JP6886811B2 - Foundation structure and method of constructing foundation structure - Google Patents

Foundation structure and method of constructing foundation structure Download PDF

Info

Publication number
JP6886811B2
JP6886811B2 JP2016249262A JP2016249262A JP6886811B2 JP 6886811 B2 JP6886811 B2 JP 6886811B2 JP 2016249262 A JP2016249262 A JP 2016249262A JP 2016249262 A JP2016249262 A JP 2016249262A JP 6886811 B2 JP6886811 B2 JP 6886811B2
Authority
JP
Japan
Prior art keywords
slab
foundation structure
incidental
beams
reinforcing bars
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016249262A
Other languages
Japanese (ja)
Other versions
JP2018104899A (en
Inventor
理揮 中原
理揮 中原
大作 矢萩
大作 矢萩
森 武史
武史 森
昭彦 豊嶋
昭彦 豊嶋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toda Corp
Original Assignee
Toda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toda Corp filed Critical Toda Corp
Priority to JP2016249262A priority Critical patent/JP6886811B2/en
Publication of JP2018104899A publication Critical patent/JP2018104899A/en
Application granted granted Critical
Publication of JP6886811B2 publication Critical patent/JP6886811B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Description

本発明は、鉄筋コンクリート造の基礎構造及び基礎構造の構築方法に関する。 The present invention relates to a reinforced concrete foundation structure and a method for constructing the foundation structure.

一般に、建築物の基礎構造としては、例えばフーチングを基礎梁でつなぐ基礎構造や、基礎全体を1枚の厚いコンクリートの固まりであるマットスラブで覆う基礎構造などが知られている。 Generally, as a foundation structure of a building, for example, a foundation structure in which footings are connected by a foundation beam, a foundation structure in which the entire foundation is covered with a mat slab which is a mass of a thick concrete, and the like are known.

基礎梁を用いる基礎構造では、建物の種類や大きさにもよるが、例えば物流倉庫などであれば1800mm〜2000mmの梁せいが必要とされる。このように高い梁せいの基礎梁を施工するために地盤の掘削深さ及び掘削量も増えるという問題がある。掘削深さが大きいと山留の設置が必要となる場合があり、また、掘削量が増えると掘削残土の処理が必要となる場合があり、いずれもコストアップの要因となる。 In a foundation structure using a foundation beam, a beam of 1800 mm to 2000 mm is required for a distribution warehouse, for example, although it depends on the type and size of the building. There is a problem that the excavation depth and the excavation amount of the ground increase in order to construct the foundation beam of such a high beam. If the excavation depth is large, it may be necessary to install a mountain reservoir, and if the excavation amount increases, it may be necessary to dispose of the excavated surplus soil, both of which are factors that increase costs.

また、配筋で補強されたマットスラブを用いる基礎構造では、基礎梁を用いる方法に比べて高さを抑えることができ、例えば1000mm前後となるが、1階全体を厚いマットスラブで覆うため、躯体数量が増加し、建物重量の増加に伴う杭基礎などのコストの増加が問題となる。 Further, in the foundation structure using the mat slab reinforced by the reinforcement, the height can be suppressed as compared with the method using the foundation beam. For example, the height is about 1000 mm, but since the entire first floor is covered with the thick mat slab, The number of skeletons will increase, and the increase in costs such as pile foundations due to the increase in building weight will become a problem.

このような従来の基礎構造の問題を解決するため、例えば、地盤上に格子状に形成された偏平基礎が提案されている(特許文献1)。 In order to solve such a problem of the conventional foundation structure, for example, a flat foundation formed in a grid pattern on the ground has been proposed (Patent Document 1).

特開2015−229854号公報Japanese Unexamined Patent Publication No. 2015-229854

本発明は、基礎梁の梁せいを抑えることができると共に、躯体数量も抑えることができる鉄筋コンクリート造の基礎構造及び基礎構造の構築方法を提供することを目的とする。 An object of the present invention is to provide a foundation structure of a reinforced concrete structure and a method for constructing a foundation structure, which can suppress the beam squeeze of a foundation beam and also suppress the number of skeletons.

[適用例1]
本適用例に係る基礎構造は、
鉄筋コンクリート造の基礎構造であって、
平面視で格子状に構成された梁と、
前記梁に四方を囲まれた領域で前記梁と一体に形成されたスラブと、
を含み、
前記スラブは、地盤上に設けられると共に、前記スラブの上面に配置された免震装置または前記上面に固定された柱を介して建物の上部構造体の鉛直荷重を受けることを特徴とする。
[Application example 1]
The basic structure of this application example is
It is a reinforced concrete foundation structure
Beams constructed in a grid pattern in a plan view,
A slab formed integrally with the beam in an area surrounded on all sides by the beam,
Including
The slab is provided on the ground Rutotomoni, characterized in that for receiving the vertical load of the upper structure of the building via the fixed pillars seismic isolation device or the top surface disposed on an upper surface of the slab.

本適用例に係る基礎構造によれば、スラブが建物の上部構造体の鉛直荷重を受け、スラブを囲む梁が格子状に構成されることによって、梁せいを抑えることができ、躯体数量も抑えることができる。 According to the foundation structure according to this application example, the slab receives the vertical load of the superstructure of the building, and the beams surrounding the slab are constructed in a grid pattern, so that the beam slab can be suppressed and the number of skeletons is also suppressed. be able to.

[適用例2]
本適用例に係る基礎構造において、
前記スラブは、平面視で矩形状であり、
前記梁における前記スラブを囲む部分は、付帯梁であり、
前記梁における前記付帯梁の長手方向の端部から当該長手方向に沿って延びる部分は、境界梁であり、
前記付帯梁は、前記スラブの側面の全長に渡って接続し、
前記境界梁は、隣接する他の前記スラブを囲む他の前記付帯梁に接続することができる。
[Application example 2]
In the basic structure according to this application example
The slab has a rectangular shape in a plan view and has a rectangular shape.
The portion of the beam surrounding the slab is an ancillary beam.
The portion of the beam extending along the longitudinal direction from the longitudinal end of the incidental beam is a boundary beam.
The ancillary beams are connected over the entire length of the side surface of the slab.
The boundary beam can be connected to the other ancillary beam surrounding the other adjacent slab.

本適用例に係る基礎構造によれば、付帯梁がスラブの側面の全長に渡って接続しているので、梁に加わる水平方向の応力の一部をスラブに負担させることができるため梁せいを抑えることができ、躯体数量も抑えることができる。
[適用例3]
前記適用例に係る基礎構造において、
前記境界梁と前記付帯梁とによって囲まれた領域は、スラブを形成せずに地盤の上面を土間床に形成することができる。
According to the foundation structure according to this application example, since the incidental beam is connected over the entire length of the side surface of the slab, a part of the horizontal stress applied to the beam can be borne by the slab. It can be suppressed, and the number of skeletons can also be suppressed.
[Application example 3]
In the basic structure according to the application example,
The area surrounded by the boundary beam and the incidental beam can form the upper surface of the ground on the soil floor without forming a slab.

[適用例
前記適用例に係る基礎構造において、
前記スラブの鉄筋の少なくとも一部は、前記付帯梁に定着することができる。
[Application example 4 ]
In the basic structure according to the application example,
At least a part of the reinforcing bar of the slab can be fixed to the incidental beam.

本適用例に係る基礎構造によれば、地震時の曲げ応力をスラブと付帯梁との間で確実に伝達し、それぞれが応力を負担することができる。 According to the foundation structure according to this application example, the bending stress at the time of an earthquake can be reliably transmitted between the slab and the incidental beam, and each of them can bear the stress.

[適用例
前記適用例に係る基礎構造において、
前記スラブの上面は、前記付帯梁の上面と同じ高さにすることができる。
[Application example 5 ]
In the basic structure according to the application example,
The upper surface of the slab can be flush with the upper surface of the incidental beam.

本適用例に係る基礎構造によれば、スラブと付帯梁との段差をなくすことができる。 According to the foundation structure according to this application example, it is possible to eliminate the step between the slab and the incidental beam.

[適用例
前記適用例に係る基礎構造において、
前記スラブの上面は、前記付帯梁の上面よりも低い位置にあることができる。
[Application example 6 ]
In the basic structure according to the application example,
The top surface of the slab may be positioned lower than the upper surface of the auxiliary beam.

本適用例に係る基礎構造によれば、免震装置を配置しても付帯梁を低くする必要がないので、地盤の掘削量を抑えることができる。 According to the foundation structure according to this application example, it is not necessary to lower the incidental beam even if the seismic isolation device is arranged, so that the amount of excavation of the ground can be suppressed.

[適用例
前記適用例に係る基礎構造において、
前記スラブに埋設される鉄筋の本数は、前記スラブの四隅より中央部の方が鉄筋の本数が多いことができる。
[Application example 7 ]
In the basic structure according to the application example,
As for the number of reinforcing bars embedded in the slab, the number of reinforcing bars in the central portion may be larger than that in the four corners of the slab.

本適用例に係る基礎構造によれば、スラブの中央部と付帯梁との間の鉄筋の本数を多くすることで、鉛直荷重を受けるスラブの中央部を効率よく補強することができる。 According to the foundation structure according to this application example, by increasing the number of reinforcing bars between the central portion of the slab and the incidental beam, the central portion of the slab that receives a vertical load can be efficiently reinforced.

[適用例
本適用例に係る基礎構造の構築方法は、
格子状に構成された梁を形成するための第1鉄筋を配筋し、
前記梁に四方を囲まれた領域にスラブを形成するための第2鉄筋を配筋し、
前記スラブから見て前記第1鉄筋の外側に型枠を設置し、
前記型枠内にコンクリートを打設して、前記梁と前記スラブとを一体に形成し、
前記スラブが建物の上部構造体の鉛直荷重を受けるように構成される鉄筋コンクリート造の基礎構造を構築することを特徴とする。
[Application example 8 ]
The method of constructing the foundation structure according to this application example is as follows.
Arrange the first reinforcing bars to form the beams constructed in a grid pattern,
A second reinforcing bar for forming a slab is arranged in the area surrounded by the beam on all sides.
A formwork is installed on the outside of the first reinforcing bar when viewed from the slab.
Concrete is cast in the formwork to integrally form the beam and the slab .
It is characterized by constructing a reinforced concrete foundation structure in which the slab is configured to receive a vertical load of a superstructure of a building.

本適用例に係る基礎構造の構築方法によれば、梁せいを抑えることができると共に、躯
体数量も抑えることができる鉄筋コンクリート造の基礎構造を構築することができる。
According to the method for constructing a foundation structure according to this application example, it is possible to construct a reinforced concrete foundation structure capable of suppressing beam stakes and reducing the number of skeletons.

本実施形態に係る基礎構造の平面図である。It is a top view of the foundation structure which concerns on this embodiment. 本実施形態に係る基礎構造のA−A断面図である。It is a cross-sectional view of AA of the foundation structure which concerns on this embodiment. 本実施形態に係る基礎構造の斜視図である。It is a perspective view of the foundation structure which concerns on this embodiment. 本実施形態に係る基礎構造の配筋を示す図である。It is a figure which shows the reinforcement arrangement of the foundation structure which concerns on this embodiment. 変形例1に係る基礎構造のA−A断面図である。It is a cross-sectional view of AA of the foundation structure which concerns on modification 1. FIG. 変形例2に係る基礎構造のA−A断面図である。It is a cross-sectional view of AA of the foundation structure which concerns on modification 2. FIG.

以下、本発明の好適な実施形態について、図面を用いて詳細に説明する。なお、以下に説明する実施形態は、特許請求の範囲に記載された本発明の内容を不当に限定するものではない。また、以下で説明される構成の全てが本発明の必須構成要件であるとは限らない。 Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the drawings. The embodiments described below do not unreasonably limit the content of the present invention described in the claims. Moreover, not all of the configurations described below are essential constituent requirements of the present invention.

本実施形態に係る基礎構造は、鉄筋コンクリート造の基礎構造であって、平面視で格子状に構成された梁と、前記梁に四方を囲まれた領域で前記梁と一体に形成されたスラブと、を含み、前記スラブは、地盤上に設けられると共に、前記スラブの上面に配置された免震装置または前記上面に固定された柱を介して建物の上部構造体の鉛直荷重を受けることを特徴とする。 The foundation structure according to the present embodiment is a reinforced concrete foundation structure, which includes a beam configured in a grid pattern in a plan view and a slab integrally formed with the beam in a region surrounded by the beam on all sides. , wherein the said slab, Rutotomoni provided on the ground, to receive the vertical load of the upper structure of the building via the fixed pillars seismic isolation device or the top surface disposed on an upper surface of the slab It is a feature.

本実施形態に係る基礎構造の構築方法は、格子状に構成された梁を形成するための第1鉄筋を配筋し、前記梁に四方を囲まれた領域にスラブを形成するための第2鉄筋を配筋し、前記スラブから見て前記第1鉄筋の外側に型枠を設置し、前記型枠内にコンクリートを打設して、前記梁と前記スラブとを一体に形成し、前記スラブが建物の上部構造体の鉛直荷重を受けるように構成される鉄筋コンクリート造の基礎構造を構築することを特徴とする。
In the method for constructing the foundation structure according to the present embodiment, a first reinforcing bar for forming a beam configured in a grid pattern is arranged, and a second reinforcing bar for forming a slab in a region surrounded on all sides by the beam is arranged. Reinforcing bars are arranged, a formwork is installed outside the first reinforcing bar when viewed from the slab, concrete is cast in the formwork, the beam and the slab are integrally formed, and the slab is formed. Is characterized by constructing a reinforced concrete foundation structure that is configured to receive the vertical load of the building superstructure.

1.基礎構造
図1〜図4を用いて本実施形態に係る基礎構造2について説明する。図1は本実施形態に係る基礎構造2の平面図であり、図2は本実施形態に係る基礎構造2のA−A断面図であり、図3は本実施形態に係る基礎構造2の斜視図であり、図4は本実施形態に係る基礎構造2の配筋を示す図である。
1. 1. Basic Structure The basic structure 2 according to the present embodiment will be described with reference to FIGS. 1 to 4. FIG. 1 is a plan view of the foundation structure 2 according to the present embodiment, FIG. 2 is a sectional view taken along the line AA of the foundation structure 2 according to the present embodiment, and FIG. 3 is a perspective view of the foundation structure 2 according to the present embodiment. It is a figure, and FIG. 4 is a figure which shows the bar arrangement of the foundation structure 2 which concerns on this embodiment.

図1〜図3に示す基礎構造2は、鉄筋コンクリート造の基礎構造2である。 The foundation structure 2 shown in FIGS. 1 to 3 is a reinforced concrete foundation structure 2.

図1に示すように、基礎構造2は、平面視で格子状に構成された梁20と、梁20に四方を囲まれた領域で梁と一体に形成されたスラブ30と、を含む。図1においてスラブ30は破線で囲まれた網掛け領域で示した。梁20は、内部に複数の第1鉄筋22c(図4)が埋設された鉄筋コンクリート造である。 As shown in FIG. 1, the foundation structure 2 includes a beam 20 formed in a grid pattern in a plan view, and a slab 30 formed integrally with the beam in a region surrounded by the beam 20 on all sides. In FIG. 1, the slab 30 is shown by a shaded area surrounded by a broken line. The beam 20 is a reinforced concrete structure in which a plurality of first reinforcing bars 22c (FIG. 4) are embedded therein.

図2に示すように、基礎構造2は、建物1の上部構造体3の下方にあって、地盤40上に構築された構造物である。基礎構造2は、上部構造体3の荷重を地盤40に伝える。基礎構造2の下方には、図2のように複数の杭42を設けてもよいし、安定した地盤40であれば基礎構造2を地盤40上に直接構築してもよい。なお、図2では、基礎構造2と地盤40との間の砂利及び捨コンクリートを省略して示している。 As shown in FIG. 2, the foundation structure 2 is a structure that is below the superstructure 3 of the building 1 and is constructed on the ground 40. The foundation structure 2 transmits the load of the superstructure 3 to the ground 40. A plurality of piles 42 may be provided below the foundation structure 2 as shown in FIG. 2, or the foundation structure 2 may be directly constructed on the ground 40 if the ground is stable 40. In FIG. 2, the gravel and waste concrete between the foundation structure 2 and the ground 40 are omitted.

スラブ30は、地盤40上に設けられる。スラブ30は、建物1の上部構造体3の鉛直荷重を受ける。スラブ30は、内部に複数の第2鉄筋30c(図4)が埋設された鉄筋コンクリート造であり、格子状の梁20と連続している。スラブ30は、平面視で矩形状の厚い板状である。スラブ30の上面30aは略平坦であり、上面30aの中央にある免震装置基礎36に設置された免震装置10を介して上部構造体3の鉛直荷重を受ける。本実
施の形態では免震構造を採用したが、免震構造に限らず、耐震構造を採用してもよい。
The slab 30 is provided on the ground 40. The slab 30 receives the vertical load of the superstructure 3 of the building 1. The slab 30 is a reinforced concrete structure in which a plurality of second reinforcing bars 30c (FIG. 4) are embedded therein, and is continuous with the lattice-shaped beams 20. The slab 30 is a thick plate having a rectangular shape in a plan view. The upper surface 30a of the slab 30 is substantially flat, and receives the vertical load of the superstructure 3 via the seismic isolation device 10 installed on the seismic isolation device foundation 36 at the center of the upper surface 30a. Although the seismic isolation structure is adopted in this embodiment, the seismic isolation structure is not limited to the seismic isolation structure, and a seismic isolation structure may be adopted.

このように、スラブ30が建物1の上部構造体3の鉛直荷重を受け、スラブ30を囲む梁20が格子状に構成されることによって、従来の基礎梁構造に比べて梁20の梁せいを抑えることができる。梁20と一体に形成されたスラブ30が水平方向の応力を負担することにより、梁20の応力負担が減ることで梁せいを抑えることができるからである。梁20の梁せいとしては、物流倉庫の場合、例えば1000mm〜1350mm程度にすることができる。また、基礎構造2は、従来の基礎全体を覆うマットスラブ工法に比べて、建物1の躯体数量も抑えることができる。スラブ30を部分的に配置すればよいからである。 In this way, the slab 30 receives the vertical load of the superstructure 3 of the building 1, and the beams 20 surrounding the slab 30 are formed in a grid pattern, so that the beam length of the beam 20 is increased as compared with the conventional foundation beam structure. It can be suppressed. This is because the slab 30 integrally formed with the beam 20 bears the stress in the horizontal direction, so that the stress load on the beam 20 is reduced and the beam squeeze can be suppressed. In the case of a distribution warehouse, the beam length of the beam 20 can be, for example, about 1000 mm to 1350 mm. Further, the foundation structure 2 can reduce the number of skeletons of the building 1 as compared with the conventional mat slab method for covering the entire foundation. This is because the slab 30 may be partially arranged.

また、梁20におけるスラブ30を囲む部分は、付帯梁22である。梁20における付帯梁22の長手方向の端部から当該長手方向に沿って延びる部分は、境界梁24である。付帯梁22は、スラブ30の側面30bの全長に渡って接続する。境界梁24は、隣接する他のスラブ30を囲む他の付帯梁22に接続する。梁20は、平面視で矩形状のスラブ30の4つの側面30bに接続する4本の付帯梁22と、付帯梁22の端部からその長手方向に沿って延びる少なくとも4本の境界梁24と、を含む。ここで、「接続する」とは、一体につながっている状態を示す。「接続する」部分では、一方の鉄筋が他方の内部にまで延びて固着されてもよいし、定着されてもよい。スラブ30と付帯梁22とは一体であり、スラブ30の側面30b及び付帯梁22の側面22bは付帯梁22を説明するための便宜的なものであって、図1〜図4の実施形態では実際に側面30bと側面22bとが「面」として存在するわけではない。また、境界梁24と付帯梁22とは一体であり、連続して梁20を構成する。 The portion of the beam 20 surrounding the slab 30 is an incidental beam 22. The portion of the beam 20 extending along the longitudinal direction from the longitudinal end of the incidental beam 22 is the boundary beam 24. The incidental beam 22 is connected over the entire length of the side surface 30b of the slab 30. The boundary beam 24 is connected to another incidental beam 22 that surrounds the other adjacent slab 30. The beam 20 includes four incidental beams 22 connected to the four side surfaces 30b of the rectangular slab 30 in a plan view, and at least four boundary beams 24 extending from the end of the incidental beam 22 along the longitudinal direction thereof. ,including. Here, "connecting" indicates a state in which they are integrally connected. In the "connecting" portion, one reinforcing bar may extend and be fixed to the inside of the other. The slab 30 and the incidental beam 22 are integrated, and the side surface 30b of the slab 30 and the side surface 22b of the incidental beam 22 are for convenience of explaining the incidental beam 22, and in the embodiment of FIGS. The side surface 30b and the side surface 22b do not actually exist as "planes". Further, the boundary beam 24 and the incidental beam 22 are integrated to form the beam 20 continuously.

このように、上部構造体3の鉛直荷重を受けるスラブ30に接続する4本の付帯梁22と他のスラブ30の付帯梁22に接続する境界梁24とを有することによって、付帯梁22及び境界梁24の梁せいを抑えることができる。付帯梁22を介してスラブ30が梁20に加えられる水平方向の応力を負担するからである。また、基礎構造2は、従来のマットスラブ工法に比べて、建物1の躯体数量も抑えることができる。隣接するスラブ30の間を境界梁24で接続しているため、スラブ30を部分的に配置すればよいからである。 In this way, by having the four incidental beams 22 connected to the slab 30 that receives the vertical load of the superstructure 3 and the boundary beams 24 connected to the incidental beams 22 of the other slabs 30, the incidental beams 22 and the boundary are provided. It is possible to suppress the beam load of the beam 24. This is because the slab 30 bears the horizontal stress applied to the beam 20 via the incidental beam 22. Further, the foundation structure 2 can reduce the number of skeletons of the building 1 as compared with the conventional mat slab method. This is because the slabs 30 need only be partially arranged because the adjacent slabs 30 are connected by the boundary beam 24.

スラブ30のせい(厚さ)は、従来のマットスラブ工法に比べると同じかわずかに高くなるように設定することができる。スラブ30のせいは、物流倉庫の場合、例えば1000mm〜1350mm程度である。 The cause (thickness) of the slab 30 can be set to be the same as or slightly higher than that of the conventional mat slab method. In the case of a distribution warehouse, the slab 30 is, for example, about 1000 mm to 1350 mm.

図2及び図3に示すように、付帯梁22の上面22aと境界梁24の上面24aとは同じ高さであって、連続している。境界梁24と付帯梁22とによって囲まれた領域は、スラブ30がなく、地盤40をそのまま土間床60としてもよいし、土間床60の上面にコンクリートを打設して土間スラブとしてもよい。 As shown in FIGS. 2 and 3, the upper surface 22a of the incidental beam 22 and the upper surface 24a of the boundary beam 24 have the same height and are continuous. The area surrounded by the boundary beam 24 and the incidental beam 22 does not have a slab 30, and the ground 40 may be used as it is as the soil floor 60, or concrete may be cast on the upper surface of the soil floor 60 to form a soil slab.

土間床60の領域は地盤40を掘削しなくてもよいので、掘削量が少なくて済み、掘削残土の処理の面からも低コストである。また、従来のように基礎構造の全体をマットスラブとする場合に比べて、土間床60の領域がある分、コンクリート量を削減できる。さらに、土間床60の地盤40を利用して捨て型枠工法を採用することができる。 Since it is not necessary to excavate the ground 40 in the area of the soil floor 60, the amount of excavation is small, and the cost is low from the viewpoint of treating the excavated residual soil. Further, as compared with the case where the entire foundation structure is made of a mat slab as in the conventional case, the amount of concrete can be reduced due to the area of the soil floor 60. Further, the discard formwork method can be adopted by utilizing the ground 40 of the soil floor 60.

スラブ30の上面30aは、付帯梁22の上面22aと同じ高さにある。スラブ30と付帯梁22との段差をなくすことができるため、例えば作業員のスラブ30上の移動が容易であり、作業員の移動のための仮設足場(地足場)が不要となる。 The upper surface 30a of the slab 30 is at the same height as the upper surface 22a of the incidental beam 22. Since the step between the slab 30 and the incidental beam 22 can be eliminated, for example, the worker can easily move on the slab 30, and a temporary scaffold (ground scaffold) for moving the worker becomes unnecessary.

スラブ30の上面30a、付帯梁22の上面22a、境界梁24の上面24a、及び土
間床60は同じ高さにあるため、上部構造体3の上部梁12との間のスペースは段差なく利用することができ、例えばピットとして使用するのに適している。
Since the upper surface 30a of the slab 30, the upper surface 22a of the incidental beam 22, the upper surface 24a of the boundary beam 24, and the soil floor 60 are at the same height, the space between the upper surface of the upper structure 3 and the upper beam 12 of the upper structure 3 is used without steps. It can be used, for example, as a pit.

上部構造体3は、免震装置10に支えられた柱11と、上部梁12と、上部梁12上に設けられる1階床スラブと、図示しない2階以上の構造物を含む。上部構造体3の鉛直荷重は免震装置10を介してスラブ30に加えられる。スラブ30の下方には杭42が設置され、スラブ30に加えられた鉛直荷重を地盤40の図示しない支持層へ伝える。免震装置10を用いない場合は、柱11を直接スラブ30と接続する。杭42の杭頭はスラブ30と接続する。杭42の杭頭から延びる公知の杭頭補強筋がスラブ30内に延びて固着してもよいし、金属製のキャップを杭42の杭頭に被せて公知の杭頭半剛性接合構造を用いてもよい。 The upper structure 3 includes a pillar 11 supported by the seismic isolation device 10, an upper beam 12, a first floor slab provided on the upper beam 12, and a structure having a second floor or higher (not shown). The vertical load of the superstructure 3 is applied to the slab 30 via the seismic isolation device 10. A pile 42 is installed below the slab 30, and the vertical load applied to the slab 30 is transmitted to a support layer (not shown) of the ground 40. When the seismic isolation device 10 is not used, the pillar 11 is directly connected to the slab 30. The pile head of the pile 42 is connected to the slab 30. A known pile head reinforcing bar extending from the pile head of the pile 42 may extend into the slab 30 and be fixed, or a metal cap may be placed on the pile head of the pile 42 to use a known pile head semi-rigid joint structure. You may.

2.配筋構造
図4を用いて基礎構造2の内部の配筋構造について説明する。図4は図1〜図3における基礎構造2の配筋を示す図である。なお、図4では、型枠50が配置される部分を斜線で表し、第1鉄筋22c及び第2鉄筋30cは実線で表した。
2. Reinforcement structure The internal reinforcement structure of the foundation structure 2 will be described with reference to FIG. FIG. 4 is a diagram showing the reinforcement arrangement of the foundation structure 2 in FIGS. 1 to 3. In FIG. 4, the portion where the formwork 50 is arranged is represented by diagonal lines, and the first reinforcing bar 22c and the second reinforcing bar 30c are represented by solid lines.

スラブ30の第2鉄筋30cは、付帯梁22からスラブ30を挟んで対向する付帯梁22へ向かって配筋され、複数の第2鉄筋30cが直交して格子状に配筋される。図4で示した第2鉄筋30cはスラブ30の上面22a,24a側にある上端筋(主筋)であり、図示しないが同様の下端筋も配筋されている。 The second reinforcing bars 30c of the slab 30 are arranged from the incidental beam 22 toward the incidental beams 22 facing each other with the slab 30 interposed therebetween, and the plurality of second reinforcing bars 30c are arranged orthogonally in a grid pattern. The second reinforcing bar 30c shown in FIG. 4 is an upper end bar (main bar) on the upper surface 22a and 24a side of the slab 30, and a similar lower end bar is also arranged although not shown.

付帯梁22の第1鉄筋22cは、付帯梁22の長手方向に沿って配筋され、境界梁24に延びる。図4で示した第1鉄筋22cは、上面22a,24a側にある付帯梁22及び境界梁24の梁主筋であり、図示しないが同様の主筋が下面側にも配筋されている。 The first reinforcing bar 22c of the incidental beam 22 is arranged along the longitudinal direction of the incidental beam 22 and extends to the boundary beam 24. The first reinforcing bar 22c shown in FIG. 4 is a beam main bar of the incidental beam 22 and the boundary beam 24 on the upper surface 22a and 24a side, and although not shown, the same main bar is also arranged on the lower surface side.

スラブ30の第2鉄筋30cの少なくとも一部は、付帯梁22に定着している。第1鉄筋22cと第2鉄筋30cとの相互作用により、地震時の曲げ応力をスラブ30と付帯梁22との間で確実に伝達し、それぞれが応力を負担することができる。 At least a part of the second reinforcing bar 30c of the slab 30 is fixed to the incidental beam 22. By the interaction between the first reinforcing bar 22c and the second reinforcing bar 30c, the bending stress at the time of an earthquake can be reliably transmitted between the slab 30 and the incidental beam 22, and each of them can bear the stress.

スラブ30の四隅32(図4で太い破線の円で示した領域)を通る第2鉄筋30cは、いずれもその両端または一方が付帯梁22に定着され、中央部34(図4で太い破線の円で示した領域)を通る第2鉄筋30cは、いずれもその両端または一方が付帯梁22に定着される。 The second reinforcing bar 30c passing through the four corners 32 of the slab 30 (the area indicated by the thick broken line circle in FIG. 4) is fixed to the incidental beam 22 at both ends or one of the second reinforcing bars 30c, and the central portion 34 (the thick broken line in FIG. 4). Both ends or one of the second reinforcing bars 30c passing through the region indicated by the circle) are fixed to the incidental beam 22.

スラブ30に埋設される第2鉄筋30cの本数は、スラブ30の四隅32より中央部34の方がより多く配筋することができる。中央部34と付帯梁22との間の第2鉄筋30cの本数を多くすることにより、鉛直荷重を受けるスラブ30の中央部34を補強することができる。 The number of the second reinforcing bars 30c embedded in the slab 30 can be arranged more in the central portion 34 than in the four corners 32 of the slab 30. By increasing the number of the second reinforcing bars 30c between the central portion 34 and the incidental beam 22, the central portion 34 of the slab 30 that receives the vertical load can be reinforced.

3.構築方法
図2及び図4を用いて、基礎構造2の構築方法について説明する。
3. 3. Construction Method The construction method of the foundation structure 2 will be described with reference to FIGS. 2 and 4.

まず、基礎構造2を構築する前に、地盤40を掘削する。掘削する部分は、境界梁24、付帯梁22及びスラブ30が構築される部分である。すなわち、土間床60の部分を除いて地盤40を掘削する。 First, the ground 40 is excavated before the foundation structure 2 is constructed. The part to be excavated is the part where the boundary beam 24, the incidental beam 22 and the slab 30 are constructed. That is, the ground 40 is excavated except for the portion of the soil floor 60.

次に、掘削された境界梁24、付帯梁22及びスラブ30が構築される部分に、図示しない砂利を敷き、捨コンクリートを打設する。なお、砂利及び捨コンは構造上の必須構成要素ではない。 Next, gravel (not shown) is laid on the portion where the excavated boundary beam 24, the incidental beam 22 and the slab 30 are constructed, and waste concrete is placed. It should be noted that gravel and waste material are not structurally essential components.

次に、格子状に構成された梁20(付帯梁22及び境界梁24)を形成するための第1鉄筋22cを配筋する。付帯梁22及び境界梁24は、掘削された基礎工事を行う土地ではなく、別の土地で第1鉄筋22cを先組みし、クレーンで掘削された場所へ釣り込んでもよい。施工作業の向上のためである。先組みされた梁20の1組は、境界梁24の中間地点までとし、所定位置へ配置された後に隣接する先組みされた他の梁20の1組の境界梁24の第1鉄筋22c同士を例えば溶接で接合することができる。 Next, the first reinforcing bars 22c for forming the beams 20 (incidental beams 22 and boundary beams 24) configured in a grid pattern are arranged. The incidental beam 22 and the boundary beam 24 may not be the land where the excavated foundation work is to be performed, but the first reinforcing bar 22c may be pre-assembled on another land and fished into the excavated place by the crane. This is to improve the construction work. One set of pre-assembled beams 20 extends to the intermediate point of the boundary beam 24, and after being placed at a predetermined position, the first reinforcing bars 22c of the pair of pre-assembled beams 20 of the adjacent pre-assembled beams 20 are connected to each other. Can be joined by welding, for example.

次に、付帯梁22に四方を囲まれた領域にスラブ30を形成するための第2鉄筋30cを配筋する。第2鉄筋30cは、その一方の端部または両端部を付帯梁22に定着する。 Next, a second reinforcing bar 30c for forming the slab 30 is arranged in a region surrounded on all sides by the incidental beam 22. One end or both ends of the second reinforcing bar 30c are fixed to the incidental beam 22.

次に、スラブ30から見て第1鉄筋22cの外側に型枠50を設置する。型枠50は、コンクリートを打設後に回収しない捨て型枠を用いてもよい。 Next, the formwork 50 is installed outside the first reinforcing bar 22c when viewed from the slab 30. As the formwork 50, a discard formwork in which concrete is not collected after being placed may be used.

最後に、型枠50内にコンクリートを打設する。付帯梁22及びスラブ30並びに境界梁24は同時にコンクリートが打設され、一体的に形成される。 Finally, concrete is placed in the formwork 50. Concrete is poured into the incidental beam 22, the slab 30, and the boundary beam 24 at the same time to form them integrally.

さらに、土間床60の部分の表面にもコンクリートを打設してもよい。スラブ30から土間床60を含む平坦な床が形成されるからである。 Further, concrete may be cast on the surface of the soil floor 60. This is because a flat floor including the soil floor 60 is formed from the slab 30.

このように、格子状の梁20とスラブ30とを形成することで、梁20の梁せいを抑えることができると共に、躯体数量も抑えることができる。 By forming the lattice-shaped beams 20 and the slabs 30 in this way, it is possible to suppress the beam squeeze of the beams 20 and also to suppress the number of skeletons.

また、梁20の形状が基礎構造2の全体で統一されることにより、以下のメリットがある。
・梁20内の鉄筋を地組して現地で組み立てることにより工期が短縮できる。
・型枠の形状が基礎構造2の全体で統一できるため、システム化できる。
・基礎用の仮設足場(地足場)が不要になる。
Further, by unifying the shape of the beam 20 in the entire foundation structure 2, there are the following merits.
-The construction period can be shortened by assembling the reinforcing bars in the beam 20 on site.
-Since the shape of the formwork can be unified in the entire foundation structure 2, it can be systematized.
・ Temporary scaffolding (ground scaffolding) for foundations is no longer required.

4.変形例1
図5を用いて変形例1に係る基礎構造2aについて説明する。図5は、変形例1に係る基礎構造2aのA−A断面図である。なお、図1〜図4の基礎構造2と同様の構成については同様の符号を付し、重複する説明は省略する。
4. Modification 1
The basic structure 2a according to the first modification will be described with reference to FIG. FIG. 5 is a cross-sectional view taken along the line AA of the foundation structure 2a according to the first modification. The same components as those of the basic structure 2 of FIGS. 1 to 4 are designated by the same reference numerals, and redundant description will be omitted.

図5に示すように、基礎構造2aは、スラブ30の上面30aは、付帯梁22の上面22aよりも低い位置にあり、スラブ30の上面30aには、免震装置10が配置される。 As shown in FIG. 5, in the foundation structure 2a, the upper surface 30a of the slab 30 is located at a position lower than the upper surface 22a of the incidental beam 22, and the seismic isolation device 10 is arranged on the upper surface 30a of the slab 30.

スラブ30だけが低い位置にあるため、免震装置10を配置しても梁20または付帯梁22を低くする必要がないので、1階床面の高さが決まっている場合には、図1〜図4の基礎構造2と比べて、地盤40の掘削量を抑えることができる。 Since only the slab 30 is in a low position, it is not necessary to lower the beam 20 or the incidental beam 22 even if the seismic isolation device 10 is arranged. -Compared with the foundation structure 2 of FIG. 4, the amount of excavation of the ground 40 can be suppressed.

スラブ30の側面30bと付帯梁22の側面22bとは、例えば、梁せいの2/3程度の高さで接続している。 The side surface 30b of the slab 30 and the side surface 22b of the incidental beam 22 are connected at a height of, for example, about 2/3 of the beam.

5.変形例2
図6を用いて変形例2に係る基礎構造2bについて説明する。図6は、変形例2に係る基礎構造2bのA−A断面図である。なお、図1〜図4の基礎構造2と同様の構成については同様の符号を付し、重複する説明は省略する。
5. Modification 2
The basic structure 2b according to the modified example 2 will be described with reference to FIG. FIG. 6 is a cross-sectional view taken along the line AA of the foundation structure 2b according to the modified example 2. The same components as those of the basic structure 2 of FIGS. 1 to 4 are designated by the same reference numerals, and redundant description will be omitted.

図6に示すように、基礎構造2bは、免震装置10(図2)を設けず、スラブ30に柱
11を直接固定して上部構造体3aを支えている。基礎構造2bのような耐震構造を採用することもできる。
As shown in FIG. 6, the foundation structure 2b is not provided with the seismic isolation device 10 (FIG. 2), and the pillar 11 is directly fixed to the slab 30 to support the superstructure 3a. Seismic structures such as the foundation structure 2b can also be adopted.

スラブ30の上面30aからは上方に向かって柱11が延び、スラブ30の下面からは杭42が下方に向かって延びている。柱11は鉄筋コンクリート造に限らず、鉄骨をアンカーでスラブ30に定着した構造でもよい。隣接する付帯梁22aの間には土間コンクリート62が打設されている。そのため、スラブ30、梁20及び土間コンクリート62の上面がそのまま平坦な1階の床として利用できる。なお、土間コンクリート62は構造スラブとしてもよい。 Pillars 11 extend upward from the upper surface 30a of the slab 30, and piles 42 extend downward from the lower surface of the slab 30. The column 11 is not limited to a reinforced concrete structure, and may have a structure in which a steel frame is fixed to the slab 30 with an anchor. Soil concrete 62 is placed between the adjacent incidental beams 22a. Therefore, the upper surfaces of the slab 30, the beam 20, and the soil concrete 62 can be used as they are as a flat first floor. The soil concrete 62 may be a structural slab.

本発明は、上述した実施形態に限定されるものではなく、さらに種々の変形が可能である。例えば、本発明は、実施形態で説明した構成と実質的に同一の構成(例えば、機能、方法、及び結果が同一の構成、あるいは目的及び効果が同一の構成)を含む。また、本発明は、実施形態で説明した構成の本質的でない部分を置き換えた構成を含む。また、本発明は、実施形態で説明した構成と同一の作用効果を奏する構成又は同一の目的を達成することができる構成を含む。また、本発明は、実施形態で説明した構成に公知技術を付加した構成を含む。 The present invention is not limited to the above-described embodiment, and various modifications are possible. For example, the present invention includes substantially the same configurations as those described in the embodiments (eg, configurations with the same function, method, and result, or configurations with the same purpose and effect). The present invention also includes a configuration in which a non-essential part of the configuration described in the embodiment is replaced. In addition, the present invention includes a configuration that exhibits the same effects as the configuration described in the embodiment or a configuration that can achieve the same object. Further, the present invention includes a configuration in which a known technique is added to the configuration described in the embodiment.

1…建物、2,2a,2b…基礎構造、3,3a…上部構造体、10…免震装置、11…柱、12…上部梁、13…1階床スラブ、20…梁、22…付帯梁、22a…付帯梁の上面、22b…付帯梁の側面、22c…第1鉄筋、24…境界梁、24a…境界梁の上面、30…スラブ、30a…スラブの上面、30b…スラブの側面、30c…第2鉄筋、32…四隅、34…中央部、36…免震装置基礎、40…地盤、42…杭、50…型枠、60…土間床、62…土間コンクリート 1 ... building, 2,2a, 2b ... foundation structure, 3,3a ... superstructure, 10 ... seismic isolation device, 11 ... pillar, 12 ... upper beam, 13 ... 1st floor slab, 20 ... beam, 22 ... incidental Beam, 22a ... Upper surface of incidental beam, 22b ... Side surface of incidental beam, 22c ... First reinforcing bar, 24 ... Boundary beam, 24a ... Upper surface of boundary beam, 30 ... Slab, 30a ... Upper surface of slab, 30b ... Side surface of slab, 30c ... 2nd reinforcing bar, 32 ... four corners, 34 ... central part, 36 ... seismic isolation device foundation, 40 ... ground, 42 ... beams, 50 ... mold, 60 ... soil floor, 62 ... soil concrete

Claims (8)

鉄筋コンクリート造の基礎構造であって、
平面視で格子状に構成された梁と、
前記梁に四方を囲まれた領域で前記梁と一体に形成されたスラブと、
を含み、
前記スラブは、地盤上に設けられると共に、前記スラブの上面に配置された免震装置または前記上面に固定された柱を介して建物の上部構造体の鉛直荷重を受けることを特徴とする、基礎構造。
It is a reinforced concrete foundation structure
Beams constructed in a grid pattern in a plan view,
A slab formed integrally with the beam in an area surrounded on all sides by the beam,
Including
The slab is characterized by receiving Rutotomoni provided on the ground, the vertical load of the upper structure of the building via the fixed pillars seismic isolation device or the top surface disposed on an upper surface of the slab, Foundation structure.
請求項1において、
前記スラブは、平面視で矩形状であり、
前記梁における前記スラブを囲む部分は、付帯梁であり、
前記梁における前記付帯梁の長手方向の端部から当該長手方向に沿って延びる部分は、境界梁であり、
前記付帯梁は、前記スラブの側面の全長に渡って接続し、
前記境界梁は、隣接する他の前記スラブを囲む他の前記付帯梁に接続することを特徴とする、基礎構造。
In claim 1,
The slab has a rectangular shape in a plan view and has a rectangular shape.
The portion of the beam surrounding the slab is an ancillary beam.
The portion of the beam extending along the longitudinal direction from the longitudinal end of the incidental beam is a boundary beam.
The ancillary beams are connected over the entire length of the side surface of the slab.
The foundation structure, characterized in that the boundary beam is connected to the other ancillary beam surrounding the other adjacent slab.
請求項2において、 In claim 2,
前記境界梁と前記付帯梁とによって囲まれた領域は、スラブを形成せずに地盤の上面を土間床に形成されることを特徴とする、基礎構造。 A foundation structure in which a region surrounded by the boundary beam and the incidental beam is formed on the upper surface of the ground as a soil floor without forming a slab.
請求項2または3において、
前記スラブの鉄筋の少なくとも一部は、前記付帯梁に定着していることを特徴とする、基礎構造。
In claim 2 or 3 ,
A foundation structure characterized in that at least a part of the reinforcing bars of the slab is fixed to the incidental beam.
請求項2〜4のいずれか一項において、
前記スラブの上面は、前記付帯梁の上面と同じ高さにあることを特徴とする、基礎構造
In any one of claims 2 to 4,
A foundation structure characterized in that the upper surface of the slab is at the same height as the upper surface of the incidental beam.
請求項2〜4のいずれか一項において、
前記スラブの上面は、前記付帯梁の上面よりも低い位置にあることを特徴とする、基礎構造。
In any one of claims 2 to 4,
The top surface of the slab is characterized the position near Turkey lower than the upper surface of the auxiliary beam, substructure.
請求項1〜のいずれか1項において、
前記スラブに埋設される鉄筋の本数は、前記スラブの四隅より中央部の方が鉄筋の本数が多いことを特徴とする、基礎構造。
In any one of claims 1 to 6 ,
The number of reinforcing bars embedded in the slab is a foundation structure characterized in that the number of reinforcing bars in the central portion is larger than that in the four corners of the slab.
格子状に構成された梁を形成するための第1鉄筋を配筋し、
前記梁に四方を囲まれた領域にスラブを形成するための第2鉄筋を配筋し、
前記スラブから見て前記第1鉄筋の外側に型枠を設置し、
前記型枠内にコンクリートを打設して、前記梁と前記スラブとを一体に形成し
前記スラブが建物の上部構造体の鉛直荷重を受けるように構成される鉄筋コンクリート造の基礎構造を構築することを特徴とする、基礎構造の構築方法。
Arrange the first reinforcing bars to form the beams constructed in a grid pattern,
A second reinforcing bar for forming a slab is arranged in the area surrounded by the beam on all sides.
A formwork is installed on the outside of the first reinforcing bar when viewed from the slab.
Concrete is cast in the formwork to integrally form the beam and the slab .
A method for constructing a foundation structure, which comprises constructing a reinforced concrete foundation structure in which the slab is configured to receive a vertical load of a superstructure of a building.
JP2016249262A 2016-12-22 2016-12-22 Foundation structure and method of constructing foundation structure Active JP6886811B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016249262A JP6886811B2 (en) 2016-12-22 2016-12-22 Foundation structure and method of constructing foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016249262A JP6886811B2 (en) 2016-12-22 2016-12-22 Foundation structure and method of constructing foundation structure

Publications (2)

Publication Number Publication Date
JP2018104899A JP2018104899A (en) 2018-07-05
JP6886811B2 true JP6886811B2 (en) 2021-06-16

Family

ID=62787662

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016249262A Active JP6886811B2 (en) 2016-12-22 2016-12-22 Foundation structure and method of constructing foundation structure

Country Status (1)

Country Link
JP (1) JP6886811B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109355992B (en) * 2018-10-16 2024-01-23 中铁二院工程集团有限责任公司 Karst area sudden collapse prevention roadbed structure and construction method

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4886399A (en) * 1987-02-12 1989-12-12 Pidgeon John T Method of constructing a foundation for buildings
JPH0384120A (en) * 1989-08-28 1991-04-09 Taisei Corp Structure of flat foundation
JPH03202511A (en) * 1989-12-28 1991-09-04 Shimizu Corp Liquefaction-proof construction
JPH07197475A (en) * 1993-12-29 1995-08-01 Misawa Homes Co Ltd Structure of foundation
JPH08177068A (en) * 1994-12-27 1996-07-09 Ohbayashi Corp Construction of underground structure
JPH10266226A (en) * 1997-03-27 1998-10-06 Shimizu Corp Foundation structure
JPH11264142A (en) * 1998-03-17 1999-09-28 Shimizu Corp Foundation structure of building
JP4590300B2 (en) * 2005-05-02 2010-12-01 大成建設株式会社 Base structure of base-isolated building
JP4762877B2 (en) * 2006-12-15 2011-08-31 株式会社竹中工務店 Reinforcing existing foundation
JP6335029B2 (en) * 2014-06-04 2018-05-30 株式会社竹中工務店 Foundation structure
JP6368584B2 (en) * 2014-08-25 2018-08-01 株式会社竹中工務店 Foundation construction method

Also Published As

Publication number Publication date
JP2018104899A (en) 2018-07-05

Similar Documents

Publication Publication Date Title
KR100927344B1 (en) Construction method for connecting underground structure and underground structure using connection structure for underground construction
JP2013518199A (en) Construction Method of Steel Composite Girder Bridge {ConstructionMethod SteelCompositeGirderBridge}
JPH0532521B2 (en)
CN109403654B (en) Underpinning and reinforcing method for existing building structure
CN209855277U (en) Conversion layer structure for underground added layer of existing building
JP6886811B2 (en) Foundation structure and method of constructing foundation structure
KR101133420B1 (en) Precast concrete connection block and the continuity method of composite bridges using it
JP2005105531A (en) Foundation structure of building and its construction method
JP6945341B2 (en) Expansion foundation structure
JP3240438B2 (en) Seismic isolation method for seismically isolated buildings and existing buildings
CN216616975U (en) Reinforced structure with existing reinforced concrete column of space steel framework restraint
JP2007277856A (en) Aseismatic reinforcing structure of existing building
JP6855296B2 (en) Building foundation structure and its construction method
JP2000144904A (en) Joint construction between pile and upper structural skeleton in structure
CN213418233U (en) Stiff column structure
KR101483865B1 (en) Construction Method of Underground Structure using Composite Wale
CN110805304A (en) Construction method for reinforcing structure of concrete beam
KR101215764B1 (en) A burial slab structure of an outer wall of an underground construction
KR101194866B1 (en) Rahmen bridge construction method using longitudinal and lateral steel member
JP5181288B2 (en) Structure of new structure using existing pile and existing foundation and construction method of new structure using existing pile and existing foundation
JP7502208B2 (en) Building
JP7510328B2 (en) Construction Method
CN109853748B (en) Connecting node of steel plate combined shear wall and unequal-height foundation
JP2005068859A (en) Earthquake-resistant dirt floor
JPH07138972A (en) Construction method for underground skeleton

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190829

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200728

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20201006

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20201203

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210511

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210517

R150 Certificate of patent or registration of utility model

Ref document number: 6886811

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250