JP6428948B2 - Power control apparatus, power control method, and program - Google Patents

Power control apparatus, power control method, and program Download PDF

Info

Publication number
JP6428948B2
JP6428948B2 JP2017544087A JP2017544087A JP6428948B2 JP 6428948 B2 JP6428948 B2 JP 6428948B2 JP 2017544087 A JP2017544087 A JP 2017544087A JP 2017544087 A JP2017544087 A JP 2017544087A JP 6428948 B2 JP6428948 B2 JP 6428948B2
Authority
JP
Japan
Prior art keywords
power
power generation
renewable energy
value
absorbed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017544087A
Other languages
Japanese (ja)
Other versions
JPWO2017060957A1 (en
Inventor
耕治 工藤
耕治 工藤
康将 本間
康将 本間
龍 橋本
龍 橋本
鈴木 勝也
勝也 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Corp
Original Assignee
NEC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Corp filed Critical NEC Corp
Publication of JPWO2017060957A1 publication Critical patent/JPWO2017060957A1/en
Application granted granted Critical
Publication of JP6428948B2 publication Critical patent/JP6428948B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Description

本発明は、電力制御装置、電力制御方法およびプログラムに関する。 The present invention is a power control device, a contact and a program power control how.

太陽光発電装置や風力発電装置などの再生可能エネルギーを用いて発電する発電装置(以下「再エネ電源」とも称する)が知られている。そして、電力会社が再エネ電源にて発電された電力を固定価格で買い取ることを義務づけたFIT(固定価格買取)が始まったことも一因となって、電力系統に接続された再エネ電源が急激に増えてきている。
電力系統に接続された再エネ電源が増えると、電力供給が電力需要に対して過多となる状況が想定される。この状況を回避する手法として、再エネ電源の発電電力を上限値以下に抑制する手法が考えられる。
特許文献1には、再エネ電源から電力系統(電力網)へ逆潮流される電力を抑制する発電システムが記載されている。この発電システムは、再エネ電源の出力電圧が上限閾値を超えないように、再エネ電源の出力電力を抑制する。そして、この発電システムは、出力電力の抑制が必要な余剰電力を蓄電池に蓄えることができる。
2. Description of the Related Art A power generation device that generates power using renewable energy such as a solar power generation device or a wind power generation device (hereinafter also referred to as “renewable power source”) is known. And, partly because FIT (Fixed Price Purchase), which obligates electric power companies to purchase electricity generated by renewable energy power sources at a fixed price, has started. It is increasing rapidly.
When the renewable energy power source connected to the power system increases, it is assumed that the power supply becomes excessive with respect to the power demand. As a technique for avoiding this situation, a technique for suppressing the generated power of the renewable energy power source to be equal to or lower than an upper limit value can be considered.
Patent Document 1 describes a power generation system that suppresses power that flows backward from a renewable energy power source to a power system (power network). This power generation system suppresses the output power of the renewable energy power supply so that the output voltage of the renewable energy power supply does not exceed the upper threshold. And this electric power generation system can store the surplus electric power which needs suppression of output electric power in a storage battery.

特開2013−5537号公報JP 2013-5537 A

再エネ電源の発電は、自然環境(例えば、太陽光や風)の影響を受けるため、再エネ電源の発電電力は自然環境の変化に応じた短い周期で変動する可能性がある。よって、再エネ電源に起因する余剰電力も、自然環境の変化に応じた短い周期で変動する可能性がある。
このため、特許文献1に記載の発電システムでは、再エネ電源の発電電力の短い周期の変動に合わせて蓄電池に蓄える余剰電力を調整する場合、短い周期は、蓄電池が充電する充電可能特性よりも短いことも往々にしてある。そのため再エネ電源の出力変動に追従して蓄電池を適切に充電することができないという問題があった。
Since the power generation of the renewable energy power source is affected by the natural environment (for example, sunlight and wind), the generated power of the renewable energy power source may fluctuate in a short cycle according to the change of the natural environment. Therefore, the surplus power resulting from the renewable energy power supply may also fluctuate in a short cycle according to the change in the natural environment.
For this reason, in the power generation system described in Patent Document 1, when adjusting the surplus power stored in the storage battery in accordance with the short period fluctuation of the generated power of the renewable energy power source, the short period is longer than the chargeable characteristic charged by the storage battery. Often it is short. Therefore, there has been a problem that the storage battery cannot be appropriately charged following the output fluctuation of the renewable energy power source.

本発明の目的は、上記課題を解決可能な電力制御装置、電力制御方法およびプログラムを提供することである。 An object of the present invention is capable of solving the power control device of the above problems, it is to provide a contact and the program power control how.

本発明の電力制御装置は、再生可能エネルギーを用いて発電する発電装置の所定の出力抑制時間帯における予測発電電力値と、前記発電装置の発電電力の許容上限値とに基づいて、電力系統を介して前記発電装置と接続された、前記発電装置を備える需要家とは異なる需要家が備える電気機器に吸収させる吸収電力を決定する第1決定部と、
前記出力抑制時間帯における前記発電装置の実際の発電電力と前記吸収電力とに基づいて、前記発電装置から電力系統に逆潮流させる逆潮流電力を決定する第2決定部と、を備える。
The power control device according to the present invention is configured to change the power system based on a predicted power generation value in a predetermined output suppression time zone of a power generation device that generates power using renewable energy, and an allowable upper limit value of the power generation power of the power generation device. A first determination unit for determining absorbed power to be absorbed by an electric device provided by a consumer different from a consumer provided with the power generation device, connected to the power generation device via
A second determination unit that determines reverse flow power to be reversely flowed from the power generation device to a power system based on the actual generated power and the absorbed power of the power generation device in the output suppression time period .

本発明の電力制御方法は、再生可能エネルギーを用いて発電する発電装置の所定の出力抑制時間帯における予測発電電力値と、前記発電装置の発電電力の許容上限値とに基づいて、電力系統を介して前記発電装置と接続された、前記発電装置を備える需要家とは異なる需要家が備える電気機器に吸収させる吸収電力を決定し、
前記出力抑制時間帯における前記発電装置の実際の発電電力と前記吸収電力とに基づいて、前記発電装置から電力系統に逆潮流させる逆潮流電力を決定する。
The power control method of the present invention, based on the predicted power generation value of the predetermined output suppression time zone of the power generation device for generating power using renewable energy, the allowable upper limit value of the generated power of the power generator, the power system Determining the absorbed power to be absorbed by the electrical equipment provided by the consumer different from the consumer provided with the power generator connected to the power generator via
Based on the actual generated power and the absorbed power of the power generation device in the output suppression time zone , reverse power flow to be reverse flowed from the power generation device to the power system is determined.

本発明のプログラムは、コンピュータに、
再生可能エネルギーを用いて発電する発電装置の所定の出力抑制時間帯における予測発電電力値と、前記発電装置の発電電力の許容上限値とに基づいて、電力系統を介して前記発電装置と接続された、前記発電装置を備える需要家とは異なる需要家が備える電気機器に吸収させる吸収電力を決定する第1決定手順と、
前記出力抑制時間帯における前記発電装置の実際の発電電力と前記吸収電力とに基づいて、前記発電装置から電力系統に逆潮流させる逆潮流電力を決定する第2決定手順と
を実行させるためのものである。
The program of the present invention is stored in a computer.
Based on the predicted generated power value in a predetermined output suppression time zone of the power generation device that generates power using renewable energy and the allowable upper limit value of the generated power of the power generation device, the power generation device is connected to the power generation device via a power system. In addition, a first determination procedure for determining absorbed power to be absorbed by an electric device provided by a consumer different from the consumer provided with the power generation device ;
A second determination procedure for determining reverse flow power to be reverse flowed from the power generation device to the power system based on the actual generated power of the power generation device and the absorbed power in the output suppression time zone ;
Is to execute .

本発明によれば、発電抑制が必要な余剰電力を適切に蓄電池やHP給湯器等の電気機器を用いて吸収(消費)させることが可能になる。   ADVANTAGE OF THE INVENTION According to this invention, it becomes possible to absorb (consume) the surplus electric power which needs generation | occurrence | production suppression appropriately using electric equipments, such as a storage battery and HP water heater.

本発明の第1実施形態の電力制御装置100を示した図である。It is the figure which showed the electric power control apparatus 100 of 1st Embodiment of this invention. 発電抑制が実行される再エネ電源での、予測発電電力値Aと、許容上限値Bと、実際の発電電力Cと、吸収電力Dと、逆潮流電力Eとの一例を示した図である。It is the figure which showed an example of the prediction generated electric power value A, the allowable upper limit B, the actual generated electric power C, the absorbed electric power D, and the reverse power flow E in the renewable energy power source in which the electric power generation suppression is executed. . 第1実施形態の動作を説明するためのフローチャートである。It is a flowchart for demonstrating operation | movement of 1st Embodiment. 本発明の第2実施形態の再エネ電源100を示した図である。It is the figure which showed the renewable energy power supply 100 of 2nd Embodiment of this invention. 再エネ電源200の動作を説明するためのフローチャートである。5 is a flowchart for explaining the operation of a renewable energy power source 200. 蓄電池300が再エネ電源200に対して遠隔に存在する場合を示した図である。It is the figure which showed the case where the storage battery 300 exists remotely with respect to the renewable energy power supply 200. FIG. 図5Bに示した再エネ電源200の動作を説明するための図である。It is a figure for demonstrating operation | movement of the renewable energy power supply 200 shown to FIG. 5B. 蓄電池300が再エネ電源200に併設されている場合を示した図である。It is the figure which showed the case where the storage battery 300 was attached to the renewable energy power supply 200. FIG. 本発明の第3実施形態の電力システム1を示した図である。It is the figure which showed the electric power system 1 of 3rd Embodiment of this invention. 電力制御装置100Aの動作を説明するためのフローチャートである。It is a flowchart for demonstrating operation | movement of 100 A of electric power control apparatuses. 発電抑制の当日の蓄電池301、HP給湯器302、蓄電池303の動作を説明するためのフローチャートである。It is a flowchart for demonstrating operation | movement of the storage battery 301, the HP water heater 302, and the storage battery 303 on the day of power generation suppression. 発電抑制の当日の再エネ電源200A(n)の動作を説明するためのフローチャートである。It is a flowchart for demonstrating operation | movement of the renewable energy power supply 200A (n) on the day of power generation suppression. 抑制時間帯Tでの予測発電電力値Aが時間の経過と共に変化する場合での本実施形態の動作例を示した図である。It is the figure which showed the example of operation | movement of this embodiment in case the estimated generation electric power value A in the suppression time slot | zone T changes with progress of time. 抑制時間帯Tでの予測発電電力値Aが一定値である場合の本実施形態の動作例を示した図である。It is the figure which showed the operation example of this embodiment in case the prediction electric power generation value A in the suppression time slot | zone T is a constant value. 許容上限値が変動する一例を示した図である。It is the figure which showed an example from which an allowable upper limit fluctuates.

以下、本発明の実施形態について図面を参照して説明する。   Embodiments of the present invention will be described below with reference to the drawings.

(第1実施形態)
図1は、本発明の第1実施形態の電力制御装置100を示した図である。
電力制御装置100は、第1決定部101と、第2決定部102と、を含む。
第1決定部101は、再生可能エネルギーを用いて発電する再エネ電源の予測発電電力値(以下、単に「予測発電電力値」と称する)と、再エネ電源の発電電力の許容上限値(以下、単に「許容上限値」と称する)と、を受信する。再エネ電源は、電力系統に接続されている。
第1決定部101は、予測発電電力値を、例えば、発電電力予測装置(不図示)から受信する。発電電力予測装置は、再エネ電源の発電履歴や気象予測情報を用いて、再エネ電源の発電電力を予測する。この予測された再エネ電源の発電電力の値が「予測発電電力値」となる。発電電力予測装置は、予測発電電力値を電力制御装置100に送信する。第1決定部101は、発電電力予測装置以外の装置から、予測発電電力値を受信してもよい。また、第1決定部101は、発電電力予測装置を内蔵してもよいし、第1決定部101が、再エネ電源の発電履歴や気象予測情報を用いて、再エネ電源の発電電力を予測してもよい。
第1決定部101は、許容上限値を、例えば、電力会社が管理する装置から受信する。第1決定部101は、電力会社が管理する装置以外の装置から、許容上限値を受信してもよい。
第1決定部101は、予測発電電力値と許容上限値とに基づいて、蓄電池に吸収(充電)させる吸収電力を決定する。以下では、第1決定部101は、予測発電電力値から許容上限値を差し引いた結果を、吸収電力として決定するとする。蓄電池は、電力系統に接続されている。蓄電池は、電気機器やエネルギー蓄積装置の一例である。蓄電池は、再エネ電源の実際の発電電力(以下「実際の発電電力」とも称する)の一部を、吸収電力として吸収する。
第2決定部102は、実際の発電電力と吸収電力とに基づいて、再エネ電源から電力系統に逆潮流した逆潮流電力を決定する。以下では、第2決定部102は、実際の発電電力から吸収電力を差し引いた結果を、逆潮流電力として決定するとする。第2決定部102は、実際の発電電力の値を、再エネ電源から直接受信してもよいし、第1決定部101を介して受信してもよい。
(First embodiment)
FIG. 1 is a diagram illustrating a power control apparatus 100 according to the first embodiment of the present invention.
The power control apparatus 100 includes a first determination unit 101 and a second determination unit 102.
The first determination unit 101 includes a predicted generated power value of a renewable energy power source that generates power using renewable energy (hereinafter simply referred to as “predicted generated power value”) and an allowable upper limit value of the generated power of the renewable energy power source (hereinafter referred to as “predicted generated power value”). , Simply referred to as “allowable upper limit value”). The renewable energy power source is connected to the power system.
The first determination unit 101 receives the predicted generated power value from, for example, a generated power prediction device (not shown). The generated power prediction device predicts the generated power of the renewable energy power source using the power generation history of the renewable energy power source and weather prediction information. The predicted value of the generated power of the renewable energy power source becomes the “predicted generated power value”. The generated power prediction apparatus transmits the predicted generated power value to the power control apparatus 100. The first determination unit 101 may receive the predicted generated power value from a device other than the generated power prediction device. Moreover, the 1st determination part 101 may incorporate the generated electric power prediction apparatus, and the 1st determination part 101 estimates the electric power generation of a renewable energy power supply using the electric power generation log | history and weather prediction information of an renewable energy power supply. May be.
The first determination unit 101 receives the allowable upper limit value from, for example, an apparatus managed by the power company. The first determination unit 101 may receive the allowable upper limit value from a device other than the device managed by the power company.
The first determination unit 101 determines the absorbed power to be absorbed (charged) by the storage battery based on the predicted generated power value and the allowable upper limit value. Hereinafter, it is assumed that the first determination unit 101 determines the result of subtracting the allowable upper limit value from the predicted generated power value as the absorbed power. The storage battery is connected to the power system. A storage battery is an example of an electrical device or an energy storage device. The storage battery absorbs part of the actual generated power (hereinafter also referred to as “actual generated power”) of the renewable energy power source as absorbed power.
The second determination unit 102 determines reverse flow power that has flowed backward from the renewable energy power source to the power system based on actual generated power and absorbed power. Hereinafter, it is assumed that the second determination unit 102 determines the result of subtracting the absorbed power from the actual generated power as the reverse power flow power. The second determination unit 102 may receive the actual generated power value directly from the renewable energy source, or may receive the value via the first determination unit 101.

図2は、発電抑制が実行される再エネ電源での、予測発電電力値Aと、許容上限値Bと、実際の発電電力Cと、吸収電力Dと、逆潮流電力Eとの一例を示した図である。
出力抑制時間帯(以下「抑制時間帯」と称する)Tにおいて、実際の発電電力Cは、予測発電電力値A以下となっている。このため、蓄電池が、再エネ電源の実際の発電電力Cのうち、予測発電電力値Aから許容上限値Bを差し引いた値である吸収電力Dを充電することで、実際の発電電力Cから吸収電力Dを差し引いた逆潮流電力Eは、許容上限値B以下となる。
再エネ電源の実際の発電電力Cのうち電力系統に実効的に逆潮流される電力(逆潮流電力E)は、以下の式および図2からも明らかなように、実際の発電電力Cから吸収電力Dを差し引くことで簡単に求めることができる。
「逆潮流電力E」=「再エネ電源の実際の発電電力C」−「吸収電力D」
また、逆潮流電力Eを実際の発電電力Cから吸収電力Dを差し引いた値とすることで、蓄電池に充電される電力(吸収電力D)の中に、電力会社の供給する電力が含まれないようにすることができる。これにより、蓄電池が吸収電力を充電する際に、電力会社から電力を購入してしまうことを回避可能となる。
吸収電力Dは、実際の発電電力Cから許容上限値Bを差し引いた電力D1と、予測発電電力値Aから実際の発電電力Cを差し引いた電力D2と、の和となる。電力D1は、実際の発電抑制の対象となる電力である。一方、電力D2は、発電抑制に対して必要以上に充電された再生可能エネルギー由来の電力である。このため、例えば、第2決定部102は、電力D1と電力D2に対して、異なる価格を付けることができる。
特許文献1に記載の技術のように、再エネ電源の出力変動に応じて、許容上限値を超えた部分の電力を蓄電池に充電するのであれば、逆潮流電力Eは許容上限値Bの一定値となるので、逆潮流電力Eから売電価格を設定しやすい。
しかし、再エネ電源の出力変動に応じて、許容上限値を超えた部分の電力を蓄電池に充電する制御は、短い周期で変動する発電量にあわせて蓄電池の充電制御を行う必要がある。例えば、蓄電池の充電応答特性が、再エネ電源の出力変動についていけないと、蓄電池は、再エネ電源の出力変動に追従して、許容上限値を超えた部分の電力を充電することはできない。
そこで、本実施形態では、予測した発電電力値と許容上限値とに基づいて、事前に蓄電池に充電する電力を設定する。
この場合、充電する充電量を事前に設定できるが、その代わり売電する逆潮流電力が、再エネ電源の出力変動に合わせて変動する。そこで、再エネ電源における実際の発電電力から充電電力(吸収電力)を差し引くことで逆潮流電力を求める(決定する)ことができる。
なお、予測発電電力量に基づいて充電量(吸収電力)を設定するため、本来であれば逆潮流により売電できるはずの電力(D2)も蓄電池に充電してしまう。そのため、例えば、第2決定部102は、蓄電池に充電された電力をD1とD2とに分け、D2の電力量に対して、本来であればFITなどで逆潮流により売電できたと見做した価格の設定を行う。
ここで、D1は、実際の発電電力から許容上限値を差し引いた値である。D2は、予測発電電力値から実際の発電量を差し引いた値である。
FIG. 2 shows an example of the predicted generated power value A, the allowable upper limit value B, the actual generated power C, the absorbed power D, and the reverse power flow E in a renewable energy power source in which power generation suppression is performed. It is a figure.
In the output suppression time zone (hereinafter referred to as “suppression time zone”) T, the actual generated power C is equal to or less than the predicted generated power value A. For this reason, the storage battery absorbs the absorbed power D from the actual generated power C by charging the absorbed power D, which is a value obtained by subtracting the allowable upper limit B from the predicted generated power value A among the actual generated power C of the renewable energy source. The reverse flow power E obtained by subtracting the power D is equal to or less than the allowable upper limit B.
Of the actual generated power C of the renewable energy source, the power that is effectively reversely flowed to the power system (reverse flow power E) is absorbed from the actual generated power C as is apparent from the following equation and FIG. It can be easily obtained by subtracting the power D.
"Reverse power flow E" = "Actual generated power C of renewable energy source"-"Absorbed power D"
Further, by setting the reverse flow power E to a value obtained by subtracting the absorbed power D from the actual generated power C, the power supplied to the storage battery (absorbed power D) does not include the power supplied by the power company. Can be. Thereby, when a storage battery charges absorbed power, it becomes possible to avoid purchasing electric power from an electric power company.
The absorbed power D is the sum of the power D1 obtained by subtracting the allowable upper limit value B from the actual generated power C and the power D2 obtained by subtracting the actual generated power C from the predicted generated power value A. The electric power D1 is electric power that is a target of actual power generation suppression. On the other hand, the electric power D2 is electric power derived from renewable energy charged more than necessary for power generation suppression. For this reason, for example, the 2nd determination part 102 can attach a different price with respect to the electric power D1 and the electric power D2.
As in the technique described in Patent Document 1, if the storage battery is charged with a portion of power that exceeds the allowable upper limit value according to the output fluctuation of the renewable energy source, the reverse flow power E is constant at the allowable upper limit value B. Therefore, it is easy to set the selling price from the reverse power flow E.
However, the control for charging the storage battery with the power exceeding the allowable upper limit value according to the output fluctuation of the renewable energy power source requires the storage battery to be charged in accordance with the amount of power generation that fluctuates in a short cycle. For example, if the charging response characteristic of the storage battery cannot keep up with the output fluctuation of the renewable energy source, the storage battery cannot follow the fluctuation of the output of the renewable energy power source and charge the portion of the power exceeding the allowable upper limit value.
Therefore, in the present embodiment, the power for charging the storage battery is set in advance based on the predicted generated power value and the allowable upper limit value.
In this case, the charge amount to be charged can be set in advance, but the reverse power flow to be sold instead changes in accordance with the output fluctuation of the renewable energy power source. Therefore, the reverse power flow power can be obtained (determined) by subtracting the charging power (absorbed power) from the actual generated power in the renewable energy source.
In addition, since the charge amount (absorbed power) is set based on the predicted generated power amount, the storage battery is also charged with the power (D2) that should have been sold by reverse power flow. Therefore, for example, the second determination unit 102 divides the electric power charged in the storage battery into D1 and D2, and considered that the electric power of D2 could be sold by reverse current using FIT or the like. Set the price.
Here, D1 is a value obtained by subtracting the allowable upper limit value from the actual generated power. D2 is a value obtained by subtracting the actual power generation amount from the predicted power generation value.

次に、本実施形態の動作について説明する。
図3は、本実施形態の動作を説明するためのフローチャートである。
第1決定部101は、予測発電電力値と許容上限値を受信する(ステップS301)。
続いて、第1決定部101は、予測発電電力値から許容上限値を差し引いた値を、吸収電力として決定する(ステップS302)。予測発電電力値が許容上限値よりも低い場合は、吸収電力は0とする。続いて、第1決定部101は、抑制時間帯において、吸収電力を蓄電池に吸収させる。また、第1決定部101は、吸収電力を第2決定部102に通知する。
第2決定部102は、吸収電力の通知を受け、また、抑制時間帯での再エネ電源の実際の発電電力の値を受信する。第2決定部102は、実際の発電電力から吸収電力を差し引いた値を逆潮流電力として決定する(ステップS303)。
Next, the operation of this embodiment will be described.
FIG. 3 is a flowchart for explaining the operation of the present embodiment.
The first determination unit 101 receives the predicted generated power value and the allowable upper limit value (step S301).
Subsequently, the first determination unit 101 determines a value obtained by subtracting the allowable upper limit value from the predicted generated power value as the absorbed power (step S302). When the predicted generated power value is lower than the allowable upper limit value, the absorbed power is set to zero. Subsequently, the first determination unit 101 causes the storage battery to absorb the absorbed power in the suppression time zone. In addition, the first determination unit 101 notifies the second determination unit 102 of the absorbed power.
The second determination unit 102 receives the notification of the absorbed power and receives the value of the actual generated power of the renewable energy power source in the suppression time zone. The second determination unit 102 determines a value obtained by subtracting the absorbed power from the actual generated power as the reverse power flow power (step S303).

次に、本実施形態の効果について説明する。
第1決定部101は、予測発電電力値から許容上限値を差し引いた結果を、蓄電池に吸収させる吸収電力として決定する。第2決定部102は、実際の発電電力から吸収電力を差し引いた結果を、再エネ電源から電力系統へ実効的に逆潮流した逆潮流電力として決定する。
再エネ電源の実際の発電電力から吸収電力を差し引いた値を「逆潮流電力」として決定することは、蓄電池に吸収(充電)された吸収電力が、再エネ電源の実際の発電電力の一部となることを意味する。この点は、図2からも明らかである。
蓄電池が、第1決定部101にて決定された吸収電力を吸収(蓄積)することで、再エネ電源から電力系統への逆潮流電力が許容上限値を超えることを防ぐことができる。また、実際の発電電力から吸収電力を差し引いた値を逆潮流電力として決定しているため、実効的な逆潮流電力を精度よく求めることが可能となる。この逆潮流電力は、例えば、電力会社に売電される。
このように、本実施形態では、蓄電池で吸収する電力を再エネ電源の発電電力の変動に合わせて制御するという、非常に困難なリアルタイムな高精度制御を行うことなく、発電抑制が必要な余剰電力を容易に吸収させることが可能になる。
Next, the effect of this embodiment will be described.
The first determination unit 101 determines the result of subtracting the allowable upper limit value from the predicted generated power value as the absorbed power to be absorbed by the storage battery. The second determination unit 102 determines the result of subtracting the absorbed power from the actual generated power as the reverse power flow that has effectively reverse flow from the renewable energy source to the power system.
The value obtained by subtracting the absorbed power from the actual generated power of the renewable energy power source is determined as “reverse power flow power”. The absorbed power absorbed (charged) in the storage battery is a part of the actual generated power of the renewable energy power source. Means that This point is also apparent from FIG.
Since the storage battery absorbs (accumulates) the absorbed power determined by the first determination unit 101, it is possible to prevent the reverse flow power from the renewable energy power source to exceed the allowable upper limit value. In addition, since the value obtained by subtracting the absorbed power from the actual generated power is determined as the reverse power flow, it is possible to accurately determine the effective reverse power. This reverse power flow is sold to a power company, for example.
As described above, in this embodiment, surplus power generation must be suppressed without performing extremely difficult real-time high-precision control of controlling the power absorbed by the storage battery in accordance with fluctuations in the generated power of the renewable energy power source. Electric power can be easily absorbed.

次に、本実施形態の変形例について説明する。
第1決定部101は、再エネ電源の実際の発電電力を予測発電電力値以下にする発電抑制処理(以下、単に「発電抑制処理」と称する)を、再エネ電源に実行させてもよい。例えば、第1決定部101は、発電抑制処理を実行する旨の指示と、予測発電電力値とを、再エネ電源に送信する。再エネ電源は、その指示と予測発電電力値とを受信すると、その指示に従って発電抑制処理を実行する。
Next, a modification of this embodiment will be described.
The first determination unit 101 may cause the renewable energy power source to execute a power generation suppression process (hereinafter, simply referred to as “power generation suppression process”) that reduces the actual generated power of the renewable energy power source to a predicted generated power value or less. For example, the first determination unit 101 transmits an instruction for executing the power generation suppression process and the predicted generated power value to the renewable energy source. When receiving the instruction and the predicted generated power value, the renewable energy power source executes the power generation suppression process according to the instruction.

なお、再エネ電源が、予測発電電力値を受信した場合に発電抑制処理を実行する機能を有している場合には、第1決定部101は、発電抑制処理を実行する旨の指示を送信することなく、予測発電電力値を再エネ電源に送信すればよい。   In addition, when the renewable energy power source has a function of executing the power generation suppression process when the predicted generated power value is received, the first determination unit 101 transmits an instruction to execute the power generation suppression process. What is necessary is just to transmit an estimated generated electric power value to a renewable energy power supply, without doing.

また、第2決定部102は、逆潮流電力Eに基づいて売電価格を設定してもよい。例えば、第2決定部102は、逆潮流電力Eが大きくなるほど、売電価格を高くしてもよい。
また、第2決定部102は、逆潮流電力Eと電力D2とに基づいて売電価格を設定してもよい。例えば、第2決定部102は、逆潮流電力Eと電力D2の総量が大きくなるほど、売電価格を高くしてもよい。
In addition, the second determination unit 102 may set a power selling price based on the reverse power flow E. For example, the second determination unit 102 may increase the power selling price as the reverse flow power E increases.
Further, the second determination unit 102 may set the power selling price based on the reverse flow power E and the power D2. For example, the second determination unit 102 may increase the power selling price as the total amount of the reverse flow power E and the power D2 increases.

また、第1決定部101は、複数の再エネ電源の吸収電力の総量を、複数の蓄電池に吸収させる総吸収電力として決定してもよい。この場合、第1決定部101は、総吸収電力を、複数の蓄電池に吸収させてもよい。
ここで、蓄電池の数を増やすために、再エネ電源の遠方にある蓄電池を使う場合、蓄電池で吸収する電力を再エネ電源の発電電力の変動に合わせてリアルタイムに高精度に制御することは、例えば制御のための通信の遅延や処理の遅延の影響で、より困難になる。
これに対して、上述したように複数の再エネ電源の吸収電力の総量を複数の蓄電池で吸収させる場合、蓄電池で吸収する電力を再エネ電源の発電電力の変動に合わせて制御する必要がなくなり、発電抑制が必要な余剰電力を容易に吸収させることが可能になる。
また、総吸収電力は、「個々の吸収電力(予測発電電力値−許容上限値)の総和」であるため、「複数の再エネ電源の予測発電電力値の総量」−「複数の再エネ電源の許容上限値」の式で表すことができる。よって、余剰電力を含む総吸収電力を算出する際には、複数の再エネ電源の予測発電電力値の総量が用いられることになる。このため、個々の再エネ電源の予測発電電力値の差異(ばらつき)を相殺できる効果(均し効果)が期待できる。したがって、余剰電力吸収に必要な蓄電池等の電気機器の容量を最小化でき、非常に有効である。
Moreover, the 1st determination part 101 may determine the total amount of the absorbed power of a some renewable energy power supply as a total absorbed power made to absorb in a some storage battery. In this case, the first determination unit 101 may cause the plurality of storage batteries to absorb the total absorbed power.
Here, in order to increase the number of storage batteries, when using a storage battery far from the renewable energy source, it is possible to control the power absorbed by the storage battery with high accuracy in real time according to the fluctuation of the generated power of the renewable energy source. For example, it becomes more difficult due to the influence of communication delay for control and processing delay.
On the other hand, when the total amount of absorbed power of a plurality of renewable energy sources is absorbed by a plurality of storage batteries as described above, it is not necessary to control the power absorbed by the storage batteries in accordance with the fluctuation of the generated power of the renewable energy power source. Therefore, it is possible to easily absorb surplus power that needs to be suppressed.
Further, since the total absorbed power is “the sum of individual absorbed powers (predicted generated power value−allowable upper limit value)”, “total amount of predicted generated power values of a plurality of renewable energy sources” − “several renewable energy sources” Can be expressed by the expression “the allowable upper limit value”. Therefore, when calculating the total absorbed power including surplus power, the total amount of predicted generated power values of a plurality of renewable energy power sources is used. For this reason, the effect (equalization effect) which can cancel the difference (variation) of the prediction generated electric power value of each renewable energy power supply can be expected. Therefore, it is possible to minimize the capacity of an electric device such as a storage battery necessary for absorbing surplus power, which is very effective.

(第2実施形態)
本発明の第2実施形態は、第1実施形態の電力制御装置100(図1参照)と通信可能な再エネ電源200に関する。
図4は、本発明の第2実施形態の再エネ電源200を示した図である。
再エネ電源200は、発電部201と、制御部202と、を含む。
発電部201は、太陽光や風力等の再生可能エネルギーを用いて発電する再エネ電源である。発電部201は、電力系統に接続されている。
制御部202は、発電部201の予測発電電力値を、発電電力予測装置(不図示)または図1に示した電力制御装置100から受信する。制御部202は、発電部201の発電電力を、発電部201の予測発電電力値に基づいて制御する。以下では、制御部202は、発電部201の発電電力を、発電部201の予測発電電力値以下に抑制するとする。
(Second Embodiment)
The second embodiment of the present invention relates to a renewable energy power source 200 that can communicate with the power control apparatus 100 (see FIG. 1) of the first embodiment.
FIG. 4 is a diagram showing a renewable energy power source 200 according to the second embodiment of the present invention.
The renewable energy power source 200 includes a power generation unit 201 and a control unit 202.
The power generation unit 201 is a renewable energy power source that generates power using renewable energy such as sunlight and wind power. The power generation unit 201 is connected to the power system.
The control unit 202 receives the predicted generated power value of the power generation unit 201 from the generated power prediction device (not shown) or the power control device 100 illustrated in FIG. The control unit 202 controls the generated power of the power generation unit 201 based on the predicted generated power value of the power generation unit 201. Hereinafter, it is assumed that the control unit 202 suppresses the generated power of the power generation unit 201 below the predicted generated power value of the power generation unit 201.

次に、本実施形態の動作について説明する。
図5Aは、再エネ電源200の動作を説明するためのフローチャートである。
制御部202は、発電部201の予測発電電力値を受信する(ステップS501)。
続いて、制御部202は、発電部201の発電電力を、発電部201の予測発電電力値以下に抑制する(ステップS502)。
Next, the operation of this embodiment will be described.
FIG. 5A is a flowchart for explaining the operation of the renewable energy power source 200.
The control unit 202 receives the predicted generated power value of the power generation unit 201 (step S501).
Subsequently, the control unit 202 suppresses the generated power of the power generation unit 201 to be equal to or lower than the predicted generated power value of the power generation unit 201 (step S502).

次に、本実施形態の効果について説明する。
制御部202は、発電部201の発電電力を、発電部201の予測発電電力値以下に抑制する。このため、再エネ電源200の発電電力を予測発電電力値以下に抑制することが可能になる。よって、例えば、再エネ電源200が、図1に示した電力制御装置100に管理される場合、電力制御装置100は、別途、吸収電力値に基づく余剰電力の吸収を、何らかの他の電気機器を用いて実施しており、その結果、再エネ電源200から電力系統に供給される逆潮流電力を許容上限値以下にすることが可能になる。
Next, the effect of this embodiment will be described.
The control unit 202 suppresses the generated power of the power generation unit 201 below the predicted generated power value of the power generation unit 201. For this reason, it becomes possible to suppress the electric power generated by the renewable energy power source 200 to be equal to or lower than the predicted electric power generation value. Therefore, for example, when the renewable energy power source 200 is managed by the power control apparatus 100 shown in FIG. 1, the power control apparatus 100 separately absorbs surplus power based on the absorbed power value, As a result, the reverse flow power supplied from the renewable energy power source 200 to the electric power system can be reduced to an allowable upper limit value or less.

次に、本実施形態の変形例を説明する。
再エネ電源200の制御部202の代わりに、図1に示した電力制御装置100から吸収電力(吸収電力値)を受信する受信部と、発電部201の実際の発電電力のうち吸収電力を蓄電池に充電する供給部が用いられてもよい。また、供給部が、発電部201の発電電力と吸収電力とに基づいて、電力系統に逆潮流する逆潮流電力を決定してもよい。
この場合、蓄電池が、再エネ電源200に対して遠隔に存在する場合と、再エネ電源200に併設されている場合とが考えられる。
Next, a modification of this embodiment will be described.
Instead of the control unit 202 of the renewable energy power source 200, a receiving unit that receives the absorbed power (absorbed power value) from the power control apparatus 100 shown in FIG. A supply unit that charges the battery may be used. Further, the supply unit may determine the reverse power flow that flows backward to the power system based on the generated power and the absorbed power of the power generation unit 201.
In this case, a case where the storage battery exists remotely with respect to the renewable energy power source 200 and a case where the storage battery is attached to the renewable energy power source 200 are considered.

図5Bは、蓄電池300が再エネ電源200に対して遠隔に存在する場合を示した図である。図5Bにおいて、発電部201と蓄電池300は、電力系統500を介して接続されている。
図5Cは、図5Bに示した再エネ電源200の動作を説明するための図である。
受信部205は、電力制御装置100から吸収電力値を受信する(ステップS501C)。
続いて、供給部206は、発電部201の実際の発電電力のうち、吸収電力値が示す吸収電力P1を、蓄電池300に充電する(ステップS502C)。なお、吸収電力P1は、電力系統を逆潮流しているが、蓄電池300で吸収されるため、実効的な逆潮流ではない。
続いて、供給部206は、発電部201の実際の発電電力から、吸収電力P1を差し引いた電力を、実効的な逆潮流電力として決定する(ステップS503C)。
続いて、供給部206は、実効的な逆潮流電力を売電する(ステップS504C)。
この変形例でも、再エネ電源200の発電量が短い周期で変動しても、事前に定められた電力を蓄電池に充電し、残った分を逆潮流電力として売電できる。よって、蓄電池の制御が容易になる。
FIG. 5B is a diagram showing a case where the storage battery 300 is remotely located with respect to the renewable energy power source 200. In FIG. 5B, the power generation unit 201 and the storage battery 300 are connected via the power system 500.
FIG. 5C is a diagram for explaining the operation of the renewable energy power source 200 shown in FIG. 5B.
The receiving unit 205 receives the absorbed power value from the power control apparatus 100 (step S501C).
Subsequently, the supply unit 206 charges the storage battery 300 with the absorbed power P1 indicated by the absorbed power value among the actual generated power of the power generation unit 201 (step S502C). The absorbed power P1 is flowing backward in the power system, but is absorbed by the storage battery 300 and is not an effective reverse flow.
Subsequently, the supply unit 206 determines the power obtained by subtracting the absorbed power P1 from the actual generated power of the power generation unit 201 as effective reverse power flow (step S503C).
Subsequently, the supply unit 206 sells effective reverse power flow (step S504C).
Even in this modification, even if the amount of power generated by the renewable energy power source 200 fluctuates in a short cycle, it is possible to charge the storage battery with predetermined power and sell the remaining power as reverse power flow. Therefore, the storage battery can be easily controlled.

図5Dは、蓄電池300が再エネ電源200に併設されている場合を示した図である。図5Dにおいて、発電部201と蓄電池300は、電力系統500を介さずに、例えばローカル配線で接続されている。
図5Dに示した再エネ電源200の動作は、電力系統500を介さずに蓄電池300に吸収電力を充電させる点を除いて、図5Bに示した再エネ電源200の動作と同様である。よって、この変形例でも、再エネ電源200の発電量が短い周期で変動しても、事前に定められた電力を蓄電池に充電し、残った分を逆潮流電力として売電できる。よって、蓄電池の制御が容易になる。
FIG. 5D is a diagram illustrating a case where the storage battery 300 is provided in the renewable energy power source 200. In FIG. 5D, the power generation unit 201 and the storage battery 300 are connected by, for example, local wiring without passing through the power system 500.
The operation of the renewable energy power source 200 shown in FIG. 5D is the same as the operation of the renewable energy power source 200 shown in FIG. 5B except that the storage battery 300 is charged with absorbed power without going through the power system 500. Therefore, even in this modification, even if the power generation amount of the renewable energy power source 200 fluctuates in a short cycle, it is possible to charge the storage battery with a predetermined power and sell the remaining power as reverse power flow. Therefore, the storage battery can be easily controlled.

なお、図5Bや図5Dに示した供給部206は、図4で示した制御部202のように、発電部201の予測発電電力値を受信し、発電部201の発電電力を、発電部201の予測発電電力値以下に抑制してもよい。この場合、逆潮流により売電する電力量が、許容上限値を超えることを防止できる。   The supply unit 206 illustrated in FIG. 5B and FIG. 5D receives the predicted generated power value of the power generation unit 201 as in the control unit 202 illustrated in FIG. It is also possible to suppress it below the predicted generated power value. In this case, it is possible to prevent the amount of power sold by reverse power flow from exceeding the allowable upper limit value.

(第3実施形態)
図6は、本発明の第3実施形態の電力システム1を示した図である。
電力システム1は、電力制御装置100Aと、再エネ電源200Aと、蓄電池301と、HP(ヒートポンプ)給湯器302と、蓄電池303と、電力会社装置400と、を含む。
以下では、再エネ電源200Aの数を「r」(rは1以上の整数)とする。また、個々の再エネ電源200Aを「再エネ電源200A(n)」とも称する。ここで、nは1、・・・、rである。
蓄電池301とHP給湯器302と蓄電池303は、発電抑制時に、各再エネ電源200A(n)の発電電力の一部を吸収(充電や消費)するための電気機器またはエネルギー蓄積装置の一例である。電気機器は、蓄電池301とHP給湯器302と蓄電池303に限らず、適宜変更可能である。例えば、電気機器として、家庭用電気機器が用いられてもよい。
電力制御装置100Aは、アグリゲータにて管理される。アグリゲータは、再エネ電源200A(n)を管轄している。電力制御装置100Aは、再エネ電源200A(n)や、蓄電池301、HP給湯器302および蓄電池303と通信する。
電力会社装置400は、電力会社にて管理される。電力会社装置400は、各再エネ電源200A(n)の発電電力の許容上限値を、電力制御装置100Aに送信する。本実施形態では、各再エネ電源200A(n)の発電電力の許容上限値として、再エネ電源200A(n)の定格のX%が用いられる。
(Third embodiment)
FIG. 6 is a diagram showing a power system 1 according to the third embodiment of the present invention.
The power system 1 includes a power control device 100A, a renewable energy power source 200A, a storage battery 301, an HP (heat pump) water heater 302, a storage battery 303, and a power company device 400.
Hereinafter, the number of the renewable energy power sources 200A is assumed to be “r” (r is an integer of 1 or more). Each renewable energy power source 200A is also referred to as “renewable energy power source 200A (n)”. Here, n is 1,..., R.
The storage battery 301, the HP water heater 302, and the storage battery 303 are an example of an electrical device or an energy storage device that absorbs (charges or consumes) a part of the generated power of each renewable energy power source 200A (n) when power generation is suppressed. . The electric device is not limited to the storage battery 301, the HP water heater 302, and the storage battery 303, but can be changed as appropriate. For example, household electrical equipment may be used as the electrical equipment.
The power control apparatus 100A is managed by an aggregator. The aggregator has jurisdiction over the renewable energy power source 200A (n). The power control apparatus 100 </ b> A communicates with the renewable energy power source 200 </ b> A (n), the storage battery 301, the HP water heater 302, and the storage battery 303.
The power company device 400 is managed by the power company. The power company apparatus 400 transmits the allowable upper limit value of the generated power of each renewable energy power source 200A (n) to the power control apparatus 100A. In the present embodiment, X n % of the rating of the renewable energy power source 200A (n) is used as the allowable upper limit value of the generated power of each renewable energy power source 200A (n).

電力制御装置100Aは、制御部101Aと、決定部102Aと、通信部103Aと、を含む。
通信部103Aは、電力会社装置400から、各再エネ電源200A(n)の発電電力の許容上限値(定格のX%)を受信する。
また、通信部103Aは、発電電力予測装置(不図示)から、各再エネ電源200A(n)の予測発電電力値を受信する。発電電力予測装置は、電力制御装置100Aに内蔵されてもよい。本実施形態では、各再エネ電源200A(n)の予測発電電力値として、再エネ電源200A(n)の定格のV%が用いられる。
通信部103Aは、各再エネ電源200A(n)の発電電力の許容上限値(定格のX%)と、各再エネ電源200A(n)の予測発電電力値(定格のV%)を、制御部101Aに出力する。
制御部101Aは、第1決定部の一例である。制御部101Aは、再エネ電源200A(n)ごとに、許容上限値(定格のX%)と予測発電電力値(定格のV%)とを用いて、吸収電力を決定する。制御部101Aは、再エネ電源200A(n)ごとの吸収電力の総計を、総余剰電力として決定する。総余剰電力は、複数の再エネ電源200Aの発電電力の全体から吸収する必要のある電力である。
本実施形態では、制御部101Aは、再エネ電源200A(n)ごとに、予測発電電力値(定格のV%)から許容上限値(定格のX%)を差し引いて吸収電力を算出する。制御部101Aは、再エネ電源200A(n)ごとの吸収電力の総計を、総余剰電力として決定する。
制御部101Aは、蓄電池301とHP給湯器302と蓄電池303が共同で総余剰電力を吸収(充電または電力消費)するように、通信部103Aを介して、蓄電池301とHP給湯器302と蓄電池303を制御する。
また、制御部101Aは、再エネ電源200A(n)ごとの吸収電力の値を決定部102Aに出力する。
また、制御部101Aは、各再エネ電源200A(n)の予測発電電力値を各再エネ電源200A(n)に通知する。
決定部102Aは、第2決定部の一例である。決定部102Aは、各再エネ電源200A(n)から、通信部101Aを介して、各再エネ電源200A(n)の実際の発電電力値を受信する。
決定部102Aは、再エネ電源200A(n)ごとに、実際の発電電力値から吸収電力を差し引くことで逆潮流電力を決定する。この逆潮流電力は、電力会社に売電される。
The power control apparatus 100A includes a control unit 101A, a determination unit 102A, and a communication unit 103A.
103 A of communication parts receive the allowable upper limit ( Xn % of rating) of the generated electric power of each renewable energy power supply 200A (n) from the electric power company apparatus 400. FIG.
Further, the communication unit 103A receives the predicted generated power value of each renewable energy power source 200A (n) from the generated power prediction device (not shown). The generated power prediction apparatus may be incorporated in the power control apparatus 100A. In this embodiment, the rated V n % of the renewable energy power source 200A (n) is used as the predicted generated power value of each renewable energy power source 200A (n).
Communication unit 103A, the allowable upper limit value of the generated power of each renewable energy source 200A (n) and (X n% of rating), the predicted power generation value of each renewable energy source 200A (n) to (V n% of rated) To the control unit 101A.
The control unit 101A is an example of a first determination unit. Control unit 101A, for each renewable energy source 200A (n), by using the allowable upper limit value (X n% of rated) and predicted power generation value (V n% of rated), to determine the absorbed power. The control unit 101A determines the total absorbed power for each renewable power source 200A (n) as the total surplus power. The total surplus power is power that needs to be absorbed from the entire power generated by the plurality of renewable energy power sources 200A.
In the present embodiment, the control unit 101A, for each renewable energy source 200A (n), calculates the absorbed power by subtracting the allowable upper limit value from the predicted power generation value (V n% of rated) (X n% of rated) . The control unit 101A determines the total absorbed power for each renewable power source 200A (n) as the total surplus power.
The control unit 101A controls the storage battery 301, the HP water heater 302, and the storage battery 303 via the communication unit 103A so that the storage battery 301, the HP water heater 302, and the storage battery 303 jointly absorb (charge or consume power) the total surplus power. To control.
In addition, control unit 101A outputs the value of absorbed power for each renewable power source 200A (n) to determination unit 102A.
In addition, the control unit 101A notifies each renewable energy power source 200A (n) of the predicted generated power value of each renewable energy power source 200A (n).
The determination unit 102A is an example of a second determination unit. The determination unit 102A receives the actual generated power value of each renewable energy power source 200A (n) from each renewable energy power source 200A (n) via the communication unit 101A.
The determination unit 102A determines reverse power flow power by subtracting the absorbed power from the actual generated power value for each renewable energy power source 200A (n). This reverse power flow is sold to a power company.

再エネ電源200Aは、発電要素201Aと、制御部202Aと、パワーコンディショナー203Aと、を含む。発電要素201Aとパワーコンディショナー203Aは、発電部204Aに含まれる。
発電要素201Aは、例えば、太陽電池パネル等の再エネ電源要素である。
パワーコンディショナー203Aは、発電要素201Aから電力系統500に供給される電力を調整する。
制御部202Aは、電力制御装置100Aから予測発電電力値を受信する。制御部202Aは、パワーコンディショナー203Aを制御して、発電部204Aから電力系統500に供給される予測発電電力値以下に抑制する。
また、制御部202Aは、パワーコンディショナー203Aから電力系統500に供給される電力(発電部204の実際の発電電力)の値を、電力制御装置100Aに送信する。
The renewable energy power source 200A includes a power generation element 201A, a control unit 202A, and a power conditioner 203A. The power generation element 201A and the power conditioner 203A are included in the power generation unit 204A.
The power generation element 201A is a renewable energy power supply element such as a solar battery panel.
The power conditioner 203A adjusts the power supplied from the power generation element 201A to the power system 500.
Control unit 202A receives the predicted generated power value from power control apparatus 100A. The control unit 202A controls the power conditioner 203A to suppress the power generation unit 204A to be equal to or lower than the predicted generated power value supplied to the power system 500.
Further, the control unit 202A transmits the value of the power (actual generated power of the power generation unit 204) supplied from the power conditioner 203A to the power system 500 to the power control device 100A.

次に、本実施形態の動作について説明する。
図7は、電力制御装置100Aの動作を説明するためのフローチャートである。
電力の安定供給を実現するためには、電力供給量(発電量)が電力需要量を上回っている時間帯において電力供給量(発電量)を抑制する必要がある。
再エネ電源200Aが接続された電力系統500において再エネ電源200Aによる電力供給量を抑制する場合、優先給電規定に則って、まず再エネ電源以外の電力供給量を抑制する必要がある。
ここで、優先給電規定に則り火力発電等の出力抑制や揚水式発電のポンプくみ上げ(揚水運転)による需要創出を行った後でも、翌日の10時30分から15時30分の時間帯で再エネ電源の発電に起因する余剰電力の発生が予測されたとする。
このとき電力会社は、全ての再エネ電源200Aで出力抑制(発電抑制)が必要であると判断し、前日の段階で翌日の10時30分から15時30分の時間帯に全ての再エネ電源において出力抑制を実施することを決定する。なお、優先給電規定に則り火力発電や揚水式発電のポンプくみ上げを制御することで、再エネ電源に起因する余剰電力が解消される場合には、翌日の再エネ電源での出力抑制の実施は見送られる。
Next, the operation of this embodiment will be described.
FIG. 7 is a flowchart for explaining the operation of the power control apparatus 100A.
In order to realize a stable power supply, it is necessary to suppress the power supply amount (power generation amount) in a time zone in which the power supply amount (power generation amount) exceeds the power demand amount.
When the power supply amount by the renewable energy power source 200A is suppressed in the power system 500 to which the renewable energy power source 200A is connected, it is necessary to first suppress the power supply amount other than the renewable energy power source in accordance with the priority power supply regulations.
Here, even after generating demand by controlling output of thermal power generation and pumping up pumping (pumping operation) in accordance with the priority power supply regulations, it will be possible to re-energize from 10:30 to 15:30 on the next day. Assume that the generation of surplus power due to power generation by the power source is predicted.
At this time, the electric power company judges that output suppression (power generation suppression) is necessary for all the renewable energy power sources 200A, and all renewable energy power sources in the time zone from 10:30 to 15:30 the next day in the previous day. It is decided to carry out output suppression in step (b). If surplus power caused by renewable energy sources is eliminated by controlling pumping of thermal power generation and pumped-storage power generation in accordance with the priority power supply regulations, implementation of output suppression at the next day's renewable energy power source I will be sent off.

電力会社は、出力抑制の実施を決定すると、翌日の10時30分から15時30分までの時間帯(以下「抑制時間帯」と称する)における、各再エネ電源200A(n)の発電電力の許容上限値(定格のX%)を計算する。ここで、各再エネ電源200A(n)の発電電力が、各再エネ電源200A(n)の許容上限値(定格のX%)以下になっていれば、再エネ電源に起因する余剰電力が解消されることになる。When the electric power company decides to suppress the output, the power generation power of each renewable energy power source 200A (n) in the time zone from 10:30 to 15:30 on the next day (hereinafter referred to as “suppression time zone”) will be described. Calculate the allowable upper limit ( Xn % of rating). Here, if the generated power of each renewable energy power source 200A (n) is less than or equal to the allowable upper limit value (X n % of the rating) of each renewable energy power source 200A (n), surplus power resulting from the renewable energy power source Will be eliminated.

電力会社装置400は、抑制時間帯における各再エネ電源200A(n)の発電電力の許容上限値(定格のX%)を、電力制御装置100Aに送信する。
電力制御装置100Aでは、通信部103Aは、抑制時間帯における各再エネ電源200A(n)の発電電力の許容上限値(定格のX%)を受信する(ステップS701)。通信部103Aは、抑制時間帯における各再エネ電源200A(n)の許容上限値(定格のX%)を、制御部101Aに出力する。
また、通信部103Aは、抑制時間帯における各再エネ電源200A(n)の予測発電電力値(定格のY%)を、発電電力予測装置から受信する(ステップS702)。通信部103Aは、抑制時間帯における各再エネ電源200A(n)の予測発電電力値を、制御部101Aに出力する。
制御部101Aは、抑制時間帯での各再エネ電源200A(n)の許容上限値および予測発電電力値を受け付けると、再エネ電源200A(n)ごとに、抑制時間帯の各時刻について、予測発電電力値から許容上限値を差し引いて吸収電力を決定する。そして、制御部101Aは、抑制時間帯における時刻ごとに各再エネ電源200A(n)の吸収電力を合計して時刻(ある時刻を中心とする30分間や1時間)ごとの総余剰電力Ztotalを決定する(ステップS703)。
制御部101Aは、抑制時間帯における各時刻の総余剰電力Ztotalを、例えば以下の式に基づいて算出する。以下の式では、抑制時間帯の時刻ごとに、該時刻のYnおよびXnが用いられる。
総余剰電力Ztotal=(Σ再エネ電源200A(n)の定格×(Yn−Xn)/100)
ここで、再エネ電源200A(n)の定格×(Yn−Xn)/100で算出される電力は、抑制時間帯における各時刻の再エネ電源200A(n)の吸収電力である。
続いて、制御部101Aは、抑制時間帯の各時刻の総余剰電力Ztotalを、抑制時間帯の各時刻において蓄電池301とHP給湯器302と蓄電池303で吸収するための蓄電池301とHP給湯器302と蓄電池303の運転計画を作成する(ステップS704)。
続いて、制御部101Aは、通信部103Aを通じて、蓄電池301とHP給湯器302と蓄電池303に、それぞれの運転計画を送信する(ステップS705)。蓄電池301とHP給湯器302と蓄電池303は、それぞれ、運転計画を受信すると、運転計画を保持する。
続いて、制御部101Aは、各再エネ電源200A(n)に、予測発電電力値(定格のV%)と抑制時間帯(この場合、翌日の10時30分〜15時30分)を示す抑制時間帯情報を送信する(ステップS706)。各再エネ電源200A(n)では、制御部202Aは、予測発電電力値(定格のV%)と抑制時間帯情報を受信すると、予測発電電力値(定格のV%)と抑制時間帯情報を保持する。
ここまでの処理が、発電抑制の前日に行われる。
The power company apparatus 400 transmits the allowable upper limit value (X n % of the rating) of the generated power of each renewable energy power source 200A (n) to the power control apparatus 100A during the suppression time period.
In the power control apparatus 100A, the communication unit 103A receives the allowable upper limit value (X n % of the rating) of the generated power of each renewable energy power source 200A (n) in the suppression time zone (step S701). The communication unit 103A outputs the allowable upper limit value (X n % of the rating) of each renewable energy power source 200A (n) in the suppression time zone to the control unit 101A.
In addition, the communication unit 103A receives the predicted generated power value (rated Y n %) of each renewable energy power source 200A (n) in the suppression time period from the generated power prediction device (step S702). The communication unit 103A outputs the predicted generated power value of each renewable energy power source 200A (n) in the suppression time zone to the control unit 101A.
Upon receiving the allowable upper limit value and the predicted generated power value of each renewable energy power source 200A (n) in the suppression time zone, the control unit 101A predicts each time in the suppression time zone for each renewable energy power source 200A (n). The absorbed power is determined by subtracting the allowable upper limit value from the generated power value. And the control part 101A totals the absorbed power of each renewable energy power supply 200A (n) for every time in the suppression time slot | zone, and the total surplus electric power Ztotal for every time (30 minutes or 1 hour centering on a certain time). Is determined (step S703).
101 A of control parts calculate the total surplus electric power Ztotal of each time in the suppression time slot | zone based on the following formula | equation, for example. In the following formula, Yn and Xn of the time are used for each time in the suppression time zone.
Total surplus power Ztotal = (Rating of [Sigma] renewable energy power source 200A (n) x (Yn-Xn) / 100)
Here, the power calculated by the rating of the renewable energy power source 200A (n) × (Yn−Xn) / 100 is the absorbed power of the renewable energy power source 200A (n) at each time in the suppression time zone.
Subsequently, the control unit 101A uses the storage battery 301, the HP water heater 302, and the storage battery 303 to absorb the total surplus power Z total at each time in the suppression time zone at each time in the suppression time zone. The operation plan of 302 and the storage battery 303 is created (step S704).
Subsequently, the control unit 101A transmits each operation plan to the storage battery 301, the HP water heater 302, and the storage battery 303 through the communication unit 103A (step S705). When the storage battery 301, the HP water heater 302, and the storage battery 303 each receive the operation plan, each of them holds the operation plan.
Subsequently, the control unit 101A assigns the predicted power generation value (rated V n %) and the suppression time zone (in this case, 10:30 to 15:30) to each renewable energy source 200A (n). The suppression time zone information shown is transmitted (step S706). In each renewable energy power source 200A (n), when the control unit 202A receives the predicted generated power value (rated V n %) and the suppression time zone information, the predicted generated power value (rated V n %) and the suppressed time zone Keep information.
The process so far is performed the day before power generation suppression.

図8は、発電抑制の当日の蓄電池301、HP給湯器302、蓄電池303の動作を説明するためのフローチャートである。
蓄電池301、HP給湯器302、蓄電池303は、それぞれ、電力制御装置100Aから受信した運転計画に従って動作して抑制時間帯の各時刻における総余剰電力Ztotalを吸収(充電または電力消費)する(ステップS801)。
FIG. 8 is a flowchart for explaining the operation of the storage battery 301, the HP water heater 302, and the storage battery 303 on the day of power generation suppression.
The storage battery 301, the HP water heater 302, and the storage battery 303 each operate according to the operation plan received from the power control apparatus 100A and absorb (charge or consume power) the total surplus power Ztotal at each time in the suppression time zone (step). S801).

図9は、発電抑制の当日の再エネ電源200A(n)の動作を説明するためのフローチャートである。
再エネ電源200A(n)では、制御部202Aは、抑制時間帯になると、パワーコンディショナー203Aから電力系統500に供給される電力を、その時刻の予測発電電力値以下に抑制する(ステップS901)。ここで、パワーコンディショナー203Aから電力系統500に供給される電力は、再エネ電源200A(n)の実際の発電電力Cとなる。但し、この電力は、予測発電電力値を超えることはないよう抑制された電力である。
FIG. 9 is a flowchart for explaining the operation of the renewable energy power source 200A (n) on the day of power generation suppression.
In the renewable energy power source 200A (n), the control unit 202A suppresses the power supplied from the power conditioner 203A to the power system 500 to be equal to or less than the predicted generated power value at that time when the suppression time zone is reached (step S901). Here, the power supplied from the power conditioner 203A to the power system 500 is the actual generated power C of the renewable energy power source 200A (n). However, this power is a power that is suppressed so as not to exceed the predicted generated power value.

次に、本実施形態の効果について説明する。
本実施形態では、第1実施形態と同様の効果に加えて、以下の効果も奏する。
制御部101Aは、再エネ電源200A(n)に予測発電電力値を送信することで、再エネ電源200A(n)の実際の発電電力を予測発電電力値以下にする発電抑制処理を再エネ電源200A(n)に実行させる。このため、予測発電電力値が実際の発電電力よりも小さい場合でも、再エネ電源200A(n)から電力系統500に供給される電力を、予測発電電力以下にすることが可能になる。その結果、蓄電池等の電気機器で吸収できない余剰電力を含め、確実に余剰電力の発生を防ぐことができる。
Next, the effect of this embodiment will be described.
In this embodiment, in addition to the same effects as those of the first embodiment, the following effects are also obtained.
The control unit 101A transmits the predicted generated power value to the renewable energy power source 200A (n), thereby performing a power generation suppression process for reducing the actual generated power of the renewable energy power source 200A (n) to be equal to or lower than the predicted generated power value. 200A (n) is executed. For this reason, even when the predicted generated power value is smaller than the actual generated power, the power supplied from the renewable energy power source 200A (n) to the power system 500 can be made equal to or lower than the predicted generated power. As a result, it is possible to reliably prevent the generation of surplus power, including surplus power that cannot be absorbed by electrical devices such as storage batteries.

図10は、予測発電電力値Aが時間の経過と共に変化する場合での本実施形態の動作例を示した図である。
図10に示したように、発電要素201Aの発電電力Hが、抑制時間帯Tにおいて予測発電電力値Aを超えている場合でも、パワーコンディショナー203Aから電力系統500に供給される電力(実際の発電電力C)は、予測発電電力A以下となる。
このため、蓄電池301、303およびHP給湯器302が、各再エネ電源200A(n)の実際の発電電力Cのうち吸収電力Dを充電することで、各再エネ電源200A(n)の実効的な(つまり充電等で吸収されない分の)逆潮流電力Eを許容上限値B以下にできる。
また、再エネ電源200A(n)の実際の発電電力Cのうち電力系統500に供給される電力(逆潮流電力E、電力会社への売電分となる量)は、実際の発電電力Cから吸収電力Dを差し引くことで簡単に求めることができる。
このように、抑制時間帯Tでの予測発電電力値Aが時間の経過と共に変化する場合でも、再エネ電源200A(n)から電力系統500への実効的な逆潮流電力Eが許容上限値Bを超えることを防ぎ、逆潮流電力そのものも精度よく把握することが可能となる。また、蓄電池やHP給湯器で吸収(充電や電力消費)する電力を再エネ電源の発電電力の変動に合わせて制御するという、非常に困難なリアルタイムな高精度制御を行うことなく、発電抑制が必要な余剰電力を容易に吸収させることが可能になる。
FIG. 10 is a diagram illustrating an operation example of the present embodiment when the predicted generated power value A changes with time.
As shown in FIG. 10, even when the generated power H of the power generation element 201A exceeds the predicted generated power value A in the suppression time zone T, the power (actual power generation) supplied from the power conditioner 203A to the power system 500 The electric power C) is equal to or less than the predicted generated electric power A.
For this reason, the storage batteries 301 and 303 and the HP water heater 302 charge the absorbed power D out of the actual generated power C of the respective renewable energy power sources 200A (n), so that each of the renewable energy power sources 200A (n) is effective. Therefore, the reverse flow power E (which is not absorbed by charging or the like) can be set to the allowable upper limit B or less.
In addition, of the actual generated power C of the renewable energy power source 200A (n), the power supplied to the power system 500 (reverse power flow E, the amount to be sold to the power company) is derived from the actual generated power C. It can be easily obtained by subtracting the absorbed power D.
Thus, even when the predicted generated power value A in the suppression time zone T changes with the passage of time, the effective reverse flow power E from the renewable energy power source 200A (n) to the power system 500 is the allowable upper limit value B. The reverse power flow itself can be accurately grasped. In addition, power generation can be suppressed without performing extremely difficult real-time high-precision control that controls the power absorbed (charged or consumed) by the storage battery or HP water heater in accordance with fluctuations in the power generated by the renewable energy source. Necessary surplus power can be easily absorbed.

図11は、抑制時間帯Tでの予測発電電力値Aが一定値である場合の本実施形態の動作例を示した図である。
図11に示したように、発電要素201Aの発電電力Hが、予測発電電力値Aを超えている場合でも、発電抑制処理により、パワーコンディショナー203Aから電力系統500に供給される電力(実際の発電電力C)は、予測発電電力A以下となる。
このため、抑制時間帯Tでの予測発電電力値Aが時間の経過と共に変化する場合と同様に、各再エネ電源200A(n)の逆潮流電力Eは、許容上限値B以下となる。
また、再エネ電源200A(n)の発電電力Cのうち電力系統500に供給される電力(実効的な逆潮流電力E)は、実際の発電電力Cから吸収電力Dを差し引くことで簡単に求めることができる。
このように、抑制時間帯Tでの予測発電電力値Aが一定である場合でも、再エネ電源200A(n)から電力系統500への逆潮流電力Eが許容上限値Bを超えることを防ぎ、逆潮流電力そのものも精度よく把握することが可能となる。また、蓄電池やHP給湯器で吸収(充電または電力消費)する電力を再エネ電源の発電電力の変動に合わせて制御するという、非常に困難なリアルタイムな高精度制御を行うことなく、発電制御が必要な余剰電力を容易に吸収させることが可能になる。
FIG. 11 is a diagram illustrating an operation example of the present embodiment when the predicted generated power value A in the suppression time period T is a constant value.
As shown in FIG. 11, even when the generated power H of the power generation element 201A exceeds the predicted generated power value A, the power (actual power generation) supplied from the power conditioner 203A to the power system 500 by the power generation suppression process. The electric power C) is equal to or less than the predicted generated electric power A.
For this reason, similarly to the case where the predicted generated power value A in the suppression time zone T changes with time, the reverse flow power E of each renewable energy power source 200A (n) is equal to or lower than the allowable upper limit value B.
In addition, of the generated power C of the renewable energy power source 200A (n), the power supplied to the power system 500 (effective reverse power flow E) is easily obtained by subtracting the absorbed power D from the actual generated power C. be able to.
In this way, even when the predicted generated power value A in the suppression time period T is constant, the reverse power flow E from the renewable energy power source 200A (n) to the power system 500 is prevented from exceeding the allowable upper limit value B. It is possible to accurately grasp the reverse power flow itself. In addition, the power generation control can be performed without performing extremely difficult real-time high-precision control of controlling the power absorbed (charged or consumed) by the storage battery or the HP water heater in accordance with the fluctuation of the generated power of the renewable energy source. Necessary surplus power can be easily absorbed.

本実施形態において、抑制時間帯Tでの予測発電電力値Aとしては、例えば、抑制時間帯Tにおける再エネ電源200A(n)の発電電力の予測値の最大値が用いられる。この場合、パワーコンディショナー203Aが発電要素201の発電電力より小さい電力を電力系統500に供給する状況(以下「パワコン抑制状況」と称する)の発生を低減可能になる。パワコン抑制状況では、発電要素201の余剰電力が、蓄電池301やHP給湯器302に吸収されず、有効に利用されない。このため、抑制時間帯Tでの予測発電電力値Aとして、抑制時間帯Tにおける再エネ電源200A(n)の発電電力の予測値の最大値が用いられれば、発電要素201の余剰電力の有効活用を図ることが可能になる。   In the present embodiment, as the predicted generated power value A in the suppression time zone T, for example, the maximum value of the predicted value of the generated power of the renewable energy power source 200A (n) in the suppression time zone T is used. In this case, it is possible to reduce the occurrence of a situation in which the power conditioner 203A supplies power smaller than the power generated by the power generation element 201 to the power system 500 (hereinafter referred to as “power condition suppression situation”). In the power condition suppression state, surplus power of the power generation element 201 is not absorbed by the storage battery 301 or the HP water heater 302 and is not used effectively. For this reason, if the maximum value of the predicted value of the generated power of the renewable energy power source 200A (n) in the suppression time zone T is used as the predicted generated power value A in the suppression time zone T, the surplus power of the power generation element 201 can It can be used.

本実施形態において、再エネ電源200Aの代わりに、図5Bや図5Dに示した再エネ電源200が用いられてもよい。この場合、電力制御装置100Aは、各再エネ電源200に、対応する吸収電力値を送信する。この際、需要家の蓄電池301やHP給湯器302は、図5Bに示したように、電力系統500を介して再エネ電源200と接続されてもよいし、図5Dに示したように、電力系統500を介さずにローカル配線等を介して接続されてもよい。ここで、再エネ電源200やHP給湯器302に吸収電力を吸収させる手法は、図5Bや図5Dを用いて説明した手法が用いられる。
なお、図5Bや図5Dに示した供給部206は、制御部202Aのように、自己が含まれる再エネ電源200の予測発電電力値を受信し、該再エネ電源200の発電電力を、該再エネ電源200の予測発電電力値以下に抑制してもよい。この場合、逆潮流により売電する電力量が、許容上限値を超えることを防止できる。
In the present embodiment, the renewable energy power source 200 shown in FIGS. 5B and 5D may be used instead of the renewable energy power source 200A. In this case, the power control apparatus 100 </ b> A transmits a corresponding absorbed power value to each renewable energy power source 200. At this time, the storage battery 301 and the HP water heater 302 of the customer may be connected to the renewable energy power source 200 via the power system 500 as shown in FIG. 5B, or the electric power as shown in FIG. 5D. You may connect via local wiring etc. not via the system | strain 500. FIG. Here, the method described with reference to FIGS. 5B and 5D is used as a method of causing the renewable energy power source 200 and the HP water heater 302 to absorb the absorbed power.
The supply unit 206 shown in FIG. 5B and FIG. 5D receives the predicted generated power value of the renewable energy power source 200 including itself, like the control unit 202A, and converts the generated power of the renewable energy power source 200 to the You may suppress to below the prediction electric power generation value of the renewable energy power supply 200. FIG. In this case, it is possible to prevent the amount of power sold by reverse power flow from exceeding the allowable upper limit value.

次に、上述した実施形態の変形例について説明する。   Next, a modification of the above-described embodiment will be described.

許容上限値は、一定値に限らず、時間の経過に伴って変動してもよい。
図12は、許容上限値が変動する一例を示した図である。再エネ電源の電力を有効に活用するには、許容上限値は、きめ細かく、例えば、30分や1時間ごとに更新されることが好ましい。
The allowable upper limit value is not limited to a constant value, and may vary with the passage of time.
FIG. 12 is a diagram illustrating an example in which the allowable upper limit value fluctuates. In order to effectively use the power of the renewable energy source, the allowable upper limit value is preferably finely updated, for example, every 30 minutes or 1 hour.

第1決定部101や制御部101Aは、抑制時間帯になる前に、吸収電力を充電する蓄電池をあらかじめ放電させておくことで、蓄電池の空き容量を増やしておくことが望ましい。
また、HP給湯器では、抑制時間帯になる前に湯を消費し、抑制時間帯に湯沸かしができるようにしておくことが望ましい。
It is desirable that the first determination unit 101 and the control unit 101A increase the available capacity of the storage battery by discharging the storage battery that is charged with the absorbed power in advance before the suppression time zone is reached.
In the HP water heater, it is desirable that hot water is consumed before the suppression time zone is reached, so that the water can be boiled during the suppression time zone.

再エネ電源のそばに、蓄電池やHP給湯器が設けられてもよい。例えば、蓄電池やHP給湯器が再エネ電源に併設されてもよい。   A storage battery or an HP water heater may be provided near the renewable energy source. For example, a storage battery or an HP water heater may be provided in the renewable energy source.

再エネ電源の予測発電電力(定格のV%)を導出する手法としては、発電電力予測装置が導出する手法に限らず、例えば、以下の手法が用いられてもよい。
(1)クラウド側(例えば、電力制御装置100A)が、再エネ電源全体の総発電電力の予測を、再エネ電源の定格の総量の%(百分率)で導出し、その導出結果(以下「%予測値」と称する)を、そのまま各再エネ電源の定格のV%として用いる。
(2)クラウド側(電力制御装置100A)が、各再エネ電源の予測発電電力(定格のV%)を導出する。
(3)各再エネ電源が、自己の予測発電電力(定格のV%)を導出し、その導出結果をクラウド側(電力制御装置100A)へ送信する。
The method for deriving the predicted generated power (rated V n %) of the renewable energy power source is not limited to the method derived by the generated power prediction device, and for example, the following method may be used.
(1) The cloud side (for example, the power control apparatus 100A) derives the prediction of the total generated power of the entire renewable energy power source as a percentage (percentage) of the total amount of the renewable energy power source, and the derivation result (hereinafter “%”) "Predicted value") is used as it is as the V n % of the rating of each renewable energy source.
(2) The cloud side (power control device 100A) derives the predicted generated power (rated V n %) of each renewable energy power source.
(3) Each renewable energy power source derives its own predicted generated power (rated V n %) and transmits the derived result to the cloud side (power control device 100A).

再エネ電源の許容上限値(定格のX%)の設定手法としては、例えば、以下の手法が用いられてもよい。
(1)全ての再エネ電源に対して、一律の許容上限値(定格のX%)を設定する。
(2)再エネ電源の所在地の天候等を考慮して、再エネ電源に対して個別の許容上限値(定格のX%)を設定する。例えば、再エネ電源として太陽光発電装置を用いる場合、その所在地の日照時間が長い再エネ電源を優先的に抑制する最適化処理を行って、再エネ電源に対して個別の許容上限値(定格のX%)を設定する。
(3)全ての再エネ電源の許容上限値を「0」(完全にオフ)にする。
For example, the following method may be used as a method for setting the allowable upper limit value ( Xn % of the rated value) of the renewable energy power source.
(1) A uniform allowable upper limit (X n % of the rating) is set for all renewable energy sources.
(2) In consideration of the weather at the location of the renewable energy power source, an individual allowable upper limit value (X n % of the rating) is set for the renewable energy power source. For example, when using a solar power generation device as a renewable energy source, an optimization process that preferentially suppresses the renewable energy source with a long sunshine time at the location is performed, and individual allowable upper limit values (rated X n %).
(3) The allowable upper limit value of all renewable energy sources is set to “0” (completely off).

抑制時間帯は、翌日の10時30分から15時30分までの時間帯に限らず適宜変更可能である。   The suppression time zone is not limited to the time zone from 10:30 to 15:30 on the next day, and can be changed as appropriate.

上記実施形態において、電力制御装置100、100Aや、制御部202、202Aや、受信部205と供給部206との組合せは、それぞれ、コンピュータにて実現されてもよい。この場合、コンピュータは、コンピュータにて読み取り可能な記録媒体に記録されたプログラムを読込み実行して、電力制御装置100、100Aや、制御部202、202Aや、受信部205と供給部206との組合せのいずれか有する機能を実行する。記録媒体は、例えば、CD-ROM(Compact Disk Read Only Memory)である。記録媒体は、CD-ROMに限らず適宜変更可能である。
以上説明した各実施形態において、図示した構成は単なる一例であって、本発明はその構成に限定されるものではない。
In the embodiment described above, the power control devices 100 and 100A, the control units 202 and 202A, and the combination of the reception unit 205 and the supply unit 206 may each be realized by a computer. In this case, the computer reads and executes the program recorded on the computer-readable recording medium, and combines the power control devices 100 and 100A, the control units 202 and 202A, and the reception unit 205 and the supply unit 206. The function which has any of these is performed. The recording medium is, for example, a CD-ROM (Compact Disk Read Only Memory). The recording medium is not limited to the CD-ROM and can be changed as appropriate.
In each embodiment described above, the illustrated configuration is merely an example, and the present invention is not limited to the configuration.

1 電力システム
100、100A 電力制御装置
101 第1決定部
101A 制御部
102 第2決定部
102A 決定部
103A 通信部
200、200A 再エネ電源
201、204A 発電部
201A 発電要素
202、202A 制御部
203A パワーコンディショナー
205 受信部
206 供給部
301、303 蓄電池
302 HP給湯器
400 電力会社装置
500 電力系統
DESCRIPTION OF SYMBOLS 1 Electric power system 100,100A Power control apparatus 101 1st determination part 101A control part 102 2nd determination part 102A determination part 103A communication part 200, 200A Renewable power supply 201, 204A Power generation part 201A Power generation element 202, 202A Control part 203A Power conditioner 205 Receiving Unit 206 Supplying Unit 301, 303 Storage Battery 302 HP Water Heater 400 Electric Power Company Device 500 Electric Power System

Claims (10)

再生可能エネルギーを用いて発電する発電装置の所定の出力抑制時間帯における予測発電電力値と、前記発電装置の発電電力の許容上限値とに基づいて、電力系統を介して前記発電装置と接続された、前記発電装置を備える需要家とは異なる需要家が備える電気機器に吸収させる吸収電力を決定する第1決定部と、
前記出力抑制時間帯における前記発電装置の実際の発電電力と前記吸収電力とに基づいて、前記発電装置から電力系統に逆潮流させる逆潮流電力を決定する第2決定部と、を備える電力制御装置。
Based on the predicted generated power value in a predetermined output suppression time zone of the power generation device that generates power using renewable energy and the allowable upper limit value of the generated power of the power generation device, the power generation device is connected to the power generation device via a power system. In addition, a first determination unit that determines absorbed power to be absorbed by an electric device provided by a consumer different from the consumer provided with the power generation device ,
A power control device comprising: a second determination unit that determines reverse power flow to be reversely flowed from the power generation device to the power system based on the actual generated power and the absorbed power of the power generation device in the output suppression time zone. .
前記第1決定部は、前記予測発電電力値から前記許容上限値を差し引いた結果を前記吸収電力として決定する、請求項1に記載の電力制御装置。   The power control device according to claim 1, wherein the first determination unit determines a result of subtracting the allowable upper limit value from the predicted generated power value as the absorbed power. 前記第2決定部は、前記出力抑制時間帯における前記発電装置の実際の発電電力から前記吸収電力を差し引いた結果を前記逆潮流電力として決定する、請求項1または2に記載の電力制御装置。 The power control device according to claim 1 or 2, wherein the second determination unit determines a result of subtracting the absorbed power from actual generated power of the power generation device in the output suppression time period as the reverse power flow power. 前記第1決定部は、前記出力抑制時間帯における複数の前記発電装置の予測発電電力値と、前記複数の発電装置の許容上限値とに基づいて、複数の前記電気機器に吸収させる吸収電力を決定する、請求項1に記載の電力制御装置。 The first determination unit absorbs absorbed power to be absorbed by the plurality of electric devices based on predicted generated power values of the plurality of power generation devices in the output suppression time zone and allowable upper limit values of the plurality of power generation devices. The power control device according to claim 1, wherein the power control device is determined. 前記第1決定部は、前記予測発電電力値を前記発電装置に送信する、請求項1から4のいずれか1項に記載の電力制御装置。   5. The power control device according to claim 1, wherein the first determination unit transmits the predicted generated power value to the power generation device. 前記第1決定部は、前記出力抑制時間帯における前記発電装置の実際の発電電力を前記予測発電電力値以下にする発電抑制処理を前記発電装置に実行させる、請求項5に記載の電力制御装置。 6. The power control device according to claim 5, wherein the first determination unit causes the power generation device to execute a power generation suppression process for setting an actual generated power of the power generation device in the output suppression time period to be equal to or less than the predicted generated power value. . 前記予測発電電力値は、前記発電装置の前記出力抑制時間帯における前記発電装置の発電電力の予測値である、または、前記出力抑制時間帯における前記発電装置の発電電力の予測値の最大値である、請求項1から6のいずれか1項に記載の電力制御装置。 The predicted power generation value, the a predicted value of the generated power of the generator device at said output suppression time zone of the power plant, or, the maximum value of the predicted value of the generated power of the generator device at said output suppression time zone The power control apparatus according to any one of claims 1 to 6, wherein: 前記第2決定部は、前記出力抑制時間帯における、前記逆潮流電力と、前記予測発電電力値から前記実際の発電電力を差し引いた結果と、に基づいて、売電価格を決定する、請求項1からのいずれか1項に記載の電力制御装置。 The second determination unit determines a power selling price based on the reverse power flow power in the output suppression time zone and a result of subtracting the actual generated power from the predicted generated power value. The power control apparatus according to any one of 1 to 7 . 再生可能エネルギーを用いて発電する発電装置の所定の出力抑制時間帯における予測発電電力値と、前記発電装置の発電電力の許容上限値とに基づいて、電力系統を介して前記発電装置と接続された、前記発電装置を備える需要家とは異なる需要家が備える電気機器に吸収させる吸収電力を決定し、
前記出力抑制時間帯における前記発電装置の実際の発電電力と前記吸収電力とに基づいて、前記発電装置から電力系統に逆潮流させる逆潮流電力を決定する電力制御方法。
Based on the predicted generated power value in a predetermined output suppression time zone of the power generation device that generates power using renewable energy and the allowable upper limit value of the generated power of the power generation device, the power generation device is connected to the power generation device via a power system. In addition, determine the absorbed power to be absorbed by the electrical equipment provided by a consumer different from the consumer provided with the power generation device ,
A power control method for determining reverse flow power to be reversely flowed from the power generation device to a power system based on actual generated power and the absorbed power of the power generation device in the output suppression time zone .
コンピュータに、
再生可能エネルギーを用いて発電する発電装置の所定の出力抑制時間帯における予測発電電力値と、前記発電装置の発電電力の許容上限値とに基づいて、電力系統を介して前記発電装置と接続された、前記発電装置を備える需要家とは異なる需要家が備える電気機器に吸収させる吸収電力を決定する第1決定手順と、
前記出力抑制時間帯における前記発電装置の実際の発電電力と前記吸収電力とに基づいて、前記発電装置から電力系統に逆潮流させる逆潮流電力を決定する第2決定手順と
を実行させるためのプログラム。
On the computer,
Based on the predicted generated power value in a predetermined output suppression time zone of the power generation device that generates power using renewable energy and the allowable upper limit value of the generated power of the power generation device, the power generation device is connected to the power generation device via a power system. and a first determination procedure for determining the absorbed power to be absorbed in the electric device provided in the different customer from the customer with the power generating device,
A second determination procedure for determining reverse flow power to be reverse flowed from the power generation device to the power system based on the actual generated power of the power generation device and the absorbed power in the output suppression time zone ;
Programs of the order to the execution.
JP2017544087A 2015-10-05 2015-10-05 Power control apparatus, power control method, and program Active JP6428948B2 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2015/078229 WO2017060957A1 (en) 2015-10-05 2015-10-05 Power control device, power generation device, power control method, power generation method, and recording medium

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2018203986A Division JP6624266B2 (en) 2018-10-30 2018-10-30 Power control device

Publications (2)

Publication Number Publication Date
JPWO2017060957A1 JPWO2017060957A1 (en) 2018-07-26
JP6428948B2 true JP6428948B2 (en) 2018-11-28

Family

ID=58488163

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017544087A Active JP6428948B2 (en) 2015-10-05 2015-10-05 Power control apparatus, power control method, and program

Country Status (2)

Country Link
JP (1) JP6428948B2 (en)
WO (1) WO2017060957A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7142218B2 (en) * 2018-07-09 2022-09-27 パナソニックIpマネジメント株式会社 Control system and control method
JP7142217B2 (en) * 2018-07-09 2022-09-27 パナソニックIpマネジメント株式会社 Control system and control method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002152976A (en) * 2000-11-13 2002-05-24 Sharp Corp Power supply system for distributed source
JP2008141918A (en) * 2006-12-05 2008-06-19 Nippon Telegr & Teleph Corp <Ntt> Device, method, and program for evaluating photovoltaic power generation system
JP4808754B2 (en) * 2008-08-28 2011-11-02 三菱電機株式会社 Natural energy power generation control system
JP5580183B2 (en) * 2010-12-13 2014-08-27 パナソニック株式会社 Power control apparatus and power control system using the same
JP5756348B2 (en) * 2011-06-14 2015-07-29 シャープ株式会社 Power generation system and power generation apparatus
JP5788535B2 (en) * 2012-02-09 2015-09-30 株式会社日立製作所 Control device and control method for distributed generator

Also Published As

Publication number Publication date
JPWO2017060957A1 (en) 2018-07-26
WO2017060957A1 (en) 2017-04-13

Similar Documents

Publication Publication Date Title
JP5011230B2 (en) Secondary battery control device and control method
EP3016229B1 (en) Power adjustment device, power adjustment method, power adjustment system, power storage device, server, program
JP5372724B2 (en) Power generation system using natural energy
KR101661704B1 (en) Microgrid energy management system and power storage method of energy storage system
JP5639540B2 (en) Storage battery supply and demand plan creation device and storage battery supply and demand plan creation method
JP5838006B1 (en) Power distribution equipment
JP6166338B2 (en) Energy storage system
JPWO2017138629A1 (en) Charge / discharge control system, charge / discharge control method, and program
JP5576826B2 (en) Wind power generator group control system and control method
JP6406391B2 (en) Power generation control device and control method
WO2016038994A8 (en) Device operation plan creation device, device operation plan creation method, and storage medium storing device operation plan creation program
JP6274969B2 (en) Charging / discharging system for power storage device
JP6428948B2 (en) Power control apparatus, power control method, and program
JPWO2015111144A1 (en) Power supply system and energy management system used therefor
WO2015118744A1 (en) Energy management system
JP6746935B2 (en) Charge/discharge control system, charge/discharge control method and program
JP6705498B2 (en) Control device, supply and demand adjustment control device, power storage device, supply and demand adjustment system, control method, supply and demand adjustment method, and program
JP6705319B2 (en) Integrated control device, integrated control system, integrated control method, and integrated control program
JP2019047612A (en) Photovoltaic power generation device and control method of the same
JP6159812B2 (en) Distributed power management system
JP6503155B2 (en) Output fluctuation suppression system for distributed power supply
JP6624266B2 (en) Power control device
US20220209539A1 (en) Power management system
JP2018174623A (en) Power management device, and application power generation amount calculation method
US20190131792A1 (en) Control apparatus, control method, and non-transitory storage medium

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180323

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180323

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20181002

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20181015

R150 Certificate of patent or registration of utility model

Ref document number: 6428948

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150