device is a plurality of transport paths through which the welded parts are transported, and the welded parts having a specific shape predetermined for each transport path are transported, and the welded parts having different shapes are transported between the transport paths. In the guide device, a plurality of transport paths configured to convey the A movable part having a supply path for supplying, a communication path communicating with the selected transfer path among the plurality of transfer paths, and the movable portion so as to communicate with the selected transfer path and the communication path. With a displacement device for displacing,
The supply path is configured to communicate with the selected transport path through the communication passage.
In the plurality of transport paths, the end portion of the movable portion on the side communicating with the communication passage is connected to each opening portion of the perforated block.
The movable part has a cylindrical shape arranged coaxially with the perforated block.
The displacement device rotates the movable portion around the central axis to communicate the opening portion to which the selected transport path is connected and the communication passage to communicate with the selected transport path. It is configured to communicate with the above communication passage,
The control device is a displacement device so that the selected transport path and the communication passage communicate with each other in order to supply a desired welded part selected from a plurality of welded parts having different shapes to the guide device. A parts supply device characterized by operating.
JP2017240592A 2017-12-15 2017-12-15 Parts supply equipment Active JP7082392B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017240592A JP7082392B2 (en) 2017-12-15 2017-12-15 Parts supply equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017240592A JP7082392B2 (en) 2017-12-15 2017-12-15 Parts supply equipment

Publications (2)

Publication Number Publication Date
JP2019107654A JP2019107654A (en) 2019-07-04
JP7082392B2 true JP7082392B2 (en) 2022-06-08

Family

ID=67178603

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017240592A Active JP7082392B2 (en) 2017-12-15 2017-12-15 Parts supply equipment

Country Status (1)

Country Link
JP (1) JP7082392B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113172367B (en) * 2021-05-18 2022-10-11 青岛弘顺昌精密机械有限公司 Automatic welding rod supply device for steel pipe welding

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6071170A (en) * 1983-09-27 1985-04-23 ヤンマーディーゼル株式会社 Bolt changeover device for bolt clamping-work robot
JP2626025B2 (en) * 1989-02-10 1997-07-02 株式会社デンソー Fixture positioning device
JPH0622554Y2 (en) * 1989-04-26 1994-06-15 矢嶋工業株式会社 Welding bolt feeding device in welding machine
JPH11170064A (en) * 1997-12-14 1999-06-29 Press Kogyo Co Ltd Welding equipment of nut
US6070758A (en) * 1998-07-24 2000-06-06 Nasco Industries, Inc. Automatic screw feeding machine manifold and arrangement therefor

Also Published As

Publication number Publication date
JP2019107654A (en) 2019-07-04

Similar Documents

Publication Publication Date Title
JP4297511B1 (en) Clamping device
JP4610554B2 (en) Clamping device
US8777526B2 (en) Deep hole processing device
JP2009255219A (en) Clamp device
JP7082392B2 (en) Parts supply equipment
JP2009214288A (en) Clamping device
JP5004660B2 (en) Work clamp device
JP2008529800A (en) Method and apparatus for feeding fasteners to a processing device
JP2012528730A (en) Individual separation slides for devices for feeding coupling elements
US20160096242A1 (en) Automatic fastener driving system, apparatus and method
JP5934514B2 (en) Article supply apparatus having vacuum suction head
JP5144566B2 (en) Clamping device
US20100325879A1 (en) Device for processing clips, screws, pins, nuts or similar joining elements
JP5090071B2 (en) Small parts supply device
JP7043058B2 (en) Bolt feeder
JP5797743B2 (en) Tool holder, machine tool provided with this type of tool holder, and method for fixing a processing tool to the tool holder of a machine tool
JP7185898B2 (en) bolt feeder
JP7185891B2 (en) projection welding equipment
US6698532B2 (en) Piercing apparatus
WO2001085380A1 (en) Projection bolt welding device
KR20210047310A (en) Devices for processing work pieces
US20100089047A1 (en) Actuator, unclamp apparatus having actuator, and machining apparatus
JP5252693B2 (en) Work moving device
JP2004115191A (en) Workpiece positioning mechanism of conveyance device
JP3131083U (en) Parts supply device for supply head

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20201009

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210819

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210824

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20211007

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220222

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220406

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220510

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220520

R150 Certificate of patent or registration of utility model

Ref document number: 7082392

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150