JP6555992B2 - Control unit, hot water supply / heating system, control method, and program - Google Patents

Control unit, hot water supply / heating system, control method, and program Download PDF

Info

Publication number
JP6555992B2
JP6555992B2 JP2015174885A JP2015174885A JP6555992B2 JP 6555992 B2 JP6555992 B2 JP 6555992B2 JP 2015174885 A JP2015174885 A JP 2015174885A JP 2015174885 A JP2015174885 A JP 2015174885A JP 6555992 B2 JP6555992 B2 JP 6555992B2
Authority
JP
Japan
Prior art keywords
hot water
water supply
heating
heat pump
control method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015174885A
Other languages
Japanese (ja)
Other versions
JP2017048991A (en
Inventor
誠人 大石
誠人 大石
村上 高
高 村上
森田 哲
森田  哲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Gas Co Ltd
Original Assignee
Tokyo Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Gas Co Ltd filed Critical Tokyo Gas Co Ltd
Priority to JP2015174885A priority Critical patent/JP6555992B2/en
Publication of JP2017048991A publication Critical patent/JP2017048991A/en
Application granted granted Critical
Publication of JP6555992B2 publication Critical patent/JP6555992B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Steam Or Hot-Water Central Heating Systems (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)

Description

本発明は、制御ユニット、給湯暖房システム、制御方法、及びプログラムに関する。   The present invention relates to a control unit, a hot water supply / heating system, a control method, and a program.

従来、電気式ヒートポンプとガス給湯暖房システムにおいて、使用電力がある閾値(ここでは契約電力)を越えないように制御を行っているものがある(例えば、特許文献1参照)。   Conventionally, in an electric heat pump and a gas hot water supply / heating system, control is performed so that the power used does not exceed a certain threshold (contract power here) (for example, see Patent Document 1).

特開2012−92997号公報JP 2012-92997 A

しかしながら、特許文献1に記載されている技術は、「ある閾値を越えない制御を行う」という点では有効なものであり、ディマンドレスポンス要望があるような場合に適用できるが、使用者の中には「電気とガスを含めた光熱費を最小にするような給湯・暖房運転を行いたい。」、「ガス熱源機と電気式エアコンの双方のメリットを活かした快適な給湯・暖房運転を行いたい」といったニーズを持った使用者もおり、それぞれのニーズに合わせた給湯・暖房運転が行えないという点で限界があった。   However, the technique described in Patent Document 1 is effective in terms of “control that does not exceed a certain threshold”, and can be applied when there is a demand response demand. "I want to do hot water and heating operations that minimize electricity costs including electricity and gas." "I want to perform comfortable hot water and heating operations that take advantage of both the gas heat source and electric air conditioners." Some users have needs such as, and there was a limit in that they could not perform hot water supply or heating operation according to their needs.

そこで、本発明は、使用者のニーズに合わせた給湯・暖房運転を行うことができる制御ユニット、給湯暖房システム、制御方法、及びプログラムを提供することを目的とする。   Therefore, an object of the present invention is to provide a control unit, a hot water supply / heating system, a control method, and a program capable of performing a hot water supply / heating operation in accordance with a user's needs.

上記目的を達成するために、本発明の制御ユニットは、給湯温水及び暖房循環熱媒の各々を燃焼により加熱する熱源機と、給湯温水及び暖房循環熱媒の各々を電気ヒートポンプにより加熱するヒートポンプ装置と、を組み合わせた給湯暖房システムにおける制御ユニットであって、各時刻の電気使用量が上限値を超えないように制御するピークカット制御方式、一日の給湯利用計画に対して光熱費が最も安くなるように制御する光熱費最適制御方式、一日の給湯利用計画に対して一次エネルギー消費量が最も少なくなるように制御する一次エネルギー最適制御方式、及び使用者が給湯及び暖房を快適に利用することを優先して制御する快適制御方式のうちの少なくとも2つの制御方式から使用者により選択された制御方式に従って、前記熱源機及び前記ヒートポンプ装置の少なくとも一方を制御する。   In order to achieve the above object, the control unit of the present invention includes a heat source device that heats each of hot water supply hot water and a heating circulation heat medium by combustion, and a heat pump device that heats each of hot water supply hot water and a heating circulation heat medium using an electric heat pump. Is a control unit in a hot water supply and heating system that combines a peak cut control system that controls the amount of electricity used at each time so as not to exceed the upper limit, and the lowest utility cost for a daily hot water use plan Optimal energy cost control system that controls the energy consumption, primary energy optimal control system that controls the amount of primary energy consumption for the daily hot water supply usage plan, and the user comfortably uses hot water and heating. The heat source according to a control method selected by a user from at least two of the comfortable control methods for controlling the priority. And controlling at least one of the heat pump device.

本発明の給湯暖房システムは、上記の制御ユニットと、給湯温水及び暖房循環熱媒の各々を燃焼により加熱する熱源機と、給湯温水及び暖房循環熱媒の各々を電気ヒートポンプにより加熱するヒートポンプ装置とを含んで構成されている。   A hot water supply and heating system of the present invention includes the control unit, a heat source device that heats each of hot water supply hot water and a heating circulation heat medium by combustion, and a heat pump device that heats each of the hot water supply hot water and the heating circulation heat medium by an electric heat pump. It is comprised including.

本発明の制御方法は、給湯温水及び暖房循環熱媒の各々を燃焼により加熱する熱源機と、給湯温水及び暖房循環熱媒の各々を電気ヒートポンプにより加熱するヒートポンプ装置と、を組み合わせた給湯暖房システムにおける制御方法であって、制御ユニットが、各時刻の電気使用量が上限値を超えないように制御するピークカット制御方式、一日の給湯利用計画に対して光熱費が最も安くなるように制御する光熱費最適制御方式、一日の給湯利用計画に対して一次エネルギー消費量が最も少なくなるように制御する一次エネルギー最適制御方式、及び使用者が給湯及び暖房を快適に利用することを優先して制御する快適制御方式のうちの少なくとも2つの制御方式から使用者により選択された制御方式に従って、前記熱源機及び前記ヒートポンプ装置の少なくとも一方を制御する。   The control method of the present invention is a hot water supply and heating system that combines a heat source device that heats each of hot water supply hot water and a heating circulation heat medium by combustion, and a heat pump device that heats each of the hot water supply hot water and the heating circulation heat medium by an electric heat pump. Control method in which the control unit controls the amount of electricity used so that it does not exceed the upper limit value. Prioritize the optimal use of hot water supply and heating, and the optimal primary energy consumption control system that controls the amount of primary energy consumption for the daily hot water supply usage plan. According to the control method selected by the user from at least two of the comfortable control methods controlled by the user. Controlling at least one of the flop device.

本発明のプログラムは、給湯温水及び暖房循環熱媒の各々を燃焼により加熱する熱源機と、給湯温水及び暖房循環熱媒の各々を電気ヒートポンプにより加熱するヒートポンプ装置と、を組み合わせた給湯暖房システムにおけるプログラムであって、コンピュータに、各時刻の電気使用量が上限値を超えないように制御するピークカット制御方式、一日の給湯利用計画に対して光熱費が最も安くなるように制御する光熱費最適制御方式、一日の給湯利用計画に対して一次エネルギー消費量が最も少なくなるように制御する一次エネルギー最適制御方式、及び使用者が給湯及び暖房を快適に利用することを優先して制御する快適制御方式のうちの少なくとも2つの制御方式から使用者により選択された制御方式に従って、前記熱源機及び前記ヒートポンプ装置の少なくとも一方を制御することを実行させるためのプログラムである。   The program of the present invention is a hot water supply and heating system that combines a heat source device that heats each of hot water supply hot water and a heating circulation heat medium by combustion, and a heat pump device that heats each of the hot water supply hot water and the heating circulation heat medium by an electric heat pump. A program that controls the computer so that the amount of electricity used at each time does not exceed the upper limit, and the utility cost to control the utility cost to the lowest for the daily hot water usage plan Optimal control method, primary energy optimal control method that controls the amount of primary energy consumption to the minimum against daily hot water usage plan, and priority is given to the user's comfortable use of hot water and heating. According to the control method selected by the user from at least two of the comfort control methods, the heat source device and the heat Is a program for executing a control at least one pump device.

本発明の給湯暖房システム、制御方法、及びプログラムによれば、ピークカット制御方式、光熱費最適制御方式、一次エネルギー最適制御方式、及び快適制御方式のうちの少なくとも2つの制御方式から使用者により選択された制御方式に従って、前記熱源機及び前記ヒートポンプ装置の少なくとも一方を制御する。これにより、使用者のニーズに合わせた給湯・暖房運転を行うことができる。   According to the hot water supply and heating system, the control method, and the program of the present invention, the user selects from at least two control methods among the peak cut control method, the optimum utility cost control method, the primary energy optimal control method, and the comfort control method. And controlling at least one of the heat source device and the heat pump device according to the control method. Thereby, the hot water supply and heating operation according to a user's needs can be performed.

本発明の実施形態に係る給湯暖房システムの全体構成図である。1 is an overall configuration diagram of a hot water supply / heating system according to an embodiment of the present invention. 給湯暖房システムの制御ユニットの機能ブロック図である。It is a functional block diagram of the control unit of the hot water supply and heating system. 制御ユニットによる給湯暖房制御処理ルーチンを示すフローチャートである。It is a flowchart which shows the hot water supply heating control processing routine by a control unit. 制御ユニットによるピークカット制御処理ルーチンを示すフローチャートである。It is a flowchart which shows the peak cut control processing routine by a control unit. 制御ユニットによる給湯用光熱費最適制御処理ルーチンを示すフローチャートである。It is a flowchart which shows the utility cost optimal control processing routine for hot water supply by a control unit. 制御ユニットによる給湯比較処理ルーチンを示すフローチャートである。It is a flowchart which shows the hot water supply comparison processing routine by a control unit. 制御ユニットによる暖房用光熱費最適制御処理ルーチンを示すフローチャートである。It is a flowchart which shows the utility cost optimal control processing routine for heating by a control unit. 制御ユニットによる一次エネルギー最適制御処理ルーチンを示すフローチャートである。It is a flowchart which shows the primary energy optimal control processing routine by a control unit. 制御ユニットによる給湯比較処理ルーチンを示すフローチャートである。It is a flowchart which shows the hot water supply comparison processing routine by a control unit. 制御ユニットによる暖房用一次エネルギー最適制御処理ルーチンを示すフローチャートである。It is a flowchart which shows the primary energy optimal control process routine for heating by a control unit. 制御ユニットによる給湯用快適制御処理ルーチンを示すフローチャートである。It is a flowchart which shows the comfortable control processing routine for hot water supply by a control unit. 制御ユニットによる暖房用快適制御処理ルーチンを示すフローチャートである。It is a flowchart which shows the comfortable control process routine for heating by a control unit. 一日の給湯・暖房・その他家電の使用例を示す図である。It is a figure which shows the usage example of hot water supply of one day, heating, and other household appliances. 外部サーバから受信した情報の一例を示す図である。It is a figure which shows an example of the information received from the external server. 各設定例における比較判定結果を示す図である。It is a figure which shows the comparison determination result in each setting example.

本発明の実施形態について説明する。   An embodiment of the present invention will be described.

<システム構成>
図1に示されるように、本発明の実施形態に係る給湯暖房システムS1は、エアコン10と、エアコン用ヒートポンプ装置12と、貯湯タンク14と、貯湯タンク用ヒートポンプ装置16と、床暖房装置18と、熱源機20とを備える。
<System configuration>
As shown in FIG. 1, a hot water supply and heating system S <b> 1 according to an embodiment of the present invention includes an air conditioner 10, an air conditioner heat pump device 12, a hot water storage tank 14, a hot water storage tank heat pump device 16, and a floor heating device 18. The heat source device 20 is provided.

エアコン用ヒートポンプ装置12は、空気(暖房循環熱媒)を電気ヒートポンプにより加熱する。エアコン10とエアコン用ヒートポンプ装置12とは、熱媒往き管32及び熱媒戻り管34によって接続されている。   The heat pump device 12 for an air conditioner heats air (heating circulation heat medium) with an electric heat pump. The air conditioner 10 and the air conditioner heat pump device 12 are connected by a heat medium forward pipe 32 and a heat medium return pipe 34.

貯湯タンク用ヒートポンプ装置16は、給湯温水を電気ヒートポンプにより加熱する。また、貯湯タンク用ヒートポンプ装置16は、床暖房用温水(暖房循環熱媒)を電気ヒートポンプにより加熱する。貯湯タンク14と貯湯タンク用ヒートポンプ装置16とは、温水往き管36及び温水戻り管38によって接続されている。   The hot water tank heat pump device 16 heats hot water supply hot water using an electric heat pump. The hot water storage tank heat pump device 16 heats warm water for floor heating (heating circulation heat medium) with an electric heat pump. The hot water storage tank 14 and the hot water storage tank heat pump device 16 are connected by a hot water forward pipe 36 and a hot water return pipe 38.

貯湯タンク14に蓄えられた給湯温水は、給湯に用いられる。   Hot water supply hot water stored in the hot water storage tank 14 is used for hot water supply.

熱源機20は、ガスバーナの燃焼により給湯温水及び床暖房用温水の各々を加熱する。   The heat source unit 20 heats each hot water supply hot water and warm water for floor heating by combustion of the gas burner.

床暖房装置18は、内部に温水が流通する流通路を有し、熱源機20と床暖房装置18とが、温水往き管42によって接続されており、温水往き管42から供給された床暖房用温水が、床暖房装置18の内部に流通する。   The floor heating device 18 has a flow passage through which hot water flows, and the heat source device 20 and the floor heating device 18 are connected by a hot water forward pipe 42, and used for floor heating supplied from the hot water forward pipe 42. Hot water circulates inside the floor heating device 18.

床暖房装置18と貯湯タンク用ヒートポンプ装置16とは、温水戻り管44によって接続されている。   The floor heating device 18 and the hot water tank heat pump device 16 are connected by a hot water return pipe 44.

貯湯タンク用ヒートポンプ装置16と熱源機20とは、温水往き管40によって接続されており、温水往き管40から供給された床暖房用温水が、熱源機20により加熱されて、温水往き管42を介して、床暖房装置18へ送られる。   The hot water storage tank heat pump device 16 and the heat source unit 20 are connected by a hot water forward pipe 40, and the floor heating hot water supplied from the hot water forward pipe 40 is heated by the heat source unit 20, and the hot water forward pipe 42 is connected. To the floor heating device 18.

また、本発明の実施形態に係る給湯暖房システムS1は、操作パネル50と、制御ユニット48とをさらに備える。   Moreover, the hot water supply and heating system S <b> 1 according to the embodiment of the present invention further includes an operation panel 50 and a control unit 48.

操作パネル50は、ピークカット制御方式を優先するか否かを選択するためのピークカット制御優先スイッチと、光熱費最適制御方式、一次エネルギー最適制御方式、及び快適制御方式の何れかを選択するための制御方式スイッチと、暖房を作動させるための暖房スイッチとを有する。   The operation panel 50 is used to select a peak cut control priority switch for selecting whether or not to give priority to the peak cut control method, and an optimum utility cost control method, primary energy optimal control method, and comfort control method. And a heating switch for operating the heating.

制御ユニット48は、例えばHEMS(Home Energy Management System)であり、ネットワーク60を介して、外部サーバ62と接続されている。   The control unit 48 is, for example, a HEMS (Home Energy Management System), and is connected to the external server 62 via the network 60.

制御ユニット48は、貯湯温センサ、外気温センサ、室温センサ、ドア開閉センサ、水量センサ、給水温センサ、電力量センサ等と接続されている。   The control unit 48 is connected to a hot water storage temperature sensor, an outside air temperature sensor, a room temperature sensor, a door opening / closing sensor, a water amount sensor, a water supply temperature sensor, an electric energy sensor, and the like.

貯湯温センサは、貯湯タンク14に設けられており、貯湯タンク14の下部に貯留された湯の温度を検出し、この湯の温度に応じた信号を制御ユニット48に出力する。外気温センサは、エアコン用ヒートポンプ装置12装置の外部に設けられ、外気温を検出し、この外気温に応じた信号を制御ユニット48に出力する。   The hot water storage temperature sensor is provided in the hot water storage tank 14, detects the temperature of the hot water stored in the lower part of the hot water storage tank 14, and outputs a signal corresponding to the temperature of the hot water to the control unit 48. The outside air temperature sensor is provided outside the heat pump device 12 for the air conditioner, detects the outside air temperature, and outputs a signal corresponding to the outside air temperature to the control unit 48.

室温センサは、エアコン10が設置されている室内に設けられ、室温を検出し、この室温に応じた信号を制御ユニット48に出力する。ドア開閉センサは、エアコン10が設置されている部屋に設けられ、当該部屋のドアの開閉を検出し、ドアの開閉に応じた信号を制御ユニット48に出力する。   The room temperature sensor is provided in a room where the air conditioner 10 is installed, detects the room temperature, and outputs a signal corresponding to the room temperature to the control unit 48. The door opening / closing sensor is provided in a room where the air conditioner 10 is installed, detects opening / closing of the door of the room, and outputs a signal corresponding to the opening / closing of the door to the control unit 48.

制御ユニット48は、CPU、後述する給湯暖房制御処理ルーチンのプログラムを記憶したROM、データ等を記憶するRAM、及びこれらを接続するバスを含んで構成されている。制御ユニット48は、外部サーバ62から受信した情報、上述の操作パネル50、各種センサから出力された信号に応じて、エアコン10、エアコン用ヒートポンプ装置12、貯湯タンク14、貯湯タンク用ヒートポンプ装置16、熱源機20、床暖房装置18、その他の家電の作動を制御する。   The control unit 48 is configured to include a CPU, a ROM that stores a program for a hot water supply and heating control processing routine that will be described later, a RAM that stores data, and a bus that connects these. In accordance with the information received from the external server 62, the above-described operation panel 50, and signals output from various sensors, the control unit 48 includes an air conditioner 10, an air conditioner heat pump device 12, a hot water storage tank 14, a hot water storage tank heat pump device 16, The operation of the heat source device 20, the floor heating device 18, and other home appliances is controlled.

この制御ユニット48をハードウエアとソフトウエアとに基づいて定まる機能実現手段毎に分割した機能ブロックで説明すると、図2に示すように、制御ユニット48は、設定部70、判定部72、ピークカット制御部74、光熱費最適制御部76、一次エネルギー最適制御部78、及び快適制御部80を備えている。   The control unit 48 will be described with function blocks divided for each function realizing means determined based on hardware and software. As shown in FIG. 2, the control unit 48 includes a setting unit 70, a determination unit 72, a peak cut. A control unit 74, a utility cost optimal control unit 76, a primary energy optimal control unit 78, and a comfort control unit 80 are provided.

設定部70は、操作パネル50からの信号に応じて、ピークカット制御優先スイッチにより選択された、ピークカット制御方式を優先するか否かを設定すると共に、制御方式スイッチにより選択されている制御方式として、光熱費最適制御方式、一次エネルギー最適制御方式、及び快適制御方式の何れかを設定する。   The setting unit 70 sets whether or not to prioritize the peak cut control method selected by the peak cut control priority switch according to the signal from the operation panel 50, and the control method selected by the control method switch. As described above, any one of the utility cost optimal control method, the primary energy optimal control method, and the comfort control method is set.

判定部72は、設定部70による設定に基づいて、ピークカット制御方式を優先するか否かを判定し、ピークカット制御方式を優先すると判定された場合に、外部サーバ62から受信されるピークカット要望情報に基づいて、現時点でピークカット要望があるか否かを判定する。   The determination unit 72 determines whether or not to prioritize the peak cut control method based on the setting by the setting unit 70. If it is determined to prioritize the peak cut control method, the peak cut received from the external server 62 is determined. Based on the request information, it is determined whether there is a peak cut request at the present time.

また、判定部72は、ピークカット制御方式を優先しないと判定された場合、又は現時点でピークカット要望がないと判定された場合、光熱費最適制御方式、一次エネルギー最適制御方式、及び快適制御方式の何れかが選択されているかを判定する。   In addition, when it is determined that the peak cut control method is not prioritized, or when it is determined that there is no peak cut request at the present time, the determination unit 72 is a utility cost optimal control method, a primary energy optimal control method, and a comfort control method. It is determined whether any of the above has been selected.

ピークカット制御部74は、各時刻の電気使用量がペナルティ料金が発生しない範囲となるように制御するピークカット制御方式を優先すると判定部72により判定され、かつ、ピークカット要望があると判定されているとき、現在の電気使用量が、ペナルティ料金が発生しない範囲を超えており、かつ、貯湯タンク用ヒートポンプ装置16によって給湯温水を加熱している場合、貯湯タンク用ヒートポンプ装置16による給湯温水の加熱を停止するように制御する。更に、ピークカット制御部74は、現在の電気使用量が、ペナルティ料金が発生しない範囲を超えており、かつ、エアコン用ヒートポンプ装置12によって暖房循環熱媒を加熱している場合、エアコン用ヒートポンプ装置12による暖房循環熱媒の加熱を停止するように制御し、床暖房装置18を作動させると共に、熱源機20によって床暖房用温水を加熱するように制御する。   The peak cut control unit 74 is determined by the determination unit 72 to prioritize the peak cut control method for controlling the amount of electricity used at each time so that no penalty fee is generated, and it is determined that there is a peak cut request. When the current electricity usage exceeds the range where no penalty fee is generated and the hot water supply hot water is heated by the hot water storage tank heat pump device 16, the hot water supply hot water supplied by the hot water storage tank heat pump device 16 is used. Control to stop heating. Further, the peak cut control unit 74 determines that the current electricity usage amount exceeds the range where no penalty fee is generated and the heating circulation heating medium is heated by the air conditioning heat pump device 12. 12, the heating of the heating circulation heat medium is stopped, the floor heating device 18 is operated, and the floor heating device 20 is controlled to be heated by the heat source unit 20.

以上のように、夕方等の電気使用量のピークが発生し、ピークカット要望(ディマンドレスポンス要望)があった場合、ガス優先で給湯・暖房を使用するように制御される。   As described above, when the peak of electricity usage occurs in the evening and there is a peak cut request (demand response request), control is performed to use hot water supply / heating with priority to gas.

光熱費最適制御部76は、過去の給湯利用の履歴に基づいて、一日の給湯利用計画を予測する。例えば、1回目の給湯利用計画として、6:45に10リットルのお湯を使用し、2回目の給湯利用計画として、7:00に5リットルのお湯を使用することなどが、予測される。   The utility cost optimal control unit 76 predicts a daily hot water usage plan based on the past hot water usage history. For example, it is predicted that 10 liters of hot water will be used at 6:45 as the first hot water use plan, and 5 liters of hot water will be used at 7:00 as the second hot water use plan.

光熱費最適制御部76は、一日の給湯利用計画に対して光熱費が最も安くなるように制御する光熱費最適制御方式が使用者により選択されていると判定部72により判定され、かつ、現在時刻が、予測された給湯利用計画の給湯使用時刻の所定時間前であるとき、外部サーバ62から受信した現在時刻における電気料金単価と、給湯利用計画の給湯利用量に応じた電気使用量との積が、外部サーバ62から受信した給湯利用計画の給湯使用時刻のガス料金と、給湯利用計画の給湯利用量に応じたガス使用量との積より小さい場合、貯湯タンク用ヒートポンプ装置16によって給湯温水を加熱するように制御する。   It is determined by the determination unit 72 that the utility cost optimal control unit 76 is selected by the user so that the utility cost optimal control method for controlling the utility cost to be the cheapest with respect to the daily hot water supply utilization plan, and When the current time is a predetermined time before the hot water use time of the predicted hot water use plan, the electricity unit price at the current time received from the external server 62, and the electric use amount according to the hot water use amount of the hot water use plan Is smaller than the product of the gas charge at the hot water use time of the hot water use plan received from the external server 62 and the gas use amount according to the hot water use amount of the hot water use plan, hot water is supplied by the hot water storage tank heat pump device 16. Control to heat hot water.

また、光熱費最適制御部76は、光熱費最適制御方式が使用者により選択されていると判定部72により判定されたとき、暖房運転のスイッチがオンされ、かつ、現在時刻における電気料金単価と、予め定められた電気使用量との積が、現在時刻のガス料金と、予め定められたガス使用量との積より小さい場合、エアコン10を作動させると共に、エアコン用ヒートポンプ装置12によって暖房循環熱媒を加熱するように制御する。また、光熱費最適制御部76は、暖房運転のスイッチがオンされ、かつ、現在時刻における電気料金単価と、予め定められた電気使用量との積が、現在時刻のガス料金と、予め定められたガス使用量との積以上である場合、床暖房装置18を作動させると共に、熱源機20によって暖房循環熱媒を加熱するように制御する。   In addition, when the determining unit 72 determines that the utility cost optimal control method is selected by the user, the utility cost optimal control unit 76 is turned on, and the unit price of the electric charge at the current time is determined. When the product of the predetermined amount of electricity used is smaller than the product of the gas rate at the current time and the predetermined amount of gas used, the air conditioner 10 is operated and the heat circulating heat from the air conditioner heat pump device 12 is heated. Control to heat the medium. In addition, the optimum utility cost control unit 76 is turned on in the heating operation, and the product of the unit price of the electricity charge at the current time and the predetermined amount of electricity used is determined in advance as the gas charge at the current time. If it is equal to or greater than the product of the amount of gas used, the floor heating device 18 is operated, and the heating circulation heat medium is controlled to be heated by the heat source unit 20.

ここで、光熱費計算式は以下で表わされる。ただし、Cは、一日当たり光熱費を表し、KE,nは、時刻nにおける電気代単価を表し、KG,nは、時刻nにおけるガス代単価を表し、En、Gnは、時刻nにおける電気使用量、ガス使用量を表す。 Here, the utility cost calculation formula is expressed as follows. However, C represents the utility cost per day, K E, n represents the unit price of electricity at time n, KG , n represents the unit price of gas at time n, and E n and G n represent time It represents the amount of electricity used and the amount of gas used in n.

C=CE+CG :光熱費は電気代とガス代の和
E=ΣKE,nn, CG=ΣKG,nn :電気代、ガス代は各時刻nでの使用量と単価の積の合計
E=EHP+Eタンク+Eエアコン+E熱源機+Eその他家電
n=G熱源機
C = C E + C G: energy costs sum C E = ΣK E electric bill and gas charges, n E n, C G = ΣK G, n G n: the amount of electricity bills, gas bills at each time n Sum of product of unit price and unit price
E n = E HP + E tank + E air conditioner + E heat source machine + E other home appliances
G n = G heat source machine

このように、光熱費最適制御部76は、一日の給湯利用計画を予測すると共に、外部サーバ62から最新の料金表を受信し、光熱費が一番安くなるように機器を制御する。例えば、自由化に伴い、電気・ガスの料金が時間帯によって変化する場合(KE,nとKG,nが時間帯により変化する場合)、電気料金が高い時間帯にはガス優先で給湯・暖房を利用する。 In this way, the utility cost optimal control unit 76 predicts a daily hot water supply utilization plan, receives the latest price list from the external server 62, and controls the equipment so that the utility cost is the lowest. For example, when electricity and gas charges change according to the time zone due to liberalization (when KE, n and KG , n change depending on the time zone), hot water supply with priority to gas in the time zone when the electricity rate is high・ Use heating.

一次エネルギー最適制御部78は、過去の給湯利用の履歴に基づいて、一日の給湯利用計画を予測する。   The primary energy optimum control unit 78 predicts a daily hot water supply usage plan based on the past hot water usage history.

一次エネルギー最適制御部78は、一日の給湯利用計画に対して一次エネルギー消費量が最も少なくなるように制御する一次エネルギー最適制御方式が使用者により選択されていると判定部72により判定され、かつ、現在時刻が、予測された給湯利用計画の給湯使用時刻の所定時間前であるとき、給湯利用計画の給湯利用量に応じた電気使用量に基づく一次エネルギー消費量が、前記給湯利用計画の給湯利用量に応じたガス使用量に基づく一次エネルギー消費量より小さい場合、貯湯タンク用ヒートポンプ装置16によって給湯温水を加熱するように制御する。   The primary energy optimal control unit 78 is determined by the determination unit 72 that the primary energy optimal control method for controlling the primary energy consumption for the daily hot water supply utilization plan to be minimized is selected by the user, And when the present time is a predetermined time before the hot water use time of the predicted hot water use plan, the primary energy consumption based on the amount of electricity used according to the hot water use amount of the hot water use plan is When it is smaller than the primary energy consumption based on the gas usage corresponding to the hot water usage, the hot water supply hot water is controlled by the hot pump 16 for hot water storage tank.

また、一次エネルギー最適制御部78は、一次エネルギー最適制御方式が使用者により選択されていると判定部72により判定されたとき、暖房運転のスイッチがオンされ、かつ、予め定められた電気使用量に基づく一次エネルギー消費量が、予め定められたガス使用量に基づく一次エネルギー消費量より小さい場合、エアコン10を作動させると共に、エアコン用ヒートポンプ装置12によって暖房循環熱媒を加熱するように制御する。また、一次エネルギー最適制御部78は、暖房運転のスイッチがオンされ、かつ、予め定められた電気使用量に基づく一次エネルギー消費量が、予め定められたガス使用量に基づく一次エネルギー消費量以上である場合、床暖房装置18を作動させると共に、熱源機20によって暖房循環熱媒を加熱するように制御する。   The primary energy optimal control unit 78 turns on the heating operation when the determination unit 72 determines that the primary energy optimal control method is selected by the user, and a predetermined amount of electricity used. When the primary energy consumption amount based on is smaller than the primary energy consumption amount based on a predetermined gas usage amount, the air conditioner 10 is operated, and the air circulation heat medium 12 is controlled to be heated. The primary energy optimal control unit 78 is configured such that the heating operation is switched on and the primary energy consumption based on a predetermined amount of electricity used is equal to or greater than the primary energy consumption based on a predetermined amount of gas used. In some cases, the floor heating device 18 is activated, and the heat source unit 20 is controlled to heat the heating circulation heat medium.

ここで、一次エネルギー消費量計算式は以下で表わされる。ただし、Pは、一日当たり一次エネルギー消費量を表し、En、Gnは、時刻nにおける電気使用量、ガス使用量を表す。 Here, the primary energy consumption calculation formula is expressed as follows. Here, P represents the primary energy consumption per day, and E n and G n represent the electricity usage and gas usage at time n.

P=PE+PG :一次エネルギー消費量は電気とガスの和
E=Σ(1/ηn)En, PG=ΣGn :電気の一次エネルギー消費量は火力発電所の時刻nの効率ηnの逆数と電気消費量の積の合計
=EHP+Eタンク+Eエアコン+E熱源機+Eその他家電
n=G熱源機
P = P E + P G : Primary energy consumption is the sum of electricity and gas P E = Σ (1 / η n ) E n , P G = ΣG n : Electric primary energy consumption is at time n of the thermal power plant Total of product of reciprocal of efficiency η n and electricity consumption E n = E HP + E tank + E air conditioner + E heat source machine + E other home appliances
G n = G heat source machine

快適制御部80は、使用者が給湯及び暖房を快適に利用することを優先して制御する快適制御方式が使用者により選択されていると判定部72により判定された場合、快適給湯運転のために、貯湯タンク用ヒートポンプ装置16によって給湯温水を加熱するように制御する。   The comfort control unit 80 is configured to perform a comfortable hot water supply operation when the determination unit 72 determines that the user has selected a comfort control method that gives priority to the user's comfortable use of hot water and heating. Further, the hot water supply hot water is controlled to be heated by the hot water storage tank heat pump device 16.

これによって、夏場等、少量のお湯を使用したい場合にいつでも使用できるように常にタンクを満畜にしておく。ここで、貯湯タンク14を満畜にする理由を以下に説明する。
ガス給湯器には最低出力が決まっており、この出力を下回ると燃焼が止まる(=お湯が出ない)制御になっている。出力は以下の式で決まるため、夏場の給水温が高い条件では、特に少量のお湯が出なくなる。
出力=(設定温度-給水温度)×流量
一方で、タンクにお湯を貯めている場合は、タンクのお湯をそのまま出すか、水と少し混ぜて、設定温度のお湯を出湯するため、水量センサで検知できる流量であれば、少量のお湯を夏場でも使用することができる。
上記の理由から、快適制御方式では常に貯湯タンク14を満畜するように制御する。
This ensures that the tank is always full so that it can be used whenever a small amount of hot water is desired, such as in summer. Here, the reason why the hot water storage tank 14 is filled will be described below.
The gas water heater has a minimum output, and the combustion is stopped when the output falls below (= no hot water is produced). Since the output is determined by the following equation, a small amount of hot water will not be produced, especially when the water supply temperature in summer is high.
Output = (set temperature-water supply temperature) x flow rate On the other hand, if hot water is stored in the tank, the hot water in the tank is taken out as it is, or mixed with water a little and then the hot water at the set temperature is discharged. If the flow rate can be detected, a small amount of hot water can be used even in summer.
For the above reason, in the comfort control method, the hot water storage tank 14 is always controlled to be full.

また、快適制御部80は、快適制御方式が使用者により選択されていると判定部72により判定されたとき、暖房運転のスイッチがオンされ、かつ、外気温センサ54で検出された外気温が所定温度より低い場合、冬季エアコン能力不足フォロー制御として、床暖房装置18を作動させると共に、熱源機20によって床暖房用温水を加熱するように制御する。   In addition, when the determination unit 72 determines that the comfort control method has been selected by the user, the comfort control unit 80 turns on the heating operation switch, and the outside air temperature detected by the outside air temperature sensor 54 is When the temperature is lower than the predetermined temperature, the floor heating device 18 is operated as the winter air conditioner capacity shortage follow-up control, and the floor heating water is heated by the heat source unit 20.

これにより、冬季にエアコン室外機に霜が降りて運転できなくなってしまった場合は、機器が自動的に熱源機を使用した給湯・暖房運転に切り替える。   As a result, when the air conditioner outdoor unit becomes frosted and cannot be operated in winter, the device automatically switches to hot water supply / heating operation using a heat source device.

一方、快適制御部80は、暖房運転のスイッチがオンされ、かつ、外気温が所定温度以上である場合、床暖房装置18を作動させると共に、熱源機20によって床暖房用温水を加熱し、かつ、エアコン10を作動させると共に、エアコン用ヒートポンプ装置12によって暖房循環熱媒を加熱するように制御する。
また、快適制御部80は、快適制御方式が使用者により選択されていると判定部72により判定されたとき、室温センサ56で検出された室温が所定温度以下である場合、又はドア開閉センサ58により室内のドアの開閉が検知された場合、快適連動暖房制御として、エアコン10を作動させると共に、エアコン用ヒートポンプ装置12によって暖房循環熱媒を加熱するように制御し、室温が所定温度より高い場合、エアコン10の作動を停止させると共に、エアコン用ヒートポンプ装置12による暖房循環熱媒の加熱を停止するように制御する。
On the other hand, when the heating operation switch is turned on and the outside air temperature is equal to or higher than the predetermined temperature, the comfort control unit 80 activates the floor heating device 18 and heats the floor heating hot water using the heat source unit 20, and The air conditioner 10 is operated, and the air-conditioning heat pump device 12 is controlled to heat the heating circulation heat medium.
Further, the comfort control unit 80 determines that the comfort control method is selected by the user when the determination unit 72 determines that the room temperature detected by the room temperature sensor 56 is equal to or lower than a predetermined temperature, or the door opening / closing sensor 58. When the opening / closing of the indoor door is detected by the air conditioner, the air conditioner 10 is operated as the comfort linked heating control, and the air circulation heat medium is controlled to be heated by the heat pump device 12 for air conditioning, and the room temperature is higher than a predetermined temperature. Then, the operation of the air conditioner 10 is stopped, and the heating of the heating circulation heat medium by the air conditioner heat pump device 12 is controlled to be stopped.

これにより、下記の表1に示す、エアコンと床暖房の双方のデメリットを補間する暖房制御が可能となる。   Thereby, the heating control which interpolates the demerits of both an air-conditioner and floor heating shown in Table 1 below becomes possible.

Figure 0006555992
Figure 0006555992

例えば、立ち上がりはエアコンと床暖房を同時に作動させ、床暖房のデメリットを解消する。定常時は床暖房で運転しつつ、ドアの開閉や人が入ってきたことを検知してエアコンを部分的に当てる。   For example, at the time of start-up, the air conditioner and the floor heating are simultaneously operated to eliminate the disadvantages of the floor heating. While constantly operating with floor heating, it detects the opening and closing of doors and the entrance of people, and partially applies the air conditioner.

また、制御ユニット48は、熱源機20及びエアコン用ヒートポンプ装置12のどちらかが壊れた際に、給湯暖房運転継続可能となるように制御する。例えば、熱源機20が壊れた場合、エアコン用ヒートポンプ装置12及び貯湯タンク用ヒートポンプ装置16で、給湯と暖房が使用可能であり、安心して機器の利用が可能となる。また、エアコン用ヒートポンプ装置12及び貯湯タンク用ヒートポンプ装置16が壊れた場合、熱源機20で給湯と暖房が使用可能であり、安心して機器の利用が可能となる。   Further, the control unit 48 performs control so that the hot water supply / heating operation can be continued when either the heat source device 20 or the heat pump device 12 for an air conditioner is broken. For example, when the heat source device 20 is broken, hot water supply and heating can be used by the heat pump device 12 for an air conditioner and the heat pump device 16 for a hot water storage tank, and the device can be used with confidence. Moreover, when the heat pump device 12 for an air conditioner and the heat pump device 16 for a hot water storage tank are broken, hot water supply and heating can be used by the heat source device 20, and the device can be used with confidence.

<給湯暖房システムの動作>
次に、本発明の実施形態に係る給湯暖房システムS1の動作について説明する。
<Operation of hot-water heating system>
Next, operation | movement of the hot water supply heating system S1 which concerns on embodiment of this invention is demonstrated.

まず、使用者が、操作パネル50において、ピークカット制御方式を優先するか否かを選択するためのピークカット制御優先スイッチを操作すると共に、光熱費最適制御方式、一次エネルギー最適制御方式、及び快適制御方式の何れかを選択するための制御方式スイッチを操作する。   First, the user operates a peak cut control priority switch for selecting whether or not to prioritize the peak cut control method on the operation panel 50, and also the utility cost optimal control method, primary energy optimal control method, and comfort. A control method switch for selecting one of the control methods is operated.

<給湯暖房制御処理ルーチン>
そして、制御ユニット48は、図3に示す給湯暖房制御処理ルーチンを実行する。
<Hot water supply / heating control processing routine>
And the control unit 48 performs the hot-water supply heating control processing routine shown in FIG.

まず、ステップ100において、ピークカット制御方式を優先するか否かを判定する。使用者の操作により、ピークカット制御優先スイッチがオンされている場合には、ステップ102へ進み、一方、ピークカット制御優先スイッチがオフされている場合には、ステップ106へ進む。   First, in step 100, it is determined whether to give priority to the peak cut control method. If the peak cut control priority switch is turned on by the user's operation, the process proceeds to step 102, whereas if the peak cut control priority switch is turned off, the process proceeds to step 106.

ステップ102では、外部サーバ62から受信したピークカット要望情報に基づいて、現時点でピークカット要望があるか否かを判定する。現時点でピークカット要望がある場合には、ステップ104へ進み、ピークカット制御方式に従って給湯暖房制御を行う。   In step 102, based on the peak cut request information received from the external server 62, it is determined whether or not there is a peak cut request at the present time. If there is a peak cut request at the present time, the process proceeds to step 104, and hot water supply / heating control is performed according to the peak cut control method.

一方、現時点でピークカット要望がない場合には、ステップ106において、光熱費最適制御方式が選択されているか否かを判定する。制御方式スイッチにより光熱費最適制御方式が選択されている場合には、ステップ108へ進み、光熱費最適制御方式に従って給湯暖房制御を行う。   On the other hand, if there is no peak cut request at the present time, it is determined in step 106 whether or not the utility cost optimal control method is selected. When the optimum utility cost control method is selected by the control method switch, the process proceeds to step 108, and hot water supply / heating control is performed according to the optimum utility cost control method.

一方、制御方式スイッチにより光熱費最適制御方式が選択されていない場合には、ステップ110において、一次エネルギー最適制御方式が選択されているか否かを判定する。制御方式スイッチにより一次エネルギー最適制御方式が選択されている場合には、ステップ112へ進み、一次エネルギー最適制御方式に従って給湯暖房制御を行う。   On the other hand, if the optimum utility control method has not been selected by the control method switch, it is determined in step 110 whether or not the optimum primary energy control method has been selected. When the primary energy optimal control method is selected by the control method switch, the process proceeds to step 112, and hot water supply / heating control is performed according to the primary energy optimal control method.

一方、制御方式スイッチにより一次エネルギー最適制御方式が選択されていない場合には、ステップ114において、快適制御方式に従って給湯暖房制御を行う。   On the other hand, if the primary energy optimal control method is not selected by the control method switch, hot water supply / heating control is performed in step 114 according to the comfort control method.

<ピークカット制御処理ルーチン>
上記ステップ104は、図4に示すピークカット制御処理ルーチンにより実現される。
<Peak cut control processing routine>
Step 104 is realized by the peak cut control processing routine shown in FIG.

ステップ120において、現時刻nにおける電気使用量Eが、ペナルティ料金が発生しない範囲の上限値Eを超えているか否かを判定する。電気使用量Eが、上限値Eを超えていない場合には、上記ステップ100へ戻る。 In step 120, it is determined electricity usage E n at the current time n is whether exceeds the upper limit value E p ranges penalty does not occur. Electricity consumption E n is, if it does not exceed the upper limit value E p, the process returns to step 100.

一方、電気使用量Eが、上限値Eを超えている場合には、ステップ122において、貯湯タンク用ヒートポンプ装置16を用いた貯湯運転が行われているか否かを判定する。貯湯タンク用ヒートポンプ装置16を用いた貯湯運転が行われている場合には、ステップ124において、貯湯タンク用ヒートポンプ装置16を用いた貯湯運転を停止させるように制御する。一方、貯湯タンク用ヒートポンプ装置16を用いた貯湯運転が行われていない場合には、ステップ126へ移行する。 On the other hand, it determines the electrical consumption E n is, if it exceeds the upper limit value E p, at step 122, whether the hot water storage operation using the hot water storage tank for heat pump device 16 is being performed. When the hot water storage operation using the hot water storage tank heat pump device 16 is performed, in step 124, the hot water storage operation using the hot water storage tank heat pump device 16 is controlled to be stopped. On the other hand, when the hot water storage operation using the hot water tank heat pump device 16 is not performed, the routine proceeds to step 126.

ステップ126では、更に、貯湯タンク用ヒートポンプ装置16を用いた貯湯運転が停止されている状態において、現時刻nにおける電気使用量Eが、ペナルティ料金が発生しない範囲の上限値Eを超えているか否かを判定する。電気使用量Eが、上限値Eを超えていない場合には、上記ステップ100へ戻る。 In step 126, further, in a state where the hot water storage operation using the hot water storage tank for heat pump device 16 is stopped, electricity usage E n at the current time n is greater than an upper limit value E p ranges penalty does not occur It is determined whether or not. Electricity consumption E n is, if it does not exceed the upper limit value E p, the process returns to step 100.

一方、電気使用量Eが、上限値Eを超えている場合には、ステップ128において、エアコン用ヒートポンプ装置12を用いた暖房運転又は貯湯タンク用ヒートポンプ装置16を用いた床暖房運転が行われているか否かを判定する。エアコン用ヒートポンプ装置12を用いた暖房運転又は貯湯タンク用ヒートポンプ装置16を用いた床暖房運転が行われている場合には、ステップ130において、エアコン用ヒートポンプ装置12を用いた暖房運転、及び貯湯タンク用ヒートポンプ装置16を用いた床暖房運転を停止させるように制御し、熱源機20を用いた床暖房運転を行うように制御する。一方、エアコン用ヒートポンプ装置12を用いた暖房運転及び貯湯タンク用ヒートポンプ装置16を用いた貯湯運転の何れもが行われていない場合には、ステップ132へ移行する。 On the other hand, electricity consumption E n is, if it exceeds the upper limit value E p, at step 128, the floor heating operation using a heating operation or the hot water storage tank for heat pump device 16 using the air conditioning heat pump system 12 rows It is determined whether or not When heating operation using the heat pump device 12 for air conditioner or floor heating operation using the heat pump device 16 for hot water storage tank is performed, in step 130, heating operation using the heat pump device 12 for air conditioner and hot water storage tank are performed. The floor heating operation using the heat pump device 16 is controlled to be stopped, and the floor heating operation using the heat source device 20 is controlled to be performed. On the other hand, when neither heating operation using the air pump heat pump device 12 nor hot water storage operation using the hot water tank heat pump device 16 is performed, the process proceeds to step 132.

ステップ132では、更に、エアコン用ヒートポンプ装置12を用いた暖房運転及び貯湯タンク用ヒートポンプ装置16を用いた貯湯運転が停止されている状態において、現時刻nにおける電気使用量Eが、ペナルティ料金が発生しない範囲の上限値Eを超えているか否かを判定する。電気使用量Eが、上限値Eを超えていない場合には、上記ステップ100へ戻る。 In step 132, further, in a state where the hot water storage operation with the heating operation and the hot water storage tank for heat pump device 16 using the air conditioning heat pump device 12 is stopped, the electricity consumption E n at the current time n, a penalty fee determines whether or not exceeding the upper limit value E p in the range that does not occur. Electricity consumption E n is, if it does not exceed the upper limit value E p, the process returns to step 100.

一方、電気使用量Eが、上限値Eを超えている場合には、ステップ134において、その他の家電が作動しているか否かを判定する。その他の家電が作動している場合には、ステップ136において、その他の家電の作動を停止するように制御して、ステップ100へ戻る。 On the other hand, it determines the electrical consumption E n is, if it exceeds the upper limit value E p, at step 134, whether other appliances are operating. If other home appliances are operating, control is performed to stop the operation of the other home appliances in step 136, and the process returns to step 100.

上記のピークカット制御処理ルーチンにより、現時刻における電気使用量Eが、上限値Eを超えている場合、貯湯タンク用ヒートポンプ装置16を用いた貯湯運転、エアコン用ヒートポンプ装置12又は貯湯タンク用ヒートポンプ装置16を用いた暖房運転、その他の家電の順番に電気の使用を停止するように制御する。これにより、電気使用量を、ペナルティ料金が発生しない範囲に留めることができる。 The above peak cut control routine, electricity usage E n at the current time is, if it exceeds the upper limit value E p, hot water storage operation using the hot water storage tank for heat pump device 16, air-conditioning heat pump device 12 or for the hot water storage tank Control is performed so that the use of electricity is stopped in the order of heating operation using the heat pump device 16 and other household appliances. As a result, the amount of electricity used can be kept within a range where no penalty fee is generated.

<光熱費最適制御処理ルーチン>
上記ステップ108は、図5に示す給湯用光熱費最適制御処理ルーチン、及び図7に示す暖房用光熱費最適制御処理ルーチンにより実現される。なお、光熱費最適制御部76によって、一日の給湯利用計画が予測されているものとする。
<Utilization control routine for utility costs>
Step 108 is realized by the hot water utility cost optimal control processing routine shown in FIG. 5 and the heating utility cost optimal control processing routine shown in FIG. It is assumed that a daily hot water supply utilization plan is predicted by the utility cost optimal control unit 76.

<給湯用光熱費最適制御処理ルーチン>
まず、図5に示す給湯用光熱費最適制御処理ルーチンのステップ140において、1つ目の給湯利用計画に対して、貯湯タンク用ヒートポンプ装置16を用いた給湯と熱源機20を用いた給湯との何れが安いかを比較したか否かを示す給湯1比較完了フラグがオンになっているか否かを判定する。給湯1比較完了フラグがオンになっていない場合には、ステップ142において、1つ目の給湯利用計画に対して、貯湯タンク用ヒートポンプ装置16を用いた給湯と熱源機20を用いた給湯との何れが安いかを比較する。
<Optimization control routine for utility costs for hot water supply>
First, in step 140 of the hot water supply utility cost optimal control processing routine shown in FIG. 5, hot water supply using the hot water storage tank heat pump device 16 and hot water supply using the heat source device 20 for the first hot water supply utilization plan. It is determined whether or not a hot water supply 1 comparison completion flag that indicates which one is cheaper is compared. If the hot water supply 1 comparison completion flag is not turned on, in step 142, hot water supply using the hot water storage tank heat pump device 16 and hot water supply using the heat source device 20 are compared with the first hot water supply use plan. Compare which is cheaper.

一方、給湯1比較完了フラグがオンになっている場合には、ステップ144において、2つ目の給湯利用計画に対して、貯湯タンク用ヒートポンプ装置16を用いた給湯と熱源機20を用いた給湯との何れが安いかを比較したか否かを示す給湯2比較完了フラグがオンになっているか否かを判定する。給湯2比較完了フラグがオンになっていない場合には、ステップ146において、2つ目の給湯利用計画に対して、貯湯タンク用ヒートポンプ装置16を用いた給湯と熱源機20を用いた給湯との何れが安いかを比較する。   On the other hand, when the hot water supply 1 comparison completion flag is on, in step 144, hot water supply using the hot water storage tank heat pump device 16 and hot water supply using the heat source device 20 are used for the second hot water supply utilization plan. It is determined whether or not a hot water supply 2 comparison completion flag indicating whether or not is compared is turned on. If the hot water supply 2 comparison completion flag is not on, in step 146, the hot water supply using the hot water storage tank heat pump device 16 and the hot water supply using the heat source device 20 are compared with the second hot water supply utilization plan. Compare which is cheaper.

そして、3つ目以降の全ての給湯利用計画の各々に対して、貯湯タンク用ヒートポンプ装置16を用いた給湯と熱源機20を用いた給湯との何れが安いかを比較したか否かを示す給湯比較完了フラグがオンになっているか否かを判定し、当該給湯比較完了フラグがオンになっていない場合には、同様に、貯湯タンク用ヒートポンプ装置16を用いた給湯と熱源機20を用いた給湯との何れが安いかを比較する。   Then, for each of the third and subsequent hot water use plans, it is shown whether or not the hot water supply using the hot water storage tank heat pump device 16 and the hot water supply using the heat source unit 20 are cheaper. It is determined whether or not the hot water supply comparison completion flag is turned on, and if the hot water supply comparison completion flag is not turned on, the hot water supply and the heat source device 20 using the hot water storage tank heat pump device 16 are similarly used. Compare which hot water supply was cheaper.

そして、全ての給湯利用計画の各々に対して、給湯比較完了フラグがオンになると、ステップ150において、全ての給湯利用計画の各々に対する給湯比較完了フラグを削除し、ステップ152において、翌日になるまで待機し、上記ステップ100へ戻る。   When the hot water supply comparison completion flag is turned on for each of all the hot water use plans, in step 150, the hot water comparison completion flag for each of all the hot water use plans is deleted, and in step 152, until the next day. Wait and return to step 100 above.

上記ステップ142は、図6に示す給湯1比較処理ルーチンによって実現される。   Step 142 is realized by the hot water supply 1 comparison processing routine shown in FIG.

ステップ160において、現在時刻が、1つ目の給湯利用計画の開始時刻のA時間前以降であるか否かを判定する。現在時刻が、1つ目の給湯利用計画の開始時刻のA時間より前である場合には、上記ステップ100へ戻る。   In step 160, it is determined whether or not the current time is after A time before the start time of the first hot water supply utilization plan. If the current time is before A time of the start time of the first hot water supply utilization plan, the process returns to step 100 above.

現在時刻が、1つ目の給湯利用計画の開始時刻のA時間前以降である場合には、ステップ162において、給湯1比較完了フラグをオンにする。   If the current time is after A time before the start time of the first hot water supply utilization plan, in step 162, the hot water supply 1 comparison completion flag is turned on.

そして、ステップ164において、外部サーバ62から受信した料金表に基づいて、現在時刻における電気料金単価KE,現在と、1つ目の給湯利用計画の給湯利用量に応じた電気使用量EHP,給湯1との積KE,現在・EHP, 給湯1が、1つ目の給湯利用計画の給湯使用時刻のガス料金KG,給湯1と、1つ目の給湯利用計画の給湯利用量に応じたガス使用量G熱源機,給湯1との積KG,給湯1・G熱源機,給湯1より小さいか否かを判定する。積KE,現在・EHP, 給湯1が、積KG,給湯1・G熱源機,給湯1以上である場合には、上記ステップ144へ移行する。 In step 164, based on the rate table received from the external server 62, the electricity unit price KE at the current time, the electricity usage amount E HP corresponding to the current and hot water usage amount of the first hot water usage plan , Product K E with hot water supply 1 , current / E HP, hot water supply 1 is the gas charge KG at the hot water use time of the first hot water use plan, hot water use 1 and hot water use amount of the first hot water use plan depending gas amount G heat source equipment, the product K G with hot water 1 hot water supply 1 · G heat source unit, whether hot water smaller than 1 or not. If the product K E, the current EHP, and the hot water supply 1 are equal to or higher than the product KG , the hot water supply 1 / G heat source machine, and the hot water supply 1, the process proceeds to step 144.

一方、積KE,現在・EHP, 給湯1が、積KG,給湯1・G熱源機,給湯1より小さい場合には、ステップ166において、貯湯タンク用ヒートポンプ装置16を用いた貯湯運転が行われているか否かを判定する。貯湯タンク用ヒートポンプ装置16を用いた貯湯運転が行われていない場合には、ステップ168において、貯湯タンク用ヒートポンプ装置16を作動させて、貯湯運転を行うように制御する。 On the other hand, if the product KE, current EHP, hot water supply 1 is smaller than the product KG , hot water supply 1 / G heat source machine, hot water supply 1 , hot water storage operation using the hot water storage tank heat pump device 16 is performed in step 166. Determine whether it is done. When the hot water storage operation using the hot water storage tank heat pump device 16 is not performed, in step 168, the hot water storage tank heat pump device 16 is operated to control the hot water storage operation.

ステップ170において、貯湯タンク用ヒートポンプ装置16を用いた貯湯運転による電気使用量EHPが、1つ目の給湯利用計画の給湯利用量に応じた電気使用量EHP,給湯1以上であるか否かを判定する。ここで、電気使用量EHP,給湯1と比較する電気使用量EHPは、1つ目の給湯利用計画分の貯湯運転を開始してから積算される電気使用量である。電気使用量EHPが、電気使用量EHP,給湯1未満である場合には、ステップ172において、貯湯温センサ52によって検出された貯湯タンク14の下部の温度が、所定温度X℃より高いか否かを判定する。貯湯タンク14の下部の温度が、所定温度X℃以下である場合には、ステップ170へ戻る。一方、貯湯タンク14の下部の温度が、所定温度X℃より高い場合には、貯湯タンク14が満畜になったと判断し、ステップ174において、貯湯タンク用ヒートポンプ装置16を用いた貯湯運転を停止させる。そして、ステップ176において、B時間待機してから、上記ステップ100へ戻る。 In step 170, whether electricity consumption E HP by hot water storage operation using the hot water storage tank for heat pump device 16 is first electricity consumption E HP corresponding to the hot water usage of hot water usage plans, hot water one or not Determine whether. Here, electricity consumption E HP comparing electricity usage E HP, and hot water supply 1 is an electricity consumption which is integrated from the start of the hot water storage operation of first hot water use plan amount of. If the electricity usage amount E HP is less than the electricity usage amount E HP, the hot water supply 1 , whether or not the temperature of the lower part of the hot water storage tank 14 detected by the hot water storage temperature sensor 52 is higher than the predetermined temperature X ° C. in step 172. Determine whether or not. When the temperature at the lower part of the hot water storage tank 14 is not more than the predetermined temperature X ° C., the process returns to Step 170. On the other hand, if the temperature of the lower part of the hot water storage tank 14 is higher than the predetermined temperature X ° C., it is determined that the hot water storage tank 14 is full, and in step 174, the hot water storage operation using the hot water storage tank heat pump device 16 is stopped. Let In step 176, after waiting for B time, the process returns to step 100.

一方、上記ステップ170において、電気使用量EHPが、電気使用量EHP,給湯1以上である場合には、1つ目の給湯利用計画に必要なお湯が貯湯タンク14に蓄えられたと判断し、上記ステップ144へ移行する。 On the other hand, in the above-mentioned step 170, when the electricity usage amount E HP is equal to or more than the electricity usage amount E HP, hot water supply 1, it is determined that the hot water necessary for the first hot water usage plan has been stored in the hot water storage tank 14. Then, the process proceeds to step 144 above.

全ての給湯利用計画の各々に対して、上記図6に示す給湯1比較処理ルーチンと同様の処理ルーチンが実行される。   A processing routine similar to the hot water supply 1 comparison processing routine shown in FIG. 6 is executed for each of all the hot water usage plans.

上記のように、その日の給湯需要(給湯回数、時間帯、流量等)を予測し、給湯用光熱費最適制御処理ルーチンによって、貯湯タンク用ヒートポンプ装置16を用いた給湯と熱源機20を用いた給湯との何れで賄うか計算する。   As described above, the hot water supply demand (the number of hot water supply, the time zone, the flow rate, etc.) of the day is predicted, and the hot water supply using the hot water storage tank heat pump device 16 and the heat source unit 20 are used by the hot water utility cost optimal control processing routine. Calculate whether to supply hot water or not.

どちらが安いか比較計算する際、電気は現在時刻の電気料金単価を用い、ガスは給湯需要がある時刻のガス料金単価を用いる。   When comparing and calculating which is cheaper, electricity uses the unit price of electricity at the current time, and gas uses the unit price of gas at the time when there is a demand for hot water supply.

なお、給湯需要があった場合には、貯湯タンクのお湯を優先的に使い、足りない分を熱源機20で補うようにする。また、「現在時刻と給湯使用時刻の差」「タンク温度と外気温度との差」「タンク放熱率」等から計算されるタンク放熱量を加味した電気使用量EHP,給湯1を用いても構わない。 When there is a demand for hot water supply, the hot water in the hot water storage tank is preferentially used, and the heat source device 20 compensates for the shortage. In addition, the electric consumption E HP and the hot water supply 1 taking into account the amount of heat released from the tank calculated from “difference between current time and hot water use time”, “difference between tank temperature and outside air temperature”, “tank heat release rate”, etc. I do not care.

<暖房用光熱費最適制御処理ルーチン>
また、図7に示す暖房用光熱費最適制御処理ルーチンのステップ180において、使用者の操作により操作パネル50における暖房運転スイッチがオンされているか否かを判定する。暖房運転スイッチがオンされていない場合には、上記ステップ100へ戻る。
<Optimization control processing routine for utility cost for heating>
Further, in step 180 of the heating utility optimization control processing routine shown in FIG. 7, it is determined whether or not the heating operation switch in the operation panel 50 is turned on by the user's operation. If the heating operation switch is not turned on, the process returns to step 100.

一方、暖房運転スイッチがオンされている場合には、外部サーバ62から受信した料金表に基づいて、現在時刻における電気料金単価KE,現在と、予め定められたエアコン暖房運転に応じた電気使用量EHP,エアコン暖房との積KE,現在・EHP,エアコン暖房が、現在時刻のガス料金KG,現在と、予め定められた床暖房運転に応じたガス使用量G熱源機,暖房との積KG,現在・G熱源機,暖房より小さいか否かを判定する。積KE,現在・EHP,エアコン暖房が、積KG,現在・G熱源機,暖房以上である場合には、ステップ184へ移行し、一方、積KE,現在・EHP,エアコン暖房が、積KG,現在・G熱源機,暖房未満である場合には、ステップ188へ移行する。 On the other hand, when the heating operation switch is turned on, based on the charge table received from the external server 62, the electricity charge unit price KE at the current time , the current and the electricity usage according to the predetermined air conditioner heating operation the amount E HP, product K E of the air-conditioning heating current · E HP, air conditioning heating, gas rates K G of the current time, current and gas consumption G heat source machine according to the floor heating operation predetermined Heating It is judged whether it is smaller than the product KG , the current G heat source machine, and heating . If the product KE, current / E HP, air conditioning heating is more than product KG , current / G heat source, heating , the process proceeds to step 184, while product KE, current / E HP, air conditioning heating. However, if the product is less than the product KG , the current / G heat source machine, and heating , the process proceeds to step 188.

ステップ184では、熱源機20を用いた床暖房運転を行うように制御する。そして、ステップ186において、使用者の操作により操作パネル50における暖房運転スイッチがオフされたか否かを判定する。暖房運転スイッチがオフされると、上記ステップ100へ戻る。   In step 184, control is performed to perform floor heating operation using the heat source device 20. In step 186, it is determined whether or not the heating operation switch on the operation panel 50 is turned off by the user's operation. When the heating operation switch is turned off, the process returns to step 100.

ステップ188では、エアコン用ヒートポンプ装置12を用いた暖房運転を行うように制御する。そして、ステップ190において、使用者の操作により操作パネル50における暖房運転スイッチがオフされたか否かを判定する。暖房運転スイッチがオフされると、上記ステップ100へ戻る。   In step 188, control is performed to perform heating operation using the heat pump device 12 for an air conditioner. In step 190, it is determined whether or not the heating operation switch on the operation panel 50 is turned off by the user's operation. When the heating operation switch is turned off, the process returns to step 100.

このように、暖房用光熱費最適制御処理ルーチンにおいて、暖房に必要な電気使用量をEHP,エアコン暖房とし、ガス使用量をG熱源機,暖房として、暖房使用時の単価を使って、暖房に必要な光熱費を計算比較する。 In this way, in the heating and power cost optimal control processing routine, the amount of electricity used for heating is E HP, air conditioning heating , the amount of gas used is G heat source machine, and heating is performed using the unit price at the time of heating use. Calculate and compare the utility costs required for the project.

なお、上記の暖房用光熱費最適制御処理ルーチンでは、熱源機20を用いた床暖房運転の光熱費と、エアコン用ヒートポンプ装置12を用いた暖房運転の光熱費とを比較する場合を例に説明したが、これに限定されるものではなく、熱源機20を用いた床暖房運転の光熱費と、貯湯タンク用ヒートポンプ装置16を用いた床暖房運転の光熱費とを比較するようにしてもよい。   In the above-described heating utility optimal control processing routine for heating, the case where the utility cost of the floor heating operation using the heat source unit 20 is compared with the utility cost of the heating operation using the heat pump device 12 for an air conditioner will be described as an example. However, the present invention is not limited to this, and the utility cost of the floor heating operation using the heat source device 20 may be compared with the utility cost of the floor heating operation using the hot water storage tank heat pump device 16. .

<一次エネルギー最適制御処理ルーチン>
上記ステップ112は、図8に示す給湯用一次エネルギー最適制御処理ルーチン、及び図10に示す暖房用一次エネルギー最適制御処理ルーチンにより実現される。なお、一次エネルギー最適制御部78によって、一日の給湯利用計画が予測されているものとする。
<Primary energy optimal control processing routine>
Step 112 is realized by the hot water primary energy optimum control processing routine shown in FIG. 8 and the heating primary energy optimum control processing routine shown in FIG. 10. It is assumed that a daily hot water usage plan is predicted by the primary energy optimal control unit 78.

<給湯用一次エネルギー最適制御処理ルーチン>
まず、図8に示す給湯用一次エネルギー最適制御処理ルーチンのステップ200において、1つ目の給湯利用計画に対して、貯湯タンク用ヒートポンプ装置16を用いた給湯と熱源機20を用いた給湯との何れが少ない一次エネルギー消費量となるかを比較したか否かを示す給湯1比較完了フラグがオンになっているか否かを判定する。給湯1比較完了フラグがオンになっていない場合には、ステップ202において、1つ目の給湯利用計画に対して、貯湯タンク用ヒートポンプ装置16を用いた給湯と熱源機20を用いた給湯との何れが少ない一次エネルギー消費量となるかを比較する。
<Primary energy optimal control processing routine for hot water supply>
First, in step 200 of the hot water supply primary energy optimum control processing routine shown in FIG. 8, hot water supply using the hot water storage tank heat pump device 16 and hot water supply using the heat source device 20 for the first hot water supply use plan. It is determined whether or not a hot water supply 1 comparison completion flag indicating whether or not a comparison is made with which amount of primary energy consumption is small is on. If the hot water supply 1 comparison completion flag is not on, in step 202, hot water supply using the hot water storage tank heat pump device 16 and hot water supply using the heat source unit 20 are compared with the first hot water supply use plan. Compare which is the lower primary energy consumption.

一方、給湯1比較完了フラグがオンになっている場合には、ステップ204において、2つ目の給湯利用計画に対して、貯湯タンク用ヒートポンプ装置16を用いた給湯と熱源機20を用いた給湯との何れが少ない一次エネルギー消費量となるかを比較したか否かを示す給湯2比較完了フラグがオンになっているか否かを判定する。給湯2比較完了フラグがオンになっていない場合には、ステップ206において、2つ目の給湯利用計画に対して、貯湯タンク用ヒートポンプ装置16を用いた給湯と熱源機20を用いた給湯との何れが少ない一次エネルギー消費量となるかを比較する。   On the other hand, if the hot water supply 1 comparison completion flag is turned on, in step 204, hot water supply using the hot water storage tank heat pump device 16 and hot water supply using the heat source device 20 for the second hot water supply utilization plan. It is determined whether or not a hot water supply 2 comparison completion flag indicating whether or not which is a smaller primary energy consumption amount is compared. If the hot water supply 2 comparison completion flag is not turned on, in step 206, the hot water supply using the hot water storage tank heat pump device 16 and the hot water supply using the heat source unit 20 are compared with the second hot water supply utilization plan. Compare which is the lower primary energy consumption.

そして、3つ目以降の全ての給湯利用計画の各々に対して、貯湯タンク用ヒートポンプ装置16を用いた給湯と熱源機20を用いた給湯との何れが少ない一次エネルギー消費量となるかを比較したか否かを示す給湯比較完了フラグがオンになっているか否かを判定し、当該給湯比較完了フラグがオンになっていない場合には、同様に、貯湯タンク用ヒートポンプ装置16を用いた給湯と熱源機20を用いた給湯との何れが少ない一次エネルギー消費量となるかを比較する。   Then, for each of the third and subsequent hot water supply usage plans, a comparison is made as to which of the hot water supply using the hot water storage tank heat pump device 16 and the hot water supply using the heat source device 20 is the lower primary energy consumption. It is determined whether or not a hot water supply comparison completion flag indicating whether or not the hot water supply comparison completion flag is turned on. If the hot water supply comparison completion flag is not turned on, similarly, hot water supply using the heat pump device 16 for hot water storage tanks is performed. And hot water supply using the heat source device 20 are compared with each other to reduce the primary energy consumption.

そして、全ての給湯利用計画の各々に対して、給湯比較完了フラグがオンになると、ステップ210において、全ての給湯利用計画の各々に対する給湯比較完了フラグを削除し、ステップ212において、翌日になるまで待機し、上記ステップ100へ戻る。   When the hot water supply comparison completion flag is turned on for each of all the hot water use plans, in step 210, the hot water comparison completion flag for each of all the hot water use plans is deleted, and in step 212, until the next day. Wait and return to step 100 above.

上記ステップ202は、図9に示す給湯1比較処理ルーチンによって実現される。   Step 202 is realized by the hot water supply 1 comparison processing routine shown in FIG.

ステップ220において、現在時刻が、1つ目の給湯利用計画の開始時刻のA時間前以降であるか否かを判定する。現在時刻が、1つ目の給湯利用計画の開始時刻のA時間前より前である場合には、上記ステップ100へ戻る。   In step 220, it is determined whether or not the current time is after A time before the start time of the first hot water supply utilization plan. If the current time is before A time before the start time of the first hot water supply utilization plan, the process returns to step 100 above.

現在時刻が、1つ目の給湯利用計画の開始時刻のA時間前以降である場合には、ステップ222において、給湯2比較完了フラグをオンにする。   If the current time is after A time before the start time of the first hot water supply utilization plan, the hot water supply 2 comparison completion flag is turned on in step 222.

そして、ステップ224において、1つ目の給湯利用計画の給湯利用量に応じた電気使用量EHP,給湯1に基づく一次エネルギー消費量(=((1/η)EHP,給湯1))が、1つ目の給湯利用計画の給湯利用量に応じたガス使用量G熱源機,給湯1に基づく一次エネルギー消費量(=G熱源機,給湯1)より小さいか否かを判定する。電気使用量EHP,給湯1に基づく一次エネルギー消費量が、ガス使用量G熱源機,給湯1に基づく一次エネルギー消費量以上である場合には、上記ステップ204へ移行する。 In step 224, the amount of electricity used EHP corresponding to the amount of hot water used in the first hot water usage plan, and the amount of primary energy consumed based on hot water 1 (= ((1 / η) E HP, hot water 1 )). It is determined whether or not the gas consumption amount G heat source machine corresponding to the hot water supply usage amount of the first hot water supply use plan is smaller than the primary energy consumption based on the hot water supply 1 (= G heat source machine, hot water supply 1 ). When the primary energy consumption based on the electric consumption E HP and the hot water supply 1 is equal to or greater than the primary energy consumption based on the gas usage G heat source machine and the hot water supply 1 , the process proceeds to step 204.

一方、電気使用量EHP,給湯1に基づく一次エネルギー消費量が、ガス使用量G熱源機,給湯1に基づく一次エネルギー消費量より小さい場合には、ステップ226において、貯湯タンク用ヒートポンプ装置16を用いた貯湯運転が行われているか否かを判定する。貯湯タンク用ヒートポンプ装置16を用いた貯湯運転が行われていない場合には、ステップ228において、貯湯タンク用ヒートポンプ装置16を作動させて、貯湯運転を行うように制御する。 On the other hand, if the primary energy consumption based on the electricity consumption E HP and the hot water supply 1 is smaller than the primary energy consumption based on the gas usage G heat source machine and the hot water supply 1 , the heat pump device 16 for the hot water storage tank is turned on in step 226. It is determined whether or not the used hot water storage operation is being performed. When the hot water storage operation using the hot water storage tank heat pump device 16 is not performed, in step 228, the hot water storage tank heat pump device 16 is operated to control the hot water storage operation.

ステップ230において、貯湯タンク用ヒートポンプ装置16を用いた貯湯運転による電気使用量EHPが、1つ目の給湯利用計画の給湯利用量に応じた電気使用量EHP,給湯1以上であるか否かを判定する。電気使用量EHPが、電気使用量EHP,給湯1未満である場合には、ステップ232において、貯湯温センサ52によって検出された貯湯タンク14の下部の温度が、所定温度X℃より高いか否かを判定する。貯湯タンク14の下部の温度が、所定温度X℃以下である場合には、ステップ230へ戻る。一方、貯湯タンク14の下部の温度が、所定温度X℃より高い場合には、貯湯タンク14が満畜になったと判断し、ステップ234において、貯湯タンク用ヒートポンプ装置16を用いた貯湯運転を停止させる。そして、ステップ236において、B時間待機してから、上記ステップ100へ戻る。 In Step 230, whether or not the electricity usage E HP by the hot water storage operation using the hot water storage tank heat pump device 16 is equal to or more than the electricity usage E HP corresponding to the hot water usage in the first hot water usage plan , 1 or more. Determine whether. If the electricity usage amount E HP is less than the electricity usage amount E HP, hot water supply 1 , whether or not the temperature of the lower part of the hot water storage tank 14 detected by the hot water storage temperature sensor 52 is higher than a predetermined temperature X ° C. in step 232. Determine whether or not. When the temperature at the lower part of the hot water storage tank 14 is equal to or lower than the predetermined temperature X ° C., the process returns to step 230. On the other hand, if the temperature in the lower part of the hot water storage tank 14 is higher than the predetermined temperature X ° C., it is determined that the hot water storage tank 14 is full, and in step 234, the hot water storage operation using the hot water storage tank heat pump device 16 is stopped. Let In step 236, after waiting for B time, the process returns to step 100.

一方、上記ステップ230において、電気使用量EHPが、電気使用量EHP,給湯1以上である場合には、ステップ204へ移行する。 On the other hand, in step 230, electricity usage E HP is, electricity consumption E HP, the case where the hot water supply 1 or more, the process proceeds to step 204.

全ての給湯利用計画の各々に対して、上記図9に示す給湯1比較処理ルーチンと同様の処理ルーチンが実行される。   A processing routine similar to the hot water supply 1 comparison processing routine shown in FIG. 9 is executed for each of all the hot water usage plans.

上記のように、その日の給湯需要(給湯回数、時間帯、流量等)を予測し、給湯用一次エネルギー量最適制御処理ルーチンによって、貯湯タンク用ヒートポンプ装置16を用いた給湯と熱源機20を用いた給湯との何れで賄うか計算する。   As described above, the hot water supply demand (the number of hot water supply, the time zone, the flow rate, etc.) of the day is predicted, and the hot water supply using the heat pump device 16 for the hot water storage tank and the heat source unit 20 are used by the hot water primary energy optimal control processing routine. Calculate whether the hot water supply was covered.

なお、給湯需要があった場合には、貯湯タンクのお湯を優先的に使い、足りない分を熱源機20で補うようにする。また、「現在時刻と給湯使用時刻の差」「タンク温度と外気温度との差」「タンク放熱率」等から計算されるタンク放熱量を加味した一次エネルギー消費量を用いても構わない。   When there is a demand for hot water supply, the hot water in the hot water storage tank is preferentially used, and the heat source device 20 compensates for the shortage. In addition, primary energy consumption may be used in consideration of the amount of heat released from the tank calculated from “difference between current time and hot water supply use time”, “difference between tank temperature and outside air temperature”, “tank heat release rate”, and the like.

<暖房用一次エネルギー消費量最適制御処理ルーチン>
また、図10に示す暖房用一次エネルギー消費量最適制御処理ルーチンのステップ240において、使用者の操作により操作パネル50における暖房運転スイッチがオンされているか否かを判定する。暖房運転スイッチがオンされていない場合には、上記ステップ100へ戻る。
<Primary energy consumption optimal control processing routine for heating>
Further, in step 240 of the heating primary energy consumption optimum control processing routine shown in FIG. 10, it is determined whether or not the heating operation switch in the operation panel 50 is turned on by the user's operation. If the heating operation switch is not turned on, the process returns to step 100.

一方、暖房運転スイッチがオンされている場合には、ステップ242において、現在時刻における電気料金単価KE,現在と、予め定められたエアコン暖房運転に応じた電気使用量EHP,エアコン暖房に基づく一次エネルギー消費量(=((1/η)EHP,給湯1))が、予め定められた床暖房運転に応じたガス使用量G熱源機,暖房に基づく一次エネルギー消費量(=G熱源機,暖房)より小さいか否かを判定する。電気使用量EHP,エアコン暖房に基づく一次エネルギー消費量が、ガス使用量G熱源機,暖房に基づく一次エネルギー消費量以上である場合には、ステップ244へ移行し、一方、電気使用量EHP,エアコン暖房に基づく一次エネルギー消費量が、ガス使用量G熱源機,暖房に基づく一次エネルギー消費量未満である場合には、ステップ248へ移行する。 On the other hand, when the heating operation switch is turned on, in step 242, based on the electricity unit price K E at the current time , the current and the electricity usage E HP corresponding to the predetermined air-conditioner heating operation, and air-conditioner heating . Primary energy consumption (= ((1 / η) E HP, hot water supply 1 )) is a gas usage amount G heat source machine corresponding to a predetermined floor heating operation, primary energy consumption amount based on heating (= G heat source machine) , Heating ) or less. If the primary energy consumption based on the amount of electricity used E HP and air conditioning heating is greater than the amount of primary energy consumed based on the amount of gas used G heat source and heating , the process proceeds to step 244, while the amount of electricity used E HP If the primary energy consumption based on the air conditioning heating is less than the primary energy consumption based on the gas consumption G heat source machine and heating , the process proceeds to step 248.

ステップ244では、熱源機20を用いた床暖房運転を行うように制御する。そして、ステップ246において、使用者の操作により操作パネル50における暖房運転スイッチがオフされたか否かを判定する。暖房運転スイッチがオフされると、上記ステップ100へ戻る。   In step 244, control is performed so that the floor heating operation using the heat source device 20 is performed. In step 246, it is determined whether or not the heating operation switch in the operation panel 50 is turned off by the user's operation. When the heating operation switch is turned off, the process returns to step 100.

ステップ248では、エアコン用ヒートポンプ装置12を用いた暖房運転を行うように制御する。そして、ステップ250において、使用者の操作により操作パネル50における暖房運転スイッチがオフされたか否かを判定する。暖房運転スイッチがオフされると、上記ステップ100へ戻る。   In step 248, control is performed to perform a heating operation using the heat pump device 12 for an air conditioner. In step 250, it is determined whether or not the heating operation switch on the operation panel 50 is turned off by the user's operation. When the heating operation switch is turned off, the process returns to step 100.

このように、暖房用一次エネルギー量最適制御処理ルーチンにおいて、暖房に必要な電気使用量をEHP,エアコン暖房とし、ガス使用量をG熱源機,暖房として、暖房使用時に、暖房に必要な一次エネルギー消費量を計算比較する。 In this way, in the heating primary energy optimal control processing routine, the electricity usage required for heating is E HP, air conditioning heating , the gas usage is G heat source machine, heating , the primary required for heating when heating is used Calculate and compare energy consumption.

なお、上記の一次エネルギー消費量最適制御処理ルーチンでは、熱源機20を用いた床暖房運転の一次エネルギー消費量と、エアコン用ヒートポンプ装置12を用いた暖房運転の一次エネルギー消費量とを比較する場合を例に説明したが、これに限定されるものではなく、熱源機20を用いた床暖房運転の一次エネルギー消費量と、貯湯タンク用ヒートポンプ装置16を用いた床暖房運転の一次エネルギー消費量とを比較するようにしてもよい。   In the above primary energy consumption optimal control processing routine, the primary energy consumption of the floor heating operation using the heat source device 20 is compared with the primary energy consumption of the heating operation using the heat pump device 12 for an air conditioner. However, the present invention is not limited to this, and the primary energy consumption of the floor heating operation using the heat source device 20 and the primary energy consumption of the floor heating operation using the heat pump device 16 for hot water storage tanks are not limited thereto. May be compared.

<快適制御処理ルーチン>
上記ステップ114は、図11に示す給湯用快適制御処理ルーチン、及び図12に示す暖房用快適制御処理ルーチンにより実現される。
<Comfort control processing routine>
Step 114 is realized by a hot water comfort control process routine shown in FIG. 11 and a heating comfort control process routine shown in FIG.

<給湯用快適制御処理ルーチン>
図11に示す給湯用快適制御処理ルーチンのステップ250では、貯湯温センサ52によって検出された貯湯タンク14の下部の温度が、所定温度X℃より高いか否かを判定する。貯湯タンク14の下部の温度が、所定温度X℃以下である場合には、ステップ252へ移行する。一方、貯湯タンク14の下部の温度が、所定温度X℃より高い場合には、貯湯タンク14が満畜になったと判断し、上記ステップ100へ戻る。
<Comfort control processing routine for hot water supply>
In step 250 of the hot water comfort control process routine shown in FIG. 11, it is determined whether or not the temperature of the lower part of the hot water storage tank 14 detected by the hot water storage temperature sensor 52 is higher than a predetermined temperature X ° C. When the temperature at the lower part of the hot water storage tank 14 is equal to or lower than the predetermined temperature X ° C., the routine proceeds to step 252. On the other hand, when the temperature of the lower part of the hot water storage tank 14 is higher than the predetermined temperature X ° C., it is determined that the hot water storage tank 14 is full, and the process returns to step 100.

ステップ252では、貯湯タンク用ヒートポンプ装置16を用いた貯湯運転を行っているか否かを判定する。貯湯タンク用ヒートポンプ装置16を用いた貯湯運転を行っている場合には、上記ステップ250へ戻る。一方、貯湯タンク用ヒートポンプ装置16を用いた貯湯運転を行っていない場合には、ステップ254において、貯湯タンク用ヒートポンプ装置16を用いた貯湯運転を行うように制御して、上記ステップ250へ戻る。   In step 252, it is determined whether or not a hot water storage operation using the hot water tank heat pump device 16 is performed. When the hot water storage operation using the hot water storage tank heat pump device 16 is performed, the process returns to step 250. On the other hand, when the hot water storage operation using the hot water storage tank heat pump device 16 is not performed, in step 254, the hot water storage operation using the hot water storage tank heat pump device 16 is controlled to return to step 250.

上記の給湯用快適制御処理ルーチンにより、夏場等、少量のお湯を使いたい場合にもいつでも使用できるように、常に貯湯タンク14を満畜にしておく。   By the above-described comfort control processing routine for hot water supply, the hot water storage tank 14 is always filled so that it can be used anytime even when a small amount of hot water is desired in summer.

<暖房用快適制御処理ルーチン>
図12に示す暖房用快適制御処理ルーチンのステップ260では、使用者の操作により操作パネル50における暖房運転スイッチがオンされているか否かを判定する。暖房運転スイッチがオンされていない場合には、上記ステップ100へ戻る。
<Comfortable control processing routine for heating>
In step 260 of the comfort control processing routine for heating shown in FIG. 12, it is determined whether or not the heating operation switch in the operation panel 50 is turned on by the user's operation. If the heating operation switch is not turned on, the process returns to step 100.

一方、暖房運転スイッチがオンされている場合には、ステップ262において、外気温センサ54によって検出された外気温が、所定温度(−Y℃)より高いか否かを判定する。外気温が、−Y℃以下である場合には、ステップ264において、熱源機20を用いた床暖房運転を行うように制御する。そして、ステップ266において、使用者の操作により操作パネル50における暖房運転スイッチがオフされたか否かを判定する。暖房運転スイッチがオフされると、上記ステップ100へ戻る。   On the other hand, if the heating operation switch is on, it is determined in step 262 whether or not the outside air temperature detected by the outside air temperature sensor 54 is higher than a predetermined temperature (−Y ° C.). When the outside air temperature is −Y ° C. or lower, in step 264, control is performed to perform floor heating operation using the heat source device 20. In step 266, it is determined whether or not the heating operation switch in the operation panel 50 is turned off by the user's operation. When the heating operation switch is turned off, the process returns to step 100.

一方、上記ステップ262において、外気温が、−Y℃より高い場合には、ステップ268では、エアコン用ヒートポンプ装置12を用いた暖房運転を行うように制御すると共に、熱源機20を用いた床暖房運転を行うように制御する。そして、ステップ270において、室温センサ56によって検出された室温が、所定温度Z℃より高いか否かを判定する。室温が、所定温度Z℃以下である場合には、ステップ278において、使用者の操作により操作パネル50における暖房運転スイッチがオフされたか否かを判定する。暖房運転スイッチがオフされると、上記ステップ100へ戻る。一方、暖房運転スイッチがオフされていない場合には、上記ステップ270へ戻る。   On the other hand, when the outside air temperature is higher than −Y ° C. in step 262, in step 268, control is performed so that the heating operation using the heat pump device 12 for air conditioner is performed, and floor heating using the heat source device 20 is performed. Control to drive. In step 270, it is determined whether the room temperature detected by the room temperature sensor 56 is higher than a predetermined temperature Z ° C. If the room temperature is equal to or lower than the predetermined temperature Z ° C., it is determined in step 278 whether or not the heating operation switch on the operation panel 50 has been turned off by the user's operation. When the heating operation switch is turned off, the process returns to step 100. On the other hand, if the heating operation switch is not turned off, the process returns to step 270.

一方、上記ステップ270において、室温が、所定温度Z℃より高い場合には、ステップ272において、エアコン用ヒートポンプ装置12を用いた暖房運転を停止するように制御する。   On the other hand, if the room temperature is higher than the predetermined temperature Z ° C. in step 270, the heating operation using the air conditioner heat pump device 12 is controlled to be stopped in step 272.

そして、ステップ274において、ドア開閉センサ58によってドアの開閉が検知されたか、又は室温が、所定温度Z℃以下となったかを判定する。ドア開閉センサ58によってドアの開閉が検知された場合、又は室温が、所定温度Z℃以下となった場合には、ステップ276において、エアコン用ヒートポンプ装置12を用いた暖房運転を行うように制御し、上記ステップ270へ戻る。一方、ドア開閉センサ58によってドアの開閉が検知されておらず、かつ、室温が、所定温度Z℃より高い場合には、ステップ280において、使用者の操作により操作パネル50における暖房運転スイッチがオフされたか否かを判定する。暖房運転スイッチがオフされると、上記ステップ100へ戻る。一方、暖房運転スイッチがオフされていない場合には、上記ステップ274へ戻る。   In step 274, it is determined whether door opening / closing is detected by the door opening / closing sensor 58 or whether the room temperature is equal to or lower than a predetermined temperature Z ° C. When opening / closing of the door is detected by the door opening / closing sensor 58, or when the room temperature becomes equal to or lower than the predetermined temperature Z ° C., in step 276, control is performed to perform the heating operation using the heat pump device 12 for an air conditioner. Return to step 270. On the other hand, if door opening / closing is not detected by the door opening / closing sensor 58 and the room temperature is higher than the predetermined temperature Z ° C., the heating operation switch on the operation panel 50 is turned off by the user's operation in step 280. It is determined whether or not it has been done. When the heating operation switch is turned off, the process returns to step 100. On the other hand, if the heating operation switch is not turned off, the process returns to step 274.

上記の暖房用快適制御処理ルーチンにより、霜が降りているかの判定を行ってから、暖房運転を開始する。   The heating operation is started after determining whether the frost has fallen by the heating comfort control processing routine.

<動作例>
次に、本発明の実施形態に係る給湯暖房システムS1の具体的な動作の一例について説明する。
<Operation example>
Next, an example of a specific operation of the hot water supply / heating system S1 according to the embodiment of the present invention will be described.

図13には、本発明の実施形態に係る給湯暖房システムS1が適用される家庭における一日の給湯・暖房・その他家電の使用例が示されている。   FIG. 13 shows an example of daily hot water supply / heating / other household appliance use in a home to which the hot water supply / heating system S1 according to the embodiment of the present invention is applied.

図13の例では、給湯需要は一日に3回であり、1回目の給湯需要は、7:30に開始し、2回目の給湯需要は、19:30に開始し、3回目の給湯需要は、22:30に開始する。暖房需要は一日に1回であり、18:00から21:00までである。その他家電は一日中αkW利用する。   In the example of FIG. 13, the hot water supply demand is three times a day, the first hot water supply demand starts at 7:30, the second hot water supply demand starts at 19:30, and the third hot water supply demand. Starts at 22:30. Heating demand is once a day, from 18:00 to 21:00. Other household appliances use αkW throughout the day.

また、図14には、外部サーバ62から受信する情報の一例が示されている。   FIG. 14 shows an example of information received from the external server 62.

図14の例では、ピークカット要望が発生する時間は18:00から21:00までであり、その際のペナルティ料金が発生しない電力の上限値はαkWである。   In the example of FIG. 14, the time when the peak cut request occurs is from 18:00 to 21:00, and the upper limit value of power at which no penalty fee is generated is α kW.

また、電気料金単価が0時〜21時の間は安く、21時〜24時の間は高いプランであり、ガス料金単価は一日中一定である。   Also, the electricity bill unit price is cheap between 0:00 and 21:00, and the plan is high between 21:00 and 24:00, and the gas bill unit price is constant throughout the day.

次に、異なる設定例に対する、各需要を電気・ガスで賄うかの比較判定結果について説明する(図15参照)。   Next, the comparison determination result of whether each demand is covered with electricity and gas for different setting examples will be described (see FIG. 15).

ここでは、3回の給湯と1回の暖房需要に関して、電気のヒートポンプ装置で賄うかガス熱源機で賄うかを比較判定した。   Here, with respect to three times of hot water supply and one time of heating demand, whether to cover with an electric heat pump device or a gas heat source machine was compared.

また、給湯については、A時間前(1.5時間前)に比較判定し、電気に決定した場合は予め貯湯タンク用ヒートポンプ装置16を作動して貯湯タンク14にお湯を貯めておき、給湯需要が発生した際に、貯湯タンク14のお湯を使用する。   Further, for hot water supply, a comparison is made before A time (1.5 hours before), and when it is determined to be electricity, the hot water storage tank heat pump device 16 is operated in advance to store hot water in the hot water storage tank 14, and the hot water supply demand When this occurs, hot water in the hot water storage tank 14 is used.

暖房については、暖房需要が発生した際に電気のヒートポンプ装置で賄うかガス熱源機のどちらで需要を賄うか比較判定した。   About heating, when heating demand generate | occur | produced, it was compared and judged whether it supplied with an electric heat pump apparatus or a gas heat source machine.

<設定例1>
設定例1として、ピークカット制御を優先せずに、光熱費最適制御方式が選択されている場合における、各需要に対する比較判定結果について説明する。
<Setting example 1>
As setting example 1, a comparative determination result for each demand in the case where the utility cost optimal control method is selected without giving priority to peak cut control will be described.

1回目、2回目の給湯、暖房に関しては電力料金が安い時間帯に需要があるため、貯湯タンク用ヒートポンプ装置及びエアコン用ヒートポンプ装置を作動させて、電気で賄い、3回目の給湯に関しては電力料金が高い時間帯に需要があるため、ガスで賄うことになる。   For the first and second hot water supply and heating, there is demand in the time zone where the electricity charge is cheap. Therefore, the heat pump for the hot water storage tank and the heat pump for the air conditioner are operated to cover the electricity and the electricity charge for the third hot water supply. However, since there is demand during high hours, it will be covered with gas.

<設定例2>
設定例2として、ピークカット制御を優先し、かつ、光熱費最適制御方式が選択されている場合における、各需要に対する比較判定結果について説明する。
<Setting example 2>
As setting example 2, a description will be given of a comparison determination result for each demand when the peak cut control is prioritized and the utility cost optimal control method is selected.

基本的には設定例1と同様に貯湯タンク用ヒートポンプ装置を作動させて電気で賄うが、ピークカット要望が発生する18:00から21:00までの間に需要がある2回目の給湯と暖房については、ペナルティ電力を越えないように、熱源機20を作動させて、ガスで賄うことになる。   Basically, as in setting example 1, the hot water storage tank heat pump device is operated and covered by electricity, but the second hot water supply and heating are in demand from 18:00 to 21:00 when the peak cut request occurs. Is covered by gas by operating the heat source unit 20 so as not to exceed the penalty power.

<設定例3>
設定例3として、ピークカット制御を優先せず、かつ、一次エネルギー最適制御方式が選択されている場合における、各需要に対する比較判定結果について説明する。
<Setting example 3>
As setting example 3, the comparison determination result for each demand in the case where the peak cut control is not prioritized and the primary energy optimal control method is selected will be described.

全ての給湯、暖房需要において、一次エネルギー効率が高い、貯湯タンク用ヒートポンプ装置及びエアコン用ヒートポンプ装置を作動させて、電気で賄うことになる。   In all hot water supply and heating demands, heat pumps for hot water storage tanks and heat pumps for air conditioners, which have high primary energy efficiency, are operated and supplied by electricity.

以上詳述したように、本発明の実施形態によれば、ピークカット制御方式、光熱費最適制御方式、一次エネルギー最適制御方式、及び快適制御方式のうち、使用者により選択された制御方式に従って、熱源機、エアコン用ヒートポンプ装置、及び貯湯タンク用ヒートポンプ装置を制御する。このように、使用者が給湯・暖房運転を行う際に、自分でピークカット・光熱費・一次エネルギー・快適性のどの指標を優先させるか選んで運転させることができ、使用者のニーズに合わせた給湯・暖房運転を行うことができる。   As described in detail above, according to the embodiment of the present invention, among the peak cut control method, the utility cost optimal control method, the primary energy optimal control method, and the comfort control method, according to the control method selected by the user, It controls a heat source device, a heat pump device for an air conditioner, and a heat pump device for a hot water storage tank. In this way, when a user performs hot water supply or heating operation, he can choose which index to give priority to, such as peak cut, utility cost, primary energy, and comfort, and operate it according to the needs of the user. Hot water and heating can be performed.

更に、ヒートポンプ装置と熱源機どちらが故障した際にも、自動で運転を切り替えるため、安心して給湯・暖房利用ができる。   Furthermore, even if either the heat pump device or the heat source machine fails, the operation is automatically switched, so that hot water supply / heating can be used with peace of mind.

また、電気式ヒートポンプとガス熱源機を組み合わせた給湯暖房システムについて、給湯及び暖房は熱源機からでもヒートポンプ装置からでも可能であること、HEMSで熱源機、ヒートポンプ装置、エアコン、及びその他家電の運転を制御可能であることを活かして、使用者のニーズに合わせた給湯・暖房運転制御を可能にすることができる。   In addition, for hot water supply and heating systems that combine electric heat pumps and gas heat source units, hot water supply and heating can be performed from either a heat source unit or a heat pump unit, and HEMS can operate heat source units, heat pump units, air conditioners, and other home appliances Taking advantage of the controllability, it is possible to control hot water supply / heating operation according to the user's needs.

<変形例>
次に、本発明の実施形態の変形例について説明する。
<Modification>
Next, a modification of the embodiment of the present invention will be described.

ピークカット制御方式において、契約電力の上限値を超えないように制御してもよい。この場合には、ピークカット制御方式を優先するか否かを選択せずに、光熱費最適制御方式、一次エネルギー最適制御方式、及び快適制御方式のうちの何れか選択された制御方式に従った制御と並行して、ピークカット制御方式に従った制御を行えばよい。   In the peak cut control method, control may be performed so as not to exceed the upper limit value of the contract power. In this case, without selecting whether or not to prioritize the peak cut control method, the control method according to any one of the utility cost optimal control method, the primary energy optimal control method, and the comfort control method was followed. In parallel with the control, control according to the peak cut control method may be performed.

また、本発明の実施形態において、ピークカット制御方式、光熱費最適制御方式、一次エネルギー最適制御方式、及び快適制御方式のうちの3つ制御方式、又は2つの制御方式から、使用者が選択するようにしてもよい。   In the embodiment of the present invention, the user selects from three control methods among the peak cut control method, the utility cost optimal control method, the primary energy optimal control method, and the comfort control method, or two control methods. You may do it.

また、本発明の実施形態において、エアコン用ヒートポンプ装置12と貯湯タンク用ヒートポンプ装置16とを、1つのヒートポンプ装置として構成してもよい。   In the embodiment of the present invention, the air pump heat pump device 12 and the hot water tank heat pump device 16 may be configured as one heat pump device.

以上、本発明の実施形態について説明したが、本発明は、上記に限定されるものでなく、上記以外にも、その主旨を逸脱しない範囲内において種々変形して実施可能であることは勿論である。   Although the embodiment of the present invention has been described above, the present invention is not limited to the above, and it is needless to say that the present invention can be variously modified and implemented without departing from the spirit of the present invention. is there.

S1…給湯暖房システム、10…エアコン、12…エアコン用ヒートポンプ装置、14…貯湯タンク、16…貯湯タンク用ヒートポンプ装置、18…床暖房装置、20…熱源機、48…制御ユニット、50…操作パネル、52…貯湯温センサ、54…外気温センサ、56…室温センサ、58…ドア開閉センサ、60…ネットワーク、62…外部サーバ、70…設定部、72…判定部、74…ピークカット制御部、76…光熱費最適制御部、78…一次エネルギー最適制御部、80…快適制御部 S1 ... Hot water supply and heating system, 10 ... Air conditioner, 12 ... Heat pump device for air conditioner, 14 ... Hot water storage tank, 16 ... Heat pump device for hot water storage tank, 18 ... Floor heating device, 20 ... Heat source device, 48 ... Control unit, 50 ... Operation panel 52 ... Hot water storage temperature sensor, 54 ... Outside air temperature sensor, 56 ... Room temperature sensor, 58 ... Door open / close sensor, 60 ... Network, 62 ... External server, 70 ... Setting part, 72 ... Determination part, 74 ... Peak cut control part, 76 ... Optimum energy cost optimal control unit, 78 ... Primary energy optimal control unit, 80 ... Comfort control unit

Claims (11)

給湯温水及び暖房循環熱媒の各々を燃焼により加熱する熱源機と、給湯温水及び暖房循環熱媒の各々を電気ヒートポンプにより加熱するヒートポンプ装置と、を組み合わせた給湯暖房システムにおける制御ユニットであって、
各時刻の電気使用量が上限値を超えないように制御するピークカット制御方式、一日の給湯利用計画に対して光熱費が最も安くなるように制御する光熱費最適制御方式、一日の給湯利用計画に対して一次エネルギー消費量が最も少なくなるように制御する一次エネルギー最適制御方式、及び使用者が給湯及び暖房を快適に利用することを優先して制御する快適制御方式のうちの少なくとも2つの制御方式から、前記ピークカット制御方式が使用者により選択されているとき、
現在の電気使用量が、上限値を超えており、かつ、前記ヒートポンプ装置によって給湯温水を加熱している場合、前記ヒートポンプ装置による給湯温水の加熱を停止するように制御し、
現在の電気使用量が、上限値を超えており、かつ、前記ヒートポンプ装置によって暖房循環熱媒を加熱している場合、前記ヒートポンプ装置による暖房循環熱媒の加熱を停止するように制御し、前記熱源機によって暖房循環熱媒を加熱するように制御する制御ユニット。
A control unit in a hot water supply and heating system that combines a heat source device that heats each of hot water supply hot water and a heating circulation heat medium by combustion, and a heat pump device that heats each of the hot water supply hot water and the heating circulation heat medium by an electric heat pump,
A peak cut control system that controls the amount of electricity used at each time so that it does not exceed the upper limit, an optimal control system for utility costs that controls the lowest utility costs for a daily hot water usage plan, and a hot water supply for a day At least two of the primary energy optimal control method for controlling the usage plan so that the primary energy consumption is minimized, and the comfortable control method for giving priority to the user's comfortable use of hot water and heating. From the two control methods , when the peak cut control method is selected by the user,
When the current amount of electricity used exceeds the upper limit value and the hot water supply hot water is heated by the heat pump device, control is performed to stop heating the hot water hot water by the heat pump device,
When the current amount of electricity used exceeds the upper limit value and the heating circulation heat medium is heated by the heat pump device, control is performed to stop heating the heating circulation heat medium by the heat pump device, A control unit that controls the heating circulation heat medium to be heated by a heat source device .
給湯温水及び暖房循環熱媒の各々を燃焼により加熱する熱源機と、給湯温水及び暖房循環熱媒の各々を電気ヒートポンプにより加熱するヒートポンプ装置と、を組み合わせた給湯暖房システムにおける制御ユニットであって、
各時刻の電気使用量が上限値を超えないように制御するピークカット制御方式、一日の給湯利用計画に対して光熱費が最も安くなるように制御する光熱費最適制御方式、一日の給湯利用計画に対して一次エネルギー消費量が最も少なくなるように制御する一次エネルギー最適制御方式、及び使用者が給湯及び暖房を快適に利用することを優先して制御する快適制御方式のうちの少なくとも2つの制御方式から、前記光熱費最適制御方式が使用者により選択されているとき、
前記給湯利用計画の給湯使用時刻の所定時間前である現在時刻における電気料金単価と、前記給湯利用計画の給湯利用量に応じた電気使用量との積が、前記給湯利用計画の給湯使用時刻のガス料金と、前記給湯利用計画の給湯利用量に応じたガス使用量との積より小さい場合、前記ヒートポンプ装置によって給湯温水を加熱するように制御する制御ユニット。
A control unit in a hot water supply and heating system that combines a heat source device that heats each of hot water supply hot water and a heating circulation heat medium by combustion, and a heat pump device that heats each of the hot water supply hot water and the heating circulation heat medium by an electric heat pump,
A peak cut control system that controls the amount of electricity used at each time so that it does not exceed the upper limit, an optimal control system for utility costs that controls the lowest utility costs for a daily hot water usage plan, and a hot water supply for a day At least two of the primary energy optimal control method for controlling the usage plan so that the primary energy consumption is minimized, and the comfortable control method for giving priority to the user's comfortable use of hot water and heating. From the two control methods , when the utility cost optimal control method is selected by the user,
The product of the unit price of electricity at the current time, which is a predetermined time before the hot water use time of the hot water use plan, and the amount of electricity used according to the hot water use amount of the hot water use plan is the hot water use time of the hot water use plan. A control unit for controlling the hot water supply hot water to be heated by the heat pump device when the gas charge is smaller than the product of the gas use amount corresponding to the hot water use amount of the hot water supply use plan .
給湯温水及び暖房循環熱媒の各々を燃焼により加熱する熱源機と、給湯温水及び暖房循環熱媒の各々を電気ヒートポンプにより加熱するヒートポンプ装置と、を組み合わせた給湯暖房システムにおける制御ユニットであって、
各時刻の電気使用量が上限値を超えないように制御するピークカット制御方式、一日の給湯利用計画に対して光熱費が最も安くなるように制御する光熱費最適制御方式、一日の給湯利用計画に対して一次エネルギー消費量が最も少なくなるように制御する一次エネルギー最適制御方式、及び使用者が給湯及び暖房を快適に利用することを優先して制御する快適制御方式のうちの少なくとも2つの制御方式から、前記光熱費最適制御方式が使用者により選択されているとき、
暖房運転のスイッチがオンされ、かつ、現在時刻における電気料金単価と、予め定められた電気使用量との積が、現在時刻のガス料金と、予め定められたガス使用量との積より小さい場合、前記ヒートポンプ装置によって暖房循環熱媒を加熱するように制御し、
暖房運転のスイッチがオンされ、かつ、現在時刻における電気料金単価と、予め定められた電気使用量との積が、現在時刻のガス料金と、予め定められたガス使用量との積以上である場合、前記熱源機によって暖房循環熱媒を加熱するように制御する制御ユニット。
A control unit in a hot water supply and heating system that combines a heat source device that heats each of hot water supply hot water and a heating circulation heat medium by combustion, and a heat pump device that heats each of the hot water supply hot water and the heating circulation heat medium by an electric heat pump,
A peak cut control system that controls the amount of electricity used at each time so that it does not exceed the upper limit, an optimal control system for utility costs that controls the lowest utility costs for a daily hot water usage plan, and a hot water supply for a day At least two of the primary energy optimal control method for controlling the usage plan so that the primary energy consumption is minimized, and the comfortable control method for giving priority to the user's comfortable use of hot water and heating. From the two control methods , when the utility cost optimal control method is selected by the user,
When the heating operation switch is turned on and the product of the electricity unit price at the current time and the predetermined amount of electricity used is smaller than the product of the gas rate at the current time and the amount of gas used in advance. , Control to heat the heating circulation heat medium by the heat pump device,
The heating operation switch is turned on, and the product of the unit price of electricity at the current time and the predetermined amount of electricity used is equal to or greater than the product of the gas rate at the current time and the amount of gas used in advance. A control unit for controlling the heating circulation heat medium to be heated by the heat source device .
給湯温水及び暖房循環熱媒の各々を燃焼により加熱する熱源機と、給湯温水及び暖房循環熱媒の各々を電気ヒートポンプにより加熱するヒートポンプ装置と、を組み合わせた給湯暖房システムにおける制御ユニットであって、
各時刻の電気使用量が上限値を超えないように制御するピークカット制御方式、一日の給湯利用計画に対して光熱費が最も安くなるように制御する光熱費最適制御方式、一日の給湯利用計画に対して一次エネルギー消費量が最も少なくなるように制御する一次エネルギー最適制御方式、及び使用者が給湯及び暖房を快適に利用することを優先して制御する快適制御方式のうちの少なくとも2つの制御方式から、前記一次エネルギー最適制御方式が使用者により選択されているとき、
現在時刻が、前記給湯利用計画の給湯使用時刻の所定時間前であり、かつ、前記給湯利用計画の給湯利用量に応じた電気使用量に基づく一次エネルギー消費量が、前記給湯利用計画の給湯利用量に応じたガス使用量に基づく一次エネルギー消費量より小さい場合、前記ヒートポンプ装置によって給湯温水を加熱するように制御する制御ユニット。
A control unit in a hot water supply and heating system that combines a heat source device that heats each of hot water supply hot water and a heating circulation heat medium by combustion, and a heat pump device that heats each of the hot water supply hot water and the heating circulation heat medium by an electric heat pump,
A peak cut control system that controls the amount of electricity used at each time so that it does not exceed the upper limit, an optimal control system for utility costs that controls the lowest utility costs for a daily hot water usage plan, and a hot water supply for a day At least two of the primary energy optimal control method for controlling the usage plan so that the primary energy consumption is minimized, and the comfortable control method for giving priority to the user's comfortable use of hot water and heating. When the primary energy optimal control method is selected by the user from one control method ,
The current time is a predetermined time before the hot water use time of the hot water use plan, and the primary energy consumption based on the amount of electricity used according to the hot water use amount of the hot water use plan is the hot water use of the hot water use plan A control unit for controlling the hot water supply hot water to be heated by the heat pump device when it is smaller than the primary energy consumption based on the amount of gas used according to the amount .
給湯温水及び暖房循環熱媒の各々を燃焼により加熱する熱源機と、給湯温水及び暖房循環熱媒の各々を電気ヒートポンプにより加熱するヒートポンプ装置と、を組み合わせた給湯暖房システムにおける制御ユニットであって、
各時刻の電気使用量が上限値を超えないように制御するピークカット制御方式、一日の給湯利用計画に対して光熱費が最も安くなるように制御する光熱費最適制御方式、一日の給湯利用計画に対して一次エネルギー消費量が最も少なくなるように制御する一次エネルギー最適制御方式、及び使用者が給湯及び暖房を快適に利用することを優先して制御する快適制御方式のうちの少なくとも2つの制御方式から、前記一次エネルギー最適制御方式が使用者により選択されているとき、
暖房運転のスイッチがオンされ、かつ、予め定められた電気使用量に基づく一次エネルギー消費量が、予め定められたガス使用量に基づく一次エネルギー消費量より小さい場合、前記ヒートポンプ装置によって暖房循環熱媒を加熱するように制御し、
暖房運転のスイッチがオンされ、かつ、予め定められた電気使用量に基づく一次エネルギー消費量が、予め定められたガス使用量に基づく一次エネルギー消費量以上である場合、前記熱源機によって暖房循環熱媒を加熱するように制御する制御ユニット。
A control unit in a hot water supply and heating system that combines a heat source device that heats each of hot water supply hot water and a heating circulation heat medium by combustion, and a heat pump device that heats each of the hot water supply hot water and the heating circulation heat medium by an electric heat pump,
A peak cut control system that controls the amount of electricity used at each time so that it does not exceed the upper limit, an optimal control system for utility costs that controls the lowest utility costs for a daily hot water usage plan, and a hot water supply for a day At least two of the primary energy optimal control method for controlling the usage plan so that the primary energy consumption is minimized, and the comfortable control method for giving priority to the user's comfortable use of hot water and heating. When the primary energy optimal control method is selected by the user from one control method ,
When the heating operation switch is turned on and the primary energy consumption based on a predetermined amount of electricity used is smaller than the primary energy consumption based on a predetermined amount of gas used, the heat circulating heat medium is heated by the heat pump device. Control to heat and
When the heating operation switch is turned on and the primary energy consumption based on a predetermined amount of electricity used is equal to or greater than the primary energy consumption based on a predetermined amount of gas used, the heat source unit heats the heating circulation heat. A control unit that controls the medium to heat .
給湯温水及び暖房循環熱媒の各々を燃焼により加熱する熱源機と、給湯温水及び暖房循環熱媒の各々を電気ヒートポンプにより加熱するヒートポンプ装置と、を組み合わせた給湯暖房システムにおける制御ユニットであって、
各時刻の電気使用量が上限値を超えないように制御するピークカット制御方式、一日の給湯利用計画に対して光熱費が最も安くなるように制御する光熱費最適制御方式、一日の給湯利用計画に対して一次エネルギー消費量が最も少なくなるように制御する一次エネルギー最適制御方式、及び使用者が給湯及び暖房を快適に利用することを優先して制御する快適制御方式のうちの少なくとも2つの制御方式から、前記快適制御方式が使用者により選択されているとき、前記ヒートポンプ装置によって給湯温水を加熱するように制御する制御ユニット。
A control unit in a hot water supply and heating system that combines a heat source device that heats each of hot water supply hot water and a heating circulation heat medium by combustion, and a heat pump device that heats each of the hot water supply hot water and the heating circulation heat medium by an electric heat pump,
A peak cut control system that controls the amount of electricity used at each time so that it does not exceed the upper limit, an optimal control system for utility costs that controls the lowest utility costs for a daily hot water usage plan, and a hot water supply for a day At least two of the primary energy optimal control method for controlling the usage plan so that the primary energy consumption is minimized, and the comfortable control method for giving priority to the user's comfortable use of hot water and heating. A control unit that controls the hot water supply hot water to be heated by the heat pump device when the comfortable control method is selected by one of the two control methods.
給湯温水及び暖房循環熱媒の各々を燃焼により加熱する熱源機と、給湯温水及び暖房循環熱媒の各々を電気ヒートポンプにより加熱するヒートポンプ装置と、を組み合わせた給湯暖房システムにおける制御ユニットであって、
各時刻の電気使用量が上限値を超えないように制御するピークカット制御方式、一日の給湯利用計画に対して光熱費が最も安くなるように制御する光熱費最適制御方式、一日の給湯利用計画に対して一次エネルギー消費量が最も少なくなるように制御する一次エネルギー最適制御方式、及び使用者が給湯及び暖房を快適に利用することを優先して制御する快適制御方式のうちの少なくとも2つの制御方式から、前記快適制御方式が使用者により選択されているとき、
暖房運転のスイッチがオンされ、かつ、外気温が所定温度より低い場合、前記熱源機によって暖房循環熱媒を加熱するように制御し、
暖房運転のスイッチがオンされ、かつ、外気温が所定温度以上である場合、前記熱源機によって暖房循環熱媒を加熱し、かつ、前記ヒートポンプ装置によって暖房循環熱媒を加熱するように制御する制御ユニット。
A control unit in a hot water supply and heating system that combines a heat source device that heats each of hot water supply hot water and a heating circulation heat medium by combustion, and a heat pump device that heats each of the hot water supply hot water and the heating circulation heat medium by an electric heat pump,
A peak cut control system that controls the amount of electricity used at each time so that it does not exceed the upper limit, an optimal control system for utility costs that controls the lowest utility costs for a daily hot water usage plan, and a hot water supply for a day At least two of the primary energy optimal control method for controlling the usage plan so that the primary energy consumption is minimized, and the comfortable control method for giving priority to the user's comfortable use of hot water and heating. When the comfortable control method is selected by the user from the two control methods ,
When the heating operation switch is turned on and the outside air temperature is lower than a predetermined temperature, control is performed so that the heating circulation heat medium is heated by the heat source unit,
Control that heats the heating circulation heat medium by the heat source unit and controls the heating circulation heat medium by the heat pump device when the heating operation switch is turned on and the outside air temperature is equal to or higher than a predetermined temperature unit.
給湯温水及び暖房循環熱媒の各々を燃焼により加熱する熱源機と、給湯温水及び暖房循環熱媒の各々を電気ヒートポンプにより加熱するヒートポンプ装置と、を組み合わせた給湯暖房システムにおける制御ユニットであって、
各時刻の電気使用量が上限値を超えないように制御するピークカット制御方式、一日の給湯利用計画に対して光熱費が最も安くなるように制御する光熱費最適制御方式、一日の給湯利用計画に対して一次エネルギー消費量が最も少なくなるように制御する一次エネルギー最適制御方式、及び使用者が給湯及び暖房を快適に利用することを優先して制御する快適制御方式のうちの少なくとも2つの制御方式から、前記快適制御方式が使用者により選択されているとき、
室温が所定温度以下である場合、又は室内のドアの開閉が検知された場合、前記ヒートポンプ装置によって暖房循環熱媒を加熱するように制御し、
室温が所定温度より高い場合、前記ヒートポンプ装置による暖房循環熱媒の加熱を停止するように制御する制御ユニット。
A control unit in a hot water supply and heating system that combines a heat source device that heats each of hot water supply hot water and a heating circulation heat medium by combustion, and a heat pump device that heats each of the hot water supply hot water and the heating circulation heat medium by an electric heat pump,
A peak cut control system that controls the amount of electricity used at each time so that it does not exceed the upper limit, an optimal control system for utility costs that controls the lowest utility costs for a daily hot water usage plan, and a hot water supply for a day At least two of the primary energy optimal control method for controlling the usage plan so that the primary energy consumption is minimized, and the comfortable control method for giving priority to the user's comfortable use of hot water and heating. When the comfortable control method is selected by the user from the two control methods ,
When the room temperature is equal to or lower than a predetermined temperature, or when opening / closing of an indoor door is detected, control is performed so that the heating circulation heat medium is heated by the heat pump device,
A control unit that controls to stop heating the heating circulation heat medium by the heat pump device when the room temperature is higher than a predetermined temperature .
請求項1〜請求項の何れか1項記載の制御ユニットと、
給湯温水及び暖房循環熱媒の各々を燃焼により加熱する熱源機と、
給湯温水及び暖房循環熱媒の各々を電気ヒートポンプにより加熱するヒートポンプ装置と、
を含む記載の給湯暖房システム。
A control unit according to any one of claims 1 to 8 ,
A heat source machine for heating each hot water supply hot water and heating circulation heat medium by combustion;
A heat pump device for heating each of hot water supply hot water and a heating circulation heat medium by an electric heat pump;
A hot water heating system as described.
給湯温水及び暖房循環熱媒の各々を燃焼により加熱する熱源機と、給湯温水及び暖房循環熱媒の各々を電気ヒートポンプにより加熱するヒートポンプ装置と、を組み合わせた給湯暖房システムにおける制御方法であって、
制御ユニットが、各時刻の電気使用量が上限値を超えないように制御するピークカット制御方式、一日の給湯利用計画に対して光熱費が最も安くなるように制御する光熱費最適制御方式、一日の給湯利用計画に対して一次エネルギー消費量が最も少なくなるように制御する一次エネルギー最適制御方式、及び使用者が給湯及び暖房を快適に利用することを優先して制御する快適制御方式のうちの少なくとも2つの制御方式から、前記ピークカット制御方式が使用者により選択されているとき、
現在の電気使用量が、上限値を超えており、かつ、前記ヒートポンプ装置によって給湯温水を加熱している場合、前記ヒートポンプ装置による給湯温水の加熱を停止するように制御し、
現在の電気使用量が、上限値を超えており、かつ、前記ヒートポンプ装置によって暖房循環熱媒を加熱している場合、前記ヒートポンプ装置による暖房循環熱媒の加熱を停止するように制御し、前記熱源機によって暖房循環熱媒を加熱するように制御する制御方法。
A control method in a hot water supply and heating system that combines a heat source machine that heats each of hot water supply hot water and a heating circulation heat medium by combustion, and a heat pump device that heats each of the hot water supply hot water and the heating circulation heat medium by an electric heat pump,
A peak cut control system in which the control unit controls the amount of electricity used at each time so as not to exceed the upper limit value, an optimal control system for the utility cost to control the utility cost to the lowest for the daily hot water usage plan, An optimal primary energy control system that controls the amount of primary energy consumption to the minimum against the daily hot water usage plan, and a comfortable control system that gives priority to users comfortably using hot water and heating. When the peak cut control method is selected by the user from at least two of the control methods ,
When the current amount of electricity used exceeds the upper limit value and the hot water supply hot water is heated by the heat pump device, control is performed to stop heating the hot water hot water by the heat pump device,
When the current amount of electricity used exceeds the upper limit value and the heating circulation heat medium is heated by the heat pump device, control is performed to stop heating the heating circulation heat medium by the heat pump device, A control method for controlling a heating circulation heat medium to be heated by a heat source device .
給湯温水及び暖房循環熱媒の各々を燃焼により加熱する熱源機と、給湯温水及び暖房循環熱媒の各々を電気ヒートポンプにより加熱するヒートポンプ装置と、を組み合わせた給湯暖房システムにおけるプログラムであって、
コンピュータに、
各時刻の電気使用量が上限値を超えないように制御するピークカット制御方式、一日の給湯利用計画に対して光熱費が最も安くなるように制御する光熱費最適制御方式、一日の給湯利用計画に対して一次エネルギー消費量が最も少なくなるように制御する一次エネルギー最適制御方式、及び使用者が給湯及び暖房を快適に利用することを優先して制御する快適制御方式のうちの少なくとも2つの制御方式から、前記ピークカット制御方式が使用者により選択されているとき、
現在の電気使用量が、上限値を超えており、かつ、前記ヒートポンプ装置によって給湯温水を加熱している場合、前記ヒートポンプ装置による給湯温水の加熱を停止するように制御し、
現在の電気使用量が、上限値を超えており、かつ、前記ヒートポンプ装置によって暖房循環熱媒を加熱している場合、前記ヒートポンプ装置による暖房循環熱媒の加熱を停止するように制御し、前記熱源機によって暖房循環熱媒を加熱するように制御する
ことを実行させるためのプログラム。
A program in a hot water supply and heating system that combines a heat source device that heats each of hot water supply hot water and a heating circulation heat medium by combustion, and a heat pump device that heats each of the hot water supply hot water and the heating circulation heat medium by an electric heat pump,
On the computer,
A peak cut control system that controls the amount of electricity used at each time so that it does not exceed the upper limit, an optimal control system for utility costs that controls the lowest utility costs for a daily hot water usage plan, and a hot water supply for a day At least two of the primary energy optimal control method for controlling the usage plan so that the primary energy consumption is minimized, and the comfortable control method for giving priority to the user's comfortable use of hot water and heating. From the two control methods , when the peak cut control method is selected by the user,
When the current amount of electricity used exceeds the upper limit value and the hot water supply hot water is heated by the heat pump device, control is performed to stop heating the hot water hot water by the heat pump device,
When the current amount of electricity used exceeds the upper limit value and the heating circulation heat medium is heated by the heat pump device, control is performed to stop heating the heating circulation heat medium by the heat pump device, A program for executing control to heat the heating circulation heat medium by the heat source device .
JP2015174885A 2015-09-04 2015-09-04 Control unit, hot water supply / heating system, control method, and program Active JP6555992B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015174885A JP6555992B2 (en) 2015-09-04 2015-09-04 Control unit, hot water supply / heating system, control method, and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015174885A JP6555992B2 (en) 2015-09-04 2015-09-04 Control unit, hot water supply / heating system, control method, and program

Publications (2)

Publication Number Publication Date
JP2017048991A JP2017048991A (en) 2017-03-09
JP6555992B2 true JP6555992B2 (en) 2019-08-07

Family

ID=58280033

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015174885A Active JP6555992B2 (en) 2015-09-04 2015-09-04 Control unit, hot water supply / heating system, control method, and program

Country Status (1)

Country Link
JP (1) JP6555992B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019095147A (en) * 2017-11-27 2019-06-20 株式会社ノーリツ Storage-type hot water supply device
JP2022083255A (en) * 2020-11-24 2022-06-03 ダイキン工業株式会社 Fluid heating system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5769948B2 (en) * 2010-10-25 2015-08-26 東邦瓦斯株式会社 Hot water heating system
JP5925037B2 (en) * 2012-04-20 2016-05-25 リンナイ株式会社 Hot water storage hot water supply system

Also Published As

Publication number Publication date
JP2017048991A (en) 2017-03-09

Similar Documents

Publication Publication Date Title
JP5908302B2 (en) Storage energy storage optimization device, optimization method and optimization program
JP5391886B2 (en) Electric device with charging means, control method of electric device with charging means, and program thereof
JP5861568B2 (en) Hot water system
JP6048113B2 (en) Equipment management device, management system, program, and recording medium
WO2014002133A1 (en) Heat-pump type hot water supply/heating system
JP2017121175A (en) Controller, schedule preparation method, and program
CN105737342B (en) A kind of method that office buildings internal segment can control
JP6555992B2 (en) Control unit, hot water supply / heating system, control method, and program
JP6513257B2 (en) Controller, schedule creation method, and program
JP6628831B2 (en) Controller, schedule creation method, and program
JP6379795B2 (en) Controller and program used for controller
JP5621720B2 (en) Energy control device
JP6490218B2 (en) Energy management apparatus, energy management method, and program
JP2009121781A (en) Hot water supply apparatus
EP3337000A1 (en) Exploitation of a photovoltaic system coupled to a joint water boiler-air/air heat pump air conditioning system
JP2016092961A (en) Controller, schedule preparation method, and program
WO2012105642A1 (en) Controller, control method therefor, and storage medium
JP6111871B2 (en) Demand response system
US10976067B2 (en) Exploitation of a photovoltaic system coupled to a joint water boiler-air/air heat pump air conditioning system
JP7042180B2 (en) Heat source controller and heat source control program
JPH02251042A (en) Air conditioning prediction control device
JP7251507B2 (en) Storage hot water heater
JP2017175857A (en) Peak cut control device, peak cut control system, peak cut control method, and peak cut control program
JP2020079663A (en) Hot water supply system
JP7331663B2 (en) Storage hot water heater

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180316

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20181204

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20181130

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190201

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190702

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190709

R150 Certificate of patent or registration of utility model

Ref document number: 6555992

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250