JP6010059B2 - Equipment maintenance burden evaluation method and apparatus - Google Patents

Equipment maintenance burden evaluation method and apparatus Download PDF

Info

Publication number
JP6010059B2
JP6010059B2 JP2014025112A JP2014025112A JP6010059B2 JP 6010059 B2 JP6010059 B2 JP 6010059B2 JP 2014025112 A JP2014025112 A JP 2014025112A JP 2014025112 A JP2014025112 A JP 2014025112A JP 6010059 B2 JP6010059 B2 JP 6010059B2
Authority
JP
Japan
Prior art keywords
calculation unit
diversity
facility
unit area
area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014025112A
Other languages
Japanese (ja)
Other versions
JP2015153060A (en
Inventor
正浩 外間
正浩 外間
孝 澤田
孝 澤田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Telegraph and Telephone Corp
Original Assignee
Nippon Telegraph and Telephone Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Telegraph and Telephone Corp filed Critical Nippon Telegraph and Telephone Corp
Priority to JP2014025112A priority Critical patent/JP6010059B2/en
Publication of JP2015153060A publication Critical patent/JP2015153060A/en
Application granted granted Critical
Publication of JP6010059B2 publication Critical patent/JP6010059B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、分散設置された種類や状態の異なる各設備のメンテナンスに要する負担を、算出単位エリアごとに総合的に評価するためのメンテナンス負担評価技術に関する。   The present invention relates to a maintenance burden evaluation technique for comprehensively evaluating, for each calculation unit area, a burden required for maintenance of each facility that is distributed and installed in different types and states.

現代社会は様々な機能を保持した設備群によって維持されている。特にインフラストラクチャ設備は全国に設置されており、その種類や数は膨大である。
これらの設備が所定の機能を維持するよう、メンテナンス計画が策定され、実施されている。しかし、インフラストラクチャ設備の多くは高度成長期に集中的に整備されており、老朽化に伴うメンテナンスコストの増大が問題となっている。
Modern society is maintained by a group of equipment with various functions. In particular, infrastructure facilities are installed throughout the country, and the types and number of them are enormous.
A maintenance plan is formulated and implemented so that these facilities maintain a predetermined function. However, many infrastructure facilities are intensively maintained during the high-growth period, and the increase in maintenance costs due to aging is a problem.

インフラストラクチャ設備のような面的に大量に設置されている設備において、メンテナンスの効率性を上げ、コストをできるだけ小さくするために、設備が地理的に集中して設置され、かつ必要な補修方法等が比較的多様ではないエリアを把握し、順位付け等が行える情報は有益である。なぜならば、このようなエリアは、点検や補修等を行う際に設備から設備への移動距離が小さくなることから、単位時間当たりの実質的なメンテナンス時間の割合を上げることができ、かつ補修等に必要な機材や対応する専門作業員・専門委託業者等の種類が少ないため、準備やコスト面で比較的負担が少ないからである。   In facilities that are installed in large quantities, such as infrastructure equipment, in order to increase maintenance efficiency and minimize costs, the equipment is installed in a geographically concentrated manner and the necessary repair methods, etc. Information that can grasp and rank areas that are not relatively diverse is useful. This is because in such areas, the distance traveled from equipment to equipment becomes smaller when performing inspections, repairs, etc., so the ratio of substantial maintenance time per unit time can be increased, and repairs, etc. This is because there are relatively few types of equipment, specialized workers, contracted contractors, etc. necessary for the preparation, so there is relatively little burden on preparation and costs.

このような、空間的関係性を考慮した分散配置型設備の評価に資する情報を得る場合、まず一般的に考えられるのは、設備の設置数等の空間的な密度情報を活用することである。例えば、ある一定の広さおよび形状の算出単位エリアごとに、設置されている対象設備の数を算出し、これを比較することでメンテナンスの重要度や負担を把握する手法がある。
しかし、こうした密度情報は、実際にひとつひとつの設備を人がチェックしてまわるような場合には、効率を上げるのに必ずしも貢献しない。なぜならば、同じ密度であっても、各算出単位エリア内における実際の設備の分布状態には差があるからである。
When obtaining information that contributes to the evaluation of such distributed equipment that takes into account such spatial relationships, the first general idea is to use spatial density information such as the number of installed equipment. . For example, there is a method of calculating the number of target facilities installed for each calculation unit area of a certain area and shape, and comparing them to grasp the importance and burden of maintenance.
However, such density information does not necessarily contribute to increasing the efficiency when a person actually checks each piece of equipment. This is because even with the same density, there is a difference in the distribution state of the actual equipment in each calculation unit area.

図6は、設備の分布例を示す説明図である。図6において、図中の点が設備を表すとすると、図6(a)、図6(b)とも同じ密度(10設備/算出単位エリア)であるが、実際にはbの方が密集しており、算出単位エリア内のすべての設備を一度にチェックしてまわる場合、総移動距離は明らかに図6(b)の方が小さい。また、このような移動距離を計測する既往の手法として、道路データ等を活用したネットワーク解析がある。   FIG. 6 is an explanatory diagram showing an example of facility distribution. In FIG. 6, if the points in the figure represent equipment, the density is the same in both FIG. 6 (a) and FIG. 6 (b) (10 equipment / calculation unit area), but actually b is more dense. When all the facilities in the calculation unit area are checked at once, the total movement distance is clearly smaller in FIG. 6B. Moreover, there is a network analysis using road data or the like as a conventional method for measuring such a moving distance.

通常、このような手法は道路のようなネットワークデータがあることが前提となるが、実際にはデータが容易かつ安価に入手できるのは都市圏とその周辺に限られている。また、インフラストラクチャ設備のような都市圏とその周辺以外の地域にも大量に設置されているものの場合、ネットワークデータの不備や入手性の悪さが問題となる。さらに、道路のような明確なアクセス経路がない場所に設置されている設備に対しても不適である。   Usually, such a method is based on the premise that there is network data such as roads, but in reality, data can be obtained easily and inexpensively only in and around the metropolitan area. In addition, in the case of a large amount installed in an urban area such as an infrastructure facility and other areas other than the surrounding area, incomplete network data and poor availability are problems. It is also unsuitable for equipment installed in places where there is no clear access route such as roads.

従来、上記のような密度ではなく、ある一定空間内における分布の粗密(集塊・集密の程度)を表す指標である最近隣測度を活用した技術がある(例えば、非特許文献1など参照)。この最近隣測度は、ある範囲に存在する点(例えば設備を意味する)の分布状態について、理想的なランダム分布(ポワソン分布)からどの程度乖離しているかを、0から2.149の間の数値Rで表すものである。R<1のときに集密型、R≒1のときにランダム型、R>1のときに拡散型となる。これにより、各算出単位エリア内における設備の分布特性を類型的に把握することができる。   Conventionally, there is a technique that utilizes a nearest neighbor measure that is an index representing the density (aggregation / concentration level) of a distribution in a certain space instead of the above-described density (see, for example, Non-Patent Document 1) ). This nearest neighbor measure indicates the degree of deviation from an ideal random distribution (Poisson distribution) between 0 and 2.149 with respect to the distribution state of points existing in a certain range (for example, equipment). It is represented by the numerical value R. A density type is selected when R <1, a random type when R≈1, and a diffusion type when R> 1. Thereby, the distribution characteristics of the facilities in each calculation unit area can be grasped in a typical manner.

杉浦 章介ほか,人文地理学 ―その主題と課題―,慶應義塾大学出版会,pp.127-129,2005.Shosuke Sugiura et al., Human Geography -Themes and Challenges-, Keio University Press, pp.127-129, 2005.

しかしながら、このような従来技術によれば、分散設置された、種類や状態の異なる各設備のメンテナンスに要する負担を、算出単位エリアごとに総合的に評価できず、結果として、予算や日程など限られたリソースの範囲内で、より多くのエリアのより多くの設備をメンテナンスするための優先順位付けを、正確に行うことができないという問題点があった。   However, according to such conventional technology, it is not possible to comprehensively evaluate the load required for maintenance of each facility of different types and conditions installed in a distributed manner, and as a result, the budget and schedule are limited. There is a problem that the prioritization for maintaining more facilities in more areas cannot be performed accurately within the scope of the allocated resources.

前述した最近隣測度は、通常、都道府県や市区町村等の行政界や、JISX0410で定められ、地理的統計でよく用いられる地域メッシュ、例えば一辺の長さが約1kmの第3次メッシュで定められるエリアを算出単位エリアとしている。このため、設備が集密しているエリアが複数の算出単位エリアにまたがると、算出されたRの数値では、集密している真のエリアを把握できない場合がある。   The nearest neighbor measure described above is usually an administrative boundary such as a prefecture or a municipality, or a regional mesh that is defined in JISX0410 and is often used in geographical statistics, for example, a third mesh having a side length of about 1 km. The determined area is the calculation unit area. For this reason, when an area where facilities are concentrated extends over a plurality of calculation unit areas, the calculated area of R may not be able to grasp the true area where the facilities are concentrated.

図7は、設備分布と算出単位エリアとの関係を示す説明図である。図7の例では、全体が4つのメッシュに区分され、それぞれのメッシュにおいて最近隣測度Rが算出されている。このうちメッシュ1AはR=2.03で拡散分布、メッシュ2AはR=0.91でランダム分布、メッシュ1Bとメッシュ2BがR=0.25でともに集密分布となる。したがって、Rの算出結果だけで判断すると、4つのメッシュのうち、メッシュ1Bとメッシュ2Bの2つが集密分布となり、点の分布に偏りがあると判断される。   FIG. 7 is an explanatory diagram showing the relationship between the equipment distribution and the calculation unit area. In the example of FIG. 7, the whole is divided into four meshes, and the nearest neighbor measure R is calculated for each mesh. Among them, the mesh 1A has a diffusion distribution with R = 2.03, the mesh 2A has a random distribution with R = 0.91, and the mesh 1B and the mesh 2B have both a dense distribution with R = 0.25. Therefore, judging only from the calculation result of R, it is determined that two of the four meshes, mesh 1B and mesh 2B, have a dense distribution, and the point distribution is biased.

しかし、実際には、図7からわかるように、4つのメッシュが接する中心付近(図中の破線部分)のエリアを最も集密度が高い部分とする評価が望ましい。また、真の集密エリアを構成するメッシュとして、最近隣測度Rの算出結果からはランダム分布と判断されるメッシュ2Aも寄与していることがわかる。また、最近隣測度Rは算出単位エリアごとの集密度を表すものであることから、その算出単位エリア内のどこで点が集密しているかは示さない。
したがって、従来技術によれば、算出単位エリアと設備との位置関係によって、最近隣測度が大きく変化するため、実際の設備の分布状態を正確に評価することができない。
However, in practice, as can be seen from FIG. 7, it is desirable to evaluate the area near the center (broken line portion in the figure) where the four meshes contact each other as the portion with the highest density. Further, it can be seen that the mesh 2A determined as a random distribution from the calculation result of the nearest neighbor measure R also contributes as a mesh constituting the true density area. Further, since the nearest neighbor measure R represents the density of each calculation unit area, it does not indicate where the points are concentrated in the calculation unit area.
Therefore, according to the prior art, the nearest neighbor measure varies greatly depending on the positional relationship between the calculation unit area and the facility, and thus the actual distribution state of the facility cannot be accurately evaluated.

また、インフラストラクチャ設備のような大量の設備を維持管理する場合、その状態(劣化程度等)に対して、ある基準に従って決定される離散的な「ランク」を付与し、ランクに応じて必要な対処が規定されていることが多い。すなわち、過去あるいは最新点検時のランクに応じて、その設備に必要な補修や人員等を決定することができる。この特徴を活用すれば、点検データ等を用いて、算出単位エリアごとの補修等に必要な機材種別数等の判断が可能となる。   Also, when maintaining and managing a large amount of equipment such as infrastructure equipment, a discrete “rank” determined according to a certain standard is assigned to the state (deterioration degree, etc.), and it is necessary depending on the rank. Actions are often prescribed. That is, it is possible to determine necessary repairs, personnel, etc., for the equipment according to the rank at the past or the latest inspection. By utilizing this feature, it is possible to determine the number of types of equipment necessary for repairs, etc. for each calculation unit area using inspection data and the like.

例えば、劣化程度に関して5段階のランクが設定されている設備で、なおかつ各ランクで必要な補修方法や専門職人の種類等が異なる場合、5つのランクがまんべんなく存在する算出単位エリアはメンテナンス上「手がかかる」エリアとなる。こうした情報を得ることは設備メンテナンスの効率向上の面で有益である。こうした設備に対する点検・管理業務等は、多くの人員の活動に支えられており、その中には必ずしも数理的分析や表現に慣れていない人々が存在する。こうした人々にとっても、直観的に理解できるような指標が必要である。
しかし、従来技術によれば、設備の集密分布状態をある程度評価できるものの、各設備の種類や状態については考慮されていない。
For example, if the equipment has five ranks regarding the degree of deterioration, and the required repair methods and types of specialists are different for each rank, the calculation unit area where all five ranks are present is Will take "area. Obtaining such information is useful for improving the efficiency of equipment maintenance. Such inspection and management operations for facilities are supported by the activities of many personnel, and among them, there are people who are not necessarily used to mathematical analysis and expression. For these people, indicators that can be intuitively understood are necessary.
However, according to the prior art, although the density distribution state of facilities can be evaluated to some extent, the type and state of each facility are not considered.

本発明はこのような課題を解決するためのものであり、分散設置された種類や状態の異なる各設備のメンテナンスに要する負担を、算出単位エリアごとに総合的に評価できる設備メンテナンス負担評価技術を提供することを目的としている。   The present invention is for solving such a problem, and is a facility maintenance burden evaluation technique capable of comprehensively evaluating the burden required for maintenance of each facility of different types and states that are distributed and installed for each calculation unit area. It is intended to provide.

このような目的を達成するために、本発明にかかる設備メンテナンス負担評価方法は、分散設置された種類や状態の異なる各設備のメンテナンスに要する負担を、算出単位エリアごとに総合的に評価するための設備メンテナンス負担評価方法であって、記憶部が、設備ごとに、当該設備が設置されている位置を示す位置情報と、メンテナンスに要する負担の大きさと対応関係を有する当該設備のランク情報とが登録された設備情報とを記憶する記憶ステップと、最近隣測度算出部が、前記位置情報に基づいて、前記設備を中心または重心とした一定の算出単位エリアごとに、当該算出単位エリア内に位置する各設備の集密度合いを示す最近隣測度を算出する最近隣測度算出ステップと、多様度算出部が、前記ランク情報と情報エントロピーの概念とに基づいて、前記算出単位エリアごとに、当該算出単位エリア内に位置する各設備のランクに関するばらつき度合いを示す多様度を算出する多様度算出ステップと、集密多様度算出部が、前記算出単位エリアごとに、当該算出単位エリアの最近隣測度および多様度をそれぞれ直交成分とするベクトルの長さに基づき当該算出単位エリアの集密多様度を算出する集密多様度算出ステップとを備えている。   In order to achieve such an object, the facility maintenance burden evaluation method according to the present invention comprehensively evaluates the burden required for the maintenance of each facility that is distributed and of different types and states for each calculation unit area. In this equipment maintenance burden evaluation method, for each piece of equipment, the storage section includes position information indicating the position where the equipment is installed, and rank information of the equipment having a correspondence relationship with the magnitude of the burden required for maintenance. A storage step for storing the registered facility information, and a nearest neighbor measure calculating unit, based on the position information, for each fixed calculation unit area having the facility as a center or a center of gravity, is positioned in the calculation unit area. A nearest neighbor measure calculating step for calculating a nearest neighbor measure indicating a density degree of each facility, and a diversity calculating unit, wherein the rank information and the information entropy Based on the above, for each of the calculation unit areas, a diversity calculation step for calculating the diversity indicating the degree of variation regarding the rank of each facility located in the calculation unit area, and the congestion diversity calculation unit, For each calculation unit area, a density diversity calculation step for calculating the density diversity of the calculation unit area based on the length of a vector having the nearest neighbor measure and diversity of the calculation unit area as orthogonal components, respectively. ing.

また、本発明にかかる上記設備メンテナンス負担評価方法の一構成例は、スクリーニング部が、前記算出単位エリアのうち、当該算出単位エリア内に、設備数の下限を示すしきい値以上の設備が配置されている算出単位エリアを有効エリアとして選択し、当該有効エリアに関する集密多様度を有効な評価結果として選択するスクリーニングステップをさらに備えている。   Further, according to one configuration example of the facility maintenance burden evaluation method according to the present invention, the screening unit arranges, in the calculation unit area, facilities equal to or greater than a threshold value indicating a lower limit of the number of facilities in the calculation unit area. The method further includes a screening step of selecting the calculated unit area as an effective area and selecting the density of diversity regarding the effective area as an effective evaluation result.

また、本発明にかかる上記設備メンテナンス負担評価方法の一構成例は、スクリーニング部が、前記算出単位エリアのうち、当該算出単位エリアの最近隣測度と多様度との乖離度が、当該乖離度の上限を示すしきい値以下である算出単位エリアを有効エリアとして選択し、当該有効エリアに関する集密多様度を有効な評価結果として選択するスクリーニングステップをさらに備えている。   In addition, according to one configuration example of the facility maintenance burden evaluation method according to the present invention, the screening unit may determine that the degree of divergence between the nearest neighbor measure and the diversity of the calculation unit area is the degree of divergence. The method further includes a screening step of selecting a calculation unit area that is equal to or less than a threshold value indicating an upper limit as an effective area, and selecting a density of diversity regarding the effective area as an effective evaluation result.

また、本発明にかかる上記設備メンテナンス負担評価方法の一構成例は、スクリーニングステップが、前記算出単位エリアの全数に対する前記有効エリアの数の割合を示す有効エリア率が、予め設定されている下限有効エリア率を下回る場合、前記有効エリア率が大きくなる方向に前記しきい値を調整するステップを含むものである。   In addition, one configuration example of the equipment maintenance burden evaluation method according to the present invention is that the screening step is configured such that an effective area rate indicating a ratio of the number of the effective areas to the total number of the calculation unit areas is a preset lower limit effective When the area ratio is lower, the step of adjusting the threshold value in a direction in which the effective area ratio increases is included.

また、本発明にかかる上記設備メンテナンス負担評価方法の一構成例は、前記集密多様度算出ステップが、前記最近隣測度の最大値および最小値をRmaxおよびRminとし、前記多様度の最大値および最小値をHmaxおよびHminとした場合、任意の算出単位エリアjの集密多様度をENjを、前述の式を用いて算出するようにしたものである。   Also, in one configuration example of the facility maintenance burden evaluation method according to the present invention, the density diversity calculation step includes setting the maximum value and the minimum value of the nearest neighbor measure as Rmax and Rmin, When the minimum value is Hmax and Hmin, the density diversity of an arbitrary calculation unit area j is calculated using ENj using the above formula.

また、本発明にかかる設備メンテナンス負担評価装置は、分散設置された種類や状態の異なる各設備のメンテナンスに要する負担を、算出単位エリアごとに総合的に評価するためのメンテナンス負担評価装置であって、設備ごとに、当該設備が設置されている位置を示す位置情報と、メンテナンスに要する負担の大きさと対応関係を有する当該設備のランク情報とが登録された設備情報とを記憶する記憶部と、前記位置情報に基づいて、前記設備を中心または重心とした一定の算出単位エリアごとに、当該算出単位エリア内に位置する各設備の集密度合いを示す最近隣測度を算出する最近隣測度算出部と、前記ランク情報と情報エントロピーの概念とに基づいて、前記算出単位エリアごとに、当該算出単位エリア内に位置する各設備のランクに関するばらつき度合いを示す多様度を算出する多様度算出部と、前記算出単位エリアごとに、当該算出単位エリアの最近隣測度および多様度をそれぞれ直交成分とするベクトルの長さに基づき当該算出単位エリアの集密多様度を算出する集密多様度算出部とを備えている。   Moreover, the equipment maintenance burden evaluation apparatus according to the present invention is a maintenance burden evaluation apparatus for comprehensively evaluating the burden required for maintenance of each equipment of different types and states that are distributed and installed for each calculation unit area. A storage unit that stores, for each facility, location information indicating the location where the facility is installed, and facility information in which the rank information of the facility having a correspondence relationship with the magnitude of the burden required for maintenance is registered; Based on the position information, for each fixed calculation unit area with the facility as the center or center of gravity, a nearest neighbor measure calculation unit that calculates a nearest neighbor measure indicating the density of each facility located in the calculation unit area And the rank of each facility located in the calculation unit area for each calculation unit area based on the rank information and the concept of information entropy. And a calculation unit area for calculating a diversity indicating a degree of variation with respect to the calculation unit area, and for each calculation unit area, the calculation unit area based on the length of a vector having the nearest neighbor measure and the diversity as orthogonal components. And a density diversity calculation unit for calculating the density diversity.

本発明によれば、従来の画一的に設定したメッシュを算出単位エリアとして用いる場合と比較して、設備が地理的に集中して設置されている真の集密エリアを含む各算出単位エリアについて、その設備の集密度合いを示す最近隣測度が得られる。また、設備の種別や過去の点検データや予測等から得られた劣化状態に対応した補修方法など、メンテナンスに要する負担の大きさのばらつきに関する指標である多様度が、算出単位エリアごとに得られる。そして、これら最近隣測度と多様度とが1つに統合されて、メンテナンスに要する負担に影響を及ぼす、各設備の集密度合いおよび劣化状態を、一義的かつ定量的に評価できる評価指標として集密多様度が得られる。   According to the present invention, each calculation unit area including a true crowded area where facilities are geographically concentrated is used as compared with a case where a conventional uniform mesh is used as a calculation unit area. The nearest neighbor measure that shows the density of the equipment is obtained. Diversity, which is an index related to the variation in the amount of burden required for maintenance, such as the type of equipment and repair methods corresponding to deterioration conditions obtained from past inspection data and predictions, is obtained for each calculation unit area. . Then, these nearest neighbor measures and diversity are integrated into one, and they are collected as evaluation indexes that can unambiguously and quantitatively evaluate the density and deterioration state of each facility that affects the maintenance burden. Dense diversity is obtained.

したがって、分散設置された種類や状態の異なる各設備のメンテナンスに要する負担を、算出単位エリアごとに総合的に評価でき、集密多様度という1つの指標の大小に基づいて、高効率でメンテナンスが可能なエリアを正確に特定することが可能となる。
これにより、予算や日程など限られたリソースの範囲内で、より多くのエリアのより多くの設備をメンテナンスするための優先順位付けを、正確に行うことができる。このため、通信サービスを提供するための電柱、通信ケーブル、通信装置などの通信設備に限らず、老朽化に伴い早期のメンテナンスが必要とされている一般的なインフラストラクチャ設備に関するメンテナンス方針の決定に、極めて有用な評価指標を提供することが可能となる。
Therefore, it is possible to comprehensively evaluate the burden required for the maintenance of each type of equipment installed in different types and states in a distributed manner, and maintenance can be performed with high efficiency based on the size of a single index called “concentration diversity”. It is possible to accurately identify possible areas.
Thus, prioritization for maintaining more facilities in more areas can be accurately performed within a limited resource range such as a budget and a schedule. For this reason, it is not limited to communication facilities such as utility poles, communication cables, and communication devices for providing communication services, but to determine maintenance policies for general infrastructure facilities that require early maintenance due to aging. It becomes possible to provide an extremely useful evaluation index.

設備メンテナンス負担評価装置の構成を示すブロック図である。It is a block diagram which shows the structure of an equipment maintenance burden evaluation apparatus. 設備情報の構成例である。It is an example of composition of equipment information. 集密多様度の概念を示す説明図である。It is explanatory drawing which shows the concept of concentration diversity. 集密多様度算出処理を示すフローチャートである。It is a flowchart which shows a concentration diversity calculation process. 設備メンテナンス負担評価処理を示すフローチャートである。It is a flowchart which shows an equipment maintenance burden evaluation process. 設備の分布例を示す説明図である。It is explanatory drawing which shows the example of distribution of an installation. 設備分布と算出単位エリアとの関係を示す説明図である。It is explanatory drawing which shows the relationship between equipment distribution and a calculation unit area.

[本発明の原理]
まず、本発明の原理について説明する。
分散設置された種類や状態の異なる各設備のメンテナンスを行う場合、設備間の移動や補修内容により、メンテナンス負担が左右される。例えば、点検や補修等を行う際に設備から設備への移動距離が長い場合、移動時間が長くなり実質的なメンテナンス時間が短くなるため、メンテナンスの効率が低下し、コスト負担が増大する。また、補修内容が異なる場合、これらの補修内容に対応するための機材やスキルを持つ作業員が必要となるため、準備のための負担やコスト負担が増大する。
[Principle of the present invention]
First, the principle of the present invention will be described.
When performing maintenance on each facility of different types and states that are installed in a distributed manner, the maintenance burden depends on the movement between the facilities and the contents of repairs. For example, if the moving distance from the equipment to the equipment is long when performing inspection or repair, the moving time becomes long and the substantial maintenance time becomes short, so that the maintenance efficiency is lowered and the cost burden is increased. In addition, when the repair contents are different, workers with equipment and skills for dealing with the repair contents are required, so that the burden for preparation and the cost burden increase.

したがって、メンテナンスの効率性を上げ、負担をできるだけ小さくするためには、次のような特徴を持つエリアを高効率エリアとして把握することが重要となる。
特徴1:設備が地理的に集中して設置されていること
特徴2:必要となる補修内容が比較的限定されること
Therefore, in order to increase maintenance efficiency and reduce the burden as much as possible, it is important to grasp an area having the following characteristics as a high efficiency area.
Feature 1: The equipment is geographically concentrated. Feature 2: Necessary repair contents are relatively limited.

この際、このような高効率エリアを特定するための課題点は次のように整理される。
課題1.従来の地域メッシュ等を活用した最近隣測度では把握できない可能性のある真の集密エリアを、確実に抽出する方法が必要である。
課題2.種類の異なる設備や異なる劣化状態に対応するための補修方法や専門人員等の数(種類)を、算出単位エリアごとに定量的に把握できる方法が必要である。
At this time, problems for specifying such a high efficiency area are arranged as follows.
Problem 1. There is a need for a method of reliably extracting true congested areas that may not be grasped by the nearest neighbor measure using a conventional regional mesh or the like.
Problem 2 There is a need for a method that can quantitatively grasp the number (type) of repair methods and specialized personnel to cope with different types of equipment and different deterioration states for each calculation unit area.

本発明は、前述した特徴1および課題1に着目し、一般的な最近隣測度のように、設備の設置位置に関係なく、画一的にメッシュ状に区切ったエリアを算出単位エリアとするのではなく、各設備を中心とする半径rの円、あるいは各設備を重心とする多角形を算出単位エリアとして最近隣測度Rを算出し、各設備に自身が中心あるいは重心となるエリアの集密度情報を保持させるようにしたものである。これにより、算出単位エリアの中心あるは重心に位置する設備から周辺の設備への移動に関する効率を指標として得ることができ、高効率エリアを正確に特定することが可能となる。   The present invention pays attention to the feature 1 and the problem 1 described above, and sets the area divided uniformly in a mesh shape as the calculation unit area regardless of the installation position of the equipment as in the general nearest neighbor measure. Rather, the nearest neighbor measure R is calculated by using a circle with a radius r centered on each equipment or a polygon centered on each equipment as a calculation unit area, and the density of the area where each equipment itself becomes the center or center of gravity is calculated. Information is held. As a result, it is possible to obtain, as an index, the efficiency related to the movement from the facility located at the center or the center of gravity of the calculation unit area to the surrounding facilities, and the highly efficient area can be specified accurately.

また、本発明は、前述した特徴2および課題2に着目し、算出単位エリア内に含まれる設備群に関するランクのばらつき度合いを、情報エントロピーの概念により定量化するようにしたものである。情報エントロピーとは、物理学のエントロピーの概念を、情報量の定義指標として情報理論に導入したもので、情報を受け取る前後の不確かさの相対値、すなわち情報量を表す指標である。本発明では、設備の種別や、過去の点検データや予測等から得られた劣化状態に対応した補修方法など、メンテナンスに要する負担の大きさと対応関係を有する基準を用いて、各設備を分類しランク付けしたものをランク情報として用いる。これにより、算出単位エリア内に位置する各設備の補修に関する効率を指標として得ることができ、高効率エリアを正確に特定することが可能となる。   Further, the present invention focuses on feature 2 and problem 2 described above, and quantifies the degree of rank variation regarding the equipment group included in the calculation unit area based on the concept of information entropy. Information entropy is a concept that introduces the concept of entropy in physics into information theory as a definition index of information amount, and is an index representing the relative value of uncertainty before and after receiving information, that is, an information amount. In the present invention, each facility is classified by using a standard having a correspondence relationship with the magnitude of the burden required for maintenance, such as the type of facility and the repair method corresponding to the deterioration state obtained from past inspection data and prediction. The ranking is used as rank information. Thereby, the efficiency regarding the repair of each equipment located in the calculation unit area can be obtained as an index, and the high efficiency area can be specified accurately.

また、これら2つの指標はいずれも下限値および上限値を数学的に導くことができ、かつそれぞれの数値が導かれる条件が明確で設備の状態と対応付けることが可能である。本発明は、このような特徴を基にして、これら2つの指標を集密多様度として1つに統合するようにしたものである。これにより、各算出単位エリアに関するメンテナンス負担を、集密多様度という1つの指標の大小で評価することが可能となる。   Further, both of these two indexes can mathematically derive the lower limit value and the upper limit value, and the conditions under which the respective numerical values are derived are clear and can be associated with the state of the equipment. In the present invention, based on such characteristics, these two indexes are integrated into one as the density of concentration. As a result, it is possible to evaluate the maintenance burden for each calculation unit area based on the size of one index called the density of diversity.

次に、本発明の一実施の形態について図面を参照して説明する。
[設備メンテナンス負担評価装置]
まず、図1を参照して、本実施の形態にかかる設備メンテナンス負担評価装置10について説明する。図1は、設備メンテナンス負担評価装置の構成を示すブロック図である。
Next, an embodiment of the present invention will be described with reference to the drawings.
[Equipment maintenance burden evaluation device]
First, with reference to FIG. 1, the equipment maintenance burden evaluation apparatus 10 concerning this Embodiment is demonstrated. FIG. 1 is a block diagram showing a configuration of an equipment maintenance burden evaluation apparatus.

この設備メンテナンス負担評価装置10は、全体としてサーバ装置やパーソナルコンピュータなどの情報演算処理装置からなり、分散設置された種類や状態の異なる各設備のメンテナンスに要する負担を、算出単位エリアごとに総合的に評価する機能を有している。   This equipment maintenance burden evaluation device 10 is composed of information processing devices such as a server device and a personal computer as a whole, and the burden required for maintenance of each facility of different types and states that are distributed and installed is comprehensively calculated for each calculation unit area. It has a function to evaluate.

図1に示すように、設備メンテナンス負担評価装置10には、主な機能部として、通信I/F部11、操作入力部12,画面表示部13,記憶部14、および演算処理部15が設けられている。   As shown in FIG. 1, the equipment maintenance burden evaluation apparatus 10 includes a communication I / F unit 11, an operation input unit 12, a screen display unit 13, a storage unit 14, and an arithmetic processing unit 15 as main functional units. It has been.

通信I/F部11は、一般的なデータ通信回路からなり、通信回線を介して外部装置(図示せず)とデータ通信を行うことにより、設備メンテナンス負担評価処理に関する設備情報や評価結果などの各種処理情報をやりとりする機能を有している。
操作入力部12は、キーボード、マウス、タッチパネルなどの操作入力装置からなり、作業者の操作を検出して演算処理部15へ出力する機能を有している。
画面表示部13は、LCDなどの画面表示装置からなり、演算処理部15からの指示に基づいて、操作メニュー、パラメータ設定、評価結果などの各種情報画面を表示する機能を有している。
The communication I / F unit 11 is composed of a general data communication circuit, and performs data communication with an external device (not shown) via a communication line. It has a function to exchange various processing information.
The operation input unit 12 includes an operation input device such as a keyboard, a mouse, and a touch panel, and has a function of detecting an operation of an operator and outputting the operation to the arithmetic processing unit 15.
The screen display unit 13 includes a screen display device such as an LCD, and has a function of displaying various information screens such as operation menus, parameter settings, and evaluation results based on instructions from the arithmetic processing unit 15.

記憶部14は、ハードディスクや半導体メモリなどの記憶装置からなり、演算処理部15での設備メンテナンス負担評価処理に関する各種処理情報やプログラム14Pを記憶する機能を有している。
プログラム14Pは、演算処理部15のCPUに読み込まれて実行されることにより、設備メンテナンス負担評価処理で用いる各種処理部を実現する機能を有している。このプログラム14Pは、通信I/F部11を介して外部装置や記録媒体から読み出されて記憶部14に予め格納される。
The storage unit 14 includes a storage device such as a hard disk or a semiconductor memory, and has a function of storing various processing information related to the facility maintenance burden evaluation process in the arithmetic processing unit 15 and a program 14P.
The program 14P has a function of realizing various processing units used in the equipment maintenance burden evaluation process by being read and executed by the CPU of the arithmetic processing unit 15. The program 14P is read from an external device or a recording medium via the communication I / F unit 11 and stored in the storage unit 14 in advance.

記憶部14で記憶する主な処理情報として、設備情報14A、最近隣測度14B、多様度14C、集密多様度14D、基本統計量14E、および評価結果14Fがある。
設備情報14Aは、設備ごとに、当該設備が設置されている設置を示す位置情報と、メンテナンスに要する負担の大きさと対応関係を有する当該設備のランク情報とが登録された情報である。
As main processing information stored in the storage unit 14, there are equipment information 14A, nearest neighbor measure 14B, diversity 14C, congestion diversity 14D, basic statistics 14E, and evaluation result 14F.
The facility information 14A is information in which position information indicating the installation where the facility is installed and rank information of the facility having a correspondence relationship with the magnitude of the burden required for maintenance are registered for each facility.

図2は、設備情報の構成例である。ここでは、各設備に固有の設備番号ごとに、経緯座標からなる位置情報と、劣化ランクからなるランク情報とが組として登録されている。
ランク情報としては、メンテナンスに先立つ各設備の点検・調査により得られたランク付けの結果を用いてもよいが、メンテナンスに要する負担の大きさと対応関係を有していれば、各設備に予め割り当てられている既存の設備種別や設備規模などの情報を用いてもよい。
FIG. 2 is a configuration example of facility information. Here, for each equipment number unique to each equipment, position information composed of background coordinates and rank information composed of deterioration ranks are registered as a set.
As the rank information, the ranking result obtained by inspection and survey of each equipment prior to maintenance may be used, but if there is a correspondence with the size of the burden required for maintenance, it is assigned in advance to each equipment. Information such as existing equipment type and equipment scale may be used.

最近隣測度14Bは、算出単位エリア内に位置する各設備の集密度合いを示す指標であり、演算処理部15により、算出単位エリアごとに算出されて記憶部14に保存される。なお、最近隣測度14Bでは、必要に応じて後述する最近隣測度Rのほか正規化最近隣測度NRも記憶されるものとする。
多様度14Cは、算出単位エリア内に位置する各設備のランクに関するばらつき度合いを示す指標であり、算出単位エリアごとに算出されて記憶部14に保存される。なお、多様度14Cでは、必要に応じて後述する多様度Hのほか正規化多様度NHも記憶されるものとする。
The nearest neighbor measure 14B is an index indicating the density of each facility located in the calculation unit area, and is calculated for each calculation unit area by the arithmetic processing unit 15 and stored in the storage unit 14. In the nearest neighbor measure 14B, a normalized nearest neighbor measure NR is stored in addition to a nearest neighbor measure R, which will be described later, as necessary.
The diversity 14C is an index indicating the degree of variation regarding the rank of each facility located in the calculation unit area, and is calculated for each calculation unit area and stored in the storage unit 14. In the diversity 14C, the normalized diversity NH as well as the diversity H described later is stored as necessary.

集密多様度14Dは、算出単位エリアの最近隣測度14Bおよび多様度14Cをそれぞれ直交成分とするベクトルの長さに相当する値を有し、各算出単位エリアに位置するすべての設備のメンテナンスに要する負担の大小を示す指標である。この集密多様度14Dは、演算処理部15により、算出単位エリアごとに算出されて記憶部14に保存される。   The concentration diversity 14D has a value corresponding to the length of a vector having the nearest neighbor measure 14B and diversity 14C of the calculation unit area as orthogonal components, and is used for maintenance of all facilities located in each calculation unit area. It is an index indicating the magnitude of the required burden. The density 14D is calculated for each calculation unit area by the arithmetic processing unit 15 and stored in the storage unit 14.

基本統計量14Eは、各算出単位エリア全体に関するメンテナンス負担を評価するための指標であり、演算処理部15により、集密多様度14Dに基づいて算出されて記憶部14に保存される。基本統計量14Eの具体例としては、各集密多様度14Dの値に対する発生数を示す分布、算出単位エリア全体における集密多様度14Dの平均値、最大値、最小値、中央値などの統計値がある。また、これら基本統計量14Eは、都道府県や市区町村等の行政界や、メンテナンスの担当エリアなど、規定の範囲ごとに算出してもよい。   The basic statistic 14 </ b> E is an index for evaluating the maintenance burden related to the entire calculation unit area, and is calculated by the arithmetic processing unit 15 based on the concentration diversity 14 </ b> D and stored in the storage unit 14. Specific examples of the basic statistic 14E include a distribution indicating the number of occurrences for each confluence diversity value 14D, statistics such as the average value, maximum value, minimum value, and median value of the confluence diversity 14D in the entire calculation unit area. There is a value. These basic statistics 14E may be calculated for each prescribed range, such as administrative boundaries such as prefectures and municipalities, and areas in charge of maintenance.

評価結果14Fは、これら集密多様度14Dや基本統計量14Eに対して、並び替えや代表値選択などの編集を実施して、リスト、マップやグラフで表現したデータであり、設備メンテナンス負担評価の利用形態に応じたフォーマットで作成されている。   The evaluation result 14F is data expressed by a list, a map, or a graph after performing editing such as rearrangement and representative value selection on the congestion density 14D and the basic statistic 14E. It is created in a format according to the usage form.

演算処理部15は、CPUおよびその周辺回路を有し、記憶部14からプログラム14Pを読み込んで実行することにより、設備メンテナンス負担評価処理で用いる各種処理部を実現する機能を有している。
演算処理部15で実現される主な処理部として、パラメータ設定部15A、最近隣測度算出部15B、多様度算出部15C、集密多様度算出部15D、スクリーニング部15E、基本統計量算出部15F、および評価結果出力部15Gがある。
The arithmetic processing unit 15 includes a CPU and its peripheral circuits, and has a function of realizing various processing units used in the equipment maintenance burden evaluation process by reading and executing the program 14P from the storage unit 14.
The main processing units realized by the arithmetic processing unit 15 include a parameter setting unit 15A, a nearest neighbor measure calculating unit 15B, a diversity calculating unit 15C, a congestion diversity calculating unit 15D, a screening unit 15E, and a basic statistic calculating unit 15F. And an evaluation result output unit 15G.

パラメータ設定部15Aは、操作入力部12で検出した作業者の操作に応じて、設備メンテナンス負担評価処理で用いる各種パラメータを設定し、記憶部14に保存する機能を有している。パラメータ設定部15Aで設定される主なパラメータとしては、算出単位エリアの大きさおよび形状、算出単位エリア内の設備数の下限を示すしきい値、最近隣測度14Bと多様度14Cとの乖離度の上限を示すしきい値、算出単位エリアの全数に占める有効エリアの割合の下限を示す下限有効エリア率がある。   The parameter setting unit 15 </ b> A has a function of setting various parameters used in the equipment maintenance burden evaluation process in accordance with the operator's operation detected by the operation input unit 12 and saving the parameter in the storage unit 14. The main parameters set by the parameter setting unit 15A include the size and shape of the calculation unit area, a threshold value indicating the lower limit of the number of facilities in the calculation unit area, and the divergence between the nearest neighbor measure 14B and the diversity 14C. And a lower limit effective area rate indicating the lower limit of the ratio of the effective area to the total number of calculation unit areas.

最近隣測度算出部15Bは、記憶部14の設備情報14Aに格納されている各設備の位置情報に基づいて、設備を中心または重心とした一定の算出単位エリアごとに、当該算出単位エリア内に位置する各設備の集密度合いを示す最近隣測度14Bを算出する機能を有している。最近隣測度14Bの算出過程の詳細については後述する。   Based on the position information of each facility stored in the facility information 14A of the storage unit 14, the nearest neighbor measure calculation unit 15B includes, for each fixed calculation unit area with the facility as the center or the center of gravity, within the calculation unit area. It has a function of calculating the nearest neighbor measure 14B indicating the density of each facility located. Details of the process of calculating the nearest neighbor measure 14B will be described later.

多様度算出部15Cは、記憶部14の設備情報14Aに格納されている各設備のランク情報と情報エントロピーの概念とに基づいて、各設備の算出単位エリアごとに、当該算出単位エリア内に位置する各設備のランクに関するばらつき度合いを示す多様度14Cを算出する機能を有している。多様度14Cの算出過程の詳細については後述する。   Based on the rank information of each facility stored in the facility information 14A of the storage unit 14 and the concept of information entropy, the diversity calculation unit 15C is positioned in the calculation unit area for each calculation unit area of each facility. It has a function of calculating the diversity 14C indicating the degree of variation regarding the rank of each facility. Details of the calculation process of the diversity 14C will be described later.

集密多様度算出部15Dは、各設備の算出単位エリアごとに、最近隣測度算出部15Bで算出して当該算出単位エリアの最近隣測度14B、および、多様度算出部15Cで算出した当該算出単位エリアの多様度14Cをそれぞれ直交成分とするベクトルの長さに基づいて、当該算出単位エリアの集密多様度14Dを算出する機能と、これら集密多様度14Dを記憶部14へ保存する機能とを有している。集密多様度14Dの算出過程の詳細については後述する。   Concentration diversity calculation unit 15D calculates, for each calculation unit area of each facility, nearest neighbor measure calculation unit 15B and the nearest neighbor measure 14B of the calculation unit area and the calculation calculated by diversity calculation unit 15C. A function of calculating the density of diversity 14D of the calculation unit area based on the length of a vector having the diversity 14C of the unit area as an orthogonal component, and a function of saving the density of diversity 14D in the storage unit 14 And have. Details of the calculation process of the concentration diversity 14D will be described later.

スクリーニング部15Eは、各設備の算出単位エリアのうち、統計的に有効な有効エリアのみをクリーニングする機能を有している。スクリーニング処理の詳細の詳細については後述する。   The screening unit 15E has a function of cleaning only a statistically effective effective area among the calculation unit areas of each facility. Details of the screening process will be described later.

基本統計量算出部15Fは、集密多様度算出部15Dで算出された各算出単位エリアの集密多様度14Dや、スクリーニング部15Eでスクリーニングされた有効エリアに基づいて、基本統計量14Eを算出する機能と、これら基本統計量14Eを記憶部14に保存する機能とを有している。   The basic statistic calculation unit 15F calculates the basic statistic 14E based on the concentration diversity 14D of each calculation unit area calculated by the concentration diversity calculation unit 15D and the effective area screened by the screening unit 15E. And a function of storing these basic statistics 14E in the storage unit 14.

評価結果出力部15Gは、集密多様度算出部15Dで算出された各算出単位エリアの集密多様度14Dや、スクリーニング部15Eでスクリーニングされた有効エリア、さらには、基本統計量算出部15Fで算出された基本統計量14Eに基づいて、設備メンテナンス負担に関する評価結果14Fを生成し、記憶部14に保存する機能と、画面表示部13で評価結果14Fを表示出力する機能と、通信I/F部11を介して外部装置へ評価結果14Fを出力する機能とを有している。   The evaluation result output unit 15G includes the concentration diversity 14D of each calculation unit area calculated by the concentration diversity calculation unit 15D, the effective area screened by the screening unit 15E, and the basic statistic calculation unit 15F. Based on the calculated basic statistic 14E, an evaluation result 14F relating to the equipment maintenance burden is generated and stored in the storage unit 14, a function for displaying and outputting the evaluation result 14F on the screen display unit 13, and a communication I / F And a function of outputting the evaluation result 14F to an external device via the unit 11.

[本実施の形態の動作]
次に、本実施の形態にかかる設備メンテナンス負担評価装置10の動作について説明する。ここでは、インフラストラクチャ設備に代表されるような、面的に多数設置されている設備を想定する。
[Operation of this embodiment]
Next, operation | movement of the equipment maintenance burden evaluation apparatus 10 concerning this Embodiment is demonstrated. Here, it is assumed that there are a large number of installations such as infrastructure facilities.

[最近隣測度の算出過程]
まず、最近隣測度算出部15Bにおける最近隣測度Rの算出過程について説明する。
算出単位エリア内に配置されている各設備の設備数をNとし、当該算出単位エリアにおける単位面積あたりの設備数(配置密度)をPとし、これら設備から最も近い設備までの最短距離をdとした場合、最近隣測度Rは、次の式(1)で定義される。

Figure 0006010059
[Calculation process of nearest neighbor measure]
First, the calculation process of the nearest neighbor measure R in the nearest neighbor measure calculation unit 15B will be described.
The number of facilities of each facility arranged in the calculation unit area is N, the number of facilities per unit area (location density) in the calculation unit area is P, and the shortest distance from these facilities to the nearest facility is d In this case, the nearest neighbor measure R is defined by the following equation (1).
Figure 0006010059

式(1)のうち、daはN個の設備の最短距離dの平均値を示し、deは、無限に広がるランダム分布を想定した場合の最短処理の平均値を示している。
また、算出単位エリアとして設備を中心とする半径rの円を用いた場合、算出単位エリアの面積UAは、次の式(2)で定義される。

Figure 0006010059
In equation (1), da represents the average value of the shortest distances d of the N pieces of equipment, and de represents the average value of the shortest process when assuming an infinite random distribution.
In addition, when a circle having a radius r centered on the facility is used as the calculation unit area, the area UA of the calculation unit area is defined by the following equation (2).
Figure 0006010059

この式(2)で定義される算出単位エリアにおいて、式(1)により算出された最近隣測度Rは、最小値Rmin=0から最大値Rmax=2.149までの間の値をとり、R≒1のときランダム分布、R<1のとき集密分布、R>1のとき拡散分布と判断される。また、R=1から離れるほど、集密あるいは拡散の度合いが強いとみなされる。
したがって、前述の図7で示したように、従来の画一的に設定したメッシュからなる算出単位エリアを用いる場合と比較して、設備を中心または重心として柔軟に算出単位エリアを設定することができ、真の集密エリアを確実に抽出することが可能となる。
In the calculation unit area defined by the equation (2), the nearest neighbor measure R calculated by the equation (1) takes a value between the minimum value Rmin = 0 and the maximum value Rmax = 2.149, and R A random distribution is determined when ≈1, a dense distribution when R <1, and a diffuse distribution when R> 1. In addition, as the distance from R = 1 increases, the degree of concentration or diffusion is considered to be stronger.
Therefore, as shown in FIG. 7 described above, it is possible to set the calculation unit area flexibly with the equipment as the center or the center of gravity, as compared with the conventional case where the calculation unit area composed of a uniform mesh is used. It is possible to extract a true congested area with certainty.

[多様度の算出過程]
次に、多様度算出部15Cにおける多様度Hの算出過程について説明する。
算出単位エリア内に位置する各設備は、メンテナンスに要する負担の大きさにばらつきを有している。多様度算出部15Cで算出される多様度Hは、情報エントロピーの概念を活用して、このようなばらつきを定量化したものである。
[Diversity calculation process]
Next, the process of calculating the diversity H in the diversity calculation unit 15C will be described.
Each facility located in the calculation unit area has a variation in the magnitude of the burden required for maintenance. The diversity H calculated by the diversity calculation unit 15C is obtained by quantifying such variation using the concept of information entropy.

情報エントロピーは、用いられる分野や目的によってさまざまな解釈(対応付け)が与えられるが、その1つとして「乱雑さ」を表す指標であるという解釈がある。ここで、乱雑さを対象の多様性と読み替えると、多様性が増すほど情報エントロピーが大きくなり、情報量が大きくなることとなる。本発明では、設備の種別や設備の劣化状態をランク分けした劣化ランクなど、メンテナンスに要する負担の大きさと対応関係を有するランク情報(分類情報)を設備ごとに設定し、算出単位エリア内に位置する各設備における、これらランク情報のランク数(分類数)を情報エントロピーで表現している。   Information entropy is given various interpretations (correspondence) depending on the field and purpose used, and one of them is an interpretation that represents an indicator of “randomness”. Here, when randomness is read as the diversity of the object, the information entropy increases as the diversity increases, and the amount of information increases. In the present invention, rank information (classification information) having a correspondence relationship with the magnitude of the burden required for maintenance, such as a degradation rank obtained by ranking the type of equipment and the deterioration state of the equipment, is set for each equipment and is located within the calculation unit area. The number of rank information (number of classifications) in each facility is expressed by information entropy.

任意の算出単位エリアにおける設備の全数に対するランクiの発生率をPiとした場合、当該算出単位エリアにおける多様度Hは、次の式(3)で定義される。

Figure 0006010059
When the occurrence rate of rank i with respect to the total number of facilities in an arbitrary calculation unit area is Pi, the diversity H in the calculation unit area is defined by the following equation (3).
Figure 0006010059

式(3)において、算出単位エリアの各設備が有する全ランク数をMとし、これらランクの発生率が等しい場合、すなわちPi=1/Mのとき、多様度Hは最大値をとる。また、いずれか1つのランクの発生率が1のとき、すなわち算出単位エリアのすべての設備のランクが同じときに最小値0をとる。
つまり、式(3)で定義された多様度Hが小さいほど、特定のランクの割合が大きいことを表し、これは算出単位エリアごとの補修等に必要な機材種別等の負担、すなわちメンテナンスに要する負担が少ないことを意味する。
In Expression (3), when the number of all ranks of each facility in the calculation unit area is M and the occurrence rates of these ranks are equal, that is, when Pi = 1 / M, diversity H takes the maximum value. Further, when the occurrence rate of any one rank is 1, that is, when the ranks of all the facilities in the calculation unit area are the same, the minimum value 0 is taken.
In other words, the smaller the diversity H defined in the equation (3), the larger the ratio of the specific rank, which is a burden of the equipment type necessary for the repair or the like for each calculation unit area, that is, required for maintenance. It means less burden.

設備の状態がランクで記録されていない場合でも、状態を表す何らかの記録データから、状態に対応する必要な補修や人員等を参考にしつつ、何段階かのランク分けを行って、そのランクを用いて同様に算出すればよい。また、劣化ランクではなく設備種類数を対象とした場合、式(3)のiは設備種類を表すものとなり、同様の算出過程で多様度Hを算出できる。   Even if the status of the equipment is not recorded in the rank, the rank is used in several stages while referring to the necessary repairs and personnel corresponding to the status from some recorded data representing the status. And calculate in the same way. When the number of equipment types is used instead of the degradation rank, i in Expression (3) represents the equipment type, and the diversity H can be calculated in the same calculation process.

[集密多様度の算出過程]
次に、集密多様度算出部15Dにおける集密多様度14Dの算出過程について説明する。
集密多様度ENは、最近隣測度Rと多様度Hを活用した統合指標である。算出単位エリアjにおける最近隣測度をRjとし、最近隣測度Rの最大値および最小値をRmax(=2.149)およびRmin(=0)とし、算出単位エリアjにおける多様度をHjとし、多様度Hの最大値および最小値をHmax(at Pi=1/M)およびHmin(=0)とした場合、算出単位エリアjの集密多様度ENjは、式(4)により定義される。

Figure 0006010059
[Concentration diversity calculation process]
Next, a calculation process of the density diversity 14D in the density diversity calculation unit 15D will be described.
Concentration diversity EN is an integrated index utilizing nearest neighbor measure R and diversity H. The nearest neighbor measure in the calculation unit area j is Rj, the maximum and minimum values of the nearest neighbor measure R are Rmax (= 2.149) and Rmin (= 0), the diversity in the calculation unit area j is Hj, When the maximum value and the minimum value of the degree H are Hmax (at Pi = 1 / M) and Hmin (= 0), the density of diversity ENj of the calculation unit area j is defined by Expression (4).
Figure 0006010059

集密多様度ENは、最近隣測度Rと多様度Hのそれぞれ直行成分とする2次元空間におけるベクトルの長さに相当する。この際、最近隣測度Rを正規化して得られた正規化最近隣測度NR、同じく多様度Hを正規化して得られた正規化多様度NHを用いることで、最近隣測度Rと多様度Hの重みを等しくすることができる。   The density of diversity EN corresponds to the length of a vector in a two-dimensional space with orthogonal components of the nearest neighbor measure R and diversity H. At this time, the nearest neighbor measure R and the diversity H are obtained by using the normalized nearest neighbor measure NR obtained by normalizing the nearest neighbor measure R and the normalized diversity NH obtained by normalizing the diversity H. Can be made equal in weight.

図3は、集密多様度の概念を示す説明図である。ここでは、横軸が正規化最近隣測度NRを示し、縦軸が正規化多様度NHを示してあり、それぞれ最近隣測度Rと多様度Hを0〜1に正規化したものである。また、図3は、3つの設備E1,E2,E3がプロットされており、原点からこれら設備E1,E2,E3までのベクトルの長さEN1,EN2,EN3が各設備E1,E2,E3の集密多様度に相当する。   FIG. 3 is an explanatory diagram showing the concept of density diversity. Here, the horizontal axis indicates the normalized nearest neighbor measure NR, and the vertical axis indicates the normalized diversity NH, where the nearest neighbor measure R and the diversity H are normalized to 0 to 1, respectively. In FIG. 3, three equipments E1, E2, and E3 are plotted, and vector lengths EN1, EN2, and EN3 from the origin to these equipments E1, E2, and E3 are collected for each equipment E1, E2, and E3. It corresponds to dense diversity.

したがって、原点に近いほどベクトルが短くなるためメンテナンスにかかる負荷が小さくなり、NR,NHがともに最大値「1」となる点Qに近いほど負荷等が大きくなる。図3の例では、EN2およびEN3よりも、EN1の方がメンテナンス上の負荷等が大きいと云える。   Accordingly, the closer to the origin, the shorter the vector, so the load on maintenance becomes smaller. The closer the point Q where both NR and NH have the maximum value “1”, the larger the load and the like. In the example of FIG. 3, it can be said that EN1 has a larger maintenance load or the like than EN2 and EN3.

また、原点から点Qまでのベクトルの長さからわかるように集密多様度ENは0から√2までの値をとるが、集密多様度ENの値をさらに直観的に比較しやすいよう、次の式(5)により、「0」から「1」までの間の値を取るよう正規化した正規化集密多様度NENを用いてもよい。さらに、式(5)に「100」を乗じて小数点第1位を四捨五入等することで「0」から「100」までの間の値を取るようにすることも可能である。

Figure 0006010059
As can be seen from the length of the vector from the origin to the point Q, the density diversity EN takes a value from 0 to √2, so that the value of the density diversity EN can be compared more intuitively. The normalized density of diversity NEN normalized so as to take a value between “0” and “1” according to the following equation (5) may be used. Furthermore, it is possible to take a value between “0” and “100” by multiplying Equation (5) by “100” and rounding off the first decimal place.
Figure 0006010059

このように、算出単位エリアごと、すなわち設備ごとに算出された集密多様度(あるいは正規化集密多様度)14Dは、記憶部14メモリに記憶され、各種の統計量の算出や結果表示および出力が行われる。場合によっては設備が設置されている場所を表す地理情報(緯度経度等)を活用して、地図上にプロットされた地理的表示・出力が行われる。   As described above, the concentration density (or normalized density diversity) 14D calculated for each calculation unit area, that is, for each facility, is stored in the storage unit 14 memory, and various statistic calculations and result display and Output is done. In some cases, geographic display / output plotted on a map is performed using geographic information (such as latitude and longitude) representing the location where the facility is installed.

また、以上では、複合指標を算出するために用いる指標として最近隣測度Rと多様度Hを用いて説明したが、用いる指標は、評価すべき内容に応じた適切なものであれば他の指標でもよい。例えば、ある故障事象の発生状況を表す指標と、その故障事象によって引き起こされる様々な影響を表す指標を用いれば、対象である故障事象のリスクを評価することも可能となる。   In the above description, the nearest neighbor measure R and the diversity H are used as the indices used to calculate the composite index. However, the indices used are other indices as long as they are appropriate for the content to be evaluated. But you can. For example, the risk of the target failure event can be evaluated by using an index representing the occurrence of a certain failure event and an index representing various effects caused by the failure event.

[集密多様度算出動作]
次に、図4を参照して、本実施の形態にかかる設備メンテナンス負担評価装置10における集密多様度算出動作について説明する。図4は、集密多様度算出処理を示すフローチャートである。ここでは、正規化最近隣測度NRおよび正規化多様度NHを用いて集密多様度ENまたは正規化集密多様度NENを算出する場合を例として説明する。
[Congestion diversity calculation]
Next, with reference to FIG. 4, the operation for calculating the concentration diversity in the equipment maintenance burden evaluation apparatus 10 according to this embodiment will be described. FIG. 4 is a flowchart showing the density diversity calculation process. Here, a case will be described as an example where the density density EN or the normalized density diversity NEN is calculated using the normalized nearest neighbor measure NR and the normalized diversity NH.

まず、最近隣測度算出部15Bは、記憶部14の設備情報14Aに格納されている各設備の位置情報に基づいて、設備を中心または重心とした一定の算出単位エリアごとに、当該算出単位エリア内に位置する各設備の集密度合いを示す最近隣測度Rを算出し(ステップ100)、得られた最近隣測度Rを正規化した正規化最近隣測度NRを求める(ステップ101)。   First, the nearest neighbor measure calculation unit 15B calculates the calculation unit area for each fixed calculation unit area having the facility as the center or the center of gravity based on the position information of each facility stored in the facility information 14A of the storage unit 14. A nearest neighbor measure R indicating the degree of density of each facility located inside is calculated (step 100), and a normalized nearest neighbor measure NR obtained by normalizing the obtained nearest neighbor measure R is obtained (step 101).

一方、多様度算出部15Cは、記憶部14の設備情報14Aに格納されている各設備のランク情報と情報エントロピーの概念とに基づいて、各設備の算出単位エリアごとに、当該算出単位エリア内に位置する各設備のランクに関するばらつき度合いを示す多様度Hを算出し(ステップ102)、得られた多様度を正規化した正規化多様度NHを求める(ステップ103)。   On the other hand, the diversity calculation unit 15 </ b> C creates a calculation unit area within each calculation unit area for each facility based on the rank information of each facility and the concept of information entropy stored in the facility information 14 </ b> A of the storage unit 14. Diversity H indicating the degree of variation regarding the rank of each facility located in is calculated (step 102), and normalized diversity NH obtained by normalizing the obtained diversity is obtained (step 103).

次に、集密多様度算出部15Dは、各設備の算出単位エリアごとに、最近隣測度算出部15Bで算出して当該算出単位エリアの正規化最近隣測度NR、および、多様度算出部15Cで算出した正規化多様度NHを、それぞれ直交成分とするベクトルの長さに基づいて、当該算出単位エリアの集密多様度ENを算出する(ステップ104)。   Next, the concentration diversity calculation unit 15D calculates, for each calculation unit area of each facility, the nearest neighbor measure calculation unit 15B, the normalized nearest neighbor measure NR of the calculation unit area, and the diversity calculation unit 15C. Based on the lengths of the vectors having the normalized diversity NH calculated in step 1 as orthogonal components, the density diversity EN of the calculation unit area is calculated (step 104).

この後、集密多様度算出部15Dは、記憶部14に設定されているパラメータに基づき、集密多様度の正規化が必要かどうか確認し(ステップ105)、必要な場合には(ステップ105:YES)、集密多様度ENを正規化した正規化集密多様度NENを求め(ステップ106)、これら集密多様度ENまたは正規化集密多様度NENを、集密多様度14Dとして記憶部14に保存し(ステップ107)、一連の集密多様度算出処理を終了する。   Thereafter, the density diversity calculation unit 15D confirms whether normalization of the density diversity is necessary based on the parameters set in the storage unit 14 (step 105), and if necessary (step 105). : YES), the normalized density diversity NEN obtained by normalizing the density density EN is obtained (step 106), and the density density density EN or the normalized density diversity NEN is stored as the density density 14D. The data is stored in the unit 14 (step 107), and the series of density diversity calculation processing ends.

[設備メンテナンス負担評価動作]
次に、図5を参照して、本実施の形態にかかる設備メンテナンス負担評価装置10における設備メンテナンス負担評価動作について説明する。図5は、設備メンテナンス負担評価処理を示すフローチャートである。
設備メンテナンス負担評価装置10の演算処理部15は、操作入力部12で検出された作業者操作に応じて図5の設備メンテナンス負担評価処理を実行する。ここでは、集密多様度ENを算出する場合を例として説明するが、正規化集密多様度NENでも同様である。
[Equipment maintenance burden evaluation operation]
Next, with reference to FIG. 5, the equipment maintenance burden evaluation operation | movement in the equipment maintenance burden evaluation apparatus 10 concerning this Embodiment is demonstrated. FIG. 5 is a flowchart showing an equipment maintenance burden evaluation process.
The arithmetic processing unit 15 of the equipment maintenance burden evaluation device 10 executes the equipment maintenance burden evaluation process of FIG. 5 in accordance with the operator operation detected by the operation input unit 12. Here, the case of calculating the density density EN will be described as an example, but the same applies to the normalized density diversity NEN.

まず、パラメータ設定部15Aは、操作入力部12で検出した作業者の操作に応じて、設備メンテナンス負担評価処理で用いる各種パラメータを設定し、記憶部14に保存する(ステップ110)。
次に、演算処理部15は、各設備の算出単位エリアごとに処理を繰り返す算出単位エリアループを開始する(ステップ111)。
First, the parameter setting unit 15A sets various parameters used in the equipment maintenance burden evaluation process according to the operator's operation detected by the operation input unit 12, and stores them in the storage unit 14 (step 110).
Next, the arithmetic processing unit 15 starts a calculation unit area loop that repeats the process for each calculation unit area of each facility (step 111).

この算出単位エリアループにおいて、まず、集密多様度算出部15Dは、前述した図4の集密多様度算出処理に基づき、各算出単位エリアの集密多様度ENを算出する(ステップ112)。   In this calculation unit area loop, the density diversity calculation unit 15D first calculates the density diversity EN of each calculation unit area based on the density diversity calculation process of FIG. 4 described above (step 112).

次に、スクリーニング部15Eは、各設備の算出単位エリアのうち、統計的に有効な有効エリアのみをクリーニングする。
まず、スクリーニング部15Eは、第1のスクリーニング処理として、当該算出単位エリア内に配置されている設備の設備数と、パラメータ設定部15Aで設定された、算出単位エリア内の設備数の下限を示すしきい値とを比較し(ステップ113)、設備数がそのしきい値未満である場合(ステップ113:NO)、スクリーニング部15Eは、当該算出単位エリアを有効エリアではない参考エリアに設定し(ステップ115)、ループENDへ移行する。
Next, the screening unit 15E cleans only the statistically effective effective area among the calculation unit areas of each facility.
First, as a first screening process, the screening unit 15E indicates the number of facilities arranged in the calculation unit area and the lower limit of the number of facilities in the calculation unit area set by the parameter setting unit 15A. The threshold value is compared (step 113), and if the number of facilities is less than the threshold value (step 113: NO), the screening unit 15E sets the calculation unit area as a reference area that is not an effective area ( Step 115), the process proceeds to the loop END.

一方、設備数がしきい値以上である場合(ステップ113:YES)、スクリーニング部15Eは、第2のスクリーニング処理として、当該算出単位エリアの正規化最近隣測度NRおよび正規化多様度NHの乖離度と、パラメータ設定部15Aで設定された、最近隣測度と多様度との乖離度の上限を示すしきい値とを比較し(ステップ114)、乖離度がそのしきい値より大きい場合(ステップ114:NO)、スクリーニング部15Eは、当該算出単位エリアを有効エリアではない参考エリアに設定し(ステップ115)、ループENDへ移行する。   On the other hand, when the number of facilities is equal to or greater than the threshold (step 113: YES), the screening unit 15E, as the second screening process, divides the normalized nearest neighbor measure NR and the normalized diversity NH of the calculation unit area. And the threshold value indicating the upper limit of the divergence degree between the nearest neighbor measure and the diversity set in the parameter setting unit 15A (step 114), and if the divergence degree is larger than the threshold value (step 114) 114: NO), the screening unit 15E sets the calculation unit area as a reference area that is not an effective area (step 115), and proceeds to loop END.

正規化最近隣測度NRと正規化多様度NHのいずれか一方が極端に大きく片寄があるエリア、すなわち、集密度は高いものの多様度が低いエリアや、多様度は低いものの集密度が高いエリアについては、得られる集密多様度が一方の値に大きく影響を受けていることになり、集密多様度としてある程度の値が得られても、結果として統計的に有効な算出単位エリアとは云えない。
乖離度は、正規化最近隣測度NRと正規化多様度NHの大きさのバランスを評価する指標であり、例えば、正規化最近隣測度NRと正規化多様度NHのうち、値の小さいほうを分母、値の大きい方を分子とする比率で求められる。したがって、乖離度の上限を示すしきい値として、例えば「9」を設定した場合、正規化最近隣測度NRと正規化多様度NHの一方が他方よりよ9倍以上大きい場合には、上記のような片寄のある算出単位エリアを、参考エリアとして除外することができる。
For areas where either the normalized nearest neighbor measure NR or the normalized diversity NH is extremely large and offset, that is, areas with high density but low diversity, or areas with low density but high density This means that the confluence diversity obtained is greatly influenced by one value, and even if a certain level of confluence diversity is obtained, it can be said that it is a statistically effective calculation unit area. Absent.
The degree of divergence is an index for evaluating the balance between the size of the normalized nearest neighbor measure NR and the normalized diversity NH. For example, the smaller value of the normalized nearest neighbor measure NR and the normalized diversity NH The denominator is obtained as a ratio with the larger value as the numerator. Therefore, for example, when “9” is set as the threshold value indicating the upper limit of the divergence, when one of the normalized nearest neighbor measure NR and the normalized diversity NH is 9 times or more larger than the other, A calculation unit area with such a deviation can be excluded as a reference area.

このようにして、算出単位エリアループにおいて、各算出単位エリア関する処理が終了した後、スクリーニング部15Eは、第3のスクリーニング処理として、算出単位エリアの全数に対する有効エリア数の割合を示す有効エリア率を算出し(ステップ116)、この有効エリア率と、パラメータ設定部15Aで設定された、算出単位エリアの全数に占める有効エリアの割合の下限を示す下限有効エリア率とを比較する(ステップ117)。   In this way, after the processing for each calculation unit area is completed in the calculation unit area loop, the screening unit 15E performs the third screening process as an effective area ratio indicating the ratio of the number of effective areas to the total number of calculation unit areas. (Step 116), and this effective area rate is compared with the lower limit effective area rate that is set by the parameter setting unit 15A and indicates the lower limit of the ratio of the effective area to the total number of calculation unit areas (step 117). .

ここで、有効エリア率が下限有効エリア率を下回る場合(ステップ117:NO)、スクリーニング部15Eは、有効エリア率が大きくなる方向に、算出単位エリア内の設備数の下限を示すしきい値や、最近隣測度と多様度との乖離度の上限を示すしきい値などの設定パラメータを調整するため(ステップ118)、ステップ110へ戻る。設定パラメータの調整については、予め指定された調整内容に基づき特定のパラメータを自動調整してもよく、パラメータの設定画面を画面表示部13に表示して作業者による調整を促すようにしてもよい。   Here, when the effective area rate is lower than the lower limit effective area rate (step 117: NO), the screening unit 15E sets the threshold indicating the lower limit of the number of facilities in the calculation unit area in the direction in which the effective area rate increases. In order to adjust setting parameters such as a threshold value indicating the upper limit of the degree of divergence between the nearest neighbor measure and diversity (step 118), the process returns to step 110. Regarding the adjustment of the setting parameter, a specific parameter may be automatically adjusted based on the adjustment content specified in advance, or a parameter setting screen may be displayed on the screen display unit 13 to encourage adjustment by the operator. .

一方、有効エリア率が下限有効エリア率以上である場合(ステップ117:YES)、基本統計量算出部15Fは、集密多様度算出部15Dで算出された各算出単位エリアの集密多様度や、スクリーニング部15Eでスクリーニングされた有効エリアに基づいて、基本統計量14Eを算出し、記憶部14に保存する(ステップ119)。   On the other hand, when the effective area rate is equal to or greater than the lower limit effective area rate (step 117: YES), the basic statistic calculation unit 15F calculates the concentration diversity of each calculation unit area calculated by the concentration diversity calculation unit 15D. Based on the effective area screened by the screening unit 15E, the basic statistic 14E is calculated and stored in the storage unit 14 (step 119).

この後、評価結果出力部15Gは、集密多様度算出部15Dで算出された各算出単位エリアの集密多様度や、スクリーニング部15Eでスクリーニングされた有効エリア、さらには、基本統計量算出部15Fで算出された基本統計量14Eに基づき、設備メンテナンス負担に関する評価結果14Fを生成して記憶部14に保存し、また、画面表示部13で評価結果14Fを表示出力し、さらには必要に応じて、通信I/F部11を介して外部装置へ評価結果14Fを出力し(ステップ120)、一連の設備メンテナンス負担評価処理を終了する。   Thereafter, the evaluation result output unit 15G includes the density of each calculation unit area calculated by the density diversity calculation unit 15D, the effective area screened by the screening unit 15E, and the basic statistic calculation unit. Based on the basic statistic 14E calculated at 15F, an evaluation result 14F relating to the equipment maintenance burden is generated and stored in the storage unit 14, the evaluation result 14F is displayed on the screen display unit 13, and further, if necessary. Then, the evaluation result 14F is output to the external device via the communication I / F unit 11 (step 120), and the series of equipment maintenance burden evaluation processing is terminated.

なお、スクリーニング部15Eでは、有効エリアに関する有効エリア率とその下限有効エリア率とに基づきパラメータの調整要否を判定する場合を例として説明したが、これに限定されるものではなく、有効エリアとして設定されなかった参考エリアに関する参考エリア率(=1−有効エリア率)とその上限参考エリア率とに基づきパラメータの調整要否を判定するようにしてもよい。   In the screening unit 15E, the case where the necessity of parameter adjustment is determined based on the effective area rate related to the effective area and the lower limit effective area rate has been described as an example. The necessity of parameter adjustment may be determined based on the reference area rate (= 1-effective area rate) regarding the reference area that has not been set and the upper limit reference area rate.

[本実施の形態の効果]
このように、本実施の形態は、最近隣測度算出部15Bが、位置情報に基づいて、設備を中心または重心とした一定の算出単位エリアごとに、当該算出単位エリア内に位置する各設備の集密度合いを示す最近隣測度Rを算出し、多様度算出部15Cが、ランク情報と情報エントロピーの概念とに基づいて、算出単位エリアごとに、当該算出単位エリア内に位置する各設備のランクに関するばらつき度合いを示す多様度Hを算出し、集密多様度算出部15Dが、算出単位エリアごとに、当該算出単位エリアの最近隣測度および多様度をそれぞれ直交成分とするベクトルの長さに基づき当該算出単位エリアの集密多様度ENを算出するようにしたものである。
[Effects of the present embodiment]
As described above, according to the present embodiment, the nearest neighbor measure calculation unit 15B performs, for each fixed calculation unit area having the facility as the center or the center of gravity based on the position information, for each facility located in the calculation unit area. The nearest neighbor measure R indicating the degree of density is calculated, and the diversity calculation unit 15C determines the rank of each facility located in the calculation unit area for each calculation unit area based on the rank information and the concept of information entropy. The diversity H calculating unit 15D calculates the degree of variation H regarding the degree of variation with respect to each calculation unit area, based on the length of a vector having the nearest neighbor measure and the diversity of the calculation unit area as orthogonal components, respectively. The density diversity EN of the calculation unit area is calculated.

これにより、従来の画一的に設定したメッシュを算出単位エリアとして用いる場合と比較して、設備が地理的に集中して設置されている真の集密エリアを含む各算出単位エリアについて、その設備の集密度合いを示す最近隣測度Rが得られる。また、設備の種別や過去の点検データや予測等から得られた劣化状態に対応した補修方法など、メンテナンスに要する負担の大きさのばらつきに関する指標である多様度Hが、算出単位エリアごとに得られる。そして、これら最近隣測度Rと多様度Hとが1つに統合されて、メンテナンスに要する負担に影響を及ぼす、各設備の集密度合いおよび劣化状態を、一義的かつ定量的に評価できる評価指標として集密多様度が得られる。   As a result, compared to the conventional case where a uniform mesh is used as the calculation unit area, each calculation unit area including a true congested area where facilities are geographically concentrated is installed. A nearest neighbor measure R indicating the density of the equipment is obtained. In addition, diversity H, which is an index related to variations in the magnitude of the burden required for maintenance, such as repair methods corresponding to the deterioration status obtained from the type of equipment, past inspection data and prediction, etc., is obtained for each calculation unit area. It is done. These nearest neighbor measures R and diversity H are integrated into one, and an evaluation index that can unambiguously and quantitatively evaluate the density and deterioration state of each facility that affects the maintenance burden. As a result, the density of congestion is obtained.

したがって、分散設置された種類や状態の異なる各設備のメンテナンスに要する負担を、算出単位エリアごとに総合的に評価でき、集密多様度という1つの指標の大小に基づいて、高効率でメンテナンスが可能なエリアを正確に特定することが可能となる。
これにより、予算や日程など限られたリソースの範囲内で、より多くのエリアのより多くの設備をメンテナンスするための優先順位付けを、正確に行うことができる。このため、通信サービスを提供するための電柱、通信ケーブル、通信装置などの通信設備に限らず、老朽化に伴い早期のメンテナンスが必要とされている一般的なインフラストラクチャ設備に関するメンテナンス方針の決定に、極めて有用な評価指標を提供することが可能となる。
Therefore, it is possible to comprehensively evaluate the burden required for the maintenance of each type of equipment installed in different types and states in a distributed manner, and maintenance can be performed with high efficiency based on the size of a single index called “concentration diversity”. It is possible to accurately identify possible areas.
Thus, prioritization for maintaining more facilities in more areas can be accurately performed within a limited resource range such as a budget and a schedule. For this reason, it is not limited to communication facilities such as utility poles, communication cables, and communication devices for providing communication services, but to determine maintenance policies for general infrastructure facilities that require early maintenance due to aging. It becomes possible to provide an extremely useful evaluation index.

なお、本発明にかかる集密多様度の算出手法は、メンテナンスに関する地域的な優先順位を特定することができるため、例えば、故障リスク等の相対比較(ランク分け)を公知の手法で行った後、集密多様度を算出するという活用も考えられる。もし、過去のメンテナンスに関するデータベースから、メンテナンスに必要となるリソースの原単位を導出できる場合、前述のようにして算出された集密多様度に、この原単位を乗算することで、エリアごとの具体的な保守リソースが算定される。これにより、メンテナンスに必要なリソースや所要時間を正確に算出でき、より効果的なメンテナンス方針を策定することが可能となる。   In addition, since the calculation method of the congestion diversity concerning this invention can specify the regional priority regarding a maintenance, for example, after performing relative comparison (ranking), such as failure risk, by a well-known method It can also be used to calculate the density of congestion. If the basic unit of resources required for maintenance can be derived from the database related to past maintenance, the specific unit for each area can be calculated by multiplying the basic unit of the confluence diversity calculated as described above by this basic unit. Maintenance resources are calculated. This makes it possible to accurately calculate the resources and time required for maintenance, and to formulate a more effective maintenance policy.

[実施の形態の拡張]
以上、実施形態を参照して本発明を説明したが、本発明は上記実施形態に限定されるものではない。本発明の構成や詳細には、本発明のスコープ内で当業者が理解しうる様々な変更をすることができる。また、各構成については、矛盾しない範囲で任意に組み合わせて実施することができる。
[Extended embodiment]
The present invention has been described above with reference to the embodiments, but the present invention is not limited to the above embodiments. Various changes that can be understood by those skilled in the art can be made to the configuration and details of the present invention within the scope of the present invention. Each configuration can be implemented in any combination within a consistent range.

10…設備メンテナンス負担評価装置、11…通信I/F部、12…操作入力部、13…画面表示部、14…記憶部、14A…設備情報、14B…最近隣測度、14C…多様度、14D…集密多様度、14E…基本統計量、14D…評価結果、14P…プログラム、15…演算処理部、15A…パラメータ設定部、15B…最近隣測度算出部、15C…多様度算出部、15D…集密多様度算出部、15E…スクリーニング部、15F…基本統計量算出部、15G…評価結果出力部、R…最近隣測度、NR…正規化最近隣測度、H…多様度、NH…正規化多様度、EN…集密多様度、NEN…正規化集密多様度。   DESCRIPTION OF SYMBOLS 10 ... Equipment maintenance burden evaluation apparatus, 11 ... Communication I / F part, 12 ... Operation input part, 13 ... Screen display part, 14 ... Memory | storage part, 14A ... Equipment information, 14B ... Nearest neighbor measure, 14C ... Diversity, 14D ... Concentration diversity, 14E ... Basic statistics, 14D ... Evaluation results, 14P ... Program, 15 ... Operation processing unit, 15A ... Parameter setting unit, 15B ... Nearest neighbor measure calculation unit, 15C ... Diversity calculation unit, 15D ... Concentration diversity calculation unit, 15E ... screening unit, 15F ... basic statistic calculation unit, 15G ... evaluation result output unit, R ... nearest neighbor measure, NR ... normalized nearest neighbor measure, H ... diversity, NH ... normalization Diversity, EN ... concentration diversity, NEN ... normalized concentration diversity.

Claims (6)

分散設置された種類や状態の異なる各設備のメンテナンスに要する負担を、算出単位エリアごとに総合的に評価するための設備メンテナンス負担評価方法であって、
記憶部が、設備ごとに、当該設備が設置されている位置を示す位置情報と、メンテナンスに要する負担の大きさと対応関係を有する当該設備のランク情報とが登録された設備情報とを記憶する記憶ステップと、
最近隣測度算出部が、前記位置情報に基づいて、前記設備を中心または重心とした一定の算出単位エリアごとに、当該算出単位エリア内に位置する各設備の集密度合いを示す最近隣測度を算出する最近隣測度算出ステップと、
多様度算出部が、前記ランク情報と情報エントロピーの概念とに基づいて、前記算出単位エリアごとに、当該算出単位エリア内に位置する各設備のランクに関するばらつき度合いを示す多様度を算出する多様度算出ステップと、
集密多様度算出部が、前記算出単位エリアごとに、当該算出単位エリアの最近隣測度および多様度をそれぞれ直交成分とするベクトルの長さに基づき当該算出単位エリアの集密多様度を算出する集密多様度算出ステップと
を備えることを特徴とする設備メンテナンス負担評価方法。
A facility maintenance burden evaluation method for comprehensively evaluating the burden required for the maintenance of each facility of different types and states installed in a distributed manner for each calculation unit area,
A storage that stores, for each facility, location information indicating the location where the facility is installed, and facility information in which the rank information of the facility having a correspondence relationship with the magnitude of the burden required for maintenance is registered Steps,
Based on the position information, the nearest neighbor measure calculation unit calculates, for each calculation unit area centered on the facility or the center of gravity, a nearest neighbor measure indicating the density of each facility located in the calculation unit area. The nearest neighbor measure calculating step to calculate;
Diversity in which the diversity calculation unit calculates, for each calculation unit area, the degree of variation related to the rank of each facility located in the calculation unit area based on the rank information and the concept of information entropy A calculation step;
For each calculation unit area, the density diversity calculation unit calculates the density diversity of the calculation unit area based on the nearest neighbor measure of the calculation unit area and the length of a vector having orthogonal components as orthogonal components. A facility maintenance burden evaluation method comprising: a confluence diversity calculation step.
請求項1に記載の設備メンテナンス負担評価方法において、
スクリーニング部が、前記算出単位エリアのうち、当該算出単位エリア内に、設備数の下限を示すしきい値以上の設備が配置されている算出単位エリアを有効エリアとして選択し、当該有効エリアに関する集密多様度を有効な評価結果として選択するスクリーニングステップをさらに備えることを特徴とする設備メンテナンス負担評価方法。
In the equipment maintenance burden evaluation method according to claim 1,
The screening unit selects, as the effective area, a calculation unit area in which the facilities equal to or greater than the threshold indicating the lower limit of the number of facilities are arranged in the calculation unit area, and collects the effective unit. A facility maintenance burden evaluation method, further comprising a screening step of selecting dense diversity as an effective evaluation result.
請求項1に記載の設備メンテナンス負担評価方法において、
スクリーニング部が、前記算出単位エリアのうち、当該算出単位エリアの最近隣測度と多様度との乖離度が、当該乖離度の上限を示すしきい値以下である算出単位エリアを有効エリアとして選択し、当該有効エリアに関する集密多様度を有効な評価結果として選択するスクリーニングステップをさらに備えることを特徴とする設備メンテナンス負担評価方法。
In the equipment maintenance burden evaluation method according to claim 1,
The screening unit selects, from among the calculation unit areas, a calculation unit area whose divergence between the nearest neighbor measure and the diversity of the calculation unit area is equal to or less than a threshold value indicating the upper limit of the divergence as an effective area. A facility maintenance burden evaluation method, further comprising a screening step of selecting the density of congestion related to the effective area as an effective evaluation result.
請求項2または請求項3に記載の設備メンテナンス負担評価方法において、
スクリーニングステップは、前記算出単位エリアの全数に対する前記有効エリアの数の割合を示す有効エリア率が、予め設定されている下限有効エリア率を下回る場合、前記有効エリア率が大きくなる方向に前記しきい値を調整するステップを含むことを特徴とする設備メンテナンス負担評価方法。
In the equipment maintenance burden evaluation method according to claim 2 or claim 3,
In the screening step, when the effective area rate indicating the ratio of the number of the effective areas to the total number of the calculation unit areas is lower than a preset lower limit effective area rate, the threshold is increased in the effective area rate. An equipment maintenance burden evaluation method comprising a step of adjusting a value.
請求項1〜請求項4に記載の設備メンテナンス負担評価方法において、
前記集密多様度算出ステップは、前記最近隣測度の最大値および最小値をRmaxおよびRminとし、前記多様度の最大値および最小値をHmaxおよびHminとした場合、任意の算出単位エリアjの集密多様度をENjを、次の式
Figure 0006010059
を用いて算出することを特徴とする設備メンテナンス負担評価方法。
In the equipment maintenance burden evaluation method according to claim 1 to claim 4,
In the concentration diversity calculation step, when the maximum value and minimum value of the nearest neighbor measure are Rmax and Rmin, and the maximum value and minimum value of the diversity are Hmax and Hmin, a collection of an arbitrary calculation unit area j is performed. Dense diversity is expressed as ENj,
Figure 0006010059
An equipment maintenance burden evaluation method characterized by calculating using
分散設置された種類や状態の異なる各設備のメンテナンスに要する負担を、算出単位エリアごとに総合的に評価するための設備メンテナンス負担評価装置であって、
設備ごとに、当該設備が設置されている位置を示す位置情報と、メンテナンスに要する負担の大きさと対応関係を有する当該設備のランク情報とが登録された設備情報とを記憶する記憶部と、
前記位置情報に基づいて、前記設備を中心または重心とした一定の算出単位エリアごとに、当該算出単位エリア内に位置する各設備の集密度合いを示す最近隣測度を算出する最近隣測度算出部と、
前記ランク情報と情報エントロピーの概念とに基づいて、前記算出単位エリアごとに、当該算出単位エリア内に位置する各設備のランクに関するばらつき度合いを示す多様度を算出する多様度算出部と、
前記算出単位エリアごとに、当該算出単位エリアの最近隣測度および多様度をそれぞれ直交成分とするベクトルの長さに基づき当該算出単位エリアの集密多様度を算出する集密多様度算出部と
を備えることを特徴とする設備メンテナンス負担評価装置。
A facility maintenance burden evaluation device for comprehensively evaluating the burden required for maintenance of each facility of different types and states installed in a distributed manner for each calculation unit area,
For each facility, a storage unit that stores location information indicating a location where the facility is installed, and facility information in which rank information of the facility having a correspondence relationship with the magnitude of the burden required for maintenance is registered,
Based on the position information, for each fixed calculation unit area with the facility as the center or center of gravity, a nearest neighbor measure calculation unit that calculates a nearest neighbor measure indicating the density of each facility located in the calculation unit area When,
On the basis of the rank information and the concept of information entropy, a diversity calculation unit that calculates, for each calculation unit area, a diversity indicating the degree of variation regarding the rank of each facility located in the calculation unit area;
For each of the calculation unit areas, a density diversity calculation unit that calculates the density diversity of the calculation unit area based on the length of a vector having the nearest neighbor measure and the diversity as orthogonal components, respectively. An equipment maintenance burden evaluation apparatus comprising:
JP2014025112A 2014-02-13 2014-02-13 Equipment maintenance burden evaluation method and apparatus Active JP6010059B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014025112A JP6010059B2 (en) 2014-02-13 2014-02-13 Equipment maintenance burden evaluation method and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014025112A JP6010059B2 (en) 2014-02-13 2014-02-13 Equipment maintenance burden evaluation method and apparatus

Publications (2)

Publication Number Publication Date
JP2015153060A JP2015153060A (en) 2015-08-24
JP6010059B2 true JP6010059B2 (en) 2016-10-19

Family

ID=53895256

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014025112A Active JP6010059B2 (en) 2014-02-13 2014-02-13 Equipment maintenance burden evaluation method and apparatus

Country Status (1)

Country Link
JP (1) JP6010059B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6367757B2 (en) * 2015-05-27 2018-08-01 日本電信電話株式会社 Management method and management apparatus
JP6974732B2 (en) * 2018-04-05 2021-12-01 日本電信電話株式会社 Influential factor mixed range analysis method and influential factor mixed range analyzer
WO2021245925A1 (en) * 2020-06-05 2021-12-09 日本電信電話株式会社 Degradation estimation device and degradation estimation method
CN113947248B (en) * 2021-10-21 2024-05-31 广东电网有限责任公司广州供电局 Risk prediction method and related device for cable damp aging tripping

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3554926B2 (en) * 2000-10-11 2004-08-18 文彦 今村 Tsunami damage estimation system
JP4052861B2 (en) * 2002-03-28 2008-02-27 財団法人公園緑地管理財団 Green space management level setting method and management level setting program
JP4950508B2 (en) * 2006-02-14 2012-06-13 ヤフー株式会社 Facility information management system, facility information management device, facility information management method, and facility information management program
JP5809105B2 (en) * 2012-05-16 2015-11-10 日本電信電話株式会社 Maintenance method selection device, maintenance method selection method and program

Also Published As

Publication number Publication date
JP2015153060A (en) 2015-08-24

Similar Documents

Publication Publication Date Title
JP6770125B2 (en) Estimated damage prevention due to building renovation
Pirdavani et al. Application of geographically weighted regression technique in spatial analysis of fatal and injury crashes
Steenberghen et al. Spatial clustering of events on a network
Di Lorenzo et al. Allaboard: Visual exploration of cellphone mobility data to optimise public transport
CN104915735B (en) The early warning analysis method of enterprise operation analyzing and alarming system
JP6010059B2 (en) Equipment maintenance burden evaluation method and apparatus
AU2021236564A1 (en) Devices, methods, and systems for determining environmental standard compliance
Broitman et al. Forecasting health effects potentially associated with the relocation of a major air pollution source
KR20140090723A (en) Method and apparatus for the appropriate locaion assessment of a super tall building
Duan et al. Spatial-temporal analysis of safety risks in trajectories of construction workers based on complex network theory
Pusuluri et al. Road crash zone identification and remedial measures using GIS
Meoni et al. A procedure for bridge visual inspections prioritisation in the context of preliminary risk assessment with limited information
CN117634926A (en) Comprehensive port operation prediction method and system based on big data analysis
Yang et al. Analyzing travel time belief reliability in road network under uncertain random environment
Faravelli et al. Using OpenQuake to define seismic risk and real time damage scenario in Italy
KR101744776B1 (en) Apparatus for estimating a floating population using records of search maps and method thereof
JP5779294B1 (en) Information processing apparatus, information processing method, and information processing program
Li et al. Integrating traffic simulation models with evacuation planning system in a GIS environment
Atef et al. Understanding the effect of interdependency and vulnerability on the performance of civil infrastructure
Berardinelli et al. An advanced highway asset management system
Vahdat et al. A risk-based system for managing the retrofitting of school buildings in seismic prone areas: A case study from Iran
Baker et al. Local measures of disruption for quantifying seismic risk and reliability of complex networks
WO2020105151A1 (en) Facility maintenance inspection assisting system and order of inspection determination method
Nguyen et al. FAHP-based decision making framework for construction projects
Sanni et al. Estimating walking modal share: a novel approach based on spatial regression models and GIS

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20151117

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20160819

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20160913

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20160915

R150 Certificate of patent or registration of utility model

Ref document number: 6010059

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150