JP7063977B1 - How to remove the blade, how to attach the blade and hanging jig - Google Patents

How to remove the blade, how to attach the blade and hanging jig Download PDF

Info

Publication number
JP7063977B1
JP7063977B1 JP2020214130A JP2020214130A JP7063977B1 JP 7063977 B1 JP7063977 B1 JP 7063977B1 JP 2020214130 A JP2020214130 A JP 2020214130A JP 2020214130 A JP2020214130 A JP 2020214130A JP 7063977 B1 JP7063977 B1 JP 7063977B1
Authority
JP
Japan
Prior art keywords
blade
hanging
jig
attached
hub
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020214130A
Other languages
Japanese (ja)
Other versions
JP2022100013A (en
Inventor
魁 水上
孝之 落合
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taihei Dengyo Kaisha Ltd
Original Assignee
Taihei Dengyo Kaisha Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taihei Dengyo Kaisha Ltd filed Critical Taihei Dengyo Kaisha Ltd
Priority to JP2020214130A priority Critical patent/JP7063977B1/en
Application granted granted Critical
Publication of JP7063977B1 publication Critical patent/JP7063977B1/en
Publication of JP2022100013A publication Critical patent/JP2022100013A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Load-Engaging Elements For Cranes (AREA)
  • Wind Motors (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

【課題】クレーンが届かないような大型の風車のブレードを安全且つ迅速に取り外すことができるブレードの取り外し方法等を提供する。【解決手段】吊り下ろし対象であるブレードの先端を下方に向け、吊り下ろし対象でないブレードに第1吊り器具を取り付け、第1吊り器具と吊り下ろし対象であるブレードを接続した状態で吊り下ろし対象であるブレードをハブから取り外し、ハブの内部に第2吊り器具を設置し、第2吊り器具と吊り下ろし対象であるブレードを接続した状態で第1吊り器具と吊り下ろし対象であるブレードの接続を解除して、第2吊り器具により吊り下ろし対象であるブレードを吊り下ろす。【選択図】図3PROBLEM TO BE SOLVED: To provide a method for removing a blade capable of safely and quickly removing a blade of a large wind turbine which a crane cannot reach. SOLUTION: A first hanging device is attached to a blade that is not a hanging target, with the tip of a blade that is a hanging target facing downward, and a hanging device is connected to the first hanging device and the blade that is the hanging target. Remove a certain blade from the hub, install a second hanging device inside the hub, and disconnect the first hanging device and the blade to be hung with the second hanging device connected to the blade to be hung. Then, the blade to be hung is hung by the second hanging device. [Selection diagram] Fig. 3

Description

本発明は、風力発電等に用いられる風車のブレードを取り外す方法等に関するものである。 The present invention relates to a method of removing a blade of a wind turbine used for wind power generation or the like.

特許文献1には、風力発電に用いられる風車におけるブレードの取付方法が開示されている。特許文献1の取付方法では、特許文献1の図2a、図2b、図2cに示すように、風車のハブにブレードを取り付けるためにクレーンでブレードを当該ハブの高さまで吊り上げて取り付ける。 Patent Document 1 discloses a method of attaching a blade in a wind turbine used for wind power generation. In the mounting method of Patent Document 1, as shown in FIGS. 2a, 2b, and 2c of Patent Document 1, in order to mount the blade on the hub of the wind turbine, the blade is lifted to the height of the hub by a crane and mounted.

その一方で風車の解体時において風車のハブからブレードを取り外す場合には取り付け時と同様にクレーンでブレードを取り外すことになる。 On the other hand, when removing the blade from the hub of the wind turbine at the time of dismantling the wind turbine, the blade is removed with a crane in the same manner as at the time of installation.

欧州特許第1507975号明細書European Patent No. 1507795

しかしながら、クレーンでブレードを取り外す方法はクレーンが届く高さの風車に対して採用することができるが、クレーンが届かないような大型の風車には採用することができないという問題がある。 However, although the method of removing the blade with a crane can be adopted for a wind turbine having a height that the crane can reach, there is a problem that it cannot be adopted for a large wind turbine that the crane cannot reach.

本発明は、こうした事情を鑑み、クレーンが届かないような大型の風車のブレードを安全且つ迅速に取り外すことができるブレードの取り外し方法等を提供することを目的とする。 In view of these circumstances, it is an object of the present invention to provide a method for removing blades, which can safely and quickly remove blades of a large wind turbine that cannot be reached by a crane.

この発明は、上記目的を達成するためになされたものであって、下記を特徴とするものである。 The present invention has been made to achieve the above object and is characterized by the following.

請求項1記載の発明は、風車のハブに取り付けられたブレードを取り外して吊り下ろすブレードの取り外し方法であって、前記ハブを回転させて、吊り下ろし対象である前記ブレードの先端を下方に向ける回転工程と、前記吊り下ろし対象である前記ブレード以外のブレードに第1吊り器具を取り付け、前記第1吊り器具と前記吊り下ろし対象であり、前記先端を下方に向けた前記ブレードの一部を下方から支持する吊治具を接続する第1接続工程と、前記第1吊り器具と前記吊治具が接続された状態において、前記ハブから前記吊り下ろし対象である前記ブレードを取り外す取り外し工程と、前記第1吊り器具と前記吊治具が接続された状態において、前記ハブの内部に第2吊り器具を設置し、前記第2吊り器具と、前記第1吊り器具が接続されている前記吊治具を接続する第2接続工程と、前記第2吊り器具と前記吊治具が接続された状態において、前記第1吊り器具と前記吊治具の接続を解除する解除工程と、前記吊治具を介して前記第2吊り器具により前記吊り下ろし対象である前記ブレードを吊り下ろす吊り下ろし工程と、を含むことを特徴とする。 The invention according to claim 1 is a method of removing a blade attached to a hub of a wind turbine and suspending the blade, wherein the hub is rotated and the tip of the blade to be suspended is directed downward. In the process, the first hanging device is attached to a blade other than the blade that is the hanging target, and the first hanging device and a part of the blade that is the hanging target and whose tip is directed downward are attached. A first connection step of connecting a hanging jig supported from below , and a removing step of removing the blade to be suspended from the hub while the first hanging device and the hanging jig are connected. In a state where the first hanging device and the hanging tool are connected , the second hanging device is installed inside the hub, and the hanging device to which the second hanging device and the first hanging device are connected is connected . A second connection step of connecting the tools , a release step of disconnecting the first hanging device and the hanging jig in a state where the second hanging device and the hanging jig are connected, and the hanging jig . It is characterized by including a hanging step of hanging the blade, which is the target of hanging, by the second hanging device.

請求項2に記載の発明は、請求項1に記載のブレードの取り外し方法であって、前記吊治具は、前記第1吊り器具が取り付けられる第1取付部と、前記第2吊り器具が取り付けられる第2取付部と、前記吊り下ろし対象である前記ブレードの一部に、前記ブレードの先端を下向きにした場合における下方から当接する当接部と、を有し、前記第1接続工程では、前記第1吊り器具を前記第1取付部に取り付け、前記第2接続工程では、前記第2吊り器具を前記第2取付部に取り付け、前記解除工程では、前記第1取付部から前記第1吊り器具を取り外すことを特徴とする。
請求項3に記載の発明は、請求項2に記載のブレードの取り外し方法であって、前記吊治具は複数の本体部材からなるリング状の吊治具本体を有し、前記吊治具本体が前記当接部を有し、前記第1接続工程では、前記吊り下ろし対象である前記ブレードを前記リング状の内側に挟み込むように前記複数の本体部材を接合し、前記当接部を、前記ブレードにおける当該ブレードを前記ハブに取り付けるためのフランジに、前記ブレードの先端を下向きにした場合における下方から当接させることを特徴とする。
The invention according to claim 2 is the method for removing a blade according to claim 1, wherein the hanging jig is attached to a first mounting portion to which the first hanging device is attached and the second hanging device. The second mounting portion is provided, and a contact portion that abuts from below when the tip of the blade is directed downward is provided with a part of the blade to be suspended. The first suspension device is attached to the first attachment portion, the second suspension device is attached to the second attachment portion in the second connection step, and the first suspension device is attached to the first suspension portion in the release step. It is characterized by removing the device.
The invention according to claim 3 is the method for removing a blade according to claim 2, wherein the hanging jig has a ring-shaped hanging jig main body composed of a plurality of main body members, and the hanging jig main body. Has the contact portion, and in the first connection step, the plurality of main body members are joined so as to sandwich the blade to be suspended inside the ring shape, and the contact portion is attached to the contact portion. It is characterized in that the blade is brought into contact with a flange for attaching the blade to the hub from below when the tip of the blade is directed downward.

請求項に記載の発明は、請求項1乃至3の何れか一項に記載のブレードの取り外し方法であって、前記第1吊り器具を取り付ける前記ブレードが取り外し済みの場合に、当該取り外し済みのブレードが取り付けられていた位置に、前記第1吊り器具を取り付けるための取付け部材を取り付ける取り付け工程を含み、前記第1接続工程では、前記第1吊り器具を取り付ける前記ブレードが取り外し済みの場合に、前記取付け部材に前記第1吊り器具を取り付けることを特徴とする。 The invention according to claim 4 is the method for removing a blade according to any one of claims 1 to 3 , wherein the blade to which the first suspension device is attached has been removed. The attachment step of attaching the attachment member for attaching the first suspension device to the position where the blade was attached is included, and in the first connection step, when the blade for attaching the first suspension device has been removed, It is characterized in that the first suspension device is attached to the attachment member.

請求項に記載の発明は、請求項1乃至4の何れか一項に記載のブレードの取り外し方法に用いられる吊治具であるThe invention according to claim 5 is a hanging jig used in the method for removing a blade according to any one of claims 1 to 4 .

請求項に記載の発明は、風車のブレードを吊り上げて前記風車のハブに取り付けるブレードの取り付け方法であって、取り付け対象である前記ブレード以外のブレードに第1吊り器具を取り付ける第1工程と、前記ハブの内部に第2吊り器具を設置し、前記第2吊り器具と前記取り付け対象であり、先端を下方に向けた前記ブレードの一部を下方から支持する吊治具を接続する第2工程と、前記吊治具を介して前記第2吊り器具により前記取り付け対象である前記ブレードを吊り上げる第3工程と、前記第2吊り器具と接続されている前記吊治具と、前記第1吊り器具を接続する第4工程と、前記第1吊り器具と前記吊治具が接続された状態において、前記第2吊り器具と前記吊治具の接続を解除する第5工程と、前記吊治具を介して前記第1吊り器具により前記取り付け対象である前記ブレードを前記ハブの位置まで吊り上げて、前記ハブに前記取り付け対象である前記ブレードを取り付ける第6工程と、を含むことを特徴とする。 The invention according to claim 6 is a method of attaching a blade for lifting a blade of a wind turbine and attaching it to the hub of the wind turbine, the first step of attaching a first suspending device to a blade other than the blade to be attached. A second suspension device is installed inside the hub, and the second suspension device is connected to the suspension tool that is the attachment target and supports a part of the blade with the tip directed downward from below. Two steps, a third step of lifting the blade to be attached by the second hanging tool via the hanging tool, the hanging tool connected to the second hanging tool, and the first. The fourth step of connecting the hanging device, the fifth step of disconnecting the second hanging device and the hanging jig while the first hanging device and the hanging jig are connected, and the hanging cure. It is characterized by including a sixth step of lifting the blade to be attached to the position of the hub by the first suspension device via a tool and attaching the blade to be attached to the hub. ..

この発明によれば、風車の吊り下ろし対象以外のブレードに取り付けた第1吊り器具と、ハブ内部に取り付けた第2吊り器具により吊り下ろし対象のブレードを、吊り替えを行いながら吊り下ろすことができ、クレーンが届かないような大型の風車のブレードであっても安全且つ迅速に取り外すことができる。 According to the present invention, the blade to be hung can be hung while being replaced by the first hanging device attached to the blade other than the hanging target of the wind turbine and the second hanging device attached to the inside of the hub. Even large wind turbine blades that cranes cannot reach can be safely and quickly removed.

(A)は風車100のブレード130Cをチェーンブロック11により吊っている際の正面図であり、(B)は同左側面図である。(A) is a front view when the blade 130C of the wind turbine 100 is suspended by the chain block 11, and (B) is a left side view of the same. (A)は吊治具1の平面図であり、(B)は同正面図であり、(C)は同左側面図であり、(D)は吊治具1をブレード130Cのフランジ131の下部に取り付けた場合の平面図である。(A) is a plan view of the hanging jig 1, (B) is the front view of the same, (C) is the left side view of the same, and (D) shows the hanging jig 1 at the lower part of the flange 131 of the blade 130C. It is a plan view when it is attached to. 吊治具1を用いてチェーンブロック11によりブレード130Cを吊っている状態を示す正面図である。It is a front view which shows the state which the blade 130C is suspended by a chain block 11 using a hanging jig 1. (A)は風車100のブレード130Cをチルクライマー21により吊り下ろしている際の正面図であり、(B)は同左側面図である。(A) is a front view when the blade 130C of the wind turbine 100 is suspended by the chill climber 21, and (B) is a left side view of the same. 吊治具1を用いてチルクライマー21によりブレード130Cを吊っている状態を示す正面図である。It is a front view which shows the state which the blade 130C is suspended by the chill climber 21 using the hanging jig 1. (A)は風車100のブレード130Cをクレーンにより吊っている際の正面図であり、(B)は同左側面図である。(A) is a front view when the blade 130C of the wind turbine 100 is suspended by a crane, and (B) is a left side view of the same. 風車100のブレード130Cをクレーンにより吊っている際の部分拡大図である。It is a partially enlarged view when the blade 130C of the wind turbine 100 is suspended by a crane.

本発明の実施形態について図面を参照しながら説明する。 An embodiment of the present invention will be described with reference to the drawings.

[1.風車100の構成]
本実施形態では、図1(A)、図1(B)に示す風車100のハブ140に取り付けられたブレード130Cを取り外して地上に吊り下ろす方法について説明する。風車100は、タワー110と、ナセル120と、3本のブレード130A、130B、130C(以下、3本のブレードを総称してブレード130という場合がある)と、ハブ140とを含む。なお、タワー110は、例えば100m前後の塔状の構造物である。
[1. Configuration of wind turbine 100]
In this embodiment, a method of removing the blade 130C attached to the hub 140 of the wind turbine 100 shown in FIGS. 1A and 1B and suspending the blade 130C from the ground will be described. The wind turbine 100 includes a tower 110, a nacelle 120, three blades 130A, 130B, 130C (hereinafter, the three blades may be collectively referred to as a blade 130), and a hub 140. The tower 110 is, for example, a tower-shaped structure of about 100 m.

タワー110は、高さ方向に分割された3つのタワー部材111A、111B、111Cにより構成される(以下、3つのタワー部材を総称してタワー部材111という場合がある)。なお、タワー部材111Aが最上段のタワー部材であり、タワー部材111Bが上から2段目のタワー部材であり、タワー部材111Cが上から3段目(最下段)のタワー部材である。 The tower 110 is composed of three tower members 111A, 111B, and 111C divided in the height direction (hereinafter, the three tower members may be collectively referred to as a tower member 111). The tower member 111A is the uppermost tower member, the tower member 111B is the tower member in the second stage from the top, and the tower member 111C is the tower member in the third stage (lowermost stage) from the top.

ナセル120は、軸受けや発電装置等を格納する。発電装置は、ブレード130の回転数を引き上げる増速機や、発電機(誘導発電機、同期発電機等)や、風車100の運転状況等を監視する監視装置を含む。ナセル120は、最上段のタワー部材111Aの上部に取り付けられる。また、ナセル120の正面側にはハブ140が設けられており、ハブ140には3本のブレード130が取り付けられている。 The nacelle 120 stores a bearing, a power generation device, and the like. The power generation device includes a speed increaser that raises the rotation speed of the blade 130, a generator (induction generator, synchronous generator, etc.), and a monitoring device that monitors the operating status of the wind turbine 100. The nacelle 120 is attached to the upper part of the uppermost tower member 111A. Further, a hub 140 is provided on the front side of the nacelle 120, and three blades 130 are attached to the hub 140.

次に、図2を用いて、ブレード130Cをハブ140から取り外して吊り下ろす際に用いられる吊治具1について説明する。 Next, the hanging jig 1 used when the blade 130C is removed from the hub 140 and hung from the hub 140 will be described with reference to FIG.

[2.吊治具1の構成]
図2(A)、図2(B)、図2(C)に示すように、吊治具1は、リング状の吊治具本体2(「当接部」の一例)と、吊板3と、吊ピース4とを含む。吊治具本体2は2つの半リング状の本体部材2A、2Bからなる。吊治具本体2は、ブレード130Cのフランジ131に下方から当接する。
[2. Configuration of hanging jig 1]
As shown in FIGS. 2 (A), 2 (B), and 2 (C), the hanging jig 1 includes a ring-shaped hanging jig main body 2 (an example of a “contact portion”) and a hanging plate 3. And the hanging piece 4. The hanging jig main body 2 is composed of two semi-ring-shaped main body members 2A and 2B. The hanging jig main body 2 abuts on the flange 131 of the blade 130C from below.

本体部材2A、2Bにはそれぞれ1枚ずつ吊板3が設けられており、吊板3には挿通孔3A(「第1取付部」の一例)が形成されている。挿通孔3Aには、後述するチェーンブロック11の吊ワイヤー13がシャックルを介して取り付けられる。 One hanging plate 3 is provided for each of the main body members 2A and 2B, and an insertion hole 3A (an example of the "first mounting portion") is formed in the hanging plate 3. A suspension wire 13 of a chain block 11, which will be described later, is attached to the insertion hole 3A via a shackle.

また、本体部材2A、2Bにはそれぞれ2枚ずつ吊ピース4が設けられており、吊ピース4には挿通孔4A(「第2取付部」の一例)が形成されている。挿通孔4Aには、後述するチルクライマー21の吊ワイヤー23がシャックルを介して取り付けられる。 Further, two hanging pieces 4 are provided on each of the main body members 2A and 2B, and an insertion hole 4A (an example of a "second mounting portion") is formed in the hanging piece 4. A suspension wire 23 of a chill climber 21, which will be described later, is attached to the insertion hole 4A via a shackle.

図2(D)に示すように、吊治具1はリング状の吊治具本体2の内側にブレード130を抱え込んだ際に、吊治具本体2の外周がブレード130のフランジ131の外周よりも小さくなっている。 As shown in FIG. 2 (D), when the hanging jig 1 holds the blade 130 inside the ring-shaped hanging jig main body 2, the outer periphery of the hanging jig main body 2 is from the outer periphery of the flange 131 of the blade 130. Is also getting smaller.

[3.ブレード130Cの取り外し方法]
次に、本実施形態に係るブレード130Cの取り外し方法について説明する。
[3. How to remove the blade 130C]
Next, a method of removing the blade 130C according to the present embodiment will be described.

[3.1.工程1]
図1に示すように、まず、ハブ140及びブレード130を回転させて、吊り下ろし対象であるブレード130Cの先端を下方(鉛直方向下向き)に向ける(「回転工程」の一例)。
[3.1. Step 1]
As shown in FIG. 1, first, the hub 140 and the blade 130 are rotated so that the tip of the blade 130C to be suspended is directed downward (vertically downward) (an example of the "rotation process").

[3.2.工程2]
次に、吊り下ろし対象であるブレード130C以外のブレード130A、130Bにチェーンブロック11(「第1吊り器具」の一例)を取り付け、チェーンブロック11と吊り下ろし対象であるブレード130Cを接続する(「第1接続工程」の一例)。
[3.2. Step 2]
Next, the chain block 11 (an example of the "first suspension device") is attached to the blades 130A and 130B other than the blade 130C to be suspended, and the chain block 11 and the blade 130C to be suspended are connected ("No. 1"). An example of "1 connection process").

工程2では、吊り下ろし対象であるブレード130Cのフランジ131(「ブレードの一部」の一例)を下方から支持する吊治具1に対してチェーンブロック11を取り付けることにより、チェーンブロック11と吊り下ろし対象であるブレード130Cを間接的に接続する。 In step 2, the chain block 11 is attached to the hanging jig 1 that supports the flange 131 (an example of "a part of the blade") of the blade 130C to be suspended from below, thereby suspending the blade 130C from the chain block 11. The target blade 130C is indirectly connected.

具体的には、図3に示すように、2つのチェーンブロック11をそれぞれブレード130Aとブレード130Bに取り付けるために、チェーンブロック11に設けられたチェーンブロック取付ワイヤー12をそれぞれブレード130Aとブレード130Bに括り付ける。また、ブレード130Cにおける、ブレード130をハブ140に取り付けるためのフランジ131の下面(ブレード130Cの先端を下方に向けた状態の下側の面)に接するように治具受け具14を取り付ける。次いで予め分割しておいた本体部材2A、2Bをブレード130Cの根元に挟み込み、吊治具本体2の上面が治具受け具14の下面と接するようにボルト接合により取り付ける。 Specifically, as shown in FIG. 3, in order to attach the two chain blocks 11 to the blade 130A and the blade 130B, respectively, the chain block mounting wire 12 provided on the chain block 11 is tied to the blade 130A and the blade 130B, respectively. wear. Further, the jig receiver 14 of the blade 130C is attached so as to be in contact with the lower surface of the flange 131 for attaching the blade 130 to the hub 140 (the lower surface with the tip of the blade 130C facing downward). Next, the main body members 2A and 2B that have been divided in advance are sandwiched between the roots of the blades 130C, and attached by bolting so that the upper surface of the hanging jig main body 2 is in contact with the lower surface of the jig receiver 14.

そして、吊治具1の吊板3に形成された挿通孔3Aにチェーンブロック11の吊ワイヤー13を、シャックルを介して固定する。次いで、チェーンブロック11で吊治具1を吊り上げることにより治具受け具14と吊治具1が当接した状態となる。これにより、チェーンブロック11とブレード130Cが間接的に接続され、チェーンブロック11でブレード130Cの荷重を支える。 Then, the hanging wire 13 of the chain block 11 is fixed to the insertion hole 3A formed in the hanging plate 3 of the hanging jig 1 via a shackle. Next, by lifting the hanging jig 1 with the chain block 11, the jig receiving tool 14 and the hanging jig 1 are in contact with each other. As a result, the chain block 11 and the blade 130C are indirectly connected, and the chain block 11 supports the load of the blade 130C.

なお、工程2から工程5の作業等は、タワー110に沿って設けられたゴンドラ用ワイヤー202により昇降するゴンドラ201に作業員が搭乗して行う。 The work of steps 2 to 5 is performed by a worker on board the gondola 201 that moves up and down by the gondola wire 202 provided along the tower 110.

[3.3.工程3]
次に、チェーンブロック11と吊り下ろし対象であるブレード130Cが接続された状態において、ハブ140から吊り下ろし対象であるブレード130Cを取り外す(「取り外し工程」の一例)。このとき、チェーンブロック11がブレード130Cの荷重を受けることでブレード130Cの落下を防ぐ。
[3.3. Step 3]
Next, in a state where the chain block 11 and the blade 130C to be hung are connected, the blade 130C to be hung is removed from the hub 140 (an example of the "removal step"). At this time, the chain block 11 receives the load of the blade 130C to prevent the blade 130C from falling.

[3.4.工程4]
次に、チェーンブロック11と吊り下ろし対象であるブレード130Cが接続された状態において、ハブ140又はナセル120の内部にチルクライマー21(「第2吊り器具」の一例)を設置し、チルクライマー21と吊り下ろし対象であるブレード130Cを接続する(「第2接続工程」の一例)。
[3.4. Step 4]
Next, in a state where the chain block 11 and the blade 130C to be suspended are connected, a chill climber 21 (an example of a "second suspension device") is installed inside the hub 140 or the nacelle 120, and the chill climber 21 and the chill climber 21 are installed. The blade 130C to be suspended is connected (an example of the "second connection step").

工程4では、吊治具1に対してチルクライマー21を取り付けることにより、チルクライマー21と吊り下ろし対象であるブレード130Cを間接的に接続する。 In step 4, the chill climber 21 is attached to the hanging jig 1 to indirectly connect the chill climber 21 and the blade 130C to be suspended.

具体的には、図5に示すように、4つのチルクライマー21(図5は水平方向からの図のため2つのチルクライマー21を示している)をそれぞれハブ140又はナセル120の内部の固定部(図示しない)に取り付けるために、チルクライマー21に設けられたチルクライマー取付ワイヤー22をそれぞれ当該固定部に固定する。 Specifically, as shown in FIG. 5, four chill climbers 21 (FIG. 5 shows two chill climbers 21 because of a horizontal view) are fixed to the inside of the hub 140 or the nacelle 120, respectively. The chill climber mounting wires 22 provided on the chill climber 21 are fixed to the fixing portions for mounting on (not shown).

なお、チルクライマー21の設置方法は、風車100の構造(各メーカーで異なる)に合わせて適切な方法を採用する。例えば、多くの種類の風車100はハブ140の内部にブレード130を支持するフレームを有しているので、当該フレームに固定部としてワイヤー等を掛けてチルクライマー21を設置することができる。また、ブレード130を取り付けるボルト・ナットのナットをアイボルトに替えてチルクライマー21を吊る方法を採用することもできる。更に、ハブ140内部にチルクライマー21を設置する適当な部分が無い場合には、ナセル120内部の適当な部分に設置してもよい。 As the installation method of the chill climber 21, an appropriate method is adopted according to the structure of the wind turbine 100 (different for each manufacturer). For example, since many types of wind turbines 100 have a frame that supports the blade 130 inside the hub 140, the chill climber 21 can be installed by hanging a wire or the like as a fixing portion on the frame. Further, it is also possible to adopt a method of suspending the chill climber 21 by replacing the nuts of the bolts and nuts for attaching the blade 130 with eye bolts. Further, if there is no suitable portion for installing the chill climber 21 inside the hub 140, it may be installed at an appropriate portion inside the nacelle 120.

そして、吊治具1の吊ピース4に形成された挿通孔4Aにチルクライマー21の吊ワイヤー23を通して固定する。これにより、チルクライマー21とブレード130Cが間接的に接続され、チェーンブロック11とチルクライマー21でブレード130Cの荷重を支える。 Then, the suspension wire 23 of the chill climber 21 is passed through the insertion hole 4A formed in the suspension piece 4 of the suspension jig 1 and fixed. As a result, the chill climber 21 and the blade 130C are indirectly connected, and the chain block 11 and the chill climber 21 support the load of the blade 130C.

[3.5.工程5]
次に、チェーンブロック11と吊り下ろし対象であるブレード130Cの接続を解除する(「解除工程」の一例)。具体的には、図5に示すように、吊治具1の吊板3の挿通孔3Aに挿通されているチェーンブロック11の吊ワイヤー13を取り外す。これにより、チルクライマー21のみでブレード130Cの荷重を支える。
[3.5. Step 5]
Next, the connection between the chain block 11 and the blade 130C to be suspended is released (an example of the "release step"). Specifically, as shown in FIG. 5, the suspension wire 13 of the chain block 11 inserted into the insertion hole 3A of the suspension plate 3 of the suspension jig 1 is removed. As a result, the load of the blade 130C is supported only by the chill climber 21.

[3.6.工程6]
次に、図4に示すように、チルクライマー21により吊り下ろし対象であるブレード130Cを地上に吊り下ろす(「吊り下ろし工程」の一例)。
[3.6. Step 6]
Next, as shown in FIG. 4, the blade 130C to be suspended is suspended above the ground by the chill climber 21 (an example of the “hanging step”).

上述したように、チェーンブロック11からチルクライマー21にブレード130Cの吊り替えを行った後は、チルクライマー21のワイヤーを地上に達する長さにしておけば、チルクライマー21だけで地上までブレード130Cを降ろすことができる。なお、工程6では、チルクライマー21によりブレード130Cをクレーンが届く高さまで吊り下ろすことができれば、図6(A)、図6(B)、図7に示すように、下降の途中でチルクライマー21からクレーン30に吊り替えを行い、クレーン30で地上まで吊り下ろすこととしてもよい。このとき、クレーン30のアーム30Aの先端のフックに取り付けられた吊ワイヤー31は、空いている吊板3の挿通孔3Aに通して固定する。そして、クレーン30のアーム30Aで荷重を受けられるようになったら、チルクライマー21の吊ワイヤー23を吊ピース4の挿通孔4Aから取り外して荷重をチルクライマー21からクレーン30へと吊り替える。クレーン30への吊り替えはゴンドラ201上で行う。これにより、ブレード130Cの撤去に要する時間を短縮できる。ブレード130Cは降ろしながら横に寝かせることができるが、このとき地上で切断しながら降ろすこともできる。 As described above, after the blade 130C is suspended from the chain block 11 to the chill climber 21, if the wire of the chill climber 21 is set to a length that reaches the ground, the blade 130C can be moved to the ground only by the chill climber 21. Can be taken down. In step 6, if the blade 130C can be suspended to a height that the crane can reach by the chill climber 21, the chill climber 21 is in the middle of descending as shown in FIGS. 6 (A), 6 (B), and 7 (B). It may be possible to suspend the crane 30 from the above and then suspend the crane 30 to the ground. At this time, the suspension wire 31 attached to the hook at the tip of the arm 30A of the crane 30 is passed through the insertion hole 3A of the vacant suspension plate 3 and fixed. Then, when the load can be received by the arm 30A of the crane 30, the suspension wire 23 of the chill climber 21 is removed from the insertion hole 4A of the suspension piece 4, and the load is transferred from the chill climber 21 to the crane 30. The transfer to the crane 30 is performed on the gondola 201. As a result, the time required for removing the blade 130C can be shortened. The blade 130C can be laid down while being lowered, but at this time, it can also be lowered while being cut on the ground.

以上説明したように、本実施形態の風車100のハブ140に取り付けられたブレード130Cを取り外して吊り下ろすブレード130Cの取り外し方法は、ハブ140を回転させて、ブレード130C(「吊り下ろし対象であるブレード」の一例)の先端を下方に向ける工程1(「回転工程」の一例)と、ブレード130C以外のブレード130A、130Bにチェーンブロック11(「第1吊り器具」の一例)を取り付け、チェーンブロック11とブレード130Cを接続する工程2(「第1接続工程」の一例)と、チェーンブロック11とブレード130Cが接続された状態において、ハブ140からブレード130Cを取り外す工程3(「取り外し工程」の一例)と、チェーンブロック11とブレード130Cが接続された状態において、ハブ140の内部にチルクライマー21(「第2吊り器具」の一例)を設置し、チルクライマー21とブレード130Cを接続する工程4(「第2接続工程」の一例)と、チェーンブロック11とブレード130Cの接続を解除する工程5(「解除工程」の一例)と、チルクライマー21によりブレード130Cを吊り下ろす工程6(「吊り下ろし工程」の一例)と、を含む。 As described above, the method of removing the blade 130C for removing and suspending the blade 130C attached to the hub 140 of the wind turbine 100 of the present embodiment is to rotate the hub 140 and perform the blade 130C (“blade to be suspended”). The chain block 11 (an example of the "first suspension device") is attached to the blades 130A and 130B other than the blade 130C and the step 1 (an example of the "rotation process") in which the tip of the "1st suspension device" is directed downward. Step 2 for connecting the blade 130C and the blade 130C (an example of the "first connection step"), and a step 3 for removing the blade 130C from the hub 140 (an example of the "removal step") while the chain block 11 and the blade 130C are connected. In a state where the chain block 11 and the blade 130C are connected, a chill climber 21 (an example of a "second suspension device") is installed inside the hub 140, and a step 4 of connecting the chill climber 21 and the blade 130C ("" An example of the "second connection step"), a step 5 of disconnecting the chain block 11 and the blade 130C (an example of the "release step"), and a step 6 of suspending the blade 130C by the chill climber 21 ("suspension step"). An example)) and.

したがって、本実施形態のブレード130Cの取り外し方法によれば、ブレード130A、130Bに取り付けたチェーンブロック11と、ハブ140の内部に取り付けたチルクライマー21によりブレード130Cを、吊り替えを行いながら吊り下ろすことができ、クレーンが届かないような大型の風車100のブレード130Cであっても安全且つ迅速に取り外すことができる。 Therefore, according to the method for removing the blade 130C of the present embodiment, the blade 130C is suspended while being replaced by the chain block 11 attached to the blades 130A and 130B and the chill climber 21 attached to the inside of the hub 140. Even the blade 130C of a large wind turbine 100 that the crane cannot reach can be safely and quickly removed.

また、本実施形態のブレード130Cの取り外し方法では、工程2においてブレード130Cのフランジ131(「ブレードの一部」の一例)を下方から支持する吊治具1に対してチェーンブロック11を接続することにより、チェーンブロック11とブレード130Cを間接的に接続し、工程4において、吊治具1に対してチルクライマー21を接続することにより、チルクライマー21とブレード130Cを間接的に接続する。これにより、ブレード130Cそのものにチェーンブロック11やチルクライマー21を接続するための部分を予め形成しておいたり、取り外し時に形成する必要がない。 Further, in the method of removing the blade 130C of the present embodiment, the chain block 11 is connected to the hanging jig 1 that supports the flange 131 of the blade 130C (an example of "a part of the blade") from below in step 2. Thereby, the chain block 11 and the blade 130C are indirectly connected, and in the step 4, the chill climber 21 and the blade 130C are indirectly connected by connecting the chill climber 21 to the suspension jig 1. As a result, it is not necessary to preliminarily form a portion for connecting the chain block 11 or the chill climber 21 to the blade 130C itself, or to form the portion at the time of removal.

なお、上記実施形態では、図3に示したように、チェーンブロック取付ワイヤー12によりチェーンブロック11を吊り下ろし対象のブレード130C以外のブレード130A、130Bに取り付けることとしたが、例えば、ブレード130Cを吊り下ろした後にブレード130Bを吊り下ろす場合にはブレード130Cが存在しないためチェーンブロック11を取り付けることができない。そこで、チェーンブロック11を取り付けるブレード130Cが存在しない場合には、ブレード130Cが取り付けてあったボルト孔を利用して吊り具(「取付け部材」の一例)を設置して、当該吊り具にチェーンブロック11を取り付けることとしてもよい。吊り具はチェーンブロック取付ワイヤー12を取り付けることができ、ブレード130の荷重を支えられる強度を有していればよく、例えば、ブレード130の根元部分だけからなる構造とすることができる。 In the above embodiment, as shown in FIG. 3, the chain block 11 is attached to the blades 130A and 130B other than the blade 130C to be suspended by the chain block attachment wire 12, but for example, the blade 130C is suspended. When the blade 130B is hung after being lowered, the chain block 11 cannot be attached because the blade 130C does not exist. Therefore, when the blade 130C to which the chain block 11 is attached does not exist, a hanger (an example of a "mounting member") is installed by using the bolt hole to which the blade 130C is attached, and the chain block is attached to the hanger. 11 may be attached. The hanger can be attached with the chain block mounting wire 12, and may have enough strength to support the load of the blade 130. For example, the hanger may have a structure consisting of only the root portion of the blade 130.

[4.ブレード130Cの取り付け方法]
上記実施形態ではブレード130を取り外す方法について説明したが逆手順で行うことにより、ハブ140にブレード130を取り付ける方法とすることができる。具体的には、風車100のブレード130を吊り上げて風車100のハブ140に取り付けるブレード130の取り付け方法は、以下の工程を含む。
[4. How to install the blade 130C]
In the above embodiment, the method of removing the blade 130 has been described, but the method of attaching the blade 130 to the hub 140 can be obtained by performing the procedure in the reverse procedure. Specifically, the method of attaching the blade 130 for lifting the blade 130 of the wind turbine 100 and attaching it to the hub 140 of the wind turbine 100 includes the following steps.

[4.1.工程1]
工程1(「第1工程」の一例)では、取り付け対象であるブレード130C以外のブレード130A、130Bにチェーンブロック11(「第1吊り器具」の一例)を取り付ける。なお、事前にハブ140及びブレード130A、130Bを回転させて、ハブ140の取り付け位置を下方(鉛直方向下向き)に向けておくこととする。
[4.1. Step 1]
In step 1 (an example of the "first step"), the chain block 11 (an example of the "first suspension device") is attached to the blades 130A and 130B other than the blade 130C to be attached. The hub 140 and the blades 130A and 130B are rotated in advance so that the mounting position of the hub 140 is directed downward (vertically downward).

[4.2.工程2]
工程2(「第2工程」の一例)では、ハブ140の内部にチルクライマー21(「第2吊り器具」の一例)を設置し、チルクライマー21とブレード130Cを接続する。
[4.2. Step 2]
In step 2 (an example of the "second step"), a chill climber 21 (an example of the "second suspension device") is installed inside the hub 140, and the chill climber 21 and the blade 130C are connected to each other.

[4.3.工程3]
工程3(「第3工程」の一例)では、チルクライマー21によりブレード130Cを吊り上げる。
[4.3. Step 3]
In step 3 (an example of the "third step"), the blade 130C is lifted by the chill climber 21.

[4.4.工程4]
工程4(「第4工程」の一例)では、チルクライマー21により吊り上げられたブレード130Cと、チェーンブロック11を接続する。
[4.4. Step 4]
In step 4 (an example of the "fourth step"), the blade 130C lifted by the chill climber 21 and the chain block 11 are connected.

[4.5.工程5]
工程5(「第5工程」の一例)では、チェーンブロック11とブレード130Cが接続された状態において、チルクライマー21とブレード130Cの接続を解除する。
[4.5. Step 5]
In step 5 (an example of the "fifth step"), the connection between the chill climber 21 and the blade 130C is released while the chain block 11 and the blade 130C are connected.

[4.6.工程6]
工程6(「第6工程」の一例)では、チェーンブロック11によりブレード130Cをハブ140の位置まで吊り上げて、ハブ140にブレード130Cを取り付ける。
[4.6. Step 6]
In step 6 (an example of the “sixth step”), the blade 130C is lifted to the position of the hub 140 by the chain block 11, and the blade 130C is attached to the hub 140.

当該ブレード130の取り付け方法によれば、風力発電設備建設やブレード130の交換の大幅修繕を従来の方法よりも安全に且つ安価に行うことができる。また、吊り上げ中のブレード130Cは多点のチルクライマー21により吊り上げているため、強風時の吊り荷の回転を抑制することができる。更に、ブレード130Cとハブ140とのフランジ接続も吊治具1をブレード130Cに取り付ける際に穴振りを合わせておくことで容易に接続することができる。 According to the method of attaching the blade 130, construction of a wind power generation facility and major repair of replacement of the blade 130 can be performed safely and inexpensively as compared with the conventional method. Further, since the blade 130C being lifted is lifted by a multi-point chill climber 21, the rotation of the suspended load in a strong wind can be suppressed. Further, the flange connection between the blade 130C and the hub 140 can be easily connected by adjusting the hole swing when the suspension jig 1 is attached to the blade 130C.

なお、上述したブレード130Cの取り外し方法及びブレード130Cの取り付け方法は、陸上風力発電用の風車及び洋上風力発電用の風車のどちらにも採用することができる。 The above-mentioned method of removing the blade 130C and the method of attaching the blade 130C can be adopted for both a wind turbine for onshore wind power generation and a wind turbine for offshore wind power generation.

1 吊治具
2 吊治具本体
2A、2B 本体部材
3 吊板
3A 挿通孔
4 吊ピース
4A 挿通孔
11 チェーンブロック
12 チェーンブロック取付ワイヤー
13 吊ワイヤー
14 治具受け具
21 チルクライマー
22 チルクライマー取付ワイヤー
23 吊ワイヤー
30 クレーン
30A アーム
31 吊りワイヤー
100 風車
110 タワー
111(111A、111B、111C) タワー部材
120 ナセル
130(130A、130B、130C) ブレード
131 フランジ
140 ハブ
201 ゴンドラ
202 ゴンドラ用ワイヤー

1 Hanging jig 2 Hanging jig main body 2A, 2B Main body member 3 Hanging plate 3A Insertion hole 4 Hanging piece 4A Insertion hole 11 Chain block 12 Chain block mounting wire 13 Hanging wire 14 Jig receiver 21 Chill climber 22 Chill climber mounting wire 23 Suspended wire 30 Crane 30A Arm 31 Suspended wire 100 Windmill 110 Tower 111 (111A, 111B, 111C) Tower member 120 Nacelle 130 (130A, 130B, 130C) Blade 131 Flange 140 Hub 201 Gondola 202 Gondola wire

Claims (6)

風車のハブに取り付けられたブレードを取り外して吊り下ろすブレードの取り外し方法であって、
前記ハブを回転させて、吊り下ろし対象である前記ブレードの先端を下方に向ける回転工程と、
前記吊り下ろし対象である前記ブレード以外のブレードに第1吊り器具を取り付け、前記第1吊り器具と前記吊り下ろし対象であり、前記先端を下方に向けた前記ブレードの一部を下方から支持する吊治具を接続する第1接続工程と、
前記第1吊り器具と前記吊治具が接続された状態において、前記ハブから前記吊り下ろし対象である前記ブレードを取り外す取り外し工程と、
前記第1吊り器具と前記吊治具が接続された状態において、前記ハブの内部に第2吊り器具を設置し、前記第2吊り器具と、前記第1吊り器具が接続されている前記吊治具を接続する第2接続工程と、
前記第2吊り器具と前記吊治具が接続された状態において、前記第1吊り器具と前記吊治具の接続を解除する解除工程と、
前記吊治具を介して前記第2吊り器具により前記吊り下ろし対象である前記ブレードを吊り下ろす吊り下ろし工程と、
を含むことを特徴とするブレードの取り外し方法。
It is a method of removing the blade attached to the hub of the wind turbine and hanging it.
A rotation process in which the hub is rotated so that the tip of the blade to be suspended is directed downward.
A first hanging device is attached to a blade other than the blade that is the hanging target, and the first hanging device and a part of the blade that is the hanging target and whose tip is directed downward are supported from below. The first connection process for connecting the hanging jig to be used, and
A removal step of removing the blade to be suspended from the hub while the first suspension device and the suspension jig are connected.
In a state where the first hanging device and the hanging jig are connected , the second hanging device is installed inside the hub, and the hanging device to which the second hanging device and the first hanging device are connected is connected . The second connection process for connecting the tools and
A release step of disconnecting the first suspension device and the suspension jig while the second suspension device and the suspension jig are connected .
A hanging step of hanging the blade to be hung by the second hanging device via the hanging jig, and a hanging step.
How to remove the blade, characterized by including.
請求項1に記載のブレードの取り外し方法であって、 The method for removing a blade according to claim 1.
前記吊治具は、 The hanging jig is
前記第1吊り器具が取り付けられる第1取付部と、 The first mounting portion to which the first hanging device is mounted and
前記第2吊り器具が取り付けられる第2取付部と、 The second mounting part to which the second hanging device is mounted and
前記吊り下ろし対象である前記ブレードの一部に、前記ブレードの先端を下向きにした場合における下方から当接する当接部と、 A contact portion that abuts from below on a part of the blade to be suspended from below when the tip of the blade is directed downward.
を有し、 Have,
前記第1接続工程では、前記第1吊り器具を前記第1取付部に取り付け、 In the first connection step, the first suspension device is attached to the first mounting portion.
前記第2接続工程では、前記第2吊り器具を前記第2取付部に取り付け、 In the second connection step, the second suspension device is attached to the second attachment portion.
前記解除工程では、前記第1取付部から前記第1吊り器具を取り外すことを特徴とするブレードの取り外し方法。 The method for removing a blade, which comprises removing the first suspension device from the first mounting portion in the release step.
請求項2に記載のブレードの取り外し方法であって、 The method for removing the blade according to claim 2.
前記吊治具は複数の本体部材からなるリング状の吊治具本体を有し、 The hanging jig has a ring-shaped hanging jig main body composed of a plurality of main body members.
前記吊治具本体が前記当接部を有し、 The hanging jig main body has the contact portion, and the hanging jig main body has the contact portion.
前記第1接続工程では、 In the first connection step,
前記吊り下ろし対象である前記ブレードを前記リング状の内側に挟み込むように前記複数の本体部材を接合し、 The plurality of main body members are joined so as to sandwich the blade, which is the object to be suspended, inside the ring shape.
前記当接部を、前記ブレードにおける当該ブレードを前記ハブに取り付けるためのフランジに、前記ブレードの先端を下向きにした場合における下方から当接させることを特徴とするブレードの取り外し方法。 A method for removing a blade, wherein the contact portion is brought into contact with a flange of the blade for attaching the blade to the hub from below when the tip of the blade is directed downward.
請求項1乃至3の何れか一項に記載のブレードの取り外し方法であって、
前記第1吊り器具を取り付ける前記ブレードが取り外し済みの場合に、当該取り外し済みのブレードが取り付けられていた位置に、前記第1吊り器具を取り付けるための取付け部材を取り付ける取り付け工程を含み、
前記第1接続工程では、前記第1吊り器具を取り付ける前記ブレードが取り外し済みの場合に、前記取付け部材に前記第1吊り器具を取り付けることを特徴とするブレードの取り外し方法。
The method for removing a blade according to any one of claims 1 to 3 .
The attachment step of attaching the attachment member for attaching the first suspension device to the position where the removed blade was attached when the blade for attaching the first suspension device has been removed is included.
In the first connection step, a method for removing a blade, which comprises attaching the first suspending device to the mounting member when the blade to which the first suspending device is attached has already been removed.
請求項1乃至4の何れか一項に記載のブレードの取り外し方法に用いられる吊治具。 A hanging jig used in the method for removing a blade according to any one of claims 1 to 4 . 風車のブレードを吊り上げて前記風車のハブに取り付けるブレードの取り付け方法であって、
取り付け対象である前記ブレード以外のブレードに第1吊り器具を取り付ける第1工程と、
前記ハブの内部に第2吊り器具を設置し、前記第2吊り器具と前記取り付け対象であり、先端を下方に向けた前記ブレードの一部を下方から支持する吊治具を接続する第2工程と、
前記吊治具を介して前記第2吊り器具により前記取り付け対象である前記ブレードを吊り上げる第3工程と、
前記第2吊り器具と接続されている前記吊治具と、前記第1吊り器具を接続する第4工程と、
前記第1吊り器具と前記吊治具が接続された状態において、前記第2吊り器具と前記吊治具の接続を解除する第5工程と、
前記吊治具を介して前記第1吊り器具により前記取り付け対象である前記ブレードを前記ハブの位置まで吊り上げて、前記ハブに前記取り付け対象である前記ブレードを取り付ける第6工程と、
を含むことを特徴とするブレードの取り付け方法。
It is a method of attaching the blade that lifts the blade of the wind turbine and attaches it to the hub of the wind turbine.
The first step of attaching the first suspension device to a blade other than the blade to be attached, and
A second suspension device is installed inside the hub, and the second suspension device is connected to the suspension jig that is the attachment target and supports a part of the blade with the tip directed downward from below . 2 steps and
A third step of lifting the blade to be attached by the second hanging device via the hanging jig, and a third step.
The hanging jig connected to the second hanging device, the fourth step of connecting the first hanging device, and the like.
In the state where the first hanging device and the hanging jig are connected, the fifth step of disconnecting the second hanging device and the hanging jig and the fifth step.
The sixth step of lifting the blade to be attached to the position of the hub by the first suspending tool via the hanging jig and attaching the blade to be attached to the hub.
A method of mounting a blade, characterized by including.
JP2020214130A 2020-12-23 2020-12-23 How to remove the blade, how to attach the blade and hanging jig Active JP7063977B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020214130A JP7063977B1 (en) 2020-12-23 2020-12-23 How to remove the blade, how to attach the blade and hanging jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020214130A JP7063977B1 (en) 2020-12-23 2020-12-23 How to remove the blade, how to attach the blade and hanging jig

Publications (2)

Publication Number Publication Date
JP7063977B1 true JP7063977B1 (en) 2022-05-09
JP2022100013A JP2022100013A (en) 2022-07-05

Family

ID=81534496

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020214130A Active JP7063977B1 (en) 2020-12-23 2020-12-23 How to remove the blade, how to attach the blade and hanging jig

Country Status (1)

Country Link
JP (1) JP7063977B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004293455A (en) 2003-03-27 2004-10-21 Ebara Corp Windmill with blade to be easily maintained and wind power generating equipment
JP2014076824A (en) 2012-10-10 2014-05-01 Success Planning Co Ltd Container
US20160327016A1 (en) 2015-05-07 2016-11-10 General Electric Company Up-tower suspension system for a wind turbine rotor blade
JP2017515048A (en) 2014-04-30 2017-06-08 ウィンドケア インディア プライベート リミテッドWindcare India Pvt Ltd Wind turbine blade disassembly and re-installation method and system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DK2369174T3 (en) * 2010-03-09 2013-03-11 Lm Glasfiber As A method for crane-free installation or removal of a wind turbine blade on a wind turbine
JP5863990B2 (en) * 2012-11-16 2016-02-17 三菱重工業株式会社 Windmill blade gripping mechanism and wind turbine generator assembly method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004293455A (en) 2003-03-27 2004-10-21 Ebara Corp Windmill with blade to be easily maintained and wind power generating equipment
JP2014076824A (en) 2012-10-10 2014-05-01 Success Planning Co Ltd Container
JP2017515048A (en) 2014-04-30 2017-06-08 ウィンドケア インディア プライベート リミテッドWindcare India Pvt Ltd Wind turbine blade disassembly and re-installation method and system
US20160327016A1 (en) 2015-05-07 2016-11-10 General Electric Company Up-tower suspension system for a wind turbine rotor blade

Also Published As

Publication number Publication date
JP2022100013A (en) 2022-07-05

Similar Documents

Publication Publication Date Title
EP2224126A2 (en) Lowering and raising a single wind turbine rotor blade from six-o'clock position
KR101671596B1 (en) Method and device for mounting a rotor of a wind energy plant
EP3431751B1 (en) System and method for suspending a rotor blade of a wind turbine uptower
EP3091223B1 (en) Up-tower suspension system for a wind turbine rotor blade
WO2011064659A2 (en) Wind turbine blade lowering apparatus
JP2006152862A (en) Method of mounting and dismounting blade in wind power generation plant
JP3918905B2 (en) How to install a windmill generator
JP2023551825A (en) Device and method for attaching wind turbine components to a wind turbine tower
JP7063977B1 (en) How to remove the blade, how to attach the blade and hanging jig
US10641042B2 (en) External ladder assembly for wind turbine nacelle
CN103008972A (en) Blade replacing and installing method of wind generating set
CN108533461B (en) Self-lifting hoisting equipment for wind turbine generator and working method thereof
JP5663249B2 (en) Blade lifting method and blade lifting jig of wind power generator
CN112249874B (en) Split type hoisting method for onshore wind generating set
EP3475557B1 (en) A wind turbine comprising a parking structure for carrying the rotor during removal of the nacelle
CN110914532B (en) Lifting system for torque bearing of wind driven generator
CN205916899U (en) Take suspender tightening mechanism's fan blade hoist support
CN219412790U (en) Wind driven generator blade replacement equipment based on multiple pulley blocks
CN219509756U (en) Wind driven generator blade replacement equipment based on multiple guide units
CN102251933B (en) Method for avoiding stall caused by strong wind in vertical axis wind turbine
EP2532879A1 (en) Assembly and/or maintenance of a wind turbine
CN201952151U (en) Blade fixing lifting tool for overhauling fan blades
CN117049408B (en) Tower crane system for wind generating set
CN109484974B (en) Method for mounting axial-flow propeller turbine
US20220195989A1 (en) Blade lifting assembly for mounting a blade to or unmounting a blade from a rotor hub of a wind turbine

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20201223

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20211102

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20211206

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220419

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220421

R150 Certificate of patent or registration of utility model

Ref document number: 7063977

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150