JP6668120B2 - Photovoltaic power generation device control device, server, photovoltaic power generation system, information distribution method, photovoltaic power generation device control method, and program - Google Patents

Photovoltaic power generation device control device, server, photovoltaic power generation system, information distribution method, photovoltaic power generation device control method, and program Download PDF

Info

Publication number
JP6668120B2
JP6668120B2 JP2016051196A JP2016051196A JP6668120B2 JP 6668120 B2 JP6668120 B2 JP 6668120B2 JP 2016051196 A JP2016051196 A JP 2016051196A JP 2016051196 A JP2016051196 A JP 2016051196A JP 6668120 B2 JP6668120 B2 JP 6668120B2
Authority
JP
Japan
Prior art keywords
power generation
output control
photovoltaic power
server
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016051196A
Other languages
Japanese (ja)
Other versions
JP2017169320A (en
Inventor
森 正樹
正樹 森
松尾 清
清 松尾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sharp Corp
Original Assignee
Sharp Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sharp Corp filed Critical Sharp Corp
Priority to JP2016051196A priority Critical patent/JP6668120B2/en
Publication of JP2017169320A publication Critical patent/JP2017169320A/en
Application granted granted Critical
Publication of JP6668120B2 publication Critical patent/JP6668120B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • Y04S10/123Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving renewable energy sources

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明は、太陽光発電装置の制御装置と、その制御装置とデータを送受するサーバと、それらの制御装置およびサーバとを含んで構成される太陽光発電システムとに関する。   The present invention relates to a control device for a photovoltaic power generation device, a server for transmitting and receiving the control device and data, and a photovoltaic power generation system including the control device and the server.

太陽光発電および風力発電等は、自然エネルギを利用することによって二酸化炭素の排出量を抑制できる発電方式として注目されている。また、その発電電力を電力事業者が買い取る制度が実施されたことにより、特に、太陽光発電の一般家庭および産業用施設への普及が進んでいる。   BACKGROUND ART Solar power generation, wind power generation, and the like have attracted attention as power generation methods that can suppress carbon dioxide emissions by using natural energy. In addition, the introduction of a system in which a power provider purchases the generated power has led to the spread of photovoltaic power generation to general households and industrial facilities.

しかしながら、自然エネルギを利用した発電は天候に依存するため、その発電量が需要に一致するとは限らない。例えば、強い日射が長く続く季節では、太陽光発電による発電電力が、複数の太陽光発電装置から電力系統へ一斉に逆潮流されることが起こり得る。そうなると、電力系統が不安定になることが懸念されている。   However, power generation using natural energy depends on the weather, and the amount of power generation does not always match demand. For example, in a season in which strong solar radiation lasts for a long time, power generated by photovoltaic power generation may be reversely flown from a plurality of photovoltaic power generators to a power system at the same time. If so, there is a concern that the power system will become unstable.

そこで、電力事業者は、電力系統が不安定になることを回避できるように、複数の太陽光発電装置のそれぞれについて、パワーコンディショナが生成する交流電力の出力(交流出力)の上限値を、日時とともに指定する出力制御を行おうとしている。その出力制御の結果として、太陽光発電装置から電力系統へ逆潮流できる電力を制限できる。なお、パワーコンディショナの交流出力の上限値を、日時とともに指定する情報を、出力制御スケジュールと呼んでいる。出力制御スケジュールは、太陽光発電装置ごとの予想発電量と、電力需要予測とに基づいて作成され、電力事業者が管理するサーバから通信網を介して太陽光発電装置に配信されたり、通信不可の太陽光発電装置には人手によって供給されたりする。太陽光発電装置は、出力制御スケジュールに従って、交流出力を制御する。   Therefore, in order to prevent the power system from becoming unstable, the power company sets the upper limit value of the output (AC output) of the AC power generated by the power conditioner for each of the plurality of solar power generation devices, You are going to perform output control specified with the date and time. As a result of the output control, the power that can flow backward from the photovoltaic power generator to the power system can be limited. The information that specifies the upper limit of the AC output of the power conditioner together with the date and time is called an output control schedule. The output control schedule is created based on the estimated amount of power generation for each photovoltaic power generation device and the power demand forecast, and is distributed from the server managed by the power company to the photovoltaic power generation device via the communication network, and communication is disabled. Are supplied by hand to the solar power generation devices. The solar power generation device controls the AC output according to the output control schedule.

下掲の特許文献1には、外部サーバから電力制御に関する情報を取得し記憶し、記憶した情報を基に電力制御を行う一方、外部サーバとの通信が異常な場合には、標準動作としてあらかじめ設定された電力制御を行う電力管理システムが開示されている。   Patent Document 1 listed below obtains and stores information related to power control from an external server, and performs power control based on the stored information. On the other hand, when communication with the external server is abnormal, standard operation is performed in advance. A power management system that performs set power control is disclosed.

特開2013−74631号公報(2013年4月22日公開)JP 2013-74631 A (released on April 22, 2013)

しかしながら、上述のような従来技術には、太陽光発電装置が出力制御に対応できるように太陽光発電装置を設定しようとすると、太陽光発電装置の保守管理者に負担がかかるという問題がある。   However, the above-described related art has a problem in that if a photovoltaic power generation device is set to be able to cope with output control, a burden is imposed on a maintenance manager of the photovoltaic power generation device.

なぜなら、出力制御に対応した太陽光発電装置の設定を、太陽光発電装置のユーザが行うことはできない、もしくは困難であるため、太陽光発電装置の保守管理者が、太陽光発電装置の設置場所に赴いて行う必要があるからである。保守管理の対象となる太陽光発電装置は多数なので、保守管理者の負担、すなわちコストは、保守管理すべき太陽光発電装置の数とともに累積的に増大する。   Because it is impossible or difficult for the user of the photovoltaic power generation device to set the photovoltaic power generation device corresponding to the output control, the maintenance manager of the photovoltaic power generation device This is because it is necessary to go to. Since a large number of photovoltaic power generators are subject to maintenance management, the burden on the maintenance manager, that is, the cost, increases cumulatively with the number of photovoltaic power generators to be maintained and managed.

本発明は、上記問題点に鑑みてなされたものであり、その目的は、出力制御を実行可能にする太陽光発電装置の設定にかかる負担を軽減できる太陽光発電装置の制御装置、サーバおよび太陽光発電システムを実現することにある。   The present invention has been made in view of the above problems, and an object of the present invention is to provide a control device, a server, and a solar power generation device that can reduce a load on setting of a photovoltaic power generation device capable of performing output control. It is to realize a photovoltaic power generation system.

上記の課題を解決するために、本発明の一態様に係るサーバは、太陽光発電装置の保守管理に用いられるサーバであって、メモリと、コントローラとを備え、上記コントローラは、上記太陽光発電装置の交流出力を制限する出力制御に関わる設定情報を、上記太陽光発電装置に割り当てた識別情報に対応付けて作成し、作成した設定情報を上記メモリに格納するとともに、上記太陽光発電装置に備えられ、上記太陽光発電装置を制御する制御装置に対して、上記太陽光発電装置に対応する設定情報を上記メモリから読み出して送信することを特徴とする。   In order to solve the above problem, a server according to one embodiment of the present invention is a server used for maintenance management of a solar power generation device, including a memory and a controller, wherein the controller Setting information related to output control for limiting the AC output of the device is created in association with the identification information assigned to the solar power generation device, and the created setting information is stored in the memory, and It is provided that setting information corresponding to the solar power generation device is read from the memory and transmitted to a control device that is provided and controls the solar power generation device.

また、上記の課題を解決するために、本発明の一態様に係る制御装置は、太陽光発電装置に備えられる制御装置であって、上記太陽光発電装置の交流出力を制限する出力制御に関わる設定情報を生成するサーバから、上記設定情報を取得するとともに、上記太陽光発電装置に備えられるパワーコンディショナに対し、取得した上記設定情報に基づいて、上記出力制御に関する指示を与えることを特徴とする。   Further, in order to solve the above problem, a control device according to one embodiment of the present invention is a control device provided in a solar power generation device and relates to output control for limiting an AC output of the solar power generation device. Acquiring the setting information from a server that generates the setting information, and giving an instruction regarding the output control to the power conditioner included in the solar power generation device based on the acquired setting information. I do.

本発明の一態様によれば、出力制御を実行可能にする太陽光発電装置の設定にかかる負担を軽減できるという効果を奏する。   Advantageous Effects of Invention According to one aspect of the present invention, it is possible to reduce a load on setting of a photovoltaic power generation device that enables output control.

本発明の一実施形態における太陽光発電システムにおいて、電力モニタおよびモニタリングサーバの各機能的な構成を示すブロック図である。It is a block diagram showing each functional composition of a power monitor and a monitoring server in a photovoltaic power generation system in one embodiment of the present invention. 上記太陽光発電システムの全体的な構成を示すブロック図である。It is a block diagram showing the whole solar power generation system composition. 出力制御スケジュールを含む出力制御情報の一例を示す説明図である。FIG. 9 is an explanatory diagram illustrating an example of output control information including an output control schedule. モニタリングサーバが行う設定情報の変更処理の手順を示すフローチャートである。9 is a flowchart illustrating a procedure of a setting information change process performed by a monitoring server. 電力モニタが行う設定情報の変更処理の手順を示すフローチャートである。9 is a flowchart illustrating a procedure of a setting information change process performed by a power monitor.

〔実施形態1〕
以下、本発明の実施の形態について、詳細に説明する。
[Embodiment 1]
Hereinafter, embodiments of the present invention will be described in detail.

(太陽光発電システムの構成の概要)
図2を参照して、本発明の一実施形態における太陽光発電システムの構成について説明する。図2は、本発明の一実施形態における太陽光発電システムの全体的な構成を示すブロック図である。図2に示すように、太陽光発電システム1は、太陽光発電装置10、モニタリングサーバ20、スケジュールサーバ30、インターネット40およびルータ50を備えている。
(Outline of the configuration of the solar power generation system)
With reference to FIG. 2, a configuration of a photovoltaic power generation system according to an embodiment of the present invention will be described. FIG. 2 is a block diagram showing the overall configuration of the photovoltaic power generation system according to one embodiment of the present invention. As shown in FIG. 2, the photovoltaic power generation system 1 includes a photovoltaic power generation device 10, a monitoring server 20, a schedule server 30, the Internet 40, and a router 50.

太陽光発電装置10は、一例として、電力モニタ11(制御装置)、パワーコンディショナ12およびソーラパネル13を備えている。なお、本実施形態では、太陽光発電装置10は、一般家庭用に設置されているとする。電力モニタ11は、太陽光発電装置10の動作を統括的に制御するコントローラの機能と、ユーザインタフェースの機能とを有している。ユーザインタフェースの機能としては、例えば、発電電力、売電量、買電量および消費電力などの現在状態を表示したり、消費電力の目標値をユーザが設定したり、消費電力の目標値に対する使用状況、あるいは、太陽光発電装置10に発生した異常をユーザにお知らせしたりする機能などを含んでいる。   The solar power generation device 10 includes, for example, a power monitor 11 (control device), a power conditioner 12, and a solar panel 13. In the present embodiment, it is assumed that the photovoltaic power generator 10 is installed for general household use. The power monitor 11 has a function of a controller that comprehensively controls the operation of the solar power generation device 10 and a function of a user interface. As the function of the user interface, for example, the current state of the generated power, the amount of power sold, the amount of purchased power and the power consumption, or the like, the user sets the target value of the power consumption, the usage status for the target value of the power consumption, Alternatively, it includes a function of notifying a user of an abnormality that has occurred in the solar power generation device 10 or the like.

パワーコンディショナ12は、ソーラパネル13の発電電力が常に最大となるようにソーラパネル13の動作電圧を制御し、ソーラパネル13が発電した直流電力を交流電力に変換して、家庭負荷14および図示しない蓄電装置などに供給する。また、パワーコンディショナ12は、発電電力から、家庭負荷14および蓄電装置などに供給する負荷電力を差し引いて残る余剰電力を、電力系統60に逆潮流させる。   The power conditioner 12 controls the operating voltage of the solar panel 13 so that the power generated by the solar panel 13 is always maximized, converts the DC power generated by the solar panel 13 into AC power, Supply to power storage devices that do not. In addition, the power conditioner 12 causes excess power remaining after subtracting the load power supplied to the household load 14 and the power storage device from the generated power to flow backward to the power system 60.

なお、太陽光発電装置10のユーザが、専用の携帯端末または汎用の携帯端末を用いて、電力モニタ11の上記ユーザインタフェースの機能を利用できるように、後述のルータ50を介して上記携帯端末を太陽光発電システム1に無線接続することもできる。   In addition, the user of the photovoltaic power generation device 10 can use the above-mentioned user interface function of the power monitor 11 using a dedicated portable terminal or a general-purpose portable terminal, and connect the portable terminal via a router 50 described later. Wireless connection to the solar power generation system 1 is also possible.

モニタリングサーバ20は、太陽光発電装置10の保守管理者が保有または管理するサーバである。モニタリングサーバ20は、太陽光発電装置10を含む多数の太陽光発電装置の発電状態に関するデータを、インターネット40およびルータ50を介して、各太陽光発電装置から一定時間ごとに受信し、各太陽光発電装置の状態を診断し、診断結果を各太陽光発電装置へ送信する。各太陽光発電装置の状態は、各太陽光発電装置の過去の状態、期待される状態、あるいは、各太陽光発電装置の近隣に設置された他の太陽光発電装置の状態と比較され、各太陽光発電装置が正常な状態に保たれているかどうかが診断される。上記保守管理者は、診断結果が異常の発生を示している場合に、発生した異常から考えられるエラー状態に対応するように、サービスマンを対象の太陽光発電装置の現場へ速やかに派遣することができる。   The monitoring server 20 is a server held or managed by a maintenance manager of the photovoltaic power generator 10. The monitoring server 20 receives data on the power generation status of a large number of photovoltaic power generation devices including the photovoltaic power generation device 10 from the respective photovoltaic power generation devices at regular intervals via the Internet 40 and the router 50, and The state of the power generation device is diagnosed, and the diagnosis result is transmitted to each solar power generation device. The status of each photovoltaic device is compared with the past status of each photovoltaic device, the expected status, or the status of other photovoltaic devices installed near each photovoltaic device. It is diagnosed whether the photovoltaic power generator is kept in a normal state. When the diagnosis result indicates that an abnormality has occurred, the maintenance manager shall immediately dispatch a service technician to the site of the target photovoltaic power generator so as to respond to possible error conditions based on the abnormality that has occurred. Can be.

また、モニタリングサーバ20は、電力モニタ11から、発電電力、売電量、買電量および消費電力などの現在状態に関するデータ、消費電力の目標値などに関するデータを受信して、各太陽光発電装置の電力モニタに割り当てた識別情報(モニタリングID)に対応して蓄積することもできる。この場合、太陽光発電装置10側で現在状態等に関するデータの蓄積を省略してもよい。さらに、モニタリングサーバ20は、電力モニタ11のソフトウェアにアップデートがあった場合に、電力モニタ11に対しアップデートを行うこともできる。   Further, the monitoring server 20 receives, from the power monitor 11, data on the current state such as generated power, the amount of power sold, the amount of purchased power, and power consumption, and data on the target value of power consumption, and It can also be stored in correspondence with the identification information (monitoring ID) assigned to the monitor. In this case, accumulation of data relating to the current state and the like may be omitted on the photovoltaic power generation device 10 side. Further, the monitoring server 20 can update the power monitor 11 when the software of the power monitor 11 is updated.

スケジュールサーバ30は、電力系統60に電力を供給する電力事業者または出力制御スケジュールの配信事業者が保有または管理するサーバである。出力制御スケジュールは、太陽光発電装置10、すなわちパワーコンディショナ12の交流出力の上限を、特定の日の特定の時間帯について、例えばパーセントで規定した情報である。作成された出力制御スケジュールは、インターネット40およびルータ50を介して、出力制御スケジュールの配信対象となる太陽光発電装置に配信される。なお、各太陽光発電装置に割り当てられた識別情報としての発電所IDを使って、電力モニタ11が、スケジュールサーバ30に対し、出力制御スケジュールを取りに行くことも可能である。出力制御スケジュールの具体例については後述する。   The schedule server 30 is a server that is owned or managed by a power provider that supplies power to the power system 60 or a distributor of an output control schedule. The output control schedule is information in which the upper limit of the AC output of the photovoltaic power generator 10, that is, the power conditioner 12, is specified in, for example, a percentage for a specific time zone on a specific day. The created output control schedule is distributed via the Internet 40 and the router 50 to the photovoltaic power generation device to which the output control schedule is distributed. Note that the power monitor 11 can also go to the schedule server 30 to obtain an output control schedule using the power plant ID as identification information assigned to each solar power generation device. A specific example of the output control schedule will be described later.

(出力制御スケジュール)
図3は、出力制御スケジュールを含む出力制御情報の一例を示す説明図である。出力制御情報には、発電所IDおよび出力制御パターンデータが含まれている。発電所IDは、太陽光発電装置10を含む多数の太陽光発電装置を識別できるように、各太陽光発電装置に割り振られた識別情報である。発電所IDの具体例については後述する。出力制御パターンデータは、特定の年月日の特定の時間帯における、太陽光発電装置の交流出力の上限をパーセントで示したデータであり、太陽光発電装置に応じて異なる出力制御パターンデータが用意される。
(Output control schedule)
FIG. 3 is an explanatory diagram illustrating an example of output control information including an output control schedule. The output control information includes a power plant ID and output control pattern data. The power plant ID is identification information assigned to each solar power generation device so that a large number of solar power generation devices including the solar power generation device 10 can be identified. A specific example of the power plant ID will be described later. The output control pattern data is the data indicating the upper limit of the AC output of the photovoltaic power generator in a specific time zone on a specific date and time, and different output control pattern data is prepared according to the photovoltaic power generator. Is done.

例えば、図3の(a)〜(c)は、発電所IDによって特定される1つ以上の太陽光発電装置に適用される出力制御パターンデータを示している。図3の(a)に示す出力制御パターンデータでは、○年○月○日において、終日、交流出力の上限が0%に指定されている。ただし、自家消費電力までパワーコンディショナ12の交流出力を上げることは許容される。この出力制御パターンデータを含む出力制御スケジュールを受け取った太陽光発電装置は、○年○月○日において、終日、売電を行わず、発電電力を自家消費する制御を実行する。   For example, FIGS. 3A to 3C show output control pattern data applied to one or more photovoltaic power generation devices specified by the power plant ID. In the output control pattern data shown in FIG. 3A, the upper limit of the AC output is specified to be 0% throughout the day, year, month, and day. However, it is permissible to increase the AC output of the power conditioner 12 to the own power consumption. The solar power generation device that has received the output control schedule including the output control pattern data executes control for self-consumption of the generated power without performing power selling on the day, year, month, and day.

図3の(b)に示す出力制御パターンデータでは、同日の12時〜15時の時間帯において、交流出力の上限が50%に指定されている。この出力制御パターンデータを含む出力制御スケジュールを受け取った太陽光発電装置は、同日の12時〜15時の時間帯において、パワーコンディショナの交流出力の上限を50%とする制御を実行する。ただし、自家消費電力が出力制御(出力制御値:50%)時のパワーコンディショナ12の交流出力を上回る場合、自家消費電力までパワーコンディショナ12の出力を上げることは許容される。また、自家消費電力が出力制御(出力制御値:50%)時のパワーコンディショナ12の交流出力を下回る場合、発生した余剰電力を売電することは可能である。なお、12時〜15時の時間帯以外では、交流出力の上限が100%に指定されているので、電力系統への逆潮流は制限されない。すなわち、12時〜15時の時間帯以外で余剰電力が発生した場合には、余剰電力を売電することが可能である。   In the output control pattern data shown in FIG. 3B, the upper limit of the AC output is specified to be 50% in the time zone from 12:00 to 15:00 on the same day. The solar power generation device that has received the output control schedule including the output control pattern data executes control to set the upper limit of the AC output of the power conditioner to 50% in the time zone from 12:00 to 15:00 on the same day. However, if the private power consumption exceeds the AC output of the power conditioner 12 during the output control (output control value: 50%), it is allowed to increase the output of the power conditioner 12 to the private power consumption. Further, when the private power consumption is lower than the AC output of the power conditioner 12 during the output control (output control value: 50%), it is possible to sell the generated surplus power. Note that, except for the time period from 12:00 to 15:00, the upper limit of the AC output is specified as 100%, so that the reverse power flow to the power system is not limited. That is, when surplus power is generated outside the time zone of 12:00 to 15:00, the surplus power can be sold.

図3の(c)に示す出力制御パターンデータでは、終日、パワーコンディショナの交流出力を制限しないことが指定されている。したがって、この出力制御スケジュールを受け取った太陽光発電装置は、終日、余剰電力が発生した場合に余剰電力を売電する制御を実行することが可能である。   The output control pattern data shown in (c) of FIG. 3 specifies that the AC output of the power conditioner is not limited throughout the day. Therefore, the photovoltaic power generation device that has received the output control schedule can execute control to sell surplus power when surplus power occurs throughout the day.

なお、出力制御パターンは以上の3通りに限らないことはいうまでもなく、例えば30分単位で、より多様なパターンの作成が可能である。また、出力制御スケジュールは、通信可能な太陽光発電装置の場合、スケジュールサーバ30から太陽光発電装置へ、出力制御を実施する前日または当日の朝に配信される。さらに、天候の急変に応じて、通知済みの出力制御スケジュールをキャンセルまたは更新することも可能である。   Needless to say, the output control patterns are not limited to the above three types, and more various patterns can be created, for example, in units of 30 minutes. In the case of a photovoltaic power generation device that can communicate, the output control schedule is delivered from the schedule server 30 to the photovoltaic power generation device the day before the output control is performed or on the morning of the day. Furthermore, it is also possible to cancel or update the notified output control schedule according to a sudden change in the weather.

なお、スケジュールサーバ30と通信できない太陽光発電装置の場合、例えば400日を1サイクルとする長期的な出力制御スケジュールが作成され、太陽光発電装置の保守管理者が、太陽光発電装置の設置場所に赴いて、長期的な出力制御スケジュールを太陽光発電装置に設定してもよい。   In the case of a solar power generation device that cannot communicate with the schedule server 30, for example, a long-term output control schedule with 400 days as one cycle is created, and the maintenance manager of the solar power generation device determines the installation location of the solar power generation device. To set a long-term output control schedule for the photovoltaic power generator.

上記の長期的な出力制御スケジュールのことを固定スケジュールと言い、短いスパンで更新される出力制御スケジュールのことを更新スケジュールと言うことがある。更新スケジュールは、固定スケジュールに比べて、出力制限が緩いので、更新スケジュールに従う出力制御の方が、ユーザ側に経済的メリットがある。   The above-mentioned long-term output control schedule may be called a fixed schedule, and the output control schedule updated in a short span may be called an update schedule. Since the output schedule of the update schedule is less strict than the fixed schedule, the output control according to the update schedule has an economical advantage on the user side.

(出力制御に関わる設定情報の概要)
太陽光発電装置の交流出力を制限する出力制御は、太陽光発電装置ごとに実施される。そのため、太陽光発電装置10の交流出力の上限値は、太陽光発電装置10の最大発電電力と、上記の出力制御スケジュールにおいて提示されるパーセントとに基づいて、太陽光発電装置10にて算出される。
(Overview of setting information related to output control)
Output control for limiting the AC output of the photovoltaic power generator is performed for each photovoltaic power generator. Therefore, the upper limit of the AC output of the photovoltaic power generator 10 is calculated by the photovoltaic power generator 10 based on the maximum generated power of the photovoltaic power generator 10 and the percentage presented in the output control schedule. You.

太陽光発電装置10にて上記上限値が算出されるようにするためには、出力制御に関わる設定情報として、各種の情報を太陽光発電装置10が保有している必要がある。このような設定情報は、図2に示すように、モニタリングサーバ20で太陽光発電装置10に対応づけて作成され、モニタリングサーバ20から太陽光発電装置10へ送信される。   In order for the photovoltaic power generation device 10 to calculate the upper limit, the photovoltaic power generation device 10 needs to hold various types of information as setting information related to output control. As shown in FIG. 2, such setting information is created in the monitoring server 20 in association with the photovoltaic power generator 10, and transmitted from the monitoring server 20 to the photovoltaic power generator 10.

(設定情報の具体例)
以下に、出力制御に関わる設定情報の具体例を示す。
(Specific example of setting information)
Hereinafter, a specific example of the setting information related to the output control will be described.

(a)出力制御の有無:太陽光発電装置10が出力制御の対象になるか否か。出力制御の有無は、パワーコンディショナ12およびソーラパネル13の新設時期、増設時期、パワーコンディショナ12の交換時期などによって変わる。   (A) Whether or not output control is performed: Whether or not the photovoltaic power generator 10 is to be subjected to output control. The presence or absence of the output control varies depending on the time when the power conditioner 12 and the solar panel 13 are newly installed, the time when the power conditioner 12 is added, and the time when the power conditioner 12 is replaced.

(b)通信設定:電力モニタ11がスケジュールサーバ30と通信して出力制御スケジュールを取得するか否か。通信設定が不可の場合には、手動で出力制御スケジュールを電力モニタ11に書き込むか否か。   (B) Communication setting: whether or not the power monitor 11 communicates with the schedule server 30 to acquire the output control schedule. If the communication setting is not possible, whether to manually write the output control schedule in the power monitor 11 is determined.

(c)発電所ID:既に説明済みだが、発電所IDの設定を間違うと、太陽光発電装置10が正しい出力制御スケジュールを取得できず、不適切な出力制御が実施されることにつながるので、発電所IDは特に重要な設定情報の1つである。   (C) Power station ID: already described, but if the setting of the power station ID is wrong, the photovoltaic power generator 10 cannot acquire a correct output control schedule and leads to improper output control. The power plant ID is one of particularly important setting information.

(d)スケジュールサーバURL:出力制御スケジュールを配信するサーバ(例えば、スケジュールサーバ30)のURL(Uniform Resource Locator)。電力事業の自由化に伴い、複数の電力事業者が出力制御を行い、そのためのスケジュールサーバーが設置されると考えられる。その複数のスケジュールサーバーのそれぞれにURLが割り当てられる。スケジュールサーバURLの設定を間違うと、太陽光発電装置10に送信されるべき正しい出力制御スケジュールを、太陽光発電装置10は受け取ることができなくなる。そうすると適正な出力制御が行われない結果、電力事業者と、太陽光発電装置10のユーザとの双方が、不利益を受けるおそれがある。電力事業者が受ける不利益には、電力系統60において発生する不具合も含まれる。このため、スケジュールサーバURLも特に重要な設定情報の1つである。   (D) Schedule server URL: URL (Uniform Resource Locator) of a server (for example, schedule server 30) that distributes the output control schedule. With the liberalization of the electric power business, it is considered that a plurality of electric power companies perform output control, and a schedule server for that purpose is installed. A URL is assigned to each of the plurality of schedule servers. If the setting of the schedule server URL is incorrect, the photovoltaic power generator 10 cannot receive the correct output control schedule to be transmitted to the photovoltaic power generator 10. Then, as a result of not performing appropriate output control, both the power company and the user of the photovoltaic power generator 10 may be disadvantaged. The disadvantages experienced by the electric power company include a defect that occurs in the electric power system 60. For this reason, the schedule server URL is also one of particularly important setting information.

(e)NTPサーバURL:太陽光発電システム1内の時刻合わせのために標準時刻情報を配信するNTP(Network Time Protocol)サーバのURL。スケジュールサーバがどのNTPサーバと連携するかを、スケジュールサーバによって変えることが考えられる。   (E) NTP server URL: URL of an NTP (Network Time Protocol) server that distributes standard time information for time adjustment within the solar power generation system 1. It is possible to change which NTP server the schedule server cooperates with depending on the schedule server.

(f)出力変化時間:出力制御の実施規定には、出力制御の変化時間が規定されている。そのねらいは、パワーコンディショナが出力制御を行う際に、出力を緩やかに上げたり下げたりすることによって、出力の急変を避けることにある。例えば、5分〜10分の変化時間をかけて、1分刻みで出力を調整するといったルールが規定されている。   (F) Output change time: The output control execution rule defines the output control change time. The aim is to avoid a sudden change in the output by gradually increasing or decreasing the output when the power conditioner controls the output. For example, a rule is defined in which the output is adjusted in steps of one minute over a change time of 5 minutes to 10 minutes.

(g)パワコンシステム容量:電力モニタがパワーコンディショナに指令を出す出力制御値を計算するために必要な情報。太陽光発電装置10が搭載しているソーラパネル13の容量(kW)およびパワーコンディショナ12の定格容量(kW)。   (G) Power control system capacity: Information necessary for the power monitor to calculate an output control value for issuing a command to the power conditioner. The capacity (kW) of the solar panel 13 mounted on the photovoltaic power generator 10 and the rated capacity (kW) of the power conditioner 12.

(h)余剰/全量制御:余剰買い取り制度の適用を受けるか、全量買い取り制度の適用を受けるかの区別。どちらの制度の適用を受けるかにより、売電単価(円/kW)が変わる。
余剰買い取り制度は、最大発電電力が例えば10kw未満の太陽光発電装置を対象としている。余剰買い取り制度では、発電電力から自家消費する電力を差し引いて残る余剰電力が生じた場合に、余剰電力を売電することを保証している。
全量買い取り制度は、最大発電電力が例えば10kw以上の太陽光発電装置を対象としている。全量買い取り制度では、自家消費する電力を電力事業者から買う一方、発電電力を全て売電することを保証している。
(H) Surplus / full amount control: distinction between whether to apply the surplus purchase system or the full amount purchase system. The unit price (yen / kW) changes depending on which system is applied.
The surplus purchase system is intended for a photovoltaic power generator having a maximum generated power of, for example, less than 10 kW. The surplus purchase system guarantees that surplus power will be sold when remaining surplus power is generated by subtracting the power consumed by self from the generated power.
The full purchase system targets a photovoltaic power generator having a maximum generated power of, for example, 10 kW or more. The full purchase system guarantees that all the power generated by the company will be sold while the power it consumes is purchased from a power company.

(i)設備認定容量と閾値との大小:設備認定容量(契約容量とも呼ばれる)は、パワーコンディショナ12の定格容量αとソーラパネル13の容量βとの小さい方であり、太陽光発電装置10の最大発電電力に相当する。閾値は、例えば10kWである。太陽光発電装置10において新設、増設または交換が行われた結果、既設分の設備認定容量に対して増加した設備認定容量を出力制御の対象とするやり方は、全体の設備認定容量が10kW未満に収まっているケースに適用される。一方、全体の設備認定容量が10kW以上になるケースでは、既設分の設備認定容量を考慮せず、全体の設備認定容量を出力制御の対象とするやり方が適用される。   (I) The magnitude of the equipment certification capacity and the threshold: The equipment certification capacity (also called contract capacity) is the smaller of the rated capacity α of the power conditioner 12 and the capacity β of the solar panel 13, and Corresponding to the maximum generated power. The threshold value is, for example, 10 kW. As a result of the new installation, expansion or replacement of the photovoltaic power generator 10, the method of subjecting the installed capacity that has been increased to the installed capacity of the existing equipment to the output control is to reduce the total installed capacity to less than 10 kW. Applies to cases that fit. On the other hand, in the case where the total equipment certified capacity becomes 10 kW or more, a method is adopted in which the entire equipment certified capacity is subjected to output control without considering the existing equipment certified capacity.

〔実施形態2〕
(太陽光発電システムの具体的な構成)
次に、図1を参照して、太陽光発電システム1の機能をより具体的に説明する。図1は、太陽光発電システム1において、電力モニタ11およびモニタリングサーバ20の各機能的な構成を示すブロック図である。
[Embodiment 2]
(Specific configuration of solar power generation system)
Next, the function of the photovoltaic power generation system 1 will be described more specifically with reference to FIG. FIG. 1 is a block diagram showing a functional configuration of the power monitor 11 and the monitoring server 20 in the photovoltaic power generation system 1.

(モニタリングサーバの構成)
モニタリングサーバ20は、メモリ21と、コントローラ22と、通信部23とを備えている。コントローラ22は、設定情報作成部221と、出力制御指示部222と電力モニタデータ監視部223とを備えている。コントローラ22は、出力制御に関わる上記設定情報を、上記電力モニタ11に割り当てた上記モニタリングID(識別情報)に対応付けて作成し、作成した設定情報をメモリ21に格納する機能(A)を備えている。この機能(A)は、設定情報作成部221が担う。
(Configuration of monitoring server)
The monitoring server 20 includes a memory 21, a controller 22, and a communication unit 23. The controller 22 includes a setting information creation unit 221, an output control instruction unit 222, and a power monitor data monitoring unit 223. The controller 22 has a function (A) of creating the setting information related to output control in association with the monitoring ID (identification information) assigned to the power monitor 11 and storing the created setting information in the memory 21. ing. This function (A) is performed by the setting information creation unit 221.

なお、ここでいう「設定情報の作成」とは、太陽光発電装置10の保守管理者が、入力部を介して設定情報作成部221に与えた情報を、電力モニタごとに割り当てられているモニタリングIDと対応付けること、または、モニタリングIDを付与された電力モニタ11から、設定情報作成部221が、通信部23および電力モニタデータ監視部223を介して自動取得した情報を、モニタリングIDと対応付けることを意味する。   Here, “creation of setting information” means that the information given to the setting information creating unit 221 by the maintenance manager of the photovoltaic power generator 10 via the input unit is assigned to the monitoring assigned to each power monitor. ID, or associating, with the monitoring ID, information automatically acquired by the setting information creation unit 221 via the communication unit 23 and the power monitor data monitoring unit 223 from the power monitor 11 to which the monitoring ID is assigned. means.

また、コントローラ22は、電力モニタ11に対して、太陽光発電装置10に対応する設定情報をメモリ21から読み出して送信する機能(B)を備えている。この機能(B)は、出力制御指示部222が担う。   Further, the controller 22 has a function (B) for reading out setting information corresponding to the photovoltaic power generator 10 from the memory 21 and transmitting the setting information to the power monitor 11. This function (B) is performed by the output control instruction unit 222.

なお、前記した各種設定情報(a)〜(i)が電力モニタ11のメモリ15に保存されている場合、電力モニタ11から各種設定情報(a)〜(i)をモニタリングサーバ20に送ることも可能である。この形態によれば、例えばユーザが太陽光発電装置10の保守管理者を変更し、新たな保守管理者と契約することによって、電力モニタ11が新たなモニタリングサーバと通信する場合に、電力モニタ11の各種設定情報(a)〜(i)の書き換えを不要にする、または書き換えを簡素化することができる。   When the various setting information (a) to (i) is stored in the memory 15 of the power monitor 11, the various setting information (a) to (i) may be transmitted from the power monitor 11 to the monitoring server 20. It is possible. According to this embodiment, for example, when the user changes the maintenance manager of the photovoltaic power generator 10 and contracts with the new maintenance manager, the power monitor 11 communicates with the new monitoring server. Of the various setting information (a) to (i) can be made unnecessary or the rewriting can be simplified.

また、前記した(g)パワコンシステム容量についても、電力モニタ11のメモリ15に保存されていれば、モニタリングサーバ20が電力モニタ11に対してパワコンシステム容量に関する情報の送信を要求し、その情報を取得することもできる。なお、電力モニタ11では、後述する出力制御設定部161がパワーコンディショナ12と通信することによって、パワコンシステム容量を自動取得し、メモリ15に格納することができる。   Also, if the power control system capacity (g) is stored in the memory 15 of the power monitor 11, the monitoring server 20 requests the power monitor 11 to transmit information on the power control system capacity, and You can also get it. In the power monitor 11, the power control system capacity can be automatically acquired and stored in the memory 15 by the output control setting unit 161 described later communicating with the power conditioner 12.

電力モニタデータ監視部223は、通信部23を介して、電力モニタ11から電力に関する情報、およびエラー状態に関する情報を取得し、モニタリングIDと対応付けてメモリ21に保存する。電力モニタ11から取得する「電力に関する情報」とは、太陽光発電装置10の発電量、太陽光発電装置10の売電量および買電量、太陽光発電装置10のユーザの家庭全体の消費電力などを示す情報である。また、電力モニタデータ監視部223は、取得する「電力に関する情報」に基づいて、太陽光発電装置10の発電状態または上記ユーザによる電力消費の状態を診断し、診断結果を電力モニタ11へ送信することもできる。   The power monitor data monitoring unit 223 acquires information about the power and information about the error state from the power monitor 11 via the communication unit 23, and stores the information in the memory 21 in association with the monitoring ID. The “information related to the power” acquired from the power monitor 11 includes the power generation amount of the photovoltaic power generation device 10, the amount of power sold and purchased by the photovoltaic power generation device 10, the power consumption of the entire home of the user of the photovoltaic power generation device 10, and the like. This is the information to be shown. In addition, the power monitor data monitoring unit 223 diagnoses the power generation state of the photovoltaic power generator 10 or the state of power consumption by the user based on the acquired “information about power”, and transmits the diagnosis result to the power monitor 11. You can also.

(電力モニタの構成)
電力モニタ11は、メモリ15、コントローラ16、サーバ通信部17およびPCS通信部19を備えている。コントローラ16は、出力制御設定部161、電力値電力量記録部162および出力制御値計算部163を備えている。
(Configuration of power monitor)
The power monitor 11 includes a memory 15, a controller 16, a server communication unit 17, and a PCS communication unit 19. The controller 16 includes an output control setting unit 161, a power value / power amount recording unit 162, and an output control value calculation unit 163.

サーバ通信部17は、前記通信部23と通信し、出力制御の設定情報を受信し、出力制御設定部161へ送る。出力制御設定部161は、受信した設定情報をメモリ15に格納するとともに、メモリ15に格納されている出力制御のプログラムにおける設定情報に関する各種変数に、受信した設定情報に含まれた対応するデータが設定されるようにする。   The server communication unit 17 communicates with the communication unit 23, receives the setting information of the output control, and sends it to the output control setting unit 161. The output control setting unit 161 stores the received setting information in the memory 15, and stores, in various variables related to the setting information in the output control program stored in the memory 15, the corresponding data included in the received setting information. To be set.

また、サーバ通信部17は、前記スケジュールサーバ30と通信し、出力制御スケジュールを受信し、出力制御設定部161へ送る。出力制御設定部161は、受信した出力制御スケジュールを出力制御値計算部163へ送る。   The server communication unit 17 communicates with the schedule server 30, receives the output control schedule, and sends the output control schedule to the output control setting unit 161. The output control setting unit 161 sends the received output control schedule to the output control value calculation unit 163.

出力制御値計算部163は、NTPサーバが配信し、サーバ通信部17を介して取得される時刻情報を参照しながら、取得した出力制御スケジュールを解釈し、出力制御の対象日における時刻の経過に応じて、パワーコンディショナ12が出力できる電力の上限値を求める。   The output control value calculation unit 163 interprets the obtained output control schedule while referring to the time information distributed by the NTP server and obtained via the server communication unit 17, and calculates the time lapse on the target date of the output control. Accordingly, the upper limit value of the power that can be output by power conditioner 12 is determined.

例えば、パワーコンディショナ12の定格容量αが5kW、ソーラパネル13の容量βを4kWとし、取得した出力制御スケジュールにおいて、図3の(b)に示すように、12時〜15時の時間帯について出力比率を50%に抑えることになっているとする。パワーコンディショナ12が出力できる電力の上限値を決める演算には、上記αおよびβの小さい方の値を用い、かつ、β/αの比率を上記出力比率に乗算する。この結果、パワーコンディショナ12が、12時〜15時の時間帯に出力できる電力の上限値は、5kW×50/100×40/50=2kWと求められる。このようにして出力制御値計算部163が求めた電力の上限値が、PCS通信部19を介してパワーコンディショナ12に伝えられる。   For example, assuming that the rated capacity α of the power conditioner 12 is 5 kW and the capacity β of the solar panel 13 is 4 kW, in the acquired output control schedule, as shown in FIG. It is assumed that the output ratio is to be suppressed to 50%. In the calculation for determining the upper limit of the power that can be output by the power conditioner 12, the smaller value of α and β is used, and the output ratio is multiplied by the ratio β / α. As a result, the upper limit value of the power that the power conditioner 12 can output during the time period from 12:00 to 15:00 is calculated as 5 kW × 50/100 × 40/50 = 2 kW. The upper limit value of the power obtained by the output control value calculation unit 163 is transmitted to the power conditioner 12 via the PCS communication unit 19.

あるいは、出力制御値計算部163をパワーコンディショナ12に設けてもよい。この形態では、出力制御設定部161からPCS通信部19を介してパワーコンディショナ12へ、出力比率が伝えられるが、出力制御スケジュールから取得された出力比率50%にβ/αの比率を乗算した40%がパワーコンディショナ12へ伝えられる。パワーコンディショナ12に設けた出力制御値計算部163は、定格容量5kWの40%を計算することによって、交流出力の上限値2kWを求めることができる。   Alternatively, the output control value calculator 163 may be provided in the power conditioner 12. In this embodiment, the output ratio is transmitted from the output control setting unit 161 to the power conditioner 12 via the PCS communication unit 19, and the output ratio 50% obtained from the output control schedule is multiplied by the ratio β / α. 40% is transmitted to the inverter 12. The output control value calculation unit 163 provided in the power conditioner 12 can calculate the upper limit value 2 kW of the AC output by calculating 40% of the rated capacity 5 kW.

さらに、午後1時にソーラパネル13が発電した電力値が3kWだとすると、この電力値は、パワーコンディショナ12から、PCS通信部19および電力値電力量記録部162を介して、出力制御値計算部163に送られる。このときの自家消費電力が1kWだとすると、パワーコンディショナ12が出力できる電力の上限値は、上記の2kWであり、2kW−1kW=1kWの余剰電力が生じる。この余剰電力は、電力系統60に逆潮流させ売電することができるので、出力制御値計算部163は、パワーコンディショナ12へ売電指示を送る。また、3kW−2kW=1kWについては、売電することができない代わりに蓄電することができるので、出力制御値計算部163は、パワーコンディショナ12へ蓄電指示を送る。また、自家消費電力が上限値を超えた場合には、自家消費電力までパワーコンディショナ12が電力を出力してよいことになっているので、出力制御値計算部163は、パワーコンディショナ12へ出力指示を送る。   Further, assuming that the power value generated by the solar panel 13 at 1 pm is 3 kW, the power value is output from the power conditioner 12 to the output control value calculation unit 163 via the PCS communication unit 19 and the power value power amount recording unit 162. Sent to Assuming that the private power consumption at this time is 1 kW, the upper limit value of the power that can be output by the power conditioner 12 is 2 kW, and a surplus power of 2 kW-1 kW = 1 kW is generated. Since the surplus power can be reversely flown to the power system 60 and sold, the output control value calculation unit 163 sends a power sale instruction to the power conditioner 12. Also, for 3 kW-2 kW = 1 kW, the power cannot be sold but can be stored, so the output control value calculation unit 163 sends a power storage instruction to the power conditioner 12. When the private power consumption exceeds the upper limit value, the power conditioner 12 may output power up to the private power consumption, so the output control value calculation unit 163 sends the power control value to the power conditioner 12. Send output instructions.

なお、電力値電力量記録部162は、発電電力、売電電力、買電電力、および家庭負荷14による消費電力などについて、現在時刻における各電力値を取得してメモリ15に記録したり、時間単位、日単位、月単位または年単位で積算した各電力量をメモリ15に記録したりする。したがって、出力制御値計算部163は、現在時刻における発電電力値をパワーコンディショナ12から取得できればよいので、PCS通信部19の出力が電力値電力量記録部162を経由せずに、出力制御値計算部163に送られてもよい。   The power value power amount recording unit 162 acquires each power value at the current time and records it in the memory 15 for the generated power, the sold power, the purchased power, and the power consumed by the household load 14, The power amounts integrated in units, days, months, or years are recorded in the memory 15. Therefore, the output control value calculation unit 163 only needs to be able to obtain the generated power value at the current time from the power conditioner 12, so that the output of the PCS communication unit 19 does not pass through the power value power amount recording unit 162 and the output control value It may be sent to the calculation unit 163.

〔実施形態3〕
(設定情報の変更処理〜モニタリングサーバ)
以下、太陽光発電システム1の利用状況がユーザの事情により変更される場合に、モニタリングサーバ20が行う設定情報の変更処理例について説明する。
[Embodiment 3]
(Setting information change process ~ Monitoring server)
Hereinafter, an example of a setting information change process performed by the monitoring server 20 when the usage status of the photovoltaic power generation system 1 is changed due to a user's circumstances will be described.

図4は、モニタリングサーバ20が行う設定情報の変更処理の手順を示すフローチャートである。太陽光発電システム1の利用状況がユーザの事情により変更される例として、ユーザが電力事業者を変える場合を取り上げる。   FIG. 4 is a flowchart illustrating a procedure of a setting information change process performed by the monitoring server 20. As an example in which the usage status of the photovoltaic power generation system 1 is changed depending on the circumstances of the user, a case where the user changes the power company will be described.

太陽光発電装置10のユーザは、電力事業者の変更申し込みを、太陽光発電装置10の保守管理者に電話等で連絡し、保守管理者がモニタリングサーバ20の入力インタフェースを介して、設定情報の変更処理を行ってもよい。しかし、ここではモニタリングサーバ20が、電力事業者の変更申し込みを電子的に受け付ける例を説明する。   The user of the photovoltaic power generation device 10 informs the maintenance manager of the photovoltaic power generation device 10 of the change application of the power company by telephone or the like, and the maintenance manager transmits the setting information via the input interface of the monitoring server 20. Change processing may be performed. However, here, an example will be described in which the monitoring server 20 electronically receives a change application from a power company.

例えば、太陽光発電装置10のユーザは、モニタリングサーバ20に設けられたマイページに、パーソナルコンピュータまたは携帯端末などを用いてログインし、設定情報の変更画面に表示される電力事業者の変更を選択する。電力事業者の変更が選択されたことに応じて、モニタリングサーバ20のコントローラ22は、電力事業者の変更申し込みを受け付ける(ステップ1;以下、S1のように略記する)。このS1の処理は、例えば、設定情報作成部221が受け持つ。   For example, the user of the photovoltaic power generator 10 logs in to My Page provided in the monitoring server 20 using a personal computer or a mobile terminal, and selects the change of the power company displayed on the setting information change screen. I do. In response to the change of the electric power company being selected, the controller 22 of the monitoring server 20 accepts an application for a change of the electric power company (Step 1; hereinafter, abbreviated as S1). The process of S1 is performed, for example, by the setting information creation unit 221.

次に、コントローラ22は、ログイン認証時に取得されるユーザIDに対応するモニタリングIDを特定する(S2)。メモリ21には、ユーザIDと、モニタリングIDと、設定情報とが対応付けて記録されているので、コントローラ22は、特定したモニタリングIDに対応付けられた前記の設定情報(a)〜(h)のうち、変更を要する設定情報を書き換えて更新する(S3)。例えば、電力事業者の変更に伴い、設定情報(d)のスケジュールサーバURLが変更される。また、設定情報(e)のNTPサーバURLおよび設定情報(h)の余剰/全量制御が変更される場合もあり得る。上記S2およびS3の処理も、例えば、設定情報作成部221が受け持つ。   Next, the controller 22 specifies a monitoring ID corresponding to the user ID obtained at the time of login authentication (S2). Since the user ID, the monitoring ID, and the setting information are recorded in the memory 21 in association with each other, the controller 22 executes the setting information (a) to (h) associated with the specified monitoring ID. Among them, the setting information that needs to be changed is rewritten and updated (S3). For example, the schedule server URL of the setting information (d) is changed according to the change of the power company. Further, the NTP server URL of the setting information (e) and the surplus / full amount control of the setting information (h) may be changed. The processing of S2 and S3 is also performed by, for example, the setting information creation unit 221.

コントローラ22は、発電所IDに対応する電力モニタ11に対して、設定情報の変更の必要を示すフラグと、更新された設定情報とを送信する(S4)。このS4の処理は、例えば、更新された設定情報が、設定情報作成部221から出力制御指示部222に出力されることにより、出力制御指示部222が行う。   The controller 22 transmits a flag indicating that the setting information needs to be changed and the updated setting information to the power monitor 11 corresponding to the power plant ID (S4). The process of S4 is performed by the output control instruction unit 222, for example, when the updated setting information is output from the setting information creation unit 221 to the output control instruction unit 222.

この後、電力モニタ11からの定期的な通信、または設定情報の変更時に随時行われる通信によって、コントローラ22は、電力モニタ11から、発電状態またはエラー状態を示すデータと、各種設定情報(a)〜(i)を示すデータとを受信する(S5)。そして、コントローラ22は、電力モニタ11から受信したデータを確認し、正しい設定に更新されているかどうかを確認する(S6)。上記S5およびS6の処理は、例えば、電力モニタデータ監視部223が受け持つ。   Thereafter, the controller 22 sends data indicating a power generation state or an error state, and various setting information (a) from the power monitor 11 by periodic communication from the power monitor 11 or communication performed as needed when setting information is changed. To (i) are received (S5). Then, the controller 22 checks the data received from the power monitor 11, and checks whether the data has been updated to the correct setting (S6). The processing of S5 and S6 is performed by, for example, the power monitor data monitoring unit 223.

S6で、設定情報の更新が正しく行われていることが確認されると、設定情報の更新処理が終了する(S8)。一方、S6で、設定情報の更新が正しく行われていないことが確認されると、コントローラ22は、エラー情報を出力し(S7)、処理をS4へ戻し、S4〜S6の処理を再実行する。S4〜S6の繰り返し回数が閾値に到達した場合、モニタリングサーバ20の表示装置にエラーを表示して処理を中断してもよい。上記S7の処理は、例えば、電力モニタデータ監視部223が受け持つ。   When it is confirmed in S6 that the setting information has been correctly updated, the setting information updating process ends (S8). On the other hand, if it is confirmed in S6 that the setting information has not been correctly updated, the controller 22 outputs error information (S7), returns the processing to S4, and executes the processing in S4 to S6 again. . When the number of repetitions of S4 to S6 reaches the threshold, an error may be displayed on the display device of the monitoring server 20 and the processing may be interrupted. The process in S7 is performed by, for example, the power monitor data monitoring unit 223.

(設定情報の変更処理〜電力モニタ)
次に、電力モニタ11が行う設定情報の変更処理について説明する。図5は、電力モニタ11が行う設定情報の変更処理の手順を示すフローチャートである。
(Setting information change processing-power monitor)
Next, the setting information change processing performed by the power monitor 11 will be described. FIG. 5 is a flowchart illustrating a procedure of a setting information change process performed by the power monitor 11.

電力モニタ11のコントローラ16は、設定情報の変更の必要を示すフラグと、更新された設定情報とをモニタリングサーバ20から受信する(S11)。続いて、コントローラ16は、更新された設定情報に含まれている発電所IDが正しいかどうかを判定する(S12)。S12の判定処理の具体例については後述する。S12において、発電所IDが適正であると判定されると、S13で、コントローラ16は、発電所ID以外の設定情報が適正かどうか、例えば、発電所ID以外の設定情報が入力範囲内の値かどうかを判定する。S12、S13において、発電所IDおよびその他の設定情報が不正であると判定されると、受信した設定情報を破棄して新たなS11の処理が行われるまで待機してもよいし、不正な発電所IDまたは不正なその他の設定情報が検出されたことを、コントローラ16からモニタリングサーバ20へ通知してもよい。   The controller 16 of the power monitor 11 receives from the monitoring server 20 the flag indicating that the setting information needs to be changed and the updated setting information (S11). Subsequently, the controller 16 determines whether the power plant ID included in the updated setting information is correct (S12). A specific example of the determination processing in S12 will be described later. If it is determined in S12 that the power plant ID is appropriate, in S13, the controller 16 determines whether the setting information other than the power plant ID is appropriate, for example, if the setting information other than the power plant ID is a value within the input range. Is determined. In S12 and S13, when it is determined that the power plant ID and other setting information are invalid, the received setting information may be discarded and the process may wait until a new process of S11 is performed, or the illegal power generation may be performed. The controller 16 may notify the monitoring server 20 that the place ID or other incorrect setting information has been detected.

S12およびS13において、発電所IDおよびその他の設定情報が適正であると判定されると、コントローラ16は、メモリ15に記憶されている設定情報を変更する(S14)。この後、コントローラ16は、定期的な通信、または設定情報の変更時に随時行われる通信によって、変更した設定情報に従って、発電状態またはエラー状態を示すデータをモニタリングサーバ20へ送信し(S15)、設定情報の更新処理を終了する。   In S12 and S13, when it is determined that the power plant ID and other setting information are appropriate, the controller 16 changes the setting information stored in the memory 15 (S14). Thereafter, the controller 16 transmits data indicating a power generation state or an error state to the monitoring server 20 according to the changed setting information by periodic communication or communication performed as needed when setting information is changed (S15). The information update processing ends.

以上のS11〜S15の処理は、例えば、出力制御設定部161が受け持つ。   The processing of S11 to S15 described above is performed by, for example, the output control setting unit 161.

(発電所IDの適正判定処理)
上記S12にて実行される発電所IDの適正判定処理について、具体的に説明する。S12では、例えば、電力モニタ11が受信した設定情報に含まれている発電所IDのチェックサムが正しいかどうかをコントローラ16が判定する。チェックサムとは、誤り検出符号の一種であり、検査対象の数列を構成する各桁の数値を用いた演算によって得られた数値との一致、不一致の判定に用いる検査用数値を指す。上記演算には、数列を構成する各桁の数値を単純に加算したり、加算と掛け算または割り算とを組み合わせたりした演算が用いられる。また、演算結果自体と一致するチェックサムが定められたり、割り算による余りの数値と一致するチェックサムが定められたり、チェックサムの決め方も多様である。
(Appropriate determination processing of power plant ID)
The power plant ID appropriateness determination process executed in S12 will be specifically described. In S12, for example, the controller 16 determines whether the checksum of the power plant ID included in the setting information received by the power monitor 11 is correct. The checksum is a type of error detection code, and refers to a test numerical value used to determine whether a numerical value obtained by performing an operation using a numerical value of each digit forming the sequence to be inspected matches or does not match. For the above-mentioned calculation, a calculation is used in which the numerical values of each digit constituting the sequence are simply added, or a combination of addition and multiplication or division is used. Also, a checksum that matches the operation result itself is determined, a checksum that matches the remainder of the division is determined, and the checksum is determined in various ways.

ここでは一例として、太陽光発電装置10の発電所IDが下記のような26桁の数列によって与えられ、最終の26桁目の数値Yが、チェックサムになっているとする。
発電所ID:XX-XXXX-XXXX-XXXX-XXXX-XXXX-XXXY
上記チェックサムは、例えば、以下の計算式で得られた解の下1桁とする。
( 1桁目×1)+( 2桁目×3)+( 3桁目×5)+( 4桁目×7)+( 5桁目×9)+
( 6桁目×1)+( 7桁目×3)+( 8桁目×5)+( 9桁目×7)+(10桁目×9)+
(11桁目×1)+(12桁目×3)+(13桁目×5)+(14桁目×7)+(15桁目×9)+
(16桁目×1)+(17桁目×3)+(18桁目×5)+(19桁目×7)+(20桁目×9)+
(21桁目×1)+(22桁目×3)+(23桁目×5)+(24桁目×7)+(25桁目×9)
例えば、発電所IDが10-9876-5432-1098-7654-3210-9875と設定されており、最終桁の数値5が、チェックサムになっているとする。この場合、上記演算の結果は、
(1×1)+(0×3)+(9×5)+(8×7)+(7×9)+
(6×1)+(5×3)+(4×5)+(3×7)+(2×9)+
(1×1)+(0×3)+(9×5)+(8×7)+(7×9)+
(6×1)+(5×3)+(4×5)+(3×7)+(2×9)+
(1×1)+(0×3)+(9×5)+(8×7)+(7×9)=655
となり、655なので、その下1桁の「5」が、チェックサムY=5と一致しているので、上記の発電所IDは、適正であると判定できる。
Here, as an example, it is assumed that the power plant ID of the photovoltaic power generator 10 is given by a 26-digit numerical sequence as described below, and the final 26-digit numeric value Y is a checksum.
Power plant ID: XX-XXXX-XXXX-XXXX-XXXX-XXXX-XXXY
The checksum is, for example, the last digit of the solution obtained by the following formula.
(1st digit x 1) + (2nd digit x 3) + (3rd digit x 5) + (4th digit x 7) + (5th digit x 9) +
(6th digit × 1) + (7th digit × 3) + (8th digit × 5) + (9th digit × 7) + (10th digit × 9) +
(11th digit × 1) + (12th digit × 3) + (13th digit × 5) + (14th digit × 7) + (15th digit × 9) +
(16 digit × 1) + (17 digit × 3) + (18 digit × 5) + (19 digit × 7) + (20 digit × 9) +
(21st digit x 1) + (22nd digit x 3) + (23rd digit x 5) + (24th digit x 7) + (25th digit x 9)
For example, it is assumed that the power plant ID is set to 10-9876-5432-1098-7654-3210-9875, and that the last digit 5 is the checksum. In this case, the result of the above operation is
(1 × 1) + (0 × 3) + (9 × 5) + (8 × 7) + (7 × 9) +
(6 × 1) + (5 × 3) + (4 × 5) + (3 × 7) + (2 × 9) +
(1 × 1) + (0 × 3) + (9 × 5) + (8 × 7) + (7 × 9) +
(6 × 1) + (5 × 3) + (4 × 5) + (3 × 7) + (2 × 9) +
(1 × 1) + (0 × 3) + (9 × 5) + (8 × 7) + (7 × 9) = 655
And 655, the lower one digit “5” matches the checksum Y = 5, so that the power station ID can be determined to be appropriate.

〔ソフトウェアによる実現例〕
電力モニタ11のコントローラ16に含まれた出力制御設定部161、電力値電力量記録部162および出力制御値計算部163と、モニタリングサーバ20のコントローラ22に含まれた設定情報作成部221、出力制御指示部222および電力モニタデータ監視部223とは、集積回路(ICチップ)等に形成された論理回路(ハードウェア)によって実現してもよいし、CPU(Central Processing Unit)を用いてソフトウェアによって実現してもよい。
[Example of software implementation]
An output control setting unit 161, a power value / power amount recording unit 162, and an output control value calculation unit 163 included in the controller 16 of the power monitor 11, a setting information creation unit 221 included in the controller 22 of the monitoring server 20, and an output control The instruction unit 222 and the power monitor data monitoring unit 223 may be realized by a logic circuit (hardware) formed on an integrated circuit (IC chip) or the like, or by software using a CPU (Central Processing Unit). May be.

後者の場合、電力モニタ11およびモニタリングサーバ20は、各機能を実現するソフトウェアであるプログラムの命令を実行するCPU、上記プログラムおよび各種データがコンピュータ(またはCPU)で読み取り可能に記録されたROM(Read Only Memory)または記憶装置(これらを「記録媒体」と称する)、上記プログラムを展開するRAM(Random Access Memory)などを備えている。そして、コンピュータ(またはCPU)が上記プログラムを上記記録媒体から読み取って実行することにより、本発明の目的が達成される。   In the latter case, the power monitor 11 and the monitoring server 20 are provided with a CPU that executes instructions of a program that is software for realizing each function, and a ROM (Read) in which the program and various data are recorded so as to be readable by a computer (or CPU). Only Memory) or a storage device (these are referred to as “recording media”), and a RAM (Random Access Memory) for expanding the above-described program. Then, the object of the present invention is achieved when the computer (or CPU) reads the program from the recording medium and executes the program.

上記記録媒体としては、「一時的でない有形の媒体」、例えば、テープ、ディスク、カード、半導体メモリ、プログラマブルな論理回路などを用いることができる。また、上記プログラムは、該プログラムを伝送可能な任意の伝送媒体(通信ネットワークや放送波等)を介して上記コンピュータに供給されてもよい。なお、本発明は、上記プログラムが電子的な伝送によって具現化された、搬送波に埋め込まれたデータ信号の形態でも実現され得る。   As the recording medium, a “temporary tangible medium” such as a tape, a disk, a card, a semiconductor memory, or a programmable logic circuit can be used. Further, the program may be supplied to the computer via an arbitrary transmission medium (a communication network, a broadcast wave, or the like) capable of transmitting the program. Note that the present invention can also be realized in the form of a data signal embedded in a carrier wave, in which the program is embodied by electronic transmission.

〔まとめ〕
本発明の態様1に係るサーバ(モニタリングサーバ20)は、太陽光発電装置(10)の保守管理に用いられるサーバであって、メモリ(21)と、コントローラ(22)とを備え、上記コントローラ(22)は、上記太陽光発電装置(10)の交流出力を制限する出力制御に関わる設定情報を、上記太陽光発電装置(10)に割り当てた識別情報(発電所ID)に対応付けて作成し、作成した設定情報を上記メモリ(21)に格納するとともに、上記太陽光発電装置(10)に備えられ、上記太陽光発電装置(10)を制御する制御装置(電力モニタ11)に対して、上記太陽光発電装置(10)に対応する設定情報を上記メモリ(21)から読み出して送信するように構成されている。
[Summary]
The server (monitoring server 20) according to the first aspect of the present invention is a server used for maintenance management of the photovoltaic power generator (10), and includes a memory (21) and a controller (22). 22) Creates setting information related to output control for limiting the AC output of the photovoltaic power generator (10) in association with identification information (power station ID) assigned to the photovoltaic power generator (10). The stored setting information is stored in the memory (21), and the control device (power monitor 11) provided in the photovoltaic power generation device (10) and controlling the photovoltaic power generation device (10) includes: Configuration information corresponding to the photovoltaic power generator (10) is read from the memory (21) and transmitted.

上記の構成によれば、保守管理の対象である太陽光発電装置において、出力制御が適切に実行されるために必要な設定情報を、保守管理用のサーバから太陽光発電装置の制御装置へ遠隔的に送信することができる。太陽光発電装置では、この送信された設定情報を用いて出力制御を実行することができる。これにより、太陽光発電装置に設置された入力装置を介して、言い換えると、太陽光発電装置の設置場所で、人手を用いて制御装置に設定情報を入力する必要が無い。したがって、太陽光発電装置の保守管理の効率化およびコスト削減のメリットが、保守管理者および太陽光発電装置のユーザの双方にもたらされる。さらに、保守管理の対象である太陽光発電装置の個数は多数なので、太陽光発電装置の個数が多いほど、上記メリットは増大する。   According to the above configuration, in the photovoltaic power generation device that is a target of the maintenance management, the setting information necessary for appropriately executing the output control is remotely transmitted from the maintenance management server to the control device of the photovoltaic power generation device. Can be sent in a targeted manner. In the photovoltaic power generator, output control can be performed using the transmitted setting information. Thus, there is no need to manually input setting information to the control device via the input device installed in the solar power generation device, in other words, at the installation location of the solar power generation device. Therefore, the merit of the efficiency and cost reduction of the maintenance management of the photovoltaic power generation device is provided to both the maintenance manager and the user of the photovoltaic power generation device. Furthermore, since the number of photovoltaic power generation devices to be maintained is large, the greater the number of photovoltaic power generation devices, the greater the above advantages.

本発明の態様2に係るサーバでは、上記態様1において、上記設定情報は、上記太陽光発電装置に割り当てた上記識別情報としての発電所ID、および上記出力制御のスケジュールを配信するスケジュールサーバ(30)のURLを含んでいてもよい。   In the server according to the second aspect of the present invention, in the first aspect, the setting information is a schedule server (30) that distributes a power plant ID as the identification information assigned to the photovoltaic power generator and the output control schedule. ) May be included.

上記の構成において、電力系統に電力を供給する電力事業者が、太陽光発電装置から電力系統に逆潮流される電力を買い取る買取制度が実施されている。上記発電所IDは、太陽光発電装置を特定する識別情報であるから、発電所IDの設定を誤った場合、電力の買い取りが適切に行われず、太陽光発電装置のユーザが不利益を受けるおそれがある。このため、上記発電所IDは重要な設定情報の1つである。   In the above configuration, a purchase system is implemented in which a power company that supplies power to a power system purchases power that flows backward from the photovoltaic power generator to the power system. Since the power station ID is identification information for specifying the photovoltaic power generation device, if the setting of the power plant ID is incorrect, power purchase is not performed properly, and a user of the photovoltaic power generation device may be disadvantaged. There is. Therefore, the power station ID is one of important setting information.

また、スケジュールサーバのURLの設定を誤った場合、太陽光発電装置の制御装置に送信されるべき正しい出力制御のスケジュールを、当該制御装置は受け取ることができなくなる。そうすると適正な出力制御が行われない結果、電力事業者と、太陽光発電装置のユーザとの双方が、不利益を受けるおそれがある。電力事業者が受ける不利益には、電力系統において発生する不具合も含まれる。このため、上記スケジュールサーバのURLも重要な設定情報の1つである。   In addition, if the URL of the schedule server is set incorrectly, the control device cannot receive the correct output control schedule to be transmitted to the control device of the photovoltaic power generator. As a result, proper output control is not performed. As a result, both the power company and the user of the photovoltaic power generator may be disadvantaged. Disadvantages experienced by the electric power company include defects that occur in the electric power system. For this reason, the URL of the schedule server is also one of important setting information.

上記の構成によれば、電力事業者と、太陽光発電装置のユーザとの双方にとって重要な設定情報を、通信を介して確実かつ速やかに、多数の太陽光発電装置に対して届けることができる。   According to the above configuration, important setting information for both the power company and the user of the photovoltaic power generation device can be reliably and promptly transmitted to a large number of photovoltaic power generation devices via communication. .

本発明の態様3に係るサーバでは、上記態様1または2において、上記設定情報は、(1)上記出力制御を行うか否かの情報、(2)上記出力制御のスケジュールを配信するスケジュールサーバと通信するか否かの情報、(3)時報配信サーバのURL、(4)上記出力制御の変化時間を規定する情報、(5)上記太陽光発電装置の発電容量、(6)上記太陽光発電装置に備えられるパワーコンディショナの定格容量、および、(7)上記太陽光発電装置が発電した電力の売電の仕方の種類のうち少なくとも1つを含んでいてもよい。   In the server according to the third aspect of the present invention, in the first or second aspect, the setting information includes (1) information as to whether to perform the output control, and (2) a schedule server that distributes the output control schedule. (3) URL of the time signal distribution server, (4) information defining the change time of the output control, (5) power generation capacity of the photovoltaic power generation device, (6) photovoltaic power generation It may include at least one of a rated capacity of a power conditioner provided in the device and (7) a type of a method of selling power generated by the solar power generation device.

上記の構成において、太陽光発電装置にて実施される出力制御の内容は、太陽光発電装置を新規に設営した時期、太陽光発電装置を増設した時期、太陽光発電装置に備えられるパワーコンディショナを交換した時期、太陽光発電装置の発電容量、またはパワーコンディショナの定格容量などに応じて変わり得る。   In the above configuration, the content of the output control performed by the photovoltaic power generator includes a time when the photovoltaic power generator is newly installed, a time when the photovoltaic power generator is added, and a power conditioner provided in the photovoltaic power generator. May be changed according to the time of replacement, the power generation capacity of the photovoltaic power generator, or the rated capacity of the power conditioner.

上記の構成によれば、(1)〜(7)の情報の詳細については実施形態として後述するが、太陽光発電装置にて実施される出力制御に必要かつ煩雑な設定情報を、通信を介して確実かつ速やかに、多数の太陽光発電装置に対して届けることができる。なお、(1)〜(7)の情報のうち少なくとも一部は、変更の無い固定情報として太陽光発電装置の制御装置に初期設定しておくことにより省略してもよい。   According to the above configuration, although details of the information (1) to (7) will be described later as an embodiment, complicated and necessary setting information for output control performed by the photovoltaic power generator is communicated via communication. It can be delivered to many solar power generation devices reliably and promptly. In addition, at least a part of the information of (1) to (7) may be omitted by initial setting in the control device of the photovoltaic power generator as fixed information without change.

本発明の態様4に係る制御装置(電力モニタ11)は、太陽光発電装置(10)に備えられる制御装置であって、上記太陽光発電装置(10)の交流出力を制限する出力制御に関わる設定情報を生成するサーバ(モニタリングサーバ20)から、上記設定情報を取得するとともに、上記太陽光発電装置(10)に備えられるパワーコンディショナ(12)に対し、取得した上記設定情報に基づいて、上記出力制御に関する指示を与えるように構成されている。   The control device (power monitor 11) according to aspect 4 of the present invention is a control device provided in the photovoltaic power generator (10), and relates to output control for limiting the AC output of the photovoltaic power generator (10). The server obtains the setting information from a server (monitoring server 20) that generates the setting information, and sends the setting information to a power conditioner (12) provided in the photovoltaic power generator (10) based on the obtained setting information. It is configured to give an instruction regarding the output control.

上記の構成によれば、太陽光発電装置において実施する出力制御に関わる設定情報は、サーバから取得されるので、太陽光発電装置に設置された入力装置を介して、言い換えると、太陽光発電装置の設置場所で、人手を用いて制御装置に設定情報を入力する必要が無い。したがって、太陽光発電装置の保守管理の効率化およびコスト削減のメリットが、保守管理者および太陽光発電装置のユーザの双方にもたらされる。   According to the above configuration, since the setting information relating to the output control performed in the photovoltaic power generator is acquired from the server, the input information installed in the photovoltaic power generator, in other words, the photovoltaic power generator It is not necessary to manually input setting information to the control device at the installation location. Therefore, the merit of the efficiency and cost reduction of the maintenance management of the photovoltaic power generation device is provided to both the maintenance manager and the user of the photovoltaic power generation device.

なお、上記制御装置(電力モニタ11)を以下のように構成してもよい。すなわち、太陽光発電装置に備えられる制御装置であって、メモリ(15)と、コントローラ(16)とを備え、上記コントローラ(16)は、上記太陽光発電装置(10)の交流出力を制限する出力制御に関わる設定情報を生成するサーバ(モニタリングサーバ20)から、上記設定情報を取得して、上記メモリ(15)に保存するとともに、上記太陽光発電装置(10)に備えられるパワーコンディショナ(12)に対し、上記メモリ(15)から読み出した上記設定情報に基づいて、上記出力制御に関する指示を与えるように構成されている。この構成による効果は、上記したとおりである。   The control device (power monitor 11) may be configured as follows. That is, it is a control device provided in the photovoltaic power generator, which includes a memory (15) and a controller (16), and the controller (16) limits the AC output of the photovoltaic power generator (10). The setting information is obtained from a server (monitoring server 20) that generates setting information related to output control, and is stored in the memory (15), and the power conditioner ( 12) It is configured to give an instruction regarding the output control based on the setting information read from the memory (15). The effect of this configuration is as described above.

本発明の態様5に係る制御装置では、上記態様4において、上記サーバ(モニタリングサーバ20)で更新された設定情報を上記サーバから取得した場合に、上記更新された設定情報に含まれており、かつ上記太陽光発電装置に割り当てられた識別情報(発電所ID)が適正がどうかを、上記制御装置が検出するための検出プログラムが保存されたメモリを備えていてもよい。   In the control device according to a fifth aspect of the present invention, in the fourth aspect, when the setting information updated by the server (monitoring server 20) is obtained from the server, the setting information is included in the updated setting information; Further, the control device may include a memory storing a detection program for detecting whether the identification information (power plant ID) assigned to the solar power generation device is appropriate.

上記の構成において、電力事業の自由化に伴って、太陽光発電装置のユーザは、電力事業者を変更する自由を持つ。そうすると、電力事業者を変更した場合、出力制御のスケジュールを配信するスケジュールサーバのURL等の設定情報を変更することが必要になる可能性がある。スケジュールサーバのURLは、出力制御にとって重要な情報であることは前述したとおりであり、また、不正な設定情報、または太陽光発電装置の特定を誤った設定情報などを制御装置が取得することは避けなければならない。   In the above configuration, with the liberalization of the electric power business, the user of the solar power generation device has the freedom to change the electric power company. Then, when the power provider is changed, it may be necessary to change setting information such as the URL of the schedule server that distributes the output control schedule. As described above, the URL of the schedule server is important information for output control, and it is not possible for the control device to obtain incorrect setting information or setting information that incorrectly specifies the photovoltaic power generator. Must be avoided.

上記の構成によれば、太陽光発電装置側で検出プログラムに従った判定を行うことによって、取得した設定情報が適正かどうかを、設定情報に含まれた太陽光発電装置の識別情報が適正かどうかによって判定することができる。これにより、太陽光発電装置のユーザにとって、不適切な設定情報を用いた不適切な出力制御が実施されるリスクが低減される。   According to the above configuration, by performing the determination according to the detection program on the photovoltaic power generation device side, it is determined whether the acquired setting information is appropriate, and whether the identification information of the photovoltaic power generation device included in the setting information is appropriate. It can be determined depending on whether or not. Thereby, for the user of the photovoltaic power generator, the risk of performing inappropriate output control using inappropriate setting information is reduced.

本発明の態様6に係る太陽光発電システム(1)は、上記態様1〜3のいずれかに記載のサーバと、上記態様または5に記載の制御装置とを含んで構成されている。   A photovoltaic power generation system (1) according to an aspect 6 of the present invention includes the server according to any one of the aspects 1 to 3, and the control device according to the aspect or 5.

上記の構成によれば、太陽光発電装置の保守管理の効率化およびコスト削減のメリットが、保守管理者および太陽光発電装置のユーザの双方にもたらされる太陽光発電システムを構築することができる。また、この太陽光発電システムでは、サーバの各態様と、制御装置の各態様との組み合わせに応じて、各態様について説明したメリットを享受することができる。   According to the above configuration, it is possible to construct a photovoltaic power generation system in which the advantages of the efficiency of maintenance management and cost reduction of the photovoltaic power generation device are provided to both the maintenance manager and the user of the photovoltaic power generation device. Further, in this photovoltaic power generation system, according to the combination of each aspect of the server and each aspect of the control device, the merits described for each aspect can be enjoyed.

本発明の態様7に係る情報配信方法は、太陽光発電装置(10)の保守管理に用いられるサーバ(モニタリングサーバ20)が実行する情報配信方法であって、上記太陽光発電装置(10)の交流出力を制限する出力制御に関わる設定情報を、上記太陽光発電装置(10)に対応付けて作成し、上記太陽光発電装置(10)に備えられ、上記太陽光発電装置(10)を制御する制御装置(電力モニタ11)に対して、上記太陽光発電装置(10)に対応付けて作成した上記設定情報を送信することを特徴とする。   An information distribution method according to an aspect 7 of the present invention is an information distribution method executed by a server (monitoring server 20) used for maintenance and management of the photovoltaic power generator (10). Setting information relating to output control for limiting the AC output is created in association with the photovoltaic power generator (10), and is provided in the photovoltaic power generator (10) to control the photovoltaic power generator (10). The setting information created in association with the photovoltaic power generator (10) is transmitted to a control device (power monitor 11) that performs the setting.

上記の方法によれば、上記態様1に係るサーバの構成が奏する効果と同様の効果を得ることができる。   According to the above method, it is possible to obtain the same effect as the effect of the configuration of the server according to the first aspect.

本発明の態様8に係る太陽光発電装置(10)の制御方法は、太陽光発電装置(10)の交流出力を制限する出力制御に関わる設定情報を生成するサーバ(モニタリングサーバ20)から、上記設定情報を取得し、上記太陽光発電装置(10)に備えられるパワーコンディショナ(12)に対し、取得した上記設定情報に基づいて、上記出力制御に関する指示を与えることを特徴とする。   The method for controlling the photovoltaic power generation device (10) according to the eighth aspect of the present invention includes the following steps: a server (monitoring server 20) that generates setting information related to output control for limiting an AC output of the photovoltaic power generation device (10); The setting information is acquired, and an instruction regarding the output control is given to the power conditioner (12) provided in the photovoltaic power generator (10) based on the acquired setting information.

上記の方法によれば、上記態様4に係る制御装置の構成が奏する効果と同様の効果を得ることができる。   According to the above method, it is possible to obtain the same effect as the effect of the configuration of the control device according to the fourth aspect.

また、上記態様7に係る情報配信方法をコンピュータに実行させるためのプログラム、上記態様8に係る太陽光発電装置の制御方法をコンピュータに実行させるためのプログラム、およびこれらのプログラムをそれぞれ記録したコンピュータ読取可能な記録媒体も本発明の範疇に含めることができる。   Further, a program for causing a computer to execute the information distribution method according to the seventh aspect, a program for causing a computer to execute the control method for a photovoltaic power generation device according to the eighth aspect, and a computer-readable recording of each of these programs Possible recording media can also be included in the scope of the present invention.

本発明は上述した各実施形態に限定されるものではなく、請求項に示した範囲で種々の変更が可能であり、異なる実施形態にそれぞれ開示された技術的手段を適宜組み合わせて得られる実施形態についても本発明の技術的範囲に含まれる。さらに、各実施形態にそれぞれ開示された技術的手段を組み合わせることにより、新しい技術的特徴を形成することができる。   The present invention is not limited to the embodiments described above, and various modifications are possible within the scope shown in the claims, and embodiments obtained by appropriately combining technical means disclosed in different embodiments. Is also included in the technical scope of the present invention. Furthermore, new technical features can be formed by combining the technical means disclosed in each embodiment.

1 太陽光発電システム
10 太陽光発電装置
11 電力モニタ(制御装置)
12 パワーコンディショナ
15 メモリ
16 コントローラ
20 モニタリングサーバ(サーバ)
21 メモリ
22 コントローラ
30 スケジュールサーバ
1 solar power generation system 10 solar power generation device 11 power monitor (control device)
12 Power conditioner 15 Memory 16 Controller 20 Monitoring server (server)
21 memory 22 controller 30 schedule server

Claims (10)

交流出力を制限するための出力制御のスケジュールを配信するスケジュールサーバから、上記出力制御のスケジュールを取得する太陽光発電装置の保守管理に用いられるサーバであって、
メモリと、
コントローラとを備え、
上記コントローラは、上記出力制御に関わる設定情報を、上記太陽光発電装置に割り当てた識別情報に対応付けて作成し、作成した設定情報を上記メモリに格納するとともに、
上記太陽光発電装置に備えられ、上記太陽光発電装置を制御する制御装置に対して、上記太陽光発電装置に対応する設定情報を上記メモリから読み出して送信し、
上記制御装置が、上記太陽光発電装置に備えられるパワーコンディショナに対し、取得した上記出力制御のスケジュールおよび上記設定情報に基づいて、上記出力制御に関する指示を与えること
を特徴とするサーバ。
A server used for maintenance management of the photovoltaic power generation device that obtains the output control schedule, from a schedule server that distributes an output control schedule for limiting the AC output ,
Memory and
With a controller,
The controller setting information related to the upper Kide force control, created in association with the identification information allocated to the solar power generation apparatus, the setting information created stores in the memory,
Provided in the photovoltaic power generation device, for a control device that controls the photovoltaic power generation device, reads setting information corresponding to the photovoltaic power generation device from the memory and transmits the same,
Server the control device, with respect to the power conditioner provided in the solar power generation apparatus, based on the acquired schedule and the setting information of the output control, and wherein the Rukoto gives an indication of the output control.
上記設定情報は、上記太陽光発電装置に割り当てた上記識別情報としての発電所ID、および上記出力制御のスケジュールを配信するスケジュールサーバのURLを含んでいること
を特徴とする請求項1に記載のサーバ。
2. The setting information according to claim 1, wherein the setting information includes a power plant ID as the identification information assigned to the photovoltaic power generation device, and a URL of a schedule server that distributes the output control schedule. server.
上記設定情報は、(1)上記出力制御を行うか否かの情報、(2)上記出力制御のスケジュールを配信する上記スケジュールサーバと通信するか否かの情報、(3)時報配信サーバのURL、(4)上記出力制御の変化時間を規定する情報、(5)上記太陽光発電装置の発電容量、(6)上記太陽光発電装置に備えられるパワーコンディショナの定格容量、および、(7)上記太陽光発電装置が発電した電力の売電の仕方の種類のうち少なくとも1つを含んでいること
を特徴とする請求項1または2に記載のサーバ。
The configuration information, (1) the information whether or not performing output control, (2) whether the information to communicate with the schedule server that distributes a schedule for the output control, (3) time signal distribution server URL (4) information defining a change time of the output control, (5) power generation capacity of the solar power generation device, (6) rated capacity of a power conditioner provided in the solar power generation device, and (7). 3. The server according to claim 1, wherein the server includes at least one of types of power selling methods of the power generated by the solar power generation device. 4.
交流出力を制限するための出力制御のスケジュールを配信するスケジュールサーバから、上記出力制御のスケジュールを取得する太陽光発電装置に備えられる制御装置であって、
記出力制御に関わる設定情報を生成するサーバから、上記設定情報を取得するとともに、
上記太陽光発電装置に備えられるパワーコンディショナに対し、取得した上記出力制御のスケジュールおよび上記設定情報に基づいて、上記出力制御に関する指示を与えること
を特徴とする制御装置。
From a schedule server that distributes an output control schedule for limiting AC output, a control device included in the solar power generation device that obtains the output control schedule ,
From a server that generates setting information related to the upper Kide force control, it acquires the setting information,
A control device for giving an instruction regarding the output control to a power conditioner included in the photovoltaic power generator, based on the acquired output control schedule and the setting information.
上記サーバで更新された設定情報を上記サーバから取得した場合に、上記更新された設定情報に含まれており、かつ上記太陽光発電装置に割り当てられた識別情報に誤りがあるかどうかを、上記制御装置が検出するための検出プログラムが保存されたメモリを備えていること
を特徴とする請求項4に記載の制御装置。
When the setting information updated by the server is obtained from the server, whether the identification information included in the updated setting information and the identification information assigned to the photovoltaic power generation device has an error , The control device according to claim 4, further comprising a memory in which a detection program for detection by the control device is stored.
請求項1〜3のいずれか1項に記載のサーバと、請求項4または5に記載の制御装置とを含んでいること
を特徴とする太陽光発電システム。
A photovoltaic power generation system comprising: the server according to claim 1; and the control device according to claim 4.
交流出力を制限するための出力制御のスケジュールを配信するスケジュールサーバから、上記出力制御のスケジュールを取得する太陽光発電装置の保守管理に用いられるサーバが実行する情報配信方法であって、
上記太陽光発電装置の交流出力を制限する出力制御に関わる設定情報を、上記太陽光発電装置に対応付けて作成し、
上記太陽光発電装置に備えられ、上記太陽光発電装置を制御する制御装置に対して、上記太陽光発電装置に対応付けて作成した上記設定情報を送信し、
上記制御装置が、上記太陽光発電装置に備えられるパワーコンディショナに対し、取得した上記出力制御のスケジュールおよび上記設定情報に基づいて、上記出力制御に関する指示を与えること
を特徴とする情報配信方法。
An information distribution method executed by a server used for maintenance and management of a photovoltaic power generation device that obtains the output control schedule, from a schedule server that distributes an output control schedule for limiting AC output ,
Create setting information related to output control to limit the AC output of the photovoltaic power generation device in association with the photovoltaic power generation device,
Provided in the photovoltaic power generation device, for the control device that controls the photovoltaic power generation device, transmits the setting information created in association with the photovoltaic power generation device ,
The control device to the power conditioner provided in the solar power generation apparatus, on the basis of the obtained schedule and the setting information of the output control, information distribution method comprising Rukoto gives an indication of the output control .
交流出力を制限するための出力制御のスケジュールを配信するスケジュールサーバから、上記出力制御のスケジュールを取得する太陽光発電装置の制御方法であって、
上記出力制御に関わる設定情報を生成するサーバから、上記設定情報を取得し、
上記太陽光発電装置に備えられるパワーコンディショナに対し、取得した上記出力制御のスケジュールおよび上記設定情報に基づいて、上記出力制御に関する指示を与えること
を特徴とする太陽光発電装置の制御方法。
A method for controlling a photovoltaic power generator that acquires the output control schedule from a schedule server that distributes an output control schedule for limiting AC output,
From the server that generates the setting information related to the output control, obtain the setting information,
A control method for a photovoltaic power generator, comprising giving an instruction regarding the output control to a power conditioner included in the photovoltaic power generator based on the acquired output control schedule and the setting information.
請求項7に記載の情報配信方法をコンピュータに実行させるためのプログラム。   A program for causing a computer to execute the information distribution method according to claim 7. 請求項8に記載の太陽光発電装置の制御方法をコンピュータに実行させるためのプログラム。   A program for causing a computer to execute the method for controlling a solar power generation device according to claim 8.
JP2016051196A 2016-03-15 2016-03-15 Photovoltaic power generation device control device, server, photovoltaic power generation system, information distribution method, photovoltaic power generation device control method, and program Active JP6668120B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016051196A JP6668120B2 (en) 2016-03-15 2016-03-15 Photovoltaic power generation device control device, server, photovoltaic power generation system, information distribution method, photovoltaic power generation device control method, and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016051196A JP6668120B2 (en) 2016-03-15 2016-03-15 Photovoltaic power generation device control device, server, photovoltaic power generation system, information distribution method, photovoltaic power generation device control method, and program

Publications (2)

Publication Number Publication Date
JP2017169320A JP2017169320A (en) 2017-09-21
JP6668120B2 true JP6668120B2 (en) 2020-03-18

Family

ID=59913621

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016051196A Active JP6668120B2 (en) 2016-03-15 2016-03-15 Photovoltaic power generation device control device, server, photovoltaic power generation system, information distribution method, photovoltaic power generation device control method, and program

Country Status (1)

Country Link
JP (1) JP6668120B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6745638B2 (en) * 2016-04-28 2020-08-26 三菱電機株式会社 Power control system
KR102064256B1 (en) * 2019-07-23 2020-01-09 두성기술주식회사 System for stntagmatically monitoring solar energy generation

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2927733B1 (en) * 2008-02-19 2011-05-06 Photowatt Internat INSTALLATION OF REMOTE CONTROLLED PHOTOVOLTAIC MODULES
IN2014DN06618A (en) * 2012-02-09 2015-05-22 Hitachi Ltd
JP5980536B2 (en) * 2012-03-27 2016-08-31 シャープ株式会社 Power generation system, and power conditioner and output suppression management device used in the power generation system

Also Published As

Publication number Publication date
JP2017169320A (en) 2017-09-21

Similar Documents

Publication Publication Date Title
US8073558B2 (en) Critical resource notification system and interface device
CA2883358C (en) Automated demand response gateway
EP2963610A1 (en) Power creation control system and method
Widergren et al. Residential transactive control demonstration
JP5788591B2 (en) Power monitoring apparatus and power monitoring system
CN103003829A (en) Energy service delivery platform
US9257840B2 (en) Synchronized PWM randomization for coordinated load management
JP6246412B1 (en) Power interchange system
JP2014006011A (en) Energy management system
JP2012200138A (en) Systems and methods for managing energy distribution network
KR20120076659A (en) Load control method for load contol apparatus
JP6668120B2 (en) Photovoltaic power generation device control device, server, photovoltaic power generation system, information distribution method, photovoltaic power generation device control method, and program
WO2017033282A1 (en) Control device, event information display method and program
JP2007006579A (en) System and method for supplying power information
JP2017163630A (en) Controller, power generator, control method and program
JP2017169292A (en) Controller, control method, and program
JP6816962B2 (en) Power monitor, display control method and display control program
Kiliccote Northwest Open Automated Demand Response Technology Demonstration Project
JP2019088151A (en) Hot-water supply device control system and hot-water supply device control method
JP2010154617A (en) Underpower replenishing system of operating non-utility power generation facility
JP6630324B2 (en) Solar power remote control system
JP2023005861A (en) Power management device, power management system, and power management method
JP2014035759A (en) Operation management device and power actual value correction method under demand response control
JP6760734B2 (en) Charge calculation method, charge calculation device and charge calculation program
JP7341009B2 (en) Power management system and power management method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180920

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190606

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190618

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190808

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200128

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200226

R150 Certificate of patent or registration of utility model

Ref document number: 6668120

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150