JP6941539B2 - Expansion facility and how to expand the facility - Google Patents

Expansion facility and how to expand the facility Download PDF

Info

Publication number
JP6941539B2
JP6941539B2 JP2017219314A JP2017219314A JP6941539B2 JP 6941539 B2 JP6941539 B2 JP 6941539B2 JP 2017219314 A JP2017219314 A JP 2017219314A JP 2017219314 A JP2017219314 A JP 2017219314A JP 6941539 B2 JP6941539 B2 JP 6941539B2
Authority
JP
Japan
Prior art keywords
arena
facility
retaining wall
stand
expansion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017219314A
Other languages
Japanese (ja)
Other versions
JP2019090230A (en
Inventor
剛 有竹
剛 有竹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Corp
Original Assignee
Takenaka Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Corp filed Critical Takenaka Corp
Priority to JP2017219314A priority Critical patent/JP6941539B2/en
Publication of JP2019090230A publication Critical patent/JP2019090230A/en
Application granted granted Critical
Publication of JP6941539B2 publication Critical patent/JP6941539B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Description

本発明は、施設のアリーナ部を拡張した拡張施設、及び施設のアリーナ部を拡張する施設の拡張方法に関する。 The present invention relates to an expansion facility in which the arena section of the facility is expanded, and a method for expanding the facility in which the arena section of the facility is expanded.

スポーツ競技、演技、演奏等を行うアリーナ部と、アリーナ部の周辺に設けられた、観客等を収容するスタンド部とを有する体育館や屋外競技場等の施設がある。例えば、特許文献1には、競技エリアの周囲に観客席が設けられた屋根付き競技場が開示されている。 There are facilities such as a gymnasium and an outdoor stadium that have an arena section for sports competitions, acting, performances, etc., and a stand section for accommodating spectators, etc., which is provided around the arena section. For example, Patent Document 1 discloses a covered stadium in which spectator seats are provided around the competition area.

このような施設において、改修工事によってアリーナ部を拡張しようとする場合、スタンド部の撤去工事を行う必要があるので、施工手間が掛かってしまう。 In such a facility, when the arena part is to be expanded by repair work, it is necessary to remove the stand part, which takes time and effort.

特開平11−232908号公報Japanese Unexamined Patent Publication No. 11-232908

本発明は係る事実を考慮し、施設のアリーナ部を拡張する施工手間を低減することを課題とする。 In consideration of such facts, it is an object of the present invention to reduce the construction work for expanding the arena portion of the facility.

第1態様に係る拡張施設は、アリーナ部の周辺にスタンド部が設けられた施設と、前記アリーナ部及び前記スタンド部に盛土された盛土材で拡張された拡張アリーナ部と、前記アリーナ部又は前記スタンド部に設けられ、前記盛土材の側圧を受ける土留め壁と、を有する。 The expansion facility according to the first aspect includes a facility in which a stand portion is provided around the arena portion, an expansion arena portion expanded with the embankment material filled in the arena portion and the stand portion, and the arena portion or the above. It has a retaining wall provided on the stand portion and receiving the lateral pressure of the embankment material.

第1態様に係る拡張施設によれば、アリーナ部及びスタンド部に盛土材で盛土することにより、スタンド部を撤去することなく、盛土材で拡張アリーナ部を形成することができる。すなわち、施設のアリーナ部を拡張する施工手間を低減することができる。 According to the expansion facility according to the first aspect, by embankment of the arena portion and the stand portion with the embankment material, the expansion arena portion can be formed of the embankment material without removing the stand portion. That is, it is possible to reduce the construction work required to expand the arena portion of the facility.

また、アリーナ部又はスタンド部には、盛土材の側圧を受ける土留め壁が設けられているので、スタンド部を補強せずに又は少ない補強で使用することができる。 Further, since the arena portion or the stand portion is provided with a retaining wall that receives the lateral pressure of the embankment material, the stand portion can be used without reinforcement or with less reinforcement.

第2態様に係る拡張施設は、第1態様に係る拡張施設において、前記土留め壁は、前記アリーナ部の上に設けられている。 The expansion facility according to the second aspect is the expansion facility according to the first aspect, in which the retaining wall is provided above the arena portion.

第2態様に係る拡張施設によれば、アリーナ部は平坦であるので、土留め壁を容易に設けることができる。 According to the expansion facility according to the second aspect, since the arena portion is flat, a retaining wall can be easily provided.

また、盛土材の側圧によりスタンド部に作用する力は、土留め壁の外側では小さくなるので、スタンド部の補強を無くす又は少なくすることができる。 Further, since the force acting on the stand portion due to the lateral pressure of the embankment material becomes small on the outside of the retaining wall, the reinforcement of the stand portion can be eliminated or reduced.

第3態様に係る施設の拡張方法は、アリーナ部と、前記アリーナ部の周辺に設けられたスタンド部とを有する施設の前記アリーナ部を拡張する施設の拡張方法において、前記アリーナ部又は前記スタンド部に土留め壁を構築する工程と、前記アリーナ部及び前記スタンド部に盛土材を盛土して、拡張された拡張アリーナ部を形成する工程と、を有する。 The method for expanding a facility according to a third aspect is a method for expanding a facility that expands the arena portion of a facility having an arena portion and a stand portion provided around the arena portion, wherein the arena portion or the stand portion is used. It has a step of constructing a retaining wall and a step of filling an embankment material in the arena portion and the stand portion to form an expanded arena portion.

第3態様に係る施設の拡張方法によれば、アリーナ部及びスタンド部に盛土材で盛土することにより、スタンド部を撤去することなく、盛土材で拡張アリーナ部を形成することができる。すなわち、施設のアリーナ部を拡張する施工手間を低減することができる。 According to the method for expanding the facility according to the third aspect, by filling the arena portion and the stand portion with the embankment material, the expansion arena portion can be formed of the embankment material without removing the stand portion. That is, it is possible to reduce the construction work required to expand the arena portion of the facility.

また、アリーナ部又はスタンド部には、盛土材の側圧を受ける土留め壁が設けられているので、スタンド部を補強せずに又は少ない補強で使用することができる。 Further, since the arena portion or the stand portion is provided with a retaining wall that receives the lateral pressure of the embankment material, the stand portion can be used without reinforcement or with less reinforcement.

本発明は上記構成としたので、施設のアリーナ部を拡張する施工手間を低減することができる。 Since the present invention has the above configuration, it is possible to reduce the construction work for expanding the arena portion of the facility.

本発明の実施形態に係る既設の体育館を示す正面断面図である。It is a front sectional view which shows the existing gymnasium which concerns on embodiment of this invention. 図1のA−A矢視図である。It is the AA arrow view of FIG. 本発明の実施形態に係る土留め壁構築工程が行われた既設の体育館を示す正面断面図である。It is a front sectional view which shows the existing gymnasium where the earth retaining wall construction process which concerns on embodiment of this invention was performed. 図3のB−B矢視図である。It is a BB arrow view of FIG. 本発明の実施形態に係る拡張施設としての体育館を示す正面断面図である。It is a front sectional view which shows the gymnasium as an expansion facility which concerns on embodiment of this invention. 図5のC−C矢視図である。FIG. 5 is a view taken along the line CC of FIG. 図7(a)は、本発明の実施形態に係る土留め壁を示す正面断面図であり、図7(b)及び図7(c)は、本発明の実施形態に係る土留め壁のバリエーションを示す正面断面図である。7 (a) is a front sectional view showing the earth retaining wall according to the embodiment of the present invention, and FIGS. 7 (b) and 7 (c) are variations of the earth retaining wall according to the embodiment of the present invention. It is a front sectional view which shows.

図を参照しながら、本発明の実施形態を説明する。まず、本発明の実施形態に係る施設の拡張方法について説明する。 An embodiment of the present invention will be described with reference to the drawings. First, a method of expanding the facility according to the embodiment of the present invention will be described.

ここでは、図1の正面断面図、及び図1のA−A矢視図である図2に示す、既設の体育館10を改修して、図5の正面断面図、及び図5のC−C矢視図である図6に示す拡張施設としての体育館12を構築する施設の拡張方法の一例について示す。 Here, the existing gymnasium 10 shown in FIG. 2 which is a front sectional view of FIG. 1 and an arrow view of AA of FIG. 1 is renovated, and a front sectional view of FIG. 5 and CC of FIG. 5 are obtained. An example of an expansion method of a facility for constructing a gymnasium 12 as an expansion facility shown in FIG. 6, which is a cross-sectional view, will be shown.

図1及び図2に示すように、既設の体育館10は、外壁14A、14B、14C、14Dにより囲まれて形成された建物空間16を屋根18により覆った建物であり、地盤20上に建てられている。 As shown in FIGS. 1 and 2, the existing gymnasium 10 is a building in which a building space 16 formed by being surrounded by outer walls 14A, 14B, 14C, and 14D is covered with a roof 18 and is built on the ground 20. ing.

建物空間16内には、スポーツ競技や演技等を行う平坦なアリーナ部22(図2において一点鎖線で囲まれた部分)と、アリーナ部22の周辺に設けられた、観客等を収容するスタンド部24、26とを備えた施設28が設けられている。すなわち、体育館10は、地盤20上に設けられた、アリーナ部22とスタンド部24、26とを備えた施設28を有して構成されている。 In the building space 16, there is a flat arena portion 22 (a portion surrounded by a dashed-dotted line in FIG. 2) for performing sports competitions, acting, etc., and a stand portion provided around the arena portion 22 for accommodating spectators and the like. A facility 28 equipped with 24 and 26 is provided. That is, the gymnasium 10 is configured to have a facility 28 provided on the ground 20 and having an arena portion 22 and stand portions 24 and 26.

施設の拡張方法では、まず、図3、及び図3のB−B矢視図である図4に示すように、土留め壁構築工程によって、アリーナ部22の上のスタンド部24付近に、鉄筋コンクリート製の土留め壁30を構築する。 In the facility expansion method, first, as shown in FIG. 3 and FIG. 4 which is a view taken along the line BB of FIG. 3, reinforced concrete is placed in the vicinity of the stand portion 24 above the arena portion 22 by the earth retaining wall construction process. A retaining wall 30 made of wood is constructed.

土留め壁30は、後に説明する盛土材32(図5を参照のこと)の側圧を受けるように配置する。すなわち、土留め壁30は、盛土材32の側圧を負担する。尚、土留め壁30は、鋼製、鉄骨鉄筋コンクリート製等の他の構造のものであってもよい。例えば、土留め壁をシートパイルによって構成してもよい。 The earth retaining wall 30 is arranged so as to receive the lateral pressure of the embankment material 32 (see FIG. 5) described later. That is, the earth retaining wall 30 bears the lateral pressure of the embankment material 32. The earth retaining wall 30 may have another structure such as steel or steel-framed reinforced concrete. For example, the retaining wall may be constructed of sheet piles.

次に、図5、及び図5のC−C矢視図である図6に示すように、拡張アリーナ部形成工程によって、土砂からなる盛土材32をアリーナ部22及びスタンド部24の上へ所定レベル(本例では、スタンド部24の上面のレベル)まで盛土する。 Next, as shown in FIGS. 5 and 6, FIG. 6, which is a view taken along the line CC of FIG. 5, an embankment material 32 made of earth and sand is designated on the arena portion 22 and the stand portion 24 by the expansion arena portion forming step. Fill up to the level (in this example, the level of the upper surface of the stand portion 24).

これにより、盛土材32によってアリーナ部22を嵩上げしてアリーナ部22を拡張し、拡張された拡張アリーナ部34(図6において一点鎖線で囲まれた部分)を形成することによって、拡張施設としての体育館12が構築される。本例では、拡張アリーナ部34の水平投影面積は、アリーナ部22の水平投影面積よりも大きくなっており、この拡張アリーナ部34を野球の内野グランドとしている。 As a result, the arena portion 22 is raised by the embankment material 32 to expand the arena portion 22, and the expanded arena portion 34 (the portion surrounded by the alternate long and short dash line in FIG. 6) is formed as an expansion facility. Gymnasium 12 is constructed. In this example, the horizontal projected area of the extended arena section 34 is larger than the horizontal projected area of the arena section 22, and the extended arena section 34 is used as the infield ground of baseball.

次に、本発明の実施形態に係る拡張施設しての体育館12について説明する。 Next, the gymnasium 12 as an expansion facility according to the embodiment of the present invention will be described.

図5及び図6に示すように、拡張施設しての体育館12は、アリーナ部22の周辺にスタンド部24が設けられた施設28と、アリーナ部22及びスタンド部24の上に盛土された盛土材32で拡張された拡張アリーナ部34(図6において一点鎖線で囲まれた部分)と、アリーナ部22の上のスタンド部24付近に設けられ、盛土材32の側圧を受ける土留め壁30とを有して構成されている。 As shown in FIGS. 5 and 6, the gymnasium 12 as an expansion facility has a facility 28 in which a stand portion 24 is provided around the arena portion 22, and an embankment filled on the arena portion 22 and the stand portion 24. The expansion arena portion 34 (the portion surrounded by the alternate long and short dash line in FIG. 6) expanded by the material 32, and the retaining wall 30 provided near the stand portion 24 above the arena portion 22 and receiving the lateral pressure of the embankment material 32. It is configured to have.

図7(a)の正面断面図に示すように、土留め壁30は、土留め壁30の外壁面36と、スタンド部24の内壁面38との間に所定距離を有するようにして配置され、土留め壁30の外壁面36と、スタンド部24の内壁面38との間には、盛土材32が充填されている。土留め壁30は、壁部30Aと固定部30Bとが一体とされたL字状断面を有する構造体により構成されている。 As shown in the front sectional view of FIG. 7A, the earth retaining wall 30 is arranged so as to have a predetermined distance between the outer wall surface 36 of the earth retaining wall 30 and the inner wall surface 38 of the stand portion 24. The embankment material 32 is filled between the outer wall surface 36 of the earth retaining wall 30 and the inner wall surface 38 of the stand portion 24. The earth retaining wall 30 is composed of a structure having an L-shaped cross section in which the wall portion 30A and the fixing portion 30B are integrated.

次に、本発明の実施形態に係る拡張施設としての体育館12、及び施設の拡張方法の作用と効果について説明する。 Next, the actions and effects of the gymnasium 12 as an expansion facility according to the embodiment of the present invention and the facility expansion method will be described.

本実施形態の拡張施設としての体育館12は、図5及び図6に示すように、アリーナ部22及びスタンド部24に盛土材32で盛土することにより、スタンド部24を撤去することなく、盛土材32で拡張アリーナ部34を形成することができる。すなわち、施設28のアリーナ部22を拡張する施工手間を低減することができる。 As shown in FIGS. 5 and 6, the gymnasium 12 as an expansion facility of the present embodiment is filled with the embankment material 32 in the arena portion 22 and the stand portion 24 without removing the stand portion 24. The expansion arena portion 34 can be formed at 32. That is, it is possible to reduce the construction work for expanding the arena portion 22 of the facility 28.

例えば、図1に示す既設の体育館10のように、外壁14A、14Cがスタンド部24と一体となって構造的に成立している建物の場合、スタンド部24の撤去に伴って外壁14A、14Cのが自立しなくなってしまうので、外壁14A、14Cに補強を施さなければならないが、本実施形態の拡張施設としての体育館12では、そのような補強を施す必要がなくなる、又はそのような補強を少なくすることができる。 For example, in the case of a building in which the outer walls 14A and 14C are structurally formed integrally with the stand portion 24 like the existing gymnasium 10 shown in FIG. 1, the outer walls 14A and 14C are structurally formed with the removal of the stand portion 24. The outer walls 14A and 14C must be reinforced because they will not be able to stand on their own. However, in the gymnasium 12 as an expansion facility of the present embodiment, it is not necessary to provide such reinforcement, or such reinforcement is provided. Can be reduced.

また、本実施形態の拡張施設としての体育館12では、図5及び図6に示すように、盛土材32の側圧を受ける土留め壁30がアリーナ部22上に設けられており、盛土材32の側圧によりスタンド部24に作用する力は、土留め壁30の外側(スタンド部24側)では小さくなるので、スタンド部24の補強を無くす又は少なくすることができる。 Further, in the gymnasium 12 as an expansion facility of the present embodiment, as shown in FIGS. 5 and 6, a retaining wall 30 that receives the lateral pressure of the embankment material 32 is provided on the arena portion 22, and the embankment material 32 is provided with a retaining wall 30. Since the force acting on the stand portion 24 due to the lateral pressure becomes small on the outside of the earth retaining wall 30 (on the stand portion 24 side), the reinforcement of the stand portion 24 can be eliminated or reduced.

また、土留め壁30を設けることにより、盛土材32を高く盛り土することができ、これによって広い(水平投影面積の大きい)拡張アリーナ部34を形成できる。 Further, by providing the earth retaining wall 30, the embankment material 32 can be embanked high, whereby a wide (large horizontal projected area) expansion arena portion 34 can be formed.

さらに、本実施形態の拡張施設としての体育館12では、図5及び図6に示すように、アリーナ部22の上に土留め壁30を構築することにより、アリーナ部22は平坦であるので、土留め壁30を容易に設けることができる。 Further, in the gymnasium 12 as the expansion facility of the present embodiment, as shown in FIGS. 5 and 6, by constructing the retaining wall 30 on the arena portion 22, the arena portion 22 is flat, so that the soil is formed. The retaining wall 30 can be easily provided.

また、本実施形態の施設の拡張方法によれば、図5及び図6に示すように、アリーナ部22及びスタンド部24に盛土材32で盛土することにより、スタンド部24を撤去することなく、盛土材32で拡張アリーナ部34を形成することができる。すなわち、施設28のアリーナ部22を拡張する施工手間を低減することができる。 Further, according to the facility expansion method of the present embodiment, as shown in FIGS. 5 and 6, the arena portion 22 and the stand portion 24 are filled with the embankment material 32 without removing the stand portion 24. The expansion arena portion 34 can be formed from the embankment material 32. That is, it is possible to reduce the construction work for expanding the arena portion 22 of the facility 28.

さらに、本実施形態の施設の拡張方法によれば、アリーナ部22の上には、盛土材32の側圧を受ける土留め壁30が設けられているので、スタンド部24を補強せずに又は少ない補強で使用することができる。 Further, according to the method of expanding the facility of the present embodiment, since the retaining wall 30 that receives the lateral pressure of the embankment material 32 is provided on the arena portion 22, the stand portion 24 is not reinforced or is small. Can be used for reinforcement.

以上、本発明の実施形態について説明した。 The embodiment of the present invention has been described above.

なお、本実施形態では、図1及び図2に示すように、既設の体育館10を構成するアリーナ部22をスポーツ競技や演技等を行うところとした例を示したが、アリーナ部22は、スポーツ競技、演技、演奏等のさまざまなことを行うところであってもよい。 In the present embodiment, as shown in FIGS. 1 and 2, an example is shown in which the arena section 22 constituting the existing gymnasium 10 is used for sports competitions, performances, and the like, but the arena section 22 is used for sports. It may be a place where various things such as competition, acting, and performance are performed.

また、本実施形態では、図3及び図4に示すように、施設の拡張方法の土留め壁構築工程において、アリーナ部22の上に土留め壁30を構築した例を示したが、スタンド部24の上に土留め壁30を構築してもよい。さらに、アリーナ部22及びスタンド部24に盛土材32を盛り土した後に、盛り土された盛土材32中に土留め壁30を構築するようにしてもよい。 Further, in the present embodiment, as shown in FIGS. 3 and 4, an example in which the earth retaining wall 30 is constructed on the arena portion 22 in the earth retaining wall construction step of the facility expansion method is shown, but the stand portion A retaining wall 30 may be constructed on the 24. Further, after the embankment material 32 is filled in the arena portion 22 and the stand portion 24, the retaining wall 30 may be constructed in the filled embankment material 32.

さらに、本実施形態では、図7(a)に示すように、土留め壁30を、壁部30Aと固定部30Bとが一体とされたL字状断面を有する構造体により構成した例を示したが、土留め壁は他の形状のものであってもよい。例えば、図7(b)の正面断面図に示す土留め壁40や、図7(c)の正面断面図に示す土留め壁42のようにしてもよい。 Further, in the present embodiment, as shown in FIG. 7A, an example in which the earth retaining wall 30 is formed of a structure having an L-shaped cross section in which the wall portion 30A and the fixing portion 30B are integrated is shown. However, the retaining wall may have other shapes. For example, the earth retaining wall 40 shown in the front cross section of FIG. 7 (b) or the earth retaining wall 42 shown in the front cross section of FIG. 7 (c) may be used.

図7(b)に示すように、土留め壁40は、土留め壁40の外壁面44と、スタンド部24の内壁面38との間に所定距離を有するようにして配置され、土留め壁40の外壁面44と、スタンド部24の内壁面38との間には、盛土材32が充填されている。土留め壁40は、壁部40Aと固定部40Bとが一体とされた逆T字状断面を有する構造体により構成されている。 As shown in FIG. 7B, the earth retaining wall 40 is arranged so as to have a predetermined distance between the outer wall surface 44 of the earth retaining wall 40 and the inner wall surface 38 of the stand portion 24, and is an earth retaining wall. The embankment material 32 is filled between the outer wall surface 44 of the 40 and the inner wall surface 38 of the stand portion 24. The earth retaining wall 40 is composed of a structure having an inverted T-shaped cross section in which the wall portion 40A and the fixing portion 40B are integrated.

図7(c)に示すように、土留め壁42は、土留め壁42の外壁面46と、スタンド部24の内壁面38との間に所定距離を有するようにして配置され、土留め壁42の外壁面46と、スタンド部24の内壁面38との間には、空間48が形成されている。この空間48により、土留め壁42からスタンド部24へ伝達される力を抑制することができる。土留め壁42は、壁部42Aと固定部42Bとが一体とされたL字状断面を有する構造体を有して構成されている。 As shown in FIG. 7C, the earth retaining wall 42 is arranged so as to have a predetermined distance between the outer wall surface 46 of the earth retaining wall 42 and the inner wall surface 38 of the stand portion 24, and is an earth retaining wall. A space 48 is formed between the outer wall surface 46 of the 42 and the inner wall surface 38 of the stand portion 24. With this space 48, the force transmitted from the retaining wall 42 to the stand portion 24 can be suppressed. The earth retaining wall 42 is configured to have a structure having an L-shaped cross section in which the wall portion 42A and the fixing portion 42B are integrated.

また、本実施形態では、図5及び図6に示すように、土留め壁30を設けることによって、盛土材32の側圧によりスタンド部24に作用する力を小さくする例を示したが、スタンド部24を補強するようにしてもよい。 Further, in the present embodiment, as shown in FIGS. 5 and 6, an example is shown in which the force acting on the stand portion 24 due to the lateral pressure of the embankment material 32 is reduced by providing the earth retaining wall 30, but the stand portion 24 may be reinforced.

さらに、本実施形態では、図5及び図6に示すように、盛土材32を土砂とした例を示したが、盛土材は、盛土することにより拡張アリーナ部34を形成することができるものであればよく、盛土材は、土、砂利、スラグ等のさまざまな材料としてもよい。例えば、下層に嵩比重の重い鋼製スラグを盛土材として盛り土し、上層に嵩比重の軽い破砕スラグを盛土材として盛り土するようにしてもよい。 Further, in the present embodiment, as shown in FIGS. 5 and 6, an example in which the embankment material 32 is used as earth and sand is shown, but the embankment material can form the extended arena portion 34 by embankment. The embankment material may be various materials such as soil, gravel, and slag. For example, steel slag having a heavy bulk specific density may be filled in the lower layer as an embankment material, and crushed slag having a light bulk specific gravity may be filled in the upper layer as an embankment material.

また、実施形態では、図1及び図2に示す既設の体育館10を改修して、図5及び図6に示す拡張施設としての体育館12を構築した例を示したが、既設の体育館10は、改修される建物であれば他の用途の建物であってもよい。例えば、改修される建物は、フィールド部とスタンド部とを有する陸上競技場、野球場、サッカー競技場等の屋外施設や、コンサートホール等の建物などであってもよい。改修される建物を陸上競技場とする場合、スタンド部により囲まれたフィールド部及びトラック部がアリーナ部となる。 Further, in the embodiment, an example is shown in which the existing gymnasium 10 shown in FIGS. 1 and 2 is renovated to construct the gymnasium 12 as an expansion facility shown in FIGS. 5 and 6, but the existing gymnasium 10 is shown. The building may be used for other purposes as long as it is a building to be renovated. For example, the building to be renovated may be an outdoor facility such as an athletic field having a field part and a stand part, a baseball field, a soccer field, or a building such as a concert hall. When the building to be renovated will be an athletics stadium, the field section and track section surrounded by the stand section will be the arena section.

以上、本発明の実施形態について説明したが、本発明はこうした実施形態に何等限定されるものでなく、本発明の要旨を逸脱しない範囲において、種々なる態様で実施し得ることは勿論である。 Although the embodiments of the present invention have been described above, the present invention is not limited to these embodiments, and it goes without saying that the present invention can be implemented in various modes without departing from the gist of the present invention.

12 体育館(拡張施設)
22 アリーナ部
24 スタンド部
28 施設
30、40、42 土留め壁
32 盛土材
34 拡張アリーナ部
12 Gymnasium (expansion facility)
22 Arena section 24 Stand section 28 Facilities 30, 40, 42 Retaining wall 32 Embankment material 34 Expansion arena section

Claims (3)

アリーナ部の周辺にスタンド部が設けられた施設と、
前記アリーナ部及び前記スタンド部に盛土された盛土材で拡張された拡張アリーナ部と、
前記アリーナ部又は前記スタンド部に設けられ、前記盛土材の側圧を受ける土留め壁と、
を有する拡張施設。
A facility with a stand around the arena and
An extended arena section expanded with embankment material filled in the arena section and the stand section,
An earth retaining wall provided in the arena portion or the stand portion and receiving the lateral pressure of the embankment material, and
Expansion facility with.
前記土留め壁は、前記アリーナ部の上に設けられている請求項1に記載の拡張施設。 The expansion facility according to claim 1, wherein the retaining wall is provided on the arena portion. アリーナ部と、前記アリーナ部の周辺に設けられたスタンド部とを有する施設の前記アリーナ部を拡張する施設の拡張方法において、
前記アリーナ部又は前記スタンド部に土留め壁を構築する工程と、
前記アリーナ部及び前記スタンド部に盛土材を盛土して、拡張された拡張アリーナ部を形成する工程と、
を有する施設の拡張方法。
In a method of expanding a facility that expands the arena portion of a facility having an arena portion and a stand portion provided around the arena portion.
The process of constructing a retaining wall in the arena portion or the stand portion, and
A step of embankment material on the arena portion and the stand portion to form an expanded arena portion, and
How to expand the facility with.
JP2017219314A 2017-11-14 2017-11-14 Expansion facility and how to expand the facility Active JP6941539B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017219314A JP6941539B2 (en) 2017-11-14 2017-11-14 Expansion facility and how to expand the facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017219314A JP6941539B2 (en) 2017-11-14 2017-11-14 Expansion facility and how to expand the facility

Publications (2)

Publication Number Publication Date
JP2019090230A JP2019090230A (en) 2019-06-13
JP6941539B2 true JP6941539B2 (en) 2021-09-29

Family

ID=66835978

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017219314A Active JP6941539B2 (en) 2017-11-14 2017-11-14 Expansion facility and how to expand the facility

Country Status (1)

Country Link
JP (1) JP6941539B2 (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002054162A (en) * 2000-08-08 2002-02-20 Paritei Zipangu:Kk Concrete block for l-shaped retaining wall and retaining wall
JP4443470B2 (en) * 2005-06-06 2010-03-31 株式会社竹中工務店 Stadium renovation method
JP5800546B2 (en) * 2011-03-29 2015-10-28 有徳コンクリート株式会社 Precast foundation plates, foundations for precast structures and construction methods for earth retaining structures
JP2014227729A (en) * 2013-05-23 2014-12-08 東日本旅客鉄道株式会社 Banking reinforcement structure and banking reinforcement method

Also Published As

Publication number Publication date
JP2019090230A (en) 2019-06-13

Similar Documents

Publication Publication Date Title
JP2009097176A (en) Banking structure and its construction method
JP5728301B2 (en) Foundation structure
JP2017096063A (en) Earth retaining excavation method and skeleton construction method
JP5490300B1 (en) Retaining wall structure and retaining wall construction method
JP6941539B2 (en) Expansion facility and how to expand the facility
KR101190739B1 (en) Method of Constructing Underground Composite Outer Wall Structure and Underground Composite Outer Wall Structure Constructed by the Same
KR101775621B1 (en) Method for constructing breast wall of cip technical by using scratch structure
JP6240625B2 (en) Retaining wall, creation site and creation method of creation site
KR101206668B1 (en) Multilayer revetment structure using natural strones
JP6948663B2 (en) Retaining wall and its formation method
JP2004285711A (en) Construction method for enlarged tunnel
JP2023011057A (en) Foundation structure and foundation construction method
JP6373163B2 (en) Overhang sidewalk block
JP2008095332A (en) Levee widening/raising construction method for existing concrete wall for retaining earth
JP6188386B2 (en) Shed buffer structure
JP2006002428A (en) Reinforcing method of existing floor and base isolation method of existing building
JP4443470B2 (en) Stadium renovation method
JP7016106B2 (en) Lightweight embankment structure and how to build a lightweight embankment
JP6988047B2 (en) How to reconstruct the underground skeleton
JP2020041267A (en) Wall surface structure of embankment
JP6827256B2 (en) How to rebuild the building
JP6774774B2 (en) Pile foundation structure
JP6508960B2 (en) Divided formwork
JP6543177B2 (en) Building method
JP7194626B2 (en) Station platform reinforcement structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200924

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210820

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210831

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210906

R150 Certificate of patent or registration of utility model

Ref document number: 6941539

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150