JP6552773B1 - Air conditioner - Google Patents

Air conditioner Download PDF

Info

Publication number
JP6552773B1
JP6552773B1 JP2019516259A JP2019516259A JP6552773B1 JP 6552773 B1 JP6552773 B1 JP 6552773B1 JP 2019516259 A JP2019516259 A JP 2019516259A JP 2019516259 A JP2019516259 A JP 2019516259A JP 6552773 B1 JP6552773 B1 JP 6552773B1
Authority
JP
Japan
Prior art keywords
heat exchanger
control unit
indoor heat
prohibition period
air conditioner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019516259A
Other languages
Japanese (ja)
Other versions
JPWO2019239493A1 (en
Inventor
幸範 田中
幸範 田中
吉田 和正
和正 吉田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Johnson Controls Air Conditioning Inc
Original Assignee
Hitachi Johnson Controls Air Conditioning Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Johnson Controls Air Conditioning Inc filed Critical Hitachi Johnson Controls Air Conditioning Inc
Application granted granted Critical
Publication of JP6552773B1 publication Critical patent/JP6552773B1/en
Publication of JPWO2019239493A1 publication Critical patent/JPWO2019239493A1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F1/00Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
    • F24F1/06Separate outdoor units, e.g. outdoor unit to be linked to a separate room comprising a compressor and a heat exchanger
    • F24F1/08Compressors specially adapted for separate outdoor units
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/41Defrosting; Preventing freezing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/41Defrosting; Preventing freezing
    • F24F11/43Defrosting; Preventing freezing of indoor units
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/48Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring prior to normal operation, e.g. pre-heating or pre-cooling
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/65Electronic processing for selecting an operating mode
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B13/00Compression machines, plants or systems, with reversible cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B47/00Arrangements for preventing or removing deposits or corrosion, not provided for in another subclass
    • F25B47/02Defrosting cycles
    • F25B47/022Defrosting cycles hot gas defrosting
    • F25B47/025Defrosting cycles hot gas defrosting by reversing the cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D29/00Arrangement or mounting of control or safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/22Means for preventing condensation or evacuating condensate
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/10Temperature
    • F24F2110/12Temperature of the outside air
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2221/00Details or features not otherwise provided for
    • F24F2221/22Cleaning ducts or apparatus
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2221/00Details or features not otherwise provided for
    • F24F2221/54Heating and cooling, simultaneously or alternatively

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Signal Processing (AREA)
  • Thermal Sciences (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

室内熱交換器を清潔な状態にし、さらに、ドレンパンから水が溢れにくい空気調和機を提供する。空気調和機は、冷媒回路と、制御部と、を備えるとともに、室内熱交換器(15)の下側に配置されるドレンパン(18)を備える。そして、制御部は、室内熱交換器(15)を蒸発器として機能させ、室内熱交換器(15)を凍結又は結露させる処理を行い、外気温度が第1閾値以下であるときに前記処理を行った場合、当該処理を行ってから所定の禁止期間が経過するまでは、次回の前記処理を開始しない。To provide an air conditioner that cleans the indoor heat exchanger and further prevents water from overflowing from the drain pan. The air conditioner includes a refrigerant circuit and a control unit, and a drain pan (18) disposed below the indoor heat exchanger (15). Then, the control unit causes the indoor heat exchanger (15) to function as an evaporator, performs a process of freezing or condensing the indoor heat exchanger (15), and performs the process when the outside air temperature is equal to or lower than the first threshold value. If it is performed, the next process is not started until a predetermined prohibition period elapses after the process is performed.

Description

本発明は、空気調和機に関する。   The present invention relates to an air conditioner.

空気調和機の室内熱交換器を清潔な状態にする技術として、例えば、特許文献1には、室内熱交換器の着霜・除霜を順次に行って、室内熱交換器の汚れを除去することが記載されている。   As a technique for making an indoor heat exchanger of an air conditioner clean, for example, in Patent Document 1, frosting and defrosting of an indoor heat exchanger are sequentially performed to remove dirt from the indoor heat exchanger. It is described.

特開第2010−14288号公報JP 2010-14288 A

ところで、室内熱交換器の凝縮水はドレンパンに流れ落ち、ドレンホースを介して外部に排出される。しかしながら、何らかの理由でドレンホースが詰まった場合、ドレンパンの水が外部に排出されないため、ドレンパンから水が溢れる可能性がある。このような問題の対策について、特許文献1には記載されていない。   By the way, the condensed water of the indoor heat exchanger flows down to the drain pan and is discharged to the outside through the drain hose. However, when the drain hose is clogged for some reason, the water in the drain pan is not discharged to the outside, so that the water may overflow from the drain pan. Patent Document 1 does not describe measures against such a problem.

そこで、本発明は、室内熱交換器を清潔な状態にし、さらに、ドレンパンから水が溢れにくい空気調和機を提供することを課題とする。   Then, this invention makes it a subject to make an indoor heat exchanger into a clean state, and also to provide the air conditioner with which water does not overflow easily from a drain pan.

前記課題を解決するために、本発明に係る空気調和機は、制御部が、室内熱交換器を蒸発器として機能させ、前記室内熱交換器を凍結又は結露させる処理を行い、外気温度が第1閾値以下であるときに前記処理を行った場合、当該処理を行ってから所定の禁止期間が経過するまでは、次回の前記処理を開始せず、前記第1閾値は、前記ドレンパンからの排水が氷結するおそれがある値であることを特徴とする。 In order to solve the above-described problem, in the air conditioner according to the present invention, the control unit causes the indoor heat exchanger to function as an evaporator, performs a process of freezing or condensing the indoor heat exchanger, and the outside air temperature is When the process is performed when the threshold is less than or equal to one threshold value, the next process is not started until a predetermined prohibition period elapses after the process is performed, and the first threshold value is the drainage from the drain pan. Is a value that may cause freezing .

本発明によれば、室内熱交換器を清潔な状態にし、さらに、ドレンパンから水が溢れにくい空気調和機を提供できる。   ADVANTAGE OF THE INVENTION According to this invention, an indoor heat exchanger can be made into a clean state, and also the air conditioner with which water cannot overflow easily from a drain pan can be provided.

本発明の第1実施形態に係る空気調和機の構成図である。It is a block diagram of the air conditioner concerning 1st Embodiment of this invention. 本発明の第1実施形態に係る空気調和機の室内機の縦断面図である。It is a longitudinal cross-sectional view of the indoor unit of the air conditioner concerning 1st Embodiment of this invention. 本発明の第1実施形態に係る空気調和機の機能ブロック図である。It is a functional block diagram of the air conditioner concerning a 1st embodiment of the present invention. 本発明の第1実施形態に係る空気調和機が備える室内熱交換器の凍結洗浄に関する処理のフローチャートである。It is a flow chart of processing about freeze cleaning of an indoor heat exchanger with which an air harmony machine concerning a 1st embodiment of the present invention is provided. 本発明の第1実施形態に係る空気調和機が備える室内熱交換器の解凍中の状態を示す説明図である。It is explanatory drawing which shows the state in process of thawing | decompression of the indoor heat exchanger with which the air conditioner concerning 1st Embodiment of this invention is equipped. 本発明の第1実施形態に係る空気調和機の制御部が実行する処理のフローチャートである。It is a flowchart of the process which the control part of the air conditioner concerning 1st Embodiment of this invention performs. 本発明の第2実施形態に係る空気調和機の制御部が実行する処理のフローチャートである。It is a flowchart of the process which the control part of the air conditioner concerning 2nd Embodiment of this invention performs.

≪第1実施形態≫
<空気調和機の構成>
図1は、第1実施形態に係る空気調和機100の構成図である。
なお、図1の実線矢印は、暖房運転時の冷媒の流れを示している。
一方、図1の破線矢印は、冷房運転時の冷媒の流れを示している。
First Embodiment
<Configuration of air conditioner>
FIG. 1 is a configuration diagram of an air conditioner 100 according to the first embodiment.
In addition, the solid line arrow of FIG. 1 has shown the flow of the refrigerant | coolant at the time of heating operation.
On the other hand, broken line arrows in FIG. 1 indicate the flow of the refrigerant during the cooling operation.

空気調和機100は、暖房運転や冷房運転等の空調を行う機器である。図1に示すように、空気調和機100は、圧縮機11と、室外熱交換器12と、室外ファン13と、膨張弁14と、を備えている。また、空気調和機100は、前記した構成の他に、室内熱交換器15と、室内ファン16と、四方弁17と、を備えている。   The air conditioner 100 is a device that performs air conditioning such as heating operation and cooling operation. As shown in FIG. 1, the air conditioner 100 includes a compressor 11, an outdoor heat exchanger 12, an outdoor fan 13, and an expansion valve 14. The air conditioner 100 includes an indoor heat exchanger 15, an indoor fan 16, and a four-way valve 17 in addition to the above-described configuration.

圧縮機11は、低温低圧のガス冷媒を圧縮し、高温高圧のガス冷媒として吐出する機器である。図1に示すように、圧縮機11は、駆動源である圧縮機モータ11aを備えている。
室外熱交換器12は、その伝熱管(図示せず)を通流する冷媒と、室外ファン13から送り込まれる外気と、の間で熱交換が行われる熱交換器である。
The compressor 11 is a device that compresses a low-temperature low-pressure gas refrigerant and discharges it as a high-temperature high-pressure gas refrigerant. As shown in FIG. 1, the compressor 11 includes a compressor motor 11a which is a drive source.
The outdoor heat exchanger 12 is a heat exchanger in which heat exchange is performed between the refrigerant flowing through the heat transfer tube (not shown) and the outside air sent from the outdoor fan 13.

室外ファン13は、室外熱交換器12に外気を送り込むファンである。室外ファン13は、駆動源である室外ファンモータ13aを備え、室外熱交換器12の付近に配置されている。
膨張弁14は、「凝縮器」(室外熱交換器12及び室内熱交換器15の一方)で凝縮した冷媒を減圧する弁である。なお、膨張弁14で減圧された冷媒は、「蒸発器」(室外熱交換器12及び室内熱交換器15の他方)に導かれる。
The outdoor fan 13 is a fan that sends outside air to the outdoor heat exchanger 12. The outdoor fan 13 includes an outdoor fan motor 13a that is a drive source, and is disposed in the vicinity of the outdoor heat exchanger 12.
The expansion valve 14 is a valve that depressurizes the refrigerant condensed by the “condenser” (one of the outdoor heat exchanger 12 and the indoor heat exchanger 15). The refrigerant decompressed by the expansion valve 14 is guided to an “evaporator” (the other of the outdoor heat exchanger 12 and the indoor heat exchanger 15).

室内熱交換器15は、その伝熱管g(図2参照)を通流する冷媒と、室内ファン16から送り込まれる室内空気(空調対象空間の空気)と、の間で熱交換が行われる熱交換器である。
室内ファン16は、室内熱交換器15に室内空気を送り込むファンである。室内ファン16は、駆動源である室内ファンモータ16c(図3参照)を有し、室内熱交換器15の付近に配置されている。
The indoor heat exchanger 15 performs heat exchange between the refrigerant flowing through the heat transfer tube g (see FIG. 2) and the indoor air sent from the indoor fan 16 (air in the air-conditioning target space). It is
The indoor fan 16 is a fan that sends room air into the indoor heat exchanger 15. The indoor fan 16 has an indoor fan motor 16c (see FIG. 3) as a drive source, and is disposed in the vicinity of the indoor heat exchanger 15.

四方弁17は、空気調和機100の運転モードに応じて、冷媒の流路を切り替える弁である。例えば、冷房運転時(図1の破線矢印を参照)には、冷媒回路Qにおいて、圧縮機11、室外熱交換器12(凝縮器)、膨張弁14、及び室内熱交換器15(蒸発器)を順次に介して、冷凍サイクルで冷媒が循環する。   The four-way valve 17 is a valve that switches the flow path of the refrigerant according to the operation mode of the air conditioner 100. For example, during the cooling operation (see the broken line arrow in FIG. 1), in the refrigerant circuit Q, the compressor 11, the outdoor heat exchanger 12 (condenser), the expansion valve 14, and the indoor heat exchanger 15 (evaporator). The refrigerant circulates in the refrigeration cycle sequentially through

一方、暖房運転時(図1の実線矢印を参照)には、冷媒回路Qにおいて、圧縮機11、室内熱交換器15(凝縮器)、膨張弁14、及び室外熱交換器12(蒸発器)を順次に介して、冷凍サイクルで冷媒が循環する。   On the other hand, during the heating operation (see the solid line arrow in FIG. 1), in the refrigerant circuit Q, the compressor 11, the indoor heat exchanger 15 (condenser), the expansion valve 14, and the outdoor heat exchanger 12 (evaporator). The refrigerant circulates in the refrigeration cycle sequentially through

すなわち、圧縮機11、「凝縮器」、膨張弁14、及び「蒸発器」を順次に介して冷媒が循環する冷媒回路Qにおいて、前記した「凝縮器」及び「蒸発器」の一方は室外熱交換器12であり、他方は室内熱交換器15である。   That is, in the refrigerant circuit Q in which the refrigerant circulates sequentially through the compressor 11, the “condenser”, the expansion valve 14, and the “evaporator”, one of the “condenser” and the “evaporator” is the outdoor heat. The other is an indoor heat exchanger 15.

なお、図1に示す例では、圧縮機11、室外熱交換器12、室外ファン13、膨張弁14、及び四方弁17が、室外機Uoに設置されている。一方、室内熱交換器15や室内ファン16は、室内機Uiに設置されている。   In addition, in the example shown in FIG. 1, the compressor 11, the outdoor heat exchanger 12, the outdoor fan 13, the expansion valve 14, and the four-way valve 17 are installed in the outdoor unit Uo. On the other hand, the indoor heat exchanger 15 and the indoor fan 16 are installed in the indoor unit Ui.

図2は、室内機Uiの縦断面図である。
図2に示すように、室内機Uiは、前記した室内熱交換器15や室内ファン16の他に、ドレンパン18(露受皿ともいう)と、筐体ベース19と、フィルタ20a,20bと、を備えている。さらに、室内機Uiは、前面パネル21と、左右風向板22と、上下風向板23と、を備えている。
FIG. 2 is a longitudinal sectional view of the indoor unit Ui.
As shown in FIG. 2, in addition to the indoor heat exchanger 15 and the indoor fan 16, the indoor unit Ui includes a drain pan 18 (also referred to as a dew pan), a housing base 19, and filters 20a and 20b. Have. Further, the indoor unit Ui includes a front panel 21, a left / right wind direction plate 22, and an up / down wind direction plate 23.

室内熱交換器15は、複数のフィンfと、それらのフィンfを貫通する複数の伝熱管gと、を備えている。また、別の観点から説明すると、室内熱交換器15は、室内ファン16の前側に配置される前側室内熱交換器15aと、室内ファン16の後側に配置される後側室内熱交換器15bと、を備えている。図2に示す例では、前側室内熱交換器15aの上端部と、後側室内熱交換器15bの上端部と、が逆V状に接続されている。   The indoor heat exchanger 15 includes a plurality of fins f and a plurality of heat transfer tubes g penetrating the fins f. Further, from another viewpoint, the indoor heat exchanger 15 includes a front indoor heat exchanger 15 a disposed on the front side of the indoor fan 16 and a rear indoor heat exchanger 15 b disposed on the rear side of the indoor fan 16. And. In the example illustrated in FIG. 2, the upper end portion of the front indoor heat exchanger 15a and the upper end portion of the rear indoor heat exchanger 15b are connected in an inverted V shape.

室内ファン16は、例えば、円筒状のクロスフローファンであり、室内熱交換器15の付近に配置されている。室内ファン16は、複数のファンブレード16aと、これらのファンブレード16aが設置される仕切板16bと、駆動源である室内ファンモータ16c(図3参照)と、を備えている。   The indoor fan 16 is, for example, a cylindrical cross flow fan, and is disposed in the vicinity of the indoor heat exchanger 15. The indoor fan 16 includes a plurality of fan blades 16a, a partition plate 16b on which these fan blades 16a are installed, and an indoor fan motor 16c (see FIG. 3) as a drive source.

ドレンパン18は、室内熱交換器15の凝縮水を受けるものであり、室内熱交換器15の下側に配置されている。
筐体ベース19は、室内熱交換器15や室内ファン16等の機器が設置される筐体である。
The drain pan 18 receives the condensed water of the indoor heat exchanger 15 and is disposed below the indoor heat exchanger 15.
The housing base 19 is a housing in which devices such as the indoor heat exchanger 15 and the indoor fan 16 are installed.

フィルタ20a,20bは、室内ファン16の駆動に伴って室内熱交換器15に向かう空気から塵埃を捕集するものである。一方のフィルタ20aは室内熱交換器15の前側に配置され、他方のフィルタ20bは室内熱交換器15の上側に配置されている。   The filters 20 a and 20 b collect dust from the air traveling toward the indoor heat exchanger 15 as the indoor fan 16 is driven. One filter 20 a is disposed on the front side of the indoor heat exchanger 15, and the other filter 20 b is disposed on the upper side of the indoor heat exchanger 15.

前面パネル21は、前側のフィルタ20aを覆うように設置されるパネルであり、下端を軸として前側に回動可能になっている。なお、前面パネル21が回動しない構成であってもよい。
左右風向板22は、室内に吹き出される空気の左右方向の風向きを調整する板状部材である。左右風向板22は、吹出風路h3に配置され、左右風向板用モータ24(図3参照)によって左右方向に回動するようになっている。
The front panel 21 is a panel that is installed so as to cover the front filter 20a, and is rotatable forward with the lower end as an axis. The front panel 21 may be configured not to rotate.
The left and right wind direction plate 22 is a plate-like member that adjusts the wind direction of the air blown out into the room in the left and right direction. The left and right wind direction plate 22 is disposed in the blowout air path h3 and is configured to rotate in the left and right direction by the left and right wind direction plate motor 24 (see FIG. 3).

上下風向板23は、室内に吹き出される空気の上下方向の風向きを調整する板状部材である。上下風向板23は、空気吹出口h4の付近に配置され、上下風向板用モータ25(図3参照)によって上下方向に回動するようになっている。   The up and down wind direction plate 23 is a plate-like member that adjusts the wind direction of the air blown out into the room in the up and down direction. The vertical wind direction plate 23 is disposed in the vicinity of the air outlet h4 and is rotated in the vertical direction by a vertical wind direction plate motor 25 (see FIG. 3).

空気吸込口h1,h2を介して吸い込まれた空気は、室内熱交換器15の伝熱管gを通流する冷媒と熱交換し、熱交換した空気が吹出風路h3に導かれる。そして、吹出風路h3を通流する空気は、左右風向板22及び上下風向板23によって所定方向に導かれ、さらに、空気吹出口h4を介して室内に吹き出される。   The air sucked through the air suction ports h1 and h2 exchanges heat with the refrigerant flowing through the heat transfer tube g of the indoor heat exchanger 15, and the heat-exchanged air is guided to the blowout air path h3. And the air which flows through the blowing wind path h3 is guide | induced to the predetermined direction by the right-and-left wind direction plate 22 and the up-and-down wind direction plate 23, and is further blown out indoors through the air blower outlet h4.

なお、空気の流れに伴って空気吸込口h1,h2に向かう塵埃の大部分は、フィルタ20a,20bで捕集される。しかしながら、細かい塵埃がフィルタ20a,20bを通り抜けて室内熱交換器15に付着することがあるため、室内熱交換器15を定期的に洗浄することが望ましい。そこで、本実施形態では、室内熱交換器15で凍結して着霜させた後、室内熱交換器15を解凍して洗浄するようにしている。以下では、室内熱交換器15の着霜・解凍を含む一連の処理を、室内熱交換器15の「凍結洗浄」という。   Note that most of the dust traveling toward the air suction ports h1 and h2 along with the air flow is collected by the filters 20a and 20b. However, since fine dust may pass through the filters 20a and 20b and adhere to the indoor heat exchanger 15, it is desirable to periodically clean the indoor heat exchanger 15. So, in this embodiment, after freezing and frosting with the indoor heat exchanger 15, the indoor heat exchanger 15 is defrosted and washed. Hereinafter, a series of processes including frosting and thawing of the indoor heat exchanger 15 is referred to as “freezing cleaning” of the indoor heat exchanger 15.

図3は、空気調和機100の機能ブロック図である。
図3に示す室内機Uiは、前記した各構成の他に、リモコン送受信部26と、環境検出部27と、室内制御回路31と、を備えている。
リモコン送受信部26は、赤外線通信等によって、リモコン40との間で所定の情報をやり取りする。
FIG. 3 is a functional block diagram of the air conditioner 100.
The indoor unit Ui shown in FIG. 3 includes a remote control transmission / reception unit 26, an environment detection unit 27, and an indoor control circuit 31 in addition to the above-described components.
The remote control transmission / reception unit 26 exchanges predetermined information with the remote control 40 by infrared communication or the like.

環境検出部27は、室内温度センサ27aと、湿度センサ27bと、室内熱交換器温度センサ27cと、を備えている。
室内温度センサ27aは、室内(空調対象空間)の温度を検出するセンサであり、例えば、フィルタ20a,20b(図2参照)の空気吸込側に設置されている。
The environment detection unit 27 includes an indoor temperature sensor 27a, a humidity sensor 27b, and an indoor heat exchanger temperature sensor 27c.
The indoor temperature sensor 27a is a sensor that detects the temperature of the room (air conditioning target space), and is installed, for example, on the air suction side of the filters 20a and 20b (see FIG. 2).

湿度センサ27bは、室内空気の湿度を検出するセンサであり、室内機Uiの所定位置に設置されている。
室内熱交換器温度センサ27cは、室内熱交換器15(図2参照)の温度を検出するセンサであり、室内熱交換器15に設置されている。
室内温度センサ27a、湿度センサ27b、及び室内熱交換器温度センサ27cの検出値は、室内制御回路31に出力される。
The humidity sensor 27b is a sensor that detects the humidity of room air, and is installed at a predetermined position of the indoor unit Ui.
The indoor heat exchanger temperature sensor 27 c is a sensor that detects the temperature of the indoor heat exchanger 15 (see FIG. 2), and is installed in the indoor heat exchanger 15.
The detection values of the indoor temperature sensor 27a, the humidity sensor 27b, and the indoor heat exchanger temperature sensor 27c are output to the indoor control circuit 31.

室内制御回路31は、図示はしないが、CPU(Central Processing Unit)、ROM(Read Only Memory)、RAM(Random Access Memory)、各種インタフェース等の電子回路を含んで構成されている。そして、ROMに記憶されたプログラムを読み出してRAMに展開し、CPUが各種処理を実行するようになっている。   Although not shown, the indoor control circuit 31 includes electronic circuits such as a CPU (Central Processing Unit), a ROM (Read Only Memory), a RAM (Random Access Memory), and various interfaces. Then, the program stored in the ROM is read and expanded in the RAM, and the CPU executes various processing.

図3に示すように、室内制御回路31は、記憶部31aと、室内制御部31bと、を備えている。
記憶部31aには、所定のプログラムの他、リモコン送受信部26を介して受信したデータや、各センサの検出値等が記憶される。
室内制御部31bは、記憶部31aに記憶されたデータに基づいて、室内ファンモータ16c、左右風向板用モータ24、上下風向板用モータ25等を制御する。
As shown in FIG. 3, the indoor control circuit 31 includes a storage unit 31 a and an indoor control unit 31 b.
In addition to a predetermined program, the storage unit 31a stores data received via the remote control transmission / reception unit 26, detection values of each sensor, and the like.
The indoor control unit 31b controls the indoor fan motor 16c, the left and right air direction plate motor 24, the upper and lower air direction plate motor 25 and the like based on the data stored in the storage unit 31a.

室外機Uoは、前記した構成の他に、室外温度センサ28と、室外制御回路32を備えている。
室外温度センサ28は、室外の温度を検出するセンサであり、室外機Uo(図1参照)の所定箇所に設置されている。なお、図3では省略しているが、室外機Uoは、圧縮機11(図1参照)の吸入温度、吐出温度、吐出圧力等を検出する複数のセンサも備えている。室外温度センサ28を含む各センサの検出値は、室外制御回路32に出力される。
The outdoor unit Uo includes an outdoor temperature sensor 28 and an outdoor control circuit 32 in addition to the above-described configuration.
The outdoor temperature sensor 28 is a sensor that detects an outdoor temperature, and is installed at a predetermined location of the outdoor unit Uo (see FIG. 1). Although not shown in FIG. 3, the outdoor unit Uo also includes a plurality of sensors for detecting the suction temperature, the discharge temperature, the discharge pressure, and the like of the compressor 11 (see FIG. 1). The detection value of each sensor including the outdoor temperature sensor 28 is output to the outdoor control circuit 32.

室外制御回路32は、図示はしないが、CPU、ROM、RAM、各種インタフェース等の電子回路を含んで構成され、通信線を介して室内制御回路31に接続されている。図3に示すように、室外制御回路32は、記憶部32aと、室外制御部32bと、を備えている。   Although not illustrated, the outdoor control circuit 32 includes electronic circuits such as a CPU, a ROM, a RAM, and various interfaces, and is connected to the indoor control circuit 31 via a communication line. As shown in FIG. 3, the outdoor control circuit 32 includes a storage unit 32 a and an outdoor control unit 32 b.

記憶部32aには、所定のプログラムの他、室内制御回路31から受信したデータ等が記憶される。室外制御部32bは、記憶部32aに記憶されたデータに基づいて、圧縮機モータ11a、室外ファンモータ13a、膨張弁14等を制御する。以下では、室内制御回路31及び室外制御回路32を一括して「制御部30」という。
次に、室内熱交換器15の凍結洗浄に関する制御部30の処理について、図4を用いて説明する。
The storage unit 32a stores, in addition to a predetermined program, data received from the indoor control circuit 31 and the like. The outdoor control unit 32b controls the compressor motor 11a, the outdoor fan motor 13a, the expansion valve 14, and the like based on the data stored in the storage unit 32a. Hereinafter, the indoor control circuit 31 and the outdoor control circuit 32 are collectively referred to as a "control unit 30".
Next, processing of the control unit 30 regarding the freeze cleaning of the indoor heat exchanger 15 will be described using FIG. 4.

<制御部の処理>
図4は、室内熱交換器15の凍結洗浄に関する処理のフローチャートである(適宜、図2、図3を参照)。
図4のステップS101において制御部30は、室内熱交換器15を凍結させる。すなわち、制御部30は、室内熱交換器15を蒸発器として機能させ、空気中の水分を室内熱交換器15に着霜させて、室内熱交換器15を凍結させる。
<Processing of control unit>
FIG. 4 is a flowchart of processing relating to the freeze cleaning of the indoor heat exchanger 15 (see FIGS. 2 and 3 as appropriate).
In step S101 of FIG. 4, the control unit 30 freezes the indoor heat exchanger 15. That is, the control unit 30 causes the indoor heat exchanger 15 to function as an evaporator, causes the moisture in the air to frost on the indoor heat exchanger 15, and freezes the indoor heat exchanger 15.

ステップS101についてさらに詳しく説明すると、制御部30は、圧縮機11(図1参照)を駆動し、さらに、膨張弁14(図1参照)の開度を冷房運転時よりも小さくする。これによって、低圧で蒸発温度の低い冷媒が室内熱交換器15に流入するため、空気中の水分が室内熱交換器15で着霜し、さらに、その霜や氷(図5に示す符号i)が成長しやすくなる。
次に、ステップS102において制御部30は、室内熱交換器15を解凍する。
Describing step S101 in more detail, the control unit 30 drives the compressor 11 (see FIG. 1), and further makes the opening degree of the expansion valve 14 (see FIG. 1) smaller than that in the cooling operation. As a result, a refrigerant having a low pressure and a low evaporation temperature flows into the indoor heat exchanger 15, so that moisture in the air forms frost on the indoor heat exchanger 15, and further, the frost and ice (symbol i shown in FIG. 5). Is more likely to grow.
Next, in step S102, the control unit 30 defrosts the indoor heat exchanger 15.

図5は、室内熱交換器15の解凍中の状態を示す説明図である。
制御部30は、室内熱交換器15の凍結後、例えば、室内ファン16や圧縮機11(図1参照)等の機器を停止状態にする。これによって、室内熱交換器15の霜や氷(図5に示す符号i)が室温で自然解凍され、多量の水wが、フィンfを伝ってドレンパン18に流れ落ちる。これによって、室内熱交換器15に付着した塵埃jが洗い流される。
FIG. 5 is an explanatory diagram showing a state in which the indoor heat exchanger 15 is being thawed.
After freezing the indoor heat exchanger 15, the control unit 30 stops devices such as the indoor fan 16 and the compressor 11 (see FIG. 1), for example. As a result, frost and ice (symbol i shown in FIG. 5) in the indoor heat exchanger 15 are naturally thawed at room temperature, and a large amount of water w flows down to the drain pan 18 through the fins f. Thereby, the dust j adhering to the indoor heat exchanger 15 is washed away.

なお、室内熱交換器15の凍結・解凍(図4のS101,S102)の後、制御部30が暖房運転又は送風運転を行うことで、室内機Uiの内部を乾燥させてもよい。これによって、室内機Uiにおけるカビ等の菌の繁殖を抑制できる。   Note that, after the indoor heat exchanger 15 is frozen and thawed (S101 and S102 in FIG. 4), the control unit 30 may dry the interior of the indoor unit Ui by performing a heating operation or a blowing operation. By this, it is possible to suppress the proliferation of bacteria such as mold in the indoor unit Ui.

ところで、外気温度が低すぎると(例えば、氷点下であると)、ドレンホース(図示せず)が凍結して、水が流れなくなることがある。これまでの技術では、前記したようにドレンホースが詰まると、室内熱交換器15の解凍で生じた水がドレンパン18から溢れる可能性があった。   By the way, if the outside air temperature is too low (for example, below freezing point), the drain hose (not shown) may freeze and water may not flow. In the conventional technology, when the drain hose is clogged as described above, water generated by the thawing of the indoor heat exchanger 15 may overflow from the drain pan 18.

このようなことを考慮して、例えば、外気温度が氷点下になっている間は、制御部30が、室内熱交換器15の凍結洗浄を禁止し続けることも考えられる。しかしながら、凍結洗浄の禁止があまりに長期間に及ぶと、室内熱交換器15に汚れが溜まり、空調運転の効率低下や菌の繁殖を招く可能性がある。そこで、本実施形態では、外気温度が所定温度(第1閾値)以下であっても、凍結洗浄を敢えて行い、その後の禁止期間が経過するまでは、次回の凍結洗浄を禁止するようにしている。   Considering this, for example, it may be considered that the control unit 30 continues to prohibit freezing and washing of the indoor heat exchanger 15 while the outside air temperature is below freezing. However, if prohibition of freezing and washing is too long, dirt accumulates in the indoor heat exchanger 15, which may lead to a reduction in efficiency of air conditioning operation and bacterial growth. Therefore, in the present embodiment, even if the outside air temperature is lower than or equal to a predetermined temperature (first threshold value), the freeze cleaning is intentionally performed, and the next freeze cleaning is prohibited until the subsequent prohibition period elapses. .

図6は、制御部30が実行する処理のフローチャートである(適宜、図3を参照)。
なお、図6の「START」時には、空調運転が行われていないものとする。
ステップS201において制御部30は、所定の洗浄条件が成立しているか否かを判定する。この「洗浄条件」とは、例えば、前回の凍結洗浄の終了時から空調運転の実行時間を積算した値が所定値に達したという条件である。
FIG. 6 is a flowchart of processing executed by the control unit 30 (see FIG. 3 as appropriate).
At the time of “START” in FIG. 6, it is assumed that the air conditioning operation is not performed.
In step S201, the control unit 30 determines whether a predetermined cleaning condition is satisfied. The "washing condition" is, for example, a condition that a value obtained by integrating the execution time of the air conditioning operation from the end of the previous freeze washing has reached a predetermined value.

ステップS201において所定の洗浄条件が成立している場合(S201:Yes)、制御部30の処理はステップS202に進む。一方、所定の洗浄条件が成立していない場合(S201:No)、制御部30はステップS201の処理を繰り返す。   When the predetermined cleaning condition is satisfied in step S201 (S201: Yes), the process of control unit 30 proceeds to step S202. On the other hand, when the predetermined cleaning condition is not satisfied (S201: No), the control unit 30 repeats the process of step S201.

ステップS202において制御部30は、室外温度センサ28(図3参照)によって検出される外気温度が第1閾値以下であるか否かを判定する。前記した「第1閾値」は、凍結洗浄の禁止期間(S204)を設定するか否かの判定基準となる閾値であり、予め設定されている。例えば、ステップS202において制御部30は、外気温度が氷点下であるか否か(不図示のドレンホースが氷結等で詰まる可能性があるか否か)を判定する。   In step S202, the control unit 30 determines whether or not the outdoor temperature detected by the outdoor temperature sensor 28 (see FIG. 3) is equal to or lower than the first threshold value. The above-mentioned “first threshold value” is a threshold value that serves as a criterion for determining whether or not to set the freeze cleaning prohibition period (S204), and is set in advance. For example, in step S202, the control unit 30 determines whether or not the outside air temperature is below freezing (whether or not a drain hose (not illustrated) may be clogged with icing or the like).

ステップS202において外気温度が第1閾値以下である場合(S202:Yes)、制御部30は、ステップS203において凍結洗浄を行う。つまり、制御部30は、室内熱交換器15を蒸発器として機能させ、この室内熱交換器15を凍結等させる処理(図4、図5参照)を行う。   When the outside air temperature is equal to or lower than the first threshold value in step S202 (S202: Yes), the control unit 30 performs freeze cleaning in step S203. That is, the control part 30 performs the process (refer FIG. 4, FIG. 5) which makes the indoor heat exchanger 15 function as an evaporator, and freezes this indoor heat exchanger 15.

ステップS203で凍結洗浄を行った後、ステップS204において制御部30は、所定の禁止期間を設定する。この禁止期間は、室内熱交換器15の凍結洗浄を禁止するための期間であり、その長さは予め設定されている。   After freeze cleaning in step S203, the control unit 30 sets a predetermined prohibition period in step S204. This prohibition period is a period for prohibiting freezing and washing of the indoor heat exchanger 15, and its length is set in advance.

例えば、ドレンホース(図示せず)が凍って水が流れない状態で、制御部30が室内熱交換器15の凍結洗浄(凍結・解凍)を行うと、室内熱交換器15から流れ落ちた水がドレンパン18に溜まる。このようにドレンパン18に溜まった水のほとんどが、自然対流等で蒸発するまでの期間(例えば、数十時間)として、凍結洗浄の禁止期間の長さが予め設定されている。   For example, when the control unit 30 freezes and cleans (freezes and thaws) the indoor heat exchanger 15 in a state where the drain hose (not shown) is frozen and water does not flow, the water that has fallen from the indoor heat exchanger 15 is It collects in the drain pan 18. As described above, the length of the freeze-cleaning prohibition period is set in advance as a period (for example, several tens of hours) until most of the water accumulated in the drain pan 18 evaporates by natural convection or the like.

なお、ドレンホース(図示せず)が凍って水が流れない状態で、室内熱交換器15の凍結洗浄が1回行われてもドレンパン18から水が溢れないように、ドレンパン18の容量が設計段階で適宜に設定されている。   In addition, the capacity of the drain pan 18 is designed so that water does not overflow from the drain pan 18 even if the indoor heat exchanger 15 is subjected to freeze cleaning once while the drain hose (not shown) is frozen and water does not flow. It is set appropriately at the stage.

図6のステップS204において凍結洗浄の禁止期間を設定した後、ステップS205において制御部30は、室内熱交換器15の凍結洗浄を禁止する。   After the freeze cleaning prohibition period is set in step S204 of FIG. 6, in step S205, the control unit 30 prohibits the indoor heat exchanger 15 from being frozen and cleaned.

次に、ステップS206において制御部30は、ステップS203の凍結洗浄の終了時から所定の禁止期間が経過したか否かを判定する。禁止期間が経過していない場合(S206:Yes)、制御部30の処理はステップS205に戻る。つまり、制御部30は、所定の禁止期間が経過するまでは、次回の凍結洗浄を禁止する。これによって、ドレンホース(図示せず)が凍りついて詰まった状態で、短期間のうちに凍結洗浄が複数回行われることを防止し、ひいては、ドレンパン18から水が溢れることを防止できる。   Next, in step S206, the control unit 30 determines whether or not a predetermined prohibition period has elapsed since the end of the freeze cleaning in step S203. When the prohibition period has not elapsed (S206: Yes), the process of the control unit 30 returns to step S205. That is, the control unit 30 prohibits the next freeze cleaning until the predetermined prohibition period elapses. By this, in a state where the drain hose (not shown) is frozen and clogged, it is possible to prevent the freeze cleaning from being performed multiple times in a short period, and in turn, it is possible to prevent the water from overflowing from the drain pan 18.

また、ステップS206において禁止期間が経過した場合(S206:Yes)、制御部30の処理は「START」に戻る(RETURN)。禁止期間が経過した時点でドレンパン18の水はほとんど蒸発しているため、その後に再び凍結洗浄を行っても、特に支障はないからである。つまり、ドレンホース(図示せず)が凍りついて水が流れず、凍結洗浄後にドレンパン18に水が溜まっていても、禁止期間が経過する頃には自然対流等によって水がほとんど蒸発している。   If the prohibition period has elapsed in step S206 (S206: Yes), the process of the control unit 30 returns to “START” (RETURN). This is because the water in the drain pan 18 has almost evaporated at the time when the prohibition period has elapsed, and there is no particular problem even if freeze washing is performed again thereafter. That is, even if the drain hose (not shown) is frozen and water does not flow, and water is accumulated in the drain pan 18 after freeze cleaning, the water is mostly evaporated by natural convection or the like by the time the prohibition period elapses.

また、ステップS202において外気温度が第1閾値よりも高い場合(S202:No)、制御部30の処理はステップS207に進む。
ステップS207において制御部30は、室内熱交換器15の凍結洗浄(図4、図5参照)を通常どおりに実行する。ステップS207の処理を行った後、制御部30の処理は「START」に戻る(RETURN)。
When the outside air temperature is higher than the first threshold value in step S202 (S202: No), the process of the control unit 30 proceeds to step S207.
In step S207, the control unit 30 performs freezing cleaning (see FIGS. 4 and 5) of the indoor heat exchanger 15 as usual. After performing the process of step S207, the process of the control unit 30 returns to "START" (RETURN).

<効果>
第1実施形態によれば、制御部30は、外気温度が第1閾値以下であるときに凍結洗浄の処理を行った場合(図6のS202:Yes、S203)、凍結洗浄を行ってから所定の禁止期間が経過するまでは、次回の凍結洗浄を開始しない(S205、S206:No)。これによって、例えば、ドレンホース(図示せず)が凍りついて水が流れない状況であっても、凍結洗浄が行われるため、室内熱交換器15を清潔な状態にすることができる。
<Effect>
According to the first embodiment, when the control unit 30 performs the freeze cleaning process when the outside air temperature is equal to or lower than the first threshold (S202: Yes, S203 in FIG. 6), the control unit 30 performs a predetermined process after performing the freeze cleaning. The next freeze cleaning is not started until the prohibition period of has passed (S205, S206: No). Accordingly, for example, even when the drain hose (not shown) freezes and water does not flow, the indoor heat exchanger 15 can be kept clean because the freezing and washing are performed.

また、前記した禁止期間中は、室内熱交換器15の凍結洗浄が禁止されるため(図6のS205、S206:No)、凍結洗浄が短期間のうちに複数回行われることを防止できる。したがって、凍結洗浄に伴う水がドレンパン18から溢れることを防止できる。   Moreover, since freezing cleaning of the indoor heat exchanger 15 is prohibited during the above-mentioned prohibition period (S205 of FIG. 6, S206: No), it can prevent that freezing cleaning is performed multiple times in a short period of time. Therefore, it is possible to prevent the water associated with the freeze cleaning from overflowing from the drain pan 18.

≪第2実施形態≫
第2実施形態は、外気温度が第1閾値以下であって、前回の凍結洗浄からの経過時間が比較的短い場合には、制御部30が、室内熱交換器15の凍結時間を前回よりも短くする点が、第1実施形態とは異なっている。なお、その他(空気調和機100の構成等)については、第1実施形態と同様である。したがって、第1実施形態とは異なる部分について説明し、重複する部分については説明を省略する。
Second Embodiment
In the second embodiment, when the outside air temperature is equal to or lower than the first threshold and the elapsed time from the previous freeze cleaning is relatively short, the control unit 30 sets the freezing time of the indoor heat exchanger 15 to be less than the previous time. The point to shorten is different from 1st Embodiment. Others (such as the configuration of the air conditioner 100) are the same as in the first embodiment. Therefore, only the parts different from the first embodiment will be described, and the descriptions of the overlapping parts will be omitted.

図7は、第2実施形態に係る空気調和機の制御部30が実行する処理のフローチャートである(適宜、図3を参照)。
なお、図7の「START」時には、空調運転が行われていないものとする。また、ステップS301,S302については、第1実施形態のステップS201,S202(図6参照)と同様であるから、説明を省略する。
FIG. 7 is a flowchart of processing executed by the control unit 30 of the air conditioner according to the second embodiment (see FIG. 3 as appropriate).
At the time of “START” in FIG. 7, it is assumed that the air conditioning operation is not performed. Also, since steps S301 and S302 are the same as steps S201 and S202 (see FIG. 6) of the first embodiment, the description will be omitted.

図7のステップS302において外気温度が第1閾値以下である場合(S302:Yes)、制御部30の処理はステップS303に進む。
ステップS303において制御部30は、前回の凍結洗浄からの経過時間が所定時間以下であるか否かを判定する。より詳しく説明すると、ステップS303において制御部30は、前回の凍結洗浄の終了時から、今回の凍結洗浄の開始時までの経過時間が所定時間以下であるか否かを判定する。前記した「所定時間」とは、今回の凍結時間を前回よりも短くする(S304)か否かの判定基準となる閾値であり、予め設定されている。
If the outside air temperature is equal to or less than the first threshold in step S302 in FIG. 7 (S302: Yes), the process of the control unit 30 proceeds to step S303.
In step S303, the control unit 30 determines whether the elapsed time from the previous freeze cleaning is equal to or less than a predetermined time. More specifically, in step S303, the control unit 30 determines whether or not the elapsed time from the end of the previous freeze cleaning to the start of the current freeze cleaning is a predetermined time or less. The above-mentioned "predetermined time" is a threshold which is a determination reference of whether to make the current freezing time shorter than the previous time (S304), and is set in advance.

ステップS303において前回の凍結洗浄からの経過時間が所定時間以下である場合(S303:Yes)、制御部30の処理はステップS304に進む。
ステップS304において制御部30は、今回の凍結時間(図3に示す室内熱交換器15の温度を所定値以下にする制御の継続時間)を前回よりも短くする。つまり、制御部30は、外気温度が第1閾値よりも高いときに凍結洗浄を行う場合(例えば、前回の凍結洗浄時)に比べて、凍結洗浄の運転時間を短くする。
When the elapsed time from the previous freeze cleaning is equal to or less than the predetermined time in step S303 (S303: Yes), the process of the control unit 30 proceeds to step S304.
In step S304, the control unit 30 shortens the current freezing time (the duration of control for making the temperature of the indoor heat exchanger 15 shown in FIG. 3 equal to or less than a predetermined value) than in the previous time. That is, the control unit 30 shortens the operation time of the freeze cleaning as compared with the case where the freeze cleaning is performed when the outside air temperature is higher than the first threshold (for example, at the previous freeze cleaning).

なお、外気温度が第1閾値以下であり(S302:Yes)、さらに、前回の凍結洗浄からの経過時間が所定時間以下である場合には(S303:Yes)、前回の凍結洗浄に伴う水が蒸発しきらずに、ドレンパン18(図5参照)に溜まったままである可能性が高い。   If the outside air temperature is less than or equal to the first threshold (S302: Yes), and if the elapsed time from the previous freeze cleaning is less than or equal to the predetermined time (S303: Yes), the water associated with the previous freeze cleaning is It is highly likely that it has not accumulated and remains in the drain pan 18 (see FIG. 5).

そこで、本実施形態では、制御部30が、室内熱交換器15の今回の凍結時間を前回よりも短くするようにしている(S304)。これによって、室内熱交換器15に付着する霜や氷の量が、前回の凍結洗浄時よりも少なくなる。したがって、その後の解凍で室内熱交換器15からドレンパン18に流れ落ちる水の量が、前回の凍結洗浄時よりも少なくなるため、ドレンパン18から水が溢れることを防止できる。   Therefore, in the present embodiment, the control unit 30 makes the current freezing time of the indoor heat exchanger 15 shorter than the previous time (S304). As a result, the amount of frost or ice adhering to the indoor heat exchanger 15 is smaller than that in the previous freeze cleaning. Therefore, since the amount of water flowing down from the indoor heat exchanger 15 to the drain pan 18 in the subsequent thawing is smaller than that in the previous freeze cleaning, it is possible to prevent the water from overflowing from the drain pan 18.

なお、比較的短期間のうちに凍結洗浄が繰り返されてもドレンパン18から水が溢れないように、ステップS304での凍結時間(前回の凍結洗浄時よりも短い凍結時間)の長さが予め設定されている。   In addition, the length of the freezing time (frozen time shorter than the time of the last freeze washing) in step S304 is preset so that water does not overflow from the drain pan 18 even if the freeze washing is repeated in a relatively short period of time Has been.

次に、図7のステップS305において制御部30は、ステップS304で設定した凍結時間に基づき、室内熱交換器15の凍結洗浄を実行する。ステップS305の処理を行った後、制御部30の処理は「START」に戻る(RETURN)。   Next, in step S305 in FIG. 7, the control unit 30 performs freeze cleaning of the indoor heat exchanger 15 based on the freezing time set in step S304. After the process of step S305, the process of the control unit 30 returns to "START" (RETURN).

また、ステップS302において外気温度が第1閾値よりも高い場合(S302:No)、ステップS306において制御部30は、通常の凍結時間に基づき、室内熱交換器15の凍結洗浄を行う。室内熱交換器15に多量の霜や氷を付着させても、その後にドレンホース(図示せず)を介して水を排出できるからである。   When the outside air temperature is higher than the first threshold value in step S302 (S302: No), in step S306, the control unit 30 performs freezing and washing of the indoor heat exchanger 15 based on the normal freezing time. This is because even if a large amount of frost or ice adheres to the indoor heat exchanger 15, water can be discharged through a drain hose (not shown).

また、ステップS303において、前回の凍結洗浄からの経過時間が所定時間よりも長い場合にも(S303:No)、制御部30の処理は、ステップS306に進む。前記した「所定時間」の経過時には、ドレンパン18に溜まった水がほとんど蒸発している可能性が高いからである。つまり、ドレンホース(図示せず)が凍りついて水が流れず、前回の凍結洗浄後にドレンパン18に水が溜まっていても、前回の凍結洗浄からの経過時間が所定時間よりも長い場合には(S303:No)、自然対流等によって水がほとんど蒸発している。したがって、ステップS306において制御部30が、凍結洗浄を通常どおりに行っても、特に支障はない。ステップS306の処理を行った後、制御部30の処理は「START」に戻る(RETURN)。   Moreover, also in step S303, also when the elapsed time from the last freezing washing | cleaning is longer than predetermined time (S303: No), the process of the control part 30 progresses to step S306. This is because, when the “predetermined time” has elapsed, there is a high possibility that most of the water accumulated in the drain pan 18 has evaporated. That is, even if the drain hose (not shown) is frozen and water does not flow, and even if water is accumulated in the drain pan 18 after the previous freeze cleaning, if the elapsed time from the previous freeze cleaning is longer than the predetermined time ( S303: No), water is mostly evaporated due to natural convection and the like. Therefore, there is no particular problem even if the control unit 30 performs the freeze cleaning in step S306 as usual. After performing the process of step S306, the process of the control unit 30 returns to "START" (RETURN).

<効果>
第2実施形態によれば、外気温度が第1閾値以下であって(S302:Yes)、前回の凍結洗浄(処理)の終了時から今回の凍結洗浄の開始時までの経過時間が所定時間以下である場合(S303:Yes)、制御部30は、今回の凍結洗浄の運転時間を前回よりも短くする(S304)。これによって、例えば、ドレンホース(図示せず)が凍りついて水が流れない状況であっても、凍結洗浄が行われるため、室内熱交換器15を清潔な状態にすることができる。
<Effect>
According to the second embodiment, the outside air temperature is equal to or lower than the first threshold (S302: Yes), and the elapsed time from the end of the previous freeze cleaning (processing) to the start of the current freeze cleaning is equal to or less than a predetermined time. If it is (S303: Yes), the control unit 30 makes the operation time of the present freeze cleaning shorter than the previous operation (S304). Accordingly, for example, even when the drain hose (not shown) freezes and water does not flow, the indoor heat exchanger 15 can be kept clean because the freezing and washing are performed.

また、制御部30が、今回の凍結洗浄の運転時間を前回よりも短くすることで(S304)、凍結洗浄に伴う水がドレンパン18から溢れることを防止できる。   Moreover, the control part 30 can prevent the water accompanying freezing washing | cleaning from overflowing from the drain pan 18 by making operation time of this freezing washing | cleaning shorter than last time (S304).

≪変形例≫
以上、本発明に係る空気調和機100について各実施形態で説明したが、本発明はこれらの記載に限定されるものではなく、種々の変更を行うことができる。
例えば、室内熱交換器15の凍結・解凍に代えて、制御部30が、室内熱交換器15を蒸発器として機能させ、室内熱交換器15を結露させてもよい。例えば、制御部30は、室内熱交換器15の温度が、室内空気の露点以下であり、かつ、所定の凍結温度(室内熱交換器15が凍結し始めるときの温度)よりも高くなるように、膨張弁14の開度を調整する。これによって、室内熱交換器15が結露し、その結露水で室内熱交換器15が洗い流される。
«Modification»
As mentioned above, although each embodiment demonstrated the air conditioner 100 which concerns on this invention, this invention is not limited to these description, A various change can be made.
For example, instead of freezing / thawing the indoor heat exchanger 15, the control unit 30 may cause the indoor heat exchanger 15 to function as an evaporator and cause the indoor heat exchanger 15 to condense. For example, the control unit 30 causes the temperature of the indoor heat exchanger 15 to be equal to or lower than the dew point of the indoor air and higher than a predetermined freezing temperature (a temperature at which the indoor heat exchanger 15 starts to freeze). The opening degree of the expansion valve 14 is adjusted. As a result, the indoor heat exchanger 15 condenses, and the condensed water causes the indoor heat exchanger 15 to be washed away.

なお、第1実施形態の他、第2実施形態においても、制御部30が室内熱交換器15を蒸発器として機能させ、室内熱交換器15を凍結又は結露させる処理(「凍結洗浄等」ともいう)を行うようにしてもよい。このような構成でも、室内熱交換器15を清潔な状態にし、さらに、ドレンパン18から水が溢れにくい空気調和機100を提供できる。   In addition to the first embodiment, also in the second embodiment, the control unit 30 causes the indoor heat exchanger 15 to function as an evaporator and freezes or condenses the indoor heat exchanger 15 (also referred to as “freezing washing”). May be performed. Even with such a configuration, it is possible to provide the air conditioner 100 in which the indoor heat exchanger 15 is in a clean state and water is not easily overflowed from the drain pan 18.

また、第1実施形態では、凍結洗浄(図6のS203)の開始時の外気温度に基づいて(S202)、制御部30が、次回の凍結洗浄の禁止期間を設ける処理(S204)について説明したが、これに限らない。例えば、凍結洗浄等を行っているときの所定のタイミングでの外気温度に基づいて、制御部30が、所定の禁止期間を設けるようにしてもよい。また、凍結洗浄等の終了時の外気温度に基づいて、制御部30が、所定の禁止期間を設けるようにしてもよい。つまり、制御部30が、凍結洗浄中の外気温度に基づいて、次回の凍結洗浄の禁止期間を設けるようにしてもよい。   Further, in the first embodiment, based on the outside air temperature at the start of the freeze cleaning (S203 in FIG. 6) (S202), the control unit 30 has described the processing (S204) for providing a prohibition period for the next freeze cleaning. However, it is not limited to this. For example, the control unit 30 may provide a predetermined prohibition period based on the outside air temperature at a predetermined timing when performing freeze cleaning or the like. Further, the control unit 30 may provide a predetermined prohibition period based on the outside air temperature at the end of the freeze cleaning or the like. That is, the control unit 30 may provide a period for prohibiting the next freeze cleaning based on the outside air temperature during the freeze cleaning.

また、第1実施形態では、凍結洗浄の禁止期間(図6のS204)の長さが固定値である場合について説明したが、これに限らない。例えば、凍結洗浄等の処理中における室内温度が高いほど、又は、凍結洗浄等の処理中における室内湿度(相対湿度又は絶対湿度)が低いほど、制御部30が、凍結洗浄等の禁止期間の長さを短くするようにしてもよい。ドレンパン18に溜まった水は、室内温度が高いほど、また、室内湿度が低いほど、蒸発しやすいからである。   In the first embodiment, the case where the length of the freeze cleaning prohibition period (S204 in FIG. 6) is a fixed value has been described. However, the present invention is not limited to this. For example, as the room temperature during the process such as the freeze washing is higher, or as the room humidity (relative humidity or absolute humidity) during the process such as the freeze washing is lower, the control unit 30 May be shortened. This is because the water accumulated in the drain pan 18 is more likely to evaporate as the room temperature is higher and the room humidity is lower.

また、第2実施形態において、制御部30が、室内熱交換器15の今回の凍結時間を前回よりも短くする際(図7のS304)、今回の凍結時間を次のように設定してもよい。すなわち、凍結洗浄等の処理中における室内温度が高いほど、又は、凍結洗浄等の処理中における室内湿度が低いほど、制御部30が、今回の凍結時間(凍結洗浄等の運転時間)を短くするようにしてもよい。また、前回の凍結洗浄の終了時から今回の凍結洗浄の開始時までの経過時間が短いほど、制御部30が、今回の凍結時間を短くするようにしてもよい。これによって、凍結洗浄を行う際の凍結時間の長さを適切に設定できる。   In the second embodiment, when the control unit 30 shortens the current freezing time of the indoor heat exchanger 15 more than the previous time (S304 in FIG. 7), the current freezing time may be set as follows. Good. That is, the control unit 30 shortens the current freezing time (the operation time of the freeze washing etc.) as the room temperature during the freezing washing etc. is higher or as the room humidity during the freeze washing etc is lower. You may do it. Further, the control unit 30 may shorten the current freezing time as the elapsed time from the end of the previous freezing cleaning to the start of the current freezing cleaning is shorter. By this, the length of freezing time at the time of freeze washing can be set appropriately.

また、第1実施形態では、凍結洗浄の禁止期間の経過後(図6のS206:Yes、RETURN)、所定の洗浄条件が成立したか否か(S201)を制御部30が判定する処理について説明したが、これに限らない。例えば、凍結洗浄の禁止期間の設定後、所定の洗浄条件が成立したか否かの判定を制御部30が繰り返し行い、この洗浄条件が成立した場合であっても、禁止期間中であれば、制御部30が凍結洗浄を禁止するようにしてもよい。   In the first embodiment, after the elapse of the freeze cleaning prohibition period (S206 of FIG. 6: Yes, RETURN), the control unit 30 determines whether or not a predetermined cleaning condition is satisfied (S201). However, it is not limited to this. For example, after setting the prohibition period for freeze cleaning, the control unit 30 repeatedly determines whether or not a predetermined cleaning condition is satisfied, and even if this cleaning condition is satisfied, The control unit 30 may prohibit freezing and cleaning.

また、第1実施形態では、所定の洗浄条件が成立した場合(図6のS201:Yes)、制御部30が、室内熱交換器15の凍結洗浄(S203、S207)を適宜に行う処理について説明したが、これに限らない。すなわち、リモコン40(図3参照)から凍結洗浄等の開始指令が入力された場合、制御部30が、室内熱交換器15の凍結洗浄等を開始するようにしてもよい。   Moreover, in 1st Embodiment, when a predetermined | prescribed washing | cleaning conditions are satisfied (S201: Yes of FIG. 6), the control part 30 demonstrates the process which performs freezing washing | cleaning (S203, S207) of the indoor heat exchanger 15 suitably. However, it is not limited to this. That is, when a start command such as freeze cleaning is input from the remote controller 40 (see FIG. 3), the control unit 30 may start freeze cleaning of the indoor heat exchanger 15 or the like.

また、凍結洗浄等の禁止期間中にリモコン40(図3参照)から凍結洗浄等の開始指令が入力された場合、制御部30が、この開始指令に応じた凍結洗浄等の開始を行わないことが好ましい。この場合において、凍結洗浄等を開始しない旨が音声や画像で報知されてもよい。これによって、ドレンパン18から水が溢れることを防止し、また、凍結洗浄等を開始しない旨をユーザに報知できる。   Further, when a start command for freeze cleaning or the like is input from the remote controller 40 (see FIG. 3) during the prohibition period for freeze cleaning or the like, the control unit 30 does not start freeze cleaning or the like in response to the start command. Is preferred. In this case, it may be notified by voice or image that freezing cleaning and the like are not started. This prevents water from overflowing from the drain pan 18 and can notify the user that freeze cleaning or the like will not be started.

また、凍結洗浄等の禁止期間中にリモコン40(図3参照)から凍結洗浄等の開始指令が入力された場合、制御部30が、禁止期間の経過後に凍結洗浄等を開始するようにしてもよい。これによって、ドレンパン18から水が溢れることを防止しつつ、リモコン40からの開始指令に応じて凍結洗浄等を行うことができる。   In addition, when a start command for freeze cleaning etc. is input from the remote control 40 (see FIG. 3) during the freeze cleaning etc. prohibited period, the control unit 30 may start the freeze cleaning etc after the prohibition period has elapsed. Good. As a result, it is possible to perform freeze cleaning or the like in accordance with the start command from the remote controller 40 while preventing the water from overflowing the drain pan 18.

また、凍結洗浄等の禁止期間中にリモコン40(図3参照)から凍結洗浄等の開始指令が入力された場合において、この開始指令の入力時の外気温度が、第1閾値よりも高い第2閾値以上である場合、制御部30が、禁止期間の長さを短くするか、又は、開始指令に応じて凍結洗浄等を開始してもよい。前記した第2閾値は、例えば、0℃よりも高い温度閾値であり、予め設定されている。つまり、外気温度の上昇に伴い、ドレンホース(図示せず)を介して水を排出可能な状態になっていれば、リモコン40からの開始指令に応じて、制御部30が凍結洗浄等を行うようにしてもよい。これによって、禁止期間が無駄に長く継続することを防止し、制御部30が次回の凍結洗浄を速やかに開始できる。   In addition, when a start command for freeze cleaning or the like is input from the remote controller 40 (see FIG. 3) during the prohibition period for freeze cleaning or the like, the outside air temperature when the start command is input is higher than the first threshold value. When it is equal to or greater than the threshold value, the control unit 30 may shorten the length of the prohibition period, or may start freeze cleaning or the like according to the start command. The above-mentioned second threshold is, for example, a temperature threshold higher than 0 ° C., and is set in advance. That is, as the outside air temperature rises, if the water can be discharged through the drain hose (not shown), the control unit 30 performs freezing washing or the like according to the start command from the remote controller 40. You may do it. As a result, the prohibition period is prevented from continuing unnecessarily long, and the control unit 30 can promptly start the next freeze cleaning.

また、第2実施形態では、外気温度や(図7のS302)、前回の凍結洗浄からの経過時間(S303)に基づき、制御部30が、今回の凍結時間を前回よりも短くする処理(S304)について説明したが、これに限らない。例えば、ステップS303の判定処理を省略してもよい。すなわち、外気温度が第1閾値以下であるときに、制御部30が凍結洗浄等の処理を行う場合、外気温度が第1閾値よりも高いときに凍結洗浄等を行う場合に比べて、凍結洗浄等の運転時間を短くするようにしてもよい。   In the second embodiment, the control unit 30 shortens the current freezing time from the previous time based on the outside air temperature (S302 in FIG. 7) and the elapsed time (S303) from the previous freezing and cleaning (S304). ) Has been described, but it is not limited thereto. For example, the determination process of step S303 may be omitted. That is, when the outside air temperature is equal to or lower than the first threshold value, when the control unit 30 performs a process such as freeze washing, the freeze washing is performed as compared with the case where the freeze washing is performed when the outside air temperature is higher than the first threshold value. The operating time of the vehicle may be shortened.

また、第1実施形態で説明した処理(図6参照)に、以下で説明する暖房運転や送風運転の処理を追加してもよい。すなわち、外気温度が第1閾値以下であるときに制御部30が凍結洗浄等を行った場合、この凍結洗浄等の後に暖房運転又は送風運転を行うようにしてもよい。暖房運転又は送風運転が行われることで、ドレンパン18に溜まった水が蒸発しやすくなるからである。なお、制御部30が、凍結洗浄後に暖房運転及び送風運転のうち一方を行った後、他方を行うようにしてもよい。また、第2実施形態についても同様のことがいえる。   Moreover, you may add the process of heating operation and ventilation operation demonstrated below to the process (refer FIG. 6) demonstrated in 1st Embodiment. That is, when the control unit 30 performs freeze cleaning or the like when the outside air temperature is equal to or lower than the first threshold value, the heating operation or the air blowing operation may be performed after the freeze cleaning or the like. This is because water accumulated in the drain pan 18 is easily evaporated by performing the heating operation or the air blowing operation. The control unit 30 may perform the other after performing one of the heating operation and the air blowing operation after the freeze cleaning. The same applies to the second embodiment.

また、第1実施形態において、制御部30が、次の処理を行うようにしてもよい。すなわち、制御部30は、外気温度が第1閾値以下であるときに凍結洗浄等を行った場合において、この凍結洗浄等の後の禁止期間中、リモコン40の操作に応じた空調運転として暖房運転又は送風運転を行ったとき、禁止期間の長さを短くする。暖房運転又は送風運転が行われることで、ドレンパン18に溜まった水が蒸発しやすくなるからである。   Furthermore, in the first embodiment, the control unit 30 may perform the following processing. That is, the control unit 30 performs the heating operation as the air conditioning operation according to the operation of the remote controller 40 during the prohibition period after the freezing washing or the like when the outside air temperature is equal to or lower than the first threshold. Or when the air blowing operation is performed, the length of the prohibition period is shortened. This is because the water accumulated in the drain pan 18 is easily evaporated by performing the heating operation or the air blowing operation.

さらに、凍結洗浄等の後の禁止期間中、リモコン40の操作に応じた空調運転として暖房運転又は送風運転を行った場合、制御部30が、禁止期間中における空調運転の積算時間が長いほど、禁止期間の長さを短くするようにしてもよい。これによって、ドレンパン18に溜まった水が蒸発しきった後も、禁止期間が無駄に長く継続することを抑制できる。   Furthermore, when the heating operation or the air blowing operation is performed as the air conditioning operation according to the operation of the remote control 40 during the prohibition period after the freeze cleaning and the like, the control unit 30 increases the integration time of the air conditioning operation during the prohibition period. The length of the prohibition period may be shortened. Thereby, even after the water accumulated in the drain pan 18 has completely evaporated, the prohibition period can be prevented from continuing unnecessarily long.

また、凍結洗浄等の禁止期間の経過時の外気温度が第1閾値以下である場合、制御部30が禁止期間を延長するようにしてもよい。これによって、凍結洗浄等に伴う水がドレンパン18から溢れることを確実に防止できる。   In addition, when the outside air temperature at the time when the prohibition period such as freeze cleaning has elapsed is equal to or lower than the first threshold, the control unit 30 may extend the prohibition period. As a result, it is possible to reliably prevent the water associated with the freeze cleaning and the like from overflowing from the drain pan 18.

また、第1実施形態では、制御部30が、外気温度の検出値に基づき(図6のS202)、凍結洗浄の禁止期間を設定する処理(S204)について説明したが、これに限らない。例えば、空調運転が行われていないときの室内温度が第1閾値以下である場合、制御部30が、凍結洗浄の禁止期間を設定するようにしてもよい。さらに、室内温度が高いほど、また、室内湿度が低いほど、制御部30が禁止期間の長さを短くするようにしてもよい。これによって、室外温度センサ28(図3参照)が設けられていない構成でも、凍結洗浄等の禁止期間を適宜に設定できる。   Moreover, although control part 30 demonstrated the process (S204) which sets the prohibition period of freezing washing | cleaning based on the detected value of outside temperature (S202 of FIG. 6) in 1st Embodiment, it is not restricted to this. For example, when the room temperature when the air-conditioning operation is not being performed is equal to or lower than the first threshold, the control unit 30 may set the prohibition period for freeze cleaning. Furthermore, the control unit 30 may shorten the length of the prohibition period as the room temperature is higher and the room humidity is lower. Thereby, even in a configuration in which the outdoor temperature sensor 28 (see FIG. 3) is not provided, a prohibition period such as freeze cleaning can be appropriately set.

また、第1実施形態や第2実施形態では、外気温度が第1閾値以下であるという条件の一例として、外気温度が氷点下である場合について説明したが、これに限らない。例えば、その後にドレンホース(図示せず)の水が凍結する可能性を考慮し、前記した第1閾値として、0℃よりも高い所定値(5℃等)が設定されていてもよい。
また、第1実施形態・第2実施形態を適宜に組み合わせてもよい。例えば、外気温度が第1閾値以下である場合(図6のS202:Yes)、制御部30が凍結洗浄を行い(S203)、さらに、所定の禁止期間が経過した後、次回の凍結洗浄の運転時間を前回よりも短くするようにしてもよい。
Moreover, although 1st Embodiment and 2nd Embodiment demonstrated the case where outside temperature was below freezing as an example of conditions that outside temperature is below a 1st threshold value, it does not restrict to this. For example, in consideration of the possibility of the water in the drain hose (not shown) freezing thereafter, a predetermined value (such as 5 ° C.) higher than 0 ° C. may be set as the first threshold value.
Moreover, you may combine 1st Embodiment and 2nd Embodiment suitably. For example, when the outside air temperature is equal to or lower than the first threshold value (S202: Yes in FIG. 6), the control unit 30 performs freeze cleaning (S203), and after the predetermined prohibition period has passed, the next freeze cleaning operation is performed. You may make it make time shorter than last time.

また、各実施形態では、室内機Ui(図1参照)及び室外機Uo(図1参照)が一台ずつ設けられる構成について説明したが、これに限らない。すなわち、並列接続された複数台の室内機を設けてもよいし、また、並列接続された複数台の室外機を設けてもよい。
また、各実施形態は、壁掛型の空気調和機100の他、さまざまな種類の空気調和機に適用可能である。
Moreover, although each embodiment demonstrated the structure in which the indoor unit Ui (refer FIG. 1) and the outdoor unit Uo (refer FIG. 1) are provided 1 each, it does not restrict to this. That is, a plurality of indoor units connected in parallel may be provided, or a plurality of outdoor units connected in parallel may be provided.
Moreover, each embodiment is applicable to various types of air conditioners other than wall-mounted air conditioner 100.

また、各実施形態は本発明を分かりやすく説明するために詳細に記載したものであり、必ずしも説明した全ての構成を備えるものに限定されない。また、各実施形態の構成の一部について、他の構成の追加・削除・置換をすることが可能である。
また、前記した機構や構成は説明上必要と考えられるものを示しており、製品上必ずしも全ての機構や構成を示しているとは限らない。
Further, each embodiment is described in detail for easy understanding of the present invention, and the present invention is not necessarily limited to one having all the configurations described. Moreover, it is possible to add, delete, and replace other configurations for part of the configurations of the respective embodiments.
Further, the mechanisms and configurations described above indicate what is considered to be necessary for the description, and not all the mechanisms and configurations of the product are necessarily shown.

100 空気調和機
11 圧縮機
12 室外熱交換器(凝縮器/蒸発器)
13 室外ファン
14 膨張弁
15 室内熱交換器(蒸発器/凝縮器)
16 室内ファン
17 四方弁
18 ドレンパン
19 筐体ベース
27 環境検出部
27a 室内温度センサ
27b 湿度センサ
27c 室内熱交換器温度センサ
28 室外温度センサ
30 制御部
40 リモコン
Q 冷媒回路
Uo 室外機
Ui 室内機
100 air conditioner 11 compressor 12 outdoor heat exchanger (condenser / evaporator)
13 Outdoor fan 14 Expansion valve 15 Indoor heat exchanger (evaporator / condenser)
16 Indoor fan 17 Four-way valve 18 Drain pan 19 Case base 27 Environment detection unit 27a Indoor temperature sensor 27b Humidity sensor 27c Indoor heat exchanger temperature sensor 28 Outdoor temperature sensor 30 Control unit 40 Remote control Q Refrigerant circuit Uo Outdoor unit Ui Indoor unit

Claims (9)

圧縮機、凝縮器、膨張弁、及び蒸発器を順次に介して冷媒が循環する冷媒回路と、
少なくとも前記圧縮機及び前記膨張弁を制御する制御部と、を備え、
前記凝縮器及び前記蒸発器の一方は室外熱交換器であり、他方は室内熱交換器であり、
前記室内熱交換器の下側に配置されるドレンパンをさらに備え、
前記制御部は、
前記室内熱交換器を前記蒸発器として機能させ、前記室内熱交換器を凍結又は結露させる処理を行い、
外気温度が第1閾値以下であるときに前記処理を行った場合、当該処理を行ってから所定の禁止期間が経過するまでは、次回の前記処理を開始せず、
前記第1閾値は、前記ドレンパンからの排水が氷結するおそれがある値である空気調和機。
A refrigerant circuit in which a refrigerant circulates sequentially through a compressor, a condenser, an expansion valve, and an evaporator;
A controller that controls at least the compressor and the expansion valve, and
One of the condenser and the evaporator is an outdoor heat exchanger, and the other is an indoor heat exchanger,
Further comprising a drain pan disposed below the indoor heat exchanger;
The control unit
The indoor heat exchanger is made to function as the evaporator, and the indoor heat exchanger is frozen or condensed.
When the process is performed when the outside air temperature is equal to or less than the first threshold, the next process is not started until the predetermined prohibition period elapses after the process is performed .
The air conditioner according to claim 1, wherein the first threshold is a value at which drainage from the drain pan may freeze .
前記制御部は、
前記処理中における室内温度が高いほど、又は、前記処理中における室内湿度が低いほど、前記禁止期間の長さを短くすること
を特徴とする請求項1に記載の空気調和機。
The control unit
The air conditioner according to claim 1, wherein the length of the prohibition period is shortened as the room temperature during the process is higher or the room humidity during the process is lower.
前記禁止期間中にリモコンから前記処理の開始指令が入力された場合、前記制御部は、前記開始指令に応じた前記処理の開始を行わないこと
を特徴とする請求項1に記載の空気調和機。
2. The air conditioner according to claim 1, wherein the control unit does not start the process in response to the start command when a command to start the process is input from a remote controller during the prohibition period. .
前記禁止期間中にリモコンから前記処理の開始指令が入力された場合、前記制御部は、前記禁止期間の経過後に前記処理を開始すること
を特徴とする請求項1に記載の空気調和機。
2. The air conditioner according to claim 1, wherein when the start command of the process is input from a remote controller during the prohibition period, the control unit starts the process after the prohibition period has elapsed.
前記禁止期間中にリモコンから前記処理の開始指令が入力された場合において、前記開始指令の入力時の外気温度が、前記第1閾値よりも高い第2閾値以上である場合、前記制御部は、前記禁止期間の長さを短くするか、又は、前記開始指令に応じて前記処理を開始すること
を特徴とする請求項1に記載の空気調和機。
When the start command of the process is input from the remote controller during the prohibition period, and the outside temperature at the time of input of the start command is equal to or higher than a second threshold value that is higher than the first threshold value, the control unit The air conditioner according to claim 1, wherein the length of the prohibition period is shortened or the processing is started according to the start command.
外気温度が前記第1閾値以下であるとは、外気温度が氷点下であること
を特徴とする請求項1に記載の空気調和機。
The air conditioner according to claim 1, wherein the outside air temperature is less than or equal to the first threshold, the outside air temperature is below freezing.
前記制御部は、外気温度が前記第1閾値以下であるときに前記処理を行った場合、当該処理後に暖房運転又は送風運転を行うこと
を特徴とする請求項1に記載の空気調和機。
2. The air conditioner according to claim 1, wherein, when the process is performed when an outside air temperature is equal to or lower than the first threshold, the controller performs a heating operation or a blowing operation after the process.
前記制御部は、外気温度が前記第1閾値以下であるときに前記処理を行った場合において、当該処理後の前記禁止期間中、リモコンの操作に応じた空調運転として暖房運転又は送風運転を行ったとき、当該禁止期間の長さを短くすること
を特徴とする請求項1に記載の空気調和機。
In the case where the process is performed when the outside air temperature is equal to or lower than the first threshold, the control unit performs a heating operation or an air blowing operation as an air conditioning operation according to an operation of a remote controller during the prohibition period after the process. The air conditioner according to claim 1, wherein the length of the prohibited period is shortened.
前記制御部は、前記禁止期間の経過時の外気温度が前記第1閾値以下である場合、前記禁止期間を延長すること
を特徴とする請求項1に記載の空気調和機。
The air conditioner according to claim 1, wherein the control unit extends the prohibition period when the outside air temperature at the time when the prohibition period is over is equal to or less than the first threshold.
JP2019516259A 2018-06-12 2018-06-12 Air conditioner Active JP6552773B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2018/022456 WO2019239493A1 (en) 2018-06-12 2018-06-12 Air conditioner

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2019057960A Division JP6559923B1 (en) 2019-03-26 2019-03-26 Air conditioner

Publications (2)

Publication Number Publication Date
JP6552773B1 true JP6552773B1 (en) 2019-07-31
JPWO2019239493A1 JPWO2019239493A1 (en) 2020-06-25

Family

ID=67473257

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019516259A Active JP6552773B1 (en) 2018-06-12 2018-06-12 Air conditioner

Country Status (7)

Country Link
JP (1) JP6552773B1 (en)
CN (1) CN111684211A (en)
ES (1) ES2735304B2 (en)
FR (1) FR3082285B1 (en)
MY (1) MY193580A (en)
TW (1) TWI709714B (en)
WO (1) WO2019239493A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2022041713A (en) * 2020-09-01 2022-03-11 ダイキン工業株式会社 Air conditioner

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111059740A (en) * 2019-12-25 2020-04-24 珠海格力电器股份有限公司 Emergency automatic drainage device for air conditioner water system and control method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010014288A (en) * 2008-07-01 2010-01-21 Toshiba Carrier Corp Air conditioner
CN106016669A (en) * 2016-05-06 2016-10-12 广东美的制冷设备有限公司 Condensate water generating method and cleaning method of air conditioner and air conditioner
CN106545975A (en) * 2016-12-08 2017-03-29 美的集团武汉制冷设备有限公司 The heat exchanger cleaning control method of air-conditioner and device
CN106679111A (en) * 2017-01-23 2017-05-17 深圳创维空调科技有限公司 Automatic cleaning treatment method and automatic cleaning treatment system of air-conditioning heat exchanger
CN107514683A (en) * 2017-07-31 2017-12-26 青岛海尔空调器有限总公司 Air conditioner and its indoor set automatically cleaning control method
JP6296633B1 (en) * 2017-04-28 2018-03-20 日立ジョンソンコントロールズ空調株式会社 Air conditioner

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3773767B2 (en) * 2000-08-28 2006-05-10 シャープ株式会社 Air purifier and air conditioner equipped with an ion generator
KR101138699B1 (en) * 2009-12-23 2012-04-19 헵시바주식회사 Air conditioner of single body type having condensation water evaporation device
JP2011133148A (en) * 2009-12-24 2011-07-07 Panasonic Corp Air conditioner
EP3330642B1 (en) * 2010-05-26 2020-04-29 Mitsubishi Electric Corporation Refrigerating and air-conditioning apparatus
CN203478560U (en) * 2013-07-22 2014-03-12 郑运婷 Air conditioner indoor unit drop-proof device
KR102211113B1 (en) * 2014-05-02 2021-02-04 코웨이 주식회사 Dehumidifier
CN104101163A (en) * 2014-06-24 2014-10-15 滁州富达机械电子有限公司 Water cooling machine with compressor water pan
CN106152390B (en) * 2015-04-27 2020-03-06 广东美的制冷设备有限公司 Air conditioner control method and device
CN106594962B (en) * 2016-10-27 2019-07-23 广东美的制冷设备有限公司 Air conditioner defrosting control method, controller and air conditioner
CN106989485B (en) * 2017-04-07 2020-01-31 美的集团武汉制冷设备有限公司 Control method and device of air conditioner and air conditioner
JP6276450B1 (en) * 2017-04-28 2018-02-07 日立ジョンソンコントロールズ空調株式会社 Air conditioner

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010014288A (en) * 2008-07-01 2010-01-21 Toshiba Carrier Corp Air conditioner
CN106016669A (en) * 2016-05-06 2016-10-12 广东美的制冷设备有限公司 Condensate water generating method and cleaning method of air conditioner and air conditioner
CN106545975A (en) * 2016-12-08 2017-03-29 美的集团武汉制冷设备有限公司 The heat exchanger cleaning control method of air-conditioner and device
CN106679111A (en) * 2017-01-23 2017-05-17 深圳创维空调科技有限公司 Automatic cleaning treatment method and automatic cleaning treatment system of air-conditioning heat exchanger
JP6296633B1 (en) * 2017-04-28 2018-03-20 日立ジョンソンコントロールズ空調株式会社 Air conditioner
CN107514683A (en) * 2017-07-31 2017-12-26 青岛海尔空调器有限总公司 Air conditioner and its indoor set automatically cleaning control method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2022041713A (en) * 2020-09-01 2022-03-11 ダイキン工業株式会社 Air conditioner

Also Published As

Publication number Publication date
ES2735304A2 (en) 2019-12-17
MY193580A (en) 2022-10-19
TWI709714B (en) 2020-11-11
ES2735304B2 (en) 2021-02-26
JPWO2019239493A1 (en) 2020-06-25
CN111684211A (en) 2020-09-18
FR3082285A1 (en) 2019-12-13
TW202001161A (en) 2020-01-01
ES2735304R1 (en) 2020-05-08
ES2735304A9 (en) 2020-04-27
WO2019239493A1 (en) 2019-12-19
FR3082285B1 (en) 2021-11-26

Similar Documents

Publication Publication Date Title
JP6559923B1 (en) Air conditioner
JP6454813B2 (en) Air conditioner
JP6349013B1 (en) Air conditioner
JP6387197B1 (en) Air conditioner
JP6587777B1 (en) Air conditioner
JP6641066B1 (en) Air conditioner
JP6360593B1 (en) Air conditioner
JP6354004B1 (en) Air conditioner
JP2018200167A (en) Air conditioner
JP6552773B1 (en) Air conditioner
EP3604953B1 (en) Air conditioner
WO2023042297A1 (en) Air-conditioning device and method
WO2019159387A1 (en) Air conditioner

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190325

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190325

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20190325

A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20190410

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190507

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190522

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190604

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190702

R150 Certificate of patent or registration of utility model

Ref document number: 6552773

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150