JP6954832B2 - Energy management device and emergency power interchange method between areas - Google Patents

Energy management device and emergency power interchange method between areas Download PDF

Info

Publication number
JP6954832B2
JP6954832B2 JP2017253084A JP2017253084A JP6954832B2 JP 6954832 B2 JP6954832 B2 JP 6954832B2 JP 2017253084 A JP2017253084 A JP 2017253084A JP 2017253084 A JP2017253084 A JP 2017253084A JP 6954832 B2 JP6954832 B2 JP 6954832B2
Authority
JP
Japan
Prior art keywords
load
emergency power
power
distribution
area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017253084A
Other languages
Japanese (ja)
Other versions
JP2019122057A (en
Inventor
一成 福田
一成 福田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Azbil Corp
Original Assignee
Azbil Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Azbil Corp filed Critical Azbil Corp
Priority to JP2017253084A priority Critical patent/JP6954832B2/en
Publication of JP2019122057A publication Critical patent/JP2019122057A/en
Application granted granted Critical
Publication of JP6954832B2 publication Critical patent/JP6954832B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明は、電源喪失時、複数のエリア間で連携して非常時電力を融通するためのエリア間非常時電力融通技術に関する。 The present invention relates to an inter-area emergency power interchange technology for accommodating emergency power in cooperation between a plurality of areas when a power source is lost.

地震、火災、大規模なシステム障害など、不測の事態が発生した場合であっても、その損害を最小限に抑え、企業や自治体が事業の継続や復旧を図るための包括的なリスクマネジメントとして、事業継続マネジメント(BCM:Business Continuity Management)と呼ばれる経営手法がある。この事業継続マネジメントの成果物の1つが、BCP(事業継続計画:Business Continuity Planning)である。 As a comprehensive risk management for companies and local governments to continue and restore their businesses by minimizing damage even in the event of an unforeseen situation such as an earthquake, fire, or large-scale system failure. , There is a management method called Business Continuity Management (BCM). One of the deliverables of this business continuity management is BCP (Business Continuity Planning).

BCPにおいて、事業の継続および復旧を図るうえで重要となるのが、電力の確保である。一般に、インシデントが発生して商用電源などの平時に供給されている主電源が喪失した電源喪失時、ビルや工場など施設や、これら施設を複数含むエリア内に設置されている、自家発電装置などの非常時電源装置を起動し、得られた非常時電力が、エリア内の各負荷に順次配分される。この際、非常時電力は平時の主電源と比較して十分ではないため、エリア内のすべての負荷に非常時電力を配分することはできない。 In BCP, securing electric power is important for business continuity and restoration. Generally, when an incident occurs and the main power supply such as commercial power is lost during normal times, when the power is lost, a private power generator installed in a facility such as a building or factory or in an area containing multiple of these facilities, etc. The emergency power supply is activated, and the obtained emergency power is sequentially distributed to each load in the area. At this time, since the emergency power is not sufficient as compared with the main power source in normal times, it is not possible to distribute the emergency power to all the loads in the area.

BCPでは、このような電源喪失時において非常時電力を優先配分すべき負荷として、事業の継続および復旧に欠かせない最優先負荷(BCP負荷)を予め選定しておくものとなっている。これにより、電源喪失時には、エリア内の最優先負荷に対して優先的に非常時電力が配分され、事業の継続および復旧に必要となる電力が確保されることになる。 In BCP, the highest priority load (BCP load), which is indispensable for business continuity and recovery, is selected in advance as a load for which emergency power should be preferentially allocated in the event of such a power loss. As a result, in the event of a power loss, emergency power will be preferentially distributed to the highest priority load in the area, and the power required for business continuity and restoration will be secured.

BCPによれば、電力喪失時、個々のエリア内で事業の継続および復旧に必要となる最低限の負荷に電力が配分されるものの、エリアによってはインシデントに起因して個別のトラブルが発生する場合がある。このような場合には、非常時電力が不足し、エリア内の最優先負荷に十分な電力を供給できない緊急事態となる。このため、エリア間における非常時電力の融通が必要となる。 According to BCP, when power is lost, power is allocated to the minimum load required for business continuity and recovery within each area, but in some areas individual troubles occur due to incidents. There is. In such a case, the emergency power is insufficient, and an emergency situation occurs in which sufficient power cannot be supplied to the highest priority load in the area. Therefore, it is necessary to accommodate emergency power between areas.

従来、地域における電力の需要・供給を統合的に管理するシステムとして、CEMS(地域エネルギーマネジメントシステム:Community Energy Management System)が運用されている(例えば、非特許文献1など参照)。
このCEMSによれば、各エリア内の電力需給が集中管理されるため、インシデントに起因して任意のエリアで個別のトラブルが発生し、当該エリア内の非常時電力が不足した場合でも、当該エリアに対して他のエリアから非常時電力を融通することができる。
Conventionally, CEMS (Community Energy Management System) has been operated as a system for comprehensively managing the supply and demand of electric power in a region (see, for example, Non-Patent Document 1).
According to this CEMS, the power supply and demand in each area is centrally managed, so even if an individual trouble occurs in any area due to an incident and the emergency power in that area is insufficient, that area In contrast, emergency power can be accommodated from other areas.

「スマートコミュニティ」、富士電機株式会社、http://www.fujielectric.co.jp/products/smartcommunity/"Smart Community", Fuji Electric Corporation, http://www.fujielectric.co.jp/products/smartcommunity/

しかしながら、このような従来技術では、インフラとしてCEMS自体の設備を新たに構築する必要があるため、CEMSの導入に際し膨大な設備コストが発生するとともに、CEMS運用にもある程度のコストを要する。また、各企業や自治体におけるBCMやBCPに対する考え方も異なるため、発生したこれらコストを、誰がどの程度負担するのかという実際問題もある。したがって、各企業や自治体など周辺地域が容易に協調することができず、CEMSの導入が進まないという問題点があった。実際には、2017年の末時点において、国内でCEMSが導入されている事例は少ない。このため、現時点で非常時分散電源の広域利用を実施するには、CEMSが面的にも大量に普及するのを待つことになる。 However, in such a conventional technique, since it is necessary to newly construct the equipment of CEMS itself as an infrastructure, a huge equipment cost is incurred when introducing CEMS, and a certain amount of cost is required for CEMS operation. In addition, since each company and local government has different ideas about BCM and BCP, there is also a practical problem of who will bear these costs and how much. Therefore, there is a problem that the surrounding areas such as each company and local government cannot easily cooperate, and the introduction of CEMS does not proceed. In fact, as of the end of 2017, there are few cases where CEMS has been introduced in Japan. Therefore, in order to carry out wide-area use of emergency distributed power sources at present, it is necessary to wait for a large amount of CEMS to spread in terms of area.

本発明はこのような課題を解決するためのものであり、大きなコスト負担を必要とすることなく、エリア間で非常時電力を容易に融通できるエリア間非常時電力融通技術を提供することを目的としている。 The present invention is for solving such a problem, and an object of the present invention is to provide an inter-area emergency power interchange technology capable of easily accommodating emergency power between areas without requiring a large cost burden. It is said.

このような目的を達成するために、本発明にかかるエネルギー管理装置は、自エリア内に存在する複数の負荷に関する、非常時電力の配分順序を示す優先レベルを、記憶するように構成された記憶部と、前記複数の負荷へ供給すべき主電源が喪失した電源喪失時、非常時電源装置から供給された非常時電力を、少なくとも、前記複数の負荷のうち前記優先レベルが最も高い最優先レベルの最優先負荷へ、配分するように構成された負荷配分制御部と、前記非常時電力の配分に関する配分状況を、連携対象となる相手エリアとの間で連携通信回線を介してやり取りするように構成された配分状況連携部とを備え、前記負荷配分制御部は、前記相手エリアで相手最優先負荷に対して相手非常時電力が供給できでいない旨を示す電源融通要請を、前記相手エリアから前記配分状況連携部で受信した場合、前記非常時電力のうち前記最優先負荷へ配分する電力を除いた融通可能電力の一部または全部を連携配電線を介して前記相手エリアへ融通するようにしたものである。 In order to achieve such an object, the energy management device according to the present invention is configured to store priority levels indicating the order of emergency power distribution for a plurality of loads existing in the own area. When the main power supply to be supplied to the plurality of loads is lost, the emergency power supplied from the emergency power supply device is at least the highest priority level having the highest priority level among the plurality of loads. The load distribution control unit configured to distribute to the highest priority load of the above and the distribution status regarding the distribution of the emergency power are exchanged between the partner area to be linked via the linked communication line. The load distribution control unit is provided with a configured distribution status cooperation unit, and the load distribution control unit makes a power interchange request from the partner area indicating that the partner emergency power cannot be supplied to the partner top priority load in the partner area. When received by the distribution status cooperation unit, a part or all of the interchangeable power excluding the power to be distributed to the highest priority load among the emergency powers is accommodated to the partner area via the cooperation distribution line. It was done.

また、本発明にかかる上記エネルギー管理装置の一構成例は、前記配分状況連携部が、前記最優先負荷に対して前記非常時電力を配分できていない場合、前記連携通信回線を介して前記相手エリアに電源融通要請を送信し、前記負荷配分制御部は、前記相手エリアへ送信した前記電源融通要請に応じて、前記相手エリアから前記連携配電線を介して融通された相手非常時電力を、前記最優先負荷に配分するようにしたものである。 Further, in one configuration example of the energy management device according to the present invention, when the distribution status cooperation unit cannot distribute the emergency power to the highest priority load, the other party via the cooperation communication line. The power supply accommodation request is transmitted to the area, and the load distribution control unit receives the other party's emergency power interchanged from the other party area via the cooperation distribution line in response to the power supply accommodation request transmitted to the other party area. It is designed to be distributed to the highest priority load.

また、本発明にかかる上記エネルギー管理装置の一構成例は、前記負荷配分制御部が、前記電源喪失時、前記複数の負荷のうち、前記非常時電源装置の供給容量の範囲内で前記非常時電力を配分可能な優先レベルの負荷まで、前記非常時電力を順に配分するようにしたものである。 Further, in one configuration example of the energy management device according to the present invention, when the load distribution control unit loses power, the emergency power supply is within the supply capacity of the emergency power supply device among the plurality of loads. The emergency power is distributed in order up to the load of the priority level to which the power can be distributed.

また、本発明にかかる上記エネルギー管理装置の一構成例は、前記負荷配分制御部が、前記電源融通要請を受信した場合、前記非常時電力を配分中である配分中負荷のうちから、優先レベルが前記最優先レベルより低い、1つまたは複数の任意の負荷を遮断対象負荷として選択して、前記遮断対象負荷に対する前記非常時電力の配分を停止することにより、前記融通可能電力を確保するようにしたものである。 Further, in one configuration example of the energy management device according to the present invention, when the load distribution control unit receives the power supply accommodation request, the priority level is selected from the distribution middle loads that are allocating the emergency power. To ensure the interchangeable power by selecting one or more arbitrary loads lower than the highest priority level as the cutoff target load and stopping the distribution of the emergency power to the cutoff target load. It is the one that was made.

また、本発明にかかる上記エネルギー管理装置の一構成例は、前記負荷配分制御部が、少なくとも、前記配分中負荷のうち優先レベルが最も低い最低配分中レベルの負荷を、前記遮断対象負荷として選択するようにしたものである。 Further, in one configuration example of the energy management device according to the present invention, the load distribution control unit selects at least the load of the lowest distribution medium level having the lowest priority level among the distribution medium loads as the cutoff target load. It is something that I tried to do.

また、本発明にかかる上記エネルギー管理装置の一構成例は、前記負荷配分制御部が、前記非常時電力を配分すべき優先レベルを示す配分対象レベルを、前記配分中負荷のうち優先レベルが最も低い最低配分中レベルの1つ上の優先レベルまで引き上げることにより、前記最低配分中レベルの負荷を前記遮断対象負荷として選択するようにしたものである。 Further, in one configuration example of the energy management device according to the present invention, the load distribution control unit sets the allocation target level indicating the priority level to which the emergency power should be allocated, and the priority level is the highest among the distribution middle loads. By raising the priority level to one level higher than the lower minimum allocation medium level, the load of the minimum allocation medium level is selected as the cutoff target load.

また、本発明にかかる上記エネルギー管理装置の一構成例は、前記負荷配分制御部が、前記非常時電力を配分すべき優先レベルを示す配分対象レベルを、前記最優先レベルまで引き上げることにより、前記配分中負荷のうち前記最優先負荷を除くすべての負荷を前記遮断対象負荷として選択するようにしたものである。 Further, in one configuration example of the energy management device according to the present invention, the load distribution control unit raises the allocation target level indicating the priority level to which the emergency power should be allocated to the highest priority level. Of the loads being distributed, all the loads other than the highest priority load are selected as the cutoff target loads.

また、本発明にかかるエリア間非常時電力融通方法は、自エリア内に存在する複数の負荷へ供給すべき主電源が喪失した電源喪失時、非常時電源装置から供給された非常時電力を前記複数の負荷へ配分するエネルギー管理装置で用いられるエリア間非常時電力融通方法であって、記憶部が、前記複数の負荷に関する、前記非常時電力の配分順序を示す優先レベルを記憶する記憶ステップと、負荷配分制御部が、前記電源喪失時、前記非常時電力を、少なくとも、前記複数の負荷のうち前記優先レベルが最も高い最優先レベルの最優先負荷へ配分する負荷配分制御ステップと、配分状況連携部が、前記非常時電力の配分に関する配分状況を、連携対象となる相手エリアとの間で連携通信回線を介してやり取りする配分状況連携ステップとを備え、前記負荷配分制御ステップは、前記相手エリアで相手最優先負荷に対して相手非常時電力が供給できでいない旨を示す電源融通要請を、前記相手エリアから受信した場合、前記非常時電力のうち前記最優先負荷へ配分する電力を除いた融通可能電力の一部または全部を連携配電線を介して前記相手エリアへ融通するステップを含むようにしたものである。 Further, in the inter-area emergency power interchange method according to the present invention, when the main power supply to be supplied to a plurality of loads existing in the own area is lost, the emergency power supplied from the emergency power supply device is used as described above. An inter-area emergency power interchange method used in an energy management device that distributes power to a plurality of loads, wherein the storage unit stores a priority level indicating the order of distribution of the emergency power for the plurality of loads. The load distribution control unit allocates the emergency power to at least the highest priority load having the highest priority level among the plurality of loads in the event of power loss, and the distribution status. The cooperation unit includes a distribution status cooperation step in which the distribution status regarding the distribution of the emergency power is exchanged with the partner area to be linked via the link communication line, and the load distribution control step is the partner. When a power interchange request indicating that the other party's emergency power cannot be supplied to the other party's highest priority load in the area is received from the other party's area, the power to be distributed to the highest priority load is excluded from the emergency power. A step of accommodating a part or all of the interchangeable electric power to the partner area via the cooperative distribution line is included.

本発明によれば、電源喪失時には、近年、広く導入されているBEMSの中央監視装置に代表されるエネルギー管理装置が、複数のエリア間で連携して、それぞれの非常時電力を融通することになる。このため、CEMSのような各エリアのエネルギー管理装置とは独立した大規模な設備を必要とすることなく、電源喪失時でも各エリアの最優先負荷(BCP負荷)を復帰させて稼働させることができる。また、連携するエリア間を結ぶ連携配電線や連携通信回線については、既存の配電線や通信回線を利用すればよい。 According to the present invention, in the event of power loss, an energy management device represented by a BEMS central monitoring device, which has been widely introduced in recent years, cooperates between a plurality of areas to accommodate each emergency power. Become. Therefore, it is possible to restore the highest priority load (BCP load) in each area and operate it even when the power is lost, without requiring a large-scale facility such as CEMS that is independent of the energy management device in each area. can. Further, as for the cooperative distribution line and the cooperative communication line connecting the linked areas, the existing distribution line and the communication line may be used.

したがって、既存のエネルギー管理装置のソフトウェアを変更するという、極めて小規模のコストで容易に事業の継続および復旧を図ることが可能となる。また、CEMSを導入する場合のようなコスト分担の問題もなくなるため、各企業や自治体単位さらにはビル建物単位で、極めて容易にかつ広く導入することができ、広域停電時に生じる地域社会のリスクを大幅に軽減することが可能となる。 Therefore, it is possible to easily continue and restore the business at a very small cost of changing the software of the existing energy management device. In addition, since the problem of cost sharing as in the case of introducing CEMS is eliminated, it can be introduced extremely easily and widely in each company, local government unit, or building building unit, and the risk of the local community caused in the event of a wide area power outage can be reduced. It can be significantly reduced.

エネルギー管理装置の構成を示すブロック図である。It is a block diagram which shows the structure of the energy management apparatus. 負荷優先データの構成例である。This is a configuration example of load priority data. 優先レベルの割当例である。This is an example of priority level allocation. 優先レベルに基づく負荷の復帰・遮断順序を示す説明図である。It is explanatory drawing which shows the load recovery / cutoff order based on a priority level. エリア内の設備に関する電源系統図である。It is a power system diagram about the equipment in the area. 非常時電力の融通制御を示すフローチャートである。It is a flowchart which shows the flexibility control of emergency power. 非常時電力の融通動作例(融通前)を示す説明図である。It is explanatory drawing which shows the accommodating operation example (before accommodating) of emergency power. 非常時電力の融通動作例(障害発生時)を示す説明図である。It is explanatory drawing which shows the example of the interchange operation of emergency power (when a failure occurs). 非常時電力の融通動作例(負荷遮断時)を示す説明図である。It is explanatory drawing which shows the example of the interchange operation of emergency power (when the load is cut off). 非常時電力の融通動作例(融通時)を示す説明図である。It is explanatory drawing which shows the accommodating operation example (at the time of accommodating) of emergency power.

次に、本発明の一実施の形態について図面を参照して説明する。
[エネルギー管理装置]
まず、図1を参照して、本実施の形態にかかるエネルギー管理装置10について説明する。図1は、エネルギー管理装置の構成を示すブロック図である。
Next, an embodiment of the present invention will be described with reference to the drawings.
[Energy management device]
First, the energy management device 10 according to the present embodiment will be described with reference to FIG. FIG. 1 is a block diagram showing a configuration of an energy management device.

このエネルギー管理装置10は、全体としてサーバ装置などのコンピュータからなり、管理対象となる自エリア内に存在する複数の負荷に対して、供給すべき商用電源などの主電源が、停電などにより喪失した電源喪失時、非常時電源装置から供給された非常時電力を各負荷へ配分する装置である。
エネルギー管理装置10は、非常時電力を融通しあう連携対象として予め設定された各エリアA,B,…,Nのそれぞれに配置されており、これらエネルギー管理装置10により、エネルギー管理システム1が構成される。
The energy management device 10 is composed of a computer such as a server device as a whole, and the main power source such as a commercial power source to be supplied to a plurality of loads existing in the own area to be managed is lost due to a power failure or the like. It is a device that distributes the emergency power supplied from the emergency power supply to each load when the power is lost.
The energy management device 10 is arranged in each of the preset areas A, B, ..., N as the cooperation target for accommodating the emergency power, and the energy management device 10 constitutes the energy management system 1. Will be done.

本発明にかかるエネルギー管理装置10の具体例の1つとして、BEMS(ビルエネルギー管理システム:Building Energy Management System)の中央監視装置がある。 As one of the specific examples of the energy management device 10 according to the present invention, there is a central monitoring device of BEMS (Building Energy Management System).

BEMSは、ビルなどの建物や施設の設備管理や省エネルギー制御を行うとともに、エネルギーマネジメントによって環境性や省エネ性の改善を支援するシステムである。このようなBEMSは、1990年代から導入が始まり、省エネルギーを目的とした政府の支援もあって普及が大幅に進み、近年、多くのビルに導入されて実際に運用されている。
本発明は、このようなBEMSなどの既存技術に、新たな構成を追加することにより、電源喪失時、エリア間で非常時電力を融通するようにものである。このため、前述したCEMSを導入する場合と比較して、設備や運用に要するコストを大幅に削減することができる。
BEMS is a system that supports the improvement of environmental friendliness and energy saving by energy management as well as facility management and energy saving control of buildings and facilities such as buildings. The introduction of such BEMS began in the 1990s, and with the support of the government for the purpose of energy saving, it has spread significantly, and in recent years, it has been introduced in many buildings and is actually in operation.
The present invention is intended to accommodate emergency power between areas in the event of power loss by adding a new configuration to such existing technology such as BEMS. Therefore, as compared with the case of introducing the above-mentioned CEMS, the cost required for equipment and operation can be significantly reduced.

図1に示すように、本実施の形態にかかるエネルギー管理装置10は、主な機能部として、通信I/F部11、設備I/F部12、記憶部13、および演算処理部14を備えており、これら機能部は、内部バス15を介して接続されている。 As shown in FIG. 1, the energy management device 10 according to the present embodiment includes a communication I / F unit 11, an equipment I / F unit 12, a storage unit 13, and an arithmetic processing unit 14 as main functional units. These functional units are connected via the internal bus 15.

通信I/F部11は、連携通信回線LCを介して各エリアA,B,…,N間で、データ通信を行う機能を有している。連携通信回線LCについては、専用の通信回線を用いてもよく、インターネットや無線LANなどの一般的なデータ通信ネットワークを用いてもよい。 The communication I / F unit 11 has a function of performing data communication between each of the areas A, B, ..., N via the cooperative communication line LC. As the cooperative communication line LC, a dedicated communication line may be used, or a general data communication network such as the Internet or a wireless LAN may be used.

設備I/F部12は、エネルギー管理装置10のエリア内に存在する設備20との間でデータ通信を行うことにより、各設備20から各種の運用状況を収集する機能と、各設備20の動作制御指示を送信する機能とを有している。
主な設備20として、主電源装置21、非常時電源装置22、受給電装置23、最優先負荷31、準優先負荷32、および一般負荷34があり、これら設備20が母線Bに接続されている。
The equipment I / F unit 12 has a function of collecting various operation statuses from each equipment 20 by performing data communication with the equipment 20 existing in the area of the energy management device 10, and an operation of each equipment 20. It has a function to send control instructions.
The main equipment 20 includes a main power supply device 21, an emergency power supply device 22, a power receiving / power receiving device 23, a highest priority load 31, a quasi-priority load 32, and a general load 34, and these facilities 20 are connected to the bus B. ..

主電源装置21は、一般的な電力系統からの商用電源ACを受電して、動力電源や電灯電源などの主電源に変圧し、エリア内の各設備20およびエネルギー管理装置10へ供給する機能を有している。
非常時電源装置22は、ディーゼル発電機やガスタービン発電機などの一般的な非常用発電機や、コンバータに接続された蓄電装置からなり、主電源装置21から供給される主電源が喪失した場合に起動して、非常時電力を供給する機能を有している。
受給電装置23は、例えば自営線などの既存の配電線を利用した連携配電線LPを介して各エリアA,B,…,N間で、非常時電力を融通する機能を有している。
The main power supply device 21 has a function of receiving a commercial power supply AC from a general power system, transforming it into a main power supply such as a power power supply or a lamp power supply, and supplying it to each facility 20 and an energy management device 10 in the area. Have.
The emergency power supply device 22 includes a general emergency generator such as a diesel generator or a gas turbine generator, or a power storage device connected to a converter, and when the main power supply supplied from the main power supply device 21 is lost. It has a function to start up and supply emergency power.
The power receiving / receiving device 23 has a function of accommodating emergency power between areas A, B, ..., N via a cooperative distribution line LP using an existing distribution line such as a self-employed line.

最優先負荷(BCP負荷)31は、電源喪失時、非常時電力を最優先で配分すべき負荷である。最優先負荷31は、設備20のうちから予め選択され、記憶部13に設定される。例えばBCPでは、最優先負荷31の具体例として、企業や自治体が事業の継続や復旧を図るために必要となる、非常用、保安用、防災用、救護用、通信用などの設備が選択される。
準優先負荷32および通常優先負荷33は、電源喪失時、最優先負荷31に次いで非常時電力を順次優先して配分すべき負荷である。一般負荷34は、電源喪失時、非常時電力が配分されない負荷である。
The highest priority load (BCP load) 31 is a load for which emergency power should be allocated with the highest priority when power is lost. The highest priority load 31 is selected in advance from the equipment 20 and set in the storage unit 13. For example, in BCP, as a specific example of the highest priority load 31, equipment for emergency, security, disaster prevention, rescue, communication, etc., which is necessary for companies and local governments to continue and restore their business, is selected. NS.
The quasi-priority load 32 and the normal priority load 33 are loads in which emergency power should be sequentially prioritized and distributed next to the highest priority load 31 when the power is lost. The general load 34 is a load in which emergency power is not distributed when power is lost.

記憶部13は、ハードディスクや半導体メモリなどの記憶装置からなり、演算処理部14で実行される各種処理に用いる処理データやプログラムを記憶する機能を有している。
プログラムは、エネルギー管理装置10に接続された外部装置や記録媒体(ともに図示せず)から読み出されて予め記憶部13に格納される。
The storage unit 13 is composed of a storage device such as a hard disk or a semiconductor memory, and has a function of storing processing data and programs used for various processes executed by the arithmetic processing unit 14.
The program is read from an external device or recording medium (both not shown) connected to the energy management device 10 and stored in the storage unit 13 in advance.

記憶部13で記憶する主な処理データとして、各負荷に関する、非常時電力の配分順序を示す負荷優先データがある。
図2は、負荷優先データの構成例である。ここでは、各負荷に関する負荷優先データとして、各負荷を識別するための負荷IDと、当該負荷に割り当てられた優先レベルとの組が登録されている。
As the main processing data stored in the storage unit 13, there is load priority data indicating the emergency power distribution order for each load.
FIG. 2 is a configuration example of load priority data. Here, as load priority data for each load, a set of a load ID for identifying each load and a priority level assigned to the load is registered.

図3は、優先レベルの割当例である。ここでは、5つの優先レベル1〜5のうち、優先レベル1〜3が電源遮断時に非常時電力の配分対象となる優先負荷に割り当てられ、優先レベル4〜5が電源遮断時に非常時電力の配分対象とならない一般負荷に割り当てられている。具体的には、優先レベル1が最優先負荷(BCP負荷)に割り当てられ、優先レベル2,3が最優先負荷に次ぐ準優先負荷および通常優先負荷にそれぞれ割り当てられている。また、優先レベル4,5は優先一般負荷および通常一般負荷に割り当てられている。 FIG. 3 is an example of priority level allocation. Here, of the five priority levels 1 to 5, priority levels 1 to 3 are assigned to the priority load to be allocated emergency power when the power is cut off, and priority levels 4 to 5 are allocated to the emergency power when the power is cut off. It is assigned to a general load that is not the target. Specifically, priority level 1 is assigned to the highest priority load (BCP load), and priority levels 2 and 3 are assigned to the quasi-priority load and the normal priority load next to the highest priority load, respectively. Further, priority levels 4 and 5 are assigned to the priority general load and the normal general load.

図4は、優先レベルに基づく負荷の復帰・遮断順序を示す説明図である。
BEMSなどのエネルギー管理システムで用いられる一般的な自家発負荷配分制御では、各負荷に優先レベルを割り当てておき、非常時電力に基づく各負荷の復帰および遮断の順序を制御している。ここでいう、復帰とは、非常時電力に基づいて負荷を電源喪失前の状態に戻すことを指し、遮断とは、負荷への非常時電力の供給を停止することを指す。
FIG. 4 is an explanatory diagram showing a load recovery / cutoff order based on the priority level.
In general self-generated load distribution control used in an energy management system such as BEMS, a priority level is assigned to each load, and the order of recovery and interruption of each load based on emergency power is controlled. Here, the recovery means returning the load to the state before the power loss based on the emergency power, and the interruption means stopping the supply of the emergency power to the load.

図4に示すように、自家発負荷配分制御において、各負荷は、優先レベルの順にしたがってシーケンシャル(優先順位方式)で復帰・遮断制御される。具体的には、5つの優先レベル1〜5を設定した場合、各負荷は、優先レベル1〜5の正順で復帰制御され、優先レベル5〜1の逆順で遮断制御で遮断される。 As shown in FIG. 4, in the self-generated load distribution control, each load is sequentially (priority order method) return / cutoff control in the order of priority level. Specifically, when the five priority levels 1 to 5 are set, each load is returned and controlled in the forward order of the priority levels 1 to 5, and is cut off by the cutoff control in the reverse order of the priority levels 5 to 1.

演算処理部14は、CPUとその周辺回路を有し、記憶部13から読み出したプログラムをCPUで実行することにより、ハードウェアとソフトウェアが協働して、各種の処理部を実現する機能を有している。
演算処理部14で実現される主な処理部として、配分状況連携部14Aと負荷配分制御部14Bがある。
The arithmetic processing unit 14 has a CPU and its peripheral circuits, and has a function of realizing various processing units in cooperation with hardware and software by executing a program read from the storage unit 13 on the CPU. doing.
The main processing units realized by the arithmetic processing unit 14 include the distribution status cooperation unit 14A and the load distribution control unit 14B.

配分状況連携部14Aは、非常時電力の配分に関する配分状況を、連携対象となる相手エリアとの間で連携通信回線LCを介してやり取りする機能と、最優先負荷31に対して非常時電力を配分できていない場合、連携通信回線LCを介して相手エリアに電源融通要請を送信する機能とを有している。 Distribution status The cooperation unit 14A has a function of exchanging the distribution status regarding the distribution of emergency power with the partner area to be linked via the cooperation communication line LC, and provides emergency power to the highest priority load 31. If the distribution is not possible, it has a function of transmitting a power interchange request to the partner area via the linked communication line LC.

負荷配分制御部14Bは、電源喪失時、前述した自家発負荷配分制御により、記憶部13の負荷優先データに登録されている優先レベルに基づいて、非常時電源装置22の供給容量の範囲内で非常時電力を配分可能な優先レベルの負荷まで、各負荷に非常時電力を順に配分する機能を有している。これにより、電源喪失時には、少なくとも、優先レベルが最も高い最優先レベルの最優先負荷へ非常時電力が配分されることになる。 When the power is lost, the load distribution control unit 14B is within the supply capacity of the emergency power supply device 22 based on the priority level registered in the load priority data of the storage unit 13 by the self-generated load distribution control described above. It has a function to distribute emergency power to each load in order up to the priority level load to which emergency power can be distributed. As a result, in the event of power loss, emergency power is distributed to at least the highest priority load having the highest priority level.

また、負荷配分制御部14Bは、連携対象となる相手エリアにおいて、相手最優先負荷に対して相手非常時電力が供給できでいない旨を示す電源融通要請を、配分状況連携部14Aにより相手エリアから受信した場合、非常時電力のうち最優先負荷へ配分する電力を除いた融通可能電力の一部または全部を連携配電線LPを介して相手エリアへ融通する機能と、配分状況連携部14Aから相手エリアへ送信した電源融通要請に応じて、相手エリアから連携配電線LPを介して融通された相手非常時電力を、最優先負荷31に配分する機能とを有している。 Further, the load distribution control unit 14B makes a power supply accommodation request indicating that the other party's emergency power cannot be supplied to the other party's highest priority load in the other party's area to be linked by the distribution status cooperation unit 14A from the other party's area. When it is received, it has a function to accommodate a part or all of the interchangeable power excluding the power to be distributed to the highest priority load among the emergency powers to the partner area via the cooperative distribution line LP, and the distribution status cooperation unit 14A to the other party. It has a function of allocating the other party's emergency power interchanged from the other party's area via the cooperative distribution line LP to the highest priority load 31 in response to the power supply accommodation request transmitted to the area.

また、負荷配分制御部14Bは、相手エリアから電源融通要請を受信した場合、非常時電力を配分中である配分中負荷のうちから、優先レベルが最優先レベルより低い、1つまたは複数の任意の負荷を遮断対象負荷として選択して、遮断対象負荷に対する非常時電力の配分を停止することにより、融通可能電力を確保する機能と、少なくとも、配分中負荷のうち優先レベルが最も低い最低配分中レベルの負荷を、遮断対象負荷として選択する機能とを有している。 Further, when the load distribution control unit 14B receives a power supply accommodation request from the partner area, the load distribution control unit 14B has one or a plurality of arbitrary loads whose priority level is lower than the highest priority level among the distribution middle loads that are allocating emergency power. A function that secures interchangeable power by selecting the load of It has a function to select a level load as a load to be cut off.

この際、より具体的には、非常時電力を配分すべき優先レベルを示す配分対象レベルを、最低配分中レベルの1つ上の優先レベルまで引き上げることにより、最低配分中レベルの負荷を遮断対象負荷として選択するようにしてもよい。
あるいは、非常時電力を配分すべき優先レベルを示す配分対象レベルを、最優先レベルまで引き上げることにより、配分中負荷のうち最優先負荷を除くすべての負荷を遮断対象負荷として選択するようにしてもよい。
At this time, more specifically, by raising the allocation target level indicating the priority level to which emergency power should be allocated to the priority level one level higher than the minimum allocation medium level, the load at the minimum allocation medium level is blocked. It may be selected as the load.
Alternatively, by raising the allocation target level, which indicates the priority level to which emergency power should be allocated, to the highest priority level, all the loads other than the highest priority load among the allocated loads are selected as the cutoff target loads. good.

[本実施の形態の動作]
次に、本実施の形態にかかるエネルギー管理装置10の動作について説明する。
[Operation of the present embodiment]
Next, the operation of the energy management device 10 according to the present embodiment will be described.

[電源喪失時の電源切替制御]
まず、図5を参照して、電源喪失時における設備20への電源切替制御について説明する。図5は、エリア内の設備に関する電源系統図である。ここでは、最優先負荷31、準優先負荷32、通常優先負荷33、および一般負荷34に対して、図5に示した優先レベルが割り当てられている場合を例として説明する。
[Power switching control when power is lost]
First, the power supply switching control to the equipment 20 when the power supply is lost will be described with reference to FIG. FIG. 5 is a power system diagram relating to the equipment in the area. Here, a case where the priority level shown in FIG. 5 is assigned to the highest priority load 31, the quasi-priority load 32, the normal priority load 33, and the general load 34 will be described as an example.

図5の構成例では、図1の母線BがスイッチSBにより、主電源側母線BSと非常時電源側母線BLに分離されている。主電源装置21および一般負荷34は、それぞれスイッチSACおよびスイッチSLを介してBSに接続されている。また、非常時電源装置22、受給電装置23、最優先負荷31、準優先負荷32、および通常優先負荷33が、それぞれスイッチSG、ST、S1、S2、およびS3を介してBLに接続されている。 In the configuration example of FIG. 5, the bus B of FIG. 1 is separated into the main power supply side bus BS and the emergency power supply side bus BL by the switch SB. The main power supply 21 and the general load 34 are connected to the BS via the switch SAC and the switch SL, respectively. Further, the emergency power supply device 22, the power receiving / receiving device 23, the highest priority load 31, the quasi-priority load 32, and the normal priority load 33 are connected to the BL via switches SG, ST, S1, S2, and S3, respectively. There is.

平時において、主電源装置21が起動されており、これにより、電力系統からの商用電源ACが主電源装置21で受電されて、動力電源や電灯電源などの主電源に変圧され、SACを介してBSに供給される。この際、SBが短絡されており、BSの主電源がBLにも供給される。一方、平時において、非常時電源装置22および受給電装置23は遮断されており、SGおよびSTは開放されている。したがって、S1、S2、S3、およびSLを任意に短絡することにより、最優先負荷31、準優先負荷32、通常優先負荷33、および一般負荷34が、それぞれ主電源に投入される。 In normal times, the main power supply unit 21 is activated, whereby the commercial power supply AC from the power system is received by the main power supply unit 21 and transformed into a main power supply such as a power power supply or a light power supply, and is transformed into a main power supply such as a power supply or a light power supply via the SAC. It is supplied to the BS. At this time, the SB is short-circuited, and the main power supply of the BS is also supplied to the BL. On the other hand, in normal times, the emergency power supply device 22 and the power receiving / receiving device 23 are shut off, and the SG and ST are open. Therefore, by arbitrarily short-circuiting S1, S2, S3, and SL, the highest priority load 31, the quasi-priority load 32, the normal priority load 33, and the general load 34 are each turned on to the main power supply.

電源系統が停電し、主電源が喪失した場合、主電源装置21の2次側に接続されている不足電圧継電器HUVで電源喪失が検出される。エネルギー管理装置10の負荷配分制御部14Bは、設備I/F部12を介してHUVからの電源喪失を確認し、平時から非常時への切替制御を開始する。 When the power supply system loses power and the main power supply is lost, the power loss is detected by the undervoltage relay HUV connected to the secondary side of the main power supply device 21. The load distribution control unit 14B of the energy management device 10 confirms the loss of power from the HUV via the equipment I / F unit 12, and starts switching control from normal to emergency.

まず、負荷配分制御部14Bは、設備I/F部12によりSACを開放するとともにSBを開放して、BLをBSから切り離し、非常時電源装置22および受給電装置23を起動し、非常時電源装置22からの非常時電力が安定化した後、設備I/F部12によりSGを短絡する。これにより、非常時電源装置22で発電された非常時電力が、BLにのみ供給される。なお、非常時電力を一般負荷にも供給する場合、SBを短絡してBLにBSを接続し、非常時電力を供給すべき一般負荷のSLを短絡すればよい。 First, the load distribution control unit 14B opens the SAC and the SB by the equipment I / F unit 12, disconnects the BL from the BS, activates the emergency power supply device 22 and the power receiving / receiving device 23, and activates the emergency power supply device 22 and the power receiving / receiving device 23. After the emergency power from the device 22 is stabilized, the equipment I / F unit 12 short-circuits the SG. As a result, the emergency power generated by the emergency power supply device 22 is supplied only to the BL. When supplying emergency power to a general load, the SB may be short-circuited, the BS may be connected to the BL, and the SL of the general load to which the emergency power should be supplied may be short-circuited.

続いて、負荷配分制御部14Bは、記憶部13に設定されている優先レベルに基づく自家発負荷配分制御を実行する。この際、非常時電力に余裕があり、最優先負荷31および準優先負荷32の両方を駆動可能な場合、負荷配分制御部14Bは、まず設備I/F部12によりS1を短絡して最優先負荷31をBLに投入した後、設備I/F部12によりS2を短絡して準優先負荷32をBLに投入する。これにより、非常時電力が最優先負荷31および準優先負荷32に配分されることになる。 Subsequently, the load distribution control unit 14B executes the self-generated load distribution control based on the priority level set in the storage unit 13. At this time, if there is a margin in emergency power and both the highest priority load 31 and the quasi-priority load 32 can be driven, the load distribution control unit 14B first short-circuits S1 by the equipment I / F unit 12 to give the highest priority. After the load 31 is applied to the BL, the equipment I / F unit 12 short-circuits S2 to apply the quasi-priority load 32 to the BL. As a result, the emergency power is distributed to the highest priority load 31 and the quasi-priority load 32.

[非常時電力の融通制御]
次に、図6を参照して、非常時電力の融通制御について説明する。図6は、非常時電力の融通制御を示すフローチャートである。
[Emergency power accommodation control]
Next, with reference to FIG. 6, the accommodation control of emergency power will be described. FIG. 6 is a flowchart showing the flexibility control of emergency power.

まず、図6に示すように、負荷配分制御部14Bは、設備I/F部12により最優先負荷31から非常時電力の配分状況を取得し(ステップS100)、非常時電力が最優先負荷31へ配分できているか確認する(ステップS101)。
ここで、何らかのトラブルにより、非常時電力が最優先負荷31へ配分できていない場合(ステップS101:NO)、配分状況連携部14Aは、連携通信回線LCを介して各相手エリアに電源融通要請を送信する(ステップS102)。
First, as shown in FIG. 6, the load distribution control unit 14B acquires the emergency power distribution status from the highest priority load 31 by the equipment I / F unit 12 (step S100), and the emergency power is the highest priority load 31. (Step S101).
Here, when the emergency power cannot be distributed to the highest priority load 31 due to some trouble (step S101: NO), the distribution status cooperation unit 14A requests each partner area to accommodate the power supply via the cooperation communication line LC. Transmit (step S102).

次に、負荷配分制御部14Bは、連携配電線LPを介した相手エリアからの電源融通の有無を、設備I/F部12により受給電装置23から取得し(ステップS103)、電源融通の開始が確認されるまで待機する(ステップS103:NO)。
電源融通の開始が確認された場合(ステップS103:YES)、負荷配分制御部14Bは、受給電装置23からの相手非常時電力が安定化した後、設備I/F部12によりS3を短絡する。これにより、相手エリアから連携配電線LPを介して融通された相手非常時電力が、BLにのみ配分供給されることになる。
Next, the load distribution control unit 14B acquires the presence or absence of power supply accommodation from the mating area via the cooperative distribution line LP from the power receiving / receiving device 23 by the equipment I / F unit 12 (step S103), and starts the power supply accommodation. Waits until is confirmed (step S103: NO).
When the start of power interchange is confirmed (step S103: YES), the load distribution control unit 14B short-circuits S3 by the equipment I / F unit 12 after the other emergency power from the power receiving / receiving device 23 is stabilized. .. As a result, the partner emergency power interchanged from the partner area via the cooperative distribution line LP is distributed and supplied only to the BL.

続いて、負荷配分制御部14Bは、記憶部13に設定されている優先レベルに基づく自家発負荷配分制御を実行する。この際、BL上の非常時電力が相手エリアから融通された相手非常時電力であるため、負荷配分制御部14Bは、設備I/F部12によりS1を短絡して最優先負荷31のみをBLに投入する(ステップS104)。これにより、相手非常時電力が最優先負荷31に配分されることになり、企業や自治体が事業の継続や復旧を図るために必要となる最低限の設備を稼働させることができる。 Subsequently, the load distribution control unit 14B executes the self-generated load distribution control based on the priority level set in the storage unit 13. At this time, since the emergency power on the BL is the other emergency power accommodated from the partner area, the load distribution control unit 14B short-circuits S1 by the equipment I / F unit 12 and BLs only the highest priority load 31. (Step S104). As a result, the emergency power of the other party is distributed to the highest priority load 31, and the minimum equipment necessary for the company or the local government to continue or restore the business can be operated.

この後、負荷配分制御部14Bは、設備I/F部12によりHUVで商用電源ACの復旧状況を確認し(ステップS110)、商用電源ACが復旧していない場合には(ステップS110:NO)、ステップS100に戻る。一方、商用電源ACが復旧している場合には(ステップS110:YES)、一連の非常時電力の融通制御を終了する。 After that, the load distribution control unit 14B confirms the restoration status of the commercial power supply AC by HUV by the equipment I / F unit 12 (step S110), and if the commercial power supply AC is not restored (step S110: NO). , Return to step S100. On the other hand, when the commercial power supply AC is restored (step S110: YES), a series of emergency power interchange control is terminated.

また、ステップS101において、非常時電力が最優先負荷31へ配分できている場合(ステップS101:YES)、負荷配分制御部14Bは、自配分レベルと最優先レベルとを比較することにより、相手エリアからの電源融通要請に応じて、自エリアの非常時電力を融通できるか否か確認する(ステップS105)。
ここで、自配分レベルが最優先レベルを上回っておらず等しい場合(ステップS105:NO)、自エリアの非常時電力に融通可能電力が存在しないため、前述したステップS110へ移行する。
Further, in step S101, when the emergency power can be distributed to the highest priority load 31 (step S101: YES), the load distribution control unit 14B compares the self-distribution level and the highest priority level to the partner area. In response to the power supply interchange request from the above, it is confirmed whether or not the emergency power in the own area can be accommodated (step S105).
Here, if the self-allocation level does not exceed the highest priority level and is equal (step S105: NO), there is no interchangeable power in the emergency power in the own area, so the process proceeds to step S110 described above.

一方、自配分レベルが最優先レベルを上回っている場合(ステップS105:YES)、自エリアの非常時電力に融通可能電力が存在するため、次のような相手エリアに対する非常時電力の融通制御を実行する。
まず、負荷配分制御部14Bは、配分状況連携部14Aでの連携通信回線LCを介した相手エリアからの電源融通要請の受信を確認し(ステップS106)、電源融通要請の受信がなければ(ステップS106:NO)、前述したステップS110へ移行する。
On the other hand, when the self-allocation level exceeds the highest priority level (step S105: YES), since there is interchangeable power in the emergency power in the own area, the following emergency power accommodation control for the partner area is performed. Run.
First, the load distribution control unit 14B confirms the reception of the power supply accommodation request from the partner area via the cooperation communication line LC in the distribution status cooperation unit 14A (step S106), and if there is no reception of the power supply accommodation request (step S106). S106: NO), the process proceeds to step S110 described above.

また、相手エリアからの電源融通要請の受信があった場合(ステップS106:YES)、負荷配分制御部14Bは、非常時電力を配分すべき優先レベルを示す配分対象レベルを、最低配分中レベルの1つ上の優先レベルまで引き上げることにより、最低配分中レベルの優先負荷を遮断対象負荷として選択する(ステップS107)。
次に、負荷配分制御部14Bは、遮断対象負荷として選択した優先負荷を遮断することにより、融通可能電力を確保する(ステップS108)。
When a power interchange request is received from the partner area (step S106: YES), the load distribution control unit 14B sets the allocation target level indicating the priority level to which the emergency power should be allocated to the lowest allocation level. By raising the priority level to the next higher priority level, the priority load at the lowest allocation level is selected as the load to be cut off (step S107).
Next, the load distribution control unit 14B secures interchangeable power by shutting off the priority load selected as the cutoff target load (step S108).

この後、負荷配分制御部14Bは、設備I/F部12によりSTを短絡するとともに、設備I/F部12により受給電装置23を制御して、非常時電力のうちから確保した融通可能電力を、連携通信回線LCを介して相手エリアへ融通し(ステップS109)、前述したステップS110へ移行する。
これにより、相手エリアからの電源融通要請の受信があった場合には、自配分レベルが最優先レベルと等しくなって融通可能電力がなくなるまで、相手エリアに対する非常時電力の融通制御が実行されることになる。
After that, the load distribution control unit 14B short-circuits the ST by the equipment I / F unit 12, and controls the power receiving / receiving device 23 by the equipment I / F unit 12, so that the flexible power secured from the emergency power is obtained. Is transferred to the partner area via the cooperative communication line LC (step S109), and the process proceeds to step S110 described above.
As a result, when a power interchange request is received from the partner area, emergency power interchange control for the partner area is executed until the self-allocation level becomes equal to the highest priority level and there is no interchangeable power. It will be.

[動作例]
次に、図7〜図13を参照して、本実施の形態にかかる非常時電力の融通動作例について説明する。図7は、非常時電力の融通動作例(融通前)を示す説明図である。図8は、非常時電力の融通動作例(障害発生時)を示す説明図である。図9は、非常時電力の融通動作例(負荷遮断時)を示す説明図である。図10は、非常時電力の融通動作例(融通時)を示す説明図である。ここでは、4つのエリアA,B,C,Dが連携対象として予め設定されており、これらエリアA,B,C,Dを含む地域で広域停電が発生した後における非常時電力の融通動作例について説明する。
[Operation example]
Next, an example of an emergency power interchange operation according to the present embodiment will be described with reference to FIGS. 7 to 13. FIG. 7 is an explanatory diagram showing an example of an emergency power interchange operation (before interchange). FIG. 8 is an explanatory diagram showing an example of an emergency power interchange operation (when a failure occurs). FIG. 9 is an explanatory diagram showing an example of an emergency power interchange operation (when the load is cut off). FIG. 10 is an explanatory diagram showing an example of an emergency power interchange operation (during accommodation). Here, four areas A, B, C, and D are preset as cooperation targets, and an example of emergency power interchange operation after a wide-area power outage occurs in the areas including these areas A, B, C, and D. Will be described.

図7に示すように、電源喪失後、融通前の時点において、エリアAには、優先レベル1〜3の優先負荷が存在し、非常時電源装置(G)からこれらすべての優先負荷に対して非常時電力が配分されている。したがって、エリアAの自配分レベルは優先レベル3となり、連携通信回線LCを介して他のエリアB,C,Dに送信される。
また、エリアBには、優先レベル1の最優先負荷のみが存在し、非常時電源装置(G)から最優先負荷に対して非常時電力が配分されている。したがって、エリアBの自配分レベルは優先レベル1となり、連携通信回線LCを介して他のエリアA,C,Dに送信される。
As shown in FIG. 7, at the time after the power loss and before the accommodation, there are priority loads of priority levels 1 to 3 in the area A, and the emergency power supply device (G) applies to all of these priority loads. Emergency power is allocated. Therefore, the self-allocation level of the area A becomes the priority level 3, and is transmitted to the other areas B, C, and D via the cooperative communication line LC.
Further, only the highest priority load of priority level 1 exists in the area B, and the emergency power supply (G) allocates the emergency power to the highest priority load. Therefore, the self-allocation level of the area B becomes the priority level 1, and is transmitted to the other areas A, C, and D via the cooperative communication line LC.

また、エリアCには、優先レベル1,2の優先負荷が存在し、非常時電源装置(G)からこれらすべての優先負荷に対して非常時電力が配分されている。したがって、エリアCの自配分レベルは優先レベル2となり、連携通信回線LCを介して他のエリアA,B,Dに送信される。
また、エリアDには、優先レベル1の最優先負荷のみが存在し、非常時電源装置(G)から最優先負荷に対して非常時電力が配分されている。したがって、エリアDの自配分レベルは優先レベル1となり、連携通信回線LCを介して他のエリアA,B,Cに送信される。
Further, priority loads of priority levels 1 and 2 exist in the area C, and emergency power is distributed from the emergency power supply device (G) to all of these priority loads. Therefore, the self-allocation level of the area C becomes the priority level 2, and is transmitted to the other areas A, B, and D via the cooperative communication line LC.
Further, only the highest priority load of priority level 1 exists in the area D, and the emergency power supply (G) allocates the emergency power to the highest priority load. Therefore, the self-allocation level of the area D becomes the priority level 1, and is transmitted to the other areas A, B, and C via the cooperative communication line LC.

次に、図8に示すように、エリアBにおいて障害が発生し最優先負荷に対して非常時電力が配分されなくなった場合、エリアBのエネルギー管理装置から、他の相手エリアA,C,Dに対し、連携通信回線LCを介して電源融通要請が送信される。 Next, as shown in FIG. 8, when a failure occurs in the area B and the emergency power is not distributed to the highest priority load, the energy management device in the area B sends the other partner areas A, C, and D. In response to this, a power interchange request is transmitted via the linked communication line LC.

この後、図9に示すように、エリアBからの電源融通要請は、エリアAのエネルギー管理装置で受信され、エリアAの配分対象レベルが自配分レベルである優先レベル3から優先レベル2へ引き上げられる。これにより、優先レベル3の通常優先負荷が遮断されて、エリアAの非常時電力のうちから融通可能電力が確保される。 After that, as shown in FIG. 9, the power interchange request from the area B is received by the energy management device in the area A, and the allocation target level in the area A is raised from the priority level 3 which is the self-allocation level to the priority level 2. Be done. As a result, the normal priority load of the priority level 3 is cut off, and the interchangeable power is secured from the emergency power of the area A.

また、エリアBからの電源融通要請は、エリアCのエネルギー管理装置で受信され、エリアCの配分対象レベルが自配分レベルである優先レベル2から優先レベル1へ引き上げられる。これにより、優先レベル2の通常優先負荷が遮断されて、エリアCの非常時電力のうちから融通可能電力が確保される。
また、エリアBからの電源融通要請は、エリアDのエネルギー管理装置で受信されるが、エリアDの自配分レベルが優先レベル1であり、これ以上引き上げることができないため、エリアDからエリアBに対する非常時電力の融通は行われないことになる。
Further, the power supply interchange request from the area B is received by the energy management device in the area C, and the allocation target level in the area C is raised from the priority level 2 which is the self-allocation level to the priority level 1. As a result, the normal priority load of the priority level 2 is cut off, and the interchangeable power is secured from the emergency power of the area C.
Further, the power interchange request from the area B is received by the energy management device of the area D, but since the self-allocation level of the area D is the priority level 1 and cannot be raised any more, the area D to the area B Emergency power accommodation will not be carried out.

したがって、図10に示すように、エリアAおよびエリアCからエリアBに対して、連携配電線LPを介してそれぞれの非常時電力の余剰分が融通される。これに応じて、エリアCのエネルギー管理装置は、エリアAおよびエリアCから融通された非常時電力を連携配電線LPから受電して、優先レベル1の最優先負荷へ配分する。これにより、エリアBの最優先負荷が復帰することになる。 Therefore, as shown in FIG. 10, the surplus amount of each emergency power is accommodated from the area A and the area C to the area B via the cooperative distribution line LP. In response to this, the energy management device in area C receives the emergency power interchanged from area A and area C from the cooperative distribution line LP and distributes it to the highest priority load of priority level 1. As a result, the highest priority load in the area B is restored.

[本実施の形態の効果]
このように、本実施の形態は、配分状況連携部14Aが、非常時電力の配分に関する配分状況を、連携対象となる相手エリアとの間で連携通信回線LCを介してやり取し、負荷配分制御部14Bが、相手エリアで相手最優先負荷に対して相手非常時電力が供給できでいない旨を示す電源融通要請を、相手エリアから配分状況連携部14Aで受信した場合、非常時電力のうち最優先負荷へ配分する電力を除いた融通可能電力の一部または全部を連携配電線LPを介して相手エリアへ融通するようにしたものである。
[Effect of this embodiment]
As described above, in the present embodiment, the distribution status cooperation unit 14A exchanges the distribution status regarding the distribution of emergency power with the partner area to be linked via the cooperation communication line LC, and the load distribution control is performed. When the other party's emergency power supply request indicating that the other party's emergency power cannot be supplied to the other party's highest priority load in the other party's area is received from the other party's area by the distribution status cooperation unit 14A, the unit 14B has the highest emergency power. A part or all of the interchangeable electric power excluding the electric power to be distributed to the priority load is accommodated to the partner area via the cooperative distribution line LP.

より具体的には、配分状況連携部14Aが、最優先負荷31に対して非常時電力を配分できていない場合、連携通信回線LCを介して相手エリアに電源融通要請を送信し、負荷配分制御部14Bが、相手エリアへ送信した電源融通要請に応じて、相手エリアから連携配電線LPを介して融通された相手非常時電力を、最優先負荷31に配分するようにしたものである。 More specifically, when the distribution status cooperation unit 14A cannot distribute the emergency power to the highest priority load 31, it sends a power interchange request to the partner area via the cooperation communication line LC to control the load distribution. In response to the power interchange request transmitted to the partner area, the unit 14B distributes the partner emergency power interchanged from the partner area via the cooperative distribution line LP to the highest priority load 31.

これにより、電源喪失時には、近年、広く導入されているBEMSの中央監視装置に代表されるエネルギー管理装置10が、複数のエリア間で連携して、それぞれの非常時電力を融通することになる。このため、CEMSのような各エリアのエネルギー管理装置10とは独立した大規模な設備を必要とすることなく、電源喪失時でも各エリアの最優先負荷(BCP負荷)31を復帰させて稼働させることができる。また、連携するエリア間を結ぶ連携配電線LPや連携通信回線LCについては、既存の配電線や通信回線を利用すればよい。 As a result, in the event of power loss, the energy management device 10 represented by the central monitoring device of BEMS, which has been widely introduced in recent years, cooperates between a plurality of areas to accommodate each emergency power. Therefore, the highest priority load (BCP load) 31 in each area is restored and operated even when the power is lost, without requiring a large-scale facility such as CEMS that is independent of the energy management device 10 in each area. be able to. Further, as for the cooperative distribution line LP and the cooperative communication line LC that connect the linked areas, the existing distribution line or communication line may be used.

したがって、既存のエネルギー管理装置10のソフトウェアを変更するという、極めて小規模のコストで容易に事業の継続および復旧を図ることが可能となる。また、CEMSを導入する場合のようなコスト分担の問題もなくなるため、各企業や自治体単位さらにはビル建物単位で、極めて容易にかつ広く導入することができ、広域停電時に生じる地域社会のリスクを大幅に軽減することが可能となる。 Therefore, it is possible to easily continue and restore the business at an extremely small cost of changing the software of the existing energy management device 10. In addition, since the problem of cost sharing as in the case of introducing CEMS is eliminated, it can be introduced extremely easily and widely in each company, local government unit, or building building unit, and the risk of the local community caused in the event of a wide area power outage can be reduced. It can be significantly reduced.

また、本実施の形態において、負荷配分制御部14Bが、電源喪失時、複数の負荷のうち、非常時電源装置22の供給容量の範囲内で非常時電力を配分可能な優先レベルの負荷まで、非常時電力を順に配分するようにしてもよい。
これにより、限られた非常時電力を有効利用することができる。
Further, in the present embodiment, when the power supply is lost, the load distribution control unit 14B can distribute the emergency power within the supply capacity of the emergency power supply device 22 among the plurality of loads up to the priority level load. The emergency power may be distributed in order.
As a result, the limited emergency power can be effectively used.

また、本実施の形態において、負荷配分制御部14Bが、配分状況連携部14Aで電源融通要請を受信した場合、非常時電力を配分中である配分中負荷のうちから、優先レベルが最優先レベルより低い、1つまたは複数の任意の負荷を遮断対象負荷として選択して、遮断対象負荷に対する非常時電力の配分を停止することにより、融通可能電力を確保するようにしてもよい。 Further, in the present embodiment, when the load distribution control unit 14B receives the power supply accommodation request in the distribution status cooperation unit 14A, the priority level is the highest priority level among the distribution medium loads for which emergency power is being distributed. Flexible power may be ensured by selecting one or more of the lower arbitrary loads as the cutoff target loads and stopping the allocation of emergency power to the cutoff target loads.

非常時電力を融通する場合、非常時電源装置22の供給容量の範囲内で非常時電力を各優先負荷へ配分した残りの融通可能電力が十分ある場合には、非常時電力で復帰させた優先負荷を遮断することはないが、一般的には、非常時電源装置22の供給容量は必要最低限に抑えられている。上記のように優先レベルが最優先レベルより低い優先負荷を遮断すれば、非常時電力を各優先負荷へ配分した残りの融通可能電力を融通する場合と比較して、より大きな融通可能電力を確保することができる。 When accommodating emergency power, if there is sufficient remaining accommodative power that is allocated to each priority load within the supply capacity of the emergency power supply device 22, priority is restored by emergency power. Although the load is not cut off, the supply capacity of the emergency power supply device 22 is generally suppressed to the minimum necessary. If the priority load whose priority level is lower than the highest priority level is cut off as described above, a larger interchangeable power is secured as compared with the case where the remaining interchangeable power that allocates the emergency power to each priority load is accommodated. can do.

また、本実施の形態において、負荷配分制御部14Bが、遮断対象負荷を選択する方法として、非常時電力を配分すべき優先レベルを示す配分対象レベルを、最低配分中レベルの1つ上の優先レベルまで引き上げることにより、最低配分中レベルの負荷を遮断対象負荷として選択するようにしてもよい。
これにより、自エリアで遮断する負荷を最低限に抑制しつつ、相手エリアに対して非常時電力を融通することができる。
Further, in the present embodiment, as a method of selecting the load to be cut off, the load distribution control unit 14B gives priority to the allocation target level indicating the priority level to which emergency power should be allocated, which is one level higher than the lowest allocation middle level. By raising the level to the level, the load at the lowest allocation level may be selected as the load to be cut off.
As a result, it is possible to transfer emergency power to the partner area while suppressing the load cut off in the own area to the minimum.

また、本実施の形態において、負荷配分制御部14Bが、遮断対象負荷を選択する方法として、非常時電力を配分すべき優先レベルを示す配分対象レベルを、最優先レベルまで引き上げることにより、配分中負荷のうち最優先負荷31を除くすべての負荷を遮断対象負荷として選択するようにしてもよい。
これにより、自エリアで遮断する負荷が増加するものの、相手エリアに対して最大限の非常時電力を融通することができる。
Further, in the present embodiment, as a method of selecting the load to be cut off, the load distribution control unit 14B raises the allocation target level indicating the priority level to which the emergency power should be allocated to the highest priority level. All the loads except the highest priority load 31 may be selected as the load to be cut off.
As a result, although the load to be cut off in the own area increases, the maximum emergency power can be accommodated in the partner area.

[実施の形態の拡張]
以上、実施形態を参照して本発明を説明したが、本発明は上記実施形態に限定されるものではない。本発明の構成や詳細には、本発明のスコープ内で当業者が理解しうる様々な変更をすることができる。
[Extension of Embodiment]
Although the present invention has been described above with reference to the embodiments, the present invention is not limited to the above embodiments. Various changes that can be understood by those skilled in the art can be made within the scope of the present invention in the configuration and details of the present invention.

1…エネルギー管理システム、10…エネルギー管理装置、11…通信I/F部、12…設備I/F部、13…記憶部、14…演算処理部、14A…配分状況連携部、14B…負荷配分制御部、15…内部バス、20…設備、21…主電源装置、22…非常時電源装置、23…受給電装置、31…最優先負荷、32…準優先負荷、34…一般負荷、AC…商用電源、B…母線、LP…連携配電線、LC…連携通信回線、BS…主電源側母線、BL…非常時電源側母線、SB,SAC,SG,ST,S1,S2,S3,SL…スイッチ、HUV…不足電圧継電器。 1 ... Energy management system, 10 ... Energy management device, 11 ... Communication I / F unit, 12 ... Equipment I / F unit, 13 ... Storage unit, 14 ... Arithmetic processing unit, 14A ... Distribution status cooperation unit, 14B ... Load distribution Control unit, 15 ... Internal bus, 20 ... Equipment, 21 ... Main power supply, 22 ... Emergency power supply, 23 ... Power receiving and receiving device, 31 ... Top priority load, 32 ... Semi-priority load, 34 ... General load, AC ... Commercial power supply, B ... bus, LP ... linked distribution line, LC ... linked communication line, BS ... main power supply side bus, BL ... emergency power supply side bus, SB, SAC, SG, ST, S1, S2, S3, SL ... Switch, HUV ... Undervoltage relay.

Claims (8)

自エリア内に存在する複数の負荷に関する、非常時電力の配分順序を示す優先レベルを、記憶するように構成された記憶部と、
前記複数の負荷へ供給すべき主電源が喪失した電源喪失時、非常時電源装置から供給された非常時電力を、少なくとも、前記複数の負荷のうち前記優先レベルが最も高い最優先レベルの最優先負荷へ、配分するように構成された負荷配分制御部と、
前記非常時電力の配分に関する配分状況を、連携対象となる相手エリアとの間で連携通信回線を介してやり取りするように構成された配分状況連携部とを備え、
前記負荷配分制御部は、前記相手エリアで相手最優先負荷に対して相手非常時電力が供給できでいない旨を示す電源融通要請を、前記相手エリアから前記配分状況連携部で受信した場合、前記非常時電力のうち前記最優先負荷へ配分する電力を除いた融通可能電力の一部または全部を連携配電線を介して前記相手エリアへ融通する
ことを特徴とするエネルギー管理装置。
A storage unit configured to store the priority level indicating the emergency power distribution order for multiple loads existing in the own area, and a storage unit.
When the main power supply to be supplied to the plurality of loads is lost, the emergency power supplied from the emergency power supply device is at least the highest priority of the highest priority level among the plurality of loads. A load distribution control unit configured to distribute to the load,
It is provided with a distribution status cooperation unit configured to exchange the distribution status regarding the distribution of emergency power with the partner area to be linked via the cooperation communication line.
When the load distribution control unit receives a power supply interchange request indicating that the other party's emergency power cannot be supplied to the other party's highest priority load in the other party area from the other party area, the distribution status cooperation unit causes the above. An energy management device characterized in that a part or all of the interchangeable electric power excluding the electric power allocated to the highest priority load among the emergency electric powers is accommodated to the partner area via a cooperative distribution line.
請求項1に記載のエネルギー管理装置において、
前記配分状況連携部は、前記最優先負荷に対して前記非常時電力を配分できていない場合、前記連携通信回線を介して前記相手エリアに電源融通要請を送信し、
前記負荷配分制御部は、前記相手エリアへ送信した前記電源融通要請に応じて、前記相手エリアから前記連携配電線を介して融通された相手非常時電力を、前記最優先負荷に配分することを特徴とするエネルギー管理装置。
In the energy management device according to claim 1,
When the emergency power cannot be distributed to the highest priority load, the distribution status cooperation unit transmits a power interchange request to the partner area via the cooperation communication line.
The load distribution control unit allocates the other party's emergency power interchanged from the other party area via the cooperative distribution line to the highest priority load in response to the power supply accommodation request transmitted to the other party area. Characterized energy management device.
請求項1または請求項2に記載のエネルギー管理装置において、
前記負荷配分制御部は、前記電源喪失時、前記複数の負荷のうち、前記非常時電源装置の供給容量の範囲内で前記非常時電力を配分可能な優先レベルの負荷まで、前記非常時電力を順に配分することを特徴とするエネルギー管理装置。
In the energy management device according to claim 1 or 2.
When the power supply is lost, the load distribution control unit supplies the emergency power to a priority level load capable of distributing the emergency power within the supply capacity of the emergency power supply device among the plurality of loads. An energy management device characterized by allocating in order.
請求項1〜請求項3のいずれかに記載のエネルギー管理装置において、
前記負荷配分制御部は、前記電源融通要請を受信した場合、前記非常時電力を配分中である配分中負荷のうちから、優先レベルが前記最優先レベルより低い、1つまたは複数の任意の負荷を遮断対象負荷として選択して、前記遮断対象負荷に対する前記非常時電力の配分を停止することにより、前記融通可能電力を確保することを特徴とするエネルギー管理装置。
In the energy management device according to any one of claims 1 to 3.
When the load distribution control unit receives the power interchange request, the load distribution control unit may use one or more arbitrary loads whose priority level is lower than the highest priority level among the distribution middle loads that are allocating the emergency power. Is selected as the load to be cut off, and the allocation of the emergency power to the load to be cut off is stopped to secure the interchangeable power.
請求項4に記載のエネルギー管理装置において、
前記負荷配分制御部は、少なくとも、前記配分中負荷のうち優先レベルが最も低い最低配分中レベルの負荷を、前記遮断対象負荷として選択することを特徴とするエネルギー管理装置。
In the energy management device according to claim 4.
The load distribution control unit is an energy management device that selects at least the load of the lowest distribution medium level having the lowest priority level among the distribution middle loads as the cutoff target load.
請求項4に記載のエネルギー管理装置において、
前記負荷配分制御部は、前記非常時電力を配分すべき優先レベルを示す配分対象レベルを、前記配分中負荷のうち優先レベルが最も低い最低配分中レベルの1つ上の優先レベルまで引き上げることにより、前記最低配分中レベルの負荷を前記遮断対象負荷として選択することを特徴とするエネルギー管理装置。
In the energy management device according to claim 4.
The load allocation control unit raises the allocation target level indicating the priority level to which the emergency power should be allocated to the priority level one higher than the lowest allocation medium level having the lowest priority level among the allocation middle loads. , An energy management device comprising selecting a load at the minimum allocation medium level as the load to be cut off.
請求項4に記載のエネルギー管理装置において、
前記負荷配分制御部は、前記非常時電力を配分すべき優先レベルを示す配分対象レベルを、前記最優先レベルまで引き上げることにより、前記配分中負荷のうち前記最優先負荷を除くすべての負荷を前記遮断対象負荷として選択することを特徴とするエネルギー管理装置。
In the energy management device according to claim 4.
The load distribution control unit raises the allocation target level indicating the priority level to which the emergency power should be allocated to the highest priority level, so that all the loads other than the highest priority load among the distribution middle loads are said to be. An energy management device characterized by being selected as a load to be shut off.
自エリア内に存在する複数の負荷へ供給すべき主電源が喪失した電源喪失時、非常時電源装置から供給された非常時電力を前記複数の負荷へ配分するエネルギー管理装置で用いられるエリア間非常時電力融通方法であって、
前記エネルギー管理装置は、記憶部、負荷配分制御部、及び配分状況連携部を備え、
前記記憶部が、前記複数の負荷に関する、前記非常時電力の配分順序を示す優先レベルを記憶する記憶ステップと、
前記負荷配分制御部が、前記電源喪失時、前記非常時電力を、少なくとも、前記複数の負荷のうち前記優先レベルが最も高い最優先レベルの最優先負荷へ配分する負荷配分制御ステップと、
前記配分状況連携部が、前記非常時電力の配分に関する配分状況を、連携対象となる相手エリアとの間で連携通信回線を介してやり取りする配分状況連携ステップとを備え、
前記負荷配分制御ステップは、前記相手エリアで相手最優先負荷に対して相手非常時電力が供給できでいない旨を示す電源融通要請を、前記相手エリアから受信した場合、前記非常時電力のうち前記最優先負荷へ配分する電力を除いた融通可能電力の一部または全部を連携配電線を介して前記相手エリアへ融通するステップを含む
ことを特徴とするエリア間非常時電力融通方法。
When the main power supply that should be supplied to multiple loads existing in the own area is lost, the inter-area emergency used in the energy management device that distributes the emergency power supplied from the emergency power supply device to the multiple loads. It is a method of power interchange
The energy management device includes a storage unit, a load distribution control unit, and a distribution status cooperation unit.
A storage step wherein the storage unit is said about the plurality of loads, stores the priority level indicating the distribution order of the emergency power,
A load distribution control step in which the load distribution control unit distributes the emergency power to at least the highest priority load having the highest priority level among the plurality of loads in the event of power loss.
The distribution status cooperation unit is provided with a distribution status cooperation step in which the distribution status regarding the distribution of the emergency power is exchanged with the partner area to be linked via the cooperation communication line.
When the load distribution control step receives a power supply accommodation request from the other party area indicating that the other party's emergency power cannot be supplied to the other party's highest priority load in the other party area, the load distribution control step is said to be the emergency power of the other party. An inter-area emergency power interchange method comprising a step of accommodating a part or all of the interchangeable electric power excluding the electric power to be distributed to the highest priority load to the partner area via a cooperative distribution line.
JP2017253084A 2017-12-28 2017-12-28 Energy management device and emergency power interchange method between areas Active JP6954832B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017253084A JP6954832B2 (en) 2017-12-28 2017-12-28 Energy management device and emergency power interchange method between areas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017253084A JP6954832B2 (en) 2017-12-28 2017-12-28 Energy management device and emergency power interchange method between areas

Publications (2)

Publication Number Publication Date
JP2019122057A JP2019122057A (en) 2019-07-22
JP6954832B2 true JP6954832B2 (en) 2021-10-27

Family

ID=67306492

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017253084A Active JP6954832B2 (en) 2017-12-28 2017-12-28 Energy management device and emergency power interchange method between areas

Country Status (1)

Country Link
JP (1) JP6954832B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7370211B2 (en) * 2019-10-11 2023-10-27 国立大学法人電気通信大学 Virtual grid hub port unit, virtual grid control device, virtual grid system, program

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010178504A (en) * 2009-01-29 2010-08-12 Tokyo Gas Co Ltd Method of supplying electric power using distributed power supplies and power supply program
JP2011101534A (en) * 2009-11-06 2011-05-19 Panasonic Electric Works Co Ltd Electric power interchange system
EP3376636B1 (en) * 2013-11-14 2019-12-04 Sony Corporation Power supplying device and method

Also Published As

Publication number Publication date
JP2019122057A (en) 2019-07-22

Similar Documents

Publication Publication Date Title
US9671807B2 (en) Power grid stabilization system and power grid stabilization method
EP3032679B1 (en) Method and apparatus for control of a power distribution system
JP6964284B2 (en) Aggregation system and its control method and composite power converter
WO2014057599A1 (en) Electric power interchange system, electric power interchange method, and non-temporary computer-readable medium storing program
KR20080099320A (en) Systems and methods for providing and managing high-availability power infrastructures with flexible load prioritization
JP5216381B2 (en) Power supply method using distributed power supply
US20150263519A1 (en) Demand area power system building system, virtual electrical grid building apparatus, power transmission/reception unit, demand area power system building method, and program
Li et al. Joint optimization of workforce scheduling and routing for restoring a disrupted critical infrastructure
JP5611611B2 (en) Elevator emergency power supply system
US10326270B2 (en) DC power transmission device, DC power reception device, and DC power transmission system
CN105812161B (en) A kind of controller failure backup method and system
JP6954832B2 (en) Energy management device and emergency power interchange method between areas
JP5797122B2 (en) Distributed power management system
WO2014097834A1 (en) Power supply control device, battery device, power supply system, and power supply control method
JP2012231636A (en) Monitoring control system for electric power system
WO2016031755A1 (en) Electricity-generation control system, control device, electricity-generation control method, and program
CN101155071B (en) Method, device and communication system for selecting local domain supervisor
WO2015015770A1 (en) Control device, power management system, and electricity storage device management method
CN105518966A (en) Shared backup power data centers
JP2016171713A (en) Supervision control device
JP2011039996A (en) Work support system
JP2010180004A (en) Group supervisory control device for elevator
CN109587189B (en) Node management method and device
CN103259829A (en) Method for improving backup efficiency of cloud computing dispatching system
Aryanfar et al. Application of recovery techniques to enhance the resilience of power systems

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200911

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210707

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210727

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210812

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210907

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210930

R150 Certificate of patent or registration of utility model

Ref document number: 6954832

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150