JP5863635B2 - Surveying orbital ruler - Google Patents
Surveying orbital ruler Download PDFInfo
- Publication number
- JP5863635B2 JP5863635B2 JP2012283963A JP2012283963A JP5863635B2 JP 5863635 B2 JP5863635 B2 JP 5863635B2 JP 2012283963 A JP2012283963 A JP 2012283963A JP 2012283963 A JP2012283963 A JP 2012283963A JP 5863635 B2 JP5863635 B2 JP 5863635B2
- Authority
- JP
- Japan
- Prior art keywords
- reference rail
- rail
- track
- ruler
- surveying
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012795 verification Methods 0.000 claims description 13
- 238000010330 laser marking Methods 0.000 description 24
- 239000004677 Nylon Substances 0.000 description 7
- 239000011810 insulating material Substances 0.000 description 7
- 229920001778 nylon Polymers 0.000 description 7
- 238000009434 installation Methods 0.000 description 6
- 238000000034 method Methods 0.000 description 5
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 3
- 229910052782 aluminium Inorganic materials 0.000 description 3
- 238000005259 measurement Methods 0.000 description 3
- 238000000926 separation method Methods 0.000 description 3
- 230000007774 longterm Effects 0.000 description 2
- 239000000470 constituent Substances 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 239000013585 weight reducing agent Substances 0.000 description 1
Images
Landscapes
- A Measuring Device Byusing Mechanical Method (AREA)
- Machines For Laying And Maintaining Railways (AREA)
- Length-Measuring Instruments Using Mechanical Means (AREA)
Description
本発明は、測量用軌道定規に関し、特に、可動式ホーム柵の設置位置の測量に使用される測量用軌道定規に関する。 The present invention relates to a surveying track ruler, and more particularly to a surveying track ruler used for surveying the installation position of a movable home fence.
近年、鉄道の駅等の軌道用車両乗降場において、軌道に接して設けられるプラットホームに可動式ホーム柵の設置が進められている。可動式ホーム柵の設置は、路線に沿う構造物や現場機器と同様に建築限界が適用される。従って、可動式ホーム柵を設置する際には、建築限界を侵さぬ様に、軌道中心から測量しており、また、設置後は、軌道中心からの距離を測定する「建築限界測定」を行うことになっている。特に、可動式ホーム柵は、建築限界より数十mm外側という、非常に厳しい条件での設置であるため、設置には正確な測量を行う必要がある。 2. Description of the Related Art In recent years, installation of movable home fences has been promoted on platforms provided in contact with tracks at railway vehicle landings such as railway stations. Installation limits for movable home fences are subject to building limits as well as structures and field equipment along the route. Therefore, when installing a movable platform fence, the survey is carried out from the center of the track so that the building limit is not violated, and after installation, the “building limit measurement” is performed to measure the distance from the center of the track. It is supposed to be. In particular, the movable platform fence is installed under extremely strict conditions of several tens of mm outside the building limit, and therefore it is necessary to perform accurate surveying for installation.
可動式ホーム柵を設置する際の測量方法は、まず、列車停止目標を基点に各車両のボギー車中心位置を測量する。そして、測量したボギー車中心位置にそれぞれ軌道定規(例えば。特許文献1参照)を置き、軌道中心を測量する。この際、再度確認できるように、レールにマーキングを行っておく。
次に、ボギー車中心位置の2点間を結んだ中心位置を測量する。ボギー車中心位置の2点間を結んだ中心位置が車両中心及び車両連結間中心位置となる。
次に、車両中心及び車両連結間中心位置にレーザー墨出し器を置き、レールと直角方向にラインを出し、プラットホーム端に墨を付ける。
次に、プラットホーム端の墨を付け箇所で下げ振りによる「プラットホーム離れ」を測量し、計画距離から下げ振りで測量した値の差を計算によって求める。求めた値がプラットホーム端からの奥行き距離となる。なお、「離れ」とは、軌道上面が位置する平面に投影した2点間の距離であり、「プラットホーム離れ」は、軌道中心からプラットホーム端までの距離を意味する。
次に、プラットホーム端の墨を付け箇所から奥行き距離の位置をプラットホーム床面に墨出して、測量を終了する。
The surveying method for installing the movable platform fence first measures the bogie center position of each vehicle based on the train stop target. Then, a track ruler (for example, refer to Patent Document 1) is placed at each measured bogie center position, and the track center is measured. At this time, the rail is marked so that it can be confirmed again.
Next, the center position connecting two points of the bogie car center position is measured. The center position connecting the two bogie car center positions is the vehicle center and the vehicle connection center position.
Next, a laser marking device is placed at the center of the vehicle and between the vehicle connections, a line is drawn in a direction perpendicular to the rail, and the platform end is marked.
Next, the “separation of the platform” is measured by swinging it down at the place where the platform edge is marked, and the difference between the values measured by swinging it down from the planned distance is obtained by calculation. The obtained value is the depth distance from the platform edge. Note that “separation” is a distance between two points projected on a plane on which the upper surface of the track is positioned, and “platform separation” means a distance from the center of the track to the platform end.
Next, the position of the depth distance from the marking end of the platform is marked on the platform floor, and the survey is completed.
墨出し後は、墨出し箇所にコア穿孔を行い、可動式ホーム柵の基礎をモルタルで固定する。一度基礎を設置してしまうと、設置後に行われる「建築限界測定」で可動式ホーム柵が建築限界を侵したと分かっても、早急に修正するのは困難であり、大変な作業となる。 After inking, the core is drilled in the inking area and the foundation of the movable home fence is fixed with mortar. Once the foundation has been installed, it is difficult to fix it quickly, even if it is found that the movable platform fence has violated the building limit in the “building limit measurement” performed after the installation, and this is a difficult task.
しかしながら、可動式ホーム柵を設置する際の測量は、夜間から早朝までの極めて短い時間で作業を行わなければならないにも拘わらず、従来技術では、軌道構造によって、路盤上に置くレーザー墨出し器によるライン出しに手間取ってしまうことがあった。 However, surveying when installing movable platform fences requires that the work be done in a very short time from night to early morning. There were times when it took time to put out a line.
すなわち、バラスト軌道である場合には、バラスト道床にレーザー墨出し器を安定して置くことが困難であり、ライン出しに手間取ってしまう。また、近年主流になりつつあるフローティングラダー軌道では、路盤とレール踏面とが離れているため、レーザー墨出し器の設定に時間を要する上、レーザー光がプラットホーム端の目的箇所に届かないことがある。 That is, in the case of a ballast track, it is difficult to stably place the laser marking device on the ballast roadbed, and it takes time to draw the line. In addition, in floating ladder tracks that are becoming mainstream in recent years, the roadbed and the rail tread are separated, so it takes time to set up the laser marking device, and the laser beam may not reach the target location on the platform edge. .
本発明は斯かる問題点を鑑みてなされたものであり、その目的とするところは、軌道構造に拘わらず、レーザー墨出し器によるライン出しを速やか且つ正確に行うことができる測量用軌道定規を提供する点にある。 The present invention has been made in view of such problems, and an object of the present invention is to provide a surveying orbit ruler that can quickly and accurately perform line drawing by a laser marking device regardless of the orbital structure. The point is to provide.
本発明の測量用軌道定規は、基準レールと他方レールとの間に橋架されるロッド部と、前記ロッド部に対して直角に取り付けられたアーム部と、前記基準レールの内側に当接することで、前記アーム部を前記基準レールの軌道方向に対して平行に位置決めする基準ピンと、前記基準レールの軌道方向に対する直角方向を示す直角度認識目印が形成された載置板と、前記アーム部の両端部分にそれぞれ取り付けられた、前記基準レールの踏面に当接する一対の基準レール側第1当接部材とを具備し、前記基準ピンは、一対の前記基準レール側第1当接部材のそれぞれに立設され、前記基準レール側第1当接部材には、前記基準レールの軌道方向に対する平行方向を示す直角度検証目印が形成され、前記直角度検証目印は、前記ロッド部が前記基準レールに対して直角位置決めされた状態で、上方側から見て前記基準レールの内側と一致する位置に形成されていることを特徴とする。
さらに、本発明の測量用軌道定規おいて、前記載置板に、軌道中心線を示す軌道中心認識目印を形成しても良い。
さらに、本発明の測量用軌道定規おいて、前記載置板に、前記基準レールの内側を視認可能な切り抜き窓を形成しても良い。
さらに、本発明の測量用軌道定規おいて、前記基準ピンは、前記基準レール側第1当接部材の前記基準レールの踏面との当接面に対して垂直な方向を軸とするカムフォロアで構成しても良い。
The surveying track ruler of the present invention comprises a rod portion bridged between a reference rail and the other rail, an arm portion attached at a right angle to the rod portion, and an inner side of the reference rail. A reference pin for positioning the arm portion in parallel to the track direction of the reference rail, a mounting plate on which a perpendicularity recognition mark indicating a direction perpendicular to the track direction of the reference rail is formed , and both ends of the arm portion A pair of reference rail side first abutting members attached to the respective parts, which abut on the tread surface of the reference rail, and the reference pin stands on each of the pair of reference rail side first abutting members. A perpendicularity verification mark indicating a direction parallel to the track direction of the reference rail is formed on the reference rail side first abutting member, and the perpendicularity verification mark is formed so that the rod portion has the base portion. In a state of being perpendicular positioned relative to the rail, characterized in that as viewed from the upper side are formed at positions matching the inside of the reference rail.
Furthermore, in the survey ruler of the present invention, a track center recognition mark indicating a track center line may be formed on the mounting plate.
Further, in the surveying track ruler of the present invention, a cutout window that can visually recognize the inside of the reference rail may be formed on the mounting plate.
Further, in the surveying track ruler of the present invention, the reference pin is constituted by a cam follower whose axis is a direction perpendicular to the contact surface of the reference rail side first contact member with the contact surface of the reference rail. You may do it.
本発明の測量用軌道定規は、レーザー墨出し器を載置板に載置させ、直角度認識目印に縦ラインBを合わせることで、軌道構造に拘わらず、レーザー墨出し器による直角方向のライン出しを速やか且つ正確に行うことができるという効果を奏する。 The surveying orbit ruler of the present invention has a laser marking device placed on a mounting plate, and a vertical line B is aligned with a perpendicularity recognition mark, so that a line in a perpendicular direction by the laser marking device is used regardless of the track structure. There is an effect that the feeding can be performed quickly and accurately.
以下に、本発明の好適な実施の形態を添付図面に基づいて説明する。 Preferred embodiments of the present invention will be described below with reference to the accompanying drawings.
本実施の形態の測量用軌道定規1について図1を参照して説明する。図1は、測量用軌道定規1の構成が示されており、(a)は平面図、(b)は側面図、(c)は裏面図である。 A surveying orbit ruler 1 according to the present embodiment will be described with reference to FIG. FIG. 1 shows the configuration of a surveying orbit ruler 1, where (a) is a plan view, (b) is a side view, and (c) is a back view.
測量用軌道定規1は、一方のレールを基準レールとして、基準レールに対する直角度を導出することができる定規である。測量用軌道定規1は、基準レールと他方のレールとの間に平行に橋架される一対のロッド部10a、10bと、ロッド部10a、10bの一端に、ロッド部10a、10bに対して直角に取り付けられたアーム部20と、アーム部20に取り付けられた一対の基準レール側第1当接部材30a、30bと、アーム部20に取り付けられた基準レール側第2当接部材40と、ロッド部10a、10b間に架け渡されて取り付けられた他方レール側当接部材50a、50bと、ロッド部10a、10b間に架け渡されて取り付けられた載置板60とを備えている。
The surveying track ruler 1 is a ruler capable of deriving a perpendicularity with respect to a reference rail using one rail as a reference rail. The surveying track ruler 1 includes a pair of
ロッド部10a、10bは、軽量で強度のある角材(例えば、アルミ角材)で構成されている。ロッド部10a、10bは、使用が想定される最大の軌間よりも長く構成されている。また、ロッド部10a、10bは、MCナイロン等の絶縁材料で構成された絶縁ブロック11によって分離され、分離された長さは、使用が想定される最小の軌間よりも短く構成されている。この構成により、ロッド部10a、10bによる基準レールと他方のレールとの間の軌道回路短絡事故を防止することができる。なお、本実施の形態の測量用軌道定規1は、国内で多く用いられている軌間が1067mm、1372mm、1435mmの3種類の軌道での使用を想定しているものであり、ロッド部10a、10bの長さは、1435mmよりも長く、絶縁ブロック11によって分離されたそれぞれの長さは、1067mmよりも短くなっている。
The
アーム部20は、軽量で強度のある角材(例えば、アルミ角材)で構成されている。アーム部20の長さは、使用が想定される最小の軌間(1067mm)よりも短く構成されている。アーム部20とロッド部10a、10bとは、それぞれMCナイロン等の絶縁材料で構成された絶縁ブロック21を介して取り付けられている。この構成により、ロッド部10aと、ロッド部10bとが絶縁され、継目を挟んだレール間の軌道回路短絡事故を防止することができる。
The
基準レール側第1当接部材30a、30bは、図2を参照すると、基準レールの踏面に当接する当接面31が形成されたMCナイロン等の絶縁材料で構成された板状部材であり、アーム部20の両端部の1側面にそれぞれ取り付けられている。基準レール側第1当接部材30a、30bを基準レールの踏面に当接させることで、アーム部20は、基準レールの踏面に対して平行に位置決めされる。
The reference rail side first abutting
基準レール側第1当接部材30a、30bの当接面31側には、基準レールの内側と線接触で当接される基準ピン32が、アーム部20から等距離にそれぞれ立設されている。この構成により、2個の基準ピン32が、ほぼアーム部20の長さの間隔(例えば、50mm)で配置されることになり、2個の基準ピン32を基準レールの内側に当接させることで、測量用軌道定規1の基準レールに対する直角方向の位置決め(以下、直角位置決めと称す)が行われる。2個の基準ピン32を基準レールの内側に当接させた状態では、アーム部20は、基準レールの軌道方向に対して平行に位置決めされる。従って、ロッド部10a、10bも、基準レールの軌道方向(レール方向)に対して直角方向にセットされる。本実施の形態の基準ピン32は、基準レール側第1当接部材30a、30bの当接面31に対して垂直な方向を軸とするカムフォロアで構成されている。これにより、軌道方向の位置合わせに際し、基準ピン32を基準レールに対して均一に摺動させることができ、長期使用による摩耗を抑えることができる。
On the
また、基準レール側第1当接部材30a、30bにおける当接面31の反対面には、アーム部20と平行なケガキ線33が直角度検証目印としてそれぞれ形成されている。基準レール側第1当接部材30a、30bにそれぞれ形成されているケガキ線33は、同一線上に位置し、測量用軌道定規1が直角位置決めされた状態で、上方側から見て基準レールの内側と一致する位置に形成されている。
Further, on the surface opposite to the
基準レール側第2当接部材40は、図3を参照すると、基準レールの踏面に当接する当接面41が形成されたMCナイロン等の絶縁材料で構成された板状部材であり、アーム部20の中央部分の1側面に取り付けられている。基準レール側第2当接部材40の当接面41は、基準レール側第1当接部材30a、30bの当接面31と同一平面に位置している。基準レール側第2当接部材40における当接面41の少なくとも一片42は、測量用軌道定規1が直角位置決めされた状態で、基準レールの踏面上に位置する。そして、基準レール側第2当接部材40の側面には、基準レールの踏面上に位置する一片42から立ち上がり、上方側から視認可能な傾斜面43が形成されている。また、傾斜面43には、アーム部20と垂直なケガキ線44が直角度認識目印として形成されている。ケガキ線44は、基準レール側第1当接部材30a、30bにそれぞれ立設された基準ピン32と基準レールとそれぞれの接続箇所を結ぶ線分の垂直二等分線上に位置する。
Referring to FIG. 3, the reference rail side
他方レール側当接部材50a、50bは、図4を参照すると、他方レールの踏面に当接する当接面51が形成されたMCナイロン等の絶縁材料で構成された板状部材であり、ロッド部10a、10bの1側面にロッド部10a、10b間に架け渡されて取り付けられている。他方レール側当接部材50a、50bの当接面51は、基準レール側第1当接部材30a、30bの当接面31及び基準レール側第2当接部材40の当接面41と同一平面に位置している。他方レール側当接部材50a、50bにおける当接面51の少なくとも一片52は、測量用軌道定規1が直角位置決めされた状態で、他方レールの踏面上に位置する。そして、他方レール側当接部材50a、50bの側面には、他方レールの踏面上に位置する一片52から立ち上がり、上方側から視認可能な傾斜面53が形成されている。また、傾斜面53には、アーム部20と垂直なケガキ線54が直角度認識目印として形成されている。ケガキ線54は、基準レール側第1当接部材30a、30bにそれぞれ立設された基準ピン32と基準レールとそれぞれの接続箇所を結ぶ線分の垂直二等分線上に位置する。
Referring to FIG. 4, the other rail
他方レール側当接部材50aは、軌間が1067mmの軌道に用いられ、他方レール側当接部材50bは、取り付ける位置を変更することで、軌間が1372mmの軌道と軌間が1435mmの軌道とに用いられる。他方レール側当接部材50aは、軌間が1067mmの軌道に対して、基準レールに基づいて測量用軌道定規1が直角位置決めされた際に、他方レールの踏面と当接する位置に取り付けられている。また、図1では、他方レール側当接部材50bは、軌間が1435mmの軌道に対して、基準レールに基づいて測量用軌道定規1が直角位置決めされた際に、他方レールの踏面と当接する位置に取り付けられている。なお、1つの他方レール側当接部材50aを取り付ける位置を変更することで全ての軌間に対応させるように構成しても良い。
The other rail-
載置板60は、レーザー墨出し器を載置するためのMCナイロン等の絶縁材料で構成された板状部材であり、ロッド部10a、10b間に架け渡されて取り付けられている。載置板60の上面には、アーム部20と垂直なケガキ線61が直角度認識目印として形成されている。ケガキ線61は、基準レール側第1当接部材30a、30bにそれぞれ立設された基準ピン32と基準レールとそれぞれの接続箇所を結ぶ線分の垂直二等分線上に位置する。また、載置板60の上面には、ケガキ線61直交するケガキ線62a、62b、62cが軌道中心認識目印としてそれぞれ形成されている。ケガキ線62a、62b、62cと、基準レール側第1当接部材30a、30bにそれぞれ立設された基準ピン32と基準レールとそれぞれの接続箇所を結ぶ直線W0とのそれぞれの間隔Wa、Wb、Wcは、それぞれ533.5mm、686mm、717.5mmに設定されている。従って、基準レールに基づいて測量用軌道定規1が直角位置決めされた際に、ケガキ線62a、62b、62cのそれぞれ位置が、軌間が1067mm、1372mm、1435mmの3種類の軌道のそれぞれの軌道中心線となる。さらに、載置板60には、基準レールに基づいて測量用軌道定規1が直角位置決めされた際に、基準レール側第2当接部材40の傾斜面43及びケガキ線44と、基準レールの内側とを視認するための切り抜き窓63が形成されている。
The mounting
次に、本実施の形態の測量用軌道定規1を用いた墨出し方法について図5を参照して詳細に説明する。
測量用軌道定規1とレーザー墨出し器2とを用い、基準レール3と他方レール4とからなる軌間が1435mmの軌道の軌道中心線に基づいて、プラットホーム5上に墨出しを行う例について説明する。
まず、軌道方向の概略位置で、基準レール3の踏面上に基準レール側第1当接部材30a、30b及び基準レール側第2当接部材40を載置させると共に、他方レール4の踏面上に他方レール側当接部材50bを載置させる。これにより、図5に示すように、測量用軌道定規1が基準レール3と他方レール4との間に橋架される。
次に、基準レール側第1当接部材30a、30bのそれぞれに立設されている基準ピン32を基準レール3の内側に押し付けて当接されることで、測量用軌道定規1を基準レール3に対して直角位置決めする。これにより、載置板60に形成されているケガキ線61(直角度認識目印)は、基準レール3に対して直角方向に位置決めされると共に、載置板60に形成されているケガキ線62c(軌間1435mm用の直角度認識目印)は、軌道中心線に位置決めされることになる。
次に、レーザー墨出し器2を、図5に示すように、地墨Aがケガキ線61とケガキ線62cとの交点に位置するように載置板60上に載置し、縦ラインBの床墨部分をケガキ線61に合わせる。これにより、レーザー墨出し器2から出力される縦ラインBが基準レール3に対して直角方向に調整される。
この状態で、プラットホーム5に置いた定規6(スタッフ又は曲尺等)の目盛と天井墨Cとを合わせ、定規6を縦ラインBと平行に位置決めすることで、プラットホーム5上で計画距離の目盛位置に墨出しを行うことができる。このように、軌道上での作業は、全て測量用軌道定規1上で行えるので、軌道構造により作業性か左右されることがない。
Next, the marking method using the surveying orbit ruler 1 of the present embodiment will be described in detail with reference to FIG.
A description will be given of an example in which marking is performed on the platform 5 using the surveying ruler 1 and the laser marking device 2 based on the track center line of the track having a distance of 1435 mm between the reference rail 3 and the other rail 4. .
First, the reference rail side
Next, the
Next, as shown in FIG. 5, the laser marking device 2 is placed on the placing
In this state, by aligning the scale of the ruler 6 (staff or curve measure) placed on the platform 5 and the ceiling ink C, and positioning the
以上、軌間が1435mmの軌道の軌道中心線に基づいて、プラットホーム5上に墨出しを行う例について説明したが、軌間の違いによるそれぞれの軌道中心線は、測量用軌道定規1の載置板60に形成されたケガキ線62a、62b、62cによって認識することができ、レーザー墨出し器2の載置位置を変えるだけで対応することができる。
The example in which marking is performed on the platform 5 based on the trajectory center line of the trajectory having a gauge of 1435 mm has been described above, but each trajectory center line due to the difference between the gauges indicates the mounting
また、レーザー墨出し器2は、基準レール3の内側に地墨Aを合わせて載置するようにしても良い。この場合には、切り抜き窓63を跨ぐようにレーザー墨出し器2を載置板60上に載置させ、図6(a)に示すように、地墨Aを基準レール3の内側と、基準レール側第2当接部材40の傾斜面43に形成されたケガキ線44及び載置板60に形成されたケガキ線61の延長線との交点に位置させる。そして、縦ラインBの床墨部分をケガキ線61に合わせる。これにより、レーザー墨出し器2から出力される縦ラインBが基準レール3に対して直角方向に調整される。
Further, the laser marking device 2 may be placed with the ground ink A inside the reference rail 3. In this case, the laser marking device 2 is placed on the
なお、レーザー墨出し器2は、基準レール3の内側に地墨Aを合わせて載置した場合には、基準レール側第1当接部材に形成されたケガキ線33(直角度検証目印)を用いて、測量用軌道定規1自体の直角度を検証することができる。直角度の検証のために、図6(b)、(c)に示すように、レーザー墨出し器2からケガキ線61に合わせた縦ラインBと直角な縦ラインDを出力させる。正常な測量用軌道定規1では、図6(b)に示すように、ケガキ線33と縦ラインDとが平行で一致する。これに対して、基準レール側第1当接部材30a、30bのアーム部20への取り付けが緩む等の要因で直角度が維持されていない測量用軌道定規1では、図6(c)に示すように、ケガキ線33と縦ラインDとが平行にならず、不一致になる。従って、ケガキ線33と縦ラインDとを観察することで、一連の墨出し作業中に測量用軌道定規1自体の直角度を検証することができる。
In addition, when the laser marking device 2 is placed with the ground mark A on the inner side of the reference rail 3, the laser marking device 2 displays the marking line 33 (squareness verification mark) formed on the reference rail side first contact member. It is possible to verify the squareness of the surveying orbit ruler 1 itself. For verification of the squareness, as shown in FIGS. 6B and 6C, a vertical line D perpendicular to the vertical line B aligned with the marking
さらに、曲線区間の軌道に測量用軌道定規1を直角位置決めした場合には、軌道中心線とケガキ線62a、62b、62c(軌道中心認識目印)とに若干の誤差が生じる。しかしながら、この軌道中心線の誤差は数mm程度であり、誤差を勘案した計画距離決定したり、プラットホーム5上での墨出し時に修正を行ったりすることで対応することができる。また、基準レール側第1当接部材に形成されたケガキ線33(直角度検証目印)を用いて誤差を測定することもできる。誤差測定のために、図7に示すように、レーザー墨出し器2からケガキ線61に合わせた縦ラインBと直角な縦ラインDを出力させる。縦ラインDは、ケガキ線33と平行に出力され、縦ラインDとケガキ線33との間隔dWが軌道中心線の誤差となる。
Further, when the surveying track ruler 1 is positioned at right angles to the curved track, a slight error occurs between the track center line and the marking
なお、本実施の形態では、直角度検証目印、直角度認識目印及び軌道中心認識目印としてケガキ線を形成したが、直角度検証目印、軌道中心認識目印及び直角度認識目印は、ケガキ線に限定されるものではなく、点線やその他のマークで形成したり、印刷によって形成したりしても良い。 In this embodiment, the marking lines are formed as the perpendicularity verification mark, the perpendicularity recognition mark, and the trajectory center recognition mark. However, the perpendicularity verification mark, the trajectory center recognition mark, and the perpendicularity recognition mark are limited to the marking line. However, it may be formed by dotted lines or other marks, or may be formed by printing.
また、本実施の形態では、軌間が1067mm、1372mm、1435mmの3種類の軌道での使用を想定した測量用軌道定規1について説明したが、国内の一部で使用されている軌間が762mmの軌道に対応させることもできる。この場合には、軌間が1435mmの軌道との互換性が不可能であるため、狭軌用として軌間が762mmと軌道と軌間が1067mmの軌道とに対して共用可能に構成すると良い。 Further, in this embodiment, the surveying orbit ruler 1 that is assumed to be used in three types of tracks with a gauge of 1067 mm, 1372 mm, and 1435 mm has been described. However, a track with a gauge of 762 mm that is used in a part of Japan. It can be made to correspond to. In this case, since compatibility with a 1435 mm track is impossible, it may be configured to be shared with a 762 mm track and a track with 1067 mm track for a narrow track.
さらに、本実施の形態では、測量用軌道定規1に必要な強度と、軽量化との兼ね合いから、ロッド部10a、10b及びアーム部20をアルミ角材としたが、ロッド部10a、10b及びアーム部20を他の構成と同様にMCナイロン等の絶縁材料で構成しても良く、載置板60を他方レール4まで延出させてロッド部10a、10bとして機能させたり、載置板60の幅を広げることでアーム部20として機能させたりすることもできる。
Furthermore, in the present embodiment, the
以上、説明したように本実施の形態は、基準レール3と他方レール4との間に橋架されるロッド部10a、10bと、ロッド部10a、10bに対して直角に取り付けられたアーム部20と、基準レール3の内側に当接することで、アーム部20を基準レール3の軌道方向に対して平行に位置決めする基準ピン32と、基準レール3の軌道方向に対する直角方向を示す直角度認識目印(ケガキ線61)が形成された載置板60とを備えている。この構成により、レーザー墨出し器2を載置板60に載置させ、直角度認識目印(ケガキ線61)に縦ラインBを合わせることで、軌道構造に拘わらず、レーザー墨出し器2による直角方向のライン出しを速やか且つ正確に行うことができる。
As described above, in the present embodiment, the
さらに、本実施の形態において、載置板60には、軌道中心線を示す軌道中心認識目印(ケガキ線62a、62b、62c)が形成されている。この構成により、レーザー墨出し器2の地墨Aを直角度認識目印(ケガキ線61)と、軌道中心認識目印(ケガキ線62a、62b、62c)との交点に合わせることで、簡単に軌道中心線からの墨出しを行うことができる。
Further, in the present embodiment, on the mounting
さらに、本実施の形態において、載置板60には、基準レール3の内側を視認可能な切り抜き窓63が形成されている。この構成により、レーザー墨出し器2の地墨Aを直角度認識目印(ケガキ線61)と、基準レール3の内側との交点に合わせることで、簡単に基準レール3の内側からの墨出しを行うことができる。
Further, in the present embodiment, the mounting
さらに、本実施の形態は、アーム部20の両端部分にそれぞれ取り付けられた、基準レール3の踏面に当接する一対の基準レール側第1当接部材30a、30bを備え、基準ピン32は、一対の基準レール側第1当接部材30a、30bのそれぞれに立設されている。この構成により、簡単且つ正確に、アーム部20を基準レール3の軌道方向に対して平行に位置決めすることができる。
Furthermore, the present embodiment includes a pair of reference rail side
さらに、本実施の形態において、基準ピン32は、基準レール側第1当接部材30a、30bの基準レール3の踏面との当接面31に対して垂直な方向を軸とするカムフォロアで構成されている。この構成により、軌道方向の位置合わせに際し、基準ピン32を基準レール3に対して均一に摺動させることができ、長期使用による摩耗を抑えることができる。
Further, in the present embodiment, the
さらに、本実施の形態において、基準レール側第1当接部材30a、30bには、基準レール3の軌道方向に対する平行方向を示す直角度検証目印(ケガキ線33)が形成されている。この構成により、
レーザー墨出し器2を基準レール3の内側に地墨Aを合わせて載置し、ケガキ線61に合わせた縦ラインBと直角な縦ラインDを出力させることで、一連の墨出し作業中に測量用軌道定規1自体の直角度を検証することができると共に、曲線区間における軌道中心線の誤差を測定することができる。
Further, in the present embodiment, the reference rail side
The laser marking device 2 is placed inside the reference rail 3 with the ground ink A aligned, and the vertical line D perpendicular to the vertical line B aligned with the marking
なお、本発明が上記各実施の形態に限定されず、本発明の技術思想の範囲内において、各実施の形態は適宜変更され得ることは明らかである。また、上記構成部材の数、位置、形状等は上記実施の形態に限定されず、本発明を実施する上で好適な数、位置、形状等にすることができる。なお、各図において、同一構成要素には同一符号を付している。 Note that the present invention is not limited to the above-described embodiments, and it is obvious that the embodiments can be appropriately changed within the scope of the technical idea of the present invention. In addition, the number, position, shape, and the like of the constituent members are not limited to the above-described embodiment, and can be set to a suitable number, position, shape, and the like in practicing the present invention. In each figure, the same numerals are given to the same component.
1 測量用軌道定規
2 レーザー墨出し器
3 基準レール
4 他方レール
5 プラットホーム
6 定規
10a、10b ロッド部
11、21 絶縁ブロック
20 アーム部
30a、30b 基準レール側第1当接部材
31 当接面
32 基準ピン
33 ケガキ線(直角度検証目印)
40 基準レール側第2当接部材
41 当接面
42 一片
43 傾斜面
44 ケガキ線(直角度認識目印)
50a、50b 他方レール側当接部材
51 当接面
52 一片
53 傾斜面
54 ケガキ線
60 載置板
61 ケガキ線
62a、62b、62c ケガキ線(軌道中心認識目印)
63 切り抜き窓
DESCRIPTION OF SYMBOLS 1 Surveying ruler 2 Laser marking device 3 Reference rail 4 Other rail 5
40 Reference rail side
50a, 50b The other rail
63 Cutout window
Claims (4)
前記ロッド部に対して直角に取り付けられたアーム部と、
前記基準レールの内側に当接することで、前記アーム部を前記基準レールの軌道方向に対して平行に位置決めする基準ピンと、
前記基準レールの軌道方向に対する直角方向を示す直角度認識目印が形成された載置板と、
前記アーム部の両端部分にそれぞれ取り付けられた、前記基準レールの踏面に当接する一対の基準レール側第1当接部材とを具備し、
前記基準ピンは、一対の前記基準レール側第1当接部材のそれぞれに立設され、
前記基準レール側第1当接部材には、前記基準レールの軌道方向に対する平行方向を示す直角度検証目印が形成され、
前記直角度検証目印は、前記ロッド部が前記基準レールに対して直角位置決めされた状態で、上方側から見て前記基準レールの内側と一致する位置に形成されていることを特徴とする測量用軌道定規。 A rod section bridged between the reference rail and the other rail;
An arm portion attached at right angles to the rod portion;
A reference pin for positioning the arm portion parallel to the track direction of the reference rail by abutting the inside of the reference rail;
A mounting plate on which a perpendicularity recognition mark indicating a direction perpendicular to the track direction of the reference rail is formed ;
A pair of reference rail side first abutting members attached to both end portions of the arm portion and abutting against the tread surface of the reference rail,
The reference pin is erected on each of the pair of reference rail side first contact members,
The reference rail side first contact member is formed with a squareness verification mark indicating a direction parallel to the track direction of the reference rail,
The squareness verification mark is formed at a position that coincides with the inside of the reference rail when viewed from above in a state where the rod portion is positioned at right angles to the reference rail . Orbital ruler.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2012283963A JP5863635B2 (en) | 2012-12-27 | 2012-12-27 | Surveying orbital ruler |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2012283963A JP5863635B2 (en) | 2012-12-27 | 2012-12-27 | Surveying orbital ruler |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2014126474A JP2014126474A (en) | 2014-07-07 |
JP5863635B2 true JP5863635B2 (en) | 2016-02-16 |
Family
ID=51406085
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2012283963A Active JP5863635B2 (en) | 2012-12-27 | 2012-12-27 | Surveying orbital ruler |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP5863635B2 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6613195B2 (en) * | 2016-03-31 | 2019-11-27 | 株式会社奥村組 | Inking equipment |
CN108955486A (en) * | 2018-09-04 | 2018-12-07 | 中建安装工程有限公司 | A kind of subway line center Relative ranging device |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0516804A (en) * | 1991-07-16 | 1993-01-26 | East Japan Railway Co | Simplified measuring device for track |
JP3096712B2 (en) * | 1994-09-08 | 2000-10-10 | 小田急建設株式会社 | Orbit right angle ruler |
JPH1082876A (en) * | 1996-08-07 | 1998-03-31 | Sankyo Trading:Kk | Support base for laser beam irradiation device, and reference marking method by laser beam irradiation |
JP4273854B2 (en) * | 2003-06-18 | 2009-06-03 | 株式会社浅羽製作所 | Obstacle limit measuring device mount |
JP3939730B2 (en) * | 2005-07-05 | 2007-07-04 | 東日本旅客鉄道株式会社 | Sleeper perpendicularity measuring device |
JP5645588B2 (en) * | 2010-10-15 | 2014-12-24 | 鉄建建設株式会社 | Building limit measuring device and building limit measuring method |
-
2012
- 2012-12-27 JP JP2012283963A patent/JP5863635B2/en active Active
Also Published As
Publication number | Publication date |
---|---|
JP2014126474A (en) | 2014-07-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109515252B (en) | Trackless measurement construction method for subway contact network | |
US9650229B2 (en) | Aligning shaft doors of an elevator | |
CN102828470B (en) | Method for locating main girder cable sleeve of cable-stayed bridge | |
CN103278146B (en) | Measurement and mounting method of target spots on plane calibration target plate | |
CN108680103A (en) | A kind of cable-stayed bridge superelevation bridge tower pier anchor structure Rapid precision locating measurement method | |
CN105674967A (en) | Method for measuring rail transportation shaft relation | |
JP5863635B2 (en) | Surveying orbital ruler | |
CN110193671B (en) | Installation and adjustment method for base of cold-rolled large-sized plate strip laser welding machine | |
JP2006343260A (en) | Appliance and method for measuring size of gauge line | |
CN219077211U (en) | Single-point constraint measuring instrument for railway track coordinates | |
CN111974960A (en) | Integral installation method for replacing guide rail of segmented fan-shaped section of continuous casting machine | |
CN105648861A (en) | Rail track measuring mark point positioning method | |
CN116590967A (en) | Method for controlling pushing connection precision of magnetic levitation turnout in overhead section | |
KR101874636B1 (en) | Multi-horizontal fixing equipment for displacement measurement in transmission tower | |
CN112444230B (en) | Rigid contact net tunnel suspension post bottom plate angle trackless measuring method | |
CN107841949A (en) | A kind of building technology of inverted trapezoidal Bridge beam assembly moulding bed | |
CN202522213U (en) | High-speed rail measurement control point CPIII marking post detector | |
KR100812126B1 (en) | Measurement apparatus of a structure over turn | |
CN112575637B (en) | Joint type turnout line type detection method | |
CN102564375B (en) | High-speed rail measurement control point CPIII marking post detector | |
CN109973099B (en) | Method for monitoring vertical displacement of bridge type shield rail | |
CN102674127B (en) | Positioning device and positioning method for oblique handrail supports of moving pavement | |
JPH07270157A (en) | Setting method of reference device for installing railway and measuring apparatus used therefor | |
JP3315101B2 (en) | Track measuring instrument for track laying and track slab measuring instrument | |
CN108317972B (en) | System for measuring eccentricity between rail center and bridge center |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20140807 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20150515 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20150526 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20150713 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20151215 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20151222 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 5863635 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |