JP6703447B2 - Electric power data management system, consumer group and electric power interchange block - Google Patents

Electric power data management system, consumer group and electric power interchange block Download PDF

Info

Publication number
JP6703447B2
JP6703447B2 JP2016130924A JP2016130924A JP6703447B2 JP 6703447 B2 JP6703447 B2 JP 6703447B2 JP 2016130924 A JP2016130924 A JP 2016130924A JP 2016130924 A JP2016130924 A JP 2016130924A JP 6703447 B2 JP6703447 B2 JP 6703447B2
Authority
JP
Japan
Prior art keywords
power
amount
customer
data
charge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016130924A
Other languages
Japanese (ja)
Other versions
JP2017028986A (en
Inventor
尚 梅岡
尚 梅岡
章太 上西
章太 上西
純一 松崎
純一 松崎
中森 勇一
勇一 中森
伸浩 森
伸浩 森
安宅 元晴
元晴 安宅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Publication of JP2017028986A publication Critical patent/JP2017028986A/en
Application granted granted Critical
Publication of JP6703447B2 publication Critical patent/JP6703447B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/50Energy storage in industry with an added climate change mitigation effect
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • Y04S10/123Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving renewable energy sources
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/12Energy storage units, uninterruptible power supply [UPS] systems or standby or emergency generators, e.g. in the last power distribution stages

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、電力データ管理システム、需要家集合体及び電力融通街区に関する。 The present invention relates to a power data management system, a customer group, and a power interchange block.

近年、需要家に設置される太陽光発電設備や蓄電設備が増えている。このような場合、余った電力を、容量の空いている蓄電設備に蓄電し、また、電力が足りない需要家は、別の需要家の蓄電池に貯められた電力を使用するなど、需要家間の電力融通により、より多く太陽光発電電力を使うことができる(例えば、特許文献1参照)。 In recent years, the number of solar power generation facilities and power storage facilities installed in customers has increased. In such a case, the surplus power is stored in a power storage facility with a vacant capacity, and a customer with insufficient power uses the power stored in the storage battery of another customer. With the power interchange of the above, more photovoltaic power can be used (for example, see Patent Document 1).

特開2012−055078号公報JP2012-055078A

既存の電気料金プランのもとでは、需要家間における電力融通を行う際の有効な仕組みがない。
例えば、深夜時間帯は安価な乗率(単価[円/kWh])で、日中は高価な乗率の設定の料金プランの場合、このように時間帯別に乗率が異なると、例えば、図1のB需要家が、A需要家が発電した電力を高価な乗率で購入し、一旦蓄電設備に貯めた後に、C需要家へ安価な乗率で販売することとなった場合、B需要家は、一時的に余分な電気を預かっただけにも関わらず、経済的損失を被ることとなる。
Under the existing electricity tariff plan, there is no effective mechanism for exchanging electricity between customers.
For example, in the case of a rate plan with a cheap multiplication factor (unit price [yen/kWh]) in the late-night hours and an expensive multiplication factor during the daytime, if the multiplication factors differ according to the time zone, for example, If the B customer of 1 purchases the electric power generated by the A customer at an expensive multiplication factor, stores it in the power storage equipment, and then sells it to the C customer at an inexpensive multiplication factor, the B demand The house suffers financial loss even though it has temporarily stored extra electricity.

また、電力量に応じた段階料金制のものでは、一時的に蓄電池設備で他の需要家からの融通電力を預かる量が多いと、乗率が高い段階へ上がってしまい、需要家は損失を被ることとなる。
更に、購入電力に対する料金の精算と、余剰電力の買取料金の精算は別々の価格が設定され、別々になされている。購入電力の精算は、その全額を電力会社が需要家から徴収し、買取料金の精算は、その全額が電力会社から需要家に支払われる。それぞれの料金算定の際の乗率も異なる。
Also, in the case of a tiered charge system according to the amount of electricity, if the amount of accommodating power from other customers is temporarily stored in the storage battery equipment, the multiplying factor will rise to a stage where the consumers will lose money. Will suffer.
Further, the payment for the purchased power and the payment for the surplus power are set separately and separately. The power company collects the entire amount of the purchased power from the customer, and the power company pays the entire amount of the purchase fee to the customer. The multiplying factor when calculating each charge is also different.

購入電力の乗率は、電気料金プランに応じて、時間帯や電力の使用量に応じて異なり、買取料金の乗率は、購入料金とは別の乗率で買い取られる。これを電力融通街区の需要家へ適用した場合を説明する。例えば、A需要家、B需要家及びC需要家からなる電力融通街区において、順潮流電力よりも逆潮流電力の計量値に乗ずる乗率の方が小さいと次のような問題が発生する。ここで、B需要家が、A需要家が発電した電力を高価な乗率で購入し、一旦蓄電設備に貯めた後に、C需要家へ安価な乗率で販売した場合を考える。すなわち、C需要家は安価な乗率で買い取ることとなり、B需要家は一時的に余分な電気をA需要家から預かっただけで、経済的な損失を被ることとなる。
このように、電力融通街区を成立させるためには、その料金制度の在り方を併せて考える必要がある。
The multiplying factor of the purchased power varies depending on the electricity rate plan, the time of day and the amount of power used, and the multiplying factor of the purchase fee is purchased at a different multiplying factor from the purchasing fee. A case where this is applied to a customer in a power interchange district will be described. For example, in the electric power interchange block including the A customer, the B customer, and the C customer, the following problem occurs when the multiplying factor of the backward flow power is smaller than the forward flow power. Here, consider a case where the B customer purchases the electric power generated by the A customer at an expensive multiplication factor, temporarily stores it in the power storage facility, and then sells it to the C customer at an inexpensive multiplication factor. That is, the C customer purchases at a cheap multiplication factor, and the B customer temporarily suffers an economic loss only by depositing extra electricity from the A customer.
As described above, in order to establish the power interchange district, it is necessary to consider the way of the charge system.

本発明は、このような事情に鑑みてなされたもので、需要家間における電力融通の仕組みが可能である電力データ管理システム、需要家集合体及び電力融通街区を提供することを目的とする。 The present invention has been made in view of such circumstances, and an object of the present invention is to provide a power data management system, a customer group, and a power interchange block that allow a mechanism of power interchange between consumers.

本発明の一態様における電力データ管理システムは、電力系統に接続された複数の需要家の電力の売買における電力データを管理するサーバを備える電力データ管理システムであり、前記複数の需要家の内、少なくとも2以上の需要家に発電設備または需要設備のいずれか、あるいは前記発電設備と前記需要設備とが設置され、前記複数の需要家の少なくとも2以上の需要家が、前記電力系統から受電した順潮流電力のデータと、前記電力系統へ送電した逆潮流電力のデータとの各々のデータに基づき、前記需要家の各々が負担すべき料金を求めるための料金データを算定する際、前記サーバが時間帯により変化しない一定の数値であり、かつ順潮流電力及び逆潮流電力の各々に対して同一の乗率を計量値に乗算した結果に基づき、当該料金データを算定することを特徴とする。 An electric power data management system according to an aspect of the present invention is an electric power data management system that includes a server that manages electric power data in buying and selling of electric power of a plurality of consumers connected to a power system, and among the plurality of consumers, Either the power generation equipment or the demand equipment, or the power generation equipment and the demand equipment are installed in at least two or more customers, and at least two or more of the plurality of customers are in the order of receiving power from the power grid. When calculating the charge data for obtaining the charge to be paid by each of the customers based on the respective data of the power flow data and the data of the reverse flow power transmitted to the power system, the server is required to calculate the time. The charge data is a constant value that does not change depending on the band, and the charge data is calculated based on the result of multiplying the metric value by the same multiplication factor for each of the forward power flow and the reverse power flow .

本発明の一態様における電力データ管理システムは、前記サーバが、前記計量手段で計量された所定の期間における前記順潮流電力の計量値と、前記逆潮流電力の計量値との差分を求め、前記乗率を乗算した結果に基づき、当該所定の期間における前記料金データを算定することを特徴とする。 Power data management system in one embodiment of the present invention, the server obtains the weight value of the forward flow power in a predetermined period of time that is metered by the metering means, the difference between the weight value of the backward flow power, the It is characterized in that the charge data for the predetermined period is calculated based on the result of multiplication by the multiplication factor.

本発明の一態様における電力データ管理システムは、前記サーバが、前記計量手段で計量された所定の期間における前記順潮流電力の計量値と、前記逆潮流電力の計量値との差分を求め、前記乗率を乗算した結果に基づき、当該所定の期間における前記料金データを算定することを特徴とする。 Power data management system in one embodiment of the present invention, the server obtains the weight value of the forward flow power in a predetermined period of time that is metered by the metering means, the difference between the weight value of the backward flow power, the It is characterized in that the charge data for the predetermined period is calculated based on the result of multiplication by the multiplication factor.

本発明の一態様における電力データ管理システムは、前記複数の需要家が、隣接して立地する電力融通街区であり、前記サーバが、外部から前記電力融通街区に供給された街区順潮流電力を計量する街区計量手段で計量された所定の期間における順潮流電力量に基づき、前記電力融通街区における前記需要家の使用電力に応じて支払う費用を算定することを特徴とする。 In the power data management system according to one aspect of the present invention, the plurality of consumers are power interchange blocks located adjacent to each other, and the server measures the block forward power supplied from the outside to the power interchange block. The cost to be paid according to the power used by the customer in the power interchange block is calculated based on the forward power flow amount in a predetermined period measured by the block measurer.

本発明の一態様における需要家集合体は、少なくとも各々が電力系統に接続された複数の需要家で構成され、前記複数の需要家の内、少なくとも一の需要家に任意に制御可能な発電設備または需要設備のいずれか、前記複数の需要家間で、前記電力系統を介して電力を融通する、需要家集合体であって、前記複数の需要家の各々が、所定の期間において計量された順潮流電力のデータと、逆潮流電力のデータとに基づき、需要家が負担すべき電力量の料金を求める料金データを算定する際、サーバが時間帯により変化しない一定の数値であり、かつ順潮流電力及び逆潮流電力の各々に対して同一の乗率を計量値に乗算した結果に基づき、当該料金データを算定することを特徴とする。 The customer set according to one aspect of the present invention includes at least a plurality of customers, each of which is connected to an electric power system, and at least one of the plurality of customers can arbitrarily control the power generation facility. Alternatively, any one of the demand equipment, which is a customer group that exchanges electric power between the plurality of customers via the power system, each of the plurality of customers being measured in a predetermined period . When calculating the charge data for the charge for the amount of power that the customer should bear based on the forward power flow data and the reverse power flow data , the server is a constant value that does not change with time, and It is characterized in that the charge data is calculated based on the result of multiplying the metric value by the same multiplication factor for each of the tidal power and the backward power .

本発明の一態様における需要家集合体は、前記電力系統から受電した順潮流電力を計量する機能と、前記電力系統へ送電した逆潮流電力を計量する機能と、を備えた計量手段を備えることを特徴とする。 The customer aggregate in one aspect of the present invention includes a measuring unit having a function of measuring forward power flow power received from the power system and a function of measuring reverse power flow power transmitted to the power system. Is characterized by.

本発明の一態様における需要家集合体は、算定した需要家が負担すべき電力量の料金を求めるデータに、時間帯により変化しない一定の乗率を乗算した結果をもとに、需要家が負担すべき電力量の料金を求めることを特徴とする。 The customer group in one aspect of the present invention is based on the result of multiplying the calculated data for obtaining the charge for the amount of power to be paid by the customer by a constant multiplication factor that does not change depending on the time zone. The feature is that the charge for the amount of power to be paid is obtained.

本発明の一態様における需要家集合体は、所定の期間における需要家が負担すべき電力量の料金を求めるデータの総和をもとに、前記複数の需要家の使用電力に応じて支払う料金を求める料金データを算定することを特徴とする。 The consumer set according to one aspect of the present invention, based on the sum of data for obtaining the charge of the amount of power that the consumer should bear in a predetermined period, the charge to be paid according to the power consumption of the plurality of consumers. It is characterized by calculating the required charge data.

本発明の一態様における電力融通街区は、上記需要家集合体を構成する複数の需要家が隣接して立地する電力融通街区であり、前記電力融通街区と外部との配電系統の連携点において、所定の期間において計量された前記電力融通街区の順潮流電力の計量値に基づいて、前記複数の需要家の使用電力に応じて支払う料金を求める料金データを算定することを特徴とする。
The power interchange block in one aspect of the present invention is a power interchange block in which a plurality of consumers forming the above-mentioned customer group are located adjacent to each other, and at the cooperation point of the distribution system between the power interchange block and the outside, It is characterized in that the charge data for calculating the charge to be paid according to the power used by the plurality of consumers is calculated based on the measured value of the forward flow power of the power interchange district measured in a predetermined period.

本発明によれば、需要家間における電力融通の仕組みが可能である電力データ管理システム、需要家集合体及び電力融通街区を提供することができる。 According to the present invention, it is possible to provide a power data management system, a customer group, and a power interchange block that allow a mechanism of power interchange between consumers.

第1の実施形態における需要家施設10の構成例を示す図である。It is a figure which shows the structural example of the consumer facility 10 in 1st Embodiment. 第1の実施形態における課金システム20の構成例を示す図である。It is a figure which shows the structural example of the charging system 20 in 1st Embodiment. 割引額テーブルの一例を示す図である。It is a figure which shows an example of a discount amount table. 第2の実施形態における需要家施設10の構成例を示す図である。It is a figure which shows the structural example of the customer facility 10 in 2nd Embodiment. 第2の実施形態における課金システム20aの構成例を示す図である。It is a figure which shows the structural example of the charging system 20a in 2nd Embodiment. 第1の実施形態における課金システム20の構成例を示す図である。It is a figure which shows the structural example of the charging system 20 in 1st Embodiment. 図6に示す課金システム20の動作例を示すフローチャートである。7 is a flowchart showing an operation example of the charging system 20 shown in FIG. 6. 第1の実施形態における課金システム20の他の構成例を示す図である。It is a figure which shows the other structural example of the charging system 20 in 1st Embodiment. 図8に示す課金システム20の動作例を示すフローチャートである。9 is a flowchart showing an operation example of the charging system 20 shown in FIG. 8. 第2の実施形態における課金システム20aおよび蓄電設備11aの構成例を示す図である。It is a figure which shows the structural example of the charging system 20a and the electrical storage equipment 11a in 2nd Embodiment. 図10に示す課金システム20aおよび蓄電設備11aの動作例を示すフローチャートである。11 is a flowchart showing an operation example of the charging system 20a and the power storage equipment 11a shown in FIG. 10. 第2の実施形態における課金システム20aおよび蓄電設備11aの他の構成例を示す図である。It is a figure which shows the other structural example of the charging system 20a and the electrical storage equipment 11a in 2nd Embodiment. 図12に示す課金システム20aおよび蓄電設備11aの動作例を示すフローチャートである。13 is a flowchart showing an operation example of the charging system 20a and the power storage equipment 11a shown in FIG. 12. 第3の実施形態による課金システムが管理する電力融通街区の構成例を示す図である。It is a figure which shows the structural example of the electric power interchange block which the charging system by 3rd Embodiment manages. 第3の実施形態の電力融通街区における電力の販売構造を示す図である。It is a figure which shows the sales structure of the electric power in the electric power interchange block of 3rd Embodiment. 電力融通街区を構成する需要家10の間における電力融通を説明する図である。It is a figure explaining the electric power interchange between the consumers 10 which comprise an electric power interchange block. 第3の実施形態による課金システムが管理する電力融通街区の他の構成例を示す図である。It is a figure which shows the other structural example of the electric power interchange block which the charging system by 3rd Embodiment manages. 第1の実施形態における複数の需要家施設を備える需要家集合体の構成例を説明する概念図である。It is a conceptual diagram explaining the structural example of the customer aggregate provided with the some customer facility in 1st Embodiment. 第1の実施形態における課金システム20の他の構成例を示す図である。It is a figure which shows the other structural example of the charging system 20 in 1st Embodiment. 第2の実施形態の他の例である費用演算システムの構成例としての電力融通街区を示す図である。It is a figure which shows the electric power interchange block as a structural example of the expense calculation system which is another example of 2nd Embodiment. 第2の実施形態の電力融通街区における電力の販売構造を示す図である。It is a figure which shows the sales structure of the electric power in the electric power interchange block of 2nd Embodiment.

<第1の実施形態>
小売電気事業者は、発電事業者から電力を調達し、複数の需要家に販売する。複数の需要家全体の電力消費は日中に多く、夜間に少ないため、30分単位の時間帯別にその電力消費に相当する量の電力を発電事業者から調達する。しかし、小売電気事業者は一日を通して一定の発電量で発電機を運転する方が設備効率は良いため、小売電気事業者は昼夜の電力調達量に差が少ない場合に、安価な値で電力を調達することができる。そこで小売電気事業者は、需要家のうち、蓄電設備を設置している需要家に夜間に商用電力を蓄電してもらい、日中に蓄電した電力を使用してもらうことで負荷平準化を果たしたいというニーズがある。蓄電設備の容量が大きい方が負荷平準化に貢献できることになるので、小売電気事業者は蓄電設備の容量に応じた対価を、電気料金から割引く。
<First Embodiment>
A retail electric power company procures electric power from a power generation company and sells it to a plurality of customers. Since the power consumption of a plurality of consumers as a whole is high during the day and low at night, an amount of power equivalent to the power consumption is procured from the power generation company for each 30-minute time period. However, it is more efficient for retail electric utilities to operate generators with a certain amount of power generation throughout the day. Can be procured. Therefore, the retail electric power company achieves load leveling by having the customers who have installed the electricity storage equipment store the commercial power at night and use the stored power during the day. There is a need to want. Since the larger the capacity of the power storage equipment can contribute to the load leveling, the retail electric power company discounts the consideration according to the capacity of the power storage equipment from the electricity charge.

第1の実施形態を説明するための需要家として、一般住宅の需要家施設を想定する。図1は、第1の実施形態における需要家施設10の構成例を示す図である。
需要家施設10は、蓄電設備11、太陽光発電設備12、分電盤13、負荷14、買電用電力計Mp、売電用電力計Mqを含んで構成される。ここで、買電用電力計Mp及び売電用電力計Mqを、買電用電力の測定機能と売電用電力の測定機能との各々の機能を有する電力計(計量手段)に置き換えても良い。
蓄電設備11は、充電のために入力される電力を蓄積し、また、蓄積した電力を放電して出力する。蓄電設備11の構成に限定はなく、蓄電池であったり、リチウムイオンキャパシタであったり、フライホイールなどであっても良い。
太陽光発電設備12は、再生可能エネルギーである太陽光を利用する発電装置の1つであり、光起電力効果により光エネルギーを電力に変換することにより発電を行う。太陽光発電設備12は、例えば需要家施設10の屋根などのように、太陽光が他の建物に遮蔽されにくい場所に設置されている。これにより、太陽光発電設備12は、発電素子が配置されている面に対し、太陽光が遮蔽されずに照射され、この照射された太陽光を効率的に電力に変換する。
As a consumer for explaining the first embodiment, a consumer facility of a general residence is assumed. FIG. 1 is a diagram illustrating a configuration example of a customer facility 10 according to the first embodiment.
The customer facility 10 is configured to include a power storage facility 11, a solar power generation facility 12, a distribution board 13, a load 14, a power purchase power meter Mp, and a power sale power meter Mq. Here, even if the power purchase power meter Mp and the power sale power meter Mq are replaced with a power meter (measuring means) having a function of measuring power for power purchase and a function of measuring power for power sale, respectively. good.
The power storage facility 11 stores electric power input for charging, and discharges and outputs the stored electric power. The configuration of the electricity storage facility 11 is not limited, and may be a storage battery, a lithium ion capacitor, a flywheel, or the like.
The solar power generation facility 12 is one of power generation devices that use sunlight, which is a renewable energy, and generates power by converting light energy into electric power by the photovoltaic effect. The solar power generation facility 12 is installed in a place where sunlight is hard to be shielded by other buildings, such as the roof of the customer facility 10. As a result, the solar power generation facility 12 irradiates the surface on which the power generation element is arranged with the sunlight without being shielded, and efficiently converts the radiated sunlight into electric power.

分電盤13は、電力経路を分岐し、蓄電設備、電力系統、太陽光発電設備、宅内負荷等を電気的に接続する。ここで、電力系統は、配送電事業者の系統設備である商用系統及び後述する需要家集合体の各々が接続されるスマートコミュニティにおける自営線の各々を含む。
分電盤13は、需要家施設10において、電力経路を分岐し、外部から供給される商用電力を負荷14に供給するように、電力系統と負荷14とを電気的に接続する。
また、分電盤13は、需要家施設10において、電力経路を分岐し、太陽光発電設備12により発生された電力を負荷14に供給するように、太陽光発電設備12と負荷14とを電気的に接続する。
また、分電盤13は、需要家施設10において、電力経路を分岐し、電力系統と太陽光発電設備12の一方または両方から供給される電力を蓄電設備11に充電するように、電力系統と太陽光発電設備12との一方または両方と蓄電設備11とを電気的に接続する。
また、分電盤13は、需要家施設10において、電力経路を分岐し、蓄電設備11から放電により出力させた電力を、負荷14に供給するように、蓄電設備11と負荷14とを電気的に接続する。
さらに、分電盤13は、需要家施設10において、電力経路を分岐し、太陽光発電設備12により発生された電力を、例えば商用電力の電力系統を経由して、他の需要家施設10における蓄電設備11に対して供給するように、太陽光発電設備12と他の需要家施設10における蓄電設備11とを電気的に接続する。
また、分電盤13は、需要家施設10において、電力経路を分岐し、蓄電設備11の放電により出力される電力を、他の需要家施設10における負荷14に供給するように、蓄電設備11と他の需要家施設10における負荷14とを電気的に接続する。
The distribution board 13 branches an electric power path and electrically connects a power storage facility, a power system, a solar power generation facility, a home load, and the like. Here, the electric power system includes each of the commercial system which is the system equipment of the distribution electric power company and each of the self-employed lines in the smart community to which each of the customer aggregates described later is connected.
The distribution board 13 branches the power path in the customer facility 10 and electrically connects the power system and the load 14 so as to supply the commercial power supplied from the outside to the load 14.
In addition, the distribution board 13 electrically connects the solar power generation facility 12 and the load 14 to each other so as to branch the power path and supply the power generated by the solar power generation facility 12 to the load 14 in the customer facility 10. Connect to each other.
Further, the distribution board 13 is connected to the power system so as to branch the power path in the customer facility 10 and charge the power storage facility 11 with the power supplied from one or both of the power system and the solar power generation facility 12. One or both of the solar power generation facility 12 and the power storage facility 11 are electrically connected.
In addition, the distribution board 13 electrically connects the power storage equipment 11 and the load 14 so as to supply the electric power output from the power storage equipment 11 by discharging in the customer facility 10 to the load 14. Connect to.
Furthermore, the distribution board 13 branches the electric power path in the customer facility 10, and the electric power generated by the solar power generation facility 12 is supplied to the other customer facility 10 via, for example, a commercial electric power system. The solar power generation facility 12 and the power storage facility 11 in another consumer facility 10 are electrically connected so as to supply the power storage facility 11.
Further, the distribution board 13 branches the power path in the customer facility 10, and supplies the power output by the discharge of the power storage equipment 11 to the load 14 in the other customer facility 10, so that the power storage equipment 11 can be supplied. And a load 14 in another consumer facility 10 are electrically connected.

負荷14は、需要家施設10において自己が動作するために電力を消費する機器(需要設備)や設備などが一つ以上含まれて構成されている。
買電用電力計Mpは、購入した商用電力の量を計量する。
売電用電力計Mqは、太陽光発電設備12により発生された電力(太陽光発電電力)のうち、宅内の負荷14の電力消費を補った上で余剰分として発生する余剰電力の量を計量する。
The load 14 is configured to include at least one device (demand facility) or facility that consumes electric power to operate itself in the customer facility 10.
The power purchase power meter Mp measures the amount of purchased commercial power.
The power-selling power meter Mq measures the amount of surplus power generated as surplus after supplementing the power consumption of the load 14 in the house among the power generated by the solar power generation facility 12 (photovoltaic power). To do.

図2は、第1の実施形態における課金システム20の構成例を示す図である。
課金システム20は、演算部21、検針値受信部22、メモリ23を含んで構成される。
また、演算部21は、電気料金算出部211、割引額算出部212、請求額算出部213を含んで構成される。
需要家施設10における買電用電力計Mpでの計量値(検針値P)と、売電用電力計Mqでの計量値(検針値Q)とは、送配電事業者により検針され、その確定値が月ごとにインターネット回線を介して小売電気事業者の課金システム20にデータ送信される。検針値受信部22は、検針値Pと、検針値Qとを受信し、電気料金算出部211に出力する。
小売電気事業者は自らが電気を供給する複数の需要家の検針データを受信し、課金システム20の電気料金算出部211において、予め決められた計算方法に従い電気料金を算出する。電気料金算出部211が算出する電気料金は、需要家が購入した電力の買電料金と、売電した売電料金に大別される。
FIG. 2 is a diagram showing a configuration example of the charging system 20 in the first embodiment.
The billing system 20 includes a calculation unit 21, a meter reading value reception unit 22, and a memory 23.
In addition, the calculation unit 21 includes an electricity charge calculation unit 211, a discount amount calculation unit 212, and a bill amount calculation unit 213.
The measured value (meter reading value P) of the electricity purchase power meter Mp and the measured value (meter reading value Q) of the power sale power meter Mq in the customer facility 10 are meter-read by the power transmission and distribution company, and their confirmation is confirmed. The value is transmitted monthly to the charging system 20 of the retail electric power company via the Internet. The meter reading value receiving unit 22 receives the meter reading value P and the meter reading value Q, and outputs the meter reading value P to the electricity charge calculation unit 211.
The retail electric power company receives the meter-reading data of a plurality of consumers who supply electricity by itself, and the electricity charge calculation unit 211 of the charging system 20 calculates the electricity charge according to a predetermined calculation method. The electricity charges calculated by the electricity charge calculation unit 211 are roughly classified into a power purchase charge of the power purchased by the consumer and a power sale charge of the power sold.

また、課金システム20には、予め需要家ごとにその需要家に設置されている蓄電設備11の非常時電力量と蓄電可能量が登録されサーバーのメモリ23に記憶されている。ここでは、オペレータが課金システム20に手入力することを想定している。オペレータは、需要家との契約時に、契約者氏名、連絡先、非常時電力量、蓄電可能量等の契約情報をメモリ23に入力する。メモリ23は、非常時電力量が登録される第1の記憶部231と、蓄電可能量が登録される第2の記憶部232と、から構成される。 Further, in the charging system 20, the emergency power amount and the storable amount of the electricity storage equipment 11 installed in each customer in advance are registered and stored in the memory 23 of the server. Here, it is assumed that the operator manually inputs the billing system 20. The operator inputs contract information such as the contractor name, contact information, emergency power amount, and storable amount into the memory 23 at the time of contract with the consumer. The memory 23 is composed of a first storage unit 231 in which the amount of emergency power is registered and a second storage unit 232 in which the chargeable amount is registered.

ここで、「非常時電力量」とは、需要家が非常時即ち商用電力系統の停電時のために最低保有しておきたい電力量であって、蓄電設備11に設定する電力量である。
家庭用の蓄電設備11には、非常時即ち停電時に備え、確保しておく電力量を設定できるものがある。常時は設定された電力量を残して放電され蓄電した電力が使われる。非常時には設定された電力量も使われる。これにより、需要家は、いざ停電した際、最低でも設定しておいた「非常時電力量」を使用することができる。
なお、需要家による設定値変更の際には、小売電気事業者に連絡をするか、或いは小売電気事業者によるパスワード入力など立会いの下でしか、「非常時電力量」を変更できない仕組みが蓄電設備11に備わっていることが望ましい。
Here, the “emergency power amount” is the power amount that the customer wants to have at least for an emergency, that is, in the event of a power failure of the commercial power system, and is the power amount set in the power storage facility 11.
Some household electric storage facilities 11 can set the amount of electric power to be reserved for an emergency, that is, in the event of a power failure. The power that is discharged and stored with the set amount of power is normally used. In an emergency, the set electric energy is also used. This allows the customer to use at least the set "emergency power amount" in the event of a power failure.
It should be noted that when changing the set value by the customer, the mechanism to change the "emergency energy" can be stored only by contacting the retail electric power company or by witnessing the password input by the retail electric power company. It is desirable that the facility 11 be equipped.

また、「蓄電可能量」とは、蓄電設備11に蓄えておける電力で、非常時電力量を含む。
「蓄電可能量」をメモリ23へ記憶させるに当たり、オペレータが手入力で課金システム20を入力することが上述のように考えられるが、この手法には限定されない。
なぜなら、「蓄電可能量」は、蓄電設備11の型式によるメーカーの定格値(カタログ値)でも良いし、充放電効率を勘案し差し引いて設定しても良い。また、将来、経年劣化によって容量が減ってきた場合を勘案し、ある一定期間、例えば10年間に劣化すると考えられる容量の平均をとって「蓄電可能量」とすることなどが考えられる。
このように、「蓄電可能量」は製品の型式で決まるため、課金システム20内に、製品の型式と「蓄電可能量」とを紐付けるテーブルを設け、型式番号を入力することで型式番号を「蓄電可能量」に置き換えて割引額を算出することが考えられる。
In addition, the “storable amount” is electric power that can be stored in the electric storage facility 11, and includes an emergency electric power amount.
It is conceivable that the operator manually inputs the charging system 20 to store the “storable amount” in the memory 23 as described above, but the method is not limited to this.
This is because the “storable amount” may be the manufacturer's rated value (catalog value) according to the model of the power storage facility 11, or may be set by subtracting it in consideration of charge/discharge efficiency. In addition, in consideration of the case where the capacity decreases due to deterioration over time in the future, it is possible to take the average of the capacity that is considered to deteriorate over a certain period of time, for example, 10 years, to obtain the “storable amount”.
In this way, since the "storable amount" is determined by the product type, a table is provided in the charging system 20 for associating the product type with the "storable amount", and the model number is entered by entering the model number. It is possible to calculate the discount amount by replacing it with the “storable amount”.

また、「常時蓄電可能量」とは、「蓄電可能量」から「非常時電力量」を減算した電力量であり、実際に負荷平準化に寄与する蓄電設備の電力量である。なお、「非常時電力量」が0の場合、「蓄電可能量」は「常時蓄電可能量」と同一となる。 Further, the "constant chargeable amount" is the power amount obtained by subtracting the "emergency power amount" from the "chargeable amount", and is the power amount of the power storage facility that actually contributes to load leveling. When the "emergency power amount" is 0, the "chargeable amount" is the same as the "always chargeable amount".

割引額算出部212は、予め設定した割引額テーブルを参照し、「常時蓄電可能量」に対応する割引額を算出する。図3は、割引額テーブルの一例を示す図である。
請求額算出部213は、電気料金算出部211が算出した買電料金、売電料金と、割引額算出部212が算出した割引額と、に基づく請求費用を算出する。
The discount amount calculation unit 212 refers to a preset discount amount table, and calculates the discount amount corresponding to the “always-storable amount”. FIG. 3 is a diagram showing an example of the discount amount table.
The billing amount calculation unit 213 calculates a billing cost based on the power purchase charge and the power sale charge calculated by the electricity charge calculation unit 211 and the discount amount calculated by the discount amount calculation unit 212.

本実施形態では、蓄電可能量を10kWhとし、非常時電力量を4kWhとする。非常時電力量を4kWhとすると、蓄電設備11は、常に4kWhを蓄電しておき、放電する際も4kWhを残して放電を停止する。すると、実際に負荷平準化に寄与する常時蓄電可能量は、蓄電可能量10kWhから非常時電力量4kWhを減算した6kWhとなる。
課金システム20の演算部21では、前述の買電料金や売電料金を電気料金算出部211が計算するほか、需要家の蓄電設備11の設置の対価としての割引額を割引額算出部212が計算する。
割引額算出部212が実行する計算過程として、まず、蓄電可能量10kWhから非常時電力量4kWhを減算し、常時蓄電可能量6kWhを算出する。次に、割引額算出部212は、予め設定した割引額テーブル(図3)に従って、割引額を決定する。図3に示す割引額テーブルによれば、常時蓄電可能量6kWhの場合、割引額は1,000[円/月]と算定される。
請求額算出部213は、前述の買電料金からこの割引額を差引き、燃料調整費等の全需要家に負担の義務がある費用を加算して、需要家に請求する。請求書には蓄電設備11の設置による割引額が分かるよう明示するのが望ましい。
In this embodiment, the chargeable amount is 10 kWh and the emergency power amount is 4 kWh. When the emergency power amount is 4 kWh, the power storage facility 11 always stores 4 kWh, and when discharging, leaves 4 kWh and stops discharging. Then, the constant chargeable amount that actually contributes to the load leveling is 6 kWh obtained by subtracting the emergency power amount 4 kWh from the chargeable amount 10 kWh.
In the calculation unit 21 of the charging system 20, the electricity charge calculation unit 211 calculates the above-mentioned power purchase charge and power sale charge, and the discount amount calculation unit 212 calculates the discount amount as the consideration for the installation of the power storage equipment 11 by the customer. calculate.
As the calculation process executed by the discount amount calculation unit 212, first, the emergency power amount 4 kWh is subtracted from the chargeable amount 10 kWh to calculate the constant chargeable amount 6 kWh. Next, the discount amount calculation unit 212 determines the discount amount according to a preset discount amount table (FIG. 3). According to the discount amount table shown in FIG. 3, the discount amount is calculated to be 1,000 [yen/month] in the case where the always-storable amount is 6 kWh.
The billing amount calculation unit 213 deducts this discount amount from the above-mentioned power purchase fee, adds a cost such as a fuel adjustment cost, which all customers are obliged to bear, and bills the customer. It is desirable to clearly indicate on the bill so that the discount amount due to the installation of the electricity storage equipment 11 can be known.

また、本実施形態においては、図1に示す需要家施設10の複数により需要家集合体が構成され、この需要家集合体内において、需要家施設10間における電力の融通が電力系統を介して行なわれる。この需要家集合体は、それぞれ隣接した需要家施設10で構成される形態、あるいは異なる地域に散在する需要家施設10の各々により構成される形態、隣接した需要家施設10及び異なる地域に散在する需要家施設10の双方を含んで構成される形態がある。 Further, in the present embodiment, a plurality of the customer facilities 10 shown in FIG. 1 constitutes a customer group, and in this customer group, the power exchange between the customer facilities 10 is performed through the power system. Be done. This customer aggregate is composed of adjacent customer facilities 10, or each of the customer facilities 10 scattered in different areas, adjacent customer facilities 10 and scattered in different areas. There is a form that includes both the consumer facilities 10.

図18は、本実施形態における複数の需要家施設を備える需要家集合体の構成例を説明する概念図である。図18において、需要家集合体500は、異なる地域550A、550B、550C、550D、…の需要家施設10_1、10_2、10_3、10_4、10_5、…(需要家施設10_nと総称する場合もある)を備えている。例えば、地域500Aが北海道、地域550Bが福島県、地域550Cが大阪府、地域550Dが熊本県などに散在している。また、地域550におけるように、隣接した需要家施設10_3及び需要家施設10_4の各々から構成されていても良い。図18における需要家施設10_1、10_2、10_3、10_4、10_5の各々は、図1に示す需要家施設10に対して、モデム制御部17が付加されている。 FIG. 18 is a conceptual diagram illustrating a configuration example of a customer aggregate including a plurality of customer facilities according to this embodiment. In FIG. 18, the customer aggregate 500 includes customer facilities 10_1, 10_2, 10_3, 10_4, 10_5,... (In some cases, collectively referred to as customer facilities 10_n) in different areas 550A, 550B, 550C, 550D,. I have it. For example, region 500A is scattered in Hokkaido, region 550B in Fukushima prefecture, region 550C in Osaka prefecture, region 550D in Kumamoto prefecture, and so on. Further, as in the area 550, each of the adjacent customer facilities 10_3 and 10_4 may be configured. Each of the consumer facilities 10_1, 10_2, 10_3, 10_4, 10_5 in FIG. 18 has a modem control unit 17 added to the consumer facility 10 shown in FIG.

需要家施設10_1、10_2、10_3、10_4、10_5の各々は、このモデム制御部17により、公衆インターネットなどからなるネットワークを介して、小売電気事業者の課金システム20(費用演算システムとも言う)に接続されている。需要家施設10_nの各々における発電設備としては、発電電力量が外部から任意に制御可能であればどのような発電装置でも良く、すでに説明した太陽光発電設備12に代え、例えば燃料電池などを用いても良い。また、需要家施設10_nの各々における需要設備としては、負荷14がすでに説明されているが、需要電力量が外部から任意に制御できるもの、例えば電気温水器、ヒートポンプ式給湯器及び空調設備などが含まれている。 Each of the consumer facilities 10_1, 10_2, 10_3, 10_4, 10_5 is connected to the charging system 20 (also referred to as a cost calculation system) of the retail electric power company by the modem control unit 17 via a network such as the public Internet. Has been done. As the power generation equipment in each of the customer facilities 10 — n, any power generation device may be used as long as the generated power amount can be arbitrarily controlled from the outside. Instead of the solar power generation equipment 12 described above, for example, a fuel cell or the like is used. May be. Further, as the demand equipment in each of the customer facilities 10 — n, the load 14 has already been described, but a demand water quantity that can be arbitrarily controlled from the outside, such as an electric water heater, a heat pump water heater, and an air conditioner, is used. include.

ここで、需要家集合体を構成する需要家施設10_nの各々は、小売電気事業者の課金システム20によって、ネットワークを介して外部から制御を行なうことができる上記発電設備または需要設備のいずれか、あるいは発電設備及び需要設備の双方を備えている。
また、需要家施設10に蓄電池11が設けられている場合、小売電気事業者は、課金システム20により、各需要家施設10_nが備える蓄電池11の放電及び充電を制御することにより、この制御による放電電力量及び受電電力量を用いて、需要家施設10_n毎の発電電力量及び需要電力量それぞれの調整行なう。
なお、需要家集合体500には、構成する需要家施設群の中に、買電用電力計Mp及び売電用電力計Mqが設けられていない需要家施設が含まれていても良いが、少なくとも2つ以上の需要家施設が、買電用電力計Mp及び売電用電力計Mqが設けられた需要家施設10_nである必要がある。
Here, each of the customer facilities 10_n forming the customer group is either the power generation facility or the demand facility that can be externally controlled via the network by the charging system 20 of the retail electric power company, Alternatively, it has both power generation equipment and demand equipment.
Further, when the customer facility 10 is provided with the storage battery 11, the retail electric power company controls the discharging and charging of the storage battery 11 included in each customer facility 10_n by the charging system 20, thereby performing the discharge by this control. Using the electric power amount and the received electric power amount, the generated electric power amount and the demand electric power amount for each consumer facility 10_n are adjusted.
In addition, the customer group 500 may include a customer facility in which the power purchasing power meter Mp and the power selling power meter Mq are not provided in the constituent customer facility group. At least two or more customer facilities need to be the customer facilities 10_n provided with the power purchasing power meter Mp and the power selling power meter Mq.

図19は、第1の実施形態における課金システム20の他の構成例を示す図である。図19aは、図19において、小売電気事業者の課金システム20が需要家施設各々の電力量に対して支払うべき料金を算出している。また、後述する(図19(b)の説明における)ように、電気料金算出部21aは、支払額を求めるパラメータとしては、検針値P及び検針値Qの各々の差分ではなく、各需要家が支払うべき電力量の料金を求めるための料金データを用いて、各需要家の支払額を算出するように構成しても良い。課金システム20は、検針値受信部22、電気料金算出部21a(費用演算システムとも言う)、送受信部25及び電力管理部26の各々を備えている。検針値受信部22は、すでに説明したように、送配電事業者から供給される買電用電力計Mpの検量値である検針値Pと売電用電力計Mqの検量値である検針値Qとを、ネットワークを介して受信する。
電気料金算出部21aは、検針値受信部22を介して得た検針値P及び検針値Qの各々の差分を算出する。そして、電気料金算出部22aは、求めた検針値の差分に対して、所定の係数を乗じることにより、各需要家施設10_nの各々が使用した電力に応じて支払う支払額を算出する。
FIG. 19 is a diagram showing another configuration example of the charging system 20 in the first embodiment. FIG. 19a calculates the charge to be paid by the charging system 20 of the retail electric power company in FIG. 19 for the power amount of each customer facility. Further, as will be described later (in the description of FIG. 19B), the electricity rate calculation unit 21a determines that each consumer is not the difference between the meter reading value P and the meter reading value Q as a parameter for obtaining the payment amount. You may comprise so that the payment amount of each consumer may be calculated using the charge data for calculating|requiring the charge of the amount of electric power to be paid. The billing system 20 includes a meter reading value reception unit 22, an electricity charge calculation unit 21a (also referred to as a cost calculation system), a transmission/reception unit 25, and a power management unit 26. As described above, the meter reading value receiving unit 22 is a meter reading value P that is a calibration value of the power purchasing power meter Mp and a meter reading value Q that is a calibration value of the power selling power meter Mq supplied from the power transmission and distribution company. And are received via the network.
The electricity charge calculation unit 21a calculates a difference between each of the meter reading value P and the meter reading value Q obtained via the meter reading value receiving unit 22. Then, the electricity charge calculation unit 22a calculates the payment amount to be paid according to the electric power used by each of the customer facilities 10_n by multiplying the calculated difference in the meter reading value by a predetermined coefficient.

また、電気料金算出部22aは、需要家集合体500の全ての需要家施設10_nにおける、送配電事業者から供給される買電用電力計Mpの検量値である検針値Pと売電用電力計Mqの検量値である検針値Qとのそれぞれの総和を算出し、検針値Pの総和から検針値Qの総和を減算し、この減算結果(差分)に基づき、需要家集合体500全体の買電電力(あるいは売電電力)を求める。小売電気業者は、この需要家集合体500全体の買電電力(あるいは売電電力)に対応して、各需要家施設の需要家の支払金額を算定する。
ここで、電気料金算出部22aは、需要家集合体500の需要家施設10_nの各々の買電用電力計Mpの検量値である検針値Pと売電用電力計Mqの検量値である検針値Qとの差分を求め、需要家集合体500における全ての需要家施設10_nの差分の総和を求め、需要家集合体500全体の買電電力(あるいは売電電力)を算定する構成としても良い。
In addition, the electricity price calculation unit 22a, in all the customer facilities 10_n of the customer group 500, the meter reading value P that is the calibration value of the power purchase power meter Mp supplied from the power transmission and distribution company and the power sale power. The sum total of the meter reading values Q, which are the calibration values of the total Mq, is calculated, and the sum total of the meter reading values Q is subtracted from the sum total of the meter reading values P. Based on the subtraction result (difference), the entire customer aggregate 500 is calculated. Ask for purchased power (or sold power). The retail electric power supplier calculates the payment amount of the customer of each customer facility corresponding to the purchased power (or the sold power) of the entire customer group 500.
Here, the electricity price calculation unit 22a is a meter reading value P that is a calibration value of the power purchase power meter Mp and a meter reading value that is a calibration value of the power sale power meter Mq of each of the customer facilities 10_n of the customer group 500. The configuration may be such that the difference from the value Q is calculated, the sum of the differences of all the customer facilities 10_n in the customer group 500 is calculated, and the purchased power (or the sold power) of the entire customer group 500 is calculated. ..

上述した費用演算処理サーバ521による計算において、買電電力計Mpが順潮流された電力の計量値である検針値Pを示し、売電電力計Mqが逆潮流された電力の計量値である検針値Qを示している。このため、小売電気事業者は、これらの所定の期間(例えば、一ヶ月間)における差分の積算値に基づいて、需要家施設集合体の枠組みのなかで、需要家施設10_nの各々の需要家が負担すべき電力量の支払額が、費用演算システム520により求められる。また、需要家集合体500において商用配電の電力系統ではなく、自営線を施設する場合には、需要家自身が自信の費用で買電用電力計Mp及び売電用電力計Mqの各々を、需要家施設10_nに設ける。 In the calculation by the cost calculation processing server 521 described above, the purchased power meter Mp indicates the meter reading value P that is the measured value of the forward-flowed power, and the sold power meter Mq is the measured value of the reverse-flowed power. The value Q is shown. Therefore, the retail electric power company, based on the integrated value of the differences in these predetermined periods (for example, one month), in the framework of the customer facility aggregate, each of the customer facilities 10_n The cost calculation system 520 determines the amount of power to be paid by the user. Moreover, when the customer group 500 installs a self-employed line instead of a commercial power distribution system, the customer himself/herself purchases each of the power purchasing power meter Mp and the power selling power meter Mq at a confidence cost. It is provided in the customer facility 10_n.

上述したように、電気料金算出部21aは、需要家施設10_nの各々の買電用電力計Mp及び売電用電力計Mqそれぞれから、所定の期間が経過する毎に供給される順潮流された電力の検針値P及び逆潮流された電力の検針値Qの各々により、需要家施設10_nそれぞれの需要家が負担すべき電力量の料金を算定する。 As described above, the electricity charge calculation unit 21a is forward-flowed from each of the power purchasing power meter Mp and the power selling power meter Mq of each of the customer facilities 10_n, each time a predetermined period elapses. Each of the meter-reading value P of the electric power and the meter-reading value Q of the reversely flown power calculates the charge of the amount of electric power that each customer of the customer facility 10_n should bear.

送受信部25は、需要家集合体500における需要家施設10_nの各々から、太陽光発電設備12の発電量、蓄電値11の蓄電電力量及び負荷14の消費電力量それぞれを、ネットワークを介して入力する。
電力管理部26は、送受信部25を介して得た需要家施設10_nの各々の発電量、蓄電電力量及び消費電力量それぞれに基づき、需要家集合体500における融通できる電力量を増加させるように、各需要家施設10_nにおける発電量、蓄電電力量及び消費電力量を制御し、需要家集合体500全体の発電量、蓄電電力量及び消費電力量の調整、または需要家施設10_n間における電力の融通を行なう。
The transmission/reception unit 25 inputs the power generation amount of the photovoltaic power generation facility 12, the stored power amount of the stored value 11 and the consumed power amount of the load 14 from each of the customer facilities 10_n in the customer group 500 via the network. To do.
The power management unit 26 increases the interchangeable amount of power in the customer group 500 based on each of the power generation amount, the stored power amount, and the power consumption amount of each of the customer facilities 10_n obtained via the transmission/reception unit 25. , The power generation amount, the stored power amount, and the power consumption amount in each customer facility 10_n are controlled to adjust the power generation amount, the stored power amount and the power consumption amount of the entire customer group 500, or the power between the customer facility 10_n. Make an accommodation.

ここで、ある需要家施設10_1が、電力系統を介して他の複数の需要家施設10_2から10_dに対し、太陽光発電設備12の発電電力あるいは蓄電池11からの放電電力を供給して電力の融通を行う場合がある。この場合において、電気料金算出部21aは、需要家施設10_1に対する電力量の支払額を、需要家施設10_1における買電用電力計Mpの検量値である検針値Pと売電用電力計Mqの検量値である検針値Qと、他の複数の需要家施設10_2から10_dの各々に対して融通した合計の電力量(見なし供給電力量)とに基づいて算定する。 Here, a certain customer facility 10_1 supplies the generated power of the photovoltaic power generation facility 12 or the discharge power from the storage battery 11 to a plurality of other customer facilities 10_2 to 10_d through the power system to exchange power. May be done. In this case, the electricity charge calculation unit 21a calculates the payment amount of the amount of electric power for the customer facility 10_1 by using the meter reading value P, which is the calibration value of the power purchase power meter Mp in the customer facility 10_1, and the power sale power meter Mq. It is calculated based on the meter reading value Q which is a calibration value and the total amount of power (deemed power supply amount) that is accommodated to each of the other plurality of customer facilities 10_2 to 10_d.

一方、ある需要家施設10_1が、電力系統を介して他の複数の需要家施設10_2〜10_dより、太陽光発電設備12の発電電力あるいは蓄電池11からの放電電力を供給されて電力の融通を受ける場合がある。この場合において、電気料金算出部21aは、需要家施設10_1が負担すべき電力量の支払額を、需要家施設10_1における買電用電力計Mpの検量値である検針値Pと売電用電力計Mqの検量値である検針値Qと、他の複数の需要家施設10_2から10_dの各々から融通された合計の電力量(見なし受給電力量)とに基づいて算定する。 On the other hand, a certain customer facility 10_1 is supplied with power generated by the photovoltaic power generation facility 12 or discharge power from the storage battery 11 from a plurality of other customer facilities 10_2 to 10_d via the power system to receive power interchange. There are cases. In this case, the electricity rate calculation unit 21a determines the payment amount of the amount of electric power that the customer facility 10_1 should bear, the meter reading value P that is the calibration value of the power purchase power meter Mp in the customer facility 10_1, and the power sale power. Calculation is performed based on the meter reading value Q that is the calibration value of the total Mq and the total amount of power (deemed received power amount) that is accommodated from each of the other plurality of customer facilities 10_2 to 10_d.

また、ある需要家施設10_1が、電力系統を介して他の複数の需要家施設10_2〜10_dより、太陽光発電設備12の発電電力あるいは蓄電池11の放電電力を供給されて電力の融通を受け、かつ他の複数の需要家施設10_k〜10_mに対して、太陽光発電設備12の発電電力あるいは蓄電池11の放電電力を供給して電力の融通を行なう場合がある。この場合において、電気料金算出部21aは、需要家施設10_1に対する電力量の支払額あるいは負担すべき支払額を、需要家施設10_1における買電用電力計Mpの検量値である検針値Pと売電用電力計Mqの検量値である検針値Qと、他の複数の需要家施設10_2から10_dの各々から融通された合計の電力量(見なし受給電力量)と、他の複数の需要家施設10_k〜10_mの各々に対して融通した合計の電力量(見なし供給電力量)とに基づいてに基づいて算定する。 In addition, a certain customer facility 10_1 is supplied with the generated power of the solar power generation facility 12 or the discharge power of the storage battery 11 from a plurality of other consumer facilities 10_2 to 10_d via the power system to receive the power interchange, In addition, power may be exchanged by supplying the generated power of the solar power generation facility 12 or the discharged power of the storage battery 11 to a plurality of other customer facilities 10_k to 10_m. In this case, the electricity price calculation unit 21a sells the payment amount or the payment amount to be paid for the electricity amount to the customer facility 10_1 and the meter reading value P that is the calibration value of the electricity purchase meter Mp in the customer facility 10_1 and the sales amount. A meter reading value Q that is a calibration value of the electric power meter Mq, a total amount of power (deemed received power amount) that is accommodated from each of the other plurality of customer facilities 10_2 to 10_d, and a plurality of other customer facilities Based on the total amount of electric power (deemed electric power supply) that has been accommodated for each of 10_k to 10_m.

ここで、電気料金算出部21aは、上述した見なし受給電力量を、逆潮流電力の単価(後述する電力の単価)と順潮流電力の単価との各々を元に、順潮流電力量が最小となるように、すなわち見なし需要電力量(需要家集合体500における需要家施設10_n間において融通される電力量)が最大となるように算出する。
すなわち、電気料金算出部21aは、買電用電力計Mpの検量値である検針値Pと売電用電力計Mqの検量値である検針値Qとにより差分が求められる所定の期間において、上記見なし供給電力量を、逆潮流電力の単価(例えば、太陽光発電設備12より発電された電力や夜間電力などの順潮流電力の単価が安い時間帯に蓄電池11に充電された電力の単価を用いる)と、見なし供給電力を供給する際における順潮流電力の単価との差分を元に求める。
Here, the electricity price calculation unit 21a determines that the above-mentioned deemed received power amount is the minimum forward power flow amount based on each of the unit price of reverse power flow power (unit price of power described later) and the unit price of forward power flow power. That is, it is calculated so that the deemed demand power amount (the power amount exchanged between the customer facilities 10_n in the customer group 500) is maximized.
That is, the electricity price calculation unit 21a is configured to perform the above-described operation in a predetermined period in which a difference is obtained from the meter reading value P that is the calibration value of the power purchase power meter Mp and the meter reading value Q that is the calibration value of the power sale power meter Mq. Assuming the supplied power amount, the unit price of the reverse flow power (for example, the unit price of the power charged to the storage battery 11 during the time when the unit price of the forward power such as the power generated by the solar power generation facility 12 and the night power is low is used. ) And the unit price of the forward flow power when the deemed supply power is supplied.

上述した逆潮流電力の単価は、現在の順潮流電力に対応する現在の逆潮流電力の単価よりも単価が安い電力、すなわち、見なし供給電力を供給する際(現在)の順潮流電力の単価に比較して、より単価が安い時間(例えば、上述した夜間電力の利用)の順潮流電力、あるいは太陽光発電設備12の発電電力を蓄電池11に対して蓄電した蓄電電力の単価である。これにより、需要家施設10_nの各々が負担する単位時間あたりの電力量の支払額が最小と成るように算定される。 The unit price of the reverse flow power described above is lower than the unit price of the current reverse flow power that corresponds to the current forward flow power, that is, the unit price of the forward flow power when the deemed supply power is (current) supplied. By comparison, the unit price is the forward flow power during a time when the unit price is lower (for example, the use of nighttime power described above) or the unit price of the stored power in which the generated power of the photovoltaic power generation facility 12 is stored in the storage battery 11. As a result, the payment of the amount of electric power per unit time that each of the customer facilities 10_n bears is calculated to be the minimum.

すなわち、小売電気事業者は、需要家集合体500を構成する需要家施設10の各々の発電設備(太陽光発電設備12)、需要設備(負荷14)及び蓄電設備(蓄電池11)のそれぞれを電力管理部26で制御することにより、需要家集合体500における需要家施設10_n間における融通される電力量(見なし供給電力量、見なし受給電力量)を任意に制御する。例えば、ある需要家施設の発電設備で発電した発電電力が、負荷14の消費電力量を上回っている場合に蓄電設備に一旦充電して蓄積しておき、自身あるいは他の需要家施設において電力の需要が発生した際、この需要家施設の蓄電値11を制御し、自身あるいは他の需要家施設に対して供給あるいは融通する電力を放電させ、需要家集合体500内における電力供給の自立を行なうことができる。 That is, the retail electric power company supplies power to each of the power generation equipment (photovoltaic power generation equipment 12), the demand equipment (load 14), and the power storage equipment (storage battery 11) of the customer facilities 10 constituting the customer aggregate 500. By the control by the management unit 26, the amount of power exchanged between the customer facilities 10_n in the customer aggregate 500 (deemed power supply amount, deemed received power amount) is arbitrarily controlled. For example, when the generated power generated by the power generation facility of a certain customer facility exceeds the power consumption of the load 14, the power storage facility is once charged and accumulated, and the power is stored in itself or another consumer facility. When a demand occurs, the electricity storage value 11 of this customer facility is controlled to discharge the electric power supplied to or supplied from the customer facility or other customer facilities, thereby making the power supply in the customer group 500 independent. be able to.

また、電力管理部20は、需要家集合体50における消費電力量が増加した際、各需要家施設10_nの太陽光発電設備12を制御して発電量を増加させたり、太陽光発電設備12の発電量では消費電力量を充足できない場合、各需要家施設10_nの負荷14を制御して消費電力量を低下させる。
この結果、小売電気事業者は、需要家集合体500における発電量、蓄電電力量及び消費電力の各々を制御することにより、需要家集合体500全体においてこの需要家集合体500の外部の発電事業者から調達する電力量を低減させることができ、発電事業者から電力を調達して複数の需要家に販売する電力量を減らす自立が促進されて、需要家施設10_nの各々の需要家から、それぞれ徴収する電力量の料金を安価に設定することができる。
In addition, the power management unit 20 controls the solar power generation facility 12 of each customer facility 10_n to increase the power generation amount when the power consumption amount in the customer aggregate 50 increases, or the solar power generation facility 12 operates. When the power generation amount cannot satisfy the power consumption amount, the load 14 of each consumer facility 10_n is controlled to reduce the power consumption amount.
As a result, the retail electric power company controls each of the power generation amount, the stored power amount, and the power consumption in the customer group 500 to generate a power generation business outside the customer group 500 in the entire customer group 500. It is possible to reduce the amount of electric power to be procured from a consumer, and to promote self-reliance to reduce the amount of electric power to be procured from a power generation company and sold to a plurality of consumers, from each consumer of the consumer facility 10_n, It is possible to set a low price for the amount of electricity collected.

なお、本実施形態においては、順潮流電力量の計量値と逆潮流電力量の計量値との差分により、各需要家の各々が支払うべき電力量の料金を求める構成とした。しかしながら、各需要家が支払うべき電力量の料金を求めるためのデータである料金データとして、需要家の各々における順潮流電力量、逆潮流電力量、時間帯別電力量などのデータ、需要家が使用した電力量の時間帯別単価を演算して積分した金額(電気料金そのもの)、あるいはこの金額をポイントなどのインセンティブな数値に換算したデータを用いて、各需要家が支払うべき電力量の料金を求める構成としても良い。この、料金データは、電力系統から受電した順潮流電力のデータ(買電用電力計Mpの検量値である検針値P)と、前記電力系統へ送電した逆潮流電力のデータ(売電用電力計Mqの検量値である検針値Q)との各々のデータに基づいて、電気料金算出部21aにおいて算出される。
また、すでに述べたように、上述した各需要家の支払う電力料の料金を求めるためのデータは、順潮流電力のデータと逆潮流電力のデータの両方からなるデータ、または順潮流電力のデータと逆潮流電力のデータの差分のデータであっても良い。
In the present embodiment, the charge of the amount of electric power to be paid by each customer is calculated based on the difference between the measured value of the forward flow electric power and the measured value of the reverse flow electric power. However, as the charge data, which is the data for obtaining the charge of the amount of power that each consumer should pay, the data such as the forward power flow amount, the reverse power flow amount, and the hourly power amount for each customer Charges of the amount of electricity that each customer should pay, using the amount of electricity (the electricity rate itself) obtained by calculating and integrating the unit price of the amount of electricity used for each time period, or by converting this amount into an incentive value such as points The configuration may be such that The charge data is data of forward flow power received from the power system (a meter reading value P which is a calibration value of the power meter Mp for purchase) and data of reverse flow power transmitted to the power system (power selling power). It is calculated in the electricity charge calculation unit 21a based on each data of the meter reading value Q) which is the calibration value of the total Mq.
Further, as described above, the data for obtaining the above-mentioned electricity charges to be paid by each consumer is the data composed of both the forward power flow data and the reverse power flow data, or the forward power data. It may be data of the difference between the reverse flow power data.

次に、図19(b)は、電力量の料金の徴収を、課金の処理の代行を行なう他の業者、機関(料金徴収代行業者)に依頼する際の構成を示している。データ算出サーバ20bが小売電気事業者の有するサーバであり、課金処理サーバ600が料金徴収代行業者の有するサーバである。
すなわち、上記料金徴収代行業者は、銀行、信用金庫などの金融機関、あるいはクレジットカード会社などの公共料金を含む各種料金の徴収を行なう事業者である。これらの料金徴収代行業者は、図19(a)の電気料金算出部21aにおける料金データから電気料金を算出する機能を有する課金処理サーバ600を備え、小売電気事業者に代わり、電力量に応じて各需要家が支払うべき料金の算出を行ない、算出した料金を各需要家から徴収する処理を行なう。そして、料金データ算出部21bが、上述した需要家が支払うべき電力料の料金を求めるための料金データを算出し、算出した料金データを、料金を徴収する機関である料金徴収代行業者の有する課金処理サーバ600に、インターネットを含むネットワークを介して送信する。ここで、料金データは、電力系統から受電した順潮流電力のデータ(買電用電力計Mpの検量値である検針値P)と、前記電力系統へ送電した逆潮流電力のデータ(売電用電力計Mqの検量値である検針値Q)との各々のデータに基づいて、料金データ算出部21bにおいて算出される。そして、小売電気事業者ではなくこの料金徴収代行業者において、上記課金処理サーバ600が、需要家毎の支払うべき電力料金を、電力料の料金を求めるための料金データに基づいて算出し、需要家各々からそれぞれの電力の料金を徴収する構成としても良い。
Next, FIG. 19B shows the configuration when requesting the collection of the charge of the electric power amount to another company or an organization (a charge collection agency) that performs the charging process. The data calculation server 20b is a server owned by the retail electric power company, and the billing processing server 600 is a server owned by a fee collection agency.
That is, the charge collection agency is a bank, a credit institution such as a credit union, or a credit card company or the like that collects various charges including public charges. These charge collection agents are provided with a charging processing server 600 having a function of calculating an electric charge from the charge data in the electric charge calculating unit 21a of FIG. 19A, and instead of the retail electric power company, according to the amount of electric power. Each consumer calculates the charge to be paid, and the calculated charge is collected from each consumer. Then, the charge data calculation unit 21b calculates the charge data for obtaining the above-mentioned charge of the electricity charge to be paid by the consumer, and charges the calculated charge data to a charge collecting agency, which is an institution collecting the charge. It is transmitted to the processing server 600 via a network including the Internet. Here, the charge data includes data of forward power flow received from the power system (a meter reading value P which is a calibration value of the power meter Mp for power purchase) and data of reverse power flow transmitted to the power system (for power sale). It is calculated by the charge data calculation unit 21b based on the respective data of the meter reading value Q) which is the calibration value of the power meter Mq. Then, in the charge collection agency, not the retail electric power company, the charging processing server 600 calculates the power charge to be paid for each consumer based on the charge data for obtaining the charge of the power charge, and It may be configured to collect the charge of each power from each.

また、小売電気事業者あるいは料金徴収代行業者が備える課金サーバは、所定の期間における買電用電力計Mpの検針値Pと売電用電力計Mqの検針値Qとの各々のデータに基づき、需要家の各々が負担すべき料金を求めるためのデータを算定し、この算定したデータに基づいて求めた料金を示す支払通知を、需要家の各々に送信する。この支払通知は、請求書、振込依頼書、金融機関の需要家の口座からの料金の引落し通知などである。また、この支払通知は、上記課金サーバに備えられた料金通知手段により通知、例えばメール送信、SNS( social networking service)を利用した通知、あるいは需要家に設けられた料金表示手段の表示画面に表示することで通知しても良い。 In addition, the billing server included in the retail electric power company or the charge collection agency, based on the respective data of the meter reading value P of the power purchase power meter Mp and the meter reading value Q of the power sale power meter Mq in a predetermined period, Data for calculating the charge to be paid by each customer is calculated, and a payment notice showing the calculated charge is transmitted to each customer based on the calculated data. This payment notice is an invoice, a transfer request form, a notice of withdrawal of a charge from a customer's account of a financial institution, or the like. Further, this payment notice is given by the charge notifying means provided in the above billing server, for example, mail transmission, notification using SNS (social networking service), or displayed on the display screen of the charge displaying means provided in the customer. You may notify by doing.

<第2の実施形態>
小売電気事業者は、発電事業者から電力を調達し、複数の需要家に販売する。この調達電力量を減らすことができれば、調達額を減らし、それにより需要家から徴収する電気代を安価に設定することが可能となる。調達電力量を削減する手法として、例えば特開2014−30334に示されたような蓄電設備内部のインバータロスを低減させる技術があり、また、特許第5576218号に示された、地域内需要家群の自然エネルギーによる電力自給率を高める技術などの応用が考えられる。これらはいずれも需要家施設に設置された蓄電設備を外部から制御することで、蓄電設備の損失低減、電力自給率の向上を実現するものである。小売電気事業者が調達電力量を抑えるために、需要家が設置した蓄電設備を外部から制御するニーズはここにある。
この他にも、小売電気事業者や発電事業者によるインバランス調整、送配電事業者による送配電網の負担軽減を目的とした需要家の蓄電設備の活用なども考えられる。
このように、小売電気事業者等が需要家の蓄電池を自らの目的のために制御する場合、需要家への対価の支払いが望まれる。蓄電設備の容量が大きい方が小売電気事業者等の目的に貢献できる割合が大きいので、小売電気事業者は蓄電設備の容量に応じた対価を、電気料金から割引く形で支払う。
<Second Embodiment>
A retail electric power company procures electric power from a power generation company and sells it to a plurality of customers. If this procured power amount can be reduced, the procured amount can be reduced, and thereby the electricity bill collected from the customer can be set at a low cost. As a method for reducing the amount of procured electric power, there is a technique for reducing the inverter loss inside the power storage equipment as shown in JP-A-2014-30334, for example, and there is a domestic customer group shown in Japanese Patent No. 5576218. It is possible to apply technology such as technology to increase the self-sufficiency rate of electricity by natural energy. All of these realize the reduction of the loss of the electricity storage equipment and the improvement of the power self-sufficiency rate by externally controlling the electricity storage equipment installed in the customer facility. This is the need for retail electric power companies to externally control the electricity storage equipment installed by consumers in order to suppress the amount of electricity procured.
In addition to this, it is also possible to adjust imbalances by retail electric power companies and power generation companies, and to use electricity storage equipment of customers for the purpose of reducing the burden on the power transmission and distribution network by power transmission and distribution companies.
Thus, when a retail electric power company or the like controls a storage battery of a customer for his own purpose, it is desired to pay the consideration to the customer. Since the larger the capacity of the power storage equipment is, the greater the contribution to the purpose of the retail electric power company, etc., the retail electric power company pays the price corresponding to the capacity of the power storage equipment in the form of a discount from the electricity rate.

実施例説明のための需要家として、太陽光発電設備、蓄電設備付きの一般住宅を想定する。需要家の蓄電設備には、非常時電力量を任意に設定できる機能が備えられていて、需要家が設定することができる。また、蓄電設備の経時劣化で蓄電可能量が変化するため、定期的に蓄電可能量を推定する機能が備えられている。現在実用化されている推定方法では、蓄電設備に蓄電された電力を一旦全て放電し、満充電状態になるまで充電して、その時に充電できた電力量から蓄電可能量を推定するものがある。
蓄電可能量は、厳密には経年劣化により減少する。蓄電設備のメーカー補償は、例えば、「10年後に蓄電容量50%以上維持」である。蓄電設備をエネルギーマネジメントに使用する場合、どのくらいの容量が使えるかが、蓄電設備の制御計画を立てる上で重要な情報となる。リアルタイムに蓄電池の状態を把握し、現在時点の蓄電池容量を推定する機能の研究・開発がなされており、このような技術を取り込むことで、蓄電可能量を随時更新することができる。蓄電池容量を推定方法で実用化されている方法は、年に一度のメンテナンス運転で、蓄電設備の蓄電電力を全て放電させ、満充電になるまで充電し、その充電電力をもとに推定するものである。
蓄電設備には、需要家が設定した非常時電力量と、推定された蓄電可能量(蓄電可能推定量)を、メモリに記憶する記憶部が設けられている。また、メモリに記憶された非常時電力量と蓄電可能量を外部へ送信する送信部を有する。
As a consumer for explaining the embodiment, a general house equipped with a photovoltaic power generation facility and a power storage facility is assumed. The power storage equipment of the customer has a function of arbitrarily setting the amount of emergency power, which can be set by the customer. Further, since the storable amount changes due to deterioration of the storage facility over time, a function for periodically estimating the storable amount is provided. One of the estimation methods currently in practical use is to temporarily discharge all the electric power stored in the electric storage facility, charge it until it reaches a fully charged state, and estimate the storable amount from the amount of electric power charged at that time. ..
Strictly speaking, the amount of electricity that can be stored decreases with age. The manufacturer's compensation for the electricity storage equipment is, for example, “maintain an electricity storage capacity of 50% or more after 10 years”. When using electricity storage equipment for energy management, how much capacity can be used is important information when making a control plan for electricity storage equipment. Research and development have been conducted on a function of grasping the state of the storage battery in real time and estimating the storage battery capacity at the present time. By incorporating such a technology, the chargeable amount can be updated at any time. The method that has been put into practical use as a method for estimating the storage battery capacity is to perform a maintenance operation once a year to discharge all the stored power in the storage equipment, charge it until it is fully charged, and estimate it based on the charged power. Is.
The power storage facility is provided with a storage unit that stores, in a memory, the emergency power amount set by the customer and the estimated storable amount (estimated storable amount). Further, it has a transmission unit for transmitting the emergency power amount and the storable amount stored in the memory to the outside.

図4は、第2の実施形態における需要家施設10の構成例を示す図である。
需要家施設10は、蓄電設備11a、太陽光発電設備12、分電盤13、負荷14、買電用電力計Mp、売電用電力計Mq、HEMS(Home Energy Management System)15、モデム16を含んで構成される。
HEMS15は、蓄電設備11aのコントローラー機能と、小売電気事業者が保有する外部の電力管理システム30との連携機能を有している。
蓄電設備11aとHEMS15間の通信手段は、例えばMAC層・物理層をIEEE802.11b/g/n、IEEE802.15.4などで行い、通信プロトコルにはECHONET Liteなどが考えられる。
蓄電設備11aとHEMS15間の通信により、蓄電設備11aからHEMS15に非常時電力量と蓄電可能量のデータが送信され、また、HEMS15から蓄電設備11aに蓄電設備11aへの制御指令が送信される。制御指令は、予め取り決められた蓄電設備11aの動作モード、例えば、「定電力充電」、「定電力放電」、「負荷追従放電」、「待機」などが挙げられ、いずれかの制御指令を受信した蓄電設備11aは、取り決められた所定の動作を行う。
モデム16は、公衆インターネット回線を介して、蓄電設備11aと電力管理システム30との間の通信を行うための送受信部である。
なお、蓄電設備11aは、非常時電力量を保存する第1の記憶部101、蓄電可能量(または蓄電可能推定量)を保存する第2の記憶部102、或いは蓄電可能量から非常時電力量を減算した常時蓄電可能量を保存する記憶部100(いずれの記憶部も図4においては不図示である)を有している。
FIG. 4 is a diagram illustrating a configuration example of the customer facility 10 according to the second embodiment.
The customer facility 10 includes a power storage facility 11a, a solar power generation facility 12, a distribution board 13, a load 14, a power meter for power purchase Mp, a power meter for power sale Mq, a HEMS (Home Energy Management System) 15, and a modem 16. It is configured to include.
The HEMS 15 has a controller function of the electricity storage equipment 11a and a cooperation function of an external power management system 30 owned by the retail electric power company.
As a communication means between the power storage equipment 11a and the HEMS 15, for example, the MAC layer/physical layer is IEEE802.11b/g/n, IEEE802.15.4, etc., and the communication protocol may be ECHONET Lite.
By communication between the power storage equipment 11a and the HEMS 15, data of the emergency power amount and the storable capacity are transmitted from the power storage equipment 11a to the HEMS 15, and a control command to the power storage equipment 11a is transmitted from the HEMS 15 to the power storage equipment 11a. The control command includes an operation mode of the electricity storage equipment 11a that has been agreed in advance, such as “constant power charging”, “constant power discharging”, “load following discharge”, and “standby”. The stored electricity storage equipment 11a performs a predetermined operation determined.
The modem 16 is a transmission/reception unit for performing communication between the power storage equipment 11a and the power management system 30 via the public Internet line.
The power storage facility 11a includes a first storage unit 101 that stores the amount of emergency power, a second storage unit 102 that stores the amount of power that can be stored (or an estimated amount of power that can be stored), or an amount of power that can be stored from the power storage unit in an emergency. It has a storage unit 100 (none of the storage units is shown in FIG. 4) that stores the always-storable amount obtained by subtracting.

図5は、第2の実施形態における課金システム20a(あるいはサーバ)の構成例を示す図である。
課金システム20aは、演算部21、検針値受信部22、受信部24を含んで構成される。メモリ23を含まず、受信部24を含む点が、第1の実施形態における課金システム20との相違点である。すなわち、図5は、課金システム20にオペレータが入力するのではなく、蓄電設備11aに常時蓄電可能量等の情報が記憶されていて、通信により自動で課金システム20aに情報が電力管理システム30を介して送られる形態について示している。
また、演算部21は、課金システム20と同様に、電気料金算出部211、割引額算出部212、請求額算出部213を含んで構成される。
FIG. 5 is a diagram showing a configuration example of the charging system 20a (or server) in the second embodiment.
The charging system 20a includes a calculation unit 21, a meter reading value receiving unit 22, and a receiving unit 24. The difference from the charging system 20 in the first embodiment is that the memory 23 is not included and the receiving unit 24 is included. That is, in FIG. 5, the operator does not input the information into the charging system 20, but information such as the amount of power that can be stored at all times is stored in the power storage facility 11a, and the information is automatically transmitted to the charging system 20a by the power management system 30 by communication. It shows the form sent via.
In addition, the calculation unit 21 is configured to include an electricity charge calculation unit 211, a discount amount calculation unit 212, and a billed amount calculation unit 213, similarly to the charging system 20.

電力管理システム30は、情報収集部31、蓄電池制御決定部32、送受信部33、送信部34を含んで構成される。
需要家施設10におけるHEMS15と電力管理システム30との間の通信は、モデム16および公衆インターネット回線を介して行われる。HEMS15からユーザーID、蓄電設備11aの非常時電力量と蓄電可能量とを含むデータが送信され、電力管理システム30における送受信部33がこれを受信する。
電力管理システム30では、複数の需要家のHEMS15から送受信部33により受信したデータを情報収集部31が演算し、複数の需要家が保有する各々の蓄電設備11aの動作を蓄電池制御決定部32が決定し、制御指令として送受信部33がHEMS15に送信する。また、電力管理システム30は、課金システム20aに非常時電力量と蓄電可能量のデータを送信部34が送信し、課金システム20aの受信部24がこれを受信する。
つまり、課金システム20aは、蓄電設備11aから、HEMS15、電力管理システム30を介し、間接的に非常時電力量と蓄電可能量のデータを受信することとなる。なお、課金システム20aが、電力管理システム30を介さないで、蓄電設備11aから、HEMS15、モデム16、インターネット回線を介して、直接的に非常時電力量と蓄電可能量のデータを受信部24により受信することも可能である。
The power management system 30 includes an information collection unit 31, a storage battery control determination unit 32, a transmission/reception unit 33, and a transmission unit 34.
Communication between the HEMS 15 and the power management system 30 in the customer facility 10 is performed via the modem 16 and a public internet line. Data including the user ID, the emergency power amount of the power storage equipment 11a, and the storable amount is transmitted from the HEMS 15, and the transmission/reception unit 33 in the power management system 30 receives the data.
In the power management system 30, the information collection unit 31 calculates the data received by the transmitter/receiver unit 33 from the HEMS 15 of a plurality of consumers, and the storage battery control determination unit 32 determines the operation of each power storage facility 11a owned by a plurality of consumers. The transmission/reception unit 33 determines and sends the control instruction to the HEMS 15. Further, in the power management system 30, the transmitting unit 34 transmits the data of the emergency power amount and the storable amount to the charging system 20a, and the receiving unit 24 of the charging system 20a receives the data.
That is, the charging system 20a indirectly receives the data of the emergency power amount and the storable amount from the power storage facility 11a via the HEMS 15 and the power management system 30. It should be noted that the charging system 20a directly receives the data of the emergency power amount and the storable amount from the power storage equipment 11a through the HEMS 15, the modem 16 and the Internet line by the receiving unit 24 without passing through the power management system 30. It is also possible to receive.

第1の実施形態と同様、課金システム20aは、送配電事業者から受信した検針値P、Qをもとに電気料金を電気料金算出部211において算出し、また、非常時電力量と蓄電可能量から割引額を割引額算出部212において算出する。
割引額は、例えば下記式(1)で算出される。
D=85.5×R+800…(1)
ここで、Dは割引額[円]を表す。
また、Rは、割引額算出部212が、常時蓄電可能量[kWh]=蓄電可能量−非常時電力量の式に基づいて算出する。ただし、Rが、2.5kWh未満の場合はD=0円とする。また、Dの上限値は、1,600円とする。また、Dの算出値は、小数点以下を切り捨てて算出される。
例えば、蓄電可能量が6.08kWhで非常時電力量が3.5kWhであった場合、式(1)によれば、割引額Dは1,020円となる。非常時電力量は、需要家が任意の時点で任意の設定が可能なことから、毎日一度データ取得し、日割り計算にて割引額を算出することも考えられる。
Similar to the first embodiment, the charging system 20a calculates the electricity charge based on the meter reading values P and Q received from the power transmission and distribution company in the electricity charge calculation unit 211, and can also store the emergency power and the electricity. The discount amount calculation unit 212 calculates the discount amount from the amount.
The discount amount is calculated by the following formula (1), for example.
D=85.5×R+800 (1)
Here, D represents a discount amount [yen].
Further, R is calculated by the discount amount calculation unit 212 based on the formula of always-storable amount [kWh]=storable amount-emergency power amount. However, if R is less than 2.5 kWh, D=0 yen. The upper limit of D is 1,600 yen. Further, the calculated value of D is calculated by rounding down the number after the decimal point.
For example, when the chargeable amount is 6.08 kWh and the emergency power amount is 3.5 kWh, according to the formula (1), the discount amount D is 1,020 yen. Since it is possible for a consumer to arbitrarily set the amount of emergency power at any time, it is possible to obtain data once a day and calculate a discount amount by a prorated calculation.

続いて、上記に説明した第1の実施形態および第2の実施形態における課金システムの動作例について説明する。
図6は、第1の実施形態における課金システム20の構成例を示す図である。また、図7は、図6に示す課金システム20の動作例を示すフローチャートである。
課金システム20は、演算部21、メモリ23(第1の記憶部231と第2の記憶部232)を含んで構成される。
オペレータは、ユーザーの契約情報のうち、蓄電可能量を課金システム20へ入力する(ステップST1)。
第2の記憶部232は、入力された蓄電可能量を保存する(ステップST2)。
オペレータは、ユーザーの契約情報のうち、非常時電力量を課金システム20へ入力する(ステップST3)。
第1の記憶部231は、入力された非常時電力量を保存する(ステップST4)。
演算部21は、蓄電可能量に従って割引額を演算する(ステップST5)。
演算部21における割引額算出部212は、蓄電可能量から非常時電力量を減算し、常時蓄電可能量を算出する。
演算部21は、割引額を算出する(ステップST6)。
演算部21における割引額算出部212は、予め設定した割引額テーブルを参照し、常時蓄電可能量に対応する割引額を算出する。
Subsequently, an operation example of the charging system in the above-described first and second embodiments will be described.
FIG. 6 is a diagram showing a configuration example of the charging system 20 in the first embodiment. Further, FIG. 7 is a flowchart showing an operation example of the charging system 20 shown in FIG.
The charging system 20 includes a calculation unit 21 and a memory 23 (first storage unit 231 and second storage unit 232).
The operator inputs the storable amount of the contract information of the user to the charging system 20 (step ST1).
The second storage unit 232 stores the input chargeable amount (step ST2).
The operator inputs the emergency power amount in the contract information of the user to the charging system 20 (step ST3).
The first storage unit 231 stores the input emergency power amount (step ST4).
The calculation unit 21 calculates the discount amount according to the chargeable amount (step ST5).
The discount amount calculation unit 212 in the calculation unit 21 subtracts the emergency power amount from the storable amount to constantly calculate the storable amount.
The calculation unit 21 calculates the discount amount (step ST6).
The discount amount calculation unit 212 in the calculation unit 21 refers to a preset discount amount table and calculates the discount amount corresponding to the always storable amount.

図8は、第1の実施形態における課金システム20の他の構成例を示す図である。また、図9は、図8に示す課金システム20の動作例を示すフローチャートである。
課金システム20は、演算部21、メモリ23を含んで構成される。
上記図6と相違する点は、メモリ23には、ユーザーの契約情報のうち、非常時電力量がユーザーにより入力される点である。上述したように、蓄電可能量は、製品の型式で決まるため、課金システム20は、製品の型式と蓄電可能量とを紐付けるテーブルを有している。課金システム20は、型式番号をテーブルへ入力することで蓄電可能量を入手し、割引額を算出する。なお、型式番号は、例えば、ユーザーの契約情報の中に含まれ、予め課金システム20に入力されておく構成とすればよい。これにより、型式番号をテーブルへ入力することで、型式番号を「蓄電可能量」に置き換えることができる。
オペレータは、ユーザーの契約情報のうち、非常時電力量を課金システム20へ入力する(ステップST11)。
メモリ23は、入力された非常時電力量を保存する(ステップST12)。
演算部21は、蓄電可能量に従って割引額を演算する(ステップST13)。
演算部21における割引額算出部212は、蓄電可能量から非常時電力量を減算し、常時蓄電可能量を算出する。
演算部21は、割引額を算出する(ステップST14)。
演算部21における割引額算出部212は、予め設定した割引額テーブルを参照し、常時蓄電可能量に対応する割引額を算出する。
FIG. 8 is a diagram showing another configuration example of the charging system 20 in the first embodiment. FIG. 9 is a flowchart showing an operation example of the charging system 20 shown in FIG.
The charging system 20 includes a calculation unit 21 and a memory 23.
The difference from FIG. 6 is that the emergency power amount of the user's contract information is input to the memory 23 by the user. As described above, since the storable amount is determined by the product type, the charging system 20 has a table that associates the product type and the storable amount. The charging system 20 obtains the chargeable amount by inputting the model number into the table and calculates the discount amount. The model number may be included in the contract information of the user and input to the charging system 20 in advance. Accordingly, by inputting the model number into the table, the model number can be replaced with the “storable amount”.
The operator inputs the emergency power amount in the contract information of the user to the charging system 20 (step ST11).
The memory 23 stores the input emergency power amount (step ST12).
The calculation unit 21 calculates the discount amount according to the chargeable amount (step ST13).
The discount amount calculation unit 212 in the calculation unit 21 subtracts the emergency power amount from the storable amount to constantly calculate the storable amount.
The calculation unit 21 calculates the discount amount (step ST14).
The discount amount calculation unit 212 in the calculation unit 21 refers to a preset discount amount table and calculates the discount amount corresponding to the always storable amount.

図10は、第2の実施形態における課金システム20aおよび蓄電設備11aの構成例を示す図である。また、図11は、図10に示す課金システム20aおよび蓄電設備11aの動作例を示すフローチャートである。
蓄電設備11aは、非常時電力量を保存する第1の記憶部101、蓄電可能量を保存する第2の記憶部102、送信部160(モデム16およびHEMS15)を含んで構成される。
課金システム20aは、演算部21、受信部24を含んで構成される。
本構成は、課金システム20aが、電力管理システム30を介さないで、蓄電設備11aから、HEMS15、モデム16、インターネット回線を介して、直接的に非常時電力量と蓄電可能量のデータを受信部24により受信する構成である。もちろん、課金システム20aが、課金システム20aと蓄電設備11aとの間の電力管理システム30を介して、間接的に非常時電力量と蓄電可能量のデータを受信部24により受信する構成であってもよい。
蓄電設備11aにおいて、第2の記憶部102は、蓄電可能量を保存する(ステップST21)。
蓄電設備11aにおいて、第1の記憶部101は、非常時電力量を保存する(ステップST22)。
蓄電設備11aにおいて、送信部160は、蓄電可能量と非常時電力量とを、課金システム20aに対して送信する(ステップST23)。
課金システム20aにおいて、受信部24は、蓄電可能量と非常時電力量とを、蓄電設備11aから受信する(ステップST24)。
課金システム20aにおいて、演算部21は、蓄電可能量と非常時電力量とに従って割引額を演算する(ステップST25)。
演算部21における割引額算出部212は、蓄電可能量から非常時電力量を減算し、常時蓄電可能量を算出する。
課金システム20aにおいて、演算部21は、割引額を算出する(ステップST26)。
演算部21における割引額算出部212は、式(1)に基づいて割引額を算出する。
なお、蓄電可能量は蓄電設備11aの第2の記憶部102に記憶されるとなっているが、蓄電可能量は蓄電設備11aの型式で決まるため、予め課金システム20aに入力しておき、蓄電設備11aとの通信では、非常時電力量のみを受信すればよい、というケースも考えられる。
FIG. 10 is a diagram showing a configuration example of the charging system 20a and the power storage equipment 11a in the second embodiment. Further, FIG. 11 is a flowchart showing an operation example of the charging system 20a and the power storage equipment 11a shown in FIG.
The electricity storage facility 11a is configured to include a first storage unit 101 that stores the amount of emergency power, a second storage unit 102 that stores the storable amount, and a transmission unit 160 (modem 16 and HEMS 15).
The billing system 20a includes a calculation unit 21 and a reception unit 24.
In this configuration, the charging system 20a receives the data of the emergency power amount and the storable amount directly from the power storage facility 11a via the HEMS 15, the modem 16 and the Internet line without passing through the power management system 30. It is configured to receive by 24. Of course, the charging system 20a has a configuration in which the data of the emergency power amount and the storable amount are indirectly received by the receiving unit 24 via the power management system 30 between the charging system 20a and the power storage facility 11a. Good.
In the electricity storage facility 11a, the second storage unit 102 stores the amount of electricity that can be stored (step ST21).
In the power storage equipment 11a, the first storage unit 101 stores the emergency power amount (step ST22).
In the power storage facility 11a, the transmitting unit 160 transmits the chargeable amount and the emergency power amount to the charging system 20a (step ST23).
In the charging system 20a, the receiving unit 24 receives the chargeable amount and the emergency power amount from the power storage facility 11a (step ST24).
In the charging system 20a, the calculation unit 21 calculates the discount amount according to the chargeable amount and the emergency power amount (step ST25).
The discount amount calculation unit 212 in the calculation unit 21 subtracts the emergency power amount from the storable amount, and constantly calculates the storable amount.
In the charging system 20a, the calculation unit 21 calculates the discount amount (step ST26).
The discount amount calculation unit 212 in the calculation unit 21 calculates the discount amount based on the equation (1).
Although the storable amount is stored in the second storage unit 102 of the power storage facility 11a, the storable amount is determined by the model of the power storage facility 11a. In communication with the equipment 11a, a case may be considered in which only the emergency power amount needs to be received.

図12は、第2の実施形態における課金システム20aおよび蓄電設備11aの他の構成例を示す図である。また、図13は、図12に示す課金システム20aおよび蓄電設備11aの動作例を示すフローチャートである。
蓄電設備11aは、蓄電可能量から非常時電力量を減算した常時蓄電可能量を保存する記憶部100、送信部160(モデム16およびHEMS15)を含んで構成される。
課金システム20aは、演算部21、受信部24を含んで構成される。
本構成は、課金システム20aが、蓄電設備11aから、直接的または間接的に常時蓄電可能量のデータを受信部24により受信する構成である。
蓄電設備11aにおいて、第2の記憶部は、出願時において記憶済の蓄電可能量を保存する(ステップST31)。
蓄電設備11aにおいて、第1の記憶部は、需要家設定により記憶済の非常時電力量を保存する(ステップST32)。
蓄電設備11aにおいて、HEMS15は、蓄電可能量から非常時電力量を減算し、常時蓄電可能量を算出する(ステップST33)。
蓄電設備11aにおいて、記憶部100は、常時蓄電可能量を保存する(ステップST34)。
蓄電設備11aにおいて、送信部160は、常時蓄電可能量を、課金システム20aに対して送信する(ステップST35)。
課金システム20aにおいて、受信部24は、常時蓄電可能量を、蓄電設備11aから受信する(ステップST36)。
課金システム20aにおいて、演算部21は、常時蓄電可能量に従って割引額を演算する(ステップST37)。
課金システム20aにおいて、演算部21は、割引額を算出する(ステップST38)。
演算部21における割引額算出部212は、式(1)に基づいて割引額を算出する。
FIG. 12: is a figure which shows the other structural example of the charging system 20a and the electrical storage equipment 11a in 2nd Embodiment. Further, FIG. 13 is a flowchart showing an operation example of the charging system 20a and the power storage equipment 11a shown in FIG.
The power storage facility 11a is configured to include a storage unit 100 that stores the always-storable amount obtained by subtracting the emergency power amount from the storable amount, and a transmission unit 160 (modem 16 and HEMS 15).
The billing system 20a includes a calculation unit 21 and a reception unit 24.
In this configuration, the charging system 20a is configured such that the data of the chargeable amount is always or directly received from the power storage equipment 11a by the receiving unit 24.
In the electricity storage facility 11a, the second storage unit stores the storable amount of electricity stored at the time of application (step ST31).
In the power storage facility 11a, the first storage unit stores the stored emergency power amount according to the consumer setting (step ST32).
In the electricity storage facility 11a, the HEMS 15 subtracts the emergency power amount from the storable amount to constantly calculate the storable amount (step ST33).
In the electricity storage facility 11a, the storage unit 100 always stores the amount of electricity that can be stored (step ST34).
In the power storage facility 11a, the transmission unit 160 constantly transmits the amount of power that can be stored to the charging system 20a (step ST35).
In the charging system 20a, the receiving unit 24 receives the always-storable amount from the power storage equipment 11a (step ST36).
In the charging system 20a, the calculation unit 21 calculates the discount amount according to the always chargeable amount (step ST37).
In the charging system 20a, the calculation unit 21 calculates the discount amount (step ST38).
The discount amount calculation unit 212 in the calculation unit 21 calculates the discount amount based on the equation (1).

上述したように、本発明の課金システム20は、蓄電設備11が設置された需要家の電気料金の割引額を計算する課金システムであって、非常時に備え蓄電設備11に確保する非常時電力量を記憶する第1の記憶部231と、非常時電力量を含んだ蓄電可能量を記憶する第2の記憶部232と、非常時電力量と蓄電可能量とに応じて電気料金の割引額を計算する演算部21を有する。
また、本発明の課金システム20は、蓄電設備11が設置された需要家の電気料金の割引額を計算する課金システムであって、蓄電設備11の常時に利用可能な常時蓄電可能量を記憶する記憶部(メモリ23)と、常時蓄電可能量に応じて電気料金の割引額を計算する演算部21を有する。
As described above, the charging system 20 of the present invention is a charging system that calculates the discounted amount of the electricity charge of the customer in which the power storage equipment 11 is installed. , A second storage unit 232 that stores a storable amount including an emergency power amount, and a discount amount of an electric charge according to the emergency power amount and the storable amount. It has a calculation unit 21 for calculating.
In addition, the charging system 20 of the present invention is a charging system that calculates a discounted amount of the electricity charge of a customer in which the power storage equipment 11 is installed, and stores the always available storage capacity of the power storage equipment 11 that is always available. It has a storage unit (memory 23) and a calculation unit 21 for calculating the discounted amount of electricity charges according to the always-storable amount.

また、本発明の課金システム20aは、非常時のために確保する非常時電力量を記憶する第1の記憶部101と、非常時電力量を含んだ蓄電可能量を記憶する第2の記憶部102と、通信手段により、非常時電力量と蓄電可能量を外部へ送信する送信部160と、を有する蓄電設備11aが設置された需要家の電気料金の割引額を計算する課金システム20aである。課金システム20aは、蓄電設備11aが送信した非常時電力量と蓄電可能量を直接的又は間接的に受信する受信部24と、受信部24で受信した非常時電力量と蓄電可能量に応じて電気料金の割引額を計算する演算部21と、を有する。
また、本発明の課金システム20aは、常時に利用可能な常時蓄電可能量を記憶する記憶部100と、通信手段により常時蓄電可能量を外部へ送信する送信部160と、を有する蓄電設備11aが設置された需要家の電気料金の割引額を計算する課金システム20aである。課金システム20aは、蓄電設備11aが送信した常時蓄電可能量を直接的又は間接的に受信する受信部24と、受信部24で受信した常時蓄電可能量に応じて電気料金の割引額を計算する演算部21と、を有する。
In addition, the charging system 20a of the present invention includes a first storage unit 101 that stores an emergency power amount secured for an emergency and a second storage unit that stores a chargeable amount including the emergency power amount. A charging system 20a for calculating a discounted amount of electricity charges of a customer in which the power storage facility 11a having the power storage facility 11a having a power consumption amount 102 and a power storage capacity to the outside is transmitted by a communication unit. .. The charging system 20a includes a receiving unit 24 that directly or indirectly receives the emergency power amount and the storable amount transmitted by the power storage equipment 11a, and the receiving unit 24 receives the emergency power amount and the storable amount according to the receiving unit 24. And a calculation unit 21 that calculates a discount amount of the electricity charge.
In addition, the charging system 20a of the present invention includes a storage unit 11a that includes a storage unit 100 that stores the always-storable amount that is always available and a transmission unit 160 that transmits the always-storable amount to the outside by communication means. It is a charging system 20a that calculates a discounted amount of electricity charges of installed customers. The charging system 20a calculates a discounted amount of electricity charges according to the receiving unit 24 that directly or indirectly receives the always-storable amount transmitted by the power storage facility 11a and the always-storable amount received by the receiving unit 24. And a calculation unit 21.

本発明の課金システム20、20aによれば、蓄電池の容量[kWh](蓄電設備11、11aの常時蓄電可能量)に応じて、電気料金の割引額を算定することができる。すなわち、本発明の課金システム20、20aによれば、需要家、事業者双方のメリットが生み出されるので、継続可能な、蓄電池を活用した電力需給の仕組みを実現することができる。
これにより、本発明によれば、継続可能な、蓄電池を活用した電力需給の仕組みを実現することができる課金システムおよび課金システムの制御方法を提供することができる。
According to the charging systems 20 and 20a of the present invention, it is possible to calculate the discounted amount of the electricity charge according to the capacity [kWh] of the storage battery (the amount of electricity that can be constantly stored in the storage facilities 11 and 11a). That is, according to the charging system 20 or 20a of the present invention, the advantages of both the consumer and the business are created, so that it is possible to realize a sustainable power supply and demand mechanism using a storage battery.
Thus, according to the present invention, it is possible to provide a billing system and a control method for the billing system, which can realize a sustainable power supply and demand mechanism using a storage battery.

また、本実施形態においては、需要家集合体としての形態として、需要家集合体における需要家10の各々が隣接を含んで近傍に位置し、当該需要家10の各々が同一の電力系統線(後述する電力系統線200)を介して、相互に電力を融通し合う電力融通街区の構成がある。
図20は、第2の実施形態の他の例である費用演算システムの構成例としての電力融通街区を示す図である。電力融通街区400は、図17と同様に、例えば70戸の需要家10から構成されており、各需要家10の個々において電力消費量や、太陽光発電設備12の発電容量、蓄電設備11の蓄電容量がそれぞれ異なる。図20においては、図17の構成と異なり、一般送配電事業者の高圧系統(系統電力線210)と、電力融通街区400の電力系統線200との間に、順潮流電力メーターMptと順潮流電力メーターMqtとの各々が設けられている。
In addition, in the present embodiment, as a form of a customer group, each of the customers 10 in the customer group is located in the vicinity including adjacent, and each of the customers 10 has the same power system line ( There is a configuration of an electric power interchange block that mutually exchanges electric power via an electric power system line 200) described later.
FIG. 20 is a diagram showing a power interchange block as a configuration example of a cost calculation system which is another example of the second embodiment. As in FIG. 17, the power interchange district 400 includes, for example, 70 consumers 10, and the power consumption, the power generation capacity of the solar power generation facility 12, and the power storage facility 11 of each of the consumers 10 are individually set. The storage capacity is different. 20, unlike the configuration of FIG. 17, between the high-voltage system (system power line 210) of the general power transmission and distribution company and the power system line 200 of the power interchange block 400, the forward power meter Mpt and the forward power Each is provided with a meter Mqt.

上述した順潮流電力メーターMptと逆潮流電力メーターMqtとの各々は、一般送配電事業者の高圧系統(系統電力線210)と、電力融通街区400の電力系統線200との間に設けられるため、計器用変圧変流器と組み合わせて取り付けられる。また、順潮流電力メーターMptと逆潮流電力メーターMqtとの各々は、順潮流電力を測定する機能と逆潮流電力を測定する機能との双方を有する電力計(計量手段)に代えても良い。 Since each of the forward power flow meter Mpt and the reverse power flow meter Mqt described above is provided between the high voltage system (system power line 210) of the general power transmission and distribution company and the power system line 200 of the power interchange block 400, It is installed in combination with an instrument transformer. Further, each of the forward power flow meter Mpt and the reverse power flow power meter Mqt may be replaced with a power meter (measuring means) having both a function of measuring forward power flow and a function of measuring reverse power flow.

図21は、第2の実施形態の電力融通街区における電力の販売構造を示す図である。図21においては費用演算システム350は、小売電気事業者510に設けられており、検針値受信部351と費用演算処理サーバ352との各々を備えている。検針値受信部351は、電力融通街区400の需要家10の各々の買電用電力計Mp及び売電用電力計Mqそれぞれから、所定の期間が経過する毎に、ネットワークを介して送配電事業者から供給される順潮流された電力の検針値P及び逆潮流された電力の検針値Qを入力する。また、検針値受信部351は、順潮流電力メーターMptの順潮流電力の検針値Ptと、逆潮流電力メーターMqtの逆潮流電力の検針値Qtとを、所定の期間が経過する毎に、ネットワークを介して送配電事業者530から得る。 FIG. 21: is a figure which shows the electric power selling structure in the electric power interchange block of 2nd Embodiment. In FIG. 21, a cost calculation system 350 is provided in the retail electric power company 510, and includes a meter reading value reception unit 351 and a cost calculation processing server 352. The meter reading value receiving unit 351 transmits and receives the power transmission and distribution business via the network each time a predetermined period elapses from each of the power purchasing power meter Mp and the power selling power meter Mq of each of the consumers 10 in the power interchange district 400. A meter reading value P of forward-flowing power and a meter reading value Q of reverse-flowing power supplied from a person are input. Further, the meter reading value receiving unit 351 obtains the meter reading value Pt of the forward power flow power of the forward power meter Mpt and the meter reading value Qt of the reverse power flow of the reverse power meter Mqt each time a predetermined period elapses. From the power transmission and distribution company 530 via the.

これにより、小売電気事業者は、電力融通街区400すべての需要家10に対して、卸電気事業者から調達して販売した電力を、順潮流電力メーターMptの順潮流電力の検針値Ptとして得ることができる。すなわち、小売電気事業者は、費用演算システム350により、上記検針値Ptに基づいて、電力融通街区400全体における外部の卸電気事業者から調達した電力に対する支払額を求めることができる。また、小売電気事業者は、費用演算処理サーバ352により、順潮流電力メーターMptの順潮流電力の検針値Ptと、逆潮流電力メーターMqtの順潮流電力の検針値Qtとの差分に基づき、電力融通街区400における需要家10の各々の消費した電力量に応じた支払額を求める。ここで、需要家10の各々の消費した電力量とは、需要家10の各々の買電用電力計Mpの検針値Pと売電用電力計Mqの検針値Qとの差分の電力量である。 Thereby, the retail electric power supplier obtains the electric power procured from the wholesale electric power supplier and sold to all the consumers 10 of the electric power interchange district 400 as the meter reading Pt of the forward power flow power of the forward power flow meter Mpt. be able to. That is, the retail electric power company can obtain the amount of payment for the electric power procured from the external electric power wholesaler in the entire electric power interchange block 400 based on the meter reading value Pt by the cost calculation system 350. Further, the retail electric power company uses the expense calculation processing server 352 to calculate the power based on the difference between the meter reading value Pt of the forward power meter of the forward power meter Mpt and the meter reading value Qt of the forward power meter of the reverse power meter Mqt. The amount of payment according to the amount of power consumed by each of the consumers 10 in the interchange district 400 is calculated. Here, the amount of power consumed by each of the consumers 10 is the amount of difference between the meter reading value P of each of the power purchasing power meters Mp and the meter reading value Q of the power selling power meter Mq of the customers 10. is there.

上述したように、小売電気事業者510は、送配電事業者530へ支払う託送費、卸電気事業者へ支払う電力量の対価、費用負担調整機関に納付する再生可能エネルギー促進賦課金の算定を、費用演算処理サーバ352に行わせる際、順潮流電力の検針値Ptを用いる。ここで、費用演算処理サーバ352は、小売電気事業者510が卸電気事業者520に支払う調達電力の対価を、検針値Ptと検針値Qtとの電力量の差分に基づいて算定する。また、小売電気事業者510は、電力融通街区400に対する順潮流の電力量の検針値Ptに基づいて、この電力量の託送費を送配電事業者530に対して支払う。再生可能エネルギー発電促進賦課金は、電力融通街区400に対する順潮流の電力量の検針値Ptに基づいて、小売電気事業者510が需要家10の各々から消費した電力量に対応して徴収し、所定の費用負担調整機関540に支払う。 As described above, the retail electric power company 510 calculates the consignment cost paid to the power transmission and distribution company 530, the consideration of the amount of power paid to the wholesale electric power company, and the calculation of the renewable energy promotion levy to be paid to the cost burden adjustment agency. When causing the cost calculation processing server 352 to perform the operation, the meter reading value Pt of the forward flow power is used. Here, the expense calculation processing server 352 calculates the consideration of the procured electric power that the retail electric power company 510 pays to the wholesale electric power company 520 based on the difference in the amount of electric power between the meter reading value Pt and the meter reading value Qt. In addition, the retail electric power company 510 pays the power transmission fee to the power transmission and distribution company 530 based on the meter reading value Pt of the normal power flow amount for the power interchange district 400. The renewable energy power generation promotion levy is collected corresponding to the amount of electric power consumed by each of the consumers 10 by the retail electric power company 510 based on the meter reading Pt of the amount of electric power in the forward flow with respect to the electric power interchange district 400, Payment is made to a predetermined cost burden adjusting agency 540.

すなわち、費用演算システム350は、電力融通街区400における需要家10の各々の消費した電力量に応じて支払う支払額を求めるため、買電用電力計Mp及び売電用電力計Mqから、検針値P及び検針値Qそれぞれを得ている。
しかしながら、電力融通街区400においては、各需要家10を結ぶ配電系統が商用系統あるいは自営線である場合を含み、発電設備である太陽光発電設備12による発電、蓄電設備である蓄電池10からの充放電により、各需要家10間における電力の融通が行われている。この場合、一の需要家10の蓄電池11に対して、他の需要家10の太陽光発電設備12により発電した発電電力を一時的に充電して蓄電し、夜間において、一の需要家10及び他の需要家以外の需要家の需要のために、他の需要家の蓄電池11から放電する場合がある。
That is, the expense calculation system 350 obtains the payment amount to be paid according to the amount of power consumed by each of the consumers 10 in the power interchange district 400, and therefore the meter reading value from the power meter for power purchase Mp and the power meter for power sale Mq is read. P and the meter reading value Q are obtained.
However, in the power interchange district 400, including the case where the distribution system connecting each customer 10 is a commercial system or a private line, power generation by the solar power generation facility 12 which is a power generation facility, and charging from the storage battery 10 which is a power storage facility. The electric power is exchanged between the consumers 10 by the discharge. In this case, the storage battery 11 of one customer 10 is temporarily charged with the generated power generated by the photovoltaic power generation facility 12 of another customer 10 to store the power, and at night, There is a case where the storage battery 11 of another customer is discharged due to the demand of a customer other than the other customer.

上述した場合においては、需要家10の各々に設置された順潮流電力メーターMqtでは、測定した順潮流の電力が、電力融通街区400の外部から商用電力として供給された電力であるか、あるいは電力融通街区400内の他の需要家から供給された電力であるかの判別を行うことができない。
このため、順潮流電力メーターMptと逆潮流電力メーターMqtとを電力融通街区400と系統電力線210との間に設け、費用演算処理サーバ352は、上述した順潮流電力メーターMpt及び逆潮流電力メーターMqtの各々が計量した計量値を用いて、電力融通街区400全体に対して供給され順潮流の電力量に対応して、配送電事業者530へ支払う託送費、卸電気事業者520へ支払う電力量の対価である調達料金、費用負担調整機関540に納付する再生可能エネルギー促進賦課金の算定を行う。
In the case described above, in the forward flow power meter Mqt installed in each of the customers 10, the measured forward flow power is the power supplied from outside the power interchange block 400 as commercial power, or the power. It is not possible to determine whether the power is supplied from another customer in the interchange district 400.
Therefore, the forward flow power meter Mpt and the reverse flow power meter Mqt are provided between the power interchange block 400 and the grid power line 210, and the cost calculation processing server 352 causes the forward power flow meter Mpt and the reverse flow power meter Mqt described above. Using the measurement values measured by each of the above, in accordance with the amount of forward-flowing electric power supplied to the entire electric power interchange district 400, a consignment cost paid to the distribution electric power company 530 and an amount of electric power paid to the wholesale electric power company 520. The calculation of the procurement fee, which is the consideration for the above, and the renewable energy promotion levy to be paid to the cost burden adjusting agency 540.

ここで、小売電気事業者は、電力融通街区400における配電系統が一般の送配電事業者により管理される電力系統である場合、低圧の電圧で電力が供給される需要家への接続供給に必要な託送費を送配配電事業者530に対して支払う必要がある。一方、電力融通街区400における配電系統が需要家10の各々から出資して施設した自営線としての電力系統である場合、高圧の電圧で電力が供給される需要家への接続供給に必要な託送費を送配電事業者530に対して支払う必要がある。 Here, if the distribution system in the power interchange district 400 is a power system managed by a general power transmission and distribution company, the retail electric power company needs to connect and supply to a customer who is supplied with power at a low voltage. It is necessary to pay a certain consignment fee to the power transmission and distribution company 530. On the other hand, when the power distribution system in the power interchange district 400 is a power system as a self-employed line funded by each of the customers 10 and consigned, the consignment required for connection and supply to the customers supplied with power at a high voltage. The cost needs to be paid to the power transmission and distribution company 530.

上述したように、小売電気事業者510が送配電事業者530や費用負担調整機関540に対する支払額は、順潮流電力メーターMptの順潮流の電力の計量値に基づき、送配電事業者530及び費用負担調整機関540の各々が算定する。また、小売電気事業者510は、送配電事業者530及び費用負担調整機関540の各々からの請求額の確認のため、あるいはこの請求額の請求が行われる前に請求額の把握を行うため、課金システム20aにより、送配電事業者530や費用負担調整機関540に対する支払額の算定を、送配電事業者530及び費用負担調整機関540の各々の算定の基準と同様のアルゴリズムに基づいて、順潮流電力メーターMptの順潮流の電力の検針値Ptに基づいて行う。 As described above, the amount paid by the retail electric power company 510 to the power transmission and distribution company 530 and the cost burden adjusting agency 540 is based on the forward flow power meter Mpt's forward power flow measurement value, and the power transmission and distribution company 530 and the cost. Each of the burden adjusting organizations 540 calculates. In addition, the retail electric power company 510 confirms the amount charged from each of the power transmission and distribution company 530 and the cost burden adjusting agency 540, or grasps the amount charged before the demand is charged, The charging system 20a calculates the payment amount to the power transmission and distribution business operator 530 and the cost burden adjustment agency 540 based on the same algorithm as the calculation standard of each of the power transmission and distribution business entity 530 and the cost burden adjustment agency 540. This is performed based on the meter reading value Pt of the forward power flow of the power meter Mpt.

上述した第2の実施形態においても、すでに述べた第1の実施形態と同様に、各需要家の各々が支払うべき電力量の料金を、順潮流電力量の計量値と逆潮流電力量の計量値との差分により求めるのではなく需要家の各々における順潮流電力量、逆潮流電力量、時間帯別電力量などのデータ、需要家が使用した電力量の時間帯別単価を演算して積分した金額、あるいはこの金額をポイントなどのインセンティブな数値に換算したデータを用いて、各需要家が支払うべき電力量の料金を求める構成としても良い。
また、上述した需要家が支払うべき電力料の料金を求めるためのデータを、料金を徴収する料金徴収代行業者に送信し、小売電気事業者ではなくこの料金徴収代行業者が電力料金を課金処理サーバ600(図19(b))により算出し、需要家各々からそれぞれの電力の料金を徴収する構成としても良い。
In the second embodiment described above, as in the first embodiment, which has already been described, the charges for the amount of electric power to be paid by each consumer are calculated by measuring the forward flow power amount and the reverse flow power amount. Data such as forward power flow amount, reverse power flow power amount, power amount by time period, etc. for each customer, and unit price by time period of the power amount used by the customer are calculated and integrated, instead of being calculated from the difference from the value It is also possible to use the amount of money, or the data obtained by converting the amount of money into an incentive numerical value such as points, to obtain the charge of the amount of power to be paid by each consumer.
In addition, the above-described data for requesting the charge of the power charge to be paid by the consumer is transmitted to the charge collecting agent that collects the charge, and this charge collecting agent, not the retail electric power company, charges the power charge processing server. It is also possible to adopt a configuration in which it is calculated according to 600 (FIG. 19B) and the respective electricity charges are collected from each consumer.

上記支払通知は、請求書、振込依頼書、金融機関の需要家の口座からの料金の引落し通知などである。また、この支払通知は、上記課金サーバに備えられた料金通知手段により通知、例えばメール送信、SNSを利用した通知、あるいは需要家に設けられた料金表示手段の表示画面に表示することで通知しても良い。
また、順潮流電力メーターMptと逆潮流電力メーターMqtと各々が計量した計量値を用いて、電力融通街区400全体に対して供給され順潮流の電力量に対応して、配送電事業者530へ支払う託送費、卸電気事業者520へ支払う電力量の対価である調達料金、費用負担調整機関540に納付する再生可能エネルギー促進賦課金の算定を、料金徴収代行業者が備える課金処理サーバ600により行う構成としても良い。
The payment notice is an invoice, a transfer request form, a debit notice from a customer's account of a financial institution, or the like. Further, this payment notification is notified by the charge notification means provided in the above-mentioned charging server, for example, by mail transmission, notification using SNS, or by being displayed on the display screen of the charge display means provided in the customer. May be.
In addition, the forward power flow meter Mpt and the reverse power flow power meter Mqt are used to measure the respective values, and the power is supplied to the entire electric power interchange block 400 in accordance with the amount of the forward power flow to the distribution electric power company 530. The billing server 600 provided in the fee collection agency calculates the consignment fee to be paid, the procurement fee, which is the price of the amount of electric power paid to the wholesale electric power company 520, and the renewable energy promotion levy to be paid to the cost burden adjusting agency 540. It may be configured.

<第3の実施形態>
図を用いて第3の実施形態による課金システムの構成を説明する。図14は、第3の実施形態による課金システムが管理する電力融通街区の構成例を示す図である。本第3の実施形態において、第1の実施形態及び第2の実施形態の各々と同様な構成については同一の符号を付す。また、本第3の実施形態において、第1の実施形態及び第2の実施形態の各々の構成を有しても良い。すなわち、課金サーバ(後述)が算出した電気料金から、第1の実施形態及び第2の実施形態における構成を用いて割引を行っても良い。
電力融通街区400は、住宅である需要家10の複数戸と、商業施設であるショッピンセンター250とから形成されている。需要家10は、図1の構成と同様に蓄電設備11、太陽光発電設備12、分電盤13、負荷14、買電用電力計(以下、順潮流電力メーター)Mp及び売電用電力計(以下、順潮流電力メーター)Mqの各々が備えられている。
順潮流電力メーターMp及び順潮流電力メーターMqの各々は、電力系統線200から需要家10に供給される順潮流電力と電力系統線200に対して需要家10から供給する逆潮流電力とを測定する。
<Third Embodiment>
The configuration of the charging system according to the third embodiment will be described with reference to the drawings. FIG. 14: is a figure which shows the structural example of the electric power interchange block managed by the charging system by 3rd Embodiment. In the third embodiment, the same components as those in the first and second embodiments are designated by the same reference numerals. In addition, the present third embodiment may have the respective configurations of the first embodiment and the second embodiment. That is, a discount may be provided from an electricity rate calculated by a billing server (described later) using the configurations of the first and second embodiments.
The power interchange district 400 is formed of a plurality of consumers 10 who are houses and a shopping center 250 which is a commercial facility. The consumer 10 has a power storage facility 11, a photovoltaic power generation facility 12, a distribution board 13, a load 14, a power meter for power purchase (hereinafter, forward power meter) Mp, and a power meter for power sale, as in the configuration of FIG. 1. Each of these (hereinafter referred to as a forward power meter) Mq is provided.
Each of the forward power flow meter Mp and the forward power flow meter Mq measures forward power flow power supplied from the power system line 200 to the customer 10 and reverse power flow power supplied from the customer 10 to the power system line 200. To do.

また、一般送配電事業者の高圧系統(系統電力線210)にから需要家10への電力供給の際には、低圧への変圧器(不図示)を介して低圧供給を行っている。この変圧器は、例えば需要家10の5戸に1台の割合で配備されている。
また、ショッピンセンター250には、順潮流電力メーター101のみが設置されている。また、ショッピンセンター250には、逆潮流を発生させるような発電設備を備えておらず、電力消費量が15000kWh/月であり、高圧で電力の供給を受けている。電力系統線200は一般送配電事業者(後述する送配電事業者530)が所有している配電線である。
Further, when power is supplied to the customer 10 from the high voltage system (system power line 210) of the general power transmission and distribution company, low voltage is supplied via a low voltage transformer (not shown). This transformer is installed, for example, at a ratio of 1 to 5 of the customers 10.
Further, only the forward power meter 101 is installed in the shopping center 250. In addition, the shopping center 250 is not equipped with a power generation facility that generates a reverse power flow, has a power consumption of 15,000 kWh/month, and is supplied with power at high voltage. The power system line 200 is a distribution line owned by a general power transmission and distribution company (a power transmission and distribution company 530 described later).

また、電力融通街区400は、70戸の需要家10から構成されており、各需要家10の個々において電力消費量や、太陽光発電設備12の発電容量、蓄電設備11の蓄電容量がそれぞれ異なる。電力融通街区400の需要家10の全てで平均すると、例えば1戸当たりの電力消費量が500kWh/月、太陽光発電設備12の太陽光発電量が200kWh/月であり、蓄電設備11が6kWhの蓄電容量の家庭用蓄電池設備である。ショッピングセンターの電力消費量は15000kWh/月である。 In addition, the power interchange district 400 is composed of 70 consumers 10, and each consumer 10 has different power consumption, power generation capacity of the photovoltaic power generation facility 12, and power storage capacity of the power storage facility 11. .. On average for all the consumers 10 in the power interchange district 400, for example, the power consumption per unit is 500 kWh/month, the solar power generation amount of the solar power generation facility 12 is 200 kWh/month, and the power storage facility 11 is 6 kWh. It is a household storage battery facility with a storage capacity. The electricity consumption of the shopping center is 15,000kWh/month.

・電力融通街区内における住戸間の電力融通
図15は、電力融通街区における電力の販売構造を示す図である。電力融通街区400においては、小売電気事業者(小売事業者)510が個々の需要家10及びショッピングセンター250との間で、電力の販売(売電)と買取り(買電)を行っている。販売した電力量については需要家10から販売料金を徴収し、一方、買取分の電力量については買取料金を需要家10に対して支払う。
また、小売電気事業者510は、需要家10の各々に販売する電力を卸電気事業者520から調達し、その調達した電力量に対して対価を卸電気事業者(例えば、発電事業者に相当)520に対して支払う。ここで、課金サーバ300は、各需要家10、ショッピングセンター250を含めた需要家全体の順潮流電力メーターMpと逆潮流電力メーターMqとの計量値の差分を求める。そして、小売電気事業者510は、卸電気事業者520に、課金サーバ300が求めた電力量の差分に基づいて調達電力の対価を支払う。
また、小売電気事業者510は、託送費を送配電事業者530に対して支払う。図15にある再生可能エネルギー発電促進賦課金は、小売電気事業者510が需要家10の各々から徴収し、所定の費用負担調整機関540に支払う。
-Electrical power interchange between dwelling units in the electric power interchange block FIG. 15 is a diagram showing a power sales structure in the electric power interchange block. In the electric power interchange district 400, a retail electric power company (retail company) 510 sells (sells power) and buys (power purchases) electric power between each consumer 10 and the shopping center 250. A sales charge is collected from the consumer 10 for the amount of sold electricity, while a purchase charge is paid to the consumer 10 for the amount of purchased electricity.
Further, the retail electric power company 510 procures the electric power to be sold to each of the customers 10 from the wholesale electric power company 520, and pays the price for the procured electric power amount to the wholesale electric power company (e.g., equivalent to a power generation company). ) Pay for 520. Here, the charging server 300 obtains the difference between the measured values of the forward power flow power meter Mp and the reverse power flow power meter Mq of all the customers including the customers 10 and the shopping center 250. Then, the retail electric power company 510 pays the consideration for the procured electric power to the wholesale electric power company 520 based on the difference in the amount of electric power obtained by the charging server 300.
Further, the retail electric power company 510 pays the consignment fee to the power transmission and distribution company 530. The renewable energy power generation promotion levy shown in FIG. 15 is collected from each of the customers 10 by the retail electric power company 510 and paid to a predetermined cost burden adjusting agency 540.

この図15に示す電力融通街区における電力の販売構造のもとで、電力融通街区における需要家10間の電力融通は実施される。その技術的な方法は、例えば小売電気事業者510が、需要家10の電力情報をネットワークに接続された課金サーバ300により随時監視する。そして、小売電気事業者510は、取得した電力情報に基づき、課金サーバ300を介して需要家10の各々に設置された蓄電池設備11や負荷14(負荷機器)を制御することで、余剰電力がある需要家10と電力が不足している需要家10との間において電力融通が行われる。
需要家10の各々が購入した電力量は、順潮流電力メーターMpのみで特定することはできない。この理由としては、他の需要家10から融通され一時的に蓄電設備11に貯めた電力量も供給された電力量として、順潮流電力メーターMpにおいて積算されて含まれるためである。
Under the power sales structure in the power interchange block shown in FIG. 15, power interchange between the customers 10 in the power interchange block is implemented. As for the technical method, for example, the retail electric power company 510 monitors the power information of the customer 10 at any time by the billing server 300 connected to the network. Then, the retail electric power company 510 controls the storage battery facility 11 and the load 14 (load device) installed in each of the consumers 10 via the charging server 300 based on the acquired power information, and thus the surplus power is reduced. Electric power is exchanged between a certain customer 10 and a customer 10 having a shortage of electric power.
The amount of power purchased by each of the consumers 10 cannot be specified only by the forward flow power meter Mp. The reason for this is that the amount of electric power that has been accommodated by other customers 10 and temporarily stored in the power storage facility 11 is also included in the forward power meter Mp as the amount of electric power that has been supplied.

以下の説明は、小売電気事業者510が電力融通街区400内のエネルギーマネジメントを行う仮定で説明する。小売電気事業者510は、電力融通街区400内で発電される太陽光発電電力を、可能な限り電力融通街区400内で消費し、それによって、卸電気事業者からの調達電気量を抑え、需要家10に電気料金を安価に提供するサービスを考える。そのため、需要家10の蓄電設備11を課金サーバ300により制御することにより、電力融通街区400内エネルギーマネジメントを行う。 The following description will be made on the assumption that the retail electric power company 510 performs energy management in the power interchange block 400. The retail electric power company 510 consumes the photovoltaic power generated in the electric power interchange district 400 as much as possible in the electric power interchange district 400, thereby suppressing the amount of electricity procured from the wholesale electric power producer and reducing the demand. Consider a service that provides electric charges to the house 10 at low cost. Therefore, by controlling the power storage equipment 11 of the customer 10 by the charging server 300, energy management in the power interchange block 400 is performed.

図16は、電力融通街区を構成する需要家10の間における電力融通を説明する図である。図16に示す電力融通街区は、需要家10_A、需要家10_B及び需要家10_Cの各々の3戸の需要家10から構成されている。
課金サーバ300は、例えば、ある需要家10_Aにおける太陽光発電設備12が発電した発電電力による余剰電力を、空き容量の大きい需要家10_Bの蓄電池設備11に蓄電させる制御を行う。このとき、課金サーバ300は、各需要家10から余剰電力の電力量及び蓄電設備11の蓄電量をネットワークを介して取得する。例えば、課金サーバ300は、ネットワークを介して、太陽光発電設備12の発電電力量、需要家10の負荷14における消費電力量、蓄電設備11の蓄電量などを取得する。すなわち、小売電気事業者510は、課金サーバ300を用いることにより、需要家10の各々の電力情報をネットワークを介してリアルタイムで監視する。そして、小売電気事業者510は、課金サーバ300を介して、空き容量の大きい需要家10_Bの蓄電設備11に、需要家10_Aの余剰電力を充電するよう、需要家10_Bの蓄電設備11を充電制御することにより実現する。
FIG. 16: is a figure explaining the power interchange between the consumers 10 which comprise a power interchange block. The power interchange block shown in FIG. 16 is configured by three consumers 10_A, 10_B, and 10_C.
The billing server 300 controls, for example, the surplus power generated by the photovoltaic power generation facility 12 of a certain consumer 10_A to be stored in the storage battery facility 11 of the consumer 10_B having a large free space. At this time, the charging server 300 acquires the amount of surplus power and the amount of electricity stored in the electricity storage facility 11 from each customer 10 via the network. For example, the charging server 300 acquires the amount of power generated by the solar power generation facility 12, the amount of power consumed by the load 14 of the customer 10, the amount of power stored by the power storage facility 11, and the like via the network. That is, the retail electric power company 510 monitors the power information of each customer 10 in real time via the network by using the charging server 300. Then, the retail electric power company 510 controls the charging of the power storage equipment 11 of the customer 10_B via the charging server 300 so that the power storage equipment 11 of the customer 10_B having a large free space is charged with the surplus power of the customer 10_A. It is realized by doing.

課金サーバ300は、需要家10_Bへ電力の融通量を、需要家10_Aの逆潮流電力メーターMqで測定した逆潮流電力量と、需要家10_Bの順潮流電力メーターMpで測定した順潮流電力量とにより計量する。このとき、小売電気事業者510は、課金サーバ300を用いることにより、需要家10_Bにおいても余剰電力が発生していた場合、需要家10_Bの余剰電力も併せて充電できるよう、需要家10_Bの蓄電設備11を制御することもできる。このとき、需要家10_Bの余剰電力を、需要家10_Bの自身の蓄電設備11に充電する場合、順潮流電力メーターMp及び逆潮流電力メーターMqの各々を通らずに、需要家10_Bの蓄電設備11に蓄電されるため、蓄電される電力量は計量されない。 The billing server 300 measures the amount of power exchanged to the customer 10_B with the amount of reverse power flow measured by the reverse flow power meter Mq of the customer 10_A and the amount of forward power flow measured with the forward power flow meter Mp of the customer 10_B. Weigh by. At this time, the retail electric power company 510 uses the charging server 300 to store the power of the customer 10_B so that the customer 10_B can also charge the surplus power of the customer 10_B when the customer 10_B also generates the surplus power. The equipment 11 can also be controlled. At this time, when the surplus power of the customer 10_B is charged into the power storage equipment 11 of the customer 10_B, the power storage equipment 11 of the customer 10_B does not pass through each of the forward power flow meter Mp and the reverse power flow meter Mq. Since the electric power is stored in, the amount of electric power stored is not measured.

また、夕方や雨などの場合、太陽光発電設備12に照射される太陽光の量が減少するため、太陽光発電設備12の発電する太陽光発電電力が低減する。この太陽光発電電力の低減に伴い、各需要家10は消費電力を太陽光発電電力で賄えなくなり、不足する電力を他の需要家10から購入することとなる。
この時、小売電気事業者510は、課金サーバ300を介して、各需要家10で不足する電力を、需要家10それぞれの蓄電設備11から放電させ、各需要家10に対して供給する制御を、各需要家10の蓄電設備11の各々に対して行う。
Further, in the case of evening or rain, the amount of sunlight applied to the photovoltaic power generation facility 12 decreases, so that the photovoltaic power generated by the photovoltaic power generation facility 12 decreases. With the reduction of the photovoltaic power generation, each consumer 10 cannot cover the power consumption with the photovoltaic power, and purchases the insufficient power from another consumer 10.
At this time, the retail electric power company 510 controls, via the charging server 300, the power shortage in each customer 10 to be discharged from the power storage equipment 11 of each customer 10 and be supplied to each customer 10. , For each power storage facility 11 of each customer 10.

また、需要家10_Bの蓄電設備11に蓄積された蓄電電力を、放電電力として需要家10_B自身でも使用し、同時にこの放電電力を需要家10_Cに対しても供給する。
このとき、需要家10_Bで使用した蓄電設備11からの放電電力は、需要家10_Bが備える順潮流電力メーターMpでも逆潮流電力メーターMqでも計量されない。
しかしながら、需要家10_Bの蓄電設備11から需要家10_Cに融通した放電電力は、需要家10_Bに備えられている逆潮流電力メーターMqにより計量される。また、同様に、需要家10_Cが需要家10_Bの蓄電設備11から融通された放電電力は、需要家10_Cに備えられている順潮流電力メーターMqにより計量される。
Further, the stored power stored in the power storage facility 11 of the customer 10_B is also used as discharge power by the customer 10_B itself, and at the same time, the discharged power is also supplied to the customer 10_C.
At this time, the discharged power from the power storage equipment 11 used by the customer 10_B is not measured by the forward power flow power meter Mp or the reverse power flow power meter Mq provided in the customer 10_B.
However, the discharge power that has been exchanged from the power storage equipment 11 of the customer 10_B to the customer 10_C is measured by the reverse flow power meter Mq provided in the customer 10_B. Similarly, the discharge power that the customer 10_C has exchanged from the power storage facility 11 of the customer 10_B is measured by the forward power meter Mq provided in the customer 10_C.

需要家10_Cの消費電力量が、小売電気事業者510の推定以上に多い場合、需要家10_Bの蓄電設備11からの融通電力(放電電力)だけでは足りない。この場合、課金需要家10_Cが需要家10_Bの蓄電設備11から融通された放電電力では不足することを、需要家10_Cの消費電力量によりサーバ300が検知した場合、小売電気事業者510は卸電気事業者520から商用電力を購入することで、電力融通街区400内における不足電力を賄う。この時、課金サーバ300は、需要家10_Cの蓄電設備11に蓄電されている電力がある場合でも、小売電気事業者510の制御により、想定外の電力消費であったために、需要家10_Cの蓄電設備11からの放電を行わずに停止したままにしたとする。 When the power consumption of the consumer 10_C is larger than the estimation of the retail electric power company 510, the interchanged power (discharge power) from the power storage equipment 11 of the consumer 10_B is not sufficient. In this case, if the server 300 detects that the charging customer 10_C is insufficient with the discharge power that is accommodated from the power storage equipment 11 of the customer 10_B, the retail electric power company 510 determines that the wholesale electricity By purchasing commercial power from the business operator 520, the power shortage in the power interchange district 400 is covered. At this time, even if there is electric power stored in the power storage facility 11 of the consumer 10_C, the charging server 300 controls the retail electric power company 510 to cause unexpected power consumption, and thus the power storage of the consumer 10_C is performed. It is assumed that the facility 11 is stopped without being discharged.

また、時間が経過することにより、需要家10_Bに備えられている蓄電設備11に蓄電されている蓄電電力量が減少することにより、需要家10_Bも卸電気事業者520から商用電力を購入する状態となる。さらに、課金サーバ300は、需要家10_Aに備えられた蓄電設備11を放電させ、この放電電力を需要家10_Bに対して供給する。需要家10_Bが備える順潮流電力メーターMpは、卸電気事業者520から小売電気事業者510が購入した商用電力、及び需要家10_Aからの融通電力の合計が計量される。従来の課金方法においては、この順潮流電力メーターMpにより計量された計量値に基づいて電力量料金が課金される。 In addition, as time passes, the amount of stored power stored in the power storage facility 11 provided in the consumer 10_B decreases, so that the consumer 10_B also purchases commercial power from the wholesale electric power company 520. Becomes Further, the charging server 300 discharges the power storage equipment 11 provided in the customer 10_A and supplies the discharged power to the customer 10_B. The forward power meter Mp provided in the consumer 10_B measures the total of commercial power purchased by the retail electric power company 510 from the wholesale electric power company 520 and the interchanged power from the customer 10_A. In the conventional charging method, the electricity charge is charged based on the measured value measured by the forward power meter Mp.

ここで、この需要家10_Bに供給される商用電力及び融通電力の一部は、需要家10_Bでは消費されずに需要家10_Cで使用されている。したがって、需要家10_Bは、その分の電力量料金の金額だけ損を被ることになる。
しかしながら、需要家10_Bの備える逆潮流電力メーターMqで計量された電力は、需要家10_Cへの融通電力である。この需要家10_Bの備える逆潮流電力メーターMqの計量値を、前述の順潮流電力メーターMpの計量値から差し引くことで損を被ることはなくなる。また、需要家10_Cの順潮流電力メーターMpは、需要家10_Bから融通された融通電力と購入した商用電力との電力量を計量する。ここで、小売電気事業者510の課金サーバ300が需要家10_Cの消費電力量を推定できていれば、需要家10_Cにおいては商用電力を購入せずに済むと考えられる。
上述したように、融通電力と商用電力とに差分があり、商用電力の方が高価であった場合、需要家Cは電力料金において損を被ることになる。
Here, a part of the commercial power and the interchanged power supplied to the consumer 10_B is used by the consumer 10_C without being consumed by the consumer 10_B. Therefore, the consumer 10_B is incurred a loss corresponding to the amount of the electricity charge.
However, the electric power measured by the reverse flow electric power meter Mq included in the consumer 10_B is the interchanged power to the consumer 10_C. By subtracting the measured value of the reverse flow electric power meter Mq provided in the consumer 10_B from the measured value of the forward flow electric power meter Mp described above, there is no loss. In addition, the forward power meter Mp of the customer 10_C measures the amount of power of the interchanged power that is accommodated by the consumer 10_B and the purchased commercial power. Here, if the charging server 300 of the retail electric power company 510 can estimate the power consumption of the customer 10_C, it is considered that the customer 10_C does not need to purchase commercial power.
As described above, if there is a difference between the interchange power and the commercial power, and the commercial power is more expensive, the customer C will suffer a loss in the power charge.

しかしながら、後述するように本実施形態の場合、課金サーバ300が電気料金を求める計算を行う際、電力量に対して乗算しで電力料金を求める乗率が時間帯により一定で、融通電力と商用電力とが区別することなく計量される。このため、上述した課金方法とは異なり、本実施形態においては、需要家10_Cは電力料金において損を被ることが無くなる。このため、需要家10_Cの蓄電設備11に蓄電されている蓄電電力を、放電電力として、後に使用しても、他の需要家10に対して融通しても、需要家10_Cは損を被ることなく、需要家10間における電気料金の経済的損失が軽減される。 However, in the case of the present embodiment, as will be described later, when the billing server 300 performs the calculation for obtaining the electricity charge, the multiplying factor for multiplying the power amount to obtain the power charge is constant depending on the time zone, and the interchange power and commercial Electricity is measured without distinction. Therefore, unlike the above-described charging method, in the present embodiment, the customer 10_C does not suffer a loss in the power charge. Therefore, even if the stored power stored in the power storage facility 11 of the customer 10_C is used as discharge power later or is shared with another customer 10, the customer 10_C suffers a loss. Therefore, the economic loss of the electricity charge between the customers 10 is reduced.

月間において需要家10_Bに備えられている順潮流電力メーターMpの計量値が800kWh、逆潮流電力メーターMqの計量値が400kWhであったとすると、課金サーバ300は、その差分の電力量400kWhに乗率、例えば20円/kWhを乗算して、電力量料金を8000円と求める。小売電気事業者510は、電力量料金8000円に加え、基本料金等を需要家10_Bから徴収する。
電力融通街区400においては、晴れた日中に各需要家10に備えられた太陽光発電設備12が発電する太陽光発電量が多く、各需要家10の蓄電設備11が満充電となっても、余剰電力が発生する。この場合、その電力融通街区400全体の余剰電力は、電力融通街区400から系統に対して逆潮流される。
Assuming that the metric value of the forward flow power meter Mp provided in the consumer 10_B is 800 kWh and the metric value of the reverse flow power meter Mq is 400 kWh in the month, the charging server 300 multiplies the difference power amount 400 kWh. , For example, 20 yen/kWh is multiplied to obtain the electricity charge of 8000 yen. The retail electric power company 510 collects a basic charge and the like from the customer 10_B in addition to the electric power charge of 8,000 yen.
In the power interchange district 400, the amount of solar power generated by the solar power generation facility 12 provided in each consumer 10 is large during a sunny day, and the power storage facility 11 of each consumer 10 is fully charged. , Surplus power is generated. In this case, the surplus power of the entire power interchange district 400 flows backward from the power interchange district 400 to the grid.

・小売電気事業者の電力取引
電力融通街区400内には、需要家としてショッピングセンター250がある。ショッピングセンター250の日中の電力消費量は、電力融通街区400内の需要家10の各々の余剰電力量に比べて十分に大きく、電力融通街区400内の需要家10の余剰電力は全てショッピングセンター250に対して融通される。このため、電力融通街区400全体では余剰電力は発生しない。
Electric power transaction of retail electric power company In the electric power interchange district 400, there is a shopping center 250 as a customer. The daytime power consumption of the shopping center 250 is sufficiently larger than the surplus power amount of each of the consumers 10 in the power interchange district 400, and all the surplus power of the consumers 10 in the electricity interchange district 400 is a shopping center. Flexible to 250. Therefore, no surplus power is generated in the entire power interchange district 400.

本実施形態においては、需要家10が各々、送配電事業者530の配電線200上で、需要家10の各々の間で物理的に電力融通がなされ、小売電気事業者510がある需要家10の余剰電力を買取り、他の需要家10に販売することで、電力の取引上において融通したと見做すことができる。
これまで説明のために、需要家10_A、需要家10_B及び需要家10_Cの3戸を用いて説明したが、電力融通街区400に70戸の需要家10があり、需要家10それぞれの間において電力の融通が行われる。例えば、課金サーバ300は、電力融通街区400において、70戸の需要家10に対して電力を融通する場合に、このうちの45戸の需要家10が備える蓄電設備11を動かす、といった運用を行う。
In the present embodiment, each customer 10 physically exchanges power between each of the customers 10 on the distribution line 200 of the power transmission and distribution company 530, and there is a customer 10 with the retail electric company 510. It is possible to consider that the surplus electric power is purchased and sold to other customers 10, so that it is flexible in the transaction of electric power.
Up to this point, the description has been made by using three units of the customer 10_A, the customer 10_B, and the customer 10_C, but there are 70 customers 10 in the electric power interchange block 400, and electricity is consumed between the customers 10 respectively. The accommodation of For example, in the power interchange district 400, the charging server 300 operates such that when power is supplied to 70 customers 10, 45 of the customers 10 operate the power storage equipment 11 provided therein. ..

小売電気事業者510は、卸電気事業者520から電力を調達し、電力融通街区400の需要家10に販売する。小売電気事業者510は、卸電気事業者520に調達電力の対価を支払う。また、一般送配電事業者である送配電事業者530の配電線を使用する場合は、一般送配電事業者に託送費を支払う。加えて、再生可能エネルギー発電促進賦課金を定められた費用負担調整機関540に支払う。これらの費用は電気を需要家10に供給した量に応じて支払う必要がある。課金サーバ300は、この需要家10に供給した電力量に基づき、上記小売電気事業者510、送配電事業者530及び費用負担調整機関に支払う費用の算出を行う。 The retail electric power company 510 procures electric power from the wholesale electric power company 520 and sells it to the customers 10 in the electric power interchange district 400. The retail electric power company 510 pays the wholesale electric power company 520 consideration for the procured electric power. Moreover, when using the distribution line of the power transmission and distribution company 530 which is a general power transmission and distribution company, a consignment fee is paid to the general power transmission and distribution company. In addition, the renewable energy power generation promotion levy is paid to the established cost burden adjustment agency 540. These costs need to be paid according to the amount of electricity supplied to the customer 10. The billing server 300 calculates the cost to be paid to the retail electric power company 510, the power transmission and distribution company 530, and the cost burden adjusting agency based on the amount of electric power supplied to the customer 10.

しかしながら、各需要家10に設置された順潮流電力メーターMpは、一時的に蓄電した他の住戸からの融通電力の電力量も計量されており、この計量値をもとにすれば少なくとも調達電力の対価や再生可能エネルギー発電促進賦課金の支払額が過剰になる。したがって、順潮流電力メーターMpの計量した電力量を、上記小売電気事業者510、送配電事業者530及び費用負担調整機関に支払う費用の算定には使えない。
そこで、電力融通街区400全体の電力供給量を、電力融通街区400の需要家10に備えられている順潮流電力メーターMp全ての電力量を加算することにより、その計量値を用いることで問題を解決することができる。
However, the forward flow power meter Mp installed in each consumer 10 also measures the amount of the interchanged power from other dwelling units that has temporarily stored electricity, and based on this measured value, at least the procured power is obtained. Will be overpaid and the levy for renewable energy generation will be excessive. Therefore, the amount of power measured by the forward power meter Mp cannot be used to calculate the cost to be paid to the retail electric power company 510, the power transmission and distribution company 530, and the cost burden adjusting agency.
Therefore, the power supply amount of the entire power interchange block 400 is added to the power amounts of all the forward flow power meters Mp provided in the consumers 10 of the power interchange block 400 to use the measured value to solve the problem. Can be resolved.

例えば、電力融通街区400の需要家10の順潮流電力メーターMp全ての電力量の計量値がある月に12500kWhであり、逆潮流電力メーターMq全ての電力量の計量値がある月に500kWhであり、ショッピングセンター250の順潮流電力メーターMpの電力量の計量値が15000kWh/月であった場合、順潮流量から逆潮流量を減算した総計27000kWhの電力量に対し、卸電気事業者520に調達電力の対価、送配電事業者530に託送費、費用負担調整機関540に再生可能エネルギー発電促進賦課金を支払う。 For example, it is 12,500kWh in the month when there is a metric value of the power amount of all forward power meter Mp of the consumer 10 in the power interchange district 400, and 500kWh in the month when there is a metric value of all the reverse power meter Mq. , If the metric value of the power flow meter Mp of the shopping center 250 is 15000kWh/month, the total amount of 27,000kWh of the power flow obtained by subtracting the reverse flow rate from the forward flow rate is procured by the wholesale electric power company 520. The price of electricity, the transmission cost to the power transmission and distribution company 530, and the renewable energy power generation promotion levy to the cost burden adjusting agency 540 are paid.

また、本実施形態においては、電力融通街区400を需要家10とショッピングセンター250とからの構成例で説明したが、一般の住宅である需要家だけで構成された需要家集合体でなくても構わない。例えば、電力融通街区に設置された太陽光発電施設などの発電施設が需要家集合体に加わっていても良い。
また、需要家に特に限定はなく、住宅や商店などの低圧需要家や、スーパーや事業所、オフィスビルなどの高圧需要家、大型ショッピングセンターや大規模工場などの特別高圧需要家などがある。
また、需要家10に備えられている蓄電設備に限定はなく、蓄電池設備、リチウムイオンキャパシタ、フライホイールなどのいすれかあるいは組み合わせを用いても良い。
Further, in the present embodiment, the power interchange district 400 has been described with the example of the configuration including the customer 10 and the shopping center 250, but it is not limited to the customer aggregate including only the customers who are ordinary houses. I do not care. For example, a power generation facility such as a solar power generation facility installed in the power interchange district may be added to the customer group.
Further, the customers are not particularly limited, and there are low-voltage customers such as houses and shops, high-voltage customers such as supermarkets, business offices and office buildings, and special high-voltage customers such as large shopping centers and large-scale factories.
Further, the power storage equipment provided in the consumer 10 is not limited, and any one or combination of a storage battery equipment, a lithium ion capacitor, a flywheel and the like may be used.

また、順潮流電力メーターMpと逆潮流電力メーターMqとに限定はないが、一般的には計量法上の検定を通った積算電力計であり、遠隔検針可能なスマートメーターを用いることが望ましい。課金サーバ300は、ネットワークを介して順潮流電力メーターMpと逆潮流電力メーターMqとの計量値を各需要家10から取得する。
また、順潮流電力メーターMpと逆潮流電力メーターMqとの各々が積算電力計である場合、積算値が課金サーバ300により検針されて電力量が取得される。ある時点の検針値が23456.7[kWh]であり、前回検針した際の検針値が23789.0[kWh]であった場合、所定の期間における計量値は、332.3[kWh]となる。所定の期間は大手電力会社の場合、通常1ヶ月である。
Further, the forward power flow power meter Mp and the reverse power flow power meter Mq are not limited, but they are generally integrated power meters that have passed the verification in accordance with the Measurement Law, and it is desirable to use a smart meter capable of remote meter reading. The billing server 300 acquires the measured values of the forward flow power meter Mp and the reverse flow power meter Mq from each customer 10 via the network.
When each of the forward power flow power meter Mp and the reverse power flow power meter Mq is an integrated power meter, the integrated value is read by the billing server 300 to obtain the power amount. When the meter reading value at a certain point is 23456.7 [kWh] and the meter reading value at the time of the previous meter reading is 23789.0 [kWh], the measured value in a predetermined period becomes 332.3 [kWh]. .. The predetermined period is usually one month for a major electric power company.

また、すでに電力料金を求める際に説明した「乗率」とは、計量値(電力量)[kWh]に乗じて電力量に応じた電力量料金を算出するための単価[円/kWh]である。
順潮流電力メーターMpと逆潮流電力メーターMqとの各々がスマートメーターの場合、30分単位で計量が可能であるため、時間帯によって乗率を変えることもできる。TOU(Time of Use)料金プランがその例で、深夜時間帯は安価な乗率で、日中は高価な乗率の設定となっている。
In addition, the "multiplying factor" that was already explained when calculating the electricity charge is the unit price [yen/kWh] for multiplying the measured value (electric energy) [kWh] to calculate the electricity charge according to the electric energy. is there.
When each of the forward power flow power meter Mp and the reverse power flow power meter Mq is a smart meter, it is possible to measure in units of 30 minutes, and thus the multiplication factor can be changed depending on the time zone. An example of this is the TOU (Time of Use) rate plan, in which a low-cost multiplication factor is set at midnight and an expensive multiplication factor is set during the daytime.

しかしながら、このように時間帯別に乗率が異なると、以下の様な電力料金の経済的負担の格差が生じる。例えば、図16の需要家10_Bが、需要家10_Aから需要家10_Aの太陽光発電設備12が発電した発電電力を高価な乗率で購入する。そして、一旦蓄電設備11に貯めた後に、需要家10_Bが需要家10_Cに対して安価な乗率で販売することとなる場合がある。この場合において、需要家10_Bは、自身の蓄電設備11において一時的に余分な電気を預かっただけにも関わらず、経済的損失を被ることとなる。
したがって、「時間帯により変化しない一定の乗率」を設定することによって、はじめて電力融通街区400が電力料金において経済的負担の格差を軽減することが可能なものとなる。
However, if the multiplying factors differ depending on the time of day, the following disparities in the economic burden of electricity charges will occur. For example, the consumer 10_B in FIG. 16 purchases the power generated by the solar power generation facility 12 of the consumer 10_A from the consumer 10_A at an expensive multiplication factor. Then, after the electricity is temporarily stored in the electricity storage facility 11, the customer 10_B may sell the electricity to the customer 10_C at an inexpensive multiplication factor. In this case, the customer 10_B suffers an economic loss even though he/she temporarily deposits extra electricity in his/her power storage facility 11.
Therefore, by setting the "constant multiplication factor that does not change depending on the time zone", it becomes possible for the electric power interchange district 400 to reduce the difference in the economic burden of the electric power charges for the first time.

本実施形態においては、課金サーバ300が、順潮流電力の計量値から逆潮流電力の計量値を差し引いて、それに乗率を乗じて電力料金を求めている。しかしながら、この電力料金の求め方は、計算順序を限定するものではなく、順潮流電力の計量値に乗率を乗算したものと、逆潮流電力の計量値に乗率を乗算したものの差分をとっても構わない。 In the present embodiment, the charging server 300 subtracts the metric value of the backward flow power from the metric value of the forward flow power and multiplies it by the multiplication factor to obtain the power charge. However, the method of obtaining the power charge does not limit the calculation order, and even if the difference between the product of the metric value of the forward flow power and the product of the metric value of the reverse flow power is multiplied, I do not care.

また、電力融通街区400内において、順潮流電力の計量値に乗ずる乗率と、逆潮流電力の計量値に乗ずる乗率は同一である(言い換えると、同一でなければならない)。
例えば、順潮流電力よりも逆潮流電力の計量値に乗ずる乗率の方が大きいと、図16において、需要家10_Bが需要家10_Aの太陽光発電設備12が発電した電力を安価な乗率で購入し、一旦、需要家10_Bが自身の蓄電設備12に蓄電して貯める。その後、需要家10_Bは、蓄電設備11に蓄電した電力を、需要家10_Cへ高価な乗率で販売する。この場合、需要家10_Cは、安価な乗率(電力料金)で電力を買い取ることとなる。一方、需要家10_Bは、一時的に余分な電気を預かっただけで利益を得る。
Further, in the power interchange district 400, the multiplying factor by which the metric value of forward power flow power is multiplied by the multiplying factor by which the metric value of reverse power flow power is multiplied (in other words, they must be the same).
For example, if the multiplying factor for multiplying the backward flow power by the measured value of the backward flow power is larger than the forward flow power, in FIG. 16, the customer 10_B generates the power generated by the solar power generation facility 12 of the customer 10_A at a low multiplication rate. The customer 10_B purchases and once stores electricity in the electricity storage facility 12 of his/her own. After that, the customer 10_B sells the electric power stored in the power storage equipment 11 to the customer 10_C at an expensive multiplication factor. In this case, the customer 10_C will purchase the electric power at an inexpensive multiplication factor (electricity charge). On the other hand, the consumer 10_B profits only by temporarily depositing extra electricity.

この時、需要家10_A、需要家10_B及び需要家10_Cの各々の間における電力売買は、それぞれの需要家自らが行うことはできない。このため、小売電気事業者510が仲介し、需要家10_Aから一旦電力を買取り、買い取った電力を需要家10_Bに対して販売し、需要家10_Bから電気を買取り、買い取った電力を需要家10_Cに販売することになる。しかしながら、需要家10_Bの利益額を負担するのは小売電気事業者510となり、小売電気事業者510の事業は成立しなくなくなる懸念がある。
このようなことを勘案すれば、順潮流電力の計量値に乗ずる乗率と、逆潮流電力の計量値に乗ずる乗率は同一に設定した電力融通街区400において、初めて、電力料金の経済的負担の格差を低減することが担保され電力融通街区400の実現性が得られる。
At this time, power purchase and sale among the consumers 10_A, the consumers 10_B, and the consumers 10_C cannot be performed by the consumers themselves. Therefore, the retail electric power company 510 mediates, buys the power from the customer 10_A once, sells the purchased power to the customer 10_B, buys the electricity from the customer 10_B, and sells the purchased power to the customer 10_C. Will be sold. However, the retail electric power company 510 bears the profit amount of the consumer 10_B, and there is a concern that the business of the retail electric power company 510 will not be established.
Taking this into consideration, in the electric power interchange district 400 where the multiplying factor for multiplying the metric value of the forward power flow and the multiplying factor for multiplying the metric value of the reverse flow power are set to be the same, the economic burden of the power charge will be for the first time. It is ensured that the difference in power consumption is reduced, and the feasibility of the power interchange district 400 is obtained.

なお、需要家10が負担すべき料金が、計算の結果、負の値となった時は、小売電気事業者510から需要家10へその絶対値の金額が支払われる。
また、複数の需要家10は、地理的に隣接して立地する必要はなく、小売電気事業者510が需要家からの電力を販売・買取することで、地理的に離れていても電力融通を行ったと見做すことができる。
When the charge that the customer 10 should bear becomes a negative value as a result of the calculation, the retail electric power company 510 pays the customer 10 the amount of the absolute value.
Further, the plurality of consumers 10 do not need to be located geographically adjacent to each other, and the retail electric power company 510 sells and purchases the power from the consumers, thereby allowing the power interchange even if geographically separated. You can think that you went.

図17は、第3の実施形態による課金システムが管理する電力融通街区の他の構成例を示す図である。
図14のように、ショッピングセンター250の様な商業施設はなく、図17に示す融通街区100は、一般の住宅である需要家10の複数戸から構成されている。
すでに説明したように、電力融通街区400内の需要化10の間で、電力の融通が行われ、課金サーバ300により、融通した(供給した)電力量と融通された(供給された)電力量とから、電力料金の計算が行われ、このとき使用される乗率(電力量に乗算する乗率、すなわち係数)はすでに説明したように、時間、順潮流(融通された)及び逆潮流(融通した)によらず一定(同一)である。課金サーバ300は、上記乗率を、融通した電力量と融通された電力量との差分の電力量に対して乗算する。このため、融通した電力量が融通された電力量よりも大きい場合、電気料金は負の値(支払い金額)となる。一方、融通した電力量が融通された電力量よりも小さい場合、電気料金は正の値(受取金額)となる。
FIG. 17 is a diagram showing another configuration example of the power interchange block managed by the charging system according to the third embodiment.
As shown in FIG. 14, there is no commercial facility like the shopping center 250, and the interchange block 100 shown in FIG. 17 is composed of a plurality of consumers 10 who are ordinary houses.
As described above, the power is exchanged during the demand 10 in the power interchange block 400, and the amount of power that has been exchanged (supplied) and the amount of power that has been exchanged (supplied) by the charging server 300. From this, the power charge is calculated, and the multiplier factor (multiplier factor for multiplying the amount of power, that is, coefficient) used at this time is the time, forward power (flexible) and reverse power flow ( It is constant (identical) regardless of whether it is flexible. The billing server 300 multiplies the multiplication factor by the power amount of the difference between the shared power amount and the shared power amount. For this reason, when the interchanged power amount is larger than the interchanged power amount, the electricity charge has a negative value (payment amount). On the other hand, when the interchanged power amount is smaller than the interchanged power amount, the electricity charge has a positive value (receipt amount).

電力融通街区100の需要家10全体から逆潮流電力が生じない場合、需要家10の集合体を構成する需要家の逆潮流電力は、全て電力融通街区100内部で消費されたことになる。そのため、需要家10ごとの順潮流電力メーターMpの計量値と逆潮流電力メーターMqの計量値の差分の電力融通街区100における総和が、電力融通街区100全体の購入電力として算出できる。
この計算結果の購入電力を根拠として課金サーバ300が電気料金の計算を行い、小売電気事業者510は、この電気料金に基づいて、託送費を送配電事業者530に、再生可能エネルギー発電促進賦課金を費用負担調整機関540に支払い、また、卸電気事業者520に調達料金を支払う。
When the reverse flow power is not generated from the entire consumers 10 in the power interchange district 100, all the reverse flow power of the consumers forming the aggregate of the consumers 10 is consumed inside the electricity interchange district 100. Therefore, the sum of the difference between the measured value of the forward flow power meter Mp and the measured value of the reverse flow power meter Mq for each consumer 10 in the power interchange district 100 can be calculated as the purchase power of the entire electricity interchange district 100.
The billing server 300 calculates an electricity charge based on the purchased power as a result of this calculation, and the retail electric power company 510 charges the transportation cost to the power transmission and distribution company 530 on the basis of the electricity charge. The money is paid to the expense burden adjusting organization 540, and the procurement fee is paid to the wholesale electric power company 520.

この図17に示す他の構成においても、需要家だけで構成された需要家集合体でなくても構わない。例えば、課金サーバが管理する電力融通街区に設置された太陽光発電施設なの発電施設が需要家集合体に加わっていても良い。 Even in the other configuration shown in FIG. 17, the customer aggregate does not have to be configured by only the customers. For example, a power generation facility such as a solar power generation facility installed in a power interchange block managed by the billing server may be added to the customer group.

上述した本実施形態によれば、時間帯、順潮流及び逆潮流により変化しない一定の乗率を設定し、融通した電力量と融通された電力量との差分の電力量に乗算するため、いつ電力を融通しても、いつ電力を融通されたとしても、同一乗率であるため、電力料金が電力量にのみ対応することとなり、電力融通街区における電力料金に対する各需要家10の経済的負担の格差を低減し、この電力融通街区を実現可能なものとすることができる。 According to the present embodiment described above, a constant multiplication factor that does not change depending on the time zone, forward power flow and reverse power flow is set, and the difference power amount between the interchanged power amount and the interchanged power amount is multiplied. Even if the power is exchanged, even if the power is exchanged at all times, the power factor corresponds only to the amount of power because the multiplication factor is the same, and the economic burden of each consumer 10 on the power fee in the power interchange block It is possible to reduce the disparity between the two and realize the power interchange district.

なお、上述の課金システム20、20a及び課金サーバ300の機能を実現するためのプログラムをコンピュータ読み取り可能な記録媒体に記録して、この記録媒体に記録されたプログラムをコンピュータシステムに読み込ませ、実行することにより上述の課金サーバ300の処理を行ってもよい。ここで、「記録媒体に記録されたプログラムをコンピュータシステムに読み込ませ、実行する」とは、コンピュータシステムにプログラムをインストールすることを含む。
ここでいう「コンピュータシステム」とは、OSや周辺機器等のハードウェアを含むものとする。また、「コンピュータシステム」は、インターネットやWAN、LAN、専用回線等の通信回線を含むネットワークを介して接続された複数のコンピュータ装置を含んでもよい。また、「コンピュータ読み取り可能な記録媒体」とは、フレキシブルディスク、光磁気ディスク、ROM、CD−ROM等の可搬媒体、コンピュータシステムに内蔵されるハードディスク等の記憶装置のことをいう。このように、プログラムを記憶した記録媒体は、CD−ROM等の非一過性の記録媒体であってもよい。
It should be noted that a program for realizing the functions of the above-described charging system 20, 20a and charging server 300 is recorded in a computer-readable recording medium, and the program recorded in this recording medium is read by the computer system and executed. By doing so, the processing of the charging server 300 described above may be performed. Here, “reading and executing a program recorded in a recording medium on a computer system” includes installing the program in the computer system.
The “computer system” mentioned here includes an OS and hardware such as peripheral devices. Further, the “computer system” may include a plurality of computer devices connected via a network including a communication line such as the Internet, WAN, LAN, and a dedicated line. Further, the “computer-readable recording medium” refers to a portable medium such as a flexible disk, a magneto-optical disk, a ROM, a CD-ROM, or a storage device such as a hard disk built in a computer system. As described above, the recording medium storing the program may be a non-transitory recording medium such as a CD-ROM.

また、記録媒体には、当該プログラムを配信するために配信サーバからアクセス可能な内部または外部に設けられた記録媒体も含まれる。配信サーバの記録媒体に記憶されるプログラムのコードは、端末装置で実行可能な形式のプログラムのコードと異なるものでもよい。すなわち、配信サーバからダウンロードされて端末装置で実行可能な形でインストールができるものであれば、配信サーバで記憶される形式は問わない。なお、プログラムを複数に分割し、それぞれ異なるタイミングでダウンロードした後に端末装置で合体される構成や、分割されたプログラムのそれぞれを配信する配信サーバが異なっていてもよい。さらに「コンピュータ読み取り可能な記録媒体」とは、ネットワークを介してプログラムが送信された場合のサーバやクライアントとなるコンピュータシステム内部の揮発性メモリ(RAM)のように、一定時間プログラムを保持しているものも含むものとする。また、上記プログラムは、上述した機能の一部を実現するためのものであってもよい。さらに、上述した機能をコンピュータシステムにすでに記録されているプログラムとの組み合わせで実現できるもの、いわゆる差分ファイル(差分プログラム)であってもよい。 The recording medium also includes a recording medium provided inside or outside accessible from the distribution server for distributing the program. The code of the program stored in the recording medium of the distribution server may be different from the code of the program in a format executable by the terminal device. That is, the format stored in the distribution server does not matter as long as it can be downloaded from the distribution server and installed in a form executable by the terminal device. Note that the program may be divided into a plurality of programs and downloaded at different timings, and then combined by the terminal device, or the distribution server that distributes each of the divided programs may be different. Further, the "computer-readable recording medium" holds a program for a certain period of time, such as a volatile memory (RAM) inside a computer system that serves as a server or a client when the program is transmitted via a network. It also includes things. Further, the program may be for realizing a part of the functions described above. Further, it may be a so-called difference file (difference program) that can realize the above-mentioned functions in combination with a program already recorded in the computer system.

以上、本発明の実施形態について図面を参照して詳述してきたが、具体的な構成は本実施形態に限られるものではなく、本発明の要旨を逸脱しない範囲の設計等も含まれる。 Although the embodiment of the present invention has been described in detail above with reference to the drawings, the specific configuration is not limited to the present embodiment, and includes a design and the like within a range not departing from the gist of the present invention.

10,10_1,10_2,10_3,10_4,10_5…需要家施設(需要家)、11,11a…蓄電設備、12…太陽光発電設備、13…分電盤、14…負荷、15…HEMS、16…モデム、20,20a…課金システム、20b…データ算出サーバ、21…演算部、21a…電気料金算出部、22,351…検針値受信部、23…メモリ、24…受信部、25,33…送受信部、26…電力管理部、30…電力管理システム、31…情報収集部、32…蓄電池制御決定部、34,160…送信部、100…記憶部、101,231…第1の記憶部、102,232…第2の記憶部、211…電気料金算出部、212…割引額算出部、213…請求額算出部250…ショッピングセンター、300…電力サーバ、350…費用演算システム、352…費用演算処理サーバ、400…電力融通街区、500…需要家集合体、510…小売電気事業者、520…卸電気事業者、530…送配電事業者、540…費用負担調整機関、550A,550B,550C,550D…地域、600…課金処理サーバ、Mp,Mpt…買電用電力計(順潮流電力メーター)、Mq,Mqt…売電用電力計(逆潮流電力メータ) 10, 10_1, 10_2, 10_3, 10_4, 10_5... Consumer facility (customer), 11, 11a... Power storage facility, 12... Solar power generation facility, 13... Distribution board, 14... Load, 15... HEMS, 16... Modem, 20, 20a...Billing system, 20b...Data calculation server, 21...Calculation unit, 21a...Electricity charge calculation unit, 22,351...Meter reading value receiving unit, 23...Memory, 24...Reception unit, 25,33...Transmission/reception Unit, 26... power management unit, 30... power management system, 31... information collection unit, 32... storage battery control determination unit, 34, 160... transmission unit, 100... storage unit, 101, 231... first storage unit, 102 , 232... Second storage unit, 211... Electricity charge calculation unit, 212... Discount amount calculation unit, 213... Billing amount calculation unit 250... Shopping center, 300... Electric power server, 350... Expense calculation system, 352... Expense calculation process Servers, 400... Electric power interchange districts, 500... Consumer groups, 510... Retail electric power companies, 520... Wholesale electric power companies, 530... Power transmission and distribution companies, 540... Cost burden adjustment agencies, 550A, 550B, 550C, 550D ... area, 600... billing server, Mp, Mpt... power meter for power purchase (forward flow power meter), Mq, Mqt... power meter for power sale (reverse power flow meter)

Claims (9)

電力系統に接続された複数の需要家の電力の売買における電力データを管理するサーバを備える電力データ管理システムであり、
前記複数の需要家の内、少なくとも2以上の需要家に発電設備または需要設備のいずれか、あるいは前記発電設備と前記需要設備とが設置され、
前記複数の需要家の少なくとも2以上の需要家が、
前記電力系統から受電した順潮流電力のデータと、前記電力系統へ送電した逆潮流電力のデータとの各々のデータに基づき、前記需要家の各々が負担すべき料金を求めるための料金データを算定する際、前記サーバが時間帯により変化しない一定の数値であり、かつ順潮流電力及び逆潮流電力の各々に対して同一の乗率を計量値に乗算した結果に基づき、当該料金データを算定する
ことを特徴とする電力データ管理システム。
It is a power data management system including a server that manages power data in buying and selling power of a plurality of consumers connected to a power grid,
At least two or more of the plurality of customers are provided with either the power generation equipment or the demand equipment, or the power generation equipment and the demand equipment.
At least two or more customers of the plurality of customers,
Based on each data of the forward flow power data received from the power system and the reverse flow power data transmitted to the power system, the charge data for calculating the charge to be paid by each of the consumers is calculated. In doing so, the server calculates the fee data based on the result of multiplying the measured value by a constant value that does not change depending on the time zone and multiplying the forward power and the backward power by the same multiplication factor. A power data management system characterized in that
前記電力系統から受電した順潮流電力のデータを計量する機能と、
前記電力系統へ送電した逆潮流電力のデータを計量する機能と
を備えた計量手段を備える
ことを特徴とする請求項1に記載の電力データ管理システム。
A function of measuring data of forward power flow received from the power system,
The power data management system according to claim 1, further comprising: a measuring unit having a function of measuring data of reverse flow power transmitted to the power system.
前記サーバが、
前記計量手段で計量された所定の期間における前記順潮流電力の計量値と、前記逆潮流電力の計量値との差分を求め、前記乗率を乗算した結果に基づき、当該所定の期間における前記料金データを算定する
ことを特徴とする請求項2に記載の電力データ管理システム。
The server is
Based on the result of obtaining the difference between the measured value of the forward flow power and the measured value of the reverse flow power in the predetermined period measured by the measuring means and multiplying the multiplication factor, the fee in the predetermined period The power data management system according to claim 2, wherein data is calculated.
前記複数の需要家が、隣接して立地する電力融通街区であり、
前記サーバが、
外部から前記電力融通街区に供給された街区順潮流電力を計量する街区計量手段で計量された所定の期間における順潮流電力量に基づき、
前記電力融通街区における前記需要家の使用電力に応じて支払う費用を算定する
ことを特徴とする請求項1から請求項のいずれか一項に記載の電力データ管理システム。
The plurality of consumers is an electric power interchange block located adjacent to each other,
The server is
Based on the forward flow power in a predetermined period measured by the block measuring means for measuring the block forward power supplied to the power interchange block from the outside,
The power data management system according to any one of claims 1 to 3 , wherein a cost to be paid is calculated according to the power used by the customer in the power interchange block.
少なくとも各々が電力系統に接続された複数の需要計量値を乗算した家で構成され、
前記複数の需要家の内、少なくとも一の需要家に任意に制御可能な発電設備または需要設備のいずれか、あるいは前記発電設備及び前記需要設備の各々が設置され、
前記複数の需要家間で、前記電力系統を介して電力を融通する、需要家集合体であって、
前記複数の需要家の各々が、
所定の期間において計量された順潮流電力のデータと、逆潮流電力のデータとに基づき、需要家が負担すべき電力量の料金を求める料金データを算定する際、サーバが時間帯により変化しない一定の数値であり、かつ順潮流電力及び逆潮流電力の各々に対して同一の乗率を計量値に乗算した結果に基づき、当該料金データを算定する
ことを特徴とする需要家集合体。
At least each is made up of a house multiplied by multiple demand metrics connected to the grid,
Of the plurality of customers, at least one of the power generation equipment or demand equipment that can be arbitrarily controlled, or each of the power generation equipment and the demand equipment is installed,
Among the plurality of customers, which is a customer group that exchanges electric power through the power system,
Each of the plurality of consumers,
When calculating the charge data for the charge of the amount of power that the customer should bear based on the data of the forward flow power measured in a predetermined period and the data of the reverse flow power, the server does not change depending on the time period. The customer aggregate characterized in that the charge data is calculated based on the result of multiplying the metric value by the same multiplication factor for each of the forward flow power and the reverse flow power.
前記電力系統から受電した順潮流電力を計量する機能と、
前記電力系統へ送電した逆潮流電力を計量する機能と、
を備えた計量手段を備える
ことを特徴とする請求項に記載の需要家集合体。
A function for measuring the forward flow power received from the power system,
A function of measuring the reverse flow power transmitted to the power system,
The customer aggregate according to claim 5 , further comprising a weighing means including.
算定した料金データに、時間帯により変化しない一定の乗率を乗算した結果をもとに、需要家が負担すべき電力量の料金を求める
ことを特徴とする請求項に記載の需要家集合体。
The set of consumers according to claim 6 , wherein a charge for the amount of electric power that the customer should bear is obtained based on the result of multiplying the calculated charge data by a constant multiplication factor that does not change depending on the time of day. body.
所定の期間における料金データの総和をもとに、前記複数の需要家の使用電力に応じて支払う料金を求める料金データを算定する
ことを特徴とする請求項または請求項に記載の需要家集合体。
The consumer data according to claim 6 or 7 , wherein the consumer data according to claim 6 or 7 is calculated based on the total sum of the bill data in a predetermined period according to the power consumption of the plurality of consumers. Aggregation.
請求項から請求項のいずれか一項に記載の需要家集合体を構成する複数の需要家が隣接して立地する電力融通街区であり、
前記電力融通街区と外部との配電系統の連携点において、所定の期間において計量された前記電力融通街区の順潮流電力の計量値に基づいて、
前記複数の需要家の使用電力に応じて支払う料金を求める料金データを算定する
ことを特徴とする電力融通街区。
A power interchange block in which a plurality of customers constituting the customer group according to any one of claims 5 to 8 are adjacently located,
At the cooperation point of the distribution system of the power interchange block and the outside, based on the measured value of the forward flow power of the power interchange block measured in a predetermined period,
An electric power interchange block characterized by calculating charge data for a charge to be paid according to the electric power used by the plurality of consumers.
JP2016130924A 2015-07-17 2016-06-30 Electric power data management system, consumer group and electric power interchange block Active JP6703447B2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2015143174 2015-07-17
JP2015143174 2015-07-17

Publications (2)

Publication Number Publication Date
JP2017028986A JP2017028986A (en) 2017-02-02
JP6703447B2 true JP6703447B2 (en) 2020-06-03

Family

ID=57950667

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016130924A Active JP6703447B2 (en) 2015-07-17 2016-06-30 Electric power data management system, consumer group and electric power interchange block

Country Status (1)

Country Link
JP (1) JP6703447B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4300751A1 (en) * 2022-06-21 2024-01-03 Toshiba Energy Systems & Solutions Corporation Reverse flow power control device and reverse flow power control method

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018181732A1 (en) * 2017-03-31 2018-10-04 京セラ株式会社 Power supply control method, second provider server, and control device
KR101830895B1 (en) * 2017-05-10 2018-02-21 피에스텍 주식회사 Multi Channel Watt-Hour Meter
EP3407452A1 (en) * 2017-05-24 2018-11-28 Siemens Aktiengesellschaft Control of a distribution network
KR102075410B1 (en) * 2017-12-29 2020-02-10 주식회사 인코어드 테크놀로지스 Apparatus and method for intermediating electric power trade
JP2020124022A (en) * 2019-01-29 2020-08-13 京セラ株式会社 Power management device, power storage device, and power management method
JP2022050576A (en) * 2019-01-29 2022-03-30 京セラ株式会社 Power management device, power storage device, and power management method
JP7221129B2 (en) * 2019-04-12 2023-02-13 京セラ株式会社 Power management device, power management system and power management method
JP7413674B2 (en) * 2019-08-05 2024-01-16 中国電力株式会社 Electricity storage point system
JP7316433B2 (en) * 2022-01-11 2023-07-27 京セラ株式会社 Power management device, power storage device, and power management method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003244843A (en) * 2002-02-15 2003-08-29 Sanyo Electric Co Ltd Power-purchasing system
JP5503677B2 (en) * 2012-03-06 2014-05-28 ヤフー株式会社 System, information processing method, and computer program

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4300751A1 (en) * 2022-06-21 2024-01-03 Toshiba Energy Systems & Solutions Corporation Reverse flow power control device and reverse flow power control method

Also Published As

Publication number Publication date
JP2017028986A (en) 2017-02-02

Similar Documents

Publication Publication Date Title
JP6703447B2 (en) Electric power data management system, consumer group and electric power interchange block
Taşcıkaraoğlu Economic and operational benefits of energy storage sharing for a neighborhood of prosumers in a dynamic pricing environment
US20120259760A1 (en) Hybrid energy market and currency system for total energy management
US20110055036A1 (en) Methods and systems for managing electricity delivery and commerce
JP6512503B2 (en) Power adjustment device, power adjustment method, program
US20130332327A1 (en) Hybrid Energy Market and Currency System for Total Energy Management
WO2015019599A1 (en) Power adjustment device, power adjustment method, and program
JP6754615B2 (en) Incentive calculation system and control method of incentive calculation system
JP2014228948A (en) Electric power charge management system
Sgouridis et al. Tangible and fungible energy: Hybrid energy market and currency system for total energy management. A Masdar City case study
WO2016186056A1 (en) Power station system and power station system server
JP5474716B2 (en) Solar power generation system
JP2005185016A (en) Electric power information processing system
JP7297004B2 (en) Power supply system and power management method
JP6698371B2 (en) Electric charge management device, electric charge management method and program
JP7205421B2 (en) Power supply system and method of managing electricity rates
JP2005333751A (en) Power supply system and power supply method
JP6749621B1 (en) Calculation system
KR102526109B1 (en) Method of sharing the reduced power bill by using an ESS device
JP7450337B2 (en) Power supply system, power supply method and power supply program
JP2019159350A (en) Electricity charge management apparatus for power generation system
JP2018169860A (en) Power supply system and electricity charge calculation device
US20230281733A1 (en) Information processing apparatus for smart grid
US20230096126A1 (en) Information processing apparatus for smart grid
JP2017153289A (en) Reverse flow management device, reverse flow management system, reverse flow management method, and reverse flow management program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190110

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20191025

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20191119

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200120

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20200204

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200310

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20200317

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200414

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200508

R151 Written notification of patent or utility model registration

Ref document number: 6703447

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151