JP6009531B2 - Dehumidification system - Google Patents

Dehumidification system Download PDF

Info

Publication number
JP6009531B2
JP6009531B2 JP2014265449A JP2014265449A JP6009531B2 JP 6009531 B2 JP6009531 B2 JP 6009531B2 JP 2014265449 A JP2014265449 A JP 2014265449A JP 2014265449 A JP2014265449 A JP 2014265449A JP 6009531 B2 JP6009531 B2 JP 6009531B2
Authority
JP
Japan
Prior art keywords
heat exchanger
adsorption
air
adsorption heat
heat exchange
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014265449A
Other languages
Japanese (ja)
Other versions
JP2016125720A (en
Inventor
尚利 藤田
尚利 藤田
敏幸 夏目
敏幸 夏目
中山 浩
浩 中山
松井 伸樹
伸樹 松井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daikin Industries Ltd
Daikin Applied Systems Co Ltd
Original Assignee
Daikin Industries Ltd
Daikin Applied Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daikin Industries Ltd, Daikin Applied Systems Co Ltd filed Critical Daikin Industries Ltd
Priority to JP2014265449A priority Critical patent/JP6009531B2/en
Publication of JP2016125720A publication Critical patent/JP2016125720A/en
Application granted granted Critical
Publication of JP6009531B2 publication Critical patent/JP6009531B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Central Air Conditioning (AREA)
  • Air Conditioning Control Device (AREA)
  • Drying Of Gases (AREA)

Description

本発明は、空気を除湿して調湿空間に供給する除湿装置を備えた除湿システムに関するものである。   The present invention relates to a dehumidifying system including a dehumidifying device that dehumidifies air and supplies it to a humidity control space.

従来、空気を除湿して調湿空間(例えば、室内空間)に供給する除湿装置が知られている。例えば、特許文献1には、2つの吸着熱交換器を有する冷媒回路を備え、吸着熱交換器において空気の湿度調整を行う調湿装置が記載されている。この調湿装置は、第1吸着熱交換器が凝縮器となり第2吸着熱交換器が蒸発器となる動作と、第1吸着熱交換器が蒸発器となり第2吸着熱交換器が凝縮器となる動作とを交互に繰り返し行う。具体的には、この調湿装置は、蒸発器として機能する吸着熱交換器において除湿された空気を室内に供給するとともに凝縮器として機能する吸着熱交換器において加湿された空気を室外に排出する除湿運転を行う。   Conventionally, a dehumidifying device that dehumidifies air and supplies it to a humidity control space (for example, indoor space) is known. For example, Patent Document 1 describes a humidity control device that includes a refrigerant circuit having two adsorption heat exchangers and adjusts the humidity of air in the adsorption heat exchanger. In this humidity control apparatus, the first adsorption heat exchanger serves as a condenser and the second adsorption heat exchanger serves as an evaporator, and the first adsorption heat exchanger serves as an evaporator and the second adsorption heat exchanger serves as a condenser. This operation is repeated alternately. Specifically, this humidity control apparatus supplies the air dehumidified in the adsorption heat exchanger functioning as an evaporator to the room and discharges the air humidified in the adsorption heat exchanger functioning as a condenser to the outside. Perform dehumidifying operation.

ところで、特許文献1のような除湿装置(調湿装置)では、冷媒回路の圧縮機の回転数を増加させることによって除湿能力を向上させることが考えられる。しかしながら、冷媒回路の圧縮機の回転数を増加させると、除湿装置の消費電力が増大してしまう。そこで、吸着熱交換器とともに吸着ブロック(通気性のある構造体に吸着剤を担持させたブロック状の部材)を用いて空気の除湿量を増大させ、消費電力を抑えながら除湿能力を向上させることが考えられる。   By the way, in a dehumidifying apparatus (humidity adjusting apparatus) like patent document 1, it is possible to improve a dehumidification capability by increasing the rotation speed of the compressor of a refrigerant circuit. However, when the rotation speed of the compressor in the refrigerant circuit is increased, the power consumption of the dehumidifier increases. Therefore, using an adsorption block (a block-like member in which an adsorbent is supported on a breathable structure) together with an adsorption heat exchanger, the amount of air dehumidification is increased, and the dehumidification capability is improved while suppressing power consumption. Can be considered.

特開2006−349294号公報JP 2006-349294 A

しかしながら、除湿装置を設置する場所は、周囲温度が高温(例えば40℃〜50℃)になる環境である場合があり、そのような環境で吸着ブロックを用いる構成を採用すると、圧縮機を起動する前に吸着ブロックが高温になっていることがある。そうすると、圧縮機を起動したときに冷媒回路の凝縮温度が高くなりすぎるおそれがあり、その結果、冷媒回路の高圧圧力が過度に上昇して圧縮機が停止してしまうおそれがある。   However, the place where the dehumidifying device is installed may be an environment where the ambient temperature is high (for example, 40 ° C. to 50 ° C.), and when a configuration using an adsorption block is employed in such an environment, the compressor is started. The adsorption block may be hot before. If it does so, there exists a possibility that the condensing temperature of a refrigerant circuit may become high too much when starting a compressor, As a result, there exists a possibility that the high pressure of a refrigerant circuit may rise too much and a compressor may stop.

本発明は、このような問題点に鑑みてなされたものであり、その目的は、吸着熱交換器とともに吸着ブロックを用いる除湿システムにおいて、除湿装置の設置場所の周囲温度に関わらず、吸着熱交換器が接続されている冷媒回路の高圧圧力が圧縮機の起動時に過度に上昇するのを抑え、圧縮機が停止するのを防止できるようにすることである。   The present invention has been made in view of such problems, and the object thereof is a dehumidification system that uses an adsorption block together with an adsorption heat exchanger, regardless of the ambient temperature at the location where the dehumidifier is installed. The high pressure of the refrigerant circuit to which the compressor is connected is prevented from excessively rising when the compressor is started, and the compressor can be prevented from stopping.

第1の発明の除湿システムは、吸着剤が担持された第1吸着熱交換器(101)及び第2吸着熱交換器(102)を有し、これらの吸着熱交換器(101,102)の一方が蒸発器になって他方が凝縮器になる動作と一方が凝縮器になって他方が蒸発器になる動作が交互に切り換えられる冷媒回路(100)と、上記第1吸着熱交換器(101)が設けられる第1熱交換室(S11)及び上記第2吸着熱交換器(102)が設けられる第2熱交換室(S12)と、通常運転時に、両熱交換室(S11,S12)のうちで蒸発器になっている吸着熱交換器(101,102)がある熱交換室(S11,S12)を通過した処理側空気を調湿空間(S1)に供給し、凝縮器になっている吸着熱交換器(101,102)がある熱交換室(S11,S12)を再生側空気が通過するように空気の流れを切り換える切換機構(200)と、上記第1熱交換室(S11)において上記第1吸着熱交換器(101)が蒸発器になっている場合に該蒸発器の下流側になり該第1吸着熱交換器(101)が凝縮器になっている場合に該凝縮器の上流側になる位置に設けられた、吸着剤が担持された第1吸着ブロック(301)と、上記第2熱交換室(S12)において上記第2吸着熱交換器(102)が蒸発器になっている場合に該蒸発器の下流側になり該第2吸着熱交換器(102)が凝縮器になっている場合に該凝縮器の上流側になる位置に設けられた、吸着剤が担持された第2吸着ブロック(302)と、を備えた除湿システムにおいて、上記切換機構(200)が、上記冷媒回路(100)の圧縮機(103)を起動する前に、該圧縮機(103)の起動時に凝縮器になる吸着熱交換器(101,102)に対して上流側に位置する吸着ブロック(301,302)に冷却用の空気を流す予冷運転を行うように構成されていることを特徴としている。   The dehumidifying system of the first invention has a first adsorption heat exchanger (101) and a second adsorption heat exchanger (102) on which an adsorbent is supported, and one of these adsorption heat exchangers (101, 102) The refrigerant circuit (100) in which the operation of becoming an evaporator and the other becoming a condenser and the operation of one becoming a condenser and the other becoming an evaporator are alternately switched, and the first adsorption heat exchanger (101) includes Between the first heat exchange chamber (S11) provided and the second heat exchange chamber (S12) in which the second adsorption heat exchanger (102) is provided, and the two heat exchange chambers (S11, S12) during normal operation The processing side air that has passed through the heat exchange chamber (S11, S12) with the adsorption heat exchanger (101, 102) that is the evaporator is supplied to the humidity control space (S1), and the adsorption heat exchanger that is the condenser A switching mechanism (200) for switching the flow of air so that the regeneration side air passes through a heat exchange chamber (S11, S12) with (101, 102), and the first heat When the first adsorption heat exchanger (101) is an evaporator in the exchange chamber (S11), it is on the downstream side of the evaporator and the first adsorption heat exchanger (101) is a condenser. In this case, the first adsorption block (301) provided on the upstream side of the condenser and carrying the adsorbent, and the second adsorption heat exchanger (102) in the second heat exchange chamber (S12). ) Is located on the downstream side of the evaporator when it is an evaporator, and is located on the upstream side of the condenser when the second adsorption heat exchanger (102) is a condenser. In the dehumidification system comprising the second adsorption block (302) carrying the adsorbent, the switching mechanism (200) before starting the compressor (103) of the refrigerant circuit (100), Adsorption block (301,302) located upstream from the adsorption heat exchanger (101,102) that becomes a condenser when the compressor (103) is started It is characterized in that it is configured to perform precooling operation flow of air for cooling.

この第1の発明では、上記冷媒回路(100)の圧縮機(103)を起動する前に、該圧縮機(103)の起動時に凝縮器になる吸着熱交換器(101,102)に対して上流側に位置する吸着ブロック(301,302)に冷却用の空気を流す予冷運転が行われるように、上記切換機構(200)が切り換えられる。このことにより、次に圧縮機(103)を起動するときには、凝縮器になる吸着熱交換器(101,102)に対して上流側に位置する吸着ブロック(301,302)が既に冷却されているので、凝縮器の温度上昇が抑えられる。   In the first aspect of the invention, before starting the compressor (103) of the refrigerant circuit (100), the upstream side with respect to the adsorption heat exchanger (101, 102) that becomes a condenser when the compressor (103) is started. The switching mechanism (200) is switched so that a pre-cooling operation in which cooling air is supplied to the adsorption block (301, 302) positioned in the position is performed. As a result, the next time the compressor (103) is started, the adsorption block (301, 302) located upstream from the adsorption heat exchanger (101, 102) that becomes the condenser has already been cooled. Temperature rise is suppressed.

第2の発明は、第1の発明において、上記切換機構(200)が、予冷運転時に、上記処理側空気と再生側空気のうちで温度が低い空気を、上記圧縮機(103)の起動時に凝縮器になる吸着熱交換器(101,102)の上流側に位置する吸着ブロック(301,302)に流すように構成されていることを特徴としている。   According to a second aspect of the present invention, in the first aspect, the switching mechanism (200) causes air having a lower temperature between the processing side air and the regeneration side air during precooling operation to start up the compressor (103). It is characterized by being configured to flow through the adsorption block (301, 302) located on the upstream side of the adsorption heat exchanger (101, 102) serving as a condenser.

この第2の発明では、予冷運転時に、上記処理側空気と再生側空気のうちで温度が低い空気が、上記圧縮機(103)の起動時に凝縮器になる吸着熱交換器(101,102)の上流側に位置する吸着ブロック(301,302)を流れる。したがって、その吸着ブロック(301,302)が確実に冷却される。   In the second aspect of the invention, during the pre-cooling operation, the low-temperature air among the processing side air and the regeneration side air is upstream of the adsorption heat exchanger (101, 102) that becomes a condenser when the compressor (103) is started. It flows through the suction block (301, 302) located on the side. Therefore, the suction block (301, 302) is reliably cooled.

第3の発明は、第2の発明において、上記切換機構(200)は、予冷運転時に上記処理側空気の温度が上記再生側空気の温度よりも低い場合、上記圧縮機(103)の起動時に凝縮器になる吸着熱交換器(101,102)がある熱交換室(S11,S12)を処理側空気が通過する切り換え動作が可能に構成されていることを特徴としている。   According to a third aspect, in the second aspect, the switching mechanism (200) is configured to start the compressor (103) when the temperature of the processing side air is lower than the temperature of the regeneration side air during the precooling operation. It is characterized in that it is configured to be able to perform a switching operation in which the processing-side air passes through the heat exchange chamber (S11, S12) where the adsorption heat exchanger (101, 102) serving as a condenser is located.

この第3の発明では、予冷運転時に、上記処理側空気と再生側空気のうちで温度が低い処理側空気が、上記圧縮機(103)の起動時に凝縮器になる吸着熱交換器(101,102)の上流側に位置する吸着ブロック(301,302)を流れる。したがって、その吸着ブロック(301,302)が確実に冷却される。   In the third aspect of the invention, during the pre-cooling operation, the adsorption side heat exchanger (101, 102) in which the processing side air having a low temperature among the processing side air and the regeneration side air becomes a condenser when the compressor (103) is started. It flows through the suction block (301, 302) located on the upstream side. Therefore, the suction block (301, 302) is reliably cooled.

第4の発明は、第3の発明において、上記切換機構(200)は、上記第1熱交換室(S11)と第2熱交換室(S12)を通る空気の流通経路を切り換える複数のダンパ(D1〜D8)により構成され、上記通常運転の開始時に開くダンパ(D2,D3,D5,D8)を上記予冷運転時に閉じ、上記通常運転の開始時に閉じるダンパ(D1,D4,D6,D7)を上記予冷運転時に開くことにより、予冷運転の切り換え動作が行われることを特徴としている。   In a fourth aspect based on the third aspect, the switching mechanism (200) includes a plurality of dampers that switch a flow path of air passing through the first heat exchange chamber (S11) and the second heat exchange chamber (S12). D1 to D8), and the dampers (D2, D3, D5, D8) that are opened at the start of the normal operation are closed during the precooling operation, and the dampers (D1, D4, D6, D7) that are closed at the start of the normal operation are closed. By opening during the precooling operation, the switching operation of the precooling operation is performed.

この第4の発明では、通常運転の開始時に開くダンパ(D2,D3,D5,D8)を上記予冷運転時に閉じ、上記通常運転の開始時に閉じるダンパ(D1,D4,D6,D7)を上記予冷運転時に開くことにより、上記圧縮機(103)の起動時に凝縮器になる吸着熱交換器(101,102)の上流側に位置する吸着ブロック(301,302)が冷却される。   In the fourth aspect of the invention, the dampers (D2, D3, D5, D8) that are opened at the start of normal operation are closed during the precooling operation, and the dampers (D1, D4, D6, D7) that are closed at the start of normal operation are precooled. By opening during operation, the adsorption block (301, 302) located on the upstream side of the adsorption heat exchanger (101, 102) that becomes a condenser when the compressor (103) is started is cooled.

第5の発明は、第3または第4の発明において、上記切換機構(200)は、圧縮機(103)の起動時に凝縮器になる吸着熱交換器(101,102)がある熱交換室(S11,S12)を処理側空気が通過する予冷運転の切り換え動作を所定時間にわたって行った後に、蒸発器になる吸着熱交換器(101,102)がある熱交換室(S11,S12)を処理側空気が通過する通常運転の切り換え動作を行うように構成されていることを特徴としている。   According to a fifth aspect of the present invention, in the third or fourth aspect, the switching mechanism (200) includes a heat exchange chamber (S11, 102) having an adsorption heat exchanger (101, 102) that becomes a condenser when the compressor (103) is started. After switching the precooling operation in which the processing side air passes through S12) for a predetermined time, the processing side air passes through the heat exchange chamber (S11, S12) where the adsorption heat exchanger (101, 102) that becomes the evaporator is located. It is configured to perform a switching operation of normal operation.

この第5の発明では、上記圧縮機(103)の起動時に凝縮器になる吸着熱交換器(101,102)がある熱交換室(S11,S12)を処理側空気が通過する予冷運転の切り換え動作を所定時間にわたって行った後に、蒸発器になる吸着熱交換器(101,102)がある熱交換室(S11,S12)を処理側空気が通過する通常運転の切り換え動作が行われる。   In the fifth aspect of the invention, the switching operation of the precooling operation in which the processing side air passes through the heat exchange chamber (S11, S12) where the adsorption heat exchanger (101, 102) that becomes the condenser when the compressor (103) is started is provided. After performing for a predetermined time, the switching operation of the normal operation is performed in which the processing-side air passes through the heat exchange chambers (S11, S12) where the adsorption heat exchangers (101, 102) serving as the evaporator are located.

第6の発明は、第1から第5の発明の何れか1つにおいて、上記吸着熱交換器(101,102)へ供給される処理側空気を予め冷却する冷却器(11)を備え、上記切換機構(200)は、予冷運転時に、上記冷却器(11)で冷却された空気を圧縮機(103)の起動時に凝縮器になる吸着熱交換器(101,102)の上流側に位置する吸着ブロック(301,302)へ送るように構成されていることを特徴としている。   A sixth invention includes a cooler (11) for preliminarily cooling the processing-side air supplied to the adsorption heat exchanger (101, 102) according to any one of the first to fifth inventions, and the switching mechanism. (200) is an adsorption block (301,302) located upstream of the adsorption heat exchanger (101,102) that becomes a condenser when the compressor (103) is started during the pre-cooling operation. ).

この第6の発明では、予冷運転時に、上記冷却器(11)で冷却された空気が圧縮機(103)の起動時に凝縮器になる吸着熱交換器(101,102)の上流側に位置する吸着ブロック(301,302)へ送られるので、該吸着ブロック(301,302)が確実に冷却される。   In the sixth aspect of the invention, the adsorption block located on the upstream side of the adsorption heat exchanger (101, 102) in which the air cooled by the cooler (11) becomes a condenser when the compressor (103) is started during the pre-cooling operation. Since it is sent to (301, 302), the adsorption block (301, 302) is reliably cooled.

本発明によれば、圧縮機(103)を起動する前に、次に圧縮機(103)を起動するときに凝縮器になる吸着熱交換器(101,102)に対して上流側に位置する吸着ブロック(301,302)を冷却することにより、凝縮器の温度上昇を抑えるようにしている。したがって、除湿装置(10)の設置場所の周囲温度に関わらず、圧縮機(103)の起動時に冷媒回路(100)の高圧圧力が過度に上昇するのを抑え、圧縮機(103)が停止するのを防止できる。   According to the present invention, before starting the compressor (103), the adsorption block located upstream from the adsorption heat exchanger (101, 102) that becomes a condenser when the compressor (103) is started next time. By cooling (301, 302), an increase in the temperature of the condenser is suppressed. Therefore, regardless of the ambient temperature at the installation location of the dehumidifier (10), the high pressure of the refrigerant circuit (100) is prevented from excessively rising when the compressor (103) is started, and the compressor (103) is stopped. Can be prevented.

上記第2の発明によれば、予冷運転時に、上記処理側空気と再生側空気のうちで温度が低い空気を、上記圧縮機(103)の起動時に凝縮器になる吸着熱交換器(101,102)の上流側に位置する吸着ブロック(301,302)に流すことにより、その吸着ブロック(301,302)が確実に冷却されるので、圧縮機(103)が停止するのを確実に防止できる。   According to the second aspect of the invention, during the pre-cooling operation, the adsorption heat exchanger (101, 102) that becomes a condenser when the compressor (103) is started is used to convert the low-temperature air among the processing-side air and the regeneration-side air. Since the suction block (301, 302) is reliably cooled by flowing through the suction block (301, 302) located upstream of the compressor (103), it is possible to reliably prevent the compressor (103) from stopping.

上記第3の発明によれば、予冷運転時に、上記処理側空気と再生側空気のうちで温度が低い処理側空気を、上記圧縮機(103)の起動時に凝縮器になる吸着熱交換器(101,102)の上流側に位置する吸着ブロック(301,302)に流すことにより、その吸着ブロック(301,302)を確実に冷却するようにしているので、圧縮機(103)が停止するのを確実に防止できる。   According to the third aspect of the present invention, during the pre-cooling operation, the adsorption-side heat exchanger (the condenser-side air having a low temperature among the treatment-side air and the regeneration-side air is converted into a condenser when the compressor (103) is started ( 101, 102), the adsorbing block (301, 302) is surely cooled by flowing it to the adsorbing block (301, 302) located upstream of the compressor 101, 102), so that the compressor (103) can be reliably prevented from stopping.

上記第4の発明によれば、通常運転の開始時に開くダンパ(D2,D3,D5,D8)を上記予冷運転時に閉じ、上記通常運転の開始時に閉じるダンパ(D1,D4,D6,D7)を上記予冷運転時に開くことにより、上記圧縮機(103)の起動時に凝縮器になる吸着熱交換器(101,102)の上流側に位置する吸着ブロック(301,302)を冷却することができ、ダンパ(D1〜D8)を切り換えるだけで予冷運転を行えるので、装置の構造が複雑化するのを防止できる。   According to the fourth aspect of the invention, the dampers (D2, D3, D5, D8) that are opened at the start of normal operation are closed during the precooling operation, and the dampers (D1, D4, D6, D7) that are closed at the start of normal operation are closed. By opening during the pre-cooling operation, the adsorption block (301, 302) located upstream of the adsorption heat exchanger (101, 102) that becomes a condenser when the compressor (103) is started can be cooled, and the damper (D1- Since the pre-cooling operation can be performed simply by switching D8), the structure of the apparatus can be prevented from becoming complicated.

上記第5の発明によれば、上記圧縮機(103)の起動時に凝縮器になる吸着熱交換器(101,102)がある熱交換室(S11,S12)を処理側空気が通過する予冷運転の切り換え動作を所定時間にわたって行った後に、蒸発器になる吸着熱交換器(101,102)がある熱交換室(S11,S12)を処理側空気が通過する通常運転の切り換え動作が行われる。そして、予冷運転中には、蒸発器になる吸着熱交換器(101,102)に再生側空気が流れるので、吸着熱交換器(101,102)が次に処理側になるときの処理能力を高められる。   According to the fifth aspect of the invention, switching of the precooling operation in which the processing side air passes through the heat exchange chamber (S11, S12) where the adsorption heat exchanger (101, 102) that becomes the condenser when the compressor (103) is started is provided. After the operation is performed for a predetermined time, a switching operation of the normal operation is performed in which the processing side air passes through the heat exchange chambers (S11, S12) where the adsorption heat exchangers (101, 102) serving as the evaporator are located. During the pre-cooling operation, the regeneration side air flows through the adsorption heat exchanger (101, 102) that becomes the evaporator, so that the processing capacity when the adsorption heat exchanger (101, 102) becomes the next processing side can be increased.

上記第6の発明によれば、予冷運転時に、上記冷却器(11)で冷却された空気を圧縮機(103)の起動時に凝縮器になる吸着熱交換器(101,102)の上流側に位置する吸着ブロック(301,302)に流すことにより、該吸着ブロック(301,302)を確実に冷却するようにしているので、圧縮機(103)の起動時に冷媒回路(100)の高圧圧力が過度に上昇するのを確実に抑え、圧縮機(103)が停止するのを確実に防止できる。   According to the sixth aspect of the invention, during the pre-cooling operation, the air cooled by the cooler (11) is located upstream of the adsorption heat exchanger (101, 102) that becomes a condenser when the compressor (103) is started. Since the adsorbing block (301,302) is surely cooled by flowing it to the adsorbing block (301,302), the high pressure of the refrigerant circuit (100) is excessively increased when the compressor (103) is started. It is possible to reliably suppress the compressor (103) from stopping.

図1は、実施形態に係る除湿システムの構成例について説明するための配管系統図である。FIG. 1 is a piping diagram illustrating a configuration example of a dehumidification system according to an embodiment. 図2は、除湿装置の構造及び第1除湿動作における空気の流れについて説明するための概略図である。FIG. 2 is a schematic diagram for explaining the structure of the dehumidifying device and the air flow in the first dehumidifying operation. 図3は、除湿装置の構造及び第2除湿動作における空気の流れについて説明するための概略図である。FIG. 3 is a schematic diagram for explaining the structure of the dehumidifying device and the air flow in the second dehumidifying operation. 図4(A)は、図1の除湿システムにおいて予冷運転の動作を開始するときの状態図、図4(B)は予冷運転の開始直後の状態図、図4(C)は予冷運転中に圧縮機を起動した状態図、図4(D)は予冷運転後に通常運転を開始するときの状態図である。4A is a state diagram when starting the precooling operation in the dehumidifying system of FIG. 1, FIG. 4B is a state diagram immediately after the start of the precooling operation, and FIG. 4C is during the precooling operation. FIG. 4D is a state diagram when starting the normal operation after the pre-cooling operation.

以下、本発明の実施形態を図面に基づいて詳細に説明する。   Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.

図1は、この実施形態に係る除湿システム(1)の構成例を示している。この除湿システム(1)は、空気(この例では、室外空気(OA))を除湿して調湿空間(S0)に供給するものである。この例では、調湿空間(S0)は、室内空間(S1)によって構成されている。室内空間(S1)は、露点温度が低い空気(例えば、露点温度が−30℃〜−50℃程度の空気)の供給を要求されている空間であり、例えば、リチウム電池の製造ラインに設けられるドライクリーンルームである。   FIG. 1 shows a configuration example of a dehumidification system (1) according to this embodiment. This dehumidification system (1) dehumidifies air (in this example, outdoor air (OA)) and supplies it to the humidity control space (S0). In this example, the humidity control space (S0) is configured by an indoor space (S1). The indoor space (S1) is a space in which supply of air having a low dew point temperature (for example, air having a dew point temperature of about −30 ° C. to −50 ° C.) is required, and is provided, for example, in a lithium battery production line. It is a dry clean room.

この除湿システム(1)は、除湿装置(10)とコントローラ(20)と加熱器(21)とを備えている。また、除湿装置(10)には、給気通路(P1)と再生通路(P2)が設けられている。除湿装置(10)は、第1及び第2熱交換室(S11,S12)と、冷媒回路(100)と、切換機構(200)と、第1及び第2吸着ブロック(301,302)とを備えている。   The dehumidifying system (1) includes a dehumidifying device (10), a controller (20), and a heater (21). The dehumidifier (10) is provided with an air supply passage (P1) and a regeneration passage (P2). The dehumidifier (10) includes first and second heat exchange chambers (S11, S12), a refrigerant circuit (100), a switching mechanism (200), and first and second adsorption blocks (301, 302). Yes.

〈給気通路〉
給気通路(P1)には、調湿空間(S0)に供給するための空気(この例では、室内空間(S1)に供給するための空気)が流れる。この例では、給気通路(P1)は、室外空間から室外空気(OA)を取り込んで供給空気(SA)を室内空間(S1)に供給するように構成されている。具体的には、給気通路(P1)は、流入端が室外空間に接続される第1給気通路部(P11)と、流出端が室内空間(S1)に接続される第2給気通路部(P12)とを有している。また、この例では、給気通路(P1)の第1給気通路部(P11)には冷却器(11)が設けられ、冷却器(11)の近傍にはドレンパン(12)が設けられている。
<Air supply passage>
Air to be supplied to the humidity control space (S0) (in this example, air to be supplied to the indoor space (S1)) flows through the air supply passage (P1). In this example, the air supply passage (P1) is configured to take outdoor air (OA) from the outdoor space and supply supply air (SA) to the indoor space (S1). Specifically, the air supply passage (P1) includes a first air supply passage portion (P11) whose inflow end is connected to the outdoor space, and a second air supply passage whose outflow end is connected to the indoor space (S1). Part (P12). In this example, a cooler (11) is provided in the first air supply passage (P11) of the air supply passage (P1), and a drain pan (12) is provided in the vicinity of the cooler (11). Yes.

〈再生通路〉
再生通路(P2)には、吸着剤を再生するための空気が流れる。この例では、再生通路(P2)は、室内空間(S1)から室内空気(RA)を取り込んで排出空気(EA)を室外空間に排出するように構成されている。具体的には、再生通路(P2)は、流入端が室内空間(S1)に接続される第1再生通路部(P21)と、流出端が室外空間に接続される第2再生通路部(P22)とを有している。なお、この例では、室内空間(S1)の空気の一部は、再生通路(P2)を経由せずに排出空気(EA)として室外空間に排出される。
<Regeneration passage>
Air for regenerating the adsorbent flows through the regeneration passage (P2). In this example, the regeneration passage (P2) is configured to take in indoor air (RA) from the indoor space (S1) and discharge exhaust air (EA) to the outdoor space. Specifically, the regeneration passage (P2) includes a first regeneration passage portion (P21) whose inflow end is connected to the indoor space (S1) and a second regeneration passage portion (P22) whose outflow end is connected to the outdoor space. ). In this example, part of the air in the indoor space (S1) is discharged to the outdoor space as exhaust air (EA) without passing through the regeneration passage (P2).

〈熱交換室〉
第1及び第2熱交換室(S11,S12)は、一方の熱交換室を給気通路(P1)の一部として給気通路(P1)に組み込むとともに他方の熱交換室を再生通路(P2)の一部として再生通路(P2)に組み込むことができるように構成されている。具体的には、第1及び第2熱交換室(S11,S12)の各々は、第1給気通路部(P11)の流出端と第2給気通路部(P12)の流入端との間に接続されることによって給気通路(P1)に組み込まれて空気(すなわち、調湿空間(S0)に供給するための空気(処理側空気))が流通し、第1再生通路部(P21)の流出端と第2再生通路部(P22)の流入端との間に接続されることによって再生通路(P2)に組み込まれて空気(すなわち、吸着剤を再生するための空気(再生側空気))が流通する。なお、以下の説明では、第1及び第2熱交換室(S11,S12)の総称を単に「熱交換室(S11,S12)」と表記する。
<Heat exchange room>
The first and second heat exchange chambers (S11, S12) include one heat exchange chamber as a part of the air supply passage (P1) in the air supply passage (P1) and the other heat exchange chamber as the regeneration passage (P2). ) Can be incorporated into the regeneration passage (P2) as a part of. Specifically, each of the first and second heat exchange chambers (S11, S12) is between the outflow end of the first supply passage portion (P11) and the inflow end of the second supply passage portion (P12). Is connected to the air supply passage (P1), and air (that is, air for supplying to the humidity control space (S0) (processing-side air)) flows through the first regeneration passage portion (P21). Connected to the inflow end of the second regeneration passage portion (P22) and incorporated into the regeneration passage (P2) by being connected between the outflow end of the second regeneration passage portion (P22) (ie, air for regenerating the adsorbent (regeneration side air)) ) Is distributed. In the following description, the generic name of the first and second heat exchange chambers (S11, S12) is simply referred to as “heat exchange chamber (S11, S12)”.

〈冷却器,ドレンパン〉
冷却器(11)は、室外空気(OA)を冷却して除湿する。例えば、冷却器(11)は、冷媒回路(図示を省略)の蒸発器として機能する熱交換器(具体的には、フィンアンドチューブ式の熱交換器)によって構成されていてもよい。ドレンパン(12)は、冷却器(11)において凝縮された水を回収する。例えば、ドレンパン(12)は、冷却器(11)において凝縮された水を受け止めることができるように、上面が開口する容器によって構成されて冷却器(11)の下方に配置されている。この例では、冷却器(11)は、給気通路(P1)の第1給気通路部(P11)に設けられている。
<Cooler, drain pan>
The cooler (11) cools and dehumidifies outdoor air (OA). For example, the cooler (11) may be configured by a heat exchanger (specifically, a fin-and-tube heat exchanger) that functions as an evaporator of a refrigerant circuit (not shown). The drain pan (12) collects the water condensed in the cooler (11). For example, the drain pan (12) is configured by a container having an open upper surface and disposed below the cooler (11) so that water condensed in the cooler (11) can be received. In this example, the cooler (11) is provided in the first air supply passage portion (P11) of the air supply passage (P1).

〈冷媒回路〉
冷媒回路(100)は、冷媒を循環させて冷凍サイクル動作を実行するものであり、第1及び第2吸着熱交換器(101,102)と、圧縮機(103)と、膨張弁(104)と、四方切換弁(105)とを備えている。
<Refrigerant circuit>
The refrigerant circuit (100) circulates the refrigerant to execute a refrigeration cycle operation. The first and second adsorption heat exchangers (101, 102), the compressor (103), the expansion valve (104), And a four-way switching valve (105).

《吸着熱交換器》
第1及び第2吸着熱交換器(101,102)の各々は、熱交換器(例えば、クロスフィン型のフィンアンドチューブ式の熱交換器)の表面に吸着剤を担持させることによって構成されている。また、第1及び第2吸着熱交換器(101,102)は、第1及び第2熱交換室(S11,S12)にそれぞれ設けられている。なお、吸着剤として、ゼオライト,シリカゲル,活性炭,親水性の官能基を有する有機高分子材料を用いてもよいし、水分を吸着する機能だけではなく水分を吸収する機能も有する材料(所謂、収着剤)を用いてもよい。なお、以下の説明では、第1及び第2吸着熱交換器(101,102)の総称を単に「吸着熱交換器(101,102)」と表記する。
《Adsorption heat exchanger》
Each of the first and second adsorption heat exchangers (101, 102) is configured by supporting an adsorbent on the surface of a heat exchanger (for example, a cross-fin type fin-and-tube heat exchanger). The first and second adsorption heat exchangers (101, 102) are provided in the first and second heat exchange chambers (S11, S12), respectively. As the adsorbent, zeolite, silica gel, activated carbon, an organic polymer material having a hydrophilic functional group may be used, or a material having not only a function of adsorbing moisture but also a function of absorbing moisture (so-called “concentration”). Adhesive) may be used. In the following description, the generic name of the first and second adsorption heat exchangers (101, 102) is simply referred to as “adsorption heat exchanger (101, 102)”.

《圧縮機》
圧縮機(103)は、冷媒を圧縮して吐出する。また、圧縮機(103)は、コントローラ(20)の制御によって回転数(運転周波数)を変更可能に構成されている。例えば、圧縮機(103)は、インバータ回路(図示を省略)により回転数を調節可能な可変容量式の圧縮機(ロータリー式,スイング式,スクロール式などの圧縮機)によって構成されている。
《Compressor》
The compressor (103) compresses and discharges the refrigerant. Moreover, the compressor (103) is comprised so that a rotation speed (operation frequency) can be changed by control of a controller (20). For example, the compressor (103) is configured by a variable capacity compressor (rotary, swing, scroll, etc. compressor) whose rotation speed can be adjusted by an inverter circuit (not shown).

《膨張弁》
膨張弁(104)は、冷媒の圧力を調整する。例えば、膨張弁(104)は、コントローラ(20)による制御に応答して開度を変更可能な電子膨張弁によって構成されている。
《Expansion valve》
The expansion valve (104) adjusts the pressure of the refrigerant. For example, the expansion valve (104) is configured by an electronic expansion valve that can change the opening degree in response to control by the controller (20).

《四方切換弁》
四方切換弁(105)は、第1〜第4ポートを有し、第1ポートは、圧縮機(103)の吐出側に接続され、第2ポートは、圧縮機(103)の吸入側に接続され、第3ポートは、第2吸着熱交換器(102)の端部に接続され、第4ポートは、第1吸着熱交換器(101)の端部に接続されている。四方切換弁(105)は、コントローラ(20)による制御に応答して、第1接続状態(図1の実線で示された状態)と、第2接続状態(図1の破線で示された状態)とに切り換え可能に構成されている。
<4-way switching valve>
The four-way switching valve (105) has first to fourth ports, the first port is connected to the discharge side of the compressor (103), and the second port is connected to the suction side of the compressor (103). The third port is connected to the end of the second adsorption heat exchanger (102), and the fourth port is connected to the end of the first adsorption heat exchanger (101). In response to control by the controller (20), the four-way switching valve (105) is in a first connection state (a state indicated by a solid line in FIG. 1) and a second connection state (a state indicated by a broken line in FIG. 1). ) And can be switched to.

《冷媒回路による冷凍サイクル動作》
四方切換弁(105)が第1接続状態になっている場合、冷媒回路(100)は、第1吸着熱交換器(101)が蒸発器となって空気を除湿し第2吸着熱交換器(102)が凝縮器となって空気を加湿する(すなわち、吸着剤を再生させる)第1冷凍サイクル動作(第1動作)を実行する。一方、四方切換弁(105)が第2接続状態になっている場合、冷媒回路(100)は、第2吸着熱交換器(102)が蒸発器となって空気を除湿し第1吸着熱交換器(101)が凝縮器となって空気を加湿する(すなわち、吸着剤を再生させる)第2冷凍サイクル動作(第2動作)を実行する。このように、冷媒回路(100)は、コントローラ(20)による制御に応答して、第1及び第2冷凍サイクル動作を実行可能に構成されている。具体的には、冷媒回路(100)は、第1及び第2冷凍サイクル動作を交互に行うように構成されている。
<Refrigeration cycle operation by refrigerant circuit>
When the four-way switching valve (105) is in the first connection state, the refrigerant circuit (100) uses the first adsorption heat exchanger (101) as an evaporator to dehumidify the air and to remove the second adsorption heat exchanger ( 102) becomes a condenser and performs a first refrigeration cycle operation (first operation) that humidifies air (that is, regenerates the adsorbent). On the other hand, when the four-way switching valve (105) is in the second connection state, the refrigerant circuit (100) serves as the first adsorption heat exchanger (102) for dehumidifying the air by using the evaporator as the second adsorption heat exchanger (102). The second refrigeration cycle operation (second operation) is performed in which the vessel (101) becomes a condenser to humidify the air (that is, regenerate the adsorbent). Thus, the refrigerant circuit (100) is configured to be able to execute the first and second refrigeration cycle operations in response to the control by the controller (20). Specifically, the refrigerant circuit (100) is configured to alternately perform the first and second refrigeration cycle operations.

−第1冷凍サイクル動作(第1動作)−
四方切換弁(105)が第1接続状態になると、第1ポートと第3ポートとが連通するとともに第2ポートと第4ポートとが連通する。これにより、圧縮機(103)によって圧縮された冷媒は、四方切換弁(105)を通過して第2吸着熱交換器(102)に流れ込む。第2吸着熱交換器(102)では、冷媒によって吸着剤が加熱され、吸着剤中の水分が空気へ放出される再生動作が行われる。第2吸着熱交換器(102)において放熱して凝縮した冷媒は、膨張弁(104)によって減圧された後、第1吸着熱交換器(101)に流れ込む。第1吸着熱交換器(101)では、空気中の水分が吸着剤に吸着される吸着動作が行われ、その際に生じる吸着熱が冷媒に付与される。第1吸着熱交換器(101)において吸熱して蒸発した冷媒は、圧縮機(103)に吸入されて圧縮される。
-First refrigeration cycle operation (first operation)-
When the four-way switching valve (105) is in the first connection state, the first port and the third port communicate with each other, and the second port and the fourth port communicate with each other. Thus, the refrigerant compressed by the compressor (103) passes through the four-way switching valve (105) and flows into the second adsorption heat exchanger (102). In the second adsorption heat exchanger (102), a regeneration operation is performed in which the adsorbent is heated by the refrigerant and moisture in the adsorbent is released to the air. The refrigerant that dissipates heat and condenses in the second adsorption heat exchanger (102) is decompressed by the expansion valve (104), and then flows into the first adsorption heat exchanger (101). In the first adsorption heat exchanger (101), an adsorption operation in which moisture in the air is adsorbed by the adsorbent is performed, and the adsorption heat generated at that time is imparted to the refrigerant. The refrigerant that has absorbed heat and evaporated in the first adsorption heat exchanger (101) is sucked into the compressor (103) and compressed.

−第2冷凍サイクル動作(第2動作)−
四方切換弁(105)が第2接続状態になると、第1ポートと第4ポートとが連通するとともに第2ポートと第3ポートとが連通する。これにより、圧縮機(103)によって圧縮された冷媒は、四方切換弁(105)を通過して第1吸着熱交換器(101)に流れ込む。第1吸着熱交換器(101)では、冷媒によって吸着剤が加熱され、吸着剤中の水分が空気へ放出される再生動作が行われる。第1吸着熱交換器(101)において放熱して凝縮した冷媒は、膨張弁(104)によって減圧された後、第2吸着熱交換器(102)に流れ込む。第2吸着熱交換器(102)では、空気中の水分が吸着剤に吸着される吸着動作が行われ、その際に生じる吸着熱が冷媒に付与される。第2吸着熱交換器(102)において吸熱して蒸発した冷媒は、圧縮機(103)に吸入されて圧縮される。
-Second refrigeration cycle operation (second operation)-
When the four-way switching valve (105) is in the second connection state, the first port communicates with the fourth port, and the second port communicates with the third port. Thus, the refrigerant compressed by the compressor (103) passes through the four-way switching valve (105) and flows into the first adsorption heat exchanger (101). In the first adsorption heat exchanger (101), the adsorbent is heated by the refrigerant, and a regeneration operation is performed in which moisture in the adsorbent is released to the air. The refrigerant radiated and condensed in the first adsorption heat exchanger (101) is decompressed by the expansion valve (104) and then flows into the second adsorption heat exchanger (102). In the second adsorption heat exchanger (102), an adsorption operation in which moisture in the air is adsorbed by the adsorbent is performed, and adsorption heat generated at that time is imparted to the refrigerant. The refrigerant that has absorbed heat and evaporated in the second adsorption heat exchanger (102) is sucked into the compressor (103) and compressed.

〈加熱器〉
加熱器(21)は、再生通路(P2)に設けられ、第1及び第2熱交換室(S11,S12)のうち凝縮器となっている吸着熱交換器が設けられた熱交換室の上流側(風上側)に配置されている。すなわち、加熱器(21)は、吸着剤を再生するための空気を加熱するように構成されている。この例では、加熱器(21)は、第1再生通路部(P21)に配置されている。例えば、加熱器(21)は、第1再生通路部(P21)を流れる空気と第2再生通路部(P22)を流れる空気との間で熱交換を行う顕熱熱交換器によって構成されていてもよいし、冷媒回路(図示を省略)の凝縮器として機能する熱交換器(具体的には、フィンアンドチューブ式の熱交換器)などによって構成されていてもよい。
<Heater>
The heater (21) is provided in the regeneration passage (P2) and is upstream of the heat exchange chamber in which the adsorption heat exchanger serving as a condenser is provided among the first and second heat exchange chambers (S11, S12). It is arranged on the side (windward side). That is, the heater (21) is configured to heat air for regenerating the adsorbent. In this example, the heater (21) is disposed in the first regeneration passage portion (P21). For example, the heater (21) is constituted by a sensible heat exchanger that exchanges heat between the air flowing through the first regeneration passage (P21) and the air flowing through the second regeneration passage (P22). Alternatively, a heat exchanger (specifically, a fin-and-tube heat exchanger) that functions as a condenser of a refrigerant circuit (not shown) may be used.

〈切換機構〉
切換機構(200)は、コントローラ(20)による制御に応答して、第1及び第2熱交換室(S11,S12)の接続状態を、第1通路状態(図1の実線で示した状態)と第2通路状態(図1の破線で示した状態)とに設定可能に構成されている。また、切換機構(200)は、四方切換弁(105)が第1接続状態(図1の実線で示した状態)である場合に、第1及び第2熱交換室(S11,S12)の接続状態を第1通路状態に設定し、四方切換弁(105)が第2接続状態である場合(図1の破線で示した状態)に、第1及び第2熱交換室(S11,S12)の接続状態を第2通路状態に設定する。すなわち、切換機構(200)は、第1及び第2熱交換室(S11,S12)のうち、蒸発器となっている吸着熱交換器(101,102)が設けられた熱交換室(S11,S12)を通過した空気が調湿空間(S0)に供給され、凝縮器となっている吸着熱交換器(102,101)が設けられた熱交換室(S12,S11)に吸着剤を再生するための空気(この例では、加熱器(21)を通過した空気)が流通するように、空気の流れを切り換える。
<Switching mechanism>
In response to the control by the controller (20), the switching mechanism (200) changes the connection state of the first and second heat exchange chambers (S11, S12) to the first passage state (state indicated by the solid line in FIG. 1). And a second passage state (state indicated by a broken line in FIG. 1). Further, the switching mechanism (200) connects the first and second heat exchange chambers (S11, S12) when the four-way switching valve (105) is in the first connection state (the state shown by the solid line in FIG. 1). When the state is set to the first passage state and the four-way switching valve (105) is in the second connection state (the state indicated by the broken line in FIG. 1), the first and second heat exchange chambers (S11, S12) The connection state is set to the second passage state. That is, the switching mechanism (200) includes a heat exchange chamber (S11, S12) provided with an adsorption heat exchanger (101, 102) serving as an evaporator among the first and second heat exchange chambers (S11, S12). The air passing through the air is supplied to the humidity control space (S0), and the air for regenerating the adsorbent in the heat exchange chamber (S12, S11) provided with the adsorption heat exchanger (102, 101) serving as a condenser ( In this example, the air flow is switched so that the air passing through the heater (21) flows.

なお、この例では、第1及び第2熱交換室(S11,S12)の接続状態が第1通路状態である場合(すなわち、第1熱交換室(S11)が給気通路(P1)の一部として組み込まれている場合)に第1吸着熱交換器(101)を通過する空気の流通方向は、第1及び第2熱交換室(S11,S12)の接続状態が第2通路状態である場合(すなわち、第1熱交換室(S11)が再生通路(P2)の一部として組み込まれている場合)に第1吸着熱交換器(101)を通過する空気の流通方向の逆方向となっている(所謂、対向流となっている)。第2吸着熱交換器(102)を通過する空気の流通方向についても同様である。このように、第1及び第2吸着熱交換器(101,102)の各々を通過する空気の流通方向は、吸着熱交換器が蒸発器から凝縮器に(または、凝縮器から蒸発器に)切り換わると反転する。すなわち、切換機構(200)は、第1及び第2吸着熱交換器(101,102)の各々を通過する空気の流通方向が、その吸着熱交換器(101,102)が蒸発器となっている場合とその吸着熱交換器(101,102)が凝縮器となっている場合とで逆方向となるように、空気の流れを切り換える。   In this example, when the connection state of the first and second heat exchange chambers (S11, S12) is the first passage state (that is, the first heat exchange chamber (S11) is a part of the air supply passage (P1). As for the flow direction of the air passing through the first adsorption heat exchanger (101) in the case of being incorporated as a part), the connection state of the first and second heat exchange chambers (S11, S12) is the second passage state. In this case (that is, when the first heat exchange chamber (S11) is incorporated as part of the regeneration passage (P2)), the flow direction of the air passing through the first adsorption heat exchanger (101) is opposite. (So-called counter flow). The same applies to the flow direction of the air passing through the second adsorption heat exchanger (102). Thus, the flow direction of the air passing through each of the first and second adsorption heat exchangers (101, 102) switches the adsorption heat exchanger from the evaporator to the condenser (or from the condenser to the evaporator). And reverse. That is, the switching mechanism (200) has a case where the flow direction of the air passing through each of the first and second adsorption heat exchangers (101, 102) is the same as when the adsorption heat exchanger (101, 102) is an evaporator. The air flow is switched so that the adsorption heat exchanger (101, 102) is in the opposite direction to the case where it is a condenser.

〈吸着ブロック〉
第1及び第2吸着ブロック(301,302)の各々は、吸着剤が担持されて空気を吸着剤と接触させるように構成されている。例えば、第1及び第2吸着ブロック(301,302)の各々は、構造体(具体的には、ハニカム構造を有する通気性のある構造体)の表面に吸着剤を担持させることによって構成されている。また、第1及び第2吸着ブロック(301,302)は、第1及び第2熱交換室(S11,S12)にそれぞれ設けられる。なお、以下の説明では、第1及び第2吸着ブロック(301,302)の総称を単に「吸着ブロック(301,302)」と表記する。
<Suction block>
Each of the first and second adsorption blocks (301, 302) is configured to carry an adsorbent and bring air into contact with the adsorbent. For example, each of the first and second adsorption blocks (301, 302) is configured by supporting an adsorbent on the surface of a structure (specifically, a breathable structure having a honeycomb structure). The first and second adsorption blocks (301, 302) are provided in the first and second heat exchange chambers (S11, S12), respectively. In the following description, the generic name of the first and second adsorption blocks (301, 302) is simply referred to as “adsorption block (301, 302)”.

第1吸着ブロック(301)は、第1熱交換室(S11)において、第1吸着熱交換器(101)が蒸発器となっている場合に第1吸着熱交換器(101)の下流側(風下側)となる位置(すなわち、第1熱交換室(S11)が給気通路(P1)の一部として組み込まれている場合に第1吸着熱交換器(101)によって除湿された空気が通過する位置)に配置されている。   The first adsorption block (301) is located downstream of the first adsorption heat exchanger (101) when the first adsorption heat exchanger (101) is an evaporator in the first heat exchange chamber (S11) ( Air dehumidified by the first adsorption heat exchanger (101) passes when the position becomes the leeward side (that is, when the first heat exchange chamber (S11) is incorporated as a part of the air supply passage (P1)) Position).

第2吸着ブロック(302)は、第2熱交換室(S12)において、第2吸着熱交換器(102)が蒸発器となっている場合に第2吸着熱交換器(102)の下流側(風下側)となる位置(すなわち、第2熱交換室(S12)が給気通路(P1)の一部として組み込まれている場合に第2吸着熱交換器(102)によって除湿された空気が通過する位置)に配置されている。   The second adsorption block (302) is located downstream of the second adsorption heat exchanger (102) when the second adsorption heat exchanger (102) is an evaporator in the second heat exchange chamber (S12). Air dehumidified by the second adsorption heat exchanger (102) passes when the position becomes the leeward side (that is, when the second heat exchange chamber (S12) is incorporated as a part of the air supply passage (P1)) Position).

なお、この例では、第1及び第2吸着熱交換器(101,102)の各々を通過する空気の流通方向は、その吸着熱交換器(101,102)が蒸発器となっている場合とその吸着熱交換器(101,102)が凝縮器となっている場合とで逆方向となっている。したがって、第1及び第2熱交換室(S11,S12)の接続状態が第1通路状態(図1の実線で示した状態)である場合に第1吸着熱交換器(101)の下流側となる位置は、第1及び第2熱交換室(S11,S12)の接続状態が第2通路状態(図1の破線で示した状態)である場合に第1吸着熱交換器(101)の上流側となる位置(この例では、加熱器(21)と第1吸着熱交換器(101)との間となる位置)と同じ位置である。これと同様に、第1及び第2熱交換室(S11,S12)の接続状態が第2通路状態(図1の破線で示した状態)である場合に第2吸着熱交換器(102)の下流側となる位置は、第1及び第2熱交換室(S11,S12)の接続状態が第1通路状態(図1の実線で示した状態)である場合に第2吸着熱交換器(102)の上流側となる位置(この例では、加熱器(21)と第2吸着熱交換器(102)との間となる位置)と同じ位置である。すなわち、第1及び第2熱交換室(S11,S12)の各々では、吸着ブロック(301,302)は、吸着熱交換器(101,102)が蒸発器となっている場合には、吸着熱交換器(101,102)の下流側に位置し、吸着熱交換器(101,102)が凝縮器となっている場合には、吸着熱交換器(101,102)の上流側に位置する。   In this example, the flow direction of the air passing through each of the first and second adsorption heat exchangers (101, 102) depends on whether the adsorption heat exchanger (101, 102) is an evaporator and the adsorption heat exchange. The direction is opposite to the case where the condenser (101, 102) is a condenser. Therefore, when the connection state of the first and second heat exchange chambers (S11, S12) is the first passage state (the state indicated by the solid line in FIG. 1), the downstream side of the first adsorption heat exchanger (101) Is located upstream of the first adsorption heat exchanger (101) when the connection state of the first and second heat exchange chambers (S11, S12) is the second passage state (the state indicated by the broken line in FIG. 1). This is the same position as the position (in this example, the position between the heater (21) and the first adsorption heat exchanger (101)). Similarly, when the connection state of the first and second heat exchange chambers (S11, S12) is the second passage state (the state indicated by the broken line in FIG. 1), the second adsorption heat exchanger (102) The position on the downstream side is the second adsorption heat exchanger (102 when the connection state of the first and second heat exchange chambers (S11, S12) is the first passage state (the state indicated by the solid line in FIG. 1). ) On the upstream side (in this example, the position between the heater (21) and the second adsorption heat exchanger (102)). That is, in each of the first and second heat exchange chambers (S11, S12), the adsorption block (301, 302) has an adsorption heat exchanger (101, 102) when the adsorption heat exchanger (101, 102) is an evaporator. When the adsorption heat exchanger (101, 102) is a condenser, it is located upstream of the adsorption heat exchanger (101, 102).

〈コントローラ〉
コントローラ(20)は、各種センサ(例えば、温度センサや湿度センサなど)の検出値に基づいて、除湿装置(10)を制御する。例えば、コントローラ(20)は、CPUやメモリによって構成されている。
<controller>
The controller (20) controls the dehumidifier (10) based on detection values of various sensors (for example, a temperature sensor, a humidity sensor, etc.). For example, the controller (20) is constituted by a CPU and a memory.

また、本実施形態では、上記コントローラ(20)は、上記冷媒回路(100)の圧縮機(103)を起動する前に、上記切換機構(200)を切り換えることにより、凝縮器となる吸着熱交換器(101,102)の上流側の位置に設けられている吸着ブロック(301,302)に冷却用の空気を流して該吸着ブロック(301,302)を予冷する予冷運転を行うように構成されている。   In the present embodiment, the controller (20) switches the switching mechanism (200) before starting the compressor (103) of the refrigerant circuit (100), so that the adsorption heat exchange functioning as a condenser is performed. The precooling operation for precooling the adsorption block (301, 302) by flowing cooling air through the adsorption block (301, 302) provided at the upstream position of the vessel (101, 102) is configured.

この予冷運転時には、上記処理側空気と再生側空気のうち、上記冷却器(11)を通過することにより冷却されて温度が低くなった処理側空気を、上記圧縮機(103)の起動時に凝縮器になる吸着熱交換器(101,102)の上流側に位置する吸着ブロック(301,302)に流すように上記切換機構(200)が切り換えられる。   During the pre-cooling operation, the processing-side air that has been cooled by passing through the cooler (11) and whose temperature has decreased is condensed between the processing-side air and the regeneration-side air when the compressor (103) is started. The switching mechanism (200) is switched so as to flow to the adsorption block (301, 302) located on the upstream side of the adsorption heat exchanger (101, 102) serving as a vacuum vessel.

また、本実施形態では、本実施形態によれば、通常運転の開始時に開く後述のダンパ(D2,D3,D5,D8)を予冷運転時に閉じ、通常運転の開始時に閉じる後述のダンパ(D1,D4,D6,D7)を予冷運転時に開くことにより、予冷運転を行うようにしている。予冷運転の動作の詳細は後述する。   Further, in this embodiment, according to this embodiment, dampers (D2, D3, D5, D8) that are opened at the start of normal operation are closed during pre-cooling operation, and dampers (D1, D1) that are closed at the start of normal operation are closed. D4, D6, D7) are opened during the precooling operation, so that the precooling operation is performed. Details of the pre-cooling operation will be described later.

〈除湿装置による除湿運転〉
次に、図1を参照して、この実施形態の除湿装置(10)の除湿運転について説明する。この除湿装置(10)は、第1及び第2除湿動作を所定の時間間隔(例えば、10分間隔)で交互に繰り返す。
<Dehumidifying operation with dehumidifier>
Next, the dehumidifying operation of the dehumidifying device (10) of this embodiment will be described with reference to FIG. The dehumidifier (10) repeats the first and second dehumidifying operations alternately at predetermined time intervals (for example, every 10 minutes).

《第1除湿動作》
第1除湿動作では、圧縮機(103)が駆動され、膨張弁(104)の開度が調節され、四方切換弁(105)が第1接続状態(図1の実線で示した状態)となる。これにより、冷媒回路(100)は、第1吸着熱交換器(101)が蒸発器となり第2吸着熱交換器(102)が凝縮器となる第1冷凍サイクル動作を行う。また、切換機構(200)は、第1及び第2熱交換室(S11,S12)の接続状態を第1通路状態(図1の実線で示した状態)に設定する。
<< First dehumidifying operation >>
In the first dehumidifying operation, the compressor (103) is driven, the opening degree of the expansion valve (104) is adjusted, and the four-way switching valve (105) is in the first connection state (the state shown by the solid line in FIG. 1). . Thus, the refrigerant circuit (100) performs a first refrigeration cycle operation in which the first adsorption heat exchanger (101) serves as an evaporator and the second adsorption heat exchanger (102) serves as a condenser. Further, the switching mechanism (200) sets the connection state of the first and second heat exchange chambers (S11, S12) to the first passage state (the state indicated by the solid line in FIG. 1).

−給気通路における空気の流れ−
給気通路(P1)に取り込まれた空気(この例では、室外空気(OA))は、冷却器(11)によって冷却除湿された後に、第1熱交換室(S11)に供給される。第1熱交換室(S11)に供給された空気は、蒸発器として機能している第1吸着熱交換器(101)を通過する。このとき、蒸発器として機能している第1吸着熱交換器(101)を通過する空気は、第1吸着熱交換器(101)の吸着剤に水分を奪われて湿度が低下するとともに、第1吸着熱交換器(101)を流れる冷媒の吸熱作用により冷却されて温度も低下する。次に、第1吸着熱交換器(101)によって除湿及び冷却された空気は、第1吸着ブロック(301)を通過する。このとき、この空気中の水分が第1吸着ブロック(301)の吸着剤に吸着する。これにより、第1吸着熱交換器(101)によって除湿された空気は、第1吸着ブロック(301)によってさらに除湿される。第1吸着熱交換器(101)及び第1吸着ブロック(301)を通過して除湿された空気は、供給空気(SA)として室内空間(S1)に供給される。
-Air flow in the air supply passage-
The air taken into the supply passage (P1) (in this example, outdoor air (OA)) is cooled and dehumidified by the cooler (11), and then supplied to the first heat exchange chamber (S11). The air supplied to the first heat exchange chamber (S11) passes through the first adsorption heat exchanger (101) functioning as an evaporator. At this time, the air passing through the first adsorption heat exchanger (101) functioning as an evaporator is deprived of moisture by the adsorbent of the first adsorption heat exchanger (101), and the humidity decreases. It is cooled by the endothermic action of the refrigerant flowing through the one adsorption heat exchanger (101), and the temperature also decreases. Next, the air dehumidified and cooled by the first adsorption heat exchanger (101) passes through the first adsorption block (301). At this time, moisture in the air is adsorbed on the adsorbent of the first adsorption block (301). Thereby, the air dehumidified by the first adsorption heat exchanger (101) is further dehumidified by the first adsorption block (301). The air dehumidified after passing through the first adsorption heat exchanger (101) and the first adsorption block (301) is supplied to the indoor space (S1) as supply air (SA).

−再生通路における空気の流れ−
再生通路(P2)に取り込まれた空気(この例では、室内空気(RA))は、加熱器(21)によって加熱された後に、第2熱交換室(S12)に供給される。第2熱交換室(S12)に供給された空気は、第2吸着ブロック(302)を通過する。このとき、第2吸着ブロック(302)の吸着剤の水分が第2吸着ブロック(302)を通過する空気に放出される。これにより、第2吸着ブロック(302)の吸着剤が再生される。次に、第2吸着ブロック(302)によって加湿された空気は、凝縮器として機能している第2吸着熱交換器(102)を通過する。凝縮器として機能している第2吸着熱交換器(102)を通過する空気は、第2吸着熱交換器(102)の吸着剤から水分を付与されて湿度が上昇するとともに、第2吸着熱交換器(102)を流れる冷媒の放熱作用により加熱されて温度も上昇する。これにより、第2吸着熱交換器(102)の吸着剤が再生される。第2吸着熱交換器(102)及び第2吸着ブロック(302)を通過した空気は、排出空気(EA)として室外空間に排出される。
-Air flow in the regeneration passage-
The air (in this example, room air (RA)) taken into the regeneration passage (P2) is heated by the heater (21) and then supplied to the second heat exchange chamber (S12). The air supplied to the second heat exchange chamber (S12) passes through the second adsorption block (302). At this time, the moisture of the adsorbent of the second adsorption block (302) is released to the air passing through the second adsorption block (302). Thereby, the adsorbent of the second adsorption block (302) is regenerated. Next, the air humidified by the second adsorption block (302) passes through the second adsorption heat exchanger (102) functioning as a condenser. The air passing through the second adsorption heat exchanger (102) functioning as a condenser is given moisture from the adsorbent of the second adsorption heat exchanger (102) to increase the humidity and the second adsorption heat. It is heated by the heat radiation action of the refrigerant flowing through the exchanger (102), and the temperature rises. Thereby, the adsorbent of the second adsorption heat exchanger (102) is regenerated. The air that has passed through the second adsorption heat exchanger (102) and the second adsorption block (302) is exhausted to the outdoor space as exhaust air (EA).

《第2除湿動作》
第2除湿動作では、圧縮機(103)が駆動され、膨張弁(104)の開度が調節され、四方切換弁(105)が第2接続状態(図1の破線で示した状態)となる。これにより、冷媒回路(100)は、第1吸着熱交換器(101)が凝縮器となり第2吸着熱交換器(102)が蒸発器となる第2冷凍サイクル動作を行う。また、切換機構(200)は、第1及び第2熱交換室(S11,S12)の接続状態を第2通路状態(図1の破線で示した状態)に設定する。
<Second dehumidifying operation>
In the second dehumidifying operation, the compressor (103) is driven, the opening degree of the expansion valve (104) is adjusted, and the four-way switching valve (105) is in the second connection state (the state indicated by the broken line in FIG. 1). . Thereby, the refrigerant circuit (100) performs a second refrigeration cycle operation in which the first adsorption heat exchanger (101) serves as a condenser and the second adsorption heat exchanger (102) serves as an evaporator. Further, the switching mechanism (200) sets the connection state of the first and second heat exchange chambers (S11, S12) to the second passage state (the state indicated by the broken line in FIG. 1).

−給気通路における空気の流れ−
給気通路(P1)に取り込まれた空気(この例では、室外空気(OA))は、冷却器(11)によって冷却除湿された後に、第2熱交換室(S12)に供給される。第2熱交換室(S12)に供給された空気は、蒸発器として機能している第2吸着熱交換器(102)を通過する。このとき、蒸発器として機能している第2吸着熱交換器(102)を通過する空気は、第2吸着熱交換器(102)の吸着剤に水分を奪われて湿度が低下するとともに、第2吸着熱交換器(102)を流れる冷媒の吸熱作用により冷却されて温度も低下する。次に、第2吸着熱交換器(102)によって除湿及び冷却された空気は、第2吸着ブロック(302)を通過する。このとき、この空気中の水分が第2吸着ブロック(302)の吸着剤に吸着する。これにより、第2吸着熱交換器(102)によって除湿された空気は、第2吸着ブロック(302)によってさらに除湿される。第2吸着熱交換器(102)及び第2吸着ブロック(302)を通過して除湿された空気は、供給空気(SA)として室内空間(S1)に供給される。
-Air flow in the air supply passage-
The air taken into the supply passage (P1) (in this example, outdoor air (OA)) is cooled and dehumidified by the cooler (11), and then supplied to the second heat exchange chamber (S12). The air supplied to the second heat exchange chamber (S12) passes through the second adsorption heat exchanger (102) functioning as an evaporator. At this time, the air passing through the second adsorption heat exchanger (102) functioning as an evaporator is deprived of moisture by the adsorbent of the second adsorption heat exchanger (102), and the humidity decreases. The refrigerant is cooled by the endothermic action of the refrigerant flowing through the two-adsorption heat exchanger (102), and the temperature also decreases. Next, the air dehumidified and cooled by the second adsorption heat exchanger (102) passes through the second adsorption block (302). At this time, moisture in the air is adsorbed to the adsorbent of the second adsorption block (302). Thereby, the air dehumidified by the second adsorption heat exchanger (102) is further dehumidified by the second adsorption block (302). The air dehumidified after passing through the second adsorption heat exchanger (102) and the second adsorption block (302) is supplied to the indoor space (S1) as supply air (SA).

−再生通路における空気の流れ−
再生通路(P2)に取り込まれた空気(この例では、室内空気(RA))は、加熱器(21)によって加熱された後に、第1熱交換室(S11)に供給される。第1熱交換室(S11)に供給された空気は、第1吸着ブロック(301)を通過する。このとき、第1吸着ブロック(301)の吸着剤の水分が第1吸着ブロック(301)を通過する空気に放出される。これにより、第1吸着ブロック(301)の吸着剤が再生される。次に、第1吸着ブロック(301)によって加湿された空気は、凝縮器として機能している第1吸着熱交換器(101)を通過する。このとき、凝縮器として機能している第1吸着熱交換器(101)を通過する空気は、第1吸着熱交換器(101)の吸着剤から水分を付与されて湿度が上昇するとともに、第1吸着熱交換器(101)を流れる冷媒の放熱作用により加熱されて温度も上昇する。これにより、第1吸着熱交換器(101)の吸着剤が再生される。第1吸着熱交換器(101)及び第1吸着ブロック(301)を通過した空気は、排出空気(EA)として室外空間に排出される。
-Air flow in the regeneration passage-
The air taken into the regeneration passage (P2) (in this example, room air (RA)) is heated by the heater (21) and then supplied to the first heat exchange chamber (S11). The air supplied to the first heat exchange chamber (S11) passes through the first adsorption block (301). At this time, the moisture of the adsorbent of the first adsorption block (301) is released to the air passing through the first adsorption block (301). Thereby, the adsorbent of the first adsorption block (301) is regenerated. Next, the air humidified by the first adsorption block (301) passes through the first adsorption heat exchanger (101) functioning as a condenser. At this time, the air passing through the first adsorption heat exchanger (101) functioning as a condenser is given moisture from the adsorbent of the first adsorption heat exchanger (101), and the humidity rises. The temperature rises due to heating by the heat radiation action of the refrigerant flowing through the one adsorption heat exchanger (101). Thereby, the adsorbent of the first adsorption heat exchanger (101) is regenerated. The air that has passed through the first adsorption heat exchanger (101) and the first adsorption block (301) is discharged into the outdoor space as exhaust air (EA).

〈除湿装置の構造〉
次に、図2を参照して、この実施形態による除湿装置(10)の構造について説明する。なお、以下の説明において用いる「上」「下」「左」「右」「前」「後」「奥」は、除湿装置(10)を前面側から見た場合の方向を示している。また、図2において、中央図は、除湿装置(10)の平面図であり、上図は、除湿装置(10)の背面図であり、下図は、除湿装置(10)の正面図である。
<Structure of dehumidifier>
Next, the structure of the dehumidifier (10) according to this embodiment will be described with reference to FIG. Note that “upper”, “lower”, “left”, “right”, “front”, “rear”, and “back” used in the following description indicate directions when the dehumidifier (10) is viewed from the front side. Moreover, in FIG. 2, a center figure is a top view of a dehumidification apparatus (10), an upper figure is a rear view of a dehumidification apparatus (10), and a lower figure is a front view of a dehumidification apparatus (10).

除湿装置(10)は、冷媒回路(100)の構成部品を収容するケーシング(41)を備えている。ケーシング(41)は、やや扁平で高さが比較的低い直方体状に形成され、前面パネル(42)と背面パネル(43)と左側面パネル(44)と右側面パネル(45)とを有している。この例では、ケーシング(41)の長手方向が左右方向となっている。   The dehumidifier (10) includes a casing (41) that houses the components of the refrigerant circuit (100). The casing (41) is formed in a substantially flat and relatively low rectangular parallelepiped shape, and has a front panel (42), a rear panel (43), a left side panel (44), and a right side panel (45). ing. In this example, the longitudinal direction of the casing (41) is the left-right direction.

ケーシング(41)には、吸着側吸込口(51)と、再生側吸込口(52)と、給気口(53)と、排気口(54)とが形成されている。吸着側吸込口(51)は、背面パネル(43)の右寄りの位置に設けられ、再生側吸込口(52)は、背面パネル(43)の左寄りの位置に設けられる。給気口(53)は、前面パネル(42)の左寄りの位置に設けられ、排気口(54)は、前面パネル(42)の右寄りの位置に設けられる。   The casing (41) is formed with an adsorption side suction port (51), a regeneration side suction port (52), an air supply port (53), and an exhaust port (54). The suction side suction port (51) is provided at a position on the right side of the back panel (43), and the reproduction side suction port (52) is provided at a position on the left side of the back panel (43). The air supply port (53) is provided on the left side of the front panel (42), and the exhaust port (54) is provided on the right side of the front panel (42).

また、ケーシング(41)の内部空間は、第1仕切板(46)と第2仕切板(47)と中央仕切板(48)とが設けられている。これらの仕切板(46,47,48)は、ケーシング(41)の底板に起立した状態で設置され、ケーシング(41)の内部空間をケーシング(41)の底板から天板に亘って区画している。第1及び第2仕切板(46,47)は、左側面パネル(44)及び右側面パネル(45)と平行な姿勢で、ケーシング(41)の左右方向に所定の間隔をおいて配置されている。第1仕切板(46)は、左側面パネル(44)寄りに配置され、第2仕切板(47)は、右側面パネル(45)寄りに配置されている。そして、第1仕切板(46)の左側の空間が左側空間(S31)となり、第1仕切板(46)と第2仕切板(47)の間の空間が中央空間(S32)となり、第2仕切板(47)の右側の空間が右側空間(S33)となっている。なお、中央仕切板(48)の配置については、後述する。   Moreover, the 1st partition plate (46), the 2nd partition plate (47), and the center partition plate (48) are provided in the internal space of the casing (41). These partition plates (46, 47, 48) are installed upright on the bottom plate of the casing (41) and partition the internal space of the casing (41) from the bottom plate of the casing (41) to the top plate. Yes. The first and second partition plates (46, 47) are arranged in parallel with the left side panel (44) and the right side panel (45) at a predetermined interval in the left-right direction of the casing (41). Yes. The first partition plate (46) is disposed closer to the left side panel (44), and the second partition plate (47) is disposed closer to the right side panel (45). The space on the left side of the first partition plate (46) becomes the left space (S31), the space between the first partition plate (46) and the second partition plate (47) becomes the central space (S32), and the second space The space on the right side of the partition plate (47) is the right space (S33). The arrangement of the central partition plate (48) will be described later.

左側空間(S31)は、左側面パネル(44)側の部分と第1仕切板(46)側の部分とに区画されている。左側空間(S31)内におけるケーシング(41)の左面側の空間は、前後2つの空間に仕切られており、前側の空間が給気ファン室(S25)を構成し、奥側の空間が再生側吸込室(S28)を構成している。左側空間(S31)内における第1仕切板(46)側の空間は、上下2つの空間に仕切られており、上側の空間が第2吸着側内部通路(S23)を構成し、下側の空間が第1再生側内部通路(S22)をそれぞれ構成している。   The left space (S31) is partitioned into a left side panel (44) side portion and a first partition (46) side portion. The space on the left side of the casing (41) in the left space (S31) is partitioned into two front and rear spaces, the front space forms the supply fan chamber (S25), and the back space is the regeneration side It constitutes the suction chamber (S28). The space on the first partition (46) side in the left space (S31) is partitioned into two upper and lower spaces, and the upper space constitutes the second suction side internal passage (S23), and the lower space. Respectively constitutes the first regeneration-side internal passage (S22).

給気ファン室(S25)は、給気口(53)に接続されるダクト(図1の第2給気通路部(P12)に対応)を介して室内空間(S1)と連通している。また、給気ファン室(S25)には、給気ファン(61)が収容されている。給気ファン(61)の吹出口は、給気口(53)に接続されている。また、給気ファン室(S25)には、冷媒回路(100)の圧縮機(103)及び四方切換弁(105)(図示を省略)が収容されている。一方、再生側吸込室(S28)は、再生側吸込口(52)に接続されるダクト(図1の第1再生通路部(P21)に対応)を介して室内空間(S1)と連通している。   The air supply fan chamber (S25) communicates with the indoor space (S1) through a duct (corresponding to the second air supply passage portion (P12) in FIG. 1) connected to the air supply port (53). An air supply fan (61) is housed in the air supply fan chamber (S25). The air outlet of the air supply fan (61) is connected to the air supply port (53). Further, the compressor fan (103) and the four-way switching valve (105) (not shown) of the refrigerant circuit (100) are accommodated in the air supply fan chamber (S25). On the other hand, the regeneration side suction chamber (S28) communicates with the indoor space (S1) via a duct (corresponding to the first regeneration passage portion (P21) in FIG. 1) connected to the regeneration side suction port (52). Yes.

第2吸着側内部通路(S23)は、再生側吸込室(S28)とは前後に延びる仕切板で仕切られる一方、給気ファン室(S25)と連通している。第1再生側内部通路(S22)は、再生側吸込室(S28)と連通している。   The second adsorption side internal passage (S23) is separated from the regeneration side suction chamber (S28) by a partition plate extending in the front-rear direction, and communicates with the air supply fan chamber (S25). The first regeneration side internal passage (S22) communicates with the regeneration side suction chamber (S28).

右側空間(S33)は、ケーシング(41)の右面側の部分と第2仕切板(47)側の部分とに区画されている。右側空間(S33)内におけるケーシング(41)の右面側の空間は、前側の空間が排気ファン室(S26)を構成している。一方、奥側の空間は、上下に仕切られており、下側の空間が排気ファン室(S26)から仕切られた吸着側吸込室(S27)を構成し、上側の空間が排気ファン室(S26)と連通している。右側空間(S33)内における第2仕切板(47)側の空間は、上下2つの空間に仕切られており、上側の空間が第2再生側内部通路(S24)を構成し、下側の空間が第1吸着側内部通路(S21)を構成している。   The right space (S33) is partitioned into a right side portion of the casing (41) and a second partition plate (47) side portion. In the space on the right side of the casing (41) in the right space (S33), the front space constitutes the exhaust fan chamber (S26). On the other hand, the inner space is partitioned vertically, the lower space constitutes the suction side suction chamber (S27) partitioned from the exhaust fan chamber (S26), and the upper space is the exhaust fan chamber (S26). ). The space on the second partition (47) side in the right space (S33) is partitioned into two upper and lower spaces, and the upper space constitutes the second reproduction-side internal passage (S24), and the lower space Constitutes the first suction side internal passage (S21).

排気ファン室(S26)は、排気口(54)に接続されるダクト(図1の第2再生通路部(P22)に対応)を介して室外空間と連通している。また、排気ファン室(S26)には、排気ファン(62)が収容されている。排気ファン(62)の吹出口は、排気口(54)に接続されている。吸着側吸込室(S27)は、吸着側吸込口(51)に接続されるダクト(図1の第1給気通路部(P11)に対応)を介して室外空間と連通している。   The exhaust fan chamber (S26) communicates with the outdoor space via a duct (corresponding to the second regeneration passage portion (P22) in FIG. 1) connected to the exhaust port (54). An exhaust fan (62) is housed in the exhaust fan chamber (S26). The outlet of the exhaust fan (62) is connected to the exhaust outlet (54). The suction side suction chamber (S27) communicates with the outdoor space via a duct (corresponding to the first air supply passage portion (P11) in FIG. 1) connected to the suction side suction port (51).

第2再生側内部通路(S24)は、排気ファン室(S26)と連通している。第1吸着側内部通路(S21)は、吸着側吸込室(S27)と連通している。   The second regeneration side internal passage (S24) communicates with the exhaust fan chamber (S26). The first suction side internal passage (S21) communicates with the suction side suction chamber (S27).

中央空間(S32)は、中央仕切板(48)によって前後に区画されており、中央仕切板(48)の後側の空間が第1熱交換室(S11)を構成し、中央仕切板(48)の前側の空間が第2熱交換室(S12)を構成している。第1熱交換室(S11)には、第1吸着熱交換器(101)が収容され、第2熱交換室(S12)には、第2吸着熱交換器(102)が収容されている。また、第2熱交換室(S12)には、冷媒回路(100)の膨張弁(104)(図示を省略)が収容されている。   The central space (S32) is divided forward and backward by a central partition plate (48), and the space behind the central partition plate (48) constitutes the first heat exchange chamber (S11), and the central partition plate (48 ) In front of the second heat exchange chamber (S12). A first adsorption heat exchanger (101) is accommodated in the first heat exchange chamber (S11), and a second adsorption heat exchanger (102) is accommodated in the second heat exchange chamber (S12). The second heat exchange chamber (S12) accommodates an expansion valve (104) (not shown) of the refrigerant circuit (100).

第1及び第2吸着熱交換器(101,102)の各々は、全体として長方形の厚板状あるいは扁平な直方体状に形成され、互いに対向する2つの主面(幅広の側面)が空気を通過させる面となっている。そして、第1吸着熱交換器(101)は、その2つの主面が第1及び第2仕切板(46,47)と平行になる姿勢で、第1熱交換室(S11)内に起立した状態で設置されている。これと同様に、第2吸着熱交換器(102)は、その2つの主面が第1及び第2仕切板(46,47)と平行になる姿勢で、第2熱交換室(S12)内に起立した状態で設置されている。   Each of the first and second adsorption heat exchangers (101, 102) is formed in a rectangular thick plate shape or a flat rectangular parallelepiped shape as a whole, and two main surfaces (wide side surfaces) facing each other are surfaces through which air passes. It has become. And the 1st adsorption heat exchanger (101) stood up in the 1st heat exchange room (S11) with the posture where the two principal surfaces became parallel to the 1st and 2nd partition plates (46, 47). It is installed in a state. Similarly, the second adsorptive heat exchanger (102) has a configuration in which the two main surfaces thereof are parallel to the first and second partition plates (46, 47), and in the second heat exchange chamber (S12). It is installed in a standing state.

第1及び第2吸着ブロック(301,302)の各々は、全体として長方形の厚板状あるいは扁平な直方体状に形成され、互いに対向する2つの主面(幅広の側面)が空気を通過させる面となっている。例えば、第1及び第2吸着ブロック(301,302)の各々は、その一方の主面から他方の主面まで貫通する多数の孔を有するハニカム状の構造体である。また、第1吸着ブロック(301)は、その2つの主面が第1及び第2仕切板(46,47)と平行になる姿勢で、第1熱交換室(S11)内に起立した状態で設置されている。これと同様に、第2吸着ブロック(302)は、その2つの主面が第1及び第2仕切板(46,47)と平行になる姿勢で、第2熱交換室(S12)内に起立した状態で設置されている。また、この例では、第1吸着ブロック(301)は、第1熱交換室(S11)において第1吸着熱交換器(101)と第1仕切板(46)との間に配置され、第2吸着ブロック(302)は、第2熱交換室(S12)において第2吸着熱交換器(102)と第1仕切板(46)との間に配置されている。なお、第1吸着ブロック(301)は、左右方向において第1吸着熱交換器(101)と間隔をおいて配置され、第2吸着ブロック(302)は、左右方向において第2吸着熱交換器(102)と間隔をおいて配置されている。   Each of the first and second adsorption blocks (301, 302) is formed in a rectangular thick plate shape or flat rectangular parallelepiped shape as a whole, and two main surfaces (wide side surfaces) facing each other serve as surfaces through which air passes. ing. For example, each of the first and second adsorption blocks (301, 302) is a honeycomb structure having a large number of holes penetrating from one main surface to the other main surface. In addition, the first adsorption block (301) stands up in the first heat exchange chamber (S11) with its two main surfaces parallel to the first and second partition plates (46, 47). is set up. Similarly, the second adsorption block (302) stands up in the second heat exchange chamber (S12) with its two main surfaces parallel to the first and second partition plates (46, 47). Installed. In this example, the first adsorption block (301) is disposed between the first adsorption heat exchanger (101) and the first partition plate (46) in the first heat exchange chamber (S11), and the second The adsorption block (302) is disposed between the second adsorption heat exchanger (102) and the first partition plate (46) in the second heat exchange chamber (S12). The first adsorption block (301) is spaced apart from the first adsorption heat exchanger (101) in the left-right direction, and the second adsorption block (302) is arranged in the second adsorption heat exchanger (101) in the left-right direction. 102) and spaced apart.

第1仕切板(46)には、第1〜第4ダンパ(D1〜D4)が設けられ、第2仕切板(47)には、第5〜第8ダンパ(D5〜D8)が設けられている。第1〜第8ダンパ(D1〜D8)の各々は、コントローラ(20)による制御に応答して開状態と閉状態とを切換可能に構成されている。これらの第1〜第8ダンパ(D1〜D8)は、切換機構(200)を構成している。   The first divider plate (46) is provided with first to fourth dampers (D1 to D4), and the second divider plate (47) is provided with fifth to eighth dampers (D5 to D8). Yes. Each of the first to eighth dampers (D1 to D8) is configured to be switchable between an open state and a closed state in response to control by the controller (20). These first to eighth dampers (D1 to D8) constitute a switching mechanism (200).

第1ダンパ(D1)は、第1仕切板(46)の上側部分(第2吸着側内部通路(S23)に面する部分)において中央仕切板(48)よりも正面側に取り付けられ、第2ダンパ(D2)は、第1仕切板(46)の上側部分において中央仕切板(48)よりも背面側に取り付けられる。第3ダンパ(D3)は、第1仕切板(46)の下側部分(第1再生側内部通路(S22)に面する部分)において中央仕切板(48)よりも正面側に取り付けられ、第4ダンパ(D4)は、第1仕切板(46)の下側部分において中央仕切板(48)よりも背面側に取り付けられる。   The first damper (D1) is attached to the front side of the central partition plate (48) in the upper portion of the first partition plate (46) (the portion facing the second suction side internal passage (S23)). The damper (D2) is attached to the back side of the central partition plate (48) in the upper part of the first partition plate (46). The third damper (D3) is attached to the front side of the central partition plate (48) in the lower portion of the first partition plate (46) (the portion facing the first regeneration-side internal passage (S22)). The 4 damper (D4) is attached to the back side of the central partition plate (48) in the lower portion of the first partition plate (46).

第1ダンパ(D1)を開くと、第2吸着側内部通路(S23)と第2熱交換室(S12)が連通する。第2ダンパ(D2)を開くと、第2吸着側内部通路(S23)と第1熱交換室(S11)が連通する。第3ダンパ(D3)を開くと、第1再生側内部通路(S22)と第2熱交換室(S12)が連通する。第4ダンパ(D4)を開くと、第1再生側内部通路(S22)と第1熱交換室(S11)が連通する。   When the first damper (D1) is opened, the second adsorption side internal passage (S23) and the second heat exchange chamber (S12) communicate with each other. When the second damper (D2) is opened, the second adsorption side internal passage (S23) and the first heat exchange chamber (S11) communicate with each other. When the third damper (D3) is opened, the first regeneration side internal passage (S22) and the second heat exchange chamber (S12) communicate with each other. When the fourth damper (D4) is opened, the first regeneration side internal passage (S22) and the first heat exchange chamber (S11) communicate with each other.

第5ダンパ(D5)は、第2仕切板(47)の上側部分(第2再生側内部通路(S24)に面する部分)において中央仕切板(48)よりも正面側に取り付けられ、第6ダンパ(D6)は、第2仕切板(47)の上側部分において中央仕切板(48)よりも背面側に取り付けられる。第7ダンパ(D7)は、第2仕切板(47)の下側部分(第1吸着側内部通路(S21)に面する部分)において中央仕切板(48)よりも正面側に取り付けられ、第8ダンパ(D8)は、第2仕切板(47)の下側部分において中央仕切板(48)よりも背面側に取り付けられる。   The fifth damper (D5) is attached to the front side of the central partition plate (48) in the upper portion of the second partition plate (47) (the portion facing the second regeneration-side internal passage (S24)). The damper (D6) is attached to the back side of the central partition plate (48) in the upper part of the second partition plate (47). The seventh damper (D7) is attached to the front side of the central partition plate (48) in the lower portion of the second partition plate (47) (the portion facing the first suction side internal passage (S21)). The 8 damper (D8) is attached to the back side of the central partition plate (48) in the lower portion of the second partition plate (47).

第5ダンパ(D5)を開くと、第2再生側内部通路(S24)と第2熱交換室(S12)が連通する。第6ダンパ(D6)を開くと、第2再生側内部通路(S24)と第1熱交換室(S11)が連通する。第7ダンパ(D7)を開くと、第1吸着側内部通路(S21)と第2熱交換室(S12)が連通する。第8ダンパ(D8)を開くと、第1吸着側内部通路(S21)と第1熱交換室(S11)が連通する。   When the fifth damper (D5) is opened, the second regeneration side internal passage (S24) communicates with the second heat exchange chamber (S12). When the sixth damper (D6) is opened, the second regeneration side internal passage (S24) communicates with the first heat exchange chamber (S11). When the seventh damper (D7) is opened, the first adsorption side internal passage (S21) communicates with the second heat exchange chamber (S12). When the eighth damper (D8) is opened, the first adsorption side internal passage (S21) and the first heat exchange chamber (S11) communicate with each other.

《第1除湿動作における空気の流れ》
次に、図2を参照して、この実施形態の除湿装置(10)による第1除湿動作における空気の流れについて説明する。第1除湿動作では、第1吸着熱交換器(101)が蒸発器となり、第2吸着熱交換器(102)が凝縮器となる。また、図2のように、第2,第3,第5,第8ダンパ(D2,D3,D5,D8)が開状態となり、第1,第4,第6,第7ダンパ(D1,D4,D6,D7)が閉状態となる。これにより、第1及び第2熱交換室(S11,S12)の接続状態が第1通路状態(図1の実線で示した状態)に設定され、第1熱交換室(S11)が給気通路(P1)に組み込まれ、第2熱交換室(S12)が再生通路(P2)に組み込まれる。図1においては、実線の空気の流れを示す矢印に付与した符号(D2,D3,D5,D8)が開状態のダンパを示し、破線の空気の流れを示す矢印に付与した符号(D1,D4,D6,D7)が閉状態のダンパを示している。
<< Air flow in the first dehumidifying action >>
Next, the air flow in the first dehumidifying operation by the dehumidifying device (10) of this embodiment will be described with reference to FIG. In the first dehumidifying operation, the first adsorption heat exchanger (101) serves as an evaporator, and the second adsorption heat exchanger (102) serves as a condenser. As shown in FIG. 2, the second, third, fifth, and eighth dampers (D2, D3, D5, and D8) are opened, and the first, fourth, sixth, and seventh dampers (D1, D4) are opened. , D6, D7) are closed. Thereby, the connection state of the first and second heat exchange chambers (S11, S12) is set to the first passage state (the state indicated by the solid line in FIG. 1), and the first heat exchange chamber (S11) is set to the air supply passage. (P1) and the second heat exchange chamber (S12) is incorporated into the regeneration passage (P2). In FIG. 1, symbols (D2, D3, D5, D8) given to the arrows indicating the solid air flow indicate open dampers, and symbols (D1, D4) given to the arrows indicating the broken air flow. , D6, D7) indicate the dampers in the closed state.

−給気通路における空気の流れ−
吸着側吸込口(51)及び吸着側吸込室(S27)を経由して第1吸着側内部通路(S21)に供給された空気(この例では、室外空気(OA))は、第8ダンパ(D8)を通過して第1熱交換室(S11)に供給される。
-Air flow in the air supply passage-
The air (outdoor air (OA) in this example) supplied to the first suction side internal passage (S21) via the suction side suction port (51) and the suction side suction chamber (S27) is an eighth damper ( D8) is supplied to the first heat exchange chamber (S11).

第1熱交換室(S11)に供給された空気は、第1吸着熱交換器(101)と第1吸着ブロック(301)とを順に通過する際に、第1吸着熱交換器(101)及び第1吸着ブロック(301)の吸着剤に水分を奪われて除湿される。   When the air supplied to the first heat exchange chamber (S11) passes through the first adsorption heat exchanger (101) and the first adsorption block (301) in order, the first adsorption heat exchanger (101) and Moisture is taken away by the adsorbent of the first adsorption block (301) and dehumidified.

第1吸着熱交換器(101)及び第1吸着ブロック(301)を通過して除湿された空気は、第2ダンパ(D2)を通過して第2吸着側内部通路(S23)に流れ込み、給気ファン室(S25)及び給気口(53)を通過して供給空気(SA)として室内空間(S1)に供給される。   The dehumidified air that has passed through the first adsorption heat exchanger (101) and the first adsorption block (301) passes through the second damper (D2) and flows into the second adsorption side internal passage (S23). The air passes through the air fan chamber (S25) and the air supply port (53) and is supplied to the indoor space (S1) as supply air (SA).

−再生通路における空気の流れ−
再生側吸込口(52)及び再生側吸込室(S28)を経由して第1再生側内部通路(S22)に供給された空気(この例では、室内空気(RA))は、第3ダンパ(D3)を通過して第2熱交換室(S12)に供給される。
-Air flow in the regeneration passage-
The air supplied to the first regeneration side internal passage (S22) via the regeneration side suction port (52) and the regeneration side suction chamber (S28) (in this example, room air (RA)) is supplied to the third damper ( D3) is supplied to the second heat exchange chamber (S12).

第2熱交換室(S12)に供給された空気は、第2吸着ブロック(302)と第2吸着熱交換器(102)とを順に通過する際に、第2吸着ブロック(302)及び第2吸着熱交換器(102)の吸着剤から水分を付与される。これにより、第2吸着熱交換器(102)及び第2吸着ブロック(302)の吸着剤が再生される。   When the air supplied to the second heat exchange chamber (S12) passes through the second adsorption block (302) and the second adsorption heat exchanger (102) in order, the second adsorption block (302) and the second adsorption block (302). Moisture is given from the adsorbent of the adsorption heat exchanger (102). Thereby, the adsorbent of the second adsorption heat exchanger (102) and the second adsorption block (302) is regenerated.

第2吸着ブロック(302)及び第2吸着熱交換器(102)を通過した空気は、第5ダンパ(D5)を通過して第2再生側内部通路(S24)に流れ込み、排気ファン室(S26)及び排気口(54)を通過して室外空間に排出される。   The air that has passed through the second adsorption block (302) and the second adsorption heat exchanger (102) passes through the fifth damper (D5) and flows into the second regeneration side internal passage (S24), and the exhaust fan chamber (S26 ) And the exhaust port (54) to be discharged into the outdoor space.

《第2除湿動作における空気の流れ》
次に、図3を参照して、この実施形態の除湿装置(10)による第2除湿動作における空気の流れについて説明する。第2除湿動作では、第1吸着熱交換器(101)が凝縮器となり、第2吸着熱交換器(102)が蒸発器となる。また、図3のように、第1,第4,第6,第7ダンパ(D1,D4,D6,D7)が開状態となり、第2,第3,第5,第8ダンパ(D2,D3,D5,D8)が閉状態となる。これにより、第1及び第2熱交換室(S11,S12)の接続状態が第2通路状態(図1の破線で示した状態)に設定され、第1熱交換室(S11)が再生通路(P2)に組み込まれ、第2熱交換室(S12)が給気通路(P1)に組み込まれる。図1においては、破線の空気の流れを示す矢印に付与した符号(D1,D4,D6,D7)が開状態のダンパを示し、実線の空気の流れを示す矢印に付与した符号(D2,D3,D5,D8)が閉状態のダンパを示している。
<< Air flow in the second dehumidifying action >>
Next, the air flow in the second dehumidifying operation by the dehumidifying device (10) of this embodiment will be described with reference to FIG. In the second dehumidifying operation, the first adsorption heat exchanger (101) serves as a condenser, and the second adsorption heat exchanger (102) serves as an evaporator. Further, as shown in FIG. 3, the first, fourth, sixth and seventh dampers (D1, D4, D6, D7) are opened, and the second, third, fifth and eighth dampers (D2, D3) are opened. , D5, D8) are closed. Thereby, the connection state of the first and second heat exchange chambers (S11, S12) is set to the second passage state (the state indicated by the broken line in FIG. 1), and the first heat exchange chamber (S11) is set to the regeneration passage ( P2) and the second heat exchange chamber (S12) is incorporated into the air supply passage (P1). In FIG. 1, symbols (D1, D4, D6, D7) given to the arrows indicating the air flow indicated by broken lines indicate the open dampers, and symbols (D2, D3) given to the arrows indicating the solid air flow. , D5, D8) indicate the closed dampers.

−給気通路における空気の流れ−
吸着側吸込口(51)及び吸着側吸込室(S27)を経由して第1吸着側内部通路(S21)に供給された空気(この例では、室外空気(OA))は、第7ダンパ(D7)を通過して第2熱交換室(S12)に供給される。
-Air flow in the air supply passage-
The air (in this example, outdoor air (OA)) supplied to the first suction side internal passage (S21) via the suction side suction port (51) and the suction side suction chamber (S27) is supplied with a seventh damper ( D7) is supplied to the second heat exchange chamber (S12).

第2熱交換室(S12)に供給された空気は、第2吸着熱交換器(102)と第2吸着ブロック(302)とを順に通過する際に、第2吸着熱交換器(102)及び第2吸着ブロック(302)の吸着剤に水分を奪われて除湿される。   When the air supplied to the second heat exchange chamber (S12) sequentially passes through the second adsorption heat exchanger (102) and the second adsorption block (302), the second adsorption heat exchanger (102) and Moisture is taken away by the adsorbent of the second adsorption block (302) and dehumidified.

第2吸着熱交換器(102)及び第2吸着ブロック(302)を通過して除湿された空気は、第1ダンパ(D1)を通過して第2吸着側内部通路(S23)に流れ込み、給気ファン室(S25)及び給気口(53)を通過して供給空気(SA)として室内空間(S1)に供給される。   The dehumidified air that has passed through the second adsorption heat exchanger (102) and the second adsorption block (302) passes through the first damper (D1) and flows into the second adsorption side internal passage (S23). The air passes through the air fan chamber (S25) and the air supply port (53) and is supplied to the indoor space (S1) as supply air (SA).

−再生通路における空気の流れ−
再生側吸込口(52)及び再生側吸込室(S28)を経由して第1再生側内部通路(S22)に供給された空気(この例では、室内空気(RA))は、第4ダンパ(D4)を通過して第1熱交換室(S11)に供給される。
-Air flow in the regeneration passage-
The air supplied to the first regeneration side internal passage (S22) via the regeneration side suction port (52) and the regeneration side suction chamber (S28) (in this example, the room air (RA)) is supplied to the fourth damper ( D4) is supplied to the first heat exchange chamber (S11).

第1熱交換室(S11)に供給された空気は、第1吸着ブロック(301)と第1吸着熱交換器(101)とを順に通過する際に、第1吸着ブロック(301)及び第1吸着熱交換器(101)の吸着剤から水分を付与される。これにより、第1吸着熱交換器(101)及び第1吸着ブロック(301)の吸着剤が再生される。   When the air supplied to the first heat exchange chamber (S11) sequentially passes through the first adsorption block (301) and the first adsorption heat exchanger (101), the first adsorption block (301) and the first adsorption block (301) Moisture is given from the adsorbent of the adsorption heat exchanger (101). Thereby, the adsorbent of the first adsorption heat exchanger (101) and the first adsorption block (301) is regenerated.

第1吸着ブロック(301)及び第1吸着熱交換器(101)を通過した空気は、第6ダンパ(D6)を通過して第2再生側内部通路(S24)に流れ込み、排気ファン室(S26)及び排気口(54)を通過して室外空間に排出される。   The air that has passed through the first adsorption block (301) and the first adsorption heat exchanger (101) passes through the sixth damper (D6) and flows into the second regeneration side internal passage (S24), and the exhaust fan chamber (S26 ) And the exhaust port (54) to be discharged into the outdoor space.

〈除湿装置の起動前の予冷運転〉
除湿装置(10)の起動前(圧縮機(103)を起動する前)には、図4(A)〜図4(D)に示す動作が行われる。具体的には、この図4(A)〜図4(D)に示す動作により、圧縮機を起動する次の運転時に凝縮器となる吸着熱交換器(102)の上流側の位置に設けられている吸着ブロック(302)に冷却用の空気を流して該吸着ブロック(302)を予冷する予冷運転を行う。除湿装置(10)の周囲温度が高温(例えば40℃〜50℃)になっていると、停止中に吸着ブロック(301,302)が高温になっていることがあり、そのまま運転を開始すると、凝縮器となる吸着熱交換器(102)に高温の空気が流入するために冷媒回路の凝縮温度が高くなりすぎて、圧縮機(103)が停止するおそれがあるのに対して、そのような問題が起こらないようにするためである。
<Pre-cooling operation before starting dehumidifier>
Before the dehumidifier (10) is started (before the compressor (103) is started), the operations shown in FIGS. 4 (A) to 4 (D) are performed. Specifically, the operation shown in FIGS. 4 (A) to 4 (D) is provided at a position upstream of the adsorption heat exchanger (102) serving as a condenser during the next operation of starting the compressor. A pre-cooling operation for pre-cooling the adsorption block (302) by flowing cooling air through the adsorption block (302) is performed. If the ambient temperature of the dehumidifier (10) is high (for example, 40 ° C. to 50 ° C.), the adsorption block (301, 302) may be hot during stoppage. Such a problem may occur because the condensing temperature of the refrigerant circuit becomes too high and the compressor (103) may stop because hot air flows into the adsorption heat exchanger (102). This is to prevent it from happening.

除湿装置(10)の運転を前回停止したときに、第2吸着熱交換器(102)が凝縮器(ドットを付して表示)で第1吸着熱交換器(101)が蒸発器(ハッチングを付して表示)であったとする(図4(D)参照)と、次に運転を開始するときも、第2吸着熱交換器(102)が凝縮器で第1吸着熱交換器(101)が蒸発器となる。   When the operation of the dehumidifier (10) was stopped last time, the second adsorption heat exchanger (102) is a condenser (shown with a dot), and the first adsorption heat exchanger (101) is an evaporator (hatched) (Refer to FIG. 4D), the second adsorption heat exchanger (102) is a condenser and the first adsorption heat exchanger (101) when the operation is started next time. Becomes the evaporator.

そのため、図4の例では、次の起動時には、まず図4(D)の第1除湿動作が行われることになる。この場合の予冷運転を開始する図4(A)の状態では、第1除湿動作で閉じられる第1,第4,第6,第7ダンパ(D1,D4,D6,D7)が開かれ、第1除湿動作で開かれる第2,第3,第5,第8ダンパ(D2,D3,D5,D8)が閉じられる。つまり、各ダンパの開閉状態は第2除湿動作と同じになる。このとき、給気ファン(61)と排気ファン(62)は停止しており、空気は流れていない。   Therefore, in the example of FIG. 4, at the next startup, first, the first dehumidifying operation of FIG. 4D is performed. In the state shown in FIG. 4A where the pre-cooling operation is started in this case, the first, fourth, sixth and seventh dampers (D1, D4, D6, D7) that are closed by the first dehumidifying operation are opened. The second, third, fifth and eighth dampers (D2, D3, D5, D8) that are opened by one dehumidifying operation are closed. That is, the open / closed state of each damper is the same as in the second dehumidifying operation. At this time, the air supply fan (61) and the exhaust fan (62) are stopped, and no air is flowing.

次に、各ダンパを図4(A)の状態に設定した直後、あるいはその数秒後に、給気ファン(61)と排気ファン(62)が起動される。このとき、図4(B)に実線で示すように、この図4(B)には示していない冷却器(11)を通った室外空気(OA)が第2熱交換室(S12)の第2吸着熱交換器(102)と第2吸着ブロック(302)を通って室内へ流入し、室内空気(RA)は第1熱交換室(S11)の第1吸着ブロック(301)と第1吸着熱交換器(101)を通過し、室外へ流出する。この動作が行われている間は、第2吸着ブロック(302)が室外空気(OA)で冷却される。   Next, immediately after setting each damper to the state shown in FIG. 4A, or a few seconds after that, the air supply fan (61) and the exhaust fan (62) are activated. At this time, as indicated by a solid line in FIG. 4 (B), outdoor air (OA) that has passed through the cooler (11) not shown in FIG. 4 (B) becomes the second heat exchange chamber (S12). It flows into the room through the two-adsorption heat exchanger (102) and the second adsorption block (302), and the indoor air (RA) passes through the first adsorption block (301) and the first adsorption in the first heat exchange chamber (S11). It passes through the heat exchanger (101) and flows out of the room. While this operation is performed, the second adsorption block (302) is cooled by outdoor air (OA).

その後、所定時間(本実施形態では約3分)が経過すると、圧縮機(103)が起動される。このときの状態を図4(C)に示している。冷媒回路(100)では、第2吸着熱交換器(102)が凝縮器(ドットを付して表示)となり、第1吸着熱交換器(101)が蒸発器(ハッチングを付して表示)となる第1冷凍サイクル動作が行われる。そして、この動作を約3分間行った後、図4(D)の通常運転の動作が開始される。図4(C)の動作を3分間行っているのは、圧縮機(103)の起動後に圧力が過度に上昇しないことを確認するためである。また、この図4(C)の状態では、凝縮器である第2吸着熱交換器(102)を通過した空気が第2吸着ブロック(302)を通過するが、圧縮機(103)の起動直後で凝縮温度が低い状態であるため、第2吸着ブロック(302)の温度はそれほど上昇しない。   Thereafter, when a predetermined time (about 3 minutes in the present embodiment) elapses, the compressor (103) is started. The state at this time is shown in FIG. In the refrigerant circuit (100), the second adsorption heat exchanger (102) is a condenser (displayed with dots), and the first adsorption heat exchanger (101) is an evaporator (displayed with hatching). The first refrigeration cycle operation is performed. And after performing this operation | movement for about 3 minutes, the operation | movement of the normal driving | operation of FIG.4 (D) is started. The reason why the operation of FIG. 4C is performed for 3 minutes is to confirm that the pressure does not increase excessively after the compressor (103) is started. In the state of FIG. 4C, the air that has passed through the second adsorption heat exchanger (102), which is a condenser, passes through the second adsorption block (302), but immediately after the compressor (103) is started. Since the condensation temperature is low, the temperature of the second adsorption block (302) does not rise so much.

図4(D)の動作を行うときは、凝縮器になっている第2吸着熱交換器(102)の上流側に位置する第2吸着ブロック(302)が既に冷却されている。したがって、冷媒回路(100)の高圧圧力が上昇しすぎることを防止できる。その後は、第1除湿動作と第2除湿動作を交互に繰り返すことにより、通常の運転制御が行われる。   When the operation of FIG. 4D is performed, the second adsorption block (302) located on the upstream side of the second adsorption heat exchanger (102) serving as a condenser has already been cooled. Therefore, it can prevent that the high pressure of a refrigerant circuit (100) rises too much. Thereafter, normal operation control is performed by alternately repeating the first dehumidifying operation and the second dehumidifying operation.

〈実施形態の効果〉
本実施形態によれば、圧縮機(103)を起動する前には予冷運転を行い、次に圧縮機(103)を起動するときに凝縮器になる吸着熱交換器(101,102)に対して上流側に位置する吸着ブロック(301,302)を冷却することにより、凝縮器の温度上昇を抑えるようにしている。したがって、除湿装置の設置場所の周囲温度に関わらず、圧縮機(103)の起動時に冷媒回路(100)の高圧圧力が過度に上昇するのを抑え、圧縮機(103)が停止するのを防止できる。
<Effect of the embodiment>
According to the present embodiment, a pre-cooling operation is performed before starting the compressor (103), and the upstream of the adsorption heat exchanger (101, 102) that becomes a condenser when the compressor (103) is started next time. By cooling the adsorption blocks (301, 302) located on the side, the temperature rise of the condenser is suppressed. Therefore, regardless of the ambient temperature of the installation location of the dehumidifier, the high pressure of the refrigerant circuit (100) is prevented from excessively rising when the compressor (103) is started, and the compressor (103) is prevented from stopping. it can.

特に、予冷運転時には、上記処理側空気と再生側空気のうち、冷却器(11)を通過して温度が低くなった処理側空気を、上記圧縮機(103)の起動時に凝縮器になる吸着熱交換器(101,102)の上流側に位置する吸着ブロック(301,302)に流すことにより、その吸着ブロック(301,302)を確実に冷却するようにしているので、圧縮機(103)が停止するのを確実に防止できる。   In particular, during pre-cooling operation, of the processing side air and the regeneration side air, the processing side air that has passed through the cooler (11) and has a low temperature is adsorbed to become a condenser when the compressor (103) is started. Since the suction block (301,302) is reliably cooled by flowing it to the suction block (301,302) located upstream of the heat exchanger (101,102), it is ensured that the compressor (103) stops. Can be prevented.

また、本実施形態によれば、通常運転の開始時に開くダンパ(D2,D3,D5,D8)を上記予冷運転時に閉じ、上記通常運転の開始時に閉じるダンパ(D1,D4,D6,D7)を上記予冷運転時に開くことにより、上記圧縮機(103)の起動時に凝縮器になる吸着熱交換器(101,102)の上流側に位置する吸着ブロック(301,302)を冷却することができ、ダンパ(D1〜D8)を切り換えるだけで予冷運転を行えるので、装置の構造が複雑化するのを防止できる。   Further, according to the present embodiment, the dampers (D2, D3, D5, D8) that are opened at the start of normal operation are closed during the precooling operation, and the dampers (D1, D4, D6, D7) that are closed at the start of normal operation are closed. By opening during the pre-cooling operation, the adsorption block (301, 302) located upstream of the adsorption heat exchanger (101, 102) that becomes a condenser when the compressor (103) is started can be cooled, and the damper (D1- Since the pre-cooling operation can be performed simply by switching D8), the structure of the apparatus can be prevented from becoming complicated.

さらに、本実施形態によれば、上記圧縮機(103)の起動時に凝縮器になる吸着熱交換器(101,102)がある熱交換室(S11,S12)を処理側空気が通過する予冷運転の切り換え動作を、図4(C)に示すように所定時間にわたって行った後に、蒸発器になる吸着熱交換器(101,102)がある熱交換室(S11,S12)を処理側空気が通過する通常運転の切り換え動作を行うようにしており、予冷運転中には蒸発器になる吸着熱交換器(101,102)に再生側空気を流しているので、吸着熱交換器(101,102)が次に処理側になるときの処理能力を高められる。   Further, according to the present embodiment, switching of the precooling operation in which the processing side air passes through the heat exchange chamber (S11, S12) where the adsorption heat exchanger (101, 102) that becomes the condenser when the compressor (103) is started is provided. After the operation is performed for a predetermined time as shown in FIG. 4C, normal operation in which the processing side air passes through the heat exchange chamber (S11, S12) where the adsorption heat exchanger (101, 102) that becomes the evaporator is located. Switching operation is performed, and during the pre-cooling operation, the regeneration side air is flowing to the adsorption heat exchanger (101, 102) that becomes the evaporator, so the next time the adsorption heat exchanger (101, 102) becomes the processing side Can increase the processing capacity.

(その他の実施形態)
上記実施形態については、以下のような構成としてもよい。
(Other embodiments)
About the said embodiment, it is good also as the following structures.

例えば、上記実施形態では、予冷運転時には、圧縮機(103)の起動時に凝縮器になる吸着熱交換器(101,102)の上流側に位置する吸着ブロック(301,302)に処理側空気を流すようにダンパ(D1〜D8)を切り換えているが、その吸着ブロック(301,302)よりも温度が低い空気であれば、再生側空気を流してもよい。その場合、再生側空気の温度は、上記吸着ブロック(301,302)の温度より低ければ、処理側空気の温度より高くてもよい。   For example, in the above-described embodiment, during the pre-cooling operation, the damper is configured to flow the processing side air to the adsorption block (301, 302) located upstream of the adsorption heat exchanger (101, 102) that becomes a condenser when the compressor (103) is started. (D1 to D8) are switched, but regeneration air may be flowed if the temperature is lower than that of the adsorption block (301, 302). In this case, the temperature of the regeneration side air may be higher than the temperature of the processing side air as long as it is lower than the temperature of the adsorption block (301, 302).

また、上記実施形態では、切換機構(200)を、上記第1熱交換室(S11)と第2熱交換室(S12)を通る空気の流通経路を切り換える複数のダンパ(D1〜D8)により構成し、上記通常運転の開始時に開くダンパ(D2,D3,D5,D8)を上記予冷運転時に閉じ、上記通常運転の開始時に閉じるダンパ(D1,D4,D6,D7)を上記予冷運転時に開くことにより、予冷運転の切り換え動作を行うようにしているが、ダンパ以外の機構を用いて切換機構(200)を構成してもよい。   Moreover, in the said embodiment, the switching mechanism (200) is comprised by the several damper (D1-D8) which switches the distribution | circulation path | route of the air which passes along the said 1st heat exchange chamber (S11) and a 2nd heat exchange chamber (S12). The dampers (D2, D3, D5, D8) that are opened at the start of normal operation are closed during the precooling operation, and the dampers (D1, D4, D6, D7) that are closed at the start of normal operation are opened during the precooling operation. Thus, the switching operation of the pre-cooling operation is performed, but the switching mechanism (200) may be configured using a mechanism other than the damper.

なお、以上の実施形態は、本質的に好ましい例示であって、この発明、その適用物、あるいはその用途の範囲を制限することを意図するものではない。   In addition, the above embodiment is an essentially preferable illustration, Comprising: It does not intend limiting the range of this invention, its application thing, or its use.

以上説明したように、本発明は、空気を除湿して調湿空間に供給する除湿装置を備えた除湿システムについて有用である。   As described above, the present invention is useful for a dehumidifying system including a dehumidifying device that dehumidifies air and supplies it to a humidity control space.

11 冷却器
100 冷媒回路
101 第1吸着熱交換器
102 第2吸着熱交換器
200 切換機構
301 第1吸着ブロック
302 第2吸着ブロック
S0 調湿空間
S11 第1熱交換室
S12 第2熱交換室
11 Cooler
100 Refrigerant circuit
101 First adsorption heat exchanger
102 Second adsorption heat exchanger
200 switching mechanism
301 First adsorption block
302 Second adsorption block
S0 Humidity control space
S11 1st heat exchange room
S12 Second heat exchange chamber

Claims (6)

吸着剤が担持された第1吸着熱交換器(101)及び第2吸着熱交換器(102)を有し、これらの吸着熱交換器(101,102)の一方が蒸発器になって他方が凝縮器になる動作と一方が凝縮器になって他方が蒸発器になる動作が交互に切り換えられる冷媒回路(100)と、
上記第1吸着熱交換器(101)が設けられる第1熱交換室(S11)及び上記第2吸着熱交換器(102)が設けられる第2熱交換室(S12)と、
通常運転時に、両熱交換室(S11,S12)のうちで蒸発器になっている吸着熱交換器(101,102)がある熱交換室(S11,S12)を通過した処理側空気を調湿空間(S1)に供給し、凝縮器になっている吸着熱交換器(101,102)がある熱交換室(S11,S12)を再生側空気が通過するように空気の流れを切り換える切換機構(200)と、
上記第1熱交換室(S11)において上記第1吸着熱交換器(101)が蒸発器になっている場合に該蒸発器の下流側になり該第1吸着熱交換器(101)が凝縮器になっている場合に該凝縮器の上流側になる位置に設けられた、吸着剤が担持された第1吸着ブロック(301)と、
上記第2熱交換室(S12)において上記第2吸着熱交換器(102)が蒸発器になっている場合に該蒸発器の下流側になり該第2吸着熱交換器(102)が凝縮器になっている場合に該凝縮器の上流側になる位置に設けられた、吸着剤が担持された第2吸着ブロック(302)と、を備え、
上記切換機構(200)は、上記冷媒回路(100)の圧縮機(103)を起動する前に、該圧縮機(103)の起動時に凝縮器になる吸着熱交換器(101,102)に対して上流側に位置する吸着ブロック(301,302)に冷却用の空気を流す予冷運転を行うように構成されていることを特徴とする除湿システム。
It has a first adsorption heat exchanger (101) and a second adsorption heat exchanger (102) on which an adsorbent is supported, and one of these adsorption heat exchangers (101, 102) is an evaporator and the other is a condenser. A refrigerant circuit (100) in which the operation to become one and the operation in which one becomes a condenser and the other becomes an evaporator are alternately switched,
A first heat exchange chamber (S11) in which the first adsorption heat exchanger (101) is provided and a second heat exchange chamber (S12) in which the second adsorption heat exchanger (102) is provided;
During normal operation, the processing-side air that has passed through the heat exchange chamber (S11, S12) where the adsorption heat exchanger (101, 102), which is the evaporator, of the two heat exchange chambers (S11, S12) is placed in the humidity control space ( A switching mechanism (200) for switching the air flow so that the regeneration side air passes through the heat exchange chamber (S11, S12) where the adsorption heat exchanger (101, 102) serving as the condenser is supplied to S1), and
When the first adsorption heat exchanger (101) is an evaporator in the first heat exchange chamber (S11), the first adsorption heat exchanger (101) becomes a condenser on the downstream side of the evaporator. A first adsorbing block (301) carrying an adsorbent provided at a position on the upstream side of the condenser when
When the second adsorption heat exchanger (102) is an evaporator in the second heat exchange chamber (S12), the second adsorption heat exchanger (102) becomes a condenser on the downstream side of the evaporator. A second adsorption block (302) carrying an adsorbent provided at a position on the upstream side of the condenser in the case of
The switching mechanism (200) is upstream of the adsorption heat exchanger (101, 102) that becomes a condenser when starting the compressor (103) before starting the compressor (103) of the refrigerant circuit (100). A dehumidification system configured to perform a pre-cooling operation in which cooling air is supplied to suction blocks (301, 302) positioned on the side.
請求項1において、
上記切換機構(200)は、予冷運転時に、上記処理側空気と再生側空気のうちで温度が低い空気を、上記圧縮機(103)の起動時に凝縮器になる吸着熱交換器(101,102)の上流側に位置する吸着ブロック(301,302)に流すように構成されていることを特徴とする除湿システム。
In claim 1,
In the pre-cooling operation, the switching mechanism (200) is configured to convert the low-temperature air among the processing-side air and the regeneration-side air into the adsorption heat exchanger (101, 102) that becomes a condenser when the compressor (103) is started. A dehumidification system configured to flow through an adsorption block (301, 302) located upstream.
請求項2において、
上記切換機構(200)は、予冷運転時に上記処理側空気の温度が上記再生側空気の温度よりも低い場合、上記圧縮機(103)の起動時に凝縮器になる吸着熱交換器(101,102)がある熱交換室(S11,S12)を処理側空気が通過する切り換え動作が可能に構成されていることを特徴とする除湿システム。
In claim 2,
The switching mechanism (200) includes an adsorption heat exchanger (101, 102) that becomes a condenser when the compressor (103) is started when the temperature of the processing side air is lower than the temperature of the regeneration side air during the pre-cooling operation. A dehumidification system characterized by being configured to be able to perform a switching operation in which processing-side air passes through a heat exchange chamber (S11, S12).
請求項3において、
上記切換機構(200)は、上記第1熱交換室(S11)と第2熱交換室(S12)を通る空気の流通経路を切り換える複数のダンパ(D1〜D8)により構成され、上記通常運転の開始時に開くダンパ(D2,D3,D5,D8)を上記予冷運転時に閉じ、上記通常運転の開始時に閉じるダンパ(D1,D4,D6,D7)を上記予冷運転時に開くことにより、予冷運転の切り換え動作が行われることを特徴とする除湿システム。
In claim 3,
The switching mechanism (200) is composed of a plurality of dampers (D1 to D8) that switch the air flow path passing through the first heat exchange chamber (S11) and the second heat exchange chamber (S12). Switching the pre-cooling operation by closing the dampers (D2, D3, D5, D8) that open at the start during the pre-cooling operation and opening the dampers (D1, D4, D6, D7) that close at the start of the normal operation during the pre-cooling operation A dehumidification system characterized by operation.
請求項3または4において、
上記切換機構(200)は、圧縮機(103)の起動時に凝縮器になる吸着熱交換器(101,102)がある熱交換室(S11,S12)を処理側空気が通過する予冷運転の切り換え動作を所定時間にわたって行った後に、蒸発器になる吸着熱交換器(101,102)がある熱交換室(S11,S12)を処理側空気が通過する通常運転の切り換え動作を行うように構成されていることを特徴とする除湿システム。
In claim 3 or 4,
The switching mechanism (200) performs the switching operation of the pre-cooling operation in which the processing side air passes through the heat exchange chamber (S11, S12) where the adsorption heat exchanger (101, 102) that becomes a condenser when the compressor (103) is started. After performing for a predetermined time, it is configured to perform the switching operation of the normal operation in which the processing side air passes through the heat exchange chamber (S11, S12) where the adsorption heat exchanger (101, 102) that becomes the evaporator is located. Dehumidification system featuring.
請求項1から5の何れか1つにおいて、
上記吸着熱交換器(101,102)へ供給される処理側空気を予め冷却する冷却器を備え、
上記切換機構(200)は、予冷運転時に、上記冷却器で冷却された空気を圧縮の起動時に凝縮器になる吸着熱交換器(101,102)の上流側に位置する吸着ブロック(301,302)へ送るように構成されていることを特徴とする除湿システム。
In any one of claims 1 to 5,
A cooler that pre-cools the processing-side air supplied to the adsorption heat exchanger (101, 102);
In the pre-cooling operation, the switching mechanism (200) sends the air cooled by the cooler to the adsorption block (301, 302) located upstream of the adsorption heat exchanger (101, 102) that becomes a condenser when starting compression. The dehumidification system characterized by being comprised in.
JP2014265449A 2014-12-26 2014-12-26 Dehumidification system Active JP6009531B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014265449A JP6009531B2 (en) 2014-12-26 2014-12-26 Dehumidification system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014265449A JP6009531B2 (en) 2014-12-26 2014-12-26 Dehumidification system

Publications (2)

Publication Number Publication Date
JP2016125720A JP2016125720A (en) 2016-07-11
JP6009531B2 true JP6009531B2 (en) 2016-10-19

Family

ID=56356913

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014265449A Active JP6009531B2 (en) 2014-12-26 2014-12-26 Dehumidification system

Country Status (1)

Country Link
JP (1) JP6009531B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022038721A1 (en) * 2020-08-19 2022-02-24 三菱電機株式会社 Air treatment device

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010281476A (en) * 2009-06-02 2010-12-16 Daikin Ind Ltd Humidity controller
JP5126443B1 (en) * 2011-07-11 2013-01-23 ダイキン工業株式会社 Humidity control device
US9297543B2 (en) * 2012-12-28 2016-03-29 Daikin Industries, Ltd. Dehumidification system

Also Published As

Publication number Publication date
JP2016125720A (en) 2016-07-11

Similar Documents

Publication Publication Date Title
JP5885781B2 (en) Dehumidifying device and dehumidifying system
JP5695752B2 (en) Dehumidification system
JP5822931B2 (en) Humidity control apparatus, air conditioning system, and control method of humidity control apparatus
US20230022397A1 (en) Air quality adjustment system
JP5631415B2 (en) Air conditioning system and humidity control device
JP5018402B2 (en) Humidity control device
JP3891207B2 (en) Humidity control device
JP5218135B2 (en) Humidity control device
JP2010281476A (en) Humidity controller
JP6054734B2 (en) Dehumidification system
JP6009531B2 (en) Dehumidification system
JP2017044387A (en) Dehumidification system
JP7126611B2 (en) air conditioner
JP2016084982A (en) Dehumidifier
JP2010281502A (en) Humidifier
JP6372517B2 (en) Humidity control device
JP6050107B2 (en) Dehumidification system
JP2014126255A (en) Humidity controller and dehumidification system using humidity controller
JP6443402B2 (en) Humidity control device
JP2017138078A (en) Dehumidification system
JP5195216B2 (en) Humidity control system
JP4529530B2 (en) Humidity control device
WO2021005657A1 (en) Air-conditioning apparatus
JP6085468B2 (en) Dehumidification system
JP2016031208A (en) Dehumidification system

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20160825

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20160830

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20160914

R150 Certificate of patent or registration of utility model

Ref document number: 6009531

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150