JP6670971B1 - Connection hardware and connection structure for steel structural members - Google Patents

Connection hardware and connection structure for steel structural members Download PDF

Info

Publication number
JP6670971B1
JP6670971B1 JP2019144844A JP2019144844A JP6670971B1 JP 6670971 B1 JP6670971 B1 JP 6670971B1 JP 2019144844 A JP2019144844 A JP 2019144844A JP 2019144844 A JP2019144844 A JP 2019144844A JP 6670971 B1 JP6670971 B1 JP 6670971B1
Authority
JP
Japan
Prior art keywords
dowel
plate
hole
connection
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019144844A
Other languages
Japanese (ja)
Other versions
JP2021025335A (en
Inventor
シィ ホセ
シィ ホセ
シィ ウィルソン
シィ ウィルソン
豊樹 黒岩
豊樹 黒岩
啓輔 杉原
啓輔 杉原
正雄 寺嶋
正雄 寺嶋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Engineering Co Ltd
Original Assignee
Nippon Steel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Engineering Co Ltd filed Critical Nippon Steel Engineering Co Ltd
Priority to JP2019144844A priority Critical patent/JP6670971B1/en
Priority to PH12019000317A priority patent/PH12019000317A1/en
Application granted granted Critical
Publication of JP6670971B1 publication Critical patent/JP6670971B1/en
Publication of JP2021025335A publication Critical patent/JP2021025335A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Connection Of Plates (AREA)

Abstract

【課題】制震ダンパーをせん断塑性変形させてエネルギーを吸収し、制震ダンパーの施工性を高める。【解決手段】制震ダンパーの接続金物は、鋼製の構造部材の接続端が一方の面に接続されるベース板41と、ベース板41の他方の面41dに起立又は垂下するように固定されたジベル板42とを備える。ジベル板42には、ベース板41から離れる方向に並ぶ複数の貫通孔45、46、47が形成され、それらのうちベース板41に最も近い貫通孔45は、その貫通孔45よりもベース板41から遠い貫通孔46よりも小さい。【選択図】図4PROBLEM TO BE SOLVED: To enhance the workability of a vibration damper by absorbing the energy by shearing plastically deforming the vibration damper. SOLUTION: The seismic damper connecting hardware is fixed so as to stand or hang down on a base plate 41 to which a connecting end of a structural member made of steel is connected to one surface and to the other surface 41d of the base plate 41. And a dowel plate 42. A plurality of through holes 45, 46, 47 arranged in the direction away from the base plate 41 are formed in the dowel plate 42, and the through hole 45 closest to the base plate 41 among them is the base plate 41 more than the through hole 45. It is smaller than the through hole 46 farther from. [Selection diagram] FIG.

Description

本発明は、鋼製の構造部材を、鉄筋コンクリート構造又は鉄骨鉄筋コンクリート構造の構造物に接続するための接続金物、及び前記構造部材を含む接続構造に関する。   The present invention relates to a metal fitting for connecting a steel structural member to a reinforced concrete structure or a steel reinforced concrete structure, and a connection structure including the structural member.

鋼製の柱、梁、ブレース等の構造部材を、鉄筋コンクリート構造又は鉄骨鉄筋コンクリート構造の構造物に接続する場合、構造物側の躯体に接続金物を固定し、鋼製の構造部材を、接続金物を介して躯体に接続することが知られている。
例えば、特許文献1には、柱梁架構を構成する上階の梁と下階の梁とに鉄筋コンクリート製の支持部が設けられ、これら上下の支持部間に、制震部材としての鋼材型の制震ダンパーが接続金物(ブラケット)を介して接続された制震間柱が開示されている。鋼材型の制震ダンパーとは、地震の際に建物に生じる揺れのエネルギーを自らが塑性変形することで吸収する部材であって、例えばH形鋼で形成されている。接続金物は、ベースプレートの裏面から剪断力伝達部材及びアンカーボルトが突出され、これら剪断力伝達部材及びアンカーボルトが支持部のコンクリートに埋設されることにより、制震ダンパーが接続金物を介して支持部に接続される。
When connecting structural members such as steel columns, beams, braces, etc. to a reinforced concrete structure or a steel reinforced concrete structure, fix the connecting hardware to the skeleton on the structure side and connect the steel structural members to the connecting hardware. It is known to connect to the skeleton via an interface.
For example, in Patent Literature 1, reinforced concrete support portions are provided on an upper floor beam and a lower floor beam that constitute a column-beam frame, and a steel material type as a vibration damping member is provided between the upper and lower support portions. A seismic control stud to which a seismic damper is connected via a connection hardware (bracket) is disclosed. A steel-type damping damper is a member that absorbs the energy of shaking that occurs in a building during an earthquake by plastically deforming itself, and is formed of, for example, an H-shaped steel. The connecting hardware has a shear force transmitting member and an anchor bolt protruding from the back surface of the base plate, and the shearing force transmitting member and the anchor bolt are buried in the concrete of the supporting portion. Connected to.

この接続金物は、ベースプレートの裏面から突出させた剪断力伝達部材及びアンカーボルトが支持部のコンクリートに埋設されることにより、制震ダンパーに所定の水平荷重が作用した際に、支持部に対する制震ダンパーのずれ変形が小さく抑えられる。よって、制震ダンパーへのせん断力伝達性能が充分に得られる。これにより、制震ダンパーがせん断塑性変形してエネルギーを吸収することにより建物の損傷を低減することが可能である。   When a predetermined horizontal load is applied to the damping damper, the connection metal fittings are embedded in the concrete of the supporting portion with the shear force transmitting member and the anchor bolt protruding from the back surface of the base plate. The displacement of the damper can be kept small. Therefore, sufficient shear force transmission performance to the vibration damper can be obtained. Thereby, the damping of the building can be reduced by absorbing the energy by the shear damping of the vibration damper.

特開2003−129691号公報JP-A-2003-129691

しかし、特許文献1の接続金物は、支持部に対する制震ダンパーのずれ変形を小さく抑えるために、支持部のコンクリートに剪断力伝達部材及びアンカーボルトを埋設している。このため、剪断力伝達部材及びアンカーボルトが、支持部に配筋された鉄筋に干渉する可能性がある。同様の問題は、制震ダンパーに限らず、鋼製の構造部材を、鉄筋コンクリート構造又は鉄骨鉄筋コンクリート構造の構造物に接続する場合に考慮される。つまり、構造部材を接続される鉄筋コンクリート構造又は鉄骨鉄筋コンクリート構造の構造物の健全性を担保するうえで、鋼製構造部材の接続金物及び接続構造には改良の余地が残されていた。   However, in the connection hardware of Patent Literature 1, the shear force transmitting member and the anchor bolt are embedded in the concrete of the support portion in order to suppress the deformation of the vibration damper with respect to the support portion. For this reason, there is a possibility that the shearing force transmitting member and the anchor bolt may interfere with the reinforcing bars arranged in the support portion. A similar problem is considered when connecting a steel structural member to a reinforced concrete structure or a steel reinforced concrete structure, not limited to the vibration damper. In other words, there is room for improvement in the connection hardware and the connection structure of the steel structural member in order to ensure the soundness of the reinforced concrete structure or the steel reinforced concrete structure to which the structural members are connected.

本発明は、前述した事情に鑑みてなされたものであって、鋼製の構造部材を接続される構造物の健全性を高めることができる鋼製構造部材の接続金物及び接続構造を提供することを目的とする。   The present invention has been made in view of the above-mentioned circumstances, and provides a metal fitting and a connecting structure of a steel structural member capable of improving the soundness of a structure to which the steel structural member is connected. With the goal.

前記課題を解決するために、本発明は以下の手段を提案している。
本発明に係る構造部材の接続金物は、鋼製の構造部材の接続端が一方の面に接続されるベース板と、前記ベース板の他方の面に、該他方の面上に対して起立又は垂下するように固定されたジベル板とを備える。前記ジベル板には、前記ベース板から離れる方向に並ぶ複数の肉抜き部が形成され、前記複数の肉抜き部のうち前記ベース板に最も近い第一の肉抜き部は、前記第一の肉抜き部よりも前記ベース板から遠い第二の肉抜き部よりも小さい。
In order to solve the above problems, the present invention proposes the following means.
The connection metal of the structural member according to the present invention is a base plate in which the connection end of the steel structural member is connected to one surface, and the other end of the base plate is erected on the other surface. And a dowel plate fixed so as to hang down. A plurality of lightening portions arranged in a direction away from the base plate are formed on the dowel plate, and a first lightening portion closest to the base plate among the plurality of lightening portions is the first lightening portion. It is smaller than the second lightened portion farther from the base plate than the cutout portion.

肉抜き部とは、ジベル板に形成された中空の部分である。ジベル板に引抜力が作用する場合には、せん断力作用時と異なり、ジベル板の第一の肉抜き部付近において、ジベル板(鋼板)の引張降伏によって終局耐力が決定することがある。このような状況下において、第一の肉抜き部を第二の肉抜き部より小さくすることで、ジベル板(鋼板)の長さ方向に直交する断面の大きさ(nett値、断面内において貫通孔が占める部分の面積を含まない)を、従来型のジベル板と比較して大きくすることができる。これにより、ジベル板の寸法(長さ、幅、厚さ)を大きく変えることなくジベル板の引抜耐力を高めることができ、ジベル板を従来よりも小さくすることができる。
加えて、ジベル板の第一の肉抜き部がコンクリートの表面に近い場合には、第一の肉抜き部の位置を起点にコンクリートがコーン状破壊することがある。第一の肉抜き部を第二の肉抜き部より小さくすることにより、第一の肉抜き部が抵抗する引抜力が抑制され、コーン状破壊を効果的に抑制できる。これにより、鋼製の構造部材を接続される鉄筋コンクリート構造又は鉄骨鉄筋コンクリート構造の構造物の健全性を高めることができる。
The lightening portion is a hollow portion formed in the dowel plate. When a pulling force acts on the dowel plate, the ultimate strength may be determined by the tensile yield of the dowel plate (steel plate) in the vicinity of the first hollow portion of the dovetail plate, unlike during the action of the shear force. Under such circumstances, by making the first lightening portion smaller than the second lightening portion, the size of the cross section orthogonal to the length direction of the dowel plate (steel plate) (nett value, penetration in the cross section) (Excluding the area of the portion occupied by the holes) can be made larger than that of a conventional dowel plate. Thereby, the pull-out strength of the dowel plate can be increased without largely changing the dimensions (length, width, thickness) of the dovetail plate, and the dovetail plate can be made smaller than before.
In addition, when the first hollow portion of the dowel plate is close to the surface of the concrete, the concrete may break in a cone shape starting from the position of the first hollow portion. By making the first lightening portion smaller than the second lightening portion, the pullout force resisted by the first lightening portion is suppressed, and cone-shaped destruction can be effectively suppressed. Thus, the soundness of the reinforced concrete structure or the steel reinforced concrete structure to which the steel structural members are connected can be improved.

なお、前記複数の肉抜き部は、前記ジベル板に形成された貫通孔、及び前記ジベル板の側縁に形成された切欠部のいずれか一方、又は両方であってもよい。
前記複数の肉抜き部を、前記ジベル板に形成された貫通孔とした場合、前記第一の肉抜き部である第一の貫通孔の内径は、前記第二の肉抜き部である第二の貫通孔の内径よりも小さくされる。
前記複数の肉抜き部を、前記ジベル板の側縁に形成された切欠部とした場合は、前記第一の肉抜き部である第一の切欠部は、前記第二の肉抜き部である第二の切欠部よりも小さくされる。
The plurality of lightening portions may be one or both of a through hole formed in the dowel plate and a notch formed in a side edge of the dowel plate.
When the plurality of lightening portions are through holes formed in the dowel plate, the inner diameter of the first through hole that is the first lightening portion is the second diameter that is the second lightening portion. Is smaller than the inner diameter of the through hole.
When the plurality of lightening portions are cutout portions formed on side edges of the dowel plate, the first notch portion that is the first lightening portion is the second lightening portion. It is made smaller than the second cutout.

鉄筋コンクリート構造に構造部材を配置する場合には、層間変位は鉄骨構造に比べて小さく、風荷重時には数ミリ程度、地震時でもせいぜい数十ミリ程度である。この層間変位を構造部材に効率よく伝達するためには、構造部材の回転ずれが小さい(すなわち、剛性が高い)接続構造とする必要がある。
ここで、構造部材の回転ずれは、構造部材のフランジと平行に配置されたジベル板の抜出しによって引き起こされる。このため、ジベル板の抜出しを防ぐ(すなわち、引抜きに対する剛性を高める)ことが非常に重要となる。
When a structural member is arranged in a reinforced concrete structure, the interlayer displacement is smaller than that of a steel frame structure, and is about several millimeters under a wind load and at most several tens of millimeters even during an earthquake. In order to efficiently transmit the interlayer displacement to the structural member, it is necessary to use a connection structure in which the rotational deviation of the structural member is small (that is, high in rigidity).
Here, the rotational displacement of the structural member is caused by withdrawal of the dowel plate arranged parallel to the flange of the structural member. For this reason, it is very important to prevent the dowel plate from being pulled out (that is, to increase the rigidity against pulling out).

前記肉抜き部として、ジベル板の側縁に切欠部を形成すると、上記の作用に加えて、切欠部がコンクリートに対するアンカーとしての作用を生じるので、ジベル板の寸法(長さ、幅、厚さ)を大きく変えることなく、ジベル板の抜出しに対する耐力を高めることができる。   When the cutout is formed at the side edge of the dowel plate as the hollow portion, in addition to the above-described effects, the cutout acts as an anchor for concrete, so the dimensions (length, width, thickness) of the dovetail plate ) Can be improved without significantly changing the dowel plate.

本発明に係る接続構造は、鋼製の構造部材と、鉄筋コンクリート構造又は鉄骨鉄筋コンクリート構造の構造物の躯体との接続構造であって、前記接続金物を含み、前記ジベル板が前記構造体に埋設されている。   The connection structure according to the present invention is a connection structure between a steel structural member and a skeleton of a reinforced concrete structure or a steel reinforced concrete structure, and includes the connection hardware, and the dowel plate is embedded in the structure. ing.

ジベル板の第一の肉抜き部を、第二の肉抜き部よりも小さく形成して構造体に埋設することにより、第一の肉抜き部が抵抗する引抜力が抑制され、構造体のコーン状破壊を効果的に抑制できる。よって、ジベル板のずれ変形を小さく抑えることができ、構造部材にせん断変形を集中させることができる。これにより、構造部材を効果的にせん断塑性変形させてエネルギーを吸収することにより建物の損傷を抑制できる。   By forming the first lightening portion of the dowel plate smaller than the second lightening portion and burying it in the structure, the pulling force that the first lightening portion resists is suppressed, and the cone of the structure is State destruction can be effectively suppressed. Therefore, the shear deformation of the dowel plate can be suppressed small, and the shear deformation can be concentrated on the structural member. Thereby, the structural member can be effectively shear-plastically deformed to absorb energy, thereby suppressing damage to the building.

また、第一の肉抜き部を、第二の肉抜き部よりも小さく形成することにより、構造体のコーン状破壊が効果的に抑制されるので、第一の肉抜き部を構造体の表面に近づけることができる。よって、ジベル板の長さを従来よりも短くすることができる。これにより、例えば、構造体の内部に配筋された鉄筋にジベル板が干渉することを抑えて、構造体の健全性を高めることができる。   Further, by forming the first lightening portion smaller than the second lightening portion, the cone-shaped destruction of the structure is effectively suppressed, so that the first lightening portion is formed on the surface of the structure. Can be approached. Therefore, the length of the dowel plate can be made shorter than before. Thereby, for example, it is possible to suppress the interference of the dowel plate with the reinforcing bars arranged inside the structure, thereby improving the soundness of the structure.

前記構造体に埋設される鉄筋をさらに含み、前記鉄筋は、前記構造躯体の内部で前記複数の肉抜き部に配設されていてもよい。   It may further include a reinforcing bar buried in the structure, wherein the reinforcing bar is provided in the plurality of lightening portions inside the structural skeleton.

ジベル板の肉抜き部に配設された鉄筋が構造体に埋設されることにより、構造体のコーン状破壊をより効果的に抑制でき、ジベル板の抜出しに対する耐力、弾性剛性をさらに高めることができる。   By burying the reinforcing bars arranged in the hollow part of the dowel plate in the structure, the cone-shaped destruction of the structure can be suppressed more effectively, and the resistance to pulling out the dowel plate and the elastic rigidity can be further increased. it can.

本発明によれば、鋼製の構造部材を接続される鉄筋コンクリート構造又は鉄骨鉄筋コンクリート構造の構造物の健全性を高めることができる。   ADVANTAGE OF THE INVENTION According to this invention, the soundness of the structure of a reinforced concrete structure or a steel reinforced concrete structure to which a steel structural member is connected can be improved.

本発明に係る第1実施形態の接続金物及び接続構造を制震間柱に備えた例を示す断面図である。BRIEF DESCRIPTION OF THE DRAWINGS It is sectional drawing which shows the example which provided the connection hardware and connection structure of 1st Embodiment which concern on this invention in the vibration control stud. 図1のA−A線に沿う断面図である。FIG. 2 is a sectional view taken along line AA of FIG. 1. 第1実施形態の下部接続構造を示す斜視図である。It is a perspective view showing the lower connection structure of a 1st embodiment. 図1のIV部を拡大して示す断面図である。It is sectional drawing which expands and shows the IV section of FIG. 図2のV部を拡大して示す断面図である。It is sectional drawing which expands and shows the V section of FIG. 本発明に係る第1実施形態の変形例を示す断面図である。It is sectional drawing which shows the modification of 1st Embodiment which concerns on this invention. 本発明に係る第2実施形態の接続構造を示す断面図である。It is sectional drawing which shows the connection structure of 2nd Embodiment concerning this invention. 本発明に係る第3実施形態の接続構造を示す断面図である。It is sectional drawing which shows the connection structure of 3rd Embodiment concerning this invention. 本発明に係る第1実施例及び第2実施例の下部接続構造による引抜力と引抜変位との関係を示すグラフである。5 is a graph showing the relationship between the pulling force and the pulling displacement by the lower connection structure of the first and second embodiments according to the present invention. 本発明に係る第3実施例及び第4実施例の下部接続構造による引抜力と引抜変位との関係を示すグラフである。It is a graph which shows the relationship between the pull-out force and the pull-out displacement by the lower connection structure of the third embodiment and the fourth embodiment according to the present invention. 本発明に係る第1実施例及び第5実施例の下部接続構造による引抜力と引抜変位との関係を示すグラフである。It is a graph which shows the relationship between the pull-out force and the pull-out displacement by the lower connection structure of the first embodiment and the fifth embodiment according to the present invention. 本発明に係る第4実施形態の接続構造をシアリンクに備えた例を示す概略図である。It is the schematic which shows the example which provided the connection structure of 4th Embodiment concerning this invention in the shear link. 本発明に係る第5実施形態の接続構造をブレースに備えた例を示す概略図である。It is the schematic which shows the example which equipped the brace with the connection structure of 5th Embodiment which concerns on this invention. 図13のB−B線に沿う断面図である。FIG. 14 is a sectional view taken along line BB of FIG. 13.

以下、本発明の一実施形態に係る構造部材の接続金物35及び接続構造30を、鉄筋コンクリート構造10の建物に適用する例について説明する。
(第1実施形態)
図1、図2に示すように、鉄筋コンクリート構造10は、上階の梁12と、下階の梁14と、制震間柱20とを備えた架構式構造である。制震間柱20は、例えば、鉄筋コンクリート構造10の架構の上階の梁12と下階の梁14との間に取付けられている。制震間柱20は、上部支持部21と、下部支持部22と、鋼材型の制震ダンパー(構造部材)25と、接続構造30とを備えている。
Hereinafter, an example in which the connection hardware 35 and the connection structure 30 of the structural member according to the embodiment of the present invention are applied to a building having the reinforced concrete structure 10 will be described.
(1st Embodiment)
As shown in FIG. 1 and FIG. 2, the reinforced concrete structure 10 is a frame-type structure provided with a beam 12 on the upper floor, a beam 14 on the lower floor, and a seismic control stud 20. The seismic damping stud 20 is attached, for example, between the upper beam 12 and the lower beam 14 of the frame of the reinforced concrete structure 10. The damping stud 20 includes an upper support 21, a lower support 22, a steel-type damping damper (structural member) 25, and a connection structure 30.

上部支持部21は、上階の梁12から垂設され、下側端面21aが上階の梁12と下階の梁14との間の中間に位置する鉄筋コンクリート構造の構造体である。上部支持部21は、例えば、下側端面21aが矩形状の平坦に形成されている。下部支持部22は、下階の梁14から立設され、上側端面(表面)22aが上階の梁12と下階の梁14との間の中間に位置する鉄筋コンクリート構造の構造体である。下部支持部22は、上部支持部21と同様に、例えば、上側端面22aが矩形状の平坦に形成されている。上部支持部21の下側端面21aと、下部支持部22の上側端面22aとは、上下方向に所定間隔を置いて配置されている。下側端面21aと上側端面22aとの間には、制震ダンパー25が上下方向へ向けて配置されている。   The upper support portion 21 is a reinforced concrete structure having a lower end surface 21a which is suspended from the upper beam 12 and whose lower end surface 21a is located in the middle between the upper beam 12 and the lower beam 14. For example, the lower end surface 21a of the upper support portion 21 is formed in a rectangular flat shape. The lower support portion 22 is a reinforced concrete structure having an upper end surface (surface) 22a that is erected from the lower floor beam 14 and that is located at an intermediate position between the upper floor beam 12 and the lower floor beam 14. The lower support portion 22 has, for example, an upper end surface 22a formed in a rectangular flat shape similarly to the upper support portion 21. The lower end surface 21a of the upper support portion 21 and the upper end surface 22a of the lower support portion 22 are arranged at predetermined intervals in the vertical direction. A vibration damper 25 is disposed between the lower end face 21a and the upper end face 22a in a vertical direction.

制震ダンパー25は、下側端面21aと上側端面22a間に配置された状態において、下側端面21a及び上側端面22aに接続構造30により接続されている。
制震ダンパー25は、上側接続端(接続端)25a及び下側接続端(接続端)25bにウエブ26及びフランジ27を備えている。制震ダンパー25は、ウエブ26の両端部にフランジ27が接続されることにより断面H状に形成された鋼材ダンパーである。
実施形態においては、制震ダンパー25を鋼材ダンパーとした例について説明するが、制震ダンパー25は鋼材ダンパーに限らない。その他の例として、制震ダンパー25を摩擦ダンパー、粘弾性ダンパー、オイルダンパー、粘性ダンパーとしてもよい。
制震ダンパー25は、下側端面21a及び上側端面22aに接続構造30により接続された状態において、所定の水平荷重(せん断力Qu)が作用した際に剪断パネルとしての機能を果たす。
The vibration damper 25 is connected to the lower end surface 21a and the upper end surface 22a by the connection structure 30 in a state where the damper 25 is disposed between the lower end surface 21a and the upper end surface 22a.
The vibration damper 25 includes a web 26 and a flange 27 at an upper connection end (connection end) 25a and a lower connection end (connection end) 25b. The vibration damper 25 is a steel damper formed to have an H-shaped cross section by connecting flanges 27 to both ends of the web 26.
In the embodiment, an example will be described in which the damping damper 25 is a steel damper, but the damping damper 25 is not limited to a steel damper. As another example, the vibration damper 25 may be a friction damper, a viscoelastic damper, an oil damper, or a viscous damper.
When connected to the lower end surface 21a and the upper end surface 22a by the connection structure 30, the vibration damper 25 functions as a shear panel when a predetermined horizontal load (shear force Qu) is applied.

接続構造30は、上部接続構造31と、下部接続構造32と、と備えている。上部接続構造31は、制震ダンパー25の上側接続端25aに、例えば溶接で接続されている。よって、上部接続構造31が上部支持部21の下側端面21a側に接続されることにより、制震ダンパー25の上側接続端25aが上部接続構造31を介して上部支持部21の下側端面21a側に接続されている。
下部接続構造32は、制震ダンパー25の下側接続端25bに、例えば溶接で接続されている。よって、下部接続構造32が下部支持部22の上側端面22a側に接続されることにより、制震ダンパー25の下側接続端25bが下部接続構造32を介して下部支持部22の上側端面22a側に接続されている。
上部接続構造31及び下部接続構造32は、上下方向において対称に構成されている。よって、以下、下部接続構造32について説明して上部接続構造31の詳しい説明を省略する。
The connection structure 30 includes an upper connection structure 31 and a lower connection structure 32. The upper connection structure 31 is connected to the upper connection end 25a of the vibration damper 25 by, for example, welding. Therefore, the upper connection structure 31 is connected to the lower end face 21a of the upper support 21 so that the upper connection end 25a of the vibration damper 25 is connected to the lower end face 21a of the upper support 21 via the upper connection structure 31. Connected to the side.
The lower connection structure 32 is connected to the lower connection end 25b of the vibration damper 25 by, for example, welding. Therefore, the lower connection structure 32 is connected to the upper end face 22a side of the lower support portion 22 so that the lower connection end 25b of the vibration damper 25 is connected to the upper end face 22a side of the lower support portion 22 via the lower connection structure 32. It is connected to the.
The upper connection structure 31 and the lower connection structure 32 are configured symmetrically in the vertical direction. Therefore, the lower connection structure 32 will be described below, and detailed description of the upper connection structure 31 will be omitted.

図3から図5に示すように、下部接続構造32は、制震ダンパー25の接続金物35と、第一の鉄筋(鉄筋)36と、第二の鉄筋(鉄筋)37と、第三の鉄筋(鉄筋)38とを含む。
接続金物35は、ベース板41と、第一のジベル板42と、第二のジベル板43とを備えている。
ベース板41は、対向する2つの長辺41aと、対向する2つの短辺41bとにより平面視矩形状に形成されている。ベース板41は、上面(一方の面)41cに制震ダンパー25の下側接続端25bが、例えば、溶接により接続されている。ベース板41の下面(他方の面)41dのうち、2つの短辺41bの近傍に第一のジベル板42が間隔をおいて対向するように設けられている。
As shown in FIGS. 3 to 5, the lower connection structure 32 includes a connection hardware 35 of the vibration damper 25, a first rebar (rebar) 36, a second rebar (rebar) 37, and a third rebar. (Rebar) 38.
The connection hardware 35 includes a base plate 41, a first dowel plate 42, and a second dowel plate 43.
The base plate 41 is formed in a rectangular shape in a plan view by two opposing long sides 41a and two opposing short sides 41b. The lower connection end 25b of the vibration damper 25 is connected to the upper surface (one surface) 41c of the base plate 41 by, for example, welding. In the lower surface (the other surface) 41d of the base plate 41, a first dowel plate 42 is provided in the vicinity of the two short sides 41b so as to face each other at an interval.

第一のジベル板42は、例えば、上下方向に延びる第一のジベル縦辺42aの長さ寸法が、横方向(水平方向)に延びる第一のジベル横辺42bの幅寸法より大きく形成された矩形状の鋼板である。第一のジベル板42は、ベース板41の2つの短辺41bのうち一方の近傍に、上側の第一のジベル横辺42bが、例えば、溶接で接続されることにより、ベース板41の下面41dから垂下するように固定されている。第一のジベル板42は、制震ダンパー25のフランジ27の下方においてフランジ27に沿って設けられている。
第一のジベル板42は、ベース板41から離れる方向に並び、間隔を置いて形成された円形の貫通孔(肉抜き部)45、46、47を有する。第1実施形態においては、これら複数の貫通孔45、46、47として、例えば、第一の貫通孔45、第二の貫通孔46、及び第三の貫通孔(第二の貫通孔)47を例に説明するが、これに限定しない。
The first dowel plate 42 is formed, for example, such that the length of the first dowel vertical side 42a extending in the up-down direction is larger than the width of the first dovetail side 42b extending in the horizontal direction (horizontal direction). It is a rectangular steel plate. The first dowel plate 42 has a lower surface of the base plate 41 by being connected, for example, by welding to the upper first dovetail side 42b near one of the two short sides 41b of the base plate 41. It is fixed so as to hang down from 41d. The first dowel plate 42 is provided along the flange 27 below the flange 27 of the vibration damper 25.
The first dowel plate 42 is arranged in a direction away from the base plate 41, and has circular through holes (lightening portions) 45, 46, 47 formed at intervals. In the first embodiment, for example, a first through hole 45, a second through hole 46, and a third through hole (second through hole) 47 are used as the plurality of through holes 45, 46, and 47. This will be described by way of example, but not limited thereto.

第一の貫通孔45は、第一の貫通孔45、第二の貫通孔46、及び第三の貫通孔47のうちベース板41に最も近い位置に配置されている。第二の貫通孔46は、第一の貫通孔45よりもベース板41から遠い位置に配置されている。第三の貫通孔47は、第二の貫通孔46よりもベース板41から遠い位置に配置されている。第二の貫通孔46及び第三の貫通孔47は同じ大きさに形成されている。第一の貫通孔45の孔径(内径)d1は、第二の貫通孔46及び第三の貫通孔47の孔径(内径)d2よりも小さく形成されている。   The first through-hole 45 is arranged at a position closest to the base plate 41 among the first through-hole 45, the second through-hole 46, and the third through-hole 47. The second through-hole 46 is arranged at a position farther from the base plate 41 than the first through-hole 45. The third through hole 47 is disposed at a position farther from the base plate 41 than the second through hole 46. The second through hole 46 and the third through hole 47 are formed in the same size. The hole diameter (inner diameter) d1 of the first through hole 45 is formed smaller than the hole diameter (inner diameter) d2 of the second through hole 46 and the third through hole 47.

ベース板41の下面41dのうち、2つの短辺41bの近傍に第一のジベル板42が間隔をおいて設けられている。2つの第一のジベル板42の第一の貫通孔45に第一の鉄筋36が挿通され、両端部36aが下方に向けて折り曲げられている。また、2つの第一のジベル板42において、第二の貫通孔46に第一の鉄筋36が挿通され、両端部36aが下方に向けて折り曲げられている。さらに、2つの第一のジベル板42において、第三の貫通孔47に第二の鉄筋37が挿通され、両端部寄りの部位37aが下方に向けて折り曲げられている。折り曲げられた部位のうちの両端部37bが内側に向けて水平に折り曲げられている。   In the lower surface 41d of the base plate 41, a first dowel plate 42 is provided at an interval in the vicinity of the two short sides 41b. The first reinforcing bar 36 is inserted into the first through holes 45 of the two first dowel plates 42, and both ends 36a are bent downward. Further, in the two first dowel plates 42, the first reinforcing bar 36 is inserted into the second through hole 46, and both ends 36a are bent downward. Further, in the two first dowel plates 42, the second reinforcing bar 37 is inserted into the third through hole 47, and the portions 37a near both ends are bent downward. Both ends 37b of the bent portions are horizontally bent inward.

ベース板41の下面41dのうち、2つの長辺41a寄りに第二のジベル板43が間隔をおいて対向するように設けられている。第二のジベル板43は、例えば、上下方向に延びる第二のジベル縦辺43aの長さ寸法が横方向(水平方向)に延びる第二のジベル横辺43bの幅寸法より小さく形成された矩形状の鋼板である。第二のジベル板43は、ベース板41の2つの長辺41aのうち一方の長辺41aよりの部位に、上側の第二のジベル横辺43bが、例えば、溶接で接続されることにより、ベース板41の下面41dから垂下するように固定されている。すなわち、第二のジベル板43は、制震ダンパー25のウエブ26の下方においてウエブ26に沿って設けられている。   On the lower surface 41d of the base plate 41, a second dowel plate 43 is provided so as to face the two long sides 41a at an interval. The second dowel plate 43 is, for example, a rectangular shape in which the length of the second dowel vertical side 43a extending in the up-down direction is smaller than the width of the second dowel side 43b extending in the horizontal direction (horizontal direction). It is a shaped steel plate. The second dowel plate 43 is formed by connecting the upper second dowel side 43b to a portion of one of the two long sides 41a of the two long sides 41a of the base plate 41 by, for example, welding. It is fixed so as to hang down from the lower surface 41 d of the base plate 41. That is, the second dowel plate 43 is provided along the web 26 below the web 26 of the vibration damper 25.

第二のジベル板43は、ベース板41の長辺41aに沿って間隔をおいて形成された複数の第四の貫通孔48を有する。
ベース板41の下面41dのうち、2つの長辺41a寄りの部位に第二のジベル板43が間隔をおいて設けられている。2つの第二のジベル板43の第四の貫通孔48に第三の鉄筋38が挿通され、両端部38aが第四の貫通孔48から外側に向けて直線上に突出されている。
The second dowel plate 43 has a plurality of fourth through holes 48 formed at intervals along the long side 41 a of the base plate 41.
On the lower surface 41d of the base plate 41, a second dowel plate 43 is provided at a position near two long sides 41a at intervals. The third reinforcing bar 38 is inserted into the fourth through hole 48 of the two second dowel plates 43, and both ends 38 a protrude linearly outward from the fourth through hole 48.

ベース板41の下面41dに、2枚の第一のジベル板42と、2枚の第二のジベル板43とが固定されることにより、接続金物35が一体に形成されている。2枚の第一のジベル板42及び2枚の第二のジベル板43は、下部支持部22の内部に埋設されている。第一のジベル板42の第一の貫通孔45、第二の貫通孔46及び第三の貫通孔47と、第二のジベル板43の第四の貫通孔48に、下部支持部22のコンクリートが充填されている。   By fixing two first dowel plates 42 and two second dowel plates 43 to the lower surface 41d of the base plate 41, the connection hardware 35 is integrally formed. The two first dowel plates 42 and the two second dowel plates 43 are embedded inside the lower support 22. The first through hole 45, the second through hole 46 and the third through hole 47 of the first dowel plate 42, and the fourth through hole 48 of the second dowel plate 43 Is filled.

また、下部支持部22の内部において、接続金物35の第一のジベル板42の第一の貫通孔45及び第二の貫通孔46に第一の鉄筋36が挿通され、第三の貫通孔47に第二の鉄筋37が挿通されている。さらに、接続金物35の第二のジベル板43の第四の貫通孔48に第三の鉄筋38が挿通されている。すなわち、第一の鉄筋36、第二の鉄筋37、及び第三の鉄筋38が下部支持部22の内部に埋設されている。
この状態において、ベース板41の下面41dが下部支持部22の上側端面22aに接触する。ベース板41は、下部支持部22の上側端面22aに接触した状態において、2枚の第一のジベル板42、2枚の第二のジベル板43、第一の鉄筋36、第二の鉄筋37、及び第三の鉄筋38により上側端面22a側に固定されている。
Further, inside the lower support portion 22, the first reinforcing bar 36 is inserted into the first through hole 45 and the second through hole 46 of the first dowel plate 42 of the connection hardware 35, and the third through hole 47 is formed. , A second reinforcing bar 37 is inserted. Further, the third reinforcing bar 38 is inserted into the fourth through hole 48 of the second dowel plate 43 of the connection metal 35. That is, the first reinforcing bar 36, the second reinforcing bar 37, and the third reinforcing bar 38 are embedded in the lower support portion 22.
In this state, the lower surface 41 d of the base plate 41 contacts the upper end surface 22 a of the lower support 22. When the base plate 41 is in contact with the upper end surface 22a of the lower support portion 22, the two first dowel plates 42, the two second dowel plates 43, the first reinforcing bar 36, and the second reinforcing bar 37 are provided. , And a third reinforcing bar 38 fixed to the upper end face 22a side.

図1、図4に示すように、上部接続構造31は、下部接続構造32と上下方向において対称に、ベース板41の上面(他方の面)41c上に2枚の第一のジベル板42、及び2枚の第二のジベル板43が起立するように固定されている。また、ベース板41の下面(一方の面)41dに制震ダンパー25の上側接続端25aが、例えば、溶接により接続されている。
上部接続構造31のベース板41は、上部支持部21の下側端面21aに接触した状態において、2枚の第一のジベル板42、2枚の第二のジベル板43、第一の鉄筋36、第二の鉄筋37、及び第三の鉄筋38により固定されている。
As shown in FIGS. 1 and 4, the upper connection structure 31 has two first dowel plates 42 on the upper surface (the other surface) 41 c of the base plate 41 symmetrically in the vertical direction with the lower connection structure 32. And the two second dowel plates 43 are fixed upright. The upper connection end 25a of the vibration damper 25 is connected to the lower surface (one surface) 41d of the base plate 41 by, for example, welding.
When the base plate 41 of the upper connection structure 31 is in contact with the lower end surface 21a of the upper support portion 21, the two first dowel plates 42, the two second dowel plates 43, and the first reinforcing bars 36 are provided. , A second reinforcing bar 37, and a third reinforcing bar 38.

この状態において、例えば、地震や風荷重により制震ダンパー25に曲げモーメントMuと、せん断力Quとが作用する。曲げモーメントMuは、主に、フランジ27に作用する。せん断力Quは、主に、ウエブ26に作用する。
制震ダンパー25のウエブ26にせん断力Quが作用することにより、第二のジベル板43の第四の貫通孔48及び第三の鉄筋38にせん断力Quに抵抗する力が作用する。よって、制震ダンパー25のウエブ26に作用するせん断力Quに対して、下部支持部22の上側端面22aに対する下部接続構造32のずれ変形を小さく抑えることができる。
同様に、制震ダンパー25のウエブ26に作用するせん断力Quに対して、上部支持部21の下側端面21aに対する上部接続構造31のずれ変形を小さく抑えることができる。
In this state, for example, a bending moment Mu and a shearing force Qu act on the vibration damper 25 due to an earthquake or a wind load. The bending moment Mu mainly acts on the flange 27. The shear force Qu mainly acts on the web 26.
When the shear force Qu acts on the web 26 of the vibration damper 25, a force that resists the shear force Qu acts on the fourth through hole 48 and the third reinforcing bar 38 of the second dowel plate 43. Therefore, the shear deformation of the lower connection structure 32 with respect to the upper end surface 22a of the lower support portion 22 can be suppressed to be small with respect to the shearing force Qu acting on the web 26 of the vibration damper 25.
Similarly, the shear deformation of the upper connection structure 31 with respect to the lower end surface 21a of the upper support 21 can be suppressed to a small degree with respect to the shearing force Qu acting on the web 26 of the vibration damper 25.

また、制震ダンパー25のフランジ27に曲げモーメントMuが作用することにより、第一のジベル板42に引抜力Fが作用する。第一のジベル板42に引抜力Fが作用する場合には、第一のジベル板42の第一の貫通孔45付近において、第一のジベル板42の引張降伏によって終局耐力が決定することが考えられる。   Further, when the bending moment Mu acts on the flange 27 of the vibration damper 25, the pull-out force F acts on the first dowel plate 42. When the pull-out force F acts on the first dowel plate 42, the ultimate yield strength may be determined by the tensile yield of the first dovetail plate 42 near the first through hole 45 of the first dovetail plate 42. Conceivable.

図4、図5に示すように、第一の貫通孔45は、第二の貫通孔46の孔径d2より孔径d1が小さく形成されている。第一の貫通孔45の孔径d1を第二の貫通孔46の孔径d2より小さくすることで、第一のジベル板42の長さ方向に直交するネット断面の大きさ(すなわち、断面内において第一の貫通孔が占める部分の面積を含まない)を、従来型のジベル板と比較して大きくすることができる。これにより、第一のジベル板42の寸法(長さ、幅、厚さ)を大きく変えることなく第一のジベル板42の引抜耐力を高めることができ、第一のジベル板42をコンパクトにできる。   As shown in FIGS. 4 and 5, the first through hole 45 is formed such that the hole diameter d1 is smaller than the hole diameter d2 of the second through hole 46. By making the hole diameter d1 of the first through hole 45 smaller than the hole diameter d2 of the second through hole 46, the size of the net cross section orthogonal to the length direction of the first dowel plate 42 (that is, (Excluding the area of the portion occupied by one through hole) can be made larger than that of a conventional dowel plate. Thereby, the pull-out strength of the first dowel plate 42 can be increased without largely changing the dimensions (length, width, thickness) of the first dovetail plate 42, and the first dovetail plate 42 can be made compact. .

加えて、第一のジベル板42の第一の貫通孔45が下部支持部22の上側端面(表面)22aに近い場合には、第一の貫通孔45の位置を起点に下部支持部22のコンクリートがコーン状破壊することが考えられる。これにより、第一の貫通孔45の孔径d1を第二の貫通孔46の孔径d2より小さくすることにより、第一の貫通孔45が抵抗する引抜力が抑制され、コーン状破壊を効果的に抑制できる。
このように、第一の貫通孔45の孔径d1を第二の貫通孔46の孔径d2より小さくすることにより、制震ダンパー25のウエブ26に作用する曲げモーメントMuに対して、第一のジベル板42のずれ変形を小さく抑えることができる。
同様に、制震ダンパー25のウエブ26に作用する曲げモーメントMuに対して、上部支持部21の下側端面21aに対する上部接続構造31(図1参照)のずれ変形を小さく抑えることができる。
これにより、地震や風荷重により制震ダンパー25に曲げモーメントMuと、せん断力Quとが作用した場合に、制震ダンパー25を効果的にせん断塑性変形させてエネルギーを吸収することにより建物の損傷を抑制できる。
In addition, when the first through-hole 45 of the first dowel plate 42 is close to the upper end surface (surface) 22 a of the lower support 22, the position of the first through-hole 45 is used as a starting point for the lower support 22. It is conceivable that concrete breaks in a cone shape. Thereby, by making the hole diameter d1 of the first through-hole 45 smaller than the hole diameter d2 of the second through-hole 46, the pull-out force resisted by the first through-hole 45 is suppressed, and the cone-shaped destruction is effectively performed. Can be suppressed.
In this manner, by making the hole diameter d1 of the first through hole 45 smaller than the hole diameter d2 of the second through hole 46, the bending force Mu acting on the web 26 of the vibration damper 25 is reduced by the first dowel. Displacement deformation of the plate 42 can be reduced.
Similarly, the displacement of the upper connection structure 31 (see FIG. 1) with respect to the lower end surface 21a of the upper support 21 can be suppressed to a small value with respect to the bending moment Mu acting on the web 26 of the vibration damper 25.
Accordingly, when the bending moment Mu and the shearing force Qu act on the damping damper 25 due to an earthquake or a wind load, the damping damper 25 is effectively subjected to shear plastic deformation to absorb energy, thereby damaging the building. Can be suppressed.

また、第一の貫通孔45の孔径d1を小さく形成して下部支持部22のコンクリートがコーン状破壊を効果的に抑制することにより、第一の貫通孔45を下部支持部22のコンクリートの上側端面22aに近づけることができる。よって、第一のジベル板42の第一のジベル縦辺42aの長さ寸法(すなわち、全長)を短く抑えてコンパクトに形成できる。これにより、例えば、下部支持部22の内部に配筋された鉄筋(図示せず)に第一のジベル板42が干渉することを抑えることにより、制震ダンパー25の施工性を高めることができる。   Further, the first through hole 45 is formed to have a small hole diameter d1 so that the concrete of the lower support portion 22 effectively suppresses the cone-shaped destruction, so that the first through hole 45 is formed above the concrete of the lower support portion 22. It can approach the end face 22a. Therefore, the length dimension (namely, the total length) of the first dowel vertical side 42a of the first dowel plate 42 can be reduced to be compact. Thereby, for example, the workability of the vibration damper 25 can be improved by suppressing the interference of the first dowel plate 42 with the reinforcing bars (not shown) arranged inside the lower support portion 22. .

さらに、第一の鉄筋36、第二の鉄筋37、及び第三の鉄筋38が上部支持部21の内部と、下部支持部22の内部とに埋設されている。これにより、上部支持部21と下部支持部22のコンクリートのコーン状破壊を一層効果的に抑制でき、第一のジベル板42の抜出しに対する耐力、弾性剛性を一層高めることができる。   Further, a first reinforcing bar 36, a second reinforcing bar 37, and a third reinforcing bar 38 are embedded in the upper support portion 21 and the lower support portion 22. Thereby, the cone-shaped destruction of the concrete of the upper support portion 21 and the lower support portion 22 can be more effectively suppressed, and the strength and elastic rigidity of the first dowel plate 42 against pulling out can be further increased.

(変形例1)
第一実施形態の変形例を図6に示す。本変形例では、第一のジベル板42は、ベース板41の幅方向に離間した二辺に間隔を置いて形成された半円形の切欠部(肉抜き部)48、49、50を有する。第一の切欠部48は、第一の切欠部48、第二の切欠部49、及び第三の切欠部50のうちベース板41に最も近い位置に配置されている。第二の切欠部49は、第一の切欠部48よりもベース板41から遠い位置に配置されている。第三の切欠部50は、第二の切欠部49よりもベース板41から遠い位置に配置されている。第二の切欠部49及び第三の切欠部50は同じ形状、同じ大きさに形成されている。第一の切欠部48の半径(r1)は、第二の切欠部49及び第三の切欠部50の半径(r2)よりも小さく形成されている。なお、第一のジベル板42には複数の貫通孔40が形成されているが、貫通孔40の孔径はすべて同じであり、よって貫通孔40は本発明における肉抜き部には該当しない。
(Modification 1)
FIG. 6 shows a modification of the first embodiment. In the present modification, the first dowel plate 42 has semicircular cutouts (lightening portions) 48, 49, 50 formed at two sides spaced apart in the width direction of the base plate 41. The first cutout 48 is arranged at a position closest to the base plate 41 among the first cutout 48, the second cutout 49, and the third cutout 50. The second notch 49 is arranged at a position farther from the base plate 41 than the first notch 48. The third notch 50 is arranged at a position farther from the base plate 41 than the second notch 49. The second notch 49 and the third notch 50 are formed in the same shape and the same size. The radius (r1) of the first notch 48 is smaller than the radius (r2) of the second notch 49 and the third notch 50. Although the plurality of through holes 40 are formed in the first dowel plate 42, the diameters of the through holes 40 are all the same, and thus the through holes 40 do not correspond to the hollow portions in the present invention.

本変形例によれば、第一の切欠部48の半径r1が第二の切欠部49の半径r2よりも小さい。つまり、第一の切欠部48が第二の切欠部49よりも小さい。このようにすることで、第一のジベル板42の長さ方向に直交するネット断面の大きさ(断面内において第一の切欠部が占める部分の面積を含まない)を、従来型のジベル板と比較して大きくすることができる。これにより、第一のジベル板42の寸法(長さ、幅、厚さ)を大きく変えることなく第一のジベル板42の引抜耐力を高めることができ、第一のジベル板42を従来よりも小さくすることができる。
また、第一の切欠部48の大きさを意図的に小さくすることにより、第一の切欠部48が抵抗する引抜力が抑制され、コーン状破壊を効果的に抑制できる。これにより、制震ダンパー25を接続される建物の健全性を高めることができる。
According to this modification, the radius r1 of the first notch 48 is smaller than the radius r2 of the second notch 49. That is, the first notch 48 is smaller than the second notch 49. By doing so, the size of the net cross section orthogonal to the length direction of the first dowel plate 42 (not including the area of the portion occupied by the first notch in the cross section) is reduced by the conventional dowel plate. It can be larger than that. Thereby, the pull-out strength of the first dowel plate 42 can be increased without largely changing the dimensions (length, width, thickness) of the first dovetail plate 42, and the first dovetail plate 42 can be made to be larger than before. Can be smaller.
In addition, by intentionally reducing the size of the first notch 48, the pullout force resisted by the first notch 48 is suppressed, and cone-shaped destruction can be effectively suppressed. Thereby, the soundness of the building to which the vibration damper 25 is connected can be improved.

本実施形態においては、制震部材の接続金物35及び接続構造30を鉄筋コンクリート構造10に適用する例について説明するが、本発明はこれに限定されるものではない。その他の例として、接続金物35及び接続構造30を鉄骨鉄筋コンクリート構造の建物や、鉄骨構造の建物に適用してもよい。接続金物35及び接続構造30を鉄骨構造の建物に適用する場合には、鉄骨構造の躯体を支持する基礎(鉄筋コンクリート製)の部分に接続構造30が設置される。
また、接続金物35及び接続構造30を、制震部材ではなく単純な柱、梁、ブレース等の構造部材を躯体に接続するために用いてもよい。
In the present embodiment, an example in which the connection hardware 35 and the connection structure 30 of the vibration damping member are applied to the reinforced concrete structure 10 will be described, but the present invention is not limited to this. As another example, the connection hardware 35 and the connection structure 30 may be applied to a building having a steel-framed reinforced concrete structure or a building having a steel-frame structure. When the connection hardware 35 and the connection structure 30 are applied to a building having a steel structure, the connection structure 30 is installed on a portion of a foundation (made of reinforced concrete) that supports a frame of the steel structure.
Further, the connection hardware 35 and the connection structure 30 may be used to connect a structural member such as a simple column, a beam, a brace, or the like, instead of the vibration control member, to the frame.

以下、第2実施形態、第3実施形態の制震ダンパーの接続金物を図7、図8に基づいて説明する。また、第4実施形態、第5実施形態の接続構造を図12、図13に基づいて説明する。なお、第2実施形態から第5実施形態において第1実施形態と同一、類似部材については同じ符号を付して詳しい説明を省略する。   Hereinafter, the connection hardware of the vibration damper of the second embodiment and the third embodiment will be described with reference to FIGS. 7 and 8. In addition, connection structures of the fourth and fifth embodiments will be described with reference to FIGS. In the second to fifth embodiments, the same or similar members as those in the first embodiment are denoted by the same reference numerals, and detailed description is omitted.

(第2実施形態)
図7に示すように、接続金物100は、第一のジベル板102が第1実施形態の第一のジベル板42と異なるだけで、その他の構成は第1実施形態の接続金物35と同様である。
第一のジベル板102は、第一のジベル縦辺(側縁)102aに形成された複数の切欠部104を有する。切欠部104は、例えば、半円形に形成されている。複数の切欠部104は、第一のジベル縦辺102aに、ベース板41から離れる方向に並び、間隔をおいて形成されている。
(2nd Embodiment)
As shown in FIG. 7, the connection hardware 100 is the same as the connection hardware 35 of the first embodiment except that the first dowel plate 102 is different from the first dowel plate 42 of the first embodiment. is there.
The first dowel plate 102 has a plurality of notches 104 formed on the first dovetail (side edge) 102a. The notch 104 is formed, for example, in a semicircular shape. The plurality of notches 104 are formed at intervals on the first dowel vertical side 102 a in a direction away from the base plate 41.

ところで、特に、鉄筋コンクリート構造に制震ダンパー25を配置する場合には、層間変位は鉄骨構造に比べて小さく、風荷重時には数ミリ程度、地震時でもせいぜい数十ミリ程度である。この層間変位を制震ダンパー25に効率よく伝達するためには、制震ダンパー25の回転ずれが小さい(すなわち、剛性が高い)接続構造とする必要がある。
ここで、制震ダンパー25の回転ずれに対しては、制震ダンパー25のフランジ27に沿って平行に配置された第一のジベル板102の抜出しによって引き起こされる。このため、第一のジベル板102の抜出しを防ぐ(すなわち、引抜きに対する剛性を高める)ことが重要となる。
By the way, especially when the vibration damper 25 is arranged in the reinforced concrete structure, the interlayer displacement is smaller than that of the steel frame structure, and is about several millimeters under a wind load, and at most about tens of millimeters even during an earthquake. In order to efficiently transmit the interlayer displacement to the vibration damper 25, it is necessary to use a connection structure in which the rotational displacement of the vibration damper 25 is small (that is, high in rigidity).
Here, the rotational displacement of the vibration damper 25 is caused by the removal of the first dowel plate 102 arranged in parallel along the flange 27 of the vibration damper 25. For this reason, it is important to prevent the first dowel plate 102 from being pulled out (that is, to increase the rigidity against pulling out).

そこで、第2実施形態において、第一のジベル板102の第一のジベル縦辺102aに切欠部104を形成することにした。よって、第一のジベル板102と下部支持部22との支圧面積を増大させることができる。これにより、第一のジベル板102の板サイズ、板厚寸法を大きく変えることなく、第一のジベル板102の抜出しに対する耐力、弾性剛性を高めることができる。
さらに、第一のジベル縦辺102aに複数の切欠部104を形成することにより、第一のジベル板102の板サイズ、板厚を変えることなく、第一のジベル板102の抜出しに対する耐力、弾性剛性を一層高めることができる。よって、第一のジベル板102のずれ変形を抑えることができ、第一のジベル板102を一層コンパクトに形成できる。これにより、制震ダンパー25を効果的にせん断塑性変形させてエネルギーを一層良好に吸収でき、第一のジベル板102による下部支持部22の鉄筋への干渉を抑えて一層良好に施工性を高めることができる。
Therefore, in the second embodiment, the notch 104 is formed on the first dowel vertical side 102a of the first dowel plate 102. Therefore, the bearing area between the first dowel plate 102 and the lower support 22 can be increased. This makes it possible to increase the strength and elastic rigidity of the first dowel plate 102 withdrawal without largely changing the plate size and plate thickness of the first dowel plate 102.
Further, by forming a plurality of cutouts 104 in the first dowel vertical side 102a, the resistance to withdrawal of the first dowel plate 102 and the elasticity without changing the plate size and thickness of the first dowel plate 102 The rigidity can be further increased. Therefore, the first dowel plate 102 can be prevented from being displaced and deformed, and the first dovetail plate 102 can be formed more compactly. As a result, the vibration damper 25 can be effectively sheared and plastically deformed to absorb the energy more favorably, and the interference of the first dowel plate 102 with the rebar of the lower support portion 22 can be suppressed to further improve the workability. be able to.

(第3実施形態)
図8に示すように、接続金物200は、第一のジベル板202が第2実施形態の第一のジベル板102と異なるだけで、その他の構成は第2実施形態の接続金物100と同様である。
第一のジベル板202は、第一のジベル縦辺(側縁)202aに形成された複数の切欠部204を有する。切欠部204は、例えば、V字状の凹形に形成されている。複数の切欠部204は、第一のジベル縦辺202aに、ベース板41から離れる方向に並び、凹凸が連続するように並んで形成されている。
(Third embodiment)
As shown in FIG. 8, the connection hardware 200 is the same as the connection hardware 100 of the second embodiment except that the first dowel plate 202 is different from the first dowel plate 102 of the second embodiment. is there.
The first dowel plate 202 has a plurality of notches 204 formed on the first dovetail side (side edge) 202a. The notch 204 is formed, for example, in a V-shaped concave shape. The plurality of cutouts 204 are formed on the first dowel vertical side 202a in a direction away from the base plate 41, and are formed so that the unevenness is continuous.

よって、第一のジベル板202と下部支持部22との支圧面積を増大させることができる。これにより、第一のジベル板202の板サイズ、板厚寸法を大きく変えることなく、第一のジベル板202の抜出しに対する耐力、弾性剛性を高めることができる。
さらに、第一のジベル縦辺202aに複数の切欠部204を形成することにより、第一のジベル板202の板サイズ、板厚を変えることなく、第一のジベル板202の抜出しに対する耐力、弾性剛性を一層高めることができる。よって、第一のジベル板202のずれ変形を抑えることができ、第一のジベル板202を一層コンパクトに形成できる。これにより、制震ダンパー25を効果的にせん断塑性変形させてエネルギーを一層良好に吸収でき、第一のジベル板202による下部支持部22の鉄筋への干渉を抑えて一層良好に施工性を高めることができる。
Therefore, the bearing area between the first dowel plate 202 and the lower support portion 22 can be increased. This makes it possible to increase the withstand strength and elastic rigidity of the first dowel plate 202 against pulling out without largely changing the plate size and plate thickness of the first dowel plate 202.
Further, by forming a plurality of cutouts 204 in the first dowel vertical side 202a, the strength and elasticity against pulling out the first dowel plate 202 can be obtained without changing the plate size and thickness of the first dovetail plate 202. The rigidity can be further increased. Therefore, it is possible to suppress the deformation of the first dowel plate 202 and to form the first dovetail plate 202 more compactly. Thereby, the vibration damper 25 can be effectively shear-plastically deformed to absorb energy more favorably, and the interference of the first dowel plate 202 with the rebar of the lower support portion 22 can be suppressed to further improve the workability. be able to.

(実施例)
以下、第1実施例から第5実施例の第一のジベル板を例に引張力と引抜変位との関係を表1、図9から図11のグラフに基づいて説明する。表1において、第1実施例から第5実施例の第一のジベル板は、例えば、第1実施形態の第一のジベル板42に相当する部材である。また、第1実施例から第5実施例の第一の貫通孔、及びその他の貫通孔は、例えば、第1実施形態の第一の貫通孔45、第二、第三の貫通孔46,47に相当する孔である。また、第一の貫通孔、その他の貫通孔の孔径に、第1実施形態の孔径d1,d2を付して説明する。また、第一の貫通孔の埋込深さLは、例えば、第1実施形態の下部支持部22の上側端面22aから第一の貫通孔45の中心までの距離である。また、切欠部は、例えば、第2実施形態の第一のジベル縦辺102aに形成された複数の切欠部104に相当する部位である。
さらに、図9から図11において、縦軸は引張力(kN)を示し、横軸は引抜変位(mm)を示す。また、第1実施例の第一のジベル板をG1、第2実施例の第一のジベル板をG2として説明する。また、第3実施例の第一のジベル板をG3、第4実施例の第一のジベル板をG4、第5実施例の第一のジベル板をG5として説明する。
(Example)
Hereinafter, the relationship between the pulling force and the pull-out displacement will be described based on Table 1 and the graphs of FIGS. 9 to 11 using the first dowel plate of the first to fifth embodiments as an example. In Table 1, the first dowel plate of the first to fifth examples is, for example, a member corresponding to the first dowel plate 42 of the first embodiment. Further, the first through-hole and the other through-holes of the first to fifth examples are, for example, the first through-hole 45, the second and third through-holes 46 and 47 of the first embodiment. Is a hole corresponding to. In addition, the diameters of the first through-hole and the other through-holes are described with the hole diameters d1 and d2 of the first embodiment. The embedding depth L of the first through hole is, for example, a distance from the upper end surface 22a of the lower support portion 22 of the first embodiment to the center of the first through hole 45. The notch is, for example, a part corresponding to the plurality of notches 104 formed on the first dowel vertical side 102a of the second embodiment.
Further, in FIGS. 9 to 11, the vertical axis indicates the tensile force (kN), and the horizontal axis indicates the pull-out displacement (mm). Further, the first dowel plate of the first embodiment will be described as G1, and the first dowel plate of the second embodiment will be described as G2. The first dowel plate of the third embodiment will be described as G3, the first dowel plate of the fourth embodiment will be G4, and the first dowel plate of the fifth embodiment will be described as G5.

Figure 0006670971
Figure 0006670971

まず、第1実施例の第一のジベル板及び第2実施例の第一のジベル板について引張力と引抜変位との関係を表1、図9に基づいて説明する。
表1に示すように、第1実施例及び第2実施例の第一のジベル板は、第一の貫通孔の埋込深さLを210mmと大きく設定されている。加えて、第2実施例の第一のジベル板は、第一の貫通孔がその他の貫通孔の孔径d2より小さい孔径d1に形成されている。よって、第一のジベル板の引張降伏を第一の貫通孔の近傍において遅らせることができる。
これにより、図9に示すように、グラフG2の引抜力がグラフG1の引抜力より大きくなる。このように、第一の貫通孔の孔径d1を小さく形成することにより、下部支持部22の上側端面22aから第一のジベル板が引き抜かれる引抜力(すなわち、終局耐力)を約13%高めることができることがわかる。
First, the relationship between the pulling force and the pull-out displacement of the first dowel plate of the first embodiment and the first dowel plate of the second embodiment will be described with reference to Table 1 and FIG.
As shown in Table 1, in the first dowel plate of the first and second embodiments, the embedding depth L of the first through hole is set to be as large as 210 mm. In addition, in the first dowel plate of the second embodiment, the first through-hole has a hole diameter d1 smaller than the hole diameter d2 of the other through-holes. Therefore, the tensile yield of the first dowel plate can be delayed in the vicinity of the first through hole.
Thereby, as shown in FIG. 9, the pulling force of the graph G2 becomes larger than the pulling force of the graph G1. In this way, by making the hole diameter d1 of the first through hole small, it is possible to increase the pulling force (that is, the ultimate strength) by which the first dowel plate is pulled out from the upper end surface 22a of the lower support portion 22 by about 13%. You can see that you can do it.

次に、第3実施例の第一のジベル板及び第4実施例の第一のジベル板について引張力と引抜変位との関係を表1、図10に基づいて説明する。
表1に示すように、第3実施例及び第4実施例の第一のジベル板は、第一の貫通孔の埋込深さLを100mmと小さく抑えられている。加えて、第3実施例の第一のジベル板は、第一の貫通孔がその他の貫通孔の孔径d2より小さい孔径d1に形成されている。このように、第3実施例の第一のジベル板によれば、第一の貫通孔の埋込深さLを小さく抑えた状態において、第一の貫通孔の孔径d1を小さく形成することにより、下部支持部22のコンクリートがコーン状破壊することを効果的に抑制できる。
Next, the relationship between the pulling force and the pull-out displacement of the first dowel plate of the third embodiment and the first dowel plate of the fourth embodiment will be described with reference to Table 1 and FIG.
As shown in Table 1, in the first dowel plate of the third and fourth embodiments, the embedding depth L of the first through hole is suppressed to a small value of 100 mm. In addition, in the first dowel plate of the third embodiment, the first through hole has a hole diameter d1 smaller than the hole diameter d2 of the other through holes. As described above, according to the first dowel plate of the third embodiment, the hole diameter d1 of the first through-hole is formed small in a state where the embedding depth L of the first through-hole is kept small. In addition, the concrete of the lower support portion 22 can be effectively prevented from being broken in a cone shape.

これにより、図10に示すように、グラフG3の引抜力がグラフG4の引抜力より大きくなる。このように、第一の貫通孔の埋込深さLを小さく抑えた状態において、第一の貫通孔の孔径d1を小さく形成することにより、下部支持部22の上側端面22aから第一のジベル板が引き抜かれる引抜力(終局耐力)を約8%高めることができることがわかる。   Thereby, as shown in FIG. 10, the pulling force of the graph G3 becomes larger than the pulling force of the graph G4. As described above, in the state where the embedding depth L of the first through-hole is kept small, the hole diameter d1 of the first through-hole is made small, so that the first dowel is removed from the upper end face 22a of the lower support portion 22. It can be seen that the pull-out force (final strength) at which the board is pulled out can be increased by about 8%.

次いで、第5実施例の第一のジベル板及び第1実施例の第一のジベル板について引張力と引抜変位との関係を表1、図11に基づいて説明する。
表1に示すように、第5実施例及び第1実施例の第一のジベル板は、第一の貫通孔の埋込深さLを210mmと大きく設定されている。加えて、第5実施例の第一のジベル板は、第一のジベル縦辺に複数の切欠部が形成されている。よって、下部支持部22に対する第一のジベル板の抜出しによる初期耐力、初期剛性を高めることができる。
Next, the relationship between the pulling force and the pull-out displacement of the first dowel plate of the fifth embodiment and the first dowel plate of the first embodiment will be described with reference to Table 1 and FIG.
As shown in Table 1, in the first dowel plate of the fifth embodiment and the first embodiment, the embedding depth L of the first through hole is set to be as large as 210 mm. In addition, the first dowel plate of the fifth embodiment has a plurality of cutouts formed on the first dowel vertical side. Therefore, the initial strength and the initial rigidity of the lower support portion 22 by pulling out the first dowel plate can be increased.

これにより、図11に示すように、グラフG5の初期引抜力がグラフG1の初期引抜力より大きくなる。このように、第一のジベル縦辺に複数の切欠部を形成することにより、下部支持部22の上側端面22aから第一のジベル板が引き抜かれる初期引抜力(すなわち、初期耐力)を約44%高めることができることがわかる。
一方、グラフG5の終局引抜力(すなわち、終局耐力)がグラフG1の終局引抜力より約15%小さくなる。グラフG5の終期引抜力は、例えば、第一の貫通孔45の孔径d1を変える方策との組み合わせや、第一のジベル板の板厚の調整で終局耐力を高めることは可能である。
Thereby, as shown in FIG. 11, the initial pulling force of the graph G5 becomes larger than the initial pulling force of the graph G1. By forming a plurality of notches in the vertical side of the first dowel, the initial withdrawal force (i.e., the initial proof strength) at which the first dowel plate is pulled out from the upper end surface 22a of the lower support portion 22 can be reduced to about 44. % Can be increased.
On the other hand, the ultimate pulling force (ie, the ultimate proof stress) of the graph G5 is about 15% smaller than the ultimate pulling force of the graph G1. The end pull-out force in the graph G5 can be increased, for example, by a combination with a measure for changing the hole diameter d1 of the first through hole 45 or by adjusting the thickness of the first dowel plate.

第1実施形態から第3実施形態においては、制震ダンパーの接続金物35及び接続構造30を用いて制震間柱20に制震ダンパー25を接続する例について説明したが、これに限定するものではない。その他の例として、制震ダンパー25及び接続金物35を含むシアリンク型の制震ダンパーの例を図12に、ブレース型の制震ダンパーを図13、図14に基づいて説明する。   In the first embodiment to the third embodiment, the example in which the damping damper 25 is connected to the damping stud 20 using the connection hardware 35 and the connection structure 30 of the damping damper has been described. However, the present invention is not limited to this. Absent. As another example, an example of a shear-link type damping damper including a damping damper 25 and a connection hardware 35 will be described with reference to FIG. 12, and a brace-type damping damper will be described with reference to FIGS.

(第4実施形態)
図12に示すように、鉄筋コンクリート構造300は、隣り合う鉄筋コンクリート製の柱301、302と、一方の柱301に設けられた第一支持部303と、他方の柱302に設けられた第二支持部304と、第一、第二支持部303、304間に架設された制震ダンパー25と、接続構造30とを備えている。本構造は、第1実施形態の制震間柱20を、上下階の梁間ではなく左右に隣り合う柱301、302間に配設したものである。
(Fourth embodiment)
As shown in FIG. 12, the reinforced concrete structure 300 includes adjacent reinforced concrete columns 301 and 302, a first support portion 303 provided on one column 301, and a second support portion provided on the other column 302. 304, a vibration damper 25 installed between the first and second support portions 303 and 304, and a connection structure 30. In this structure, the seismic control studs 20 of the first embodiment are arranged not between the beams on the upper and lower floors but between the columns 301 and 302 adjacent to the left and right.

鉄筋コンクリート構造300が採用された構造物に、地震や強い横風によって横揺れが生じると、柱301、302は局所的にみて同じ方向に斜めに傾く。これに伴い、第一支持部303と第二支持部304とが、構造物の長さ(高さ)方向に相互に離間するように変位するため、制震ダンパー25には、曲げモーメントMuとせん断力Quとが作用するが、第1実施形態と同様に、制震ダンパー25を効果的にせん断塑性変形させて揺れのエネルギーを良好に吸収できる。   When the structure employing the reinforced concrete structure 300 is rolled by an earthquake or strong crosswind, the columns 301 and 302 are inclined obliquely in the same direction when viewed locally. Accordingly, since the first support portion 303 and the second support portion 304 are displaced so as to be separated from each other in the length (height) direction of the structure, the bending dam Mu is applied to the vibration damper 25. Although the shear force Qu acts, as in the first embodiment, the vibration damper 25 can be effectively shear-plastically deformed and the energy of the shaking can be favorably absorbed.

(第5実施形態)
図13、図14に示すように、鉄筋コンクリート構造400は、上階の梁401及び一方の柱403の上側交差部404と、下階の梁402及び他方の柱403の下側交差部405との間に制震ブレース410が斜めに架設されている。制震ブレース410の上端は、上側交差部404に設置された上側の接続金物(ブラケット)404aに接続され、ブレース410の下端は、下側交差部405に設置された下側の接続金物(ブラケット)405aに接続されている。
接続金物404a、405aは同じ構造を有しているので、以下では下側の接続金物405aについて説明し、接続金物404aの説明は省略する。
(Fifth embodiment)
As shown in FIG. 13 and FIG. 14, the reinforced concrete structure 400 includes a beam 401 on the upper floor and an upper intersection 404 of one column 403, a beam 402 on the lower floor and a lower intersection 405 of the other column 403. A vibration control brace 410 is installed diagonally between them. The upper end of the vibration control brace 410 is connected to an upper connection hardware (bracket) 404 a installed at the upper intersection 404, and the lower end of the brace 410 is connected to a lower connection hardware (bracket) installed at the lower intersection 405. ) 405a.
Since the connection hardware 404a and 405a have the same structure, the lower connection hardware 405a will be described below, and the description of the connection hardware 404a will be omitted.

接続金物405aは、第一のベース板411と、第二のベース板412と、複数のジベル板420とを備えている。複数のジベル板420の一部は、第一のベース板411の下面から垂下するように固定され、複数のジベル板420の残りは、第二のベース板412の側面から梁402と平行な方向に延びるように固定されている。各ジベル板420は、ベース板41から離れる方向に間隔を置いて形成された複数の貫通孔45、46、47を有し、これら複数の貫通孔45、46、47に、鉄筋コンクリート構造400に含まれる鉄筋36が挿通されたうえでコンクリートに埋設固定されている。
これにより、第4実施形態によれば、上記の実施形態と同様に、制震ブレース410を効果的にせん断塑性変形させてエネルギーを一層良好に吸収できる。
The connection hardware 405a includes a first base plate 411, a second base plate 412, and a plurality of dowel plates 420. Part of the plurality of dowel plates 420 is fixed so as to hang down from the lower surface of the first base plate 411, and the rest of the dozen of the dowel plates 420 is in a direction parallel to the beam 402 from the side surface of the second base plate 412. It is fixed so as to extend. Each dowel plate 420 has a plurality of through holes 45, 46, 47 formed at intervals in a direction away from the base plate 41, and the plurality of through holes 45, 46, 47 are included in the reinforced concrete structure 400. A reinforcing bar 36 is inserted and fixed in concrete.
Thus, according to the fourth embodiment, similarly to the above-described embodiment, the vibration damping brace 410 can be effectively shear-plastically deformed, and the energy can be more favorably absorbed.

なお、本発明の技術的範囲は前記実施形態に限定されるものではなく、本発明の趣旨を逸脱しない範囲において種々の変更を加えることが可能である。
その他、本発明の趣旨に逸脱しない範囲で、前記実施形態における構成要素を周知の構成要素に置き換えることは適宜可能であり、また、前記した実施形態や実施例を適宜組み合わせてもよい。
Note that the technical scope of the present invention is not limited to the above embodiment, and various changes can be made without departing from the spirit of the present invention.
In addition, without departing from the spirit of the present invention, it is possible to appropriately replace the components in the above-described embodiment with well-known components, and the above-described embodiments and examples may be appropriately combined.

10,300,400 鉄筋コンクリート構造
21 上部支持部(構造体)
22 下部支持部(構造体)
25 制震ダンパー
25a 上側接続端(接続端)
25b 下側接続端(接続端)
30 接続構造
31 上部接続構造
32 下部接続構造
35,100,200 制震ダンパーの接続金物
36,37,38 第一、第二及び第三の鉄筋(鉄筋)
41 ベース板
41c 下側ベース板の上面(一方の面)、上側ベース板の上面(他方の面)
41d 下側ベース板の下面(他方の面)、上側ベース板の下面(一方の面)
42,102,202 第一のジベル板(ジベル板)
43 第二のジベル板
45 第一の貫通孔
46 第二の貫通孔
47 第三の貫通孔(第二の貫通孔)
102a,202a 第一のジベル縦辺(側縁)
104,204 切欠部
10, 300, 400 Reinforced concrete structure 21 Upper support (structure)
22 Lower support (structure)
25 Damper 25a Upper connection end (connection end)
25b Lower connection end (connection end)
Reference Signs List 30 connection structure 31 upper connection structure 32 lower connection structure 35, 100, 200 connection hardware 36, 37, 38 of vibration damper First, second and third reinforcing bars (rebar)
41 Base plate 41c Upper surface of lower base plate (one surface), upper surface of upper base plate (other surface)
41d Lower surface of lower base plate (other surface), lower surface of upper base plate (one surface)
42, 102, 202 First dowel plate (Dowel plate)
43 second dowel plate 45 first through hole 46 second through hole 47 third through hole (second through hole)
102a, 202a First dowel vertical side (side edge)
104, 204 Notch

Claims (7)

鋼製の構造部材の接続端が一方の面に接続されるベース板と、
前記ベース板の他方の面に、該他方の面上に対して起立又は垂下するように固定されたジベル板とを備え、
前記ジベル板には、前記ベース板から離れる方向に並ぶ複数の肉抜き部が形成され、
前記複数の肉抜き部のうち前記ベース板に最も近い第一の肉抜き部は、前記第一の肉抜き部よりも前記ベース板から遠い第二の肉抜き部よりも小さい、鋼製構造部材の接続金物。
A base plate to which a connection end of a steel structural member is connected to one surface,
On the other surface of the base plate, comprising a dowel plate fixed so as to stand or hang down on the other surface,
A plurality of lightening portions arranged in a direction away from the base plate are formed on the dowel plate,
A first lightening portion closest to the base plate among the plurality of lightening portions is a steel structural member smaller than a second lightening portion farther from the base plate than the first lightening portion. Connection hardware.
前記複数の肉抜き部が、前記ジベル板に形成された貫通孔、及び前記ジベル板の側縁に形成された切欠部のいずれか一方、又は両方である、請求項1に記載の鋼製構造部材の接続金物。   The steel structure according to claim 1, wherein the plurality of lightening portions are one or both of a through hole formed in the dowel plate and a notch formed in a side edge of the dowel plate. Connection hardware for members. 前記複数の肉抜き部が、前記ジベル板に形成された貫通孔であって、前記第一の肉抜き部である第一の貫通孔の内径は、前記第二の肉抜き部である第二の貫通孔の内径よりも小さい、請求項1に記載の鋼製構造部材の接続金物。   The plurality of lightening portions are through holes formed in the dowel plate, and an inner diameter of a first through hole that is the first lightening portion is a second hole that is the second lightening portion. The metal fitting for a steel structural member according to claim 1, wherein the metal fitting is smaller than the inner diameter of the through hole. 前記複数の肉抜き部が、前記ジベル板の側縁に形成された切欠部であって、前記第一の肉抜き部である第一の切欠部は、前記第二の肉抜き部である第二の切欠部よりも小さい、請求項1に記載の鋼製構造部材の接続金物。   The plurality of lightening portions are cutout portions formed on side edges of the dowel plate, and the first notch portion, which is the first lightening portion, is the second lightening portion, which is the second lightening portion. The metal fitting for a steel structural member according to claim 1, wherein the metal fitting is smaller than the two notches. 鋼製の構造部材と、鉄筋コンクリート構造又は鉄骨鉄筋コンクリート構造の構造物の躯体との接続構造であって、
請求項1からのいずれか一項に記載の接続金物を含み、
前記ジベル板が前記躯体に埋設されている、接続構造。
A connection structure between a steel structural member and a skeleton of a reinforced concrete structure or a steel reinforced concrete structure,
A connection hardware according to any one of claims 1 to 3 ,
The dowel plate is embedded before Kimukuro member connection structure.
記躯体に埋設される鉄筋をさらに含み、
前記鉄筋は、前記躯体の内部で前記複数の肉抜き部に配設されている、請求項5に記載の接続構造。
Further comprising a reinforcement embedded in the front Kimukuro body,
The reinforcing bar is disposed on said plurality of lightening portion inside the front Kimukuro member connection structure according to claim 5.
鋼製の構造部材と、鉄筋コンクリート構造又は鉄骨鉄筋コンクリート構造の構造物の躯体との接続構造であって、  A connection structure between a steel structural member and a skeleton of a reinforced concrete structure or a steel reinforced concrete structure,
請求項4に記載の接続金物を含み、  A connection hardware according to claim 4, comprising:
前記ジベル板が前記躯体に埋設されている、接続構造。  A connection structure, wherein the dowel plate is embedded in the skeleton.
JP2019144844A 2019-08-06 2019-08-06 Connection hardware and connection structure for steel structural members Active JP6670971B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2019144844A JP6670971B1 (en) 2019-08-06 2019-08-06 Connection hardware and connection structure for steel structural members
PH12019000317A PH12019000317A1 (en) 2019-08-06 2019-08-20 Anchorage piece for steel structural member and connection structure including the structural member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019144844A JP6670971B1 (en) 2019-08-06 2019-08-06 Connection hardware and connection structure for steel structural members

Publications (2)

Publication Number Publication Date
JP6670971B1 true JP6670971B1 (en) 2020-03-25
JP2021025335A JP2021025335A (en) 2021-02-22

Family

ID=70000756

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019144844A Active JP6670971B1 (en) 2019-08-06 2019-08-06 Connection hardware and connection structure for steel structural members

Country Status (2)

Country Link
JP (1) JP6670971B1 (en)
PH (1) PH12019000317A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4296254A1 (en) 2021-02-19 2023-12-27 API Corporation Method for producing cyclohexenone compound

Also Published As

Publication number Publication date
JP2021025335A (en) 2021-02-22
PH12019000317A1 (en) 2021-03-01

Similar Documents

Publication Publication Date Title
KR101263078B1 (en) Connection metal fitting and building with the same
JP4729134B1 (en) Metal plate for vibration control and building structure
JP6990979B2 (en) Framing structure of a building
JP2008045393A (en) Composite energy absorbing structure and method for forming composite structure of building including one or plural floor slabs
KR101236575B1 (en) Method for constructing partition wall using seismic control device
JP6612014B2 (en) Seismic reinforcement device, seismic reinforcement structure, earthquake-resistant building, seismic reinforcement method
JP4931490B2 (en) Structure reinforcement structure and method of reinforcement
JP6670971B1 (en) Connection hardware and connection structure for steel structural members
JP2016199861A (en) Pile foundation structure
JP7228344B2 (en) Joint structure of reinforced concrete frame and brace and precast member
JP4070117B2 (en) Vibration control device
KR101242978B1 (en) Method for constructing partition wall using seismic control device
KR102083066B1 (en) Frame-type Damping Device and Reinforcing Method Using The Same
JP2015052200A (en) Aseismatic reinforcing structure
KR101226778B1 (en) Structure of connecting steel beam and column having improved earthquake resistance ability
CN210887654U (en) Damping device for constructional engineering
JP2018199958A (en) Damping structure
KR20170023572A (en) Steel coulmn connecting construction method for earthquake-resistant
JP2016084701A (en) Vibration control building
JP6108787B2 (en) Building structure
JP7465221B2 (en) Vibration-damping structures and buildings
JP5891982B2 (en) Bearing wall joint structure
KR102074040B1 (en) Steel Damper and Frame-type Damping Device usig the Damper and Reinforcing Method thereof
JP7429550B2 (en) building
KR102074039B1 (en) Steel Damper and Frame-type Damping Device usig the Damper and Reinforcing Method thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190927

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20190927

A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20191008

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20191023

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20191224

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200204

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200302

R150 Certificate of patent or registration of utility model

Ref document number: 6670971

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250