JP6383848B1 - Relay unit and battery device - Google Patents

Relay unit and battery device Download PDF

Info

Publication number
JP6383848B1
JP6383848B1 JP2017163653A JP2017163653A JP6383848B1 JP 6383848 B1 JP6383848 B1 JP 6383848B1 JP 2017163653 A JP2017163653 A JP 2017163653A JP 2017163653 A JP2017163653 A JP 2017163653A JP 6383848 B1 JP6383848 B1 JP 6383848B1
Authority
JP
Japan
Prior art keywords
relay
state
control
controller
relays
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017163653A
Other languages
Japanese (ja)
Other versions
JP2019040815A (en
Inventor
田中 順也
順也 田中
正直 島▲崎▼
正直 島▲崎▼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Calsonic Kansei Corp
Original Assignee
Calsonic Kansei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Calsonic Kansei Corp filed Critical Calsonic Kansei Corp
Priority to JP2017163653A priority Critical patent/JP6383848B1/en
Application granted granted Critical
Publication of JP6383848B1 publication Critical patent/JP6383848B1/en
Publication of JP2019040815A publication Critical patent/JP2019040815A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Keying Circuit Devices (AREA)
  • Control Of Charge By Means Of Generators (AREA)

Abstract

【課題】個々のリレーの故障の可能性を低減する。
【解決手段】リレーユニット10は複数のリレー19とコントローラ22とを有する。複数のリレーは互いに直列に接続される。コントローラ22は複数のリレー19それぞれの遮断状態と通電状態との切替え制御を実行可能である。コントローラ22は通電制御において複数のリレー19を順番に遮断状態から通電状態に切替える。コントローラ22は遮断制御において複数のリレー19を順番に通電状態から遮断状態に切替える。コントローラ22は通電制御において最後に通電状態へ切替えるリレー19と遮断制御において最初に遮断状態へ切替えるリレー19とを複数のリレー19の中で分散させるように制御する。
【選択図】図1
An object of the present invention is to reduce the possibility of failure of individual relays.
A relay unit includes a plurality of relays and a controller. The plurality of relays are connected in series with each other. The controller 22 can execute switching control between the cutoff state and the energization state of each of the plurality of relays 19. The controller 22 sequentially switches the plurality of relays 19 from the cut-off state to the energized state in the energization control. The controller 22 sequentially switches the plurality of relays 19 from the energized state to the disconnected state in the cutoff control. The controller 22 performs control so that the relay 19 that is finally switched to the energized state in the energization control and the relay 19 that is first switched to the disconnected state in the disconnection control are distributed among the plurality of relays 19.
[Selection] Figure 1

Description

本発明は、リレーユニットおよび電池装置に関するものである。   The present invention relates to a relay unit and a battery device.

電気回路で用いるリレーにおいて、開閉状態の切替わり時は完全接触時に比べて接触面積が小さいため、接点の抵抗値が高くなり得る。それゆえ、リレーの両端に電圧差がある状態における通電状態への切替え時、または電流が流れているときの遮断状態への切替え時に高抵抗の接点に大電流が流れることにより接点が発熱し、最終的に固着し得る。   In a relay used in an electric circuit, a contact area is smaller when switching between open and closed states than when completely contacting, so that a contact resistance value can be increased. Therefore, when switching to the energized state when there is a voltage difference between both ends of the relay, or when switching to the cutoff state when current is flowing, the contact generates heat due to a large current flowing through the high resistance contact, It can eventually stick.

そこで、二つのリレーを直列に接続させたリレーにおいて、上流側のリレーを、通電時において最後に接続させ且つ遮断時には最初に遮断させることにより、上流側のリレーに固着が発生した場合であっても、下流側のリレーを用いてリレー回路を遮断することが提案されている(特許文献1参照)。   Therefore, in the relay in which the two relays are connected in series, the upstream relay is connected lastly when energized and first shut off when shutting off, so that the upstream relay is stuck. However, it has been proposed to shut off the relay circuit using a downstream relay (see Patent Document 1).

特開2001−173545号公報JP 2001-173545 A

しかし、特許文献1に記載のリレー回路では、上流側のリレーに負荷が集中する結果、早期に故障する可能性があった。   However, in the relay circuit described in Patent Document 1, there is a possibility that the load is concentrated on the upstream relay, resulting in failure early.

かかる事情に鑑みてなされた本発明の目的は、遮断状態および通電状態の間を切替えるための、直列に接続される複数のリレーにおいて、個々のリレーの故障の可能性を低減させるリレーユニットおよび電池装置を提供することにある。   An object of the present invention made in view of such circumstances is a relay unit and a battery that reduce the possibility of failure of individual relays in a plurality of relays connected in series for switching between a cut-off state and an energized state To provide an apparatus.

上記課題を解決するために本発明の第1の観点に係るリレーユニットは、
互いに直列に接続される複数のリレーと、
前記複数のリレーそれぞれの遮断状態と通電状態との切替え制御を実行可能であり、前記複数のリレーを順番に前記遮断状態から前記通電状態に切替える通電制御において最後に前記通電状態へ切替えるリレーと、前記複数のリレーを前記通電状態から前記遮断状態に切替える遮断制御において最初に前記遮断状態へ切替えるリレーとを、前記複数のリレーの中で分散させるように制御するコントローラと、を備え、前記コントローラは、前記通電制御を実行する場合、前記複数のリレーの中で最後に通電状態に切替えるリレー以外の少なくとも一部のリレーに固着が発生しているか否かを判別し、固着が発生していないと判別するとき、該少なくとも一部のリレーを遮断状態から通電状態に切替えるよう制御した後に、該少なくとも一部のリレー以外の前記複数のリレーを通電状態に切替えるよう制御する。
In order to solve the above problem, a relay unit according to the first aspect of the present invention provides:
A plurality of relays connected in series with each other;
A switching control between the cut-off state and the energized state of each of the plurality of relays is possible, and the relay that finally switches to the energized state in the energization control for switching the plurality of relays from the cut-off state to the energized state in order, a relay for switching to the first to the cut-off state in the cutoff control for switching the plurality of relays to the cutoff state from the conduction state, and a control for the controller to disperse among the plurality of relays, the controller When performing the energization control, it is determined whether at least some of the plurality of relays other than the relay that is finally switched to the energized state are stuck, and no sticking occurs. When determining, after controlling to switch the at least some of the relays from the cut-off state to the energized state, the at least some of the relays It said plurality of relays other than the rate that control to switch to the conduction state.

上記課題を解決するために本発明の第2の観点に係る電池装置は、
組電池と、
前記組電池に直列に接続され、互いに直列に接続される複数のリレーと、
前記複数のリレーそれぞれの遮断状態と通電状態との切替え制御を実行可能であり、前記複数のリレーを順番に前記遮断状態から前記通電状態に切替える通電制御において最後に前記通電状態へ切替えるリレーと、前記複数のリレーを前記通電状態から前記遮断状態に切替える遮断制御において最初に前記遮断状態へ切替えるリレーとを、前記複数のリレーの中で分散させるように制御するコントローラと、を備え、前記コントローラは、前記通電制御を実行する場合、前記複数のリレーの中で最後に通電状態に切替えるリレー以外の少なくとも一部のリレーに固着が発生しているか否かを判別し、固着が発生していないと判別するとき、該少なくとも一部のリレーを遮断状態から通電状態に切替えるよう制御した後に、該少なくとも一部のリレー以外の前記複数のリレーを通電状態に切替えるよう制御する。
In order to solve the above problems, a battery device according to a second aspect of the present invention provides:
An assembled battery;
A plurality of relays connected in series to the battery pack and connected in series with each other;
A switching control between the cut-off state and the energized state of each of the plurality of relays is possible, and the relay that finally switches to the energized state in the energization control for switching the plurality of relays from the cut-off state to the energized state in order, a relay for switching to the first to the cut-off state in the cutoff control for switching the plurality of relays to the cutoff state from the conduction state, and a control for the controller to disperse among the plurality of relays, the controller When performing the energization control, it is determined whether at least some of the plurality of relays other than the relay that is finally switched to the energized state are stuck, and no sticking occurs. When determining, after controlling to switch the at least some of the relays from the cut-off state to the energized state, the at least some of the relays It said plurality of relays other than the rate that control to switch to the conduction state.

本発明によれば、遮断状態および通電状態の間を切替えるための、直列に接続される複数のリレーにおいて、個々のリレーの故障の可能性を低減させるリレーユニットおよび電池装置を提供可能である。   ADVANTAGE OF THE INVENTION According to this invention, in the some relay connected in series for switching between the interruption | blocking state and an electricity supply state, the relay unit and battery apparatus which reduce the possibility of failure of each relay can be provided.

本発明の第1の実施形態に係るリレーユニットを内包する電池装置が構成する回生蓄電システムの概略構成を示す機能ブロック図である。It is a functional block diagram which shows schematic structure of the regenerative electrical storage system which the battery device which includes the relay unit which concerns on the 1st Embodiment of this invention comprises. 第1の実施形態において、図1のコントローラが実行する通電制御を説明するためのフローチャートである。3 is a flowchart for explaining energization control executed by the controller of FIG. 1 in the first embodiment. 第1の実施形態において、図1のコントローラが実行する遮断制御を説明するためのフローチャートである。2 is a flowchart for explaining shut-off control executed by the controller of FIG. 1 in the first embodiment. 第2の実施形態において、図1のコントローラが実行する通電制御を説明するためのフローチャートである。In 2nd Embodiment, it is a flowchart for demonstrating the electricity supply control which the controller of FIG. 1 performs. 第2の実施形態において、図1のコントローラが実行する遮断制御を説明するためのフローチャートである。In 2nd Embodiment, it is a flowchart for demonstrating the interruption | blocking control which the controller of FIG. 1 performs. 第1の実施形態において、図1のコントローラが実行する通電制御の変形例を説明するためのフローチャートである。6 is a flowchart for explaining a modification of energization control executed by the controller of FIG. 1 in the first embodiment. 第1の実施形態において、図1のコントローラが実行する遮断制御の変形例を説明するためのフローチャートである。6 is a flowchart for explaining a modification example of the cutoff control executed by the controller of FIG. 1 in the first embodiment. 第2の実施形態において、図1のコントローラが実行する通電制御の変形例を説明するためのフローチャートである。10 is a flowchart for explaining a modification of energization control executed by the controller of FIG. 1 in the second embodiment. 第2の実施形態において、図1のコントローラが実行する遮断制御の変形例を説明するためのフローチャートである。FIG. 9 is a flowchart for explaining a modification example of the cutoff control executed by the controller of FIG. 1 in the second embodiment.

以下、本発明を適用したリレーユニットの実施形態について、図面を参照して説明する。   Hereinafter, an embodiment of a relay unit to which the present invention is applied will be described with reference to the drawings.

図1に示すように、本発明の第1の実施形態に係るリレーユニット10を内包する電池装置11は、回生蓄電システム12の一部を構成する。回生蓄電システム12は、ISG(Integrated Starter Generator)13、スタータ14、鉛蓄電池15、電装品16、および電池装置11を含んでいる。ISG13、スタータ14、鉛蓄電池15、電装品16、および電池装置11は、並列に接続される。なお、ISG13および電池装置11は、供給用リレー17を介して、スタータ14、鉛蓄電池15、および電装品16に接続されている。   As shown in FIG. 1, the battery device 11 including the relay unit 10 according to the first embodiment of the present invention constitutes a part of the regenerative power storage system 12. The regenerative power storage system 12 includes an ISG (Integrated Starter Generator) 13, a starter 14, a lead storage battery 15, an electrical component 16, and a battery device 11. The ISG 13, the starter 14, the lead storage battery 15, the electrical component 16, and the battery device 11 are connected in parallel. The ISG 13 and the battery device 11 are connected to the starter 14, the lead storage battery 15, and the electrical component 16 through the supply relay 17.

なお、回生蓄電システム12は、例えば、ガソリン自動車、ディーゼル自動車、およびハイブリッド車などの車両に搭載される。なお、図1において、各機能ブロックを結ぶ実線は、電力の流れを表す。また、図1において、各機能ブロックを結ぶ破線は、制御信号または通信される情報の流れを表す。   The regenerative power storage system 12 is mounted on vehicles such as gasoline cars, diesel cars, and hybrid cars, for example. In FIG. 1, a solid line connecting each functional block represents a flow of power. Moreover, in FIG. 1, the broken line which connects each functional block represents the flow of the control signal or the information communicated.

ISG13は、車両のエンジンおよび駆動シャフトの少なくとも一方に直接的または間接的に、機械的に接続される。ISG13は、エンジンの駆動または駆動シャフトの回転によって発電可能である。ISG13は発電した電力をレギュレータで出力電圧を調整して、鉛蓄電池15、電装品16、および電池装置11に供給可能である。ISG13は、車両の減速時等に回生によって発電可能である。ISG13が回生発電した電力は、鉛蓄電池15および電池装置11に蓄電可能である。ISG13は、電池装置11から電力供給を受けて、例えば、アイドリングストップ中のエンジンを再始動させる。   The ISG 13 is mechanically connected directly or indirectly to at least one of the vehicle engine and the drive shaft. The ISG 13 can generate electricity by driving the engine or rotating the drive shaft. The ISG 13 can supply the generated power to the lead storage battery 15, the electrical component 16, and the battery device 11 by adjusting the output voltage with a regulator. The ISG 13 can generate power by regeneration when the vehicle is decelerated or the like. The electric power regenerated by the ISG 13 can be stored in the lead storage battery 15 and the battery device 11. The ISG 13 receives power supply from the battery device 11 and restarts the engine during idling stop, for example.

スタータ14は、例えばセルモータである。スタータ14は、イグニッションキー操作または始動ボタンの押下に基づいて、スタータ14に接続されるスイッチが導通するとき鉛蓄電池15および電池装置11の少なくとも一方からの電力供給を受けて、エンジンを始動させる。   The starter 14 is, for example, a cell motor. The starter 14 receives an electric power supply from at least one of the lead storage battery 15 and the battery device 11 when the switch connected to the starter 14 is turned on based on an ignition key operation or pressing of a start button, and starts the engine.

鉛蓄電池15は、例えば公称電圧12Vの出力電圧を有する鉛蓄電池であって、スタータ14および電装品16に対して電力を供給可能である。   The lead storage battery 15 is a lead storage battery having an output voltage of a nominal voltage of 12 V, for example, and can supply power to the starter 14 and the electrical component 16.

電装品16は、例えば車両に備えられたオーディオ、エアコン、及びナビゲーションシステム等を含む負荷装置であって、供給された電力を消費して動作する。   The electrical component 16 is a load device including, for example, an audio, an air conditioner, and a navigation system provided in a vehicle, and operates by consuming supplied power.

電池装置11は、例えばリチウムイオン電池装置である。第1の実施形態において、電池装置11の出力電圧は、鉛蓄電池15の出力電圧と異なっており、DC/DCコンバータによって、鉛蓄電池15の出力電圧と略同一となるように調整される。または、電池装置11の出力電圧は、鉛蓄電池15の出力電圧と略同一であってもよい。電池装置11は、ISG13、スタータ14、および電装品16に対して電力を供給可能である。   The battery device 11 is, for example, a lithium ion battery device. In the first embodiment, the output voltage of the battery device 11 is different from the output voltage of the lead storage battery 15 and is adjusted by the DC / DC converter so as to be substantially the same as the output voltage of the lead storage battery 15. Alternatively, the output voltage of the battery device 11 may be substantially the same as the output voltage of the lead storage battery 15. The battery device 11 can supply power to the ISG 13, the starter 14, and the electrical component 16.

電池装置11は、組電池18およびリレーユニット10を含んでいる。組電池18は、リレーユニット10を介して、ISG13および供給用リレー17に接続している。   The battery device 11 includes an assembled battery 18 and a relay unit 10. The assembled battery 18 is connected to the ISG 13 and the supply relay 17 via the relay unit 10.

組電池18は、例えば、リチウムイオン電池などである複数のセルによって構成されている。組電池18においては、複数のセルが直列または並列に接続されている。   The assembled battery 18 includes a plurality of cells such as lithium ion batteries. In the assembled battery 18, a plurality of cells are connected in series or in parallel.

リレーユニット10は、複数のリレー19、ヒューズ20、複数の電圧センサ21、およびコントローラ22を含んでいる。   The relay unit 10 includes a plurality of relays 19, fuses 20, a plurality of voltage sensors 21, and a controller 22.

複数のリレー19は、第1の実施形態において、第1のリレー23および第2のリレー24を含む。なお、複数のリレー19の数は2個に限定されない。複数のリレー19は、例えば、電磁リレーである。複数のリレー19は、さらに具体的には、メークリレーである。   The plurality of relays 19 include a first relay 23 and a second relay 24 in the first embodiment. Note that the number of the plurality of relays 19 is not limited to two. The plurality of relays 19 are, for example, electromagnetic relays. More specifically, the plurality of relays 19 are make relays.

複数のリレー19は、互いに直列に接続されている。第1の実施形態では、第1のリレー23が下流側に、第2のリレー24が上流側に配置されている。言換えると、第1の実施形態では、第2のリレー24が、組電池18側に配置され、組電池18に直列に接続されている。なお、複数のリレー19は、リレーの間に組電池18を挟んでいてもよい。複数のリレー19は、後述するコントローラ22の制御に基づいて、リレーユニット10全体の通電状態と遮断状態とを切替える。   The plurality of relays 19 are connected to each other in series. In the first embodiment, the first relay 23 is disposed on the downstream side, and the second relay 24 is disposed on the upstream side. In other words, in the first embodiment, the second relay 24 is disposed on the assembled battery 18 side and connected to the assembled battery 18 in series. Note that the plurality of relays 19 may sandwich the assembled battery 18 between the relays. The plurality of relays 19 switch between an energized state and a cut-off state of the entire relay unit 10 based on the control of the controller 22 described later.

ヒューズ20は、第1の実施形態において、第1のリレー23に直列に接続されている。ヒューズ20は、大電流通電時のジュール熱に伴う昇温により遮断する。遮断する時の発熱量は、ヒューズ20が遮断するまで加熱するために必要な熱量から放熱量を減じた値である。なお、発熱量は、(電流)2×(通電時間)×(ヒューズ20の内部抵抗)により算出される。また、報熱量は、{(ヒューズ20の遮断時の温度)−(外気温)}×(放熱速度定数)×(時間)により算出される。 The fuse 20 is connected in series to the first relay 23 in the first embodiment. The fuse 20 is interrupted by a temperature rise accompanying Joule heat when a large current is applied. The amount of heat generated at the time of interruption is a value obtained by subtracting the amount of heat radiation from the amount of heat necessary for heating until the fuse 20 is interrupted. The calorific value is calculated by (current) 2 × (energization time) × (internal resistance of fuse 20). The amount of heat generated is calculated by {(temperature when the fuse 20 is cut off) − (outside air temperature)} × (heat radiation rate constant) × (time).

複数の電圧センサ21は、第1の実施形態において、第1の電圧センサ25および第2の電圧センサ26を含む。複数の電圧センサ21はそれぞれ、複数のリレー19の接点端子間の電圧を検出する。第1の実施形態において、第1の電圧センサ25および第2の電圧センサ26は、それぞれ、第1のリレー23および第2のリレー24の接点端子間の電圧を検出する。複数の電圧センサ21は、検出した電圧値をコントローラ22に通知する。   The plurality of voltage sensors 21 includes a first voltage sensor 25 and a second voltage sensor 26 in the first embodiment. Each of the plurality of voltage sensors 21 detects a voltage between contact terminals of the plurality of relays 19. In the first embodiment, the first voltage sensor 25 and the second voltage sensor 26 detect voltages between contact terminals of the first relay 23 and the second relay 24, respectively. The plurality of voltage sensors 21 notify the detected voltage value to the controller 22.

コントローラ22は、例えばマイクロコンピュータで構成される。コントローラ22は、複数の電圧センサ21から電圧値を取得する。コントローラ22は、組電池18から、例えばセル毎の電圧値などの検出値を取得する。また、コントローラ22は、ECUなどの外部機器から車両の情報および指令などを取得する。   The controller 22 is constituted by a microcomputer, for example. The controller 22 acquires voltage values from the plurality of voltage sensors 21. The controller 22 acquires a detection value such as a voltage value for each cell from the assembled battery 18. In addition, the controller 22 acquires vehicle information and commands from an external device such as an ECU.

コントローラ22は、取得した情報に基づいて、複数のリレー19それぞれの通電状態と遮断状態との切替え制御を実行可能である。コントローラ22は、複数のリレー19を順番に遮断状態から通電状態に切替える通電制御を実行し得る。コントローラ22は、複数のリレー19を順番に通電状態から遮断状態に切替える遮断制御を実行し得る。   The controller 22 can execute switching control between the energized state and the disconnected state of each of the plurality of relays 19 based on the acquired information. The controller 22 can execute energization control for sequentially switching the plurality of relays 19 from the cutoff state to the energized state. The controller 22 can execute a cutoff control for switching the plurality of relays 19 in turn from the energized state to the cutoff state.

コントローラ22は、通電制御における最後の通電状態への切替えと、遮断制御における最初の遮断状態への切替えとを、複数のリレー19の中で分散させるように、複数のリレー19を制御する。以下に、第1の実施形態における、コントローラ22による切替えの分散について、説明する。   The controller 22 controls the plurality of relays 19 so that the switching to the final energization state in the energization control and the switching to the first interruption state in the interruption control are distributed among the plurality of relays 19. Hereinafter, distribution of switching by the controller 22 in the first embodiment will be described.

例えば、コントローラ22は、遮断制御における最初の遮断状態への切替えを、直近の通電制御において最後に通電状態へ切替えたリレーと異なるリレーに対して行うように制御する。第1の実施形態においては、コントローラ22は、例えば、通電制御において第1のリレー23を最後に通電状態に切替え、次の遮断制御において第2のリレー24を最初に遮断状態に切替えるように制御する。   For example, the controller 22 performs control so that switching to the first cutoff state in the cutoff control is performed on a relay different from the relay that was last switched to the energized state in the latest energization control. In the first embodiment, for example, the controller 22 performs control so that the first relay 23 is finally switched to an energized state in energization control and the second relay 24 is first switched to an interrupted state in the next disconnection control. To do.

また、例えば、コントローラ22は、通電制御における最後の通電状態への切替えを、直近の遮断制御において最初に遮断状態へ切替えたリレーと異なるリレーに対して行うように制御する。第1の実施形態においては、コントローラ22は、遮断制御において第2のリレー24を最初に遮断状態に切替え、次の通電制御において第1のリレー23を最後に通電状態に切替えるように制御する。   Further, for example, the controller 22 performs control so that switching to the last energized state in the energization control is performed on a relay different from the relay first switched to the interrupted state in the most recent interruption control. In the first embodiment, the controller 22 performs control so that the second relay 24 is first switched to the cutoff state in the cutoff control, and the first relay 23 is finally switched to the conduction state in the next energization control.

したがって、コントローラ22は、例えば、通電制御において第2のリレー24、第1のリレー23の順番に通電状態に切替え、かつ遮断制御においても第2のリレー24、第1のリレー23の順番に遮断状態に切替える。   Therefore, for example, the controller 22 switches to the energized state in the order of the second relay 24 and the first relay 23 in the energization control, and also interrupts in the order of the second relay 24 and the first relay 23 in the disconnection control. Switch to state.

また、コントローラ22は、通電制御を実行する場合、当該通電制御において最後に通電状態に切替えるリレー以外の少なくとも一部のリレーに固着が発生しているか否かの判別に基づいて、通電制御の続行の可否を判別してよい。   In addition, when executing the energization control, the controller 22 continues the energization control based on the determination as to whether or not at least some of the relays other than the relay that is finally switched to the energized state in the energization control have occurred. It may be determined whether or not.

コントローラ22は、固着が発生しているか否かの判別のために、当該リレーを遮断状態から通電状態に切替え、再び遮断状態に切替えるように制御する。なお、コントローラ22は、遮断状態から通電状態および通電状態から遮断状態へのそれぞれの切替えには、例えば0.1秒の間隔で行う。コントローラ22は、当該リレーの接点端子間の電圧を検出する電圧センサが検出する電圧値の変化に基づいて、固着の発生の有無を判別する。なお、コントローラ22は、電圧値の変化の絶対値が所定値未満である場合には、固着が発生していると判別する。   In order to determine whether or not the sticking has occurred, the controller 22 performs control so that the relay is switched from the cut-off state to the energized state and then switched to the cut-off state again. Note that the controller 22 performs switching from the cut-off state to the energized state and from the energized state to the cut-off state at intervals of 0.1 seconds, for example. The controller 22 determines whether or not sticking has occurred based on a change in voltage value detected by a voltage sensor that detects a voltage between the contact terminals of the relay. The controller 22 determines that sticking has occurred when the absolute value of the change in voltage value is less than a predetermined value.

コントローラ22は、固着が発生していないと判別する場合に、固着の発生の有無を判別したリレーを遮断状態から通電状態に切替えるように制御する。コントローラ22は、当該リレーを通電状態に切替える制御をした後に、当該リレー以外の複数のリレー19を通電状態に切替えるように制御する。   When it is determined that the sticking has not occurred, the controller 22 performs control so that the relay that has determined whether or not the sticking has occurred is switched from the cutoff state to the energized state. The controller 22 performs control to switch the relays to the energized state, and then controls the plurality of relays 19 other than the relays to be switched to the energized state.

なお、コントローラ22は、車両が音を発する時に、遮断制御における最初のリレーの遮断状態への切替えのための制御を実行する。また、コントローラ22は、車両から搭乗者が離れていることを推定した時に、前記遮断制御における最初のリレーの遮断状態への切替えのための制御を実行する。また、コントローラ22は、車両が音を発する時に、通電制御におけるリレーの固着の発生の有無の判別を実行する。   Note that the controller 22 executes control for switching the first relay to the cutoff state in the cutoff control when the vehicle emits a sound. Further, when it is estimated that the passenger is away from the vehicle, the controller 22 executes control for switching the first relay to the cutoff state in the cutoff control. Further, the controller 22 determines whether or not the relay is stuck in the energization control when the vehicle emits sound.

次に、第1の実施形態において、コントローラ22が実行する通電制御について、図2のフローチャートを用いて説明する。コントローラ22は、外部機器から通電制御を実行する指令を取得する場合に、通電制御を開始する。なお、コントローラ22は、当該指令の取得後に、さらに、車両が音を発している場合に通電制御を開始してよい。   Next, energization control executed by the controller 22 in the first embodiment will be described with reference to the flowchart of FIG. The controller 22 starts energization control when acquiring a command to execute energization control from an external device. The controller 22 may start energization control when the vehicle is making a sound after obtaining the command.

ステップS100において、コントローラ22は、第2のリレー24を通電状態に切替えるように制御する。さらに、コントローラ22は、通電状態への切替え制御後に、第2の電圧センサ26が検出する電圧値を取得する。電圧値の取得後、プロセスはステップS101に進む。   In step S100, the controller 22 controls the second relay 24 to be switched to the energized state. Furthermore, the controller 22 acquires the voltage value detected by the second voltage sensor 26 after the switching control to the energized state. After obtaining the voltage value, the process proceeds to step S101.

ステップS101では、コントローラ22は、ステップS100において通電状態に切替えた第2のリレー24を、遮断状態に切替えるように制御する。さらに、コントローラ22は、遮断状態への切替え制御後に、第2の電圧センサ26が検出する電圧値を取得する。電圧値の取得後、プロセスはステップS102に進む。   In step S101, the controller 22 controls the second relay 24 that has been switched to the energized state in step S100 so as to be switched to the cutoff state. Furthermore, the controller 22 acquires the voltage value detected by the second voltage sensor 26 after the switching control to the cutoff state. After obtaining the voltage value, the process proceeds to step S102.

ステップS102では、コントローラ22は、ステップS100およびステップS101において取得した電圧値の差分の絶対値が所定値未満であるか否かを判別する。電圧値の差分の絶対値が所定値未満である場合、プロセスはステップS103に進む。電圧値の差分の絶対値が所定値未満で無い場合、通電制御は終了する。   In step S102, the controller 22 determines whether or not the absolute value of the difference between the voltage values acquired in steps S100 and S101 is less than a predetermined value. If the absolute value of the voltage value difference is less than the predetermined value, the process proceeds to step S103. When the absolute value of the voltage value difference is not less than the predetermined value, the energization control ends.

ステップS103では、コントローラ22は、ステップS101において遮断状態に切替えた第2のリレー24を、通電状態に切替えるように制御する。制御後、プロセスはステップS104に進む。   In step S103, the controller 22 controls the second relay 24 switched to the cutoff state in step S101 to switch to the energized state. After control, the process proceeds to step S104.

ステップS104では、コントローラ22は、第1のリレー23を通電状態に切替えるように制御する。制御後、通電制御は終了する。   In step S104, the controller 22 controls the first relay 23 to be switched to the energized state. After the control, the energization control ends.

次に、第1の実施形態において、コントローラ22が実行する遮断制御について、図3のフローチャートを用いて説明する。コントローラ22は、外部機器から遮断制御を実行する指令を取得する場合に、遮断制御を開始する。   Next, the cutoff control executed by the controller 22 in the first embodiment will be described with reference to the flowchart of FIG. The controller 22 starts the cutoff control when acquiring a command to execute the cutoff control from an external device.

ステップS200において、コントローラ22は、第2のリレー24を通電状態から遮断状態に切替えるように制御する。制御後、プロセスはステップS201に進む。   In step S200, the controller 22 controls the second relay 24 to switch from the energized state to the disconnected state. After control, the process proceeds to step S201.

ステップS201では、コントローラ22は、第1のリレー23を通電状態から遮断状態に切替えるように制御する。遮断状態への切替えの制御後に、遮断制御は終了する。   In step S201, the controller 22 controls the first relay 23 to switch from the energized state to the disconnected state. After the control for switching to the shut-off state, the shut-off control ends.

以上のような第1の実施形態に係るリレーユニット10において、コントローラ22は、通電制御において最後に通電状態へ切替えるリレーと、遮断制御において最初に遮断状態へ切替えるリレーとを、複数のリレー19の中で分散させるように、制御する。通電制御における最後の通電状態への切替えと、遮断制御における最初の遮断状態への切替えとにおいて、リレーに大電流が通電する可能性がある。上述のような構成により、リレーユニット10は、大電流の通電という負荷を複数のリレー19に分散させることにより、一部のリレーへの負荷の集中を防ぎ得る。したがって、リレーユニット10は、個々のリレーの故障の可能性を低減し得る。   In the relay unit 10 according to the first embodiment as described above, the controller 22 includes a relay that finally switches to the energized state in the energization control and a relay that first switches to the interrupted state in the disconnection control. Control to disperse in. There is a possibility that a large current flows through the relay in the switching to the final energization state in the energization control and the switching to the first interruption state in the interruption control. With the configuration as described above, the relay unit 10 can prevent the concentration of loads on some of the relays by distributing the load of energizing a large current to the plurality of relays 19. Therefore, the relay unit 10 can reduce the possibility of failure of individual relays.

また、第1の実施形態に係るリレーユニット10において、通電制御を実行する場合、最後に通電状態に切替えるリレー以外の少なくとも一部のリレーに固着が発生していないことの判別後に当該該少なくとも一部のリレーを遮断状態から通電状態に切替えるよう制御した後に、当該該少なくとも一部のリレー以外の複数のリレーを通電状態に切替えるよう制御する。このような構成により、第1の実施形態のリレーユニット10は、固着が発生しても、他のリレーを用いてリレーユニット10全体で遮断を実行し得る。   Further, in the relay unit 10 according to the first embodiment, when energization control is performed, the at least one relay is determined after it is determined that at least some of the relays other than the relay that is finally switched to the energized state are not stuck. Control is performed so that a plurality of relays other than the at least some of the relays are switched to the energized state. With such a configuration, even if the relay unit 10 of the first embodiment is stuck, the relay unit 10 as a whole can be blocked using another relay.

また、第1の実施形態に係るリレーユニット10は、ヒューズ20を備えているので、過大な電流の通電を遮断し得る。したがって、リレーユニット10は、複数のリレー19のすべてに固着が発生したとしても、ヒューズ20が切れることにより、リレーユニット10全体の遮断の確実性を向上し得る。   Moreover, since the relay unit 10 according to the first embodiment includes the fuse 20, it is possible to cut off the energization of an excessive current. Therefore, even if the relay unit 10 is fixed to all of the plurality of relays 19, the fuse 20 is blown to improve the reliability of the interruption of the entire relay unit 10.

次に、本発明の第2の実施形態に係るリレーユニットについて説明する。第2の実施形態ではコントローラ22による制御が第1の実施形態と異なっている。以下に、第1の実施形態と異なる点を中心に第2の実施形態について説明する。なお、第1の実施形態と同じ構成を有する部位には同じ符号を付す。   Next, a relay unit according to the second embodiment of the present invention will be described. In the second embodiment, the control by the controller 22 is different from that in the first embodiment. The second embodiment will be described below with a focus on differences from the first embodiment. In addition, the same code | symbol is attached | subjected to the site | part which has the same structure as 1st Embodiment.

図1に示すように、第2の実施形態に係るリレーユニット10は、複数のリレー19、ヒューズ20、複数の電圧センサ21、およびコントローラ22を含んでいる。複数のリレー19、ヒューズ20、および複数の電圧センサ21の構成および機能は、第1の実施形態と同じである。コントローラ22の構成は、第1の実施形態と同じである。   As shown in FIG. 1, the relay unit 10 according to the second embodiment includes a plurality of relays 19, fuses 20, a plurality of voltage sensors 21, and a controller 22. The configurations and functions of the plurality of relays 19, the fuse 20, and the plurality of voltage sensors 21 are the same as those in the first embodiment. The configuration of the controller 22 is the same as that of the first embodiment.

コントローラ22は、第1の実施形態と同じく、取得した情報に基づいて、複数のリレー19それぞれの通電状態と遮断状態との切替え制御を実行可能である。コントローラ22は、第1の実施形態と同じく複数のリレー19の一部ずつを順番に遮断状態から通電状態に切替える通電制御を実行し得る。コントローラ22は、第1の実施形態と同じく、複数のリレー19の一部ずつを順番に通電状態から遮断状態に切替える遮断制御を実行し得る。   As in the first embodiment, the controller 22 can perform switching control between the energized state and the disconnected state of each of the plurality of relays 19 based on the acquired information. As in the first embodiment, the controller 22 can execute energization control that sequentially switches a part of each of the plurality of relays 19 from the cutoff state to the energized state. As in the first embodiment, the controller 22 can execute a cutoff control that sequentially switches a part of the plurality of relays 19 from the energized state to the disconnected state.

コントローラ22は、第1の実施形態と類似して、通電制御における最後の通電状態への切替えと、遮断制御における最初の遮断状態への切替えとを、複数のリレー19の中で分散させるように、複数のリレー19を制御する。以下に、第2の実施形態における、コントローラ22による切替えの分散について、説明する。   Similar to the first embodiment, the controller 22 distributes the switching to the last energization state in the energization control and the switching to the first interruption state in the interruption control among the plurality of relays 19. The plurality of relays 19 are controlled. The distribution of switching by the controller 22 in the second embodiment will be described below.

例えば、コントローラ22は、通電制御において最後に通電状態に切替えたリレーと異なるリレーに対して、当該通電制御の次回の通電制御における最後の遮断状態への切替えを行うように制御する。第2の実施形態においては、コントローラ22は、通電制御において第1のリレー23を最後に通電状態に切替える場合は、次回の通電制御において第2のリレー24を最後に通電状態に切替えるように制御する。また、コントローラ22は、通電制御において第2のリレー24を最後に通電状態に切替える場合は、次回の通電制御において第1のリレー23を最後に通電状態に切替えるように制御する。   For example, the controller 22 controls a relay different from the relay that was last switched to the energized state in the energization control so as to switch to the last cut-off state in the next energization control of the energization control. In the second embodiment, when the first relay 23 is finally switched to the energized state in the energization control, the controller 22 performs control so that the second relay 24 is finally switched to the energized state in the next energization control. To do. In addition, when the second relay 24 is finally switched to the energized state in the energization control, the controller 22 performs control so that the first relay 23 is finally switched to the energized state in the next energization control.

また、例えば、コントローラ22は、遮断制御において最初に遮断状態に切替えたリレーと異なるリレーに対して、当該遮断制御の次回の遮断制御における最後の通電状態への切替えを行うように制御する。第1の実施形態においては、コントローラ22は、遮断制御において第1のリレー23を最初に遮断状態に切替える場合は、次回の遮断制御において第2のリレー24を最初に遮断状態に切替えるように制御する。また、コントローラ22は、遮断制御において第2のリレー24を最初に遮断状態に切替える場合は、次回の遮断制御において第1のリレー23を最初に遮断状態に切替えるように制御する。   Further, for example, the controller 22 controls the relay different from the relay first switched to the cutoff state in the cutoff control so as to switch to the last energized state in the next cutoff control of the cutoff control. In the first embodiment, when switching the first relay 23 to the cutoff state first in the cutoff control, the controller 22 controls the second relay 24 to switch to the cutoff state first in the next cutoff control. To do. In addition, when the second relay 24 is first switched to the cutoff state in the cutoff control, the controller 22 controls the first relay 23 to be switched to the cutoff state first in the next cutoff control.

また、コントローラ22は、第1の実施形態と同じく、通電制御を実行する場合、当該通電制御において最後に通電状態に切替えるリレー以外の少なくとも一部のリレーに固着が発生しているか否かの判別に基づいて、通電制御の続行の可否を判別してよい。   Similarly to the first embodiment, when the controller 22 executes energization control, the controller 22 determines whether or not at least some of the relays other than the relay that is finally switched to the energized state in the energization control are stuck. Based on the above, it may be determined whether or not the energization control can be continued.

コントローラ22は、第1の実施形態と同じく、車両が音を発する時に、遮断制御における最初のリレーの遮断状態への切替えのための制御を実行する。また、コントローラ22は、第1の実施形態と同様に、車両から搭乗者が離れていることを推定した時に、遮断制御における最初のリレーの遮断状態への切替えのための制御を実行する。また、コントローラ22は、第1の実施形態と同様に、車両が音を発する時に、通電制御におけるリレーの固着の発生の有無の判別を実行する。   As in the first embodiment, the controller 22 executes control for switching the first relay to the cutoff state in the cutoff control when the vehicle emits sound. Similarly to the first embodiment, the controller 22 executes control for switching the first relay to the cutoff state in the cutoff control when it is estimated that the passenger is away from the vehicle. Similarly to the first embodiment, the controller 22 determines whether or not the relay is stuck in the energization control when the vehicle emits sound.

次に、第2の実施形態において、コントローラ22が実行する通電制御について、図4のフローチャートを用いて説明する。コントローラ22は、外部機器から通電制御を実行する指令を取得する場合に、通電制御を開始する。なお、コントローラ22は、当該指令の取得後に、さらに、車両が音を発している場合に通電制御を開始してよい。   Next, energization control executed by the controller 22 in the second embodiment will be described with reference to the flowchart of FIG. The controller 22 starts energization control when acquiring a command to execute energization control from an external device. The controller 22 may start energization control when the vehicle is making a sound after obtaining the command.

ステップS300において、コントローラ22は、第1のリレー23および第2のリレー24の中で、最後に通電状態に切替えるべき一方のリレーを認識する。なお、コントローラ22は、例えば、コントローラ22に内蔵または接続されるメモリから、最後に切替える一方のリレーを読出すことにより、当該リレーを認識する。最後に切替えるべきリレーを認識後、プロセスはステップS301に進む。   In step S300, the controller 22 recognizes one of the first relay 23 and the second relay 24 that should be switched to the energized state last. For example, the controller 22 recognizes the relay by reading one of the relays to be switched last from a memory built in or connected to the controller 22. After recognizing the relay to be switched last, the process proceeds to step S301.

ステップS301では、コントローラ22は、ステップS300において認識された一方のリレーに対する他方のリレーを通電状態に切替えるように制御する。さらに、コントローラ22は、通電状態への切替え制御後に、他方のリレーに対応する電圧センサが検出する電圧値を取得する。電圧値の取得後、プロセスはステップS302に進む。   In step S301, the controller 22 controls the other relay recognized in step S300 to switch to the energized state. Furthermore, the controller 22 acquires the voltage value detected by the voltage sensor corresponding to the other relay after the switching control to the energized state. After obtaining the voltage value, the process proceeds to step S302.

ステップS302では、コントローラ22は、ステップS300において通電状態に切替えた他方のリレーを、遮断状態に切替えるように制御する。さらに、コントローラ22は、遮断状態への切替え制御後に、他方のリレーに対応する電圧センサが検出する電圧値を取得する。電圧値の取得後、プロセスはステップS303に進む。   In step S302, the controller 22 controls the other relay that has been switched to the energized state in step S300 to be switched to the cut-off state. Furthermore, the controller 22 acquires the voltage value detected by the voltage sensor corresponding to the other relay after the switching control to the cutoff state. After obtaining the voltage value, the process proceeds to step S303.

ステップS303では、コントローラ22は、ステップS301およびステップS302において取得した電圧値の差分の絶対値が所定値未満であるか否かを判別する。電圧値の差分の絶対値が所定値未満である場合、プロセスはステップS304に進む。電圧値の差分の絶対値が所定値未満で無い場合、通電制御は終了する。   In step S303, the controller 22 determines whether or not the absolute value of the difference between the voltage values acquired in steps S301 and S302 is less than a predetermined value. If the absolute value of the voltage value difference is less than the predetermined value, the process proceeds to step S304. When the absolute value of the voltage value difference is not less than the predetermined value, the energization control ends.

ステップS304では、コントローラ22は、ステップS302において遮断状態に切替えた他方のリレー24を、通電状態に切替えるように制御する。制御後、プロセスはステップS305に進む。   In step S304, the controller 22 controls the other relay 24 switched to the cutoff state in step S302 to switch to the energized state. After control, the process proceeds to step S305.

ステップS305では、コントローラ22は、ステップS300において認識された一方のリレーを通電状態に切替えるように制御する。制御後、プロセスはステップS306に進む。   In step S305, the controller 22 controls one of the relays recognized in step S300 to be switched to the energized state. After control, the process proceeds to step S306.

ステップS306では、コントローラ22は、次回の通電制御において最後に通電状態に切替えるべきリレーを、ステップS304において通電状態に切替えた他方のリレーに決定する。コントローラ22は、例えばメモリに決定したリレーを記憶させる。決定後、通電制御は終了する。   In step S306, the controller 22 determines the relay to be finally switched to the energized state in the next energization control as the other relay that has been switched to the energized state in step S304. For example, the controller 22 stores the determined relay in a memory. After the determination, the energization control ends.

次に、第2の実施形態において、コントローラ22が実行する遮断制御について、図5のフローチャートを用いて説明する。コントローラ22は、外部機器から遮断制御を実行する指令を取得する場合に、遮断制御を開始する。   Next, the interruption control executed by the controller 22 in the second embodiment will be described with reference to the flowchart of FIG. The controller 22 starts the cutoff control when acquiring a command to execute the cutoff control from an external device.

ステップS400において、コントローラ22は、第1のリレー23および第2のリレー24の中で、最初に遮断状態に切替えるべき一方のリレーを認識する。なお、コントローラ22は、例えば、コントローラ22に内蔵または接続されるメモリから、最初に切替える一方のリレーを読出すことにより、当該リレーを認識する。最初に切替えるべきリレーを認識後、プロセスはステップS401に進む。   In step S <b> 400, the controller 22 recognizes one of the first relay 23 and the second relay 24 that should be switched to the cutoff state first. For example, the controller 22 recognizes the relay by reading one of the relays to be switched first from a memory built in or connected to the controller 22. After recognizing the relay to be switched first, the process proceeds to step S401.

ステップS401では、コントローラ22は、ステップS400において認識された一方のリレーを遮断状態に切替えるように制御する。制御後、プロセスはステップS402に進む。   In step S401, the controller 22 controls one of the relays recognized in step S400 to be switched to the cutoff state. After control, the process proceeds to step S402.

ステップS402では、コントローラ22は、ステップS400において認識された一方のリレーに対する他方のリレーを遮断状態に切替えるように制御する。制御後、プロセスはステップS403に進む。   In step S402, the controller 22 controls the other relay recognized in step S400 to switch the other relay to the cut-off state. After control, the process proceeds to step S403.

ステップS403では、コントローラ22は、次回の遮断制御において最初に遮断状態に切替えるべきリレーを、ステップS402において遮断状態に切替えた他方のリレーに決定する。コントローラ22は、例えばメモリに決定したリレーを記憶させる。決定後、遮断制御は終了する。   In step S403, the controller 22 determines the relay to be switched to the cutoff state first in the next cutoff control as the other relay switched to the cutoff state in step S402. For example, the controller 22 stores the determined relay in a memory. After the determination, the shutoff control ends.

以上のような第2の実施形態に係るリレーユニット10においても、コントローラ22は、通電制御において最後に通電状態へ切替えるリレーと、遮断制御において最初に遮断状態への切替えるリレーとを、複数のリレー19の中で分散させるように、制御する。したがって、第2の実施形態のリレーユニット10も、個々のリレーの故障の可能性を低減し得る。また、第2の実施形態に係るリレーユニット10においても、通電制御を実行する場合、最後に通電状態に切替えるリレー以外の少なくとも一部のリレーに固着が発生していないことを判別した後に、当該少なくとも一部のリレーを通電状態に切替えるように制御した後に、当該少なくとも一部のリレー以外の複数のリレー19を通電状態に切替えるよう制御を実行する。このような構成により、第2の実施形態のリレーユニット10も、固着が発生しても、他のリレーを用いてリレーユニット10全体で遮断を実行し得る。また、第2の実施形態に係るリレーユニット10も、ヒューズ20を備えているので、過大な電流の通電を遮断し得る。したがって、第2の実施形態のリレーユニット10も、ヒューズ20が切れることにより、リレーユニット10全体の遮断の確実性を向上し得る。   Also in the relay unit 10 according to the second embodiment as described above, the controller 22 includes a plurality of relays including a relay that finally switches to the energized state in the energization control and a relay that first switches to the interrupted state in the disconnection control. It controls so that it may distribute in 19. Therefore, the relay unit 10 of the second embodiment can also reduce the possibility of failure of individual relays. Also, in the relay unit 10 according to the second embodiment, when energization control is performed, after determining that at least some of the relays other than the relay that is finally switched to the energized state are not stuck, After controlling to switch at least some of the relays to the energized state, control is performed to switch a plurality of relays 19 other than the at least some of the relays to the energized state. With such a configuration, even when the relay unit 10 of the second embodiment is stuck, the relay unit 10 as a whole can be blocked using another relay. Moreover, since the relay unit 10 according to the second embodiment also includes the fuse 20, it is possible to cut off the energization of an excessive current. Therefore, the relay unit 10 of the second embodiment can also improve the reliability of the interruption of the entire relay unit 10 by cutting the fuse 20.

本発明は、その精神又はその本質的な特徴から離れることなく、上述した実施形態以外の他の所定の形態で実現できることは当業者にとって明白である。したがって、先の記述は例示的なものであり、これに限定されるものではない。発明の範囲は、先の記述によってではなく、付加した請求項によって定義される。あらゆる変更のうちその均等の範囲内にあるいくつかの変更は、その中に包含されるものとする。   It will be apparent to those skilled in the art that the present invention can be realized in other predetermined forms other than the above-described embodiments without departing from the spirit or essential characteristics thereof. Accordingly, the foregoing description is illustrative and not restrictive. The scope of the invention is defined by the appended claims rather than by the foregoing description. Some of all changes that fall within the equivalent scope shall be included therein.

例えば、第1の実施形態において、コントローラ22は、通電制御において第2のリレー24、第1のリレー23の順番に通電状態に切替え、かつ遮断制御においても第2のリレー24、第1のリレー23の順番に遮断状態に切替えているが、この順番に限定されない。コントローラ22は、例えば、通電制御において第1のリレー23、第2のリレー24の順番に通電状態に切替え、かつ遮断制御においても第1のリレー23、第2のリレー24の順番に遮断状態に切替えてよい。すなわち、コントローラ22は、通電制御において第2のリレー23を最後に通電状態に切替え、次の遮断制御において第1のリレー23を最初に遮断状態に切替えるように制御してよい。また、コントローラ22は、遮断制御において第1のリレー23を最初に遮断状態に切替え、次の通電制御において第2のリレー24を最後に通電状態に切替えるように制御してよい。   For example, in the first embodiment, the controller 22 switches to the energized state in the order of the second relay 24 and the first relay 23 in the energization control, and the second relay 24 and the first relay also in the cutoff control. Although it is switched to the shut-off state in the order of 23, it is not limited to this order. For example, the controller 22 switches to the energized state in the order of the first relay 23 and the second relay 24 in the energization control, and also switches to the disconnected state in the order of the first relay 23 and the second relay 24 in the disconnection control. You may switch. That is, the controller 22 may perform control so that the second relay 23 is finally switched to the energized state in the energization control, and the first relay 23 is first switched to the disconnected state in the next disconnection control. Further, the controller 22 may perform control so that the first relay 23 is first switched to the cut-off state in the cut-off control, and the second relay 24 is finally switched to the turn-on state in the next energization control.

あるいは、コントローラ22が、直近の通電制御において最後に通電状態へ切替えたリレーに基づいて、遮断制御において最初に遮断状態へ切替えるリレーを判別してもよい。また、コントローラ22が、直近の遮断制御において最初に遮断状態へ切替えたリレーに基づいて、通電制御において最後に通電状態へ切替えるリレーを判別してもよい。   Alternatively, the controller 22 may determine the relay that is first switched to the cut-off state in the cut-off control, based on the relay that was last switched to the energized state in the most recent energization control. Further, the controller 22 may determine the relay that is finally switched to the energized state in the energization control based on the relay that is first switched to the interrupted state in the most recent disconnection control.

切替えるリレーの判別を行なう構成において、コントローラ22は、第1の実施形態の変形例として、例えば、以下に説明する、図6および図7に示すフローチャートにそれぞれ示す、通電制御および遮断制御を実行する。   In the configuration for determining the relay to be switched, the controller 22 executes, for example, energization control and cutoff control shown in the flowcharts shown in FIGS. 6 and 7 described below as a modification of the first embodiment. .

図6に示すように、第1の実施形態の変形例における通電制御では、ステップS500において、直近の遮断制御において最初に遮断状態に切替えたリレーが第1のリレー23であるか否かを判別する。最初に遮断状態に切替えたリレーが第1のリレー23である場合、プロセスはステップS501進む。最初に遮断状態に切替えたリレーが第1のリレー23でない場合、プロセスはステップS506に進む。   As shown in FIG. 6, in the energization control in the modified example of the first embodiment, in step S500, it is determined whether or not the relay first switched to the cutoff state in the latest cutoff control is the first relay 23. To do. If the first relay 23 switched to the cut-off state is the first relay 23, the process proceeds to step S501. If the relay first switched to the cut-off state is not the first relay 23, the process proceeds to step S506.

ステップS501では、コントローラ22は、第1のリレー23を通電状態に切替えるように制御する。さらに、コントローラ22は、通電状態への切替え制御後に、第1の電圧センサ25が検出する電圧値を取得する。電圧値の取得後、プロセスはステップS502に進む。   In step S501, the controller 22 controls the first relay 23 to switch to the energized state. Furthermore, the controller 22 acquires the voltage value detected by the first voltage sensor 25 after the switching control to the energized state. After obtaining the voltage value, the process proceeds to step S502.

ステップS502では、コントローラ22は、ステップS501において通電状態に切替えた第1のリレー23を、遮断状態に切替えるように制御する。さらに、コントローラ22は、遮断状態への切替え制御後に、第1の電圧センサ25が検出する電圧値を取得する。電圧値の取得後、プロセスはステップS503に進む。   In step S502, the controller 22 controls the first relay 23 that has been switched to the energized state in step S501 so as to be switched to the cutoff state. Furthermore, the controller 22 acquires the voltage value detected by the first voltage sensor 25 after the switching control to the cutoff state. After obtaining the voltage value, the process proceeds to step S503.

ステップS503では、コントローラ22は、ステップS501およびステップS502において取得した電圧値の差分の絶対値が所定値未満であるか否かを判別する。電圧値の差分の絶対値が所定値未満である場合、プロセスはステップS504に進む。電圧値の差分の絶対値が所定値未満で無い場合、通電制御は終了する。   In step S503, the controller 22 determines whether or not the absolute value of the difference between the voltage values acquired in steps S501 and S502 is less than a predetermined value. If the absolute value of the voltage value difference is less than the predetermined value, the process proceeds to step S504. When the absolute value of the voltage value difference is not less than the predetermined value, the energization control ends.

ステップS504では、コントローラ22は、ステップS502において遮断状態に切替えた第1のリレー23を、通電状態に切替えるように制御する。制御後、プロセスはステップS505に進む。   In step S504, the controller 22 controls the first relay 23 switched to the cutoff state in step S502 to switch to the energized state. After control, the process proceeds to step S505.

ステップS505では、コントローラ22は、第2のリレー24を通電状態に切替えるように制御する。制御後、通電制御は終了する。   In step S505, the controller 22 controls the second relay 24 to switch to the energized state. After the control, the energization control ends.

ステップS500において最初に遮断状態に切替えたリレーが第1のリレー23でないと判別する場合に進む、ステップS506では、コントローラ22は、第2のリレー24を通電状態に切替えるように制御する。さらに、コントローラ22は、通電状態への切替え制御後に、第2の電圧センサ26が検出する電圧値を取得する。電圧値の取得後、プロセスはステップS507に進む。   In step S506, the controller 22 performs control so that the second relay 24 is switched to the energized state. The controller 22 proceeds to the case where it is determined that the relay that is first switched to the cutoff state in step S500 is not the first relay 23. Furthermore, the controller 22 acquires the voltage value detected by the second voltage sensor 26 after the switching control to the energized state. After obtaining the voltage value, the process proceeds to step S507.

ステップS507では、コントローラ22は、ステップS506において通電状態に切替えた第2のリレー24を、遮断状態に切替えるように制御する。さらに、コントローラ22は、遮断状態への切替え制御後に、第2の電圧センサ26が検出する電圧値を取得する。電圧値の取得後、プロセスはステップS508に進む。   In step S507, the controller 22 controls the second relay 24 that has been switched to the energized state in step S506 so as to be switched to the cutoff state. Furthermore, the controller 22 acquires the voltage value detected by the second voltage sensor 26 after the switching control to the cutoff state. After obtaining the voltage value, the process proceeds to step S508.

ステップS508では、コントローラ22は、ステップS506およびステップS507において取得した電圧値の差分の絶対値が所定値未満であるか否かを判別する。電圧値の差分の絶対値が所定値未満である場合、プロセスはステップS509に進む。電圧値の差分の絶対値が所定値未満で無い場合、通電制御は終了する。   In step S508, the controller 22 determines whether or not the absolute value of the difference between the voltage values acquired in steps S506 and S507 is less than a predetermined value. If the absolute value of the voltage value difference is less than the predetermined value, the process proceeds to step S509. When the absolute value of the voltage value difference is not less than the predetermined value, the energization control ends.

ステップS509では、コントローラ22は、ステップS507において遮断状態に切替えた第2のリレー24を、通電状態に切替えるように制御する。制御後、プロセスはステップS510に進む。   In step S509, the controller 22 controls the second relay 24 switched to the cut-off state in step S507 so as to switch to the energized state. After control, the process proceeds to step S510.

ステップS510では、コントローラ22は、第1のリレー23を通電状態に切替えるように制御する。制御後、通電制御は終了する。   In step S510, the controller 22 controls the first relay 23 to switch to the energized state. After the control, the energization control ends.

図7に示すように、第1の実施形態の変形例における遮断制御では、ステップS600において、コントローラ22は、コントローラ22は、直近の通電制御において最後に通電状態に切替えたリレーが第1のリレー23であるか否かを判別する。最後に通電状態に切替えたリレーが第1のリレー23である場合、プロセスはステップS601進む。最後に通電状態に切替えたリレーが第1のリレー23でない場合、プロセスはステップS603に進む。   As shown in FIG. 7, in the shut-off control in the modification of the first embodiment, in step S600, the controller 22 is the first relay in which the controller 22 is the last relay switched to the energized state in the most recent energization control. It is determined whether or not it is 23. If the relay that was last switched to the energized state is the first relay 23, the process proceeds to step S601. If the relay that was last switched to the energized state is not the first relay 23, the process proceeds to step S603.

ステップS601では、コントローラ22は、第2のリレー24を通電状態から遮断状態に切替えるように制御する。制御後、プロセスはステップS602に進む。   In step S601, the controller 22 controls the second relay 24 to switch from the energized state to the disconnected state. After control, the process proceeds to step S602.

ステップS602では、コントローラ22は、第1のリレー23を通電状態から遮断状態に切替えるように制御する。遮断状態への切替えの制御後に、遮断制御は終了する。   In step S602, the controller 22 controls the first relay 23 to switch from the energized state to the disconnected state. After the control for switching to the shut-off state, the shut-off control ends.

ステップS600において最後に通電状態に切替えたリレーが第1のリレー23でないと判別する場合に進む、ステップS603では、コントローラ22は、第1のリレー23を社団状態に切替えるように制御する。制御後、プロセスはステップS604に進む。   In step S603, the controller 22 performs control so that the first relay 23 is switched to the corporate state. The controller 22 proceeds to the case where it is determined that the relay that is finally switched to the energized state in step S600 is not the first relay 23. After control, the process proceeds to step S604.

ステップS604では、コントローラ22は、第2のリレー24を通電状態から遮断状態に切替えるように制御する。遮断状態への切替えの制御後に、遮断制御は終了する。   In step S604, the controller 22 controls the second relay 24 to switch from the energized state to the disconnected state. After the control for switching to the shut-off state, the shut-off control ends.

また、第2の実施形態において、コントローラ22は通電制御において最後に切替えるべき一方のリレーおよび遮断制御において最初に切替えるべきリレーをメモリから読出すことにより認識する構成であるが、このような構成に限定されない。例えば、コントローラ22が、通電制御において最後に切替えるべきリレーおよび遮断制御において最初に切替えるべきリレーを判別してもよい。   In the second embodiment, the controller 22 is configured to recognize one relay to be switched last in the energization control and the relay to be switched first in the cutoff control by reading from the memory. It is not limited. For example, the controller 22 may determine the relay to be switched last in the energization control and the relay to be switched first in the cutoff control.

切替えるリレーの判別を行なう構成において、コントローラ22は、第2の実施形態の変形例として、例えば、以下に説明する、図8および図9に示すフローチャートにそれぞれ示す、通電制御および遮断制御を実行する。   In the configuration for determining the relay to be switched, the controller 22 executes, for example, energization control and cutoff control shown in the flowcharts shown in FIGS. 8 and 9 described below as modifications of the second embodiment. .

図8に示すように、第2の実施形態の変形例における通電制御では、ステップS700において、コントローラ22は、前回の通電制御において最後に通電状態に切替えたリレーが第1のリレー23であるか否かを判別する。最後に通電状態に切替えたリレーが第1のリレー23である場合、プロセスはステップS701進む。最後に通電状態に切替えたリレーが第1のリレー23でない場合、プロセスはステップS706に進む。   As shown in FIG. 8, in the energization control in the modification of the second embodiment, in step S700, the controller 22 determines whether the relay that was last switched to the energized state in the previous energization control is the first relay 23. Determine whether or not. If the relay that was last switched to the energized state is the first relay 23, the process proceeds to step S701. If the relay that was last switched to the energized state is not the first relay 23, the process proceeds to step S706.

ステップS701からS710では、コントローラ22は、第1の実施形態の変形例の通電制御(図6参照)におけるステップS501からS510と同じ制御を行う。   In Steps S701 to S710, the controller 22 performs the same control as Steps S501 to S510 in the energization control (see FIG. 6) of the modification of the first embodiment.

図9に示すように、第2の実施形態の変形例における遮断制御では、ステップS800において、コントローラ22は、前回の遮断制御において最初に遮断状態に切替えたリレーが第1のリレー23であるか否かを判別する。最初に遮断状態に切替えたリレーが第1のリレー23である場合、プロセスはステップS801進む。最初に遮断状態に切替えたリレーが第1のリレー23でない場合、プロセスはステップS803に進む。   As shown in FIG. 9, in the cutoff control in the modification of the second embodiment, in step S800, the controller 22 determines whether the relay first switched to the cutoff state in the previous cutoff control is the first relay 23. Determine whether or not. If the first relay 23 switched to the cut-off state is the first relay 23, the process proceeds to step S801. If the relay first switched to the cut-off state is not the first relay 23, the process proceeds to step S803.

ステップS801からS804では、コントローラ22は、第1の実施形態の変形例の遮断制御(図7参照)におけるステップS601からS604と同じ制御を行う。   In Steps S801 to S804, the controller 22 performs the same control as Steps S601 to S604 in the cutoff control (see FIG. 7) of the modification of the first embodiment.

10 リレーユニット
11 電池装置
12 回生蓄電システム
13 ISG(Integrated Starter Generator)
14 スタータ
15 鉛蓄電池
16 電装品
17 供給用リレー
18 組電池
19 複数のリレー
20 ヒューズ
21 複数の電圧センサ
22 コントローラ
13 第1のリレー
24 第2のリレー
25 第1の電圧センサ
26 第2の電圧センサ
DESCRIPTION OF SYMBOLS 10 Relay unit 11 Battery apparatus 12 Regenerative electrical storage system 13 ISG (Integrated Starter Generator)
DESCRIPTION OF SYMBOLS 14 Starter 15 Lead acid battery 16 Electrical component 17 Supply relay 18 Assembly battery 19 Multiple relay 20 Fuse 21 Multiple voltage sensor 22 Controller 13 1st relay 24 2nd relay 25 1st voltage sensor 26 2nd voltage sensor

Claims (6)

互いに直列に接続される複数のリレーと、
前記複数のリレーそれぞれの遮断状態と通電状態との切替え制御を実行可能であり、前記複数のリレーを順番に前記遮断状態から前記通電状態に切替える通電制御において最後に前記通電状態へ切替えるリレーと、前記複数のリレーを前記通電状態から前記遮断状態に切替える遮断制御において最初に前記遮断状態へ切替えるリレーとを、前記複数のリレーの中で分散させるように制御するコントローラと、を備え
前記コントローラは、前記通電制御を実行する場合、前記複数のリレーの中で最後に通電状態に切替えるリレー以外の少なくとも一部のリレーに固着が発生しているか否かを判別し、固着が発生していないと判別するとき、該少なくとも一部のリレーを遮断状態から通電状態に切替えるよう制御した後に、該少なくとも一部のリレー以外の前記複数のリレーを通電状態に切替えるよう制御する
リレーユニット。
A plurality of relays connected in series with each other;
A switching control between the cut-off state and the energized state of each of the plurality of relays is possible, and the relay that finally switches to the energized state in the energization control for switching the plurality of relays from the cut-off state to the energized state in order, A controller that controls the first relay to be switched to the shut-off state in the shut-off control for switching the plurality of relays from the energized state to the shut-off state ;
When performing the energization control, the controller determines whether at least some of the plurality of relays other than the relay that is finally switched to the energized state are stuck, and the sticking occurs. A relay unit that controls to switch the plurality of relays other than the at least some of the relays to the energized state after controlling to switch the at least some of the relays from the cut-off state to the energized state when it is determined that they are not .
請求項1に記載のリレーユニットにおいて、
前記コントローラは、前記遮断制御における最初の遮断状態への切替えを、直近の前記通電制御において最後に通電状態へ切替えたリレーと異なるリレーに対して行うように制御する
リレーユニット。
The relay unit according to claim 1,
The controller controls the switching to the first cutoff state in the cutoff control to be performed on a relay different from the relay that was last switched to the energized state in the latest energization control.
請求項1または2に記載のリレーユニットにおいて、
前記コントローラは、前記通電制御における最後の通電状態への切替えを、直近の前記遮断制御において最初に遮断状態へ切替えたリレーと異なるリレーに対して行うように制御する
リレーユニット。
The relay unit according to claim 1 or 2,
The controller controls the switching to the last energized state in the energization control to a relay different from the relay that was first switched to the interrupted state in the most recent interruption control.
請求項1から3のいずれか1項に記載のリレーユニットにおいて、
前記コントローラは、前記通電制御において最後に通電状態に切替えたリレーと異なるリレーに対して、該通電制御の次回の前記通電制御において最後に通電状態へ切替えるように制御する
リレーユニット。
The relay unit according to any one of claims 1 to 3,
The controller controls a relay different from the relay that was last switched to the energized state in the energization control so that the relay is finally switched to the energized state in the next energization control of the energization control.
請求項1から4のいずれか1項に記載のリレーユニットにおいて、
前記コントローラは、前記遮断制御において最初に遮断状態に切替えたリレーと異なるリレーに対して、該遮断制御の次回の前記遮断制御において最初に遮断状態へ切替えるように制御する
リレーユニット。
In the relay unit according to any one of claims 1 to 4,
The controller controls a relay different from the relay that is first switched to the cutoff state in the cutoff control so that the relay is first switched to the cutoff state in the next cutoff control of the cutoff control.
組電池と、
前記組電池に直列に接続され、互いに直列に接続される複数のリレーと、
前記複数のリレーそれぞれの遮断状態と通電状態との切替え制御を実行可能であり、前記複数のリレーを順番に前記遮断状態から前記通電状態に切替える通電制御において最後に前記通電状態へ切替えるリレーと、前記複数のリレーを前記通電状態から前記遮断状態に切替える遮断制御において最初に前記遮断状態へ切替えるリレーとを、前記複数のリレーの中で分散させるように制御するコントローラと、を備え、
前記コントローラは、前記通電制御を実行する場合、前記複数のリレーの中で最後に通電状態に切替えるリレー以外の少なくとも一部のリレーに固着が発生しているか否かを判別し、固着が発生していないと判別するとき、該少なくとも一部のリレーを遮断状態から通電状態に切替えるよう制御した後に、該少なくとも一部のリレー以外の前記複数のリレーを通電状態に切替えるよう制御する
電池装置。
An assembled battery;
A plurality of relays connected in series to the battery pack and connected in series with each other;
A switching control between the cut-off state and the energized state of each of the plurality of relays is possible, and the relay that finally switches to the energized state in the energization control for switching the plurality of relays from the cut-off state to the energized state in order, A controller that controls the first relay to be switched to the shut-off state in the shut-off control for switching the plurality of relays from the energized state to the shut-off state;
When performing the energization control, the controller determines whether at least some of the plurality of relays other than the relay that is finally switched to the energized state are stuck, and the sticking occurs. When it is determined that the relays are not, the control is performed so that the at least some relays are switched from the cut-off state to the energized state, and then the plurality of relays other than the at least some relays are switched to the energized state. Battery device.
JP2017163653A 2017-08-28 2017-08-28 Relay unit and battery device Active JP6383848B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017163653A JP6383848B1 (en) 2017-08-28 2017-08-28 Relay unit and battery device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017163653A JP6383848B1 (en) 2017-08-28 2017-08-28 Relay unit and battery device

Publications (2)

Publication Number Publication Date
JP6383848B1 true JP6383848B1 (en) 2018-08-29
JP2019040815A JP2019040815A (en) 2019-03-14

Family

ID=63354788

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017163653A Active JP6383848B1 (en) 2017-08-28 2017-08-28 Relay unit and battery device

Country Status (1)

Country Link
JP (1) JP6383848B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020123452A (en) * 2019-01-29 2020-08-13 マレリ株式会社 Relay device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003514361A (en) * 1999-11-12 2003-04-15 ピルツ ゲーエムベーハー アンド コー. Safety switching device for connection and safe disconnection of electric loads, in particular electric drives
JP2004014242A (en) * 2002-06-05 2004-01-15 Toyota Motor Corp Power supply control system
JP2006338924A (en) * 2005-05-31 2006-12-14 Yamatake Corp Contact-driving device and method thereof
JP2007035388A (en) * 2005-07-26 2007-02-08 Yaskawa Electric Corp Power supply device of automatic machine

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003514361A (en) * 1999-11-12 2003-04-15 ピルツ ゲーエムベーハー アンド コー. Safety switching device for connection and safe disconnection of electric loads, in particular electric drives
JP2004014242A (en) * 2002-06-05 2004-01-15 Toyota Motor Corp Power supply control system
JP2006338924A (en) * 2005-05-31 2006-12-14 Yamatake Corp Contact-driving device and method thereof
JP2007035388A (en) * 2005-07-26 2007-02-08 Yaskawa Electric Corp Power supply device of automatic machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020123452A (en) * 2019-01-29 2020-08-13 マレリ株式会社 Relay device
JP7103965B2 (en) 2019-01-29 2022-07-20 マレリ株式会社 Relay device

Also Published As

Publication number Publication date
JP2019040815A (en) 2019-03-14

Similar Documents

Publication Publication Date Title
JP5977855B1 (en) Vehicle power supply
KR101863737B1 (en) Electric power storage system
JP6467451B2 (en) Vehicle power supply
CN107696865B (en) Controlled precharge circuit arrangement
JP5019571B2 (en) Vehicle load control system
JP7119401B2 (en) FAILURE DIAGNOSIS DEVICE, POWER STORAGE DEVICE, FAILURE DIAGNOSIS METHOD
CN103098298A (en) Battery temperature control device
JP6691502B2 (en) Vehicle power supply
CN107696864B (en) Pre-charging a load with a main contactor coil
JP2007159326A (en) Power supply controller
KR20180122685A (en) Power system and control method thereof
EP2250050A1 (en) Electrical system for a motor vehicle and method for control of a starter motor and a battery isolator in such an electrical system
JP6646703B2 (en) Power supply for vehicles
JP2015023762A (en) Power storage system
JP6860421B2 (en) Vehicle power supply
JP2018037193A (en) Temperature raising system of battery
JP5787176B2 (en) Vehicle power supply control device
JP5736974B2 (en) Battery failure judgment device
JP6383848B1 (en) Relay unit and battery device
JP6859210B2 (en) Relay unit and battery device
JP6793156B2 (en) Vehicle power supply
JP4259348B2 (en) Power supply circuit control device
JP6648217B2 (en) Switch unit and battery device
JP2008253048A (en) Vehicle start controller
JP2017119454A (en) Power supply management device and abnormality detection method

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180608

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180626

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20180713

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180806

R150 Certificate of patent or registration of utility model

Ref document number: 6383848

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S343 Written request for registration of root pledge or change of root pledge

Free format text: JAPANESE INTERMEDIATE CODE: R316354

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

SZ02 Written request for trust registration

Free format text: JAPANESE INTERMEDIATE CODE: R316Z02

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S803 Written request for registration of cancellation of provisional registration

Free format text: JAPANESE INTERMEDIATE CODE: R316803

SZ02 Written request for trust registration

Free format text: JAPANESE INTERMEDIATE CODE: R316Z02

SZ03 Written request for cancellation of trust registration

Free format text: JAPANESE INTERMEDIATE CODE: R316Z03

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350