JP6124055B2 - Power measurement system - Google Patents

Power measurement system Download PDF

Info

Publication number
JP6124055B2
JP6124055B2 JP2013025172A JP2013025172A JP6124055B2 JP 6124055 B2 JP6124055 B2 JP 6124055B2 JP 2013025172 A JP2013025172 A JP 2013025172A JP 2013025172 A JP2013025172 A JP 2013025172A JP 6124055 B2 JP6124055 B2 JP 6124055B2
Authority
JP
Japan
Prior art keywords
circuit
current transformer
power
attached
current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013025172A
Other languages
Japanese (ja)
Other versions
JP2014153292A (en
Inventor
英司 岩見
英司 岩見
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Intellectual Property Management Co Ltd
Original Assignee
Panasonic Intellectual Property Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panasonic Intellectual Property Management Co Ltd filed Critical Panasonic Intellectual Property Management Co Ltd
Priority to JP2013025172A priority Critical patent/JP6124055B2/en
Publication of JP2014153292A publication Critical patent/JP2014153292A/en
Application granted granted Critical
Publication of JP6124055B2 publication Critical patent/JP6124055B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Description

本発明は、変流器(CT:Current Transformer)を用いて分電盤内などにおける回路の電力を計測する電力計測システムに関する。   The present invention relates to a power measurement system that measures the power of a circuit in a distribution board or the like using a current transformer (CT).

従来より、住宅内やビルディングなどの施設に設けられた分電盤内における回路の電力を計測する際、測定範囲拡大のために変流器が用いられる。一般的に、この変流器の受け側回路には電力計測器が接続され、この電力計測器は、変流器と接続される回路に負担抵抗を挿入して、この負担抵抗の両端の電圧を検出することで電流値を計測して電力演算を行う。   Conventionally, when measuring the power of a circuit in a distribution board provided in a facility such as a house or a building, a current transformer is used to expand the measurement range. Generally, a power measuring instrument is connected to the receiving circuit of this current transformer, and this power measuring instrument inserts a burden resistor into the circuit connected to the current transformer, and the voltage across this burden resistor. By detecting the current value, the current value is measured to calculate the power.

分電盤内における回路の電力計測には、従来、大きな電流が流れる主幹回路のみを計測する場合が殆どであったが、近年の消費電力の「見える化」の実現などのため、主幹回路から分岐された分電盤内の末端回路である複数の分岐回路の電力も計測する必要がある。この分岐回路には、主幹回路からの電流が分流されているため、例えば数十A程度の電流が流れる。電力の「見える化」では、分電盤内の分岐回路ごとの電力の情報を、LAN経由でモニタを備えた監視装置(パソコン)などに表示することができる。   In the past, most of the power measurement of the circuit in the distribution panel has been to measure only the main circuit through which a large current flows. However, in order to realize “visualization” of power consumption in recent years, It is also necessary to measure the power of a plurality of branch circuits that are terminal circuits in the branched distribution board. In this branch circuit, a current of about several tens of A flows, for example, because the current from the main circuit is shunted. In the “visualization” of power, information on power for each branch circuit in the distribution board can be displayed on a monitoring device (personal computer) equipped with a monitor via a LAN.

分岐回路の電流計測においては、従来より使用されている比較的大型の変流器ではなく、出力電流が数十mA程度である小型の変流器(小型CT)が用いられる。この小型CTでは鉄心コアや巻き線を小型化することができる。それゆえ、小型CTは、分電盤内の比較的電流の低い分岐回路等の電流計測用として、従来の変流器では形状の制約上用いることができない箇所に用いることが可能となる。このように、分電盤内の設置スペースに応じて、種類の異なる変流器を使い分ける必要がある。   In the current measurement of the branch circuit, a small current transformer (small CT) having an output current of about several tens of mA is used instead of a comparatively large current transformer used conventionally. In this small CT, the iron core and the winding can be miniaturized. Therefore, the small CT can be used for current measurement of a branch circuit or the like having a relatively low current in the distribution board at a place where the conventional current transformer cannot be used due to shape restrictions. Thus, it is necessary to use different types of current transformers according to the installation space in the distribution board.

ところで、変流器の器体の一面に、コネクタに設けられた押釦の押操作に応じて発光する発光部を設けて、変流器と電力計測器に接続されるコネクタとの対応関係を目視で確認し、誤接続の防止を図る電力計測ユニットが開示されている(例えば、特許文献1参照)。また、絶対値変換手段により変流器の結合方向が任意でも常に正しい電力を求めることを可能とした三相電力測定器、及び三相電力電力量計並びにその結線状態判別方法も開示されている(例えば、特許文献2参照)。   By the way, a light emitting unit that emits light in response to a push operation of a push button provided on the connector is provided on one surface of the current transformer body, and the correspondence between the current transformer and the connector connected to the power meter is visually checked. The electric power measurement unit which confirms by this and aims at prevention of a misconnection is disclosed (for example, refer patent document 1). Also disclosed are a three-phase power measuring device, a three-phase power watt-hour meter, and a method for determining the connection state thereof, which can always obtain the correct power even if the coupling direction of the current transformer is arbitrary by the absolute value conversion means. (For example, refer to Patent Document 2).

特開2011−33462号公報JP 2011-33462 A 特開2001−124806号公報JP 2001-124806 A

しかしながら、上述したような電力の「見える化」を図るために、分電盤内の複数の分岐回路それぞれに複数(例えば40個)の小型CTが取り付けられる場合、計測回路数が非常に多くなり、回路設定や変流器の取り付けなどの施工が非常に複雑になる。その結果、変流器の取り付け位置の誤りや変流器の取付け方向の誤りなどが発生することが想定される。   However, in order to “visualize” the power as described above, when a plurality of (for example, 40) small CTs are attached to each of a plurality of branch circuits in the distribution board, the number of measurement circuits becomes very large. Construction such as circuit setting and current transformer installation becomes very complicated. As a result, it is assumed that an error in the mounting position of the current transformer or an error in the mounting direction of the current transformer occurs.

そして、一般的に、分電盤の施工完了時に行われるテストでは、全ての分岐回路に接続された照明器具や空調機器などの負荷に電流を流し、計測される全ての電力値の正誤判定が行われることはない。このため、変流器を誤って取り付けていた場合でも、ユーザが負荷を実際に使用する段階になって初めて電力表示に不具合が現れることが想定される。例えば、変流器の回路への取り付け方向が逆向きの場合、監視装置(パソコンなど)の表示画面には、負荷の使用中にも関わらず「現在の使用電力:−100W」などと表示され、ユーザがその表示されている使用電力に違和感を持つこととなる。   And generally, in the test performed at the completion of construction of the distribution board, current is passed through loads such as lighting equipment and air conditioners connected to all branch circuits, and correctness determination of all measured power values is made. Never done. For this reason, even if the current transformer is attached by mistake, it is assumed that a failure appears in the power display only when the user actually uses the load. For example, when the current transformer is attached to the circuit in the reverse direction, “Current power consumption: −100 W” is displayed on the display screen of the monitoring device (such as a personal computer) even when the load is being used. The user will feel uncomfortable with the displayed power consumption.

本発明は、上記課題に鑑みてなされたものであり、分電盤内などの回路への変流器の取り付けの誤りを判別可能とし、監視装置などに誤って表示される電力値に対してユーザが違和感を持つことがないようにした電力計測システムを提供することを目的とする。   The present invention has been made in view of the above-described problems, and enables determination of an error in attaching a current transformer to a circuit such as a distribution board, and the power value erroneously displayed on a monitoring device or the like. It is an object of the present invention to provide an electric power measurement system that prevents a user from feeling uncomfortable.

上記目的を達成するために本発明は、回路から電圧の信号を検出する電圧検出部と、前記回路に取り付けられた変流器からの出力に基づいて電流の信号を検出する電流検出部と、前記電圧検出部及び電流検出部で検出される電圧及び電流の各信号に基づいて前記回路の電力値を演算する電力演算部と、前記電力演算部の演算に基づく結果を表示する表示部と、を備える電力計測システムにおいて、前記電力演算部で演算され、複数回路中における一の変流器が取り付けられた回路の電力値と、複数回路中における他の変流器が取り付けられた回路の電力値とに基づいて、当該一の変流器と当該他の変流器とが同一回路を測定していることを判定する判定部を備え、前記判定部は、前記一の変流器が取り付けられた回路の平均電力値又は積算電力値と、前記他の変流器が取り付けられた回路の平均電力値又は積算電力値との差分が所定範囲内であり、且つ当該所定範囲内となることが所定割合以上となる場合において、同一回路を測定していると判定するものである。 In order to achieve the above object, the present invention provides a voltage detection unit that detects a voltage signal from a circuit, a current detection unit that detects a current signal based on an output from a current transformer attached to the circuit, A power calculator that calculates the power value of the circuit based on the voltage and current signals detected by the voltage detector and the current detector; and a display that displays a result based on the calculation of the power calculator; In a power measurement system comprising: a power value of a circuit that is calculated by the power calculation unit and in which one current transformer in a plurality of circuits is attached; and a power in a circuit to which another current transformer is attached in the plurality of circuits And a determination unit that determines that the one current transformer and the other current transformer are measuring the same circuit based on the value, and the determination unit is attached to the one current transformer. Average power value or integrated power The difference between the value and the average power value or integrated power value of the circuit to which the other current transformer is attached is within the predetermined range, and the same is true when the predetermined range is equal to or greater than the predetermined ratio. It is determined that the circuit is being measured.

また、本発明は、回路から電圧の信号を検出する電圧検出部と、前記回路に取り付けられた変流器からの出力に基づいて電流の信号を検出する電流検出部と、前記電圧検出部及び電流検出部で検出される電圧及び電流の各信号に基づいて前記回路の電力値を演算する電力演算部と、前記電力演算部の演算に基づく結果を表示する表示部と、を備える電力計測システムにおいて、前記電力演算部で演算され、複数回路中における一の変流器が取り付けられた回路の電力値と、複数回路中における他の変流器が取り付けられた回路の電力値とに基づいて、当該一の変流器と当該他の変流器とが同一回路を測定していることを判定する判定部を備え、前記判定部は、前記一の変流器が取り付けられた回路の平均電力値又は積算電力値を、時間軸を軸として反転させた値と、前記他の変流器が取り付けられた回路の平均電力値又は積算電力値との差分が所定範囲内であり、且つ当該所定範囲内となることが所定割合以上となる場合において、同一回路を測定していると判定するものであってもよい。 The present invention also provides a voltage detection unit that detects a voltage signal from a circuit, a current detection unit that detects a current signal based on an output from a current transformer attached to the circuit, the voltage detection unit, A power measurement system comprising: a power calculation unit that calculates a power value of the circuit based on voltage and current signals detected by the current detection unit; and a display unit that displays a result based on the calculation of the power calculation unit. In the above, based on the power value of the circuit to which one current transformer in the plurality of circuits is attached and the power value of the circuit to which the other current transformer in the plurality of circuits is attached. , Including a determination unit that determines that the one current transformer and the other current transformer are measuring the same circuit, and the determination unit is an average of a circuit to which the one current transformer is attached. The power value or integrated power value is displayed on the time axis. The difference between the inverted value and the average power value or integrated power value of the circuit to which the other current transformer is attached is within a predetermined range, and the predetermined range or more is within the predetermined range. In this case, it may be determined that the same circuit is being measured .

この電力計測システムにおいて、前記差分が所定範囲内とは、回路に取り付けられる変流器の確度の2倍以内の範囲であることが好ましい。   In this power measurement system, it is preferable that the difference within a predetermined range is a range within twice the accuracy of the current transformer attached to the circuit.

この電力計測システムにおいて、前記表示部は、前記判定部において検出した判定結果、及び当該判定結果に基づく対応の少なくとも一方をさらに表示することが好ましい。   In this power measurement system, it is preferable that the display unit further displays at least one of a determination result detected by the determination unit and a correspondence based on the determination result.

この電力計測システムにおいて、前記判定部における検出結果、及び当該判定結果に基づく対応の少なくとも一方を発報する発報部をさらに備えることが好ましい。   In this power measurement system, it is preferable to further include a reporting unit that reports at least one of the detection result in the determination unit and the correspondence based on the determination result.

この電力計測システムにおいて、前記表示部に表示される複数回路中における一の変流器が取り付けられた回路の名称と、他の変流器が取り付けられた回路の名称とが同一又は類似となることを検出する名称検出部をさらに備え、前記同一又は類似となる場合には、前記表示部に名称の再設定を促す表示を行うことが好ましい。   In this power measurement system, the name of the circuit to which one current transformer is attached in the plurality of circuits displayed on the display unit is the same as or similar to the name of the circuit to which another current transformer is attached. It is preferable to further include a name detection unit for detecting this, and in the case where the name is the same or similar, it is preferable to perform a display for prompting the user to reset the name on the display unit.

本発明に係る電力計測システムによれば、変流器が取り付けられた回路の電力値に基づいて、一の変流器と他の変流器とが同一回路を測定していることを判定する。このため、本発明では、回路への変流器の取り付けの誤りを判別可能とし、監視装置などに誤って表示される電力値に対してユーザが違和感を持つことを低減できる。   According to the power measurement system of the present invention, based on the power value of the circuit to which the current transformer is attached, it is determined that one current transformer and another current transformer are measuring the same circuit. . For this reason, in the present invention, it is possible to determine an error in attaching the current transformer to the circuit, and it is possible to reduce the user's uncomfortable feeling with respect to the power value erroneously displayed on the monitoring device or the like.

本発明の実施の形態1に係る電力計測システムの全体構成図である。1 is an overall configuration diagram of a power measurement system according to Embodiment 1 of the present invention. 同上電力計測システムに備わる電力計測器及び監視装置の機能ブロック図である。It is a functional block diagram of the electric power measuring device and monitoring apparatus with which an electric power measurement system same as the above is provided. (a)〜(c)同上監視装置に備わる判定演算部の判定アルゴリズムを説明するための図である。(A)-(c) It is a figure for demonstrating the determination algorithm of the determination calculating part with which a monitoring apparatus same as the above is equipped. 同上監視装置に備わる表示部への表示の一例を示す図である。It is a figure which shows an example of the display to the display part with which a monitoring apparatus same as the above is equipped. 前記実施の形態1の変形例1に係る電力計測システムの全体構成図である。It is a whole block diagram of the electric power measurement system which concerns on the modification 1 of the said Embodiment 1. FIG. 同上監視装置に備わる判定演算部の判定アルゴリズムを説明するための図である。It is a figure for demonstrating the determination algorithm of the determination calculating part with which a monitoring apparatus same as the above is provided. (a)本発明の実施の形態2に係る電力計測システムに備わる表示部の表示の一例を示す図、(b)同上電力計測システムの動作手順を示すフローチャートである。(A) The figure which shows an example of the display of the display part with which the electric power measurement system which concerns on Embodiment 2 of this invention is equipped, (b) It is a flowchart which shows the operation | movement procedure of an electric power measurement system same as the above. 同上電力計測システムに備わる電力計測器及び監視装置の機能ブロック図である。It is a functional block diagram of the electric power measuring device and monitoring apparatus with which an electric power measurement system same as the above is provided. 本発明の参考例に係る電力計測システムの全体構成図である。1 is an overall configuration diagram of a power measurement system according to a reference example of the present invention. 同上電力計測システムに備わる表示部の表示の一例を示す図である。It is a figure which shows an example of the display of the display part with which an electric power measurement system same as the above is provided.

(実施の形態1)
本発明の実施の形態1に係る電力計測システムについて図面を参照して説明する。図1に示すように、電力計測システムSは、分電盤1、変流器2、電力計測器3、監視装置4、負荷5、及びブレーカ6a〜6cを備える。この電力計測システムSは、例えば一般住宅内やオフィスビル内において、分電盤1から電力供給を受ける照明器具やパソコンなどの様々な負荷5の消費電力を監視して、電力の「見える化」を実現している。
(Embodiment 1)
A power measurement system according to Embodiment 1 of the present invention will be described with reference to the drawings. As shown in FIG. 1, the power measurement system S includes a distribution board 1, a current transformer 2, a power meter 3, a monitoring device 4, a load 5, and breakers 6 a to 6 c. This power measurement system S monitors the power consumption of various loads 5 such as lighting equipment and personal computers that receive power supply from the distribution board 1 in, for example, ordinary houses and office buildings, and “visualizes” the power. Is realized.

分電盤1は、外部からビル内や宅内に供給される商用電源を、単相3線式などの電線7を介して一次側に受ける主幹回路と、主幹回路の2次側から分岐した電路に介装される複数の分岐回路とを備える。各分岐回路には照明器具やパソコンのほか、空調機器やIH機器などの様々な負荷5が接続される。また、ブレーカ6aは、主幹回路の電線7に接続された主幹ブレーカであり、ブレーカ6bは、主幹回路から分岐した複数の分岐回路に配設された分岐ブレーカである。   The distribution board 1 includes a main circuit that receives commercial power supplied from outside to the building or house via a single-phase three-wire type electric wire 7 and a main circuit that branches from the secondary side of the main circuit. And a plurality of branch circuits intervening. Each branch circuit is connected to various loads 5 such as an air conditioner and an IH device in addition to a lighting fixture and a personal computer. Moreover, the breaker 6a is a main breaker connected to the electric wire 7 of the main circuit, and the breaker 6b is a branch breaker disposed in a plurality of branch circuits branched from the main circuit.

変流器2は、各回路の電流を一定の割合で小さくして専用ケーブルである信号線8を介して電力計測器3に供給する。本実施の形態1において、変流器2は、比較的小さな電流の流れる各分岐回路を流れる分岐電流を分岐回路毎に定期的に計測するために設置され、分岐回路の電線の所定位置に取り付けられ、電力計測器3と信号線8にて接続される。なお、変流器2は、分岐回路の電線7に開口式などで簡単に取り付けられ、信号線8として専用ケーブルを用いることで誤結線を未然に防止する。   The current transformer 2 reduces the current of each circuit at a constant rate and supplies the current to the power meter 3 via the signal line 8 which is a dedicated cable. In the first embodiment, the current transformer 2 is installed to periodically measure the branch current flowing through each branch circuit through which a relatively small current flows for each branch circuit, and is attached to a predetermined position of the electric wire of the branch circuit. And connected to the power meter 3 by the signal line 8. The current transformer 2 is simply attached to the branch circuit electric wire 7 by an open type or the like, and by using a dedicated cable as the signal line 8, erroneous connection is prevented in advance.

電力計測器3は、変流器2と接続され、これら変流器2と接続される回路に挿入する負担抵抗を備え、変流器2が設置された回路の電力を計測する。電力計測器3は、通信線を介して監視装置4に電力演算結果を出力する。この電力計測器3は、例えば分電盤1内の所定箇所に設置されている。   The power measuring instrument 3 is connected to the current transformer 2 and includes a burden resistor inserted into a circuit connected to the current transformer 2, and measures the power of the circuit in which the current transformer 2 is installed. The power meter 3 outputs the power calculation result to the monitoring device 4 via the communication line. The power measuring instrument 3 is installed at a predetermined location in the distribution board 1, for example.

監視装置4は、モニタを有する専用のパソコンなどであり、各分岐回路の電力情報を管理し表示する監視ユニットである。監視装置4は、電力計測器3とRS−485通信などでネットワーク接続され、各負荷5の電力使用に関するデータ収集を行い、データ解析のためグラフなどの表示を行う。また、本実施の形態1において、監視装置4は、変流器2の取り付けの誤りを検出をする機能も有している。そして、監視装置4は、例えば一時間ごとや一日ごとの電力使用に関するデータを自動記録し、電力計測器3と接続されたネットワーク経由によるエネルギーの一括管理を行い、効率のよい電力使用量の「見える化」を実現する。   The monitoring device 4 is a dedicated personal computer or the like having a monitor, and is a monitoring unit that manages and displays power information of each branch circuit. The monitoring device 4 is connected to the power meter 3 via RS-485 communication or the like, collects data related to the power usage of each load 5, and displays a graph or the like for data analysis. In the first embodiment, the monitoring device 4 also has a function of detecting an installation error of the current transformer 2. Then, the monitoring device 4 automatically records, for example, data relating to power usage every hour or every day, performs collective management of energy via a network connected to the power meter 3, and allows efficient power consumption. Realize “visualization”.

負荷5は、分岐回路に接続された照明器具やパソコンのほか、空調機器やIH機器などの様々な電気機器である。   The load 5 is various electric devices such as an air conditioner and an IH device, in addition to a lighting device and a personal computer connected to the branch circuit.

次に、本実施の形態1に係る電力計測システムSに備わる電力計測器3の機能構成に関して図2を参照して説明する。電力計測器3は、変流器2の信号から電流を検出する電流検出部31、回路の電圧の信号を検出する電圧検出部32、及び電流検出部31における電流及び電圧検出部32における電圧の各信号に基づいて電力演算する電力演算部33を備える。   Next, the functional configuration of the power meter 3 provided in the power measurement system S according to the first embodiment will be described with reference to FIG. The power meter 3 includes a current detection unit 31 that detects a current from a signal from the current transformer 2, a voltage detection unit 32 that detects a voltage signal of the circuit, and a current in the current detection unit 31 and a voltage in the voltage detection unit 32. A power calculation unit 33 that calculates power based on each signal is provided.

電流検出部31は、変流器2と接続される回路に挿入された負担抵抗や、所定周波数帯の信号を通過させるフィルタを通過した電流信号に所定値を加算する加算回路などを備える。電圧検出部32は、ブレーカ6cなどを介して電線7と端子で接続され、電圧降圧回路、所定周波数帯の電圧信号を通過させるフィルタを通過した信号に対して電圧波形が例えば0〜5Vの範囲となるように適切なバイアスをかける加算回路などを備えている。   The current detection unit 31 includes a burden resistor inserted in a circuit connected to the current transformer 2, an addition circuit that adds a predetermined value to a current signal that has passed through a filter that passes a signal in a predetermined frequency band, and the like. The voltage detection unit 32 is connected to the electric wire 7 via a breaker 6c or the like at a terminal, and a voltage waveform ranges from 0 to 5 V, for example, with respect to a signal that has passed through a voltage step-down circuit and a filter that passes a voltage signal in a predetermined frequency band An adder circuit that applies an appropriate bias is provided.

電力演算部33は、電流検出部31で計測された電流、及び電圧検出部32で検出される電圧に基づいて、変流器2が取付けられた電線7に接続された負荷5に供給される積算電力量や平均電力値などを演算するマイコンである。この電力演算部33は、A/D変換部331,332、乗算部333、及び伝送回路部334を備える。   The power calculation unit 33 is supplied to the load 5 connected to the electric wire 7 to which the current transformer 2 is attached based on the current measured by the current detection unit 31 and the voltage detected by the voltage detection unit 32. It is a microcomputer that calculates the integrated power amount and average power value. The power calculation unit 33 includes A / D conversion units 331 and 332, a multiplication unit 333, and a transmission circuit unit 334.

A/D変換部331は、電圧検出部32から受信するアナログ信号をデジタル信号に変換する。A/D変換部332は、電流検出部31から受信するアナログ信号をデジタル信号に変換する。乗算部333は、A/D変換部331及び332から出力される信号を乗算する回路であり、すなわち電力を算出する。伝送回路部334は、例えば、RS485などに準拠した2線式シリアル通信回路を有し、接続される通信線を介して相互に通信可能な監視装置4に電力演算値を送信する。   The A / D converter 331 converts the analog signal received from the voltage detector 32 into a digital signal. The A / D converter 332 converts the analog signal received from the current detector 31 into a digital signal. The multiplier 333 is a circuit that multiplies the signals output from the A / D converters 331 and 332, that is, calculates power. The transmission circuit unit 334 includes, for example, a two-wire serial communication circuit compliant with RS485 and transmits a power calculation value to the monitoring device 4 that can communicate with each other via a connected communication line.

次に、本実施の形態1に係る電力計測システムSに備わる監視装置4の機能構成に関して図2を参照して説明する。監視装置4は、判定演算部41、電力値や電力使用量など電力に関する各種データを表示する表示部42、及び発報部43を備えている。   Next, the functional configuration of the monitoring device 4 provided in the power measurement system S according to the first embodiment will be described with reference to FIG. The monitoring device 4 includes a determination calculation unit 41, a display unit 42 that displays various data related to power such as a power value and a power usage amount, and a notification unit 43.

判定演算部41は、電力計測器3から受信する電力演算値に基づいて各変流器2の取り付けの不具合を演算処理に基づいて判定するものであり、当該演算処理は監視装置4に予めインストールされる専用プログラムの機能において実現される。なお、本実施の形態1において、判定演算部41は、図1に示す変流器2A,2Bのように、一の変流器2Aが測定する回路と他の変流器2Bが測定する回路とが同一回路を測定している場合を想定している。   The determination calculation unit 41 determines a mounting failure of each current transformer 2 based on a calculation process based on a power calculation value received from the power meter 3, and the calculation process is installed in the monitoring device 4 in advance. It is realized in the function of the dedicated program. In the first embodiment, the determination calculation unit 41 is configured such that a circuit measured by one current transformer 2A and a circuit measured by another current transformer 2B, such as the current transformers 2A and 2B shown in FIG. Are measuring the same circuit.

具体的には、判定演算部41は、電力演算部33で演算され、複数回路中における一の変流器2Aが取り付けられた回路の平均電力値又は積算電力値と、他の変流器2Bが取り付けられた回路の平均電力値又は積算電力値との差分が所定範囲内か判定する。そして、判定演算部41は、当該差分が所定範囲となる割合が所定割合以上となる場合において、同一回路を測定していると判定するアルゴリズムを用いる。   Specifically, the determination calculation unit 41 is calculated by the power calculation unit 33, and an average power value or an integrated power value of a circuit to which one current transformer 2A in a plurality of circuits is attached, and another current transformer 2B. It is determined whether the difference between the average power value or the integrated power value of the circuit to which the is attached is within a predetermined range. And the determination calculating part 41 uses the algorithm which determines with measuring the same circuit, when the ratio from which the said difference becomes a predetermined range becomes more than a predetermined ratio.

ここで、差分が所定範囲とは、例えば回路に取り付けられた変流器2の確度誤差(仕様上の誤差の最大値)の2倍以内の範囲である。これは、複数の変流器2が同一対象の負荷5/電源の電線7に取り付けられた場合、電力計測器3の演算結果である電力値の誤差は、変流器2の確度誤差の2倍以上は異ならないということに基づくものである。例えば、図3(a)に示すように、確度誤差2.5%の変流器2A,2Bを用いた場合、同一回路を測定した時の変流器2A,2Bの違いによる電力値の誤差は高々5%以内の範囲に収まることとなる。   Here, the difference is within a predetermined range, for example, a range within twice the accuracy error of the current transformer 2 attached to the circuit (maximum error in specification). This is because when a plurality of current transformers 2 are attached to the load 5 / power source wire 7 of the same target, the error of the power value as the calculation result of the power measuring instrument 3 is 2 of the accuracy error of the current transformer 2. It is based on the fact that more than double is not different. For example, as shown in FIG. 3A, when current transformers 2A and 2B with an accuracy error of 2.5% are used, an error in power value due to the difference between current transformers 2A and 2B when the same circuit is measured. Will fall within a range of no more than 5%.

次に、判定演算部41の演算アルゴリズムに関して図3(b),(c)を参照して説明する。図3(b)は変流器2Aが取り付けられた回路の電力値の推移、図3(b)は変流器2Bが取り付けられた回路の電力値の推移を示している。判定演算部41は、所定のサンプリング周期(例えば1秒毎)ごとに電力値f(t)、f(t)を取得する。次に、判定演算部41は、例えば、下記の式(1)に基づいて同時点でのf(t)及びf(t)の差分が変流器2A,2Bの確度誤差の2倍以内(例えば5%以内)となるか否かを判定する。
{(f(t)−f(t))/f(t)}×100≦5(%)・・・(1)
Next, the calculation algorithm of the determination calculation unit 41 will be described with reference to FIGS. FIG. 3B shows the transition of the power value of the circuit to which the current transformer 2A is attached, and FIG. 3B shows the transition of the power value of the circuit to which the current transformer 2B is attached. The determination calculation unit 41 acquires power values f 1 (t) and f 2 (t) every predetermined sampling period (for example, every second). Next, the determination calculation unit 41 determines that the difference between f 1 (t) and f 2 (t) at the same point is twice the accuracy error of the current transformers 2A and 2B based on the following equation (1), for example. It is determined whether it is within (for example, within 5%).
{(F 2 (t) −f 1 (t)) / f 1 (t)} × 100 ≦ 5 (%) (1)

判定演算部41は、この演算を所定期間(例えば1日)に亘って継続し、(I)差分の9割以上が5%以内となる場合や、(II)差分の平均値が5%以内となる場合には、変流器2A,2Bは同一回路を計測している不具合状態であると判定する。   The determination calculation unit 41 continues this calculation for a predetermined period (for example, one day). (I) When 90% or more of the differences are within 5%, or (II) The average value of the differences is within 5% In this case, it is determined that the current transformers 2A and 2B are in a trouble state in which the same circuit is measured.

また、判定演算部41は、変流器2を用いて電力計測する回路総数がN個の場合に、最初に、回路1と回路2〜Nの全てとを比較判定し、次に回路2と回路3〜Nとを比較、次に回路3と回路4〜N、,,最後に回路(N−1)と回路Nとを比較判定する。そして、判定演算部41が全ての回路の比較判定が終了すると、全回路ともに同一回路を測定していない正常な接続状態、又は同一回路を測定している不具合が発生している状態かを判定できる。   When the total number of circuits for measuring power using the current transformer 2 is N, the determination calculation unit 41 first compares and determines the circuit 1 and all the circuits 2 to N, and then the circuit 2 The circuits 3 to N are compared, then the circuit 3 and the circuits 4 to N, and finally the circuit (N-1) and the circuit N are compared and determined. Then, when the comparison calculation unit 41 finishes comparing and determining all the circuits, it is determined whether all the circuits are in a normal connection state where the same circuit is not measured or a failure occurs in which the same circuit is measured. it can.

表示部42は、監視装置4であるパソコンの液晶モニタなどで実現され、図4に示すように、各回路の名称、各回路の平均電力(W)、積算電力(Wh)などが表示される。また、判定演算部41において検出した判定結果、及び当該判定結果に基づく対応などが表示される。判定結果としては、例えば「回路2と回路3とは同一回路(同一負荷)を測定している可能性があります」と表示する。その他、判定結果としては、例えば「回路1と回路2が同一回路を対象にしています虞があります」、「回路1と回路2における変流器の接続状態を確認してください」、「サポートセンターの連絡先は***−****です。お手数ですがご連絡お願いします」などと表示される。このように、ユーザがとり得るべき対応が監視装置4の表示部42に明示されるため、ユーザが感じる違和感をより低減できる。   The display unit 42 is realized by a liquid crystal monitor of a personal computer which is the monitoring device 4, and displays the name of each circuit, the average power (W) of each circuit, the integrated power (Wh), etc., as shown in FIG. . Moreover, the determination result detected in the determination calculating part 41, the response | compatibility based on the said determination result, etc. are displayed. As the determination result, for example, “Circuit 2 and circuit 3 may be measuring the same circuit (same load)” is displayed. Other judgment results include, for example, “Circuit 1 and Circuit 2 may be targeted for the same circuit”, “Check the connection status of current transformers in Circuit 1 and Circuit 2”, “Support Center” The contact information for *** is ***-****. Please contact us. " In this way, the correspondence that the user should be able to take is clearly indicated on the display unit 42 of the monitoring device 4, so that it is possible to further reduce the sense of discomfort felt by the user.

発報部43は、判定演算部41が検出した判定結果や、判定結果に基づく対応を表す旨の内容を発声・音で発報する。発報内容としては、例えば「回路2と回路3とは同一回路(同一負荷)を測定している可能性があります」と発報する。このため、ユーザがとり得るべき対応が監視装置4の発声・音で発報されるため、より幅広いユーザを対象にできる。   The alerting | reporting part 43 alert | reports the content which represents the determination result which the determination calculating part 41 detected, and the response | compatibility based on a determination result by utterance and a sound. For example, “Circuit 2 and circuit 3 may be measuring the same circuit (same load)” is issued. For this reason, since the correspondence that the user should be able to take is reported by the utterance / sound of the monitoring device 4, a wider range of users can be targeted.

以上のように、本実施の形態1に係る電力計測システムSにおいては、判定演算部41が所定の演算アルゴリズムに基づいて変流器2の取り付けの誤りを判定でき、変流器2の取り付け状態に不具合があることを視認や検査をすることなく自動的に検出できる。   As described above, in the power measurement system S according to the first embodiment, the determination calculation unit 41 can determine an attachment error of the current transformer 2 based on a predetermined calculation algorithm, and the attachment state of the current transformer 2 It is possible to automatically detect that there is a defect without visual inspection or inspection.

また、表示部42にその判定結果を表示することで、変流器2の取り付けを誤った場合でも、監視装置4に誤った電力値が表示されることで持たれるユーザの違和感を低減できる。さらに、電力計測システムSの稼動後においても、表示部42の表示内容に基づいて、ユーザが工事資格のある専門家に変流器2の検査依頼ができ、変流器2の取り付け状態が正しくなるまでの期間において、適切な対応が取れるようになる。   In addition, by displaying the determination result on the display unit 42, even when the current transformer 2 is incorrectly attached, the user's uncomfortable feeling due to the incorrect power value being displayed on the monitoring device 4 can be reduced. In addition, even after the power measurement system S is operated, the user can request an inspection of the current transformer 2 to an expert who is qualified for construction based on the display contents of the display unit 42, and the mounting state of the current transformer 2 is correct. Appropriate responses can be taken in the period up to.

(第1の変形例)
本実施の形態1の第1の変形例について、図5を参照して説明する。本変形例1では、図5に示すように、変流器2Bを間違って変流器2Aが取り付けられた配線の隣の配線に取り付けた場合を想定している。
(First modification)
A first modification of the first embodiment will be described with reference to FIG. In the first modification, as shown in FIG. 5, it is assumed that the current transformer 2B is mistakenly attached to the wiring adjacent to the wiring to which the current transformer 2A is attached.

この場合、図6に示すように、変流器2Aが取り付けられた回路の電力値の推移と、変流器2Bが取り付けられた回路の電流値の推移は、時間軸を軸として略対称となる。従って、本変形例1において、判定演算部41は、最初に、変流器2Aが取り付けられた回路の平均電力値又は積算電力値を、時間軸を軸として反転させる。そして、判定演算部41は、この反転させた値と、変流器2Bが取り付けられた回路の平均電力値又は積算電力値との差分が所定範囲内(例えば変流器2A,2Bの確度誤差の2倍以内)となるか否かを判定する。また、判定演算部41は、当該所定範囲内となることが所定割合以上となる場合において、同一回路を測定していると判定する。   In this case, as shown in FIG. 6, the transition of the power value of the circuit to which the current transformer 2A is attached and the transition of the current value of the circuit to which the current transformer 2B is attached are substantially symmetrical about the time axis. Become. Therefore, in the first modification, the determination calculation unit 41 first inverts the average power value or the integrated power value of the circuit to which the current transformer 2A is attached with the time axis as an axis. The determination calculation unit 41 determines that the difference between the inverted value and the average power value or integrated power value of the circuit to which the current transformer 2B is attached is within a predetermined range (for example, the accuracy error of the current transformers 2A and 2B). Or less). In addition, the determination calculation unit 41 determines that the same circuit is being measured when the predetermined range exceeds the predetermined range.

従って、本変形例1においても、上記実施の形態1と同様に、判定演算部41において回路への変流器2の取り付け位置の誤りを判別でき、変流器2の取り付けに不具合があることを、視認や検査をすることなく自動的に検出できる。   Therefore, also in the first modification, as in the first embodiment, the determination calculation unit 41 can determine an error in the mounting position of the current transformer 2 to the circuit, and there is a problem in mounting the current transformer 2. Can be automatically detected without visual inspection or inspection.

(第2の変形例)
本実施の形態1の第2の変形例について説明する。本変形例2では、変流器2の分電盤1内での施工状態は正しいが、一の変流器2が取り付けられた回路の電力値と、他の変流器2が取り付けられた回路の電力値とが偶然に同等傾向にある回路同士を「同一回路」と誤判定しないようにしたものである。
(Second modification)
A second modification of the first embodiment will be described. In this modification 2, the construction state of the current transformer 2 in the distribution board 1 is correct, but the power value of the circuit to which one current transformer 2 is attached and the other current transformer 2 are attached. Circuits in which the power values of the circuits accidentally have the same tendency are not erroneously determined as “same circuits”.

具体的には、判定演算部41は、複数回路中における一の変流器2が取り付けられた回路の平均電力値又は積算電力値と、他の変流器2が取り付けられた回路の平均電力値又は積算電力値との差分が所定範囲内かを判定する。次に、判定演算部41は、当該所定範囲となる割合が所定割合以上となるか否かを判定するが、この期間を、より長期間(例えば2日〜一週間)とする。このことで、一の変流器2が取り付けられた回路の電力値と、他の変流器2が取り付けられた回路の電力値とが偶然に同等傾向にある回路同士を「同一回路」と誤判定することを、より適切に防止できる。   Specifically, the determination calculation unit 41 includes an average power value or an integrated power value of a circuit to which one current transformer 2 is attached in a plurality of circuits, and an average power of a circuit to which another current transformer 2 is attached. It is determined whether the difference from the value or the integrated power value is within a predetermined range. Next, the determination calculation unit 41 determines whether or not the ratio within the predetermined range is equal to or greater than the predetermined ratio, and sets this period to a longer period (for example, two days to one week). As a result, circuits having the same power value of a circuit to which one current transformer 2 is attached and circuits having other current transformers 2 accidentally have the same tendency are referred to as “same circuit”. It is possible to prevent erroneous determination more appropriately.

(実施の形態2)
本発明の実施の形態2に係る電力計測システムについて、図7を参照して説明する。なお、上記実施の形態1と同様の構成には同一の符号を付し、その詳細な説明は省略する(以下同じ)。
(Embodiment 2)
A power measurement system according to Embodiment 2 of the present invention will be described with reference to FIG. In addition, the same code | symbol is attached | subjected to the structure similar to the said Embodiment 1, and the detailed description is abbreviate | omitted (hereinafter the same).

本実施の形態2では、各回路への変流器2の取り付け位置や取り付け方向、変流器2と電力計測器3との間のコネクタ接続も正しく、変流器2の施工誤りはない場合であるが、施工時や使用時に表示部42を介して設定される回路の名称が誤入力される場合がある。例えば、図7(a)に示すように、表示部42において名称設定を「回路3」とすべきところを「回路2(42a)」と誤入力するケースが想定される。この場合、誤入力状態を放置することにより、(I)回路2の平均電力は150Wか300Wのいずれかが正しいか不明、(II)回路3の計測もれという不具合が生じる。また、回路名称の入力誤りを再度正しく訂正するためには、分電盤1を再度開けて変流器2の施工状態をチェックする必要があり、必要以上の手間を要することとなる。   In this Embodiment 2, the attachment position and attachment direction of the current transformer 2 to each circuit, the connector connection between the current transformer 2 and the power measuring instrument 3 are also correct, and there is no construction error of the current transformer 2 However, the name of the circuit set through the display unit 42 during construction or use may be erroneously input. For example, as illustrated in FIG. 7A, a case is assumed where a place where the name setting should be “circuit 3” in the display unit 42 is erroneously input as “circuit 2 (42 a)”. In this case, leaving the erroneous input state causes problems that (I) it is unknown whether the average power of the circuit 2 is correct, that is, 150 W or 300 W, and (II) the measurement leakage of the circuit 3 occurs. Further, in order to correct the input error of the circuit name again correctly, it is necessary to open the distribution board 1 again and check the construction state of the current transformer 2, which requires more labor than necessary.

従って、本実施の形態2では、図8に示すように、監視装置4が表示部42に表示される複数回路中における一の変流器2が取り付けられた回路の名称と、他の変流器2が取り付けられた回路の名称とが同一又は類似となることを検出する名称検出部44を備える。なお、名称検出部44の機能は、監視装置4に予めインストールされる専用プログラムにおいて実現可能である。   Therefore, in the second embodiment, as shown in FIG. 8, the name of the circuit to which the current transformer 2 is attached in the plurality of circuits displayed on the display unit 42 by the monitoring device 4 and the other current transformers. A name detection unit 44 for detecting that the name of the circuit to which the device 2 is attached is the same or similar is provided. The function of the name detection unit 44 can be realized by a dedicated program installed in advance in the monitoring device 4.

次に、本実施の形態2に係る電力計測システムSの動作手順に関し、図7(b)を参照して説明する。最初に、名称検出部44は、回路の名称入力がなされる毎に(S71)、文字列が完全一致するなど、既に入力済みの名称と一致するか否かを検証する(S72)。そして、名称検出部44は、既に入力済みの回路名称と一致する場合には(S72でYes)、名称再設定を促す処理、例えば、表示部42に「同一名称が設定されています」や「名称設定をやり直してください」と表示する(S73)。一方、名称検出部44は、既に入力済みの回路名称と一致しない場合には(S72でNo)、その次の処理を実行する(S74)。   Next, the operation procedure of the power measurement system S according to the second embodiment will be described with reference to FIG. First, each time a name of a circuit is input (S71), the name detection unit 44 verifies whether or not the name already matches, such as a character string being completely matched (S72). When the name detection unit 44 matches the circuit name that has already been input (Yes in S72), the name detection unit 44 prompts the user to reset the name, for example, “the same name is set” or “ Please perform name setting again "(S73). On the other hand, if the name detection unit 44 does not match the already input circuit name (No in S72), the name detection unit 44 executes the next process (S74).

以上のように、本実施の形態2に係る電力計測システムSにおいては、変流器2が取り付けられる各回路の名称が誤入力されたことをユーザにいち早く知らせることで変流器2に関する設定の不具合を判別可能とし、より正しく電力値を管理できるようになる。   As described above, in the power measurement system S according to the second embodiment, the setting of the current transformer 2 can be performed by promptly notifying the user that the name of each circuit to which the current transformer 2 is attached is erroneously input. This makes it possible to identify defects and manage power values more correctly.

(参考例)
本発明に係る電力計測システムの参考例について、図9及び図10を参照して説明する。本参考例では、図9に示すように、施工時において、変流器2Aの電線に対する取付け方向(電源側と負荷側)を誤った場合を想定している。
(Reference example)
A reference example of the power measurement system according to the present invention will be described with reference to FIGS. 9 and 10. In this reference example, as shown in FIG. 9, it is assumed that the installation direction (power supply side and load side) of the current transformer 2 </ b> A with respect to the electric wire is wrong during construction.

この場合、図10に示すように、表示部42において本来は正値で表示されるべき平均電力値及び積算電力値が負値(本図では−100Wと表示)となって表示される虞がある。或いは表示部42において本来は負値で表示されるべき平均電力値及び積算電力値が正値となって表示される虞がある。従って、監視装置4の表示部42において「正/負」変換スイッチ45を設け、ユーザがカーソル選択した電力値(本図では−100W)を、絶対値をそのままにして正値⇔負値に互換表示(本図では100W若しくは+100Wと互換表示)する機能を有する。また、この場合、表示部42において「回路1の変流器が逆向きに取り付けされている可能性があります」などの警告表示もできる。なお、「正/負」変換スイッチ45は、電力計測器3側に設けられた表示部において設けることもできるし、また、物理的な押ボタンや静電容量式スイッチとして設けることも考え得る。   In this case, as shown in FIG. 10, there is a possibility that the average power value and the integrated power value that should be normally displayed on the display unit 42 are displayed as negative values (displayed as −100 W in this figure). is there. Alternatively, the average power value and the integrated power value that should be displayed as negative values in the display unit 42 may be displayed as positive values. Therefore, a “positive / negative” conversion switch 45 is provided in the display unit 42 of the monitoring device 4 so that the power value (−100 W in the figure) selected by the user is compatible with a positive value minus a negative value while leaving the absolute value as it is. It has a function of displaying (in this figure, compatible display with 100W or + 100W). In this case, a warning such as “the current transformer of circuit 1 may be attached in the reverse direction” can be displayed on the display unit 42. The “positive / negative” conversion switch 45 can be provided in a display unit provided on the power meter 3 side, or can be provided as a physical push button or a capacitive switch.

この構成により、本参考例では、「正/負」変換スイッチ45のスイッチ操作を行うだけで、変流器2Aの取り付けが正しく施工されるまでの一定期間、新たな施工作業を要することなく、表示される誤った電力値に対するユーザの違和感を少なくできる。   With this configuration, in this reference example, only by performing the switch operation of the “positive / negative” conversion switch 45, a new construction work is not required for a certain period until the current transformer 2A is correctly installed. It is possible to reduce the user's uncomfortable feeling with respect to the displayed incorrect power value.

また、例えば、分電盤1の分岐回路に発電装置が接続されているような場合には、「正/負」変換スイッチ45を操作するだけで、分電盤1側に電流が流れてくる発電時における電力値をプラス表示にユーザ設定できる。このため、表示部42に表示される電力値の正/負が、売電/買電又は充電/放電に対応した表示とでき、表示部42に表示される電力値に対するユーザの違和感を軽減できる。   For example, when a power generation device is connected to the branch circuit of the distribution board 1, the current flows to the distribution board 1 simply by operating the “positive / negative” conversion switch 45. The user can set the power value during power generation to a plus display. For this reason, the positive / negative of the power value displayed on the display unit 42 can be displayed corresponding to power selling / buying or charging / discharging, and the user's uncomfortable feeling with respect to the power value displayed on the display unit 42 can be reduced. .

なお、本発明は、上記実施の形態の構成に限られず、発明の趣旨を変更しない範囲で種々の変形が可能である。例えば、監視装置4が備えている判定演算部41の機能を電力計測器3側に備えることもできる。   The present invention is not limited to the configuration of the embodiment described above, and various modifications can be made without departing from the spirit of the invention. For example, the function of the determination calculation unit 41 provided in the monitoring device 4 can be provided on the power meter 3 side.

また、本発明の目的を達成するために、本発明は、電力計測システムに含まれる特徴的な構成手段をステップとする電力計測方法としたり、それらの特徴的なステップを含むプログラムとして実現することもできる。そして、そのプログラムは、ROM等に格納しておくだけでなく、USBメモリ等の記録媒体や通信ネットワークを介して流通させることもできる。   In order to achieve the object of the present invention, the present invention is realized as a power measurement method using characteristic constituent means included in the power measurement system as a step, or as a program including these characteristic steps. You can also. The program can be distributed not only in the ROM, but also via a recording medium such as a USB memory or a communication network.

S 電力計測システム
1 分電盤
2 変流器
3 電力計測器
4 監視装置
5 負荷
6a,6b,6c ブレーカ
7 電線
8 信号線
31 電流検出部
32 電圧検出部
33 電力演算部
41 判定演算部(判定部)
42 表示部
43 発報部
44 名称検出部
45 正/負変換スイッチ
DESCRIPTION OF SYMBOLS S Power measurement system 1 Distribution board 2 Current transformer 3 Power meter 4 Monitoring apparatus 5 Load 6a, 6b, 6c Breaker 7 Electric wire 8 Signal line 31 Current detection part 32 Voltage detection part 33 Power calculation part 41 Determination calculation part (determination Part)
42 Display unit 43 Reporting unit 44 Name detection unit 45 Positive / negative conversion switch

Claims (6)

回路から電圧の信号を検出する電圧検出部と、前記回路に取り付けられた変流器からの出力に基づいて電流の信号を検出する電流検出部と、前記電圧検出部及び電流検出部で検出される電圧及び電流の各信号に基づいて前記回路の電力値を演算する電力演算部と、前記電力演算部の演算に基づく結果を表示する表示部と、を備える電力計測システムにおいて、
前記電力演算部で演算され、複数回路中における一の変流器が取り付けられた回路の電力値と、複数回路中における他の変流器が取り付けられた回路の電力値とに基づいて、当該一の変流器と当該他の変流器とが同一回路を測定していることを判定する判定部を備え
前記判定部は、前記一の変流器が取り付けられた回路の平均電力値又は積算電力値と、前記他の変流器が取り付けられた回路の平均電力値又は積算電力値との差分が所定範囲内であり、且つ当該所定範囲内となることが所定割合以上となる場合において、同一回路を測定していると判定する、ことを特徴とする電力計測システム。
A voltage detector that detects a voltage signal from the circuit, a current detector that detects a current signal based on an output from a current transformer attached to the circuit, and the voltage detector and the current detector. In a power measurement system comprising: a power calculation unit that calculates a power value of the circuit based on each voltage and current signal; and a display unit that displays a result based on the calculation of the power calculation unit.
Based on the power value of the circuit to which one current transformer in the plurality of circuits is attached and the power value of the circuit to which the other current transformer in the plurality of circuits is attached, A determination unit for determining that one current transformer and the other current transformer are measuring the same circuit ;
The determination unit has a predetermined difference between an average power value or an integrated power value of a circuit to which the one current transformer is attached and an average power value or an integrated power value of a circuit to which the other current transformer is attached. A power measurement system characterized in that it is determined that the same circuit is being measured when it is within a range and within a predetermined range is equal to or greater than a predetermined ratio .
回路から電圧の信号を検出する電圧検出部と、前記回路に取り付けられた変流器からの出力に基づいて電流の信号を検出する電流検出部と、前記電圧検出部及び電流検出部で検出される電圧及び電流の各信号に基づいて前記回路の電力値を演算する電力演算部と、前記電力演算部の演算に基づく結果を表示する表示部と、を備える電力計測システムにおいて、
前記電力演算部で演算され、複数回路中における一の変流器が取り付けられた回路の電力値と、複数回路中における他の変流器が取り付けられた回路の電力値とに基づいて、当該一の変流器と当該他の変流器とが同一回路を測定していることを判定する判定部を備え、
前記判定部は、前記一の変流器が取り付けられた回路の平均電力値又は積算電力値を、時間軸を軸として反転させた値と、前記他の変流器が取り付けられた回路の平均電力値又は積算電力値との差分が所定範囲内であり、且つ当該所定範囲内となることが所定割合以上となる場合において、同一回路を測定していると判定する、ことを特徴とする電力計測システム。
A voltage detector that detects a voltage signal from the circuit, a current detector that detects a current signal based on an output from a current transformer attached to the circuit, and the voltage detector and the current detector. In a power measurement system comprising: a power calculation unit that calculates a power value of the circuit based on each voltage and current signal; and a display unit that displays a result based on the calculation of the power calculation unit.
Based on the power value of the circuit to which one current transformer in the plurality of circuits is attached and the power value of the circuit to which the other current transformer in the plurality of circuits is attached, A determination unit for determining that one current transformer and the other current transformer are measuring the same circuit;
The determination unit is a value obtained by inverting an average power value or an integrated power value of a circuit to which the one current transformer is attached with respect to a time axis as an axis, and an average of a circuit to which the other current transformer is attached. It is determined that the same circuit is measured when the difference between the power value or the integrated power value is within a predetermined range and the predetermined range is equal to or greater than the predetermined range. Measuring system.
前記差分が所定範囲内とは、回路に取り付けられる変流器の確度の2倍以内の範囲である、ことを特徴とする請求項1又は2記載の電力計測システム。 The power measurement system according to claim 1 or 2, wherein the difference is within a predetermined range is a range within twice the accuracy of a current transformer attached to the circuit . 前記表示部は、前記判定部において検出した判定結果、及び当該判定結果に基づく対応の少なくとも一方をさらに表示する、ことを特徴とする請求項1乃至3のいずれか一項に記載の電力計測システム。 The power measurement system according to any one of claims 1 to 3, wherein the display unit further displays at least one of a determination result detected by the determination unit and a correspondence based on the determination result. . 前記判定部における検出結果、及び当該判定結果に基づく対応の少なくとも一方を発報する発報部をさらに備える、ことを特徴とする請求項1乃至4のいずれか一項に記載の電力計測システム。 The power measurement system according to any one of claims 1 to 4 , further comprising a report unit that reports at least one of a detection result in the determination unit and a response based on the determination result . 前記表示部に表示される複数回路中における一の変流器が取り付けられた回路の名称と、他の変流器が取り付けられた回路の名称とが同一又は類似となることを検出する名称検出部をさらに備え、前記同一又は類似となる場合には、前記表示部に名称の再設定を促す表示を行う、ことを特徴とする請求項1乃至5のいずれか一項に記載の電力計測システム。 Name detection for detecting that the name of the circuit to which one current transformer is attached in the plurality of circuits displayed on the display unit is the same as or similar to the name of the circuit to which another current transformer is attached. 6. The power measurement system according to claim 1 , further comprising: a display unit that, when the same or similar, displays the display unit to prompt the user to reset the name. .
JP2013025172A 2013-02-13 2013-02-13 Power measurement system Active JP6124055B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013025172A JP6124055B2 (en) 2013-02-13 2013-02-13 Power measurement system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013025172A JP6124055B2 (en) 2013-02-13 2013-02-13 Power measurement system

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2017055385A Division JP6425102B2 (en) 2017-03-22 2017-03-22 Power measurement system

Publications (2)

Publication Number Publication Date
JP2014153292A JP2014153292A (en) 2014-08-25
JP6124055B2 true JP6124055B2 (en) 2017-05-10

Family

ID=51575279

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013025172A Active JP6124055B2 (en) 2013-02-13 2013-02-13 Power measurement system

Country Status (1)

Country Link
JP (1) JP6124055B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5973495B2 (en) * 2014-06-09 2016-08-23 Necプラットフォームズ株式会社 Power measuring apparatus and power measuring method
JP6775940B2 (en) * 2015-12-04 2020-10-28 株式会社東芝 Measurement management system, control device, and control method
JP2018098939A (en) * 2016-12-14 2018-06-21 パナソニックIpマネジメント株式会社 Energy management device and program
CN113075447B (en) * 2021-02-04 2024-06-18 浙江华云信息科技有限公司 400V low-voltage distribution network intelligent detection device and method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4179097B2 (en) * 2003-08-07 2008-11-12 松下電工株式会社 Multi-circuit watt-hour meter and expansion unit of multi-circuit watt-hour meter
JP2007178326A (en) * 2005-12-28 2007-07-12 Ebara Ballard Corp Method of measuring electric power and generating facility
JP2012145466A (en) * 2011-01-13 2012-08-02 Sharp Corp Current measurement system and power measurement system

Also Published As

Publication number Publication date
JP2014153292A (en) 2014-08-25

Similar Documents

Publication Publication Date Title
US9593985B2 (en) Temperature measurement system and method
KR100899632B1 (en) Electricity meter with a function for detecting failure of current transformer
JP6124055B2 (en) Power measurement system
US20110298626A1 (en) Battery system and management method
JP2006349424A (en) System and method for detecting leak current
KR101690134B1 (en) Error detection device for power meter
KR101680226B1 (en) 11 Electronic watthour meter management system included RJ11 Connector DlmsCosem protocol using smart phones
CN107810422A (en) System for detecting and indicating shelf depreciation and voltage
JP2017106937A (en) Power measurement system
JP6202988B2 (en) Power measurement system, power measurement method, and program
KR100852185B1 (en) electric power analysis recorder for electric safety check
JP6116493B2 (en) Electronic indicator
KR200360131Y1 (en) An electronic wattmeter consists of plurality module
JP2018194546A (en) Determination method and determination device
CN108896817A (en) Relay protection device outlet pressure plate potential measuring device with data recording function
US20140125313A1 (en) Electrical measurement apparatus having a detector providing an identification signal and corresponding method
JP4685438B2 (en) Electricity meter
JP4690680B2 (en) Electricity meter
JP2005233879A (en) Single-phase three-wire system watt-hour meter equipped with line current monitoring function, and line current managing system thereof
JP6180743B2 (en) Power measurement device cable bypass connection support system and power measurement device cable bypass connection method using the same
JP2011169703A (en) Wattmeter
JP6061128B2 (en) Pulse checker for watt-hour meter and method of using the same
JP2014081282A (en) Wire connection state diagnosis device and wire connection state diagnosis method
KR20240046452A (en) Multi-measurement system survey capable of Watt-Hour Meter error and MOF ratio error simutaneously
JP5942478B2 (en) Electric power information notification apparatus and electric power system for residential use provided with the same

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20150312

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20150330

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20151210

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20161028

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20161108

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170110

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170228

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170322

R151 Written notification of patent or utility model registration

Ref document number: 6124055

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151