JP6725406B2 - Power generation planning device, power generation planning method, and power generation planning program - Google Patents

Power generation planning device, power generation planning method, and power generation planning program Download PDF

Info

Publication number
JP6725406B2
JP6725406B2 JP2016240619A JP2016240619A JP6725406B2 JP 6725406 B2 JP6725406 B2 JP 6725406B2 JP 2016240619 A JP2016240619 A JP 2016240619A JP 2016240619 A JP2016240619 A JP 2016240619A JP 6725406 B2 JP6725406 B2 JP 6725406B2
Authority
JP
Japan
Prior art keywords
power generation
type
generator
state
generation plan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016240619A
Other languages
Japanese (ja)
Other versions
JP2018097537A (en
Inventor
あゆみ 須藤
あゆみ 須藤
秀和 斎藤
秀和 斎藤
琢史 吉田
琢史 吉田
経夫 渡邉
経夫 渡邉
仁 村田
仁 村田
翔太郎 山根
翔太郎 山根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Toshiba Energy Systems and Solutions Corp
Original Assignee
Toshiba Corp
Toshiba Energy Systems and Solutions Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp, Toshiba Energy Systems and Solutions Corp filed Critical Toshiba Corp
Priority to JP2016240619A priority Critical patent/JP6725406B2/en
Priority to AU2017239602A priority patent/AU2017239602A1/en
Priority to TW106134871A priority patent/TWI676907B/en
Publication of JP2018097537A publication Critical patent/JP2018097537A/en
Priority to AU2019232863A priority patent/AU2019232863A1/en
Application granted granted Critical
Publication of JP6725406B2 publication Critical patent/JP6725406B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明の実施形態は、発電計画策定装置、発電計画策定方法、および発電計画策定プログラムに関する。 The embodiment of the present invention relates to a power generation plan formulation device, a power generation plan formulation method, and a power generation plan formulation program.

電力会社の発電部門において、将来の電力需要を予測し、予測される電力需要を満たすように発電機の運転計画(発電計画)を立てることは、重要な業務の1つである。 In the power generation department of an electric power company, it is one of important tasks to predict future power demand and to make a generator operation plan (power generation plan) so as to satisfy the predicted power demand.

例えば、発電機の燃料としてLNG(液化天然ガス)を使用する場合、LNGは特殊なタンクに備蓄されることから、LNGの備蓄は、石油や石炭などの備蓄に比べて制約が大きい。そのため、電力需要に応じてLNGを適切に消費、補充するための正確な発電計画が必要とされる。 For example, when LNG (liquefied natural gas) is used as fuel for a power generator, LNG is stored in a special tank, so the LNG storage is more limited than the storage of oil, coal, and the like. Therefore, an accurate power generation plan for appropriately consuming and supplementing LNG according to the power demand is required.

しかしながら、発電計画の最適解を計算しようとすると、発電機の運転状態の組合せが膨大となり、計算時間が長くかかってしまう。そこで、厳密な最適解の代わりに近似解を計算することで計算時間を短縮することが考えられるが、近似方法が悪いと発電計画の最適性が大きく損なわれてしまう。 However, when trying to calculate the optimum solution of the power generation plan, the number of combinations of the operating states of the generator becomes huge and the calculation time becomes long. Therefore, it is possible to shorten the calculation time by calculating an approximate solution instead of the exact optimum solution, but if the approximation method is bad, the optimality of the power generation plan will be greatly impaired.

特開2015−88110号公報JP, 2005-88110, A

そこで、本発明の実施形態は、正確性の高い発電計画を短時間で策定することが可能な発電計画策定装置、発電計画策定方法、および発電計画策定プログラムを提供することを課題とする。 Therefore, it is an object of an embodiment of the present invention to provide a power generation plan formulation device, a power generation plan formulation method, and a power generation plan formulation program capable of formulating a highly accurate power generation plan in a short time.

一の実施形態によれば、発電計画策定装置は、複数の発電機のうちの各発電機が所定期間内に取り得る運転状態の種別を1つ以上特定し、各発電機の運転状態が前記特定された種別を取る場合に各発電機が前記所定期間内に取り得る運転状態を1つ以上列挙する運転状態列挙部を備える。さらに、前記装置は、前記特定された種別と前記列挙された運転状態とに基づいて、前記複数の発電機についての発電計画を作成する発電計画作成部を備える。 According to one embodiment, the power generation plan formulation device specifies one or more types of operating states that each generator of the plurality of generators can take within a predetermined period, and the operating state of each generator is the above-mentioned. An operation state enumeration unit is provided that enumerates one or more operation states that each generator can take within the predetermined period when the specified type is adopted. Further, the device includes a power generation plan creation unit that creates a power generation plan for the plurality of power generators based on the specified type and the listed operating states.

第1実施形態の発電計画策定装置の構成を示すブロック図である。It is a block diagram which shows the structure of the electric power generation plan formulation apparatus of 1st Embodiment. 第1実施形態のピーク・ボトム抽出部の動作を説明するためのグラフである。6 is a graph for explaining the operation of the peak/bottom extraction unit of the first embodiment. 第1実施形態における発電機の運転状態の種別について説明するためのグラフである。It is a graph for explaining the type of operating state of the generator in the first embodiment. 第1実施形態における発電機の運転状態の種別について説明するためのグラフである。It is a graph for explaining the type of operating state of the generator in the first embodiment. 第1実施形態における発電機の運転状態の詳細について説明するためのグラフである。It is a graph for explaining the details of the operating state of the generator in the first embodiment. 第1実施形態の運転状態列挙部と運転状態絞り込み部の動作を説明するためのグラフである。It is a graph for explaining the operation of the operating state enumeration unit and the operating state narrowing unit of the first embodiment. 第1実施形態の発電計画作成部の動作を説明するためのグラフである。It is a graph for explaining the operation of the power generation plan creation unit of the first embodiment. 第1実施形態の運転状態調整部の動作を説明するための図である。It is a figure for demonstrating operation|movement of the driving|running state adjustment part of 1st Embodiment. 第1実施形態の運転状態調整部の動作を説明するための図である。It is a figure for demonstrating operation|movement of the driving|running state adjustment part of 1st Embodiment. 第1実施形態の発電計画策定装置の動作を示すフローチャートである。It is a flowchart which shows operation|movement of the electric power generation plan formulation apparatus of 1st Embodiment.

以下、本発明の実施形態を、図面を参照して説明する。図1〜図10では、同一または類似の構成に同一の符号を付し、重複する説明は省略する。 Embodiments of the present invention will be described below with reference to the drawings. 1 to 10, the same reference numerals are given to the same or similar configurations, and overlapping description will be omitted.

(第1実施形態)
図1は、第1実施形態の発電計画策定装置1の構成を示すブロック図である。発電計画策定装置1は、発電機をいつ起動してどれくらいの発電出力で動作させるかという発電計画を策定する。本実施形態の発電機は例えば、油火力発電やLNG火力発電などの種々の発電形式の発電機である。
(First embodiment)
FIG. 1 is a block diagram showing the configuration of the power generation plan formulation device 1 according to the first embodiment. The power generation plan formulation device 1 formulates a power generation plan for when to start the generator and how much power generation output to operate. The generator of the present embodiment is, for example, a generator of various power generation types such as oil-fired power generation and LNG thermal power generation.

発電計画策定装置1は、需要予測システム2、運転データ取得システム3、およびユーザ入出力I/F(インタフェース)4との間でデータの授受を行う。また、発電計画策定装置1は、需要データ格納部11と、運転実績データ格納部12と、ユーザ入力条件格納部13と、ユーザ設定条件格納部14と、発電計画データ格納部15と、ピーク・ボトム抽出部16と、運転状態列挙部17と、運転状態絞り込み部18と、発電計画作成部19と、運転状態調整部20とを備えている。 The power generation plan formulation device 1 exchanges data with the demand prediction system 2, the operation data acquisition system 3, and the user input/output I/F (interface) 4. In addition, the power generation plan formulation device 1 includes a demand data storage unit 11, an operation result data storage unit 12, a user input condition storage unit 13, a user setting condition storage unit 14, a power generation plan data storage unit 15, and a peak A bottom extraction unit 16, an operation state listing unit 17, an operation state narrowing unit 18, a power generation plan creation unit 19, and an operation state adjustment unit 20 are provided.

以下、図1に示す構成の詳細について説明する。この説明の中で、図2〜図9についても適宜参照する。 The details of the configuration shown in FIG. 1 will be described below. In this description, reference will also be made to FIGS. 2 to 9 as appropriate.

需要予測システム2は、電力需要の予測に関する時系列データである需要データを発電計画策定装置1に供給する。需要予測システム2から供給された需要データは、需要データ格納部11内に格納される。需要データ格納部11の電力需要量は、発電計画の策定対象の発電機が満たすべき発電量でもある。 The demand forecasting system 2 supplies demand data, which is time-series data relating to forecasting of power demand, to the power generation plan formulation device 1. The demand data supplied from the demand prediction system 2 is stored in the demand data storage unit 11. The amount of power demand in the demand data storage unit 11 is also the amount of power generation that should be satisfied by the generator that is the target of the power generation plan.

運転データ取得システム3は、発電機の基本特性に関するデータである基本特性データを発電計画策定装置1に供給する。基本特性データの例は、各発電機の定格出力および最低出力の値や、各発電機に課される制約に関する情報や、各発電機の発電コストに関する情報である。運転データ取得システム3から供給された基本特性データは、運転実績データ格納部12内に格納される。 The operation data acquisition system 3 supplies basic characteristic data, which is data relating to the basic characteristics of the generator, to the power generation plan planning device 1. Examples of the basic characteristic data are the values of the rated output and the minimum output of each generator, information about the constraints imposed on each generator, and information about the power generation cost of each generator. The basic characteristic data supplied from the operation data acquisition system 3 is stored in the operation record data storage unit 12.

運転実績データ格納部12には例えば、発電計画に要求される制約条件や、発電コストに関する様々な条件が格納される。制約条件の例としては、各時刻の電力供給量を電力需要量以上とする需給バランス制約や、発電機の停止から起動までに所定時間以上の時間を要するという停止時間制約や、発電に関する変数の上下限を規定する上下限制約などが挙げられる。発電計画は、これらの制約条件をできるだけ満たしつつ、発電コストの総和をできるだけ少なくするものであることが望ましい。 The operation record data storage unit 12 stores, for example, constraint conditions required for a power generation plan and various conditions regarding power generation costs. Examples of constraint conditions are a supply and demand balance constraint that makes the power supply amount at each time more than the power demand amount, a stop time constraint that it takes more than a predetermined time from stopping the generator to starting it, and variables related to power generation. Examples include upper and lower limit constraints that define upper and lower limits. It is desirable for the power generation plan to satisfy the above-mentioned constraints as much as possible while minimizing the total power generation cost.

ユーザ入出力I/F4は、ユーザが情報の入出力用に使用するユーザインタフェースである。ユーザ入出力I/F4は例えば、発電計画策定装置1の画面上で発電計画作成条件を入力するためや、発電計画策定装置1の画面上に発電計画データの内容を出力するために使用される。発電計画作成条件の例は、発電計画を作成する際の処理の繰り返し回数、変数や条件の余裕度、発電機の停止比率、発電機の保守計画、種々の制約条件や調整条件などである。ユーザ入出力I/F4から入力された条件は、ユーザ入力条件やユーザ設定条件として、ユーザ入力条件格納部13内やユーザ設定条件格納部14内に格納される。一方、発電計画データは、発電計画データ格納部15から読み出され、ユーザ入出力I/F4に出力される。 The user input/output I/F 4 is a user interface used by the user for inputting/outputting information. The user input/output I/F 4 is used, for example, to input power generation plan creation conditions on the screen of the power generation plan formulation device 1 or to output the content of power generation plan data on the screen of the power generation plan formulation device 1. .. Examples of the power generation plan creation conditions include the number of times the process is repeated when creating the power generation plan, the margin of variables and conditions, the generator stop ratio, the generator maintenance plan, and various constraint conditions and adjustment conditions. The conditions input from the user input/output I/F 4 are stored in the user input condition storage unit 13 and the user setting condition storage unit 14 as user input conditions and user setting conditions. On the other hand, the power generation plan data is read from the power generation plan data storage unit 15 and output to the user input/output I/F 4.

ピーク・ボトム抽出部16は、電力需要の予測に関する時系列データ(需要データ)のピークPおよびボトムBを抽出する(図2)。図2は、第1実施形態のピーク・ボトム抽出部16の動作を説明するためのグラフである。図2の曲線は、予測される電力需要の時間変化を示す時系列曲線であり、需要データをグラフ化したものである。横軸の時間は、計算メッシュごとに区切られている。ピーク・ボトム抽出部16は、需要データ格納部11から需要データを取得し、ピークPおよびボトムBを抽出する。 The peak/bottom extraction unit 16 extracts a peak P and a bottom B of time-series data (demand data) regarding prediction of power demand (FIG. 2 ). FIG. 2 is a graph for explaining the operation of the peak/bottom extraction unit 16 of the first embodiment. The curve of FIG. 2 is a time-series curve showing the time change of the predicted power demand, and is a graph of the demand data. The time on the horizontal axis is divided for each calculation mesh. The peak/bottom extraction unit 16 acquires the demand data from the demand data storage unit 11 and extracts the peak P and the bottom B.

そして、ピーク・ボトム抽出部16は、互いに隣接するピークP間の区間を、発電計画作成用の計算区間として設定する。図2は、一例として、N1メッシュ分の計算区間と、N2メッシュ分の計算区間とを示している。本実施形態の発電計画は、各計算区間を計算の単位区間として作成される。計算区間は、所定期間の例である。 Then, the peak/bottom extraction unit 16 sets a section between the peaks P adjacent to each other as a calculation section for generating a power generation plan. FIG. 2 shows, as an example, a calculation section for N1 mesh and a calculation section for N2 mesh. In the power generation plan of this embodiment, each calculation section is created as a unit section for calculation. The calculation section is an example of a predetermined period.

なお、ピーク・ボトム抽出部16は、互いに隣接するピークP間の区間を計算区間として設定してもよいし、代わりに、互いに隣接するボトムB間の区間を計算区間として設定してもよい。ピーク・ボトム抽出部16は、前者の場合にはピークPのみを抽出してもよいし、後者の場合にはボトムBのみを抽出してもよい。以下の説明では、ピーク・ボトム抽出部16が、図2に示すように、互いに隣接するピークP間の区間を計算区間として設定する場合について説明する。 The peak/bottom extraction unit 16 may set a section between the peaks P adjacent to each other as a calculation section, or may alternatively set a section between the bottoms B adjacent to each other as a calculation section. The peak/bottom extraction unit 16 may extract only the peak P in the former case, or may extract only the bottom B in the latter case. In the following description, a case where the peak/bottom extraction unit 16 sets a section between adjacent peaks P as a calculation section as shown in FIG.

運転状態列挙部17は、個々の計算区間に関し、各発電機が取り得る運転状態の種別を1つ以上特定する。図3と図4は、第1実施形態における発電機の運転状態の種別について説明するためのグラフである。 The operating state enumeration unit 17 identifies one or more types of operating states that can be taken by each generator for each calculation section. 3 and 4 are graphs for explaining the types of operating states of the generator according to the first embodiment.

図3(a)の種別1は、発電機が1計算区間内に停止し続けることを示している。図3(b)の種別2は、発電機が1計算区間内に起動し続けることを示している。図3(c)の種別3は、発電機が1計算区間内に起動状態から停止状態に変化することを示している。図3(c)のT1、T2はそれぞれ、停止開始時刻、停止完了時刻を示している。 The type 1 in FIG. 3A indicates that the generator continues to stop within one calculation section. The type 2 of FIG.3(b) has shown that the generator continues starting within one calculation area. Type 3 in FIG. 3C indicates that the generator changes from the activated state to the deactivated state within one calculation section. T1 and T2 in FIG. 3C indicate the stop start time and the stop completion time, respectively.

図4(a)の種別4は、発電機が1計算区間内に起動状態から停止状態を介して再び起動状態に変化することを示している。図4(a)のT1、T2、T3、T4はそれぞれ、停止開始時刻、停止完了時刻、起動開始時刻、起動完了時刻を示している。図4(b)の種別5は、発電機が1計算区間内に停止状態から起動状態に変化することを示している。図4(b)のT1、T2はそれぞれ、起動開始時刻、起動完了時刻を示している。図4(c)の種別6は、発電機が1計算区間内に停止状態から起動状態を介して再び停止状態に変化することを示している。図4(c)のT1、T2、T3、T4はそれぞれ、起動開始時刻、起動完了時刻、停止開始時刻、停止完了時刻を示している。 The type 4 in FIG. 4A indicates that the generator changes from the activated state to the activated state again through the stopped state within one calculation section. T1, T2, T3, and T4 in FIG. 4A indicate a stop start time, a stop completion time, a start start time, and a start completion time, respectively. Type 5 in FIG. 4B indicates that the generator changes from the stopped state to the activated state within one calculation section. T1 and T2 in FIG. 4B indicate the start start time and the start completion time, respectively. Type 6 in FIG. 4(c) indicates that the generator changes from the stopped state to the stopped state again via the activated state within one calculation section. In FIG. 4C, T1, T2, T3, and T4 indicate the start start time, the start completion time, the stop start time, and the stop completion time, respectively.

なお、種別1、2、3をそれぞれ「ZERO」「NON-ZERO」「STOP_ZERO」と呼び、種別4、5、6をそれぞれ「STOP_START」「ZERO_START」「START_STOP」と呼ぶ。 The types 1, 2 and 3 are called “ZERO”, “NON-ZERO” and “STOP_ZERO” respectively, and the types 4, 5 and 6 are called “STOP_START”, “ZERO_START” and “START_STOP” respectively.

本実施形態では、各発電機が1計算区間内に取り得る運転状態を、種別1から種別5までの5つの種別に分類する(種別6は除く)。そして、各発電機は1計算区間内にその他の種別の運転状態を取り得ないとの近似の下、発電計画を策定する。これにより、発電計画を策定するための計算時間を短縮することが可能となる。 In this embodiment, the operating states that each generator can take within one calculation section are classified into five types from type 1 to type 5 (excluding type 6). Then, each power generator formulates a power generation plan under the approximation that it is not possible to take other types of operating states within one calculation section. This makes it possible to shorten the calculation time for formulating a power generation plan.

このような近似を採用する理由は、計算区間が互いに隣接するピークP間の区間であることに関連している。この場合、1計算区間内の電力需要の変化は、ピークPからボトムBまで減少し、その後、ボトムBから次のピークPまで増加するという、おおむね2次関数的な変化となる。そのため、1計算区間内の各発電機の運転状態の変化は、おおむね0次、1次、2次関数的な変化に限定され、3次以上の高次関数的な変化となる可能性は低いと推論される。よって、本実施形態では、各発電機が1計算区間内に取り得る運転状態を、種別1(0次)、種別2(0次)、種別3(1次)、種別4(2次)、種別5(1次)に限定している。 The reason for adopting such an approximation is related to the fact that the calculation section is a section between the peaks P adjacent to each other. In this case, the change in the power demand in one calculation section decreases from the peak P to the bottom B, and then increases from the bottom B to the next peak P, which is a quadratic function change. Therefore, the change in the operating state of each generator within one calculation section is generally limited to 0th-order, 1st-order, and 2nd-order function-like changes, and is unlikely to be a 3rd-order or higher-order function-like change. Be inferred. Therefore, in the present embodiment, the operating states that each generator can take within one calculation section are classified into type 1 (0th order), type 2 (0th order), type 3 (first order), type 4 (secondary), It is limited to type 5 (primary).

なお、種別6は、種別4と同様に2次関数的な変化を示している。しかしながら、1計算区間内の電力需要は、ピークP、ボトムB、ピークPの順に変化し、下に凸の2次関数的な変化を示しているのに対し、種別6は、上に凸の2次関数的な変化を示している。そのため、1計算区間内の各発電機の運転状態の変化が、種別6のような変化となる可能性は低いと推論される。よって、本実施形態では、種別1〜5のみを分類に使用し、種別6を除外している。なお、互いに隣接するボトムB間の区間を計算区間として設定する場合には、種別1〜3、5、および6のみを分類に使用し、種別4を除外してもよい。 It should be noted that the type 6 shows a quadratic function-like change like the type 4. However, the power demand in one calculation section changes in the order of peak P, bottom B, and peak P, and shows a quadratic function change that is convex downward, whereas type 6 is convex upward. A quadratic function change is shown. Therefore, it is inferred that the change in the operating state of each generator within one calculation section is unlikely to be the change of type 6. Therefore, in this embodiment, only types 1 to 5 are used for classification, and type 6 is excluded. In addition, when the section between the bottoms B adjacent to each other is set as the calculation section, only the types 1 to 5, 5 and 6 may be used for the classification, and the type 4 may be excluded.

また、種別1〜5において、起動完了後の各発電機の出力は変化してもよいことに留意されたい(図5)。図5は、第1実施形態における発電機の運転状態の詳細について説明するためのグラフである。例えば、図5(a)の運転状態は種別1に分類され、図5(b)の運転状態は種別4に分類され、図5(c)の運転状態は種別5に分類される。 It should also be noted that in types 1 to 5, the output of each generator after completion of startup may change (FIG. 5). FIG. 5 is a graph for explaining the details of the operating state of the generator in the first embodiment. For example, the operating state of FIG. 5A is classified into type 1, the operating state of FIG. 5B is classified into type 4, and the operating state of FIG. 5C is classified into type 5.

ここで、再び図3(a)〜図4(c)を参照し、1計算区間内における各発電機の初期状態について説明する。図3(a)〜図4(c)は、各発電機の初期状態(時刻0における運転状態)を黒丸で示している。種別1〜6は、初期出力値が0である種別1、5、6と、初期出力値が0より大きい種別2、3、4とに分類される。 Here, referring again to FIGS. 3A to 4C, the initial state of each generator within one calculation section will be described. 3A to 4C, the initial state (operating state at time 0) of each generator is indicated by a black circle. Types 1 to 6 are classified into types 1, 5, and 6 whose initial output value is 0, and types 2, 3, and 4 whose initial output value is greater than 0.

運転状態列挙部17は、各発電機がある計算区間内に取り得る運転状態の種別を、その計算区間内における各発電機の初期状態に基づいて特定する。例えば、ある発電機のある計算区間における初期出力値が0より大きい場合には、その発電機がその計算区間に取り得る運転状態の種別は「種別2、3、および4」であると特定される。一方、ある発電機のある計算区間における初期出力値が0の場合には、その発電機がその計算区間に取り得る運転状態の種別は「種別1および5」であると特定される(種別6は需要の変化と逆行するため除外する)。なお、各発電機の各計算区間における初期出力値は、後述するように、上記の需要データに基づいて計算される。 The operation state enumeration unit 17 identifies the types of operation states that each generator can take within a certain calculation section based on the initial state of each generator in the calculation section. For example, if the initial output value of a certain generator in a certain calculation section is greater than 0, the types of operating states that the generator can take in the calculation section are identified as "types 2, 3, and 4". It On the other hand, when the initial output value in a certain calculation section of a certain generator is 0, the types of operating states that the generator can take in the calculation section are identified as "types 1 and 5" (type 6). Is excluded because it goes against changes in demand). The initial output value in each calculation section of each generator is calculated based on the above demand data, as will be described later.

運転状態列挙部17と運転状態絞り込み部18は、種別の特定結果に基づいて運転状態の列挙と絞り込みを行う(図6)。図6は、第1実施形態の運転状態列挙部17と運転状態絞り込み部18の動作を説明するためのグラフである。 The operating state listing unit 17 and the operating state narrowing unit 18 list and narrow down the operating states based on the identification result of the type (FIG. 6). FIG. 6 is a graph for explaining the operation of the operating state listing unit 17 and the operating state narrowing unit 18 of the first embodiment.

運転状態列挙部17は、各発電機がある計算区間内に取り得る運転状態の種別を特定した後、各発電機の運転状態がこの特定された種別を取る場合に各発電機がこの計算区間内に取り得る運転状態を1つ以上列挙する。例えば、ある発電機がある計算区間内に取り得る運転状態の種別が「種別1および5」と特定された場合には、この発電機がこの計算区間内に取り得る運転状態として「種別1および5」に対応する運転状態が列挙される。 The operating state enumeration unit 17 identifies the types of operating states that the respective generators can take within a certain calculation section, and then, when the operating states of the respective generators take this identified type, One or more possible operating states are listed. For example, when the types of operating states that a certain generator can take within a certain calculation section are specified as "types 1 and 5", the operating states that this generator can take within this calculation section are "type 1 and 5". The operating states corresponding to "5" are listed.

種別1および5に対応する運転状態を列挙する場合、種別1に対応する運転状態は1つしか存在しないが、種別5に対応する運転状態は多数列挙可能である。理由は、種別5に対応する運転状態は、時刻T1、T2を変化させることで様々な運転状態に変化するからである(図6(a))。 When enumerating the operating states corresponding to types 1 and 5, there is only one operating state corresponding to type 1, but a large number of operating states corresponding to type 5 can be enumerated. The reason is that the operating state corresponding to type 5 changes to various operating states by changing the times T1 and T2 (FIG. 6(a)).

図6(a)は、ある発電機がある計算区間内に取り得る運転状態として、種別5に対応する様々な運転状態を示している。符号Cは、これらの運転状態を表す様々な曲線を示している。曲線C同士は、時刻T1、T2を一定時間(一定メッシュ)の整数倍だけスライドさせた関係にある。この一定時間・一定メッシュの例は、30分・1メッシュである。なお、任意の2つの曲線C同士において、時刻T1のスライド量と時刻T2のスライド量は同じである。 FIG. 6A shows various operating states corresponding to type 5 as the operating states that a certain generator can take within a certain calculation section. The symbol C indicates various curves representing these operating states. The curves C have a relationship in which the times T1 and T2 are slid by an integral multiple of a fixed time (fixed mesh). An example of this fixed time/fixed mesh is 30 minutes/1 mesh. The amount of slide at time T1 and the amount of slide at time T2 are the same between any two arbitrary curves C.

運転状態列挙部17は、曲線Cに対応する運転状態をすべて列挙してもよいが、本実施形態では、曲線Cに対応する運転状態のみを列挙し、曲線Cに対応する運転状態は列挙しない。曲線Cに対応する運転状態は、発電計画に要求される所定の制約条件を満足する運転状態であり、曲線Cに対応する運転状態は、発電計画に要求される所定の制約条件を満足しない運転状態である。 The operating state listing unit 17 may list all operating states corresponding to the curve C, but in the present embodiment, only the operating states corresponding to the curve C A are listed, and the operating states corresponding to the curve C B are listed. Do not list. The operating state corresponding to the curve C A is an operating state that satisfies the predetermined constraint condition required for the power generation plan, and the operating state corresponding to the curve C B satisfies the predetermined constraint condition required for the power generation plan. Not in operation.

このような制約条件の例は、発電機の停止から起動までに所定時間以上の時間を要するという停止時間制約である。曲線Cは、発電機の起動開始時刻が早いことから、停止時間制約を満足していない。よって、運転状態列挙部17は、曲線Cに対応する運転状態を列挙しない。なお、運転状態列挙部17が考慮する制約条件の数はいくつでもよいし、運転状態列挙部17は制約条件を運転実績データ格納部12から取得してもユーザ入力条件格納部13から取得してもよい。 An example of such a constraint condition is a stop time constraint that a predetermined time or more is required from the stop of the generator to the start. The curve C B does not satisfy the stop time constraint because the start time of starting the generator is early. Therefore, the driving state listing unit 17 does not list the driving states corresponding to the curve C B. It should be noted that any number of constraint conditions may be considered by the operation state enumeration unit 17, and the operation state enumeration unit 17 may obtain the constraint condition from the operation record data storage unit 12 or the user input condition storage unit 13. Good.

制約条件を満足するか否かは、種別5に対応する複数の運転状態だけでなく、種別1に対応する1つの運転状態についても判断される。種別1に対応する運転状態が制約条件を満足しない場合には、種別5に対応する運転状態のみが列挙される。一方、種別1に対応する運転状態が制約条件を満足する場合には、種別1に対応する運転状態と種別5に対応する運転状態とが列挙される。特定された種別と列挙された運転状態の情報は、運転状態列挙部17から運転状態絞り込み部18に提供される。 Whether or not the constraint condition is satisfied is determined not only for a plurality of operating states corresponding to type 5, but also for one operating state corresponding to type 1. If the operating state corresponding to type 1 does not satisfy the constraint condition, only the operating states corresponding to type 5 are listed. On the other hand, when the operating state corresponding to the type 1 satisfies the constraint condition, the operating state corresponding to the type 1 and the operating state corresponding to the type 5 are listed. The information on the operating state listed as the identified type is provided from the operating state listing unit 17 to the operating state narrowing unit 18.

運転状態絞り込み部18は、各発電機について特定された種別と列挙された運転状態のうち、発電計画の作成に使用する1つ以上の種別と1つ以上の運転状態とを絞り込む。例えば、ある発電機について、種別1および5が特定され、種別1および5に対応する運転状態が列挙された場合には、これらの種別および運転状態の中から、発電計画の作成に使用する種別および運転状態が絞り込まれる。 The operation state narrowing unit 18 narrows down one or more types and one or more operation states used to create a power generation plan among the operation states listed as the types identified for each generator. For example, if types 1 and 5 are specified for a certain generator and the operating states corresponding to the types 1 and 5 are listed, the type used to create a power generation plan from these types and operating states. And the operating condition is narrowed down.

図6(b)は、図6(a)の処理により列挙された運転状態を示している。よって、曲線Cは、種別5に対応し、所定の制約条件を満足する運転状態を示している。曲線CA1は、絞り込みにより採用される運転状態を示し、曲線CA2は、絞り込みにより排除される運転状態を示している。以下、この絞り込み方法について説明する。 FIG. 6(b) shows the operating states listed by the processing of FIG. 6(a). Therefore, the curve C A shows the operating state corresponding to the type 5 and satisfying the predetermined constraint condition. A curve C A1 shows an operating state adopted by narrowing down, and a curve C A2 shows an operating state excluded by narrowing down. Hereinafter, this narrowing down method will be described.

図6(b)において太線で示す曲線CA1は、別途作成された事前処理から推奨される推奨運転状態を示す。本実施形態では、事前処理から上記の需要データが予測され、需要データに基づいて推奨運転状態が導出される(これは、上記の初期出力値についても同様である)。推奨運転状態は、運転状態絞り込み部18の事前処理で1メッシュずつ解いた結果を繋ぎ合わせた計画としては好適な運転状態であるが、短期発電計画にとっては好適な運転状態とは限らない。しかしながら、推奨運転状態は、短期発電計画にとって好適な運転状態に近いと予測されるため、本実施形態では推奨運転状態を短期発電計画の作成に利用する。推奨運転状態は、基準の運転状態の例である。 A curve C A1 indicated by a thick line in FIG. 6B shows a recommended operation state recommended from the separately prepared pretreatment. In the present embodiment, the above demand data is predicted from the preliminary processing, and the recommended operating state is derived based on the demand data (this is the same for the above initial output value). The recommended operating state is a preferable operating state as a plan in which the results obtained by solving each mesh in the preprocessing of the operating state narrowing unit 18 are combined, but is not necessarily a preferable operating state for a short-term power generation plan. However, since the recommended operating state is predicted to be close to the operating state suitable for the short-term power generation plan, the recommended operating state is used to create the short-term power generation plan in this embodiment. The recommended operating state is an example of the standard operating state.

具体的には、運転状態絞り込み部18は、各運転状態を発電計画の作成に使用するか否かを、各運転状態と推奨運転状態との差異に基づいて決定する。図6(b)では、推奨運転状態からのスライド量がそれぞれ2メッシュ以内で、推奨運転状態との差異が小さい運転状態(曲線CA1)が絞り込みにより採用され、その他の運転状態(曲線CA2)が絞り込みにより排除されている。 Specifically, the operating condition narrowing unit 18 determines whether to use each operating condition for creating a power generation plan based on the difference between each operating condition and the recommended operating condition. In FIG. 6B, the sliding amount from the recommended operating state is within 2 mesh, and the operating state (curve C A1 ) with a small difference from the recommended operating state is adopted by narrowing down, and the other operating states (curve C A2 ) Is excluded by narrowing down.

なお、運転状態絞り込み部18は、ある発電機がある計算区間内に取り得る運転状態を絞り込む際に、種別1〜5のいずれかに対応する1つの推奨運転状態を使用する。そのため、種別1および5に対応する運転状態の絞り込みに、例えば種別5に対応する推奨運転状態を使用する場合には、種別5に対応する運転状態のみが絞り込みにより採用されることとなる。図6(b)の例では、発電計画の作成に使用する種別が、種別5のみに絞り込まれ、発電計画の作成に使用する運転状態が、曲線CA1に対応する5つの運転状態のみに絞り込まれる。絞り込まれた種別および運転状態の情報は、運転状態絞り込み部18から発電計画作成部19に提供される。 The operation state narrowing unit 18 uses one recommended operation state corresponding to any one of types 1 to 5 when narrowing the operation states that a certain generator can take within a certain calculation section. Therefore, when the recommended operating state corresponding to the type 5 is used for narrowing down the operating states corresponding to the types 1 and 5, only the operating state corresponding to the type 5 is adopted by the narrowing down. In the example of FIG. 6B, the type used for creating the power generation plan is narrowed down to only type 5, and the operating states used for creating the power generation plan are narrowed down to only five operating states corresponding to the curve C A1. Be done. The information on the narrowed down type and operation state is provided from the operation state narrowing unit 18 to the power generation plan creation unit 19.

発電計画作成部19は、各発電機について絞り込まれた種別および運転状態に基づいて発電計画を作成する。具体的には、発電計画作成部19は、複数の発電機について各計算区間にて絞り込まれた種別および運転状態の情報を取得し、これらの種別および運転状態の最適な組合せを計算区間ごとに繰り返し計算する。すなわち、発電計画作成部19は、これらの種別および運転状態の組合せの最適解を計算する。発電計画作成部19の例は、このような最適解を計算するソルバーである。発電計画作成部19は、これらの種別および運転状態の組合せの中から、発電コストの総和が最小となる組合せを選択し、選択した組合せを最適解に決定する。 The power generation plan creation unit 19 creates a power generation plan based on the type and operation state narrowed down for each generator. Specifically, the power generation plan creation unit 19 acquires information on types and operating states narrowed down in each calculation section for a plurality of generators, and obtains an optimal combination of these types and operating states for each calculation section. Calculate repeatedly. That is, the power generation plan creation unit 19 calculates an optimum solution of a combination of these types and operating states. An example of the power generation plan creation unit 19 is a solver that calculates such an optimal solution. The power generation plan creation unit 19 selects a combination that minimizes the total power generation cost from among the combinations of these types and operating states, and determines the selected combination as the optimum solution.

こうして、発電計画作成部19は、最適解に沿った発電計画を作成する。発電計画作成部19により作成された発電計画は、発電計画データとして発電計画データ格納部15内に格納される。発電計画データの例を、図7を参照して説明する。図7は、第1実施形態の発電計画作成部19の動作を説明するためのグラフである。 In this way, the power generation plan creation unit 19 creates a power generation plan in accordance with the optimum solution. The power generation plan created by the power generation plan creation unit 19 is stored in the power generation plan data storage unit 15 as power generation plan data. An example of power generation plan data will be described with reference to FIG. 7. FIG. 7 is a graph for explaining the operation of the power generation plan creation unit 19 of the first embodiment.

図7(a)〜図7(d)はそれぞれ、上記の最適解において、発電機1〜4がある計算区間内に取る運転状態を示している。図7(a)において、発電機1は種別5の運転状態を取り、発電機2は種別4の運転状態を取り、発電機3は種別1の運転状態を取り、発電機4は種別5の運転状態を取っている。なお、発電機1、4の運転状態は、共に種別5に該当しているが、発電機1における時刻T1、T2の値と、発電機4における時刻T1、T2の値が互いに異なることに留意されたい。すなわち、発電機1、4の運転状態は、同じ種別に属する異なる運転状態である。 FIGS. 7(a) to 7(d) respectively show the operating states taken by the generators 1 to 4 within a certain calculation section in the above optimal solution. In FIG. 7A, the generator 1 has a type 5 operating state, the generator 2 has a type 4 operating state, the generator 3 has a type 1 operating state, and the generator 4 has a type 5 operating state. It is operating. Note that although the operating states of the generators 1 and 4 both correspond to type 5, it is noted that the values at times T1 and T2 in the generator 1 and the values at times T1 and T2 in the generator 4 are different from each other. I want to be done. That is, the operating states of the generators 1 and 4 are different operating states belonging to the same type.

一般に、複数の発電機が取り得る複数の運転状態の組合せの最適解を計算する場合、長い時間がかかる。しかしながら、本実施形態では、これらの運転状態を種別により分類し種別ごとに列挙するため、計算時間を短縮することができる。また、本実施形態では、互いに隣接するピークP間の区間を計算区間として設定し、各発電機が1計算区間内に取り得る運転状態を種別1〜5に分類することで、解の最適性が近似により損なわれることを抑制しつつ計算時間を短縮することができる。さらに、本実施形態では、運転状態を列挙する際に制限条件を考慮することや、列挙された運転状態を事前処理から得られる推奨運転状態に基づいて絞り込むことにより、計算時間をさらに短縮することができる。 Generally, it takes a long time to calculate an optimal solution of a combination of a plurality of operating states that a plurality of generators can take. However, in the present embodiment, these operating states are classified by type and listed for each type, so that the calculation time can be shortened. Further, in the present embodiment, the interval between the peaks P adjacent to each other is set as a calculation interval, and the operating states that each generator can take within one calculation interval are classified into types 1 to 5 to optimize the solution. It is possible to reduce the calculation time while suppressing the loss due to the approximation. Further, in the present embodiment, the calculation time is further shortened by considering the limiting condition when enumerating the operating states, and narrowing down the enumerated operating states based on the recommended operating states obtained from the pre-processing. You can

発電計画策定装置1のユーザは、発電計画策定装置1の画面上で発電計画データの内容を確認することができる。この際、電力需要の多い計算区間内に発電コストの安い発電機が停止している場合や、電力需要の少ない計算区間内に発電コストの高い発電機が起動している場合など、発電計画に好適でない箇所が確認される場合がある。この場合、ユーザは、発電計画の作成をやり直すための操作を画面上で行うことができる。このような操作が行われると、運転状態絞り込み部18による前回の絞り込みが運転状態調整部20により調整され、発電計画の作成がやり直される。以下、運転状態調整部20の動作について説明する。 The user of the power generation plan formulation device 1 can confirm the content of the power generation plan data on the screen of the power generation plan formulation device 1. At this time, if the generator with the lowest power generation cost is stopped in the calculation section with high power demand, or if the generator with the high power generation cost is started in the calculation section with low power demand, the power generation plan In some cases, unsuitable points may be confirmed. In this case, the user can perform an operation for re-creating the power generation plan on the screen. When such an operation is performed, the previous narrowing down by the operating condition narrowing unit 18 is adjusted by the operating condition adjusting unit 20, and the generation of the power generation plan is redone. Hereinafter, the operation of the driving condition adjusting unit 20 will be described.

図8と図9は、第1実施形態の運転状態調整部20の動作を説明するための図である。 8 and 9 are diagrams for explaining the operation of the operating state adjustment unit 20 of the first embodiment.

図8(a)は、前回の絞り込みを調整するための調整画面を示す。調整画面は、運転状態調整部20によりユーザ入出力I/F4を介して発電計画策定装置1のディスプレイ上に表示される。 FIG. 8A shows an adjustment screen for adjusting the previous refinement. The adjustment screen is displayed on the display of the power generation plan formulation device 1 by the operating state adjustment unit 20 via the user input/output I/F 4.

図8(a)の調整画面は、ある発電計画のある計算区間における電力需要の変化と各発電機の運転状態とを表示している。図8(a)では、発電機1が種別5の運転状態を取り、発電機2が種別1の運転状態を取り、発電機3が種別4の運転状態を取っている。 The adjustment screen of FIG. 8A displays the change in the power demand and the operating state of each generator in a certain calculation section of a certain power generation plan. In FIG. 8A, the generator 1 is in the type 5 operating state, the generator 2 is in the type 1 operating state, and the generator 3 is in the type 4 operating state.

本実施形態の運転状態絞り込み部18は、各発電機の各計算区間における運転状態の種別を1つの種別に絞り込み、この場合の運転状態を、この種別に対応する5つの運転状態に絞り込む(図6(b)を参照)。そして、発電計画作成部19は、これら5つの運転状態を使用して最適化計算を行い、これら5つの運転状態のうちの1つを最適解に適用し、最適解に沿った発電計画を作成する。図8(a)は、各発電機に関し、最適解に適用された運転状態を示している。 The operating state narrowing unit 18 of the present embodiment narrows the type of operating state in each calculation section of each generator to one type, and narrows the operating state in this case to five operating states corresponding to this type (Fig. 6(b)). Then, the power generation plan creation unit 19 performs optimization calculation using these five operation states, applies one of these five operation states to the optimum solution, and creates a power generation plan according to the optimum solution. To do. FIG. 8A shows the operating state applied to the optimum solution for each generator.

図8(a)の調整画面は、各発電機に関し、種別ボタン21と推奨ボタン22とを含んでいる。発電機1の種別ボタン21をクリックすると、図8(b)の種別変更ダイアログボックスが表示される。 The adjustment screen of FIG. 8A includes a type button 21 and a recommendation button 22 for each generator. When the type button 21 of the generator 1 is clicked, the type change dialog box of FIG. 8B is displayed.

図8(b)の種別変更ダイアログボックスでは、発電機1の運転状態の種別を変更することができる。現時点では、発電機1の運転状態の種別は「ZERO_START(種別5)」であるが、例えば種別を「ZERO_START(種別5)」から「STOP_ZERO(種別3)」に変更することができる。 In the type change dialog box of FIG. 8B, the type of operating state of the generator 1 can be changed. At present, the type of the operating state of the generator 1 is "ZERO_START (type 5)", but the type can be changed from "ZERO_START (type 5)" to "STOP_ZERO (type 3)", for example.

また、図8(a)にて発電機1の推奨ボタン22をクリックすると、図9(a)の推奨変更ダイアログボックスが表示される。ここでは、時間調整用アイコン23にマウスポインタを合わせて矢印A1の方向にドラッグすることで、推奨運転状態の時刻T1を変更することができる。この際、時間調整用アイコン24もこれに追従して矢印A2の方向に自動的に移動し、推奨運転状態の時刻T2も変更される。 When the recommended button 22 of the generator 1 is clicked in FIG. 8A, the recommended change dialog box in FIG. 9A is displayed. Here, the time T1 of the recommended driving state can be changed by moving the mouse pointer to the time adjustment icon 23 and dragging it in the direction of the arrow A1. At this time, the time adjusting icon 24 also automatically moves in the direction of the arrow A2 following this, and the time T2 of the recommended operating state is also changed.

また、図8(a)にて発電機3の推奨ボタン22をクリックすると、図9(b)の推奨変更ダイアログボックスが表示される。ここでは、時間調整用アイコン26にマウスポインタを合わせてドラッグすることで、推奨運転状態の時刻T2を変更することができる。この際、時間調整用アイコン25もこれに追従して自動的に移動し、推奨運転状態の時刻T1も変更される。同様に、時間調整用アイコン27にマウスポインタを合わせてドラッグすることで、推奨運転状態の時刻T3を変更することができる。この際、時間調整用アイコン28もこれに追従して自動的に移動し、推奨運転状態の時刻T4も変更される。 When the recommendation button 22 of the generator 3 is clicked in FIG. 8A, the recommendation change dialog box in FIG. 9B is displayed. Here, by moving the mouse pointer to the time adjustment icon 26 and dragging it, the time T2 of the recommended driving state can be changed. At this time, the time adjustment icon 25 also automatically moves following this, and the time T1 in the recommended operating state is also changed. Similarly, by moving the mouse pointer to the time adjustment icon 27 and dragging it, the time T3 of the recommended driving state can be changed. At this time, the time adjustment icon 28 also automatically moves following the change, and the time T4 in the recommended operation state is also changed.

なお、ある発電機の種別を種別変更ダイアログボックスで変更した場合には、その発電機が種別変更後に推奨運転状態を有していないことになる。この場合、この発電機の推奨運転状態を、推奨変更ダイアログボックスで新たに設定する必要がある。 If the type of a certain generator is changed in the type change dialog box, the generator does not have the recommended operating state after the type change. In this case, it is necessary to newly set the recommended operating state of this generator in the recommended change dialog box.

図8(a)の調整画面で、種別や推奨運転状態の変更後に、発電計画の作成をやり直す旨の操作が行われると、運転状態調整部20から運転状態絞り込み部18に絞り込みのやり直しが要求される。 In the adjustment screen of FIG. 8(a), when the operation for recreating the power generation plan is performed after the type and the recommended operation state are changed, the operation state adjustment unit 20 requests the operation state narrowing unit 18 to narrow down again. To be done.

例えば、発電機1のある計算区間における運転状態の種別が調整画面上で種別3に変更された場合には、運転状態絞り込み部18は、発電機1のこの計算区間における運転状態の種別を種別3に絞り込み、この場合の運転状態を、種別3に対応する5つの運転状態に絞り込む。この際、絞り込み用の推奨運転状態として、推奨変更ダイアログボックスで設定された推奨運転状態が使用される。 For example, when the type of the operating state of the generator 1 in a certain calculation section is changed to type 3 on the adjustment screen, the operating state narrowing unit 18 sets the type of the operating state of the generator 1 in the calculation section of the type. The operation state in this case is narrowed down to five operation states corresponding to type 3. At this time, the recommended operating state set in the recommended change dialog box is used as the recommended operating state for narrowing down.

なお、種別3に対応する運転状態を絞り込む際には、種別5に対応する運転状態を絞り込む場合(図6(b))と同様に、推奨運転状態を2メッシュ以内でスライドさせる。すなわち、時刻T1をある量だけスライドさせ、時刻T2はこれと同じ量だけ自動的にスライドされる。一方、種別4に対応する運転状態を絞り込む際には、時刻T2、T3を同じ量だけスライドさせてもよいし、時刻T2と時刻T3とを別々の量だけスライドさせてもよい。いずれの場合も、時刻T1は時刻T2と同じ量だけ自動的にスライドされ、時刻T4は時刻T3と同じ量だけ自動的にスライドされる。 When narrowing down the operating state corresponding to type 3, the recommended operating state is slid within 2 meshes as in the case of narrowing down the operating state corresponding to type 5 (FIG. 6B). That is, the time T1 is slid by a certain amount, and the time T2 is automatically slid by the same amount. On the other hand, when narrowing down the operating states corresponding to type 4, the times T2 and T3 may be slid by the same amount, or the times T2 and T3 may be slid by different amounts. In either case, time T1 is automatically slid by the same amount as time T2, and time T4 is automatically slid by the same amount as time T3.

絞り込みのやり直し結果は、運転状態絞り込み部18から発電計画作成部19に提供される。そして、発電計画作成部19は、この結果に基づいて発電計画の作成をやり直し、やり直しにより得られた発電計画を発電計画データとして発電計画データ格納部15内に格納する。 The operation result narrowing-down unit 18 provides the power generation plan creation unit 19 with the result of re-selection. Then, the power generation plan creation unit 19 re-creates the power generation plan based on this result, and stores the power generation plan obtained by the redoing in the power generation plan data storage unit 15 as power generation plan data.

図10は、第1実施形態の発電計画策定装置1の動作を示すフローチャートである。 FIG. 10 is a flowchart showing the operation of the power generation plan formulation device 1 according to the first embodiment.

まず、電力需要の予測に関する時系列データ(需要データ)のピークPおよびボトムBを抽出し、互いに隣接するピークP間の区間を利用して計算区間を作成する(ステップS1)。次に、複数の計算区間についてステップS2〜S7のループ処理を行う。 First, a peak P and a bottom B of time series data (demand data) relating to prediction of power demand are extracted, and a calculation section is created using a section between the peaks P adjacent to each other (step S1). Next, the loop processing of steps S2 to S7 is performed on the plurality of calculation sections.

ループ処理ではまず、各発電機が各計算区間内に取り得る運転状態の種別を1つ以上特定した後、各発電機の運転状態がこの特定された種別を取る場合に各発電機が各計算区間内に取り得る運転状態を1つ以上列挙する(ステップS3)。この際、本実施形態の運転状態列挙部17は、所定の制約条件を満足する運転状態のみを列挙する。 In the loop process, first, after identifying one or more types of operating states that each generator can take within each calculation section, each operating generator calculates each type when the operating state of each generator takes this identified type. One or more operating states that can be taken in the section are listed (step S3). At this time, the operation state listing unit 17 of the present embodiment lists only the operation states that satisfy the predetermined constraint condition.

次に、各発電機について特定された種別と列挙された運転状態のうち、発電計画の作成に使用する1つ以上の種別と1つ以上の運転状態とを絞り込む(ステップS4)。この際、本実施形態の運転状態絞り込み部18は、推奨運転状態に基づいて種別および運転状態の絞り込みを行う。 Next, among the operating states listed as the types identified for each generator, one or more types and one or more operating states used to create a power generation plan are narrowed down (step S4). At this time, the operating condition narrowing unit 18 of the present embodiment narrows down the type and operating condition based on the recommended operating condition.

次に、各発電機について絞り込まれた種別および運転状態に基づいて、発電計画を作成する(ステップS5)。本実施形態の発電計画作成部19は、これらの種別および運転状態の最適な組合せを計算することで発電計画を作成する。 Next, a power generation plan is created based on the narrowed down type and operating state of each generator (step S5). The power generation plan creation unit 19 of this embodiment creates a power generation plan by calculating an optimal combination of these types and operating states.

この発電計画の内容は、調整画面上に表示される。そして、ユーザがこの解(この発電計画)を許容しない場合には(ステップS6)、調整画面上で種別や推奨運転状態の変更を行い、発電計画の作成をやり直す旨の操作を行う。その結果、ステップS4〜S6の処理が再度実行される。 The contents of this power generation plan are displayed on the adjustment screen. Then, when the user does not allow this solution (this power generation plan) (step S6), the type and the recommended operation state are changed on the adjustment screen, and the operation of recreating the power generation plan is performed. As a result, the processes of steps S4 to S6 are executed again.

一方、ユーザが発電計画を許容する場合には、この発電計画が発電計画データとして発電計画データ格納部15内に保存される(ステップS8)。なお、発電計画データは、このフローチャートのようにユーザが許容したものだけが発電計画データ格納部15内に保存されてもよいし、作成されたすべての発電計画データが発電計画データ格納部15内に保存されてもよい。 On the other hand, when the user permits the power generation plan, this power generation plan is stored in the power generation plan data storage unit 15 as power generation plan data (step S8). As for the power generation plan data, only the data allowed by the user may be stored in the power generation plan data storage unit 15 as in this flowchart, or all the generated power generation plan data may be stored in the power generation plan data storage unit 15. May be stored in.

以上のように、発電計画策定装置1は、各発電機が各計算区間内に取り得る運転状態の種別を1つ以上特定し、各発電機の運転状態がこの特定された種別を取る場合に各発電機が各計算区間内に取り得る運転状態を1つ以上列挙する。発電計画策定装置1はさらに、特定された種別と列挙された運転状態とに基づいて、複数の発電機についての発電計画を作成する。よって、本実施形態によれば、正確性の高い発電計画を短時間で策定することが可能となる。 As described above, the power generation plan formulation device 1 identifies one or more types of operating states that each generator can take within each calculation section, and when the operating state of each generator takes this identified type. One or more operating states that each generator can take within each calculation section are listed. The power generation plan formulation device 1 further creates a power generation plan for a plurality of generators based on the specified type and the listed operating states. Therefore, according to this embodiment, it is possible to formulate a highly accurate power generation plan in a short time.

なお、ピーク・ボトム抽出部16、運転状態列挙部17、運転状態絞り込み部18、発電計画作成部19、および運転状態調整部20の処理は例えば、発電計画策定装置1のHDD(Hard Disc Drive)内に格納された発電計画策定プログラムを、発電計画策定装置1のCPU(Central Processing Unit)により実行することで実現可能である。本実施形態では、このプログラムを記録したコンピュータ読み取り可能な記録媒体を発電計画策定装置1のメモリインタフェースに挿入し、記録媒体からHDD内にこのプログラムをインストールしてもよい。 The processes of the peak/bottom extraction unit 16, the operation state enumeration unit 17, the operation state narrowing unit 18, the power generation plan creation unit 19, and the operation state adjustment unit 20 are, for example, an HDD (Hard Disc Drive) of the power generation plan formulation device 1. This can be realized by executing the power generation plan formulation program stored therein by the CPU (Central Processing Unit) of the power generation plan formulation device 1. In the present embodiment, a computer-readable recording medium in which this program is recorded may be inserted into the memory interface of the power generation plan formulation device 1, and this program may be installed in the HDD from the recording medium.

以上、いくつかの実施形態を説明したが、これらの実施形態は、例としてのみ提示したものであり、発明の範囲を限定することを意図したものではない。本明細書で説明した新規な装置、方法、およびプログラムは、その他の様々な形態で実施することができる。また、本明細書で説明した装置、方法、およびプログラムの形態に対し、発明の要旨を逸脱しない範囲内で、種々の省略、置換、変更を行うことができる。添付の特許請求の範囲およびこれに均等な範囲は、発明の範囲や要旨に含まれるこのような形態や変形例を含むように意図されている。 Although some embodiments have been described above, these embodiments are presented only as examples and are not intended to limit the scope of the invention. The novel device, method, and program described in this specification can be implemented in various other forms. Various omissions, substitutions, and changes can be made to the forms of the apparatus, method, and program described in the present specification without departing from the spirit of the invention. The appended claims and their equivalents are intended to cover such forms and modifications as fall within the scope and spirit of the invention.

1:発電計画策定装置、2:需要予測システム、
3:運転データ取得システム、4:ユーザ入出力I/F、
11:需要データ格納部、12:運転実績データ格納部、
13:ユーザ入力条件格納部、14:ユーザ設定条件格納部、
15:発電計画データ格納部、16:ピーク・ボトム抽出部、
17:運転状態列挙部、18:運転状態絞り込み部、
19:発電計画作成部、20:運転状態調整部、
21:種別ボタン、22:推奨ボタン、
23、24、25、26、27、28:時間調整用アイコン
1: Power generation planning device, 2: Demand forecasting system,
3: Operation data acquisition system, 4: User input/output I/F,
11: demand data storage unit, 12: operation record data storage unit,
13: user input condition storage unit, 14: user setting condition storage unit,
15: power generation plan data storage unit, 16: peak/bottom extraction unit,
17: operating state listing unit, 18: operating state narrowing unit,
19: power generation plan creation unit, 20: operating condition adjustment unit,
21: type button, 22: recommendation button,
23, 24, 25, 26, 27, 28: Time adjustment icons

Claims (8)

複数の発電機のうちの各発電機が所定期間内に取り得る運転状態の種別を1つ以上特定し、各発電機の運転状態が前記特定された種別を取る場合に各発電機が前記所定期間内に取り得る運転状態を1つ以上列挙する運転状態列挙部と、
電力需要の予測に関する時系列データの複数のピークと複数のボトムの少なくともいずれかを抽出し、前記ピーク間の区間または前記ボトム間の区間を前記所定期間として設定するピーク・ボトム抽出部と、
前記特定された種別と前記列挙された運転状態とに基づいて、前記複数の発電機についての発電計画を作成する発電計画作成部と、
を備え
前記運転状態列挙部は、発電機が停止し続ける第1種別と、発電機が起動し続ける第2種別と、発電機が起動状態から停止状態に変化する第3種別と、発電機が起動状態から停止状態を介して再び起動状態に変化する第4種別または発電機が停止状態から起動状態を介して再び停止状態に変化する第6種別と、発電機が停止状態から起動状態に変化する第5種別の中から、前記複数の発電機のうちの各発電機が前記所定期間内に取り得る運転状態の種別を1つ以上特定する、発電計画策定装置。
Each generator of the plurality of generators specifies one or more types of operating states that can be taken within a predetermined period, and when each operating state of each generator takes the specified type, each generator has the predetermined An operating state listing unit that lists one or more operating states that can be taken within a period;
A peak/bottom extraction unit that extracts at least one of a plurality of peaks and a plurality of bottoms of time-series data regarding prediction of power demand, and sets a section between the peaks or a section between the bottoms as the predetermined period,
A power generation plan creation unit that creates a power generation plan for the plurality of generators based on the identified type and the listed operating states;
Equipped with
The operating state enumeration unit includes a first type in which the generator continues to stop, a second type in which the generator continues to start, a third type in which the generator changes from a starting state to a stopped state, and a starting state. From the 4th type that changes from the stopped state to the activated state again or from the 6th type that the generator changes from the stopped state to the stopped state again via the activated state and the 6th type that the generator changes from the stopped state to the activated state A power generation plan formulation device that identifies one or more types of operating states that each generator of the plurality of generators can take within the predetermined period from the five types .
前記特定された種別と前記列挙された運転状態のうち、前記発電計画の作成に使用する1つ以上の種別と1つ以上の運転状態とを絞り込む運転状態絞り込み部を備え、
前記発電計画作成部は、前記絞り込まれた種別および運転状態に基づいて、前記発電計画を作成する、請求項に記載の発電計画策定装置。
An operating state narrowing unit that narrows down one or more types and one or more operating states used to create the power generation plan from the identified types and the listed operating states,
The power generation plan formulation device according to claim 1 , wherein the power generation plan creation unit creates the power generation plan based on the narrowed-down type and operation state.
前記運転状態絞り込み部は、電力需要の予測に関する時系列データに基づいて、前記発電計画の作成に使用する種別および運転状態を絞り込む、請求項に記載の発電計画策定装置。 The power generation plan formulation device according to claim 2 , wherein the operation state narrowing unit narrows down a type and an operation state used to create the power generation plan based on time-series data regarding prediction of power demand. 前記絞り込まれた種別を変更して前記運転状態の絞り込みを調整するための調整画面を表示する運転状態調整部を備え、
前記運転状態絞り込み部は、前記発電計画の作成に使用する種別を、前記調整画面で変更された種別に絞り込み、前記発電計画に使用する運転状態を、前記変更された種別に対応する運転状態に絞り込む、請求項またはに記載の発電計画策定装置。
An operating state adjusting unit is provided for displaying an adjustment screen for changing the narrowed-down type and adjusting the narrowing down of the operating state.
The operation state narrowing unit narrows down the type used for creating the power generation plan to the type changed on the adjustment screen, and changes the operation state used for the power generation plan to the operation state corresponding to the changed type. The power generation plan formulation device according to claim 2 or 3, which is narrowed down.
前記運転状態列挙部は、各発電機が前記所定期間内に取り得る運転状態の種別を、前記所定期間内における各発電機の初期状態に基づいて特定する、請求項1からのいずれか1項に記載の発電計画策定装置。 The driving state enumeration unit, the type of operating condition the generator can take within the predetermined time period is specified based on the initial state of each generator within the predetermined time period, any one of claims 1 to 4 1 The power generation plan formulation device described in the item. 前記運転状態列挙部は、各発電機が前記所定期間内に取り得る運転状態として、前記発電計画に要求される制約条件を満足する運転状態を列挙する、請求項1からのいずれか1項に記載の発電計画策定装置。 The operating state enumeration unit, as the operating state of the generator can be taken within the predetermined time period, listed operating state that satisfies the required constraint to the power generation plan, any one of claims 1 to 5 The power generation planning device described in. 運転状態列挙部が、複数の発電機のうちの各発電機が所定期間内に取り得る運転状態の種別を1つ以上特定し、各発電機の運転状態が前記特定された種別を取る場合に各発電機が前記所定期間内に取り得る運転状態を1つ以上列挙し、
ピーク・ボトム抽出部が、電力需要の予測に関する時系列データの複数のピークと複数のボトムの少なくともいずれかを抽出し、前記ピーク間の区間または前記ボトム間の区間を前記所定期間として設定し、
発電計画作成部が、前記特定された種別と前記列挙された運転状態とに基づいて、前記複数の発電機についての発電計画を作成する、
ことを備え
前記運転状態列挙部は、発電機が停止し続ける第1種別と、発電機が起動し続ける第2種別と、発電機が起動状態から停止状態に変化する第3種別と、発電機が起動状態から停止状態を介して再び起動状態に変化する第4種別または発電機が停止状態から起動状態を介して再び停止状態に変化する第6種別と、発電機が停止状態から起動状態に変化する第5種別の中から、前記複数の発電機のうちの各発電機が前記所定期間内に取り得る運転状態の種別を1つ以上特定する、発電計画策定方法。
When the operating state enumeration unit identifies one or more types of operating states that each generator of the plurality of generators can take within a predetermined period, and the operating state of each generator takes the identified type. Enumerate one or more operating states that each generator can take within the predetermined period,
The peak/bottom extraction unit extracts at least one of a plurality of peaks and a plurality of bottoms of time-series data related to prediction of power demand, and sets a section between the peaks or a section between the bottoms as the predetermined period,
A power generation plan creation unit creates a power generation plan for the plurality of generators based on the specified type and the listed operating states,
Provided that,
The operating state enumeration unit includes a first type in which the generator continues to stop, a second type in which the generator continues to start, a third type in which the generator changes from a starting state to a stopped state, and a starting state. From the 4th type that changes from the stopped state to the activated state again or from the 6th type that the generator changes from the stopped state to the stopped state again via the activated state and the 6th type that the generator changes from the stopped state to the activated state A power generation plan formulation method , wherein one or more types of operating states that can be taken by each generator of the plurality of generators within the predetermined period are specified from among five types .
運転状態列挙部が、複数の発電機のうちの各発電機が所定期間内に取り得る運転状態の種別を1つ以上特定し、各発電機の運転状態が前記特定された種別を取る場合に各発電機が前記所定期間内に取り得る運転状態を1つ以上列挙し、
ピーク・ボトム抽出部が、電力需要の予測に関する時系列データの複数のピークと複数のボトムの少なくともいずれかを抽出し、前記ピーク間の区間または前記ボトム間の区間を前記所定期間として設定し、
発電計画作成部が、前記特定された種別と前記列挙された運転状態とに基づいて、前記複数の発電機についての発電計画を作成する、
ことを備える発電計画策定方法をコンピュータに実行させる発電計画策定プログラムであって、
前記運転状態列挙部は、発電機が停止し続ける第1種別と、発電機が起動し続ける第2種別と、発電機が起動状態から停止状態に変化する第3種別と、発電機が起動状態から停止状態を介して再び起動状態に変化する第4種別または発電機が停止状態から起動状態を介して再び停止状態に変化する第6種別と、発電機が停止状態から起動状態に変化する第5種別の中から、前記複数の発電機のうちの各発電機が前記所定期間内に取り得る運転状態の種別を1つ以上特定する、発電計画策定プログラム
When the operating state enumeration unit identifies one or more types of operating states that each generator of the plurality of generators can take within a predetermined period, and the operating state of each generator takes the identified type. Enumerate one or more operating states that each generator can take within the predetermined period,
The peak/bottom extraction unit extracts at least one of a plurality of peaks and a plurality of bottoms of time-series data related to prediction of power demand, and sets a section between the peaks or a section between the bottoms as the predetermined period,
A power generation plan creation unit creates a power generation plan for the plurality of generators based on the specified type and the listed operating states,
A power generation planning program that causes a computer to execute a power generation planning method including
The operating state enumeration unit includes a first type in which the generator continues to stop, a second type in which the generator continues to start, a third type in which the generator changes from a starting state to a stopped state, and a starting state. From the 4th type that changes from the stopped state to the activated state again or from the 6th type that the generator changes from the stopped state to the stopped state again via the activated state and the 6th type that the generator changes from the stopped state to the activated state A power generation plan formulation program that identifies one or more types of operating states that each generator of the plurality of generators can take within the predetermined period from the five types .
JP2016240619A 2016-12-12 2016-12-12 Power generation planning device, power generation planning method, and power generation planning program Active JP6725406B2 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
JP2016240619A JP6725406B2 (en) 2016-12-12 2016-12-12 Power generation planning device, power generation planning method, and power generation planning program
AU2017239602A AU2017239602A1 (en) 2016-12-12 2017-10-06 Power generation plan developing apparatus, power generation plan developing method, and recording medium
TW106134871A TWI676907B (en) 2016-12-12 2017-10-12 Power generation plan developing apparatus, power generation plan developing method, and recording medium
AU2019232863A AU2019232863A1 (en) 2016-12-12 2019-09-19 Power generation plan developing apparatus, power generation plan developing method, and recording medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016240619A JP6725406B2 (en) 2016-12-12 2016-12-12 Power generation planning device, power generation planning method, and power generation planning program

Publications (2)

Publication Number Publication Date
JP2018097537A JP2018097537A (en) 2018-06-21
JP6725406B2 true JP6725406B2 (en) 2020-07-15

Family

ID=62633009

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016240619A Active JP6725406B2 (en) 2016-12-12 2016-12-12 Power generation planning device, power generation planning method, and power generation planning program

Country Status (3)

Country Link
JP (1) JP6725406B2 (en)
AU (2) AU2017239602A1 (en)
TW (1) TWI676907B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6877280B2 (en) * 2017-07-19 2021-05-26 株式会社東芝 Operation plan creation device, operation plan creation method, and operation plan creation program

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3332032B2 (en) * 2000-03-09 2002-10-07 株式会社日立製作所 Generator operation planning device, generator operation planning method, and storage medium storing generator operation planning program
US6853930B2 (en) * 2001-02-27 2005-02-08 Hitachi, Ltd. System for aiding the preparation of operation and maintenance plans for a power generation installation
US7313465B1 (en) * 2003-09-11 2007-12-25 Dte Energy Technologies, Inc. System and method for managing energy generation equipment
JP4896084B2 (en) * 2008-06-30 2012-03-14 株式会社日立製作所 Generator operation plan creation method
JP5606114B2 (en) * 2010-03-19 2014-10-15 株式会社東芝 Power generation amount prediction device, prediction method, and prediction program
US20110295761A1 (en) * 2010-05-31 2011-12-01 Kabushiki Kaisha Toshiba Business form management system, method and program
KR20150043311A (en) * 2012-07-13 2015-04-22 닛토덴코 가부시키가이샤 On-demand multiple power source management system, on-demand multiple power source management system program and computer-readable recording medium on which said program is recorded

Also Published As

Publication number Publication date
TWI676907B (en) 2019-11-11
AU2019232863A1 (en) 2019-10-10
TW201822040A (en) 2018-06-16
AU2017239602A1 (en) 2018-06-28
JP2018097537A (en) 2018-06-21

Similar Documents

Publication Publication Date Title
Wierzbowski et al. MILP model for long-term energy mix planning with consideration of power system reserves
Jewell et al. Energy security under de-carbonization scenarios: An assessment framework and evaluation under different technology and policy choices
EP2778872B1 (en) Industrial asset event chronology
US20120041990A1 (en) System and Method for Generating Dashboard Display in Software Applications
TW200949665A (en) Ranking visualization types based upon fitness for visualizing a data set
JP2007102475A (en) Test case extraction device, test case extraction program, and test case extraction method for software system
JP4896084B2 (en) Generator operation plan creation method
JP2001211548A (en) Method for power-generation planning and device
KR20140108721A (en) Sequence program creation device
JP2001195483A (en) Device and method for supporting project risk management, and storage medium with program stored thereon
US20090254551A1 (en) Guided entry system for individuals for annotating process deviations
JP2017146888A (en) Design support device and method and program
JP5803469B2 (en) Prediction method and prediction program
JP6725406B2 (en) Power generation planning device, power generation planning method, and power generation planning program
JP5412332B2 (en) Generator operation plan determination device, generator operation plan determination method, and generator operation plan determination program
Medić et al. Modelling energy demand of Croatian industry sector
JP6612800B2 (en) Design support system and design support method
JP6555024B2 (en) Information processing apparatus and information processing program
JP2022179882A (en) Plan evaluation apparatus and plan evaluation method
JP6132064B1 (en) Operation support apparatus, operation support system, information processing apparatus, operation support method, and program
Kumar et al. Gap to Potential Identification through An Online Process Digital Twin
US20190243618A1 (en) House of quality for federated manufacturing apps
JP6104633B2 (en) Needs judging device, needs judging method and needs judging program
EP3822885B1 (en) System and method for generating single-line diagrams for an industrial automation system
JP7129184B2 (en) Case search system

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20171108

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20171109

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190218

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20191220

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200110

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200306

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200526

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200625

R150 Certificate of patent or registration of utility model

Ref document number: 6725406

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150