JP6230861B2 - Ground improvement method by high-pressure jet stirring method - Google Patents

Ground improvement method by high-pressure jet stirring method Download PDF

Info

Publication number
JP6230861B2
JP6230861B2 JP2013203905A JP2013203905A JP6230861B2 JP 6230861 B2 JP6230861 B2 JP 6230861B2 JP 2013203905 A JP2013203905 A JP 2013203905A JP 2013203905 A JP2013203905 A JP 2013203905A JP 6230861 B2 JP6230861 B2 JP 6230861B2
Authority
JP
Japan
Prior art keywords
ground
tube rod
cement milk
pressure
underground obstacle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013203905A
Other languages
Japanese (ja)
Other versions
JP2015068075A (en
Inventor
田中 肇一
肇一 田中
磯谷 修二
修二 磯谷
雅則 岡戸
雅則 岡戸
嘉孝 中嶋
嘉孝 中嶋
鈴木 亮彦
亮彦 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fudo Tetra Corp
Original Assignee
Fudo Tetra Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fudo Tetra Corp filed Critical Fudo Tetra Corp
Priority to JP2013203905A priority Critical patent/JP6230861B2/en
Publication of JP2015068075A publication Critical patent/JP2015068075A/en
Application granted granted Critical
Publication of JP6230861B2 publication Critical patent/JP6230861B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Description

本発明は、地盤中に高速高圧で硬化材を噴射し、この噴射エネルギーで地盤を切削しながら噴射した硬化材と地盤とを攪拌混合させ、地盤中に固結改良体を造成して地盤を改良するようにした高圧噴射攪拌工法による地盤改良方法に関し、特に、既設構造物直下における地盤を改良するときの高圧噴射攪拌工法による地盤改良方法に関する。   The present invention sprays a hardened material at high speed and high pressure into the ground, stirs and mixes the hardened material sprayed while cutting the ground with this jet energy, and creates a consolidated improvement body in the ground. More particularly, the present invention relates to a ground improvement method using a high pressure jet stirring method for improving the ground directly under an existing structure.

従来、高圧噴射攪拌工法による地盤改良方法としては、施工機械41にて地盤中に管ロッド42を所定深度まで挿入し、挿入後、図14に示すように、管ロッド42を回動させて管ロッド42先端の噴射口43からセメントミルク等の硬化材を高速高圧で噴射する。そして、この硬化材の噴射エネルギーで地盤を切削しながら噴射した硬化材と地盤とを攪拌混合させ、この管ロッド42を回動して一回転(360度)させ、これを上方に引き抜きながら行うことにより、地盤中に縦向きの円柱状の固結改良体Tを造成して地盤を改良するようにしたものが一般的に知られていた。   Conventionally, as a ground improvement method by a high-pressure jet agitation method, a pipe rod 42 is inserted into the ground by a construction machine 41 to a predetermined depth, and after insertion, as shown in FIG. A hardening material such as cement milk is jetted at a high speed and a high pressure from the jet port 43 at the tip of the rod 42. Then, the hardened material and the ground sprayed while cutting the ground with the jetting energy of the hardened material are agitated and mixed, and this tube rod 42 is rotated and rotated once (360 degrees), and this is performed while pulling upward. Thus, it has been generally known that a vertical columnar consolidation improvement body T is formed in the ground to improve the ground.

また、この高圧噴射攪拌工法による地盤改良方法の別の例として、地盤中に縦向きの円柱状の固結改良体Tを造成する代わりに、管ロッド42の回動を一回転(360度)させるのではなく、一定の角度の範囲内で管ロッド42を回動させ、たとえば、管ロッド42の回動を三分の一回転(120度)させることで、扇形の柱状の固結改良体Tを造成して地盤を改良するようにしたものもあった。これは、特に、建物などの既製構造物Kがある場所の地盤、すなわち既設構造物K直下における地盤を改良するときに用いられていた。   As another example of the ground improvement method by this high-pressure jet agitation method, the tube rod 42 is rotated once (360 degrees) instead of creating a vertical columnar consolidated improvement body T in the ground. Instead of rotating the tube rod 42 within a certain angle range, for example, by rotating the tube rod 42 by one third (120 degrees), a fan-shaped columnar consolidated improvement body There were some that improved T by creating T. This has been particularly used to improve the ground where there is a ready-made structure K such as a building, that is, the ground directly under the existing structure K.

このような建物などの既製構造物K直下における地盤を改良するとき、既設構造物Kの下の地盤中には基礎杭などの地中障害物Pが多数存在することが多々あった。この地中障害物Pが既設構造物Kの下などの地盤中に存在する場合において、従来の高圧噴射攪拌工法による地盤改良方法によって地盤を改良しようとすると、回動している管ロッド42から噴射したセメントミルク等の硬化材が地盤中に存在する地中障害物Pに当たって遮られてしまうため、図15に示すように、噴射した硬化材を地中障害物Pの背面側に十分に送り込むことができなかった。このため、既設構造物K直下における地盤を改良するとき、地中障害物Pの背面側に固結改良体Tを造成できずに未造成箇所Sができてしまうため、地盤を良好に改良することができなくなるといった問題が生じるおそれがあった。   When improving the ground directly under an existing structure K such as a building, there are often many underground obstacles P such as foundation piles in the ground under the existing structure K. In the case where the underground obstacle P exists in the ground such as under the existing structure K, if the ground is improved by the conventional ground improvement method using the high-pressure jet stirring method, the rotating tube rod 42 is removed. Since the injected hardened material such as cement milk hits the underground obstacle P existing in the ground and is blocked, the injected hardened material is sufficiently fed to the back side of the underground obstacle P as shown in FIG. I couldn't. For this reason, when improving the ground just under the existing structure K, the solidified improvement body T cannot be formed on the back side of the underground obstacle P, and an undeveloped portion S is formed. There was a risk of problems such as being unable to do so.

そこで、本発明は、このような問題点に鑑み、既設構造物直下における地盤を改良するとき、地中障害物の背面側に十分に硬化材を送り込むことにより、地中障害物の背面側にも固結改良体を造成可能にすることで、地盤中に地中障害物が存在するような場所でも、極めて良好に地盤を改良することのできる高圧噴射攪拌工法による地盤改良方法を提供することを、その課題とする。   Therefore, in view of such problems, the present invention, when improving the ground directly under the existing structure, by sufficiently feeding the curing material to the back side of the underground obstacle, to the back side of the underground obstacle Providing a ground improvement method by high-pressure jet agitation method that can improve the ground very well even in places where there are underground obstacles in the ground by making it possible to build a consolidation improvement body Is the issue.

第一の発明は、施工機械にて地盤中に管ロッドを所定深度まで挿入し、挿入後、管ロッドから硬化材を高速高圧で噴射し、この硬化材の噴射エネルギーで地盤を切削しながら噴射した硬化材と地盤とを攪拌混合させ、地盤中に固結改良体を造成して地盤を改良するようにした高圧噴射攪拌工法による地盤改良方法において、既設構造物の下などの地盤中に地中障害物が存在する場合、この地中障害物の際に向けて、管ロッドを回動させることなく停止した状態で管ロッドから硬化材を高速高圧で直線的に所定時間噴射し、地中障害物の背面側に噴射した硬化材を廻り込ませるようにした高圧噴射攪拌工法による地盤改良方法である。   In the first invention, the tube rod is inserted into the ground with a construction machine to a predetermined depth, and after insertion, the hardened material is injected from the tube rod at high speed and high pressure, and the ground is cut while cutting the ground with the injection energy of this hardened material. In the ground improvement method using the high-pressure jet agitation method, which stirs and mixes the hardened material and the ground and creates a consolidated improvement body in the ground to improve the ground, the ground is placed under the existing structure. When there is a medium obstacle, the hardened material is sprayed straight from the tube rod at a high speed and high pressure for a predetermined time in a state where the tube rod is stopped without rotating toward the underground obstacle. This is a ground improvement method using a high-pressure jet agitation method in which the hardened material sprayed around the back side of the obstacle is circulated.

第二の発明は、第一の発明において、管ロッドを回動させることなく停止した状態で管ロッドから硬化材を高速高圧で直線的に所定時間噴射する際の噴射する時間を、地盤中に存在する地中障害物の大きさに基づいて変更するようにした高圧噴射攪拌工法による地盤改良方法である。   According to a second invention, in the first invention, the time for spraying the hardened material from the tube rod linearly at a high speed and high pressure for a predetermined time in the ground in a state where the tube rod is stopped without rotating. This is a ground improvement method using a high-pressure jet agitation method that is changed based on the size of the existing underground obstacle.

本発明によれば、地盤中に存在する地中障害物の際に向けて、管ロッドを回動させることなく停止した状態で管ロッドから硬化材を高速高圧で直線的に所定時間噴射し、地中障害物の背面側に噴射した硬化材を廻り込ませるようにしたことで、管ロッドから噴射した硬化材を地中障害物の背面側に十分に送り込むことができ、地中障害物の背面側にも固結改良体を造成することにより、地盤中に完璧な固結改良体を造成することができ、これにより、既設構造物直下における地盤を改良するとき、地盤中に存在する地中障害物に邪魔されることなく、極めて良好に地盤を強固な地盤へと改良することができる。   According to the present invention, the hardened material is sprayed linearly at a high speed and high pressure for a predetermined time from the tube rod in a state where it is stopped without rotating the tube rod toward the underground obstacle existing in the ground, By making the hardened material sprayed around the back side of the underground obstacles, the hardened material sprayed from the tube rod can be sufficiently fed to the back side of the underground obstacles, By creating a consolidation improvement body on the back side, it is possible to create a perfect consolidation improvement body in the ground, which makes it possible to improve the ground directly under the existing structure. The ground can be improved to a solid ground very well without being obstructed by middle obstacles.

また、管ロッドを回動させることなく停止した状態で管ロッドから硬化材を高速高圧で直線的に所定時間噴射する際の噴射する時間を、地盤中に存在する地中障害物の大きさに基づいて変更するようにしたことで、地中障害物の大きさに応じて硬化材の噴射する時間をコントロールすることにより、効率の良い作業を行うことができ、作業性の向上を図ることができる。   In addition, the time for spraying the hardened material from the tube rod linearly at a high speed and high pressure for a predetermined time with the tube rod stopped without rotating is set to the size of the underground obstacle existing in the ground. By changing based on the size of the underground obstacle, it is possible to perform efficient work and improve workability by controlling the time for injecting the curing material according to the size of the underground obstacle it can.

本発明における高圧噴射攪拌機の説明図である。It is explanatory drawing of the high pressure injection stirrer in this invention. 本発明における特殊先端具の正面図である。It is a front view of the special tip implement in the present invention. 本発明における特殊先端具を下面図である。It is a bottom view of the special tip tool in the present invention. 本発明における別の特殊先端具の正面図である。It is a front view of another special tip implement in the present invention. 本発明における別の特殊先端具の正面図である。It is a front view of another special tip implement in the present invention. 本発明における別の特殊先端具の正面図である。It is a front view of another special tip implement in the present invention. 既設構造物直下における地盤を改良するときの本発明の高圧噴射攪拌工法による地盤改良方法での状態を説明する上面図である。It is a top view explaining the state in the ground improvement method by the high-pressure jet stirring method of the present invention when improving the ground directly under an existing structure. (a)本発明の高圧噴射攪拌工法による地盤改良方法の作業工程の説明図である。(b)本発明の高圧噴射攪拌工法による地盤改良方法の作業工程の説明図である。(c)本発明の高圧噴射攪拌工法による地盤改良方法の作業工程の説明図である。(A) It is explanatory drawing of the operation | work process of the ground improvement method by the high pressure injection stirring method of this invention. (B) It is explanatory drawing of the operation | work process of the ground improvement method by the high pressure jet stirring construction method of this invention. (C) It is explanatory drawing of the operation | work process of the ground improvement method by the high voltage | pressure injection stirring construction method of this invention. 本発明の高圧噴射攪拌工法による地盤改良方法における地盤中に固結改良体を造成した状態の説明図である。It is explanatory drawing of the state which created the consolidation improvement body in the ground in the ground improvement method by the high-pressure jet stirring method of this invention. (a)本発明の高圧噴射攪拌工法による地盤改良方法における硬化材を噴射しているときの上面図である。(b)本発明の高圧噴射攪拌工法による地盤改良方法における硬化材を噴射しているときの上面図である。(A) It is a top view when injecting the hardening material in the ground improvement method by the high-pressure jet stirring method of the present invention. (B) It is a top view when injecting the hardening material in the ground improvement method by the high-pressure jet stirring method of the present invention. (d)本発明の高圧噴射攪拌工法による地盤改良方法の作業工程の説明図である。(e)本発明の高圧噴射攪拌工法による地盤改良方法の作業工程の説明図である。(f)本発明の高圧噴射攪拌工法による地盤改良方法の作業工程の説明図である。(D) It is explanatory drawing of the operation | work process of the ground improvement method by the high voltage | pressure injection stirring construction method of this invention. (E) It is explanatory drawing of the work process of the ground improvement method by the high-pressure jet stirring method of this invention. (F) It is explanatory drawing of the operation | work process of the ground improvement method by the high voltage | pressure injection stirring construction method of this invention. 本発明の高圧噴射攪拌工法による地盤改良方法における硬化材の噴射状態を説明する上面図である。It is a top view explaining the injection state of the hardening | curing material in the ground improvement method by the high pressure injection stirring method of this invention. 本発明の高圧噴射攪拌工法による地盤改良方法における地盤中に他の固結改良体を造成した状態の説明図である。It is explanatory drawing of the state which created the other consolidation improvement body in the ground in the ground improvement method by the high-pressure jet stirring method of this invention. 従来の高圧噴射攪拌工法による地盤改良方法の説明図である。It is explanatory drawing of the ground improvement method by the conventional high-pressure jet stirring method. 既設構造物直下における地盤を改良するときの従来の高圧噴射攪拌工法による地盤改良方法での状態を説明する上面図である。It is a top view explaining the state in the ground improvement method by the conventional high-pressure jet stirring method when improving the ground directly under an existing structure.

本発明による高圧噴射攪拌工法による地盤改良方法の実施形態について説明する。
まず、この高圧噴射攪拌工法による地盤改良方法において使用する高圧噴射攪拌機について説明すると、図1に示すように、地盤中に管ロッド2を所定深度まで挿入あるいは引き抜くための施工機械1を備え、この施工機械1はたとえば自走可能な小型の杭打ち機である。ただし、施工機械1としては小型の杭打ち機に限定されるものではなく、地盤改良の施工深度等の改良規模に応じてボーリングマシンや他の機械でも良い。そして、この施工機械1にあっては、マスト3を立設し、このマスト3に沿って管ロッド2を縦に向けて取り付けると共に、マスト3の上部に管ロッド2を地盤中に挿入したり引き抜いたりする昇降装置4と管ロッド2を回動させる回動装置5をそれぞれ設ける。管ロッド2はその内側を硬化材や圧縮空気等が通るようになる中空状の鋼管であり、その下端である先端に特殊先端具6を取り付けている。
An embodiment of the ground improvement method by the high-pressure jet stirring method according to the present invention will be described.
First, a high-pressure jet agitator used in the ground improvement method by this high-pressure jet agitation method will be described. As shown in FIG. 1, a construction machine 1 for inserting or extracting a tube rod 2 to a predetermined depth is provided in the ground. The construction machine 1 is, for example, a small pile driver capable of self-propelling. However, the construction machine 1 is not limited to a small pile driving machine, and may be a boring machine or other machines depending on the scale of improvement such as the depth of construction for ground improvement. In this construction machine 1, the mast 3 is erected and the tube rod 2 is attached vertically along the mast 3, and the tube rod 2 is inserted into the ground above the mast 3. A lifting device 4 for pulling out and a rotating device 5 for rotating the tube rod 2 are provided. The tube rod 2 is a hollow steel tube through which hardened material, compressed air, etc. pass, and a special tip 6 is attached to the tip which is the lower end thereof.

また、高圧噴射攪拌機における施工機械1の周辺設備としては、施工機械1に取り付けた管ロッド2に硬化材や圧縮空気を供給するための設備である。硬化材はセメントミルクであるが、このセメントミルクに各種の添加剤等を混ぜ合わせるようにしても良い。そして、圧縮空気を供給するための設備としては、コンプレッサー11であり、流量計12を介してコンプレッサー11から管ロッド2に圧縮空気を供給する。また、硬化材を供給するための設備としては、水中ポンプ13を設けた混合装置14を備え、この混合装置14において、水中ポンプ13を用いてセメントサイロ15からセメント原料を流入すると共に、水中ポンプ16を設けた水槽17から水を流入し、これらを混合して硬化材であるセメントミルクを生成する。そして、このセメントミルクを流量計18を介して高圧ポンプ19から成る硬化材供給装置20に供給し、この硬化材供給装置20から管ロッド2にセメントミルクを供給する。なお、各装置には図示していないがそれぞれ発電機を設けている。   In addition, the peripheral equipment of the construction machine 1 in the high-pressure jet agitator is equipment for supplying a hardener or compressed air to the tube rod 2 attached to the construction machine 1. The hardener is cement milk, but various additives may be mixed with the cement milk. The equipment for supplying compressed air is the compressor 11, and the compressed air is supplied from the compressor 11 to the tube rod 2 via the flow meter 12. Moreover, as equipment for supplying the hardener, a mixing device 14 provided with a submersible pump 13 is provided. In this mixing device 14, a cement raw material is introduced from the cement silo 15 using the submersible pump 13, and a submersible pump is provided. Water is introduced from a water tank 17 provided with 16 and mixed to produce cement milk as a hardener. Then, the cement milk is supplied to the hardener supply device 20 including the high-pressure pump 19 through the flow meter 18, and the cement milk is supplied from the hardener supply device 20 to the tube rod 2. Although not shown in the drawings, each device is provided with a generator.

一方、管ロッド2の下端である先端に取り付けた特殊先端具6については、図2、図3に示すように、先端側に多数のビット31を取り付けた掘削ヘッド30を備えると共に、横方向の左右両側に突出する水平翼32を備え、この水平翼32の下部にもビット33を取り付ける。また、水平翼32には管ロッド2の内側と連通する噴射口34を横方向に向けて設けており、この噴射口34は水平翼32の長手方向(左右方向)にわたって複数、たとえば2個の噴射口34を横に並べるように配置し、ここからセメントミルク等を噴射する。この2個の噴射口34にあっては、同じ方向に向けており、2個の噴射口34からセメントミルク等が地盤中に横方向に平行な状態で噴射される。   On the other hand, as shown in FIGS. 2 and 3, the special tip 6 attached to the tip which is the lower end of the tube rod 2 is provided with an excavation head 30 attached with a number of bits 31 on the tip side, and in the lateral direction. Horizontal wings 32 projecting from the left and right sides are provided, and a bit 33 is also attached to the lower part of the horizontal wings 32. Further, the horizontal blade 32 is provided with an injection port 34 that communicates with the inside of the tube rod 2 in the lateral direction. The injection port 34 has a plurality of, for example, two, for example, in the longitudinal direction (left-right direction) of the horizontal blade 32. The injection ports 34 are arranged side by side, and cement milk or the like is injected from here. The two injection ports 34 are directed in the same direction, and cement milk or the like is injected from the two injection ports 34 into the ground in a state parallel to the lateral direction.

なお、この噴射口34については、1個でも良いが、3個以上の複数個にしても良い。また、複数の噴射口34を横に配置しているが、これを、図4に示すように、上下にずらして配置するようにしても良い。さらには複数の噴射口34を設ける場合、図5に示すように、3個の噴射口34を縦に並べるように配置しても良いし、図6に示すように、縦横両方向に並べるように配置しても良い。なお、複数の噴射口34を縦に並べるように配置する場合は水平翼32を備えることなく、噴射口34を特殊先端具6の本体に設けるようにする。また、複数個の噴射口34を設けたとき、前述したものは噴射口34が同じ方向に向き平行な状態でセメントミルクが噴射されるようになるが、これに限定されるものではなく、噴射口34の向きを若干異ならせることにより、噴射するセメントミルクがクロスするように噴射口34からセメントミルクを噴射させるようにしても良い。   The number of the injection ports 34 may be one, or may be three or more. Moreover, although the several injection port 34 is arrange | positioned sideways, as shown in FIG. 4, you may make it arrange | position by shifting up and down. Further, when a plurality of injection ports 34 are provided, three injection ports 34 may be arranged vertically as shown in FIG. 5, or as shown in FIG. It may be arranged. In addition, when arrange | positioning so that the several injection nozzle 34 may be arranged vertically, the injection nozzle 34 is provided in the main body of the special tip tool 6 without providing the horizontal blade 32. FIG. In addition, when a plurality of injection ports 34 are provided, the above-described one causes cement milk to be injected with the injection ports 34 facing in the same direction and parallel, but the present invention is not limited to this. By slightly changing the direction of the mouth 34, the cement milk may be jetted from the jet port 34 so that the cement milk to be jetted crosses.

次に、このような構成となる高圧噴射攪拌機を使用して行う高圧噴射攪拌工法による地盤改良方法の例について説明する。なお、この例は、図7に示すように、建物などの既製構造物K直下における地盤を改良するときである。   Next, the example of the ground improvement method by the high-pressure jet stirring method performed using the high-pressure jet stirrer which becomes such a structure is demonstrated. In addition, this example is a time of improving the ground directly under the ready-made structure K, such as a building, as shown in FIG.

図8(a)に示すように、管ロッド2を取り付けた施工機械1を所定の位置に設置する。そして、図8(b)に示すように、施工機械1にて管ロッド2を回動させながら地盤中に挿入して行く。このとき、管ロッド2の下端に取り付けた特殊先端具6にて地盤を掘削するが、管ロッド2の挿入を補助するため、特殊先端具6の噴射口34から圧縮空気や水等を噴射しながら行うようにしている。そして、図8(c)に示すように、管ロッド2を所定深度まで挿入した後、管ロッド2及び特殊先端具6の回動を停止する。   As shown to Fig.8 (a), the construction machine 1 which attached the pipe rod 2 is installed in a predetermined position. And as shown in FIG.8 (b), it inserts in the ground, rotating the pipe rod 2 with the construction machine 1. FIG. At this time, the ground is excavated by the special tip tool 6 attached to the lower end of the tube rod 2, but in order to assist the insertion of the tube rod 2, compressed air, water or the like is sprayed from the injection port 34 of the special tip tool 6. While doing so. And as shown in FIG.8 (c), after inserting the tube rod 2 to the predetermined depth, rotation of the tube rod 2 and the special tip tool 6 is stopped.

それから、管ロッド2の噴射口34から地盤中にセメントミルクを高速高圧で噴射し、このセメントミルクの噴射エネルギーで地盤を切削しながら噴射したセメントミルクと地盤とを攪拌混合させ、地盤中に固結改良体Tを造成する作業を行う。この地盤中に造成する固結改良体としては、一定の角度の範囲内で管ロッド2を回動させ、具体的には管ロッド2の回動を三分の一回転(120度)させることで、図7、図9に示すように、扇形の柱状の固結改良体Tとするものである。   Then, cement milk is sprayed into the ground at a high speed and high pressure from the injection port 34 of the tube rod 2, and the cement milk sprayed and ground are mixed while cutting the ground with the spray energy of the cement milk. The work which produces the improvement body T is performed. As a consolidation improvement body to be created in the ground, the tube rod 2 is rotated within a certain angle range, and specifically, the tube rod 2 is rotated by one third (120 degrees). Thus, as shown in FIGS. 7 and 9, a fan-shaped columnar consolidated improvement body T is obtained.

これは、管ロッド2における特殊先端具6の2個の噴射口34を施工する地盤の方向に向けてから管ロッド2をゆっくり回動させつつ、管ロッド2に供給されたセメントミルクと圧縮空気によって、管ロッド2における特殊先端具6の2個の噴射口34からセメントミルクを地盤中に高速高圧で噴射する。これにより、セメントミルクの噴射エネルギーで地盤を切削しながら噴射したセメントミルクと地盤とを攪拌混合させ、地盤中に固結改良体Tを造成するようにしている。   This is because cement milk and compressed air supplied to the tube rod 2 while slowly rotating the tube rod 2 from the direction of the ground where the two injection ports 34 of the special tip 6 in the tube rod 2 are constructed. Thus, cement milk is injected into the ground at high speed and high pressure from the two injection ports 34 of the special tip 6 in the tube rod 2. Thereby, the cement milk sprayed while cutting the ground with the spray energy of cement milk and the ground are agitated and mixed, and the consolidation improvement body T is formed in the ground.

このように管ロッド2の噴射口34からセメントミルクを噴射するとき、管ロッド2を回動させながら行うようにしているが、地盤中に存在する地中障害物Pの場所に来たとき、管ロッド2の回動を停止し、まず、図10(a)に示すように、管ロッド2の噴射口34を地盤中に存在する地中障害物Pの一方の際に向ける。そして、この状態にて、管ロッド2を回動させることなく停止した状態で管ロッド2の噴射口34からセメントミルクを高速高圧で直線的に所定時間噴射し、このセメントミルクを所定時間噴射する際の噴射する時間としては、たとえば30秒である。ただし、このセメントミルクを噴射する時間については、この30秒に限定されるものではなく、地盤中に存在する地中障害物Pの大きさなどに基づいて変更するようにしている。たとえば、地中障害物Pの大きさが大きいと、セメントミルクを噴射する時間も長めにし、地中障害物Pの大きさが小さいと、セメントミルクを噴射する時間も短めにしている。なお、この地中障害物Pとしては、建物などの既製構造物Kの下に存在する基礎杭などであって、これらは予めその位置やその大きさが特定できるものである。   In this way, when the cement milk is jetted from the jet port 34 of the tube rod 2, the tube rod 2 is rotated, but when it comes to the place of the underground obstacle P existing in the ground, The rotation of the tube rod 2 is stopped. First, as shown in FIG. 10A, the injection port 34 of the tube rod 2 is directed to one of the underground obstacles P existing in the ground. In this state, cement milk is sprayed linearly at a high speed and high pressure for a predetermined time from the injection port 34 of the tube rod 2 in a state where the tube rod 2 is stopped without rotating, and the cement milk is sprayed for a predetermined time. The time for spraying at that time is, for example, 30 seconds. However, the time for injecting the cement milk is not limited to 30 seconds, and is changed based on the size of the underground obstacle P existing in the ground. For example, when the size of the underground obstacle P is large, the time for injecting cement milk is lengthened, and when the size of the underground obstacle P is small, the time for injecting cement milk is also shortened. In addition, as this underground obstruction P, it is a foundation pile etc. which exist under the ready-made structure K, such as a building, These can identify the position and the magnitude | size beforehand.

そして、管ロッド2の噴射口34から地中障害物Pの一方の際に向けてセメントミルクを直線的に所定時間である30秒噴射したのち、管ロッド2を回動させ、この管ロッド2を回動させながら管ロッド2の噴射口34からセメントミルクを地中障害物Pに向けながら噴射する。そして、再び管ロッド2の回動を停止し、図10(b)に示すように、管ロッド2の噴射口34を地中障害物Pの他方の際に向ける。そして、この状態にて、管ロッド2を回動させることなく停止した状態で管ロッド2の噴射口34からセメントミルクを高速高圧で直線的に所定時間である30秒噴射する。   And after spraying cement milk linearly for 30 seconds which is predetermined time from the injection port 34 of the tube rod 2 toward one side of the underground obstacle P, the tube rod 2 is rotated, and this tube rod 2 The cement milk is sprayed from the spray port 34 of the tube rod 2 while turning toward the underground obstacle P. Then, the rotation of the tube rod 2 is stopped again, and the injection port 34 of the tube rod 2 is directed to the other side of the underground obstacle P as shown in FIG. In this state, cement milk is sprayed linearly at high speed and high pressure for 30 seconds, which is a predetermined time, from the injection port 34 of the tube rod 2 while the tube rod 2 is stopped without being rotated.

そして、管ロッド2の噴射口34から地中障害物Pの他方の際に向けてセメントミルクを直線的に所定時間噴射したのち、再び管ロッド2を回動させ、この管ロッド2を回動させながら管ロッド2の噴射口34からセメントミルクを噴射する。それから、また地盤中に存在する地中障害物Pの場所に来たときは、前述と同様、管ロッド2の回動を停止し、管ロッド2の噴射口34を地中障害物Pの際に向けて、管ロッド2を回動させることなく停止した状態で管ロッド2の噴射口34からセメントミルクを高速高圧で直線的に所定時間噴射する。なお、地盤中に存在する地中障害物Pが非常に小さい場合は、前述したような地中障害物Pの両方の際に向けてセメントミルクを噴射していたのを、地中障害物Pの一方の際のみだけにするようにしても良い。   Then, after the cement milk is sprayed linearly from the injection port 34 of the tube rod 2 toward the other side of the underground obstacle P for a predetermined time, the tube rod 2 is rotated again, and the tube rod 2 is rotated. The cement milk is jetted from the jet port 34 of the tube rod 2 while being allowed to flow. Then, when it comes to the place of the underground obstacle P existing in the ground, the rotation of the tube rod 2 is stopped as described above, and the injection port 34 of the tube rod 2 is moved to the position of the underground obstacle P. In the state where the tube rod 2 is stopped without rotating, the cement milk is sprayed linearly at a high speed and high pressure for a predetermined time from the injection port 34 of the tube rod 2. In addition, when the underground obstacle P which exists in the ground is very small, it is the underground obstacle P which injected cement milk toward the case of the underground obstacle P as mentioned above. You may make it only at the time of one of these.

そして、図11(d)に示すように、この所定深度において地盤中に扇形の固結改良体Tを造成してから、管ロッド2を数センチから数十センチ引く抜き上方に移動させ、その上方の位置においても、前述と同様、管ロッド2を回動させながら管ロッド2の噴射口34からセメントミルクを噴射し、また、地盤中に地中障害物Pが存在する場所では、管ロッド2の回動を停止し、その地中障害物Pの際に向けて、管ロッド2を回動させることなく停止した状態で管ロッド2からセメントミルクを高速高圧で直線的に所定時間噴射する。これを、図11(e)に示すように、管ロッド2を引き抜き上方に移動させながら所望の深度まで繰り返し行うことにより、地盤中に扇形の柱状の固結改良体Tを造成する。   Then, as shown in FIG. 11 (d), after forming a fan-shaped consolidation improvement body T in the ground at this predetermined depth, the tube rod 2 is moved upwards by pulling several centimeters to several tens of centimeters, Also in the upper position, as described above, cement milk is injected from the injection port 34 of the tube rod 2 while rotating the tube rod 2, and the tube rod 2 is used in a place where the underground obstacle P exists in the ground. 2 is stopped, and cement milk is sprayed linearly from the tube rod 2 at a high speed and high pressure for a predetermined time in a state where the tube rod 2 is stopped without rotating toward the underground obstacle P. . As shown in FIG. 11 (e), a fan-shaped columnar consolidated improvement body T is formed in the ground by repeatedly pulling the tube rod 2 and moving it up to a desired depth.

そして、最後に地盤中に固結改良体Tを造成したのち、図11(f)に示すように、施工機械1にて管ロッド2を地盤から引き抜くことによって、高圧噴射攪拌工法による地盤改良の作業が完了する。   Finally, after the consolidation improvement body T is created in the ground, as shown in FIG. 11 (f), the pipe rod 2 is pulled out from the ground by the construction machine 1, thereby improving the ground by the high-pressure jet stirring method. The work is complete.

このような高圧噴射攪拌工法による地盤改良方法にあっては、地盤中に地中障害物Pが存在する場合、この地中障害物Pの際に向けて、管ロッド2を回動させることなく停止した状態で管ロッド2からセメントミルクを高速高圧で直線的に所定時間である30秒噴射することによって、管ロッド2から噴射したセメントミルクが地中障害物Pの背面側に廻り込むようになる。これは、地中障害物Pの際に向けて管ロッド2からセメントミルクを噴射すると、図12に示すように、そのセメントミルクが地中障害物Pの際に当たって、当たった地中障害物Pの正面側の圧力が高く、地中障害物Pの背面側の圧力が低くなるという圧力差が生じ、この圧力差により圧力の高い方から低い方に流れるという流体の法則に従って、噴射されたセメントミルクが地中障害物Pの背面側に廻り込むようにして流れるようになり、地中障害物Pの背面側にも固結改良体Tが造成されるようになるものである。なお、地盤中に存在する地中障害物Pの大きさなどによって、地中障害物Pの背面側にセメントミルクが廻り込むのに時間がかかるため、前述したように、地盤中に存在する地中障害物Pの大きさなどに基づいて、セメントミルクの噴射する時間を変更するようにし、地中障害物Pの背面側に確実にセメントミルクを廻り込ませるようにする。   In the ground improvement method by such a high-pressure jet stirring method, when the underground obstacle P exists in the ground, the tube rod 2 is not rotated toward the underground obstacle P. When the cement milk is sprayed from the tube rod 2 at a high speed and high pressure for 30 seconds, which is a predetermined time, in a stopped state, the cement milk sprayed from the tube rod 2 moves around to the back side of the underground obstacle P. Become. When cement milk is jetted from the tube rod 2 toward the underground obstacle P, the cement milk hits the underground obstacle P as shown in FIG. A pressure difference occurs in which the pressure on the front side of the pipe is high and the pressure on the back side of the underground obstacle P is low, and the injected cement is in accordance with the fluid law that the pressure difference flows from the higher pressure side to the lower pressure side. The milk flows around the back side of the underground obstacle P, and the consolidation improvement body T is formed also on the back side of the underground obstacle P. In addition, since it takes time for the cement milk to go around to the back side of the underground obstacle P due to the size of the underground obstacle P existing in the ground, the ground existing in the ground as described above. Based on the size of the medium obstacle P, the time for spraying the cement milk is changed, and the cement milk is surely moved around the back side of the underground obstacle P.

なお、前述した高圧噴射攪拌工法による地盤改良方法の例において、地盤中に造成する固結改良体としては、管ロッドの回動を三分の一回転(120度)させた扇形の柱状の固結改良体としていたが、これに限定されるものではなく、その他の大きさ(角度)の扇形の柱状の固結改良体でも良く、さらには、管ロッドの回動を一回転(360度)させることにより、図13に示すように、円柱状の固結改良体Tとしても良い。また、これ以外の形の固結改良体Tにしても良い。   In the example of the ground improvement method using the high-pressure jet agitation method described above, the consolidation improvement body to be created in the ground is a fan-shaped columnar solid body in which the tube rod is rotated by one third (120 degrees). However, the present invention is not limited to this, but may be a fan-shaped columnar consolidation improvement body of other sizes (angles), and further, the tube rod rotates once (360 degrees). By doing so, as shown in FIG. Moreover, you may make the consolidation improvement body T of a shape other than this.

また、地盤中に固結改良体Tを造成する方式としては、前述の例では、基本的には管ロッド2を回動させながら管ロッド2の噴射口34からセメントミルクを噴射して地盤中に固結改良体Tを造成する方式のものであったが、この方式のものに限定されるものではなく、たとえば、管ロッド2を所定角度である2,3度回動させてから停止し、この停止した状態で管ロッド2の噴射口34からセメントミルクを直線的に所定時間噴射し、噴射後、再び管ロッド2を所定角度である2,3度回動させてから停止し、この停止した状態で管ロッド2の噴射口34からセメントミルクを直線的に所定時間噴射するといった所定角度毎にセメントミルクを噴射して地盤中に固結改良体Tを造成する方式のものでも良く、また、その他の固結改良体Tを造成する方式のものでも良い。   Further, as a method of creating the consolidation improvement body T in the ground, in the above-described example, basically, cement milk is sprayed from the spray port 34 of the tube rod 2 while the tube rod 2 is rotated. However, the present invention is not limited to this method. For example, the tube rod 2 is rotated after a predetermined angle of 2 or 3 degrees and then stopped. In this stopped state, the cement milk is linearly sprayed from the injection port 34 of the tube rod 2 for a predetermined time, and after the injection, the tube rod 2 is again rotated by a predetermined angle of 2 or 3 degrees, and then stopped. In the stopped state, the cement milk may be sprayed from the injection port 34 of the tube rod 2 linearly for a predetermined time, and the cement milk may be sprayed at a predetermined angle to form the consolidation improvement body T in the ground. In addition, other consolidation improvement body T Or it may be of a type to be formed.

1…施工機械、2…管ロッド、3…マスト、4…昇降装置、5…回動装置、6…特殊先端具、11…コンプレッサー、12…流量計、13…水中ポンプ、14…混合装置、15…セメントサイロ、16…水中ポンプ、17…水槽、18…流量計、19…高圧ポンプ、20…硬化材供給装置、30…掘削ヘッド、31…ビット、32…水平翼、33…ビット、34…噴射口、41…施工機械、42…管ロッド、43…噴射口   DESCRIPTION OF SYMBOLS 1 ... Construction machine, 2 ... Pipe rod, 3 ... Mast, 4 ... Lifting device, 5 ... Turning device, 6 ... Special tip, 11 ... Compressor, 12 ... Flow meter, 13 ... Submersible pump, 14 ... Mixing device, DESCRIPTION OF SYMBOLS 15 ... Cement silo, 16 ... Submersible pump, 17 ... Water tank, 18 ... Flow meter, 19 ... High pressure pump, 20 ... Hardener supply device, 30 ... Excavation head, 31 ... Bit, 32 ... Horizontal wing, 33 ... Bit, 34 ... injection port, 41 ... construction machine, 42 ... tube rod, 43 ... injection port

Claims (2)

施工機械にて地盤中に管ロッドを所定深度まで挿入し、挿入後、管ロッドから硬化材を高速高圧で噴射し、この硬化材の噴射エネルギーで地盤を切削しながら噴射した硬化材と地盤とを攪拌混合させ、地盤中に固結改良体を造成して地盤を改良するようにした高圧噴射攪拌工法による地盤改良方法において、
既設構造物の下などの地盤中に地中障害物が存在する場合、この地中障害物の際に向けて、管ロッドを回動させることなく停止した状態で管ロッドから硬化材を高速高圧で直線的に所定時間噴射し、地中障害物の背面側に噴射した硬化材を廻り込ませるようにしたことを特徴とする高圧噴射攪拌工法による地盤改良方法。
Insert the tube rod into the ground with a construction machine to a predetermined depth, and after the insertion, the hardened material is injected from the tube rod at high speed and high pressure, and the hardened material and the ground injected while cutting the ground with the injection energy of this hardened material In the ground improvement method by the high-pressure jet agitation method that improves the ground by creating a consolidation improvement body in the ground,
When there are underground obstacles in the ground such as under existing structures, high-speed and high-pressure materials are hardened from the tube rod while the tube rod is stopped without rotating toward the underground obstacle. A ground improvement method using a high-pressure jet agitation method, characterized in that the hardened material sprayed linearly for a predetermined period of time and circulated around the back side of the underground obstacle is wrapped around.
管ロッドを回動させることなく停止した状態で管ロッドから硬化材を高速高圧で直線的に所定時間噴射する際の噴射する時間を、地盤中に存在する地中障害物の大きさに基づいて変更するようにしたことを特徴とする請求項1記載の高圧噴射攪拌工法による地盤改良方法。   Based on the size of the underground obstacle existing in the ground, the time to inject the hardened material from the tube rod linearly at a high speed and high pressure for a predetermined time with the tube rod stopped without rotating. 2. The ground improvement method according to claim 1, wherein the ground is improved.
JP2013203905A 2013-09-30 2013-09-30 Ground improvement method by high-pressure jet stirring method Active JP6230861B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013203905A JP6230861B2 (en) 2013-09-30 2013-09-30 Ground improvement method by high-pressure jet stirring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013203905A JP6230861B2 (en) 2013-09-30 2013-09-30 Ground improvement method by high-pressure jet stirring method

Publications (2)

Publication Number Publication Date
JP2015068075A JP2015068075A (en) 2015-04-13
JP6230861B2 true JP6230861B2 (en) 2017-11-15

Family

ID=52835043

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013203905A Active JP6230861B2 (en) 2013-09-30 2013-09-30 Ground improvement method by high-pressure jet stirring method

Country Status (1)

Country Link
JP (1) JP6230861B2 (en)

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5014803B1 (en) * 1970-11-30 1975-05-30
JPS60199112A (en) * 1984-03-21 1985-10-08 Toa Harbor Works Co Ltd Ground improvement work by deep layer mixing treatment of cement
JPH07109093B2 (en) * 1989-06-01 1995-11-22 株式会社エヌ、アイ、ティ Ground hardening material High pressure injection injection method
JP2702337B2 (en) * 1991-10-24 1998-01-21 株式会社 エヌ、アイ、テイ Construction method of hardened material injection structure
JP3596687B2 (en) * 1995-04-26 2004-12-02 鹿島建設株式会社 Seismic retrofitting method for existing foundation
JP3264887B2 (en) * 1998-08-10 2002-03-11 ライト工業株式会社 High-pressure injection mixing ground improvement method
JP2002348851A (en) * 2001-05-23 2002-12-04 Nishimatsu Constr Co Ltd Composite pile and method for executing earth retaining wall
JP3550392B2 (en) * 2001-09-20 2004-08-04 有限会社 ニューテック研究▲しゃ▼ Ground improvement method and ground improvement equipment
JP3735363B1 (en) * 2004-08-27 2006-01-18 有限会社ニューテック研究▲しゃ▼ Hardened layer forming method and apparatus
JP4520913B2 (en) * 2005-07-08 2010-08-11 大成建設株式会社 Ground improvement method and existing structure foundation reinforcement method
JP2007107366A (en) * 2005-10-14 2007-04-26 Newtech Kenkyusha:Kk Method and device for creating ground mixed bound body
JP4684142B2 (en) * 2006-03-23 2011-05-18 株式会社不動テトラ Injection mixing treatment method

Also Published As

Publication number Publication date
JP2015068075A (en) 2015-04-13

Similar Documents

Publication Publication Date Title
KR101284089B1 (en) Enhanced ground improvement of mixing device and method of ground improvement
JP6440934B2 (en) Ground improvement method by high-pressure jet stirring method
KR101441929B1 (en) Foundation method for complex pile
JP6490865B1 (en) Ground improvement device and ground improvement method
WO2016051858A1 (en) Ground improving method
JP5717148B2 (en) Underground consolidated body construction method
JP6230861B2 (en) Ground improvement method by high-pressure jet stirring method
KR101416869B1 (en) Boring apparatus for complex pile and foundation method using the same
JP5985417B2 (en) Ground improvement method by high-pressure jet stirring method
JP6203101B2 (en) Ground improvement method by high-pressure jet stirring method and special head used in this ground improvement method
JP5558280B2 (en) High-pressure jet stirring method
KR102297853B1 (en) Mortar pile formation method that can reduce the occurrence of floating soil
JP2008081942A (en) Construction method for water passage portion of underground wall
JP2014177827A (en) Core material and soil cement continuous wall construction method using the same
JP2013127157A (en) Injection and agitation ground improvement method
JP5250729B2 (en) Underground consolidated body construction method and underground solid body creation device for creating a solid body using the method
KR101986265B1 (en) Grouting method and apparatus for forming underground pile of non-circle section
JP2017155528A (en) Ground improvement method just under existing structure
JP4615841B2 (en) Synthetic pile construction method and synthetic pile
JP2016079745A (en) Drilling method and construction method for cast-in-place pile
KR100974075B1 (en) Method and automatic stopper unit of horizontal high velocity blast shaking for use in construction of tunnel etc.
JP6408948B2 (en) Construction method of impermeable wall
JP2006233749A (en) Construction method for root hardened part of pile hole, digging method for pile hole, construction device for root hardened part, and digging head
JP4929378B2 (en) Composite pile and composite pile construction method
JP6261412B2 (en) Construction method of multi-layer impermeable structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160318

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20160318

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170322

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170404

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20171017

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20171018

R150 Certificate of patent or registration of utility model

Ref document number: 6230861

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250