JP6835571B2 - Manhole rehabilitation structure and construction method of manhole rehabilitation structure - Google Patents

Manhole rehabilitation structure and construction method of manhole rehabilitation structure Download PDF

Info

Publication number
JP6835571B2
JP6835571B2 JP2016250084A JP2016250084A JP6835571B2 JP 6835571 B2 JP6835571 B2 JP 6835571B2 JP 2016250084 A JP2016250084 A JP 2016250084A JP 2016250084 A JP2016250084 A JP 2016250084A JP 6835571 B2 JP6835571 B2 JP 6835571B2
Authority
JP
Japan
Prior art keywords
joint
manhole
rehabilitation
pipe
new pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016250084A
Other languages
Japanese (ja)
Other versions
JP2018104928A (en
Inventor
重樹 白石
重樹 白石
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP2016250084A priority Critical patent/JP6835571B2/en
Publication of JP2018104928A publication Critical patent/JP2018104928A/en
Application granted granted Critical
Publication of JP6835571B2 publication Critical patent/JP6835571B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

本発明は、例えば、下水用管路や農業用水路等に用いられる人孔を更生する人孔更生構造およびその施工方法に関する。 The present invention relates to, for example, a manhole rehabilitation structure for rehabilitating a manhole used in a sewage pipe, an agricultural waterway, or the like, and a construction method thereof.

従来から、例えば下記特許文献1に記載された、既設管が連通する人孔が知られている。この種の人孔は、老朽化や腐食劣化したときに、強度(耐力)や耐震性能を更生するために更生材を用いる。 Conventionally, for example, a manhole through which an existing pipe communicates, which is described in Patent Document 1 below, has been known. This type of manhole uses a rehabilitating material to rehabilitate its strength (proof stress) and seismic performance when it deteriorates due to aging or corrosion.

特開2015−74965号公報JP 2015-74965

しかしながら、前記従来の更生材を用いた人孔更生構造では、更生材と既設管とが接続される部分における耐震性能に改善の余地がある。 However, in the manhole rehabilitation structure using the conventional rehabilitation material, there is room for improvement in seismic performance at the portion where the rehabilitation material and the existing pipe are connected.

本発明は、前述した事情に鑑みてなされたものであって、人孔更生構造における耐震性能を向上させることを目的とする。 The present invention has been made in view of the above circumstances, and an object of the present invention is to improve seismic performance in a manhole rehabilitation structure.

前記課題を解決するために、本発明は以下の手段を提案している。
本発明に係る人孔更生構造は、既設管が連通する人孔を更生する管材であり、鉛直方向に延びる更生材と、前記更生材を水平方向に貫通する装着孔内に嵌合された状態で前記更生材に固定された管材である継手と、前記既設管内に配置され、前記継手に嵌合された新管と、を備える。前記継手は、2つのみ設けられていてもよい。
In order to solve the above problems, the present invention proposes the following means.
The manhole rehabilitation structure according to the present invention is a pipe material for rehabilitating a manhole through which an existing pipe communicates, and is fitted with a rehabilitation material extending in the vertical direction and a mounting hole penetrating the rehabilitation material in the horizontal direction. It is provided with a joint which is a pipe material fixed to the rehabilitation material and a new pipe which is arranged in the existing pipe and fitted to the joint. Only two of the joints may be provided.

この場合、新管が継手に嵌合されている。したがって、例えば地震発生時に、継手と新管とが継手の径方向に沿って相対的に変位するのを規制すること等ができる。これにより、例えば、新管が更生材から離脱するのを抑制すること等ができる。
一方で、新管が継手に単に嵌合されているだけなので、例えば、液状化に伴う沈下等の地盤変状が生じたときには、継手と新管との嵌合の形態を地盤変状に応じて容易に追従させることができる。すなわち、例えば、継手と新管とを互いに嵌合させた状態で、継手と新管との嵌合部を屈曲させたり、継手と新管との嵌合部を伸縮させたりすることができる。
以上より、人孔更生構造における耐震性能を向上させることができる。
In this case, the new pipe is fitted to the joint. Therefore, for example, when an earthquake occurs, it is possible to regulate the relative displacement of the joint and the new pipe along the radial direction of the joint. As a result, for example, it is possible to prevent the new pipe from separating from the rehabilitating material.
On the other hand, since the new pipe is simply fitted to the joint, for example, when ground deformation such as subsidence due to liquefaction occurs, the form of fitting between the joint and the new pipe depends on the ground deformation. Can be easily followed. That is, for example, in a state where the joint and the new pipe are fitted to each other, the fitting portion between the joint and the new pipe can be bent, or the fitting portion between the joint and the new pipe can be expanded or contracted.
From the above, seismic performance in the manhole rehabilitation structure can be improved.

ここで継手が、更生材に設けられている。したがって、更生材を人孔に配置する前に、例えば工場などの地上で、継手を更生材に固定することが可能になり、更生材と継手との固定の程度を精度良く管理することができる。
また、新管が継手に嵌合されている。したがって、例えば、継手および新管の寸法などを調整することで、継手と新管との嵌合の程度を精度良く管理することもできる。
以上のように、更生材と継手との固定の程度、および継手と新管との嵌合の程度の両方を精度良く管理することができる。これにより、更生材と新管との間の耐震性能を精度良く管理することができる。したがって、例えば、更生材と新管との間の耐震性能を、所定の耐震性能を満たすように設計し易くすることができる。その結果、この耐震性能を、例えばマンホールと管きょとの接続部について従来から公的に定められている基準(例えば、「下水道施設の耐震対策指針と解説−2014年版−(日本下水道協会))を満たすように設計することで、更生材と新管との間の耐震性能の信頼性を確保することができる。なお継手として、例えば繊維強化樹脂管(以下、「FRPM管」という。)の分野(例えば、JIS A 5350:2006に規定される強化プラスチック複合管の分野)における継手(受口)と同等の構成を採用することで、同分野で確認されている耐震性能についての技術思想を、人孔更生構造にも援用することができる。
さらに、更生材と継手との固定の程度、および継手と新管との嵌合の程度の両方を精度良く管理することで、例えば、鉛直土圧による水平土圧で生じる発生応力に対する強度なども精度良く管理することができる。これにより、前述の耐震性能と同様に、前記強度の信頼性を確保することも可能になり、例えば、FRPM管の分野における外圧性能や外水圧性能についての技術思想を援用することもできる。
Here, the joint is provided on the rehabilitation material. Therefore, before arranging the rehabilitation material in the manhole, the joint can be fixed to the rehabilitation material on the ground such as a factory, and the degree of fixing between the rehabilitation material and the joint can be accurately controlled. ..
In addition, a new pipe is fitted to the joint. Therefore, for example, by adjusting the dimensions of the joint and the new pipe, it is possible to accurately control the degree of fitting between the joint and the new pipe.
As described above, both the degree of fixing between the rehabilitating material and the joint and the degree of fitting between the joint and the new pipe can be controlled with high accuracy. This makes it possible to accurately manage the seismic performance between the rehabilitated material and the new pipe. Therefore, for example, the seismic performance between the rehabilitated material and the new pipe can be easily designed to satisfy a predetermined seismic performance. As a result, this seismic performance is based on, for example, the standards that have been publicly established for the connection between manholes and pipes (for example, "Guidelines and explanations for seismic measures for sewerage facilities-2014 edition- (Japan Sewerage Association)". ), The reliability of seismic performance between the rehabilitated material and the new pipe can be ensured. As a joint, for example, a fiber reinforced resin pipe (hereinafter referred to as "FRPM pipe") By adopting the same configuration as the joint (receptacle) in the field (for example, the field of reinforced plastic composite pipe specified in JIS A 5350: 2006), the technical concept of seismic performance confirmed in the field. Can also be used for manhole rehabilitation structures.
Furthermore, by accurately controlling both the degree of fixation between the rehabilitation material and the joint and the degree of fitting between the joint and the new pipe, for example, the strength against the stress generated by the horizontal earth pressure due to the vertical earth pressure can be obtained. It can be managed with high accuracy. As a result, it is possible to ensure the reliability of the strength as well as the seismic performance described above, and for example, the technical idea regarding the external pressure performance and the external water pressure performance in the field of FRPM pipe can be incorporated.

前記既設管と前記新管との間に設置されて前記既設管と前記新管とを接続する間仕切り壁を更に備えてもよい。 A partition wall which is installed between the existing pipe and the new pipe and connects the existing pipe and the new pipe may be further provided.

この場合、新管が、継手に嵌合され、間仕切り壁が、既設管と新管とを接続する。したがって、例えば、長期耐用年数が保障されていないいわゆる内面バンドを使用することなく、新管と、更生材や既設管と、を接続することができる。さらに例えば、施工現場でFRP積層接着作業を実施しなくても、新管と、更生材や既設管と、を接続することができる。ここでFRP積層接着は、界面剥離により接続品質に対する予期せぬ影響が生じるおそれがある。また、施工現場でのFRP積層接着作業は、特殊技能が必要であること等から、作業者によって品質のばらつきが生じやすい。またこのように特殊技能が必要である上、例えば、既設管の内水や地下水がある場合など、施工環境によって作業期間に影響が生じるため、工期が遅延するおそれもある。したがって、新管と、更生材や既設管と、を接続するために、施工現場でFRP積層接着作業を実施するのに代えて、施工現場で部材同士を嵌合させる等することで、更に精度良い品質管理を実施するとともに、工期の安定化を図ることができる。 In this case, the new pipe is fitted to the joint, and the partition wall connects the existing pipe and the new pipe. Therefore, for example, the new pipe can be connected to the rehabilitated material or the existing pipe without using a so-called inner band whose long-term service life is not guaranteed. Further, for example, the new pipe can be connected to the rehabilitated material or the existing pipe without performing the FRP laminating and bonding work at the construction site. Here, the FRP laminated bonding may have an unexpected effect on the connection quality due to the interfacial peeling. Further, since the FRP laminating and bonding work at the construction site requires special skills and the like, the quality tends to vary depending on the worker. In addition to such special skills, the construction period may be delayed because the construction environment affects the work period, for example, when there is internal water or groundwater in the existing pipe. Therefore, in order to connect the new pipe to the rehabilitated material or the existing pipe, instead of performing the FRP laminating and bonding work at the construction site, the members are fitted to each other at the construction site to further improve the accuracy. It is possible to carry out good quality control and stabilize the construction period.

前記継手に設けられ、前記新管が前記継手の軸方向に沿う更生材側に向けて移動することを規制するストッパーを更に備えてもよい。 A stopper provided on the joint may be further provided to prevent the new pipe from moving toward the rehabilitating material side along the axial direction of the joint.

この場合、新管が、継手の軸方向に沿う更生材側に向けて移動することを、ストッパーが規制する。したがって、更生材に新管を接続する際の過挿入を防止することが可能になり、例えば、ストッパーを、施工管理の指標として有効に利用すること等ができる。 In this case, the stopper regulates the new pipe from moving toward the rehabilitating material side along the axial direction of the joint. Therefore, it becomes possible to prevent over-insertion when connecting the new pipe to the rehabilitating material, and for example, the stopper can be effectively used as an index of construction management.

前記継手と前記新管との間に配置された弾性シールを更に備えてもよい。 An elastic seal disposed between the joint and the new pipe may be further provided.

この場合、弾性シールが、継手と新管との間に配置されているので、耐水性能を効果的に向上させることができる。 In this case, since the elastic seal is arranged between the joint and the new pipe, the water resistance performance can be effectively improved.

前記人孔と前記更生材との間に充填された裏込め材を更に備えてもよい。 A backfilling material filled between the manhole and the rehabilitating material may be further provided.

この場合、裏込め材が、人孔と更生材との間に充填されているので、耐震性能を効果的に向上させることができる。 In this case, since the backfill material is filled between the manhole and the rehabilitation material, the seismic performance can be effectively improved.

本発明に係る人孔更生構造の施工方法は、前記人孔更生構造を施工する人孔更生構造の施工方法であって、前記人孔内に配置された前記更生材の前記継手に、前記既設管内に配置された前記新管を嵌合する。 The method for constructing the manhole rehabilitation structure according to the present invention is a method for constructing the manhole rehabilitation structure for constructing the manhole rehabilitation structure, which is installed in the joint of the rehabilitation material arranged in the manhole. The new pipe arranged in the pipe is fitted.

この場合、人孔内に配置された更生材の継手に、既設管内に配置された新管を嵌合するので、作業の簡素化を図り、施工性を向上させることができる。 In this case, since the new pipe arranged in the existing pipe is fitted to the joint of the rehabilitating material arranged in the manhole, the work can be simplified and the workability can be improved.

本発明によれば、人孔更生構造における耐震性能を向上させることができる。 According to the present invention, seismic performance in a manhole rehabilitation structure can be improved.

本発明の一実施形態に係る人孔更生構造における平面図であって、継手および新管を上面視した図である。It is a top view of the manhole rehabilitation structure which concerns on one Embodiment of this invention, and is the top view of the joint and a new pipe. 図1に示す人孔更生構造における縦断面図であって、継手および新管を側面視した図である。It is a vertical cross-sectional view of the manhole rehabilitation structure shown in FIG. 1, and is a side view of a joint and a new pipe. 図1に示す人孔更生構造における更生材および継手を含む要部の平面図ある。FIG. 5 is a plan view of a main part including a rehabilitation material and a joint in the manhole rehabilitation structure shown in FIG. 図1に示す人孔更生構造における更生材および継手を含む要部の縦断面図である。It is a vertical cross-sectional view of a main part including a rehabilitation material and a joint in the manhole rehabilitation structure shown in FIG. 図4に示す人孔更生構造における継手の嵌合部の伸縮性と可とう性の作用を説明する縦断面図である。FIG. 3 is a vertical cross-sectional view illustrating the action of elasticity and flexibility of a fitting portion of a joint in the manhole rehabilitation structure shown in FIG. 図1に示す人孔更生構造の施工方法を説明するフローチャートである。It is a flowchart explaining the construction method of the manhole rehabilitation structure shown in FIG. 図6に示す人孔更生構造の施工方法における新管配置工程を説明する図であって、図1に示す平面図に相当する図である。It is a figure explaining the new pipe arrangement process in the construction method of the manhole rehabilitation structure shown in FIG. 6, and is the figure corresponding to the plan view shown in FIG. 図6に示す人孔更生構造の施工方法における新管配置工程を説明する図であって、図2に示す縦断面図に相当する図である。It is a figure explaining the new pipe arrangement process in the construction method of the manhole rehabilitation structure shown in FIG. 6, and is the figure corresponding to the vertical sectional view shown in FIG. 図6に示す人孔更生構造の施工方法における更生材配置工程を説明する図であって、図1に示す平面図に相当する図である。It is a figure explaining the rehabilitation material arrangement process in the construction method of the manhole rehabilitation structure shown in FIG. 6, and is the figure corresponding to the plan view shown in FIG. 図6に示す人孔更生構造の施工方法における更生材配置工程を説明する図であって、図2に示す縦断面図に相当する図である。It is a figure explaining the rehabilitation material arrangement process in the construction method of the manhole rehabilitation structure shown in FIG. 6, and is the figure corresponding to the vertical sectional view shown in FIG. 図6に示す人孔更生構造の施工方法における嵌合工程を説明する図であって、図1に示す平面図に相当する図である。It is a figure explaining the fitting process in the construction method of the manhole rehabilitation structure shown in FIG. 6, and is the figure corresponding to the plan view shown in FIG. 図6に示す人孔更生構造の施工方法における嵌合工程を説明する図であって、図2に示す縦断面図に相当する図である。It is a figure explaining the fitting process in the construction method of the manhole rehabilitation structure shown in FIG. 6, and is the figure corresponding to the vertical sectional view shown in FIG. 図6に示す人孔更生構造の施工方法における設置工程を説明する図であって、図1に示す平面図に相当する図である。It is a figure explaining the installation process in the construction method of the manhole rehabilitation structure shown in FIG. 6, and is the figure corresponding to the plan view shown in FIG. 図6に示す人孔更生構造の施工方法における設置工程を説明する図であって、図2に示す縦断面図に相当する図である。It is a figure explaining the installation process in the construction method of the manhole rehabilitation structure shown in FIG. 6, and is the figure corresponding to the vertical sectional view shown in FIG.

以下、図1から図14を参照し、本発明の一実施形態に係る人孔更生構造20およびその施工方法を説明する。人孔更生構造20は、既設管11が連通する人孔10(マンホール)を更生する。 Hereinafter, the manhole rehabilitation structure 20 and the construction method thereof according to the embodiment of the present invention will be described with reference to FIGS. 1 to 14. The human hole rehabilitation structure 20 rehabilitates the human hole 10 (manhole) through which the existing pipe 11 communicates.

人孔10は、例えば、下水用管路や農業用水路等に用いられる。人孔10は、地表から下方に延びる既設の縦穴である。人孔10は、例えばコンクリート等により形成されている。
既設管11は、例えば鋼管などにより形成されている。既設管11は、円筒状または矩形筒状に形成されている。既設管11は、複数設けられている。既設管11は、人孔10から水平方向に延びている。既設管11は、人孔10を水平方向に挟んで一対設けられている。なお既設管11は、人孔10に対して水平方向の一方側(片方)に設けられていてもよい。また既設管11には、鋼管に代えて、例えば、コンクリート管、ボックスカルバート、陶管、ダクタイル鋳鉄管等を採用することができる。
The manhole 10 is used, for example, in a sewage pipe, an agricultural waterway, or the like. The manhole 10 is an existing vertical hole extending downward from the ground surface. The manhole 10 is formed of, for example, concrete or the like.
The existing pipe 11 is formed of, for example, a steel pipe. The existing pipe 11 is formed in a cylindrical shape or a rectangular tubular shape. A plurality of existing pipes 11 are provided. The existing pipe 11 extends horizontally from the manhole 10. A pair of existing pipes 11 are provided so as to sandwich the manhole 10 in the horizontal direction. The existing pipe 11 may be provided on one side (one side) in the horizontal direction with respect to the manhole 10. Further, for the existing pipe 11, for example, a concrete pipe, a box culvert, a ceramic pipe, a ductile cast iron pipe or the like can be adopted instead of the steel pipe.

図1から図4に示すように、人孔更生構造20は、更生材21(人孔更生材)と、継手22(受口カラー)と、新管23(マンホール短管)と、ストッパー24(ストッパーゴムリング)と、弾性シール25と、間仕切り壁26(妻枠)と、裏込め材27と、を備えている。なお更生材21、継手22および新管23は、いずれも繊維強化樹脂管(以下、「FRPM管」という。)によって形成されている。 As shown in FIGS. 1 to 4, the human hole rehabilitation structure 20 includes a rehabilitation material 21 (human hole rehabilitation material), a joint 22 (receptacle collar), a new pipe 23 (manhole short pipe), and a stopper 24 (a stopper 24). A stopper rubber ring), an elastic seal 25, a partition wall 26 (manhole frame), and a backfill material 27 are provided. The rehabilitation material 21, the joint 22, and the new pipe 23 are all formed of fiber-reinforced resin pipes (hereinafter, referred to as “FRPM pipes”).

図1および図2に示すように、更生材21は、人孔10を更生する。更生材21は、鉛直方向に延びる筒状(円筒状)に形成されている。更生材21は、人孔10と同軸に配置されている。
継手22は、更生材21に設けられている。継手22は、既設管11に対応して複数(一対)設けられている。図3および図4に示すように、継手22は、筒状(円筒状)に形成され、更生材21に固定(固着)されている。継手22は、対応する既設管11と同軸に配置されている。継手22は、対応する既設管11よりも小径である。
As shown in FIGS. 1 and 2, the rehabilitation material 21 rehabilitates the manhole 10. The rehabilitation material 21 is formed in a tubular shape (cylindrical shape) extending in the vertical direction. The rehabilitation material 21 is arranged coaxially with the manhole 10.
The joint 22 is provided on the rehabilitation material 21. A plurality (pair) of joints 22 are provided corresponding to the existing pipe 11. As shown in FIGS. 3 and 4, the joint 22 is formed in a cylindrical shape (cylindrical shape) and is fixed (fixed) to the rehabilitation material 21. The joint 22 is arranged coaxially with the corresponding existing pipe 11. The joint 22 has a smaller diameter than the corresponding existing pipe 11.

更生材21には、継手22が装着される装着孔28が形成されている。装着孔28は、更生材21を水平方向に貫通する。装着孔28は、対応する既設管11と同軸に配置されている。装着孔28は、その軸方向から見た正面視において、継手22と同形状(図示の例では、同径の円形状)に形成されている。継手22は、装着孔28内に嵌合されている。 The rehabilitation material 21 is formed with a mounting hole 28 into which the joint 22 is mounted. The mounting hole 28 penetrates the rehabilitation material 21 in the horizontal direction. The mounting hole 28 is arranged coaxially with the corresponding existing pipe 11. The mounting hole 28 is formed to have the same shape as the joint 22 (in the illustrated example, a circular shape having the same diameter) when viewed from the front in the axial direction. The joint 22 is fitted in the mounting hole 28.

継手22と更生材21とは、固着部29を介して互いに固着されている。固着部29は、継手22の外周面をその全周にわたって、更生材21の外周面または内周面に固着する。固着部29は、外固着部30と、内固着部31と、を備えている。
外固着部30は、継手22の外周面と更生材21の外周面とを固着する。外固着部30は、外接着層30aを備えている。外接着層30aは、継手22の外周面および更生材21の外周面の両方に接着されている。外接着層30aは、FRP積層作業により形成される。
The joint 22 and the rehabilitation material 21 are fixed to each other via the fixing portion 29. The fixing portion 29 fixes the outer peripheral surface of the joint 22 to the outer peripheral surface or the inner peripheral surface of the rehabilitation material 21 over the entire circumference thereof. The fixing portion 29 includes an outer fixing portion 30 and an inner fixing portion 31.
The outer fixing portion 30 fixes the outer peripheral surface of the joint 22 and the outer peripheral surface of the rehabilitation material 21. The outer fixing portion 30 includes an outer adhesive layer 30a. The outer adhesive layer 30a is adhered to both the outer peripheral surface of the joint 22 and the outer peripheral surface of the rehabilitation material 21. The outer adhesive layer 30a is formed by FRP laminating work.

内固着部31は、継手22の外周面と更生材21の内周面とを固着する。内固着部31は、充填部31aと、内接着層31bと、を備えている。充填部31aは、継手22の外周面と更生材21の内周面との間の間隙を充填している。充填部31aは、継手22の周方向に沿って連続して延びている。充填部31aは、継手22の外周面の全周にわたって延びている。充填部31aは、装着孔28の内周縁と継手22の外周面との間にわずかに形成される隙間を閉塞する。内接着層31bは、充填部31aを更生材21の内側から覆う。内接着層31bは、継手22の外周面および更生材21の内周面の両方に接着されている。内接着層31bは、FRP積層作業により形成される。 The inner fixing portion 31 fixes the outer peripheral surface of the joint 22 and the inner peripheral surface of the rehabilitation material 21. The inner fixing portion 31 includes a filling portion 31a and an inner adhesive layer 31b. The filling portion 31a fills the gap between the outer peripheral surface of the joint 22 and the inner peripheral surface of the rehabilitation material 21. The filling portion 31a extends continuously along the circumferential direction of the joint 22. The filling portion 31a extends over the entire circumference of the outer peripheral surface of the joint 22. The filling portion 31a closes a gap slightly formed between the inner peripheral edge of the mounting hole 28 and the outer peripheral surface of the joint 22. The inner adhesive layer 31b covers the filling portion 31a from the inside of the rehabilitation material 21. The inner adhesive layer 31b is adhered to both the outer peripheral surface of the joint 22 and the inner peripheral surface of the rehabilitation material 21. The internal adhesive layer 31b is formed by FRP laminating work.

図1および図2に示すように、新管23は、既設管11内に配置されている。新管23は、更生材21内と既設管11内とを連通する。新管23は、継手22に嵌合(接合、接続)されている。新管23は、継手22に嵌合(接合、接続)することで、更生材21と既設管11とを連通したときの耐震性を向上させることができる。
新管23は、既設管11に水平方向に一対設けられている。各新管23は、各継手22内に嵌合(接合、接続)されている。新管23は、継手22から継手22の軸方向(水平方向)に沿って更生材21の反対側(以下、「軸方向の外側」という。)に突出している。これにより、本実施形態では、一対の新管23が、更生材21から水平方向の両側に突出している。なお例えば、既設管11が、人孔10に対して水平方向の一方側(片方)にのみ設けられている場合などには、新管23が、更生材21に対して水平方向の前記一方側にのみ設けられていてもよく、更生材21から前記一方側にのみ突出していてもよい。
As shown in FIGS. 1 and 2, the new pipe 23 is arranged in the existing pipe 11. The new pipe 23 communicates with the inside of the rehabilitation material 21 and the inside of the existing pipe 11. The new pipe 23 is fitted (joined, connected) to the joint 22. By fitting (joining, connecting) the new pipe 23 to the joint 22, the seismic resistance when the rehabilitation material 21 and the existing pipe 11 are communicated with each other can be improved.
A pair of new pipes 23 are provided in the existing pipe 11 in the horizontal direction. Each new pipe 23 is fitted (joined, connected) in each joint 22. The new pipe 23 projects from the joint 22 along the axial direction (horizontal direction) of the joint 22 to the opposite side of the rehabilitation material 21 (hereinafter, referred to as “outside in the axial direction”). As a result, in the present embodiment, the pair of new pipes 23 project from the rehabilitation material 21 on both sides in the horizontal direction. For example, when the existing pipe 11 is provided only on one side (one side) in the horizontal direction with respect to the manhole 10, the new pipe 23 is provided on the one side in the horizontal direction with respect to the rehabilitation material 21. It may be provided only on the slab, or may protrude from the rehabilitation material 21 only on one side thereof.

図3から図5に示すように、ストッパー24は、新管23が継手22の軸方向に沿う更生材21側(以下、「軸方向の内側」という。)に向けて移動することを規制する。ストッパー24は、継手22に設けられている。ストッパー24は、環状に形成され、継手22の内周面に固着されている。ストッパー24の内径は、新管23の内径と同等となっている。新管23を継手22内に軸方向の内側に向けて挿入するとき、新管23の端面がストッパー24に当接することで、新管23の更なる移動が規制される。ストッパー24は、例えばゴム等の弾性体によって形成されている。 As shown in FIGS. 3 to 5, the stopper 24 regulates the movement of the new pipe 23 toward the rehabilitation material 21 side (hereinafter, referred to as “inside in the axial direction”) along the axial direction of the joint 22. .. The stopper 24 is provided on the joint 22. The stopper 24 is formed in an annular shape and is fixed to the inner peripheral surface of the joint 22. The inner diameter of the stopper 24 is the same as the inner diameter of the new pipe 23. When the new pipe 23 is inserted into the joint 22 inward in the axial direction, the end surface of the new pipe 23 comes into contact with the stopper 24, so that further movement of the new pipe 23 is restricted. The stopper 24 is formed of an elastic body such as rubber.

弾性シール25は、継手22の先端と新管23との間に配置されている。弾性シール25は、環状に形成され、継手22の内周面に固着されている。弾性シール25は、例えばゴム等の弾性体によって形成されている。弾性シール25は、ストッパー24よりも軸方向の外側に位置している。新管23が継手22内に嵌合された状態で、継手22の内周面と新管23の外周面との間で弾性シール25が圧縮変形することで、継手22の内周面と新管23の外周面との間の止水性が高められている。またこのとき、弾性シール25の弾性復元力に基づいて、継手22と新管23との相対的な移動が効果的に規制される。 The elastic seal 25 is arranged between the tip of the joint 22 and the new pipe 23. The elastic seal 25 is formed in an annular shape and is fixed to the inner peripheral surface of the joint 22. The elastic seal 25 is formed of an elastic body such as rubber. The elastic seal 25 is located outside the stopper 24 in the axial direction. With the new pipe 23 fitted in the joint 22, the elastic seal 25 is compressively deformed between the inner peripheral surface of the joint 22 and the outer peripheral surface of the new pipe 23, so that the inner peripheral surface of the joint 22 and the new pipe 23 are newly formed. The water blocking property between the pipe 23 and the outer peripheral surface is enhanced. At this time, the relative movement between the joint 22 and the new pipe 23 is effectively regulated based on the elastic restoring force of the elastic seal 25.

図1および図2に示すように、間仕切り壁26は、既設管11と新管23との間に設置され、既設管11と新管23とを接続している。間仕切り壁26は、新管23における軸方向の外側の端部に設置されている。間仕切り壁26は、例えば、セメントレンガ等により環状に形成されている。間仕切り壁26は、新管23における周方向の全周にわたって連続して延びている。間仕切り壁26は、既設管11と新管23との間を、軸方向の外側から閉塞している。 As shown in FIGS. 1 and 2, the partition wall 26 is installed between the existing pipe 11 and the new pipe 23, and connects the existing pipe 11 and the new pipe 23. The partition wall 26 is installed at the outer end of the new pipe 23 in the axial direction. The partition wall 26 is formed in an annular shape by, for example, cement brick. The partition wall 26 extends continuously over the entire circumference of the new pipe 23 in the circumferential direction. The partition wall 26 closes between the existing pipe 11 and the new pipe 23 from the outside in the axial direction.

裏込め材27は、人孔10と更生材21との間に充填されている。裏込め材27は、さらに既設管11と新管23との間にも充填されている。裏込め材27は、例えばエアーモルタル等の充填材により形成されている。 The backfill material 27 is filled between the manhole 10 and the rehabilitation material 21. The backfill material 27 is further filled between the existing pipe 11 and the new pipe 23. The backfill material 27 is formed of a filler such as air mortar.

次に、図6のフローチャートに示すような、人孔更生構造20の施工方向を説明する。
なお、人孔更生構造20の施工方法の実施前に、更生材21と継手22とを予め固定(固着)しておく。この作業は、例えば工場などの地上で実施する。これにより、前記作業を例えば施工現場で実施する場合に比べて、安定した品質を確保することができる。
Next, the construction direction of the manhole rehabilitation structure 20 as shown in the flowchart of FIG. 6 will be described.
Before implementing the construction method of the manhole rehabilitation structure 20, the rehabilitation material 21 and the joint 22 are fixed (fixed) in advance. This work is carried out on the ground such as a factory. As a result, stable quality can be ensured as compared with the case where the work is carried out at a construction site, for example.

この施工方法では、まず図7および図8に示すように、新管23を既設管11内に配置する新管配置工程を実施する(S11)。このとき、作業者が新管23を人孔10に搬入し、既設管11内に仮置きする。 In this construction method, first, as shown in FIGS. 7 and 8, a new pipe arranging step of arranging the new pipe 23 in the existing pipe 11 is carried out (S11). At this time, the worker carries the new pipe 23 into the manhole 10 and temporarily places it in the existing pipe 11.

次に図9および図10に示すように、更生材21を人孔10内に配置する更生材配置工程を実施する(S12)。このとき、作業者が更生材21を人孔10に搬入することで、更生材21に固定された継手22も一体に搬入される。またこのとき、更生材21を人孔10内に位置決めする。 Next, as shown in FIGS. 9 and 10, a rehabilitation material arranging step of arranging the rehabilitation material 21 in the manhole 10 is carried out (S12). At this time, when the worker carries the rehabilitation material 21 into the manhole 10, the joint 22 fixed to the rehabilitation material 21 is also carried in integrally. At this time, the rehabilitation material 21 is positioned in the manhole 10.

次に図11および図12に示すように、新管23を継手22に嵌合する嵌合工程を実施する(S13)。このとき、新管23を継手22内に嵌合させ、新管23を、ストッパー24により移動が規制されるまで軸方向の内側に挿入する。この過程で、継手22と新管23との間で弾性シール25が圧縮変形させられる。これにより、更生材21と新管23とが接続される。 Next, as shown in FIGS. 11 and 12, a fitting step of fitting the new pipe 23 to the joint 22 is performed (S13). At this time, the new pipe 23 is fitted into the joint 22, and the new pipe 23 is inserted inside in the axial direction until the movement is restricted by the stopper 24. In this process, the elastic seal 25 is compressively deformed between the joint 22 and the new pipe 23. As a result, the rehabilitation material 21 and the new pipe 23 are connected.

次に図13および図14に示すように、間仕切り壁26を設置する設置工程を実施する(S14)。このとき、間仕切り壁26を既設管11と新管23との間に設置する。これにより、既設管11と新管23とが接続され、既設管11と新管23との間が、軸方向の外側から閉塞される。
次に図1および図2に示すように、裏込め材27を充填する充填工程を実施する(S15)。このとき裏込め材27を、人孔10と更生材21との間、および既設管11と新管23との間に一体に充填する。なお、裏込め材27の既設管11内への流入は、間仕切り壁26により規制される。
以上により、人孔更生構造20の施工が完了する。
Next, as shown in FIGS. 13 and 14, an installation step of installing the partition wall 26 is carried out (S14). At this time, the partition wall 26 is installed between the existing pipe 11 and the new pipe 23. As a result, the existing pipe 11 and the new pipe 23 are connected, and the space between the existing pipe 11 and the new pipe 23 is closed from the outside in the axial direction.
Next, as shown in FIGS. 1 and 2, a filling step of filling the backfill material 27 is carried out (S15). At this time, the backfill material 27 is integrally filled between the manhole 10 and the rehabilitation material 21 and between the existing pipe 11 and the new pipe 23. The inflow of the backfill material 27 into the existing pipe 11 is regulated by the partition wall 26.
With the above, the construction of the manhole rehabilitation structure 20 is completed.

以上説明したように、本実施形態に係る人孔更生構造20によれば、新管23が継手22に嵌合されている。したがって、例えば地震発生時に、継手22と新管23とが継手22の径方向に沿って相対的に変位するのを規制すること等ができる。これにより、例えば、新管23が更生材21から離脱するのを抑制すること等ができる。
一方で、新管23が継手22に単に嵌合されているだけなので、例えば、液状化に伴う沈下等の地盤変状が生じたときには、継手22と新管23との嵌合の形態を地盤変状に応じて容易に追従させることができる。すなわち、例えば、継手22と新管23とを互いに嵌合させた状態で、継手22と新管23との嵌合部を屈曲させたり(図5に示す矢印A1参照)、継手22と新管23との嵌合部を伸縮させたり(図5に示す矢印A2参照)することができる。
以上より、人孔更生構造20における耐震性能を向上させることができる。
As described above, according to the manhole rehabilitation structure 20 according to the present embodiment, the new pipe 23 is fitted to the joint 22. Therefore, for example, when an earthquake occurs, it is possible to regulate the relative displacement of the joint 22 and the new pipe 23 along the radial direction of the joint 22. Thereby, for example, it is possible to prevent the new pipe 23 from being separated from the rehabilitation material 21.
On the other hand, since the new pipe 23 is simply fitted to the joint 22, for example, when ground deformation such as subsidence due to liquefaction occurs, the fitting form of the joint 22 and the new pipe 23 is changed to the ground. It can be easily followed according to the deformation. That is, for example, in a state where the joint 22 and the new pipe 23 are fitted to each other, the fitting portion between the joint 22 and the new pipe 23 may be bent (see arrow A1 shown in FIG. 5), or the joint 22 and the new pipe 23 may be bent. The fitting portion with the 23 can be expanded and contracted (see arrow A2 shown in FIG. 5).
From the above, the seismic performance of the manhole rehabilitation structure 20 can be improved.

ここで継手22が、更生材21に設けられている。したがって、更生材21を人孔10に配置する前に、例えば工場などの地上で、継手22を更生材21に固定することが可能になり、更生材21と継手22との固定の程度を精度良く管理することができる。
また、新管23が継手22に嵌合されている。したがって、例えば、継手22および新管23の寸法などを調整することで、継手22と新管23との嵌合の程度を精度良く管理することもできる。
以上のように、更生材21と継手22との固定の程度、および継手22と新管23との嵌合の程度の両方を精度良く管理することができる。これにより、更生材21と新管23との間の耐震性能を精度良く管理することができる。したがって、例えば、更生材21と新管23との間の耐震性能を、所定の耐震性能を満たすように設計し易くすることができる。その結果、この耐震性能を、例えばマンホールと管きょとの接続部について従来から公的に定められている基準(例えば、「下水道施設の耐震対策指針と解説−2014年版−(日本下水道協会))を満たすように設計することで、更生材21と新管23との間の耐震性能の信頼性を確保することができる。なお継手22として、例えばFRPM管の分野(例えば、JIS A 5350:2006に規定される強化プラスチック複合管の分野)における継手22(受口)と同等の構成を採用することで、同分野で確認されている耐震性能についての技術思想を、人孔更生構造20にも援用することができる。
さらに、更生材21と継手22との固定の程度、および継手22と新管23との嵌合の程度の両方を精度良く管理することで、例えば、鉛直土圧による水平土圧で生じる発生応力に対する強度なども精度良く管理することができる。これにより、前述の耐震性能と同様に、前記強度の信頼性を確保することも可能になり、例えば、FRPM管の分野における外圧性能や外水圧性能についての技術思想を援用することもできる。
Here, the joint 22 is provided on the rehabilitation material 21. Therefore, before arranging the rehabilitation material 21 in the manhole 10, it is possible to fix the joint 22 to the rehabilitation material 21 on the ground such as a factory, and the degree of fixing between the rehabilitation material 21 and the joint 22 is accurate. Can be managed well.
Further, the new pipe 23 is fitted to the joint 22. Therefore, for example, by adjusting the dimensions of the joint 22 and the new pipe 23, the degree of fitting between the joint 22 and the new pipe 23 can be controlled with high accuracy.
As described above, both the degree of fixation between the rehabilitation material 21 and the joint 22 and the degree of fitting between the joint 22 and the new pipe 23 can be accurately controlled. As a result, the seismic performance between the rehabilitating material 21 and the new pipe 23 can be accurately managed. Therefore, for example, the seismic performance between the rehabilitating material 21 and the new pipe 23 can be easily designed to satisfy a predetermined seismic performance. As a result, this seismic performance is based on, for example, the standards that have been publicly established for the connection between manholes and pipes (for example, "Guidelines and explanations for seismic measures for sewerage facilities-2014 edition- (Japan Sewerage Association)". ) Can be ensured to ensure the reliability of seismic performance between the rehabilitating material 21 and the new pipe 23. As the joint 22, for example, in the field of FRPM pipes (eg, JIS A 5350:). By adopting the same configuration as the joint 22 (receptacle) in the field of reinforced plastic composite pipes specified in 2006), the technical concept of seismic performance confirmed in the same field can be applied to the manhole rehabilitation structure 20. Can also be used.
Furthermore, by accurately controlling both the degree of fixation between the rehabilitation material 21 and the joint 22 and the degree of fitting between the joint 22 and the new pipe 23, for example, the stress generated by the horizontal earth pressure due to the vertical earth pressure It is also possible to accurately manage the strength against earth pressure. As a result, it is possible to ensure the reliability of the strength as well as the seismic performance described above, and for example, the technical idea regarding the external pressure performance and the external water pressure performance in the field of FRPM pipe can be incorporated.

また、新管23が、継手22に嵌合され、間仕切り壁26が、既設管11と新管23とを接続する。したがって、例えば、長期耐用年数が保障されていないいわゆる内面バンドを使用することなく、新管23と、更生材21や既設管11と、を接続することができる。さらに例えば、施工現場でFRP積層接着作業を実施しなくても、新管23と、更生材21や既設管11と、を接続することができる。ここでFRP積層接着は、界面剥離により接続品質に対する予期せぬ影響が生じるおそれがある。また、施工現場でのFRP積層接着作業は、特殊技能が必要であること等から、作業者によって品質のばらつきが生じやすい。またこのように特殊技能が必要である上、例えば、既設管11の内水や地下水がある場合など、施工環境によって作業期間に影響が生じるため、工期が遅延するおそれもある。したがって、新管23と、更生材21や既設管11と、を接続するために、施工現場でFRP積層接着作業を実施するのに代えて、施工現場で部材同士を嵌合させる等することで、更に精度良い品質管理を実施するとともに、工期の安定化を図ることができる。 Further, the new pipe 23 is fitted to the joint 22, and the partition wall 26 connects the existing pipe 11 and the new pipe 23. Therefore, for example, the new pipe 23 can be connected to the rehabilitation material 21 or the existing pipe 11 without using a so-called inner band whose long-term service life is not guaranteed. Further, for example, the new pipe 23 can be connected to the rehabilitation material 21 or the existing pipe 11 without performing the FRP laminating and bonding work at the construction site. Here, the FRP laminated bonding may have an unexpected effect on the connection quality due to the interfacial peeling. Further, since the FRP laminating and bonding work at the construction site requires special skills and the like, the quality tends to vary depending on the worker. In addition to such special skills, the construction period may be delayed because the construction environment affects the work period, for example, when there is inland water or groundwater in the existing pipe 11. Therefore, in order to connect the new pipe 23 to the rehabilitation material 21 and the existing pipe 11, instead of performing the FRP laminating and bonding work at the construction site, the members are fitted to each other at the construction site. In addition to implementing more accurate quality control, it is possible to stabilize the construction period.

また、新管23が、継手22の軸方向の内側に向けて移動することを、ストッパー24が規制する。したがって、更生材21に新管23を接続する際の過挿入を防止することが可能になり、例えば、ストッパー24を、施工管理の指標として有効に利用すること等ができる。
また、弾性シール25が、継手22と新管23との間に配置されているので、耐水性能を効果的に向上させることができる。
また、裏込め材27が、人孔10と更生材21との間に充填されているので、耐震性能を効果的に向上させることができる。
Further, the stopper 24 restricts the new pipe 23 from moving inward in the axial direction of the joint 22. Therefore, it is possible to prevent over-insertion when connecting the new pipe 23 to the rehabilitation material 21, and for example, the stopper 24 can be effectively used as an index of construction management.
Further, since the elastic seal 25 is arranged between the joint 22 and the new pipe 23, the water resistance performance can be effectively improved.
Further, since the backfill material 27 is filled between the manhole 10 and the rehabilitation material 21, the seismic performance can be effectively improved.

また、本実施形態に係る人孔更生構造20の施工方法によれば、人孔10内に配置された更生材21の継手22に、既設管11内に配置された新管23を嵌合するので、作業の簡素化を図り、施工性を向上させることができる。 Further, according to the construction method of the manhole rehabilitation structure 20 according to the present embodiment, the new pipe 23 arranged in the existing pipe 11 is fitted into the joint 22 of the rehabilitation material 21 arranged in the manhole 10. Therefore, the work can be simplified and the workability can be improved.

なお、本発明の技術的範囲は前記実施形態に限定されるものではなく、本発明の趣旨を逸脱しない範囲において種々の変更を加えることが可能である。 The technical scope of the present invention is not limited to the above-described embodiment, and various modifications can be made without departing from the spirit of the present invention.

例えば、ストッパー24や弾性シール25がなくてもよい。
前記実施形態では、新管23が継手22に内側から嵌合されているが、新管23が継手22に外側から嵌合されていてもよい。
For example, the stopper 24 and the elastic seal 25 may not be provided.
In the above embodiment, the new pipe 23 is fitted to the joint 22 from the inside, but the new pipe 23 may be fitted to the joint 22 from the outside.

その他、本発明の趣旨に逸脱しない範囲で、前記実施形態における構成要素を周知の構成要素に置き換えることは適宜可能であり、また、前記した変形例を適宜組み合わせてもよい。 In addition, it is possible to replace the constituent elements in the embodiment with well-known constituent elements as appropriate without departing from the spirit of the present invention, and the above-mentioned modifications may be appropriately combined.

10 人孔
11 既設管
20 人孔更生構造
21 更生材
22 継手
23 新管
24 ストッパー
25 弾性シール
26 間仕切り壁
27 裏込め材
10 Manhole 11 Existing pipe 20 Manhole rehabilitation structure 21 Rehabilitation material 22 Joint 23 New pipe 24 Stopper 25 Elastic seal 26 Partition wall 27 Backfill material

Claims (7)

既設管が連通する人孔を更生する管材であり、鉛直方向に延びる更生材と、
前記更生材を水平方向に貫通する装着孔内に嵌合された状態で前記更生材に固定された管材である継手と、
前記既設管内に配置され、前記継手に嵌合された新管と、を備える人孔更生構造。
A pipe material that rehabilitates a manhole through which existing pipes communicate, and a rehabilitation material that extends in the vertical direction.
A joint that is a pipe material fixed to the rehabilitation material in a state of being fitted in a mounting hole that penetrates the rehabilitation material in the horizontal direction.
A manhole rehabilitation structure comprising a new pipe arranged in the existing pipe and fitted to the joint.
前記既設管と前記新管との間に設置されて前記既設管と前記新管とを接続する間仕切り壁を更に備える請求項1に記載の人孔更生構造。 The manhole rehabilitation structure according to claim 1, further comprising a partition wall installed between the existing pipe and the new pipe and connecting the existing pipe and the new pipe. 前記継手に設けられ、前記新管が前記継手の軸方向に沿う更生材側に向けて移動することを規制するストッパーを更に備える請求項1または2に記載の人孔更生構造。 The manhole rehabilitation structure according to claim 1 or 2, further comprising a stopper provided on the joint and restricting the new pipe from moving toward the rehabilitation material side along the axial direction of the joint. 前記継手と前記新管との間に配置された弾性シールを更に備える請求項1から3のいずれか1項に記載の人孔更生構造。 The manhole rehabilitation structure according to any one of claims 1 to 3, further comprising an elastic seal arranged between the joint and the new pipe. 前記人孔と前記更生材との間に充填された裏込め材を更に備える請求項1から4のいずれか1項に記載の人孔更生構造。 The manhole rehabilitation structure according to any one of claims 1 to 4, further comprising a backfill material filled between the manhole and the rehabilitation material. 前記継手は、2つのみ設けられている請求項1から5のいずれか1項に記載の人孔更生構造。 The manhole rehabilitation structure according to any one of claims 1 to 5, wherein the joint is provided with only two. 請求項1からのいずれか1項に記載の人孔更生構造を施工する人孔更生構造の施工方法であって、
前記人孔内に配置された前記更生材の前記継手に、前記既設管内に配置された前記新管を嵌合する人孔更生構造の施工方法。
A method for constructing a manhole rehabilitation structure according to any one of claims 1 to 6.
A method for constructing a manhole rehabilitation structure in which the new pipe arranged in the existing pipe is fitted to the joint of the rehabilitation material arranged in the manhole.
JP2016250084A 2016-12-22 2016-12-22 Manhole rehabilitation structure and construction method of manhole rehabilitation structure Active JP6835571B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016250084A JP6835571B2 (en) 2016-12-22 2016-12-22 Manhole rehabilitation structure and construction method of manhole rehabilitation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016250084A JP6835571B2 (en) 2016-12-22 2016-12-22 Manhole rehabilitation structure and construction method of manhole rehabilitation structure

Publications (2)

Publication Number Publication Date
JP2018104928A JP2018104928A (en) 2018-07-05
JP6835571B2 true JP6835571B2 (en) 2021-02-24

Family

ID=62787670

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016250084A Active JP6835571B2 (en) 2016-12-22 2016-12-22 Manhole rehabilitation structure and construction method of manhole rehabilitation structure

Country Status (1)

Country Link
JP (1) JP6835571B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114906499A (en) * 2021-02-07 2022-08-16 中国石油化工股份有限公司 Manhole structure and petroleum storage tank

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0141823Y2 (en) * 1980-11-27 1989-12-08
FI84384C (en) * 1990-03-30 1991-11-25 Kwh Pipe Ab Oy FOERFARANDE FOER RENOVERING AV BRUNNAR.
JP2988647B2 (en) * 1993-07-19 1999-12-13 株式会社クボタ Rehabilitation basin and rehabilitation sewage pipeline
JPH10325166A (en) * 1997-05-26 1998-12-08 Sekisui Chem Co Ltd Pipe body for burrying under ground
JP3418144B2 (en) * 1999-11-01 2003-06-16 ライト工業株式会社 Connection method between human hole and pipe
JP2002106051A (en) * 2000-09-27 2002-04-10 Maezawa Kasei Ind Co Ltd Repair method and repair pit for existing manhole
EP1533560A1 (en) * 2003-11-19 2005-05-25 Uponor Innovation Ab Method of relining an underground pipe
JP2007023522A (en) * 2005-07-13 2007-02-01 Nikko Kensetsu Kk Earthquake-proof structure of buried pipe and its manufacturing method

Also Published As

Publication number Publication date
JP2018104928A (en) 2018-07-05

Similar Documents

Publication Publication Date Title
JP5519737B2 (en) Method for joining concrete structures
JP2001311387A (en) Repairing method for existing conduit, repairing material used for it and repaired conduit
JP6835571B2 (en) Manhole rehabilitation structure and construction method of manhole rehabilitation structure
WO2003008715A1 (en) Manhole structure constructing method, manhole structure water-stop flexible joint and manhole structure
KR101122052B1 (en) A fixing sleeve of building pipe
JP3597789B2 (en) Manhole structure, watertight flexible joint for manhole structure and method of construction of manhole structure
JP6159295B2 (en) Manhole repair method
JP4944691B2 (en) Water stop structure and water stop method for temporary closing
JP2017125369A (en) Manhole repairing method and manhole repairing structure
JP5036370B2 (en) Sewer pipe, construction method thereof, and water stop member
KR101263996B1 (en) Substructure of the sewage manhole which is composed multi material and manufacturing method the same
RU2730268C1 (en) Universal repair kit for pipelines
JP2003090077A (en) Connecting construction between manhole and sewer main pipe
JP2007092305A (en) Waterproof flexible coupling for culvert
JP2006161329A (en) Reclamation method for manhole
JP6290491B1 (en) Method for joining concrete structures
JP6793386B2 (en) Seismic joints for manholes and their mounting methods
JP6106134B2 (en) Earthquake response manhole repair method
JP6963318B2 (en) How to confirm the position of the concrete side block joint in the split manhole
JP4374258B2 (en) Manhole-tube connection structure and connection method
KR101568982B1 (en) Shutting off water method of hole on sheet pile
JP5727863B2 (en) Water stop member for manhole repair and manhole repair method
JP2571380B2 (en) Geological change absorption joint mechanism of pipeline for structure.
JP6378663B2 (en) Seam structure of the manhole wall
JP4146191B2 (en) Rehabilitation pipe of existing pipe with corrosion resistant seal structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190710

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200610

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200616

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200806

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20200911

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210112

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210204

R151 Written notification of patent or utility model registration

Ref document number: 6835571

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250