JP6505899B1 - Elevator return method and elevator return apparatus - Google Patents

Elevator return method and elevator return apparatus Download PDF

Info

Publication number
JP6505899B1
JP6505899B1 JP2018050188A JP2018050188A JP6505899B1 JP 6505899 B1 JP6505899 B1 JP 6505899B1 JP 2018050188 A JP2018050188 A JP 2018050188A JP 2018050188 A JP2018050188 A JP 2018050188A JP 6505899 B1 JP6505899 B1 JP 6505899B1
Authority
JP
Japan
Prior art keywords
main rope
hanging
rope
suspension
elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018050188A
Other languages
Japanese (ja)
Other versions
JP2019156635A (en
Inventor
翔 田嶋
翔 田嶋
真介 田原
真介 田原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Elevator and Building Systems Corp
Original Assignee
Toshiba Elevator Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Elevator Co Ltd filed Critical Toshiba Elevator Co Ltd
Priority to JP2018050188A priority Critical patent/JP6505899B1/en
Priority to CN201821998962.0U priority patent/CN209396733U/en
Application granted granted Critical
Publication of JP6505899B1 publication Critical patent/JP6505899B1/en
Publication of JP2019156635A publication Critical patent/JP2019156635A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Maintenance And Inspection Apparatuses For Elevators (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

【課題】停止位置にかかわらず、機械室及びガバナで、非常止め装置が作動して昇降が停止したエレベータの復帰ができるエレベータの復帰方法及びエレベータの復帰装置を提供することにある。【解決手段】つるべ式に昇降動するエレベータにおいて、非常止め装置が作動して昇降が停止したエレベータの復帰方法であって、前記巻上機を支持する一対のマシンビーム間に吊元梁を設置する吊元梁設置工程と、吊元梁にチェーンブロックの掛けフックを掛け、チェーンブロックの吊フック及びチェーンをロープ通り穴からガバナ室に降ろすチェーンブロック設置工程と、メインロープの籠側部又は釣合錘側部にメインロープ吊具を挟着固定するメインロープ吊具取付工程と、チェーンブロックの吊フックをメインロープ吊具に掛けるメインロープ吊具吊り工程と、チェーンブロックのチェーンを巻き上げてメインロープ吊具を上昇させることで、籠又は釣合錘を上昇させて非常止め装置の作動を外す非常止め解除工程とを備える。【選択図】図1An elevator return method and an elevator return device capable of returning an elevator whose safety is stopped by raising and lowering the emergency stop device in a machine room and a governor regardless of a stop position. A method of returning an elevator in which a safety gear is activated to stop raising and lowering in a lift-type elevator, wherein a lifting beam is installed between a pair of machine beams supporting the hoisting machine. Hanging beam installation process, hanging hook of chain block on the hanging beam, chain block installation process of lowering chain block suspension hook and chain from rope passage hole to governor room, hook side of main rope or fishing Main rope hanger mounting process of holding and fixing the main rope hanger on the side of the weight, main rope hanger hanging process of hanging the chain block's hanging hook on the main rope hanger, winding up the chain of the chain block And raising the rope hanger to raise the hook or counterweight to release the operation of the safety gear. [Selected figure] Figure 1

Description

本発明の実施形態は、非常止め装置が作動して昇降が停止したエレベータの復帰方法及びエレベータの復帰装置に関する。   An embodiment of the present invention relates to a method of returning an elevator whose elevator is stopped by operation of a safety gear and a device for returning an elevator.

籠と釣合錘とをメインロープで連結し、機械室に設けた巻上機でメインロープを巻き上げて籠及び釣合錘をつるべ式に昇降動させると共に機械室の下に調速機が配置されたガバナ室を備えるエレベータが公知である。   The rod and the counterweight are connected by a main rope, and the main rope is wound up with a hoist provided in the machine room to lift and lower the rod and the counterweight in a hoisting manner, and a governor is disposed under the machine room An elevator is known which comprises a controlled governor chamber.

係るエレベータにおいて、不具合等によりエレベータの籠又は釣合錘の非常止め装置が作動してしまった場合、非常止め装置の作動を解除するために、籠又は釣合錘を一度引き上げる必要がある。   In such an elevator, when the safety device of the elevator wedge or counterweight has been activated due to a failure or the like, it is necessary to once raise the wedge or the counterweight in order to release the operation of the safety gear.

特開2017−165578号公報Unexamined-Japanese-Patent No. 2017-165578

しかしながら、籠又は釣合錘の停止位置によっては引き上げが困難な場合があった。   However, depending on the stopping position of the hook or the counterweight, it may be difficult to pull up.

本実施形態の目的は、停止位置にかかわらず、機械室及びガバナで、非常止め装置が作動して昇降が停止したエレベータの復帰ができるエレベータの復帰方法及びエレベータの復帰装置を提供することにある。   An object of the present embodiment is to provide an elevator return method and an elevator return device capable of returning an elevator whose emergency stop device is activated to stop raising and lowering in a machine room and a governor regardless of the stop position. .

実施形態に係るエレベータの復帰方法は、籠と釣合錘とをメインロープで連結し、機械室に設けた巻上機で前記メインロープを巻き上げて前記籠及び前記釣合錘をつるべ式に昇降動させると共に前記機械室の下に調速機が配置されたガバナ室を備えるエレベータにおいて、非常止め装置が作動して昇降が停止したエレベータの復帰方法であって、前記機械室で、前記巻上機を支持する一対のマシンビーム間に吊元梁を設置する吊元梁設置工程と、前記機械室で、前記吊元梁にチェーンブロックの掛けフックを掛け、チェーンブロックの吊フック及びチェーンをロープ通り穴から前記ガバナ室に降ろすチェーンブロック設置工程と、前記ガバナ室で、前記メインロープの籠側部又は釣合錘側部にメインロープ吊具を挟着固定するメインロープ吊具取付工程と、前記ガバナ室で、前記チェーンブロックの前記吊フックを前記メインロープ吊具に掛けるメインロープ吊具吊り工程と、前記ガバナ室で、前記チェーンブロックのチェーンを巻き上げて前記メインロープ吊具を上昇させることで、前記籠又は前記釣合錘を上昇させて前記非常止め装置の作動を外す非常止め解除工程と、を備えるエレベータの復帰方法である。   In the method for returning the elevator according to the embodiment, the rod and the counterweight are connected by the main rope, and the main rope is wound up by a hoist provided in the machine room to lift and lower the rod and the counterweight in a lifting manner. What is claimed is: 1. An elevator comprising: a governor chamber having a governor and a governor installed under the machine chamber, wherein the emergency stop device is activated to stop raising and lowering the elevator. Suspension beam installation step of installing a suspension beam between a pair of machine beams supporting the machine, and in the machine room, the suspension beam of the chain block is hooked on the suspension beam and a chain block suspension hook and a chain are roped A chain block setting step of lowering the governor chamber from the through hole, and a main rope suspension for clamping and fixing a main rope suspension on the heel side or the counterweight side of the main rope in the governor chamber Mounting step, a main rope lifting step of hanging the hanging hook of the chain block to the main rope lifting member in the governor chamber, and winding up the chain of the chain block in the governor chamber to lift the main rope lifting member And the safety lock releasing step of lifting up the wedge or the counterweight to release the operation of the safety gear.

また、実施形態に係るエレベータの復帰装置は、籠と釣合錘とをメインロープで連結し、機械室に設けた巻上機で前記メインロープを巻き上げて前記籠及び前記釣合錘をつるべ式に昇降動させると共に前記機械室の下に調速機が配置されたガバナ室を備えるエレベータにおいて、非常止め装置が作動して昇降が停止したエレベータの復帰装置であって、前記巻上機を支持する一対のマシンビーム間に設置する吊元梁と、前記メインロープの籠側部又は釣合錘側部に挟着固定するメインロープ吊具と、前記吊元梁に掛ける掛けフックと前記メインロープ吊具を吊る吊フックとを有するチェーンブロックとを備え、前記チェーンブロックのチェーンを巻き上げて前記メインロープ吊具を上昇させることで、前記籠又は前記釣合錘を引き上げて非常止め装置の作動を外すエレベータの復帰装置である。   In the elevator return apparatus according to the embodiment, the rod and the counterweight are connected by the main rope, and the main rope is wound up by a hoist provided in the machine room to pick up the rod and the counterweight. An elevator including an governor chamber in which a governor is disposed under the machine room, the safety gear being operated to stop the elevator, and the elevator supports the hoisting machine Suspension beams installed between a pair of machine beams, a main rope suspension fixture fixed by clamping to a heel side or a counterweight side of the main rope, a hook for hanging on the suspension beams, and the main rope And a chain block having a hanging hook for hanging the lifting gear, and raising the chain or the counterweight by raising the chain of the chain block and raising the main rope lifting gear. It is a return device for an elevator to remove the operation of the order apparatus.

実施形態に係るエレベータの概略的構成を示す側面図である。It is a side view showing a schematic structure of an elevator concerning an embodiment. 図1に示す機械室及びガバナ室の概略を示す縦断面図である。It is a longitudinal cross-sectional view which shows the outline of a machine room and a governor room shown in FIG. 非常止め装置の正面図である。It is a front view of an emergency stop device. 第1及び第2実施形態に係るエレベータの復帰装置に用いられる部品であって、マシンビームにおける設置状態を示す斜視図である。It is a component used for the return apparatus of the elevator which concerns on 1st and 2nd embodiment, Comprising: It is a perspective view which shows the installation state in a machine beam. 第1及び第2実施形態に係るエレベータの復帰方法を実施するまえのマシンビームを示す斜視図である。It is a perspective view showing a machine beam before implementing a return method of an elevator concerning a 1st and 2nd embodiment. 第1実施形態に係る籠側吊元梁の常設状態を示す斜視図である。It is a perspective view which shows the permanent installation state of the weir side suspension source beam which concerns on 1st Embodiment. 第1実施形態に係る吊元梁設置工程であって、マシンビームに常設してある吊元梁を取り外す工程を示す斜視図である。It is a hanging source beam installation process which concerns on 1st Embodiment, Comprising: It is a perspective view which shows the process of removing the hanging source beam always installed in the machine beam. 第1実施形態に係る吊元梁設置工程であって、吊元梁を補助梁の位置にセットした状態を示す斜視図である。It is a suspension source beam installation process which concerns on 1st Embodiment, Comprising: It is a perspective view which shows the state which set the suspension source beam to the position of an auxiliary beam. 第1実施形態に係る吊元梁にチェーンブロックの掛けフックを掛ける工程を示す斜視図である。It is a perspective view which shows the process of hooking the hook of a chain block on the suspension beam which concerns on 1st Embodiment. 各実施形態に係るメインロープ吊具の分解斜視図である。It is an exploded perspective view of a main rope hanger concerning each embodiment. 各実施形態に係るメインロープ吊具にピンを取付ける前の状態を示す斜視図である。It is a perspective view which shows the state before attaching a pin to the main rope hanger concerning each embodiment. 各実施形態に係るメインロープ吊具の図であり、(a)は斜視図、(b)は平面図、(c)は側面図である。It is a figure of the main rope hanger which concerns on each embodiment, (a) is a perspective view, (b) is a top view, (c) is a side view. メインロープ吊具の押さえ金具の図であり、(a)は平面図、(b)は正面図である。It is a figure of the press fitting of a main rope hanger, (a) is a top view, (b) is a front view. 第2実施形態に係る釣合錘側吊元梁の設置工程を説明する図であり、マシンビームに釣合錘側吊元梁を取付ける前のマシンビームの端部を示す斜視図である。It is a figure explaining the installation process of the balance weight side suspension beam which concerns on 2nd Embodiment, and is a perspective view which shows the edge part of the machine beam before attaching a balance weight side suspension beam to a machine beam. 第2実施形態に係る釣合錘側吊元梁の設置工程を説明する図であり、マシンビームにアダプタを取付けた状態を示す斜視図である。It is a figure explaining the installation process of the counterweight side suspension beam which concerns on 2nd Embodiment, and is a perspective view which shows the state which attached the adapter to the machine beam. 第2実施形態に係る釣合錘側吊元梁をマシンビームに取付けた状態を示す斜視図である。It is a perspective view which shows the state which attached the counterweight side suspension source beam which concerns on 2nd Embodiment to the machine beam. 第2実施形態に係る釣合錘側吊元梁に吊ロープを固定した状態を示す斜視である。It is a perspective view which shows the state which fixed the suspension rope to the counterweight side suspension source beam which concerns on 2nd Embodiment. 第2実施形態に係る吊ロープをロープ通り穴に通した状態を示す斜視図である。It is a perspective view which shows the state which let the suspension rope which concerns on 2nd Embodiment pass through a rope passage hole. 第2実施形態に係る吊ロープにチェーブロックの掛けフックを掛けた状態を示す斜視図である。It is a perspective view which shows the state which hung the hook of a chain hook on the suspension rope which concerns on 2nd Embodiment. 第3実施形態に係るエレベータの復帰装置の吊元梁ユニットの吊元梁を釣合錘側に設置した状態の斜視図である。It is a perspective view in the state where the suspension beam of the suspension beam unit of the reset device of the elevator concerning a 3rd embodiment was installed in the counterweight side. 第3実施形態に係るエレベータの復帰装置であって、マシンビームに各土台を取付けた状態を示す斜視図である。It is a return apparatus of the elevator concerning 3rd Embodiment, Comprising: It is a perspective view which shows the state which attached each foundation to the machine beam. 図21に示す第1土台の取付け工程を示す斜視図である。It is a perspective view which shows the attachment process of the 1st base shown in FIG. 図21に示す第2土台を取付けた状態を示す斜視図であり、(a)は一方側から見た図であり、(b)は(a)に対して反対側から見た図である。It is a perspective view which shows the state which attached the 2nd base shown in FIG. 21, (a) is the figure seen from one side, (b) is the figure seen from the opposite side with respect to (a). 図21に示す第3土台の取付け状態を示す斜視図である。It is a perspective view which shows the attachment state of the 3rd base shown in FIG. 第3実施形態の吊元梁ユニットの設置工程前の状態を示し、マシンビームに油飛散防止カバー及び固定用アングルを取付けた状態を示す斜視図である。It is a perspective view which shows the state before the installation process of the hanging source beam unit of 3rd Embodiment, and shows the state which attached the oil scattering prevention cover and the angle for fixation to the machine beam. 図25に示す油飛散防止カバー及び固定用アングルを取外した状態を示す斜視図である。It is a perspective view which shows the state which removed the oil scattering prevention cover shown in FIG. 25, and the angle for fixation. 台座に支柱を取付けた状態を示す斜視図である。It is a perspective view which shows the state which attached the support | pillar to a base. (a)は支柱間に吊元梁を取付けた状態を示す図であり、(b)は(a)に示す吊元梁の側面図であり、(c)は(a)に示すA部の拡大図である。(A) is a figure which shows the state which attached the suspension source beam between support | pillars, (b) is a side view of the suspension source beam shown to (a), (c) is a part of A shown to (a) It is an enlarged view. 図28に示す支柱及びマシンビームに補助柱を取付けた状態を示す斜視図である。It is a perspective view which shows the state which attached the auxiliary | assistant pillar to the support | pillar and machine beam which are shown in FIG. (a)は第3実施形態に係る吊元梁にチェーンブロックの掛けフックを掛ける前の状態を示す斜視図であり、(b)はチェーンブロックを吊上げるロープ掛け方を示す斜視図である。(A) is a perspective view which shows the state before hooking the hook of a chain block on the suspension beam which concerns on 3rd Embodiment, (b) is a perspective view which shows the rope hooking method which lifts a chain block. 第3実施形態に係る吊元梁ユニットにチェーンブロックを取付けた状態を示す斜視図である。It is a perspective view which shows the state which attached the chain block to the hanging source beam unit which concerns on 3rd Embodiment. 第3実施形態において、吊ロープ用吊具に吊ロープを取付けた状態を示す正面図である。In 3rd Embodiment, it is a front view which shows the state which attached the suspension rope to the suspension tool for suspension ropes. 吊ロープ用吊具に吊フックの掛け状態を示す斜視図であり、(a)は吊ロープ用吊具に吊ロープを取付けた状態であり、(b)は吊ロープ用吊具に吊ロープを取付ける前の状態である。It is a perspective view which shows the hanging state of a hanging hook to the hanging rope for a hanging rope, (a) is a state which attached a hanging rope to the hanging rope for a hanging rope, (b) is a hanging rope to a hanging rope for a hanging rope It is in the condition before installation. 第3実施形態に係るエレベータの復帰装置の吊元梁ユニットの吊元梁を籠側に設置した状態の斜視図である。It is a perspective view in the state where the suspension beam of the suspension beam unit of the restoration device of the elevator concerning a 3rd embodiment was installed in the heel side.

[第1実施形態]
以下、第1実施形態について、図1〜図13を参照して説明する。尚、図4及び図5には、第1及び第2実施形態を一緒に示しているが、第1及び第2実施形態は同時に実施するものではなく、必要に応じていずれか一方を実施する。
First Embodiment
Hereinafter, the first embodiment will be described with reference to FIGS. 1 to 13. In addition, although 1st and 2nd embodiment is shown together in FIG.4 and FIG.5, 1st and 2nd embodiment does not implement simultaneously, but implements either as needed. .

図1に示すように、エレベータ1は、建屋2に設けられた昇降路3を備えており、昇降路3の上には、図1及び図2に示すように、巻上機5を設置した機械室7と、機械室7の下に調速機8を設置したガバナ室9が設けられている。図2に示すように、巻上機5は一対のマシンビーム6、6の上に設置されている。図1に示すように、昇降路3には、籠11と釣合錘13とが設けてあり、籠11と釣合錘13とはメインロープ15で連結されており、機械室7に設けた巻上機5でメインロープ15を巻き上げて籠11及び釣合錘13をつるべ式に昇降動する。籠11及び釣合錘13は、それぞれ昇降路3に設けたガイドレール17で昇降動が案内されている。籠11及び釣合錘13のような昇降体には、それぞれ非常止め装置19が設けてあっても良い。   As shown in FIG. 1, the elevator 1 is provided with a hoistway 3 provided in a building 2, and on the hoistway 3, a hoisting machine 5 is installed as shown in FIG. 1 and FIG. A machine room 7 and a governor room 9 in which a governor 8 is installed under the machine room 7 are provided. As shown in FIG. 2, the hoisting machine 5 is installed on a pair of machine beams 6, 6. As shown in FIG. 1, the hoistway 3 is provided with a weir 11 and a counterweight 13, and the weir 11 and the counterweight 13 are connected by a main rope 15 and provided in the machine room 7 The main rope 15 is wound up by the hoisting machine 5, and the rod 11 and the counterweight 13 are lifted and lowered in a lifting manner. The vertical movement of the wedge 11 and the counterweight 13 is guided by the guide rails 17 provided in the hoistway 3 respectively. The safety devices 19 may be provided on the elevators such as the rod 11 and the counterweight 13 respectively.

図3に示すように、非常止め装置19は、ガイドレール17の刃部17aを挟む位置に互いに間隔をあけて設けた楔受け21a、21bが設けてあり、各楔受け21a、21bには、上下に摺動可能な楔22a、22bが対向して設けてある。各楔22a、22bにはブレーキシュー23が固定されている。楔受け21a、21bには、刃部17aとの対向面に上側ほど楔22a、22bの間隔を狭めるように傾斜したガイド面24が形成されている。   As shown in FIG. 3, the safety gear 19 is provided with wedge receptacles 21a and 21b provided at mutually spaced positions at positions sandwiching the blade part 17a of the guide rail 17, and each wedge receptacle 21a and 21b has The wedges 22a and 22b which can slide up and down are provided facing each other. A brake shoe 23 is fixed to each weir 22a, 22b. The wedge receiver 21a, 21b is provided with a guide surface 24 which is inclined so as to narrow the gap between the wedges 22a, 22b on the surface facing the blade portion 17a.

昇降体(籠11及び釣合錘13)が定格速度を超過した速度で下降すると、この非常止め装置19が作動して、楔22a、22bがガイド面24に沿って上方に移動し、ガイドレール17の刃部17aに圧接することで、昇降体(籠11及び釣合錘13)が停止する。   When the elevating body (the rod 11 and the counterweight 13) descends at a speed exceeding the rated speed, the safety gear 19 operates to move the rods 22a and 22b upward along the guide surface 24, and the guide rail By press-contacting the 17 blade portions 17a, the elevating body (the weir 11 and the counterweight 13) is stopped.

非常止め装置19の作動を解除する場合には、昇降体(籠11及び釣合錘13)を吊り上げることで、ガイドレール17に対して相対的に楔22a、22bが下降して、ガイドレール17の刃部17aから離れる。これにより、非常止め装置19の作動が解除される。   When the operation of the safety gear 19 is to be released, by lifting up the elevating body (the weir 11 and the counterweight 13), the weirs 22a and 22b are lowered relative to the guide rail 17, and the guide rail 17 is released. Leaves the blade 17a. Thus, the operation of the safety gear 19 is released.

次に、第1実施形態に係るエレベータの復帰装置の構成について説明する。第1実施形態は、籠11の非常止め装置19の作動を解除するエレベータの復帰装置及び復帰方法である。第1実施形態のエレベータの復帰装置は、図4に示すように、機械室7において、巻上機5(図4及び図5では省略している)を支持する一対のマシンビーム6、6間に設置する籠側吊元梁(吊元梁)25及び補助梁27と、図10及び図11に示すメインロープ吊具29及びチェーンブロック31(図11参照)とを備えている。   Next, the configuration of the elevator return apparatus according to the first embodiment will be described. The first embodiment is a return device and a return method of an elevator for releasing the operation of the safety gear 19 of the rod 11. The elevator return apparatus according to the first embodiment is, as shown in FIG. 4, between a pair of machine beams 6, 6 supporting a hoisting machine 5 (not shown in FIGS. 4 and 5) in a machine room 7. 10 and 11 and a main rope hanger 29 and a chain block 31 (see FIG. 11).

図4に示すように、籠側吊元梁25は、一対の梁材25a、25bと、吊元ピン33と、シム35とで構成されている。各梁材25a、25bには、それぞれ下方に突出するピン受け25cが形成されており、各梁材25a、25bのピン受け25cには吊元ピン33を挿通して固定されている。ここで、図6は籠側吊元梁25が常設位置に取付けてある状態を示しているが、マシンビーム6、6に対する固定方法は同じなので、図6を参照して籠側吊元梁25の固定方法について説明する。図6に示すように、各梁材25a、25bの両端部は、それぞれ対応するマシンビーム6、6の下片6aに載置されており、籠側吊元梁25の荷重を預けてある。また、各梁材25a、25bの両端部の下面にはシム35がボルト30aとナット30bで固定されている。シム35はマシンビーム6の下片6aの縁に隣接して設けてあり、これにより籠側吊元梁25がマシンビーム6、6間で動かないように固定されている。   As shown in FIG. 4, the weir-side suspension beam 25 is configured by a pair of beam members 25 a and 25 b, a suspension pin 33 and a shim 35. In each of the beam members 25a and 25b, a pin receiver 25c projecting downward is formed, and a lifting pin 33 is inserted into and fixed to the pin receiver 25c of each beam member 25a and 25b. Here, FIG. 6 shows a state where the weir side suspension base beam 25 is attached at the permanent installation position, but since the fixing method for the machine beams 6 and 6 is the same, referring to FIG. The method of fixing the As shown in FIG. 6, both ends of each beam 25a, 25b are placed on the lower piece 6a of the corresponding machine beam 6, 6, respectively, and the load of the hook side suspension beam 25 is deposited. Further, shims 35 are fixed to the lower surfaces of both end portions of the beam members 25a and 25b by bolts 30a and nuts 30b. A shim 35 is provided adjacent to the edge of the lower piece 6a of the machine beam 6, so that the weir suspension beam 25 is fixed so as not to move between the machine beams 6,6.

図4に示すように、補助梁27は、予め各マシンビーム6、6の下面にボルトナットで固定されている。この補助梁27は、メインロープ15のロープ通り穴に対応する位置に設けてあり、籠側吊元梁25の設置位置を示している。   As shown in FIG. 4, the auxiliary beams 27 are fixed in advance to the lower surfaces of the machine beams 6, 6 with bolts and nuts. The auxiliary beam 27 is provided at a position corresponding to the rope passage hole of the main rope 15 and indicates the installation position of the weir-side hanging beam 25.

図10及び図11に示すように、メインロープ吊具29はメインロープ15に取付けてあるが、第1実施形態では籠11側のメインロープ15に取付けてある。メインロープ吊具29は、メインロープ15を挟む一対の押さえ金具37と、一対の吊プレート39と、シャックル41と、ピン43(図11参照)とを備えている。尚、メインロープ15は複数のロープ15aで構成されている。   As shown in FIGS. 10 and 11, the main rope hanger 29 is attached to the main rope 15, but in the first embodiment, it is attached to the main rope 15 on the hook 11 side. The main rope hanger 29 is provided with a pair of pressing brackets 37 sandwiching the main rope 15, a pair of lifting plates 39, a shackle 41, and a pin 43 (see FIG. 11). The main rope 15 is composed of a plurality of ropes 15a.

図12及び図13に示すように、押さえ金具37には、メインロープ15の各ロープ15aを配置する複数のロープ溝37aと、ロープ溝37aの左右に設けた固定部37bとが左右方向に交互に形成してあり、図11に示すように、一対の押さえ金具37、37でメインロープ15の全てのロープ15aを挟んで、固定部37bにボルト42aを挿通してナット42b(図12(b)(c)参照)で固定してある。ロープ溝37aはロープ15aの本数と同じ数だけ並んで形成されている。図11及び図13に示すように、各押さえ金具37には、数字の記号が付されており、ボルト42aとナット42の締め付け作業をするときにどの位置のボルト42aとナット42bの締め付けを行うかがメインロープ15を挟む各押さえ金具37側でわかるようにしてある。   As shown in FIG. 12 and FIG. 13, in the press fitting 37, a plurality of rope grooves 37a for arranging the ropes 15a of the main rope 15 and fixing portions 37b provided on the left and right of the rope grooves 37a alternate in the left and right direction. As shown in FIG. 11, with all the ropes 15a of the main rope 15 being sandwiched by the pair of pressing brackets 37, the bolt 42a is inserted through the fixing portion 37b and the nut 42b (FIG. 12 (b ) (C))). The rope grooves 37a are formed in the same number as that of the ropes 15a. As shown in FIG. 11 and FIG. 13, each pressing member 37 is given a numeral symbol, and when tightening the bolt 42 a and the nut 42, the bolt 42 a and the nut 42 b are tightened at any position. The hooks are made to be recognized on the side of each pressing metal fitting 37 sandwiching the main rope 15.

図11及び図12に示すように一対の押さえ金具37、37の下部は、一対の吊プレート39、39で挟んで、吊プレート39、39及び押さえ金具37、37の下部をボルト44aとナット44bとで固定してある。尚、図12(a)に示すように、吊プレート39、39にもボルト挿通穴の位置に数字の記号が付されている。吊プレート39、39の左右両端部は各々ピン43で止めてあり、図11に示すように、各ピン43はシャックル41に挿入して、シャックル41を吊プレート39、39間に止めてある。   As shown in FIGS. 11 and 12, the lower portions of the pair of pressers 37, 37 are sandwiched between the pair of suspension plates 39, 39, and the lower portions of the suspension plates 39, 39 and the clamps 37, 37 are bolts 44a and nuts 44b. And fixed. As shown in FIG. 12 (a), the suspension plates 39, 39 are also given numerical symbols at the positions of the bolt insertion holes. The left and right end portions of the hanging plates 39, 39 are respectively stopped by pins 43, and as shown in FIG. 11, each pin 43 is inserted into the shackle 41 and the shackle 41 is held between the hanging plates 39, 39.

チェーンブロック31は、掛けフック31aと吊フック31bを備えており、図9に示すように、掛けフック31aは籠側吊元梁25の下端に固定した吊元ピン33に掛けられている。図10に示すように、チェーンブロック31の吊フック31bはシャックル41に掛けられている。   The chain block 31 includes a hook 31a and a hook 31b. As shown in FIG. 9, the hook 31a is hooked on a hook pin 33 fixed to the lower end of the hook side hook beam 25. As shown in FIG. 10, the hanging hook 31 b of the chain block 31 is hooked on a shackle 41.

また、第1実施形態では、メインロープ吊具29及びチェーンブロック31の巻上げチェーンはガバナ室9にあり、ガバナ室9でチェーンを巻き上げるようになっている。   Further, in the first embodiment, the hoisting chain of the main rope hanger 29 and the chain block 31 is in the governor chamber 9, and the governor chamber 9 is adapted to wind up the chain.

次に、第1実施形態に係るエレベータの復帰方法を工程ごとに説明する。
(1)吊元梁設置工程
図4に示すように、機械室7で、一対のマシンビーム6、6間に籠側吊元梁25を設置する。図5に示すように、籠側吊元梁25は通常駆動している巻上機5の邪魔にならない位置に予め取り付けて、常設されている。また、補助梁27は籠側吊元梁25を設置する位置で各マシンビーム6、6の下面に常設されている。
Next, the method for returning the elevator according to the first embodiment will be described step by step.
(1) Hanging-Beam Installation Step As shown in FIG. 4, in the machine room 7, the weir-side hanging beam 25 is installed between the pair of machine beams 6, 6. As shown in FIG. 5, the weir-side lifting beam 25 is fixedly installed in advance so as not to interfere with the winding machine 5 which is normally driven. Further, the auxiliary beam 27 is always provided on the lower surface of each of the machine beams 6, 6 at the position where the weir side hanging element beam 25 is installed.

まず、図5に示すように常設された籠側吊元梁25を各マシンビーム6、6から外す。籠側吊元梁25を外すときには、図6及び図7に示すように、シム35を止めているボルト30a及びナット30bを籠側吊元梁25の梁材25a、25bから外すと共にピン受け25cの吊元ピン33を外す。   First, as shown in FIG. 5, the weir-side suspension beam 25 that is permanently installed is removed from each of the machine beams 6, 6. When removing the weir-side suspension beam 25, as shown in FIGS. 6 and 7, the bolt 30a and the nut 30b holding the shim 35 are removed from the beam members 25a and 25b of the weir-side suspension beam 25 and the pin receiver 25c. Remove the hanging pin 33 of.

次に、図8に示すように、籠側吊元梁25の各梁材25a、25bを補助梁27の位置へ移動した後、常設位置(図6参照)から外したシム35、ボルト30a、ナット30bを補助梁27の位置で、梁材25a、25bに取り付ける。
(2)チェーンブロック設置工程
機械室7で、図9に示すように、チェーンブロック31の掛けフック31aを籠側吊元梁25の一対の梁材25a、25b間に挿入し、吊元ピン33をピン受け25c、25cに挿通して抜けないように固定する。次に、チェーンブロック31の吊フック31b及びチェーンをロープ通り穴(図示せず)からガバナ室9に降ろす。
(3)メインロープ吊具取付工程
ガバナ室9で、メインロープ15のロープカバー(図示せず)を外し、メインロープ15を露出した状態にする。そして、図10及び図11に示すように、一対の押さえ金具37、37でメインロープ15を挟み、押さえ金具37、37の上側をボルト42aとナット42b(図12(c)参照)で固定する。尚、図10では押さえ金具37、37のボルト42a及びナット42bの位置に付されている記号は省略している。図11及び図12に示すように、メインロープ15の各ロープ15aは、ロープ溝37aに配置される。押さえ金具37、37の下側は吊プレート39、39で挟み、ボルト44aとナット44bとで固定する。図11に示すように、吊プレート39、39の左右端部にはシャックル41を挟んだ状態でピン43をシャックル41に挿通して固定する。尚、メインロープ吊具取付工程では、ガバナ室9の床に開口されているロープ通り穴9aにメインロープ15を囲む開口塞ぎ板(図示せず)を設置して、ボルト類の落下やロープドロー(ロープの振れ)を防止する。
(4)非常止め解除工程
ガバナ室9で、チェーンブロック31のチェーンを巻き上げて、メインロープ吊具29を上昇させることで籠11を上昇させる。これにより、図3に示すように、非常止め装置19では、ガイドレール17に対して相対的に楔22a、22bが下降して、ガイドレール17の刃部17aから離れて、刃部17aとの圧接が離れ、非常止め装置19の作動が解除される。
Next, as shown in FIG. 8, after moving each beam 25a, 25b of the weir-side suspension beam 25 to the position of the auxiliary beam 27, the shim 35 removed from the permanent installation position (see FIG. 6), bolts 30a, The nut 30b is attached to the beams 25a, 25b at the position of the auxiliary beam 27.
(2) Chain block installation process In the machine room 7, as shown in FIG. 9, the hook 31a of the chain block 31 is inserted between the pair of beam members 25a and 25b of the hook side suspension beam 25 and the hook pin 33 Are fixed to the pin receptacles 25c, 25c so as not to come off. Next, the hanging hook 31b of the chain block 31 and the chain are lowered from the rope passing hole (not shown) to the governor chamber 9.
(3) Main rope suspension attachment process In the governor room 9, the rope cover (not shown) of the main rope 15 is removed, and the main rope 15 is exposed. And as shown in FIG.10 and FIG.11, the main rope 15 is pinched with a pair of pressing metal fittings 37, 37, and the upper side of the pressing metal fittings 37, 37 is fixed with bolt 42a and nut 42b (refer FIG.12 (c)). . In FIG. 10, the symbols attached to the positions of the bolts 42a and the nuts 42b of the pressers 37 and 37 are omitted. As shown in FIGS. 11 and 12, each rope 15a of the main rope 15 is disposed in the rope groove 37a. The lower sides of the pressing metal fittings 37, 37 are sandwiched by the hanging plates 39, 39, and fixed by bolts 44a and nuts 44b. As shown in FIG. 11, the pin 43 is inserted into and fixed to the shackle 41 with the shackle 41 interposed between the left and right end portions of the hanging plates 39, 39. In the main rope suspension attachment step, an opening closing plate (not shown) surrounding the main rope 15 is installed in the rope passage hole 9a opened in the floor of the governor chamber 9, and dropping of bolts and rope drawing To prevent the runout of the rope.
(4) Emergency Stop Release Step In the governor chamber 9, the chain of the chain block 31 is wound up, and the main rope hanger 29 is raised to raise the hook 11. Thereby, as shown in FIG. 3, in the safety gear 19, the hooks 22 a and 22 b are lowered relative to the guide rail 17 to separate from the blade 17 a of the guide rail 17, and The pressure contact is released, and the operation of the safety gear 19 is released.

尚、エレベータの復帰後は、ガバナ室9では、チェーンブロック31の吊フック31bをメインロープ吊具29から外した後、メインロープ吊具29をメインロープ15から外し、ロープカバー(図示せず)を復帰する。また、機械室7では、チェーンブロック31の掛けフック31aを籠側吊元梁25から外し、籠側吊元梁25をマシンビーム6から外してその常設位置に戻す。   In addition, after the elevator returns, in the governor room 9, after removing the suspension hook 31b of the chain block 31 from the main rope suspension 29, remove the main rope suspension 29 from the main rope 15, and a rope cover (not shown) To return. Further, in the machine room 7, the hooks 31a of the chain block 31 are removed from the hook-side suspension beam 25, and the hook-side suspension beam 25 is removed from the machine beam 6 and returned to its permanent position.

次に、第1実施形態の作用効果について説明する。エレベータの復帰作業は、図11に示すように、ガバナ室9でメインロープ15にメインロープ吊具29を取付け、メインロープ吊具29を引き上げる構成であるから、籠11が引き上げ困難な位置にある場合でも、籠11の引き上げが容易にできる。   Next, the operation and effect of the first embodiment will be described. In the return operation of the elevator, as shown in FIG. 11, the main rope hanger 29 is attached to the main rope 15 in the governor room 9 and the main rope hanger 29 is pulled up, so the hook 11 is in a difficult position to pull up. Even in this case, it is easy to pull up the bag 11.

また、第1実施形態によれば、図9及び図10示すように、チェーンブロック31を籠側吊元梁25とメインロープ吊具29とに掛けてチェーンを巻き上げているので、簡易な構成でメインロープ吊具29を引き上げてエレベータの復帰ができる。   Further, according to the first embodiment, as shown in FIG. 9 and FIG. 10, the chain block 31 is hooked on the hook side suspension beam 25 and the main rope hanger 29, and the chain is wound up. The main rope hanger 29 can be pulled up to return the elevator.

エレベータの復帰作業は、機械室7とガバナ室9とで行い、昇降路3に入る必要がないので、安全である。   The return work of the elevator is performed in the machine room 7 and the governor room 9 and is safe because it is not necessary to enter the hoistway 3.

籠側吊元梁25及び補助梁27はマシンビーム6に常設してあるから、エレベータの復帰作業のときに、これらを機械室7へ搬送しなくて済むので、この点でもエレベータの復帰作業が容易にできる。   Since the weir side suspension beam 25 and the auxiliary beam 27 are always installed on the machine beam 6, it is not necessary to transport them to the machine room 7 when the elevator is restored, so the elevator can be restored from this point as well. You can do it easily.

図10及び図11に示すように、メインロープ吊具29の一対の押さえ金具37、37には、各メインロープ15を配置するロープ溝37aがメインロープ15のロープ15aの数だけ形成してあり、一度にメインロープ15全体を挟んで固定できるので、メインロープ吊具29の設置作業が容易にできる。   As shown in FIG. 10 and FIG. 11, the same number of rope grooves 37a for arranging the main ropes 15 as the number of ropes 15a of the main ropes 15 are formed in the pair of pressing brackets 37, 37 of the main rope hanger 29 Since the entire main rope 15 can be clamped and fixed at one time, installation work of the main rope hanger 29 can be facilitated.

図12及び図13に示すように、各押さえ金具37、37には、ボルト42a、ナット42の取付け位置にそれぞれ記号を付してあるので、ボルト42aとナット42bの締め付け作業を二人の作業者が両側からするときに作業者が記号を言いながら締め付けすることで、一致したボルト42aとナット42bの締め付けが容易にできる。   As shown in FIG. 12 and FIG. 13, since each mounting bracket 37, 37 has a symbol attached to the mounting position of the bolt 42 a and the nut 42, respectively, the work of two people tightening the bolt 42 a and the nut 42 b The operator can easily tighten the corresponding bolts 42a and the nuts 42b by tightening while saying the symbol when the operator is from both sides.

以下に、他の実施形態を説明するが、以下に説明する実施形態では、上述した第1実施形態と同一の作用効果を奏する部分には同一の符号を付することによりその部分の説明を省略し、以下の説明では、第1実施形態と主に異なる点を説明する。
[第2実施形態]
図4、図5及び図14〜図19を参照して第2実施形態を説明する。第2実施形態は、釣合錘13の非常止め装置19が作動してエレベータの昇降が停止した場合の復帰装置と復帰方法である。
The other embodiments will be described below, but in the embodiments described below, the parts having the same effects as those of the first embodiment described above are denoted by the same reference numerals, and the description of the parts will be omitted. The following description mainly describes differences from the first embodiment.
Second Embodiment
The second embodiment will be described with reference to FIGS. 4, 5 and 14 to 19. The second embodiment is a return device and a return method in the case where the safety gear 19 of the counterweight 13 operates to stop the elevation of the elevator.

図4に示すように、第2実施形態のエレベータの復帰装置は、釣合錘側吊元梁(吊元梁)45と、吊ロープ47と、メインロープ吊具29(図11参照)と、チェーンブロック31(図10及び図19参照)とを備えている。図4に示すように、吊ロープ47は合計4本ある。   As shown in FIG. 4, the elevator return apparatus according to the second embodiment includes a counterweight-side suspension beam (hanger beam) 45, a suspension rope 47, and a main rope suspension 29 (see FIG. 11). And a chain block 31 (see FIGS. 10 and 19). As shown in FIG. 4, there are a total of four hanging ropes 47.

図5に示すように、釣合錘側吊元梁45は、一対のマシンビーム6、6の端部に常設されている。釣合錘側吊元梁45は、垂直部45aと、垂直部45aの上端で巻上機5(図2参照)側に突設する上片45bと、垂直部45aの下端で巻上機5側に突設する下片45cとを有し、垂直部45aと上片45bと下片45cとで断面略コ字形状を成している。釣合錘側吊元梁45には上片45bに吊ロープ47を通す挿通孔(図示せず)が2個を一組として、2組形成してあり、合計4個の挿通孔が形成されている。上片45bにおいて各組の挿通孔に対応する位置には、対応する挿通孔が形成された台座ブロック49が固定されている。台座ブロック49は間隔をあけて2個設けてある。台座ブロック49は上面が巻上機5側を高くして傾斜されている。   As shown in FIG. 5, the counterweight side suspension beam 45 is always provided at the end of the pair of machine beams 6, 6. The counterweight-side hanging element beam 45 includes a vertical portion 45a, an upper piece 45b protruding toward the hoisting machine 5 (see FIG. 2) at the upper end of the vertical portion 45a, and a hoisting machine 5 at the lower end of the vertical portion 45a. It has a lower piece 45c projecting on the side, and the vertical portion 45a, the upper piece 45b and the lower piece 45c form a substantially U-shaped cross section. Two pairs of insertion holes (not shown) through which the suspension rope 47 passes through the upper piece 45b are formed in the counterweight side suspension base beam 45, and a total of four insertion holes are formed. ing. A pedestal block 49 in which a corresponding insertion hole is formed is fixed at a position corresponding to the set of insertion holes in the upper piece 45b. Two pedestal blocks 49 are provided at intervals. The pedestal block 49 is inclined such that the upper surface thereof is higher on the side of the hoisting machine 5.

また、釣合錘側吊元梁45は、一対のマシンビーム6、6の上端に取付けたアダプタ53を介して固定されている。   Further, the counterweight side hanging element beam 45 is fixed via an adapter 53 attached to the upper end of the pair of machine beams 6, 6.

図4及び図17に示すように、釣合錘側吊元梁45を使用してエレベータの復帰作業をするときには、機械室7において、各台座ブロック49及び釣合錘側吊元梁45の挿通孔に、吊ロープ47の上端部に設けてあるロッド部47aを挿通して、ナット47bで固定する。図4に示すように、吊ロープ47の下端部には吊輪47cが形成してあり、吊輪47cは、図18及び図19に示すように、釣合錘側のロープ通り穴15bからガバナ室9に降ろす。尚、図19では吊輪47cは簡略化して示している。   As shown in FIGS. 4 and 17, when the elevator is returned using the counterweight side suspension beam 45, in the machine room 7, the insertion of each pedestal block 49 and the balance weight side suspension element 45 The rod portion 47a provided at the upper end portion of the hanging rope 47 is inserted into the hole and fixed by the nut 47b. As shown in FIG. 4, a suspension ring 47c is formed at the lower end of the suspension rope 47, and the suspension ring 47c is, as shown in FIGS. 18 and 19, a governor through the rope passing hole 15b on the counterweight side. Drop it into room 9. In FIG. 19, the hanger 47c is shown in a simplified manner.

図4に示すように、吊ロープ47は、2本を一組として用いており、図19に示すように、各2本の吊ロープ47の吊輪47cにチェーンブロック31の掛けフック31aを掛けてある。   As shown in FIG. 4, two hanging ropes 47 are used as one set, and as shown in FIG. 19, the hooks 31a of the chain block 31 are hooked on the hanging rings 47c of each of the two hanging ropes 47. It is

その他の構成、即ち、メインロープ吊具29及びチェーンブロック31の構成は上述した第1実施形態と同じである。   The other configurations, that is, the configurations of the main rope hanger 29 and the chain block 31 are the same as those of the first embodiment described above.

ここで、釣合錘側吊元梁45の設置について説明する。図14に示すように、一対のマシンビーム6、6の端部に固定してあるアングル51のボルト51aを外して、図15に示すように、アダプタ53を、アングル51を外したボルト51aを流用して固定する。その後、図16に示すように、アダプタ53の上に、台座ブロック49を固定した釣合錘側吊元梁45を載置して、マシンビーム6、6と重ならない位置で釣合錘側吊元梁45をボルト52で固定する。   Here, the installation of the counterweight side suspension base beam 45 will be described. As shown in FIG. 14, the bolt 51a of the angle 51 fixed to the end of the pair of machine beams 6, 6 is removed, and the adapter 53 is removed as shown in FIG. Fix and divert. Thereafter, as shown in FIG. 16, the counterweight side suspension beam 45 fixing the pedestal block 49 is placed on the adapter 53, and the counterweight side suspension is carried out at a position not overlapping with the machine beams 6, 6. The original beam 45 is fixed by the bolt 52.

次に、第2実施形態に係るエレベータの復帰方法を説明する。第2実施形態では、マシンビーム6、6に釣合錘側吊元梁45は常設されているので、第1実施形態における(1)吊元梁設置工程はなく、これに代えて(1)吊ロープ設置工程がある。
(1)吊ロープ設置工程
図4及び図17に示すように、機械室7で、吊ロープ47のロッド部47aを釣合錘側吊元梁45の上片45bと台座ブロック49の挿通孔に斜め下から通して、ナット47bで固定する。そして、吊ロープ47の吊輪47cをロープ通り穴15b(図18参照)からガバナ室9に降ろす。ロープ通り穴15bの縁には吊ロープ47が当たる部分に当材(かませ)55を取り付けておく。
(2)チェーンブロック設置工程
第2実施形態のチェーンブロック設置工程では、図19に示すように、ガバナ室9で、チェーンブロック31の掛けフック31aを吊ロープ47の吊輪47cに掛けることが上述した第1実施形態と異なっている。その他の工程は上述した第1実施形態と同じである。
(3)メインロープ吊具取付工程及び(4)非常止め解除工程は、第1実施形態と同じである。
Next, a method of returning the elevator according to the second embodiment will be described. In the second embodiment, since the counterweight side suspension base beam 45 is always installed on the machine beams 6 and 6, (1) there is no suspension source beam installation step in the first embodiment, and it is replaced by (1) There is a hanging rope installation process.
(1) Hanging rope installation step As shown in FIGS. 4 and 17, in the machine room 7, the rod portion 47a of the hanging rope 47 is inserted into the upper piece 45b of the counterweight side suspension beam 45 and the insertion hole of the pedestal block 49. Pass through from diagonally below and secure with nut 47b. Then, the suspension ring 47 c of the suspension rope 47 is lowered from the rope passage hole 15 b (see FIG. 18) to the governor room 9. A material 55 is attached to the edge of the rope passage hole 15b at the portion where the hanging rope 47 hits.
(2) Chain Block Installation Step In the chain block installation step of the second embodiment, as shown in FIG. 19, hooking the hook 31a of the chain block 31 to the suspension ring 47c of the suspension rope 47 in the governor chamber 9 is described above. It differs from the first embodiment. The other steps are the same as those in the first embodiment described above.
(3) The main rope suspension attaching process and the (4) emergency stop releasing process are the same as in the first embodiment.

図4に示すように、この第2実施形態によれば、釣合錘側吊元梁45の構成及び釣合錘側吊元梁45に吊ロープ47を取り付けることが、第1実施形態と異なっており、その他の構成及び工程は第1実施形態と同じであるから、第1実施形態における籠側吊元梁25に係る効果を除いて、第1実施形態と同様の作用効果を奏することができる。   As shown in FIG. 4, according to the second embodiment, the configuration of the counterweight side hanging element beam 45 and the attachment of the suspension rope 47 to the counterweight side hanging element beam 45 are different from the first embodiment. Since the other configurations and processes are the same as those of the first embodiment, the same effects as those of the first embodiment can be obtained except for the effects of the anchor-side suspension beam 25 in the first embodiment. it can.

更に、第2実施形態では、釣合錘側吊元梁(吊元梁)45は、常設してあるから、エレベータの復帰作業に際してその取付け工程が不要であり、更に作業が簡易である。
[第3実施形態]
次に、図20〜34を参照して、第3実施形態について説明する。第1実施形態では、籠11と釣合錘13をつないでいるメインロープ15(図1参照)が、籠11側や釣合錘13側で2:1や4:1などのローピングで巻上機5の荷重を軽減している場合に、非常止め装置を解除するための引き上げ量が多くなる場合に使用するものである。
Furthermore, in the second embodiment, since the counterweight side suspension beam (hanger beam) 45 is always installed, the attaching process is unnecessary when the elevator is restored, and the operation is further simplified.
Third Embodiment
Next, a third embodiment will be described with reference to FIGS. In the first embodiment, the main rope 15 (see FIG. 1) connecting the rod 11 and the counterweight 13 is wound by roping such as 2: 1 or 4: 1 on the rod 11 side or the counterweight 13 side. When reducing the load of the machine 5, it is used when the amount of pulling up for releasing the safety gear is large.

尚、図20に示すエレベータの復帰装置は、釣合錘側のメインロープ15を吊上げる例を示し、図34に示すエレベータの復帰装置は籠側のメインロープ15を吊上げる例を示すものであり、取付位置が異なるだけで、エレベータの復帰装置の構成及び復帰方法の工程は同じである。また、図20は、吊ロープ用吊具61に吊ロープ47(図34参照)を装着する前の状態を示している。   The elevator return apparatus shown in FIG. 20 shows an example of lifting the main rope 15 on the counterweight side, and the elevator return apparatus shown in FIG. 34 shows an example of lifting the main rope 15 on the heel side. However, the steps of the construction and return method of the elevator return apparatus are the same except for the installation position. Moreover, FIG. 20 has shown the state before mounting the suspension rope 47 (refer FIG. 34) to the suspension tool 61 for suspension ropes.

図20及び図34に示すように、第3実施形態に係るエレベータの復帰装置は、吊元梁ユニット57と、吊ロープ47(図34参照)と、吊ロープ用吊具61を有することが第1実施形態と異なっている。   As shown in FIGS. 20 and 34, the elevator return apparatus according to the third embodiment includes a lifting beam unit 57, a lifting rope 47 (see FIG. 34), and a lifting rope hanger 61. It differs from the one embodiment.

図20及び図34に示すように、吊元梁ユニット57は、一対の支柱63と、一対の支柱の上端間に架設した吊元梁65と、第1補助柱67a、第2補助柱67bとを備えている。各支柱63の下端63aはマシンビーム6、6の土台69a、69b、69cに取付られている。各土台69a、69b、69cはマシンビーム6、6に常設されている。第1補助柱67aは、支柱63の上端とマシンビーム6の間に取付けられており、第2補助柱67bは吊元梁65と支柱63との間に取付けられている。   As shown in FIGS. 20 and 34, the hanging beam unit 57 includes a pair of columns 63, a hanging beam 65 constructed between the upper ends of the pair of columns, a first auxiliary column 67a, and a second auxiliary column 67b. Is equipped. The lower ends 63a of the columns 63 are attached to the bases 69a, 69b, 69c of the machine beams 6, 6, respectively. Each base 69 a, 69 b, 69 c is permanently installed on the machine beam 6, 6. The first auxiliary column 67 a is attached between the upper end of the column 63 and the machine beam 6, and the second auxiliary column 67 b is attached between the suspension beam 65 and the column 63.

図21に示すように、籠側で反ヒッチ側の土台(第1土台)69aは、図22に示すように、マシンビーム6の上面及び下面にボルトナットで固定した固定板71のクリップ71aに側方から挿入してボルトナットで固定されている。   As shown in FIG. 21, the base (first base) 69a on the heel side and the anti-hitch side is the clip 71a of the fixing plate 71 fixed to the upper surface and the lower surface of the machine beam 6 by bolt nuts as shown in FIG. It is inserted from the side and fixed with a bolt and nut.

図21に示すように、釣合錘側で反ヒッチ側の土台(第2土台)69bは、図23に示すように、下端部(リブ部)をマシンビーム6の下片6aに乗せて、マインビームのリブ6cにボルトナットで固定されている。   As shown in FIG. 21, the base (second base) 69b on the counterweight side on the counterweight side is placed on the lower piece 6a of the machine beam 6 with its lower end (rib portion) as shown in FIG. It is fixed to the rib 6c of the main beam with a bolt and a nut.

図21に示すように、ロープヒッチ側の土台(第3土台)69cは、図24に示すように、マシンビーム6でロープヒッチ70の横に台板68を取付けて、台板68に固定されている。   As shown in FIG. 21, the base (third base) 69c on the rope hitch side is fixed to the base plate 68 by attaching the base plate 68 to the side of the rope hitch 70 with the machine beam 6, as shown in FIG. ing.

図28(a)(c)に示すように、吊元梁65は、互いに間隔をあけて設けた一対の梁材65a、65bを有し、各梁材を支柱63、63の上端にボルトナットで固定してあると共に図28(b)に示すように一対の各梁材65a、65bの長手方向中央部には吊元ピン73が固定されている。   As shown in FIGS. 28 (a) and (c), the suspension beam 65 has a pair of beam members 65a and 65b spaced apart from each other, and each beam member is a bolt nut at the upper end of the column 63, 63. In addition, as shown in FIG. 28 (b), a lifting pin 73 is fixed to the longitudinal center of each of the pair of beams 65a and 65b.

図32及び図33に示すように、吊ロープ用吊具61は、中空を有するブロック状であり、中央部にピン61aが設けてあり、左右に吊ロープ47のロッド部47aを挿通する挿通部61bが設けてある。   As shown in FIG. 32 and FIG. 33, the lifting rope suspending member 61 is in the form of a hollow hollow block, and a pin 61a is provided at the central portion, and an inserting portion through which the rod portion 47a of the lifting rope 47 is inserted 61b is provided.

吊ロープ47は上端部のロッド部47aを吊ロープ用吊具61の挿通部61bに下から挿通してナット75で固定してある。図34に示すように、吊ロープ47下端部には吊輪47cが形成してあり、メインロープ吊具29のピン43に掛けてある。   The hanging rope 47 is fixed by a nut 75 by inserting the rod portion 47a at the upper end into the insertion portion 61b of the hanging member 61 from below. As shown in FIG. 34, a suspension ring 47 c is formed at the lower end portion of the suspension rope 47 and is hung on a pin 43 of the main rope suspension 29.

図30(b)及び図31に示すように、チェーンブロック31は掛けフック31aを吊元梁65の吊元ピン73に掛けてあり、図32及び図33に示すように、吊フック31bは吊ロープ用吊具61のピン61aに掛けてある。   As shown in FIGS. 30 (b) and 31, the chain block 31 has the hook 31a hooked on the hook pin 73 of the hook beam 65, and as shown in FIGS. 32 and 33, the hook 31b is hooked. It is hooked on the pin 61 a of the rope hanger 61.

次に、第3実施形態によるエレベータの復帰方法について説明する。まず、図20で示す釣合錘13(図1参照)側のメインロープ15を吊上げる場合について説明する。まず、図25に示すように、第3実施形態の吊元梁ユニット57を設置する前に、マシンビーム6、6の釣合錘側に取付けてある油飛散防止カバー76及びその固定用アングル78を外し、図26に示す状態にする。
(1)吊元梁ユニット設置工程
図27に示すように、機械室7で、吊元梁ユニット57の支柱63の各下端部を、それぞれマシンビーム6、6に常設してある土台69a、69cにボルトナットで固定する。次に、図28(a)に示すように、支柱63、63の上端に吊元梁65を架設する。吊元梁65の架設は、各吊元梁材65a、65bを支柱63、63の上端にボルトナットで固定する。
Next, a method of returning the elevator according to the third embodiment will be described. First, the case where the main rope 15 on the counterweight 13 (see FIG. 1) side shown in FIG. 20 is lifted will be described. First, as shown in FIG. 25, before the suspension beam unit 57 of the third embodiment is installed, the oil scattering prevention cover 76 attached to the counterweight side of the machine beams 6, 6 and the fixing angle 78 thereof To the state shown in FIG.
(1) Hanging-Beam Unit Installation Step As shown in FIG. 27, in the machine room 7, foundations 69a, 69c are permanently installed on the machine beams 6, 6 at the lower end portions of the columns 63 of the hanging-beam unit 57. Fix it with a bolt and nut. Next, as shown in FIG. 28A, the suspension beam 65 is installed on the upper ends of the columns 63, 63. In the installation of the suspension beam 65, the suspension beams 65a and 65b are fixed to the upper ends of the columns 63 and 63 with bolts and nuts.

図29に示すように、第1補助柱67aの上端を支柱63の上端に取付け、下端を土台69a又は土台69cに固定する。   As shown in FIG. 29, the upper end of the first auxiliary column 67a is attached to the upper end of the column 63, and the lower end is fixed to the base 69a or the base 69c.

(2)チェーブロック設置工程
図20に示すように、機械室で、チェーンブロック31の掛けフック31aを吊元梁65の吊元ピン73に掛ける。この第3実施形態では、吊元梁65は高い位置にあるので、掛けフック31aは、つぎのようにして掛ける。図30(b)に示すように、ロープ81の一端81aを吊元梁65に取付けた一方のピン82に固定し、チェーンブロック31の上側ブロックにロープ81をU字状に通して、吊元梁65に取付けたパイプ83に掛けて下方に引き回し、図30(a)に示すように、マシンビーム6の下を通して、ロープ81の他端81bを引き上げ状態にする。そして、ロープ81の他端81bを引き上げて、チェーンブロック31の掛けフック31aを吊元梁65の梁材65a、65bに案内して、掛けフック31aに吊元ピン73を刺して吊元ピン73を固定する。そして、図33(b)に示すように、チェーンブロック31の吊フック31bを吊ロープ用吊具61に挿入した後、ピン61aを挿入してチェーンブロック31に吊ロープ用吊具61を吊り下げる。
(2) Chain Block Installation Step As shown in FIG. 20, in the machine room, the hook 31a of the chain block 31 is hooked on the hook pin 73 of the hook beam 65. In the third embodiment, since the hanging beam 65 is at the high position, the hook 31a is hooked as follows. As shown in FIG. 30 (b), one end 81a of the rope 81 is fixed to one pin 82 attached to the hanging beam 65, and the rope 81 is passed through the upper block of the chain block 31 in a U shape to As shown in FIG. 30 (a), the other end 81b of the rope 81 is pulled up through the bottom of the machine beam 6, as shown in FIG. Then, the other end 81b of the rope 81 is pulled up, the hook 31a of the chain block 31 is guided to the beams 65a and 65b of the hanging beam 65, and the hanging pin 73 is pierced into the hook 31a. Fix the And as shown in FIG.33 (b), after inserting the suspension hook 31b of the chain block 31 in the suspension rope suspension tool 61, the pin 61a is inserted and the suspension rope suspension fixture 61 is suspended in the chain block 31. .

尚、図31に示すように、第2補助柱67bは、チェーンブロック31の掛けフック31aを吊元ピン73に掛けた後、吊元梁65と各支柱63との間に固定する。   As shown in FIG. 31, after the hooks 31 a of the chain block 31 are hooked on the hook pins 73, the second auxiliary pillars 67 b are fixed between the hook beams 65 and the columns 63.

(3)メインロープ吊具取付工程は、第1実施形態のメインロープ吊具取付工程と同じである。   (3) The main rope hanger mounting step is the same as the main rope hanger mounting step of the first embodiment.

(4)吊ロープ取付工程
メインロープ吊具取付工程後に、吊ロープ47をメインロープ吊具29に下記のようにして取付ける。
(4) Hanging Rope Attaching Process After the main rope lifting device attaching process, the hanging rope 47 is attached to the main rope lifting device 29 as follows.

図32に示すように、吊ロープ用吊具61において、左右に設けた吊ロープ47のロッド部(上端部)47aを吊ロープ用吊具61の挿通部61bに下から挿通してナット75で吊ロープ用吊具61に固定する。次に、各吊ロープ47の吊輪(下端)47cをガバナ室9に降ろし、図34に示すように、ガバナ室9で吊ロープ47の吊輪47cをメインロープ吊具29の吊プレート39、39間のピン43を通して固定する(図12参照)。   As shown in FIG. 32, in the lifting rope lifting gear 61, the rod portion (upper end) 47a of the lifting rope 47 provided on the left and right is inserted from below into the insertion portion 61b of the lifting rope lifting gear 61 and It fixes to the hanger 61 for suspension ropes. Next, lower the suspension ring (lower end) 47c of each suspension rope 47 to the governor chamber 9, and as shown in FIG. 34, the suspension ring 47c of the suspension rope 47 in the governor chamber 9 is the suspension plate 39 of the main rope suspension 29, It fixes through the pin 43 between 39 (refer FIG. 12).

(5)非常止め解除工程
機械室7で、チェーンブロック31のチェーンを巻き上げて、メインロープ吊具29を上昇させることで籠を上昇させる。
(5) Emergency Stop Release Step In the machine room 7, the chain of the chain block 31 is wound up, and the main rope hanger 29 is raised to raise the weir.

この第3実施形態では、籠側吊元梁25の効果を除いて上述した第1実施形態と同様の作用効果を得ることができると共に吊元梁65を支柱63で高くした吊元梁ユニット57を用いているので、メインロープ吊具29の吊り上げ高さ(距離)を長くとることができる。   In the third embodiment, the same operation and effect as those of the first embodiment described above can be obtained except for the effect of the weir-side suspension beam 25, and a hanging beam unit 57 in which the hanging beam 65 is raised by the columns 63. As a result, the lifting height (distance) of the main rope hanger 29 can be increased.

また、第3実施形態では、図20に示すように吊元梁65を釣合錘側に設置する場合や図34に示すように吊元梁65を籠側に設置する場合には、支柱63及び第1補助柱67aの取付け位置を変えるだけであるから、作業性が良い。   In the third embodiment, when the hanging beam 65 is installed on the counterweight side as shown in FIG. 20 or when the hanging beam 65 is installed on the heel side as shown in FIG. And since it only changes the attachment position of the 1st auxiliary pillar 67a, workability is good.

上述した実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。これら新規な実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。実施形態やその変形は、発明の範囲や要旨に含まれるとともに、特許請求の範囲に記載された発明とその均等の範囲に含まれる。   The embodiments described above are presented as examples and are not intended to limit the scope of the invention. These novel embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the scope of the invention. The embodiments and the modifications thereof are included in the scope and the gist of the invention, and are included in the invention described in the claims and the equivalent scope thereof.

例えば、第1〜第3実施形態において、メインロープ吊具29を籠側のメインロープ15に設置して吊り上げるときには、エレベータの乗り場ドアまで引き上げて、籠11内の乗員を救出しても良い。   For example, in the first to third embodiments, when the main rope hanger 29 is installed on the main rope 15 on the heel side and lifted up, the occupant in the heel 11 may be rescued by pulling up to the landing door of the elevator.

1…エレベータ、5…巻上機、6…マシンビーム、7…機械室、8…調速機、9…ガバナ室、11…籠、13…釣合錘、15…メインロープ、15b…ロープ通り穴、19…非常止め装置、25…籠側吊元梁(吊元梁)、29…メインロープ吊具、31…チェーンブロック、31a…掛けフック、31b…吊フック、45…釣合錘側吊元梁(吊元梁)、47…吊ロープ、57…吊元梁ユニット、61…吊ロープ用吊具、63…支柱、65…吊元梁。   DESCRIPTION OF SYMBOLS 1 ... Elevator, 5 ... Winding machine, 6 ... Machine beam, 7 ... Machine room, 8 ... Glow machine, 9 ... Governor room, 11 ... Ax, 13 ... Balance weight, 15 ... Main rope, 15b ... Rope street Holes 19: Emergency stop device 25: Beam-side suspension beam (hanger beam) 29: Main rope hanger 31: Chain block 31a: Hook hook 31b: Suspension hook 45: Balance weight side suspension Main beam (hanging beam), 47: hanging rope, 57: hanging beam unit, 61: hanging rope lifting gear, 63: post, 65: hanging beam.

Claims (11)

籠と釣合錘とをメインロープで連結し、機械室に設けた巻上機で前記メインロープを巻き上げて前記籠及び前記釣合錘をつるべ式に昇降動させると共に前記機械室の下に調速機が配置されたガバナ室を備えるエレベータにおいて、非常止め装置が作動して昇降が停止したエレベータの復帰方法であって、
前記機械室で、前記巻上機を支持する一対のマシンビーム間に吊元梁を設置する吊元梁設置工程と、
前記機械室で、前記吊元梁にチェーンブロックの掛けフックを掛け、前記チェーンブロックの吊フック及びチェーンをロープ通り穴から前記ガバナ室に降ろすチェーンブロック設置工程と、
前記ガバナ室で、前記メインロープの籠側部又は釣合錘側部にメインロープ吊具を挟着固定するメインロープ吊具取付工程と、
前記ガバナ室で、前記チェーンブロックの前記吊フックを前記メインロープ吊具に掛けるメインロープ吊具吊り工程と、
前記ガバナ室で、前記チェーンブロックの前記チェーンを巻き上げて前記メインロープ吊具を上昇させることで、前記籠又は前記釣合錘を上昇させて前記非常止め装置の作動を外す非常止め解除工程と、を備えるエレベータの復帰方法。
The rod and the counterweight are connected by a main rope, and the main rope is wound up with a hoist provided in the machine room, and the rod and the counterweight are moved up and down like a leash and adjusted under the machine room In an elevator provided with a governor room in which a speed gear is disposed, a method of returning the elevator in which the safety gear is activated and the raising and lowering is stopped,
A hanging beam installation step of installing a lifting beam between a pair of machine beams supporting the winding machine in the machine room;
A chain block setting step of hooking a hook hook of a chain block on the lifting beam in the machine room and lowering the chain hook and the hook from the rope passage hole to the governor room;
A main rope suspension attaching step of sandwiching and fixing a main rope suspension on the heel side or the counterweight side of the main rope in the governor room;
A main rope hanging step of hanging the hanging hook of the chain block on the main rope hanging member in the governor chamber;
An emergency stop releasing step of lifting the chain or the counterweight by raising the chain of the chain block and raising the main rope suspension in the governor chamber; A method of returning an elevator comprising:
前記一対のマシンビームには前記吊元梁の設置位置に補助梁を取付けてあると共に前記吊元梁は前記一対のマシンビームに取付けた前記補助梁から離れた位置に取付けてあり、前記吊元梁設置工程は、補助梁から離れた位置にある前記吊元梁を前記一対のマシンビームから外して前記補助梁の位置に設置する請求項1に記載のエレベータの復帰方法。   An auxiliary beam is attached to the installation position of the suspension beam at the pair of machine beams, and the suspension beam is attached at a distance from the auxiliary beam attached to the pair of machine beams, The method for returning an elevator according to claim 1, wherein in the beam installation step, the lifting beam located away from the auxiliary beam is removed from the pair of machine beams and installed at the position of the auxiliary beam. 前記吊元梁は一対の吊元梁材で構成してあり、前記チェーンブロック設置工程は、前記一対の吊元梁材間に通した吊元ピンに前記チェーンブロックの前記掛けフックを掛ける請求項1又は2に記載のエレベータの復帰方法。   The suspension beam is composed of a pair of suspension beam members, and in the chain block installation step, the hook of the chain block is hung on a suspension pin that is passed between the pair of suspension beam members. The elevator return method according to 1 or 2. 籠と釣合錘とをメインロープで連結し、機械室に設けた巻上機で前記メインロープを巻き上げて前記籠及び前記釣合錘をつるべ式に昇降動させると共に前記機械室の下に調速機が配置されたガバナ室を備え、前記巻上機を支持する一対のマシンビーム間には吊元梁が設置してあるエレベータにおいて、非常止め装置が作動して昇降が停止したエレベータの復帰方法であって、
前記機械室で、前記吊元梁に吊ロープの上端部を係止し、前記吊ロープをロープ通り穴に通して前記吊ロープの下端部を前記ガバナ室に降ろす吊ロープ設置工程と、
前記ガバナ室で、前記メインロープの籠側部又は釣合錘側部にメインロープ吊具を挟着固定するメインロープ吊具取付工程と、
前記ガバナ室で、チェーンブロックの掛けフックを前記吊ロープの下端に掛け、前記チェーンブロックの吊フックを前記メインロープ吊具に掛けるチェーンブロック設置工程と、
前記ガバナ室で、前記チェーンブロックのチェーンを巻き上げて前記メインロープ吊具を上昇させることで、前記籠又は前記釣合錘を上昇させて前記非常止め装置の作動を外す非常止め解除工程と、を備えるエレベータの復帰方法。
The rod and the counterweight are connected by a main rope, and the main rope is wound up with a hoist provided in the machine room, and the rod and the counterweight are moved up and down like a leash and adjusted under the machine room In an elevator having a governor room in which a speed gear is disposed, and a lifting beam installed between a pair of machine beams supporting the hoisting machine, return of the elevator in which the safety gear is activated to stop raising and lowering Method,
A hanging rope installation step of locking the upper end of the hanging rope to the hanging beam in the machine room, passing the hanging rope through the rope passage hole, and lowering the lower end of the hanging rope into the governor room;
A main rope suspension attaching step of sandwiching and fixing a main rope suspension on the heel side or the counterweight side of the main rope in the governor room;
A chain block setting step of hooking a hook hook of a chain block to a lower end of the hanging rope and hooking a hook hook of the chain block to the main rope hook in the governor chamber;
An emergency stop releasing step of lifting the chain of the chain block and raising the main rope suspension in the governor chamber to raise the weir or the counterweight to release the operation of the emergency stop device; The elevator return method provided.
籠と釣合錘とをメインロープで連結し、機械室に設けた巻上機で前記メインロープを巻き上げて前記籠及び前記釣合錘をつるべ式に昇降動させると共に前記機械室の下に調速機が配置されたガバナ室を備えるエレベータにおいて、非常止め装置が作動して昇降が停止したエレベータの復帰方法であって、
前記機械室で、一対の支柱と、前記一対の支柱の上端部間に架設した吊元梁と、補助柱とを有する吊元梁ユニットの前記支柱の各下端部を、前記巻上機を支持する一対のマシンビームに固定すると共に前記補助柱の上端部を前記支柱の上端部に取付け、前記補助柱の下端部を前記支柱の下端部から離れた位置で前記マシンビームに取付ける吊元梁ユニット設置工程と、
前記機械室で、チェーンブロックの掛けフックを前記吊元梁に掛け、前記チェーンブロックの吊フックを吊ロープ用吊具に掛けるチェーンブロック設置工程と、
前記ガバナ室で、前記メインロープの籠側部又は釣合錘側部にメインロープ吊具を挟着固定するメインロープ吊具取付工程と、
前記機械室で、前記吊ロープ用吊具に吊ロープの上端部を取付け、前記吊ロープの下端部を前記ガバナ室に降ろして、前記ガバナ室で前記メインロープ吊具に前記吊ロープの前記下端部を取付ける吊ロープ取付工程と、
前記機械室で、前記チェーンブロックのチェーンを巻き上げて、前記メインロープ吊具を上昇させることで、前記籠又は前記釣合錘を上昇させて非常止め装置の作動を外す非常止め解除工程と、を備えるエレベータの復帰方法。
The rod and the counterweight are connected by a main rope, and the main rope is wound up with a hoist provided in the machine room, and the rod and the counterweight are moved up and down like a leash and adjusted under the machine room In an elevator provided with a governor room in which a speed gear is disposed, a method of returning the elevator in which the safety gear is activated and the raising and lowering is stopped,
In the machine room, the lower end portions of the columns of the suspension beam unit having a pair of columns, a suspension beam installed between the upper ends of the pair of columns, and an auxiliary column support the winding machine A hanging beam unit fixed to the pair of machine beams and attaching the upper end of the auxiliary column to the upper end of the column and attaching the lower end of the auxiliary column to the machine beam at a distance from the lower end of the column Installation process,
A chain block setting step of hooking a hook of a chain block to the hanging beam and hooking a hook of the chain block to a hook for a hanging rope in the machine room;
A main rope suspension attaching step of sandwiching and fixing a main rope suspension on the heel side or the counterweight side of the main rope in the governor room;
Attach the upper end of the hanging rope to the hanging rope lifting gear in the machine room, lower the lower edge of the hanging rope to the governor room, and lower the lower end of the lifting rope to the main rope lifting gear in the governor room Hanging rope mounting process for mounting parts,
An emergency stop releasing step of lifting the chain of the chain block and raising the main rope suspension in the machine room to raise the wedge or the counterweight to release the operation of the emergency stop device; The elevator return method provided.
前記吊元梁は間隔をあけて対向配置した一対の吊元梁材を有し、前記チェーンブロック設置工程は、前記チェーンブロックの前記掛けフックを前記一対の吊元梁材間に通した吊元ピンに掛ける請求項5に記載のエレベータの復帰方法。   The suspension beam has a pair of suspension beam members disposed opposite to each other at intervals, and in the chain block installation step, the suspension beam which passes the hook of the chain block between the pair of suspension beam members The method for returning an elevator according to claim 5, wherein the elevator is hung on a pin. 籠と釣合錘とをメインロープで連結し、機械室に設けた巻上機で前記メインロープを巻き上げて前記籠及び前記釣合錘をつるべ式に昇降動させると共に前記機械室の下に調速機が配置されたガバナ室を備えるエレベータにおいて、非常止め装置が作動して昇降が停止したエレベータの復帰装置であって、
前記巻上機を支持する一対のマシンビーム間に設置する吊元梁と、
前記メインロープの籠側部又は釣合錘側部に挟着固定するメインロープ吊具と、
前記吊元梁に掛ける掛けフックと、前記メインロープ吊具を吊る吊フックとを有するチェーンブロックとを備え、
前記チェーンブロックのチェーンを巻き上げて前記メインロープ吊具を上昇させることで、前記籠又は前記釣合錘を引き上げて非常止め装置の作動を外すエレベータの復帰装置。
The rod and the counterweight are connected by a main rope, and the main rope is wound up with a hoist provided in the machine room, and the rod and the counterweight are moved up and down like a leash and adjusted under the machine room What is claimed is: 1. An elevator comprising: a governor chamber in which a speed gear is disposed, wherein the safety gear is activated to stop raising and lowering;
A lifting beam installed between a pair of machine beams supporting the hoist;
A main rope hanger which is clamped and fixed to a heel side or a counterweight side of the main rope;
A chain block having a hook for hanging on the suspension beam and a suspension hook for suspending the main rope hanger;
The return apparatus of the elevator which cancels | hangs the said cage | basket or the said counterweight by pulling up the chain of the said chain block and raising the said main rope hanger, and cancels | releases the action | operation of a safety gear.
前記マシンビームは前記吊元梁の取付け位置に補助梁を有し、前記吊元梁は補助梁の位置で前記マシンビームに荷重をあずけて取付けてある請求項7に記載のエレベータの復帰装置。   8. The elevator return apparatus according to claim 7, wherein the machine beam has an auxiliary beam at the attachment position of the suspension beam, and the suspension beam is attached to the machine beam at a position of the auxiliary beam with a load applied. 籠と釣合錘とをメインロープで連結し、機械室に設けた巻上機で前記メインロープを巻き上げて前記籠及び前記釣合錘をつるべ式に昇降動させると共に前記機械室の下に調速機が配置されたガバナ室を備え、前記巻上機を支持する一対のマシンビーム間には吊元梁が設置してあるエレベータにおいて、非常止め装置が作動して昇降が停止したエレベータの復帰装置であって、
前記メインロープの籠側部又は釣合錘側部に挟着固定するメインロープ吊具と、
前記吊元梁に上端を係止し、下端をロープ通り穴からガバナ室に降ろす吊ロープと、
前記吊ロープの下端に掛ける掛けフックと、前記メインロープ吊具を吊る吊フックとを有するチェーンブロックとを備え、
前記チェーンブロックのチェーンを巻き上げて前記メインロープ吊具を上昇させることで、籠又は釣合錘を引き上げて非常止め装置の作動を外すエレベータの復帰装置。
The rod and the counterweight are connected by a main rope, and the main rope is wound up with a hoist provided in the machine room, and the rod and the counterweight are moved up and down like a leash and adjusted under the machine room In an elevator having a governor room in which a speed gear is disposed, and a lifting beam installed between a pair of machine beams supporting the hoisting machine, return of the elevator in which the safety gear is activated to stop raising and lowering A device,
A main rope hanger which is clamped and fixed to a heel side or a counterweight side of the main rope;
A hanging rope which holds the upper end of the hanging beam and lowers the lower end from the rope passage hole into the governor room;
A chain block having a hook hook hung on a lower end of the hanging rope, and a hanging hook hanging the main rope hook;
The return apparatus of the elevator which pulls up a cage | basket or a counterweight and pulls out the action | operation of a safety gear by winding up the chain of the said chain block and raising the said main rope hanger.
籠と釣合錘とをメインロープで連結し、機械室に設けた巻上機で前記メインロープを巻き上げて前記籠及び前記釣合錘をつるべ式に昇降動させると共に前記機械室の下に調速機が配置されたガバナ室を備えるエレベータにおいて、非常止め装置が作動して昇降が停止したエレベータの復帰装置であって、
一対の支柱と、前記一対の支柱の上端部間に架設した吊元梁と、補助柱とを有し、前記支柱の各下端部は前記巻上機を支持する一対のマシンビームに固定されると共に前記補助柱は前記支柱の上端部と前記各マシンビームとの間に取付けられる吊元梁ユニットと、
前記メインロープの籠側部又は釣合錘側部に挟着固定されるメインロープ吊具と、
前記メインロープ吊具を吊る吊ロープと、
前記吊ロープを吊る吊ロープ用吊具と、
前記吊元梁に掛ける掛けフックと、前記吊ロープ用吊具を吊る吊フックとを有するチェーンブロックとを備え、
前記チェーンブロックのチェーンを巻き上げて前記メインロープ吊具を上昇させることで、籠又は釣合錘を引き上げて非常止め装置の作動を外すエレベータの復帰装置。
The rod and the counterweight are connected by a main rope, and the main rope is wound up with a hoist provided in the machine room, and the rod and the counterweight are moved up and down like a leash and adjusted under the machine room What is claimed is: 1. An elevator comprising: a governor chamber in which a speed gear is disposed, wherein the safety gear is activated to stop raising and lowering;
It has a pair of support columns, a suspension beam that is installed between the upper ends of the pair of support columns, and an auxiliary column, and the lower end sections of the support columns are fixed to a pair of machine beams that support the hoisting machine And a suspension beam unit mounted between the upper end of the column and each of the machine beams.
A main rope hanger that is clamped and fixed to the heel side or the counterweight side of the main rope;
A hanging rope for hanging the main rope lifting device;
A lifting rope lifting device for lifting the lifting rope;
A chain block having a hook for hanging on the hanging beam and a hanging hook for hanging the hanging member for the hanging rope;
The return apparatus of the elevator which pulls up a cage | basket or a counterweight and pulls out the action | operation of a safety gear by winding up the chain of the said chain block and raising the said main rope hanger.
前記メインロープ吊具は、メインロープを挟着する一対の押さえ金具を有し、一対の押さえ金具は複数のボルトとナットで固定してあり、各押さえ金具には、ボルトとナットの取付け位置に記号が付してある請求項7〜10のいずれか一項に記載のエレベータの復帰装置。   The main rope hanger has a pair of clamps for clamping the main rope, and the clamps are fixed by a plurality of bolts and nuts, and each clamp has a mounting position of the bolt and nut. The elevator return apparatus according to any one of claims 7 to 10, wherein the symbol is attached.
JP2018050188A 2018-03-16 2018-03-16 Elevator return method and elevator return apparatus Active JP6505899B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2018050188A JP6505899B1 (en) 2018-03-16 2018-03-16 Elevator return method and elevator return apparatus
CN201821998962.0U CN209396733U (en) 2018-03-16 2018-11-30 The resetting apparatus of elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018050188A JP6505899B1 (en) 2018-03-16 2018-03-16 Elevator return method and elevator return apparatus

Publications (2)

Publication Number Publication Date
JP6505899B1 true JP6505899B1 (en) 2019-04-24
JP2019156635A JP2019156635A (en) 2019-09-19

Family

ID=66324212

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018050188A Active JP6505899B1 (en) 2018-03-16 2018-03-16 Elevator return method and elevator return apparatus

Country Status (2)

Country Link
JP (1) JP6505899B1 (en)
CN (1) CN209396733U (en)

Also Published As

Publication number Publication date
JP2019156635A (en) 2019-09-19
CN209396733U (en) 2019-09-17

Similar Documents

Publication Publication Date Title
JP2648373B2 (en) Beam for suspending elevator traction wire rope pulley
JP6969686B2 (en) How to extend the lift of a construction elevator
JP6505899B1 (en) Elevator return method and elevator return apparatus
JP3281168B2 (en) Lifting equipment for elevator cars
JP4089986B2 (en) Hydraulic rope main rope replacement method
EP2679531B1 (en) Elevator with moveable rope suspension point
JP7156530B2 (en) Elevator safety device replacement method and elevator safety device replacement device
JP4118126B2 (en) Elevator equipment
KR101976724B1 (en) Method for installing elevator guide rails without a machine room
US11059701B2 (en) Methods and apparatuses for lifting elevator cars during installation
JP5948828B2 (en) Lifting device used for assembling cargo lift for building demolition work, cargo lift for building demolition work, and assembling method thereof
JP6382391B1 (en) Elevator counterweight frame reinforcement support device and elevator balance weight frame reinforcement mounting method
JP4260453B2 (en) Gondola safety device
JP6555183B2 (en) Elevator elevator weight measuring device
JP7424534B1 (en) Elevator installation structure and installation method
CN218538894U (en) Self-lifting unloading platform
CN211169385U (en) Pit maintenance device of high-speed ladder
CN219751697U (en) Side-sway preventing limiting tool for vertical hoisting of object
JP2508939B2 (en) Elevator device main rope installation method
JP3888513B2 (en) Main rope end adjustment method for 2-to-1 roping elevator
JP2601921B2 (en) Method and apparatus for supporting a counterweight
JPH08169662A (en) Elevator suspending device
JP6324216B2 (en) Car suspension device and elevator maintenance work method
JP4652850B2 (en) Replacement method of main ropes for traction type and lower suspension type elevators
WO2015044977A1 (en) Elevator device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180316

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190215

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190226

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190327

R150 Certificate of patent or registration of utility model

Ref document number: 6505899

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150