JP6103461B1 - Simple crane, suspension load suspension method with simple crane - Google Patents

Simple crane, suspension load suspension method with simple crane Download PDF

Info

Publication number
JP6103461B1
JP6103461B1 JP2016126099A JP2016126099A JP6103461B1 JP 6103461 B1 JP6103461 B1 JP 6103461B1 JP 2016126099 A JP2016126099 A JP 2016126099A JP 2016126099 A JP2016126099 A JP 2016126099A JP 6103461 B1 JP6103461 B1 JP 6103461B1
Authority
JP
Japan
Prior art keywords
guide rope
lifting
pulley
bracket
hoist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016126099A
Other languages
Japanese (ja)
Other versions
JP2017226541A (en
Inventor
古屋 謙
謙 古屋
Original Assignee
株式会社古屋興産
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社古屋興産 filed Critical 株式会社古屋興産
Priority to JP2016126099A priority Critical patent/JP6103461B1/en
Application granted granted Critical
Publication of JP6103461B1 publication Critical patent/JP6103461B1/en
Publication of JP2017226541A publication Critical patent/JP2017226541A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Jib Cranes (AREA)

Abstract

【課題】荷揚げ中の荷の振れ止めを容易化する。【解決手段】簡易クレーン40をビティ仮設足場30の上部の建枠部材に装着し、ブラケットの前部に懸吊された荷吊りホイスト47からワイヤロープ81を垂下し、吊りフック82に荷揚げ資材14を玉掛けする。ブラケットの上枠45に装着した前方延設部48の前端部のガイドロープ取り付け金具51に上端を掛装したガイドロープ52を地上まで垂らし、吊りフック82に支持させたガイドロープ用滑車84を通す。荷上げ中、地上の作業員Aがガイドロープ52を引っ張ると、ガイドロープ用滑車84と吊りフック82を介して荷揚げ資材14がガイドロープ52寄りに引っ張られる。荷が高くなると、ガイドロープ用滑車84の上側のガイドロープ52が吊りフック82を比較的大きな力で前方へ引っ張るようになるので、作業員Aがガイドロープ52を強く引っ張らなくても吊り荷の振れが抑制される。【選択図】図3An object of the present invention is to facilitate the steadying of a load during unloading. A simple crane 40 is mounted on a building frame member at an upper part of a temporary temporary scaffold 30, a wire rope 81 is suspended from a load hoist 47 suspended on the front portion of the bracket, and the material 14 is unloaded on a suspension hook 82. Slay. A guide rope 52 having an upper end hung on the guide rope mounting bracket 51 at the front end portion of the front extending portion 48 attached to the upper frame 45 of the bracket is suspended to the ground, and the guide rope pulley 84 supported by the suspension hook 82 is passed through. . When the worker A on the ground pulls the guide rope 52 during loading, the unloading material 14 is pulled closer to the guide rope 52 via the guide rope pulley 84 and the suspension hook 82. When the load becomes high, the guide rope 52 on the upper side of the guide rope pulley 84 pulls the suspension hook 82 forward with a relatively large force. Therefore, even if the worker A does not pull the guide rope 52 strongly, Swing is suppressed. [Selection] Figure 3

Description

本発明は、簡易クレーン、簡易クレーンによる吊り荷の振れ止め方法に係り、とくに、マンション、ビル等の建築物の新築・改修工事現場等の仮設足場に設置する簡易クレーン、簡易クレーンによる吊り荷の振れ止め方法に関する。   The present invention relates to a simple crane and a method for stabilizing a suspended load using a simple crane. It relates to a steady rest method.

マンション、ビル等で新築・改修工事現場等では、外壁仕上げ、外壁補修等のための仮設足場の組み上げ、建築物内への資材の搬入のため、仮設足場に簡易クレーンを設置し、地上から仮設足場の上の段に仮設足場の資材、建築物の資材を吊り上げ、足場内に取り込むようにしている。
図1に建築物の改修工事現場で用いられる従来の簡易クレーンの設置例を示す。仮設足場1の上段の枠部材2の前側の縦枠2Aに、複数のクランプ3を用いて基部支柱4が着脱自在に締結されており、この基部支柱4に前方へ延設されたブラケット5が装着されている。ブラケット5の前端にはホイスト取り付け部6を介してホイスト7が懸吊されている。ホイスト7から巻き出されたワイヤロープ8の下端に装着された吊りフック9には玉掛けワイヤ10と介錯ロープ11が掛装されている。地上の作業員Aはリモコン12によりホイスト7からワイヤロープ8を巻き出させて玉掛けワイヤ10を地上近くに下ろし、吊り荷としての足場資材14に玉掛けする。そして、リモコン12によりホイスト7を稼働しワイヤロープ8を巻き取らせ、地上から仮設足場1の上の段のステージの高さに荷揚げし、ホイスト7を止める。仮設足場1の上の段のステージの作業員Bは荷揚げされた足場資材14を足場内に取り込む。荷揚げ中、地上の作業員Aは介錯ロープ11を操作して吊り荷の振れを抑える。
In new construction and renovation work sites in condominiums, buildings, etc., a temporary crane will be installed on the temporary scaffolding for temporary building from the ground to assemble temporary scaffolding for finishing the outer wall and repairing the outer wall, and to carry materials into the building. The material of the temporary scaffold and the material of the building are lifted on the step above the scaffold and are taken into the scaffold.
FIG. 1 shows an installation example of a conventional simple crane used at a building renovation site. The vertical frame 2A of the front of the upper construction frame member 2 temporary scaffold 1, the base struts 4 by using a plurality of clamps 3 are fastened detachably, a bracket 5 which extends forward to the base struts 4 Is installed. A hoist 7 is suspended from a front end of the bracket 5 via a hoist attachment portion 6. A hanging hook 9 mounted on the lower end of the wire rope 8 unwound from the hoist 7 is hung with a sling wire 10 and an intermediary rope 11. The worker A on the ground unwinds the wire rope 8 from the hoist 7 with the remote controller 12 to lower the sling wire 10 near the ground and hangs it on the scaffolding material 14 as a suspended load. Then, the hoist 7 is operated by the remote controller 12 to wind the wire rope 8, and is unloaded from the ground to the height of the stage above the temporary scaffold 1, and the hoist 7 is stopped. The worker B on the stage on the temporary scaffold 1 takes the unloaded scaffold material 14 into the scaffold. During unloading, the worker A on the ground operates the interposition rope 11 to suppress the swing of the suspended load.

ここで、図2に示す如く、吊りフック9を水平方向前方へ引っ張る力をfとすると、fが振れ止めの制御力となる。介錯ロープ11の重量を無視し、作業員Aが介錯ロープ11を引っ張る力をF、介錯ロープ11と垂線のなす角度をθとすると、
f=F・sinθ
である。
吊り荷の揚程が高い場合、図2(1)に示す如く、吊り荷としての足場資材14が地上近くにあるときは、作業員Aが前方へ移動することでθを容易に大きくでき、介錯ロープ11を強く引っ張らなくても振れ止め制御が可能であるが、荷揚げ資材14が高く上がるとθが小さくなり、振れ止め制御が困難になる欠点があった。
Here, as shown in FIG. 2, when f is a force for pulling the suspension hook 9 forward in the horizontal direction, f becomes a control force for steadying. Ignoring the weight of the intervening rope 11, assuming that the force that the worker A pulls the intervening rope 11 is F, and the angle between the intervening rope 11 and the perpendicular is θ,
f = F · sin θ
It is.
When the lift of the suspended load is high, as shown in FIG. 2 (1), when the scaffolding material 14 as the suspended load is near the ground, the worker A can move forward and the θ can be easily increased. Although the steadying control is possible even if the rope 11 is not pulled strongly, there is a drawback that when the unloading material 14 is raised, θ decreases and the steadying control becomes difficult.

実用新案登録第3023683号公報Utility Model Registration No. 3023683

本発明は上記した従来技術の問題に鑑みなされたもので、吊り荷が高く上がったときの振れ止めを容易に行える簡易クレーン、簡易クレーンによる吊り荷の振れ止め方法を提供することを、その目的とする。   The present invention has been made in view of the above-described problems of the prior art, and it is an object of the present invention to provide a simple crane that can easily prevent the suspension when the suspended load rises high, and a method for preventing the suspension of the suspended load using the simple crane. And

請求項1記載の発明では、
仮設足場の構造物に着脱自在に装着可能な基部部材と、
基部部材に水平面内で旋回自在に軸支されたブラケットと、
ブラケットの前部に設けられた荷吊り用ホイスト取り付け部と、
ブラケットに設けられた前方延設部と、
前方延設部の前端部に設けられたガイドロープ取り付け部と、
を備え、
荷吊り用ホイスト取り付け部に取り付けた荷吊り用ホイストから吊りフック付のワイヤロープを垂下し、吊りフックに荷揚げ資材を玉掛けするとともに、
ガイドロープ取り付け部に上端部を取り付けたガイドロープを地上近くまで垂らし、このガイドロープに吊りフックまたは玉掛けワイヤまたは荷揚げ資材に支持させた滑車を通し、
ガイドロープの下端部を地上の作業員が引っ張るかまたは張った状態で地上近くに固定することにより、荷揚げ資材がガイドロープ寄りに引っ張られるようにしたこと、
を特徴としている。
請求項2記載の発明では、
ブラケットの前部に、荷吊り用ホイスト取り付け部に代えて荷吊り用滑車取り付け部を設け、
荷吊り用滑車取り付け部に取り付けた荷吊り用滑車に荷吊り用ウインチから巻き出した吊りフック付のワイヤロープを巻き掛けて垂下し、吊りフックに荷揚げ資材を玉掛けするようにしたこと、
を特徴としている。
請求項3記載の発明では、
ブラケットの前部に、荷吊り用ホイスト取り付け部に代えて荷吊り用シーブを設け、
荷吊り用シーブに荷吊り用ウインチから巻き出した吊りフック付のワイヤロープを巻き掛けて垂下し、吊りフックに荷揚げ資材を玉掛けするようにしたこと、
を特徴としている。
請求項4記載の発明では、
前方延設部の前端部に、ガイドロープ取り付け部に代えてガイドロープ用ホイスト取り付け部を設け、このガイドロープ用ホイスト取り付け部に取り付けたガイドロープ用ホイストからガイドロープを垂らすようにしたこと、
を特徴としている。
請求項5記載の発明では、
仮設足場の構造物に着脱自在に装着可能な基部部材と、
基部部材に水平面内で旋回自在に軸支されたブラケットと、
ブラケットの前部に設けられた荷吊り用ホイスト取り付け部と、
ブラケットに設けられた前方延設部と、
前方延設部の前端部に設けられた前側ガイドロープ用シーブと、
ブラケットの後端部の上側に設けられた後側ガイドロープ用滑車取り付け部と、
を備え、
荷吊り用ホイスト取り付け部に取り付けた荷吊り用ホイストから吊りフック付のワイヤロープを垂下し、吊りフックに荷揚げ資材を玉掛けするとともに、
ガイドロープの一端側を仮設足場に止め、ガイドロープの他端側を後側ガイドロープ用滑車取り付け部に取り付けた後側ガイドロープ用滑車と前側ガイドロープ用シーブに巻き掛けたのち、地上近くまで垂らし、ガイドロープに吊りフックまたは玉掛けワイヤまたは荷揚げ資材に支持させた滑車を通し、
ガイドロープの下端部を地上近くに固定するとともに、仮設足場の上の作業員がガイドロープの一端側を引っ張ることにより、荷揚げ資材がガイドロープ寄りに引っ張られるようにしたこと、
を特徴としている。
請求項6記載の発明では、
ブラケットの前部に、荷吊り用ホイスト取り付け部に代えて荷吊り用滑車取り付け部を設け、
荷吊り用滑車取り付け部に取り付けた荷吊り用滑車に荷吊り用ウインチから巻き出した吊りフック付のワイヤロープを巻き掛けて垂下し、吊りフックに荷揚げ資材を玉掛けするようにしたこと、
を特徴としている。
請求項7記載の発明では、
ブラケットの前部に、荷吊り用ホイスト取り付け部に代えて荷吊り用シーブを設け、
荷吊り用シーブに荷吊り用ウインチから巻き出した吊りフック付のワイヤロープを巻き掛けて垂下し、吊りフックに荷揚げ資材を玉掛けするようにしたこと、
を特徴としている。
請求項8記載の発明では、
前方延設部の前端部に、前側ガイドロープ用シーブに代えて前側ガイドロープ用滑車取り付け部を設け、一端側を仮設足場に止めたガイドロープの他端側を後側ガイドロープ用滑車取り付け部に取り付けた後側ガイドロープ用滑車と前側ガイドロープ用滑車取り付け部に取り付けた後側ガイドロープ用滑車に巻き掛けたのち、地上近くまで垂らすようにしたこと、
を特徴としている。
請求項9記載の発明では、
仮設足場の構造物に着脱自在に装着可能な基部部材と、基部部材に水平面内で旋回自在に軸支されたブラケットと、ブラケットの前部に設けられた荷吊り用ホイスト取り付け部とを備えた簡易クレーンの内、ブラケットに設けた前方延設部の前端部にガイドロープ取り付け部を設けておき、
荷吊り用ホイスト取り付け部に取り付けた荷吊り用ホイストから先端に吊りフック付のワイヤロープを垂下し、吊りフックに吊り荷を玉掛けするとともに、
ガイドロープ取り付け部に上端を取り付けたガイドロープを地上近くまで垂らし、ガイドロープに吊りフックまたは玉掛けワイヤまたは荷揚げ資材に支持させた滑車を通し、
荷揚げ中、ガイドロープの下端部を地上の作業員が引っ張るかまたは張った状態で地上近くに固定することにより、荷揚げ資材がガイドロープ寄りに引っ張られるようにしたこと、
を特徴としている。
請求項10記載の発明では、
ブラケットの前部に、荷吊り用ホイスト取り付け部に代えて荷吊り用滑車取り付け部を設け、
荷吊り用滑車取り付け部に取り付けた荷吊り用滑車に荷吊り用ウインチから巻き出した吊りフック付のワイヤロープを巻き掛けて垂下し、吊りフックに荷揚げ資材を玉掛けするようにしたこと、
を特徴としている。
請求項11記載の発明では、
ブラケットの前部に、荷揚げ用ホイスト取り付け部に代えて荷吊り用シーブを設け、
荷吊り用シーブに荷吊り用ウインチから巻き出した吊りフック付のワイヤロープを巻き掛けて垂下し、吊りフックに荷揚げ資材を玉掛けするようにしたこと、
を特徴としている。
請求項12記載の発明では、
前方延設部の前端部に、ガイドロープ取り付け部に代えてガイドロープ用ホイスト取り付け部を設け、このガイドロープ用ホイスト取り付け部に取り付けたガイドロープ用ホイストからガイドロープを垂らすようにしたこと、
を特徴としている。
請求項13記載の発明では、
仮設足場の構造物に着脱自在に装着可能な基部部材と、基部部材に水平面内で旋回自在に軸支されたブラケットと、ブラケットの前部に設けられた荷吊り用ホイスト取り付け部とを備えた簡易クレーンの内、ブラケットに設けた前方延設部の前端部に前側ガイドロープ用シーブを設けるとともに、ブラケットの後端部の上側に後側ガイドロープ用滑車取り付け部を設けておき、
荷吊り用ホイスト取り付け部に取り付けた荷吊り用ホイストから吊りフック付のワイヤロープを垂下し、吊りフックに吊り荷を玉掛けするとともに、
一端側を仮設足場に止めたガイドロープの他端側を、後側ガイドロープ用滑車取り付け部に取り付けた後側ガイドロープ用滑車と前側ガイドロープ用シーブに巻き掛けたのち、地上近くまで垂らし、ガイドロープに吊りフックまたは玉掛けワイヤまたは荷揚げ資材に支持させた滑車を掛装し、
荷揚げ中、ガイドロープの下端側を地上近くに固定し、上端側を仮設足場の上の作業員が引っ張ることにより、荷揚げ資材がガイドロープ寄りに引っ張られるようにしたこと、
を特徴としている。
請求項14記載の発明では、
ブラケットの前部に、荷吊り用ホイスト取り付け部に代えて荷吊り用滑車取り付け部を設け、
荷吊り用滑車取り付け部に取り付けた荷吊り用滑車に荷吊り用ウインチから巻き出した吊りフック付のワイヤロープを巻き掛けて垂下し、吊りフックに荷揚げ資材を玉掛けするようにしたこと、
を特徴としている。
請求項15記載の発明では、
ブラケットの前部に、荷揚げ用ホイスト取り付け部に代えて荷吊り用シーブを設け、
荷吊り用シーブに荷吊り用ウインチから巻き出した吊りフック付のワイヤロープを巻き掛けて垂下し、吊りフックに荷揚げ資材を玉掛けするようにしたこと、
を特徴としている。
請求項16記載の発明では、
前方延設部の前端部に、前側ガイドロープ用シーブに代えて前側ガイドロープ用滑車取り付け部を設け、一端側を仮設足場に止めたガイドロープの他端側を、後側ガイドロープ用滑車取り付け部に取り付けた後側ガイドロープ用滑車と前側ガイドロープ用滑車取り付け部に取り付けた前側ガイドロープ用滑車に巻き掛けたのち、地上近くまで垂らすようにしたこと、
を特徴としている。
In invention of Claim 1,
A base member detachably attachable to the structure of the temporary scaffold,
A bracket pivotally supported on the base member in a horizontal plane,
A load hoist mounting portion provided at the front of the bracket;
A front extension provided on the bracket;
A guide rope attaching portion provided at a front end portion of the front extending portion;
With
While hanging a wire rope with a hanging hook from the lifting hoist attached to the lifting hoist mounting part, hanging the lifting material on the hanging hook,
The guide rope with the upper end attached to the guide rope attachment part is hung down to the ground, and the guide rope is passed through a suspension hook or sling wire or a pulley supported by a lifting material,
The lower end of the guide rope was pulled near the ground while being pulled or stretched by an operator on the ground, so that the unloading material was pulled closer to the guide rope,
It is characterized by.
In invention of Claim 2,
In the front part of the bracket, instead of the lifting hoist mounting part, a lifting pulley mounting part is provided,
A wire rope with a hanging hook that was unwound from a lifting winch was hung on a hanging pulley attached to the loading pulley attachment part and suspended, and the lifting material was slung on the hanging hook.
It is characterized by.
In invention of Claim 3,
At the front of the bracket, instead of the load hoist mounting part, a load sheave is provided,
A wire rope with a hanging hook that was unwound from a lifting winch was hung on a hanging sheave and suspended, and the lifting material was hung on the hanging hook.
It is characterized by.
In invention of Claim 4,
At the front end of the front extension part, instead of the guide rope attachment part, a guide rope hoist attachment part was provided, and the guide rope was hung from the guide rope hoist attached to the guide rope hoist attachment part,
It is characterized by.
In invention of Claim 5,
A base member detachably attachable to the structure of the temporary scaffold,
A bracket pivotally supported on the base member in a horizontal plane,
A load hoist mounting portion provided at the front of the bracket;
A front extension provided on the bracket;
A sheave for the front guide rope provided at the front end of the front extension part;
A rear guide rope pulley mounting portion provided above the rear end of the bracket;
With
While hanging a wire rope with a hanging hook from the lifting hoist attached to the lifting hoist mounting part, hanging the lifting material on the hanging hook,
Stop one end of the guide rope on the temporary scaffold, wrap the other end of the guide rope around the rear guide rope pulley and the front guide rope sheave attached to the rear guide rope pulley attachment, and then close to the ground Hanging down, passing a suspension hook or sling wire or a pulley supported by a lifting material through a guide rope,
The lower end of the guide rope was fixed near the ground, and the worker on the temporary scaffolding pulled the one end of the guide rope so that the unloading material was pulled closer to the guide rope.
It is characterized by.
In invention of Claim 6,
In the front part of the bracket, instead of the lifting hoist mounting part, a lifting pulley mounting part is provided,
A wire rope with a hanging hook that was unwound from a lifting winch was hung on a hanging pulley attached to the loading pulley attachment part and suspended, and the lifting material was slung on the hanging hook.
It is characterized by.
In invention of Claim 7,
At the front of the bracket, instead of the load hoist mounting part, a load sheave is provided,
A wire rope with a hanging hook that was unwound from a lifting winch was hung on a hanging sheave and suspended, and the lifting material was hung on the hanging hook.
It is characterized by.
In invention of Claim 8,
A front guide rope sheave mounting portion is provided at the front end portion of the front extension portion instead of the front guide rope sheave, and the other end side of the guide rope having one end fixed to the temporary scaffolding is the rear guide rope pulley mounting portion. After being wrapped around the rear guide rope pulley attached to the rear guide rope pulley attached to the front guide rope pulley attachment section, it was hung down to the ground.
It is characterized by.
In invention of Claim 9,
A base member that can be detachably attached to the structure of the temporary scaffold, a bracket that is pivotally supported on the base member so as to be rotatable in a horizontal plane, and a load hoist attachment portion that is provided at the front portion of the bracket. A guide rope attachment is provided at the front end of the front extension of the simple crane,
A wire rope with a hanging hook is suspended from the lifting hoist attached to the lifting hoist mounting section, and a suspended load is hung on the hanging hook.
The guide rope with the upper end attached to the guide rope attachment part is hung to the ground, and the guide rope is passed through a suspension hook or slinging wire or a pulley supported by a lifting material,
The unloading material was pulled closer to the guide rope by unloading the lower end of the guide rope while it was unloaded, or by fixing it near the ground while being pulled or stretched by the ground worker.
It is characterized by.
In invention of Claim 10,
In the front part of the bracket, instead of the lifting hoist mounting part, a lifting pulley mounting part is provided,
A wire rope with a hanging hook that was unwound from a lifting winch was hung on a hanging pulley attached to the loading pulley attachment part and suspended, and the lifting material was slung on the hanging hook.
It is characterized by.
In the invention according to claim 11,
In place of the lifting hoist mounting part at the front part of the bracket, a load sheave is provided,
A wire rope with a hanging hook that was unwound from a lifting winch was hung on a hanging sheave and suspended, and the lifting material was hung on the hanging hook.
It is characterized by.
In invention of Claim 12,
At the front end of the front extension part, instead of the guide rope attachment part, a guide rope hoist attachment part was provided, and the guide rope was hung from the guide rope hoist attached to the guide rope hoist attachment part,
It is characterized by.
In invention of Claim 13,
A base member that can be detachably attached to the structure of the temporary scaffold, a bracket that is pivotally supported on the base member so as to be rotatable in a horizontal plane, and a load hoist attachment portion that is provided at the front portion of the bracket. Among the simple cranes, a front guide rope sheave is provided at the front end portion of the front extension portion provided on the bracket, and a rear guide rope pulley mounting portion is provided above the rear end portion of the bracket.
While hanging a wire rope with a hanging hook from the lifting hoist attached to the lifting hoist mounting part, hanging a suspended load on the hanging hook,
After wrapping the other end of the guide rope with one end on the temporary scaffolding wrapped around the rear guide rope pulley and the front guide rope sheave attached to the rear guide rope pulley attachment, hang it down to the ground, Hang a pulley that is supported by a suspension hook or sling wire or a lifting material on a guide rope,
During unloading, the lower end side of the guide rope was fixed near the ground, and the upper end side was pulled by a worker on the temporary scaffold, so that the unloading material was pulled closer to the guide rope.
It is characterized by.
In invention of Claim 14,
In the front part of the bracket, instead of the lifting hoist mounting part, a lifting pulley mounting part is provided,
A wire rope with a hanging hook that was unwound from a lifting winch was hung on a hanging pulley attached to the loading pulley attachment part and suspended, and the lifting material was slung on the hanging hook.
It is characterized by.
In the invention of claim 15,
In place of the lifting hoist mounting part at the front part of the bracket, a load sheave is provided,
A wire rope with a hanging hook that was unwound from a lifting winch was hung on a hanging sheave and suspended, and the lifting material was hung on the hanging hook.
It is characterized by.
In the invention of claim 16,
A front guide rope sheave mounting part is provided at the front end of the front extension instead of the front guide rope sheave, and the other end of the guide rope with one end fixed to the temporary scaffolding is attached to the rear guide rope sheave. After being wrapped around the rear guide rope pulley attached to the front guide pulley and the front guide rope pulley attached to the front guide rope pulley attachment section, it was hung to near the ground,
It is characterized by.

本発明によれば、ブラケットに設けた前方延設部の前端部から地上近くまでガイドロープを垂らすとともに、ブラケット前部から垂下した荷揚げ用ワイヤロープ先端の吊りフックまたは玉掛けワイヤまたは吊り荷に支持させた滑車にガイドロープを通し、ガイドロープを作業員が引っ張ったり、張った状態で固定したりして、荷揚げ中の荷揚げ資材を滑車を介してガイドロープ寄りに引っ張ることができるようにしたので、高い位置に吊り上げたときの荷の振れ止めが容易となる。   According to the present invention, the guide rope is hung from the front end portion of the front extending portion provided on the bracket to near the ground, and supported by the hanging hook or sling wire or hanging load at the tip of the lifting wire rope hanging from the bracket front portion. Since the guide rope was passed through the pulley and the operator pulled the guide rope or fixed it in the tensioned state, the unloading material being unloaded could be pulled closer to the guide rope via the pulley. It is easy to keep the load steady when it is lifted at a high position.

従来の簡易クレーンの使用状態を示す斜視図である。It is a perspective view which shows the use condition of the conventional simple crane. 従来の介錯ロープを用いた荷の振れ止め法の問題点の説明図である。It is explanatory drawing of the problem of the steadying method of the load using the conventional interposition rope. 本発明の第1実施例に係る簡易クレーンの使用状態を示す一部省略した斜視図である(実施例1)。It is the perspective view which abbreviate | omitted partially which shows the use condition of the simple crane which concerns on 1st Example of this invention (Example 1). 図3中の簡易クレーンの組み立て図である。It is an assembly drawing of the simple crane in FIG. 図3中のガイドロープの作用説明図である。It is action | operation explanatory drawing of the guide rope in FIG. 図3中の簡易クレーンの使用方法の説明図である。It is explanatory drawing of the usage method of the simple crane in FIG. 第1実施例の変形例に係る簡易クレーンの使用状態を示す説明図である。It is explanatory drawing which shows the use condition of the simple crane which concerns on the modification of 1st Example. 本発明の第2実施例に係る簡易クレーンの使用状態を示す一部省略した斜視図である(実施例2)。It is the perspective view which abbreviate | omitted partially which shows the use condition of the simple crane which concerns on 2nd Example of this invention (Example 2). 図8中の簡易クレーンの組み立て方法の説明図である。It is explanatory drawing of the assembly method of the simple crane in FIG. 図8中のガイドロープの作用説明図である。It is action | operation explanatory drawing of the guide rope in FIG. 図8中の簡易クレーンの使用方法の説明図である。It is explanatory drawing of the usage method of the simple crane in FIG. 第2実施例の変形例に係る簡易クレーンの要部の説明図である。It is explanatory drawing of the principal part of the simple crane which concerns on the modification of 2nd Example.

以下、本発明の最良の形態を実施例に基づき説明する。   Hereinafter, the best mode of the present invention will be described based on examples.

図3乃至図6を参照して本発明の第1実施例を説明する。図3は本発明に係る簡易クレーンの使用状態を示す斜視図、図4は簡易クレーンの組み立て図、図5はガイドロープの作用説明図、図6は簡易クレーンの使用方法の説明図である。
図3乃至図6において、30はビティ仮設足場、31はビティ仮設足場30の最上部の建枠部材(ビティ仮設足場の構造物)、40は建枠部材31の前側の縦枠31Aの上部に設置された簡易クレーン、14は簡易クレーン40により地上からビティ仮設足場30の最上部の一段下のステージに荷揚げされる荷揚げ資材(足場部材) である。
A first embodiment of the present invention will be described with reference to FIGS. 3 is a perspective view showing the usage state of the simple crane according to the present invention, FIG. 4 is an assembly view of the simple crane, FIG. 5 is an explanatory diagram of the action of the guide rope, and FIG. 6 is an explanatory diagram of how to use the simple crane.
3 to 6, 30 is a bitty temporary scaffold, 31 is the uppermost building frame member of the bitty temporary scaffold 30 (the structure of the bitty temporary scaffold), and 40 is an upper portion of the vertical frame 31A on the front side of the building frame member 31. The installed simple crane 14 is an unloading material (scaffold member) that is unloaded from the ground onto the stage below the uppermost portion of the temporary temporary scaffold 30 by the simple crane 40.

簡易クレーン40の内、41は基部部材としての角パイプ材からなる基部支柱であり、3つの締結金具(クランプ)42により建枠部材31の縦枠31Aの上部に鉛直向き、かつ着脱自在に締結されている。締結金具42は基部支柱41に予め固着していてもよく、或いは、現場で基部支柱41に着脱自在に装着しても良い。43は三角枠形のブラケットであり、基部支柱41に対して、上下3箇所の支軸44により水平面内で前方を基準にして左右に各々90乃至120度ずつ旋回可能に装着されている。ブラケット43の上枠45の前端には荷吊り用ホイスト取り付け部としてのU字状の荷吊り用ホイスト取り付け金具46が固着されおり、この荷吊り用ホイスト取り付け金具46に荷吊り用ホイスト47が掛脱自在に懸吊されている。図4に示す如く、ブラケット43の上枠45の前端部には前方に延設された角パイプ材からなる前方延設部48が着脱自在に装着されている。即ち、前方延設部48の前後2個所の両側に2組の固定金具49と49、50と50の上端部がボルト止めされており、固定金具49と49、50と50の下端部間が上枠45を跨いでボルト止めされている。前方延設部48の前端にはガイドロープ取り付け部としてのU字状のガイドロープ取り付け金具51が固着されおり、このガイドロープ取り付け金具51にガイドロープ52の一端側が取り付けられたフック53が掛装されている。   Of the simple crane 40, 41 is a base column made of a square pipe material as a base member, and is fastened to the upper part of the vertical frame 31 </ b> A of the building frame member 31 by three fastening brackets (clamps) 42 so as to be detachable. Has been. The fastening bracket 42 may be fixed to the base column 41 in advance, or may be detachably attached to the base column 41 in the field. Reference numeral 43 denotes a triangular frame-shaped bracket which is attached to the base column 41 so as to be capable of turning 90 to 120 degrees to the left and right with respect to the front in the horizontal plane by three support shafts 44 at the top and bottom. A U-shaped load hoist mounting bracket 46 as a load hoist mounting portion is fixed to the front end of the upper frame 45 of the bracket 43, and the load hoist 47 is hung on the load hoist mounting bracket 46. It is suspended freely. As shown in FIG. 4, a front extending portion 48 made of a square pipe material extending forward is detachably attached to the front end portion of the upper frame 45 of the bracket 43. That is, the upper ends of two sets of fixing brackets 49 and 49, 50 and 50 are bolted to both sides of the front extending portion 48 in the front and rear portions, and the lower end portions of the fixing brackets 49 and 49, 50 and 50 are between the lower ends. It is bolted across the upper frame 45. A U-shaped guide rope mounting bracket 51 as a guide rope mounting portion is fixed to the front end of the front extending portion 48, and a hook 53 with one end side of the guide rope 52 mounted on the guide rope mounting bracket 51 is hooked. Has been.

図3と図6は上記した簡易クレーンによる資材荷揚げ方法の説明図、図5はガイドロープの作用説明図であり、以下、これらの図を参照して上記した実施例の作用を説明する。
図3に示す如く、予めビティ仮設足場30の最上部の前側の縦枠31Aの上端近くに簡易クレーン40が締結金具42により締結済みであるとする。ガイドロープ取り付け金具51にはフック53が懸吊してあり、このフック53に一端が取り付けられたガイドロープ52の他端側が地上まで垂れ下げられている。荷吊り用ホイスト取り付け金具46には荷吊り用ホイスト47が懸吊してある。荷吊り用ホイスト47から巻き出されたワイヤロープ81の先端に吊りフック82が取り付けてある。簡易クレーン40のブラケット43は左右に各々90乃至120度の範囲で旋回可能としてある。
3 and 6 are explanatory views of the material unloading method using the above-mentioned simple crane, and FIG. 5 is an explanatory view of the operation of the guide rope. The operation of the above-described embodiment will be described below with reference to these drawings.
As shown in FIG. 3, it is assumed that the simple crane 40 has been fastened by the fastening bracket 42 in the vicinity of the upper end of the vertical frame 31 </ b> A on the uppermost front side of the temporary temporary scaffold 30. A hook 53 is suspended from the guide rope mounting bracket 51, and the other end of the guide rope 52 having one end attached to the hook 53 is suspended to the ground. A load hoist 47 is suspended from the load hoist mounting bracket 46. A suspension hook 82 is attached to the tip of the wire rope 81 unwound from the load hoist 47. The bracket 43 of the simple crane 40 is turnable in the range of 90 to 120 degrees to the left and right.

地上に玉掛け、荷吊り用ホイスト47の操作、ガイドロープ52の介錯をする作業員A、ビティ仮設足場30の最上部より一段下の足場上に荷揚げ資材14の引き込みを行う作業員Bが配置されているものとする。
図3に示す如く、簡易クレーン40が前方向きの状態で、作業員Aはリモコン90を操作し、荷吊り用ホイスト47を稼働させてワイヤロープ81を垂下し、吊りフック82を地上近くまで下げる。作業員Aはガイドロープ52をガイドロープ用滑車84に通すとともに、ガイドロープ用滑車84のステー85を吊りフック82に掛装して支持させる。また、荷揚げ資材14に玉掛けワイヤ83で玉掛けし、吊りフック82に取り付けたシャックル86に玉掛けワイヤ83を取り付ける(図6参照)。
A worker A who places a sling on the ground, operates the hoist 47 for lifting the load, interposes the guide rope 52, and a worker B who pulls the unloading material 14 onto the scaffold one step below the top of the temporary temporary scaffold 30 is arranged. It shall be.
As shown in FIG. 3, the worker A operates the remote controller 90 with the simple crane 40 facing forward, operates the load hoist 47, hangs the wire rope 81, and lowers the hanging hook 82 to near the ground. . The worker A passes the guide rope 52 through the guide rope pulley 84, and supports the stay 85 of the guide rope pulley 84 on the suspension hook 82. Moreover, the slinging wire 83 is hung on the unloading material 14 and the slinging wire 83 is attached to the shackle 86 attached to the hanging hook 82 (see FIG. 6).

作業員Aがリモコン90の操作で荷吊り用ホイスト47を吊りフック上昇側に回転させ、ワイヤロープ81を巻き上げて荷揚げ資材14を上昇させる。この際、作業員Aはガイドロープ52をガイドロープ取り付け金具51の真下より少し斜め前方向へ引っ張って荷揚げ資材14の揺れを制御する。作業員Aがガイドロープ52を引っ張ると、ガイドロープ用滑車84と吊りフック82を介して荷揚げ資材14がガイドロープ52寄りに引っ張られる。   The operator A operates the remote controller 90 to rotate the lifting hoist 47 to the lifting hook raising side, winds the wire rope 81 and raises the unloading material 14. At this time, the worker A controls the swing of the unloading material 14 by pulling the guide rope 52 slightly obliquely forward from just below the guide rope mounting bracket 51. When the worker A pulls the guide rope 52, the unloading material 14 is pulled closer to the guide rope 52 via the guide rope pulley 84 and the suspension hook 82.

ここで、図5に示す如く、ガイドロープ52の上端のフック53をa点、ガイドロープ用滑車84をb点、地上の作業員Aがガイドロープ52を把持した個所をc点とし、三角形abcの点bから辺acに下ろした垂線と辺acとの交点をdとすると、ガイドロープ用滑車84から下側のガイドロープ52がガイドロープ用滑84に加えるbd方向の力の成分f1と、ガイドロープ用滑車84から上側のガイドロープ52がガイドロープ用滑車84に加えるbd方向の力の成分f2の和が吊り荷に対する凡その振れ止め制御力となる。ガイドロープ52の重量を無視し地上の作業員Aがガイドロープ52に加える引っ張り力をF、角度bcdをθ1、角度badをθ2とすると、
f1=F・sinθ1、f2=F・sinθ2
である。
吊り荷の揚程が高い場合、図5(1)に示す如く、荷揚げ資材14が地上近くにあるときは、作業員Aが前方へ移動することでθ1を容易に大きくでき、ガイドロープ52を強く引っ張らなくても振れ止め制御が可能である。また、荷揚げ資材14が高く上がったときは図5(2)に示す如く、θ2が比較的大きくなり、ガイドロープ用滑車84の上側のガイドロープ52が吊りフック82を比較的大きな力で前方へ引っ張るようになるので、作業員Aがガイドロープ52を強く引っ張らなくても吊り荷の振れが抑制される。
この点、従来の吊りフックに付けた介錯ロープで振れ止めを行う方法では、荷揚げ資材が高くなるほど振れ止めが困難となり、また、荷揚げ資材が低い位置では余った介錯ロープ同士が絡んだり、荷揚げ資材やビティ仮設足場の下部に絡んで、荷揚げ作業を中断しなければならない欠点があった。
Here, as shown in FIG. 5, the hook 53 at the upper end of the guide rope 52 is a point a, the guide rope pulley 84 is a point b, the point where the ground worker A grips the guide rope 52 is a point c, and the triangle abc When the intersection of the perpendicular drawn from the point b to the side ac and the side ac is d, the force component f1 in the bd direction applied by the lower guide rope 52 to the guide rope pulley 84 from the guide rope pulley 84; The sum of the component f2 of the force in the bd direction that the guide rope 52 on the upper side from the guide rope pulley 84 applies to the guide rope pulley 84 becomes an approximate steady-state control force for the suspended load. When the weight of the guide rope 52 is ignored and the pulling force applied to the guide rope 52 by the ground worker A is F, the angle bcd is θ1, and the angle bad is θ2,
f1 = F · sin θ1, f2 = F · sin θ2
It is.
When the lift of the suspended load is high, as shown in FIG. 5 (1), when the unloading material 14 is near the ground, the worker A can easily increase θ1, and the guide rope 52 can be strengthened. The steadying control is possible without pulling. Further, when the unloading material 14 rises high, as shown in FIG. 5 (2), θ2 becomes relatively large, and the guide rope 52 on the upper side of the guide rope pulley 84 moves the suspension hook 82 forward with a relatively large force. Since it pulls, even if the worker A does not pull the guide rope 52 strongly, the swing of the suspended load is suppressed.
In this regard, with the conventional method of steadying with an intermediary rope attached to a hanging hook, the higher the unloading material, the more difficult it is to rest, and at the lower position of the unloading material, excess intervening ropes get entangled with each other, There was a drawback that the unloading work had to be interrupted because it was involved in the lower part of the temporary scaffolding.

荷揚げ資材14がビティ仮設足場30の最上部の一段下まで上がったところで、作業員Aは荷吊り用ホイスト47を停止し、ガイドロープ52を緩める。そして、作業員Bが荷揚げ資材14をブラケット43とともに旋回させながら荷揚げ資材14をビティ仮設足場30の最上部より一段下に取り込む(図6参照)。   When the unloading material 14 has been moved up to one level below the uppermost portion of the temporary temporary scaffold 30, the worker A stops the lifting hoist 47 and loosens the guide rope 52. Then, the worker B takes the unloading material 14 below the uppermost portion of the bite temporary scaffold 30 while turning the unloading material 14 together with the bracket 43 (see FIG. 6).

この実施例によれば、ブラケット43に設けた前方延設部48の前端部から地上近くまでガイドロープ52を垂らし、ブラケット43の前部に懸吊した荷吊り用ホイスト47から巻き出し垂下したワイヤロープ81の先端の吊りフック82に支持させたガイドロープ用滑車84にガイドロープ52を通し、荷揚げ中にガイドロープ52を地上の作業員Aが引っ張ると、吊りフック82とともに荷揚げ資材14がガイドロープ52寄りに引っ張られる。荷の揚程が高い場合に、荷揚げ資材14が地上近くにあるときは、作業員Aが荷吊り用ホイスト47の直下より前方に移動することで、ガイドロープ52を強く引っ張らなくても容易に荷揚げ資材14の振れ止め制御を行うことができる。また、荷揚げ資材14が高い位置に上がったときは、ガイドロープ用滑車84の上側のガイドロープ52が吊りフック82を前方へ比較的大きな力で引っ張るようになるので、作業員Aがガイドロープ52を強く引っ張らなくても吊り荷の振れが抑制される。
また、荷揚げ資材14の吊り上げ後、地上の作業員Aがガイドロープ52を緩めることで、仮設足場30の作業員Bがブラケット43を旋回させて吊り荷を仮設足場30に近づけることができ、足場内への引き込み作業が容易となる。
According to this embodiment, the guide rope 52 is hung from the front end portion of the front extending portion 48 provided on the bracket 43 to the ground, and the wire is unwound from the load hoist 47 suspended from the front portion of the bracket 43. When the guide rope 52 is passed through the guide rope pulley 84 supported by the suspension hook 82 at the tip of the rope 81, and the worker A on the ground pulls the guide rope 52 during unloading, the unloading material 14 together with the suspension hook 82 becomes the guide rope. Pulled toward 52. When the lift of the load is high and the unloading material 14 is near the ground, the operator A moves forward from directly below the lifting hoist 47 so that the guide rope 52 can be easily lifted without being pulled strongly. The steadying control of the material 14 can be performed. When the unloading material 14 is raised to a high position, the guide rope 52 on the upper side of the guide rope pulley 84 pulls the suspension hook 82 forward with a relatively large force. Even if it is not pulled strongly, the swing of the suspended load is suppressed.
In addition, after lifting the unloading material 14, the ground worker A loosens the guide rope 52, so that the worker B of the temporary scaffold 30 can turn the bracket 43 to bring the suspended load closer to the temporary scaffold 30. The drawing-in work becomes easy.

なお、上記した第1実施例では、ブラケットの前部にU字状の荷吊り用ホイスト取り付け金具を設けて、荷吊り用ホイストを懸吊可能としたが、U字状の荷吊り用滑車取り付け金具に置き換え、仮設足場等に設置したウインチから巻き出された吊りフック付のワイヤロープを荷吊り用滑車取り付け金具に懸吊した荷吊り用滑車に巻装し、下方へ垂下するようにしても良い。或いは、U字状の荷吊り用ホイスト取り付け金具を荷吊り用シーブに置き換え、仮設足場等に設置したウインチから巻き出された吊りフック付のワイヤロープを荷吊り用シーブに巻装したのち、下方へ垂下するようにしても良い。   In the first embodiment described above, a U-shaped load hoist mounting bracket is provided at the front portion of the bracket so that the load hoist can be suspended. However, the U-shaped load suspension pulley is attached. Replace the bracket with a wire rope with a hanging hook that has been unwound from a winch installed on a temporary scaffolding, etc., and wind it around the cargo pulley suspended on the cargo pulley mounting bracket and hang down. good. Alternatively, replace the U-shaped load hoist mounting bracket with a load sheave, wind a wire rope with a hook hook unwound from a winch installed on a temporary scaffolding, etc. You may make it hang down.

また、ブラケットに装着した前方延設部の前端部に、U字状のガイドロープ取り付け金具を設けて、ガイドロープを懸吊可能としたが、図7の簡易クレーン40Aに示す如く、ガイドロープ取り付け金具をU字状のガイドロープ用ホイスト取り付け金具51Aに置き換え、このガイドロープ用ホイスト取り付け金具51Aにガイドロープ用ホイスト100を懸吊し、ガイドロープ用ホイスト100からガイドロープ101を巻き出させて地上近くまで垂らし、下端を地上に設置した重量物102に固定するようにしても良い。重量物102は簡易クレーン40Aを前向きにしたときのガイドロープ用ホイスト100の直下より少し前方にすると良い。荷の吊り上げ中は、ガイドロープ用ホイスト100を少し巻き上げてガイドロープ101を張った状態としておくことにより、ガイドロープ101が通されたガイドロープ用滑車84を介して吊りフック82をガイドロープ101寄りに引っ張ることができる。吊り上げ後は、ガイドロープ用ホイスト100を少し巻き出して、ガイドロープ101を緩めることで容易に吊り荷を仮設足場30の中に引き込むことができる。   In addition, a U-shaped guide rope mounting bracket is provided at the front end of the front extending portion mounted on the bracket so that the guide rope can be suspended. However, as shown in the simplified crane 40A in FIG. The bracket is replaced with a U-shaped guide rope hoist mounting bracket 51A, the guide rope hoist 100 is suspended from the guide rope hoist mounting bracket 51A, and the guide rope 101 is unwound from the guide rope hoist 100 to the ground. You may make it hang to near and fix the lower end to the heavy article 102 installed on the ground. It is preferable that the heavy object 102 be slightly forward from directly below the guide rope hoist 100 when the simple crane 40A faces forward. During the lifting of the load, the hoist 100 for the guide rope is slightly wound up so that the guide rope 101 is stretched, and the suspension hook 82 is moved closer to the guide rope 101 via the guide rope pulley 84 through which the guide rope 101 is passed. Can be pulled to. After the lifting, the hoist 100 for the guide rope is slightly unwound and the guide rope 101 is loosened, so that the suspended load can be easily drawn into the temporary scaffold 30.

次に、図8乃至図11を参照して本発明の第2実施例を説明する。
図8は本発明に係る簡易クレーンの使用状態を示す斜視図、図9は簡易クレーンの組み立て図、図10はガイドロープの作用説明図、図11は簡易クレーンの使用方法の説明図である。
図8乃至図11において、30はビティ仮設足場、31はビティ仮設足場30の最上部の建枠部材(ビティ仮設足場の構造物)、40Bは建枠部材31の前側の縦枠31Aの上部に設置された簡易クレーン、14は簡易クレーン40Bにより地上からビティ仮設足場30の最上部の一段下のステージに荷揚げされる荷揚げ資材(足場部材) である。
Next, a second embodiment of the present invention will be described with reference to FIGS.
Figure 8 is a perspective view showing a state of use of simple crane according to the present invention, FIG. 9 is an assembled view of the simple crane 10 is a view illustrating the operation of the gas Idoropu, FIG. 11 is an explanatory view of how to use a simple crane.
8 to 11, 30 is a bitty temporary scaffold, 31 is an uppermost building frame member of the bitty temporary scaffold 30 (structure of the bitty temporary scaffold), and 40B is located above the vertical frame 31A on the front side of the building frame member 31. The installed simple crane 14 is an unloading material (scaffolding member) that is unloaded from the ground to the stage below the topmost part of the temporary temporary scaffold 30 by the simple crane 40B.

簡易クレーン40Bの内、41は基部部材としての角パイプ材からなる基部支柱であり、3つの締結金具(クランプ)42により建枠部材31の縦枠31Aの上部に鉛直向き、かつ着脱自在に締結されている。締結金具42は基部支柱41に予め固着していてもよく、或いは、現場で基部支柱41に着脱自在に装着しても良い。43は三角枠形のブラケットであり、基部支柱41に対して、上下3箇所の支軸44により水平面内で前方を基準にして左右に各々90乃至120度ずつ旋回可能に装着されている。ブラケット43の上枠45の前端には荷吊り用ホイスト取り付け部としてのU字状の荷吊り用ホイスト取り付け金具46が固着されおり、この荷吊り用ホイスト取り付け金具46に荷吊り用ホイスト47が掛脱自在に懸吊されている。   Of the simple crane 40B, reference numeral 41 denotes a base column made of a square pipe material as a base member, and is fastened vertically and detachably to the upper part of the vertical frame 31A of the building frame member 31 by three fastening brackets (clamps) 42. Has been. The fastening bracket 42 may be fixed to the base column 41 in advance, or may be detachably attached to the base column 41 in the field. Reference numeral 43 denotes a triangular frame-shaped bracket which is attached to the base column 41 so as to be capable of turning 90 to 120 degrees to the left and right with respect to the front in the horizontal plane by three support shafts 44 at the top and bottom. A U-shaped load hoist mounting bracket 46 as a load hoist mounting portion is fixed to the front end of the upper frame 45 of the bracket 43, and the load hoist 47 is hung on the load hoist mounting bracket 46. It is suspended freely.

図9に示す如く、ブラケット43の上枠45には前方に延設された前方延設部48Bが着脱自在に装着されている。第2実施例の前方延設部48Bは、角パイプ材を溶接することにより略7字形に形成されており、前端部がブラケット43の上枠45の前端から更に前方に突出しており、後端部が上枠45の後端から上方へ逆L字状に立ち上がっている。前方延設部48Bの前後3個所の両側に3組の固定金具60と60、61と61、62と62の上端部がボルト止めされており、固定金具60と60、61と61、62と62の下端部間が上枠45を跨いでボルト止めされている。前方延設部48Bの前端には左右一対の支持金具63と63を介して前側ガイドロープ用シーブ64が装着されている。また、前方延設部48Bの後端部の立ち上がり部65の上部前端には、後側ガイドロープ用滑車取り付け部としてのU字状の後側ガイドロープ用滑車取り付け金具66が固着されており、この後側ガイドロープ取り付け金具66に後側ガイドロープ用滑車67を掛脱自在に懸吊可能になっている。   As shown in FIG. 9, a front extending portion 48 </ b> B extending forward is detachably attached to the upper frame 45 of the bracket 43. The front extending portion 48B of the second embodiment is formed in a substantially seven shape by welding a square pipe material, and the front end portion protrudes further forward from the front end of the upper frame 45 of the bracket 43, and the rear end The portion rises upward from the rear end of the upper frame 45 in an inverted L shape. The upper ends of the three sets of fixing brackets 60 and 60, 61 and 61, 62 and 62 are bolted to both sides of the front extending portion 48B in the front and rear three portions, and the fixing brackets 60 and 60, 61 and 61, 62 are The lower end portion of 62 is bolted across the upper frame 45. A front guide rope sheave 64 is attached to the front end of the front extension 48B via a pair of left and right support fittings 63 and 63. Further, a U-shaped rear guide rope pulley attachment fitting 66 as a rear guide rope pulley attachment portion is fixed to the upper front end of the rising portion 65 at the rear end portion of the front extension portion 48B. A rear guide rope pulley 67 can be hooked and detachably attached to the rear guide rope attachment fitting 66.

図8と図11は上記した簡易クレーンによる資材荷揚げ方法の説明図、図10はガイドロープの作用説明図であり、以下、これらの図を参照して上記した第2実施例の作用を説明する。
図8に示す如く、予めビティ仮設足場30の最上部の前側の縦枠31Aの上端近くに簡易クレーン40Bが締結金具42により締結済みであるとする。また、後側ガイドロープ用滑車取り付け金具66に後側ガイドロープ用滑車67が懸吊してある。ガイドロープ52の一端側に設けたフック53が仮設足場30に掛け止められており、ガイドロープ52の他端側が後側ガイドロープ用滑車67と前側ガイドロープ用シーブ64に巻装されたのち、地上近くに垂れ下げられているものとする。
簡易クレーン40Bの荷吊り用ホイスト取り付け金具46には荷吊り用ホイスト47が懸吊してある。荷吊り用ホイスト47から巻き出されたワイヤロープ81の先端に吊りフック82が取り付けてある。簡易クレーン40Bのブラケット43は左右に各々90乃至120度の範囲で旋回可能としてある。
8 and 11 are explanatory diagrams of the material unloading method using the simple crane described above, and FIG. 10 is an explanatory diagram of the operation of the guide rope. Hereinafter, the operation of the second embodiment will be described with reference to these drawings. .
As shown in FIG. 8, it is assumed that the simple crane 40 </ b> B has been fastened by the fastening bracket 42 in the vicinity of the upper end of the vertical frame 31 </ b> A on the uppermost side of the uppermost portion of the temporary temporary scaffold 30. Further, a rear guide rope pulley 67 is suspended from a rear guide rope pulley attachment fitting 66. A hook 53 provided on one end side of the guide rope 52 is hooked on the temporary scaffold 30, and after the other end side of the guide rope 52 is wound around the rear guide rope pulley 67 and the front guide rope sheave 64, It is assumed that it is hung near the ground.
A load hoist 47 is suspended from a load hoist mounting bracket 46 of the simple crane 40B. A suspension hook 82 is attached to the tip of the wire rope 81 unwound from the load hoist 47. The bracket 43 of the simple crane 40B can turn in the range of 90 to 120 degrees to the left and right.

地上に玉掛けをする作業員A、ビティ仮設足場30の最上部より一段下の足場上に荷吊り用ホイスト47の操作、ガイドロープ52の操作、荷揚げ資材14の引き込みを行う作業員Bが配置されているものとする。
簡易クレーン40Bが前方向きの状態で、作業員Bはリモコン90を操作し、荷吊り用ホイスト47を稼働させてワイヤロープ81を垂下し、吊りフック82を地上近くまで下げる。作業員Aはガイドロープ52をガイドロープ用滑車84に通して掛装するとともに、ガイドロープ用滑車84のステー85を吊りフック82に掛装して支持させる。また、荷揚げ資材14に玉掛けワイヤ83で玉掛けし、吊りフック82に取り付けたシャックル86に玉掛けワイヤ83を取り付ける。そして、ガイドロープ52の先端に設けたフック54を重量物102Bに掛け止めて固定する。重量物102Bとの固定箇所は、簡易クレーン40Bが前向きのときの前側ガイドロープ用シーブ64の直下より、少し前方にすると良い。
Worker A who hangs on the ground and worker B who operates the hoist 47 for lifting the load, operates the guide rope 52, and pulls the unloading material 14 are placed on the scaffold one step below the top of the temporary temporary scaffold 30. It shall be.
With the simple crane 40B facing forward, the worker B operates the remote controller 90, operates the load hoist 47, hangs the wire rope 81, and lowers the hanging hook 82 to near the ground. The worker A hangs the guide rope 52 through the guide rope pulley 84 and hangs the stay 85 of the guide rope pulley 84 on the suspension hook 82. The slinging wire 83 is hung on the lifting material 14 and the slinging wire 83 is attached to the shackle 86 attached to the hanging hook 82. Then, the hook 54 provided at the tip of the guide rope 52 is hooked and fixed to the heavy object 102B. It is preferable that the fixed portion with the heavy object 102B be slightly forward from directly below the front guide rope sheave 64 when the simple crane 40B is facing forward.

作業員Bがリモコン90の操作で荷吊り用ホイスト47を吊りフック上昇側に回転させ、ワイヤロープ81を巻き上げて荷揚げ資材14を上昇させる。この際、作業員Bはガイドロープ52の内、後側ガイドロープ用滑車67とフック53の間を引っ張り、前側ガイドロープ用シーブ64と地上との間のガイドロープ52を張った状態にして荷揚げ資材14の揺れを制御する。作業員Bがガイドロープ52を引っ張ると、ガイドロープ用滑車84と吊りフック82を介して荷揚げ資材14がガイドロープ52寄りに引っ張られる。
ここで図10に示す如く、前側ガイドロープ用シーブ64をa’点、ガイドロープ用滑車84をb点、地上近くの固定個所をc’点とし、三角形a’bc’の点bから辺a’c’に下ろした垂線と辺a’c’との交点をd’とすると、ガイドロープ用滑車84から下側のガイドロープ52がガイドロープ用滑84に加えるbd’方向の力の成分f1’と、ガイドロープ用滑車84から上側のガイドロープ52がガイドロープ用滑車84に加えるbd’方向の力の成分f2’の和が吊り荷に対する凡その振れ止め制御力となる。ガイドロープ52の重量を無視し作業員Bがガイドロープ52に加える引っ張り力をF’、角度bc’d’をθ1’、角度ba’d’をθ2’とすると、
f1’=F’・sinθ1’、f2’=F’・sinθ2’
である。
吊り荷の揚程が高い場合、図10(1)に示す如く、吊り荷としての足場資材14が地上近くにあるときは、ガイドロープ52の下端と重量物102Bとの固定個所を前寄りとしておくことでθ1’を容易に大きくでき、作業員Bがガイドロープ52を強く引っ張らなくても振れ止め制御が可能である。また、荷揚げ資材14が高く上がったときは図10(2)に示す如く、θ2’が比較的大きくなり、ガイドロープ用滑車84の上側のガイドロープ52が吊りフック82を前方へ比較的大きな力で引っ張るようになるので、作業員Bがガイドロープ52を強く引っ張らなくても吊り荷の振れが抑制される。
The operator B operates the remote controller 90 to rotate the load hoist 47 to the lifting hook raising side, winds the wire rope 81 and raises the unloading material 14. At this time, the operator B pulls the guide rope 52 between the rear guide rope pulley 67 and the hook 53 and unloads the guide rope 52 between the front guide rope sheave 64 and the ground. The shaking of the material 14 is controlled. When the worker B pulls the guide rope 52, the unloading material 14 is pulled closer to the guide rope 52 via the guide rope pulley 84 and the suspension hook 82.
As shown in FIG. 10, the front guide rope sheave 64 is a 'point, the guide rope pulley 84 is b point, the fixed part near the ground is c' point, and the side a from the point b of the triangle a'bc ' Assuming that the intersection point of the perpendicular line down to “c” and the side a′c ”is d ′, the component f1 of the force in the bd ′ direction that the lower guide rope 52 applies to the guide rope pulley 84 from the guide rope pulley 84. The sum of the component f2 'of the force in the bd' direction applied to the guide rope pulley 84 by the upper guide rope 52 from the guide rope pulley 84 is the general anti-sway control force for the suspended load. When the weight of the guide rope 52 is ignored and the pulling force applied to the guide rope 52 by the worker B is F ′, the angle bc′d ′ is θ1 ′, and the angle ba′d ′ is θ2 ′,
f1 ′ = F ′ · sin θ1 ′, f2 ′ = F ′ · sin θ2 ′
It is.
When the lift of the suspended load is high, as shown in FIG. 10 (1), when the scaffolding material 14 as the suspended load is near the ground, the fixing point between the lower end of the guide rope 52 and the heavy object 102B is set forward. Thus, θ1 ′ can be easily increased, and the steadying control can be performed without the operator B pulling the guide rope 52 strongly. Further, when the unloading material 14 rises high, as shown in FIG. 10 (2), θ2 ′ becomes relatively large, and the guide rope 52 on the upper side of the guide rope pulley 84 pushes the suspension hook 82 forward with a relatively large force. Therefore, even if the worker B does not pull the guide rope 52 strongly, the swing of the suspended load is suppressed.

荷揚げ資材14がビティ仮設足場30の最上部の一段下まで上がったところで、作業員Bは荷吊り用ホイスト47を停止し、ガイドロープ52を緩める。そして、荷揚げ資材14をブラケット43とともに旋回させながらビティ仮設足場30の最上部より一段下に取り込む(図11参照)。   When the unloading material 14 has been raised to the level below the uppermost part of the temporary temporary scaffold 30, the worker B stops the hoist 47 for lifting the load and loosens the guide rope 52. Then, the unloading material 14 is swung together with the bracket 43 and taken in one step below the top of the temporary temporary scaffold 30 (see FIG. 11).

この第2実施例によっても、ブラケット43に設けた前方延設部48Bの前端部の前側ガイドロープ用シーブ64から地上近くまでガイドロープ52を垂らし、ブラケット43の前部に懸吊した荷吊り用ホイスト47から巻き出し垂下したワイヤロープ81の先端の吊りフック82に支持させたガイドロープ用滑車84にガイドロープ52を通すとともに、ガイドロープ52の下端を固定物102Bに固定しておき、荷揚げ中にガイドロープ52を仮設足場30の作業員Bが引っ張ると、吊りフック82とともに荷揚げ資材14がガイドロープ用滑車84を介してガイドロープ52寄りに引っ張られる。荷の揚程が高い場合に、荷揚げ資材14が地上近くにあるときは、予めガイドロープ52の下端を前寄りに固定しておくことで、作業員Bがガイドロープ52を強く引っ張らなくても容易に荷揚げ資材14の振れ止め制御を行うことができる。また、荷揚げ資材14が高い位置に上がったときは、ガイドロープ用滑車84の上側のガイドロープ52が吊りフック82を前方へ比較的大きな力で引っ張るようになるので、作業員Bがガイドロープ52を強く引っ張らなくても吊り荷の振れが抑制される。
また、荷揚げ資材14の吊り上げ後、作業員Bがガイドロープ52を緩めることで、ブラケット43を旋回させて吊り荷を仮設足場30に近づけることができ、足場内への引き込み作業が容易となる。
また、荷揚げ中に地上の作業員Aはガイドロープ52を引っ張らなくて済み、他の作業を行うことができる。
Also according to the second embodiment, the guide rope 52 is hung from the front guide rope sheave 64 at the front end portion of the front extending portion 48B provided on the bracket 43 to the ground, and suspended from the front portion of the bracket 43. The guide rope 52 is passed through the guide rope pulley 84 supported by the suspension hook 82 at the tip of the wire rope 81 unwound from the hoist 47 and the lower end of the guide rope 52 is fixed to the fixed object 102B. When the operator B of the temporary scaffold 30 pulls the guide rope 52, the unloading material 14 is pulled along with the suspension hook 82 toward the guide rope 52 via the guide rope pulley 84. When the lift of the load is high and the unloading material 14 is near the ground, the lower end of the guide rope 52 is fixed to the front in advance, so that the operator B can easily do not pull the guide rope 52 strongly. The steadying control of the unloading material 14 can be performed. When the unloading material 14 is raised to a high position, the guide rope 52 on the upper side of the guide rope pulley 84 pulls the suspension hook 82 forward with a relatively large force. Even if it is not pulled strongly, the swing of the suspended load is suppressed.
In addition, after lifting the unloading material 14, the worker B loosens the guide rope 52, so that the bracket 43 can be turned to bring the suspended load closer to the temporary scaffold 30, and the drawing work into the scaffold becomes easy.
Further, the worker A on the ground does not have to pull the guide rope 52 during unloading, and can perform other operations.

なお、上記した第2実施例では、ガイドロープの下端側を地上の重量物に固定し、ガイドロープの上端側を仮設足場の上の作業員が引っ張るようにしたが、ガイドロープの上端側を仮設足場に固定し、下端側を地上の作業員が引っ張るようにしても良い。
また、ブラケットの前部にU字状の荷吊り用ホイスト取り付け金具を設けて、荷吊り用ホイストを懸吊可能としたが、U字状の荷吊り用滑車取り付け金具に置き換え、仮設足場等に設置したウインチから巻き出された吊りフック付のワイヤロープを荷吊り用滑車取り付け金具に懸吊した荷吊り用滑車に巻装し、下方へ垂下するようにしても良い。或いは、U字状の荷吊り用ホイスト取り付け金具を荷吊り用シーブに置き換え、仮設足場等に設置したウインチから巻き出された吊りフック付のワイヤロープを荷吊り用シーブに巻装したのち、下方へ垂下するようにしても良い。
In the second embodiment described above, the lower end side of the guide rope is fixed to a heavy object on the ground and the upper end side of the guide rope is pulled by an operator on the temporary scaffold. It may be fixed to a temporary scaffold and a ground worker may pull the lower end side.
In addition, a U-shaped load hoist mounting bracket is provided at the front of the bracket so that the load hoist can be suspended. However, the U-shaped load lifting pulley mounting bracket can be replaced with a temporary scaffolding, etc. A wire rope with a hanging hook unwound from an installed winch may be wound on a load pulley suspended from a load pulley attachment bracket and hung downward. Alternatively, replace the U-shaped load hoist mounting bracket with a load sheave, wind a wire rope with a hook hook unwound from a winch installed on a temporary scaffolding, etc. You may make it hang down.

また、前方延設部の前端部に前側カイドロープ用シーブを装着するようにしたが、ブラケットの上枠に固着される前方延設部を図12の符号48Cの如く変形し、前方延設部48Cの前端を逆L字状に立ち上げ、立ち上がり部68の上部前端に、前側ガイドロープ用滑車取り付け部としてのU字状の前側ガイドロープ用滑車取り付け金具69を固着し、この前側ガイドロープ用滑車取り付け金具69に前側ガイドロープ用滑車70を掛脱自在に懸吊可能としても良い。図12の前方延設部48Cが装着された簡易クレーンを仮設足場に締結後、一端側を仮設足場に止めたガイドロープの他端側を、後側ガイドロープ用滑車取り付け金具66に取り付けた後側ガイドロープ用滑車67と前側ガイドロープ用滑車取り付け金具69に取り付けた前側ガイドロープ用滑車70に巻き掛けたのち、地上近くまで垂らし、地上の重量物に固定すれば良い。   Also, the front guide rope sheave is attached to the front end portion of the front extension portion, but the front extension portion fixed to the upper frame of the bracket is deformed as indicated by reference numeral 48C in FIG. The front end of the guide rope is raised in an inverted L shape, and a U-shaped front guide rope pulley attachment fitting 69 as a front guide rope pulley attachment portion is fixed to the upper front end of the rising portion 68. The front guide rope pulley 70 may be hooked and detachably suspended from the mounting bracket 69. After fastening the simple crane with the forward extending portion 48C of FIG. 12 attached to the temporary scaffolding, after attaching the other end of the guide rope with one end to the temporary scaffolding to the rear guide rope pulley fitting 66. What is necessary is just to hang | hang around near the ground after hanging on the pulley 70 for front guide ropes attached to the pulley 67 for side guide ropes, and the pulley attachment bracket 69 for front side guide ropes, and just to fix to the heavy article on the ground.

また、上記した各実施例及びその変形例では、ガイドロープ用滑車を吊りフックに支持させるようにしたが、玉掛けワイヤに支持させたり、荷揚げ資材に支持させるようにしても良い。   Further, in each of the above-described embodiments and modifications thereof, the guide rope pulley is supported by the hanging hook, but may be supported by a sling wire or supported by a lifting material.

本発明は、マンション、ビル等の建築物の新築・改修工事現場等に設置される架設足場の上で使用するクレーンに適用できる。   INDUSTRIAL APPLICABILITY The present invention can be applied to a crane used on a construction scaffold installed in a new construction / renovation construction site of a building such as an apartment or a building.

14 荷揚げ資材
30 ビティ仮設足場
31 建枠部材
40、40A、40B 簡易クレーン
41 基部支柱
42 クランプ
43 ブラケット
44 支軸
45 上枠
46 荷吊り用ホイスト取り付け金具
47 荷吊り用ホイスト
48、48B、48C 前方延設部
51 ガイドロープ取り付け金具
51A ガイドロープ用ホイスト取り付け金具
52、101 ガイドロープ
64 前側ガイドロープ用シーブ
66 後側ガイドロープ用滑車取り付け金具
67 後側ガイドロープ用滑車
69 前側ガイドロープ用滑車取り付け金具
70 前側ガイドロープ用滑車
81 ワイヤロープ
82 吊りフック
83 玉掛けワイヤ
84 ガイドロープ用滑車
102、102B 重量物
14 Lifting material 30 Bitity temporary scaffold 31 Building frame member 40, 40A, 40B Simple crane 41 Base column 42 Clamp 43 Bracket 44 Support shaft 45 Upper frame 46 Hoist mounting bracket for load lifting 47 Hoist for loading 48, 48B, 48C Installation portion 51 Guide rope mounting bracket 51A Guide rope hoist mounting bracket 52, 101 Guide rope 64 Front guide rope sheave 66 Rear guide rope pulley mounting bracket 67 Rear guide rope pulley 69 Front guide rope pulley mounting bracket 70 Pulley for front guide rope 81 Wire rope 82 Suspension hook 83 Catch wire 84 Pulley for guide rope 102, 102B Heavy goods

Claims (16)

仮設足場の構造物に着脱自在に装着可能な基部部材と、
基部部材に水平面内で旋回自在に軸支されたブラケットと、
ブラケットの前部に設けられた荷吊り用ホイスト取り付け部と、
ブラケットに設けられた前方延設部と、
前方延設部の前端部に設けられたガイドロープ取り付け部と、
を備え、
荷吊り用ホイスト取り付け部に取り付けた荷吊り用ホイストから吊りフック付のワイヤロープを垂下し、吊りフックに荷揚げ資材を玉掛けするとともに、
ガイドロープ取り付け部に上端部を取り付けたガイドロープを地上近くまで垂らし、このガイドロープに吊りフックまたは玉掛けワイヤまたは荷揚げ資材に支持させた滑車を通し、
ガイドロープの下端部を地上の作業員が引っ張るかまたは張った状態で地上近くに固定することにより、荷揚げ資材がガイドロープ寄りに引っ張られるようにしたこと、
を特徴とする簡易クレーン。
A base member detachably attachable to the structure of the temporary scaffold,
A bracket pivotally supported on the base member in a horizontal plane,
A load hoist mounting portion provided at the front of the bracket;
A front extension provided on the bracket;
A guide rope attaching portion provided at a front end portion of the front extending portion;
With
While hanging a wire rope with a hanging hook from the lifting hoist attached to the lifting hoist mounting part, hanging the lifting material on the hanging hook,
The guide rope with the upper end attached to the guide rope attachment part is hung down to the ground, and the guide rope is passed through a suspension hook or sling wire or a pulley supported by a lifting material,
The lower end of the guide rope was pulled near the ground while being pulled or stretched by an operator on the ground, so that the unloading material was pulled closer to the guide rope,
A simple crane characterized by
ブラケットの前部に、荷吊り用ホイスト取り付け部に代えて荷吊り用滑車取り付け部を設け、
荷吊り用滑車取り付け部に取り付けた荷吊り用滑車に荷吊り用ウインチから巻き出した吊りフック付のワイヤロープを巻き掛けて垂下し、吊りフックに荷揚げ資材を玉掛けするようにしたこと、
を特徴とする請求項1記載の簡易クレーン。
In the front part of the bracket, instead of the lifting hoist mounting part, a lifting pulley mounting part is provided,
A wire rope with a hanging hook that was unwound from a lifting winch was hung on a hanging pulley attached to the loading pulley attachment part and suspended, and the lifting material was slung on the hanging hook.
The simple crane according to claim 1.
ブラケットの前部に、荷吊り用ホイスト取り付け部に代えて荷吊り用シーブを設け、
荷吊り用シーブに荷吊り用ウインチから巻き出した吊りフック付のワイヤロープを巻き掛けて垂下し、吊りフックに荷揚げ資材を玉掛けするようにしたこと、
を特徴とする請求項1記載の簡易クレーン。
At the front of the bracket, instead of the load hoist mounting part, a load sheave is provided,
A wire rope with a hanging hook that was unwound from a lifting winch was hung on a hanging sheave and suspended, and the lifting material was hung on the hanging hook.
The simple crane according to claim 1.
前方延設部の前端部に、ガイドロープ取り付け部に代えてガイドロープ用ホイスト取り付け部を設け、このガイドロープ用ホイスト取り付け部に取り付けたガイドロープ用ホイストからガイドロープを垂らすようにしたこと、
を特徴とする請求項1乃至3の内のいずれか一項記載の簡易クレーン。
At the front end of the front extension part, instead of the guide rope attachment part, a guide rope hoist attachment part was provided, and the guide rope was hung from the guide rope hoist attached to the guide rope hoist attachment part,
The simple crane as described in any one of Claims 1 thru | or 3 characterized by these.
仮設足場の構造物に着脱自在に装着可能な基部部材と、
基部部材に水平面内で旋回自在に軸支されたブラケットと、
ブラケットの前部に設けられた荷吊り用ホイスト取り付け部と、
ブラケットに設けられた前方延設部と、
前方延設部の前端部に設けられた前側ガイドロープ用シーブと、
ブラケットの後端部の上側に設けられた後側ガイドロープ用滑車取り付け部と、
を備え、
荷吊り用ホイスト取り付け部に取り付けた荷吊り用ホイストから吊りフック付のワイヤロープを垂下し、吊りフックに荷揚げ資材を玉掛けするとともに、
ガイドロープの一端側を仮設足場に止め、ガイドロープの他端側を後側ガイドロープ用滑車取り付け部に取り付けた後側ガイドロープ用滑車と前側ガイドロープ用シーブに巻き掛けたのち、地上近くまで垂らし、ガイドロープに吊りフックまたは玉掛けワイヤまたは荷揚げ資材に支持させた滑車を通し、
ガイドロープの下端部を地上近くに固定するとともに、仮設足場の上の作業員がガイドロープの一端側を引っ張ることにより、荷揚げ資材がガイドロープ寄りに引っ張られるようにしたこと、
を特徴とする簡易クレーン。
A base member detachably attachable to the structure of the temporary scaffold,
A bracket pivotally supported on the base member in a horizontal plane,
A load hoist mounting portion provided at the front of the bracket;
A front extension provided on the bracket;
A sheave for the front guide rope provided at the front end of the front extension part;
A rear guide rope pulley mounting portion provided above the rear end of the bracket;
With
While hanging a wire rope with a hanging hook from the lifting hoist attached to the lifting hoist mounting part, hanging the lifting material on the hanging hook,
Stop one end of the guide rope on the temporary scaffold, wrap the other end of the guide rope around the rear guide rope pulley and the front guide rope sheave attached to the rear guide rope pulley attachment, and then close to the ground Hanging down, passing a suspension hook or sling wire or a pulley supported by a lifting material through a guide rope,
The lower end of the guide rope was fixed near the ground, and the worker on the temporary scaffolding pulled the one end of the guide rope so that the unloading material was pulled closer to the guide rope.
A simple crane characterized by
ブラケットの前部に、荷吊り用ホイスト取り付け部に代えて荷吊り用滑車取り付け部を設け、
荷吊り用滑車取り付け部に取り付けた荷吊り用滑車に荷吊り用ウインチから巻き出した吊りフック付のワイヤロープを巻き掛けて垂下し、吊りフックに荷揚げ資材を玉掛けするようにしたこと、
を特徴とする請求項5記載の簡易クレーン。
In the front part of the bracket, instead of the lifting hoist mounting part, a lifting pulley mounting part is provided,
A wire rope with a hanging hook that was unwound from a lifting winch was hung on a hanging pulley attached to the loading pulley attachment part and suspended, and the lifting material was slung on the hanging hook.
The simple crane according to claim 5.
ブラケットの前部に、荷吊り用ホイスト取り付け部に代えて荷吊り用シーブを設け、
荷吊り用シーブに荷吊り用ウインチから巻き出した吊りフック付のワイヤロープを巻き掛けて垂下し、吊りフックに荷揚げ資材を玉掛けするようにしたこと、
を特徴とする請求項5記載の簡易クレーン。
At the front of the bracket, instead of the load hoist mounting part, a load sheave is provided,
A wire rope with a hanging hook that was unwound from a lifting winch was hung on a hanging sheave and suspended, and the lifting material was hung on the hanging hook.
The simple crane according to claim 5.
前方延設部の前端部に、前側ガイドロープ用シーブに代えて前側ガイドロープ用滑車取り付け部を設け、一端側を仮設足場に止めたガイドロープの他端側を後側ガイドロープ用滑車取り付け部に取り付けた後側ガイドロープ用滑車と前側ガイドロープ用滑車取り付け部に取り付けた後側ガイドロープ用滑車に巻き掛けたのち、地上近くまで垂らすようにしたこと、
を特徴とする請求項5乃至7の内のいずれか一項記載の簡易クレーン
A front guide rope sheave mounting portion is provided at the front end portion of the front extension portion instead of the front guide rope sheave, and the other end side of the guide rope having one end fixed to the temporary scaffolding is the rear guide rope pulley mounting portion. After being wrapped around the rear guide rope pulley attached to the rear guide rope pulley attached to the front guide rope pulley attachment section, it was hung down to the ground.
A simple crane according to any one of claims 5 to 7 .
仮設足場の構造物に着脱自在に装着可能な基部部材と、基部部材に水平面内で旋回自在に軸支されたブラケットと、ブラケットの前部に設けられた荷吊り用ホイスト取り付け部とを備えた簡易クレーンの内、ブラケットに設けた前方延設部の前端部にガイドロープ取り付け部を設けておき、
荷吊り用ホイスト取り付け部に取り付けた荷吊り用ホイストから先端に吊りフック付のワイヤロープを垂下し、吊りフックに吊り荷を玉掛けするとともに、
ガイドロープ取り付け部に上端を取り付けたガイドロープを地上近くまで垂らし、ガイドロープに吊りフックまたは玉掛けワイヤまたは荷揚げ資材に支持させた滑車を通し、
荷揚げ中、ガイドロープの下端部を地上の作業員が引っ張るかまたは張った状態で地上近くに固定することにより、荷揚げ資材がガイドロープ寄りに引っ張られるようにしたこと、
を特徴とする簡易クレーンによる吊り荷の振れ止め方法。
A base member that can be detachably attached to the structure of the temporary scaffold, a bracket that is pivotally supported on the base member so as to be rotatable in a horizontal plane, and a load hoist attachment portion that is provided at the front portion of the bracket. A guide rope attachment is provided at the front end of the front extension of the simple crane,
A wire rope with a hanging hook is suspended from the lifting hoist attached to the lifting hoist mounting section, and a suspended load is hung on the hanging hook.
The guide rope with the upper end attached to the guide rope attachment part is hung to the ground, and the guide rope is passed through a suspension hook or slinging wire or a pulley supported by a lifting material,
The unloading material was pulled closer to the guide rope by unloading the lower end of the guide rope while it was unloaded, or by fixing it near the ground while being pulled or stretched by the ground worker.
A method for stabilizing a suspended load using a simple crane.
ブラケットの前部に、荷吊り用ホイスト取り付け部に代えて荷吊り用滑車取り付け部を設け、
荷吊り用滑車取り付け部に取り付けた荷吊り用滑車に荷吊り用ウインチから巻き出した吊りフック付のワイヤロープを巻き掛けて垂下し、吊りフックに荷揚げ資材を玉掛けするようにしたこと、
を特徴とする請求項9記載の簡易クレーンによる吊り荷の振れ止め方法。
In the front part of the bracket, instead of the lifting hoist mounting part, a lifting pulley mounting part is provided,
A wire rope with a hanging hook that was unwound from a lifting winch was hung on a hanging pulley attached to the loading pulley attachment part and suspended, and the lifting material was slung on the hanging hook.
The method for preventing a suspended load from swinging with a simple crane according to claim 9.
ブラケットの前部に、荷揚げ用ホイスト取り付け部に代えて荷吊り用シーブを設け、
荷吊り用シーブに荷吊り用ウインチから巻き出した吊りフック付のワイヤロープを巻き掛けて垂下し、吊りフックに荷揚げ資材を玉掛けするようにしたこと、
を特徴とする請求項9記載の簡易クレーンによる吊り荷の振れ止め方法。
In place of the lifting hoist mounting part at the front part of the bracket, a load sheave is provided,
A wire rope with a hanging hook that was unwound from a lifting winch was hung on a hanging sheave and suspended, and the lifting material was hung on the hanging hook.
The method for preventing a suspended load from swinging with a simple crane according to claim 9.
前方延設部の前端部に、ガイドロープ取り付け部に代えてガイドロープ用ホイスト取り付け部を設け、このガイドロープ用ホイスト取り付け部に取り付けたガイドロープ用ホイストからガイドロープを垂らすようにしたこと、
を特徴とする請求項9乃至11の内のいずれか一項記載の簡易クレーンによる吊り荷の振れ止め方法。
At the front end of the front extension part, instead of the guide rope attachment part, a guide rope hoist attachment part was provided, and the guide rope was hung from the guide rope hoist attached to the guide rope hoist attachment part,
The method for preventing a suspended load from swinging with a simple crane according to any one of claims 9 to 11.
仮設足場の構造物に着脱自在に装着可能な基部部材と、基部部材に水平面内で旋回自在に軸支されたブラケットと、ブラケットの前部に設けられた荷吊り用ホイスト取り付け部とを備えた簡易クレーンの内、ブラケットに設けた前方延設部の前端部に前側ガイドロープ用シーブを設けるとともに、ブラケットの後端部の上側に後側ガイドロープ用滑車取り付け部を設けておき、
荷吊り用ホイスト取り付け部に取り付けた荷吊り用ホイストから吊りフック付のワイヤロープを垂下し、吊りフックに吊り荷を玉掛けするとともに、
一端側を仮設足場に止めたガイドロープの他端側を、後側ガイドロープ用滑車取り付け部に取り付けた後側ガイドロープ用滑車と前側ガイドロープ用シーブに巻き掛けたのち、地上近くまで垂らし、ガイドロープに吊りフックまたは玉掛けワイヤまたは荷揚げ資材に支持させた滑車を掛装し、
荷揚げ中、ガイドロープの下端側を地上近くに固定し、上端側を仮設足場の上の作業員が引っ張ることにより、荷揚げ資材がガイドロープ寄りに引っ張られるようにしたこと、
を特徴とする簡易クレーンによる吊り荷の振れ止め方法。
A base member that can be detachably attached to the structure of the temporary scaffold, a bracket that is pivotally supported on the base member so as to be rotatable in a horizontal plane, and a load hoist attachment portion that is provided at the front portion of the bracket. Among the simple cranes, a front guide rope sheave is provided at the front end portion of the front extension portion provided on the bracket, and a rear guide rope pulley mounting portion is provided above the rear end portion of the bracket.
While hanging a wire rope with a hanging hook from the lifting hoist attached to the lifting hoist mounting part, hanging a suspended load on the hanging hook,
After wrapping the other end of the guide rope with one end on the temporary scaffolding wrapped around the rear guide rope pulley and the front guide rope sheave attached to the rear guide rope pulley attachment, hang it down to the ground, Hang a pulley that is supported by a suspension hook or sling wire or a lifting material on a guide rope,
During unloading, the lower end side of the guide rope was fixed near the ground, and the upper end side was pulled by a worker on the temporary scaffold, so that the unloading material was pulled closer to the guide rope.
A method for stabilizing a suspended load using a simple crane.
ブラケットの前部に、荷吊り用ホイスト取り付け部に代えて荷吊り用滑車取り付け部を設け、
荷吊り用滑車取り付け部に取り付けた荷吊り用滑車に荷吊り用ウインチから巻き出した吊りフック付のワイヤロープを巻き掛けて垂下し、吊りフックに荷揚げ資材を玉掛けするようにしたこと、
を特徴とする請求項9記載の簡易クレーンによる吊り荷の振れ止め方法。
In the front part of the bracket, instead of the lifting hoist mounting part, a lifting pulley mounting part is provided,
A wire rope with a hanging hook that was unwound from a lifting winch was hung on a hanging pulley attached to the loading pulley attachment part and suspended, and the lifting material was slung on the hanging hook.
The method for preventing a suspended load from swinging with a simple crane according to claim 9.
ブラケットの前部に、荷揚げ用ホイスト取り付け部に代えて荷吊り用シーブを設け、
荷吊り用シーブに荷吊り用ウインチから巻き出した吊りフック付のワイヤロープを巻き掛けて垂下し、吊りフックに荷揚げ資材を玉掛けするようにしたこと、
を特徴とする請求項9記載の簡易クレーンによる吊り荷の振れ止め方法。
In place of the lifting hoist mounting part at the front part of the bracket, a load sheave is provided,
A wire rope with a hanging hook that was unwound from a lifting winch was hung on a hanging sheave and suspended, and the lifting material was hung on the hanging hook.
The method for preventing a suspended load from swinging with a simple crane according to claim 9.
前方延設部の前端部に、前側ガイドロープ用シーブに代えて前側ガイドロープ用滑車取り付け部を設け、一端側を仮設足場に止めたガイドロープの他端側を、後側ガイドロープ用滑車取り付け部に取り付けた後側ガイドロープ用滑車と前側ガイドロープ用滑車取り付け部に取り付けた前側ガイドロープ用滑車に巻き掛けたのち、地上近くまで垂らすようにしたこと、
を特徴とする請求項13乃至15の内のいずれか一項記載の簡易クレーンによる吊り荷の振れ止め方法。
A front guide rope sheave mounting part is provided at the front end of the front extension instead of the front guide rope sheave, and the other end of the guide rope with one end fixed to the temporary scaffolding is attached to the rear guide rope sheave. After being wrapped around the rear guide rope pulley attached to the front guide pulley and the front guide rope pulley attached to the front guide rope pulley attachment section, it was hung to near the ground,
The method for stabilizing a suspended load by a simple crane according to any one of claims 13 to 15.
JP2016126099A 2016-06-24 2016-06-24 Simple crane, suspension load suspension method with simple crane Active JP6103461B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016126099A JP6103461B1 (en) 2016-06-24 2016-06-24 Simple crane, suspension load suspension method with simple crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016126099A JP6103461B1 (en) 2016-06-24 2016-06-24 Simple crane, suspension load suspension method with simple crane

Publications (2)

Publication Number Publication Date
JP6103461B1 true JP6103461B1 (en) 2017-03-29
JP2017226541A JP2017226541A (en) 2017-12-28

Family

ID=59366127

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016126099A Active JP6103461B1 (en) 2016-06-24 2016-06-24 Simple crane, suspension load suspension method with simple crane

Country Status (1)

Country Link
JP (1) JP6103461B1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS51154878U (en) * 1975-06-05 1976-12-10
JP3023683U (en) * 1995-10-11 1996-04-23 株式会社スーパーツール Simple crane
JP2006144234A (en) * 2004-11-16 2006-06-08 Misawa Homes Co Ltd Panel suspending method
JP2007145509A (en) * 2005-11-28 2007-06-14 Chugoku Electric Power Co Inc:The Simple boom device
JP3181627U (en) * 2012-12-05 2013-02-14 眞司 大村 Lifting aid

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS51154878U (en) * 1975-06-05 1976-12-10
JP3023683U (en) * 1995-10-11 1996-04-23 株式会社スーパーツール Simple crane
JP2006144234A (en) * 2004-11-16 2006-06-08 Misawa Homes Co Ltd Panel suspending method
JP2007145509A (en) * 2005-11-28 2007-06-14 Chugoku Electric Power Co Inc:The Simple boom device
JP3181627U (en) * 2012-12-05 2013-02-14 眞司 大村 Lifting aid

Also Published As

Publication number Publication date
JP2017226541A (en) 2017-12-28

Similar Documents

Publication Publication Date Title
CN101177959A (en) Curtain wall unit hanging equipment and construction method thereof
CN108149928A (en) The tower end installation method of suspension cable
KR101114030B1 (en) Jib crane
JP2016199997A (en) Simple crane
JP6103461B1 (en) Simple crane, suspension load suspension method with simple crane
JP5948542B1 (en) Simple crane
JPWO2020035930A1 (en) How to extend the lift of a construction elevator and a rope unloading jig for an elevator
JP2008222382A (en) Method for moving lifting device for installation
JP6628310B2 (en) Derrick for steel tower assembly and dismantling
JP5888603B2 (en) Method of moving net suspension to indoor space and apparatus for moving net suspension to indoor space
JPWO2018138831A1 (en) Elevator installation method
JP6123148B1 (en) Rope direction changer
JP6638434B2 (en) Crane boom mounting method
JP5098389B2 (en) Elevator control cable suspension device
JP6127303B1 (en) Lifting aid
JP2018003492A (en) Simple crane, and auxiliary tool for the same
JP6003556B2 (en) Jib fixing method for mobile tower crane
JP2021050063A (en) Crane assembling method and crane
JP6917048B2 (en) Kaishakunin arm, and a crane arm with a kaishakunin arm
CN205294671U (en) Device of falling roof beam
JP2016023021A (en) Column lifting tool and method of using the same
CN210855068U (en) Suspension beam lifting device
JP2001316074A (en) Lifting jig for lifted cargo and its use
JP3233537U (en) Suspended support for cable drum
JP4708067B2 (en) Crane equipment

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20170125

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170202

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170217

R150 Certificate of patent or registration of utility model

Ref document number: 6103461

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350