JP7033405B2 - Installation structure of wall material mounting members - Google Patents

Installation structure of wall material mounting members Download PDF

Info

Publication number
JP7033405B2
JP7033405B2 JP2017143223A JP2017143223A JP7033405B2 JP 7033405 B2 JP7033405 B2 JP 7033405B2 JP 2017143223 A JP2017143223 A JP 2017143223A JP 2017143223 A JP2017143223 A JP 2017143223A JP 7033405 B2 JP7033405 B2 JP 7033405B2
Authority
JP
Japan
Prior art keywords
wall material
slab
base
exposed
mounting member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017143223A
Other languages
Japanese (ja)
Other versions
JP2019023413A (en
Inventor
真輝 加藤
慶 岩本
友規 山口
悟 駒井
学▲禎▼ 薛
杏奈 伊藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Corp
Original Assignee
Takenaka Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Corp filed Critical Takenaka Corp
Priority to JP2017143223A priority Critical patent/JP7033405B2/en
Publication of JP2019023413A publication Critical patent/JP2019023413A/en
Application granted granted Critical
Publication of JP7033405B2 publication Critical patent/JP7033405B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)
  • Joining Of Building Structures In Genera (AREA)

Description

本発明は、壁材取付用部材に関する。 The present invention relates to a member for mounting a wall material.

従来、ALCボードを設置する際には、固化したコンクリートスラブに孔を空けて、この孔に設置したALCボード取付用金具にALCボードを取付ける後付け工法が提案されている(例えば、特許文献1参照)。しかし、このような後付け工法ではコンクリートに孔を空けるので、スラブの強度が低下する可能性がある。この強度低下を防止するために、コンクリート打設前から予めALCボード取付用金具を設置しておく先付工法も提案されている。このような先付工法では、ALCボード取付用金具をスラブ筋に対して上方に突出するように溶接し、コンクリート打設後に、コンクリート上面に突出しているALCボード取付用金具に対してALCボードを設置していた。 Conventionally, when installing an ALC board, a retrofit method has been proposed in which a hole is made in a solidified concrete slab and the ALC board is attached to an ALC board mounting bracket installed in this hole (see, for example, Patent Document 1). ). However, in such a retrofit method, holes are made in the concrete, which may reduce the strength of the slab. In order to prevent this decrease in strength, a pre-attached method in which ALC board mounting brackets are installed in advance before concrete is placed has also been proposed. In such a pre-attachment method, the ALC board mounting bracket is welded so as to protrude upward with respect to the slab bar, and after the concrete is placed, the ALC board is attached to the ALC board mounting bracket protruding above the concrete upper surface. It was installed.

特開2005-200984号公報Japanese Unexamined Patent Publication No. 2005-200984

しかしながら、このような方法では、スラブ筋を配筋するまでALCボード取付用金具を設置することができず、施工手順がスラブ筋の配筋後に限定されてしまっていた。また、スラブ筋に複数のALCボード取付用金具を溶接する必要があるため、溶接に手間や費用を要すると共に、スラブ筋上での溶接作業となるため施工性低下及び施工時の危険性上昇の可能性があった。そこで、施工タイミングがスラブ筋の配筋後に限定されることなく、また、溶接に要する手間や費用を削減でき、さらに、施工性向上及び危険性低下が可能なALCボード取付用金具が要望されていた。 However, in such a method, the metal fittings for mounting the ALC board cannot be installed until the slab reinforcements are arranged, and the construction procedure is limited after the slab reinforcements are arranged. In addition, since it is necessary to weld a plurality of ALC board mounting brackets to the slab reinforcement, it takes time and cost to weld, and since the welding work is performed on the slab reinforcement, the workability is lowered and the risk at the time of construction is increased. There was a possibility. Therefore, there is a demand for ALC board mounting metal fittings which can reduce the labor and cost required for welding without limiting the construction timing after arranging the slab reinforcements, and can improve the workability and reduce the risk. rice field.

本発明は上記事実に鑑み、施工タイミングの自由度を向上させることが可能となり、また、施工の手間や費用を削減することが可能となり、さらに、施工作業の危険性を低下させることが可能となる壁材取付用部材を提供することを目的とする。 In view of the above facts, the present invention makes it possible to improve the degree of freedom in construction timing, reduce the labor and cost of construction, and further reduce the risk of construction work. It is an object of the present invention to provide a member for mounting a wall material.

上述した課題を解決し、目的を達成するために、請求項1に記載の壁材取付用部材の設置構造は、スラブ筋よりも下方に位置する設置土台に対して設置可能な土台部と、前記土台部に対して突出するように取り付け可能な突出部と、前記土台部と前記突出部とを相互に固定するナット部と、を備えた、壁材取付用部材の設置構造であって、前記突出部は、前記スラブ筋を覆うスラブコンクリートの上方の空間側に露出する露出部であって、壁材を取付可能な前記露出部と、前記露出部から突出しているボルト部であって、前記土台部及び前記ナット部の両方に対して螺合する前記ボルト部と、を有しており、前記露出部と前記土台部との距離を調節可能であり、前記ナット部は、前記土台部及び前記突出部とは別の部品であり、前記ナット部は、前記土台部と前記露出部との間に設けられており、前記ナット部前記土台部における前記露出部側の端部に押し付けられることにより、前記土台部と前記突出部とが相互に固定され、前記露出部は、平板であり、前記露出部は、前記ボルト部における前記土台部と螺合する側の端部とは反対側の先端部に設けられている。 In order to solve the above-mentioned problems and achieve the object, the installation structure of the wall material mounting member according to claim 1 includes a base portion that can be installed on an installation base located below the slab bolt. An installation structure for a wall material mounting member , comprising a projecting portion that can be mounted so as to project from the base portion and a nut portion that mutually fixes the base portion and the projecting portion . The protruding portion is an exposed portion exposed on the space side above the slab concrete covering the slab bar, the exposed portion to which a wall material can be attached, and a bolt portion protruding from the exposed portion. It has the bolt portion screwed to both the base portion and the nut portion, and the distance between the exposed portion and the base portion can be adjusted, and the nut portion is the base portion. And the protruding portion, the nut portion is provided between the base portion and the exposed portion, and the nut portion is pressed against the end portion of the base portion on the exposed portion side. By doing so, the base portion and the projecting portion are mutually fixed, the exposed portion is a flat plate, and the exposed portion is opposite to the end portion of the bolt portion on the side screwed with the base portion. It is provided at the tip of the side.

請求項1に記載の壁材取付用部材の設置構造によれば、土台部を設置土台に対して設置できるので、スラブ筋を施工済であるか否かに関わらず壁材取付用部材を施工することができ、施工タイミングの自由度を向上させることが可能となる。特に、スラブ筋が施工されていない状態で壁材取付用部材の施工を行うことができるので、施工スペースを広くとることができ、施工作業の危険性を低下させることが可能となる。また、スラブ筋が邪魔になることを防止できるので、施工の手間を削減することが可能となる。また、施工の手間を削減することができるので、施工作業の作業時間を短縮することができ、施工費用を削減することが可能となる。
また、スラブコンクリートと露出部との相互間の高さ関係を調整することができるので、スラブコンクリートと露出部との相互間の高さを容易に一致させることができ、壁材取付用部材の施工性を一層向上させることが可能となる。
According to the installation structure of the wall material mounting member according to claim 1, since the base portion can be installed on the installation base, the wall material mounting member is installed regardless of whether or not the slab bar has been installed. It is possible to improve the degree of freedom in construction timing. In particular, since the wall material mounting member can be constructed without the slab reinforcement being constructed, the construction space can be widened and the risk of the construction work can be reduced. In addition, since the slab muscles can be prevented from becoming an obstacle, it is possible to reduce the labor of construction. In addition, since the labor of construction can be reduced, the work time of construction work can be shortened, and the construction cost can be reduced.
Further, since the height relationship between the slab concrete and the exposed portion can be adjusted, the height between the slab concrete and the exposed portion can be easily matched, and the wall material mounting member can be used. It is possible to further improve workability.

本実施の形態に係る壁材取付用部材を示す分解斜視図である。It is an exploded perspective view which shows the wall material mounting member which concerns on this embodiment. 壁材取付用部材が設けられている状態のスラブの断面図である。It is sectional drawing of the slab in the state which the member for attaching a wall material is provided. 壁材取付用部材が設けられている状態のスラブの平面図である。It is a top view of the slab in the state where the wall material mounting member is provided. 図1の壁材取付用部材の拡大図である。It is an enlarged view of the wall material mounting member of FIG.

以下に添付図面を参照して、この発明に係る壁材取付用部材の実施の形態を詳細に説明する。まず、〔I〕実施の形態の基本的概念を説明した後、〔II〕実施の形態の具体的内容について説明し、最後に、〔III〕実施の形態に対する変形例について説明する。ただし、実施の形態によって本発明が限定されるものではない。 Hereinafter, embodiments of the wall material mounting member according to the present invention will be described in detail with reference to the accompanying drawings. First, [I] the basic concept of the embodiment will be described, then [II] the specific contents of the embodiment will be described, and finally, [III] a modification to the embodiment will be described. However, the present invention is not limited to the embodiments.

〔I〕実施の形態の基本的概念
まず、実施の形態の基本的概念について説明する。実施の形態は、概略的に、壁材取付用部材に関する。
[I] Basic concept of the embodiment First, the basic concept of the embodiment will be described. Embodiments typically relate to wall material mounting members.

ここで、「壁材取付用部材」とは、壁材を取り付けるための取付手段であり、具体的には、壁材を建物のスラブに取り付ける場合に用いられるものであり、例えば、土台部と、突出部とを備えるものである。 Here, the "wall material mounting member" is a mounting means for mounting the wall material, and specifically, is used when the wall material is mounted on a slab of a building, for example, with a base portion. , With a protrusion.

なお、「壁材」とは、建物の壁を形成する部材であり、具体的には、スラブに取り付けられるものであり、例えば、ALC(Autoclaved Lightweight aerated Concrete:高温高圧蒸気養生された軽量気泡コンクリート)パネルにより形成された部材、又は、ALCパネル以外の任意の材料により形成された部材等を含む概念である。「スラブ」とは、建物の床構造を形成するものであり、例えば、少なくとも、設置土台、及びスラブ筋を備えるものであり、一例としては、これらの要素に加えてコンクリートを備えるコンクリートスラブ、あるいは、これらの要素に加えてコンクリート以外の任意の建材を備えるスラブ等を含む概念である。「設置土台」とは、スラブの土台となるものであり、例えば、任意の材料で形成されるデッキスラブ、あるいは、梁鉄骨等を含む概念である。「スラブ筋」とは、スラブに設けられる鉄筋であり、例えば、設置土台よりも上方において、設置土台に対して平行に設けられるもの等を含む概念である。 The "wall material" is a member that forms the wall of the building, and specifically, is attached to a slab. For example, ALC (Autoclaved Lightweight aerated Concrete): lightweight aerated concrete cured by high temperature and high pressure steam. ) It is a concept including a member formed of a panel, a member formed of an arbitrary material other than an ALC panel, and the like. A "slab" is one that forms the floor structure of a building, for example, one that has at least an installation base and a slab streak, for example, a concrete slab with concrete in addition to these elements, or , A concept that includes slabs and the like provided with any building material other than concrete in addition to these elements. The "installation base" is a base for a slab, and is a concept including, for example, a deck slab made of an arbitrary material, a beam steel frame, or the like. The "slab bar" is a reinforcing bar provided on the slab, and is a concept including, for example, a reinforcing bar provided above the installation base and parallel to the installation base.

また、「土台部」とは、壁材取付用部材の一部であり、具体的には、スラブ筋よりも下方に位置する設置土台に対して設置可能な部分である。 Further, the "base portion" is a part of the wall material mounting member, and specifically, is a portion that can be installed on an installation base located below the slab bar.

また、「突出部」とは、壁材取付用部材の一部であり、具体的には、土台部に対して上方に突出するように取り付け可能な部分であり、例えば、露出部を備えるものである。「露出部」とは、突出部の一部であり、具体的には、スラブ筋を覆うスラブコンクリートの上方の空間側に露出する部分であって、壁材を取付可能な部分である。 Further, the "protruding portion" is a part of the wall material mounting member, specifically, a portion that can be mounted so as to project upward with respect to the base portion, and is provided with, for example, an exposed portion. Is. The "exposed portion" is a part of the protruding portion, specifically, a portion exposed on the space side above the slab concrete covering the slab streaks, and a portion to which a wall material can be attached.

そして、以下に示す実施の形態では、「壁材」がALCパネルであり、「スラブ」がコンクリートスラブである場合について説明する。 Then, in the embodiment shown below, the case where the "wall material" is an ALC panel and the "slab" is a concrete slab will be described.

〔II〕実施の形態の具体的内容
次に、実施の形態の具体的内容について説明する。
[II] Specific contents of the embodiment Next, the specific contents of the embodiment will be described.

(構成)
まず、本実施の形態に係る壁材取付用部材の構成について説明する。図1は、本実施の形態に係る壁材取付用部材を示す分解斜視図であり、図2は、壁材取付用部材が設けられている状態のスラブの断面図であり、図3は、壁材取付用部材が設けられている状態のスラブの平面図である。
(Constitution)
First, the configuration of the wall material mounting member according to the present embodiment will be described. FIG. 1 is an exploded perspective view showing a wall material mounting member according to the present embodiment, FIG. 2 is a cross-sectional view of a slab in a state where the wall material mounting member is provided, and FIG. 3 is a cross-sectional view. It is a top view of the slab in a state where the wall material mounting member is provided.

なお、図1のスラブ200については、図2のコンクリート材23の打設前のスラブ200を図示している。また、図2は、図1のA‐A矢印が指し示す位置に対応する位置の断面図であるが、説明の便宜上、コンクリート材23のハッチングが省略されており、また、各要素が実線で示されている。なお、実際には、スラブ200に対して壁材取付用部材100が複数設けられるが、説明の便宜上、図1では壁材取付用部材100が1個図示されており、また、図2及び図3では壁材取付用部材100が2個図示されている。以下の説明では、壁材取付用部材100については、複数であることを明示する必要がある場合にのみ明示し、これ以外の場合には、1個の壁材取付用部材100について着目して説明する。 As for the slab 200 in FIG. 1, the slab 200 before placing the concrete material 23 in FIG. 2 is shown. Further, FIG. 2 is a cross-sectional view of a position corresponding to the position indicated by the arrow AA in FIG. 1, but for convenience of explanation, the hatching of the concrete material 23 is omitted, and each element is shown by a solid line. Has been done. In reality, a plurality of wall material mounting members 100 are provided for the slab 200, but for convenience of explanation, one wall material mounting member 100 is shown in FIG. 1, and FIGS. 2 and 2 and FIGS. In No. 3, two wall material mounting members 100 are shown. In the following description, the wall material mounting member 100 is specified only when it is necessary to clearly indicate that there are a plurality of wall material mounting members 100, and in other cases, attention is paid to one wall material mounting member 100. explain.

そして、以下では、スラブ200、壁材300、及び壁材固定具400について説明した後、壁材取付用部材100について説明する。 Then, in the following, the slab 200, the wall material 300, and the wall material fixture 400 will be described, and then the wall material mounting member 100 will be described.

(構成‐スラブ)
図2及び図3のスラブ200は、図1の壁材300が設けられる床構造である。このスラブ200の具体的な種類や構成は任意であり、例えば、壁材取付用部材100が設けられる点を除いて従来と同様に構成することができるので、概略のみ説明する。スラブ200は、例えば、設置土台21、スラブ筋22、及びコンクリート材23を備える。
(Composition-Slab)
The slab 200 of FIGS. 2 and 3 has a floor structure in which the wall material 300 of FIG. 1 is provided. The specific type and configuration of the slab 200 are arbitrary, and can be configured in the same manner as the conventional slab 200 except that the wall material mounting member 100 is provided, and only the outline will be described. The slab 200 includes, for example, an installation base 21, a slab bar 22, and a concrete material 23.

(構成‐スラブ‐設置土台)
設置土台21は、スラブ200の土台となるものであり、例えば、全体としてXY平面に沿って広がっているものであり、また、X方向において山部及び谷部を繰り返す段形状のものであり、また、金属製のものである。
(Composition-Slab-Installation base)
The installation base 21 is a base of the slab 200, and is, for example, one that extends along the XY plane as a whole, and has a stepped shape that repeats peaks and valleys in the X direction. It is also made of metal.

(構成‐スラブ‐スラブ筋)
スラブ筋22は、スラブ200を補強するものであり、例えば、設置土台21よりも上方(+Z方向)に設けられているものであり、また、相互に直交するように複数設けられているものであり、また、金属製のものである。
(Composition-Slab-Slab muscle)
The slab bar 22 reinforces the slab 200, for example, one provided above the installation base 21 (+ Z direction), and a plurality of slab bars 22 provided so as to be orthogonal to each other. Yes, and it is made of metal.

(構成‐スラブ‐コンクリート材)
コンクリート材23は、スラブ筋22を覆うスラブコンクリートであり、例えば、設置土台21よりも上方(+Z方向)に設けられているものであり、また、スラブ筋22の下方(-Z方向)から当該スラブ筋22の上方(+Z方向)にわたっているものであり、また、コンクリートを打設することにより形成されるものである。
(Composition-Slab-Concrete material)
The concrete material 23 is slab concrete that covers the slab bar 22, for example, is provided above the installation base 21 (+ Z direction), and is said from below the slab bar 22 (−Z direction). It extends above the slab bar 22 (in the + Z direction) and is formed by placing concrete.

(構成‐壁材)
図1の壁材300は、建物の壁を形成するものである。この壁材300の具体的な種類や構成は任意であり、例えば、取り付けられ方を除いて従来と同様に構成することができるが、例えば、矩形の形状のものであり、また、ALCパネルにより形成されたものである。
(Composition-Wall material)
The wall material 300 in FIG. 1 forms a wall of a building. The specific type and configuration of the wall material 300 is arbitrary, and can be configured in the same manner as the conventional one except for how it is attached, but for example, it has a rectangular shape, and an ALC panel is used. It was formed.

(構成‐壁材固定具)
図1の壁材固定具400は、壁材300をスラブ200に取り付けるためのものである。この壁材固定具400の具体的な種類や構成は任意であり、例えば、取り付けられ方を除いて従来と同様に構成することができるが、例えば、鉛直断面視L字型のものであり、また、金属製のものである。
(Composition-Wall material fixture)
The wall material fixture 400 of FIG. 1 is for attaching the wall material 300 to the slab 200. The specific type and configuration of the wall material fixture 400 is arbitrary, and can be configured in the same manner as the conventional one except for the mounting method, but is, for example, an L-shaped vertical cross-sectional view. It is also made of metal.

(構成‐壁材取付用部材)
図4は、図1の壁材取付用部材の拡大図である。図4の壁材取付用部材100は、壁材300をスラブ200に取り付けるためのものであり、具体的には、壁材固定具400を介して取り付けるためのものであり、例えば、土台部11、突出部12、及びナット部13を備える。
(Structure-Wall material mounting member)
FIG. 4 is an enlarged view of the wall material mounting member of FIG. The wall material mounting member 100 of FIG. 4 is for mounting the wall material 300 on the slab 200, specifically, for mounting via the wall material fixture 400, for example, the base portion 11. , A protrusion 12, and a nut 13.

(構成‐壁材取付用部材‐土台部)
土台部11は、スラブ筋22よりも下方(-Z方向)に位置する設置土台21に対して設置可能なものである。この土台部11の具体的な種類や構成は任意であり、例えば、金属製のものであり、一例としては、基部111、及び円筒部112を備える。
(Structure-Wall material mounting member-Base)
The base portion 11 can be installed on the installation base 21 located below the slab bar 22 (in the −Z direction). The specific type and configuration of the base portion 11 is arbitrary, for example, it is made of metal, and as an example, it includes a base portion 111 and a cylindrical portion 112.

(構成‐壁材取付用部材‐土台部‐基部)
基部111は、例えば、設置土台21に溶接される部分であり、円盤形状の部分である。
(Structure-Wall material mounting member-Base-Base)
The base 111 is, for example, a portion welded to the installation base 21 and is a disk-shaped portion.

(構成‐壁材取付用部材‐土台部‐円筒部)
円筒部112は、例えば、突出部12が取り付けられる部分であり、また、基部111の中央付近から高さ方向(Z方向)において上方(+Z方向)に突出してものであり、また、突出部12と螺合するネジ山が内面に形成されている螺合中空部112aを備えるものである。また、この円筒部112の長さは任意であるが、例えば、施工性向上の観点から、図2に示すように、設置土台21の上面からスラブ筋22までの距離よりも短く設定されている。
(Structure-Wall material mounting member-Base part-Cylindrical part)
The cylindrical portion 112 is, for example, a portion to which the protruding portion 12 is attached, and also projects upward (+ Z direction) in the height direction (Z direction) from the vicinity of the center of the base portion 111, and the protruding portion 12 It is provided with a screw hollow portion 112a in which a screw thread to be screwed with is formed on the inner surface. The length of the cylindrical portion 112 is arbitrary, but is set shorter than the distance from the upper surface of the installation base 21 to the slab bar 22 as shown in FIG. 2, for example, from the viewpoint of improving workability. ..

(構成‐壁材取付用部材‐突出部)
突出部12は、土台部11に対して上方(+Z方向)に突出するように取り付け可能な部分である。この突出部12の具体的な種類や構成は任意であり、例えば、金属製のものであり、一例としては、露出部121、及びボルト部122を備える。
(Structure-Wall material mounting member-Protruding part)
The protruding portion 12 is a portion that can be attached so as to project upward (+ Z direction) with respect to the base portion 11. The specific type and configuration of the protruding portion 12 are arbitrary, for example, those made of metal, and as an example, an exposed portion 121 and a bolt portion 122 are provided.

(構成‐壁材取付用部材‐突出部‐露出部)
露出部121は、スラブ筋22を覆うコンクリート材23の上方(+Z方向)の空間側に露出する部分であって、壁材300を取付可能な部分であり、具体的には、壁材固定具400を介して壁材300を取付可能な部分である。露出部121は、例えば、矩形形状の部分であり、また、XY平面に平行な平板である。
(Structure-Wall material mounting member-Protruding part-Exposed part)
The exposed portion 121 is a portion exposed on the space side above (+ Z direction) of the concrete material 23 covering the slab bar 22, and is a portion to which the wall material 300 can be attached. Specifically, the wall material fixing tool. It is a part to which the wall material 300 can be attached via the 400. The exposed portion 121 is, for example, a rectangular portion and is a flat plate parallel to the XY plane.

(構成‐壁材取付用部材‐突出部‐ボルト部)
ボルト部122は、例えば、土台部11に取り付けられる部分であり、また、露出部121の中央付近から高さ方向(Z方向)において下方(-Z方向)に突出してものであり、また、土台部11の円筒部112と螺合するネジ山、つまり、土台部11の円筒部112の螺合中空部112aのネジ山に対応するネジ山が形成されているものである。そして、特に、ボルト部122が円筒部112の螺合中空部112aと螺合するので、ボルト部122及び円筒部112を相互に回転させることにより、これらの各部が高さ方向(Z軸方向)において相対的に移動することになり、つまり、露出部121と土台部11との距離が調節可能となっている。また、このボルト部122の長さは任意であるが、例えば、突出部12を土台部11に取りつけた場合に露出部121の上面をコンクリート材23の上面に一致させ得るという観点から、比較的長く設定されている。
(Structure-Wall material mounting member-Protruding part-Bolt part)
The bolt portion 122 is, for example, a portion attached to the base portion 11, and also projects downward (-Z direction) in the height direction (Z direction) from the vicinity of the center of the exposed portion 121, and the base portion 122. A screw thread that is screwed with the cylindrical portion 112 of the portion 11, that is, a screw thread corresponding to the screw thread of the screwed hollow portion 112a of the cylindrical portion 112 of the base portion 11 is formed. In particular, since the bolt portion 122 is screwed with the screwed hollow portion 112a of the cylindrical portion 112, by rotating the bolt portion 122 and the cylindrical portion 112 with each other, each of these portions is in the height direction (Z-axis direction). That is, the distance between the exposed portion 121 and the base portion 11 can be adjusted. Further, the length of the bolt portion 122 is arbitrary, but it is relatively relatively possible to match the upper surface of the exposed portion 121 with the upper surface of the concrete material 23 when the protruding portion 12 is attached to the base portion 11. It has been set for a long time.

(構成‐壁材取付用部材‐ナット部)
ナット部13は、土台部11と突出部12とを相互に固定する固定手段である。このナット部13の具体的な種類や構成は任意であり、例えば、突出部12のボルト部122と螺合するネジ山、つまり、突出部12のボルト部122のネジ山に対応するネジ山が内面に形成されている螺合孔13aが形成されているものである。
(Structure-Wall material mounting member-Nut part)
The nut portion 13 is a fixing means for fixing the base portion 11 and the protruding portion 12 to each other. The specific type and configuration of the nut portion 13 is arbitrary, and for example, a screw thread that is screwed with the bolt portion 122 of the protruding portion 12, that is, a screw thread corresponding to the screw thread of the bolt portion 122 of the protruding portion 12 is provided. The screw hole 13a formed on the inner surface is formed.

(壁材の取り付け)
次に、このように構成される壁材取付用部材100を設けてスラブ200を形成し、この壁材取付用部材100を用いて壁材300をスラブ200に取り付ける手法について説明する。なお、実際には、壁材取付用部材100を複数設けて、この複数の壁材取付用部材100を用いて壁材300を取り付けることになるが、複数の壁材取付用部材100の具体的な設け方は相互に同様であるので、代表して1つの壁材取付用部材100の設け方について説明する。
(Installation of wall material)
Next, a method of forming the slab 200 by providing the wall material mounting member 100 configured as described above and mounting the wall material 300 to the slab 200 using the wall material mounting member 100 will be described. In reality, a plurality of wall material mounting members 100 are provided, and the wall material 300 is mounted using the plurality of wall material mounting members 100. Since the method of providing the same is the same as each other, a method of providing one wall material mounting member 100 will be described as a representative.

まず、建物の床構造となる位置に図2の設置土台21を構築し、壁材取付用部材100の土台部11を設置土台21に設置する。この設置土台21の設置手法は任意であるが、例えば、設置土台21の基部111を設置土台21の山部に溶接することにより固定して設置する。 First, the installation base 21 shown in FIG. 2 is constructed at a position that becomes the floor structure of the building, and the base portion 11 of the wall material mounting member 100 is installed on the installation base 21. The installation method of the installation base 21 is arbitrary, but for example, the base 111 of the installation base 21 is fixedly installed by welding to the mountain portion of the installation base 21.

次に、スラブ筋22を配筋する。具体的には任意であるが、例えば、設置土台21の円筒部112よりも僅かに上方(+Z方向)に配筋する。 Next, the slab muscle 22 is arranged. Specifically, although it is arbitrary, for example, reinforcement is arranged slightly above (+ Z direction) from the cylindrical portion 112 of the installation base 21.

次に、図1の突出部12にナット部13を設ける。具体的には任意であるが、例えば、ナット部13の螺合孔13aに突出部12のボルト部122を合わせた上で、ナット部13をボルト部122に対して回転させることにより、ナット部13をボルト部122の長手方向に沿って露出部121側に移動させて当該ボルト部122の中央付近にナット部13を螺合する。 Next, the nut portion 13 is provided on the protruding portion 12 of FIG. Specifically, although it is optional, for example, the nut portion is formed by aligning the bolt portion 122 of the protruding portion 12 with the screw hole 13a of the nut portion 13 and then rotating the nut portion 13 with respect to the bolt portion 122. 13 is moved toward the exposed portion 121 along the longitudinal direction of the bolt portion 122, and the nut portion 13 is screwed near the center of the bolt portion 122.

次に、図2の土台部11に突出部12を取り付ける。具体的には任意であるが、例えば、土台部11の円筒部112の螺合中空部112aに突出部12のボルト部122を合わせた上で、ボルト部122を土台部11の円筒部112に対して回転させることにより、突出部12を高さ方向(Z方向)において移動させて土台部11にボルト部122を螺合する。詳細には、前述したように、突出部12のボルト部122の外面のネジ山と土台部11の円筒部112の螺合中空部112aの内面のネジ山とが相互に対応しているので、ボルト部122の円筒部112に対する回転方向を変更することにより、突出部12を上方(+Z方向)又は下方(-Z方向)に移動させることが可能となっているが、この構成を利用して位置決めを行って螺合する。より詳細には、ボルト部122を円筒部112に対して回転させることにより、突出部12の露出部121の上面が、後に設けられるコンクリート材23の上面と一致する(つまり、各上面が同じ高さになる)ように位置決めを行って、土台部11に突出部12を螺合する。 Next, the protruding portion 12 is attached to the base portion 11 of FIG. Specifically, although it is arbitrary, for example, after aligning the bolt portion 122 of the projecting portion 12 with the screwed hollow portion 112a of the cylindrical portion 112 of the base portion 11, the bolt portion 122 is attached to the cylindrical portion 112 of the base portion 11. By rotating the protrusion 12 in the height direction (Z direction), the bolt portion 122 is screwed to the base portion 11. Specifically, as described above, the threads on the outer surface of the bolt portion 122 of the protruding portion 12 and the threads on the inner surface of the screwed hollow portion 112a of the cylindrical portion 112 of the base portion 11 correspond to each other. By changing the rotation direction of the bolt portion 122 with respect to the cylindrical portion 112, it is possible to move the protruding portion 12 upward (+ Z direction) or downward (-Z direction). Position and screw. More specifically, by rotating the bolt portion 122 with respect to the cylindrical portion 112, the upper surface of the exposed portion 121 of the protruding portion 12 coincides with the upper surface of the concrete material 23 provided later (that is, each upper surface has the same height). Positioning is performed so that the protrusion 12 is screwed into the base 11.

次に、土台部11に突出部12を固定する。具体的には任意であるが、例えば、突出部12のボルト部122に設けられているナット部13を回転させて露出部121の反対側に移動させて、土台部11の円筒部112の上端に押し付ける。この場合、突出部12が、当該突出部12のボルト部122に設けられているナット部13の土台部11の円筒部112に対する押付力によって固定されて回転不可能となり、土台部11に固定されることになる。 Next, the protruding portion 12 is fixed to the base portion 11. Specifically, although it is arbitrary, for example, the nut portion 13 provided on the bolt portion 122 of the protruding portion 12 is rotated and moved to the opposite side of the exposed portion 121 to move the upper end of the cylindrical portion 112 of the base portion 11. Press on. In this case, the protruding portion 12 is fixed by the pressing force of the base portion 11 of the base portion 11 provided on the bolt portion 122 of the protruding portion 12 against the cylindrical portion 112 to prevent rotation, and is fixed to the base portion 11. Will be.

次に、上述のようにして、複数の壁材取付用部材100を設けた上で、コンクリートを打設することにより、コンクリート材23を形成する。具体的には任意であるが、例えば、コンクリート材23の上面と壁材取付用部材100の突出部12の露出部121の上面とが一致する(つまり、各上面が同じ高さになる)ように、コンクリート材23を形成する。特に、図3に示すように、壁材取付用部材100の突出部12の露出部121の上面がコンクリート材23に覆われずに当該コンクリート材23の上方(+Z方向)の空間に露出するようにコンクリート材23を形成する。このようにして、図2及び図3に示すように、複数の壁材取付用部材100が設けられた状態のスラブ200を形成する。 Next, as described above, the concrete material 23 is formed by providing the plurality of wall material mounting members 100 and then placing concrete. Specifically, although it is optional, for example, the upper surface of the concrete material 23 and the upper surface of the exposed portion 121 of the protruding portion 12 of the wall material mounting member 100 are aligned (that is, the upper surfaces are at the same height). In addition, the concrete material 23 is formed. In particular, as shown in FIG. 3, the upper surface of the exposed portion 121 of the protruding portion 12 of the wall material mounting member 100 is not covered by the concrete material 23 but is exposed in the space above the concrete material 23 (+ Z direction). The concrete material 23 is formed on the surface. In this way, as shown in FIGS. 2 and 3, the slab 200 is formed in a state where a plurality of wall material mounting members 100 are provided.

次に、図1の壁材固定具400をスラブ200に固定する。具体的には任意であるが、例えば、1個の壁材固定具400を図2及び図3に示す複数の壁材取付用部材100の露出部121上に架けわたした上で、公知の手法(例えば、溶接、又はネジ止め等)で壁材固定具400を壁材取付用部材100の露出部121に固定する。 Next, the wall material fixture 400 of FIG. 1 is fixed to the slab 200. Specifically, although it is arbitrary, for example, a known method is performed after one wall material fixture 400 is hung on the exposed portions 121 of the plurality of wall material mounting members 100 shown in FIGS. 2 and 3. The wall material fixture 400 is fixed to the exposed portion 121 of the wall material mounting member 100 by (for example, welding, screwing, etc.).

次に、スラブ200に固定された壁材固定具400に壁材300を取り付ける。具体的には任意であるが、例えば、公知の手法(例えば、ネジ止め等)で壁材固定具400に壁材300を取り付ける。このようにして、壁材300がスラブ200に取り付けられることになる。これにて、壁材300の取り付けを終了する。 Next, the wall material 300 is attached to the wall material fixture 400 fixed to the slab 200. Specifically, although it is arbitrary, for example, the wall material 300 is attached to the wall material fixture 400 by a known method (for example, screwing or the like). In this way, the wall material 300 is attached to the slab 200. This completes the installation of the wall material 300.

(本実施の形態の効果)
本実施の形態によれば、土台部11を設置土台21に対して設置できるので、スラブ筋22を施工済であるか否かに関わらず壁材取付用部材100を施工することができ、施工タイミングの自由度を向上させることが可能となる。特に、スラブ筋22が施工されていない状態で壁材取付用部材100の施工を行うことができるので、施工スペースを広くとることができ、施工作業の危険性を低下させることが可能となる。また、スラブ筋22が邪魔になることを防止できるので、施工の手間を削減することが可能となる。また、施工の手間を削減することができるので、施工作業の作業時間を短縮することができ、施工費用を削減することが可能となる。
(Effect of this embodiment)
According to the present embodiment, since the base portion 11 can be installed on the installation base 21, the wall material mounting member 100 can be installed regardless of whether or not the slab bar 22 has been installed. It is possible to improve the degree of freedom in timing. In particular, since the wall material mounting member 100 can be constructed in a state where the slab bar 22 is not constructed, the construction space can be widened and the risk of the construction work can be reduced. Further, since the slab muscle 22 can be prevented from becoming an obstacle, it is possible to reduce the labor of construction. In addition, since the labor of construction can be reduced, the work time of construction work can be shortened, and the construction cost can be reduced.

また、コンクリート材23と露出部121との相互間の高さ関係を調整することができるので、コンクリート材23と露出部121との相互間の高さを容易に一致させることができ、壁材取付用部材100の施工性を一層向上させることが可能となる。 Further, since the height relationship between the concrete material 23 and the exposed portion 121 can be adjusted, the height between the concrete material 23 and the exposed portion 121 can be easily matched, and the wall material can be easily matched. It is possible to further improve the workability of the mounting member 100.

また、鉛直断面視L字型の壁材固定具400を用いて壁材300を取り付けることができるので、壁材300の取付強度を向上させることが可能となる。 Further, since the wall material 300 can be attached by using the wall material fixture 400 having an L-shaped vertical cross-sectional view, it is possible to improve the attachment strength of the wall material 300.

〔III〕実施の形態に対する変形例
以上、本発明に係る実施の形態について説明したが、本発明の具体的な構成及び手段は、特許請求の範囲に記載した各発明の技術的思想の範囲内において、任意に改変及び改良することができる。以下、このような変形例について説明する。
[III] Modifications to the Embodiment The embodiment of the present invention has been described above, but the specific configuration and means of the present invention are within the scope of the technical idea of each invention described in the claims. Can be arbitrarily modified and improved. Hereinafter, such a modification will be described.

(解決しようとする課題や発明の効果について)
まず、発明が解決しようとする課題や発明の効果は、上述の内容に限定されるものではなく、発明の実施環境や構成の細部に応じて異なる可能性があり、上述した課題の一部のみを解決したり、上述した効果の一部のみを奏したりすることがある。
(About the problem to be solved and the effect of the invention)
First, the problem to be solved by the invention and the effect of the invention are not limited to the above-mentioned contents, and may differ depending on the implementation environment and the details of the configuration of the invention, and only a part of the above-mentioned problems. May be resolved or only some of the above effects may be achieved.

(分散や統合について)
また、上述した各電気的構成要素は機能概念的なものであり、必ずしも物理的に図示の如く構成されていることを要しない。すなわち、各部の分散や統合の具体的形態は図示のものに限られず、その全部または一部を、各種の負荷や使用状況などに応じて、任意の単位で機能的または物理的に分散又は統合して構成できる。
(About distribution and integration)
Further, each of the above-mentioned electrical components is a functional concept and does not necessarily have to be physically configured as shown in the figure. That is, the specific form of dispersion or integration of each part is not limited to the one shown in the figure, and all or part of them may be functionally or physically dispersed or integrated in any unit according to various loads and usage conditions. Can be configured.

(形状、数値、構造、時系列について)
実施の形態や図面において例示した構成要素に関して、形状、数値、又は複数の構成要素の構造若しくは時系列の相互関係については、本発明の技術的思想の範囲内において、任意に改変及び改良することができる。
(About shape, numerical value, structure, time series)
With respect to the components exemplified in the embodiments and drawings, the shape, numerical value, or the mutual relationship of the structure or time series of the plurality of components shall be arbitrarily modified and improved within the scope of the technical idea of the present invention. Can be done.

(壁材取付用部材の施工について)
また、上記実施の形態においては、壁材取付用部材100の土台部11を設置土台21に設置した後に、スラブ筋22を配筋し、この後に、壁材取付用部材100の突出部12を土台部11に取り付ける場合について説明したが、これに限らず、壁材取付用部材100の土台部11、壁材取付用部材100の突出部12、及びスラブ筋22の施工順序を任意に入れ替えてもよい。例えば、土台部11を設置し、この土台部11に突出部12を取り付けた後に、スラブ筋22を配筋してもよい。また、例えば、スラブ筋22を配筋した後に、土台部11を設置し、この土台部11に突出部12を取り付けてもよい。
(About the construction of wall material mounting members)
Further, in the above embodiment, after the base portion 11 of the wall material mounting member 100 is installed on the installation base 21, the slab reinforcement 22 is arranged, and then the protruding portion 12 of the wall material mounting member 100 is provided. The case of attaching to the base portion 11 has been described, but the present invention is not limited to this, and the construction order of the base portion 11 of the wall material mounting member 100, the protruding portion 12 of the wall material mounting member 100, and the slab bar 22 is arbitrarily changed. May be good. For example, the slab reinforcement 22 may be arranged after the base portion 11 is installed and the protrusion portion 12 is attached to the base portion 11. Further, for example, after arranging the slab reinforcement 22, the base portion 11 may be installed, and the protrusion portion 12 may be attached to the base portion 11.

(土台部及び突出部について)
また、上記実施の形態の土台部11の円筒部112の構成と、突出部12のボルト部122の構成とを相互に入れ替えてもよい。つまり、土台部11側をボルト構造(つまり、ボルト部122の如き構造)にし、突出部12側を当該ボルト構造と螺合する円筒部構造(円筒部112の如き構造)にしてもよい。
(About the base and protrusions)
Further, the configuration of the cylindrical portion 112 of the base portion 11 of the above embodiment and the configuration of the bolt portion 122 of the protruding portion 12 may be interchanged with each other. That is, the base portion 11 side may have a bolt structure (that is, a structure such as the bolt portion 122), and the protruding portion 12 side may have a cylindrical portion structure (a structure such as the cylindrical portion 112) screwed with the bolt structure.

(露出部について)
また、上記実施の形態の露出部121を、矩形形状以外の任意の形状(例えば、円形、楕円形、三角形等)にしてもよい。
(About exposed parts)
Further, the exposed portion 121 of the above embodiment may have an arbitrary shape other than the rectangular shape (for example, a circle, an ellipse, a triangle, etc.).

(コンクリート材と露出部について)
また、上記実施の形態では、露出部121の上面とコンクリート材23の上面との高さを一致させる場合について説明したが、これに限らず、露出部121の上面とコンクリート材23の上面とを相互に異なる高さにしてもよい。つまり、露出部121の上面がコンクリート材23の上面よりも下方(-Z方向)に設けられるように施工したり、あるいは、上方(+Z方向)に設けられるように施工したりしてもよい。
(Concrete material and exposed parts)
Further, in the above embodiment, the case where the heights of the upper surface of the exposed portion 121 and the upper surface of the concrete material 23 are matched has been described, but the present invention is not limited to this, and the upper surface of the exposed portion 121 and the upper surface of the concrete material 23 are not limited to this. The heights may be different from each other. That is, the upper surface of the exposed portion 121 may be installed so as to be provided below (in the −Z direction) the upper surface of the concrete material 23, or may be installed so as to be provided above (+ Z direction).

(付記)
付記1の壁材取付用部材は、スラブ筋よりも下方に位置する設置土台に対して設置可能な土台部と、前記土台部に対して上方に突出するように取り付け可能な突出部と、を備え、前記突出部は、前記スラブ筋を覆うスラブコンクリートの上方の空間側に露出する露出部であって、壁材を取付可能な露出部を有する。
(Additional note)
The wall material mounting member of Appendix 1 includes a base portion that can be installed on an installation base located below the slab bar, and a protruding portion that can be mounted so as to project upward with respect to the base portion. The protruding portion is an exposed portion exposed on the space side above the slab concrete covering the slab bar, and has an exposed portion to which a wall material can be attached.

付記2の壁材取付用部材は、付記1に記載の壁材取付用部材において、前記露出部と前記土台部との距離を調節可能である。 In the wall material mounting member described in Appendix 1, the distance between the exposed portion and the base portion can be adjusted in the wall material mounting member described in Appendix 1.

付記3の壁材取付用部材は、付記1又は2に記載の壁材取付用部材において、前記露出部は平板であって、当該平板に対して鉛直断面視L字型の壁材固定具を介して壁材を取付可能である。 The wall material mounting member of Appendix 3 is the wall material mounting member according to Appendix 1 or 2, wherein the exposed portion is a flat plate, and an L-shaped wall material fixture in a vertical cross-sectional view is attached to the flat plate. The wall material can be attached via the plumb bob.

(付記の効果)
付記1に記載の壁材取付用部材によれば、土台部を設置土台に対して設置できるので、スラブ筋を施工済であるか否かに関わらず壁材取付用部材を施工することができ、施工タイミングの自由度を向上させることが可能となる。特に、スラブ筋が施工されていない状態で壁材取付用部材の施工を行うことができるので、施工スペースを広くとることができ、施工作業の危険性を低下させることが可能となる。また、スラブ筋が邪魔になることを防止できるので、施工の手間を削減することが可能となる。また、施工の手間を削減することができるので、施工作業の作業時間を短縮することができ、施工費用を削減することが可能となる。
(Effect of appendix)
According to the wall material mounting member described in Appendix 1, since the base portion can be installed on the installation base, the wall material mounting member can be installed regardless of whether or not the slab bar has been installed. , It is possible to improve the degree of freedom in construction timing. In particular, since the wall material mounting member can be constructed without the slab reinforcement being constructed, the construction space can be widened and the risk of the construction work can be reduced. In addition, since the slab muscles can be prevented from becoming an obstacle, it is possible to reduce the labor of construction. In addition, since the labor of construction can be reduced, the work time of construction work can be shortened, and the construction cost can be reduced.

付記2に記載の壁材取付用部材によれば、スラブコンクリートと露出部との相互間の高さ関係を調整することができるので、スラブコンクリートと露出部との相互間の高さを容易に一致させることができ、壁材取付用部材の施工性を一層向上させることが可能となる。 According to the wall material mounting member described in Appendix 2, the height relationship between the slab concrete and the exposed portion can be adjusted, so that the height between the slab concrete and the exposed portion can be easily adjusted. It is possible to make them match, and it is possible to further improve the workability of the wall material mounting member.

付記3に記載の壁材取付用部材によれば、鉛直断面視L字型の壁材固定具を用いて壁材を取り付けることができるので、壁材の取付強度を向上させることが可能となる。 According to the wall material mounting member described in Appendix 3, the wall material can be mounted by using the wall material fixture having an L-shaped vertical cross-sectional view, so that the mounting strength of the wall material can be improved. ..

11 土台部
12 突出部
13 ナット部
13a 螺合孔
21 設置土台
22 スラブ筋
23 コンクリート材
100 壁材取付用部材
111 基部
112 円筒部
112a 螺合中空部
121 露出部
122 ボルト部
200 スラブ
300 壁材
400 壁材固定具
11 Base part 12 Protruding part 13 Nut part 13a Screw hole 21 Installation base 22 Slab bar 23 Concrete material 100 Wall material mounting member 111 Base 112 Cylindrical part 112a Screwed hollow part 121 Exposed part 122 Bolt part 200 Slab 300 Wall material 400 Wall material fixture

Claims (1)

スラブ筋よりも下方に位置する設置土台に対して設置可能な土台部と、
前記土台部に対して突出するように取り付け可能な突出部と、
前記土台部と前記突出部とを相互に固定するナット部と、を備えた、壁材取付用部材の設置構造であって、
前記突出部は、
前記スラブ筋を覆うスラブコンクリートの上方の空間側に露出する露出部であって、壁材を取付可能な前記露出部と、
前記露出部から突出しているボルト部であって、前記土台部及び前記ナット部の両方に対して螺合する前記ボルト部と、を有しており、
前記露出部と前記土台部との距離を調節可能であり、
前記ナット部は、前記土台部及び前記突出部とは別の部品であり、
前記ナット部は、前記土台部と前記露出部との間に設けられており、
前記ナット部前記土台部における前記露出部側の端部に押し付けられることにより、前記土台部と前記突出部とが相互に固定され、
前記露出部は、平板であり、
前記露出部は、前記ボルト部における前記土台部と螺合する側の端部とは反対側の先端部に設けられている、
壁材取付用部材の設置構造
A base that can be installed with respect to the installation base located below the slab muscle ,
A protrusion that can be attached so as to protrude from the base,
It is an installation structure of a wall material mounting member provided with a nut portion for mutually fixing the base portion and the projecting portion .
The protrusion is
An exposed portion exposed on the space side above the slab concrete covering the slab streaks, and the exposed portion to which a wall material can be attached.
It has a bolt portion that protrudes from the exposed portion and that is screwed to both the base portion and the nut portion.
The distance between the exposed portion and the base portion can be adjusted.
The nut portion is a separate component from the base portion and the protruding portion.
The nut portion is provided between the base portion and the exposed portion.
By pressing the nut portion against the end portion of the base portion on the exposed portion side, the base portion and the projecting portion are mutually fixed.
The exposed portion is a flat plate and
The exposed portion is provided at the tip end portion of the bolt portion on the side opposite to the end portion on the side where the base portion is screwed.
Installation structure of wall material mounting members.
JP2017143223A 2017-07-25 2017-07-25 Installation structure of wall material mounting members Active JP7033405B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017143223A JP7033405B2 (en) 2017-07-25 2017-07-25 Installation structure of wall material mounting members

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017143223A JP7033405B2 (en) 2017-07-25 2017-07-25 Installation structure of wall material mounting members

Publications (2)

Publication Number Publication Date
JP2019023413A JP2019023413A (en) 2019-02-14
JP7033405B2 true JP7033405B2 (en) 2022-03-10

Family

ID=65368429

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017143223A Active JP7033405B2 (en) 2017-07-25 2017-07-25 Installation structure of wall material mounting members

Country Status (1)

Country Link
JP (1) JP7033405B2 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005200984A (en) 2004-01-19 2005-07-28 Sumitomo Kinzoku Kozan Siporex Kk Bed steel member fixing metal fitting and mounting structure for mounting alc panel
JP2015200171A (en) 2014-04-03 2015-11-12 ナム キム、ホン Multifunctional insertion device for concrete casting

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5295213U (en) * 1976-01-16 1977-07-16
JPH0710107U (en) * 1993-07-22 1995-02-14 大成建設株式会社 Slab insert

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005200984A (en) 2004-01-19 2005-07-28 Sumitomo Kinzoku Kozan Siporex Kk Bed steel member fixing metal fitting and mounting structure for mounting alc panel
JP2015200171A (en) 2014-04-03 2015-11-12 ナム キム、ホン Multifunctional insertion device for concrete casting

Also Published As

Publication number Publication date
JP2019023413A (en) 2019-02-14

Similar Documents

Publication Publication Date Title
JP7033405B2 (en) Installation structure of wall material mounting members
JP4693737B2 (en) Interior panel mounting structure on the inner surface of steel shell submerged tunnel
JP2018040132A (en) Structure and method for fixing anchor
JP6861108B2 (en) Fixtures and building wall structures
JP6632290B2 (en) Steel column leg structure and steel column leg construction method
JP3165719U (en) Infrastructure for facilities
KR101154344B1 (en) An assembly system for interior and exterior pannel in arc shape structure
JP2008291438A (en) Anchor frame
JP2021195834A (en) Column base anchor structure, trestle, and design method for column base anchor structure
SE1950293A1 (en) Load-bearing adjustable column joint device and method for mounting columns in a frame system for a multi-storey building
JP5940322B2 (en) Pillar fixture
JP7329992B2 (en) steel stairs
KR100668593B1 (en) Anchor frame assembly of tower crane
JP2017095989A (en) Steel staircase and installation method thereof
JP2007092311A (en) Foot board device
JP3734571B2 (en) Wall panel mounting structure
JP2015055079A (en) Anchor frame, and method for constructing anchor structure using the anchor frame
JP2022063587A (en) Column base anchor structure, frame, and design method for column base anchor structure
JP7241941B1 (en) anchor unit
JP2009209626A (en) Structure for tightening and securing member to be secured to installation surface
JP2750663B2 (en) Outlet for embedding concrete columns
JP7377616B2 (en) Height adjustment member, foundation structure, and height adjustment method of rising member
JP6565942B2 (en) Elevator equipment attachment and elevator equipment installation method
JP5677072B2 (en) Base plate and column base fixing structure using base plate
JP2017110349A (en) Earthquake-proof member and installation method of earthquake-proof member

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200625

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210427

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210430

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210524

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210921

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20211022

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220201

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220228

R150 Certificate of patent or registration of utility model

Ref document number: 7033405

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150