JP6279900B2 - Fluid supply method and storage facility - Google Patents

Fluid supply method and storage facility Download PDF

Info

Publication number
JP6279900B2
JP6279900B2 JP2013272453A JP2013272453A JP6279900B2 JP 6279900 B2 JP6279900 B2 JP 6279900B2 JP 2013272453 A JP2013272453 A JP 2013272453A JP 2013272453 A JP2013272453 A JP 2013272453A JP 6279900 B2 JP6279900 B2 JP 6279900B2
Authority
JP
Japan
Prior art keywords
tank
fluid
supply
control valve
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013272453A
Other languages
Japanese (ja)
Other versions
JP2014142062A (en
Inventor
裕貴 和田
裕貴 和田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Shokubai Co Ltd
Original Assignee
Nippon Shokubai Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Shokubai Co Ltd filed Critical Nippon Shokubai Co Ltd
Priority to JP2013272453A priority Critical patent/JP6279900B2/en
Publication of JP2014142062A publication Critical patent/JP2014142062A/en
Application granted granted Critical
Publication of JP6279900B2 publication Critical patent/JP6279900B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Description

本発明は、流体を外部から貯留設備に供給する方法に係り、流体供給時に誤った操作が行われた場合であっても、この誤操作に対し迅速に対応できる流体の供給方法に関するものである。また本発明は、該貯留設備にも関わるものである。   The present invention relates to a method for supplying fluid from the outside to a storage facility, and relates to a fluid supply method capable of quickly responding to this erroneous operation even when an erroneous operation is performed during fluid supply. The present invention also relates to the storage facility.

LNGやプロピレン等の気体燃料は、石油等の液体燃料、石炭等の固体燃料に並ぶ重要な資源である。これらの気体燃料は、諸外国で採掘された後、タンカー等の輸送手段に積載され、貯蔵設備を有する基地まで輸送された後、各貯蔵タンクへ荷卸しされる。運搬コストを下げるため、これらの気体燃料は通常液化されて、液化ガスの形態で基地まで輸送される。   Gaseous fuels such as LNG and propylene are important resources along with liquid fuels such as petroleum and solid fuels such as coal. These gas fuels are mined in other countries, loaded on transportation means such as tankers, transported to a base having a storage facility, and then unloaded to each storage tank. In order to reduce transportation costs, these gaseous fuels are usually liquefied and transported to the base in the form of liquefied gas.

しかし従来では、この液化ガスを各貯蔵タンクへ供給(荷卸し)する際に、様々な問題が生じていた。   However, conventionally, various problems have arisen when supplying (unloading) this liquefied gas to each storage tank.

例えば、一つのタンク内に比重の異なる複数のLNGを受け入れようとすると、LNGの比重が異なるため、これらが混合せず、軽い液と重い液が上下に分離し、層状化するという問題があった。この問題に対処するため、液面計からの液情報に応じて、液受入制御弁の開閉を制御し、LNGをタンクに導入する際のノズル高さを変えることにより層状化防止を目的とした液受入設備が提供されている(特許文献1)。   For example, when a plurality of LNGs having different specific gravities are received in a single tank, the specific gravity of LNG differs, so that they do not mix, and light and heavy liquids are separated vertically and stratified. It was. In order to deal with this problem, the liquid reception control valve is controlled to open and close according to the liquid information from the liquid level gauge, and the purpose is to prevent stratification by changing the nozzle height when introducing LNG into the tank. A liquid receiving facility is provided (Patent Document 1).

また、液化ガス供給時に、複数ある貯蔵タンクの内、一つの貯蔵タンクの圧力を一時的に下げ、圧力差を設けることにより、液化ガスを輸送する方法が広く知られている。しかし、貯蔵タンクにLNGを供給するときに、タンク内の圧力が過剰に昇圧した場合、又は、タンク間の圧力差が小さい場合に、LNGの供給を続行できないという問題が生じていた。この問題に対処するため、LNG等の受入液を積載したタンクを加圧し、そのタンク内の受入液を貯蔵タンクに受け入れる際に、液面或いは圧力の上昇に応じて、高さの異なるノズルを切り換えて、液面に到達するように受入液を送液する方法が提供されている(特許文献2)。   In addition, a method of transporting liquefied gas by supplying a pressure difference by temporarily lowering the pressure of one storage tank among a plurality of storage tanks when supplying liquefied gas is widely known. However, when LNG is supplied to the storage tank, there has been a problem that the supply of LNG cannot be continued if the pressure in the tank is excessively increased or if the pressure difference between the tanks is small. In order to cope with this problem, when a tank loaded with a receiving liquid such as LNG is pressurized, and when the receiving liquid in the tank is received in the storage tank, nozzles having different heights are used according to the rise in liquid level or pressure. There has been provided a method of switching and feeding the receiving liquid so as to reach the liquid level (Patent Document 2).

上記の受入設備や送液方法は、従来の各種問題を解消することは可能である。しかしその一方で、これらの受入設備や送液方法では、液化ガス供給時の安全性が充分に検討されていない。   The above receiving equipment and liquid feeding method can solve various conventional problems. However, on the other hand, the safety at the time of liquefied gas supply is not fully examined in these receiving facilities and liquid feeding methods.

液化ガス供給時の安全性を検討した例として、例えば、液体貯蔵タンクの内圧が所定圧力以上になったことを検知し、そのことを示す信号を発信する内圧検知手段を備えた内圧検知システムが挙げられる(特許文献3)。   As an example of examining the safety at the time of liquefied gas supply, for example, there is an internal pressure detection system provided with an internal pressure detection means that detects that the internal pressure of the liquid storage tank exceeds a predetermined pressure and transmits a signal indicating that (Patent Document 3).

また、低引火点燃料を貯蔵する際の、爆発の危険性を確実に回避するシステムとして、タンク内の内圧に応じて、不活性ガス供給管路の閉鎖と開放を制御する供給制御弁を備えた貯蔵システムが提供されている(特許文献4)。   In addition, as a system that reliably avoids the risk of explosion when storing low flash point fuel, it is equipped with a supply control valve that controls the closing and opening of the inert gas supply line according to the internal pressure in the tank. A storage system is provided (Patent Document 4).

ところで、装置設計の分野においては、人間やコンピュータの過誤(エラー)から生じる事故を未然に防止するための策が従来から数多く検討されている。例えば、誤った種類の流体移送を防止することができる設備として、流体の移送開始前に選択された流体が移送予定流体であるか否かを判別する流体種判別手段と、この流体種判別手段が移送予定流体であることを判別した場合にのみ流体の移送動作を開始する流体移送実行手段とを備えた流体移送管理システムが知られている(特許文献5)。   By the way, in the field of device design, many measures for preventing accidents caused by human or computer errors have been studied. For example, as equipment capable of preventing the wrong type of fluid transfer, a fluid type discriminating unit that discriminates whether or not the fluid selected before the start of fluid transfer is a fluid to be transferred, and the fluid type discriminating unit There is known a fluid transfer management system including a fluid transfer execution unit that starts a fluid transfer operation only when it is determined that is a fluid to be transferred (Patent Document 5).

特開平8−200596号公報Japanese Patent Laid-Open No. 8-200156 特開2002−206694号公報JP 2002-206694 A 特開2011−37482号公報JP 2011-37482 A 特開2009−120204号公報JP 2009-120204 A 特開平5−193699号公報JP-A-5-193699

本発明者は、貯蔵タンクを複数備える貯留設備へ流体を供給するときに生じ得る過誤として、供給対象タンクとは異なるタンクに備えられる弁を、誤って開放するという誤接続の問題に着目した。   The present inventor has paid attention to the problem of erroneous connection in which a valve provided in a tank different from the supply target tank is erroneously opened as an error that may occur when fluid is supplied to a storage facility including a plurality of storage tanks.

液化ガスの供給対象とは異なるタンクの弁を開放すると、本来流体を供給すべきタンクに流体が充填されない、という問題だけでなく、流体供給対象とは異なるタンク内の流体が増量し、流体がタンクから溢れ出るという問題や、タンク内の圧力が過剰に上昇し、タンクが損傷する等の様々な問題が生じる。そこで、本発明者は、この誤接続の問題解決を試みるべく、先に例示した技術を検討した。   Opening the valve of a tank different from the liquefied gas supply target not only does not fill the tank that should originally be supplied with the fluid, but also increases the amount of fluid in the tank that is different from the fluid supply target. Various problems arise, such as the problem of overflowing from the tank and the pressure inside the tank rising excessively and damaging the tank. Therefore, the present inventor examined the technology exemplified above in order to try to solve the problem of the erroneous connection.

しかし、例示したいずれの技術を以てしても、本課題解決には至らなかった。特許文献1及び3〜4に開示される技術は、一つのタンクへ液化ガスを供給する場合を検討するのみであり、そもそも誤接続の問題が生じ得ない。また、特許文献5に記載の流体移送管理システムは、流体種判別手段が移送予定流体であることを判別した場合にのみ流体の移送開始を制御するものであり、流体を移送している最中の誤接続問題を解決するものではない。   However, even with any of the exemplified techniques, this problem has not been solved. The techniques disclosed in Patent Documents 1 and 3 to 4 only examine the case where liquefied gas is supplied to one tank, and the problem of erroneous connection cannot occur in the first place. In addition, the fluid transfer management system described in Patent Document 5 controls the start of fluid transfer only when the fluid type determination unit determines that the fluid is to be transferred, and is in the process of transferring the fluid. It does not solve the problem of misconnection.

また、2以上の貯蔵タンクを含む貯留設備において、通常、貯蔵タンクの弁の開閉に誤りがあるときは、本来流体が供給されるべきタンクの弁が閉栓し、異なるタンクに備えられる弁が開栓するという2つの誤操作を含んでいる。そのため、流体を安全に供給するためには、(1)本来流体が供給されるべきタンクの弁を正しく開き、且つ(2)誤って弁が開栓されたタンクを特定して、開栓した弁を閉じる操作をしなければならない。   In addition, in a storage facility including two or more storage tanks, when there is an error in opening and closing the valves of the storage tank, normally, the valve of the tank to which the fluid should be supplied is closed and the valve provided in the different tank is opened. It includes two erroneous operations of plugging. Therefore, in order to supply the fluid safely, (1) the valve of the tank to which the fluid should be originally supplied is correctly opened, and (2) the tank in which the valve is erroneously opened is identified and opened. The valve must be closed.

例えば、特許文献2に開示される技術では、各タンクに備えられた液位検出手段と圧力検出手段により、タンク内の状態を観測できる一方で、検出された情報は、各タンクに対応するノズル開閉制御弁の開閉制御にしか利用されない。そのため、弁の開閉に誤りがあったとしても、タンクに対応する弁を閉栓するしか対処の方法がないため、弁の開閉に誤りが生じた場合、まず、必ず誤りのあるタンクを特定する必要があり、誤操作への対処に時間を要してしまう。   For example, in the technique disclosed in Patent Document 2, while the state in the tank can be observed by the liquid level detection means and the pressure detection means provided in each tank, the detected information is the nozzle corresponding to each tank. It is used only for opening / closing control of the opening / closing control valve. Therefore, even if there is an error in opening and closing the valve, there is no other way than to close the valve corresponding to the tank, so if an error occurs in opening or closing the valve, you must first identify the tank with the error. And it takes time to deal with erroneous operations.

この様な状況下、本発明では、供給対象タンクとは異なるタンクに備えられる弁を、誤って開放するという誤接続の問題が生じた場合であっても、弁の開閉に誤りが生じている貯蔵タンクを特定することなく、素早く流体供給量を抑えることのできる流体の供給方法を提供することを課題として掲げた。   Under such circumstances, in the present invention, there is an error in opening and closing the valve even when there is a problem of erroneous connection in which a valve provided in a tank different from the supply target tank is erroneously opened. An object of the present invention is to provide a fluid supply method capable of quickly suppressing the fluid supply amount without specifying a storage tank.

本発明者は、前記課題を解決するために鋭意研究を重ねた結果、(1)少なくとも1つの分岐を有し、且つ、2以上の貯蔵タンクに繋がる流体供給用の配管が存在する貯留設備において、(2)該分岐点よりも上流に、流量を調整するための弁である供給制御弁を設け、(3)前記タンクのうちの一つに繋がる供給制御弁と、該タンクに備えられる停止弁を開いて、該タンクに外部から流体を供給し、(4)流体を供給しているタンク内の流体貯留量又は圧力が所定値に達した場合には、該供給制御弁を絞ることにより、タンクの接続に誤りがある場合であっても、どの接続に異常があるかを突き止めることをしなくとも、貯留設備へ導入される流体の供給量を速やかに低減できるため、迅速な対応が可能となることを見出し、本発明を完成した。   As a result of intensive studies to solve the above problems, the present inventor has (1) a storage facility having at least one branch and having a fluid supply pipe connected to two or more storage tanks. (2) A supply control valve which is a valve for adjusting the flow rate is provided upstream from the branch point, and (3) a supply control valve connected to one of the tanks and a stop provided in the tank Open the valve and supply fluid to the tank from the outside. (4) When the fluid storage amount or pressure in the tank supplying fluid reaches a predetermined value, throttle the supply control valve. Even if there is an error in the tank connection, it is possible to quickly reduce the amount of fluid supplied to the storage facility without having to determine which connection is abnormal. Finding that it is possible to complete the present invention It was.

すなわち、貯留設備に外部から流体を供給する方法であって、前記貯留設備は、2以上のタンクと、一端が流体受入口に繋がる供給主管と、前記供給主管の他端に備えられる供給制御弁と、一端が前記供給制御弁に繋がり、他端が前記各タンクに備えられる停止弁に繋がる供給側管とを有し、少なくとも1つの前記供給側管は、1以上の分岐を有し且つ2以上のタンクに繋がっており、前記貯留設備に流体を供給する方法は、前記タンクのうちの一つに繋がる供給制御弁と、該タンクに備えられる停止弁を開いて、該タンクに外部から流体を供給する流体供給工程、及び流体を供給しているタンク内の流体貯留量がQiであること又は圧力がPiであることを検知した場合には、該供給制御弁の開度を絞ることにより流体供給量を減らす制御弁絞り工程、を含むことを特徴とする(前記Qiとは、貯蔵タンクに繋がる供給制御弁と、該タンクに備えられる停止弁の両方が開いており、且つ、該タンク内の流体貯蔵量がそれ以上の場合に、該供給制御弁を絞るべき設定値であり、前記Piとは、貯蔵タンクに繋がる供給制御弁と、該タンクに備えられる停止弁の両方が開いており、且つ、該タンク内の圧力がそれ以上の場合に、該供給制御弁を絞るべき設定値である)。
また、前記供給主管が分岐しない管であることが好ましい。本構成により、一度の弁の開閉操作で全てのタンクへの流体供給量を制御することが可能となるため、誤接続に対し迅速な対応ができるようになる。
また、前記供給主管が1つの分岐を有し、該供給主管に繋がる供給制御弁が、1以上の分岐を有し且つ2以上のタンクに繋がる供給側管に連結されていれば、該タンクのうちの1つに流体を供給する方法において、誤接続に対し、最先に供給制御弁を絞ることによる効果は発揮される。
流体を供給しているタンクに繋がる供給制御弁を閉栓した後で、該タンクに備えられる停止弁を閉栓する閉栓工程を実施することが好ましい。閉栓工程を実施することにより、流体供給量を更に減少することができる。
加えて、流体を供給しているタンク内の流体貯留量がQiであること、若しくは圧力がPiであることを検知したとき、又はその後で、警報を作動させる警報工程を実施してもよい。警報工程を実施することにより、タンク内の状態を容易に認識することができる。
また、前記制御弁絞り工程において、自動で供給制御弁の開度が絞られることがより望ましい態様である。供給制御弁の絞りを自動で行うことにより、作業員が誤接続に気づかない場合であっても、確実に流体の供給量を低減することができる。
加えて本発明には、外部から供給する流体を貯留する貯留設備であって、前記貯留設備は、2以上のタンクと、一端が流体受入口に繋がる供給主管と、前記供給主管の他端に備えられる供給制御弁と、一端が前記供給制御弁に繋がり、他端が前記各タンクに備えられる停止弁に繋がる供給側管とを有し、少なくとも1つの前記供給側管は、1以上の分岐を有し且つ2以上のタンクに繋がっており、流体を供給しているタンク内の流体貯留量を検出するレベル計、及び/又は、タンク内の圧力を検出する圧力計を備え、前記供給制御弁が、流体を供給しているタンク内の流体貯留量がQi、又は、タンク内圧力がPiである場合に開度が絞られるものであることを特徴とする貯留設備も包含する(Qi、Piは前記に同じ)。
That is, it is a method for supplying fluid to the storage facility from the outside, wherein the storage facility includes two or more tanks, a supply main pipe having one end connected to the fluid receiving port, and a supply control valve provided at the other end of the supply main pipe And a supply side pipe connected to one end of the supply control valve and the other end to a stop valve provided in each tank, at least one of the supply side pipes has one or more branches and 2 A method of supplying fluid to the storage facility connected to the above tank is to open a supply control valve connected to one of the tanks and a stop valve provided in the tank, and to supply fluid to the tank from the outside. When it is detected that the amount of fluid stored in the tank supplying the fluid is Qi or the pressure is Pi, the opening of the supply control valve is reduced. Control to reduce fluid supply (Qi means that both the supply control valve connected to the storage tank and the stop valve provided in the tank are open, and the amount of fluid stored in the tank is In the above case, the supply control valve is a set value to be throttled, and the Pi is that both the supply control valve connected to the storage tank and the stop valve provided in the tank are open, and the tank This is the set value to which the supply control valve should be throttled when the pressure of the gas is higher than that)
Moreover, it is preferable that the supply main pipe is a pipe that does not branch. With this configuration, the fluid supply amount to all the tanks can be controlled by a single valve opening / closing operation, so that it is possible to quickly cope with an erroneous connection.
Further, if the supply main pipe has one branch and the supply control valve connected to the supply main pipe is connected to a supply side pipe having one or more branches and connected to two or more tanks, In the method of supplying fluid to one of them, the effect of narrowing the supply control valve first is exhibited against erroneous connection.
After closing the supply control valve connected to the tank supplying the fluid, it is preferable to perform a closing step of closing a stop valve provided in the tank. By performing the closing process, the amount of fluid supply can be further reduced.
In addition, when detecting that the amount of fluid stored in the tank supplying the fluid is Qi or that the pressure is Pi, or after that, an alarm step for activating an alarm may be performed. By performing the warning process, the state in the tank can be easily recognized.
In the control valve throttling step, it is a more desirable aspect that the opening of the supply control valve is automatically throttled. By automatically reducing the supply control valve, the amount of fluid supply can be reliably reduced even when the worker does not notice the erroneous connection.
In addition, the present invention is a storage facility for storing fluid supplied from the outside, and the storage facility includes two or more tanks, a supply main pipe having one end connected to a fluid receiving port, and the other end of the supply main pipe. A supply control valve provided at one end and a supply side pipe connected at one end to the supply control valve and the other end connected to a stop valve provided at each of the tanks, wherein at least one of the supply side pipes has one or more branches. And a level gauge that detects the amount of fluid stored in the tank supplying the fluid and / or a pressure gauge that detects the pressure in the tank, and the supply control The valve includes a storage facility characterized in that the opening of the valve is throttled when the fluid storage amount in the tank supplying the fluid is Qi or the tank internal pressure is Pi (Qi, Pi is the same as above).

従来では、各貯蔵タンクに備えられる停止弁を閉栓することにより流体の供給を制御していたため、誤って弁が開放されているタンクを特定するための時間を要していた。しかし、本発明によれば、分岐を有し、2以上の貯蔵タンクに接続される流体供給用の配管に、該分岐点よりも上流に、供給する流体の流量を調整するための供給制御弁が設置されている貯留設備において、外部から前記貯蔵タンクの少なくとも1つへ流体を供給し、流体供給を停止するときに、貯蔵タンクに備えられる停止弁よりも先に、該供給制御弁の開度を絞ることで、誤った操作により、流体の供給対象ではないタンクの停止弁やガス弁を開栓した場合であっても、どの接続に異常があるかを特定する工程を省略することができるため、迅速に流体の供給量を低減でき、従来よりも安全に流体の供給を実施することができる。   Conventionally, since the supply of fluid is controlled by closing a stop valve provided in each storage tank, it takes time to specify a tank in which the valve is opened by mistake. However, according to the present invention, the supply control valve for adjusting the flow rate of the fluid supplied to the pipe for supplying fluid connected to two or more storage tanks upstream from the branch point. When a fluid is supplied from the outside to at least one of the storage tanks and the fluid supply is stopped, the supply control valve is opened before the stop valve provided in the storage tank. By narrowing the degree, even if the stop valve or gas valve of a tank that is not the target of fluid supply is opened by mistake, the process of identifying which connection is abnormal can be omitted. Therefore, the amount of fluid supply can be quickly reduced, and the fluid can be supplied more safely than before.

図1は、貯留設備の構成を説明するための概略図である。FIG. 1 is a schematic diagram for explaining a configuration of a storage facility. 図2は、流体の供給対象であるタンクの停止弁及びガス弁を正しく開栓したときの流体の供給方法を説明するための概略図である。FIG. 2 is a schematic diagram for explaining a fluid supply method when a stop valve and a gas valve of a tank to which fluid is supplied are correctly opened. 図3は、流体の供給対象ではないタンクのガス弁を誤って開栓したときの流体の供給方法を説明するための概略図である。FIG. 3 is a schematic diagram for explaining a fluid supply method when a gas valve of a tank that is not a fluid supply target is accidentally opened. 図4は、流体の供給対象ではないタンクの停止弁を誤って開栓したときの流体の供給方法を説明するための概略図である。FIG. 4 is a schematic diagram for explaining a fluid supply method when a stop valve of a tank that is not a fluid supply target is accidentally opened. 図5は、流体の供給対象ではないタンクのガス弁及び停止弁を誤って開栓したときの流体の供給方法を説明するための概略図である。FIG. 5 is a schematic diagram for explaining a fluid supply method when a gas valve and a stop valve of a tank that is not a fluid supply target are accidentally opened. 図6は、3以上のタンクを備える貯留設備において、供給対象タンクとは異なるタンクの停止弁を誤って開栓したときの流体の供給方法を説明するための概略図である。FIG. 6 is a schematic diagram for explaining a fluid supply method when a stop valve of a tank different from the supply target tank is accidentally opened in a storage facility including three or more tanks.

以下、本発明に係る流体の供給方法に関して、実施例を示す図面を参照しつつ具体的に説明するが、本発明はもとより図示例に限定される訳ではなく、前・後記の趣旨に適合し得る範囲で適当に変更を加えて実施することも可能であり、それらはいずれも本発明の技術的範囲に包含される。   Hereinafter, the fluid supply method according to the present invention will be described in detail with reference to the drawings showing the embodiments. However, the present invention is not limited to the illustrated examples, and conforms to the purpose described above and below. It is also possible to carry out the present invention with appropriate modifications within the range to be obtained, all of which are included in the technical scope of the present invention.

はじめに、本発明の流体について説明する。本発明において流体とは、外力に対し流動可能な連続体をいい、具体的には液体と気体を総称する概念である。   First, the fluid of the present invention will be described. In the present invention, the fluid refers to a continuum that can flow with respect to an external force, and specifically, a concept that collectively refers to liquid and gas.

本発明で定義する液体とは、例えば、常温・常圧下で液状の連続体(以下、単に「液体」と称する場合がある)や、冷却若しくは加圧、又は冷却及び加圧されることにより液化した気体(以下では、「液化ガス」と称する)等をいい、具体的に「液化ガス」とは、高圧ガス保安法の通達(高圧ガス保安法及び関係政省令の運用及び解釈について(内規))で規定される「液化ガス」の定義を用いることとする。すなわち、「液化ガス」とは、現に液体であって、(1)大気圧下における沸点が40度以下のもの(大気中に放出された場合ほぼガス状になるもの)又は(2)大気圧下における沸点が40度を超える液体が、その沸点以上にある場合のものをいう。   The liquid defined in the present invention is, for example, a liquid continuum (hereinafter sometimes referred to simply as “liquid”) at room temperature and normal pressure, or liquefied by being cooled or pressurized, or cooled and pressurized. Gas (hereinafter referred to as “liquefied gas”), etc., specifically “liquefied gas” refers to the notification of the High Pressure Gas Safety Law (the operation and interpretation of the High Pressure Gas Safety Law and relevant government ordinances (internal regulations)) The definition of “liquefied gas” defined in That is, “liquefied gas” is actually liquid and has (1) a boiling point of 40 ° C. or less under atmospheric pressure (substantially gaseous when released into the atmosphere) or (2) atmospheric pressure. A liquid having a boiling point below 40 degrees below the boiling point.

常温・常圧で液状の連続体(液体)としては、例えば、原油、原油を精製して取得される重油、軽油、灯油、ガソリン、ナフサ等の石油類;メタノール、エタノール、n−プロピルアルコール、イソプロピルアルコール、n−ブチルアルコール等のアルコール類;エチレングリコール、グリセリン等の多価アルコール類;ベンゼン、トルエン、クロロベンゼン、キシレン、ニトロベンゼン等の芳香環族炭化水素類;アセトン、メチルエチルケトン等のケトン類;ジエチルエーテル等のエーテル類;酢酸エチル等のエステル類;酢酸、プロピオン酸、アクリル酸等のカルボン酸;ヤシ油、ゴマ油、アマニ油、オリーブ油、大豆油等の動植物油類;ギヤー油、シリンダー油、タービン油、マシン油等の各種オイル;等が挙げられる。   Examples of liquid continuum (liquid) at room temperature and normal pressure include, for example, crude oil, petroleum oils obtained by refining crude oil, light oil, kerosene, gasoline, naphtha, etc .; methanol, ethanol, n-propyl alcohol, Alcohols such as isopropyl alcohol and n-butyl alcohol; polyhydric alcohols such as ethylene glycol and glycerin; aromatic cyclic hydrocarbons such as benzene, toluene, chlorobenzene, xylene and nitrobenzene; ketones such as acetone and methyl ethyl ketone; diethyl Ethers such as ether; Esters such as ethyl acetate; Carboxylic acids such as acetic acid, propionic acid and acrylic acid; Animal and vegetable oils such as coconut oil, sesame oil, linseed oil, olive oil and soybean oil; Gear oil, cylinder oil, turbine And various oils such as oil and machine oil.

また、本発明において、液化ガスとして用いることのできる物質としては、水素、メタン、エタン、プロパン、シクロプロパン、ブタン、エチレン、プロピレン、ブチレン、アセチレン、天然ガス、石油ガス等の可燃性ガス;酸素、塩素、フッ素、空気等の支燃性ガス;四フッ化窒素、ジシラン、ホスフィン、アルシン、セレン化水素、酸化エチレン、アンモニア等の毒性ガス;窒素、アルゴン、ヘリウム、ネオン、二酸化炭素等の不燃性ガス;等が例示できる。   In the present invention, the substance that can be used as the liquefied gas includes hydrogen, methane, ethane, propane, cyclopropane, butane, ethylene, propylene, butylene, acetylene, natural gas, petroleum gas, and other flammable gases; oxygen Flammable gases such as chlorine, fluorine, air; toxic gases such as nitrogen tetrafluoride, disilane, phosphine, arsine, hydrogen selenide, ethylene oxide, ammonia; nonflammable gases such as nitrogen, argon, helium, neon, carbon dioxide Examples thereof include sex gases.

また、前記気体としては、前記液体に例示した各種物質が気化した流体を使用することができる。本発明では、特に、可燃性ガス、中でもプロピレンガスを貯留設備に導入する方法について詳述するが、本発明を、他の流体に適用することも可能である。   Further, as the gas, a fluid in which various substances exemplified in the liquid are vaporized can be used. In the present invention, a method for introducing a combustible gas, particularly propylene gas, into a storage facility will be described in detail. However, the present invention can be applied to other fluids.

図1は、本発明の貯留設備の構成を説明するための概略図である。貯留設備1に導入される流体は、外部設備35から供給される。外部設備35には、流体を供給する際の供給口となる外部供給口39、及び通気口となる外部ガス排出口40が設けられている。また、外部設備35には、流体を供給する際の動力源となるポンプ(図示しない)が備えられている。   FIG. 1 is a schematic diagram for explaining the configuration of the storage facility of the present invention. The fluid introduced into the storage facility 1 is supplied from the external facility 35. The external equipment 35 is provided with an external supply port 39 that serves as a supply port for supplying fluid and an external gas discharge port 40 that serves as a vent. In addition, the external equipment 35 is provided with a pump (not shown) serving as a power source when supplying fluid.

貯留設備1は、流体受入口33及びガス排出口34を含む流体の貯蔵設備をいう。そして、本発明において、貯留設備1と外部設備35は、液体や気体を送るための管である接続管(38A、38B)により連結されている。すなわち、貯留設備1の末端に設置される流体受入口33と外部設備35の外部供給口39は、接続管38A(流体供給用の接続管)を介して連結されている。また、ガス排出口34と外部ガス排出口40は、接続管38B(通気用の接続管)を介して連結される。接続管38A、38Bは、例えば、鋼材製の配管、ポリアルキレン製(例えば、ポリエチレン製)の配管、フレキシブルホース等を使用するとよい。   The storage facility 1 refers to a fluid storage facility including a fluid receiving port 33 and a gas discharge port 34. In the present invention, the storage facility 1 and the external facility 35 are connected by connecting pipes (38A, 38B) that are pipes for sending liquid or gas. That is, the fluid receiving port 33 installed at the end of the storage facility 1 and the external supply port 39 of the external facility 35 are connected via the connection pipe 38A (fluid supply connection pipe). Further, the gas discharge port 34 and the external gas discharge port 40 are connected through a connection pipe 38B (a connection pipe for ventilation). For the connection pipes 38A and 38B, for example, a steel pipe, a polyalkylene (for example, polyethylene) pipe, a flexible hose, or the like may be used.

接続管38Aには、外部停止弁36が備えられている。本発明において、「外部停止弁」とは、外部から貯留設備1への流体の供給を制御するための弁であり、外部停止弁36を開栓すると、貯蔵設備35から貯留設備1に流体が供給され、外部停止弁36を閉栓すると、貯留設備1への流体の供給が停止される。外部停止弁36としては止め弁が挙げられ、例えば、玉型弁、ボール弁、仕切り弁等を使用するとよい。   An external stop valve 36 is provided in the connection pipe 38A. In the present invention, the “external stop valve” is a valve for controlling the supply of fluid from the outside to the storage facility 1, and when the external stop valve 36 is opened, fluid flows from the storage facility 35 to the storage facility 1. When supplied and the external stop valve 36 is closed, the supply of fluid to the storage facility 1 is stopped. An example of the external stop valve 36 is a stop valve. For example, a ball valve, a ball valve, a gate valve or the like may be used.

また、接続管38Bには、外部設備35内の圧力を調整するために外部ガス弁37が備えられている。本発明において、「外部ガス弁」とは、貯留設備1から外部への気体の排出量を調整するための弁をいう。外部ガス弁37にも、止め弁が挙げられる。例えば、外部ガス弁37は、玉型弁、ボール弁、仕切り弁、チェックバルブ等を使用するとよく、玉型弁、ボール弁、仕切り弁の使用が適している。   The connection pipe 38B is provided with an external gas valve 37 for adjusting the pressure in the external equipment 35. In the present invention, the “external gas valve” refers to a valve for adjusting the amount of gas discharged from the storage facility 1 to the outside. The external gas valve 37 also includes a stop valve. For example, as the external gas valve 37, a ball valve, a ball valve, a gate valve, a check valve or the like may be used, and a ball valve, a ball valve, or a gate valve is suitable.

貯留設備1は、第1タンク11と第2タンク21の少なくとも2以上のタンクを有している。本発明において「貯蔵タンク」とは、流体を貯蔵するための容器をいう。貯蔵タンクの形状は、特に限定されるものではなく、供給する流体の種類に応じて、適切な形状のタンクを選定するとよい。   The storage facility 1 has at least two tanks of a first tank 11 and a second tank 21. In the present invention, the “storage tank” refers to a container for storing a fluid. The shape of the storage tank is not particularly limited, and a tank having an appropriate shape may be selected according to the type of fluid to be supplied.

流体として液体を貯蔵する場合には、貯蔵タンクには、固定屋根タンク(具体的に、屋根の形状は、例えば、円錐屋根、球面屋根、かさ屋根等)、浮屋根タンク、昇降屋根タンク等の低圧用タンク;高張力鋼により形成される円筒形タンク、球形タンク等の高圧用タンク;断熱材を有する平底円筒形タンク、球形タンク、枕型タンク等の低温用タンク;地下タンク等の特殊タンク;等の各種液体貯蔵タンクを使用するとよい。例えば、常温・常圧で液状の液体を貯蔵する場合には、建設費用が低廉なことから、低圧用タンク等を使用することが好ましい。中でも、原油、ガソリン、灯油等の揮発性物質を貯蔵する場合には、蒸発損失を防止できるため、浮屋根タンクを使用するとよい。また、液化ガスを貯蔵する場合には、高圧条件下や低温条件下でも使用することのできる高圧用タンク又は低温用タンクを使用するとよい。   In the case of storing liquid as a fluid, the storage tank includes a fixed roof tank (specifically, the shape of the roof is a conical roof, a spherical roof, a bulk roof, etc.), a floating roof tank, an elevating roof tank, etc. Low-pressure tanks; high-pressure tanks such as cylindrical tanks and spherical tanks made of high-tensile steel; low-temperature tanks such as flat-bottomed cylindrical tanks, spherical tanks and pillow-type tanks with insulation; special tanks such as underground tanks Various liquid storage tanks may be used. For example, when storing a liquid liquid at normal temperature and normal pressure, it is preferable to use a low-pressure tank or the like because the construction cost is low. Above all, when storing volatile substances such as crude oil, gasoline, kerosene, etc., it is preferable to use a floating roof tank because evaporation loss can be prevented. Further, when storing the liquefied gas, a high pressure tank or a low temperature tank that can be used under high pressure conditions or low temperature conditions may be used.

流体として気体を貯蔵する場合には、乾式ガスホルダー(胴体形状は、例えば、円形又は多角形)、底部に円筒水槽を設けガス槽を伏せて沈めた後、ガス槽内にガスを送り込むことにより気体を貯蔵する湿式ガスホルダー、ダイヤフラム式ガスホルダー等の低圧用ガスホルダー;円筒形ガスホルダー、球形ガスホルダー等の高圧用ガスホルダー;等の各種ガスホルダーが使用できる。   When storing gas as fluid, dry gas holder (the body shape is circular or polygonal, for example), a cylindrical water tank at the bottom, sunk the gas tank, and then send the gas into the gas tank Various gas holders such as a wet gas holder for storing gas, a low pressure gas holder such as a diaphragm type gas holder; a high pressure gas holder such as a cylindrical gas holder and a spherical gas holder;

各貯蔵タンクには、タンク内の流体貯留量を検出するためのレベル計(16、26)、及び/又は、タンク内の内部圧力を検出するための圧力計(17、27)が設置されている。レベル計及び/又は圧力計を設置し、タンク内の状態を常時監視することにより、タンク内の環境に応じた流体の供給を実施することが可能となる。レベル計としては、例えば、ディスプレーサ式レベル計、静電容量式レベル計、フロート式レベル計、超音波式レベル計、圧力式レベル計等を適宜使用することができる。圧力計としては、例えば、ブルドン管式圧力計やバネ式圧力計等の機械式圧力計を適宜使用するとよい。レベル計や圧力計で検出された値は、例えば、流体の供給状況を管理する制御室に送信し、一括して管理することが望ましい。   Each storage tank is provided with a level gauge (16, 26) for detecting the amount of fluid stored in the tank and / or a pressure gauge (17, 27) for detecting the internal pressure in the tank. Yes. By installing a level meter and / or a pressure gauge and constantly monitoring the state in the tank, it becomes possible to supply fluid according to the environment in the tank. As the level meter, for example, a displacer type level meter, a capacitance type level meter, a float type level meter, an ultrasonic level meter, a pressure type level meter and the like can be used as appropriate. As the pressure gauge, for example, a mechanical pressure gauge such as a Bourdon tube pressure gauge or a spring pressure gauge may be appropriately used. It is desirable to transmit the values detected by the level gauge and pressure gauge to, for example, a control room that manages the fluid supply status and manage them in a lump.

貯留設備1内に設置される貯蔵タンクの数は、少なくとも2以上であり、より好ましくは3以上である。また貯蔵タンク数の上限は特に限定されるものではないが、10以下、より好ましくは9以下である。貯蔵タンクの数が1つのみでは、流体供給の誤操作が生じ得ないため、本発明が対象とする範囲からは除かれる。   The number of storage tanks installed in the storage facility 1 is at least 2 or more, more preferably 3 or more. The upper limit of the number of storage tanks is not particularly limited, but is 10 or less, more preferably 9 or less. If only one storage tank is used, an erroneous operation of the fluid supply cannot occur, and thus it is excluded from the scope of the present invention.

前記各貯蔵タンクと、流体受入口33とは、配管により接続されている。本発明において、「配管」とは、流体を貯蔵タンクに供給するための管である。配管の種類は、流体の種類や流体供給時の流体の圧力や温度によって適切な配管を敷設する必要がある。配管の種類については、JIS規格や法令に従って、適宜選定するとよい。流体を供給するための配管と貯蔵タンクとの接続箇所は、特に限定されるものではなく、各貯蔵タンクの形状により適宜調整するとよい。   Each storage tank and the fluid receiving port 33 are connected by piping. In the present invention, the “pipe” is a pipe for supplying fluid to the storage tank. Appropriate piping needs to be laid according to the type of fluid and the pressure and temperature of the fluid during fluid supply. About the kind of piping, it is good to choose suitably according to a JIS standard or law. The connection location between the pipe for supplying the fluid and the storage tank is not particularly limited, and may be appropriately adjusted depending on the shape of each storage tank.

また、各貯蔵タンクには、停止弁(13、23)が備えられている。本発明において、「停止弁」とは、それぞれの貯蔵タンクに流体の供給を実際に行なうことを制御するための弁であり、流体の輸送を完全に止めるか、或いは管を完全に開放するかの調整のみが可能な弁をいう。停止弁を開栓すると、貯蔵タンクに流体が供給され、停止弁を閉栓すると、貯蔵タンクへの流体の供給が停止される。停止弁は、貯蔵タンクに直接設置されたものであってもよく、ジョイント等を介して貯蔵タンクと間接的に設置されたものであってもよい。停止弁(13、23)としては止め弁が挙げられ、例えば、玉型弁、ボール弁、仕切り弁等を使用するとよい。   Each storage tank is provided with a stop valve (13, 23). In the present invention, the “stop valve” is a valve for controlling the actual supply of fluid to each storage tank, and whether the transportation of the fluid is completely stopped or the pipe is completely opened. A valve that can only be adjusted. When the stop valve is opened, fluid is supplied to the storage tank, and when the stop valve is closed, supply of fluid to the storage tank is stopped. The stop valve may be installed directly on the storage tank, or may be installed indirectly on the storage tank via a joint or the like. Examples of the stop valves (13, 23) include stop valves. For example, a ball valve, a ball valve, a gate valve or the like may be used.

そして流体受入口33と各貯蔵タンクを結ぶ配管には、供給制御弁41が備えられている。本発明において「供給制御弁」とは、流体の供給流量を調整する弁であり、比較的複雑な構造を有し、弁の開閉のみならず、供給する流体の量を、最大量から最小量の間でも段階的又は連続的に調整できる弁をいう。このように供給制御弁41を備えることにより、各貯蔵タンクへ導入する流量を調整することが可能となる。供給制御弁41としては中でも、流量の調整が容易なことから、玉型弁、ボール弁、バタフライ弁の使用が適している。   A supply control valve 41 is provided in the pipe connecting the fluid receiving port 33 and each storage tank. In the present invention, the “supply control valve” is a valve that adjusts the fluid supply flow rate, has a relatively complicated structure, and not only opens and closes the valve, but also controls the amount of fluid to be supplied from the maximum amount to the minimum amount. Refers to a valve that can be adjusted step by step or continuously. By providing the supply control valve 41 in this way, it is possible to adjust the flow rate introduced into each storage tank. As the supply control valve 41, the use of a ball valve, a ball valve, or a butterfly valve is suitable because the flow rate can be easily adjusted.

供給制御弁41は、貯留設備1内に、少なくとも1個設置され、2個以上設置することも可能である。特に供給制御弁41の設置数に上限はなく、貯留設備1の規模や貯蔵タンクの数によって適宜供給制御弁41の設置数は調整すればよいが、10個以下が好ましく、より好適には5個以下である。   At least one supply control valve 41 is installed in the storage facility 1, and two or more supply control valves 41 can be installed. In particular, there is no upper limit to the number of supply control valves 41 installed, and the number of supply control valves 41 may be adjusted as appropriate depending on the scale of the storage facility 1 and the number of storage tanks, but is preferably 10 or less, more preferably 5 Or less.

本発明では、流体受入口33と各貯蔵タンクを繋ぐ配管を、供給制御弁41が備えられる位置に応じて便宜的に呼び分ける。すなわち、本発明では、流体受入口33から前記供給制御弁41までの間に敷設される配管(供給制御弁41を含む)を供給主管31Aと称し、供給制御弁41から各貯蔵タンクに備えられる停止弁までの間に敷設される配管(供給制御弁41を含まない)を供給側管31Bと称する。換言すれば、供給制御弁41よりも上流側に敷設される配管を供給主管31Aと定義し、供給制御弁41よりも下流側に敷設される配管を供給側管31Bと定義する。   In the present invention, piping connecting the fluid receiving port 33 and each storage tank is called for convenience according to the position where the supply control valve 41 is provided. That is, in the present invention, piping (including the supply control valve 41) laid between the fluid receiving port 33 and the supply control valve 41 is referred to as a supply main pipe 31A, and is provided from the supply control valve 41 to each storage tank. A pipe (not including the supply control valve 41) laid between the stop valve and the stop valve is referred to as a supply side pipe 31B. In other words, a pipe laid upstream of the supply control valve 41 is defined as a supply main pipe 31A, and a pipe laid downstream of the supply control valve 41 is defined as a supply side pipe 31B.

供給制御弁41よりも下流側に敷設される供給側管31Bは、少なくとも1つの分岐を有している。そして、分岐後の供給側管31Bは、2以上の貯蔵タンクに接続されている。すなわち、貯留設備1では、少なくとも1本の配管が分岐し、且つ、分岐後の配管が2以上の貯蔵タンクに備えられる停止弁に接続される構造を有している。   The supply side pipe 31B laid downstream from the supply control valve 41 has at least one branch. The branched supply side pipe 31B is connected to two or more storage tanks. That is, the storage facility 1 has a structure in which at least one pipe branches and the branched pipe is connected to a stop valve provided in two or more storage tanks.

一方、前記供給主管31Aについては、分岐の有無は限定されず、供給主管31Aは、分岐を有していても良く、分岐を有しない配管であってもよい。   On the other hand, regarding the supply main pipe 31A, the presence or absence of branching is not limited, and the supply main pipe 31A may have a branch or may be a pipe having no branch.

供給主管31Aが分岐を有しないときとは、具体的には、供給制御弁41が、流体受入口33と各貯蔵タンクとを接続する配管に存在する全ての分岐のうち最も上流に位置する分岐点との間に存在する場合をいう。本構成によれば、供給制御弁41の開度を調整することにより、貯留設備1に設けられる全ての貯蔵タンクへの流体供給量を一度に制御することができる。   When supply main pipe 31A does not have a branch, specifically, supply control valve 41 is the most upstream branch among all the branches existing in the pipe connecting fluid receiving port 33 and each storage tank. The case where it exists between points. According to this configuration, the fluid supply amount to all the storage tanks provided in the storage facility 1 can be controlled at a time by adjusting the opening degree of the supply control valve 41.

また、供給主管31Aが分岐を有するときとは、具体的には、流体受入口33と各貯蔵タンクとを接続する配管に存在する全ての分岐点のうち、供給制御弁41が、最も上流に位置する分岐点よりも下流に設置され、かつ、該供給制御弁41よりも下流側にさらに少なくとも一つの分岐点を有する場合をいう。本構成によれば、前記供給制御弁41より下流側に敷設される配管に接続される2以上の貯蔵タンクへは、流体供給量を該供給制御弁41の開度を調整することにより、一度に制御することが可能となる。   Further, when the supply main pipe 31A has a branch, specifically, the supply control valve 41 is the most upstream among all the branch points existing in the pipe connecting the fluid receiving port 33 and each storage tank. The case where it is installed downstream from the branch point located and has at least one branch point further downstream than the supply control valve 41 is said. According to this configuration, the fluid supply amount is adjusted to the two or more storage tanks connected to the pipe laid downstream from the supply control valve 41 by adjusting the opening degree of the supply control valve 41. It becomes possible to control to.

本発明では、貯蔵タンクに設置されるレベル計及び圧力計の検出値は、供給制御弁41の開度の調整に使用される。例えば、供給制御弁41を自動制御する場合は、予めシーケンス制御を組み、第1タンク11に備えられるレベル計16及び圧力計17により検出された値や、第2タンク21に備えられるレベル計26及び圧力計27により検出された値を、そのシーケンスプログラムへフィードバックし、供給制御弁41の開度の自動制御に使用するとよい。若しくは、供給制御弁41の開度を手動で調整する場合は、各貯蔵タンクに備えられるレベル計及び圧力計により検出された値を作業者が確認し、その後手動で供給制御弁41の開度を調整するとよい。本構成により、誤接続の問題が生じたときに、速やかに供給制御弁41の開度を調整できるため、より迅速に流体供給量を制御することができる。   In the present invention, the detected values of the level gauge and pressure gauge installed in the storage tank are used for adjusting the opening degree of the supply control valve 41. For example, when the supply control valve 41 is automatically controlled, sequence control is set in advance, the value detected by the level gauge 16 and the pressure gauge 17 provided in the first tank 11, or the level gauge 26 provided in the second tank 21. The value detected by the pressure gauge 27 may be fed back to the sequence program and used for automatic control of the opening degree of the supply control valve 41. Or when adjusting the opening degree of the supply control valve 41 manually, an operator checks the value detected by the level gauge and pressure gauge provided in each storage tank, and then the opening degree of the supply control valve 41 manually. It is good to adjust. With this configuration, when the problem of erroneous connection occurs, the opening degree of the supply control valve 41 can be quickly adjusted, so that the fluid supply amount can be controlled more quickly.

更に、貯留設備1の各貯蔵タンクへ流体を供給するときに、貯蔵タンク内の圧力が過剰に上昇することにより、貯蔵タンクが損傷したり、破損したりする虞がある。そのため、このような事故を防止するために、貯蔵タンクには、タンク内圧力を調整するための通気口(図示しない)が設けられている。そして、貯留設備1には貯蔵タンク内の気体を排出するためのガス用配管32が敷設されており、該ガス用配管32は、一端が貯蔵タンクに設けられた通気口(図示しない)に接続され、他端が貯留設備1のガス排出口34に繋がっている。本構成により、貯蔵タンクから排出される気体は、ガス用配管32を通り、ガス排出口34、接続管38B、外部ガス排出口40を通じて、外部設備35に送られる。   Furthermore, when fluid is supplied to each storage tank of the storage facility 1, the storage tank may be damaged or broken due to excessive increase in pressure in the storage tank. Therefore, in order to prevent such an accident, the storage tank is provided with a vent (not shown) for adjusting the tank internal pressure. The storage facility 1 is provided with a gas pipe 32 for discharging the gas in the storage tank, and one end of the gas pipe 32 is connected to a vent (not shown) provided in the storage tank. The other end is connected to the gas outlet 34 of the storage facility 1. With this configuration, the gas discharged from the storage tank passes through the gas pipe 32 and is sent to the external facility 35 through the gas discharge port 34, the connection pipe 38 </ b> B, and the external gas discharge port 40.

貯蔵タンクに設けられる通気口の位置は特に限定されないが、例えば、貯蔵タンクの頂部に設置されていることが望ましい。   Although the position of the vent provided in the storage tank is not particularly limited, for example, it is desirable to be installed at the top of the storage tank.

更に、各貯蔵タンクには、ガス弁(15、25)が備えられている。本発明において、「ガス弁」とは、貯蔵タンク内の気体の排出を制御しタンク内の圧力を調整するための弁であり、前記ガス弁を開栓すると、貯蔵タンク内の気体が配管を通じて貯蔵タンクから排出され、ガス弁を閉栓すると、貯蔵タンク内の気体の外部への流出は停止する。前記ガス弁(15、25)としては、止め弁が挙げられ、例えば、玉型弁、ボール弁、仕切り弁、チェックバルブ等を使用するとよく、玉型弁、ボール弁、仕切り弁の使用が適している。   Furthermore, each storage tank is provided with a gas valve (15, 25). In the present invention, the “gas valve” is a valve for controlling the discharge of gas in the storage tank and adjusting the pressure in the tank. When the gas valve is opened, the gas in the storage tank is passed through a pipe. When the gas is discharged from the storage tank and the gas valve is closed, the outflow of the gas in the storage tank to the outside stops. Examples of the gas valve (15, 25) include a stop valve. For example, a ball valve, a ball valve, a gate valve, a check valve or the like may be used, and a ball valve, a ball valve, or a gate valve is suitable. ing.

ガス弁(15、25)を閉じたまま流体の供給を続けると、貯蔵タンク内の物質の増加(例えば、液相部や気相部の増加)により、貯蔵タンク内の圧力が上昇する。そのため、流体供給時には、貯蔵タンク内の圧力を調整するために、前記ガス弁を開栓しておくことが望ましい。   When the supply of fluid is continued with the gas valves (15, 25) closed, the pressure in the storage tank rises due to an increase in the substance in the storage tank (for example, an increase in the liquid phase part and the gas phase part). Therefore, it is desirable to open the gas valve in order to adjust the pressure in the storage tank when supplying the fluid.

そして、ガス排出口34と各貯蔵タンクを結ぶ配管には、気体の流量を調整する弁であるガス制御弁(図示しない)を備えることができる。「ガス制御弁」とは、ガスの流量を調整する弁であり、比較的複雑な構造を有し、弁の開閉のみならず、供給する流体の量を、最大量から最小量の間でも段階的又は連続的に調整できる弁をいう。ガス制御弁を備えることにより、各貯蔵タンクから排出されるガス量を調整することができる。ガス制御弁としては、例えば、玉型弁、ボール弁、仕切り弁、バタフライ弁等を使用するとよい。   A pipe connecting the gas discharge port 34 and each storage tank can be provided with a gas control valve (not shown) that is a valve for adjusting the flow rate of the gas. “Gas control valve” is a valve that adjusts the flow rate of gas, has a relatively complicated structure, and not only opens and closes the valve, but also controls the amount of fluid to be supplied between the maximum and minimum levels. A valve that can be adjusted manually or continuously. By providing the gas control valve, the amount of gas discharged from each storage tank can be adjusted. As the gas control valve, for example, a ball valve, a ball valve, a gate valve, a butterfly valve or the like may be used.

貯留設備1には、上記設備に加え、貯蔵タンク内の流体の貯留量、又は貯蔵タンク内の圧力が所定の値に達したことを知らせるための警報器(図示しない)が設置されていることが望ましい。貯蔵タンク内の流体貯留量や圧力が異常値に達したときに、警報器を作動させることにより、作業員に危険を知らせることができる。警報器としては、例えば、警報音を発するブザーや、警報光を発するパトライト(登録商標)等が好適に使用される。   In addition to the above facilities, the storage facility 1 is provided with an alarm device (not shown) for notifying that the amount of fluid stored in the storage tank or the pressure in the storage tank has reached a predetermined value. Is desirable. When the fluid storage amount or pressure in the storage tank reaches an abnormal value, the operator can be informed of the danger by operating the alarm. As the alarm device, for example, a buzzer that emits an alarm sound or Patlite (registered trademark) that emits alarm light is preferably used.

2.本発明に係る流体の供給方法について
本発明は、分岐を有し、2以上の貯蔵タンク(11、21)に接続される流体供給用の配管に、該分岐点よりも上流に、供給する流体の流量を調整するための供給制御弁41が設置されている貯留設備1において、外部から前記貯蔵タンクの少なくとも1つへ流体を供給し、流体の供給を停止するときに、該供給制御弁41の開度を絞る点に特徴を有する。本操作により、誤った操作により、流体の供給対象ではないタンクの停止弁やガス弁を開栓した場合であっても、どの接続に異常があるかを特定する工程を省略することができるため、迅速に流体の供給量を低減でき、従来よりも安全に流体の供給を実施することができる。なお本発明において好ましくは、流体を供給している貯蔵タンクに備えられる停止弁を閉栓するよりも先に、供給制御弁41の開度を絞ることが望ましい。
2. About the fluid supply method according to the present invention The present invention relates to a fluid that has a branch and is supplied to a fluid supply pipe connected to two or more storage tanks (11, 21) upstream from the branch point. In the storage facility 1 in which the supply control valve 41 for adjusting the flow rate of the storage tank 1 is installed, when the fluid is supplied from the outside to at least one of the storage tanks and the supply of the fluid is stopped, the supply control valve 41 It is characterized in that the opening degree is reduced. Even if the stop valve or gas valve of the tank that is not the fluid supply target is opened by this operation, the process of identifying which connection is abnormal can be omitted. Thus, the amount of fluid supplied can be quickly reduced, and the fluid can be supplied more safely than before. In the present invention, preferably, the opening degree of the supply control valve 41 is reduced before closing the stop valve provided in the storage tank supplying the fluid.

すなわち、本発明に係る流体の供給方法は、以下の工程を含む点に特徴を有する。
貯蔵タンクのうちの一つに繋がる供給制御弁と、該タンクに備えられる停止弁を開いて、該タンクに外部から流体を供給する流体供給工程;
流体を供給しているタンク内の流体貯留量がQiであること又は圧力がPiであることを検知した場合には、該供給制御弁の開度を絞ることにより流体供給量を減らす制御弁絞り工程。
That is, the fluid supply method according to the present invention is characterized in that it includes the following steps.
A fluid supply step of opening a supply control valve connected to one of the storage tanks and a stop valve provided in the tank to supply fluid to the tank from the outside;
A control valve throttle that reduces the fluid supply amount by reducing the opening of the supply control valve when it is detected that the fluid storage amount in the tank supplying the fluid is Qi or the pressure is Pi Process.

本発明に係る流体の供給方法において、流体が供給される貯蔵タンクとは、供給側管に接続されている貯蔵タンクのうち、それに対応する前記供給制御弁および前記停止弁が開栓されている貯蔵タンクである。実際に、流体が供給される貯蔵タンクの数は、特に限定されるものではなく、少なくとも1以上である。   In the fluid supply method according to the present invention, the storage tank to which the fluid is supplied is that the supply control valve and the stop valve corresponding to the storage tank connected to the supply side pipe are opened. It is a storage tank. Actually, the number of storage tanks to which fluid is supplied is not particularly limited, and is at least 1 or more.

本発明では、前述した流体供給工程、制御弁絞り工程に加えて、必要に応じて、下記の工程をそれぞれ実施することも可能である。
流体供給時に稼働されていたポンプを停止するポンプ停止工程;
流体が供給される貯蔵タンクの停止弁を閉栓する閉栓工程;
外部設備35の外部停止弁36を閉栓する供給停止工程。
In the present invention, in addition to the above-described fluid supply process and control valve throttling process, the following processes may be performed as necessary.
A pump stop process for stopping the pump that was operating when the fluid was supplied;
A closing step of closing a stop valve of a storage tank to which a fluid is supplied;
Supply stop process of closing the external stop valve 36 of the external equipment 35.

また、流体供給時には、タンク内圧力が過剰に上昇することを防止する目的で、タンクのガス弁が開栓されている。しかし、流体の供給量が減少又は流体の供給が終了すると、ガス弁を開栓する必要がなくなる。また、ガス弁が開栓されたままでは、ガス弁を通じて、貯蔵されたタンク内の液体のうち気化した流体や、貯蔵された気体が外部へ排出される虞がある。この様に気化した流体がガス弁を通じて外部へ排出されることを防止するため、本発明では、下記の工程をそれぞれ実施することも可能である。
各貯蔵タンクに備えられるガス弁を閉栓するガス閉栓工程;
外部設備35の外部ガス弁37を閉栓するガス停止工程。
Further, when supplying the fluid, the tank gas valve is opened for the purpose of preventing the tank internal pressure from rising excessively. However, when the fluid supply amount decreases or the fluid supply ends, it is not necessary to open the gas valve. In addition, when the gas valve is left open, the vaporized fluid or the stored gas may be discharged to the outside through the gas valve. In order to prevent the fluid thus vaporized from being discharged to the outside through the gas valve, in the present invention, the following steps can also be performed.
A gas closing step of closing a gas valve provided in each storage tank;
A gas stop process for closing the external gas valve 37 of the external equipment 35.

また、必要に応じて、貯留設備1に備えられた警報(図示しない)を作動させる警報工程を実施することも可能である。各工程について、以下に詳しく説明する。   Moreover, it is also possible to implement the alarm process which operates the alarm (not shown) with which the storage facility 1 was equipped as needed. Each step will be described in detail below.

2−1.流体供給工程
流体供給工程とは、供給制御弁と少なくともいずれか1つのタンクに対応する停止弁を開いて、外部から該貯蔵タンクへ流体を供給する工程である。
2-1. Fluid supply step The fluid supply step is a step of supplying a fluid from the outside to the storage tank by opening a supply control valve and a stop valve corresponding to at least one of the tanks.

以降、本発明では、貯蔵タンクに対応する停止弁が開栓されている貯蔵タンクを、流体供給対象タンクという。すなわち、流体供給対象タンクとは、外部設備35から流体が供給され得る状態のタンクであり、該貯蔵タンクを第1タンクと称する。   Hereinafter, in the present invention, a storage tank in which a stop valve corresponding to the storage tank is opened is referred to as a fluid supply target tank. That is, the fluid supply target tank is a tank in which fluid can be supplied from the external equipment 35, and the storage tank is referred to as a first tank.

流体供給対象タンクの流体貯留量は、特に限定されるものではない。停止弁が正しく開栓される場合、流体供給対象タンクでは、タンク内の流体貯留量が所望の貯留量から減少しているため、タンク内の貯留量は所望量に達していない場合がある。一方、流体の供給対象ではないタンクの停止弁が誤って開栓される場合(即ち、第1タンク以外のタンクの停止弁が開栓されている場合)、このタンクでは、タンク内の流体貯留量が所望量を貯蔵している場合、及び所望量から減少している場合がある。   The amount of fluid stored in the fluid supply target tank is not particularly limited. When the stop valve is correctly opened, in the fluid supply target tank, the amount of fluid stored in the tank has decreased from the desired amount of storage, so the amount of storage in the tank may not reach the desired amount. On the other hand, when a stop valve of a tank that is not a supply target of fluid is accidentally opened (that is, when a stop valve of a tank other than the first tank is opened), in this tank, fluid is stored in the tank. The amount may have stored the desired amount and may have decreased from the desired amount.

供給制御弁41と停止弁の開栓順は特に制限されない。例えば、供給制御弁41−停止弁の順に開栓する、停止弁−供給制御弁41の順に開栓する、又は供給制御弁41と停止弁を同時に開栓する、のいずれでもよいが、供給制御弁41−停止弁の順に開栓すると、流体が外部設備35から配管を通じて貯蔵タンクへ供給されるため、配管やタンク内に気泡が入る等の不具合の発生を抑制できるため好ましい。   The order of opening the supply control valve 41 and the stop valve is not particularly limited. For example, the supply control valve 41 may be opened in the order of the stop valve, the stop valve may be opened in the order of the supply control valve 41, or the supply control valve 41 and the stop valve may be opened simultaneously. It is preferable to open the valve 41 in the order of the stop valve because the fluid is supplied from the external equipment 35 to the storage tank through the pipe, so that occurrence of problems such as bubbles entering the pipe and the tank can be suppressed.

貯留設備1に設置される各タンク内の状態を監視するために、タンク内の流体貯留量及びタンク内圧力は、各タンクに設けられるレベル計や圧力計により、常時検出されていることが望ましい。流体供給対象タンクに備えられるレベル計や圧力計により、タンク内の流体貯留量や圧力が所定範囲内に維持されているか否かを観測することは、流体の供給が安全に実施されていることを確認する上で非常に重要である。   In order to monitor the state in each tank installed in the storage facility 1, it is desirable that the amount of fluid stored in the tank and the pressure in the tank are constantly detected by a level gauge and a pressure gauge provided in each tank. . Observing whether or not the amount of fluid stored in the tank or the pressure in the tank is maintained within a specified range using a level gauge or pressure gauge provided in the fluid supply target tank means that the fluid is supplied safely. Is very important in confirming.

2−2.制御弁絞り工程
制御弁絞り工程は、タンク内の流体貯留量がQi、又は、タンク内圧力がPiであることを検知した場合に、この情報に基づき、流体の供給量を減らす工程である。本発明では、この流体の供給量を減らす操作を、供給制御弁41を絞ることにより行う。本構成により、仮に弁の開栓箇所に誤りがある場合であっても、開閉を誤っている停止弁を特定することなく、確実に流体供給量を減少させることが可能となる。
2-2. Control valve throttling step The control valve throttling step is a step of reducing the fluid supply amount based on this information when it is detected that the fluid storage amount in the tank is Qi or the tank internal pressure is Pi. In the present invention, the operation of reducing the supply amount of the fluid is performed by narrowing the supply control valve 41. With this configuration, even if there is an error in the valve opening location, it is possible to reliably reduce the fluid supply amount without specifying a stop valve that is erroneously opened or closed.

Qiは、貯蔵タンクに繋がる供給制御弁41と、該タンクに備えられる停止弁の両方が開いており、且つ、該タンク内の流体貯蔵量がそれ以上の場合に、該供給制御弁41を絞るべき設定値である。すなわち、タンク内の流体貯留量がQiに達すると、該タンクに繋がる供給制御弁41の開度が絞られる。Qiは、タンクの容量及び運転条件等を鑑み、適宜設定することができる。例えば、Qiは、タンク全容量の80〜95%に設定することが望ましく、より好適には82〜92%である。Qiが前記範囲内であれば、仮に貯蔵する流体が熱膨張しても、流体がタンクから溢れ出すことがない。また、タンクから流体が溢れ出る前に供給制御弁41の開度を絞ることができるため、流体供給を安全に行うことができる。   Qi throttles the supply control valve 41 when both the supply control valve 41 connected to the storage tank and the stop valve provided in the tank are open and the amount of fluid stored in the tank is more than that. It should be a set value. That is, when the fluid storage amount in the tank reaches Qi, the opening degree of the supply control valve 41 connected to the tank is reduced. Qi can be set as appropriate in consideration of the capacity of the tank and the operating conditions. For example, Qi is desirably set to 80 to 95% of the total capacity of the tank, and more preferably 82 to 92%. If Qi is within the above range, even if the fluid to be stored is thermally expanded, the fluid does not overflow from the tank. Moreover, since the opening degree of the supply control valve 41 can be reduced before the fluid overflows from the tank, the fluid can be supplied safely.

一方、Piは、貯蔵タンクに繋がる供給制御弁41と、該タンクに備えられる停止弁の両方が開いており、且つ、該タンク内の圧力がそれ以上の場合に、該供給制御弁41を絞るべき設定値である。すなわち、タンク内の圧力がPiに達すると、該タンクに繋がる供給制御弁41の開度が絞られる。Piも、Qiの場合と同様に、タンクの容量、運転条件、及びタンク設置箇所での環境温度等に応じて適宜設定するとよい。例えば、Piは、最高外気温(1月1日から12月31日までの間を測定期間1年としたときに、該1年の測定期間内で測定された最も高い外気温を、貯留設備1の稼働日が属する年よりも前年以前の直近3年のそれぞれについて求め、これらを平均した温度)における流体の蒸気圧の75〜95%に設定することが望ましく、より好適には80〜90%である。Piが前記範囲内であれば、タンク内圧力が過剰に上昇する前に制御弁絞り工程を実施できるため、安全に流体を供給できる。   On the other hand, Pi throttles the supply control valve 41 when both the supply control valve 41 connected to the storage tank and the stop valve provided in the tank are open and the pressure in the tank is higher. It should be a set value. That is, when the pressure in the tank reaches Pi, the opening degree of the supply control valve 41 connected to the tank is reduced. As with Qi, Pi may be appropriately set according to the capacity of the tank, the operating conditions, the environmental temperature at the tank installation location, and the like. For example, Pi is the highest outside air temperature (when the period from January 1 to December 31 is one year, the highest outside air temperature measured within the one year measurement period is stored in the storage facility. It is desirable to set it to 75 to 95% of the vapor pressure of the fluid in the most recent three years before the previous year rather than the year to which one working day belongs, and more preferably 80 to 90%. %. If Pi is within the above range, the control valve throttling step can be performed before the tank pressure rises excessively, so that the fluid can be supplied safely.

制御弁絞り工程では、供給制御弁41及び停止弁のうち、停止弁を閉栓するより前に供給制御弁41を絞ることが好ましい。停止弁よりも先に供給制御弁41を絞ることで、停止弁の開閉に誤操作があった場合でも、弁の開閉に誤りがある貯蔵タンクを特定せずに、複数の貯蔵タンクへの流体の供給を確実に抑えることができる。   In the control valve throttle step, it is preferable to throttle the supply control valve 41 before closing the stop valve among the supply control valve 41 and the stop valve. By restricting the supply control valve 41 before the stop valve, even if there is an error in opening and closing the stop valve, the fluid flow to a plurality of storage tanks is not specified without specifying a storage tank that has an error in opening and closing the valve. Supply can be reliably suppressed.

制御弁絞り工程では、瞬時に流量を減少させたり流体の供給を停止したりすると、外部設備35に備えられる外部停止弁36から流体が溢れ出す虞があるため、供給制御弁41を完全に閉栓せずに、1〜10%程度開栓しておくことが望ましい(供給制御弁の開度が全開のときを100%とする)。   In the control valve throttling process, if the flow rate is decreased instantaneously or the supply of fluid is stopped, the fluid may overflow from the external stop valve 36 provided in the external equipment 35. Therefore, the supply control valve 41 is completely closed. Instead, it is desirable to open about 1 to 10% (when the opening degree of the supply control valve is fully opened is 100%).

一方で、本発明は、当該制御弁絞り工程において、供給制御弁41を完全に閉栓することを排除するものではない。例えば、タンク内の流体貯留量及び圧力が急速に上昇しているような危険な状況下では、供給制御弁41を完全に閉栓することが望ましい。   On the other hand, the present invention does not exclude completely closing the supply control valve 41 in the control valve throttling step. For example, it is desirable to completely close the supply control valve 41 in a dangerous situation where the fluid storage amount and pressure in the tank are rapidly increasing.

2−3.ポンプ停止工程
本発明では、必要に応じて、外部設備35に備えられる流体供給用のポンプ(図示しない)の稼働を停止するポンプ停止工程を実施することも可能である。制御弁絞り工程で供給制御弁41の開度を絞り、本ポンプ停止工程により外部設備35に備えられるポンプを停止することで、タンクへの更なる流量供給を抑えることが可能となる。
2-3. Pump stop process In this invention, it is also possible to implement the pump stop process which stops the operation | movement of the pump (not shown) for the fluid supply with which the external equipment 35 is equipped as needed. By restricting the opening of the supply control valve 41 in the control valve throttling step and stopping the pump provided in the external equipment 35 in the pump stop step, it is possible to suppress further supply of the flow rate to the tank.

ポンプ停止工程は、流体供給対象タンクに設置されるレベル計により、流体供給対象タンク内流体貯留量がQjであること、又は、流体供給対象タンクに設置される圧力計により、流体供給対象タンク内圧力がPjであることを検知した場合に実施することが望ましい。   The pump stop process is performed by the level meter installed in the fluid supply target tank, the amount of fluid stored in the fluid supply target tank is Qj, or the pressure gauge installed in the fluid supply target tank It is desirable to carry out when it is detected that the pressure is Pj.

Qjは、前記流体供給工程で、貯蔵タンクに繋がる供給制御弁41と、該タンクに備えられる停止弁の両方が開かれた貯蔵タンクにおいて、該タンク内の流体貯留量がそれ以上の場合に、外部設備35に備えられるポンプを停止すべき設定値である。すなわち、タンク内の流体貯留量がQjに達すると、外部設備35に備えられるポンプを停止する。Qjは、タンクの容量及び運転条件等を鑑み、適宜設定することができ、例えば、タンク全容量の85〜95%に設定することが望ましく、より好適には87〜93%である。Qjが前記範囲内であれば、タンクから流体が溢れ出す前にポンプを停止できるため、流体供給を安全に行うことができる。また、Qjの値を、Qiよりも大きくすることにより、流体供給量を段階的に制限できるようになる。これにより、ポンプにかかる負荷を低減することが可能となり、ポンプの劣化を防ぐ事ができるため好ましい。   Qj is a storage tank in which both the supply control valve 41 connected to the storage tank and the stop valve provided in the tank are opened in the fluid supply step, and when the amount of fluid stored in the tank is more than that, This is a set value for stopping the pump provided in the external equipment 35. That is, when the amount of fluid stored in the tank reaches Qj, the pump provided in the external equipment 35 is stopped. Qj can be appropriately set in view of the tank capacity and operating conditions, and is preferably set to 85 to 95% of the total capacity of the tank, and more preferably 87 to 93%. If Qj is within the above range, the pump can be stopped before the fluid overflows from the tank, so that the fluid can be supplied safely. Further, by setting the value of Qj to be larger than Qi, the fluid supply amount can be limited stepwise. Accordingly, it is possible to reduce the load applied to the pump, and it is possible to prevent deterioration of the pump, which is preferable.

一方、Pjは、前記流体供給工程で、貯蔵タンクに繋がる供給制御弁41と、該タンクに備えられる停止弁の両方が開かれた貯蔵タンクにおいて、該タンク内の圧力がそれ以上の場合に、外部設備35に備えられるポンプを停止すべき設定値である。すなわち、タンク内の圧力がPjに達すると、外部設備35に備えられるポンプを停止する。Pjは、タンクの容量、運転条件、及びタンク設置箇所での環境温度等に応じて適宜設定するとよく、例えば、最高外気温における流体の蒸気圧の82〜95%に設定することが望ましく、より好適には85〜92%である。Pjが前記範囲内であれば、タンク内の圧力が過剰に上昇する前にポンプの運転を停止できるため、安全に流体を供給できる。Pjの値を、Piよりも大きくすることにより、Qjの場合と同様に、流体供給量を段階的に制限できるようになる。これにより、ポンプにかかる負荷を低減することが可能となり、ポンプの劣化を防ぐ事ができるため好ましい。   On the other hand, Pj is a storage tank in which both the supply control valve 41 connected to the storage tank and the stop valve provided in the tank are opened in the fluid supply step, and the pressure in the tank is higher than that. This is a set value for stopping the pump provided in the external equipment 35. That is, when the pressure in the tank reaches Pj, the pump provided in the external equipment 35 is stopped. Pj may be set as appropriate according to the capacity of the tank, the operating conditions, the environmental temperature at the tank installation location, etc., for example, desirably set to 82 to 95% of the vapor pressure of the fluid at the maximum outside air temperature, Preferably it is 85 to 92%. If Pj is within the above range, the pump can be stopped before the pressure in the tank rises excessively, so that the fluid can be supplied safely. By making the value of Pj larger than Pi, the fluid supply amount can be limited in a stepwise manner as in the case of Qj. Accordingly, it is possible to reduce the load applied to the pump, and it is possible to prevent deterioration of the pump, which is preferable.

2−4.閉栓工程
本発明では、必要に応じて、流体を供給している第1タンク11に繋がる供給制御弁41を閉栓(供給制御弁41を完全に閉栓せずに、供給制御弁41の開度を絞って供給量を減らす態様も含む)した後で、各タンクに備えられる停止弁を閉栓する閉栓工程を実施することも可能である。閉栓工程では、流体供給対象タンクに対応する停止弁を閉栓する。供給制御弁41と停止弁の両方を絞ることで、タンクへの更なる流量供給を抑えることが可能となる。
2-4. In the present invention, if necessary, the supply control valve 41 connected to the first tank 11 that supplies the fluid is closed (the supply control valve 41 is not completely closed, and the opening degree of the supply control valve 41 is increased). It is also possible to carry out a closing step of closing a stop valve provided in each tank after a reduction (including a mode of reducing the supply amount). In the closing process, the stop valve corresponding to the fluid supply target tank is closed. By restricting both the supply control valve 41 and the stop valve, further supply of the flow rate to the tank can be suppressed.

制御弁絞り工程では、供給制御弁41を完全に閉栓しないことが望ましいことは前述した通りである。供給制御弁41を完全に閉栓しないときであっても、流体が供給された後のタンク内の圧力と外部設備35内の圧力が同程度であれば、流体は外部設備35からタンクへ供給されない。しかし、流体供給後のタンク内圧力が、外部設備35内の圧力よりも低ければ、制御弁絞り工程後であっても、流体が外部設備35からタンクへ更に供給される場合がある。そのため、タンクの停止弁を閉栓する閉栓工程を実施することにより、確実に流体供給を抑えることができる。   As described above, it is desirable not to completely close the supply control valve 41 in the control valve throttling step. Even when the supply control valve 41 is not completely closed, if the pressure in the tank after the fluid is supplied and the pressure in the external equipment 35 are approximately the same, the fluid is not supplied from the external equipment 35 to the tank. . However, if the pressure in the tank after the fluid supply is lower than the pressure in the external equipment 35, the fluid may be further supplied from the external equipment 35 to the tank even after the control valve throttling process. Therefore, it is possible to reliably suppress fluid supply by performing a plugging process for closing the tank stop valve.

閉栓工程は、流体供給対象タンクに設置されるレベル計により、流体供給対象タンク内流体貯留量がQkであること、又は、流体供給対象タンクに設置される圧力計により、流体供給対象タンク内圧力がPkであることを検知した場合に行うことが望ましい。   The capping step is performed by a level meter installed in the fluid supply target tank, the fluid storage amount in the fluid supply target tank being Qk, or a pressure gauge installed in the fluid supply target tank, This is desirable when it is detected that is Pk.

Qkは、前記流体供給工程で、貯蔵タンクに繋がる供給制御弁41と、該タンクに備えられる停止弁の両方が開かれた貯蔵タンクにおいて、該タンク内の流体貯留量がそれ以上の場合に、該タンクに備えられる停止弁を閉栓すべき設定値である。すなわち、タンク内の流体貯留量がQkに達すると、流体を供給している貯蔵タンクに備えられる停止弁を閉栓する。Qkは、タンクの容量及び運転条件等を鑑み、適宜設定することができ、例えば、タンク全容量の85〜95%に設定することが望ましく、より好適には87〜93%である。Qkが前記範囲内であれば、タンクから流体が溢れ出る前に停止弁を閉栓できるため、流体供給を安全に行うことができる。また、Qkの値を、Qiよりも大きくすることにより、流体供給量を段階的に制限できるため、貯蔵タンクに備えられる停止弁にかかる負荷を低減することができる。これにより、停止弁の劣化を防ぐ事ができるため好ましい。   Qk is a storage tank in which both the supply control valve 41 connected to the storage tank and the stop valve provided in the tank are opened in the fluid supply process, and when the amount of fluid stored in the tank is more than that, This is a set value for closing a stop valve provided in the tank. That is, when the amount of fluid stored in the tank reaches Qk, the stop valve provided in the storage tank supplying the fluid is closed. Qk can be appropriately set in view of the tank capacity, operating conditions, and the like. For example, Qk is preferably set to 85 to 95% of the total tank capacity, and more preferably 87 to 93%. If Qk is within the above range, the stop valve can be closed before the fluid overflows from the tank, so that the fluid can be supplied safely. Moreover, since the fluid supply amount can be limited in steps by setting the value of Qk to be larger than Qi, the load applied to the stop valve provided in the storage tank can be reduced. This is preferable because deterioration of the stop valve can be prevented.

一方、Pkは、前記流体供給工程で、貯蔵タンクに繋がる供給制御弁41と、該タンクに備えられる停止弁の両方が開かれた貯蔵タンクにおいて、該タンク内の圧力がそれ以上の場合に、該タンクに備えられる停止弁を閉栓すべき設定値である。すなわち、タンク内の圧力がPkに達すると、流体を供給している貯蔵タンクに備えられる停止弁を閉栓する。Pkは、タンクの容量、運転条件、及びタンク設置箇所での環境温度等に応じて適宜設定するとよく、例えば、最高外気温における流体の蒸気圧の85〜95%に設定することが望ましく、より好適には87〜92%である。Pkが前記範囲内であれば、タンクを損傷することなく確実に流体の供給を停止できるため、安全に流体を供給できる。Pkの値を、Piよりも高く設定することにより、流体供給量を段階的に制限できるため、貯蔵タンクに備えられる停止弁にかかる負荷を低減することができる。これにより、停止弁の劣化を防ぐ事ができるため好ましい。   On the other hand, Pk is a storage tank in which both the supply control valve 41 connected to the storage tank and the stop valve provided in the tank are opened in the fluid supply step, and the pressure in the tank is higher than that. This is a set value for closing a stop valve provided in the tank. That is, when the pressure in the tank reaches Pk, the stop valve provided in the storage tank supplying the fluid is closed. Pk may be appropriately set according to the capacity of the tank, the operating conditions, the environmental temperature at the tank installation location, etc., for example, preferably set to 85 to 95% of the vapor pressure of the fluid at the maximum outside temperature, Preferably it is 87 to 92%. If Pk is within the above range, the supply of fluid can be stopped reliably without damaging the tank, so that the fluid can be supplied safely. By setting the value of Pk higher than Pi, the fluid supply amount can be limited in a stepwise manner, so that the load on the stop valve provided in the storage tank can be reduced. This is preferable because deterioration of the stop valve can be prevented.

2−5.供給停止工程
本発明では、更に、外部設備35の外部停止弁36を閉栓する供給停止工程を実施することも可能である。外部設備35に備えられる外部停止弁36を閉栓することで、外部設備35から貯留設備1への流体供給を完全に停止できる。
2-5. Supply Stop Process In the present invention, a supply stop process for closing the external stop valve 36 of the external equipment 35 can also be performed. By closing the external stop valve 36 provided in the external facility 35, the fluid supply from the external facility 35 to the storage facility 1 can be completely stopped.

尚、前記ポンプ停止工程、前記閉栓工程、及び前記供給停止工程の実施順は、任意に決定することができる。また、いずれかの工程の実施中に、他の工程を実施することも可能である。本発明では、例えば、ポンプ停止工程、閉栓工程、供給停止工程の中でも、ポンプ停止工程を最先に実施することが望ましい態様であり、ポンプ停止工程、閉栓工程、供給停止工程を順に実施することがより望ましい態様である。   In addition, the execution order of the said pump stop process, the said plug closing process, and the said supply stop process can be determined arbitrarily. Moreover, it is also possible to implement another process during the implementation of any process. In the present invention, for example, among the pump stop process, the plug closing process, and the supply stop process, it is desirable to perform the pump stop process first, and the pump stop process, the plug closing process, and the supply stop process are performed in order. Is a more desirable embodiment.

2−6.ガス閉栓工程・ガス停止工程
流体供給時には、タンク内圧力が過剰に上昇することを防止する目的で、タンクのガス弁が開栓されている。しかし、前述したように、制御弁絞り工程、ポンプ停止工程、閉栓工程、供給停止工程等の、流体供給量を減少又は流体の供給を停止する工程を実施すると、ガス弁を開栓しておく必要がなくなる。また、ガス弁を開栓したままでは、タンク内の気化した流体が、ガス弁およびガス用配管32等を通じて外部へ排出される虞がある。気化した流体が可燃性のガスの場合、ガスが外部へ排出されると、ガスに引火する可能性が高まり危険である。そのため、本発明では、前記制御弁絞り工程、閉栓工程、供給停止工程のいずれかの工程の実施中、若しくは、これら各工程の実施前又は実施後のいずれかにおいて、各タンクのガス弁を閉栓するガス閉栓工程を実施することが望ましい。ガス閉栓工程では、開栓している全てのガス弁を閉栓することが望ましい。
2-6. Gas plugging process / gas stop process When supplying fluid, the tank gas valve is opened to prevent the tank pressure from rising excessively. However, as described above, when the process of reducing the fluid supply amount or stopping the fluid supply, such as the control valve throttling process, the pump stop process, the capping process, the supply stop process, is performed, the gas valve is opened. There is no need. Further, if the gas valve is kept open, the vaporized fluid in the tank may be discharged to the outside through the gas valve and the gas pipe 32 and the like. When the vaporized fluid is a flammable gas, if the gas is discharged to the outside, the possibility of igniting the gas increases and it is dangerous. Therefore, in the present invention, the gas valve of each tank is closed during the execution of any one of the control valve throttling step, the plugging step, and the supply stop step, or before or after the execution of these steps. It is desirable to carry out a gas capping process. In the gas closing step, it is desirable to close all the gas valves that are open.

また、本発明では必要に応じて、外部設備35に備えられる外部ガス弁37を閉栓するガス停止工程を実施することも可能である。   Moreover, in this invention, it is also possible to implement the gas stop process which plugs the external gas valve 37 with which the external equipment 35 is equipped as needed.

2−7.警報工程
貯留設備1は警報器(図示しない)を備えることも可能である。警報工程の実施により、第1タンク内の貯留量、又は、第1タンク内の圧力が上昇していることを作業員等に知らせることができるため、設備に異常が生じた場合に迅速な対応が可能となる。
2-7. Alarm process The storage facility 1 can also be provided with an alarm (not shown). By implementing the warning process, it is possible to notify workers etc. that the amount of storage in the first tank or the pressure in the first tank has increased, so it is possible to respond quickly when an abnormality occurs in equipment. Is possible.

警報器には、例えば、流体貯留量がQi、Qj、またはQkに達したとき、もしくは、タンク内圧力がPi、Pj、またはPkに達したときに、警報器が作動するよう予め設定しておくとよい。これらの値を設定することにより、流体供給対象タンク内の貯留量、又は、タンク内の圧力が上昇していることを知ることができる。   For example, the alarm device is set in advance so that the alarm device is activated when the fluid storage amount reaches Qi, Qj, or Qk, or when the tank internal pressure reaches Pi, Pj, or Pk. It is good to leave. By setting these values, it is possible to know that the storage amount in the fluid supply target tank or the pressure in the tank is increasing.

前述した各工程は、シーケンス制御等の各種制御を導入することにより、自動制御することも可能である。また、各工程を手動で実施することもできる。本発明では、少なくとも、制御弁絞り工程において、供給制御弁41の開度が、自動で絞られることが好ましい。供給制御弁の絞りを自動で行うことにより、作業員が誤接続に気づかない場合であっても、確実に流体の供給量を低減することができる。   Each process described above can be automatically controlled by introducing various controls such as sequence control. Moreover, each process can also be implemented manually. In the present invention, it is preferable that the opening of the supply control valve 41 is automatically throttled at least in the control valve throttle step. By automatically reducing the supply control valve, the amount of fluid supply can be reliably reduced even when the worker does not notice the erroneous connection.

また、本発明では、各貯蔵タンクに備えられる停止弁の開閉、及び外部設備35の外部停止弁36の開閉、も自動制御で行うことが望ましい。安全のため、外部設備35のポンプは作業員が手動で停止することが望ましい。   In the present invention, it is also desirable to automatically open and close the stop valve provided in each storage tank and open and close the external stop valve 36 of the external equipment 35. For safety, it is desirable that the operator manually stops the pump of the external equipment 35.

一方、ガス用の配管に設けられる弁についても、各タンクに備えられるガス弁(15、25)の開閉、外部ガス弁37の開閉を自動で行うことがより望ましい態様である。   On the other hand, with respect to the valves provided in the gas piping, it is more desirable to automatically open / close the gas valves (15, 25) provided in each tank and open / close the external gas valve 37.

以下、実施例を挙げて本発明をより具体的に説明するが、本発明はもとより下記実施例によって制限を受けるものではなく、前・後記の趣旨に適合し得る範囲で適宜変更を加えて実施することも勿論可能であり、それらはいずれも本発明の技術的範囲に包含される。   EXAMPLES Hereinafter, the present invention will be described more specifically with reference to examples. However, the present invention is not limited by the following examples, and may be implemented with appropriate modifications within a range that can meet the purpose described above and below. Of course, any of these is also included in the technical scope of the present invention.

流体供給操作を実際に行う時の形態については、少なくとも下記の5つに分類される。本発明によれば、いずれの場合であっても、確実に流体供給を制御できる。
(1)供給対象タンクの停止弁及びガス弁を正しく開栓したとき
(2)供給対象タンクとは異なるタンクのガス弁を誤って開栓したとき
(3)供給対象タンクとは異なるタンクの停止弁を誤って開栓したとき
(4)供給対象タンクとは異なるタンクのガス弁及び停止弁を誤って開栓したとき
(5)3以上のタンクを備える貯留設備において、供給対象タンクとは異なるタンクの停止弁を誤って開栓したとき
それぞれの場合について、以下に詳述する。
The forms when the fluid supply operation is actually performed are classified into at least the following five. According to the present invention, fluid supply can be reliably controlled in any case.
(1) When the stop valve and gas valve of the supply target tank are correctly opened (2) When the gas valve of a tank different from the supply target tank is accidentally opened (3) Stopping of the tank different from the supply target tank When the valve is accidentally opened (4) When the gas valve and stop valve of the tank different from the supply target tank are accidentally opened (5) In a storage facility having three or more tanks, it is different from the supply target tank When the tank stop valve is accidentally opened, each case is described in detail below.

(1)供給対象タンクの停止弁及びガス弁を正しく開栓したとき
図2は、流体供給対象タンクの停止弁及びガス弁を開栓したときの流体の供給方法を説明するための概略図である。図2では、第1タンク11内の流体貯留量が減少しているため、供給制御弁41及び第1停止弁13を開栓して第1タンク11へ流体を供給する。また、タンク内圧力を調整するために、第1タンクのガス弁15は開栓されている。第1タンク11では、流体貯留量がQiに達するまで流体が供給される。
第1レベル計16が、第1タンク11内の流体貯留量がQiに達したことを検知すると、この液レベル情報に基づき、供給制御弁41の開度が絞られる。本操作により、第1タンク11への流体の供給が制限されるため、第1タンク11への流体の供給は適量のところで容易に停止せしめることが可能となる。
なお図に記載される弁のうち、黒塗りの弁は閉栓している弁を意味し、白塗りの弁は開栓している弁を示す(以下の図でも同様)。また、図中の管のうち、太線で描かれる管は、流体が通過する管を意味する(以下の図でも同様)。
(1) When a stop valve and a gas valve of a supply target tank are correctly opened FIG. 2 is a schematic diagram for explaining a fluid supply method when a stop valve and a gas valve of a fluid supply target tank are opened. is there. In FIG. 2, since the amount of fluid stored in the first tank 11 has decreased, the supply control valve 41 and the first stop valve 13 are opened to supply fluid to the first tank 11. Further, the gas valve 15 of the first tank is opened to adjust the tank internal pressure. In the first tank 11, fluid is supplied until the fluid storage amount reaches Qi.
When the first level meter 16 detects that the fluid storage amount in the first tank 11 has reached Qi, the opening degree of the supply control valve 41 is reduced based on this liquid level information. By this operation, the supply of fluid to the first tank 11 is restricted, so that the supply of fluid to the first tank 11 can be easily stopped at an appropriate amount.
Of the valves shown in the figure, a black valve means a valve that is closed, and a white valve means a valve that is open (the same applies to the following figures). In addition, among the pipes in the figure, a pipe drawn with a thick line means a pipe through which a fluid passes (the same applies to the following figures).

(2)供給対象タンクとは異なるタンクのガス弁を誤って開栓したとき
図3は、供給対象タンクとは異なるタンクのガス弁を誤って開栓したときの流体の供給方法を説明するための概略図である。本来であれば、流体が供給される第1タンク11の第1ガス弁15が開栓されるべきところ、当該ガス弁15が閉栓され、誤って第2タンク21の第2ガス弁25が開栓しているため、第1タンク11へ流体を供給するにつれ、第1タンク11のタンク内圧力が上昇して過剰な負荷がかかり望ましくない。
この際、流体の供給に伴い、第1タンク11内の圧力が上昇し、タンク内圧力がPiに達したことを第1圧力計17が検知すると、この圧力情報に基づき、供給制御弁41の開度が絞られる。本操作により、第1タンク11への流体の供給が制限されるため、第1タンク11内圧力を過剰に上昇させることなく、流体供給量を低減できる。
(2) When a gas valve of a tank different from the supply target tank is accidentally opened FIG. 3 illustrates a fluid supply method when a gas valve of a tank different from the supply target tank is accidentally opened. FIG. Originally, the first gas valve 15 of the first tank 11 to which the fluid is supplied should be opened. However, the gas valve 15 is closed and the second gas valve 25 of the second tank 21 is accidentally opened. Since the plug is plugged, as the fluid is supplied to the first tank 11, the pressure in the tank of the first tank 11 rises and an excessive load is applied, which is not desirable.
At this time, when the first pressure gauge 17 detects that the pressure in the first tank 11 has increased with the supply of the fluid and the pressure in the tank has reached Pi, the supply control valve 41 is controlled based on this pressure information. The opening is reduced. Since the supply of fluid to the first tank 11 is restricted by this operation, the amount of fluid supply can be reduced without excessively increasing the pressure in the first tank 11.

(3)供給対象タンクとは異なるタンクの停止弁を誤って開栓したとき
図4は、供給対象タンクとは異なるタンクの停止弁を誤って開栓したときの流体の供給方法を説明するための概略図である。本来であれば、流体の貯留量が減少している、流体供給対象である第2タンク21の第2停止弁23を開栓し、流体を供給しなければならないところ、誤って第1停止弁13を開栓し、第1タンク11へ流体を供給しようとしている。このまま供給を継続すると、流体が第1タンク11から溢れ出す虞があり危険である。
このとき、第1レベル計16によりタンク内の流体貯留量がQiに達している、または達したことが検知される、若しくは、第1圧力計17によりタンク内の圧力がPiに達している、または達したことが検知されると、この情報に基づき、供給制御弁41の開度が絞られる。本操作により第1タンク11への流体供給が制限されるため、第1タンク11から流体を溢れさせることなく、流体供給量を低減できる。
(3) When a stop valve of a tank different from the supply target tank is accidentally opened FIG. 4 illustrates a fluid supply method when a stop valve of a tank different from the supply target tank is accidentally opened. FIG. Originally, the second stop valve 23 of the second tank 21 to be supplied with fluid, which has a reduced fluid storage amount, must be opened to supply the fluid. 13 is opened to supply fluid to the first tank 11. If the supply is continued as it is, the fluid may overflow from the first tank 11, which is dangerous.
At this time, it is detected by the first level meter 16 that the fluid storage amount in the tank has reached or has reached Qi, or the pressure in the tank has reached Pi by the first pressure gauge 17. Or, when it is detected that it has reached, the opening degree of the supply control valve 41 is reduced based on this information. Since the fluid supply to the first tank 11 is restricted by this operation, the fluid supply amount can be reduced without overflowing the fluid from the first tank 11.

(4)供給対象タンクとは異なるタンクのガス弁及び停止弁を誤って開栓したとき
図5は、供給対象タンクとは異なるタンクのガス弁及び停止弁を誤って開栓したときの流体の供給方法を説明するための概略図である。本来であれば、第2停止弁23と第2ガス弁25を開栓し、第2タンク21へ流体を供給すべきところ、誤って第1停止弁13と第1ガス弁15を開栓し、第1タンク11へ流体を供給しようとしている。このまま供給を継続すると、流体が第1タンク11から溢れ出す虞があり危険である。
(4) When a gas valve and a stop valve of a tank different from the supply target tank are accidentally opened Fig. 5 shows the fluid flow when a gas valve and a stop valve of a tank different from the supply target tank are accidentally opened. It is the schematic for demonstrating a supply method. Originally, the second stop valve 23 and the second gas valve 25 should be opened and fluid should be supplied to the second tank 21, but the first stop valve 13 and the first gas valve 15 were accidentally opened. The fluid is going to be supplied to the first tank 11. If the supply is continued as it is, the fluid may overflow from the first tank 11, which is dangerous.

このとき、第1タンク11に設置される第1レベル計16により、タンク内の流体貯留量がQiに達している、または達したことが検知されると、この情報に基づき、供給制御弁41の開度が絞られる。本操作により第1タンク11への流体供給が制限されるため、第1タンク11から流体を溢れさせることなく、流体供給量を低減できる。   At this time, when the first level meter 16 installed in the first tank 11 detects that the fluid storage amount in the tank has reached or has reached Qi, the supply control valve 41 is based on this information. The opening of is reduced. Since the fluid supply to the first tank 11 is restricted by this operation, the fluid supply amount can be reduced without overflowing the fluid from the first tank 11.

(5)3以上のタンクを備える貯留設備において、供給対象タンクとは異なるタンクの停止弁を誤って開栓したとき
図6は、3以上のタンクを備える貯留設備において、供給対象とは異なるタンクの停止弁を誤って開栓したときの流体の供給方法を説明するための概略図である(各貯蔵タンクに備えられるガス弁の記載は省略する)。本来であれば、貯蔵タンク内の流体貯留量が減少している第2タンク21へ流体を供給するために、第2停止弁23を開栓すべきところ、誤って第1タンク11に備えられる第1停止弁13を開栓して、第1タンク11へ流体を供給しようとしている。このまま供給を継続すると、流体が第1タンク11から溢れ出す虞があり危険である。
(5) When a stop valve of a tank different from the supply target tank is accidentally opened in a storage facility including three or more tanks. FIG. 6 illustrates a tank different from the supply target in a storage facility including three or more tanks. It is the schematic for demonstrating the supply method of the fluid when opening a stop valve accidentally (The description of the gas valve with which each storage tank is equipped is abbreviate | omitted). Originally, when the second stop valve 23 should be opened in order to supply the fluid to the second tank 21 in which the amount of fluid stored in the storage tank has decreased, the first tank 11 is erroneously provided. The first stop valve 13 is opened to supply fluid to the first tank 11. If the supply is continued as it is, the fluid may overflow from the first tank 11, which is dangerous.

このとき、第1レベル計16によりタンク内の流体貯留量がQiに達している、または達したことが検知される、若しくは、第1圧力計17によりタンク内の圧力がPiに達している、または達したことが検知されると、この情報に基づき、第1タンク11に繋がる供給制御弁41(ア)の開度が絞られる。この様に2以上の貯蔵タンクへ同時に流体を供給する場合であっても、誤接続されているタンクに繋がる供給制御弁41(ア)の開度を絞ることにより、誤接続のあるラインへの流体供給が制限される。また、いずれのタンクに誤接続があるか不明な場合は、例えば、供給制御弁41(ア)だけでなく、第3タンク51に繋がる供給制御弁41(イ)及び/又は第3停止弁53の開度も併せて絞ることにより、更に確実に誤接続のある貯留設備における流体供給量を低減できる。   At this time, it is detected by the first level meter 16 that the fluid storage amount in the tank has reached or has reached Qi, or the pressure in the tank has reached Pi by the first pressure gauge 17. When it is detected that the value has reached, the opening degree of the supply control valve 41 (a) connected to the first tank 11 is reduced based on this information. Thus, even when supplying fluid to two or more storage tanks at the same time, by reducing the opening of the supply control valve 41 (A) connected to the erroneously connected tank, it is possible to connect to the erroneously connected line. Fluid supply is limited. Further, when it is unclear which tank is erroneously connected, for example, not only the supply control valve 41 (A) but also the supply control valve 41 (A) and / or the third stop valve 53 connected to the third tank 51. In addition, the amount of fluid supply in the storage facility with erroneous connection can be more reliably reduced by narrowing the opening degree of.

上述したように、本発明によれば、流体を供給すべきタンクとは異なるタンクのガス弁、停止弁を開栓した場合であっても、いずれかのタンク内圧力又はタンク内貯留量が所定値に達したときに、供給制御弁41の開度を絞ることにより、速やかに流体供給量を低減できる。   As described above, according to the present invention, even when a gas valve or a stop valve of a tank different from the tank to which a fluid is to be supplied is opened, any tank pressure or tank storage amount is predetermined. When the value is reached, the fluid supply amount can be quickly reduced by reducing the opening of the supply control valve 41.

1 貯留設備
11 第1タンク
13 第1停止弁
15 第1ガス弁
16 第1レベル計
17 第1圧力計
21 第2タンク
23 第2停止弁
25 第2ガス弁
26 第2レベル計
27 第2圧力計
31A 供給主管
31B 供給側管
32 ガス用配管
33 流体受入口
34 ガス排出口
35 外部設備
36 外部停止弁
37 外部ガス弁
38A、38B 接続管
39 外部供給口
40 外部ガス排出口
41 供給制御弁
51 第3タンク
53 第3停止弁
56 第3レベル計
57 第3圧力計
DESCRIPTION OF SYMBOLS 1 Storage equipment 11 1st tank 13 1st stop valve 15 1st gas valve 16 1st level meter 17 1st pressure gauge 21 2nd tank 23 2nd stop valve 25 2nd gas valve 26 2nd level meter 27 2nd pressure Total 31A Supply main pipe 31B Supply side pipe 32 Gas piping 33 Fluid inlet 34 Gas outlet 35 External equipment 36 External stop valve 37 External gas valve 38A, 38B Connection pipe 39 External supply port 40 External gas outlet 41 Supply control valve 51 Third tank 53 Third stop valve 56 Third level gauge 57 Third pressure gauge

Claims (7)

貯留設備に外部から流体を供給する方法であって、
前記貯留設備は、
2以上のタンクと、
一端が流体受入口に繋がる供給主管と、
前記供給主管の他端に備えられる供給制御弁と、
一端が前記供給制御弁に繋がり、他端が前記各タンクに備えられる停止弁に繋がる供給側管とを有し、
少なくとも1つの前記供給側管は、1以上の分岐を有し且つ2以上のタンクに繋がっており、
前記貯留設備に流体を供給する方法は、
前記タンクのうちの一つに繋がる供給制御弁と、該タンクに備えられる停止弁を開いて、該タンクに外部から流体を供給する流体供給工程、及び
流体を供給しているタンク内の流体貯留量がQiであること又は圧力がPiであることを検知した場合には、該供給制御弁の開度を絞ることにより流体供給量を減らす制御弁絞り工程、を含むことを特徴とする流体の供給方法。
ただし、
前記Qiとは、貯蔵タンクに繋がる供給制御弁と、該タンクに備えられる停止弁の両方が開いており、且つ、該タンク内の流体貯蔵量がそれ以上の場合に、該供給制御弁を絞るべき設定値であり、
前記Piとは、貯蔵タンクに繋がる供給制御弁と、該タンクに備えられる停止弁の両方が開いており、且つ、該タンク内の圧力がそれ以上の場合に、該供給制御弁を絞るべき設定値である。
A method of supplying fluid from the outside to a storage facility,
The storage facility is
Two or more tanks,
A supply main pipe with one end connected to the fluid inlet;
A supply control valve provided at the other end of the supply main pipe;
One end is connected to the supply control valve, and the other end has a supply side pipe connected to a stop valve provided in each tank,
At least one of the supply side pipes has one or more branches and is connected to two or more tanks;
A method of supplying a fluid to the storage facility includes:
A supply control valve connected to one of the tanks, a fluid supply step of opening a stop valve provided in the tank and supplying fluid from the outside to the tank, and fluid storage in the tank supplying the fluid A control valve throttle step of reducing the fluid supply amount by reducing the opening of the supply control valve when it is detected that the amount is Qi or the pressure is Pi. Supply method.
However,
The Qi means that the supply control valve connected to the storage tank and the stop valve provided in the tank are open and the supply control valve is throttled when the amount of fluid stored in the tank is more than that. Should be set value,
Pi is a setting to throttle the supply control valve when both the supply control valve connected to the storage tank and the stop valve provided in the tank are open and the pressure in the tank is higher than that. Value.
前記供給主管が分岐しない管である請求項1に記載の流体の供給方法。   The fluid supply method according to claim 1, wherein the supply main pipe is a pipe that does not branch. 前記供給主管が1つの分岐を有し、
該供給主管に繋がる供給制御弁が、1以上の分岐を有し且つ2以上のタンクに繋がる供給側管に連結されており、該タンクのうちの1つに流体を供給する請求項1に記載の流体の供給方法。
The supply main has one branch;
The supply control valve connected to the supply main pipe is connected to a supply side pipe having one or more branches and connected to two or more tanks, and supplies fluid to one of the tanks. Fluid supply method.
流体を供給しているタンクに繋がる供給制御弁を閉栓した後で、該タンクに備えられる停止弁を閉栓する閉栓工程を含む請求項1〜3のいずれか1項に記載の流体の供給方法。   The fluid supply method according to any one of claims 1 to 3, further comprising a closing step of closing a stop valve provided in the tank after closing the supply control valve connected to the tank supplying the fluid. 流体を供給しているタンク内の流体貯留量がQiであること、若しくは圧力がPiであることを検知したとき、又はその後で、警報を作動させる警報工程を含む請求項1〜4のいずれか1項に記載の流体の供給方法。   5. The method according to claim 1, further comprising an alarm step of activating an alarm when it is detected that the fluid storage amount in the tank supplying the fluid is Qi or the pressure is Pi. 2. The fluid supply method according to item 1. 前記制御弁絞り工程において、自動で供給制御弁の開度が絞られる請求項1〜5のいずれか1項に記載の流体の供給方法。   The fluid supply method according to claim 1, wherein in the control valve throttling step, the opening degree of the supply control valve is automatically throttled. 外部から供給する流体を貯留する貯留設備であって、
前記貯留設備は、
2以上のタンクと、
一端が流体受入口に繋がる供給主管と、
前記供給主管の他端に備えられる供給制御弁と、
一端が前記供給制御弁に繋がり、他端が前記各タンクに備えられる停止弁に繋がる供給側管とを有し、
少なくとも1つの前記供給側管は、1以上の分岐を有し且つ2以上のタンクに繋がっており、
流体を供給しているタンク内の流体貯留量を検出するレベル計、及び/又は、タンク内の圧力を検出する圧力計を備え、
前記供給制御弁が、流体を供給しているタンク内の流体貯留量がQi、又は、タンク内圧力がPiである場合に開度が絞られるものであることを特徴とする貯留設備。
ただし、
前記Qiとは、貯蔵タンクに繋がる供給制御弁と、該タンクに備えられる停止弁の両方が開いており、且つ、該タンク内の流体貯蔵量がそれ以上の場合に、該供給制御弁を絞るべき設定値であり、
前記Piとは、貯蔵タンクに繋がる供給制御弁と、該タンクに備えられる停止弁の両方が開いており、且つ、該タンク内の圧力がそれ以上の場合に、該供給制御弁を絞るべき設定値である。
A storage facility for storing fluid supplied from outside,
The storage facility is
Two or more tanks,
A supply main pipe with one end connected to the fluid inlet;
A supply control valve provided at the other end of the supply main pipe;
One end is connected to the supply control valve, and the other end has a supply side pipe connected to a stop valve provided in each tank,
At least one of the supply side pipes has one or more branches and is connected to two or more tanks;
A level meter for detecting the amount of fluid stored in the tank supplying the fluid, and / or a pressure gauge for detecting the pressure in the tank,
A storage facility, wherein the supply control valve is configured to reduce an opening degree when a fluid storage amount in a tank supplying a fluid is Qi or a tank internal pressure is Pi.
However,
The Qi means that the supply control valve connected to the storage tank and the stop valve provided in the tank are open and the supply control valve is throttled when the amount of fluid stored in the tank is more than that. Should be set value,
Pi is a setting to throttle the supply control valve when both the supply control valve connected to the storage tank and the stop valve provided in the tank are open and the pressure in the tank is higher than that. Value.
JP2013272453A 2012-12-28 2013-12-27 Fluid supply method and storage facility Active JP6279900B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013272453A JP6279900B2 (en) 2012-12-28 2013-12-27 Fluid supply method and storage facility

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2012289063 2012-12-28
JP2012289063 2012-12-28
JP2013272453A JP6279900B2 (en) 2012-12-28 2013-12-27 Fluid supply method and storage facility

Publications (2)

Publication Number Publication Date
JP2014142062A JP2014142062A (en) 2014-08-07
JP6279900B2 true JP6279900B2 (en) 2018-02-14

Family

ID=51423510

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013272453A Active JP6279900B2 (en) 2012-12-28 2013-12-27 Fluid supply method and storage facility

Country Status (1)

Country Link
JP (1) JP6279900B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6636699B2 (en) * 2015-02-06 2020-01-29 ホシザキ株式会社 Cooling storage

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6037354Y2 (en) * 1980-02-14 1985-11-07 日立造船株式会社 Tank overpressure prevention device
JP2003014197A (en) * 2001-07-02 2003-01-15 Chubu Gas Kk Receiving piping cooling down method for lng satellite equipment
ATE450401T1 (en) * 2005-12-21 2009-12-15 Honda Motor Co Ltd HYDROGEN GAS SUPPLY AND REFUELING SYSTEM FOR VEHICLES
JP2010196824A (en) * 2009-02-25 2010-09-09 Chugoku Electric Power Co Inc:The Low temperature liquefied gas receiving device

Also Published As

Publication number Publication date
JP2014142062A (en) 2014-08-07

Similar Documents

Publication Publication Date Title
US9835294B2 (en) Dual pressure-retaining manway system
DK178151B1 (en) Liquid Natural Gas transfer
US8439654B2 (en) Methods and apparatus for pumping liquefied gases
US20230235855A1 (en) Portable fueling system
US20160033080A1 (en) Method for filling up a storage tank with a gaseous pressurized medium, in particular hydrogen
JP6279900B2 (en) Fluid supply method and storage facility
CN205715855U (en) The embedded stop valve that can keep in repair
US8807383B2 (en) Gasoline storage device
CN102954346B (en) Cryogenic insulation mobile storage tank safety system
CN111417818B (en) Indoor safety device, liquefied gas system and vehicle
RU165208U1 (en) TANK CRYOGENIC FUEL VEHICLE OPERATING ON LIQUEFIED NATURAL GAS
KR20110007450A (en) A co2 carrying ship
CN115465410A (en) Secondary screen wall enclosure system of B-type liquid tank
CN210511034U (en) CNG gas storage well CNG recovery system
CN204372548U (en) LPG tank pipe-line system
KR200480972Y1 (en) Cryogenic fluid hull outside drain structure of lng fpso and lng carrier including the same
KR101875089B1 (en) Abnormal pressure protection apparatus for flng storage
CN219756050U (en) Forced gasification gas supply system for liquid passing protection under intelligent micro-pipe network ecological chain
CN204750483U (en) Gaseous local shielding of storing cabin
CN103899439A (en) Liquefied natural gas fuel system for vehicle
CN215907975U (en) Marine pipeline liquid ammonia recovery system
CN113390018B (en) Gas phase system of liquefied hydrocarbon tank
RU2424467C2 (en) System for replenishment of stock of compressed natural gas
CN116464906A (en) Low-temperature LPG shipping system capable of automatically exhausting and releasing pressure
WO2015153631A1 (en) Dual pressure-retaining manway system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160906

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170629

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170711

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180116

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180118

R150 Certificate of patent or registration of utility model

Ref document number: 6279900

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150