JP6965663B2 - Building foundation repair method and building foundation structure - Google Patents

Building foundation repair method and building foundation structure Download PDF

Info

Publication number
JP6965663B2
JP6965663B2 JP2017184613A JP2017184613A JP6965663B2 JP 6965663 B2 JP6965663 B2 JP 6965663B2 JP 2017184613 A JP2017184613 A JP 2017184613A JP 2017184613 A JP2017184613 A JP 2017184613A JP 6965663 B2 JP6965663 B2 JP 6965663B2
Authority
JP
Japan
Prior art keywords
anchor
building foundation
flat plate
plate member
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017184613A
Other languages
Japanese (ja)
Other versions
JP2019060111A (en
Inventor
正雄 八木
義敬 東
安史 松本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui House Ltd
Original Assignee
Sekisui House Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui House Ltd filed Critical Sekisui House Ltd
Priority to JP2017184613A priority Critical patent/JP6965663B2/en
Publication of JP2019060111A publication Critical patent/JP2019060111A/en
Application granted granted Critical
Publication of JP6965663B2 publication Critical patent/JP6965663B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Foundations (AREA)

Description

本発明は、建物基礎に適用される補修工法および該補修工法により構成された建物の基礎構造に関する。 The present invention relates to a repair method applied to a building foundation and a foundation structure of a building constructed by the repair method.

住宅等の建物の基礎には、柱脚や土台等の上部構造体を鉄筋コンクリート造の基礎に緊結するアンカーボルトが埋設されている。地震発生時には、建物全体が揺れ、基礎に埋設されているアンカーボルトには鉛直方向力(引張力)や水平方向力(せん断力)が作用する。このような鉛直方向力や水平方向力に対して、基礎に埋設されたアンカーボルトと基礎を構成するコンクリートとの定着力が抗するものとなり、上部構造体の耐震性が確保される。 Anchor bolts that connect superstructures such as column bases and foundations to reinforced concrete foundations are buried in the foundations of buildings such as houses. When an earthquake occurs, the entire building shakes, and vertical force (tensile force) and horizontal force (shear force) act on the anchor bolts buried in the foundation. The anchor bolts embedded in the foundation and the concrete constituting the foundation resist the vertical force and the horizontal force, and the earthquake resistance of the superstructure is ensured.

現在の建築基準法によれば通常の地震時にも建物安全性が担保されるよう種々規定されているが、それ以前に建築された既存建物においては、大地震などによってコンクリート基礎に亀裂や剥落が発生する可能性を否定できない側面があった。例えば、図12に示すように、図示しない上部構造体に接続されたアンカーボルト3に大きな水平方向力が作用することで、建物基礎1に亀裂が生じたり剥落が発生したりして、欠損部2を生じることが懸念された。 According to the current Building Standards Law, various provisions are made to ensure building safety even in the event of a normal earthquake, but in existing buildings built before that, cracks and peeling occurred in the concrete foundation due to a large earthquake or the like. There was an aspect that could not be denied. For example, as shown in FIG. 12, when a large horizontal force acts on the anchor bolt 3 connected to the superstructure (not shown), the building foundation 1 is cracked or peeled off, resulting in a defective portion. There was concern that 2 would occur.

例えば、特許文献1には、地震等によりコンクリート基礎に補修が必要となった場合に、コンクリート基礎にチャンネルを締結し、チャンネルに結合した内外連結板をボルトで締結して補強する基礎の補修工法が開示されている。この補修工法では、コンクリート基礎を内外両面から構造材で挟み込むことで、次なる地震に対する強度を確保し、既存の建物を再び安全に使用し得るようにすることが意図されている。 For example, Patent Document 1 describes a foundation repair method in which a channel is fastened to a concrete foundation and an inner / outer connecting plate connected to the channel is fastened with a bolt to reinforce the concrete foundation when repair is required due to an earthquake or the like. Is disclosed. In this repair method, it is intended to secure the strength against the next earthquake and to make the existing building safe to use again by sandwiching the concrete foundation with structural materials from both inside and outside.

特開2006−161529号公報Japanese Unexamined Patent Publication No. 2006-161529

上記特許文献1に開示された技術では、建物を再び安全に使用することが可能になるとはいえ、コンクリート基礎の内面と外面に大がかりな構造材が取り付けられるので、施工対象箇所の周囲に構造材の設置スペースおよび施工時の作業スペースを必要とするうえ、建物の外観上も好ましい仕上がりであるとはいえない。 Although the technology disclosed in Patent Document 1 makes it possible to use the building safely again, since a large-scale structural material is attached to the inner and outer surfaces of the concrete foundation, the structural material is attached around the construction target site. In addition to requiring an installation space and a work space during construction, it cannot be said that the finish is favorable in terms of the appearance of the building.

また、今後発生すると懸念される大地震をも想定すれば、欠損部を単に元の形状に修復するだけでなく、補修した箇所が再度破損することのないように、補修作業と同時に当該箇所の補強を施すことが望ましい。 In addition, assuming a large earthquake that may occur in the future, not only will the defective part be repaired to its original shape, but the repaired part will not be damaged again at the same time as the repair work. It is desirable to provide reinforcement.

本発明は、上記のような問題点にかんがみて、建物基礎に生じた欠損部を効果的に補修して建物の強度を高め、安心して建物を使用することを可能にする新たな建物基礎の補修工法および建物の基礎構造を提供するものである。 In view of the above problems, the present invention provides a new building foundation that effectively repairs defects generated in the building foundation to increase the strength of the building and enables the building to be used with peace of mind. It provides repair methods and foundation structures for buildings.

前記の目的を達成するための本発明の解決手段は、建物基礎に生じた欠損部を、補強部材を用いて補修する建物基礎の補修工法を対象とする。前記建物基礎にはアンカーボルトが埋設され、前記補強部材は、貫通孔が設けられた平板部材と、前記貫通孔に挿通される新設アンカーとを有する構成としている。前記補修工法として、前記欠損部において下端部が埋設された状態のアンカーボルトの近傍に、前記新設アンカーの埋め込み孔を、前記アンカーボルトと交差する横方向に穿設する穿孔工程と、前記埋め込み孔に前記新設アンカーの一方の端部を埋設して前記欠損部に新設アンカーを設置するアンカー設置工程と、前記平板部材の貫通孔に前記新設アンカーの他方の端部を挿通し、前記平板部材と前記アンカーボルトとを当接させた状態で固着し、前記平板部材を前記欠損部に設置する平板部材設置工程と、前記各工程の後、補修剤にて前記欠損部を元の形状に修復する工程と、を含む構成としている。 The solution of the present invention for achieving the above object is a method for repairing a building foundation in which a defect formed in the building foundation is repaired by using a reinforcing member. Anchor bolts are embedded in the building foundation, and the reinforcing member has a flat plate member provided with a through hole and a new anchor inserted through the through hole. As the repair method, a drilling step of drilling an embedding hole of the new anchor in the vicinity of the anchor bolt in which the lower end portion is embedded in the defective portion in the lateral direction intersecting with the anchor bolt, and the embedding hole. Anchor installation step of burying one end of the new anchor and installing the new anchor in the defective portion, and inserting the other end of the new anchor into the through hole of the flat plate member to form the flat plate member. A flat plate member installation step of fixing the anchor bolt in contact with the anchor bolt and installing the flat plate member in the defective portion, and after each of the steps, the defective portion is repaired to the original shape with a repair agent. The configuration includes processes.

この特定事項により、建物基礎に生じた欠損部を補強部材によって補強しつつ、元の形状に補修することができ、埋設されているアンカーボルトの近傍において、補修前よりも強度性能を向上させることが可能となる。 According to this specific item, the defective part generated in the building foundation can be repaired to the original shape while being reinforced by the reinforcing member, and the strength performance can be improved in the vicinity of the buried anchor bolt as compared with that before the repair. Is possible.

前記建物基礎の補修工法として、より具体的には、前記補強部材の平板部材に複数の貫通孔を備えさせるとともに、前新設アンカーを複数本備えさせた構成とし、前記穿孔工程では、建物基礎に埋設された近接する複数本のアンカーボルトに対して、前記埋め込み孔を、前記アンカーボルトの相互間であって前記アンカーボルトの側部にそれぞれ穿設することが好ましい。また、前記平板部材設置工程では、前記平板部材を複数本のアンカーボルトにまたがるように配設することが好ましい。 As a repair method for the building foundation, more specifically, the flat plate member of the reinforcing member is provided with a plurality of through holes and a plurality of new anchors are provided. In the drilling process, the building foundation is provided with a plurality of through holes. It is preferable that the embedding holes are bored between the anchor bolts and on the side portions of the anchor bolts for a plurality of adjacent anchor bolts that are embedded. Further, in the flat plate member installation step, it is preferable to dispose the flat plate member so as to straddle a plurality of anchor bolts.

これにより、1つの補強部材で、埋設された複数本のアンカーボルトに対応させることが可能となり、多様な形態の欠損部に対して構造補強しつつ補修することが可能となる。 As a result, it is possible to correspond to a plurality of embedded anchor bolts with one reinforcing member, and it is possible to repair various forms of defective portions while structurally reinforcing them.

前記建物基礎の補修工法により補修された建物の基礎構造も本発明の技術的思想の範疇である。すなわち、前記補強部材を用いた建物の基礎構造であって、前記補強部材は、貫通孔を有する平板部材と、前記貫通孔を介して配設される新設アンカーと、前記新設アンカーに螺着されるナットとを備え、建物基礎にはアンカーボルトの下端部が埋設されている。前記アンカーボルトの埋設部には、前記平板部材が添設されており、前記平板部材の貫通孔に挿通されるとともに前記アンカーボルトに交差するように打ち込まれる前記新設アンカーに対して前記ナットが螺着された状態で前記補強部材が建物基礎に埋設され、前記平板部材における一方の面を前記アンカーボルトに対向させ、他方の面から前記新設アンカーに前記ナットが螺着されて、前記平板部材が前記アンカーボルトに交差するように固定されて構成されている。 The foundation structure of a building repaired by the building foundation repair method is also within the scope of the technical idea of the present invention. That is, it is a foundation structure of a building using the reinforcing member, and the reinforcing member is screwed to a flat plate member having a through hole, a new anchor disposed through the through hole, and the new anchor. and a nut that, the lower end portion of the anchor bolt is embedded in the building foundation. The embedded portion of the anchor bolt, wherein the flat plate member is additionally provided, the nut screw relative to the new anchor is implanted so as to intersect with is inserted into the through hole of the flat plate member to the anchor bolt wherein in wearing state reinforcing member is embedded in the building foundation, said one of the surfaces of the flat plate member is opposed to the anchor bolt, is the nut screwed on the new anchor from the other surface, the flat plate member Is fixed so as to intersect the anchor bolt.

この特定事項により、建物基礎に埋設されたアンカーボルトに作用する水平方向力を、アンカーボルトに加えて、これに交差するように埋設された補強部材によって負担しうるものとなり、建物基礎における強度性能を高めることが可能となる。 Due to this specific matter, the horizontal force acting on the anchor bolts buried in the building foundation can be borne by the reinforcing members buried so as to intersect with the anchor bolts, and the strength performance in the building foundation. Can be increased.

本発明では、貫通孔が設けられた平板部材と、前記貫通孔に挿通される新設アンカーとを有する補強部材を用いて、建物基礎に生じた欠損部を補修する構成としている。これにより、前記平板部材は、一方の面を前記アンカーボルトに対向させるとともに前記アンカーボルトに交差するように埋設され、前記新設アンカーは、前記アンカーボルトに交差する横方向に埋設された構造とすることができ、補修前よりも強度を高めた構造とすることができ、アンカーボルトの周囲に破損が発生するのを抑えることが可能となる。 In the present invention, a defective portion generated in a building foundation is repaired by using a flat plate member provided with a through hole and a reinforcing member having a new anchor inserted through the through hole. As a result, the flat plate member is embedded so that one surface faces the anchor bolt and intersects the anchor bolt, and the newly installed anchor is embedded in the lateral direction intersecting the anchor bolt. It is possible to make the structure stronger than before the repair, and it is possible to suppress the occurrence of damage around the anchor bolt.

本発明の実施形態に係る建物基礎の補修工法において用いられる補強部材の一例を示す斜視図である。It is a perspective view which shows an example of the reinforcing member used in the repair method of a building foundation which concerns on embodiment of this invention. 本発明の実施形態に係る建物基礎の補修工法において、補修対象箇所となる欠損部の一例を示す斜視図である。It is a perspective view which shows an example of the defective part which becomes the repair target part in the repair construction method of the building foundation which concerns on embodiment of this invention. 実施形態に係る建物基礎の補修工法の一工程を示す斜視図である。It is a perspective view which shows one process of the repair method of a building foundation which concerns on embodiment. 図3に示す工程を建物基礎の断面により示す説明図である。It is explanatory drawing which shows the process shown in FIG. 3 by the cross section of a building foundation. 図4の次工程を建物基礎の断面により示す説明図である。It is explanatory drawing which shows the next process of FIG. 4 by the cross section of a building foundation. 図5の次工程を建物基礎の断面により示す説明図である。It is explanatory drawing which shows the next process of FIG. 5 by the cross section of a building foundation. 図6の次工程を示す斜視図である。It is a perspective view which shows the next process of FIG. 図7の次工程を示す斜視図である。It is a perspective view which shows the next process of FIG. 他の実施形態に係る建物基礎の補修工法を示す斜視図である。It is a perspective view which shows the repair method of the building foundation which concerns on other embodiment. 前記補強部材の他の例を示す斜視図である。It is a perspective view which shows the other example of the said reinforcing member. 図10に示す補強部材を用いた建物基礎の補修工法の一例を示す斜視図である。It is a perspective view which shows an example of the repair method of a building foundation using the reinforcing member shown in FIG. 建物基礎の出隅に生じうる欠損部を説明する斜視図である。It is a perspective view explaining the defect part which may occur in the protruding corner of a building foundation.

以下、本発明の実施形態に係る建物基礎の補修工法および建物の基礎構造について、図面を参照しつつ説明する。 Hereinafter, the building foundation repair method and the building foundation structure according to the embodiment of the present invention will be described with reference to the drawings.

この実施形態では、建物が十分な耐震強度を有していても、大地震などにより比較的大きな水平方向力が作用することで、建物基礎が部分的に欠損した場合を想定している。例えば、図12に示したように建物基礎1の出隅の天端に欠損部2が生じていても、建物自体には大きな損傷が少なく、建物を継続して使用可能であることは多々ある。しかし、居住者および建物の使用者にとっては、日々、欠損部2を目にすることによって、建物の継続使用に不安を覚えるものであり、その補修に際しては、単に元の形状に修復するにとどまらず、同時に欠損部2の補強が施されることが望ましい。 In this embodiment, even if the building has sufficient seismic strength, it is assumed that the building foundation is partially damaged due to the action of a relatively large horizontal force due to a large earthquake or the like. For example, as shown in FIG. 12, even if a defect 2 is generated at the top of the protruding corner of the building foundation 1, the building itself is not significantly damaged and the building can be used continuously in many cases. .. However, residents and building users are worried about the continuous use of the building by seeing the defective part 2 every day, and when repairing it, it is not limited to simply restoring it to its original shape. It is desirable that the defect portion 2 is reinforced at the same time.

本実施形態では、かかる欠損部2の断面修復を、図1等に示す補強部材4を用いて補修するとともに、要求される強度性能を確保し得る建物基礎1の補修工法とその基礎構造について説明する。 In the present embodiment, the cross-sectional repair of the defective portion 2 is repaired by using the reinforcing member 4 shown in FIG. 1 and the like, and the repair method of the building foundation 1 capable of ensuring the required strength performance and the foundation structure thereof will be described. do.

(補強部材)
図1は、建物基礎1の補修工法に用いられる補強部材4の一例を示す斜視図である。
(Reinforcing member)
FIG. 1 is a perspective view showing an example of a reinforcing member 4 used in a repair method for a building foundation 1.

補強部材4は、帯状金属板により形成された平板部材41、新設アンカー42、および新設アンカー42に螺着されるナット43を備えている。 The reinforcing member 4 includes a flat plate member 41 formed of a strip-shaped metal plate, a new anchor 42, and a nut 43 screwed to the new anchor 42.

平板部材41は、例えば鉄鋼材などからなる金属製板状体であり、矩形状に形成されている。例示の形態では、平板部材41は横長矩形状に形成され、長手方向に沿って長孔状の貫通孔411が2つ並設されている。これらの貫通孔411には、それぞれ新設アンカー42が挿通される。 The flat plate member 41 is a metal plate-like body made of, for example, a steel material, and is formed in a rectangular shape. In the exemplary embodiment, the flat plate member 41 is formed in a horizontally long rectangular shape, and two elongated through holes 411 are arranged side by side along the longitudinal direction. A new anchor 42 is inserted into each of these through holes 411.

平板部材41に設けられる貫通孔411は、長孔状のものに限定されないが、長孔状であることによって、貫通孔411内での新設アンカー42の挿通位置を調整することが可能とされる。 The through hole 411 provided in the flat plate member 41 is not limited to the elongated hole shape, but the elongated hole shape makes it possible to adjust the insertion position of the new anchor 42 in the through hole 411. ..

新設アンカー42は、棒状部材であって、建物基礎1に打ち込まれて平板部材41を固定するのに用いられる。新設アンカー42には、例えば、寸切全ねじボルト、寸切異形棒鋼などを好適に使用することができ、外表面に凹凸部を有するアンカーボルトであることが望ましい。 The new anchor 42 is a rod-shaped member, which is driven into the building foundation 1 and used to fix the flat plate member 41. For the new anchor 42, for example, a fully threaded bolt, a deformed steel bar, or the like can be preferably used, and it is desirable that the anchor bolt has an uneven portion on the outer surface.

新設アンカー42には、軸部にナット43とパッキン材44とが装着される。平板部材41を差し挟んで、新設アンカー42の一方の軸部にナット43が備えられ、他方の軸部にパッキン材44が螺着される。パッキン材44は、中心部に新設アンカー42が貫通する貫通孔を有する。パッキン材44には、例えばポリ塩化ビニル樹脂等の合成樹脂製の平ワッシャーなどを用いることができる。 A nut 43 and a packing material 44 are attached to the shaft portion of the new anchor 42. A nut 43 is provided on one shaft portion of the newly installed anchor 42, and a packing material 44 is screwed onto the other shaft portion so as to sandwich the flat plate member 41. The packing material 44 has a through hole in the center through which the new anchor 42 penetrates. For the packing material 44, for example, a flat washer made of a synthetic resin such as a polyvinyl chloride resin can be used.

新設アンカー42は、建物基礎1に打ち込まれて固定されるものであり、後施工アンカーを適用することも可能である。その場合、後施工アンカーには接着系アンカー(ケミカルアンカー)を用いることができ、例えば2液混合固定性の接着液を収容したカプセルを、建物基礎1に削孔した孔に挿入し、新設アンカー42を打ち込んでカプセルを破壊し、2液を混合固化させることで新設アンカー42を接着固定することとなる。また、後施工アンカーとして、先端が拡開されて建物基礎1に固定される機械式アンカーを用いることもできる。 The new anchor 42 is driven into the building foundation 1 and fixed, and a post-construction anchor can be applied. In that case, an adhesive anchor (chemical anchor) can be used as the post-construction anchor. For example, a capsule containing a two-component mixed-fixing adhesive is inserted into a hole drilled in the building foundation 1, and a new anchor is installed. The new anchor 42 is adhered and fixed by driving the 42 to break the capsule and mixing and solidifying the two liquids. Further, as the post-construction anchor, a mechanical anchor whose tip is expanded and fixed to the building foundation 1 can also be used.

なお、補強部材4において、平板部材41は貫通孔411を備えた板状体であれば、どのような形状とされてもよい。補強部材4の他の実施形態については後述する。 In the reinforcing member 4, the flat plate member 41 may have any shape as long as it is a plate-like body having a through hole 411. Other embodiments of the reinforcing member 4 will be described later.

(建物基礎の補修工法)
図2〜図8は、前記補強部材4を用いて欠損部2を補修する建物基礎1の補修工法について示している。
(Building foundation repair method)
2 to 8 show a repair method for a building foundation 1 in which a defective portion 2 is repaired using the reinforcing member 4.

この実施形態では、住宅等の建物に適用される鉄筋コンクリート造の直接基礎のうち、布基礎(連続基礎)等のフーチング基礎における基礎構造を対象として説明する。なお、参照する各図面においては、建物基礎1を構成するコンクリートと、このコンクリートの上層に設けられて自己平滑性を有するセルフレベリング材とを区別せずに一体に示すとともに、建物基礎1の上方に存在する上部構造体を省略して示している。 In this embodiment, among the reinforced concrete direct foundations applied to buildings such as houses, the foundation structure of the footing foundation such as the cloth foundation (continuous foundation) will be described. In each of the drawings to be referred to, the concrete constituting the building foundation 1 and the self-smoothing self-leveling material provided on the upper layer of the concrete are shown integrally without distinction, and above the building foundation 1. The superstructure existing in is omitted.

建物基礎1には複数本のアンカーボルト3が埋設されている。アンカーボルト3は、上部が建物基礎1の天端よりも上方に突出しており、図示しない柱脚や土台等の上部構造体に接合されている。アンカーボルト3の下部は、建物基礎1に鉛直方向に埋め込まれている。 A plurality of anchor bolts 3 are embedded in the building foundation 1. The upper part of the anchor bolt 3 protrudes above the top of the building foundation 1 and is joined to an upper structure such as a column base or a base (not shown). The lower part of the anchor bolt 3 is embedded in the building foundation 1 in the vertical direction.

図2に示すように、建物基礎1が直交する出隅では、2本の既存のアンカーボルト3が配設されている。生じた欠損部2は、建物基礎1を構成するコンクリートの剥落箇所であり、表面には大小の不規則な凹凸を有している。欠損部2の表面には、アンカーボルト3の埋設部が部分的に露出していることもある。 As shown in FIG. 2, two existing anchor bolts 3 are arranged at the protruding corners where the building foundation 1 is orthogonal to each other. The generated defective portion 2 is a peeled-off portion of the concrete constituting the building foundation 1, and has irregular irregularities of large and small on the surface. The embedded portion of the anchor bolt 3 may be partially exposed on the surface of the defective portion 2.

補修作業を開始するにあたり、欠損部2の表面の脆弱部を、ビシャンハンマー等を用いて打撃したり高圧水で洗浄したりすることによって取り除く。必要に応じて、欠損部2の表面をはつることによって、補強部材4の平板部材41を設置するためのスペースを形成する。これにより、出隅に埋設されたアンカーボルト3の少なくとも上半部を欠損部2の表面に露出させる(準備工程)。 At the start of the repair work, the fragile portion on the surface of the defective portion 2 is removed by striking it with a bush hammer or the like or washing it with high-pressure water. If necessary, the surface of the defective portion 2 is struck to form a space for installing the flat plate member 41 of the reinforcing member 4. As a result, at least the upper half of the anchor bolt 3 embedded in the protruding corner is exposed on the surface of the defective portion 2 (preparation step).

・穿孔工程
次いで、欠損部2におけるアンカーボルト3の外方に、補強部材4を添設していく。まず、図3に示すように、補強部材4の新設アンカー42を設置するための埋め込み孔5を穿設する(穿孔工程)。
-Punching step Next, the reinforcing member 4 is attached to the outside of the anchor bolt 3 in the defective portion 2. First, as shown in FIG. 3, an embedding hole 5 for installing a new anchor 42 of the reinforcing member 4 is drilled (drilling step).

この場合、建物基礎1を構成するコンクリートを、欠損部2の表面側から略円柱状に切削して埋め込み孔5を形成する。例えば、欠損部2の表面からドリル等によって穿孔し、吸引またはエアブローにより切削粉を除去する。その後、埋め込み孔5に金属ブラシを挿入して孔内の清掃を行う。 In this case, the concrete constituting the building foundation 1 is cut into a substantially columnar shape from the surface side of the defective portion 2 to form the embedding hole 5. For example, the surface of the defective portion 2 is drilled with a drill or the like, and cutting powder is removed by suction or air blow. After that, a metal brush is inserted into the embedding hole 5 to clean the inside of the hole.

埋め込み孔5は、例えば建物基礎1の天端から下方に30〜50mmの高さ位置に設けられる。図示するように、アンカーボルト3が2本並設されている場合には、2つの埋め込み孔5を、これら2本のアンカーボルト3の間であって、各アンカーボルト3の近傍にそれぞれ穿設する。 The embedding hole 5 is provided at a height of 30 to 50 mm below the top of the building foundation 1, for example. As shown in the figure, when two anchor bolts 3 are arranged side by side, two embedding holes 5 are formed between these two anchor bolts 3 and in the vicinity of each anchor bolt 3. do.

図4に示すように、各埋め込み孔5は、建物基礎1の奥行方向に対しては、各アンカーボルト3と交差する水平方向に削孔されることが好ましい。埋め込み孔5の大きさは、欠損部2の大きさやアンカーボルト3の種類および本数等により決定され、例えば、孔径が10〜15mmとされ、孔深さが70〜100mmとされることが好ましい。これによって、2つの埋め込み孔5を欠損部2の表面に横並びに形成する。 As shown in FIG. 4, each embedded hole 5 is preferably drilled in the horizontal direction intersecting each anchor bolt 3 with respect to the depth direction of the building foundation 1. The size of the embedded hole 5 is determined by the size of the defective portion 2, the type and number of anchor bolts 3, and the like. For example, the hole diameter is preferably 10 to 15 mm and the hole depth is preferably 70 to 100 mm. As a result, two embedding holes 5 are formed side by side on the surface of the defect portion 2.

・アンカー設置工程
次いで、埋め込み孔5に新設アンカー42を設置する(アンカー設置工程)。例示の形態では、新設アンカー42として接着系の後施工アンカーを使用する。
-Anchor installation process Next, a new anchor 42 is installed in the embedding hole 5 (anchor installation process). In the exemplary embodiment, an adhesive post-construction anchor is used as the new anchor 42.

図5に示すように、まず、埋め込み孔5にケミカルカプセル6を挿入して設置する。新設アンカー42の軸部には、埋め込み孔5の深さ(奥行寸法)に対応する位置にパッキン材44を装着しておく。 As shown in FIG. 5, first, the chemical capsule 6 is inserted into the embedding hole 5 and installed. A packing material 44 is attached to the shaft portion of the new anchor 42 at a position corresponding to the depth (depth dimension) of the embedding hole 5.

次いで、新設アンカー42の一方の端部を埋め込み孔5に配置し、新設アンカー42を打設または回転させながら埋め込み孔5に挿入する。新設アンカー42を挿入することにより、埋め込み孔5内のケミカルカプセル6が破壊され、内部の接着液が埋め込み孔5内に充填される。このとき、新設アンカー42の軸部に装着したパッキン材44は、埋め込み孔5を塞いで接着剤の流出を防ぐ。 Next, one end of the new anchor 42 is placed in the embedding hole 5, and the new anchor 42 is inserted into the embedding hole 5 while being driven or rotated. By inserting the new anchor 42, the chemical capsule 6 in the embedding hole 5 is destroyed, and the adhesive liquid inside is filled in the embedding hole 5. At this time, the packing material 44 attached to the shaft portion of the new anchor 42 closes the embedding hole 5 to prevent the adhesive from flowing out.

ケミカルカプセル6の接着液が硬化することで、新設アンカー42が埋め込み孔5に一体に固定される。これにより、欠損部2に2本の新設アンカー42を設置することができる。埋め込み孔5をアンカーボルト3に交差する水平方向に形成しているので、新設アンカー42をアンカーボルト3に対して水平方向に交差するように埋設することができる。 When the adhesive liquid of the chemical capsule 6 is cured, the new anchor 42 is integrally fixed to the embedding hole 5. As a result, two new anchors 42 can be installed in the defective portion 2. Since the embedding hole 5 is formed in the horizontal direction intersecting the anchor bolt 3, the new anchor 42 can be embedded so as to intersect the anchor bolt 3 in the horizontal direction.

・平板部材設置工程
次いで、欠損部2に補強部材4の平板部材41を設置する(平板部材設置工程)。図6に示すように、欠損部2の表面には、アンカーボルト3に近接して新設アンカー42が突設されている。この新設アンカー42に対し、平板部材41を固着する。
-Flat plate member installation process Next, the flat plate member 41 of the reinforcing member 4 is installed in the defective portion 2 (flat plate member installation process). As shown in FIG. 6, a new anchor 42 is projected from the surface of the defective portion 2 in the vicinity of the anchor bolt 3. The flat plate member 41 is fixed to the newly installed anchor 42.

具体的には、平板部材41の各貫通孔411に新設アンカー42の他方の端部を挿通させる。この場合、並列する2本のアンカーボルト3に対して平板部材41が横方向にまたがるように添え付ける。平板部材41の貫通孔411は長孔状に形成されているので、2つの貫通孔411の開口範囲内で平板部材41の設置位置を調整することができる。 Specifically, the other end of the new anchor 42 is inserted into each through hole 411 of the flat plate member 41. In this case, the flat plate member 41 is attached to the two anchor bolts 3 in parallel so as to straddle them in the lateral direction. Since the through hole 411 of the flat plate member 41 is formed in an elongated shape, the installation position of the flat plate member 41 can be adjusted within the opening range of the two through holes 411.

その後、図7に示すように、露出しているアンカーボルト3、3に平板部材41を当接させ、その状態で、新設アンカー42にナット43を螺着し、ナット43を締め付ける。これにより平板部材41を欠損部2の表面に固定する。欠損部2においては、2本のアンカーボルト3に対して1つの補強部材4が添え付けられ、アンカーボルト3を外方から押さえるものとなる。 After that, as shown in FIG. 7, the flat plate member 41 is brought into contact with the exposed anchor bolts 3 and 3, and in that state, the nut 43 is screwed to the new anchor 42 and the nut 43 is tightened. As a result, the flat plate member 41 is fixed to the surface of the defective portion 2. In the defective portion 2, one reinforcing member 4 is attached to the two anchor bolts 3, and the anchor bolts 3 are pressed from the outside.

・打設工程
次いで、図8に示すように、欠損部2の周囲に型枠7を配置し、補修剤8を打設する。これにより、図4に破線にて示されるように、建物基礎1の天端形状を元どおりの形状に修復する。欠損部2が小さい場合には、型枠7を設置することなく、補修剤8を欠損部2に塗布することにより修復してもよい。補修剤8には、モルタルその他のグラウト充填材など適宜のコンクリート補修剤を使用することができる。
-Putting process Next, as shown in FIG. 8, the mold 7 is arranged around the defective portion 2, and the repair agent 8 is placed. As a result, as shown by the broken line in FIG. 4, the top shape of the building foundation 1 is restored to the original shape. If the defective portion 2 is small, it may be repaired by applying the repair agent 8 to the defective portion 2 without installing the formwork 7. As the repair agent 8, an appropriate concrete repair agent such as mortar or other grout filler can be used.

補修剤8が硬化した後、型枠7を除去することで、建物基礎1の出隅の補修作業が完了する。前記の各補修工程を経た建物基礎1は、アンカーボルト3に平板部材41が添設されるとともに平板部材41の貫通孔411を介して新設アンカー42が水平方向に打ち込まれた状態で、補強部材4が埋設された基礎構造を有するものとなる。平板部材41は、一方の面をアンカーボルト3に対向させた状態で、アンカーボルト3に交差するようにして埋設されている。 After the repair agent 8 has hardened, the formwork 7 is removed to complete the repair work of the protruding corner of the building foundation 1. The building foundation 1 that has undergone each of the above repair steps is a reinforcing member in a state where the flat plate member 41 is attached to the anchor bolt 3 and the new anchor 42 is driven in the horizontal direction through the through hole 411 of the flat plate member 41. 4 will have an embedded foundation structure. The flat plate member 41 is embedded so as to intersect the anchor bolt 3 with one surface facing the anchor bolt 3.

これにより、建物基礎1に補強部材4が定着され、アンカーボルト3を出隅の外方側から物理的に押さえて、建物基礎1の強度性能を補うものとなる。建物に作用した水平方向力は、アンカーボルト3を介して建物基礎1を構成するコンクリートに適切に伝達される。したがって、かかる構造を有する建物基礎1は、アンカーボルト3が十分な引抜き耐力とせん断耐力とを備えて、補修後の出隅周辺に再び破損を生じにくくすることが可能となる。また、補修された建物基礎1の出隅は、破損前と変わらない外観形状を呈するので、建物の美観を損なうものとはならず、その補修作業も建物の居住性を損なうことなく実施することが可能とされる。 As a result, the reinforcing member 4 is fixed to the building foundation 1, and the anchor bolt 3 is physically pressed from the outside of the protruding corner to supplement the strength performance of the building foundation 1. The horizontal force acting on the building is appropriately transmitted to the concrete constituting the building foundation 1 via the anchor bolts 3. Therefore, in the building foundation 1 having such a structure, the anchor bolt 3 has sufficient pull-out strength and shear strength, and it is possible to prevent the anchor bolt 3 from being damaged again around the protruding corner after repair. In addition, since the protruding corner of the repaired building foundation 1 has the same appearance shape as before the damage, it does not spoil the aesthetic appearance of the building, and the repair work should be carried out without spoiling the livability of the building. Is possible.

(他の実施形態)
本発明に係る建物基礎1の補修工法、補強部材4、およびこれらを用いた建物の基礎構造は、前記実施形態以外にも他の様々な形態で実施することができる。
(Other embodiments)
The repair method for the building foundation 1 according to the present invention, the reinforcing member 4, and the foundation structure of the building using these can be implemented in various other forms other than the above-described embodiment.

前記建物基礎1の補修工法は、出隅に限らず、建物基礎1の多様な箇所に適用することが可能である。例えば、図9に示すように、建物基礎1のT字交差部などにおいても好適に実施することができる。 The repair method of the building foundation 1 can be applied not only to the outside corner but also to various places of the building foundation 1. For example, as shown in FIG. 9, it can be suitably carried out at a T-shaped intersection of the building foundation 1.

この形態では、建物基礎1は略T字状に交差して立設され、隣接する2つの入隅を備えている。アンカーボルト3は、T字交差部に近接して2本埋設されている。この場合も、前記同様、穿孔工程、アンカー設置工程、および平板部材設置工程によって補強部材4を欠損部2に設置し、補修剤8を用いて欠損部2を元の形状に修復する。これにより、欠損部2において強度性能を補いつつ補修することができる。 In this form, the building foundation 1 is erected at a substantially T-shaped intersection and has two adjacent corners. Two anchor bolts 3 are embedded in the vicinity of the T-shaped intersection. In this case as well, the reinforcing member 4 is installed in the defective portion 2 by the drilling step, the anchor installation step, and the flat plate member installing step, and the defective portion 2 is repaired to the original shape by using the repair agent 8. As a result, the defective portion 2 can be repaired while supplementing the strength performance.

前記建物基礎1の補修工法を適用する欠損部2は、2本のアンカーボルト3が近接して埋設された箇所であるに限らず、埋設されているアンカーボルト3が1本であっても3本以上の複数本であっても同様に補修可能である。 The defective portion 2 to which the repair method of the building foundation 1 is applied is not limited to a place where two anchor bolts 3 are buried close to each other, and even if only one anchor bolt 3 is buried, 3 Even if there are more than one bolt, it can be repaired in the same way.

また、補強部材4において、平板部材41の貫通孔411および新設アンカー42の数も、前記形態のものに限定されない。平板部材41の貫通孔411は、1つであっても、複数であってもよい。また、1つの貫通孔411に挿通される新設アンカー42は1本であるに限定されず、長孔状の1つの貫通孔411に複数本の新設アンカー42が挿通される構成であってもよい。貫通孔411の数および新設アンカー42の本数に応じて、平板部材41の大きさや厚み、および新設アンカー42の外径寸法等を選択することが好ましい。 Further, in the reinforcing member 4, the number of through holes 411 and the newly installed anchor 42 of the flat plate member 41 is not limited to that of the above-mentioned form. The flat plate member 41 may have one through hole 411 or a plurality of through holes 411. Further, the number of new anchors 42 inserted into one through hole 411 is not limited to one, and a plurality of new anchors 42 may be inserted into one long hole-shaped through hole 411. .. It is preferable to select the size and thickness of the flat plate member 41, the outer diameter dimension of the new anchor 42, and the like according to the number of through holes 411 and the number of new anchors 42.

図10に示すように、補強部材4は、1つの長孔状の貫通孔411を有する平板部材41と、この貫通孔411に挿通される1本の新設アンカー42とを備えた構成であってもよい。このような補強部材4を用いて欠損部2を補修する場合、図11に示すように、欠損部2の表面に露出する2本のアンカーボルト3に対して、平板部材41を均等位置にあてがって配設し、2本のアンカーボルト3から略均等距離にある中間部に新設アンカー42を打ち込む。これにより、欠損部2において強度性能を補いつつ補修することができる。 As shown in FIG. 10, the reinforcing member 4 has a configuration including a flat plate member 41 having one elongated through hole 411 and one new anchor 42 inserted through the through hole 411. May be good. When repairing the defective portion 2 using such a reinforcing member 4, as shown in FIG. 11, the flat plate member 41 is applied to the two anchor bolts 3 exposed on the surface of the defective portion 2 at equal positions. The new anchor 42 is driven into an intermediate portion at approximately equal distances from the two anchor bolts 3. As a result, the defective portion 2 can be repaired while supplementing the strength performance.

なお、平板部材41は、欠損部2に対して水平方向に長い矩形状とされるに限らず、欠損部2のアンカーボルト3を、その外方から物理的に押さえて変位を抑制しうる形状であれば、どのような形状を有するものであってもよい。また、平板部材41を固着する手段は、新設アンカー42に螺着したナット43であるに限らず、他のどのような固着手段が用いられてもよい。 The flat plate member 41 is not limited to having a rectangular shape that is long in the horizontal direction with respect to the defective portion 2, and has a shape that can physically press the anchor bolt 3 of the defective portion 2 from the outside to suppress displacement. Any shape may be used as long as it is used. Further, the means for fixing the flat plate member 41 is not limited to the nut 43 screwed to the new anchor 42, and any other fixing means may be used.

以上説明した本発明に係る建物基礎の補修工法および建物の基礎構造は、木造または鉄骨造のいずれの構造にも適用することができる。前述の実施形態は本発明の例示であってこれに限定されるものではない。 The building foundation repair method and the building foundation structure according to the present invention described above can be applied to either a wooden structure or a steel structure. The above-described embodiment is an example of the present invention and is not limited thereto.

本発明は、建物基礎に生じた欠損部の補修に好適に利用可能である。 INDUSTRIAL APPLICABILITY The present invention can be suitably used for repairing a defective portion generated in a building foundation.

1 建物基礎
2 欠損部
3 アンカーボルト
4 補強部材
41 平板部材
411 貫通孔
42 新設アンカー
43 ナット
44 パッキン材
5 埋め込み孔
6 ケミカルカプセル
7 型枠
8 補修剤
1 Building foundation 2 Defective part 3 Anchor bolt 4 Reinforcing member 41 Flat plate member 411 Through hole 42 New anchor 43 Nut 44 Packing material 5 Embedded hole 6 Chemical capsule 7 Formwork 8 Repair agent

Claims (6)

建物基礎に生じた欠損部を、補強部材を用いて補修する建物基礎の補修工法であって、
前記建物基礎にはアンカーボルトが埋設され、前記補強部材は、貫通孔が設けられた平板部材と、前記貫通孔に挿通される新設アンカーとを有しており、
前記欠損部において下端部が埋設された状態のアンカーボルトの近傍に、前記新設アンカーの埋め込み孔を、前記アンカーボルトと交差する横方向に穿設する穿孔工程と、
前記埋め込み孔に前記新設アンカーの一方の端部を埋設して前記欠損部に新設アンカーを設置するアンカー設置工程と、
前記平板部材の貫通孔に前記新設アンカーの他方の端部を挿通し、前記平板部材と前記アンカーボルトとを当接させた状態で固着し、前記平板部材を前記欠損部に設置する平板部材設置工程と、
前記各工程の後、補修剤にて前記欠損部を元の形状に修復する工程と、
を含むことを特徴とする建物基礎の補修工法。
It is a repair method for building foundations that repairs defects that occur in building foundations using reinforcing members.
Anchor bolts are embedded in the building foundation, and the reinforcing member has a flat plate member provided with a through hole and a new anchor inserted through the through hole.
A drilling step of drilling a hole for embedding the new anchor in the vicinity of the anchor bolt in which the lower end portion is embedded in the defective portion in the lateral direction intersecting with the anchor bolt.
An anchor installation step of embedding one end of the new anchor in the embedding hole and installing the new anchor in the defective portion.
Installation of a flat plate member in which the other end of the new anchor is inserted into the through hole of the flat plate member, the flat plate member and the anchor bolt are fixed in contact with each other, and the flat plate member is installed in the defective portion. Process and
After each of the above steps, a step of repairing the defective portion to the original shape with a repair agent and a step of repairing the defective portion to the original shape.
A building foundation repair method characterized by including.
請求項1に記載の建物基礎の補修工法において、
前記穿孔工程の前に、前記欠損部の表面脆弱部を除去し、建物基礎に埋設されたアンカーボルトの上半部を前記欠損部に露出させることを特徴とする建物基礎の補修工法。
In the building foundation repair method according to claim 1,
A method for repairing a building foundation, which comprises removing the surface fragile portion of the defective portion and exposing the upper half of an anchor bolt embedded in the building foundation to the defective portion before the drilling step.
請求項1または2に記載の建物基礎の補修工法において、
前記平板部材設置工程では、建物基礎に埋設された近接する複数本のアンカーボルトに対して、前記平板部材を前記複数本のアンカーボルトにまたがるように配設することを特徴とする建物基礎の補修工法。
In the building foundation repair method according to claim 1 or 2,
In the flat plate member installation step, repair of a building foundation is characterized in that the flat plate member is arranged so as to straddle the plurality of anchor bolts with respect to a plurality of adjacent anchor bolts embedded in the building foundation. Construction method.
請求項1〜3のいずれか一つの請求項に記載の建物基礎の補修工法において、
前記補強部材は、前記平板部材に複数の貫通孔を有するとともに、複数本の新設アンカーを備えており、
前記穿孔工程では、建物基礎に埋設された近接する複数本のアンカーボルトに対して、前記埋め込み孔を、前記アンカーボルトの相互間であって前記アンカーボルトの側部にそれぞれ穿設することを特徴とする建物基礎の補修工法。
In the building foundation repair method according to any one of claims 1 to 3,
The reinforcing member has a plurality of through holes in the flat plate member and is provided with a plurality of new anchors.
The drilling step is characterized in that the embedded holes are bored between the anchor bolts and on the side portions of the anchor bolts for a plurality of adjacent anchor bolts embedded in the building foundation. Repair method for building foundations.
請求項1〜4のいずれか一つの請求項に記載の建物基礎の補修工法において、
前記アンカー設置工程では、前記新設アンカーを水平方向に配設することを特徴とする建物基礎の補修工法。
In the building foundation repair method according to any one of claims 1 to 4,
In the anchor installation step, a method for repairing a building foundation, characterized in that the new anchor is arranged in the horizontal direction.
補強部材を用いた建物の基礎構造であって、
前記補強部材は、貫通孔を有する平板部材と、前記貫通孔を介して配設される新設アンカーと、前記新設アンカーに螺着されるナットとを備え、
建物基礎にはアンカーボルトの下端部が埋設され、
前記アンカーボルトの埋設部には、前記平板部材が添設されており、
前記平板部材の貫通孔に挿通されるとともに前記アンカーボルトに交差するように打ち込まれる前記新設アンカーに対して前記ナットが螺着された状態で前記補強部材が建物基礎に埋設され、
前記平板部材における一方の面を前記アンカーボルトに対向させ、他方の面から前記新設アンカーに前記ナットが螺着されて、前記平板部材が前記アンカーボルトに交差するように固定されていることを特徴とする建物の基礎構造。
It is the foundation structure of a building that uses reinforcing members.
The reinforcing member includes a flat plate member having a through hole, a new anchor disposed through the through hole, and a nut screwed to the new anchor .
The lower end of the anchor bolt is buried in the building foundation,
The flat plate member is attached to the embedded portion of the anchor bolt .
The reinforcing member is embedded in the building foundation with the nut screwed to the newly installed anchor that is inserted into the through hole of the flat plate member and driven so as to intersect the anchor bolt .
Wherein the one of the surfaces of the flat plate member is opposed to the anchor bolt, is the nut screwed on the new anchor from the other surface, the flat plate member is fixed so as to intersect the anchor bolt The foundation structure of the building.
JP2017184613A 2017-09-26 2017-09-26 Building foundation repair method and building foundation structure Active JP6965663B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017184613A JP6965663B2 (en) 2017-09-26 2017-09-26 Building foundation repair method and building foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017184613A JP6965663B2 (en) 2017-09-26 2017-09-26 Building foundation repair method and building foundation structure

Publications (2)

Publication Number Publication Date
JP2019060111A JP2019060111A (en) 2019-04-18
JP6965663B2 true JP6965663B2 (en) 2021-11-10

Family

ID=66176313

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017184613A Active JP6965663B2 (en) 2017-09-26 2017-09-26 Building foundation repair method and building foundation structure

Country Status (1)

Country Link
JP (1) JP6965663B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7363374B2 (en) 2019-10-30 2023-10-18 中国電力株式会社 Repair method for concrete structures
CN114211595B (en) * 2021-12-07 2023-06-27 上海二十冶建设有限公司 Rapid repair die for concrete prefabricated part unfilled edges and corner falling and use method thereof

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0696916B2 (en) * 1990-10-15 1994-11-30 ナショナル住宅産業株式会社 Construction method of partition wall wall panel for extension
JPH0518120A (en) * 1991-07-09 1993-01-26 Central Japan Railway Co Repairing method for concrete skeleton
JPH0694732B2 (en) * 1991-11-25 1994-11-24 哲夫 田原 Waterproof agent sealed box
JP2003293379A (en) * 2002-03-29 2003-10-15 Daiwa House Ind Co Ltd Crack preventive structure of base concrete in vicinity of anchor
JP5525142B2 (en) * 2008-05-22 2014-06-18 大成建設株式会社 Repair structure, repair anchor and repair method
JP5864899B2 (en) * 2011-05-18 2016-02-17 岡部株式会社 Existing foundation reinforcement method
JP2013076255A (en) * 2011-09-30 2013-04-25 Okabe Co Ltd Foundation reinforcement structure

Also Published As

Publication number Publication date
JP2019060111A (en) 2019-04-18

Similar Documents

Publication Publication Date Title
JP6370729B2 (en) Road bridge protective fence installation method
KR100956974B1 (en) Building remodeling construction method using precast concrete panel, and remodeled building thereof
JP6965663B2 (en) Building foundation repair method and building foundation structure
KR20200008685A (en) Method for reinforcing the Earthquake of a concrete columns
JP5688937B2 (en) Repair panel
JP2007332555A (en) Aseismatic reinforcing structure of existing building
JP3703204B2 (en) Seismic reinforcement method for existing buildings
JP3837129B2 (en) Slab reinforcement method
JP6966964B2 (en) Reinforcement structure and reinforcement method for existing reinforced concrete structures
JP2007247744A (en) Expansion anchor
JP2007162237A (en) Skeleton reinforcing structure
KR102093070B1 (en) A seismic portal structures attached in-plane square framed type strengthened by level-gap plates and sleeve-cap anchors
JP4974023B2 (en) Connection hardware, building reinforcement structure
JP2002371633A (en) Foundation anchor bolt of building and settlement correcting method of the building
JP5282721B2 (en) Rigid floor structure and method
JP3774451B2 (en) Slab reinforcement method
KR101424347B1 (en) Shear anchor for joing new and old concrete and method for joining new and old concrete
JP6220315B2 (en) Joining structure and joining method
JP5038681B2 (en) Building reinforcement structure
JP2006083666A (en) Joint structure of pile and column and the connection method
KR102640973B1 (en) Anchor block structure
JPH09291542A (en) Reinforced base of column using u-shaped anchor bolt
JP6995584B2 (en) Bearing replacement method for existing concrete girders
JP2018091083A (en) Repair method of soil plastered wall and repair material used for the method
JP2007046229A (en) Dovetail expansion anchor installing method and dovetail expansion anchor

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200601

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210622

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210625

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210820

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210921

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20211004

R150 Certificate of patent or registration of utility model

Ref document number: 6965663

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150