JP6292358B1 - Water volume control system and water volume control method - Google Patents

Water volume control system and water volume control method Download PDF

Info

Publication number
JP6292358B1
JP6292358B1 JP2017549357A JP2017549357A JP6292358B1 JP 6292358 B1 JP6292358 B1 JP 6292358B1 JP 2017549357 A JP2017549357 A JP 2017549357A JP 2017549357 A JP2017549357 A JP 2017549357A JP 6292358 B1 JP6292358 B1 JP 6292358B1
Authority
JP
Japan
Prior art keywords
water
amount
power generation
unit
predetermined period
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017549357A
Other languages
Japanese (ja)
Other versions
JPWO2018167957A1 (en
Inventor
喜則 益永
喜則 益永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Application granted granted Critical
Publication of JP6292358B1 publication Critical patent/JP6292358B1/en
Publication of JPWO2018167957A1 publication Critical patent/JPWO2018167957A1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/20Movable barrages; Lock or dry-dock gates
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03BMACHINES OR ENGINES FOR LIQUIDS
    • F03B13/00Adaptations of machines or engines for special use; Combinations of machines or engines with driving or driven apparatus; Power stations or aggregates
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03BMACHINES OR ENGINES FOR LIQUIDS
    • F03B15/00Controlling
    • F03B15/02Controlling by varying liquid flow
    • F03B15/04Controlling by varying liquid flow of turbines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03BMACHINES OR ENGINES FOR LIQUIDS
    • F03B15/00Controlling
    • F03B15/02Controlling by varying liquid flow
    • F03B15/04Controlling by varying liquid flow of turbines
    • F03B15/06Regulating, i.e. acting automatically
    • F03B15/18Regulating, i.e. acting automatically for safety purposes, e.g. preventing overspeed
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03BMACHINES OR ENGINES FOR LIQUIDS
    • F03B17/00Other machines or engines
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Control Of Eletrric Generators (AREA)
  • Barrages (AREA)
  • Control Of Water Turbines (AREA)

Abstract

水量制御システムは、河川を流れる水の一部を貯留する貯留部を介して水が供給される水力発電機の運転制御装置と、貯留部の水位を取得する検知装置と、運転制御装置の動作に関する演算を行う演算装置とを備え、水力発電機の水車へ供給される水の量を制御する水力発電の水量制御システムであって、運転制御装置は、水車に供給される水の量を調節するガイドベーンと第1所定期間の水位に基づいて水力発電機の発電量を計測する計測部とガイドベーンの動作を制御する第1制御部とを備え、演算装置は、第1所定期間あたりの水力発電機の発電量に基づいて、第1所定期間を含み、かつ第1所定期間よりも長い第2所定期間における水力発電機の発電量が所定の発電量を超えるか判定する判定部とを備え、第1制御部は、第2所定期間における水力発電機の発電量が所定の発電量を超えると判定された場合、水車に供給される水の量を低減させるようにガイドベーンを動作させる。The water amount control system includes an operation control device for a hydroelectric generator that is supplied with water through a storage unit that stores a part of water flowing in a river, a detection device that acquires the water level of the storage unit, and an operation of the operation control device. A hydropower control system that controls the amount of water supplied to the hydro turbine of the hydroelectric generator, wherein the operation control device adjusts the amount of water supplied to the hydro turbine And a measuring unit that measures the amount of power generated by the hydroelectric generator based on the water level of the first predetermined period and a first control unit that controls the operation of the guide vane. A determination unit that determines whether the power generation amount of the hydroelectric generator in a second predetermined period including the first predetermined period and longer than the first predetermined period exceeds a predetermined power generation amount based on the power generation amount of the hydroelectric generator; The first control unit has a second predetermined period. Power generation of the hydroelectric generator if it is determined that more than prescribed amount of power to operate the guide vanes so as to reduce the amount of water supplied to the waterwheel in.

Description

本発明は、水量制御システム及び水量制御方法に関する。   The present invention relates to a water amount control system and a water amount control method.

河川を流れる水を利用する水力発電では、一般的に、ある期間内で発電に利用してもよい水量に人為的取り決め(例えば、利水権)による取水量の限度が定められている。また、この水量の限度に対応した発電量の限度が予め算出されている。この限度を超えた発電を抑制するため、限度を超えた量の水を取得しないように取水口で水量を調節する仕組みが知られている(例えば、特許文献1)。   In hydroelectric power generation using water flowing in a river, generally, the limit of water intake by an artificial arrangement (for example, water utilization right) is set for the amount of water that can be used for power generation within a certain period. Further, a power generation limit corresponding to the water amount limit is calculated in advance. In order to suppress power generation exceeding this limit, a mechanism is known in which the amount of water is adjusted at a water intake so as not to acquire water exceeding the limit (for example, Patent Document 1).

特開2011−140814号公報JP 2011-140814 A

しかしながら、単に取水口で取水量を調節したとしても、河川の増水等によって一時的に取水量の限度を超えた水が取水口に流れ込んでしまうことがあった。このような場合、図らずも超過取水と判定される。このため、より確実に超過取水とされる事態が発生しないようにするための仕組みが求められていた。   However, even if the amount of water intake is simply adjusted at the water intake, water that temporarily exceeds the limit of water intake may flow into the water intake due to an increase in the river water. In such a case, it is determined that the water intake is excessive. For this reason, there has been a demand for a mechanism for preventing the occurrence of excessive intake more reliably.

本発明では、河川からの超過取水とされる事態の発生をより確実に抑制することができる水量制御システム及び水量制御方法を提供することを目的とする。   It is an object of the present invention to provide a water amount control system and a water amount control method that can more reliably suppress the occurrence of a situation in which excess water is taken from a river.

上述した課題を解決し、目的を達成するために、本発明の水量制御システムは、河川を流れる水の一部を貯留する貯留部を介して水が供給される水力発電機の運転制御装置と、前記貯留部の水位を取得する検知装置と、前記運転制御装置の動作に関する演算を行う演算装置とを備え、前記水力発電機の水車へ供給される水の量を制御する水力発電の水量制御システムであって、前記運転制御装置は、前記水車に供給される水の量を調節するガイドベーンと、第1所定期間の前記水位に基づいて前記水力発電機の発電量を計測する計測部と、前記ガイドベーンの動作を制御する第1制御部とを備え、前記演算装置は、前記第1所定期間あたりの前記水力発電機の発電量に基づいて、前記第1所定期間を含み、かつ前記第1所定期間よりも長い第2所定期間における前記水力発電機の発電量が所定の発電量を超えるか判定する判定部とを備え、前記第1制御部は、前記第2所定期間における前記水力発電機の発電量が所定の発電量を超えると判定された場合、前記水車に供給される水の量を低減させるように前記ガイドベーンを動作させる。   In order to solve the above-described problems and achieve the object, the water amount control system of the present invention includes an operation control device for a hydroelectric generator to which water is supplied via a storage unit that stores a part of water flowing through a river. A hydroelectric power control that controls the amount of water supplied to the hydraulic turbine of the hydroelectric generator, comprising: a detection device that acquires the water level of the storage unit; and a calculation device that performs calculations related to the operation of the operation control device In the system, the operation control device includes a guide vane that adjusts an amount of water supplied to the turbine, and a measurement unit that measures an amount of power generated by the hydroelectric generator based on the water level in a first predetermined period. A first control unit that controls the operation of the guide vane, and the arithmetic unit includes the first predetermined period based on the power generation amount of the hydroelectric generator per the first predetermined period, and Longer than the first predetermined period A determination unit that determines whether or not a power generation amount of the hydroelectric generator in a predetermined period exceeds a predetermined power generation amount, and the first control unit has a power generation amount of the hydroelectric generator in the second predetermined period of When it is determined that the amount exceeds the amount, the guide vane is operated so as to reduce the amount of water supplied to the turbine.

本発明の望ましい態様として、前記河川と前記貯留部との間には前記河川から前記貯留部に流れ込む水の流路を開閉する取水ゲートが設けられており、前記演算装置は、前記判定部が前記第2所定期間における、前記水車への水の供給量が予め定められた制限水量を超えると判定した場合、前記取水ゲートの開度及び気象条件のいずれか1つ以上を記憶する記憶部を備え、前記記憶部に記憶された前記取水ゲートの開度及び気象条件のいずれか1つ以上に基づいて前記取水ゲートの開度を制御する第2制御部とを備える。   As a desirable aspect of the present invention, a water intake gate that opens and closes a flow path of water flowing from the river to the storage unit is provided between the river and the storage unit, and the arithmetic unit includes the determination unit A storage unit that stores one or more of the opening of the intake gate and weather conditions when it is determined that the amount of water supplied to the water turbine exceeds a predetermined limit amount in the second predetermined period. And a second control unit that controls the opening of the intake gate based on any one or more of the opening of the intake gate and weather conditions stored in the storage unit.

本発明の望ましい態様として、前記判定部は、前記第2所定期間における前記水車への水の供給量が予め定められた制限水量を超えると判定された場合、前記水車に供給される水の量を低減させる指令を前記運転制御装置へ送信する。   As a desirable aspect of the present invention, when the determination unit determines that the amount of water supplied to the water wheel in the second predetermined period exceeds a predetermined limit amount of water, the amount of water supplied to the water wheel Is transmitted to the operation control device.

本発明の望ましい態様として、前記運転制御装置は、前記計測部により計測された発電量に関する情報を送信する第1送信部と、前記判定部からの指令を受信する第1受信部とを備え、前記演算装置は、前記発電量に関する情報を受信する第2受信部と、前記判定部からの指令を送信する第2送信部とを備え、前記第1送信部と前記第1受信部との間の通信回線及び前記第2送信部と前記第2受信部との間の通信回線は、無線通信回線を含む。   As a desirable aspect of the present invention, the operation control device includes a first transmission unit that transmits information on the amount of power generation measured by the measurement unit, and a first reception unit that receives a command from the determination unit, The arithmetic device includes a second receiving unit that receives information on the power generation amount, and a second transmitting unit that transmits a command from the determination unit, and is between the first transmitting unit and the first receiving unit. The communication line and the communication line between the second transmitter and the second receiver include a wireless communication line.

本発明の望ましい態様として、前記第2所定期間は、前記第1所定期間の2倍以上の期間である。   As a desirable mode of the present invention, the second predetermined period is a period that is twice or more the first predetermined period.

上述した課題を解決し、目的を達成するために、本発明の水量制御方法は、河川を流れる水の一部を貯留する貯留部を介して水が供給される水力発電機の運転制御装置と、前記運転制御装置の動作に関する演算を行う演算装置とを備え、前記水力発電機の水車へ供給される水の量を制御する水量制御システムによる水量制御方法であって、前記運転制御装置が、第1所定期間の経過前後に前記貯留部の水位を取得し、第1所定期間の経過前後の前記水位に基づいて前記水力発電機の発電量を計測し、前記演算装置が、前記第1所定期間あたりの前記水力発電機の発電量に基づいて、前記第1所定期間よりも長い第2所定期間における前記水力発電機の発電量が所定の発電量を超えるか判定し、前記第2所定期間における前記水力発電機の発電量が所定の発電量を超えると判定された場合、前記運転制御装置が、前記水車に供給される水の量を低減させるように、前記水車に供給される水の量を調節するガイドベーンを動作させる。   In order to solve the above-described problems and achieve the object, the water amount control method of the present invention includes an operation control device for a hydroelectric generator to which water is supplied via a storage unit that stores a part of water flowing through a river. A water amount control method using a water amount control system that controls the amount of water supplied to the hydraulic turbine of the hydroelectric generator, comprising a calculation device that performs a calculation related to the operation of the operation control device, wherein the operation control device comprises: The water level of the reservoir is acquired before and after the elapse of the first predetermined period, the power generation amount of the hydroelectric generator is measured based on the water level before and after the elapse of the first predetermined period, and the arithmetic unit is configured to perform the first predetermined period. Based on the power generation amount of the hydroelectric generator per period, it is determined whether the power generation amount of the hydroelectric generator in a second predetermined period longer than the first predetermined period exceeds a predetermined power generation amount, and the second predetermined period Power generation of the hydroelectric generator in When it is determined that the power generation amount exceeds a predetermined power generation amount, the operation control device operates a guide vane that adjusts the amount of water supplied to the water turbine so as to reduce the amount of water supplied to the water wheel. Let

本発明によれば、河川からの超過取水とされる事態の発生をより確実に抑制することができる。   According to this invention, generation | occurrence | production of the situation made into the excess water intake from a river can be suppressed more reliably.

図1は、本発明の一実施形態に係る水力発電の制御システムの主要構成を示す図である。FIG. 1 is a diagram illustrating a main configuration of a control system for hydroelectric power generation according to an embodiment of the present invention. 図2は、ガイドベーンの模式図である。FIG. 2 is a schematic view of a guide vane. 図3は、ガイドベーンの模式図である。FIG. 3 is a schematic view of a guide vane. 図4は、参照データの内容の一例を示す図である。FIG. 4 is a diagram illustrating an example of the content of the reference data. 図5は、演算装置の主要機能構成を示す機能ブロック図である。FIG. 5 is a functional block diagram showing the main functional configuration of the arithmetic device. 図6は、水力発電の制御システムが行う処理の流れの一例を示すフローチャートである。FIG. 6 is a flowchart illustrating an example of a flow of processing performed by the hydroelectric power generation control system. 図7は、第2所定期間における水車への水の供給量が予め定められた制限水量を超えると判定された場合における取水ゲートの開度制御に関する処理の流れの一例を示すフローチャートである。FIG. 7 is a flowchart showing an example of a flow of processing relating to the opening control of the intake gate when it is determined that the amount of water supplied to the water turbine in the second predetermined period exceeds a predetermined limit amount of water.

次に、本発明の実施形態を、図面を参照して詳細に説明する。図1は、本発明の一実施形態に係る水力発電の制御システム1の主要構成を示す図である。水力発電の制御システム1は、検知装置33と、制御装置10と、演算装置20とを備える。   Next, embodiments of the present invention will be described in detail with reference to the drawings. FIG. 1 is a diagram showing a main configuration of a control system 1 for hydroelectric power generation according to an embodiment of the present invention. The hydroelectric power generation control system 1 includes a detection device 33, a control device 10, and a calculation device 20.

制御装置10は、河川81を流れる水の一部を貯留する貯留部80を介して供給される水を用いて、発電機91と連結された水車92を回転させる水力発電施設に設けられる。水力発電機は、発電機91と、この発電機91と連結された水車92とを有する構成である。具体的には、取水ゲート31が設けられた取水口を介して河川81から取得された水を貯留部80に流し込むための流路82が河川81と貯留部80との間に設けられている。取水口から流路82を流れて貯留部80に流れ込む水量は、取水ゲート31の開閉の度合いに応じる。取水ゲート31は、取水ゲート31を動作させる各種の機構を有する取水ゲート駆動装置32により駆動される。本実施形態では、取水ゲート31の開度は、取水ゲート駆動装置32が管理している。なお、開度とは、開き具合を示し、例えば0[%]から100[%]の範囲内の数値[%]で表される。取水ゲート駆動装置32は、例えば第1移動通信部41を介して通信回線Nと接続されている。   The control apparatus 10 is provided in a hydroelectric power generation facility that rotates a water turbine 92 connected to a generator 91 using water supplied through a storage unit 80 that stores a part of water flowing in a river 81. The hydroelectric generator has a configuration including a generator 91 and a water turbine 92 connected to the generator 91. Specifically, a channel 82 is provided between the river 81 and the storage unit 80 for flowing water acquired from the river 81 into the storage unit 80 via a water intake provided with the intake gate 31. . The amount of water that flows from the water intake through the flow path 82 and into the storage unit 80 depends on the degree of opening and closing of the water intake gate 31. The intake gate 31 is driven by an intake gate drive device 32 having various mechanisms for operating the intake gate 31. In the present embodiment, the opening of the intake gate 31 is managed by the intake gate drive device 32. The opening degree indicates the degree of opening, and is represented by a numerical value [%] within a range of 0 [%] to 100 [%], for example. The intake gate drive device 32 is connected to the communication line N via, for example, the first mobile communication unit 41.

水力発電の制御システム1が行う各種の通信で利用される通信回線Nは、無線通信回線を含む。具体的には、通信回線Nは、例えばLTE(Long Term Evolution)等の移動通信システムによる通信回線を含む。第1移動通信部41、第2移動通信部42は、当該移動通信システムを用いた無線通信を行うためのモジュールを有しており、当該モジュールを動作させることで無線通信を行う。   The communication line N used in various communications performed by the hydroelectric power generation control system 1 includes a wireless communication line. Specifically, the communication line N includes a communication line by a mobile communication system such as LTE (Long Term Evolution). The first mobile communication unit 41 and the second mobile communication unit 42 have a module for performing wireless communication using the mobile communication system, and perform wireless communication by operating the module.

検知装置33は、貯留部80の水位を測定する。具体的には、検知装置33は、貯留部80に設けられて所定原理で水位を測定する投込圧力式水位計を有する。所定原理は、例えば、差動トランス式、半導体式、超音波式、電波式、気泡式、静電容量式、フロート式、浮子転倒式、電極式のいずれかであるが、これに限られるものでなく、水位を測定可能な方式であれば適宜利用可能である。検知装置33は、第2移動通信部42を介して貯留部80の水位に関する情報を含むデータ(水位データ)を送信する。   The detection device 33 measures the water level of the storage unit 80. Specifically, the detection device 33 includes an injection pressure type water level meter that is provided in the storage unit 80 and measures the water level on a predetermined principle. The predetermined principle is, for example, one of a differential transformer type, a semiconductor type, an ultrasonic type, a radio wave type, a bubble type, a capacitance type, a float type, a float falling type, and an electrode type. Any method that can measure the water level can be used as appropriate. The detection device 33 transmits data (water level data) including information on the water level of the storage unit 80 via the second mobile communication unit 42.

制御装置10は、第1送信部として機能する第1通信部11と、計測部12と、第1受信部として機能する第2通信部13と、制御部14とを備える。第1通信部11は、通信回線Nを介して送信された水位データを受信して計測部12に出力する。具体的には、第1通信部11及び第2通信部13は、例えば所定規格での通信を行うネットワークインタフェースコントローラ(NIC:Network Interface Controller)を有している。所定規格として、例えばTCP/IP(Transmission Control Protocol/Internet Protocol)プロトコル・スイートを含む所謂インターネット・プロトコル・スイートが挙げられるが、これはあくまで制御装置10と演算装置20との間の通信に際して採用される規格の一例であってこれに限られるものでない。所定規格の具体的内容は、適宜変更可能である。   The control device 10 includes a first communication unit 11 that functions as a first transmission unit, a measurement unit 12, a second communication unit 13 that functions as a first reception unit, and a control unit 14. The first communication unit 11 receives the water level data transmitted via the communication line N and outputs it to the measurement unit 12. Specifically, the first communication unit 11 and the second communication unit 13 include, for example, a network interface controller (NIC) that performs communication according to a predetermined standard. The predetermined standard includes, for example, a so-called Internet protocol suite including a TCP / IP (Transmission Control Protocol / Internet Protocol) protocol suite, which is used only for communication between the control device 10 and the arithmetic device 20. It is an example of a standard and is not limited to this. The specific contents of the predetermined standard can be changed as appropriate.

計測部12は、貯留部80の水位に基づいて発電機91の発電量を計測する。具体的には、計測部12は、例えば所定の単位期間あたりの貯留部80の水位変化と発電量との対応関係を示す発電量計測用データを記憶する記憶装置と、検知装置33により測定された水位から求められた貯留部80の水位変化と発電量計測用データとに基づいて発電量を計測する回路等を有する。単位期間は任意の期間であるが、本実施形態では、例えば10[分]である。なお、発電量計測用データは、ガイドベーンの開度と、単位期間あたりの貯留部80の水位変化と発電量との対応関係に関する情報を含むデータであってもよい。   The measuring unit 12 measures the power generation amount of the generator 91 based on the water level of the storage unit 80. Specifically, the measurement unit 12 is measured by, for example, a storage device that stores power generation amount measurement data indicating a correspondence relationship between the water level change of the storage unit 80 and the power generation amount per predetermined unit period, and the detection device 33. A circuit for measuring the power generation amount based on the water level change of the storage unit 80 obtained from the water level and the power generation amount measurement data. The unit period is an arbitrary period, but is 10 [minutes] in this embodiment, for example. Note that the power generation amount measurement data may be data including information on a correspondence relationship between the opening degree of the guide vane, the water level change of the storage unit 80 per unit period, and the power generation amount.

制御部14は、水車92に供給される水量を制御する。具体的には、制御部14は、例えば貯留部80から水車92に供給される水の供給路に設けられたガイドベーン60を動作させて、ガイドベーン60の開き具合を変化させることで水車92に供給される水量を制御する。より具体的には、制御部14は、ガイドベーン60を動作させる駆動回路等を有する。制御部14は、例えば演算装置20の指令に応じてガイドベーン60の動作を制御する。ガイドベーン60は、制御部14の制御下で、水車92に供給される水の量を調節する。   The control unit 14 controls the amount of water supplied to the water wheel 92. Specifically, the control unit 14 operates, for example, a guide vane 60 provided in a supply path of water supplied from the storage unit 80 to the water turbine 92 to change the opening degree of the guide vane 60, thereby changing the water turbine 92. To control the amount of water supplied. More specifically, the control unit 14 includes a drive circuit that operates the guide vane 60 and the like. For example, the control unit 14 controls the operation of the guide vane 60 in accordance with a command from the arithmetic device 20. The guide vane 60 adjusts the amount of water supplied to the water wheel 92 under the control of the control unit 14.

図2、図3は、ガイドベーン60の模式図である。図3では、水車92に流れ込む水Wを模式的に図示している。図2、図3に示すように、ガイドベーン60は、水車92を取り巻くよう配置された複数の羽根状部材61を有する。複数の羽根状部材61の各々は、回動可能に設けられる。ガイドベーン60は、複数の羽根状部材61の回動によって隣接する羽根状部材61同士の間の隙間の開閉及び開き具合を調節可能に設けられている。図2に示すようにガイドベーン60が閉じている場合、羽根状部材61同士の間は閉じられて隙間がなく、水が流れない。図3に示すようにガイドベーン60が開いている場合、羽根状部材61同士の間の隙間に、水車92に供給される水(図3に示す水W)が流れる。   2 and 3 are schematic views of the guide vane 60. FIG. In FIG. 3, the water W flowing into the water wheel 92 is schematically illustrated. As shown in FIGS. 2 and 3, the guide vane 60 has a plurality of blade-like members 61 arranged so as to surround the water wheel 92. Each of the plurality of blade-like members 61 is rotatably provided. The guide vane 60 is provided so that the opening / closing and opening of the gap between the adjacent blade-like members 61 can be adjusted by the rotation of the plurality of blade-like members 61. As shown in FIG. 2, when the guide vane 60 is closed, the blade-like members 61 are closed with no gap, and water does not flow. As shown in FIG. 3, when the guide vane 60 is open, water (water W shown in FIG. 3) supplied to the water wheel 92 flows through the gap between the blade-like members 61.

演算装置20は、制御装置10を介した発電機91の動作制御に関する演算を行う。演算装置20は、例えば、記憶部21と、演算部22と、第3通信部23と、表示部24と、入力部25とを備える。   The computing device 20 performs computation related to operation control of the generator 91 via the control device 10. The computing device 20 includes, for example, a storage unit 21, a computing unit 22, a third communication unit 23, a display unit 24, and an input unit 25.

記憶部21は、参照データ21a及び制御プログラム21bを含む各種のデータを記憶する記憶装置を有する。この記憶装置は、例えばハードディスクドライブ、ソリッドステートドライブ、フラッシュメモリー、その他、コンピュータで用いられ得る記憶装置のいずれか又は複数を含む。記憶部は、判定部が前記第2所定期間における前記水車への水の供給量が予め定められた制限水量を超えると判定した場合、前記取水ゲートの開度及び気象条件のいずれか1つ以上を記憶する。   The memory | storage part 21 has a memory | storage device which memorize | stores various data including the reference data 21a and the control program 21b. The storage device includes, for example, one or more of a hard disk drive, a solid state drive, a flash memory, and other storage devices that can be used in a computer. When the determination unit determines that the amount of water supplied to the water wheel in the second predetermined period exceeds a predetermined limit amount of water, the storage unit is any one or more of the opening of the intake gate and weather conditions Remember.

図4は、参照データ21aの内容の一例を示す図である。参照データ21aは、例えば過去開度データ51、過去気象条件データ52等、演算部22による各種の処理で参照される各種のデータを含む。過去開度データ51は、後述する第2所定期間における水車92への水の供給量が予め定められた制限水量を超えると過去に判定された場合の取水ゲート31の開度(過去開度)に関する情報を含むデータである。過去気象条件データ52は、第2所定期間における水車92への水の供給量が予め定められた制限水量を超えると過去に判定された場合の気象条件(過去気象条件)に関する情報を含むデータである。過去開度データ51を記憶する記憶部21は、第1記憶部として機能する。また、過去気象条件データ52を記憶する記憶部21は、第2記憶部として機能する。過去開度データ51を記憶する構成と過去気象条件データ52を記憶する構成は、別個の構成(例えば、演算装置20が備える個別の記憶装置)であってもよい。   FIG. 4 is a diagram showing an example of the contents of the reference data 21a. The reference data 21a includes various types of data referred to in various types of processing by the calculation unit 22, such as past opening degree data 51 and past weather condition data 52. The past opening degree data 51 is the opening degree (past opening degree) of the intake gate 31 when it has been determined in the past that the amount of water supplied to the water wheel 92 in a second predetermined period to be described later exceeds a predetermined limit amount of water. It is data including information about. The past meteorological condition data 52 is data including information on meteorological conditions (past meteorological conditions) when it is determined in the past that the amount of water supplied to the water turbine 92 in the second predetermined period exceeds a predetermined limit amount of water. is there. The memory | storage part 21 which memorize | stores the past opening degree data 51 functions as a 1st memory | storage part. Moreover, the memory | storage part 21 which memorize | stores the past weather condition data 52 functions as a 2nd memory | storage part. The configuration for storing the past opening degree data 51 and the configuration for storing the past weather condition data 52 may be separate configurations (for example, individual storage devices included in the arithmetic device 20).

制御プログラム21bは、演算部22により読み出されて実行処理されるソフトウェア・プログラムである。制御プログラム21bは、制御装置10を介した発電機91の動作制御に関する各種の機能(例えば、後述する判定部71、指令部72、開度情報取得部73、気象条件取得部74、取水制御部75としての機能。図5参照)を実現するためのプログラムである。以下、参照データ21a及び制御プログラム21bならびに図示しない各種のソフトウェア・プログラム(例えば、オペレーティングシステム等)を総括して「プログラム等」と記載することがある。   The control program 21b is a software program that is read and executed by the calculation unit 22. The control program 21b includes various functions related to operation control of the generator 91 via the control device 10 (for example, a determination unit 71, a command unit 72, an opening degree information acquisition unit 73, a weather condition acquisition unit 74, and a water intake control unit which will be described later). This is a program for realizing the function as 75. See FIG. Hereinafter, the reference data 21a, the control program 21b, and various software programs (not shown) (for example, an operating system) may be collectively referred to as “programs”.

図5は、演算装置20の主要機能構成を示す機能ブロック図である。演算部22は、例えば1つ以上のCPU(Central Processing Unit)を有し、記憶部21から処理内容に応じたプログラム等を読み出して実行し、演算装置20の動作に関する各種の処理を行う。具体的には、演算部22は、例えば、判定部71、指令部72、開度情報取得部73、気象条件取得部74、取水制御部75として機能する。判定部71は、第1所定期間あたりの発電機91の発電量に基づいて、第2所定期間における発電機91の発電量が所定の発電量を超えるか判定する。第2所定期間は、第1所定期間を含み、かつ第1所定期間よりも長い期間である。指令部72は、第2所定期間における発電機91の発電量を所定の発電量以下とするための指令として機能するデータ(指令データ)を出力する。開度情報取得部73は、取水ゲート31の開度を取得する。気象条件取得部74は、気象条件を取得する。取水制御部75は、取水ゲート31の開度を制御する。これらの機能によりもたらされる具体的な動作内容については後述する。   FIG. 5 is a functional block diagram showing the main functional configuration of the arithmetic device 20. The calculation unit 22 has, for example, one or more CPUs (Central Processing Units), reads out and executes a program or the like corresponding to the processing content from the storage unit 21, and performs various processes related to the operation of the calculation device 20. Specifically, the calculating part 22 functions as the determination part 71, the instruction | command part 72, the opening degree information acquisition part 73, the weather condition acquisition part 74, and the water intake control part 75, for example. The determination unit 71 determines whether the power generation amount of the generator 91 in the second predetermined period exceeds the predetermined power generation amount based on the power generation amount of the power generator 91 per first predetermined period. The second predetermined period is a period that includes the first predetermined period and is longer than the first predetermined period. The command unit 72 outputs data (command data) that functions as a command for setting the power generation amount of the power generator 91 in the second predetermined period to be equal to or less than the predetermined power generation amount. The opening degree information acquisition unit 73 acquires the opening degree of the intake gate 31. The weather condition acquisition unit 74 acquires weather conditions. The intake control unit 75 controls the opening degree of the intake gate 31. Specific operation contents brought about by these functions will be described later.

第2受信部及び第2送信部として機能する第3通信部23は、送信部から送信されたデータを受信する。具体的には、第3通信部23は、例えば第1通信部11と同様、所定規格での通信を行うNIC等を有している。第1通信部11、第2通信部13及び第3通信部23の少なくともいずれか一つは、例えば第1移動通信部41、第2移動通信部42と同様、無線通信を行う構成であってもよい。   The 3rd communication part 23 which functions as a 2nd receiving part and a 2nd transmission part receives the data transmitted from the transmission part. Specifically, the third communication unit 23 includes, for example, a NIC that performs communication according to a predetermined standard, like the first communication unit 11. At least one of the first communication unit 11, the second communication unit 13, and the third communication unit 23 is configured to perform wireless communication like the first mobile communication unit 41 and the second mobile communication unit 42, for example. Also good.

表示部24は、演算装置20の処理内容に応じた表示出力を行う。具体的には、表示部24は、例えば液晶ディスプレイ等の表示装置を有し、演算部22の処理内容に応じた表示出力を行う。   The display unit 24 performs display output according to the processing content of the arithmetic device 20. Specifically, the display unit 24 includes a display device such as a liquid crystal display, for example, and performs display output according to the processing content of the calculation unit 22.

入力部25は、演算装置20に対する入力操作を受け付ける。具体的には、入力部25は、例えばキーボード、マウス等の入力装置を有し、演算装置20の管理者が行う各種の入力操作に応じた信号を生成して演算装置20に入力する。演算部22は、入力部25を介して行われた入力操作内容に応じた処理を行う。   The input unit 25 receives an input operation on the arithmetic device 20. Specifically, the input unit 25 includes input devices such as a keyboard and a mouse, for example, and generates signals according to various input operations performed by the administrator of the arithmetic device 20 and inputs the signals to the arithmetic device 20. The calculation unit 22 performs processing according to the input operation content performed through the input unit 25.

以下、水量の制御についてより具体的に説明する。水力発電では、一般的に、ある発電期間(例えば、第2所定期間)に対して利用してもよい取水量に限度がある。この限度は、人為的取り決め(例えば、利水権)による限度である。水力発電では、この限度を超えた発電を抑制するよう求められている。このため、本実施形態では、この限度を超えない発電量に対応した所定水量が水車92に供給されるよう、制御部14がガイドベーン60の開度を予め所定水量に対応した所定開度としている。ただし、河川81の水位によっては、取水口に対する水圧が強まる等の理由によって予定以上の水が貯留部80及び水車92に流入し、結果として意図せず発電量が予定を超えることがある。   Hereinafter, the control of the water amount will be described more specifically. In hydroelectric power generation, there is generally a limit to the amount of water that can be used for a certain power generation period (for example, the second predetermined period). This limit is due to human arrangements (eg water rights). Hydroelectric power generation is required to suppress power generation that exceeds this limit. For this reason, in this embodiment, the control unit 14 sets the opening of the guide vane 60 to a predetermined opening corresponding to the predetermined amount of water in advance so that the predetermined amount of water corresponding to the power generation amount not exceeding this limit is supplied to the water turbine 92. Yes. However, depending on the water level of the river 81, more than planned water may flow into the storage unit 80 and the water wheel 92 due to reasons such as an increase in water pressure at the water intake, and as a result, the power generation amount may unexpectedly exceed the plan.

計測部12は、第1所定期間の経過前後の貯留部80の水位に基づいて発電機91の発電量を計測する。具体的には、計測部12は、水位データを、第2移動通信部42、通信回線N及び第1通信部11を介して取得し、第1所定期間の経過前後の貯留部80の水位を比較する。本実施形態では、計測部12は、単位期間(例えば、10[分])毎に水位を取得して単位期間の経過前後の水位を比較することができるが、2周期以上の単位期間の経過前後の水位を比較してもよい。ここでは、第1所定期間が3周期の単位期間(30[分]=0.5[時間])であるものとして説明を行う。計測部12は、第1所定期間の経過前後の貯留部80の水位と発電量計測用データとに基づいて発電機91の発電量を計測する。計測部12は、計測された発電量に関する情報を含むデータ(発電量データ)を出力する。出力された発電量データは、第1通信部11を介して送信される。送信された発電量データは、演算装置20の第3通信部23により受信される。   The measuring unit 12 measures the power generation amount of the generator 91 based on the water level of the storage unit 80 before and after the elapse of the first predetermined period. Specifically, the measurement unit 12 acquires water level data via the second mobile communication unit 42, the communication line N, and the first communication unit 11, and calculates the water level of the storage unit 80 before and after the elapse of the first predetermined period. Compare. In the present embodiment, the measurement unit 12 can acquire the water level every unit period (for example, 10 [minutes]) and compare the water level before and after the elapse of the unit period. You may compare the water level before and after. Here, the description will be made assuming that the first predetermined period is a unit period of three cycles (30 [minutes] = 0.5 [hours]). The measurement unit 12 measures the power generation amount of the generator 91 based on the water level of the storage unit 80 and the power generation amount measurement data before and after the elapse of the first predetermined period. The measurement unit 12 outputs data (power generation amount data) including information on the measured power generation amount. The output power generation amount data is transmitted via the first communication unit 11. The transmitted power generation amount data is received by the third communication unit 23 of the arithmetic device 20.

本実施形態では、ガイドベーン60が所定開度である条件下で、例えば単位期間の経過後の貯留部80の水位が単位期間の経過前の貯留部80の水位以下である状態が第2所定期間継続した場合に発電量が第2所定期間あたりの発電量の限度を超えないものとする。また、発電量計測用データが示す水位と発電量との関係は、例えば単位期間の経過後の貯留部80の水位が単位期間の経過前の貯留部80の水位を超えていた場合、第2所定期間あたりの発電量の限度を超える可能性が生じるものとする。発電量計測用データによって水位と対応付けられた発電量は、このような発電量である。   In the present embodiment, under the condition that the guide vane 60 has a predetermined opening, for example, a state in which the water level of the storage unit 80 after the elapse of the unit period is equal to or lower than the water level of the storage unit 80 before the unit period elapses is the second predetermined. It is assumed that the power generation amount does not exceed the limit of the power generation amount per second predetermined period when the period continues. The relationship between the water level indicated by the power generation amount measurement data and the power generation amount is, for example, when the water level of the storage unit 80 after the unit period has passed exceeds the water level of the storage unit 80 before the unit period has elapsed. The possibility of exceeding the limit of power generation per given period shall occur. The power generation amount associated with the water level by the power generation amount measurement data is such a power generation amount.

判定部71は、発電量データが示す第1所定期間あたりの発電機91の発電量に基づいて、第1所定期間よりも長い第2所定期間における発電機91の発電量が所定の発電量を超えるか判定する。具体的には、例えば第1所定期間をb(例えば、0.5[時間]≦b<1[時間])とし、第2所定期間をa(例えば、a≧1[時間])とし、第1所定期間あたりの発電機91の発電量をB[kwh]とし、第2所定期間中に発電機91が発電してもよい最大発電量をA[kwh]とすると、第2所定期間のうち、第1所定期間経過後に発電機91が発電してもよい発電出力D[kw]は、以下の式(1)により求められる。
D=(A−B)/(a−b)…(1)
Based on the power generation amount of the generator 91 per first predetermined period indicated by the power generation amount data, the determination unit 71 determines that the power generation amount of the generator 91 in the second predetermined period longer than the first predetermined period is the predetermined power generation amount. Judge whether it exceeds. Specifically, for example, the first predetermined period is b (for example, 0.5 [hour] ≦ b <1 [hour]), the second predetermined period is a (for example, a ≧ 1 [hour]), and the first If the power generation amount of the generator 91 per one predetermined period is B [kwh], and the maximum power generation amount that the generator 91 may generate during the second predetermined period is A [kwh], the second predetermined period The power generation output D [kw] that may be generated by the generator 91 after the elapse of the first predetermined period is obtained by the following equation (1).
D = (A−B) / (a−b) (1)

本実施形態では、例えば、a=1であり、b=0.5である。すなわち、第2所定期間(a=1[時間])は、第1所定期間(b=0.5[時間])の2倍の期間であり、(a−b)=0.5[時間]である。判定部71は、式(1)に基づいてDを算出する。判定部71は、例えばAとDとの関係に基づいて、第2所定期間における発電機91の発電量が所定の発電量を超えるか判定する。   In the present embodiment, for example, a = 1 and b = 0.5. That is, the second predetermined period (a = 1 [hour]) is twice as long as the first predetermined period (b = 0.5 [hour]), and (ab) = 0.5 [hour]. It is. The determination unit 71 calculates D based on Expression (1). For example, based on the relationship between A and D, the determination unit 71 determines whether the power generation amount of the generator 91 in the second predetermined period exceeds a predetermined power generation amount.

第1の具体例として、A=100[kwh]であり、B=50[kwh]であり、a=1であり、b=0.5であるとする。この場合、D=(100−50)/(1−0.5)=100[kw]である。この具体例では、第2所定期間から第1所定期間を差し引いた残り期間が0.5[時間]であり、D=100[kw]を残り期間継続した場合の発電量が50[kwh]である。また、この具体例では、第2所定期間(a=1[時間])の最大発電量がA(100[kwh])であるから、発電可能な最大発電出力は、100[kw]であるといえ、第1所定期間(b=0.5[時間])に発電された発電量(B=50[kwh])は、A×bと同値である。従って、第1の具体例では、判定部71は、第1所定期間あたりの発電機91の発電量に基づく限り、第2所定期間における発電機91の発電量が所定の発電量を超えることはない。言い換えれば、判定部71は、D≧Aである場合、第1所定期間あたりの発電機91の発電量に基づく限り、第2所定期間における発電機91の発電量が所定の発電量を超えることはない。   As a first specific example, it is assumed that A = 100 [kwh], B = 50 [kwh], a = 1, and b = 0.5. In this case, D = (100-50) / (1-0.5) = 100 [kw]. In this specific example, the remaining period obtained by subtracting the first predetermined period from the second predetermined period is 0.5 [hour], and the power generation amount when D = 100 [kw] is continued for the remaining period is 50 [kwh]. is there. In this specific example, since the maximum power generation amount in the second predetermined period (a = 1 [hour]) is A (100 [kwh]), the maximum power generation output that can be generated is 100 [kw]. No, the power generation amount (B = 50 [kwh]) generated during the first predetermined period (b = 0.5 [hour]) is equivalent to A × b. Therefore, in the first specific example, as long as the determination unit 71 is based on the power generation amount of the generator 91 per first predetermined period, the power generation amount of the generator 91 in the second predetermined period does not exceed the predetermined power generation amount. Absent. In other words, in the case where D ≧ A, the determination unit 71, as long as it is based on the power generation amount of the generator 91 per first predetermined period, the power generation amount of the generator 91 in the second predetermined period exceeds the predetermined power generation amount. There is no.

一方、第2の具体例として、A=100[kwh]であり、B=60[kwh]であり、a=1であり、b=0.5であるとする。この場合、D=(100−60)/(1−0.5)=80[kw]である。この具体例では、第2所定期間から第1所定期間を差し引いた残り期間が0.5[時間]であり、D=80[kw]を残り期間継続した場合の発電量が40[kwh]である。また、この具体例では、第2所定期間(a=1[時間])の最大発電量がA(100[kwh])であるから、発電可能な最大発電量は、100[kw]であるといえ、第1所定期間(b=0.5[時間])に発電された発電量(B=60[kwh])は、A×bを超えている。従って、第2の具体例では、判定部71は、第1所定期間あたりの発電機91の発電量に基づく限り、この発電量がそのまま継続されれば第2所定期間における発電機91の発電量が所定の発電量を超える。言い換えれば、判定部71は、D<Aである場合、第1所定期間あたりの発電機91の発電量に基づくと、第2所定期間における発電機91の発電量が所定の発電量を超える。   On the other hand, as a second specific example, it is assumed that A = 100 [kwh], B = 60 [kwh], a = 1, and b = 0.5. In this case, D = (100-60) / (1-0.5) = 80 [kw]. In this specific example, the remaining period obtained by subtracting the first predetermined period from the second predetermined period is 0.5 [hour], and the power generation amount when D = 80 [kw] is continued for the remaining period is 40 [kwh]. is there. In this specific example, since the maximum power generation amount in the second predetermined period (a = 1 [hour]) is A (100 [kwh]), the maximum power generation amount that can be generated is 100 [kw]. No, the power generation amount (B = 60 [kwh]) generated during the first predetermined period (b = 0.5 [hour]) exceeds A × b. Accordingly, in the second specific example, as long as the power generation amount of the generator 91 per first predetermined period is based on the power generation amount of the generator 91, the determination unit 71 will continue to generate the power generation amount of the generator 91 in the second predetermined period. Exceeds the predetermined power generation amount. In other words, when D <A, the determination unit 71, based on the power generation amount of the generator 91 per first predetermined period, exceeds the predetermined power generation amount in the second predetermined period.

上記を踏まえ、本実施形態では、第1所定期間経過後に発電機91が発電してもよい発電量(上記の式(1)における発電出力D[kw])と現在の発電機91の出力(C[kw])との偏差Δを以下の式(2)に基づいて算出する。
Δ=(A−B)/(a−b)−C…(2)
Based on the above, in the present embodiment, the amount of power that the generator 91 may generate after the first predetermined period (the power generation output D [kw] in the above equation (1)) and the current output of the generator 91 ( C [kw]) is calculated based on the following equation (2).
Δ = (A−B) / (ab) −C (2)

偏差Δが0以上である場合、指令部72は、偏差Δを0とし、偏差Δを示す指令データを出力する。偏差Δが0未満である場合、指令部72は、0未満の偏差Δを示す指令データを出力する。指令データは、第3通信部23を介して送信される。第3通信部23から送信された指令データは、通信回線Nを経て、第2通信部13により受信されて制御部14に入力される。制御部14は、ガイドベーン60の開度を、指令データが示す発電量に対応した開度とする。具体的には、制御部14は、現在の発電機91の出力(C[kw])を偏差Δで補正した出力(C+Δ[kw])に対応したガイドベーン60の開度となるようガイドベーン60の動作を制御する。このように、指令部72が出力する指令データは、第2所定期間における発電機91の発電量を所定の発電量以下とするための指令として機能する。   When the deviation Δ is 0 or more, the command unit 72 sets the deviation Δ to 0 and outputs command data indicating the deviation Δ. When the deviation Δ is less than 0, the command unit 72 outputs command data indicating the deviation Δ less than 0. The command data is transmitted via the third communication unit 23. The command data transmitted from the third communication unit 23 is received by the second communication unit 13 via the communication line N and input to the control unit 14. The control unit 14 sets the opening degree of the guide vane 60 to an opening degree corresponding to the power generation amount indicated by the command data. Specifically, the control unit 14 guides the guide vane 60 so that the opening degree of the guide vane 60 corresponds to the output (C + Δ [kw]) obtained by correcting the current output (C [kw]) of the generator 91 with the deviation Δ. 60 operations are controlled. Thus, the command data output by the command unit 72 functions as a command for setting the power generation amount of the generator 91 in the second predetermined period to be equal to or less than the predetermined power generation amount.

以上、a=1であり、b=0.5である場合を例示したが、これは一例であってこれに限られるものでなく、a,bは適宜変更可能である。同様に、上記の各具体例で例示したA,Bの値はあくまで例示であり、これに限られるものでなく、適宜変更可能である。例えば、第1所定期間を10[分]とする等、上記の各具体例よりもより短い期間としてもよい。   The case where a = 1 and b = 0.5 has been described above, but this is only an example and is not limited thereto, and a and b can be changed as appropriate. Similarly, the values of A and B exemplified in each of the above specific examples are merely examples, and are not limited thereto, and can be changed as appropriate. For example, the first predetermined period may be 10 [minutes] or may be shorter than each of the above specific examples.

開度情報取得部73は、第2所定期間における水車92への水の供給量が予め定められた制限水量を超えると判定された場合に取水ゲート31の開度を取得する。具体的には、開度情報取得部73は、例えば取水ゲート駆動装置32に対して取水ゲート31の開度を示す情報を要求する要求データを出力する。   The opening degree information acquisition unit 73 acquires the opening degree of the water intake gate 31 when it is determined that the amount of water supplied to the water turbine 92 in the second predetermined period exceeds a predetermined limit amount of water. Specifically, the opening degree information acquisition unit 73 outputs request data for requesting information indicating the opening degree of the intake gate 31 to the intake gate drive device 32, for example.

要求データは、第3通信部23、通信回線N及び第1移動通信部41を経た通信によって伝送されて取水ゲート駆動装置32に入力される。取水ゲート駆動装置32は、要求データに応じて、取水ゲート31の開度に関する情報を含むデータ(開度データ)を出力する。開度データは、第1移動通信部41、通信回線N及び第3通信部23を経た通信によって伝送されて演算部22に入力される。これによって、開度情報取得部73は、取水ゲート31の開度を示す情報を取得する。   The request data is transmitted by communication through the third communication unit 23, the communication line N, and the first mobile communication unit 41 and is input to the intake gate driving device 32. The intake gate drive device 32 outputs data (opening data) including information related to the opening of the intake gate 31 according to the request data. The opening degree data is transmitted by communication via the first mobile communication unit 41, the communication line N, and the third communication unit 23 and is input to the calculation unit 22. Thereby, the opening degree information acquisition unit 73 acquires information indicating the opening degree of the intake gate 31.

気象条件取得部74は、第2所定期間における水車92への水の供給量が予め定められた制限水量を超えると判定された場合に気象条件を取得する。具体的には、気象条件取得部74は、例えば取水ゲート31が設けられている河川81を含む地域の気象に関する情報を提供する外部の情報処理装置100に対して当該地域の天候に関する情報の提供を要求する。情報処理装置100は、気象条件取得部74の要求に応じて当該地域の天候に関する情報を演算装置20に提供する。取得された天候に関する情報は、「最近、第2所定期間における水車92への水の供給量が予め定められた制限水量を超えると判定される事象が成立した際の天候(気象条件)に関するデータ(気象条件データ)として扱われる。このように、気象条件取得部74は、気象条件を取得する。気象条件取得部74と情報処理装置100との間の交信(通信)の具体的形態は、開度情報取得部73と取水ゲート駆動装置32との間の交信(通信)の具体的形態と同様である。   The weather condition acquisition unit 74 acquires the weather condition when it is determined that the amount of water supplied to the water turbine 92 in the second predetermined period exceeds a predetermined limit water amount. Specifically, the weather condition acquisition unit 74 provides, for example, information regarding the weather in the region to the external information processing apparatus 100 that provides information regarding the weather in the region including the river 81 where the intake gate 31 is provided. Request. The information processing apparatus 100 provides information regarding the weather in the area to the computing device 20 in response to a request from the weather condition acquisition unit 74. The information on the acquired weather is “data relating to the weather (meteorological conditions) when an event has been established that the amount of water supplied to the water turbine 92 in the second predetermined period has recently exceeded a predetermined limit amount of water. In this way, the weather condition acquisition unit 74 acquires the weather condition, and the specific form of communication (communication) between the weather condition acquisition unit 74 and the information processing apparatus 100 is as follows. This is the same as the specific form of communication (communication) between the opening degree information acquisition unit 73 and the intake gate drive device 32.

なお、情報処理装置100は、例えば天候に関する情報を提供するサービスを行っている企業の情報処理装置であるが、天候に関する情報を提供する構成は、情報処理装置100に限られない。気象条件取得部74は、例えば、天候を観測するための観測機等のセンサ類から天候に関する情報を取得するようにしてもよい。   The information processing apparatus 100 is, for example, an information processing apparatus of a company that provides a service that provides information related to the weather. However, the configuration that provides information related to the weather is not limited to the information processing apparatus 100. The weather condition acquisition unit 74 may acquire information about the weather from sensors such as an observation device for observing the weather, for example.

取水制御部75は、第1記憶部(例えば、記憶部21)に記憶された取水ゲート31の開度と第2取得部により取得された取水ゲート31の開度との比較及び第2記憶部(例えば、記憶部21)に記憶された気象条件及び第3取得部により取得された気象条件とに基づいて取水ゲート31の開度を制御する。具体的には、取水制御部75は、過去開度データ51を読み出して、開度データの示す開度と過去開度データ51の示す開度とを対照する。また、取水制御部75は、過去気象条件データ52を読み出して、気象条件データの示す気象条件と過去気象条件データ52の示す気象条件とを対照する。取水制御部75は、これらの対照結果に基づいて取水ゲート31の開度を制御する。   The intake control unit 75 compares the opening of the intake gate 31 stored in the first storage unit (for example, the storage unit 21) with the opening of the intake gate 31 acquired by the second acquisition unit, and the second storage unit. The opening degree of the intake gate 31 is controlled based on the weather conditions stored in (for example, the storage unit 21) and the weather conditions acquired by the third acquisition unit. Specifically, the water intake control unit 75 reads the past opening degree data 51 and compares the opening degree indicated by the opening degree data with the opening degree indicated by the past opening degree data 51. The intake control unit 75 reads the past weather condition data 52 and compares the weather condition indicated by the weather condition data with the weather condition indicated by the past weather condition data 52. The intake control unit 75 controls the opening degree of the intake gate 31 based on these comparison results.

具体例を挙げると、過去開度データ51は、例えばガイドベーン60が所定開度であったにも関わらず河川81の気象条件に応じて第2所定期間における発電機91の発電量を所定の発電量以下とするための指令が必要になったことのある過去の取水ゲート31の開度(一意の値又は値の範囲)を示す。また、過去気象条件データ52は、例えばガイドベーン60が所定開度であったにも関わらず第2所定期間における発電機91の発電量を所定の発電量以下とするための指令が必要になった過去の河川81の気象条件(一意の気象条件又はバリエーション)を示す。取水制御部75は、例えば、開度データの示す開度が過去開度データ51の示す開度と一致又は過去開度データ51の示す開度の範囲内であり、かつ、気象条件データの示す気象条件が過去気象条件データ52の示す気象条件と一致又は過去気象条件データ52の示す気象条件のバリエーションのうち一つであった場合、取水ゲート31の開度を小さくするための指令として機能するデータ(取水制限指令データ)を出力する。取水ゲート駆動装置32は、取水ゲート31の開度を取水制限指令データが示す開度とするよう取水ゲート31を動作させる。取水制御部75と取水ゲート駆動装置32との間の交信(通信)の具体的形態は、開度情報取得部73と取水ゲート駆動装置32との間の交信(通信)の具体的形態と同様である。   To give a specific example, the past opening degree data 51 indicates, for example, the power generation amount of the generator 91 in the second predetermined period according to the weather condition of the river 81 in spite of the guide vane 60 having a predetermined opening degree. The past opening degree (unique value or range of values) of the intake gate 31 for which a command for setting the power generation amount or less has become necessary is shown. For example, the past weather condition data 52 requires a command for setting the power generation amount of the generator 91 in the second predetermined period to be equal to or less than the predetermined power generation amount even though the guide vane 60 has a predetermined opening degree. The past weather conditions of the river 81 (unique weather conditions or variations) are shown. For example, the intake control unit 75 has an opening degree indicated by the opening degree data that coincides with an opening degree indicated by the past opening degree data 51 or is within the range of the opening degree indicated by the past opening degree data 51, and indicated by the weather condition data. When the meteorological condition matches the meteorological condition indicated by the past meteorological condition data 52 or is one of the variations of the meteorological condition indicated by the past meteorological condition data 52, it functions as a command for reducing the opening of the intake gate 31. Outputs data (intake restriction command data). The intake gate drive device 32 operates the intake gate 31 so that the opening of the intake gate 31 is the opening indicated by the water restriction command data. The specific form of communication (communication) between the intake control unit 75 and the intake gate drive device 32 is the same as the specific form of communication (communication) between the opening degree information acquisition unit 73 and the intake gate drive device 32. It is.

記憶部21は、開度データが示す制御前の取水ゲート31の開度と気象条件データが示す気象条件とが示す組み合わせ条件に応じて取水ゲート31の開度を決定するためのデータ(パターンデータ)をさらに記憶していてもよい。この場合、パターンデータは、例えば過去の取水ゲート31の開度と河川81を含む地域の気象条件との関係と、当該関係が成立する条件下で貯留部80の水位を一定以下に保って第2所定期間における発電機91の発電量を所定の発電量以下とすることができる取水ゲート31の開度に関する情報を含むデータである。パターンデータがある場合、取水制御部75は、取水制限指令データが示す取水ゲート31の開度を、パターンデータが示す開度のうち開度データ及び気象条件データの関係に対応する開度とする。過去開度データ51、過去気象条件データ52及びパターンデータは、例えば過去の事例に基づいて設定されているが、シミュレーション等によって導出されて設定されたデータを含んでいてもよい。   The storage unit 21 is data (pattern data) for determining the opening degree of the intake gate 31 according to the combination condition indicated by the opening degree of the intake gate 31 before the control indicated by the opening degree data and the weather condition indicated by the weather condition data. ) May be further stored. In this case, for example, the pattern data is obtained by maintaining the water level of the storage unit 80 below a certain level under the condition that the relationship between the past opening of the intake gate 31 and the local weather conditions including the river 81 and the relationship is established. 2 Data including information on the opening of the intake gate 31 that can reduce the power generation amount of the generator 91 in a predetermined period to be equal to or less than the predetermined power generation amount. When there is pattern data, the intake control unit 75 sets the opening of the intake gate 31 indicated by the intake restriction command data to an opening corresponding to the relationship between the opening data and the weather condition data among the openings indicated by the pattern data. . The past opening degree data 51, the past weather condition data 52, and the pattern data are set based on, for example, past cases, but may include data set by being derived by simulation or the like.

図6は、水力発電の制御システム1が行う処理の流れの一例を示すフローチャートである。まず、検知装置33によって単位期間周期で貯留部80の水位が取得され(ステップS1)、通信回線Nを介して制御装置10に送信される。計測部12は、第1所定期間の経過前後の貯留部80の水位に基づいて発電機91の発電量を計測する(ステップS2)。計測部12は、計測された発電量に関する情報を含むデータ(発電量データ)を出力する。出力された発電量データは、第1通信部11を介して送信される。送信された発電量データは、演算装置20の第3通信部23により受信される。   FIG. 6 is a flowchart illustrating an example of a flow of processing performed by the hydroelectric power generation control system 1. First, the water level of the storage unit 80 is acquired by the detection device 33 in a unit period cycle (step S1), and is transmitted to the control device 10 via the communication line N. The measuring unit 12 measures the power generation amount of the generator 91 based on the water level of the storage unit 80 before and after the elapse of the first predetermined period (step S2). The measurement unit 12 outputs data (power generation amount data) including information on the measured power generation amount. The output power generation amount data is transmitted via the first communication unit 11. The transmitted power generation amount data is received by the third communication unit 23 of the arithmetic device 20.

演算部22は、例えば第2所定期間のうち、第1所定期間経過後に発電機91が発電してもよい発電量(上記の式(1)における発電出力D[kw])と現在の発電機91の出力(C[kw])との偏差Δを上記の式(2)に基づいて算出する(ステップS3)。   For example, in the second predetermined period, the calculation unit 22 may generate the power generation amount (the power generation output D [kw] in the above equation (1)) that the generator 91 may generate after the first predetermined period has elapsed and the current generator. A deviation Δ from the output 91 (C [kw]) is calculated based on the above equation (2) (step S3).

偏差Δが0以上である場合(ステップS4;No)、演算部22は、偏差Δを0とし(ステップS5)、偏差Δを示す指令データを出力する(ステップS6)。偏差Δが0未満である場合(ステップS4;Yes)、演算部22は、ステップS5の処理を省略してステップS6の処理に移行する。すなわち、0未満の偏差Δをそのまま出力する。制御部14は、現在の発電機91の出力(C[kw])を偏差Δで補正した出力(C+Δ[kw])に対応したガイドベーン60の開度となるようガイドベーン60の動作を制御する(ステップS7)。   When the deviation Δ is 0 or more (step S4; No), the calculation unit 22 sets the deviation Δ to 0 (step S5) and outputs command data indicating the deviation Δ (step S6). When deviation (DELTA) is less than 0 (step S4; Yes), the process part 22 abbreviate | omits the process of step S5 and transfers to the process of step S6. That is, the deviation Δ less than 0 is output as it is. The control unit 14 controls the operation of the guide vane 60 so that the opening degree of the guide vane 60 corresponds to the output (C + Δ [kw]) obtained by correcting the output (C [kw]) of the current generator 91 with the deviation Δ. (Step S7).

図7は、第2所定期間における水車92への水の供給量が予め定められた制限水量を超えると判定された場合における取水ゲート31の開度制御に関する処理の流れの一例を示すフローチャートである。開度情報取得部73は、取水ゲート31の開度に関する情報を含むデータ(開度データ)を取得する(ステップS11)。気象条件取得部74は、気象条件に関する情報を含むデータ(気象条件データ)を取得する(ステップS12)。取水制御部75は、過去開度データ51を読み出して、開度データの示す開度と過去開度データ51の示す開度とを対照する(ステップS13)。また、取水制御部75は、過去気象条件データ52を読み出して、気象条件データの示す気象条件と過去気象条件データ52の示す気象条件とを対照する(ステップS14)。取水制御部75は、これらの対照結果に基づいて取水ゲート31の開度を制御する(ステップS15)。一例を挙げると、取水制御部75は、開度データの示す開度が過去開度データ51の示す開度と一致又は過去開度データ51の示す開度の範囲内であった場合、取水ゲート31の開度を小さくする。また、取水制御部75は、気象条件データの示す天候に関する情報が過去気象条件データ52に含まれる天候に関する情報と一致又は類似する場合、取水ゲート31の開度を小さくする。天候に関する情報の一致又は類似の判定は、例えば予め定められたマッチング条件に基づいて行われる。具体的には、取水ゲート31地点の河川の流域の天気(例えば、晴れ、曇り、雨、雪等)、雨等が降っている場合の降水量、温度、風向、風速その他の天候に関する各種の情報の各々に対して、取水量との関連性に応じた重み付けが予めなされている。この重み付けは、天候に関する情報の一致又は類似の度合いを判定するためのポイントを算出する根拠となる。取水制御部75は、天気の一致の有無、降水量、温度、風向、風速その他の天候に関する各種の情報の一致の度合い(誤差の有無及び誤差がある場合の大きさ)等に基づいて、ポイントを算出する。取水制御部75は、算出されたポイントと、マッチング条件として定められたポイントとの基準値を比較し、算出されたポイントがマッチング条件を満たした場合に取水ゲート31の開度を小さくする。このようなマッチング条件に関する具体的な開度の制御形態はあくまで一例であってこれに限られるものでなく、適宜変更可能である。   FIG. 7 is a flowchart showing an example of a flow of processing related to opening control of the water intake gate 31 when it is determined that the amount of water supplied to the water wheel 92 in the second predetermined period exceeds a predetermined limit amount of water. . The opening degree information acquisition unit 73 acquires data (opening degree data) including information on the opening degree of the intake gate 31 (step S11). The weather condition acquisition unit 74 acquires data (meteorological condition data) including information on weather conditions (step S12). The intake control part 75 reads the past opening degree data 51, and contrasts the opening degree which opening degree data shows, and the opening degree which the past opening degree data 51 shows (step S13). Moreover, the intake control part 75 reads the past weather condition data 52, and contrasts the weather condition which the weather condition data shows, and the weather condition which the past weather condition data 52 shows (step S14). The water intake control unit 75 controls the opening degree of the water intake gate 31 based on these comparison results (step S15). For example, if the opening indicated by the opening data coincides with the opening indicated by the past opening data 51 or is within the range of the opening indicated by the past opening data 51, the intake control unit 75 takes the intake gate. Decrease the opening of 31. In addition, the intake control unit 75 reduces the opening of the intake gate 31 when the information related to the weather indicated by the weather condition data matches or is similar to the information related to the weather included in the past weather condition data 52. The coincidence or similar determination of information regarding weather is performed based on, for example, a predetermined matching condition. Specifically, the river basin weather (for example, clear, cloudy, rain, snow, etc.) at the intake gate 31 point, various precipitation-related precipitation, temperature, wind direction, wind speed, and other weather conditions Each information is weighted in advance according to the relevance with the water intake. This weighting is a basis for calculating points for determining the degree of coincidence or similarity of information regarding weather. The intake control unit 75 points based on the presence / absence of coincidence of weather, the degree of coincidence of various information related to weather, such as precipitation, temperature, wind direction, wind speed, etc. Is calculated. The intake control unit 75 compares the calculated point with the reference value of the point determined as the matching condition, and reduces the opening of the intake gate 31 when the calculated point satisfies the matching condition. The specific control mode of the opening degree regarding such a matching condition is merely an example and is not limited to this, and can be changed as appropriate.

ステップS15の処理によって取水ゲート31の開度を小さくする処理に至った場合、記憶部は、ステップS11で取得された開度データを過去開度データ51に統合してもよい。すなわち、ステップS15の判定に用いられた開度データは、以後、過去開度データ51の一部として扱われてもよい。また、ステップS15の判定後、記憶部は、ステップS12で取得された気象条件データを過去気象条件データ52に統合してもよい。すなわち、ステップS15の判定に用いられた気象条件データは、以後、過去気象条件データ52の一部として扱われてもよい。このように、記憶部は、判定部が第2所定期間における水車92への水の供給量が予め定められた制限水量を超えると判定した場合、取水ゲートの開度及び気象条件のいずれか1つ以上を記憶するようにしてもよい。   When the process of step S15 leads to a process of reducing the opening of the intake gate 31, the storage unit may integrate the opening data acquired in step S11 into the past opening data 51. That is, the opening degree data used for the determination in step S15 may be treated as a part of the past opening degree data 51 thereafter. In addition, after the determination in step S15, the storage unit may integrate the weather condition data acquired in step S12 into the past weather condition data 52. That is, the weather condition data used for the determination in step S15 may be treated as a part of the past weather condition data 52 thereafter. As described above, when the determining unit determines that the amount of water supplied to the water turbine 92 in the second predetermined period exceeds the predetermined limit amount, any one of the opening of the intake gate and the weather condition is selected. Two or more may be stored.

図7のフローチャートでは、取水ゲート31の開度制御に関する判定条件として取水ゲート31の開度と気象条件を用いているが、少なくともいずれか一方であればよい。また、取水ゲート31を介して水が取得される河川の水位を示す情報を取水ゲート31の開度制御に関する判定条件としてもよい。この場合、河川の水位を示す情報を提供するセンサ又は外部の情報処理装置から河川の水位を示す情報が取得される。   In the flowchart of FIG. 7, the opening degree of the intake gate 31 and the weather condition are used as the determination conditions related to the opening degree control of the intake gate 31, but it may be at least one of them. In addition, information indicating the water level of a river from which water is acquired via the intake gate 31 may be used as a determination condition regarding the opening degree control of the intake gate 31. In this case, information indicating the water level of the river is acquired from a sensor that provides information indicating the water level of the river or an external information processing device.

以上、本実施形態によれば、第1所定期間あたりの発電機91の発電量に基づいて、第1所定期間よりも長い第2所定期間における発電機91の発電量が所定の発電量を超える場合、水車92に供給される水の量を低減させるようにガイドベーン60を動作させる。このため、所定の発電量を河川81からの超過取水とされない発電量にすることで、河川81からの超過取水とされる事態の発生をより確実に抑制することができる。   As described above, according to the present embodiment, based on the power generation amount of the generator 91 per first predetermined period, the power generation amount of the generator 91 in the second predetermined period longer than the first predetermined period exceeds the predetermined power generation amount. In this case, the guide vane 60 is operated so as to reduce the amount of water supplied to the water wheel 92. For this reason, generation | occurrence | production of the situation made into the excessive water intake from the river 81 can be suppressed more reliably by making predetermined electric power generation amount into the electric power generation amount which is not made into the excessive water intake from the river 81.

また、水車92に供給される水の量を低減させた場合に取水ゲート31の開度と気象条件の少なくとも一方に基づいて取水ゲート31の開度を制御する。これによって取水ゲート31を介した取水量の制御の時点で取水量を低減することができるようになるため、河川81からの超過取水とされる事態の発生をより確実に低減することができる。   Further, when the amount of water supplied to the water turbine 92 is reduced, the opening of the intake gate 31 is controlled based on at least one of the opening of the intake gate 31 and weather conditions. As a result, the amount of water intake can be reduced at the time of control of the amount of water intake through the water intake gate 31, so that it is possible to more reliably reduce the occurrence of a situation where the water intake from the river 81 is excessive.

また、制御装置10と演算装置20との間でデータの送受信を行うことで、制御装置10が設けられる場所と演算装置20が設けられる場所とを独立させやすくなる。言い換えれば、制御装置10とデータの送受信さえ行うことができれば、演算装置20がどこにあってもよいので、演算装置20の設置の自由度がより向上する。   In addition, by transmitting and receiving data between the control device 10 and the arithmetic device 20, it is easy to make the place where the control device 10 is provided and the place where the arithmetic device 20 is provided independent. In other words, as long as data can be transmitted / received to / from the control device 10, the arithmetic device 20 can be located anywhere, so that the degree of freedom of installation of the arithmetic device 20 is further improved.

また、通信回線Nが無線通信回線を含むことで、敷設される有線の構成を削減することができることに加えて、有線による送信を行う場合に比して、当該有線を設けるための設計制限事項がなくなることから、制御装置10及び演算装置20の設計要求事項を減らしやすくなる。   In addition to the fact that the communication line N includes a wireless communication line, it is possible to reduce the configuration of the wired line, and in addition to the case where transmission is performed by wired, there are design restrictions for providing the wired line. Therefore, the design requirements for the control device 10 and the arithmetic device 20 can be easily reduced.

また、第2所定期間が第1所定期間の2倍以上の期間であることで、第2所定期間が経過するまでに水量制御のための十分な期間を確保したうえで判定及び水量制御を行うことができる。   In addition, since the second predetermined period is more than twice the first predetermined period, the determination and the water amount control are performed after securing a sufficient period for controlling the water amount until the second predetermined period elapses. be able to.

なお、上記の実施形態はあくまで一例であり、本発明の技術的特徴を逸脱しない範囲内において適宜変更可能である。例えば、貯留部80は、流れ込み式の水力発電において一時的に水車92の上流側で水を貯留する水槽であってもよいし、ダムであってもよい。   The above-described embodiment is merely an example, and can be changed as appropriate without departing from the technical features of the present invention. For example, the storage unit 80 may be a water tank that temporarily stores water on the upstream side of the water wheel 92 or may be a dam in flow-type hydroelectric power generation.

気象条件は、例えば降水量であるが、これに限られるものでない。気象条件は、日射量、気温、湿度、風速その他の天候に関する各種の情報を含んでいてもよいし、月日時等の暦を示す情報を含んでいてもよい。   The weather condition is, for example, precipitation, but is not limited to this. The weather conditions may include various information relating to weather such as the amount of solar radiation, temperature, humidity, wind speed, and may include information indicating a calendar such as a month date.

また、制御部14は、何らかの理由により制御装置10と演算装置20とデータの送受信を行うことができない状態になった場合、計測部12により計測された第1所定期間の発電量に基づいて、第2所定期間が経過するまでの残り期間における発電量を制御するスタンドアロン機能を有していてもよい。   In addition, when the control unit 14 is in a state where data cannot be transmitted and received between the control device 10 and the arithmetic device 20 for some reason, the control unit 14 is based on the power generation amount of the first predetermined period measured by the measurement unit 12. You may have the stand-alone function which controls the electric power generation amount in the remaining period until the 2nd predetermined period passes.

1 水力発電の制御システム
10 制御装置
11 第1通信部
12 計測部
13 第2通信部
14 制御部
20 演算装置
21 記憶部
21a 参照データ
21b 制御プログラム
22 演算部
23 第3通信部
24 表示部
25 入力部
31 取水ゲート
32 取水ゲート駆動装置
33 検知装置
41 第1移動通信部
42 第2移動通信部
51 過去開度データ
52 過去気象条件データ
60 ガイドベーン
71 判定部
72 指令部
73 開度情報取得部
74 気象条件取得部
75 取水制御部
80 貯留部
81 河川
82 流路
91 発電機
92 水車
100 情報処理装置
N 通信回線
DESCRIPTION OF SYMBOLS 1 Control system of hydroelectric power generation 10 Control apparatus 11 1st communication part 12 Measurement part 13 2nd communication part 14 Control part 20 Arithmetic apparatus 21 Storage part 21a Reference data 21b Control program 22 Operation part 23 3rd communication part 24 Display part 25 Input Unit 31 Intake gate 32 Intake gate drive device 33 Detection device 41 First mobile communication unit 42 Second mobile communication unit 51 Past opening data 52 Past weather condition data 60 Guide vane 71 Determination unit 72 Command unit 73 Opening information acquisition unit 74 Meteorological condition acquisition unit 75 Intake control unit 80 Storage unit 81 River 82 Channel 91 Generator 92 Water wheel 100 Information processing device N Communication line

Claims (5)

河川を流れる水の一部を貯留する貯留部を介して水が供給される水力発電機の運転制御装置と、前記貯留部の水位を取得する検知装置と、前記運転制御装置の動作に関する演算を行う演算装置とを備え、前記水力発電機の水車へ供給される水の量を制御する水力発電の水量制御システムであって、
前記運転制御装置は、
前記水車に供給される水の量を調節するガイドベーンと、
第1所定期間の前記水位に基づいて前記水力発電機の発電量を計測する計測部と、
前記ガイドベーンの動作を制御する第1制御部とを備え、
前記河川と前記貯留部との間には前記河川から前記貯留部に流れ込む水の流路を開閉する取水ゲートが設けられており、
前記演算装置は、
前記第1所定期間あたりの前記水力発電機の発電量に基づいて、前記第1所定期間を含み、かつ前記第1所定期間よりも長い第2所定期間における前記水力発電機の発電量が所定の発電量を超えるか判定する判定部と、前記判定部が前記第2所定期間における前記水車への水の供給量が予め定められた制限水量を超えると判定した場合における、前記取水ゲートの開度及び気象条件のいずれか1つ以上を記憶する記憶部と、前記記憶部に記憶された前記取水ゲートの開度及び気象条件のいずれか1つ以上に基づいて前記取水ゲートの開度を制御する第2制御部と、を備え、
前記第1制御部は、前記第2所定期間における前記水力発電機の発電量が所定の発電量を超えると判定された場合、前記水車に供給される水の量を低減させるように前記ガイドベーンを動作させる
水量制御システム。
An operation control device of a hydroelectric generator that is supplied with water via a storage unit that stores a part of the water flowing through the river, a detection device that acquires the water level of the storage unit, and an operation related to the operation of the operation control device. A hydropower control system for controlling the amount of water supplied to the hydroelectric turbine of the hydroelectric generator,
The operation control device includes:
A guide vane for adjusting the amount of water supplied to the water wheel;
A measuring unit for measuring the power generation amount of the hydroelectric generator based on the water level in a first predetermined period;
A first control unit for controlling the operation of the guide vane,
A water intake gate that opens and closes a flow path of water flowing from the river into the storage unit is provided between the river and the storage unit,
The arithmetic unit is
Based on the power generation amount of the hydroelectric generator per the first predetermined period, the power generation amount of the hydroelectric generator in a second predetermined period including the first predetermined period and longer than the first predetermined period is predetermined. A determination unit that determines whether or not the amount of power generation is exceeded, and an opening degree of the intake gate when the determination unit determines that the amount of water supplied to the water turbine in the second predetermined period exceeds a predetermined limit amount of water. And a storage unit that stores at least one of the weather conditions, and an opening degree of the intake gate based on any one or more of the opening degree of the intake gate and the weather condition stored in the storage unit A second control unit ,
The first control unit is configured to reduce the amount of water supplied to the turbine when it is determined that the power generation amount of the hydroelectric generator in the second predetermined period exceeds a predetermined power generation amount. Operate water volume control system.
前記判定部は、前記第2所定期間における前記水車への水の供給量が予め定められた制限水量を超えると判定された場合、前記水車に供給される水の量を低減させる指令を前記運転制御装置へ送信する
請求項1に記載の水量制御システム。
The determination unit, when it is determined that the amount of water supplied to the water turbine in the second predetermined period exceeds a predetermined limit water amount, a command to reduce the amount of water supplied to the water wheel The water volume control system according to claim 1, which is transmitted to a control device.
前記運転制御装置は、
前記計測部により計測された発電量に関する情報を送信する第1送信部と、
前記判定部からの指令を受信する第1受信部とを備え、
前記演算装置は、
前記発電量に関する情報を受信する第2受信部と、
前記判定部からの指令を送信する第2送信部とを備え、
前記第1送信部と前記第1受信部との間の通信回線及び前記第2送信部と前記第2受信部との間の通信回線は、無線通信回線を含む
請求項に記載の水量制御システム。
The operation control device includes:
A first transmission unit that transmits information on the amount of power generation measured by the measurement unit;
A first receiving unit for receiving a command from the determination unit,
The arithmetic unit is
A second receiving unit for receiving information related to the power generation amount;
A second transmission unit that transmits a command from the determination unit;
The water amount control according to claim 2 , wherein the communication line between the first transmitter and the first receiver and the communication line between the second transmitter and the second receiver include a wireless communication line. system.
前記第2所定期間は、前記第1所定期間の2倍以上の期間である
請求項1からのいずれか一項に記載の水量制御システム。
The water amount control system according to any one of claims 1 to 3 , wherein the second predetermined period is a period that is twice or more the first predetermined period.
河川を流れる水の一部を貯留する貯留部を介して水が供給される水力発電機の運転制御装置と、前記運転制御装置の動作に関する演算を行う演算装置とを備え、前記水力発電機の水車へ供給される水の量を制御する水量制御システムによる水量制御方法であって、
前記河川と前記貯留部との間には前記河川から前記貯留部に流れ込む水の流路を開閉する取水ゲートが設けられており、
前記演算装置は、前記取水ゲートの開度及び気象条件のいずれか1つ以上を記憶する記憶部を備え、
前記運転制御装置が、第1所定期間の経過前後に前記貯留部の水位を取得し、第1所定期間の経過前後の前記水位に基づいて前記水力発電機の発電量を計測し、
前記演算装置が、前記第1所定期間あたりの前記水力発電機の発電量に基づいて、前記第1所定期間よりも長い第2所定期間における前記水力発電機の発電量が所定の発電量を超えるか判定し、
前記第2所定期間における前記水力発電機の発電量が所定の発電量を超えると判定された場合、前記運転制御装置が、前記水車に供給される水の量を低減させるように、前記水車に供給される水の量を調節するガイドベーンを動作させ、前記記憶部に記憶された前記取水ゲートの開度及び気象条件のいずれか1つ以上に基づいて前記取水ゲートの開度を制御する
水量制御方法。
An operation control device for a hydroelectric generator to which water is supplied via a storage unit for storing a part of water flowing in a river; and an arithmetic device for performing an operation related to the operation of the operation control device; A water amount control method by a water amount control system for controlling the amount of water supplied to a water wheel,
A water intake gate that opens and closes a flow path of water flowing from the river into the storage unit is provided between the river and the storage unit,
The arithmetic unit includes a storage unit that stores any one or more of the opening of the intake gate and weather conditions,
The operation control device acquires the water level of the reservoir before and after the elapse of the first predetermined period, measures the power generation amount of the hydroelectric generator based on the water level before and after the elapse of the first predetermined period,
Based on the power generation amount of the hydroelectric generator per the first predetermined period, the arithmetic unit has a power generation amount of the hydropower generator in a second predetermined period that is longer than the first predetermined period exceeds a predetermined power generation amount. Determine whether
When it is determined that the power generation amount of the hydroelectric generator in the second predetermined period exceeds a predetermined power generation amount, the operation control device causes the turbine to reduce the amount of water supplied to the turbine. A water amount for controlling the opening of the intake gate based on any one or more of the opening of the intake gate and weather conditions stored in the storage unit by operating a guide vane that adjusts the amount of supplied water Control method.
JP2017549357A 2017-03-17 2017-03-17 Water volume control system and water volume control method Active JP6292358B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2017/010983 WO2018167957A1 (en) 2017-03-17 2017-03-17 Water amount control system and water amount control method

Publications (2)

Publication Number Publication Date
JP6292358B1 true JP6292358B1 (en) 2018-03-14
JPWO2018167957A1 JPWO2018167957A1 (en) 2019-03-22

Family

ID=61628931

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017549357A Active JP6292358B1 (en) 2017-03-17 2017-03-17 Water volume control system and water volume control method

Country Status (2)

Country Link
JP (1) JP6292358B1 (en)
WO (1) WO2018167957A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110513243B (en) * 2019-08-21 2022-01-04 国家电网有限公司 Guide vane control rule stability interval determination method and device
CN110905710A (en) * 2020-01-02 2020-03-24 台州路桥布鲁新能源有限公司 New energy device for collecting water resources and utilizing water energy of water resources
CN112610387B (en) * 2020-12-11 2022-07-15 华东桐柏抽水蓄能发电有限责任公司 Temperature control device of hydroelectric generator

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0640379U (en) * 1992-11-04 1994-05-27 東芝エンジニアリング株式会社 Turbine operation control device of regulating pond type hydroelectric power plant
JP2014015710A (en) * 2012-07-05 2014-01-30 Chugoku Electric Power Co Inc:The Restriction device for intake amount
JP2014148843A (en) * 2013-02-01 2014-08-21 Chugoku Electric Power Co Inc:The Intake blocking gate device

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015218719A (en) * 2014-05-21 2015-12-07 株式会社小松製作所 Pump unit having power generation function, and power generation and water supply system
JP2016098782A (en) * 2014-11-26 2016-05-30 東北小水力発電株式会社 Small scale hydroelectric power generation system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0640379U (en) * 1992-11-04 1994-05-27 東芝エンジニアリング株式会社 Turbine operation control device of regulating pond type hydroelectric power plant
JP2014015710A (en) * 2012-07-05 2014-01-30 Chugoku Electric Power Co Inc:The Restriction device for intake amount
JP2014148843A (en) * 2013-02-01 2014-08-21 Chugoku Electric Power Co Inc:The Intake blocking gate device

Also Published As

Publication number Publication date
WO2018167957A1 (en) 2018-09-20
JPWO2018167957A1 (en) 2019-03-22

Similar Documents

Publication Publication Date Title
JP6292358B1 (en) Water volume control system and water volume control method
Yang et al. Hydraulic damping mechanism of low frequency oscillations in power systems: Quantitative analysis using a nonlinear model of hydropower plants
US9189755B2 (en) Available power estimator
KR101268137B1 (en) Small hydropower generation apparatus and method for contrlling the same
CN109973300B (en) Power control method and device for wind generating set
US9822764B2 (en) System for automatic power estimation adjustment
CN111321713B (en) Hydropower station unit operation method based on ecological flow
KR101455033B1 (en) Method for contrlling of the small hydropower generation apparatus for adjusting to flow
EP3741991B1 (en) Method for dynamic real-time optimization of the performance of a wind park and wind park
CN103984986B (en) The self study arma modeling ultrashort-term wind power prediction method of real time correction
KR101455032B1 (en) Small hydropower generation apparatus for adjusting to flow
JP2016098782A (en) Small scale hydroelectric power generation system
CN116068883B (en) Remote intelligent control method and system for water conservancy gate
EP3719590A1 (en) Plant operation support system and plant operation support method
Borkowski Water level control of a small hydropower plant with a surge tank
US20220260054A1 (en) Method for controlling a wind farm, control module for a wind farm, and wind farm
JP7271969B2 (en) Flow control device
JP4590794B2 (en) Hydroelectric power generation prediction device, hydroelectric power generation prediction method
JP5714629B2 (en) Dam sand gate opening and closing control device
JP5814721B2 (en) Hydroelectric power plant monitoring and control system
JP2018071100A (en) Hydropower generation system, hydropower generation method, and hydropower generation program
JP4627688B2 (en) POWER GENERATION OUTPUT CONTROL DEVICE, WATER LEVEL ADJUSTMENT DEVICE, AND POWER GENERATION OUTPUT CONTROL METHOD
KR101369332B1 (en) Method for controling maximum power of small hydroelectric power generator using electricity scan
Alghazali et al. The use of SCADA system in water resources management, management of Shatt Al-Hilla in Iraq as a case study
CN213843903U (en) Automatic control system for front pool water level of radial flow type hydropower station

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170919

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20170919

A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20171030

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20171107

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20171227

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180116

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180129

R150 Certificate of patent or registration of utility model

Ref document number: 6292358

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150