JP6230485B2 - Emergency power supply system - Google Patents

Emergency power supply system Download PDF

Info

Publication number
JP6230485B2
JP6230485B2 JP2014110323A JP2014110323A JP6230485B2 JP 6230485 B2 JP6230485 B2 JP 6230485B2 JP 2014110323 A JP2014110323 A JP 2014110323A JP 2014110323 A JP2014110323 A JP 2014110323A JP 6230485 B2 JP6230485 B2 JP 6230485B2
Authority
JP
Japan
Prior art keywords
transmitter
receiver
power generation
signal
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014110323A
Other languages
Japanese (ja)
Other versions
JP2015226390A (en
Inventor
山下 真司
真司 山下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yazaki Energy System Corp
Toyota Housing Corp
Original Assignee
Yazaki Energy System Corp
Toyota Housing Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yazaki Energy System Corp, Toyota Housing Corp filed Critical Yazaki Energy System Corp
Priority to JP2014110323A priority Critical patent/JP6230485B2/en
Publication of JP2015226390A publication Critical patent/JP2015226390A/en
Application granted granted Critical
Publication of JP6230485B2 publication Critical patent/JP6230485B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Stand-By Power Supply Arrangements (AREA)

Description

本発明は、停電等の非常時に住宅へ電力を供給する非常時給電システムに関する。   The present invention relates to an emergency power feeding system that supplies power to a house in an emergency such as a power failure.

エンジン発電機等の発電機は、電源供給が困難な屋外で使用することが多いが、停電等の非常時に使用することが場合がある。   Generators such as engine generators are often used outdoors where power supply is difficult, but they may be used in emergency situations such as power outages.

このような発電機では、遠隔操作により発電を開始するようにしたものがある。例えば、特許文献1に記載の技術では、エンジン発電機と、エンジン発電機の出力ラインに接続された中継端末と、中継端末と無線通信するリモコンを備えている。また、エンジン発電機とリモコンとが中継端末を介して遠隔操作信号を双方向通信する構成とされている。そして、エンジン発電機及び中継端末が出力ラインを利用した電力線搬送で遠隔操作信号送受信するようになっている。   Some of these generators are configured to start power generation by remote control. For example, the technology described in Patent Document 1 includes an engine generator, a relay terminal connected to the output line of the engine generator, and a remote controller that performs wireless communication with the relay terminal. Further, the engine generator and the remote controller are configured to bidirectionally communicate a remote operation signal via a relay terminal. And an engine generator and a relay terminal transmit / receive a remote operation signal by the power line conveyance using an output line.

特許第4329972号公報Japanese Patent No. 4332972

上述の特許文献1に記載の技術により、遠隔操作で非常時にエンジン発電機を始動することができる。しかしながら、住宅内へ供給する電力供給元の切替や、エンジン発電機が設置された場所の換気については考慮されていないので、改善の余地がある。   With the technique described in Patent Document 1, the engine generator can be started in an emergency by remote control. However, there is room for improvement because switching of the power supply source to be supplied to the house and ventilation of the place where the engine generator is installed are not considered.

本発明は、上記事実を考慮して成されたもので、非常時に発電設備の始動に伴い、住宅への電力供給元の切替と発電設備設置場所の換気とを連動して行うことを可能にすることを目的とする。   The present invention has been made in consideration of the above facts, and in the event of an emergency, the switching of the power supply source to the house and the ventilation of the power generation facility installation location can be performed in conjunction with the start of the power generation facility. The purpose is to do.

上記目的を達成するために請求項1に記載の非常時給電システムは、外部からの指示により作動可能な発電設備と、前記発電設備が設置された場所に設けられ、外部からの指示により作動可能な換気扇と、外部からの指示により電力の供給元を系統電源又は前記発電設備に切替える切替部と、前記発電設備の作動開始を指示する開始信号を送信する送信機と、前記送信機から送信された前記開始信号を受信した場合に、前記発電設備を作動させると共に、予め定めた第1の信号を送信する第1送受信機と、前記第1送受信機から送信された前記第1の信号を受信した場合に、電力の供給元が前記発電設備になるように前記切替部に指示すると共に、予め定めた第2の信号を送信する第2送受信機と、前記第2送受信機から送信された前記第2の信号を受信した場合に、前記換気扇を作動させる第3送受信機と、を備えている。   In order to achieve the above object, the emergency power supply system according to claim 1 is provided with a power generation facility operable by an instruction from the outside, a place where the power generation facility is installed, and operable by an instruction from the outside A ventilation fan, a switching unit that switches the power supply source to a system power supply or the power generation facility according to an instruction from the outside, a transmitter that transmits a start signal that instructs the operation start of the power generation facility, and a transmitter that is transmitted from the transmitter When the start signal is received, the power generation facility is operated, and a first transmitter / receiver that transmits a predetermined first signal and the first signal transmitted from the first transmitter / receiver are received. In such a case, the switching unit is instructed so that the power supply source is the power generation facility, and the second transmitter / receiver that transmits a predetermined second signal is transmitted from the second transmitter / receiver. Second When receiving the signal, and a, a third transceiver for operating the ventilating fan.

請求項1に記載の発明によれば、発電設備は、外部からの指示により作動可能とされている。また、発電設備が設置された場所に設けられた換気扇も外部からの指示により作動可能とされている。   According to the first aspect of the present invention, the power generation facility is operable by an instruction from the outside. Moreover, the ventilation fan provided in the place where the power generation equipment is installed is also operable by an instruction from the outside.

また、切替部では、外部からの指示により電力の供給元が系統電源又は発電設備に切替えられる。   Further, in the switching unit, the power supply source is switched to the system power supply or the power generation facility in accordance with an instruction from the outside.

送信機では、発電設備の作動開始を指示する開始信号が送信され、第1送受信機では、送信機によって送信された開始信号を受信した場合に、発電設備を作動させると共に、予め定めた第1の信号が送信される。   In the transmitter, a start signal instructing the start of operation of the power generation facility is transmitted. In the first transmitter / receiver, when the start signal transmitted by the transmitter is received, the power generation facility is operated and a first predetermined value is set. Is transmitted.

また、第2送受信機では、第1送受信機によって送信された第1の信号を受信した場合に、電力の供給元が発電設備になるように切替部に指示すると共に、予め定めた第2の信号が送信される。   Further, in the second transceiver, when the first signal transmitted by the first transceiver is received, the second transmitter / receiver instructs the switching unit so that the power supply source is the power generation facility, and the predetermined second A signal is transmitted.

そして、第3送受信機では、第2送受信機から送信された第2の信号を受信した場合に、換気扇が作動される。   In the third transceiver, the ventilation fan is activated when the second signal transmitted from the second transceiver is received.

すなわち、送信機によって発電設備の作動開始を指示する開始信号を送信することによって、煩雑な作業を行うことなく、住宅等へ供給する電力を系統電源から発電設備に切替えることができる。さらには、電源の切替に連動して発電設備が設置された場所を換気扇によって換気することができる。   That is, by transmitting a start signal instructing the start of operation of the power generation facility by the transmitter, the power supplied to the house or the like can be switched from the system power source to the power generation facility without performing complicated work. Furthermore, the place where the power generation equipment is installed in conjunction with the switching of the power supply can be ventilated by the ventilation fan.

従って、非常時に発電設備の始動に伴い、住宅への電力供給元の切替と発電設備設置場所の換気とを連動して行うことができる。   Therefore, in the event of an emergency, switching of the power supply source to the house and ventilation of the power generation facility installation location can be performed in conjunction with the start of the power generation facility.

なお、請求項2に記載の発明のように、送信機が、発電設備の作動停止を指示する停止信号を更に送信し、第3送受信機が、送信機から送信された停止信号を受信した場合に、換気扇を停止させる共に、予め定めた第3の信号を更に送信し、第2送受信機が、第3送受信機から送信された第3の信号を受信した場合に、電力の供給元が系統電源になるように切替部に指示すると共に、予め定めた第4の信号を更に送信し、第1送受信機が、第2送受信機から送信された第4の信号を受信した場合に、発電設備を更に停止させるようにしてもよい。これによって、送信機から発電設備の作動停止を指示する停止信号を出力することで、発電設備から系統電源に切替えることが可能となると共に、連動して換気扇を停止させることが可能となる。   As in the invention described in claim 2, when the transmitter further transmits a stop signal instructing to stop the operation of the power generation facility, and the third transmitter / receiver receives the stop signal transmitted from the transmitter In addition, when the ventilation fan is stopped, a predetermined third signal is further transmitted, and when the second transmitter / receiver receives the third signal transmitted from the third transmitter / receiver, the power supply source is Instructing the switching unit to become a power source, further transmitting a predetermined fourth signal, and when the first transmitter / receiver receives the fourth signal transmitted from the second transmitter / receiver, May be further stopped. Thus, by outputting a stop signal instructing to stop the operation of the power generation facility from the transmitter, it is possible to switch from the power generation facility to the system power supply, and to stop the ventilation fan in conjunction with it.

また、請求項3に記載の発明のように、送信機が、発電設備の作動停止を指示する停止信号を更に送信し、第3送受信機が、送信機から送信された停止信号を受信した場合に、換気扇を停止させ、第2送受信機が、送信機から送信された停止信号を受信した場合に、電力の供給元が系統電源になるように切替部に指示すると共に、予め定めた第4の信号を更に送信し、第1送受信機が、第2送受信機から送信された前記第4の信号を受信した場合に、発電設備を更に停止させるようにしてもよい。このように構成しても、送信機から発電設備の作動停止を指示する停止信号を出力することで、発電設備から系統電源に切替えることが可能となると共に、連動して換気扇を停止させることが可能となる。   Further, as in the third aspect of the invention, when the transmitter further transmits a stop signal instructing to stop the operation of the power generation facility, and the third transmitter / receiver receives the stop signal transmitted from the transmitter In addition, the ventilation fan is stopped, and when the second transmitter / receiver receives the stop signal transmitted from the transmitter, the switching unit is instructed so that the power supply source is the system power supply, and the predetermined fourth When the first transmitter / receiver receives the fourth signal transmitted from the second transmitter / receiver, the power generation facility may be further stopped. Even if comprised in this way, by outputting the stop signal which instruct | indicates the operation stop of a power generation equipment from a transmitter, it becomes possible to switch from a power generation equipment to a system power supply, and to stop a ventilation fan interlockingly It becomes possible.

また、請求項4に記載の発明のように、送信機が、発電設備の作動停止を指示する停止信号を更に送信し、第3送受信機が、送信機から送信された停止信号を受信した場合に、換気扇を停止させると共に、予め定めた第5の信号を更に送信し、第2送受信機が、送信機から送信された停止信号を受信した場合に、電力の供給元が系統電源になるように切替部に指示し、第1送受信機が、第3送受信機から送信された第5の信号を受信した場合に、発電設備を更に停止させるようにしてもよい。このように構成しても、送信機から発電設備の作動停止を指示する停止信号を出力することで、発電設備から系統電源に切替えることが可能となると共に、連動して換気扇を停止させることが可能となる。   Further, as in the invention described in claim 4, when the transmitter further transmits a stop signal instructing the operation stop of the power generation equipment, and the third transmitter / receiver receives the stop signal transmitted from the transmitter In addition, when the ventilation fan is stopped, a predetermined fifth signal is further transmitted, and when the second transmitter / receiver receives the stop signal transmitted from the transmitter, the power supply source becomes the system power source. When the first transmitter / receiver receives the fifth signal transmitted from the third transmitter / receiver, the power generation facility may be further stopped. Even if comprised in this way, by outputting the stop signal which instruct | indicates the operation stop of a power generation equipment from a transmitter, it becomes possible to switch from a power generation equipment to a system power supply, and to stop a ventilation fan interlockingly It becomes possible.

また、請求項5に記載の発明のように、送信機が、発電設備の作動停止を指示する停止信号を更に送信し、第2送受信機が、送信機から送信された停止信号を受信した場合に、電力の供給元が系統電源になるように切替部に指示すると共に、予め定めた第4の信号を更に送信し、第3送受信機が、第2送受信機から送信された第4の信号を受信した場合に、換気扇を停止させ、第1送受信機が、第2送受信機から送信された第4の信号を受信した場合に、発電設備を更に停止させるようにしてもよい。このように構成しても、送信機から発電設備の作動停止を指示する停止信号を出力することで、発電設備から系統電源に切替えることが可能となると共に、連動して換気扇を停止させることが可能となる。   Further, as in the invention described in claim 5, when the transmitter further transmits a stop signal instructing to stop the operation of the power generation facility, and the second transmitter / receiver receives the stop signal transmitted from the transmitter In addition, the switching unit is instructed so that the power supply source is the system power supply, and a predetermined fourth signal is further transmitted, and the third transmitter / receiver transmits the fourth signal transmitted from the second transmitter / receiver. May be stopped, and when the first transmitter / receiver receives the fourth signal transmitted from the second transmitter / receiver, the power generation facility may be further stopped. Even if comprised in this way, by outputting the stop signal which instruct | indicates the operation stop of a power generation equipment from a transmitter, it becomes possible to switch from a power generation equipment to a system power supply, and to stop a ventilation fan interlockingly It becomes possible.

また、請求項6に記載の発明のように、送信機は、電池レスで作動開始の指示を行う電池レスリモコンからなり、第1送受信機は、系統電源または前記発電設備の電力を蓄電する蓄電部を備えると共に、蓄電部の電力を用いて発電設備を作動させると共に、第1の信号を送信するようにしてもよい。   According to a sixth aspect of the present invention, the transmitter includes a batteryless remote controller that gives an instruction to start operation without a battery, and the first transmitter / receiver stores power stored in a system power supply or the power generation facility. The power generation equipment may be operated using the power of the power storage unit and the first signal may be transmitted.

さらに、請求項7に記載の発明のように、第1送受信機、第2送受信機、及び第3送受信機は、無線信号を送受信するものを適用するようにしてもよい。   Further, as in the seventh aspect of the invention, the first transmitter / receiver, the second transmitter / receiver, and the third transmitter / receiver may be those that transmit and receive radio signals.

以上説明したように本発明によれば、住宅への電力供給元の切替と発電設備設置場所の換気とを連動して行うことができる、という効果がある。   As described above, according to the present invention, there is an effect that the switching of the power supply source to the house and the ventilation of the place where the power generation equipment is installed can be performed in conjunction with each other.

本実施の形態に係わる非常時給電システムの概略構成を示すブロック図である。It is a block diagram which shows schematic structure of the emergency electric power feeding system concerning this Embodiment. (A)は信号の送信元に応じた第1送受信機の動作を示す表であり、(B)は信号の送信元に応じた第2送受信機の動作を示す表であり、(C)は信号の送信元に応じた第3送受信機の動作を示す表である。(A) is a table showing the operation of the first transceiver according to the signal transmission source, (B) is a table showing the operation of the second transceiver according to the signal transmission source, (C) It is a table | surface which shows operation | movement of the 3rd transmitter / receiver according to the transmission source of a signal. (A)は第1送受信機で行われる処理の一例を示すフローチャートであり、(B)は第2送受信機で行われる処理の一例を示すフローチャートである。(A) is a flowchart which shows an example of the process performed with a 1st transmitter / receiver, (B) is a flowchart which shows an example of the process performed with a 2nd transmitter / receiver. 第3送受信機で行われる処理の一例を示すフローチャートである。It is a flowchart which shows an example of the process performed with a 3rd transmitter / receiver. 本実施の形態に係る非常時給電システムの発電設備から住宅へ電力開始する場合を説明するための図である。It is a figure for demonstrating the case where electric power is started to the house from the power generation equipment of the emergency electric power feeding system which concerns on this Embodiment. 本実施の形態に係る非常時給電システムの発電設備から住宅への電力供給を停止する場合を説明するための図である。It is a figure for demonstrating the case where the electric power supply to the house from the power generation equipment of the emergency power feeding system which concerns on this Embodiment is stopped.

以下、図面を参照して本発明の実施の形態の一例を詳細に説明する。図1は、本実施の形態に係わる非常時給電システムの概略構成を示すブロック図である。   Hereinafter, an example of an embodiment of the present invention will be described in detail with reference to the drawings. FIG. 1 is a block diagram showing a schematic configuration of an emergency power feeding system according to the present embodiment.

非常時給電システム10は、住宅内へ電力を供給する供給元を切替える切替開閉器14を備えている。   The emergency power supply system 10 includes a switching switch 14 that switches a supply source that supplies power to a house.

切替開閉器14には、発電設備12が接続されており、発電設備12によって発電された電力を住宅内へ供給可能とされている。   The switching switch 14 is connected to a power generation facility 12 so that the power generated by the power generation facility 12 can be supplied into the house.

また、切替開閉器14には、分電盤16が接続されており、系統電源18からの電力が分電盤16を介して切替開閉器14に入力されるようになっている。   In addition, a distribution board 16 is connected to the switching switch 14, and power from the system power supply 18 is input to the switching switch 14 via the distribution board 16.

また、切替開閉器14には、住宅内の照明30やコンセント32、換気扇20等が接続され、切替開閉器14を介して住宅内に電力供給が行われる。なお、換気扇20は、後述する発電設備12が設置された場所に設置されているものとする。   Further, the lighting 30 in the house, the outlet 32, the ventilation fan 20 and the like are connected to the switching switch 14, and power is supplied to the house through the switching switch 14. In addition, the ventilation fan 20 shall be installed in the place in which the power generation equipment 12 mentioned later is installed.

すなわち、切替開閉器14は、住宅内へ電力を供給する供給元を、系統電源18又は発電設備12に切替えるようになっている。   That is, the switching switch 14 is configured to switch the supply source for supplying power to the house to the system power supply 18 or the power generation facility 12.

さらに、本実施の形態に係る非常時給電システム10は、遠隔操作を行うための構成を備えている。   Furthermore, the emergency power feeding system 10 according to the present embodiment has a configuration for performing remote operation.

具体的には、遠隔操作を行う構成として、送信機22、第1送受信機24、第2送受信機26、及び第3送受信機28を備えている。   Specifically, the transmitter 22, the first transmitter / receiver 24, the second transmitter / receiver 26, and the third transmitter / receiver 28 are provided as a configuration for performing remote operation.

送信機22は、非常時に発電設備12から住宅への電力供給開始の指示、及び発電設備12から住宅への電力供給停止の指示を行う。本実施の形態では、送信機22として電池レスリモコンを適用することにより、非常時に電池切れにより発電設備12から住宅への電力供給開始指示ができないことを防止するようになっている。電池レスリモコンは、例えば、電磁誘導等によってスイッチ操作を電力に変換して、変換した電力を用いて無線信号を送信する。   The transmitter 22 gives an instruction to start power supply from the power generation facility 12 to the house and an instruction to stop power supply from the power generation equipment 12 to the house in an emergency. In the present embodiment, by applying a battery-less remote controller as the transmitter 22, it is possible to prevent a power supply start instruction from the power generation facility 12 to the house from being out of battery in an emergency. For example, the batteryless remote controller converts a switch operation into electric power by electromagnetic induction or the like, and transmits a radio signal using the converted electric power.

第1送受信機24は、予め定めた送受信先と信号の送受信が可能とされており、信号を受信した場合に信号の送信元に応じて予め定めた送信先へ信号を送信するようになっている。また、第1送受信機24は、電力線が分電盤16に接続されて系統電源18からの電力により信号の送受信が行われる。また、第1送受信機24は、蓄電用キャパシタ25を備えており、停電が発生した場合でも信号の送受信が可能とされている。さらに、第1送受信機24は、外部からの指示により作動可能な発電設備12に接続されており、発電設備12へ発電開始指示や発電停止指示が可能とされている。   The first transmitter / receiver 24 can transmit / receive signals to / from a predetermined transmission / reception destination. When receiving a signal, the first transmitter / receiver 24 transmits a signal to a predetermined transmission destination according to the transmission source of the signal. Yes. In the first transmitter / receiver 24, a power line is connected to the distribution board 16, and signals are transmitted / received by power from the system power supply 18. Moreover, the 1st transmitter / receiver 24 is provided with the capacitor | condenser 25 for electrical storage, and transmission / reception of a signal is enabled even when a power failure generate | occur | produces. Furthermore, the first transmitter / receiver 24 is connected to the power generation facility 12 operable by an instruction from the outside, and can be instructed to start power generation or stop power generation to the power generation facility 12.

第2送受信機26は、電力線が発電設備12に接続されており、発電設備12からの電力により信号の送受信が可能とされている。第2送受信機26も、信号を受信した場合に信号の送信元に応じて予め定めた送信先へ信号を送信するようになっている。また、第2送受信機26は、外部からの指示により切替が可能な切替開閉器14に接続されており、切替開閉器14による住宅への電力供給元の切替が可能とされている。例えば、切替開閉器14として電磁式のスイッチを適用して、第2送受信機26が切替を行うためのコイルに通電を行うか否かによって切替開閉器14による住宅への電力供給元の切替が行われる。   The second transmitter / receiver 26 has a power line connected to the power generation facility 12, and can transmit and receive signals using power from the power generation facility 12. The second transmitter / receiver 26 also transmits a signal to a predetermined transmission destination according to the signal transmission source when the signal is received. The second transmitter / receiver 26 is connected to a switching switch 14 that can be switched by an instruction from the outside, and the switching power supply 14 can be switched to the house by the switching switch 14. For example, when the electromagnetic switch is applied as the switching switch 14 and the second transmitter / receiver 26 energizes the coil for switching, the switching switch 14 switches the power supply source to the house. Done.

第3送受信機28は、電力線が切替開閉器14に接続されており、切替開閉器14から供給される電力により信号の送受信が可能とされている。第3送受信機28も、信号を受信した場合に信号の送信元に応じて予め定めた送信先へ信号を送信するようになっている。また、第3送受信機28は、外部からの指示により作動可能な換気扇20に接続されており、換気扇20の作動開始指令及び停止指令が可能とされている。   The third transmitter / receiver 28 has a power line connected to the switching switch 14, and can transmit and receive signals using power supplied from the switching switch 14. The third transceiver 28 is also configured to transmit a signal to a predetermined transmission destination according to the signal transmission source when the signal is received. The third transmitter / receiver 28 is connected to the ventilation fan 20 that can be operated by an instruction from the outside, and an operation start command and a stop command for the ventilation fan 20 are possible.

第1〜第3送受信機24〜28は、上述したように、信号を受信した場合に信号の送信元に応じて予め定めた送信先へ信号を送信するが、本実施の形態では、信号を受信した場合に信号の送信元に応じて予め定めた動作を行うようになっている。具体的には、図2に示す動作を行うようになっている。図2(A)は信号の送信元に応じた第1送受信機24の動作を示す表であり、図2(B)は信号の送信元に応じた第2送受信機26の動作を示す表であり、図2(C)は信号の送信元に応じた第3送受信機28の動作を示す表である。   As described above, when the first to third transceivers 24 to 28 receive a signal, the first to third transceivers 24 to 28 transmit the signal to a predetermined transmission destination according to the transmission source of the signal. When the signal is received, a predetermined operation is performed according to the signal transmission source. Specifically, the operation shown in FIG. 2 is performed. 2A is a table showing the operation of the first transceiver 24 according to the signal transmission source, and FIG. 2B is a table showing the operation of the second transceiver 26 according to the signal transmission source. FIG. 2C is a table showing the operation of the third transceiver 28 in accordance with the signal transmission source.

第1送受信機24は、図2(A)に示すように、送信機22から予め定めた開始信号を受信した場合に、発電設備12に作動開始指令を出力すると共に、第2送受信機26へ予め定めた第1の信号を送信するようになっている。   When the first transmitter / receiver 24 receives a predetermined start signal from the transmitter 22 as shown in FIG. 2 (A), the first transmitter / receiver 24 outputs an operation start command to the power generation facility 12 and also to the second transmitter / receiver 26. A predetermined first signal is transmitted.

また、第1送受信機24は、第2送受信機26から予め定めた第4の信号を受信した場合に、発電設備12に停止指令を出力するようになっている。   The first transmitter / receiver 24 outputs a stop command to the power generation facility 12 when receiving a predetermined fourth signal from the second transmitter / receiver 26.

第2送受信機26は、図2(B)に示すように、第1送受信機24から送信された第1の信号を受信した場合に、切替開閉器14にオン指令(発電設備12から住宅内へ電力供給を行う指令)を出力すると共に、第3送受信機28へ予め定めた第2の信号を送信するようになっている。   When the second transmitter / receiver 26 receives the first signal transmitted from the first transmitter / receiver 24, as shown in FIG. Command to perform power supply to the third transmitter / receiver 28 and a second signal set in advance to the third transmitter / receiver 28.

また、第2送受信機26は、第3送受信機28から予め定めた第3の信号を受信した場合に、切替開閉器14にオフ指令(系統電源18から住宅内へ電力供給を行う指令)を出力すると共に、第1送受信機24へ予め定めた第4の信号を送信するようになっている。   In addition, when the second transmitter / receiver 26 receives a predetermined third signal from the third transmitter / receiver 28, the second transmitter / receiver 26 issues an off command (command for supplying power from the system power supply 18 to the house) to the switching switch 14. In addition to outputting, a predetermined fourth signal is transmitted to the first transceiver 24.

第3送受信機28は、図2(C)に示すように、第2送受信機26から送信された第2の信号を受信した場合に、換気扇20に作動開始指令を出力するようになっている。   As shown in FIG. 2C, the third transmitter / receiver 28 outputs an operation start command to the ventilation fan 20 when the second signal transmitted from the second transmitter / receiver 26 is received. .

また、第3送受信機28は、送信機22から送信された予め定めた停止信号を受信した場合に、換気扇20に停止指令を出力すると共に、第2送受信機26へ予め定めた第3の信号を送信するようになっている。   In addition, when the third transmitter / receiver 28 receives the predetermined stop signal transmitted from the transmitter 22, the third transmitter / receiver 28 outputs a stop command to the ventilation fan 20 and also outputs a third signal predetermined to the second transmitter / receiver 26. Is supposed to send.

なお、第1〜第3送受信機24〜28における送信元の特定は、例えば、各送受信機24〜28毎に送信周波数を異ならせることにより、何れから送信された信号かを特定することが可能である。この場合、受信側が送信元を周波数で特定するようにしてもよいし、受信する際の受信周波数を限定すれば、特定の送信元からのみ信号を受信できる。或いは、送信信号に送信元を特定するための情報を付加して受信側で当該情報に基づいて送信元を特定するようにしてもよい。   Note that the transmission source in the first to third transceivers 24 to 28 can be identified by, for example, changing the transmission frequency for each of the transceivers 24 to 28. It is. In this case, the reception side may specify the transmission source by frequency, or if the reception frequency at the time of reception is limited, a signal can be received only from a specific transmission source. Alternatively, information for specifying the transmission source may be added to the transmission signal, and the transmission source may be specified based on the information on the reception side.

続いて、上述のように構成された本実施の形態に係る非常時給電システム10の第1〜第3送受信機24〜28で行われる各々の処理について説明する。   Then, each process performed with the 1st-3rd transmitter-receivers 24-28 of the emergency power feeding system 10 which concerns on this Embodiment comprised as mentioned above is demonstrated.

まず、図3(A)を参照して第1送受信機24で行われる処理について説明する。図3(A)は、第1送受信機24で行われる処理の一例を示すフローチャートである。   First, processing performed by the first transceiver 24 will be described with reference to FIG. FIG. 3A is a flowchart illustrating an example of processing performed by the first transmitter / receiver 24.

まず、ステップ100では、送信機22から信号(開始信号)を受信したか否かが第1送受信機24によって判定される。該判定が肯定された場合にはステップ102へ移行し、否定された場合にはステップ104へ移行する。   First, in step 100, it is determined by the first transmitter / receiver 24 whether or not a signal (start signal) is received from the transmitter 22. If the determination is affirmative, the process proceeds to step 102, and if the determination is negative, the process proceeds to step 104.

ステップ102では、第1送受信機24によって発電設備12に作動指令が出力されると共に、第2送受信機26へ信号(第1の信号)が送信されてステップ100に戻って上述の処理が繰り返される。   In step 102, the first transmitter / receiver 24 outputs an operation command to the power generation facility 12, and a signal (first signal) is transmitted to the second transmitter / receiver 26. Then, the process returns to step 100 and the above-described processing is repeated. .

一方、ステップ104では、第2送受信機26から信号(第4の信号)を受信したか否かが第1送受信機24によって判定される。該判定が肯定された場合にはステップ106へ移行し、否定された場合にはステップ100に戻って上述の処理が繰り返される。   On the other hand, in step 104, the first transmitter / receiver 24 determines whether a signal (fourth signal) is received from the second transmitter / receiver 26. If the determination is affirmative, the process proceeds to step 106. If the determination is negative, the process returns to step 100 and the above-described processing is repeated.

ステップ106では、第1送受信機24によって発電設備12に停止指令が出力されてステップ100に戻って上述の処理が繰り返される。   In step 106, the first transceiver 24 outputs a stop command to the power generation facility 12, returns to step 100, and the above-described processing is repeated.

次に、図3(B)を参照して第2送受信機26で行われる処理について説明する。図3(B)は、第2送受信機26で行われる処理の一例を示すフローチャートである。   Next, processing performed by the second transceiver 26 will be described with reference to FIG. FIG. 3B is a flowchart illustrating an example of processing performed by the second transceiver 26.

ステップ200では、第1送受信機24から信号(第1の信号)を受信したか否か第2送受信機26によって判定される。該判定が肯定された場合にはステップ202へ移行し、否定された場合にはステップ204へ移行する。   In step 200, the second transceiver 26 determines whether a signal (first signal) is received from the first transceiver 24. If the determination is affirmative, the process proceeds to step 202, and if the determination is negative, the process proceeds to step 204.

ステップ202では、第2送受信機26によって切替開閉器14に切替(オン)指令が出力されると共に、第3送受信機28に信号(第2の信号)が送信されてステップ200に戻って上述の処理が繰り返される。   In step 202, a switching (ON) command is output to the switching switch 14 by the second transceiver 26, and a signal (second signal) is transmitted to the third transceiver 28. The process is repeated.

一方、ステップ204では、第3送受信機28から信号(第3の信号)を受信したか否か第2送受信機26によって判定される。該判定が肯定された場合にはステップ206へ移行し、否定された場合にはステップ200に戻って上述の処理が繰り返される。   On the other hand, in step 204, it is determined by the second transceiver 26 whether or not a signal (third signal) has been received from the third transceiver 28. If the determination is affirmative, the process proceeds to step 206. If the determination is negative, the process returns to step 200 and the above-described processing is repeated.

ステップ206では、第2送受信機26によって切替開閉器14に切替(オフ)指令が出力されると共に、第1送受信機24に信号(第4の信号)が出力されてステップ200に戻って上述の処理が繰り返される。   In step 206, the second transmitter / receiver 26 outputs a switching (off) command to the switching switch 14, and also outputs a signal (fourth signal) to the first transmitter / receiver 24, and returns to step 200 to return to the above-described step. The process is repeated.

次に、図4を参照して第3送受信機28で行われる処理について説明する。図4は、第3送受信機28で行われる処理の一例を示すフローチャートである。   Next, processing performed by the third transceiver 28 will be described with reference to FIG. FIG. 4 is a flowchart showing an example of processing performed by the third transceiver 28.

ステップ300では、第2送受信機26から信号(第2の信号)を受信したか否か第3送受信機28によって判定される。該判定が肯定された場合にはステップ302へ移行し、否定された場合にはステップ304へ移行する。   In step 300, the third transceiver 28 determines whether or not a signal (second signal) has been received from the second transceiver 26. If the determination is affirmative, the process proceeds to step 302. If the determination is negative, the process proceeds to step 304.

ステップ302では、第3送受信機28によって換気扇20に作動開始指令が出力されてステップ300に戻って上述の処理が繰り返される。   In step 302, the third transceiver 28 outputs an operation start command to the ventilation fan 20, returns to step 300, and the above-described processing is repeated.

一方、ステップ304では、送信機22から信号(停止信号)を受信したか否か第3送受信機28によって判定される。該判定が肯定された場合にはステップ306へ移行し、否定された場合にはステップ300に戻って上述の処理が繰り返される。   On the other hand, in step 304, it is determined by the third transmitter / receiver 28 whether or not a signal (stop signal) is received from the transmitter 22. If the determination is affirmative, the process proceeds to step 306. If the determination is negative, the process returns to step 300 and the above-described processing is repeated.

ステップ306では、第3送受信機28によって換気扇20に停止指令が出力されると共に、第2送受信機26へ信号(第3の信号)が出力されてステップ300に戻って上述の処理が繰り返される。   In step 306, a stop command is output to the ventilation fan 20 by the third transmitter / receiver 28, and a signal (third signal) is output to the second transmitter / receiver 26. The process returns to step 300 and the above-described processing is repeated.

次に、本実施の形態に係る非常時給電システム10の全体の動作について説明する。図5は、本実施の形態に係る非常時給電システム10の発電設備12から住宅へ電力開始する場合を説明するための図である。また、図6は、本実施の形態に係る非常時給電システム10の発電設備12から住宅への電力供給を停止する場合を説明するための図である。   Next, the overall operation of the emergency power supply system 10 according to the present embodiment will be described. FIG. 5 is a diagram for explaining a case where power is started from the power generation facility 12 of the emergency power feeding system 10 according to the present embodiment to a house. Moreover, FIG. 6 is a figure for demonstrating the case where the electric power supply from the power generation equipment 12 of the emergency power feeding system 10 which concerns on this Embodiment to a residence is stopped.

非常時給電システム10の発電設備12から住宅へ電力供給を開始する場合には、送信機22を用いて発電設備12から住宅への電力供給開始の指示を行う。これにより、図5の一点鎖線矢印で示すように、送信機22から第1送受信機24へ開始信号を送信され、上述のステップ100の判定が肯定される。すなわち、発電設備に作動指令が出力されて発電設備12が作動開始する。また、第1送受信機24から第2送受信機26へ第1の信号が出力される。   When the power supply from the power generation facility 12 of the emergency power supply system 10 is started to the house, the transmitter 22 is used to instruct the start of power supply from the power generation facility 12 to the house. As a result, a start signal is transmitted from the transmitter 22 to the first transmitter / receiver 24 as indicated by the one-dot chain line arrow in FIG. 5, and the determination in step 100 described above is affirmed. That is, an operation command is output to the power generation facility, and the power generation facility 12 starts to operate. The first signal is output from the first transceiver 24 to the second transceiver 26.

次に、第1送受信機24からの第1の信号を第2送受信機26が受信すると、上述のステップ200の判定が肯定される。すなわち、発電設備12からの電力を電源として第2送受信機26によって切替開閉器14にオン指令が出力され、切替開閉器14の電力供給元が系統電源18から発電設備12に切替えられる。また、第2送受信機26から第3送受信機28へ第2の信号が出力される。   Next, when the second transmitter / receiver 26 receives the first signal from the first transmitter / receiver 24, the determination in step 200 described above is affirmed. That is, the second transmitter / receiver 26 outputs an ON command to the switching switch 14 using the power from the power generation facility 12 as a power source, and the power supply source of the switching switch 14 is switched from the system power source 18 to the power generation facility 12. A second signal is output from the second transceiver 26 to the third transceiver 28.

次に、第2送受信機26からの第2の信号を第3送受信機28が受信すると、上述のステップ302の判定が肯定される。すなわち、第3送受信機28によって換気扇20のオン指令が出力されて、発電設備12からの電力により換気扇20が作動開始する。これにより、煩雑な作業を行うことなく、発電設備12が設置された場所を換気することができる。   Next, when the third transmitter / receiver 28 receives the second signal from the second transmitter / receiver 26, the determination in step 302 described above is affirmed. That is, the third transmitter / receiver 28 outputs an on-command for the ventilation fan 20, and the ventilation fan 20 starts to be activated by the power from the power generation facility 12. Thereby, the place where the power generation equipment 12 is installed can be ventilated without performing complicated work.

一方、非常時給電システム10の発電設備12から住宅への電力供給を停止する場合には、送信機22を用いて発電設備から住宅への電力供給停止の指示を行う。これにより、図6の一点鎖線矢印で示すように、送信機22から第3送受信機28へ停止信号が送信され、上述のステップ304が肯定される。すなわち、第3送受信機28によって換気扇20に停止指令が出力されて換気扇20が停止する。また、第3送受信機28から第2送受信機26へ第3の信号が出力される。   On the other hand, when stopping the power supply from the power generation facility 12 of the emergency power supply system 10 to the house, the transmitter 22 is used to instruct the power supply from the power generation facility to the house to be stopped. Thereby, as shown by the one-dot chain arrow in FIG. 6, a stop signal is transmitted from the transmitter 22 to the third transceiver 28, and the above-described step 304 is affirmed. That is, the third transceiver 28 outputs a stop command to the ventilation fan 20 and the ventilation fan 20 stops. The third signal is output from the third transceiver 28 to the second transceiver 26.

次に、第3送受信機28からの第3の信号を第2送受信機26が受信すると、上述のステップ204の判定が肯定される。すなわち、発電設備12からの電力を電源として第2送受信機26によって切替開閉器14に切替(オフ)指令が出力され、切替開閉器14の電力供給元が発電設備12から系統電源18に切替えられる。また、第2送受信機26から第1送受信機24へ第4の信号が出力される。   Next, when the second transmitter / receiver 26 receives the third signal from the third transmitter / receiver 28, the determination in step 204 described above is affirmed. That is, using the power from the power generation facility 12 as a power source, the second transmitter / receiver 26 outputs a switching (off) command to the switching switch 14, and the power supply source of the switching switch 14 is switched from the power generation facility 12 to the system power source 18. . Further, the fourth signal is output from the second transceiver 26 to the first transceiver 24.

次に、第2送受信機26からの第4の信号を第1送受信機24が受信すると、上述のステップ104の判定が肯定される。すなわち、第1送受信機24によって発電設備12に停止指令が出力されて発電設備12が停止される。   Next, when the first transmitter / receiver 24 receives the fourth signal from the second transmitter / receiver 26, the determination in step 104 described above is affirmed. That is, the first transmitter / receiver 24 outputs a stop command to the power generation facility 12 and the power generation facility 12 is stopped.

このように、本実施の形態では、送信機22を操作するだけで、発電設備12の作動/停止、及び切替開閉器14の切替を行うことができる。また、これに連動して換気扇20を作動/停止を行うことができる。   As described above, in this embodiment, it is possible to operate / stop the power generation facility 12 and switch the switching switch 14 only by operating the transmitter 22. Further, the ventilation fan 20 can be operated / stopped in conjunction with this.

なお、上記の実施の形態では、発電設備12から住宅への電力供給を停止する場合の手順は、他の手順を適用することが可能である。例えば、送信機22から第3送受信機28及び第2送受信機26にそれぞれ停止信号を送信する。そして、第3送受信機が停止信号を受信した場合に、換気扇20を停止させる。また、第2送受信機26が停止信号を受信した場合に、上記の実施の形態ように、切替開閉器14を切替えると共に、第1送受信機24に第4の信号を送信して発電設備12を停止させるようにしてもよい。   In the above embodiment, other procedures can be applied to the procedure for stopping the power supply from the power generation facility 12 to the house. For example, a stop signal is transmitted from the transmitter 22 to the third transmitter / receiver 28 and the second transmitter / receiver 26, respectively. And when the 3rd transmitter / receiver receives a stop signal, the ventilation fan 20 is stopped. When the second transmitter / receiver 26 receives the stop signal, the switching switch 14 is switched and the fourth signal is transmitted to the first transmitter / receiver 24 to switch the power generation facility 12 as in the above embodiment. You may make it stop.

或いは、送信機22から第3送受信機28及び第2送受信機26にそれぞれ停止信号を送信する。そして、第3送受信機が停止信号を受信した場合に、換気扇20を停止させると共に、予め定めた第5の信号を送信する。また、第2送受信機24が停止信号を受信した場合に、切替開閉器14を切替える。そして、第1送受信機24が第5の信号を受信した場合に、発電設備12を停止させるようにしてもよい。   Alternatively, a stop signal is transmitted from the transmitter 22 to the third transmitter / receiver 28 and the second transmitter / receiver 26, respectively. And when a 3rd transmitter / receiver receives a stop signal, while ventilating fan 20 is stopped, a predetermined 5th signal is transmitted. In addition, when the second transceiver 24 receives the stop signal, the switching switch 14 is switched. Then, when the first transmitter / receiver 24 receives the fifth signal, the power generation facility 12 may be stopped.

或いは、送信機22から第2送受信機26に停止信号を送信する。そして、第2送受信機26が停止信号を受信した場合に、切替開閉器14を切替えると共に、上記の実施の形態と同様に第4の信号を送信する。そして、第1送受信機24が上記の実施の形態と同様に第4の信号を受信した場合に発電設備12を停止させる。また、第3送受信機28が第4の信号を受信した場合に換気扇20を停止させるようにしてもよい。   Alternatively, a stop signal is transmitted from the transmitter 22 to the second transceiver 26. When the second transmitter / receiver 26 receives the stop signal, the switching switch 14 is switched and the fourth signal is transmitted in the same manner as in the above embodiment. And when the 1st transmitter / receiver 24 receives a 4th signal similarly to said embodiment, the electric power generation installation 12 is stopped. Moreover, you may make it stop the ventilation fan 20 when the 3rd transmitter / receiver 28 receives a 4th signal.

また、上記の実施の形態では、送信機22及び第1〜第3送受信機24〜28を全て無線で行う例を説明したが、これに限るものではない。例えば、全て有線で行うようにしてもよいし、有線と無線を組み合わせて行うようにしてもよい。   In the above embodiment, the example in which the transmitter 22 and the first to third transceivers 24 to 28 are all performed wirelessly has been described. However, the present invention is not limited to this. For example, all may be performed in a wired manner, or may be performed in a combination of wired and wireless.

10 非常時給電システム
12 発電設備
14 切替開閉器
18 系統電源
20 換気扇
22 送信機
24 第1送受信機
25 蓄電用キャパシタ
26 第2送受信機
28 第3送受信機
DESCRIPTION OF SYMBOLS 10 Emergency power supply system 12 Power generation equipment 14 Switching switch 18 System power supply 20 Ventilation fan 22 Transmitter 24 1st transmitter / receiver 25 Storage capacitor 26 2nd transmitter / receiver 28 3rd transmitter / receiver

Claims (7)

外部からの指示により作動可能な発電設備と、
前記発電設備が設置された場所に設けられ、外部からの指示により作動可能な換気扇と、
外部からの指示により電力の供給元を系統電源又は前記発電設備に切替える切替部と、
前記発電設備の作動開始を指示する開始信号を送信する送信機と、
前記送信機から送信された前記開始信号を受信した場合に、前記発電設備を作動させると共に、予め定めた第1の信号を送信する第1送受信機と、
前記第1送受信機から送信された前記第1の信号を受信した場合に、電力の供給元が前記発電設備になるように前記切替部に指示すると共に、予め定めた第2の信号を送信する第2送受信機と、
前記第2送受信機から送信された前記第2の信号を受信した場合に、前記換気扇を作動させる第3送受信機と、
を備えた非常時給電システム。
Power generation equipment that can be operated by external instructions;
A ventilation fan which is provided at a place where the power generation facility is installed and is operable by an instruction from the outside;
A switching unit that switches a power supply source to a system power source or the power generation facility according to an instruction from the outside;
A transmitter for transmitting a start signal instructing operation start of the power generation facility;
A first transmitter / receiver that activates the power generation facility and transmits a predetermined first signal when the start signal transmitted from the transmitter is received;
When the first signal transmitted from the first transmitter / receiver is received, the power supply source is instructed to the power generation equipment and the switching unit is instructed and a predetermined second signal is transmitted. A second transceiver;
A third transceiver for operating the ventilation fan when receiving the second signal transmitted from the second transceiver;
Emergency power supply system with
前記送信機が、前記発電設備の作動停止を指示する停止信号を更に送信し、
前記第3送受信機が、前記送信機から送信された前記停止信号を受信した場合に、前記換気扇を停止させる共に、予め定めた第3の信号を更に送信し、
前記第2送受信機が、前記第3送受信機から送信された前記第3の信号を受信した場合に、電力の供給元が前記系統電源になるように前記切替部に指示すると共に、予め定めた第4の信号を更に送信し、
前記第1送受信機が、前記第2送受信機から送信された前記第4の信号を受信した場合に、前記発電設備を更に停止させる請求項1に記載の非常時給電システム。
The transmitter further transmits a stop signal instructing to stop the operation of the power generation facility;
When the third transmitter / receiver receives the stop signal transmitted from the transmitter, the third transmitter / receiver stops the ventilation fan and further transmits a predetermined third signal,
When the second transmitter / receiver receives the third signal transmitted from the third transmitter / receiver, the second transmitter / receiver instructs the switching unit so that the power supply source is the grid power source, and is determined in advance. Further transmit a fourth signal,
The emergency power feeding system according to claim 1, wherein when the first transceiver receives the fourth signal transmitted from the second transceiver, the power generation facility is further stopped.
前記送信機が、前記発電設備の作動停止を指示する停止信号を更に送信し、
前記第3送受信機が、前記送信機から送信された前記停止信号を受信した場合に、前記換気扇を停止させ、
前記第2送受信機が、前記送信機から送信された前記停止信号を受信した場合に、電力の供給元が前記系統電源になるように前記切替部に指示すると共に、予め定めた第4の信号を更に送信し、
前記第1送受信機が、前記第2送受信機から送信された前記第4の信号を受信した場合に、前記発電設備を更に停止させる請求項1に記載の非常時給電システム。
The transmitter further transmits a stop signal instructing to stop the operation of the power generation facility;
When the third transmitter / receiver receives the stop signal transmitted from the transmitter, it stops the ventilation fan,
When the second transmitter / receiver receives the stop signal transmitted from the transmitter, the second transmitter / receiver instructs the switching unit so that the power supply source is the system power supply, and a predetermined fourth signal Send more,
The emergency power feeding system according to claim 1, wherein when the first transceiver receives the fourth signal transmitted from the second transceiver, the power generation facility is further stopped.
前記送信機が、前記発電設備の作動停止を指示する停止信号を更に送信し、
前記第3送受信機が、前記送信機から送信された前記停止信号を受信した場合に、前記換気扇を停止させると共に、予め定めた第5の信号を更に送信し、
前記第2送受信機が、前記送信機から送信された前記停止信号を受信した場合に、電力の供給元が前記系統電源になるように前記切替部に指示し、
前記第1送受信機が、前記第3送受信機から送信された前記第5の信号を受信した場合に、前記発電設備を更に停止させる請求項1に記載の非常時給電システム。
The transmitter further transmits a stop signal instructing to stop the operation of the power generation facility;
When the third transmitter / receiver receives the stop signal transmitted from the transmitter, the third transmitter / receiver stops the ventilation fan and further transmits a predetermined fifth signal,
When the second transmitter / receiver receives the stop signal transmitted from the transmitter, it instructs the switching unit to supply power to the grid power source,
The emergency power feeding system according to claim 1, wherein when the first transceiver receives the fifth signal transmitted from the third transceiver, the power generation facility is further stopped.
前記送信機が、前記発電設備の作動停止を指示する停止信号を更に送信し、
前記第2送受信機が、前記送信機から送信された前記停止信号を受信した場合に、電力の供給元が前記系統電源になるように前記切替部に指示すると共に、予め定めた第4の信号を更に送信し、
前記第3送受信機が、前記第2送受信機から送信された前記第4の信号を受信した場合に、前記換気扇を停止させ、
前記第1送受信機が、前記第2送受信機から送信された前記第4の信号を受信した場合に、前記発電設備を更に停止させる請求項1に記載の非常時給電システム。
The transmitter further transmits a stop signal instructing to stop the operation of the power generation facility;
When the second transmitter / receiver receives the stop signal transmitted from the transmitter, the second transmitter / receiver instructs the switching unit so that the power supply source is the system power supply, and a predetermined fourth signal Send more,
When the third transmitter / receiver receives the fourth signal transmitted from the second transmitter / receiver, the third fan is stopped,
The emergency power feeding system according to claim 1, wherein when the first transceiver receives the fourth signal transmitted from the second transceiver, the power generation facility is further stopped.
前記送信機は、電池レスで前記作動開始の指示を行う電池レスリモコンからなり、
前記第1送受信機は、前記系統電源または前記発電設備の電力を蓄電する蓄電部を備えると共に、前記蓄電部の電力を用いて前記発電設備を作動させると共に、前記第1の信号を送信する請求項1〜5の何れか1項に記載の非常時給電システム。
The transmitter consists of a battery-less remote control that gives instructions to start the operation without a battery,
The first transceiver includes a power storage unit that stores the power of the system power supply or the power generation facility, operates the power generation facility using the power of the power storage unit, and transmits the first signal. Item 6. The emergency power feeding system according to any one of Items 1 to 5.
前記第1送受信機、前記第2送受信機、及び前記第3送受信機は、無線信号を送受信する請求項1〜6の何れか1項に記載の非常時給電システム。   The emergency power feeding system according to any one of claims 1 to 6, wherein the first transceiver, the second transceiver, and the third transceiver transmit and receive radio signals.
JP2014110323A 2014-05-28 2014-05-28 Emergency power supply system Active JP6230485B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014110323A JP6230485B2 (en) 2014-05-28 2014-05-28 Emergency power supply system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014110323A JP6230485B2 (en) 2014-05-28 2014-05-28 Emergency power supply system

Publications (2)

Publication Number Publication Date
JP2015226390A JP2015226390A (en) 2015-12-14
JP6230485B2 true JP6230485B2 (en) 2017-11-15

Family

ID=54842830

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014110323A Active JP6230485B2 (en) 2014-05-28 2014-05-28 Emergency power supply system

Country Status (1)

Country Link
JP (1) JP6230485B2 (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3285497B2 (en) * 1996-08-06 2002-05-27 ダイハツディーゼル株式会社 Gas turbine room ventilation system
JP4329972B2 (en) * 2000-08-09 2009-09-09 本田技研工業株式会社 Remote control system for engine generator
JP4974238B2 (en) * 2007-12-04 2012-07-11 トヨタ自動車株式会社 building
US20120016546A1 (en) * 2010-07-14 2012-01-19 Nilssen Ole K System and Method for Supplying Back-Up Electric Power to a House from a Hybrid Vehicle
JP5853931B2 (en) * 2012-10-29 2016-02-09 トヨタ自動車株式会社 Energy management device

Also Published As

Publication number Publication date
JP2015226390A (en) 2015-12-14

Similar Documents

Publication Publication Date Title
US10254747B2 (en) Device cooperation control system, device control apparatus, device, method for controlling devices of device cooperation control system, and program thereof
EP3141833B1 (en) Air conditioner connection system
JP6129368B2 (en) Electric energy supply device having data bridge function and wireless lighting control system
CN104076784A (en) Intelligent home control system for finding remote control
JP2014150339A (en) Household electrical appliance controller
JP6230485B2 (en) Emergency power supply system
CN101706991A (en) Control system of general remote controller for controlling virtual key via non-man-machine interface
CN104076787A (en) Household appliance intelligent control system with remote-control unit finding function
CN103607140A (en) Motor control apparatus
KR20200125861A (en) Lighting control device using non-power switch
CN202904844U (en) Long-distance wireless sensing remote control system
EP3209026B1 (en) Control processing method, electric device, and control processing program
JP2013013287A (en) Electric power supply device, electric power management method, and electric power management program
US20180048180A1 (en) Standby control circuit and operating method thereof, playing apparatus
KR20190140518A (en) Control system to integrate home appliance controlled by infrared remote control with internet-of-things and control method therefor
JP2016046845A (en) Power supply system and power supply method
JP2005143072A (en) Remote control system of electrical equipment
TWI706690B (en) Single live wire intelligent voice-controlled wall switch system
JP2020087896A (en) Wireless power transmission lighting device
JP2010226269A (en) Monitor control system
JP2008306354A (en) Electronic apparatus with remote control device
JP6580929B2 (en) Electric motor control system
KR101400016B1 (en) Emergency shut down system and method for the same
JP2020087752A (en) Illumination system
US20190204795A1 (en) Communication System for Power Outlet Control Devices

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20161209

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20161209

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20161209

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170913

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20171003

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20171017

R150 Certificate of patent or registration of utility model

Ref document number: 6230485

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250