JP6299825B2 - Equilibrium balancing weight device, construction tool for balancing weight device, and construction method for balancing weight device - Google Patents

Equilibrium balancing weight device, construction tool for balancing weight device, and construction method for balancing weight device Download PDF

Info

Publication number
JP6299825B2
JP6299825B2 JP2016171581A JP2016171581A JP6299825B2 JP 6299825 B2 JP6299825 B2 JP 6299825B2 JP 2016171581 A JP2016171581 A JP 2016171581A JP 2016171581 A JP2016171581 A JP 2016171581A JP 6299825 B2 JP6299825 B2 JP 6299825B2
Authority
JP
Japan
Prior art keywords
weight
frame
support
elevator
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016171581A
Other languages
Japanese (ja)
Other versions
JP2018034993A (en
Inventor
祥希 和田
祥希 和田
中村 裕之
裕之 中村
俊樹 岡崎
俊樹 岡崎
拓也 村上
拓也 村上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Building Techno-Service Co Ltd
Original Assignee
Mitsubishi Electric Building Techno-Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Building Techno-Service Co Ltd filed Critical Mitsubishi Electric Building Techno-Service Co Ltd
Priority to JP2016171581A priority Critical patent/JP6299825B2/en
Priority to CN201710431458.6A priority patent/CN107792764B/en
Publication of JP2018034993A publication Critical patent/JP2018034993A/en
Application granted granted Critical
Publication of JP6299825B2 publication Critical patent/JP6299825B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B17/00Hoistway equipment
    • B66B17/12Counterpoises
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Cage And Drive Apparatuses For Elevators (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Description

この発明は、エレベーターの釣合オモリ装置、釣合オモリ装置の施工器具および釣合オモリ装置の施工方法に関する。   The present invention relates to a balancing weight device for an elevator, a construction tool for a balancing weight device, and a construction method for a balancing weight device.

特許文献1は、エレベーターの釣合オモリ装置を開示する。釣合オモリ装置において、オモリがオモリ枠から脱落することを抑制するため、吊枠バンドがオモリ枠に固定される。   Patent document 1 discloses the balance weight apparatus of an elevator. In the balancing weight device, the suspension frame band is fixed to the weight frame in order to prevent the weight from falling off the weight frame.

特開2010−254400号公報JP 2010-254400 A

吊枠バンドがオモリ枠に固定された場合、吊枠バンドの内側に幅の狭いオモリを入れる。このため、通常のオモリとは異なるオモリが必要となる。   When the hanging frame band is fixed to the weight frame, a narrow weight is inserted inside the hanging frame band. For this reason, a weight different from a normal weight is required.

この発明は、上述の課題を解決するためになされた。この発明の目的は、幅の狭いオモリを要することなく、オモリの脱落を抑制することができるエレベーターの釣合オモリ装置、釣合オモリ装置の施工器具および釣合オモリ装置の施工方法を提供することである。   The present invention has been made to solve the above-described problems. SUMMARY OF THE INVENTION An object of the present invention is to provide an elevator balancing weight device, a balancing weight device construction tool, and a balancing weight device construction method capable of suppressing the weight loss without requiring a narrow weight. It is.

この発明に係るエレベーターの釣合オモリ装置は、枠状に形成されたオモリ枠と、前記オモリ枠の内側において積層された複数のオモリと、前記複数のオモリのうちの下側のオモリと上側のオモリとの間において前記オモリ枠に固定され、前記オモリ枠の内側において上側のオモリを下方から支持する支持体を有した吊枠バンドと、を備え、前記吊枠バンドは、前記オモリ枠の一対の横枠の一方の外側に配置された第1取付体と、前記オモリ枠の一対の横枠の他方の外側に配置された第2取付体と、板状に形成され、前記オモリ枠の外側において昇降路の壁の側に配置され、前記第1取付体と前記第2取付体とに連結された第1連結体と、板状に形成され、前記オモリ枠の外側において昇降路の壁の側とは反対側に配置され、前記第1取付体と前記第2取付体に連結された第2連結体と、を備え、前記支持体は、前記第1連結体に固定されずに前記第2連結体に固定された。 An elevator balancing weight device according to the present invention includes a weight frame formed in a frame shape, a plurality of weights stacked inside the weight frame, a lower weight and an upper weight among the plurality of weights. A suspension frame band that is fixed to the weight frame and has a support body that supports the upper weight on the inner side of the weight frame from below, and the suspension frame band is a pair of the weight frame. A first mounting body disposed on one outer side of the horizontal frame, a second mounting body disposed on the other outer side of the pair of horizontal frames of the weight frame, and a plate-shaped outer side of the weight frame The first connecting body is disposed on the side of the hoistway wall and connected to the first mounting body and the second mounting body, and is formed in a plate shape. The hoistway wall is formed outside the weight frame. The first mounting body is disposed on the side opposite to the side. And a second coupling member coupled to the second attachment member, wherein the support is secured to the second coupling body without being fixed to the first coupling body.

この発明に係るエレベーターの釣合オモリ装置の施工器具は、前記釣合オモリ装置のオモリ枠の上枠に乗せれる固定体と、前記固定体に連結され、前記固定体が前記オモリ枠の上枠に乗せられた際に前記オモリ枠の前方側に配置される第1吊体と、前記固定体に連結され、前記固定体が前記オモリ枠の上枠に乗せられた際に前記オモリ枠の後方側に配置される第2吊体と、前記第1吊体に設けられ、前記固定体が前記オモリ枠の上枠に乗せられた際に前記オモリ枠の内側に突き出し、オモリの一縁部を支持する第1支持体と、前記第2吊体に設けられ、前記固定体が前記オモリ枠の上枠に乗せられた際に前記オモリ枠の内側に突き出し、オモリの他縁部を支持する第2支持体と、を備えた。
この発明に係るエレベーターの釣合オモリ装置の施工器具は、オモリ枠の上枠に乗せられる固定体と、前記固定体に連結され、前記固定体が前記オモリ枠の上枠に乗せられた際に前記オモリ枠の前方側に配置される第1吊体と、前記固定体に連結され、前記固定体が前記オモリ枠の上枠に乗せられた際に前記オモリ枠の後方側に配置される第2吊体と、前記第1吊体に設けられ、前記固定体が前記オモリ枠の上枠に乗せられた際に前記オモリ枠の内側に突き出し、オモリの一縁部を支持する第1支持体と、前記第2吊体に設けられ、前記固定体が前記オモリ枠の上枠に乗せられた際に前記オモリ枠の内側に突き出し、オモリの他縁部を支持する第2支持体と、を備えた。
Construction instrument elevator counterweight assembly according to the present invention, the fixed body carrying et is the top frame of the weights frame of the counterweight assembly, coupled to the fixed body, the fixed body is on the weights frame A first suspension body disposed on the front side of the weight frame when placed on the frame, and connected to the fixed body, and when the fixed body is placed on the upper frame of the weight frame, A second suspension body disposed on the rear side; provided on the first suspension body; and when the fixed body is placed on the upper frame of the weight frame, protrudes to the inside of the weight frame, Provided on the second suspension body, and when the fixed body is placed on the upper frame of the weight frame, it projects inside the weight frame and supports the other edge of the weight. A second support.
A construction tool for an elevator balancing weight device according to the present invention includes: a fixed body that is placed on an upper frame of a weight frame; and a fixed body that is connected to the fixed body, and the fixed body is placed on the upper frame of the weight frame. A first suspension body arranged on the front side of the weight frame and a first suspension body connected to the fixed body, and arranged on the rear side of the weight frame when the fixed body is placed on the upper frame of the weight frame. 2 suspension bodies and a first support body which is provided on the first suspension body and protrudes to the inside of the weight frame when the fixed body is put on the upper frame of the weight frame and supports one edge of the weight. And a second support body that is provided on the second suspension body and protrudes to the inside of the weight frame when the fixed body is put on the upper frame of the weight frame and supports the other edge of the weight. Prepared.

この発明に係るエレベーターの釣合オモリ装置の施工方法は、前記釣合オモリ装置の施工器具を用いてオモリ枠の内側で積層された複数のオモリのうちの上側のオモリを持ち上げた状態で支持する支持工程と、前記支持工程の後、上側のオモリが持ち上げられた状態で当該上側のオモリの下方かつ下側のオモリの上方で吊枠バンドをオモリ枠に取り付ける取付工程と、前記取付工程の後、上側のオモリを吊枠バンドの上面まで移動させる移動工程と、を備えた。

The construction method of the balance weight apparatus of the elevator according to the present invention supports the upper weight among the plurality of weights stacked on the inner side of the weight frame by using the construction tool of the balance weight apparatus. After the supporting step, after the supporting step, the attaching step of attaching the hanging frame band to the weight frame below the upper weight and above the lower weight with the upper weight being lifted, and after the attaching step And a moving step of moving the upper weight to the upper surface of the suspension frame band.

これらの発明によれば、幅の狭いオモリを要することなく、吊枠バンドが取り付けられる。このため、幅の狭いオモリを要することなく、オモリの脱落を抑制することができる。   According to these inventions, the hanging frame band can be attached without requiring a narrow weight. For this reason, dropping of a weight can be suppressed without requiring a narrow weight.

この発明の実施の形態1におけるエレベーターの釣合オモリ装置が適用されるエレベーターの構成図である。BRIEF DESCRIPTION OF THE DRAWINGS It is a block diagram of the elevator with which the elevator balance weight apparatus in Embodiment 1 of this invention is applied. この発明の実施の形態1におけるエレベーターの釣合オモリ装置に取り付けられる吊枠バンドの斜視図である。It is a perspective view of the suspension frame band attached to the balance weight apparatus of the elevator in Embodiment 1 of this invention. この発明の実施の形態1におけるエレベーターの釣合オモリ装置に取り付けられる吊枠バンドの要部の斜視図である。It is a perspective view of the principal part of the suspension frame band attached to the balance weight apparatus of the elevator in Embodiment 1 of this invention. この発明の実施の形態1におけるエレベーターの釣合オモリ装置に取り付けられる吊枠バンドの分解図である。It is an exploded view of the suspension frame band attached to the balance weight apparatus of the elevator in Embodiment 1 of this invention. この発明の実施の形態1におけるエレベーターの釣合オモリ装置に取り付けられる吊枠バンドの要部の拡大図である。It is an enlarged view of the principal part of the suspension frame band attached to the balance weight apparatus of the elevator in Embodiment 1 of this invention. この発明の実施の形態1におけるエレベーターの釣合オモリ装置に用いられる施工器具の構成図である。It is a block diagram of the construction tool used for the balance weight apparatus of the elevator in Embodiment 1 of this invention. この発明の実施の形態1におけるエレベーターの釣合オモリ装置に用いられる施工器具8の分解図の一部である。It is a part of exploded view of the construction tool 8 used for the balance weight apparatus of the elevator in Embodiment 1 of this invention. この発明の実施の形態1におけるエレベーターの釣合オモリ装置に用いられる施工器具8の要部の拡大図である。It is an enlarged view of the principal part of the construction tool 8 used for the balance weight apparatus of the elevator in Embodiment 1 of this invention. この発明の実施の形態1におけるエレベーターの釣合オモリ装置の施工方法を説明するための図である。It is a figure for demonstrating the construction method of the balance weight apparatus of the elevator in Embodiment 1 of this invention. この発明の実施の形態1におけるエレベーターの釣合オモリ装置の施工方法を説明するための図である。It is a figure for demonstrating the construction method of the balance weight apparatus of the elevator in Embodiment 1 of this invention. この発明の実施の形態1におけるエレベーターの釣合オモリ装置の施工方法を説明するための図である。It is a figure for demonstrating the construction method of the balance weight apparatus of the elevator in Embodiment 1 of this invention. この発明の実施の形態1におけるエレベーターの釣合オモリ装置の施工方法を説明するための図である。It is a figure for demonstrating the construction method of the balance weight apparatus of the elevator in Embodiment 1 of this invention. この発明の実施の形態1におけるエレベーターの釣合オモリ装置の施工方法を説明するための図である。It is a figure for demonstrating the construction method of the balance weight apparatus of the elevator in Embodiment 1 of this invention. この発明の実施の形態1におけるエレベーターの釣合オモリ装置の施工方法を説明するための図である。It is a figure for demonstrating the construction method of the balance weight apparatus of the elevator in Embodiment 1 of this invention. この発明の実施の形態1におけるエレベーターの釣合オモリ装置の施工方法を説明するための図である。It is a figure for demonstrating the construction method of the balance weight apparatus of the elevator in Embodiment 1 of this invention.

この発明を実施するための形態について添付の図面に従って説明する。なお、各図中、同一又は相当する部分には同一の符号が付される。当該部分の重複説明は適宜に簡略化ないし省略される。   A mode for carrying out the invention will be described with reference to the accompanying drawings. In addition, the same code | symbol is attached | subjected to the part which is the same or it corresponds in each figure. The overlapping explanation of the part is appropriately simplified or omitted.

実施の形態1.
図1はこの発明の実施の形態1におけるエレベーターの釣合オモリ装置が適用されるエレベーターの構成図である。
Embodiment 1 FIG.
FIG. 1 is a configuration diagram of an elevator to which an elevator balancing weight device according to Embodiment 1 of the present invention is applied.

図1に示されるように、建築物は、複数の階を備える。建築物は、エレベーターを備える。   As shown in FIG. 1, the building includes a plurality of floors. The building is equipped with an elevator.

エレベーターの昇降路1は、建築物の各階を貫く。エレベーターの複数の乗場2の各々は、建築物の各階に設けられる。複数の乗場2の各々は、昇降路1に対向する。エレベーターのかご装置3は、昇降路1の内部に設けられる。エレベーターの釣合オモリ装置4は、昇降路1の内部に設けられる。   The elevator hoistway 1 penetrates each floor of the building. Each of the elevator halls 2 is provided on each floor of the building. Each of the plurality of halls 2 faces the hoistway 1. The elevator car device 3 is provided inside the hoistway 1. An elevator balance weight device 4 is provided inside the hoistway 1.

釣合オモリ装置4は、オモリ枠5と複数のオモリ6と吊枠バンド7とを備える。   The balancing weight device 4 includes a weight frame 5, a plurality of weights 6, and a suspension frame band 7.

オモリ枠5は、枠状に形成される。複数のオモリ6は、オモリ枠5の内側において積層される。吊枠バンド7は、複数のオモリ6のうちの下側のオモリ6と上側のオモリ6との間においてオモリ枠5に固定される。吊枠バンド7は、オモリ枠5の内側において上側のオモリ6を下方から支持する。   The weight frame 5 is formed in a frame shape. The plurality of weights 6 are stacked inside the weight frame 5. The suspension frame band 7 is fixed to the weight frame 5 between the lower weight 6 and the upper weight 6 among the plurality of weights 6. The suspension frame band 7 supports the upper weight 6 on the inner side of the weight frame 5 from below.

次に、図2から図5を用いて、吊枠バンド7を説明する。
図2はこの発明の実施の形態1におけるエレベーターの釣合オモリ装置に取り付けられる吊枠バンドの斜視図である。図3はこの発明の実施の形態1におけるエレベーターの釣合オモリ装置に取り付けられる吊枠バンドの要部の斜視図である。図4はこの発明の実施の形態1におけるエレベーターの釣合オモリ装置に取り付けられる吊枠バンドの分解図である。図5はこの発明の実施の形態1におけるエレベーターの釣合オモリ装置に取り付けられる吊枠バンドの要部の拡大図である。
Next, the suspension frame band 7 will be described with reference to FIGS.
FIG. 2 is a perspective view of a suspension frame band attached to the elevator balancing device of the first embodiment of the present invention. FIG. 3 is a perspective view of a main part of a hanging frame band attached to the elevator balancing weight device according to Embodiment 1 of the present invention. FIG. 4 is an exploded view of a hanging frame band attached to the elevator balance device according to Embodiment 1 of the present invention. FIG. 5 is an enlarged view of a main part of a hanging frame band attached to the elevator balancing device of the first embodiment of the present invention.

図2に示されるように、吊枠バンド7は、第1取付体7aと第2取付体7bと第1連結体7cと第2連結体7dと支持体7eと複数のボルト7fと複数のナット7gとを備える。   As shown in FIG. 2, the suspension frame band 7 includes a first attachment body 7a, a second attachment body 7b, a first connection body 7c, a second connection body 7d, a support body 7e, a plurality of bolts 7f, and a plurality of nuts. 7g.

第1取付体7aは、オモリ枠5の一対の横枠の一方の外側に配置される。第2取付体7bは、オモリ枠5の一対の横枠の他方の外側に配置される。第1連結体7cは、オモリ枠5の外側において図2では図示されない昇降路1の壁の側に配置される。第1連結体7cは、第1取付体7aと第2取付体7bとに跨る。第2連結体7dは、オモリ枠5の外側において昇降路1の壁の側とは反対側に配置される。第2連結体7dは、第1取付体7aと第2取付体7bとに跨る。支持体7eは、第2連結体7dに固定される。支持体7eは、オモリ枠5の内側に配置される。   The first attachment body 7 a is disposed on one outer side of the pair of horizontal frames of the weight frame 5. The second attachment body 7 b is disposed on the other outer side of the pair of horizontal frames of the weight frame 5. The 1st connection body 7c is arrange | positioned in the wall side of the hoistway 1 which is not illustrated in FIG. The 1st connection body 7c straddles the 1st attachment body 7a and the 2nd attachment body 7b. The second connecting body 7d is arranged on the side opposite to the wall side of the hoistway 1 outside the weight frame 5. The second connecting body 7d straddles the first mounting body 7a and the second mounting body 7b. The support body 7e is fixed to the second coupling body 7d. The support 7 e is disposed inside the weight frame 5.

図3では示されないが、複数のボルト7fと複数のナット7gの第1組は、第1取付体7aと第1連結体7cとを連結する。図3に示されるように、複数のボルト7fと複数のナット7gの第2組は、第2取付体7bと第1連結体7cとを連結する。図3では示されないが、複数のボルト7fと複数のナット7gの第3組は、第1取付体7aと第2連結体7dとを連結する。図3に示されるように、複数のボルト7fと複数のナット7gの第4組は、第2取付体7bと第2連結体7dとを連結する。   Although not shown in FIG. 3, the first set of the plurality of bolts 7f and the plurality of nuts 7g connects the first attachment body 7a and the first connection body 7c. As shown in FIG. 3, the second set of the plurality of bolts 7f and the plurality of nuts 7g connects the second attachment body 7b and the first connection body 7c. Although not shown in FIG. 3, the third set of the plurality of bolts 7f and the plurality of nuts 7g connects the first attachment body 7a and the second connection body 7d. As shown in FIG. 3, the fourth set of the plurality of bolts 7f and the plurality of nuts 7g connects the second attachment body 7b and the second connection body 7d.

図4の(a)と(b)とに示されるように、第1取付体7aと第2取付体7bとは同じ形状である。図4の(c)に示されるように、第1連結体7cは、板状に形成される。図4の(d)に示されるように、第2連結体7dは、板状に形成される。図4の(d)に示されるように、支持体7eは、複数の板体である。   As shown in FIGS. 4A and 4B, the first attachment body 7a and the second attachment body 7b have the same shape. As shown in FIG. 4C, the first connecting body 7c is formed in a plate shape. As shown in FIG. 4D, the second connecting body 7d is formed in a plate shape. As shown in FIG. 4D, the support 7e is a plurality of plates.

図5に示されるように、支持体7eにおいて、複数の板体の各々は、第2連結体7dに強固に固定される。例えば、複数の板体の各々は、第2連結体7dに溶接される。   As shown in FIG. 5, in the support body 7e, each of the plurality of plate bodies is firmly fixed to the second connection body 7d. For example, each of the plurality of plate bodies is welded to the second connecting body 7d.

次に、図6から図8を用いて、施工器具8を説明する。
図6はこの発明の実施の形態1におけるエレベーターの釣合オモリ装置に用いられる施工器具の構成図である。図7はこの発明の実施の形態1におけるエレベーターの釣合オモリ装置に用いられる施工器具の分解図の一部である。図8はこの発明の実施の形態1におけるエレベーターの釣合オモリ装置に用いられる施工器具の要部の拡大図である。
Next, the construction tool 8 will be described with reference to FIGS.
FIG. 6 is a configuration diagram of a construction tool used in the elevator balancing weight device according to Embodiment 1 of the present invention. FIG. 7 is a part of an exploded view of a construction tool used in the elevator balancing weight device according to Embodiment 1 of the present invention. FIG. 8 is an enlarged view of a main part of the construction tool used in the elevator balancing device according to Embodiment 1 of the present invention.

図6に示されるように、一対の施工器具8の各々は、固定体8aと第1吊体8bと第2吊体8cと第1三角金具8dと第2三角金具8eと第1支持体8fと第2支持体8gと第1U字ボルト8hと第2U字ボルト8iと複数の第1ナット8jと複数の第2ナット8kとを備える。   As shown in FIG. 6, each of the pair of construction tools 8 includes a fixed body 8a, a first suspension body 8b, a second suspension body 8c, a first triangular bracket 8d, a second triangular bracket 8e, and a first support body 8f. And a second support 8g, a first U-bolt 8h, a second U-bolt 8i, a plurality of first nuts 8j, and a plurality of second nuts 8k.

固定体8aは、オモリ枠5の上枠に乗せられる。第1吊体8bは、固定体8aがオモリ枠5の上枠に乗せられた際にオモリ枠5の前方側に配置される。第2吊体8cは、固定体8aがオモリ枠5の上枠に乗せられた際にオモリ枠5の後方側に配置される。第1三角金具8dは、第1吊体8bの上部に連結される。第2三角金具8eは、第2吊体8cの上部に連結される。第1支持体8fは、第1吊体8bに設けられる。第1支持体8fは、固定体8aがオモリ枠5の上枠に乗せられた際にオモリ枠5の内側に突き出す。第2支持体8gは、第2吊体8cに設けられる。第2支持体8gは、固定体8aがオモリ枠5の上枠に乗せられた際にオモリ枠5の内側に突き出す。第1U字ボルト8hは、第1三角金具8dの内側を貫通する。第2U字ボルト8iは、第2三角金具8eの内側を貫通する。   The fixed body 8 a is placed on the upper frame of the weight frame 5. The first suspension body 8 b is disposed on the front side of the weight frame 5 when the fixed body 8 a is placed on the upper frame of the weight frame 5. The second suspension body 8 c is disposed on the rear side of the weight frame 5 when the fixed body 8 a is placed on the upper frame of the weight frame 5. The first triangular bracket 8d is connected to the upper part of the first suspension body 8b. The second triangular bracket 8e is connected to the upper part of the second suspension body 8c. The first support 8f is provided on the first suspension body 8b. The first support 8 f protrudes inside the weight frame 5 when the fixed body 8 a is placed on the upper frame of the weight frame 5. The second support 8g is provided on the second suspension body 8c. The second support 8g protrudes inside the weight frame 5 when the fixed body 8a is placed on the upper frame of the weight frame 5. The first U-shaped bolt 8h penetrates the inside of the first triangular metal fitting 8d. The second U-shaped bolt 8i penetrates the inside of the second triangular metal fitting 8e.

複数の第1ナット8jは、固定体8aと第1U字ボルト8hとを連結する。複数の第2ナット8kは、固定体8a第2U字ボルト8iを連結する。   The plurality of first nuts 8j connect the fixed body 8a and the first U-shaped bolt 8h. The plurality of second nuts 8k connect the fixed body 8a and the second U-shaped bolt 8i.

図7の(a)に示されるように、固定体8aは、H鋼である。図7の(b)に示されるように、第1吊体8bは、ベルト状に形成される。図7では示されないが、第2吊体8cは、ベルト状に形成される。図7(c)に示されるように、第1U字ボルト8hの両端部は、ネジ部である。図7では図示されないが、第2U字ボルト8iの両端部は、ネジ部である。   As shown in FIG. 7A, the fixed body 8a is H steel. As shown in FIG. 7B, the first suspended body 8b is formed in a belt shape. Although not shown in FIG. 7, the second suspension body 8c is formed in a belt shape. As shown in FIG. 7C, both end portions of the first U-shaped bolt 8h are screw portions. Although not shown in FIG. 7, both ends of the second U-shaped bolt 8i are screw portions.

図8に示されるように、第1支持体8fは、鉛直方向に並んだ複数の板体である。図8では示されないが、第2支持体8gは、鉛直方向に並んだ複数の第2板体である。   As shown in FIG. 8, the first support 8f is a plurality of plates arranged in the vertical direction. Although not shown in FIG. 8, the second support 8g is a plurality of second plates arranged in the vertical direction.

次に、図9から図15を用いて、釣合オモリ装置4の施工方法を説明する。
図9から図15はこの発明の実施の形態1におけるエレベーターの釣合オモリ装置の施工方法を説明するための図である。
Next, the construction method of the balance weight apparatus 4 will be described with reference to FIGS.
9 to 15 are views for explaining a construction method of the elevator balancing weight device according to the first embodiment of the present invention.

最初に、施工器具8が組み立てられる。具体的には、図9に示されるように、第1三角金具8dが第1U字ボルト8hに掛けられる。その後、第1U字ボルト8hが第1ナット8jにより固定体8aに固定される。図9では示されないが、第2三角金具8eが第2U字ボルト8iに掛けられる。その後、第2U字ボルト8iが第2ナット8kにより固定体8aに固定される。   First, the construction tool 8 is assembled. Specifically, as shown in FIG. 9, the first triangular bracket 8d is hung on the first U-shaped bolt 8h. Thereafter, the first U-shaped bolt 8h is fixed to the fixed body 8a by the first nut 8j. Although not shown in FIG. 9, the second triangular bracket 8e is hung on the second U-shaped bolt 8i. Thereafter, the second U-shaped bolt 8i is fixed to the fixed body 8a by the second nut 8k.

その後、図10に示されるように、固定体8aがオモリ枠5の上枠に乗せられる。その後、固定体8aが図示されないベルト体によりオモリ枠5の上枠に強固に固定される。   Thereafter, as shown in FIG. 10, the fixed body 8 a is placed on the upper frame of the weight frame 5. Thereafter, the fixed body 8a is firmly fixed to the upper frame of the weight frame 5 by a belt body (not shown).

その後、支持工程が行われる。具体的には、図11に示されるように、最上段のオモリ6が持ち上げられる。その後、オモリ6が第1支持体8fと第2支持体8gとに支持される。具体的には、オモリ6の一縁部が第1支持体8fに支持される。オモリ6の他縁部が第2支持体8gに支持される。   Then, a support process is performed. Specifically, as shown in FIG. 11, the uppermost weight 6 is lifted. Thereafter, the weight 6 is supported by the first support 8f and the second support 8g. Specifically, one edge of the weight 6 is supported by the first support 8f. The other edge of the weight 6 is supported by the second support 8g.

この際、図12に示されるように、第1支持体8fと第2支持体8gとにおいて、複数の第1板体と第2板体とは、紐体8lで縛られることによりオモリ6を支持した状態に維持される。この際、ストッパ8mと連結具8nが紐の緩みを抑制する。   At this time, as shown in FIG. 12, in the first support body 8f and the second support body 8g, the plurality of first plate bodies and second plate bodies are bound by the string body 8l so that the weight 6 Maintained in a supported state. At this time, the stopper 8m and the connector 8n suppress the looseness of the string.

その後、図13に示されるように、上から2段目のオモリ6が持ち上げられる。その後、最上段のオモリ6と同様に、上から2段目のオモリ6が第1支持体8fと第2支持体8gとに支持される。その後、同様の作業が繰り返される。   Thereafter, as shown in FIG. 13, the weight 6 on the second stage from the top is lifted. Thereafter, similarly to the uppermost weight 6, the second weight 6 from the top is supported by the first support 8 f and the second support 8 g. Thereafter, the same operation is repeated.

その後、取付工程が行われる。具体的には、図14に示されるように、上側のオモリ6の下方かつ下側のオモリ6の上方で、吊枠バンド7がオモリ枠5に取り付けられる。   Then, an attachment process is performed. Specifically, as shown in FIG. 14, the suspension frame band 7 is attached to the weight frame 5 below the upper weight 6 and above the lower weight 6.

その後、移動工程が行われる。具体的には、図15に示されるように、上側のオモリ6が吊枠バンド7の上面まで移動される。   Thereafter, a moving process is performed. Specifically, as shown in FIG. 15, the upper weight 6 is moved to the upper surface of the suspension frame band 7.

以上で説明した実施の形態1によれば、幅の狭いオモリを要することなく、吊枠バンド7が取り付けられる。このため、幅の狭いオモリを要することなく、オモリ6の脱落を抑制することができる。   According to the first embodiment described above, the hanging frame band 7 is attached without requiring a narrow weight. For this reason, dropping of the weight 6 can be suppressed without requiring a narrow weight.

この場合、上側のオモリ6を乗場2に持ち出す必要がない。その結果、かご装置3と釣合オモリ装置4とのバランスが保たれる。このため、吊枠バンド7を取り付ける際の作業を容易かつ安全に行うことができる。   In this case, it is not necessary to take the upper weight 6 to the landing 2. As a result, the balance between the car device 3 and the balance weight device 4 is maintained. For this reason, the operation | work at the time of attaching the suspension frame band 7 can be performed easily and safely.

また、支持体7eは、第2連結体7dに連結される。このため、第1連結体7cは、板状でよい。その結果、昇降路1の壁と釣合オモリ装置4との間が狭くても、吊枠バンド7をオモリ枠5に取り付けることができる。   Further, the support body 7e is connected to the second connection body 7d. For this reason, the 1st connection body 7c may be plate shape. As a result, the hanging frame band 7 can be attached to the weight frame 5 even if the space between the wall of the hoistway 1 and the balance weight device 4 is narrow.

また、支持体7eは、水平方向に並んだ複数の板体である。このため、単純な構成で上側のオモリ6を支持することができる。   The support body 7e is a plurality of plates arranged in the horizontal direction. For this reason, the upper weight 6 can be supported with a simple configuration.

また、第1支持体8fと第2支持体8gとにおいて、複数の第1板体と第2板体とは、紐体8lで縛られることによりオモリ6を支持した状態に維持される。このため、簡単な作業で、上側のオモリ6が落下することを抑制できる。   Moreover, in the 1st support body 8f and the 2nd support body 8g, the several 1st board body and the 2nd board body are maintained in the state which supported the weight 6 by being tied with the string body 8l. For this reason, it is possible to suppress the upper weight 6 from being dropped by a simple operation.

また、支持工程において、複数のオモリ6の各々は、別々に持ち上げられる。このため、オモリ6を持ち上げる際の負荷を小さくすることができる。   In the supporting step, each of the plurality of weights 6 is lifted separately. For this reason, the load at the time of lifting the weight 6 can be made small.

1 昇降路、 2 乗場、 3 かご装置、 4 釣合オモリ装置、 5 オモリ枠、 6 オモリ、 7 吊枠バンド、 7a 第1取付体、 7b 第2取付体、 7c 第1連結体、 7d 第2連結体、 7e 支持体、 7f ボルト、 7g ナット、 8 施工器具、 8a 固定体、 8b 第1吊体、 8c 第2吊体、 8d 第1三角金具、 8e 第2三角金具、 8f 第1支持体、 8g 第2支持体、 8h 第1U字ボルト、 8i 第2U字ボルト、 8j 第1ナット、 8k 第2ナット、 8l 紐体、 8m ストッパ、 8n 連結具   DESCRIPTION OF SYMBOLS 1 Hoistway, 2 landing, 3 cage apparatus, 4 counter weight apparatus, 5 weight frame, 6 weight, 7 suspension frame band, 7a 1st attachment body, 7b 2nd attachment body, 7c 1st connection body, 7d 2nd Connection body, 7e support body, 7f bolt, 7g nut, 8 construction tool, 8a fixed body, 8b first suspension body, 8c second suspension body, 8d first triangular bracket, 8e second triangular bracket, 8f first support body 8g 2nd support body, 8h 1st U-shaped bolt, 8i 2nd U-shaped bolt, 8j 1st nut, 8k 2nd nut, 8l string, 8m stopper, 8n coupling tool

Claims (8)

枠状に形成されたオモリ枠と、
前記オモリ枠の内側において積層された複数のオモリと、
前記複数のオモリのうちの下側のオモリと上側のオモリとの間において前記オモリ枠に固定され、前記オモリ枠の内側において上側のオモリを下方から支持する支持体を有した吊枠バンドと、
を備え
前記吊枠バンドは、
前記オモリ枠の一対の横枠の一方の外側に配置された第1取付体と、
前記オモリ枠の一対の横枠の他方の外側に配置された第2取付体と、
板状に形成され、前記オモリ枠の外側において昇降路の壁の側に配置され、前記第1取付体と前記第2取付体とに連結された第1連結体と、
板状に形成され、前記オモリ枠の外側において昇降路の壁の側とは反対側に配置され、前記第1取付体と前記第2取付体に連結された第2連結体と、
を備え、
前記支持体は、前記第1連結体に固定されずに前記第2連結体に固定されたエレベーターの釣合オモリ装置。
A newt frame formed in a frame shape,
A plurality of weights stacked inside the weight frame;
A suspension frame band having a support that is fixed to the weight frame between a lower weight and an upper weight among the plurality of weights, and that supports the upper weight from the lower side inside the weight frame,
Equipped with a,
The hanging frame band is
A first attachment body arranged on one outer side of a pair of horizontal frames of the weight frame;
A second mounting body disposed outside the other of the pair of horizontal frames of the weight frame;
A first connection body formed in a plate shape, disposed on the side of a hoistway wall outside the weight frame, and connected to the first attachment body and the second attachment body;
Formed in a plate shape, disposed on the opposite side of the hoistway wall outside the weight frame, and connected to the first attachment body and the second attachment body;
With
The elevator is a balance weight device for an elevator in which the support is not fixed to the first connection body but is fixed to the second connection body .
前記支持体は、前記オモリ枠の内側において水平方向に並んだ複数の板体である請求項に記載のエレベーターの釣合オモリ装置。 2. The elevator balancing device according to claim 1 , wherein the support is a plurality of plates arranged in a horizontal direction inside the weight frame. 請求項1または請求項2に記載の釣合オモリ装置のオモリ枠の上枠に乗せれる固定体と、
前記固定体に連結され、前記固定体が前記オモリ枠の上枠に乗せられた際に前記オモリ枠の前方側に配置される第1吊体と、
前記固定体に連結され、前記固定体が前記オモリ枠の上枠に乗せられた際に前記オモリ枠の後方側に配置される第2吊体と、
前記第1吊体に設けられ、前記固定体が前記オモリ枠の上枠に乗せられた際に前記オモリ枠の内側に突き出し、オモリの一縁部を支持する第1支持体と、
前記第2吊体に設けられ、前記固定体が前記オモリ枠の上枠に乗せられた際に前記オモリ枠の内側に突き出し、オモリの他縁部を支持する第2支持体と、
を備えたエレベーターの釣合オモリ装置の施工器具。
A fixed body placed et the above frame of weights frame of the counterweight assembly of claim 1 or claim 2,
A first suspended body connected to the fixed body and disposed on the front side of the weight frame when the fixed body is placed on an upper frame of the weight frame;
A second suspension body connected to the fixed body and disposed on the rear side of the weight frame when the fixed body is placed on an upper frame of the weight frame;
A first support that is provided on the first suspension body and protrudes to the inside of the weight frame when the fixed body is placed on an upper frame of the weight frame, and supports one edge of the weight;
A second support that is provided on the second suspension body and protrudes to the inside of the weight frame when the fixed body is placed on an upper frame of the weight frame, and supports the other edge of the weight;
Construction equipment for elevator balance equipment for elevators.
前記第1吊体と前記第2吊体とは、ベルト状に形成され、
前記第1支持体と前記第2支持体とは、紐体で縛られることによりオモリを支持した状態に維持される請求項に記載のエレベーターの釣合オモリ装置の施工器具。
The first suspension body and the second suspension body are formed in a belt shape,
The construction tool for an elevator balancing weight device according to claim 3 , wherein the first support body and the second support body are maintained in a state of supporting a weight by being tied with a string body.
前記第1支持体は、鉛直方向に並んだ複数の第1板体であり、
前記第2支持体は、鉛直方向に並んだ複数の第2板体であり、
前記複数の第1板体の各々と前記複数の第2板体の各々とは、紐体で縛れることによりオモリを支持した状態に維持される請求項に記載のエレベーターの釣合オモリ装置の施工器具。
The first support is a plurality of first plates arranged in a vertical direction,
The second support is a plurality of second plates arranged in the vertical direction,
The elevator balancing device according to claim 4 , wherein each of the plurality of first plate bodies and each of the plurality of second plate bodies are maintained in a state of supporting a weight by being tied with a string body. Construction equipment.
オモリ枠の上枠に乗せられる固定体と、A fixed body placed on the upper frame of the weight frame,
前記固定体に連結され、前記固定体が前記オモリ枠の上枠に乗せられた際に前記オモリ枠の前方側に配置される第1吊体と、A first suspended body connected to the fixed body and disposed on the front side of the weight frame when the fixed body is placed on an upper frame of the weight frame;
前記固定体に連結され、前記固定体が前記オモリ枠の上枠に乗せられた際に前記オモリ枠の後方側に配置される第2吊体と、A second suspension body connected to the fixed body and disposed on the rear side of the weight frame when the fixed body is placed on an upper frame of the weight frame;
前記第1吊体に設けられ、前記固定体が前記オモリ枠の上枠に乗せられた際に前記オモリ枠の内側に突き出し、オモリの一縁部を支持する第1支持体と、A first support that is provided on the first suspension body and protrudes to the inside of the weight frame when the fixed body is placed on an upper frame of the weight frame, and supports one edge of the weight;
前記第2吊体に設けられ、前記固定体が前記オモリ枠の上枠に乗せられた際に前記オモリ枠の内側に突き出し、オモリの他縁部を支持する第2支持体と、A second support that is provided on the second suspension body and protrudes to the inside of the weight frame when the fixed body is placed on an upper frame of the weight frame, and supports the other edge of the weight;
を備えたエレベーターの釣合オモリ装置の施工器具。Construction equipment for elevator balance equipment for elevators.
請求項3から請求項5のいずれか1項に記載の釣合オモリ装置の施工器具を用いてオモリ枠の内側で積層された複数のオモリのうちの上側のオモリを持ち上げた状態で支持する支持工程と、
前記支持工程の後、上側のオモリが持ち上げられた状態で当該上側のオモリの下方かつ下側のオモリの上方で吊枠バンドをオモリ枠に取り付ける取付工程と、
前記取付工程の後、上側のオモリを吊枠バンドの上面まで移動させる移動工程と、
を備えたエレベーターの釣合オモリ装置の施工方法。
The support which supports in the state which lifted the upper weight among the several weights laminated | stacked inside the weight frame using the construction tool of the balance weight apparatus of any one of Claims 3-5. Process,
After the supporting step, an attaching step of attaching the hanging frame band to the weight frame below the upper weight and above the lower weight in a state where the upper weight is lifted,
After the attaching step, a moving step of moving the upper weight to the upper surface of the hanging frame band,
Method of construction of an elevator balancing weight device equipped with
前記支持工程は、複数のオモリの各々を別々に持ち上げた状態で支持する工程を含む請求項7に記載のエレベーターの釣合オモリ装置の施工方法。   The construction method for an elevator balancing weight device according to claim 7, wherein the supporting step includes a step of supporting each of the plurality of weights in a state of being lifted separately.
JP2016171581A 2016-09-02 2016-09-02 Equilibrium balancing weight device, construction tool for balancing weight device, and construction method for balancing weight device Active JP6299825B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2016171581A JP6299825B2 (en) 2016-09-02 2016-09-02 Equilibrium balancing weight device, construction tool for balancing weight device, and construction method for balancing weight device
CN201710431458.6A CN107792764B (en) 2016-09-02 2017-06-09 Elevator counterweight device, construction tool of counterweight device and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016171581A JP6299825B2 (en) 2016-09-02 2016-09-02 Equilibrium balancing weight device, construction tool for balancing weight device, and construction method for balancing weight device

Publications (2)

Publication Number Publication Date
JP2018034993A JP2018034993A (en) 2018-03-08
JP6299825B2 true JP6299825B2 (en) 2018-03-28

Family

ID=61531169

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016171581A Active JP6299825B2 (en) 2016-09-02 2016-09-02 Equilibrium balancing weight device, construction tool for balancing weight device, and construction method for balancing weight device

Country Status (2)

Country Link
JP (1) JP6299825B2 (en)
CN (1) CN107792764B (en)

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000344445A (en) * 1999-06-04 2000-12-12 Hitachi Building Systems Co Ltd Method and device for loading elevator counterweight
JP2001253667A (en) * 2000-03-10 2001-09-18 Mitsubishi Electric Corp Balance weight for elevator
JP4799730B2 (en) * 2000-12-01 2011-10-26 三菱電機株式会社 Elevator counterweight seismic device
JP2003201078A (en) * 2002-01-09 2003-07-15 Hitachi Ltd Counterweight assembling method for elevator
SG134994A1 (en) * 2002-10-29 2007-09-28 Inventio Ag Lift counterweight
JP5214098B2 (en) * 2004-07-17 2013-06-19 インベンテイオ・アクテイエンゲゼルシヤフト Device for suspension of cages or counterweights in an elevator installation, and method for installation and maintenance of suspension means
JP2013049530A (en) * 2011-08-31 2013-03-14 Toshiba Elevator Co Ltd Connecting fitting and counterweight comprising the same
CN203199850U (en) * 2013-03-26 2013-09-18 天津赫斯曼电梯有限公司 Elevator counter-weight frame upper beam assembly structure
JP6016741B2 (en) * 2013-09-12 2016-10-26 三菱電機ビルテクノサービス株式会社 Elevator counterweight frame connecting member and method for mounting the same

Also Published As

Publication number Publication date
CN107792764B (en) 2021-01-05
CN107792764A (en) 2018-03-13
JP2018034993A (en) 2018-03-08

Similar Documents

Publication Publication Date Title
JPWO2009044481A1 (en) Elevator lifting device, elevator car frame and elevator lifting method
JP6058149B2 (en) Elevator car
JP4751915B2 (en) Elevator counterweight frame structure and counterweight device using the same
JP2008285282A (en) Car of elevator
JP5065766B2 (en) Elevator equipment
JP4891843B2 (en) How to hang an elevator rope
JP6299825B2 (en) Equilibrium balancing weight device, construction tool for balancing weight device, and construction method for balancing weight device
JP2016222370A (en) Elevator with no machine room
JP6244281B2 (en) Weight measuring method and weight measuring device for elevator elevator
JP6721625B2 (en) Balance for adjusting the center of gravity
JP4975051B2 (en) Scaffold assembly and disassembly method
WO2021014528A1 (en) Installation method and installation jig for elevator
JP5798613B2 (en) Elevator counterweight device
JP2008308247A (en) Receiving fixture of elevator elevating/lowering body
JP2016210558A (en) Elevator balancing weight device, and improving method therefor
JP5948404B1 (en) Elevator counterweight and reinforcement method
JP6555183B2 (en) Elevator elevator weight measuring device
JP6748438B2 (en) Lifting device
JP2007001676A (en) Scaffold device for elevator installing works
KR101782573B1 (en) Elevator body coupling structure
JP4290543B2 (en) Elevator hoist support device
KR20170062653A (en) Elevator body coupling structure
JP4343525B2 (en) Elevator hoistway unit
WO2003043921A1 (en) Elevator
JPH0692569A (en) Balance weight temporary supporting device

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20171206

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180130

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180212

R150 Certificate of patent or registration of utility model

Ref document number: 6299825

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250