JP6277683B2 - Boiler system - Google Patents

Boiler system Download PDF

Info

Publication number
JP6277683B2
JP6277683B2 JP2013236997A JP2013236997A JP6277683B2 JP 6277683 B2 JP6277683 B2 JP 6277683B2 JP 2013236997 A JP2013236997 A JP 2013236997A JP 2013236997 A JP2013236997 A JP 2013236997A JP 6277683 B2 JP6277683 B2 JP 6277683B2
Authority
JP
Japan
Prior art keywords
water
boiler
feed water
water supply
temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013236997A
Other languages
Japanese (ja)
Other versions
JP2015096784A (en
Inventor
孝明 大西
孝明 大西
陽一 矢作
陽一 矢作
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Miura Co Ltd
Original Assignee
Miura Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Miura Co Ltd filed Critical Miura Co Ltd
Priority to JP2013236997A priority Critical patent/JP6277683B2/en
Publication of JP2015096784A publication Critical patent/JP2015096784A/en
Application granted granted Critical
Publication of JP6277683B2 publication Critical patent/JP6277683B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Description

本発明は、ボイラへ供給する給水を加熱する給水加熱器を有するボイラシステムに関する。   The present invention relates to a boiler system having a feed water heater for heating feed water supplied to a boiler.

従来、ボイラシステムにおいては、ボイラへ供給される前の給水を、給水加熱器(「エコノマイザ」ともいう)により予め加熱することにより、ボイラ効率を向上させることが行われている(特許文献1参照)。エコノマイザは、ボイラ等から排出される排ガス(廃熱)とボイラに供給される給水とを熱交換させることにより、給水を加熱する装置である。   Conventionally, in boiler systems, boiler efficiency is improved by preheating water supplied before being supplied to the boiler with a water heater (also referred to as “economizer”) (see Patent Document 1). ). An economizer is a device that heats feed water by exchanging heat between exhaust gas (waste heat) discharged from a boiler or the like and feed water supplied to the boiler.

特開2012−002385号公報JP 2012-002385 A

一般に、ボイラシステムにおいては、ボイラ本体(缶体)の水位が下限水位(目標水位制御開始水位)まで下がると給水の供給を開始し、ボイラ本体の水位が上限水位(目標水位)に上がったときに給水の供給を停止する、いわゆるオン−オフ制御が行われている。このようなオン−オフ制御では、ボイラ本体の水位が下限水位まで下がらないと給水が供給されないため、給水が供給されるまでの間、エコノマイザ内に滞留する水は、排ガスにより加熱されて高温になる。   In general, in a boiler system, when the water level of the boiler body (can body) falls to the lower limit water level (target water level control start water level), the supply of water supply starts, and when the water level of the boiler body rises to the upper limit water level (target water level) In other words, so-called on-off control is performed to stop the supply of water. In such on-off control, the feed water is not supplied unless the water level of the boiler body is lowered to the lower limit water level, so the water staying in the economizer is heated by the exhaust gas to a high temperature until the feed water is supplied. Become.

特に、低負荷状態のためボイラ本体の水位が高い状態から高負荷状態に移行したときや、蒸気圧が低い状態からの起蒸時などのように、現在の水位に対して目標水位が低くなる場合には、給水要求が無い状態が継続する。その場合、エコノマイザ内に水が滞留する時間は長くなる。   In particular, the target water level becomes lower than the current water level, such as when the water level of the boiler body is shifted from a high state to a high load state due to a low load state, or when steaming from a low steam pressure state. In this case, the state where there is no water supply request continues. In that case, the time during which water stays in the economizer becomes longer.

エコノマイザ内に高温の水が滞留する時間が長くなると、排ガスの熱により水が沸騰しやすい。また、給水として100℃を超える高温の水が供給され、エコノマイザ内に高温の水が滞留した場合に、エコノマイザ内に滞留している水が飽和温度に達して沸騰することがある。エコノマイザ内に滞留している水が沸騰すると、圧損により給水の供給効率が低下したり(給水が遅れたり)、振動や圧力変動の影響によりエコノマイザの配管に破損等が発生したりする可能性がある。   When the time during which hot water stays in the economizer becomes longer, the water tends to boil due to the heat of the exhaust gas. Further, when high-temperature water exceeding 100 ° C. is supplied as water supply, and high-temperature water stays in the economizer, the water staying in the economizer may reach the saturation temperature and boil. If water staying in the economizer boils, there is a possibility that the supply efficiency of the water supply will be reduced due to pressure loss (water supply will be delayed), or that the economizer piping will be damaged due to the effects of vibration and pressure fluctuations. is there.

本発明は、ボイラの燃焼中において、給水加熱器内に滞留する高温の水が沸騰することを抑制できるボイラシステムを提供することを目的とする。   An object of the present invention is to provide a boiler system capable of suppressing boiling of high-temperature water staying in a feed water heater during combustion of the boiler.

本発明は、排ガスによってボイラへの給水を加熱する給水加熱器を有するボイラと、前記給水加熱器を介して前記ボイラへ給水を供給する給水ラインと、前記給水ラインにおける前記給水加熱器よりも上流側に配置され、前記給水加熱器に供給される給水の流量を調整する給水流量調整部と、前記給水ラインにおける前記給水加熱器よりも下流側に配置され、前記給水加熱器から前記ボイラに供給される給水であって前記給水加熱器の外部を流通する給水の温度を検出する給水温度検出部と、前記給水流量調整部を制御する制御部と、を備え、前記制御部は、前記ボイラから給水要求が無く且つ前記給水温度検出部により検出される給水の温度が基準温度以上である状態が設定時間以上継続するときに、前記給水加熱器へ給水を供給するように前記給水流量調整部を制御する、ボイラシステムに関する。 The present invention includes a boiler having a feed water heater that heats feed water to the boiler by exhaust gas, a feed water line that feeds feed water to the boiler via the feed water heater, and upstream of the feed water heater in the feed water line A feed water flow rate adjusting unit that adjusts the flow rate of feed water supplied to the feed water heater, and is arranged downstream of the feed water heater in the feed water line, and is supplied from the feed water heater to the boiler A feed water temperature detector that detects the temperature of the feed water that flows outside the feed water heater, and a controller that controls the feed water flow rate adjuster, the controller from the boiler When there is no water supply request and the state where the temperature of the water supply detected by the water supply temperature detection unit is equal to or higher than a reference temperature continues for a set time or longer, the water supply is supplied to the water heater. To control the water supply flow rate adjusting unit, to the boiler system.

また、前記基準温度は、前記ボイラの設定目標圧力から算出される飽和温度から所定温度低い温度である、ことが好ましい。   Further, it is preferable that the reference temperature is a temperature lower than a saturation temperature calculated from a set target pressure of the boiler by a predetermined temperature.

また、前記ボイラの内部の水位を検出する水位検出部を備え、前記制御部は、前記ボイラから給水要求が無く且つ前記給水温度検出部により検出される給水の温度が前記基準温度以上である状態が前記設定時間以上継続し、更に前記水位検出部により検出される水位が目標水位制御開始水位以下であるときに、前記給水加熱器へ給水を供給するように前記給水流量調整部を制御する、ことが好ましい。   In addition, a water level detection unit that detects a water level inside the boiler is provided, and the control unit has no water supply request from the boiler, and the temperature of the feed water detected by the feed water temperature detection unit is equal to or higher than the reference temperature. When the water level detected by the water level detection unit is lower than or equal to a target water level control start water level, the water supply flow rate adjustment unit is controlled to supply water to the water heater. It is preferable.

また、前記ボイラの発生蒸気を使用する負荷装置から排出されるドレンをクローズド方式で回収して、回収されるドレンを再度前記ボイラへの給水として利用する、ことが好ましい。   Moreover, it is preferable to collect | recover the drain discharged | emitted from the load apparatus which uses the generated steam of the said boiler by a closed system, and to utilize again the collected drain as water supply to the said boiler.

本発明によれば、ボイラの燃焼中において、給水加熱器内に滞留する高温の水が沸騰することを抑制できるボイラシステムを提供することができる。   ADVANTAGE OF THE INVENTION According to this invention, the boiler system which can suppress that the high temperature water which retains in a feed water heater boils during combustion of a boiler can be provided.

実施形態に係るボイラシステム1の全体構成図である。1 is an overall configuration diagram of a boiler system 1 according to an embodiment. 第1実施形態のボイラシステム1の動作を示すフローチャートである。It is a flowchart which shows operation | movement of the boiler system 1 of 1st Embodiment. 第1実施形態のボイラシステム1の動作を示すタイムチャートである。It is a time chart which shows operation | movement of the boiler system 1 of 1st Embodiment. 第2実施形態のボイラシステム1の動作を示すフローチャートである。It is a flowchart which shows operation | movement of the boiler system 1 of 2nd Embodiment. 第2実施形態のボイラシステム1の動作を示すタイムチャートである。It is a time chart which shows operation | movement of the boiler system 1 of 2nd Embodiment.

[第1実施形態の構成]
以下、本発明に係るボイラシステムの第1実施形態を、図面を参照しながら説明する。図1は、第1実施形態に係るボイラシステム1の全体構成図である。図2は、第1実施形態のボイラシステム1の動作を示すフローチャートである。図3は、第1実施形態のボイラシステム1の動作を示すタイムチャートである。
[Configuration of First Embodiment]
Hereinafter, a boiler system according to a first embodiment of the present invention will be described with reference to the drawings. FIG. 1 is an overall configuration diagram of a boiler system 1 according to the first embodiment. FIG. 2 is a flowchart showing the operation of the boiler system 1 of the first embodiment. FIG. 3 is a time chart showing the operation of the boiler system 1 of the first embodiment.

図1に示すように、第1実施形態に係るボイラシステム1は、ボイラ2と、スチームヘッダ4と、負荷装置5と、ドレンタンク6と、補給水タンク7と、を備える。ボイラ2は、給水加熱器としてのエコノマイザ3を備える。エコノマイザ3は、後述の給水ラインL1に設けられ、ボイラ2において燃料が燃焼したときに生じる排ガスの廃熱により、ボイラ2に供給される前の給水W1を予め加熱する設備である。   As shown in FIG. 1, the boiler system 1 according to the first embodiment includes a boiler 2, a steam header 4, a load device 5, a drain tank 6, and a makeup water tank 7. The boiler 2 includes an economizer 3 as a feed water heater. The economizer 3 is provided in a water supply line L <b> 1 described later, and is a facility that preheats the water supply W <b> 1 before being supplied to the boiler 2 by waste heat of exhaust gas generated when fuel is burned in the boiler 2.

また、ボイラシステム1は、給水ポンプ8と、制御部10と、給水流量調整部としての給水流量調整弁11と、給水温度検出部としての給水温度センサ12と、を備える。図1では、電気的な接続の経路を破線で示す。   Moreover, the boiler system 1 is provided with the feed water pump 8, the control part 10, the feed water flow rate adjustment valve 11 as a feed water flow rate adjustment part, and the feed water temperature sensor 12 as a feed water temperature detection part. In FIG. 1, a path of electrical connection is indicated by a broken line.

更に、ボイラシステム1は、給水ラインL1と、燃料供給ラインL2と、蒸気供給ラインL3と、ドレンラインL4と、補給水ラインL5と、フラッシュ蒸気排出ラインL6と、補給水導入ラインL7と、給水還流ラインL8と、を備える。本明細書における「ライン」とは、流路、径路、管路等の流体の流通が可能なラインの総称である。   Further, the boiler system 1 includes a water supply line L1, a fuel supply line L2, a steam supply line L3, a drain line L4, a makeup water line L5, a flash steam discharge line L6, a makeup water introduction line L7, and a water supply A reflux line L8. The “line” in the present specification is a general term for lines capable of flowing a fluid such as a flow path, a radial path, and a pipeline.

なお、各ラインには、各種バルブ、各種センサ、逆止弁、オリフィス、ストレーナ等の機器が必要に応じて設けられるが、図1では適宜に図示を省略する。   Each line is provided with devices such as various valves, various sensors, check valves, orifices, strainers and the like as necessary, but the illustration is omitted as appropriate in FIG.

給水ラインL1は、ドレンタンク6に貯留された給水W1を、エコノマイザ3を介してボイラ2に向けて供給するラインである。給水ラインL1の上流側の端部は、ドレンタンク6の給水排出口に接続されている。給水ラインL1の下流側の端部は、ボイラ2の給水導入口に接続されている。また、給水ラインL1には、給水ポンプ8と、給水流量調整弁11と、給水温度センサ12と、が設けられている。   The water supply line L <b> 1 is a line that supplies the water supply W <b> 1 stored in the drain tank 6 toward the boiler 2 via the economizer 3. The upstream end of the water supply line L <b> 1 is connected to the water supply / discharge port of the drain tank 6. The downstream end of the water supply line L <b> 1 is connected to the water supply inlet of the boiler 2. The water supply line L1 is provided with a water supply pump 8, a water supply flow rate adjustment valve 11, and a water supply temperature sensor 12.

給水ポンプ8は、給水W1を吸入し、ボイラ2に向けて吐出する装置である。給水ポンプ8に併設されたモータ(不図示)は、制御部10に電気的に接続されており、制御部10からの制御信号に基づいて制御されて駆動する。   The feed water pump 8 is a device that sucks in the feed water W <b> 1 and discharges it toward the boiler 2. A motor (not shown) provided in the water supply pump 8 is electrically connected to the control unit 10 and is controlled and driven based on a control signal from the control unit 10.

給水流量調整弁11は、給水ラインL1において、給水ポンプ8よりも下流側であってエコノマイザ3よりも上流側に配置され、エコノマイザ3に供給される給水W1の流量を調整可能な弁である。給水流量調整弁11は、制御部10に電気的に接続されている。給水流量調整弁11の弁開度(弁体の開度)は、制御部10からの駆動信号により制御される。   The water supply flow rate adjustment valve 11 is a valve that is arranged downstream of the water supply pump 8 and upstream of the economizer 3 in the water supply line L1 and can adjust the flow rate of the water supply W1 supplied to the economizer 3. The feed water flow rate adjustment valve 11 is electrically connected to the control unit 10. The valve opening degree of the feed water flow rate adjustment valve 11 (the opening degree of the valve element) is controlled by a drive signal from the control unit 10.

ボイラ2は、ドレンタンク6から供給された給水W1を加熱して、蒸気W2を発生させる設備である。ボイラ2は、缶体であるボイラ本体21と、水位検出部としての水位センサ25と、給水加熱器としてのエコノマイザ3と、を備える。   The boiler 2 is equipment for heating the feed water W1 supplied from the drain tank 6 to generate steam W2. The boiler 2 includes a boiler body 21 which is a can body, a water level sensor 25 as a water level detection unit, and an economizer 3 as a feed water heater.

ボイラ本体21は、下部管寄せ、水管、上部管寄せ、バーナなど(いずれも不図示)を備える。
上部管寄せは、環状に形成された中空の容器である。各水管の上端部は、上部管寄せと連通している。上部管寄せの上端には、蒸気供給ラインL3の上流側の端部が接続されている。複数の水管で発生した蒸気W2は、上部管寄せを介して蒸気供給ラインL3へ送出される。蒸気供給ラインL3は、水管で発生した蒸気W2を負荷装置5へ供給するラインである。蒸気供給ラインL3の下流側の端部は、負荷装置5に接続されている。
The boiler body 21 includes a lower header, a water tube, an upper header, a burner, and the like (all not shown).
The upper header is a hollow container formed in an annular shape. The upper end of each water pipe communicates with the upper header. The upstream end of the steam supply line L3 is connected to the upper end of the upper header. The steam W2 generated in the plurality of water pipes is sent to the steam supply line L3 through the upper header. The steam supply line L3 is a line for supplying the load W 5 with the steam W2 generated in the water pipe. The downstream end of the steam supply line L <b> 3 is connected to the load device 5.

バーナ部は、燃料(液体又は気体等)を燃焼させる燃焼装置である。バーナ部には、燃料供給ラインL2が接続されている。燃料供給ラインL2は、燃料供給源(不図示)から送出された燃料を、バーナ部に供給するラインである。   A burner part is a combustion apparatus which burns fuel (liquid or gas etc.). A fuel supply line L2 is connected to the burner portion. The fuel supply line L2 is a line for supplying fuel delivered from a fuel supply source (not shown) to the burner unit.

水位センサ25は、ボイラ本体21の内部の水位を検出する機器である。水位センサ25は、制御部10に電気的に接続されている。水位センサ25で検出されたボイラ本体21の内部の水位(以下、「水位Hd」ともいう)は、検出信号として制御部10に送信される。   The water level sensor 25 is a device that detects the water level inside the boiler body 21. The water level sensor 25 is electrically connected to the control unit 10. The water level inside the boiler body 21 detected by the water level sensor 25 (hereinafter also referred to as “water level Hd”) is transmitted to the control unit 10 as a detection signal.

エコノマイザ3は、給水ラインL1に設けられ、ボイラ2において燃料が燃焼したときに生じる排ガスの廃熱により、ボイラ2に供給される前の給水W1を予め加熱する設備である。エコノマイザ3で加熱された給水W1は、給水ラインL1を介してボイラ2のボイラ本体21の内部に供給される。   The economizer 3 is a facility that is provided in the feed water line L1 and preheats the feed water W1 before being supplied to the boiler 2 by waste heat of exhaust gas generated when fuel is burned in the boiler 2. The water supply W1 heated by the economizer 3 is supplied into the boiler body 21 of the boiler 2 through the water supply line L1.

給水温度センサ12は、給水ラインL1におけるエコノマイザ3よりも下流側に配置され、給水ラインL1におけるエコノマイザ3よりも下流側を流通する給水W1(エコノマイザ3からボイラ2に供給される給水W1)の温度を検出する機器である。換言すると、給水温度センサ12は、給水ラインL1におけるエコノマイザ3とボイラ本体21との間を流通する給水W1の温度を検出する機器である。給水温度センサ12は、接続部J2において、給水ラインL1に接続されている。接続部J2は、エコノマイザ3とボイラ本体21との間に配置されている。給水温度センサ12は、制御部10に電気的に接続されている。給水温度センサ12で検出された給水W1の温度(以下、「給水温度Td」ともいう)は、制御部10へ検出信号として送信される。   The feed water temperature sensor 12 is disposed on the downstream side of the economizer 3 in the feed water line L1, and the temperature of the feed water W1 (the feed water W1 supplied from the economizer 3 to the boiler 2) that circulates downstream from the economizer 3 in the feed water line L1. Is a device that detects In other words, the feed water temperature sensor 12 is a device that detects the temperature of the feed water W1 flowing between the economizer 3 and the boiler body 21 in the feed water line L1. The feed water temperature sensor 12 is connected to the feed water line L1 at the connection portion J2. The connecting portion J2 is disposed between the economizer 3 and the boiler body 21. The feed water temperature sensor 12 is electrically connected to the control unit 10. The temperature of the feed water W1 detected by the feed water temperature sensor 12 (hereinafter also referred to as “feed water temperature Td”) is transmitted to the control unit 10 as a detection signal.

スチームヘッダ4は、ボイラ2から蒸気供給ラインL3を介して供給された蒸気W2を一時的に溜めて、蒸気W2を使用する負荷装置5へ供給する機器である。スチームヘッダ4は、蒸気供給ラインL3において、ボイラ2と負荷装置5との間に設けられている。   The steam header 4 is a device that temporarily accumulates the steam W2 supplied from the boiler 2 via the steam supply line L3 and supplies the steam W2 to the load device 5 that uses the steam W2. The steam header 4 is provided between the boiler 2 and the load device 5 in the steam supply line L3.

負荷装置5は、ボイラ2から供給された蒸気W2により動作する装置(例えば、熱交換器)である。負荷装置5において使用された蒸気W2は、熱を奪われて凝縮し、ドレンW3となって排出される。負荷装置5から排出されたドレンW3は、ドレンラインL4を介してドレンタンク6に回収される。   The load device 5 is a device (for example, a heat exchanger) that is operated by the steam W2 supplied from the boiler 2. The steam W2 used in the load device 5 is deprived of heat and condensed to be discharged as drain W3. The drain W3 discharged from the load device 5 is collected in the drain tank 6 through the drain line L4.

ドレンラインL4は、負荷装置5から排出されたドレンW3を、ドレンタンク6に送出するラインである。ドレンラインL4の上流側の端部は、負荷装置5のドレン排出口に接続されている。ドレンラインL4の下流側の端部は、ドレンタンク6のドレン導入口に接続されている。ドレンラインL4には、ドレンW3に含まれる蒸気を除去するスチームトラップ(不図示)が設けられている。   The drain line L4 is a line for sending the drain W3 discharged from the load device 5 to the drain tank 6. The upstream end of the drain line L4 is connected to the drain discharge port of the load device 5. The downstream end of the drain line L4 is connected to the drain inlet of the drain tank 6. The drain line L4 is provided with a steam trap (not shown) that removes steam contained in the drain W3.

ドレンタンク6は、ボイラ2に供給する給水W1を貯留する密閉型のタンクである。ドレンタンク6には、負荷装置5から排出された高温高圧のドレンW3が貯留される。ドレンタンク6の下部(給水排出口)には、給水ラインL1の上流側の端部が接続されている。ドレンタンク6は、ボイラ2に対して、給水W1の供給源となる。   The drain tank 6 is a sealed tank that stores water supply W <b> 1 supplied to the boiler 2. The drain tank 6 stores high-temperature and high-pressure drain W3 discharged from the load device 5. The lower end (water supply discharge port) of the drain tank 6 is connected to the upstream end of the water supply line L1. The drain tank 6 is a supply source of the feed water W1 to the boiler 2.

つまり、第1実施形態に係るボイラシステム1は、負荷装置5から排出されて密閉型のドレンタンク6に回収した高温高圧のドレンW3を、給水W1として再度ボイラ2に供給する(利用する)クローズド方式のドレン回収システムを有する。   That is, in the boiler system 1 according to the first embodiment, the high-temperature and high-pressure drain W3 discharged from the load device 5 and collected in the sealed drain tank 6 is supplied (utilized) again to the boiler 2 as the feed water W1. A drain recovery system of the type.

補給水タンク7は、ドレンタンク6に給水W1を補給する設備である。ドレンタンク6と補給水タンク7との間は、補給水ラインL5により接続されている。補給水ラインL5は、ドレンタンク6からボイラ2へ供給される給水W1の流量が多い場合等において、給水W1をドレンタンク6へ補給するためのラインである。補給水ラインL5の上流側の端部は、補給水タンク7の給水供給口に接続されている。補給水ラインL5の下流側の端部は、ドレンタンク6の給水導入口に接続されている。   The makeup water tank 7 is a facility for replenishing the drain tank 6 with water supply W1. The drain tank 6 and the makeup water tank 7 are connected by a makeup water line L5. The makeup water line L5 is a line for replenishing the drain water 6 with the feed water W1 when the flow rate of the feed water W1 supplied from the drain tank 6 to the boiler 2 is large. The upstream end of the makeup water line L5 is connected to the water supply supply port of the makeup water tank 7. The downstream end of the makeup water line L5 is connected to the water supply inlet of the drain tank 6.

補給水ラインL5には、加圧ポンプ等(不図示)が設けられている。補給水ラインL5に設けられた加圧ポンプは、制御部10に電気的に接続されている。ドレンタンク6の水位が下限水位まで低下すると、制御部10によりこの加圧ポンプが駆動され、補給水タンク7からドレンタンク6へ給水W1が補給される。   The makeup water line L5 is provided with a pressurizing pump or the like (not shown). The pressurizing pump provided in the makeup water line L5 is electrically connected to the control unit 10. When the water level of the drain tank 6 decreases to the lower limit water level, the pressurizing pump is driven by the control unit 10, and the supply water W <b> 1 is supplied from the makeup water tank 7 to the drain tank 6.

また、ドレンタンク6(気相部)と補給水タンク7との間は、フラッシュ蒸気排出ラインL6により接続されている。フラッシュ蒸気排出ラインL6は、ドレンタンク6の内部で発生したフラッシュ蒸気を排出するためのラインである。フラッシュ蒸気排出ラインL6の上流側の端部は、ドレンタンク6のフラッシュ蒸気排出口に接続されている。フラッシュ蒸気排出ラインL6の下流側の端部は、補給水タンク7のフラッシュ蒸気導入口に接続されている。   The drain tank 6 (gas phase section) and the makeup water tank 7 are connected by a flash steam discharge line L6. The flash steam discharge line L6 is a line for discharging the flash steam generated inside the drain tank 6. The upstream end of the flash steam discharge line L6 is connected to the flash steam discharge port of the drain tank 6. The downstream end of the flash steam discharge line L <b> 6 is connected to the flash steam inlet of the makeup water tank 7.

補給水タンク7の下部には、補給水タンク7に給水W1を導入(供給)するための補給水導入ラインL7が接続されている。補給水導入ラインL7の上流側の端部は、給水W1の供給元(不図示)に接続されている。補給水導入ラインL7の下流側の端部は、補給水タンク7の給水補給口に接続されている。   A makeup water introduction line L 7 for introducing (supplying) the feed water W 1 to the makeup water tank 7 is connected to the lower portion of the makeup water tank 7. The upstream end of the makeup water introduction line L7 is connected to a supply source (not shown) of the feed water W1. The downstream end of the make-up water introduction line L7 is connected to the water supply / supply port of the make-up water tank 7.

給水ラインL1には、給水還流ラインL8が接続されている。給水還流ラインL8は、ボイラ2への給水W1の供給が不要な場合などにおいて、給水ラインL1を流通する給水W1の一部をドレンタンク6に還流させるラインである。給水還流ラインL8の上流側の端部は、接続部J1において給水ラインL1に接続されている。接続部J1は、給水ラインL1において、給水ポンプ8と給水流量調整弁11との間に配置されている。給水還流ラインL8の下流側の端部は、ドレンタンク6の給水還流口に接続されている。   A water supply recirculation line L8 is connected to the water supply line L1. The feed water recirculation line L8 is a line for returning a part of the feed water W1 flowing through the feed water line L1 to the drain tank 6 when supply of the feed water W1 to the boiler 2 is unnecessary. The upstream end of the feed water recirculation line L8 is connected to the feed water line L1 at the connection portion J1. The connecting portion J1 is disposed between the feed water pump 8 and the feed water flow rate adjustment valve 11 in the feed water line L1. The downstream end of the feed water reflux line L8 is connected to the feed water reflux port of the drain tank 6.

制御部10は、CPU及びメモリを含むマイクロプロセッサ(不図示)により構成される。マイクロプロセッサには、時間の計時等を管理するインテグレーテッドタイマユニット(以下、「ITU」ともいう)が組み込まれている。また、マイクロプロセッサのメモリには、ボイラシステム1の制御に必要な制御プログラムや各種データ等が記憶される。例えば、後述する給水要求ステータスは、マイクロプロセッサのメモリに書き替え可能なデータとして記憶される。   The control unit 10 is configured by a microprocessor (not shown) including a CPU and a memory. The microprocessor incorporates an integrated timer unit (hereinafter also referred to as “ITU”) that manages time measurement and the like. Further, a control program and various data necessary for controlling the boiler system 1 are stored in the memory of the microprocessor. For example, a water supply request status to be described later is stored as rewritable data in the memory of the microprocessor.

制御部10は、ボイラ2への給水W1の供給が必要な場合(例えば、ボイラ2から給水要求が有った場合)には、ボイラ2に所定の給水量の給水W1が供給されるように給水流量調整弁11の流量を制御する。この制御により、ボイラ2には、所定の給水量の給水W1が供給される。   When the supply of the water supply W1 to the boiler 2 is necessary (for example, when there is a water supply request from the boiler 2), the control unit 10 supplies the boiler 2 with a predetermined amount of water supply W1. The flow rate of the feed water flow rate adjustment valve 11 is controlled. By this control, the boiler 2 is supplied with a predetermined amount of water supply W1.

制御部10は、ボイラ2における燃料の燃焼状態を、負荷装置5で消費される蒸気の量や、スチームヘッダ4の内部の蒸気の圧力等に基づいて、燃焼状態(例えば、1段階〜3段階又は無段階)及び燃焼停止状態のいずれかに設定する。   The control unit 10 determines the combustion state of the fuel in the boiler 2 based on the amount of steam consumed by the load device 5, the pressure of the steam inside the steam header 4, and the like (for example, 1 to 3 stages). (Or stepless) and combustion stop state.

制御部10では、水位センサ25から送信されたボイラ本体21の内部の水位Hdに関する検出信号に基づいて、給水要求に関するステータス(以下、「給水要求ステータス」ともいう)が変更される。具体的には、ボイラ本体21の内部の水位Hdが、下限水位である目標水位制御開始水位HL以下に低下した場合には、制御部10において、給水要求ステータスが給水要求ONに変更される。また、ボイラ本体21の内部の水位Hdが、上限水位である目標水位Hhに上がった場合には、制御部10において、給水要求ステータスが給水要求OFFに変更される。   In the control unit 10, the status related to the water supply request (hereinafter also referred to as “water supply request status”) is changed based on the detection signal related to the water level Hd inside the boiler body 21 transmitted from the water level sensor 25. Specifically, when the water level Hd inside the boiler body 21 falls below the target water level control start water level HL that is the lower limit water level, the control unit 10 changes the water supply request status to the water supply request ON. In addition, when the water level Hd inside the boiler body 21 rises to the target water level Hh that is the upper limit water level, the water supply request status is changed to the water supply request OFF in the control unit 10.

図2及び図3に示すように、制御部10は、ボイラ2から給水要求が無い場合であっても、給水温度センサ12により検出される給水の温度(「給水温度Td」ともいう)が基準温度Tk以上である状態が設定時間Xs以上継続するときには、エコノマイザ3へ給水W1を供給するように給水流量調整弁11を制御する。基準温度Tkは、ボイラの制御目標圧力設定値(設定目標圧力)から算出される飽和温度Thから所定温度Ts低い温度であり、適宜設定される。制御目標圧力設定値は、要求圧力に応じて適宜設定される。また、所定温度Tsは、例えば5〜20℃である。   As shown in FIGS. 2 and 3, the control unit 10 uses the temperature of the feed water detected by the feed water temperature sensor 12 (also referred to as “feed water temperature Td”) as a reference even when there is no feed water request from the boiler 2. When the temperature Tk or higher continues for the set time Xs or longer, the water supply flow rate adjustment valve 11 is controlled so as to supply the water supply W1 to the economizer 3. The reference temperature Tk is a temperature that is a predetermined temperature Ts lower than the saturation temperature Th calculated from the control target pressure setting value (set target pressure) of the boiler, and is appropriately set. The control target pressure set value is appropriately set according to the required pressure. The predetermined temperature Ts is, for example, 5 to 20 ° C.

設定時間Xsは、適宜設定される。設定時間Xsは、ボイラ2のバーナ部が100%燃焼した場合で換算する。例えば、100%燃焼時において設定時間Xsが25秒の場合、100%燃焼時を10秒、50%燃焼を30秒行えば、同じく設定時間Xsが25秒となる(25秒=10秒+30秒×(50%/100%))。   The set time Xs is set as appropriate. The set time Xs is converted when the burner part of the boiler 2 burns 100%. For example, when the set time Xs is 25 seconds at 100% combustion, if the 100% combustion is performed for 10 seconds and 50% combustion is performed for 30 seconds, the set time Xs is also 25 seconds (25 seconds = 10 seconds + 30 seconds) X (50% / 100%)).

制御部10は、給水温度センサ12により検出される給水W1の温度(給水温度Td)が、基準温度Tk以上である状態(「基準温度以上状態」ともいう)であるか否かについて判定する。また、制御部10は、基準温度以上状態であると判定すると、制御部10のマイクロプロセッサに組み込まれたITUにより、基準温度以上状態である状態の継続時間を「基準温度以上継続時間」として計時を開始する。また、制御部10は、基準温度以上継続時間が所定の設定時間Xs以上継続するか否かについて判定する。制御部10は、基準温度以上継続時間が所定の設定時間Xs以上継続したと判定した場合には、給水要求ステータスを給水要求ONに変更する。この制御により、ボイラ2には、所定の給水量の給水W1が供給される。   The controller 10 determines whether or not the temperature of the water supply W1 (water supply temperature Td) detected by the water supply temperature sensor 12 is equal to or higher than the reference temperature Tk (also referred to as “reference temperature higher than state”). When the control unit 10 determines that the state is equal to or higher than the reference temperature, the ITU incorporated in the microprocessor of the control unit 10 measures the duration of the state that is equal to or higher than the reference temperature as “continuous time higher than the reference temperature”. To start. In addition, the control unit 10 determines whether or not the continuation time above the reference temperature continues for a predetermined set time Xs. When it is determined that the continuation time above the reference temperature has continued for the predetermined set time Xs or more, the control unit 10 changes the water supply request status to the water supply request ON. By this control, the boiler 2 is supplied with a predetermined amount of water supply W1.

制御部10は、通常給水制御としての定流量制御を行うことができる。定流量制御は、水位センサ25により検出される水位Hdが、ボイラ2のバーナ部の燃焼状態、給水温度Td、給水W1の電気伝導度、ボイラ2の内部の蒸気の圧力などに基づいて算出される目標水位Hhに近づくように、給水流量調整弁11をボイラ2の圧力によって適宜変更される定流量開度又は全閉とすることで、給水のON/OFFを行う制御(給水を間欠的に行う制御)である。
なお、通常給水制御として連続給水制御を採用することもできる。連続給水制御は、水位Hdが目標水位Hhに近づくように、給水流量調整弁11の弁開度、給水ポンプ8の駆動などを調整して、ボイラ2への給水W1の供給を連続的に行う制御である。
The control unit 10 can perform constant flow control as normal water supply control. In the constant flow control, the water level Hd detected by the water level sensor 25 is calculated based on the combustion state of the burner portion of the boiler 2, the feed water temperature Td, the electrical conductivity of the feed water W1, the pressure of the steam inside the boiler 2, and the like. Control to turn on / off the feed water by setting the feed water flow rate adjustment valve 11 to a constant flow rate opening degree or a fully closed state that is appropriately changed by the pressure of the boiler 2 so as to approach the target water level Hh. Control to be performed).
In addition, continuous water supply control is also employable as normal water supply control. In the continuous water supply control, the feed water W1 is continuously supplied to the boiler 2 by adjusting the valve opening of the water supply flow rate adjustment valve 11 and the drive of the water supply pump 8 so that the water level Hd approaches the target water level Hh. Control.

[第1実施形態の動作]
次に、本実施形態に係るボイラシステム1において、給水W1の温度(給水温度Td)に応じて給水W1を制御する動作を、図面を参照しながら説明する。
[Operation of First Embodiment]
Next, in the boiler system 1 which concerns on this embodiment, the operation | movement which controls the feed water W1 according to the temperature (feed water temperature Td) of the feed water W1 is demonstrated, referring drawings.

まず、通常給水制御による通常給水動作について説明する。ボイラ本体21の内部の水位Hdが、下限水位である目標水位制御開始水位HLまで低下すると、制御部10において、給水要求ステータスが給水要求ONに変更される。その状態において、制御部10は、ボイラ2に所定の給水量の給水W1が供給されるように給水流量調整弁11の弁開度を制御する。本実施形態において、給水流量調整弁11の弁開度は、ボイラ2の圧力によって適宜変更される定流量開度となるように制御される。この制御により、ボイラ2には、所定の給水量の給水W1が供給される。   First, the normal water supply operation by the normal water supply control will be described. When the water level Hd inside the boiler body 21 falls to the target water level control start water level HL that is the lower limit water level, the water supply request status is changed to the water supply request ON in the control unit 10. In this state, the control unit 10 controls the valve opening degree of the feed water flow rate adjustment valve 11 so that the boiler 2 is supplied with the feed water W1 having a predetermined feed water amount. In this embodiment, the valve opening degree of the feed water flow rate adjustment valve 11 is controlled to be a constant flow rate opening degree that is appropriately changed according to the pressure of the boiler 2. By this control, the boiler 2 is supplied with a predetermined amount of water supply W1.

一方、ボイラ本体21の内部の水位が、上限水位である目標水位Hhに上がると、制御部10において、給水要求ステータスが給水要求OFFに変更される。給水要求ステータスが給水要求OFFに変更された場合、ボイラ2に給水W1が供給されないように給水流量調整弁11の弁開度を制御する。このとき、給水流量調整弁11の弁開度は、全閉となるように制御される。   On the other hand, when the water level inside the boiler main body 21 rises to the target water level Hh, which is the upper limit water level, the control unit 10 changes the water supply request status to the water supply request OFF. When the water supply request status is changed to water supply request OFF, the valve opening degree of the water supply flow rate adjustment valve 11 is controlled so that the water supply W1 is not supplied to the boiler 2. At this time, the valve opening degree of the feed water flow rate adjustment valve 11 is controlled to be fully closed.

次に、第1実施形態のボイラシステム1の特徴的な動作である、給水W1の温度(給水温度Td)に応じて給水W1を制御する動作について、説明する。   Next, an operation of controlling the feed water W1 according to the temperature of the feed water W1 (feed water temperature Td), which is a characteristic operation of the boiler system 1 of the first embodiment, will be described.

図2に示すように、ステップST101において、制御部10は、給水要求が無いか否かを判定する。給水要求が有る場合(NO)には、処理はステップST121へ進む。給水要求が無い場合(YES)には、処理はステップST102へ進む。   As shown in FIG. 2, in step ST101, the control unit 10 determines whether or not there is a water supply request. If there is a water supply request (NO), the process proceeds to step ST121. If there is no water supply request (YES), the process proceeds to step ST102.

給水要求が有る場合(NO)には、ステップST121において、制御部10は、通常給水制御を開始する。この制御により、ボイラ2への給水W1の供給動作は、通常給水動作へ移行する。処理はステップST101へ戻る。   If there is a water supply request (NO), in step ST121, the control unit 10 starts normal water supply control. By this control, the supply operation of the water supply W1 to the boiler 2 shifts to the normal water supply operation. The process returns to step ST101.

図2及び図3に示すように、給水要求が無い場合(YES)には、ステップST102において、制御部10は、給水温度センサ12により検出される給水W1の温度(給水温度Td)が、基準温度Tk以上であるか否かについて、判定する。給水温度Tdが基準温度Tk以上の場合(YES)には、処理はステップST103へ進む。給水温度Tdが基準温度Tk未満の場合(NO)には、処理はステップST102へ戻る。   As shown in FIG.2 and FIG.3, when there is no water supply request | requirement (YES), in step ST102, the control part 10 WHEREIN: The temperature (water supply temperature Td) of the water supply W1 detected by the water supply temperature sensor 12 is reference | standard. It is determined whether or not the temperature is higher than Tk. If the feed water temperature Td is equal to or higher than the reference temperature Tk (YES), the process proceeds to step ST103. If the feed water temperature Td is lower than the reference temperature Tk (NO), the process returns to step ST102.

ステップST103において、制御部10は、基準温度以上状態(給水温度Tdが基準温度Tk以上の状態)の継続時間を「基準温度以上継続時間」として計時を開始する。処理はステップST104へ進む。なお、図3において、給水温度Tdが基準温度Tkになった時刻を「Xk」で示す。   In step ST <b> 103, the control unit 10 starts measuring time by setting the duration of the state above the reference temperature (the state where the feed water temperature Td is above the reference temperature Tk) as “the duration above the reference temperature”. The process proceeds to step ST104. In FIG. 3, the time when the feed water temperature Td becomes the reference temperature Tk is indicated by “Xk”.

ステップST104において、制御部10は、再度、給水要求が無いか否かを判定する。給水要求が無い場合(YES)には、処理はステップST105へ進む。給水要求が有る場合(NO)には、処理はステップST121へ進む。   In step ST104, the control part 10 determines again whether there exists any water supply request | requirement. If there is no water supply request (YES), the process proceeds to step ST105. If there is a water supply request (NO), the process proceeds to step ST121.

次に、ステップST105において、制御部10は、基準温度以上継続時間が所定の設定時間Xs以上継続するか否かについて判定する。基準温度以上継続時間が所定の設定時間Xs以上継続した場合(YES)には、処理はステップST111へ進む。基準温度以上継続時間が所定の設定時間Xs以上継続していない場合(NO)には、処理はステップST104へ戻る。なお、図3において、基準温度以上継続時間が設定時間Xsを経過した時刻を「Xp」で示す。   Next, in step ST105, the control unit 10 determines whether or not a continuation time above the reference temperature continues for a predetermined set time Xs or more. If the continuation time above the reference temperature continues for a predetermined set time Xs (YES), the process proceeds to step ST111. If the continuation time above the reference temperature does not continue for the predetermined set time Xs (NO), the process returns to step ST104. In FIG. 3, “Xp” indicates the time at which the set time Xs has elapsed for the duration above the reference temperature.

ステップST111において、制御部10は、給水要求ステータスを給水要求ONに変更する。この制御により、ボイラ2には、所定の給水量の給水W1が供給される(ON動作)。   In step ST111, the control unit 10 changes the water supply request status to the water supply request ON. By this control, the boiler 2 is supplied with a predetermined amount of water supply W1 (ON operation).

次に、ステップST112において、給水要求ステータスが給水要求ONに変更されて所定のON動作時間Xdが経過した後、制御部10は、通常給水制御を開始する。なお、図3において、ON動作の時間を「Xd」で示す。この制御により、ボイラ2への給水W1の供給動作は、通常給水動作へ移行する。処理はステップST101へ戻る。   Next, in step ST112, after the water supply request status is changed to water supply request ON and a predetermined ON operation time Xd has elapsed, the control unit 10 starts normal water supply control. In FIG. 3, the ON operation time is indicated by “Xd”. By this control, the supply operation of the water supply W1 to the boiler 2 shifts to the normal water supply operation. The process returns to step ST101.

上述した第1実施形態に係るボイラシステム1によれば、例えば、以下のような効果が得られる。   According to the boiler system 1 which concerns on 1st Embodiment mentioned above, the following effects are acquired, for example.

第1実施形態におけるボイラシステム1においては、制御部10は、ボイラ2から給水要求が無く且つ給水温度センサ12により検出される給水W1の温度Tdが基準温度Tk以上である状態が設定時間Xs以上継続するときに、エコノマイザ3へ給水W1を供給するように給水流量調整弁11を制御する。そのため、エコノマイザ3の内部の給水W1の温度Tdが基準温度Tk以上である状態、即ちエコノマイザ3の内部の給水W1が、沸騰しやすい状態でエコノマイザ3の内部に長時間滞留することが、抑制される。その結果、ボイラ2の燃焼中において、エコノマイザ3の内部に滞留する高温の水が沸騰することを抑制できる。特に、水位Hdが目標水位Hhを超えているときには、水位Hdが目標水位制御開始水位HL以下になるのに長時間を要するため、第1実施形態によるこの制御は効果的である。   In the boiler system 1 according to the first embodiment, the control unit 10 is in a state where there is no water supply request from the boiler 2 and the temperature Td of the feed water W1 detected by the feed water temperature sensor 12 is equal to or higher than the reference temperature Tk. When continuing, the water supply flow rate adjustment valve 11 is controlled so as to supply the water supply W1 to the economizer 3. Therefore, the state where the temperature Td of the water supply W1 inside the economizer 3 is equal to or higher than the reference temperature Tk, that is, the water supply W1 inside the economizer 3 is prevented from staying in the economizer 3 for a long time in a state where it is likely to boil. The As a result, it is possible to suppress boiling of high-temperature water staying inside the economizer 3 during the combustion of the boiler 2. In particular, when the water level Hd exceeds the target water level Hh, it takes a long time for the water level Hd to become equal to or lower than the target water level control start water level HL, so this control according to the first embodiment is effective.

また、第1実施形態のようなクローズド方式のボイラシステム1においては、ドレンW3は非常に高温であるため、エコノマイザ3への給水W1も高温になりやすい。つまり、エコノマイザ3の内部に滞留する給水W1が沸騰しやすい。従って、第1実施形態による制御は、特に、クローズド方式のボイラシステムに対して特に効果的である。   Further, in the closed boiler system 1 as in the first embodiment, the drain W3 is very hot, so the water supply W1 to the economizer 3 is also likely to be hot. That is, the feed water W1 staying inside the economizer 3 is likely to boil. Therefore, the control according to the first embodiment is particularly effective for a closed boiler system.

[第2実施形態]
次に、本発明の第2実施形態について、第1実施形態との相違点を中心に説明する。このため、第1実施形態と同一(又は同等)の構成については同じ符号を付し、詳細な説明を省略する。また、第2実施形態において特に説明しない点については、第1実施形態の説明が適宜に適用される。第2実施形態は、主に制御部10の構成が第1実施形態とは異なる。
[Second Embodiment]
Next, a second embodiment of the present invention will be described focusing on differences from the first embodiment. For this reason, the same code | symbol is attached | subjected about the same (or equivalent) structure as 1st Embodiment, and detailed description is abbreviate | omitted. The description of the first embodiment is appropriately applied to points that are not particularly described in the second embodiment. The second embodiment is mainly different from the first embodiment in the configuration of the control unit 10.

第1実施形態における制御部10は、前述の通り、ボイラ2から給水要求が無く且つ給水温度センサ12により検出される給水の温度(給水温度Td)が基準温度Tk以上である状態が設定時間Xs以上継続するときに、エコノマイザ3へ給水を供給するように給水流量調整弁11を制御する。
これに対して、第2実施形態における制御部10は、給水温度Tdが基準温度Tk以上である状態が設定時間Xs以上継続しただけでは、エコノマイザ3へ給水を供給するように給水流量調整弁11を制御せず、更に水位センサ25により検出される水位Hdが目標水位制御開始水位HL以下であるときに、エコノマイザ3へ給水を供給するように給水流量調整弁11を制御する。
As described above, the control unit 10 according to the first embodiment has a set time Xs in which there is no water supply request from the boiler 2 and the temperature of the water supply (water supply temperature Td) detected by the water supply temperature sensor 12 is equal to or higher than the reference temperature Tk. When continuing, the water supply flow rate adjustment valve 11 is controlled so as to supply water to the economizer 3.
In contrast, the control unit 10 according to the second embodiment is configured to supply water to the economizer 3 only when the state where the water supply temperature Td is equal to or higher than the reference temperature Tk continues for the set time Xs or longer. When the water level Hd detected by the water level sensor 25 is equal to or lower than the target water level control start water level HL, the water supply flow rate adjustment valve 11 is controlled to supply water to the economizer 3.

第2実施形態における制御部10は、水位センサ25により検出される水位Hdが目標水位制御開始水位HL以下であるか否かについて判定する。第2実施形態における制御部10は、給水温度Tdが基準温度Tk以上である状態が設定時間Xs以上継続したときであっても、水位センサ25により検出される水位Hdが目標水位制御開始水位HL以下であるときのみ、給水要求ステータスを給水要求ONに変更する。この制御により、ボイラ2には、所定の給水量の給水W1が供給される。   The control part 10 in 2nd Embodiment determines whether the water level Hd detected by the water level sensor 25 is below the target water level control start water level HL. In the control unit 10 according to the second embodiment, the water level Hd detected by the water level sensor 25 is the target water level control start water level HL even when the state where the feed water temperature Td is equal to or higher than the reference temperature Tk continues for the set time Xs or longer. Only when it is the following, the water supply request status is changed to water supply request ON. By this control, the boiler 2 is supplied with a predetermined amount of water supply W1.

[第2実施形態の動作]
次に、第2実施形態に係るボイラシステム1において、給水W1の温度(給水温度Td)及び水位Hdに応じて給水W1を制御する動作を、図面を参照しながら説明する。図4は、第2実施形態のボイラシステムの動作を示すフローチャートである。図5は、第2実施形態のボイラシステムの動作を示すタイムチャートである。
[Operation of Second Embodiment]
Next, in the boiler system 1 according to the second embodiment, an operation for controlling the feed water W1 according to the temperature of the feed water W1 (feed water temperature Td) and the water level Hd will be described with reference to the drawings. FIG. 4 is a flowchart showing the operation of the boiler system of the second embodiment. FIG. 5 is a time chart showing the operation of the boiler system of the second embodiment.

第2実施形態の動作におけるステップST201〜ステップST205、ステップST211、ステップST212及びステップST221は、それぞれ第1実施形態の動作におけるステップST101〜ステップST105、ステップST111、ステップST112及びステップST221と同じである。従って、第2実施形態の動作については、ステップST206を中心に説明する。
図4及び図5に示すように、ステップST205において、基準温度以上継続時間が所定の設定時間Xs以上継続した場合(YES)には、処理はステップST206へ進む。
Step ST201 to step ST205, step ST211, step ST212, and step ST221 in the operation of the second embodiment are the same as step ST101 to step ST105, step ST111, step ST112, and step ST221 in the operation of the first embodiment, respectively. Therefore, the operation of the second embodiment will be described focusing on step ST206.
As shown in FIGS. 4 and 5, in step ST205, when the continuation time above the reference temperature has continued for a predetermined set time Xs (YES), the process proceeds to step ST206.

ステップST206において、制御部10は、水位センサ25により検出される水位Hdが目標水位制御開始水位HL以下であるか否かについて判定する。水位Hdが目標水位制御開始水位HL以下である場合(YES)には、処理はステップST211へ進む。水位Hdが目標水位制御開始水位HLを超える場合(NO)には、処理はステップST206へ戻る。なお、図5において、水位Hdが目標水位制御開始水位HLになった時刻を「XL」で示す。   In step ST206, the control unit 10 determines whether or not the water level Hd detected by the water level sensor 25 is equal to or lower than the target water level control start water level HL. If the water level Hd is equal to or lower than the target water level control start water level HL (YES), the process proceeds to step ST211. When the water level Hd exceeds the target water level control start water level HL (NO), the process returns to step ST206. In FIG. 5, the time when the water level Hd becomes the target water level control start water level HL is indicated by “XL”.

ステップST211において、制御部10は、給水要求ステータスを給水要求ONに変更する。この制御により、ボイラ2には、所定の給水量の給水W1が供給される(ON動作)。   In step ST211, the control unit 10 changes the water supply request status to the water supply request ON. By this control, the boiler 2 is supplied with a predetermined amount of water supply W1 (ON operation).

次に、ステップST212において、給水要求ステータスが給水要求ONに変更されて所定のON動作時間Xdが経過した後、制御部10は、通常給水制御を開始する。なお、図5において、ON動作の時間を「Xd」で示す。この制御により、ボイラ2への給水W1の供給動作は、通常給水動作へ移行する。処理はステップST201へ戻る。   Next, in step ST212, after the water supply request status is changed to water supply request ON and a predetermined ON operation time Xd has elapsed, the control unit 10 starts normal water supply control. In FIG. 5, the ON operation time is indicated by “Xd”. By this control, the supply operation of the water supply W1 to the boiler 2 shifts to the normal water supply operation. The process returns to step ST201.

上述した第2実施形態に係るボイラシステム1によれば、第1実施形態の効果と同様の効果が奏される他、例えば、以下のような効果が得られる。   According to the boiler system 1 according to the second embodiment described above, the following effects are obtained in addition to the same effects as the effects of the first embodiment.

第2実施形態におけるボイラシステム1においては、制御部10は、ボイラ2から給水要求が無く且つ給水温度センサ12により検出される給水W1の温度Tdが基準温度Tk以上である状態が設定時間Xs以上継続し、更に水位センサ25により検出される水位Hdが目標水位制御開始水位HL以下であるときに、エコノマイザ3へ給水を供給するように給水流量調整弁11を制御する。そのため、第2実施形態においては、ボイラ2から給水要求が無く且つ給水温度センサ12により検出される給水W1の温度Tdが基準温度Tk以上である状態が設定時間Xs以上継続し、更に水位センサ25により検出される水位Hdが目標水位制御開始水位HL以下であるときに、通常給水制御とは異なる制御、例えば、通常給水制御が定流量給水制御であるか又は連続給水制御であるかに拘わらず、強制的に定流量給水制御を行うことができる。   In the boiler system 1 according to the second embodiment, the control unit 10 is in a state where there is no water supply request from the boiler 2 and the temperature Td of the feed water W1 detected by the feed water temperature sensor 12 is equal to or higher than the reference temperature Tk. Further, when the water level Hd detected by the water level sensor 25 is equal to or lower than the target water level control start water level HL, the water supply flow rate adjustment valve 11 is controlled so as to supply water to the economizer 3. Therefore, in the second embodiment, there is no water supply request from the boiler 2 and the state where the temperature Td of the water supply W1 detected by the water supply temperature sensor 12 is equal to or higher than the reference temperature Tk continues for the set time Xs or more, and the water level sensor 25 When the water level Hd detected by the above is equal to or lower than the target water level control start water level HL, control different from normal water supply control, for example, whether the normal water supply control is constant flow rate water supply control or continuous water supply control. The constant flow rate water supply control can be performed forcibly.

以上、本発明の好ましい実施形態について説明した。しかし、本発明は、上述した実施形態に限定されることなく、種々の形態で実施することができる。
前記実施形態においては、1つの制御部10が、給水ポンプ8及び給水流量調整弁11を制御しているが、これに制限されない。例えば、ボイラの燃焼を制御する燃焼制御部と、ボイラへの給水(ドレンの回収を含む)を制御する給水制御部とを別々に設け、燃焼制御部が給水流量調整弁11を制御し、給水制御部が給水ポンプ8を制御することもできる。
The preferred embodiments of the present invention have been described above. However, the present invention is not limited to the above-described embodiments, and can be implemented in various forms.
In the said embodiment, although the one control part 10 is controlling the feed water pump 8 and the feed water flow regulating valve 11, it is not restrict | limited to this. For example, a combustion control unit that controls combustion of the boiler and a water supply control unit that controls water supply to the boiler (including drain recovery) are provided separately, and the combustion control unit controls the water supply flow rate adjustment valve 11 to supply water. The control unit can also control the water supply pump 8.

エコノマイザ3を加熱する排ガスは、ボイラ2からの排ガスに制限されず、例えば、別設備のエンジンからの排ガスであってもよい。
給水流量調整部は、弁(バルブ)に制限されず、例えば、流量を調整可能なポンプであってもよい。
前記実施形態は、クローズド方式のボイラシステムであったが、これに制限されず、オープン方式のボイラシステムであってもよい。
The exhaust gas that heats the economizer 3 is not limited to the exhaust gas from the boiler 2, and may be, for example, exhaust gas from an engine of another facility.
The feed water flow rate adjustment unit is not limited to a valve (valve), and may be a pump capable of adjusting the flow rate, for example.
Although the said embodiment was a closed boiler system, it is not restricted to this, An open boiler system may be sufficient.

1 ボイラシステム
2 ボイラ
3 エコノマイザ(給水加熱器)
6 ドレンタンク
8 給水ポンプ
10 制御部
11 給水流量調整弁(給水流量調整部)
12 給水温度センサ(給水温度検出部)
L1 給水ライン
W1 給水
W2 蒸気
W3 ドレン
1 Boiler system 2 Boiler 3 Economizer (feed water heater)
6 Drain tank 8 Water supply pump 10 Control unit 11 Water supply flow rate adjustment valve (Water supply flow rate adjustment unit)
12 Water temperature sensor (Water temperature detector)
L1 Water supply line W1 Water supply W2 Steam W3 Drain

Claims (4)

排ガスによってボイラへの給水を加熱する給水加熱器を有するボイラと、
前記給水加熱器を介して前記ボイラへ給水を供給する給水ラインと、
前記給水ラインにおける前記給水加熱器よりも上流側に配置され、前記給水加熱器に供給される給水の流量を調整する給水流量調整部と、
前記給水ラインにおける前記給水加熱器よりも下流側に配置され、前記給水加熱器から前記ボイラに供給される給水であって前記給水加熱器の外部を流通する給水の温度を検出する給水温度検出部と、
前記給水流量調整部を制御する制御部と、を備え、
前記制御部は、前記ボイラから給水要求が無く且つ前記給水温度検出部により検出される給水の温度が基準温度以上である状態が設定時間以上継続するときに、前記給水加熱器へ給水を供給するように前記給水流量調整部を制御する、ボイラシステム。
A boiler having a feed water heater that heats feed water to the boiler by exhaust gas;
A water supply line for supplying water to the boiler via the water heater;
A water supply flow rate adjusting unit that is arranged upstream of the water supply heater in the water supply line and adjusts the flow rate of water supplied to the water supply heater,
A feed water temperature detector that is disposed downstream of the feed water heater in the feed water line and detects feed water temperature supplied from the feed water heater to the boiler and flowing outside the feed water heater. When,
A control unit for controlling the feed water flow rate adjustment unit,
The control unit supplies water to the feed water heater when there is no feed water request from the boiler and the temperature of the feed water detected by the feed water temperature detecting unit is higher than a reference temperature for a set time or longer. A boiler system that controls the feed water flow rate adjustment unit.
前記基準温度は、前記ボイラの設定目標圧力から算出される飽和温度から所定温度低い温度である、請求項1に記載のボイラシステム。   The boiler system according to claim 1, wherein the reference temperature is a temperature lower than a saturation temperature calculated from a set target pressure of the boiler by a predetermined temperature. 前記ボイラの内部の水位を検出する水位検出部を備え、
前記制御部は、前記ボイラから給水要求が無く且つ前記給水温度検出部により検出される給水の温度が前記基準温度以上である状態が前記設定時間以上継続し、更に前記水位検出部により検出される水位が目標水位制御開始水位以下であるときに、前記給水加熱器へ給水を供給するように前記給水流量調整部を制御する、請求項1又は2に記載のボイラシステム。
A water level detector for detecting the water level inside the boiler,
In the control unit, a state where there is no water supply request from the boiler and the temperature of the water supply detected by the water supply temperature detection unit is equal to or higher than the reference temperature continues for the set time or more, and is further detected by the water level detection unit. The boiler system according to claim 1 or 2, wherein when the water level is equal to or lower than a target water level control start water level, the feed water flow rate adjusting unit is controlled so as to supply feed water to the feed water heater.
前記ボイラの発生蒸気を使用する負荷装置から排出されるドレンをクローズド方式で回収して、回収されるドレンを再度前記ボイラへの給水として利用する、請求項1〜3のいずれかに記載のボイラシステム。   The boiler in any one of Claims 1-3 which collect | recovers the drain discharged | emitted from the load apparatus which uses the generated steam of the said boiler by a closed system, and uses again the collect | recovered drain as water supply to the said boiler. system.
JP2013236997A 2013-11-15 2013-11-15 Boiler system Active JP6277683B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013236997A JP6277683B2 (en) 2013-11-15 2013-11-15 Boiler system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013236997A JP6277683B2 (en) 2013-11-15 2013-11-15 Boiler system

Publications (2)

Publication Number Publication Date
JP2015096784A JP2015096784A (en) 2015-05-21
JP6277683B2 true JP6277683B2 (en) 2018-02-14

Family

ID=53374155

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013236997A Active JP6277683B2 (en) 2013-11-15 2013-11-15 Boiler system

Country Status (1)

Country Link
JP (1) JP6277683B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6146270B2 (en) * 2013-11-19 2017-06-14 三浦工業株式会社 Boiler system
CN109519912A (en) * 2017-09-19 2019-03-26 焦武军 A kind of energy-saving type boiler system matched with condensation water recovery system
CN107893988B (en) * 2017-10-13 2019-09-27 国网河北能源技术服务有限公司 Heat regenerative system carbonated drink optimal control method under Large-scale fire-electricity unit depth peak regulation
JP2019152357A (en) 2018-03-01 2019-09-12 三菱重工エンジニアリング株式会社 Exhaust gas cooler

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01193506A (en) * 1988-01-29 1989-08-03 Ebara Corp Device to prevent overheating of boiler economizer
JPH0523922Y2 (en) * 1988-09-20 1993-06-18
JPH0462306A (en) * 1990-06-29 1992-02-27 Kawasaki Steel Corp Feed water control method for drum type boiler when its pressure is raised
JP2918453B2 (en) * 1994-07-14 1999-07-12 日立造船株式会社 Method and apparatus for controlling exhaust gas temperature at startup in refuse incinerator
JPH09236207A (en) * 1996-02-28 1997-09-09 Miura Co Ltd Boiler
JPH1182914A (en) * 1997-09-16 1999-03-26 Kubota Corp Refuse incineration facility
US6196163B1 (en) * 2000-01-19 2001-03-06 Chandrakant S. Shah Boiler feed water heat energy saver
JP3980281B2 (en) * 2001-02-23 2007-09-26 川重冷熱工業株式会社 Method and apparatus for recovering and supplying high-pressure drain in a multi-tube once-through boiler with an economizer
JP5008134B2 (en) * 2007-05-29 2012-08-22 株式会社サムソン Water supply preheating boiler
JP5630084B2 (en) * 2010-06-14 2014-11-26 三浦工業株式会社 Boiler water supply system
JP5630083B2 (en) * 2010-06-14 2014-11-26 三浦工業株式会社 Drain collection system
JP2012072991A (en) * 2010-09-29 2012-04-12 Miura Co Ltd Economizer control device, economizer, and boiler

Also Published As

Publication number Publication date
JP2015096784A (en) 2015-05-21

Similar Documents

Publication Publication Date Title
JP6277683B2 (en) Boiler system
JP5987576B2 (en) Boiler system
JP6376390B2 (en) Hot water storage hot water system
JP6349946B2 (en) Boiler system
JP2014126338A (en) Water supply system
JP5983153B2 (en) Water supply system
JP6686512B2 (en) Boiler system
JP6323269B2 (en) Boiler equipment
JP2013204939A (en) Boiler system
JP2019178841A (en) Boiler device
JP6624879B2 (en) Water heater
JP6146270B2 (en) Boiler system
JP4574592B2 (en) Linked hot water system
JP7255293B2 (en) Water supply controller
JP2017172949A (en) Hot water heating device
JP6661558B2 (en) Method and apparatus for producing superheated steam from a working medium
JP2021063619A (en) Control device for boiler
JP6610943B2 (en) Hot water storage system
JP2011025206A (en) Degassed water supply system
JP5170534B2 (en) Heat source equipment
KR101636130B1 (en) Device for supplying hot water
JP2002147708A (en) Method for feedwater control for boiler
JP6265002B2 (en) Boiler system
JP2010060221A (en) Water heater
JP2012072988A (en) Boiler device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160825

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170530

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170526

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170727

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20171219

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180101

R150 Certificate of patent or registration of utility model

Ref document number: 6277683

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250