JP6534038B2 - Demand power control apparatus and demand power control method - Google Patents

Demand power control apparatus and demand power control method Download PDF

Info

Publication number
JP6534038B2
JP6534038B2 JP2015142010A JP2015142010A JP6534038B2 JP 6534038 B2 JP6534038 B2 JP 6534038B2 JP 2015142010 A JP2015142010 A JP 2015142010A JP 2015142010 A JP2015142010 A JP 2015142010A JP 6534038 B2 JP6534038 B2 JP 6534038B2
Authority
JP
Japan
Prior art keywords
power
air
target
temperature
generator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015142010A
Other languages
Japanese (ja)
Other versions
JP2017028764A (en
Inventor
中村 卓司
卓司 中村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP2015142010A priority Critical patent/JP6534038B2/en
Publication of JP2017028764A publication Critical patent/JP2017028764A/en
Application granted granted Critical
Publication of JP6534038B2 publication Critical patent/JP6534038B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明は、需要電力制御装置および需要電力制御方法に関する。   The present invention relates to a demand power control device and a demand power control method.

近年、需要家に電力供給者(以下、電力会社という)が供給する買電電力(需要電力)が、その目標値である契約電力を超えないように、需要者側では、電源機器を備えた運転管理装置を用意して、作業設備機器などの負荷装置へ電力を供給する。ここで、電源機器は、太陽光エネルギー等を利用した第1発電機、ガスタービン発電機を含む第2発電機、蓄電池、買電電源から構成される。また、負荷装置は、空調熱源設備機器、作業設備機器から構成される。   In recent years, on the consumer side, power supply equipment has been provided so that purchased power (demand power) supplied by a power supplier (hereinafter referred to as a power company) to customers does not exceed the contract power which is its target value. An operation management apparatus is prepared to supply power to load equipment such as work equipment. Here, the power supply device includes a first generator using solar energy and the like, a second generator including a gas turbine generator, a storage battery, and a power supply. Moreover, a load apparatus is comprised from an air-conditioning heat-source equipment apparatus and a working-equipment apparatus.

運転管理装置は、負荷装置の電力負荷予測値に基づき、買電電力が契約電力となるように電源機器による電源電力の割り当てを行う。例えば、運転管理装置は、電力負荷予測値が契約電力を上回っている場合、買電電力の最大値を契約電力以下に留めるとともに、不足分を電源機器からの電力で補うように、電源の割り振りを行う。   The operation management device allocates the power supply power by the power supply device based on the power load predicted value of the load device so that the purchased power becomes the contracted power. For example, when the power load predicted value exceeds the contracted power, the operation management apparatus allocates the power supply to keep the maximum purchased power below the contracted power and compensate the shortage with the power from the power supply device. I do.

特開2003−206752号公報JP 2003-206752

ところが、第2発電機を構成するガスタービン発電機は、次に説明する特性があるため、想定されていた出力よりも低下した場合には、ピークカットが必要になる場合があるという問題がある。なお、ピークカットとは、買電電力が契約電力を超えていると判断されるときに、買電電力が契約電力を超えない状態にすることを言う。
図4は、ガスタービン発電機の特性を示す図である。この図に示すように、ガスタービン発電機は、外気温度が上がるとその外気を給気する際の給気温度も上がるため、出力が低下し、それにともなって、発電量が低下するというという特性がある。つまり、ガスタービン発電機を使用して買電電力の最大値を契約電力以下に留めるとともに、不足分をガスタービン発電機からの電力で補う際、外気温度が予想した温度より高い場合には不足分を補えなくなってしまうため、買電電力が契約電力を超えていると判断される場合がある。
However, since the gas turbine generator constituting the second generator has the characteristics described below, there is a problem that peak cut may be necessary when the output falls below the expected output. . In addition, a peak cut means making a state where purchased electric power does not exceed contract electric power, when it is judged that purchased electric power exceeds contract electric power.
FIG. 4 is a diagram showing the characteristics of the gas turbine generator. As shown in this figure, the gas turbine generator is characterized in that when the outside air temperature rises, the air supply temperature at the time of supplying the outside air also rises, so the output decreases and the power generation amount decreases accordingly. There is. In other words, when using a gas turbine generator to keep the maximum value of purchased power below the contract power and compensating for the shortage with power from the gas turbine generator, the shortage will occur if the outside air temperature is higher than the expected temperature. It may be determined that the purchased power exceeds the contracted power because it can not make up for the minutes.

本発明は上記の点に鑑みてなされたものであり、主たる目的は、外気温度が上昇する場合であっても発電機が必要な発電量を得て、ピークカット、ピークシフトを実現することができる需要電力制御装置および需要電力制御方法を提供することにある。   The present invention has been made in view of the above-described point, and a main object thereof is to realize a peak cut and a peak shift by obtaining an amount of power generation necessary for a generator even when the outside air temperature rises. An object of the present invention is to provide a demand power control device and a demand power control method that can be performed.

上記の課題を解決するために、本発明の需要電力制御装置は、製造された冷水を保持する蓄熱槽と、供給される空気の温度が下がることにともなって発電機出力が上昇する特性を有する発電機に対して、前記蓄熱槽が保持する冷水により前記発電機に供給する給気の温度を下げる空調機と、を有する空調熱源設備機器を制御する需要電力制御装置であって、前記空調熱源設備機器を制御する対象日の前日において、前記対象日における需要電力の予測値に応じて前記空調機が給気する空気の目標給気温度を算出し、算出した目標給気温度に対応する前記冷水の温度で前記蓄熱槽に前記冷水を保持させ、前記対象日において、前記目標給気温度に従って冷却された空気を前記空調機から前記発電機に供給させて、当該発電機を動作させる、電力制御部を備えることを特徴とする。   In order to solve the above problems, the demand power control device of the present invention has a heat storage tank for holding cold water manufactured, and a characteristic that the generator output increases as the temperature of the supplied air decreases. An air conditioning and heat source equipment device, comprising: an air conditioner that lowers a temperature of air supply supplied to the generator by cold water held by the heat storage tank, the electric power control device comprising: The target air supply temperature of the air supplied by the air conditioner is calculated according to the predicted value of the demand power on the target day on the day before the target day for controlling the equipment, and the above corresponding to the calculated target air supply temperature The electric power is made to hold the cold water in the heat storage tank at the temperature of cold water, supply the air cooled from the air conditioner to the generator from the air conditioner according to the target supply air temperature on the target date, and operate the generator Characterized in that it comprises a control unit.

上記の課題を解決するために、本発明の需要電力制御方法は、製造された冷水を保持する蓄熱槽と、供給される空気の温度が下がることにともなって発電機出力が上昇する特性を有する発電機に対して、前記蓄熱槽が保持する冷水により前記発電機に供給する給気の温度を下げる空調機と、を有する空調熱源設備機器を制御する需要電力制御装置の需要電力制御方法であって、電力制御部が、前記空調熱源設備機器を制御する対象日の前日において、前記対象日における需要電力の予測値に応じて前記空調機が給気する空気の目標給気温度を算出し、算出した目標給気温度に対応する前記冷水の温度で前記蓄熱槽に前記冷水を保持させ、前記対象日において、前記目標給気温度に従って冷却された空気を前記空調機から前記発電機に供給させて、当該発電機を動作させる、ことを特徴とする。   In order to solve the above problems, the demand power control method of the present invention has a heat storage tank for holding cold water manufactured, and a characteristic that the generator output increases with the decrease of the temperature of the supplied air. A demand power control method of a demand power control apparatus for controlling an air conditioning and heat source equipment device, comprising: an air conditioner for lowering a temperature of air supply supplied to the generator by cold water held by the heat storage tank with respect to the generator. The power control unit calculates the target air supply temperature of the air supplied by the air conditioner according to the predicted value of the demand power on the target day on the day before the target day for controlling the air conditioning and heat source equipment. The cold water is held in the heat storage tank at the temperature of the cold water corresponding to the calculated target air supply temperature, and the air cooled according to the target air supply temperature is supplied from the air conditioner to the generator on the target day To operate the generator, characterized in that.

本発明によれば、予測した予測電力に応じた冷水により発電機への給気温度を下げて、買電電力が契約電力を超えていると判断される制御対象日の当日のピークカットを実現する。また、給気温度を下げるための冷水の製造時期を、発電機を動作させる制御対象日の当日以前の買電電力が契約電力を超えていない時期にずらす。これにより、発電機に冷風を給気したとしても、ピークカット、ピークシフトを実現することができる需要電力制御装置および需要電力制御方法を提供することができる。   According to the present invention, the temperature of air supplied to the generator is lowered by cold water according to the predicted predicted power, and peak cut on the day of the control target day where purchased power is judged to exceed the contracted power is realized Do. In addition, the production time of the cold water for lowering the supply air temperature is shifted to the time when the purchased power before the day of the control target day for operating the generator does not exceed the contracted power. Accordingly, it is possible to provide a demand power control device and a demand power control method that can realize peak cut and peak shift even when the generator is supplied with cold air.

本実施形態の需要電力制御装置の構成例を示す概略ブロック図である。It is a schematic block diagram showing an example of composition of a demand power control device of this embodiment. 本実施形態の需要電力制御装置の処理を示すフロー図である。It is a flow figure showing processing of a demand power control device of this embodiment. 本実施形態の需要電力制御装置を利用できるスマートグリッドシステムの一例を示す概略ブロック図である。BRIEF DESCRIPTION OF THE DRAWINGS It is a schematic block diagram which shows an example of the smart grid system which can utilize the demand power control apparatus of this embodiment. ガスタービン発電機の特性を示す図である。It is a figure which shows the characteristic of a gas turbine generator.

図1は、本実施形態の需要電力制御装置の構成例を示す概略ブロック図である。
図1に示すように、電源機器であるガスタービン発電機620が負荷装置へ電力を供給するため、需要電力制御装置80は、空調熱源設備機器30がガスタービン発電機620に与える給気温度を下げるように空調熱源設備機器30を制御する。なお、ガスタービン発電機620(発電機)は、供給される空気の温度が下がる(上がる)ことにともなって発電機出力が上昇する(低下する)特性を有する(図4参照)。
冷凍機310は、ファン332からガスタービン発電機620に給気する空気の給気温度に必要な冷水温度の冷水を製造する。蓄熱槽343は、冷凍機310が製造した冷水を保持する。空調機330の熱交換器331は、蓄熱槽343から供給される冷水により外気を冷却し、冷却された空気を空調機330のファン332に供給する。空調機330のファン332は、冷却された空気をガスタービン発電機620に給気する。
FIG. 1: is a schematic block diagram which shows the structural example of the demand power control apparatus of this embodiment.
As shown in FIG. 1, since the gas turbine generator 620 which is a power supply device supplies power to the load device, the demand power control device 80 supplies the air supply temperature that the air conditioning and heat source equipment 30 gives to the gas turbine generator 620. The air conditioning and heat source equipment 30 is controlled so as to lower it. The gas turbine generator 620 (generator) has a characteristic that the output of the generator rises (decreases) as the temperature of the supplied air falls (rises) (see FIG. 4).
The refrigerator 310 produces cold water of the cold water temperature required for the air supply temperature of the air supplied to the gas turbine generator 620 from the fan 332. The heat storage tank 343 holds the cold water produced by the refrigerator 310. The heat exchanger 331 of the air conditioner 330 cools the outside air with cold water supplied from the heat storage tank 343, and supplies the cooled air to the fan 332 of the air conditioner 330. The fan 332 of the air conditioner 330 supplies the cooled air to the gas turbine generator 620.

図1に示す需要電力制御装置80は、目標値記憶部801と、需要電力プロファイル予測部802と、目標超過電力算出部803と、水蓄熱量算出部804と、電力制御部805と、冷水供給判定部807と、給気温度確保部808を備えている。
目標値記憶部801には、定められた複数の計測期間(デマンド時限、例えば30分)毎に計測される需要電力の実績値のうちで最大となる需要電力(最大需要電力)の目標値である目標電力(i)が、予め定められて記憶される。つまり、契約電力(デマンド目標値C)が記憶されている。目標値記憶部801は、空調熱源設備機器30を制御する対象日における目標電力(i)(i=1〜48)を記憶している。
需要電力プロファイル予測部802は、連続する複数の計測期間のうち実績値の計測対象である計測対象期間における実績値の計測が開始される時点より前の時点で、計測対象期間における需要電力の予測(予測電力)値を算出する。ここでは、計測対象期間は対象日の1日の期間であり、デマンド時限である30分における平均需要電力の予測値を算出する。つまり、デマンド時限が30分であるので、予測値算出部83による予測値の算出処理は、対象日1日分の48回に対応する算出処理が、制御対象日の前日の例えば夕方頃において実行され、デマンド時限(i)(i=1〜48)毎の予測電力(i)が算出される。
ここで、予測値の算出方法としては、特許文献(特開2006−78009号公報)に示されるようなニューラルネットワークモデルを使用した方法、カルマンフィルタを使用した方法、最小二乗法を使用した方法等を適用することができる。例えば、ANNを使用する場合、天気予報データなどを使用すると精度の向上が見込める。なお、天気予報データは、例えば、気象庁が発表する天気予報情報等を格納するインターネット上にサーバに接続して、予め設定されている時刻毎に、天気予報情報をダウンロードする。このダウンロードした天気予報情報は、一日の時間帯に対応付けて、天気予報データとして需要電力制御装置80を備える運転管理装置の記憶部に格納される。
The demand power control apparatus 80 shown in FIG. 1 includes a target value storage unit 801, a demand power profile prediction unit 802, a target excess power calculation unit 803, a water storage amount calculation unit 804, a power control unit 805, and cold water supply. A determination unit 807 and an air supply temperature securing unit 808 are provided.
The target value storage unit 801 is a target value of demand power (maximum demand power) that is the largest of the actual values of demand power measured for each of a plurality of predetermined measurement periods (for example, 30 minutes). A certain target power (i) is predetermined and stored. That is, the contract power (demand target value C) is stored. The target value storage unit 801 stores target power (i) (i = 1 to 48) on a target date for controlling the air conditioning and heat source equipment 30.
The demand power profile prediction unit 802 predicts the demand power in the measurement target period at a time prior to the start of the measurement of the actual value in the measurement target period which is the measurement target of the actual value among the plurality of consecutive measurement periods. Calculate the (predicted power) value. Here, the measurement target period is a period of one day of the target date, and a predicted value of average demand power in 30 minutes which is a demand time limit is calculated. That is, since the demand time period is 30 minutes, the calculation process of the prediction value by the prediction value calculation unit 83 is executed on the day before the control day, for example, around the evening of the control day. The predicted power (i) is calculated for each of the demand time periods (i) (i = 1 to 48).
Here, as a method of calculating a predicted value, a method using a neural network model as disclosed in the patent document (Japanese Patent Laid-Open No. 2006-78009), a method using a Kalman filter, a method using a least squares method, etc. It can apply. For example, when using ANN, using weather forecast data etc. can improve accuracy. The weather forecast data is, for example, connected to a server on the Internet storing weather forecast information announced by the Meteorological Agency and the like, and the weather forecast information is downloaded at each preset time. The downloaded weather forecast information is stored in the storage unit of the operation management apparatus provided with the demand power control apparatus 80 as weather forecast data in association with the time zone of a day.

目標超過電力算出部803は、需要電力プロファイル予測部802によって算出された予測電力(i)と、目標値記憶部801に記憶された目標電力(i)との差分を算出する。目標超過電力算出部803が算出した差分は、対象日における電力制御処理(DR(デマンド・レスポンス)処理)により減少させることが必要な需要電力の量を示すDR必要量である。目標超過電力算出部803は、予測電力(i)が目標電力(i)を超えたか否かを判定する。   The target excess power calculation unit 803 calculates the difference between the predicted power (i) calculated by the demand power profile prediction unit 802 and the target power (i) stored in the target value storage unit 801. The difference calculated by the target excess power calculating unit 803 is a DR required amount indicating the amount of demand power that needs to be reduced by the power control process (DR (demand response) process) on the target date. The target excess power calculation unit 803 determines whether the predicted power (i) exceeds the target power (i).

水蓄熱量算出部804は、ガスタービン発電機620に与える給気温度を下げるため水蓄熱量算出を行う。
水蓄熱量算出部804は、目標超過電力算出部803が算出した「予測電力(i)−目標電力(i)」が最大となるときの外気温度予測値と目標給気温度との差を算出する。外気温度予測値とは、予測電力(i)となる時刻の外気温度であり、天気予報データとして与えられる。目標給気温度とは、ガスタービン発電機620が、目標電力(i)を実現するときの発電機出力に対応する外気温度である。
例えば、図4のガスタービン発電機の特性に示すように、ガスタービン発電機620の発電機出力として220MW必要な場合、目標給気温度は30℃でなければ、目標電力(i)を達成できない。しかしながら、外気温度予測値が35℃の場合、ガスタービン発電機620は発電機出力として215MWしか出力できない。そのため、水蓄熱量算出部804は、外気温度予測値35℃と目標給気温度30℃との差である5℃を算出する。
水蓄熱量算出部804は、外気温度予測値と目標給気温度との差が判れば、ガスタービン発電機620で使う風量は定格で決まっているので、外気温度予測値と目標給気温度との差分の空気を冷やす水蓄熱量(冷水の温度)を算出できる。
冷凍機310は、制御対象日の前日の例えば夜間に、一定量の水を、水蓄熱量算出部804が算出した冷水の温度となるように製造し、蓄熱槽343に保持させる。電力制御部805は、水蓄熱量算出部804が算出した水蓄熱量(冷水の温度)に対応する温度で、冷凍機310を動作させる制御信号を送信し、蓄熱槽343に水蓄熱量算出部804が算出した冷水の温度で冷水を保持させる。
すなわち、電力制御部805は、需要電力の予測値に応じて空調機330がガスタービン発電機620に対して給気する空気の目標給気温度を算出し、算出した目標給気温度に対応する冷水の温度で蓄熱槽343に冷水を保持させる。
The water heat storage amount calculation unit 804 performs water heat storage amount calculation in order to lower the air supply temperature given to the gas turbine generator 620.
The water heat storage amount calculation unit 804 calculates the difference between the predicted outside air temperature and the target air supply temperature when the “predicted power (i) −target power (i)” calculated by the target excess power calculation unit 803 is maximum. Do. The outside air temperature predicted value is the outside air temperature at the time of the predicted power (i), and is given as weather forecast data. The target air supply temperature is the outside air temperature corresponding to the generator output when the gas turbine generator 620 achieves the target power (i).
For example, as shown in the characteristics of the gas turbine generator of FIG. 4, when 220 MW is required as the generator output of the gas turbine generator 620, the target power supply temperature can not achieve the target power (i) unless it is 30 ° C. . However, when the outside air temperature predicted value is 35 ° C., the gas turbine generator 620 can only output 215 MW as a generator output. Therefore, the water heat storage amount calculation unit 804 calculates 5 ° C. which is the difference between the outside air temperature predicted value 35 ° C. and the target air supply temperature 30 ° C.
If the difference between the predicted outside air temperature and the target air supply temperature is known, the amount of air used by the gas turbine generator 620 is determined by the rating, so the water heat storage amount calculation unit 804 determines the outside air temperature predicted value and the target air supply temperature It is possible to calculate the amount of stored water (temperature of cold water) that cools the difference air.
The refrigerator 310 manufactures a fixed amount of water so that the temperature of the cold water calculated by the water heat storage amount calculation unit 804 becomes equal to the temperature of cold water calculated, for example, at night on the previous day of the control target day. The power control unit 805 transmits a control signal for operating the refrigerator 310 at a temperature corresponding to the water heat storage amount (temperature of cold water) calculated by the water heat storage amount calculation unit 804, and transmits the control signal to the heat storage tank 343. The cold water is held at the temperature of the cold water calculated at 804.
That is, the power control unit 805 calculates a target gas supply temperature of air supplied to the gas turbine generator 620 by the air conditioner 330 according to the predicted value of the demand power, and corresponds to the calculated target gas supply temperature. The heat storage tank 343 holds cold water at the temperature of the cold water.

気象データ計測部806は、例えばガスタービン発電機620の近傍に配置され、ガスタービン発電機620の外気温度を測定する温度計である。
冷水供給判定部807は、目標給気温度が、気象データ計測部806が測定する外気温度より低いか否かを判定する。
給気温度確保部808は、冷水供給判定部807による判定結果において、目標給気温度が外気温度より低い場合に、空調機330を動作させることを指示する制御信号をオンさせる。
ここでは、電力制御部805は、オンした制御信号により、空調機330の熱交換器331を制御して、蓄熱槽343から供給される冷水により外気を冷却する。また、電力制御部805は、空調機330のファン332から、冷却された空気をガスタービン発電機620に給気する制御を行う。すなわち、電力制御部805は、蓄熱槽343が保持する冷水によりガスタービン発電機620に給気を供給する空調機330を制御して、目標給気温度に応じてガスタービン発電機620を動作させる。
このようにして、需要電力制御装置80は、各デマンド時限における目標電力を供給するため、空調熱源設備機器30がガスタービン発電機620に与える給気温度を下げるように空調熱源設備機器30を制御することが可能となる。
すなわち、電力制御部805は、運転管理装置からリアルタイムDRの実行指示を示す情報が入力された場合、デマンド時限以前に(制御対象日の前日)に算出される予測値により、デマンド時限の開始(制御対象日)と同時にDR処理を開始することを可能にすることができる。
The weather data measurement unit 806 is, for example, a thermometer which is disposed in the vicinity of the gas turbine generator 620 and measures the outside air temperature of the gas turbine generator 620.
The cold water supply determination unit 807 determines whether the target air supply temperature is lower than the outside air temperature measured by the meteorological data measurement unit 806.
The air supply temperature securing unit 808 turns on a control signal instructing to operate the air conditioner 330 when the target air supply temperature is lower than the outside air temperature in the determination result by the cold water supply determination unit 807.
Here, the power control unit 805 controls the heat exchanger 331 of the air conditioner 330 according to the control signal that is turned on, and cools the outside air with the cold water supplied from the heat storage tank 343. Further, the power control unit 805 performs control of supplying the cooled air to the gas turbine generator 620 from the fan 332 of the air conditioner 330. That is, the power control unit 805 controls the air conditioner 330 that supplies the gas turbine generator 620 with the cold water held by the heat storage tank 343 and operates the gas turbine generator 620 according to the target air supply temperature. .
In this manner, the demand power control device 80 controls the air conditioning and heat source equipment 30 so that the temperature of the air supplied from the air conditioning and heat source equipment 30 to the gas turbine generator 620 is lowered to supply the target power in each demand period. It is possible to
That is, when the information indicating the execution instruction of the real-time DR is input from the operation management apparatus, the power control unit 805 starts the demand time limit by the predicted value calculated before the demand time limit (the day before the control target day) It is possible to start the DR process at the same time as the control target day).

続いて、図2を参照して、需要電力制御装置80の動作例を説明する。図2は、本実施形態の需要電力制御装置の処理を示すフロー図である。
なお、図2のうち、図2(a)は制御対象日の前日における処理を示し、図2(b)は制御対象日の当日における処理を示している。
需要電力プロファイル予測部802は、デマンド時限(例えば、制御対象日の当日)が開始される時点より前の時点(例えば、制御対象日の前日)において、ANN等による予測電力プロファイルを予測する(ステップS81)。需要電力プロファイル予測部802は、制御対象日当日のデマンド時限の間の平均需要電力の予測値を算出する。
目標超過電力算出部803は、需要電力プロファイル予測部802によって算出された予測電力(i)と、目標値記憶部801に記憶された目標電力(i)との差分である「予測電力(i)−目標電力(i)」を算出する(ステップS82)。
そして、目標超過電力算出部803は、予測電力(i)が目標電力(i)を超過するか否かを判定する(ステップS83)。ここで、目標超過電力算出部803が、予測電力(i)が目標電力(i)を超えないと判定すれば(ステップS83−NO)、電力制御部805は、冷凍機310の制御処理を実行しない。
Subsequently, an operation example of the power demand control device 80 will be described with reference to FIG. FIG. 2 is a flow chart showing processing of the power demand control device of the present embodiment.
In FIG. 2, (a) of FIG. 2 shows the process on the previous day of the control day, and (b) of FIG. 2 shows the process on the day of the control day.
The power demand profile prediction unit 802 predicts a predicted power profile by ANN or the like (for example, the day before the control target day) before the start of the demand time period (for example, the day of the control target day) (step S81). The power demand profile prediction unit 802 calculates a predicted value of the average demand power during the demand time limit on the day of the control target date.
The target excess power calculation unit 803 calculates the “predicted power (i)” which is the difference between the predicted power (i) calculated by the demand power profile prediction unit 802 and the target power (i) stored in the target value storage unit 801. -Calculate target power (i) "(step S82).
Then, the target excess power calculating unit 803 determines whether the predicted power (i) exceeds the target power (i) (step S83). Here, if the target excess power calculation unit 803 determines that the predicted power (i) does not exceed the target power (i) (step S83-NO), the power control unit 805 executes control processing of the refrigerator 310. do not do.

一方、ステップS83において、目標超過電力算出部803が、予測電力(i)が目標電力(i)を超えると判定すれば(ステップS83−YES)、水蓄熱量算出部804は、冷凍機による冷水蓄熱運転を行うための冷水の温度を算出する(ステップS84)。
電力制御部805は、冷凍機310を制御して、制御対象日の前日の例えば夜間に、一定量の水を、水蓄熱量算出部804が算出した冷水の温度となるように製造し、蓄熱槽343に保持させる。すなわち、制御対象日の前日に必要な冷水の負荷予測をおこなうことにより、ピークシフトを実現することができる。
On the other hand, in step S83, if the target excess power calculating unit 803 determines that the predicted power (i) exceeds the target power (i) (step S83-YES), the water heat storage amount calculating unit 804 determines that the chilled water by the refrigerator The temperature of cold water for performing the heat storage operation is calculated (step S84).
The power control unit 805 controls the refrigerator 310 to manufacture a fixed amount of water, for example, at night on the day before the control target day so as to have the temperature of the cold water calculated by the water heat storage amount calculation unit 804, The tank 343 holds it. That is, peak shift can be realized by performing cold water load prediction necessary on the day before the control target day.

制御対象日の当日において、気象データ計測部806は、外気温度計測を実行する(ステップS91)。この計測処理はリアルタイムDR処理においてデマンド時限毎に実行される。
冷水供給判定部807は、目標給気温度が外気温未満であるか否かの判定を実行する(ステップS92)。冷水供給判定部807が、目標給気温度が気象データ計測部806により計測された外気温度未満であると判定すれば(ステップS92−YES)、給気温度確保部808は、蓄熱槽から冷水供給し、熱交換器により給気温度低下させることを指示する制御信号を、電力制御部805に出力する(ステップS93)。
電力制御部805は、給気温度確保部808が出力する制御信号により、空調機330の熱交換器331を制御して、蓄熱槽343から供給される冷水により外気を冷却する。また、電力制御部805は、空調機330のファン332から、目標給気温度に冷却された空気をガスタービン発電機620に給気する制御を行う。
電力制御部805は、目標量発電を確保し(ステップS94)、目標ピーク電力を確保する(ステップS95)。
すなわち、外気温度より低い目標給気温度までガスタービン発電機620への給気温度を下げることにより、目標電力(i)を達成することができる。つまり、DR処理は、買電電力が契約電力を超えていると判断されるので、熱交換器331により給気温度低下を実行し、ピークカットが行われる。
一方、冷水供給判定部807が、目標給気温度が気象データ計測部806により計測された外気温度以上であると判定すれば(ステップS92−NO)、電力制御部805は、熱交換器331を制御して、蓄熱槽343から供給される冷水により外気を冷却させることなく、外気温度の空気をガスタービン発電機620に給気する制御を行う。つまり、この場合、DR処理は、買電電力が契約電力を超えない状態で実行される。
On the day of the control target day, the weather data measurement unit 806 executes the outside air temperature measurement (step S91). This measurement process is performed at each demand time period in the real time DR process.
The cold water supply determination unit 807 determines whether the target air supply temperature is lower than the ambient temperature (step S92). If the cold water supply determination unit 807 determines that the target air supply temperature is less than the outside air temperature measured by the weather data measurement unit 806 (step S 92 -YES), the air supply temperature securing unit 808 supplies the cold water from the heat storage tank. Then, a control signal instructing the heat exchanger to lower the supplied air temperature is output to the power control unit 805 (step S93).
The power control unit 805 controls the heat exchanger 331 of the air conditioner 330 according to the control signal output from the air supply temperature securing unit 808 to cool the outside air with the cold water supplied from the heat storage tank 343. Further, the power control unit 805 performs control of supplying the air cooled to the target air supply temperature to the gas turbine generator 620 from the fan 332 of the air conditioner 330.
The power control unit 805 secures target power generation (step S94) and secures target peak power (step S95).
That is, the target power (i) can be achieved by lowering the supply air temperature to the gas turbine generator 620 to a target supply air temperature lower than the outside air temperature. That is, in the DR process, it is determined that the purchased power exceeds the contracted power, so the heat exchanger 331 executes the decrease in the air supply temperature, and the peak cut is performed.
On the other hand, if the cold water supply determination unit 807 determines that the target air supply temperature is equal to or higher than the outside air temperature measured by the meteorological data measurement unit 806 (step S92-NO), the power control unit 805 selects the heat exchanger 331. Control is performed to supply air of the outside air temperature to the gas turbine generator 620 without cooling the outside air by the cold water supplied from the heat storage tank 343. That is, in this case, the DR process is performed in a state where the purchased power does not exceed the contracted power.

上述したように、本実施形態の需要電力制御装置80によれば、予測した予測電力に応じた冷水によりガスタービン発電機620への給気温度を下げて、買電電力が契約電力を超えていると判断される制御対象日の当日のピークカットを実現する。また、給気温度を下げるための冷水の製造時期を、ガスタービン発電機620を動作させる制御対象日の当日以前の買電電力が契約電力を超えていない時期にずらす。これにより、ピークカット、ピークシフトを実現することができる需要電力制御装置および需要電力制御方法を提供することができる。   As described above, according to the demand power control device 80 of the present embodiment, the temperature of the air supplied to the gas turbine generator 620 is lowered by cold water according to the predicted predicted power, and the purchased power exceeds the contracted power. The peak cut on the day of the control target day determined to be present is realized. In addition, the production time of the cold water for lowering the charge air temperature is shifted to the time when the purchased power before the day of the control target day when the gas turbine generator 620 is operated does not exceed the contract power. As a result, it is possible to provide a demand power control apparatus and a demand power control method capable of realizing peak cut and peak shift.

図3は、本実施形態の需要電力制御装置を利用できるスマートグリッドシステムの一例を示す概略ブロック図である。図1に示す通り、このスマートグリッドシステムは、運転管理装置1と、空調熱源設備機器3と、作業設備機器4と、電源機器6と、電源出力制御装置7と負荷電力制御装置8とを備える。
このスマートグリッドシステムは、負荷装置として、例えば、空調熱源設備機器3と作業設備機器4を含む。なお、空調熱源設備機器3は熱源を備えているため、作業設備機器4に比べて消費電力の変動が大きく、天気や室内の利用環境に応じてその消費電力が変動しやすい。
FIG. 3 is a schematic block diagram showing an example of a smart grid system that can use the power demand control device of the present embodiment. As shown in FIG. 1, this smart grid system includes an operation management device 1, an air conditioning and heat source equipment 3, a work equipment 4, a power supply 6, a power output control 7 and a load power control 8. .
The smart grid system includes, for example, an air conditioning and heat source equipment 3 and a work equipment 4 as load devices. In addition, since the air conditioning heat-source equipment 3 is equipped with a heat source, fluctuation of power consumption is large compared with the work equipment 4, and the power consumption is likely to fluctuate according to the weather or the indoor use environment.

空調熱源設備機器3(図1に示す空調熱源設備機器30に対応する)は、空調熱源機31(冷凍機310に対応する)と、外調機32と、空調機33(空調機330に対応する)と、熱循環機構34と、パッケージ空調機35とを含む。この空調熱源設備機器3のうち、空調熱源機31と、外調機32と、空調機33は、熱循環機構34を介して循環する媒体(例えば水)の温度を調整して、例えば各部屋に設置された空調機33を介して室内の温度を調整する設備機器である。この空調熱源設備機器3は、熱循環機構34を利用して、負荷装置が必要とする熱量を、外調機32や空調機33に提供する。
この熱循環機構34は、例えば、各部屋に張り巡らされ、空調熱源機31によって与えられた熱量を保持する媒体(液体や気体)を充填したパイプ341と、この媒体を循環させるポンプ342と、熱量を保持する媒体を蓄える蓄熱槽343を含む。
空調熱源機31は、例えばヒートポンプやジェネリンク等を含み、パイプ341に充填された媒体の温度を上げる加熱処理、および、媒体の温度を下げる冷却処理を行う。
外調機32は、外気を取り込み、室内温度にあわせてある程度、外気温度を調整する。
空調機33は、空調熱源機31により加熱処理あるいは冷却処理された媒体の温度を利用して、外調機32が取り込んだ外気を室内温度に合わせて調整する。
パッケージ空調機35は、空調熱源機31により加熱・冷却処理された媒体の温度を利用せずに、外調機32が取り込んだ外気を室内温度に合わせて調整する。
なお、ガスタービン発電機620に対して、専用の冷凍機、蓄熱槽および空調機が設けられてもよい。
The air conditioning and heat source equipment 3 (corresponding to the air conditioning and heat source equipment 30 shown in FIG. 1) corresponds to the air conditioning and heat source 31 (corresponding to the refrigerator 310), the external air conditioner 32, and the air conditioner 33 (air conditioner 330). And a heat circulation mechanism 34 and a packaged air conditioner 35. Among the air conditioning and heat source equipment 3, the air conditioning and heat source machine 31, the external air conditioner 32, and the air conditioner 33 adjust the temperature of the medium (for example, water) circulating through the heat circulation mechanism 34, for example, each room It is an installation apparatus which adjusts indoor temperature via the air conditioner 33 installed in the. The air conditioning and heat source equipment 3 uses the heat circulation mechanism 34 to provide the external air conditioner 32 and the air conditioner 33 with the amount of heat required by the load device.
The heat circulating mechanism 34 is, for example, a pipe 341 which is distributed in each room and is filled with a medium (liquid or gas) holding the amount of heat given by the air conditioning and heat source machine 31, and a pump 342 for circulating the medium. The heat storage tank 343 which stores the medium which hold | maintains calorie | heat amount is included.
The air conditioning and heat source machine 31 includes, for example, a heat pump and a gene link, and performs a heating process to raise the temperature of the medium filled in the pipe 341 and a cooling process to lower the temperature of the medium.
The air conditioner 32 takes in the outside air and adjusts the outside air temperature to a certain extent in accordance with the room temperature.
The air conditioner 33 adjusts the outside air taken in by the outside air conditioner 32 in accordance with the room temperature using the temperature of the medium subjected to the heating process or the cooling process by the air conditioning heat source machine 31.
The package air conditioner 35 adjusts the outside air taken in by the outside air conditioner 32 in accordance with the room temperature without using the temperature of the medium heated and cooled by the air conditioning heat source machine 31.
A dedicated refrigerator, a heat storage tank, and an air conditioner may be provided for the gas turbine generator 620.

作業設備機器4は、PC(Personal Computer)41と、照明機器42と、OA(Office Automation)機器43とを含む。
これらPC41、照明機器42、OA機器43は、オフィス等のビル内に多く設置されている作業設備機器であって、作業設備機器4の一例である。
The work equipment device 4 includes a PC (Personal Computer) 41, a lighting device 42, and an OA (Office Automation) device 43.
The PC 41, the lighting device 42, and the OA device 43 are work equipment devices installed in large numbers in a building such as an office, and are an example of the work equipment device 4.

また、このスマートグリッドシステムは、これら負荷装置に電力を供給する電源機器6として、第1発電機61と、第2発電機62と、蓄電池63と、買電電源64を含む。
第1発電機61は、風力エネルギーや太陽光エネルギー等を利用して自家発電により電力を発電する。この第1発電機61の発電エネルギーは天候によって左右されるため、その出力電力は一定ではない。
第2発電機62は、例えばガスエンジン発電機やガスタービン発電機(ガスタービン発電機620に対応する)等の発電機である。この第2発電機62は、天候によって左右される発電エネルギーを使用していないため、出力電力を調整することができる。
蓄電池63は、第1発電機61および第2発電機62によって発電された発電電力、および買電電源64から出力される買電電力を蓄電する。
買電電源64は、例えば、使用者が電力会社から購入する電力(買電電力)を出力する。
なお、この電力会社からの買電については、使用者に応じて契約電力C[kw]が決まっており、使用した予め決められた一定時間(デマンド時限)あたりの平均電力が契約電力Cを超えた場合、予め契約電力Cに応じて決められている支払料金に違約金等の追加料金が課せられる。ここでは、契約電力のことを、以下、デマンド目標値Cということもある。以下、予め決められた一定時間当たりとはデマンド時限に相当し、任意に決められる一定の時間であって、例えば30分である。
The smart grid system also includes a first generator 61, a second generator 62, a storage battery 63, and a power supply 64 as power supply devices 6 for supplying power to the load devices.
The first generator 61 generates electric power by in-house power generation using wind energy, solar energy, and the like. Since the energy generated by the first generator 61 depends on the weather, its output power is not constant.
The second generator 62 is, for example, a generator such as a gas engine generator or a gas turbine generator (corresponding to the gas turbine generator 620). The second generator 62 can adjust the output power because it does not use the weather-dependent power generation energy.
The storage battery 63 stores the generated power generated by the first generator 61 and the second generator 62 and the purchased power output from the purchased power supply 64.
The purchase power source 64 outputs, for example, the power purchased by the user from the power company (purchased power).
In addition, for the purchase of electricity from this power company, contract power C [kw] is determined according to the user, and the average power per predetermined time (demand period) used exceeds the contract power C In this case, an additional charge such as a penalty charge is imposed on the payment charge determined in advance according to the contract power C. Here, the contract power may be referred to as a demand target value C hereinafter. Hereinafter, the predetermined fixed time period corresponds to the demand time period, and is a fixed time which is arbitrarily determined and is, for example, 30 minutes.

運転管理装置1は、空調熱源運転計画と電源設備運転計画について管理する。
この空調熱源運転計画とは、空調熱源に相当する負荷装置が必要とする熱負荷をデマンド時限毎に割り振り、この割り振りを時刻毎に示す計画である。空調熱源運転計画は、例えば、予測日において予め決められている設定温度に温度調整するために予想される熱量を供給するため、一日の各時間帯において予測される空調熱源に相当する負荷装置が消費する放熱量と蓄熱槽に蓄熱される蓄熱量を示す。
電源設備運転計画とは、全ての負荷装置に供給する電力源(発電電力と買電電力)の割り振りを時刻毎に示す計画である。この電源設備運転計画は、電源機器6から給電されることが予想される電力負荷予測値を、電源機器6に含まれる各電源出力(第1発電機61と、第2発電機62と、蓄電池63と、買電電源64)毎の運転のスケジュールにより示すものである。例えば、電源設備運転計画は、一日の各時間帯において予測される供給電力を給電するため、電源機器6が、予め決められた一定時間(デマンド時限)毎に運転するための電力を示す。
The operation management apparatus 1 manages an air conditioning heat source operation plan and a power supply facility operation plan.
The air conditioning and heat source operation plan is a plan which allocates the heat load required by the load device corresponding to the air conditioning and heat source for each demand time period and indicates this allocation for each time. The air conditioning heat source operation plan is, for example, a load device equivalent to an air conditioning heat source predicted in each time zone of a day, in order to supply the heat quantity predicted to adjust the temperature to a preset temperature predetermined on the prediction day It shows the heat release amount consumed by the heat storage and the heat storage amount stored in the heat storage tank.
The power supply facility operation plan is a plan showing allocation of power sources (generated power and purchased power) to be supplied to all load devices at each time. In this power supply facility operation plan, the power load predicted value expected to be supplied from the power supply device 6 is output from each power supply included in the power supply device 6 (first generator 61, second generator 62, storage battery 63 and a schedule of operation for each purchase power supply 64). For example, the power supply facility operation plan indicates the power for the power supply device 6 to operate at predetermined time intervals (demand period) in order to supply the predicted power supply in each time zone of a day.

運転管理装置1は、予め、空調熱源設備機器3、作業設備機器4および電源機器6の最適運転制御を行うために各種情報を入力し、その情報を基に空調熱負荷予測処理と発電出力予測処理を行う。この空調熱負荷予測処理では、予め決められている設定温度に温度調整するために必要と予測される熱量(空調熱負荷)を算出する処理を行う。発電出力予測処理は、第1発電機61および第2発電機62が発電すると予測される電力を算出する処理を行う。
運転管理装置1は、空調熱負荷予測処理と発電出力予測処理の結果に基づき、運転計画作成処理を行う。この運転計画作成部105は、これらの予想結果に基づき、予測される空調熱負荷に応じて空調熱源運転計画の作成を行うとともに、予測される空調熱負荷に応じて、買電電源64からの買電電力が任意の目標値(例えば最小値)となる電源機器6の各電源(第1発電機61と、第2発電機62と、蓄電池63と、買電電源64)の電力負荷を示す電源設備運転計画を作成する。
この運転管理装置1の基本処理は、各種情報を収集して空調熱負荷予測処理と発電出力予測処理を行う処理行程1と、その結果に基づいて空調熱源運転計画と電源設備運転計画を作成するための運転計画作成処理を行う処理行程2と、の2つの処理工程である。
本実施形態に係る運転管理装置1は、この2つの処理工程に加え、計画DRを実行する処理と、リアルタイムDRを実行する処理を、場合に応じて行う。
The operation management apparatus 1 inputs various information in advance to perform optimal operation control of the air conditioning and heat source equipment 3, work equipment 4 and power supply 6, and based on the information, performs air conditioning heat load prediction processing and power generation output prediction. Do the processing. In this air conditioning heat load prediction process, a process of calculating the heat quantity (air conditioning heat load) predicted to be necessary to adjust the temperature to a predetermined set temperature is performed. The power generation output prediction process performs a process of calculating electric power predicted to be generated by the first generator 61 and the second generator 62.
The operation management device 1 performs an operation plan creation process based on the results of the air conditioning heat load prediction process and the power generation output prediction process. The operation plan creation unit 105 creates an air conditioning heat source operation plan according to the predicted air conditioning heat load based on the predicted results, and also generates the air conditioning heat source operation plan from the purchase power supply 64 according to the predicted air conditioning heat load. Indicates the power load of each power supply (the first generator 61, the second generator 62, the storage battery 63, and the purchase power supply 64) of the power supply device 6 at which the purchase power is an arbitrary target value (for example, the minimum value). Create a power supply operation plan.
The basic process of the operation management apparatus 1 collects various information and creates an air conditioning heat source operation plan and a power supply facility operation plan based on the process step 1 of performing the air conditioning heat load prediction process and the power generation output prediction process These are two processing steps of processing step 2 for performing operation plan creation processing for the purpose.
The operation management device 1 according to the present embodiment performs the process of executing the planned DR and the process of executing the real-time DR in addition to the two process steps depending on the case.

電源出力制御装置7は、運転管理装置1による運転計画、計画DR、リアルタイムDR処理に基づき、電源機器6から負荷装置である空調熱源設備機器3と作業設備機器4に対して電力を供給する電力源(第1発電機61、第2発電機62、蓄電池63、買電電源64)を指定するとともに、この電力源が出力する電力とそのタイミングとを制御する。具体的にいうと、この電源出力制御装置7は、電力源のうち第1発電機61、第2発電機62および蓄電池63が出力する電力を制御する。なお、買電電源64が出力する電力は、負荷装置(空調熱源設備機器3および作業設備機器4)のデマンドに対して、第1発電機61、第2発電機62および蓄電池63が出力する電力では不足する電力である。
負荷電力制御装置8(需要電力制御装置80に対応する)は、運転管理装置1による運転計画、計画DR、リアルタイムDR処理に基づき、空調熱源設備機器3および作業設備機器4の運転を制御する。
The power supply output control device 7 supplies electric power from the power supply device 6 to the air conditioning and heat source equipment 3 as a load device and the work equipment 4 based on the operation plan, plan DR and real time DR processing by the operation management device 1 The source (first generator 61, second generator 62, storage battery 63, purchase power supply 64) is specified, and the power output from this power source and the timing thereof are controlled. Specifically, the power supply output control device 7 controls the power output from the first generator 61, the second generator 62, and the storage battery 63 among the power sources. In addition, the electric power which the 1st power generator 61, the 2nd generator 62, and the storage battery 63 output with respect to the demand of load apparatus (the air-conditioning heat-source equipment 3 and the work equipment 4). In that case there is insufficient power.
The load power control device 8 (corresponding to the demand power control device 80) controls the operation of the air conditioning and heat source equipment 3 and the work equipment 4 based on the operation plan by the operation management device 1, the plan DR and the real time DR processing.

以上、図面を参照してこの発明の一実施形態について詳しく説明してきたが、具体的な構成は上述のものに限られることはなく、この発明の要旨を逸脱しない範囲内において様々な設計変更等をすることが可能である。   As mentioned above, although one embodiment of this invention was described in detail with reference to drawings, a specific structure is not restricted to the above-mentioned thing, Various design changes etc. in the range which does not deviate from the summary of this invention It is possible to

30…空調熱源設備機器、80…需要電力制御装置、310…冷凍機、330…空調機、331…熱交換器、332…ファン、343…蓄熱槽、620…ガスタービン発電機、801…目標値記憶部、802…需要電力プロファイル予測部、803…目標超過電力算出部、804…水蓄熱量算出部、805…電力制御部、806…気象データ計測部、807…冷水供給判定部、808…給気温度確保部   DESCRIPTION OF SYMBOLS 30 ... Air-conditioning heat-source equipment apparatus, 80 ... Demand power control apparatus, 310 ... Refrigerator, 330 ... Air-conditioner, 331 ... Heat exchanger, 332 ... Fan, 343 ... Thermal storage tank, 620 ... Gas turbine generator, 801 ... Target value Storage unit 802 Demand power profile prediction unit 803 Target excess power calculation unit 804 Water heat storage amount calculation unit 805 Power control unit 806 Weather data measurement unit 807 Cold water supply determination unit 808 Supply Air temperature securing unit

Claims (2)

製造された冷水を保持する蓄熱槽と、供給される空気の温度が下がることにともなって発電機出力が上昇する特性を有する発電機に対して、前記蓄熱槽が保持する冷水により前記発電機に供給する給気の温度を下げる空調機と、を有する空調熱源設備機器を制御する需要電力制御装置であって、
前記空調熱源設備機器を制御する対象日の前日において、前記対象日における需要電力の予測値に応じて前記空調機が給気する空気の目標給気温度を算出し、算出した目標給気温度に対応する前記冷水の温度で前記蓄熱槽に前記冷水を保持させ、
前記対象日において、前記目標給気温度に従って冷却された空気を前記空調機から前記発電機に供給させて、当該発電機を動作させる、
電力制御部を備えることを特徴とする需要電力制御装置。
With respect to a heat storage tank for holding cold water manufactured and a generator having a characteristic that the output of the generator increases as the temperature of the supplied air decreases, the generator is cooled by the cold water held by the heat storage tank. A demand power control apparatus for controlling an air-conditioning and heat-source equipment having an air conditioner that lowers the temperature of supplied air, comprising:
The target air supply temperature of the air supplied by the air conditioner is calculated according to the predicted value of the demand power on the target day on the day before the target day for controlling the air conditioning heat source equipment and the calculated target air supply temperature Holding the cold water in the heat storage tank at the temperature of the corresponding cold water,
On the target day, air cooled according to the target air supply temperature is supplied from the air conditioner to the generator, and the generator is operated.
A power demand control device comprising a power control unit.
製造された冷水を保持する蓄熱槽と、供給される空気の温度が下がることにともなって発電機出力が上昇する特性を有する発電機に対して、前記蓄熱槽が保持する冷水により前記発電機に供給する給気の温度を下げる空調機と、を有する空調熱源設備機器を制御する需要電力制御装置の需要電力制御方法であって、
電力制御部が、前記空調熱源設備機器を制御する対象日の前日において、前記対象日における需要電力の予測値に応じて前記空調機が給気する空気の目標給気温度を算出し、算出した目標給気温度に対応する前記冷水の温度で前記蓄熱槽に前記冷水を保持させ、
前記対象日において、前記目標給気温度に従って冷却された空気を前記空調機から前記発電機に供給させて、当該発電機を動作させる、
ことを特徴とする需要電力制御装置の需要電力制御方法。
With respect to a heat storage tank for holding cold water manufactured and a generator having a characteristic that the output of the generator increases as the temperature of the supplied air decreases, the generator is cooled by the cold water held by the heat storage tank. A demand power control method of a demand power control apparatus for controlling an air conditioning and heat source equipment comprising: an air conditioner having a temperature of air supply to be supplied, the method comprising:
The power control unit calculates and calculates the target air supply temperature of the air supplied by the air conditioner according to the predicted value of the demand power on the target day on the previous day of the target day for controlling the air conditioning and heat source equipment Causing the heat storage tank to hold the cold water at a temperature of the cold water corresponding to a target air supply temperature;
On the target day, air cooled according to the target air supply temperature is supplied from the air conditioner to the generator, and the generator is operated.
A demand power control method of a demand power control device characterized in that.
JP2015142010A 2015-07-16 2015-07-16 Demand power control apparatus and demand power control method Active JP6534038B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015142010A JP6534038B2 (en) 2015-07-16 2015-07-16 Demand power control apparatus and demand power control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015142010A JP6534038B2 (en) 2015-07-16 2015-07-16 Demand power control apparatus and demand power control method

Publications (2)

Publication Number Publication Date
JP2017028764A JP2017028764A (en) 2017-02-02
JP6534038B2 true JP6534038B2 (en) 2019-06-26

Family

ID=57950100

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015142010A Active JP6534038B2 (en) 2015-07-16 2015-07-16 Demand power control apparatus and demand power control method

Country Status (1)

Country Link
JP (1) JP6534038B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111795488A (en) * 2020-07-10 2020-10-20 哈尔滨工程大学 Intelligent temperature regulation and control system and method for distributed machine room

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111509738A (en) * 2020-05-29 2020-08-07 上海交通大学 Method and system for power of electric heating micro-grid source charge storage collaborative smooth tie line

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111795488A (en) * 2020-07-10 2020-10-20 哈尔滨工程大学 Intelligent temperature regulation and control system and method for distributed machine room
CN111795488B (en) * 2020-07-10 2021-11-02 哈尔滨工程大学 Intelligent temperature regulation and control system and method for distributed machine room

Also Published As

Publication number Publication date
JP2017028764A (en) 2017-02-02

Similar Documents

Publication Publication Date Title
US11705726B2 (en) Building energy system with predictive control of battery and green energy resources
US11268726B2 (en) Air handling unit and rooftop unit with predictive control
US11754984B2 (en) HVAC system with predictive airside control
Thangavelu et al. Energy optimization methodology of multi-chiller plant in commercial buildings
US7567859B2 (en) Methods and apparatuses for control of building cooling, heating and power co-generation systems
Avci et al. Model predictive HVAC load control in buildings using real-time electricity pricing
JP6073001B2 (en) Air conditioning management device
US20180004172A1 (en) Hvac system using model predictive control with distributed low-level airside optimization
US10514663B2 (en) Microgrid system and controller
US20150378381A1 (en) Systems and methods for energy cost optimization
JP6282071B2 (en) Air conditioning control system and air conditioning control method
EP2821724A1 (en) Optimization apparatus, optimization method, and optimization program for storing electricity and heat.
JP2012080681A (en) Operation management device, operation management method, and operation management program
JP2004317049A (en) Heat source operation support control method, system and program
JP5787162B2 (en) Operation management device, operation management method, program
JP5248897B2 (en) Operation plan decision system
CN103743068B (en) A kind of air-condition cooling tower blower control method and system of optimizing based on efficiency
US20220186962A1 (en) Building equipment with predictive control and allocation of energy from multiple energy sources
JP6534038B2 (en) Demand power control apparatus and demand power control method
JP2013047597A (en) Heat pump system, method for controlling the same, and program
JP6315563B2 (en) Equipment operation system and equipment operation method
JP2015169367A (en) Air conditioning system and air conditioning system control method
JP7042180B2 (en) Heat source controller and heat source control program
JP2014035759A (en) Operation management device and power actual value correction method under demand response control
JP2014036564A (en) Forecast data management device, and forecast data management method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180615

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20181005

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190307

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190416

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190515

R150 Certificate of patent or registration of utility model

Ref document number: 6534038

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150