JP5823210B2 - Injection molding machine and setting support device for injection molding machine - Google Patents

Injection molding machine and setting support device for injection molding machine Download PDF

Info

Publication number
JP5823210B2
JP5823210B2 JP2011190060A JP2011190060A JP5823210B2 JP 5823210 B2 JP5823210 B2 JP 5823210B2 JP 2011190060 A JP2011190060 A JP 2011190060A JP 2011190060 A JP2011190060 A JP 2011190060A JP 5823210 B2 JP5823210 B2 JP 5823210B2
Authority
JP
Japan
Prior art keywords
resin
screw
cavity
molding machine
injection molding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2011190060A
Other languages
Japanese (ja)
Other versions
JP2013052509A (en
Inventor
清家 幸治
幸治 清家
哲夫 針井
哲夫 針井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Heavy Industries Ltd
Original Assignee
Sumitomo Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Heavy Industries Ltd filed Critical Sumitomo Heavy Industries Ltd
Priority to JP2011190060A priority Critical patent/JP5823210B2/en
Priority to CN201210231912.0A priority patent/CN102962971B/en
Publication of JP2013052509A publication Critical patent/JP2013052509A/en
Application granted granted Critical
Publication of JP5823210B2 publication Critical patent/JP5823210B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Injection Moulding Of Plastics Or The Like (AREA)

Description

本発明は、射出成形機、および射出成形機の設定支援装置に関する。   The present invention relates to an injection molding machine and a setting support device for an injection molding machine.

射出成形機を用いた成形方法は、計量工程、充填工程、保圧工程などを含む。計量工程では、加熱シリンダ内のスクリュの前方に所定量の溶融樹脂が供給され、溶融樹脂の圧力を受けてスクリュが後退する。充填工程では、スクリュが前進することにより、溶融樹脂が加熱シリンダから射出され金型装置内のキャビティに供給される。このときのスクリュ前方の溶融樹脂に加わる圧力が充填圧力として検出される。充填工程の終わりで、スクリュの制御は、速度制御から圧力制御に切り換えられる。この切り換えは、V(速度)/P(圧力)切り換えと呼ばれており、キャビティ内で成形される成形品の品質を左右する。V/P切り換えの後、保圧工程では、充填圧力を一定に保ちながら、キャビティ内の樹脂を冷却する。保圧工程における充填圧力の目標値は、キャビティ内での樹脂のヒケの発生を抑制できる値に設定される。   A molding method using an injection molding machine includes a weighing process, a filling process, a pressure holding process, and the like. In the metering step, a predetermined amount of molten resin is supplied in front of the screw in the heating cylinder, and the screw moves backward under the pressure of the molten resin. In the filling step, when the screw moves forward, the molten resin is injected from the heating cylinder and supplied to the cavity in the mold apparatus. The pressure applied to the molten resin in front of the screw at this time is detected as the filling pressure. At the end of the filling process, the screw control is switched from speed control to pressure control. This switching is called V (speed) / P (pressure) switching, and affects the quality of a molded product molded in the cavity. After the V / P switching, in the pressure holding process, the resin in the cavity is cooled while keeping the filling pressure constant. The target value of the filling pressure in the pressure holding process is set to a value that can suppress the occurrence of resin sink in the cavity.

近年、充填工程の途中でスクリュの前進速度を減速し、スクリュを停止してスクリュ位置を維持する技術が提案されている(例えば、特許文献1参照)。充填工程開始後、スクリュが前進して設定位置に到達したとき、その設定位置にスクリュを設定時間(例えば、0.5秒)だけ停止する。あるいは、充填工程開始後、充填圧力が設定圧に達したとき、そのとき到達している位置でスクリュを設定時間だけ停止してもよい。このように、保圧工程の前に、スクリュ位置を設定時間だけ維持することにより、成形品のバリやヒケ、反りなどを低減できることが実証されている。   In recent years, a technique has been proposed in which the screw forward speed is decelerated during the filling process, the screw is stopped, and the screw position is maintained (for example, see Patent Document 1). When the screw advances and reaches the set position after the filling process starts, the screw is stopped at the set position for a set time (for example, 0.5 seconds). Alternatively, after the filling process starts, when the filling pressure reaches the set pressure, the screw may be stopped for a set time at the position reached at that time. As described above, it has been proved that by maintaining the screw position for a set time before the pressure-holding step, burrs, sink marks, warpage, and the like of the molded product can be reduced.

特開2004−216787号公報JP 2004-216787 A

ところで、成形品の品質は、例えばスクリュの前進速度の減速を開始するタイミング、保圧工程を開始するタイミング、保圧工程における充填圧力の目標値など様々な成形条件に依存する。従来、これらの成形条件の設定は、熟練者の経験や勘に頼ることが多かった。   By the way, the quality of the molded product depends on various molding conditions such as timing for starting deceleration of the forward speed of the screw, timing for starting the pressure holding step, and a target value of the filling pressure in the pressure holding step. Conventionally, the setting of these molding conditions often relies on the experience and intuition of skilled workers.

本発明は、上記課題に鑑みてなされたものであって、成形条件の設定を支援できる射出成形機および射出成形機の設定支援装置の提供を目的とする。   The present invention has been made in view of the above problems, and an object of the present invention is to provide an injection molding machine and an injection molding machine setting support device that can support the setting of molding conditions.

上記目的を解決するため、本発明の一の実施形態による射出成形機は、
溶融樹脂を収容する加熱シリンダと、該加熱シリンダ内を進退自在なスクリュとを備え、該スクリュが前進することにより、前記溶融樹脂が前記加熱シリンダから射出され金型装置内のキャビティに供給される射出成形機において、
前記スクリュの前進速度の減速開始以降における前記キャビティ内の樹脂の質量増加量および/または流動先端伸長量を樹脂の状態方程式に基づいて検出する検出部を備える。
In order to solve the above-described object, an injection molding machine according to an embodiment of the present invention includes:
A heating cylinder that accommodates the molten resin and a screw that can move forward and backward in the heating cylinder are provided, and when the screw moves forward, the molten resin is injected from the heating cylinder and supplied to the cavity in the mold apparatus. In injection molding machine,
A detection unit is provided for detecting an increase in the mass of the resin in the cavity and / or an extension amount of the flow front after the start of deceleration of the forward speed of the screw based on a state equation of the resin.

また、本発明の他の実施形態による射出成形機の設定支援装置は、
溶融樹脂を収容する加熱シリンダと、該加熱シリンダ内を進退自在なスクリュとを備え、該スクリュが前進することにより、前記溶融樹脂が前記加熱シリンダから射出され金型装置内のキャビティに供給される射出成形機の設定支援装置において、
前記スクリュの前進速度の減速開始以降における前記キャビティ内の樹脂の質量増加量および/または流動先端伸長量を樹脂の状態方程式に基づいて検出する検出部を備える。
In addition, an injection molding machine setting support apparatus according to another embodiment of the present invention,
A heating cylinder that accommodates the molten resin and a screw that can move forward and backward in the heating cylinder are provided, and when the screw moves forward, the molten resin is injected from the heating cylinder and supplied to the cavity in the mold apparatus. In the setting support device of an injection molding machine,
A detection unit is provided for detecting an increase in the mass of the resin in the cavity and / or an extension amount of the flow front after the start of deceleration of the forward speed of the screw based on a state equation of the resin.

本発明によれば、成形条件の設定を支援できる射出成形機および射出成形機の設定支援装置が提供される。   ADVANTAGE OF THE INVENTION According to this invention, the setting assistance apparatus of the injection molding machine and injection molding machine which can assist the setting of molding conditions is provided.

本発明の一実施形態による射出成形機の模式図Schematic diagram of an injection molding machine according to an embodiment of the present invention. 充填工程におけるスクリュ前進速度の時間変化を示す図The figure which shows the time change of the screw advance speed in the filling process 充填工程および保圧工程における充填圧力の時間変化を示す図The figure which shows the time change of the filling pressure in the filling process and the pressure holding process. 樹脂の状態方程式(PvT特性)を示す模式図Schematic diagram showing resin equation of state (PvT characteristics) 成形品の質量Mと、質量増加量ΔWと、初期質量Nと、充填ピーク圧力P1との関係を示す図The figure which shows the relationship between the mass M of a molded article, mass increase amount (DELTA) W, initial mass N, and filling peak pressure P1. 成形品の伸長量Lと、流動先端伸長量ΔLと、初期伸長量Kと、充填ピーク圧力P1との関係を示す図The figure which shows the relationship between the elongation amount L of the molded article, the flow tip extension amount ΔL, the initial extension amount K, and the filling peak pressure P1.

以下、本発明を実施するための形態について図面を参照して説明するが、各図面において、同一のまたは対応する構成については同一のまたは対応する符号を付して説明を省略する。   DESCRIPTION OF EMBODIMENTS Hereinafter, embodiments for carrying out the present invention will be described with reference to the drawings. In each of the drawings, the same or corresponding components are denoted by the same or corresponding reference numerals, and description thereof is omitted.

図1は、本発明の一実施形態による射出成形機の模式図である。図1に示すように、射出成形機10は、フレームFrと、フレームFr上に配置される射出装置20とを備える。   FIG. 1 is a schematic view of an injection molding machine according to an embodiment of the present invention. As shown in FIG. 1, the injection molding machine 10 includes a frame Fr and an injection device 20 disposed on the frame Fr.

射出装置20は、加熱シリンダ21を備える。加熱シリンダ21の外周にはヒータ21aが設けられおり、加熱シリンダ21の温度を設定温度に保つことができる。   The injection device 20 includes a heating cylinder 21. A heater 21 a is provided on the outer periphery of the heating cylinder 21, and the temperature of the heating cylinder 21 can be kept at a set temperature.

加熱シリンダ21にはホッパ22が設けられる。加熱シリンダ21内にはスクリュ23が進退自在かつ回転自在に設けられる。スクリュ23の後端は可動支持部24によって回転自在に支持される。   The heating cylinder 21 is provided with a hopper 22. A screw 23 is provided in the heating cylinder 21 so as to be movable forward and backward and rotatable. The rear end of the screw 23 is rotatably supported by the movable support portion 24.

可動支持部24にはサーボモータ等の計量モータ25が取り付けられる。計量モータ25の回転は出力軸31に取り付けられたタイミングベルト26を介してスクリュ23に伝達される。   A measuring motor 25 such as a servo motor is attached to the movable support portion 24. The rotation of the metering motor 25 is transmitted to the screw 23 via a timing belt 26 attached to the output shaft 31.

計量モータ25の出力軸31の後端には回転検出器32が接続されている。回転検出器32は、計量モータ25の回転数又は回転量を検出することで、スクリュ23の回転量を検出する。   A rotation detector 32 is connected to the rear end of the output shaft 31 of the weighing motor 25. The rotation detector 32 detects the rotation amount of the screw 23 by detecting the rotation number or rotation amount of the metering motor 25.

射出装置20は、スクリュ23と平行なボールねじ軸27を有する。ボールねじ軸27はボールねじナット36と螺合し、回転運動を直線運動へ変換する運動方向変換機構を構成する。   The injection device 20 has a ball screw shaft 27 parallel to the screw 23. The ball screw shaft 27 is screwed with the ball screw nut 36 to constitute a motion direction conversion mechanism that converts rotational motion into linear motion.

射出モータ29を駆動し、タイミングベルト28を介してボールねじ軸27を回転させると、ボールねじナット36に固定された可動支持部24及びサポート30が進退する。その結果、スクリュ23が進退する。   When the injection motor 29 is driven and the ball screw shaft 27 is rotated via the timing belt 28, the movable support portion 24 and the support 30 fixed to the ball screw nut 36 advance and retract. As a result, the screw 23 advances and retreats.

射出モータ29の出力軸33の後端に接続された位置検出器34は、射出モータ29の回転数又は回転量を検出することで、スクリュ23の位置を検出する。   A position detector 34 connected to the rear end of the output shaft 33 of the injection motor 29 detects the position of the screw 23 by detecting the rotation speed or rotation amount of the injection motor 29.

また、可動支持部24とサポート30との間には、スクリュ23に加えられた溶融樹脂の圧力(反力)を検出するための圧力検出器(例えば、ロードセル)35が備えられている。   In addition, a pressure detector (for example, a load cell) 35 for detecting the pressure (reaction force) of the molten resin applied to the screw 23 is provided between the movable support portion 24 and the support 30.

射出装置20は、射出装置20を駆動してノズルタッチ圧を印加する駆動機構として移動装置40を備えている。移動装置40は、移動駆動部41とガイド部42とから構成されている。ガイド部42は、射出装置20を構成する可動支持部24、サポート30及び前部フランジ43と係合している。前部フランジ部43で加熱シリンダ21が支持されている。   The injection device 20 includes a moving device 40 as a drive mechanism that drives the injection device 20 and applies a nozzle touch pressure. The moving device 40 includes a movement driving unit 41 and a guide unit 42. The guide portion 42 is engaged with the movable support portion 24, the support 30, and the front flange 43 that constitute the injection device 20. The heating cylinder 21 is supported by the front flange portion 43.

射出装置20は、ガイド部42に沿って、フレームFr上で水平に移動することができる。上述の移動装置40を駆動することにより、所定のタイミングで射出装置20を前進させて加熱シリンダ21のノズル部を金型装置50に当接させ、ノズルタッチを行う。   The injection device 20 can move horizontally on the frame Fr along the guide portion 42. By driving the above-described moving device 40, the injection device 20 is advanced at a predetermined timing, the nozzle portion of the heating cylinder 21 is brought into contact with the mold device 50, and nozzle touch is performed.

計量モータ25、回転検出器32、射出モータ29、位置検出器34、および圧力検出器35は、制御装置60に接続されている。回転検出器32、位置検出器34、及び圧力検出器35から出力される検出信号は、制御装置60に送られる。制御装置60は、検出信号に基づいて計量モータ25及び射出モータ29の動作を制御する。   The weighing motor 25, the rotation detector 32, the injection motor 29, the position detector 34, and the pressure detector 35 are connected to the control device 60. Detection signals output from the rotation detector 32, the position detector 34, and the pressure detector 35 are sent to the control device 60. The control device 60 controls the operations of the metering motor 25 and the injection motor 29 based on the detection signal.

なお、スクリュ駆動源として、射出モータ29の代わりに、例えば空気圧シリンダや油圧シリンダなどの流体圧シリンダを用いてもよく、スクリュ駆動源は特に限定されない。   As the screw drive source, a fluid pressure cylinder such as a pneumatic cylinder or a hydraulic cylinder may be used instead of the injection motor 29, and the screw drive source is not particularly limited.

なお、制御装置60は単独で設けられてもよいし、射出成形機全体の制御を司る制御部の一部として設けられてもよい。   In addition, the control apparatus 60 may be provided independently and may be provided as a part of control part which manages control of the whole injection molding machine.

次に、上記構成の射出成形機の動作(成形方法)について説明する。この成形方法は、計量工程、充填工程、保圧工程を有する。   Next, the operation (molding method) of the injection molding machine configured as described above will be described. This forming method has a measuring step, a filling step, and a pressure holding step.

計量工程では、計量モータ25によって加熱シリンダ21内に配置されているスクリュ23を回転させる。ホッパ22から加熱シリンダ21内のスクリュ23の後部に樹脂が供給される。スクリュ23の回転により、供給されてきた樹脂を溶融させながら加熱シリンダ21の前端部に一定量送り込む。この間、加熱シリンダ21の前端部に溜まってゆく溶融樹脂の圧力(背圧)を受けながらスクリュ23は後退する。   In the measuring step, the screw 23 arranged in the heating cylinder 21 is rotated by the measuring motor 25. Resin is supplied from the hopper 22 to the rear part of the screw 23 in the heating cylinder 21. By rotating the screw 23, a certain amount is fed into the front end portion of the heating cylinder 21 while melting the supplied resin. During this time, the screw 23 moves backward while receiving the pressure (back pressure) of the molten resin accumulated at the front end of the heating cylinder 21.

次いで、充填工程では、スクリュ23が前進することにより、スクリュ23の前方に蓄えられた溶融樹脂が加熱シリンダ21のノズル部から射出される。この時のスクリュ23の前方の溶融樹脂に加わる圧力が充填圧力として圧力検出器35に検出される。加熱シリンダ21のノズル部から射出された樹脂は、金型装置50内に供給され、スプル53、ランナ54などを介してキャビティ55に供給される。キャビティ55は、金型装置50を構成する可動金型51と固定金型52とを型閉じ、型締めして形成される。   Next, in the filling step, the molten resin stored in front of the screw 23 is injected from the nozzle portion of the heating cylinder 21 as the screw 23 moves forward. The pressure applied to the molten resin in front of the screw 23 at this time is detected by the pressure detector 35 as a filling pressure. The resin injected from the nozzle portion of the heating cylinder 21 is supplied into the mold apparatus 50 and supplied to the cavity 55 via the sprue 53, the runner 54, and the like. The cavity 55 is formed by closing the movable mold 51 and the fixed mold 52 constituting the mold apparatus 50 and clamping the mold.

図2は、充填工程におけるスクリュ前進速度の時間変化を示す図である。図3は、充填工程および保圧工程における充填圧力の時間変化を示す図である。図2および図3において、横軸は充填工程開始時からの経過時間tである。   FIG. 2 is a diagram showing a temporal change in the screw advance speed in the filling process. FIG. 3 is a diagram illustrating a change over time in the filling pressure in the filling step and the pressure holding step. 2 and 3, the horizontal axis represents the elapsed time t from the start of the filling process.

充填工程は、第1期と、第2期とからなる。第1期では、例えばスクリュ23の前進速度が0から加速され、所定速度で維持される。充填圧力は、図3に示すように徐々に増加してピーク値P1(以下、「充填ピーク圧力P1」という)になる。   The filling process includes a first period and a second period. In the first period, for example, the forward speed of the screw 23 is accelerated from 0 and maintained at a predetermined speed. The filling pressure gradually increases to a peak value P1 (hereinafter referred to as “filling peak pressure P1”) as shown in FIG.

第1期の開始後、スクリュ23が前進して設定位置に到達したとき(t=t1)、第2期が開始される。第1期の開始後、充填圧力が設定圧に達したときに、第2期が開始されてもよい。第2期の開始時、キャビティ55内に樹脂は完全には充填されていない。   When the screw 23 moves forward and reaches the set position after the start of the first period (t = t1), the second period is started. After the start of the first period, the second period may be started when the filling pressure reaches the set pressure. At the start of the second phase, the cavity 55 is not completely filled with resin.

第2期では、図2に示すようにスクリュ23の前進速度が急速に減速されて0になり、スクリュ位置が設定時間だけ維持される。その結果、図3に示すように、樹脂の充填圧力がP1からP3に徐々に低下する。よって、詳しくは後述するが、温度が設定温度に保たれている加熱シリンダ21内において、充填圧力の低下に伴い、樹脂の比容積が増加する。その結果、加熱シリンダ21内の溶融樹脂の体積が増加するが、スクリュ23は停止しているため、増加分の樹脂が加熱シリンダ21から溢れる。溢れた分の樹脂がキャビティ55内に流れ込む。   In the second period, as shown in FIG. 2, the forward speed of the screw 23 is rapidly reduced to 0, and the screw position is maintained for a set time. As a result, as shown in FIG. 3, the filling pressure of the resin gradually decreases from P1 to P3. Therefore, as will be described in detail later, in the heating cylinder 21 in which the temperature is maintained at the set temperature, the specific volume of the resin increases as the filling pressure decreases. As a result, although the volume of the molten resin in the heating cylinder 21 increases, the screw 23 is stopped, so that the increased amount of resin overflows from the heating cylinder 21. The overflowed resin flows into the cavity 55.

なお、本実施形態の第2期では、スクリュ位置が設定時間だけ維持され、スクリュ23が設定時間だけ停止するが、設定時間の間に、スクリュ23が微速前進してもよい。   In the second period of the present embodiment, the screw position is maintained for the set time and the screw 23 is stopped for the set time. However, the screw 23 may advance at a low speed during the set time.

設定時間が経過すると(t=t2)、保圧工程が開始される。このとき、スクリュ23の制御が速度制御(位置制御)から圧力制御に切り換えられ、充填圧力が目標値P4に近づき始める。目標値P4はキャビティ55内での樹脂のヒケの発生を抑制できる値である限り、図3に示すように第2期終了時の充填圧力P3よりも低くても、高くても、同じでもよい。充填圧力が目標値P4になるように、圧力検出器35の検出結果に基づいて射出モータ29がフィードバック制御される。このようにして充填圧力が目標値P4に保たれながら、キャビティ55内の樹脂が冷却される。   When the set time elapses (t = t2), the pressure holding process is started. At this time, the control of the screw 23 is switched from speed control (position control) to pressure control, and the charging pressure starts to approach the target value P4. The target value P4 may be lower, higher, or the same as the filling pressure P3 at the end of the second period as shown in FIG. 3 as long as it can suppress the occurrence of resin sink in the cavity 55. . The injection motor 29 is feedback-controlled based on the detection result of the pressure detector 35 so that the filling pressure becomes the target value P4. In this way, the resin in the cavity 55 is cooled while the filling pressure is maintained at the target value P4.

キャビティ55内の樹脂を冷却固化して得られる成形品は、金型装置50の型開後、金型装置50から突き出される。   A molded product obtained by cooling and solidifying the resin in the cavity 55 is ejected from the mold device 50 after the mold device 50 is opened.

成形品の品質は、例えば、第2期開始時間(t=t1)、保圧工程開始時間(t=t2)、保圧工程における充填圧力の目標値など様々な成形条件に依存する。これらの成形条件の設定を支援する設定支援装置として、制御装置60が用いられる。   The quality of the molded product depends on various molding conditions such as the second period start time (t = t1), the pressure holding process start time (t = t2), and the target value of the filling pressure in the pressure holding process. A control device 60 is used as a setting support device that supports the setting of these molding conditions.

制御装置60は、CPU、メモリなどを含むコンピュータとして構成される。制御装置60は、後述の検出部61および導出部62に対応するコンピュータプログラムをメモリなどの記録媒体に格納している。制御装置60は、これらのコンピュータプログラムをCPUに実行させることにより、検出部61および導出部62が有する機能を実現する。   The control device 60 is configured as a computer including a CPU, a memory, and the like. The control device 60 stores a computer program corresponding to a detection unit 61 and a derivation unit 62 described later in a recording medium such as a memory. The control device 60 realizes the functions of the detection unit 61 and the derivation unit 62 by causing the CPU to execute these computer programs.

検出部61は、第2期の開始以降(スクリュ23の前進速度の減速開始以降)におけるキャビティ55内の樹脂の質量増加量ΔWおよび/または流動先端伸長量ΔLを樹脂の状態方程式に基づいて検出する。   The detection unit 61 detects the resin mass increase amount ΔW and / or the flow tip extension amount ΔL in the cavity 55 after the start of the second period (after the start of deceleration of the forward speed of the screw 23) based on the state equation of the resin. To do.

ここで、「流動先端伸長量ΔL」とは、質量増加量ΔWに相当する伸長量を意味し、質量増加量ΔWが増えるほど、流動先端伸長量ΔLが増える。例えば第2期でキャビティ55内に樹脂が完全に充填されると、樹脂の流動先端位置が停止するが、保圧工程で樹脂が冷却して体積収縮し体積収縮分の樹脂がキャビティ55内に補充される場合、流動先端伸長量ΔLは保圧工程開始後に増えることになる。流動先端の伸長方向は、例えばキャビティ55の寸法形状、キャビティ55の樹脂注入口の位置や向きなどで決まる。   Here, the “flow tip extension amount ΔL” means an extension amount corresponding to the mass increase amount ΔW, and the flow tip extension amount ΔL increases as the mass increase amount ΔW increases. For example, when the resin is completely filled in the cavity 55 in the second period, the flow front position of the resin stops, but the resin cools and shrinks in the pressure-holding process, and the resin for the volume shrinkage enters the cavity 55. In the case of replenishment, the flow tip extension amount ΔL increases after the pressure holding process starts. The extending direction of the flow front is determined by, for example, the size and shape of the cavity 55 and the position and orientation of the resin inlet of the cavity 55.

樹脂の状態方程式は、一般的な方法で測定され、記録媒体に予め記録されたものを読み出して用いる。   The equation of state of the resin is measured by a general method, and is recorded in advance on a recording medium and used.

図4は樹脂の状態方程式(PvT特性)を示す模式図である。図4において、横軸は温度T(℃)、縦軸は比容積v(m/kg)である。図4は、圧力Pが大気圧P0(P0=0.1MPa)のときの比容積vの温度変化曲線v(P0、T)と、圧力Pが充填ピーク圧力P1(例えば、P1=50MPa)のときの比容積vの温度変化曲線v(P1、T)とを示す。 FIG. 4 is a schematic diagram showing a state equation (PvT characteristic) of the resin. In FIG. 4, the horizontal axis represents the temperature T (° C.), and the vertical axis represents the specific volume v (m 3 / kg). FIG. 4 shows the temperature change curve v (P0, T) of the specific volume v when the pressure P is the atmospheric pressure P0 (P0 = 0.1 MPa), and the pressure P is the filling peak pressure P1 (for example, P1 = 50 MPa). The temperature change curve v (P1, T) of the specific volume v is shown.

図4に示すように、樹脂の比容積vは、樹脂の圧力Pと、樹脂の温度Tに依存する。圧力Pが低くなるほど、比容積vが大きくなる。また、温度Tが低下するほど、比容積vが小さくなる。   As shown in FIG. 4, the specific volume v of the resin depends on the pressure P of the resin and the temperature T of the resin. As the pressure P decreases, the specific volume v increases. Further, the specific volume v decreases as the temperature T decreases.

ところで、加熱シリンダ21から射出された樹脂は、金型装置50内のスプル53、ランナ54などを介してキャビティ55に供給される。流動方向上流側(即ち、加熱シリンダ21側)ほど、圧力損失の影響で樹脂に加わる圧力が高くなる。   Incidentally, the resin injected from the heating cylinder 21 is supplied to the cavity 55 through the sprue 53, the runner 54, and the like in the mold apparatus 50. The pressure applied to the resin becomes higher due to the effect of pressure loss on the upstream side in the flow direction (that is, on the heating cylinder 21 side).

樹脂の圧力は、第2期の開始以降、徐々に低下するので、樹脂の温度が一定の場合、樹脂の比容積が大きくなる。樹脂の体積が増加すると、スクリュ位置が変わらないため、加熱シリンダ21内から樹脂が溢れる。溢れた分の樹脂がキャビティ55内に流れ込む。   Since the pressure of the resin gradually decreases after the start of the second period, the specific volume of the resin increases when the temperature of the resin is constant. When the volume of the resin increases, the screw position does not change, so the resin overflows from the heating cylinder 21. The overflowed resin flows into the cavity 55.

この流れ込み量は、温度が設定温度に保たれている加熱シリンダ21内の樹脂に加わる圧力(充填圧力)の低下量で主に定まる。加熱シリンダ21は、スプル53やランナ54に比べて容積が大きく、またスプル53やランナ54に比べて圧力低下が大きいからである。加熱シリンダ21内において、充填圧力の低下によって樹脂の比容積が増加するが、スクリュ23が停止しているので、増加分の樹脂が加熱シリンダ21から溢れる。溢れた分の樹脂がキャビティ55内に追加される。   This flow-in amount is mainly determined by the amount of decrease in pressure (filling pressure) applied to the resin in the heating cylinder 21 whose temperature is kept at the set temperature. This is because the heating cylinder 21 has a larger volume than the sprue 53 and the runner 54 and a large pressure drop compared to the sprue 53 and the runner 54. In the heating cylinder 21, the specific volume of the resin increases due to a decrease in the filling pressure. However, since the screw 23 is stopped, the increased amount of resin overflows from the heating cylinder 21. Overfilled resin is added into the cavity 55.

そこで、検出部61は、第2期の開始以降における加熱シリンダ21内の樹脂の圧力低下による比容積の増加量に基づいて、キャビティ55内の樹脂の質量増加量ΔWおよび流動先端伸長量ΔLを検出する。質量増加量ΔWや流動先端伸長量ΔLは、保圧工程開始時間t2が後述の所定時間t3(t3>t1)以下か否かで場合分けして算出される。   Therefore, the detection unit 61 calculates the mass increase amount ΔW and the flow tip extension amount ΔL of the resin in the cavity 55 based on the increase amount of the specific volume due to the pressure decrease of the resin in the heating cylinder 21 after the start of the second period. To detect. The mass increase amount ΔW and the flow tip extension amount ΔL are calculated according to whether the pressure holding process start time t2 is equal to or less than a predetermined time t3 (t3> t1) described later.

所定時間t3は、キャビティ55の樹脂の一部が固化し、キャビティ55内への樹脂の注入が実質的に終了する時間である。所定時間t3は、樹脂の種類、加熱シリンダ21内の溶融樹脂の温度、可動金型51や固定金型52の温度などで定まり、例えば下記の式(1)で算出される。
t3=s/(π×α)×ln{4/π×(θr−θm)/(θe−θm)}・・・(1)
式(1)中、t3はキャビティ55内の樹脂の平均温度が温度θrから温度θeまで冷却されるまでの冷却時間(秒)、sは成形品の厚さ(mm)、αはキャビティ表面温度における樹脂の熱拡散率(mm/秒)、θrは溶融樹脂の温度(℃)、θeは樹脂の固化温度(℃)、θmはキャビティ表面温度(℃)をそれぞれ表す。
The predetermined time t3 is a time when a part of the resin in the cavity 55 is solidified and the injection of the resin into the cavity 55 is substantially finished. The predetermined time t3 is determined by the type of resin, the temperature of the molten resin in the heating cylinder 21, the temperature of the movable mold 51 and the fixed mold 52, and is calculated by the following formula (1), for example.
t3 = s 2 / (π 2 × α) × ln {4 / π × (θr−θm) / (θe−θm)} (1)
In equation (1), t3 is the cooling time (seconds) until the average temperature of the resin in the cavity 55 is cooled from the temperature θr to the temperature θe, s is the thickness (mm) of the molded product, and α is the cavity surface temperature. The thermal diffusivity of the resin in (mm 2 / sec), θr represents the temperature of the molten resin (° C.), θe represents the solidification temperature of the resin (° C.), and θm represents the cavity surface temperature (° C.).

保圧工程開始時間t2が所定時間t3を超える場合(t2>t3)、保圧工程開始以降にキャビティ55内へ樹脂が追加されない。この場合、質量増加量ΔW1(kg)は、第2期における樹脂の比容積の増加量で主に決まるので、下記の式(2)で算出される。
ΔW1={1/v(P1、T1)−1/v(P2、T1)}×SV・・・(2)
式(2)中、v(P、T)は圧力P(MPa)、温度T(℃)のときの樹脂の比容積(m/kg)を表し、状態方程式に圧力Pおよび温度Tを代入して算出される。P1は充填ピーク圧力(MPa)、P2は経過時間tが所定時間t3に達した時の充填圧力(MPa)をそれぞれ表し、圧力検出器36から取得される。T1は加熱シリンダ21内の樹脂の温度(℃)を表す。加熱シリンダ21の温度はヒータ21aで設定温度に保たれているので、その設定温度をT1として用いる。
式(2)中、SVは第2期開始時の加熱シリンダ21内の樹脂2(図1において黒色で示す部分)の容積(m)を表す。SVは位置検出器34によって検出されるスクリュ位置と、記録媒体に予め記録されたシリンダ21(ノズル部を含む)の内側空間の寸法形状とに基づいて算出される。第2期開始後、射出モータ29の回転が急停止され、スクリュ23の前進が急停止され、スクリュ23は停止しているので、SVは略一定である。なお、第2期開始後にスクリュ23が微速前進する場合、スクリュ位置の時間変化を考慮してSVを算出してよい。
When the pressure holding process start time t2 exceeds the predetermined time t3 (t2> t3), no resin is added into the cavity 55 after the pressure holding process starts. In this case, since the mass increase amount ΔW1 (kg) is mainly determined by the increase amount of the specific volume of the resin in the second period, it is calculated by the following equation (2).
ΔW1 = {1 / v (P1, T1) −1 / v (P2, T1)} × SV (2)
In the formula (2), v (P, T) represents the specific volume (m 3 / kg) of the resin at the pressure P (MPa) and the temperature T (° C.), and the pressure P and the temperature T are substituted into the equation of state. Is calculated. P1 represents the filling peak pressure (MPa), and P2 represents the filling pressure (MPa) when the elapsed time t reaches the predetermined time t3, and is obtained from the pressure detector 36. T1 represents the temperature (° C.) of the resin in the heating cylinder 21. Since the temperature of the heating cylinder 21 is kept at the set temperature by the heater 21a, the set temperature is used as T1.
In the formula (2), SV represents the volume (m 3 ) of the resin 2 (portion shown in black in FIG. 1) in the heating cylinder 21 at the start of the second period. The SV is calculated based on the screw position detected by the position detector 34 and the size and shape of the inner space of the cylinder 21 (including the nozzle portion) recorded in advance on the recording medium. After the start of the second period, the rotation of the injection motor 29 is suddenly stopped, the forward movement of the screw 23 is suddenly stopped, and the screw 23 is stopped. Therefore, SV is substantially constant. In addition, when the screw 23 moves forward at a slow speed after the start of the second period, the SV may be calculated in consideration of the time change of the screw position.

また、保圧工程開始時間t2が所定時間t3を超える場合(t2>t3)、流動先端伸長量ΔL1(m)は下記の式(3)で算出される。
ΔL1=ΔW1×v(P0、T2)/CS・・・(3)
式(3)中のv(P、T)は式(2)中のv(P、T)と同じ意味である。P0はキャビティ55内の樹脂に加わる圧力(MPa)を表す。キャビティ55は大気開放されているので、P0=0.1MPa(大気圧)とする。また、T2はキャビティ55内における樹脂の温度(℃)であって、可動金型51や固定金型52の温度と等しい。可動金型51や固定金型52の温度は温調器で設定温度に保たれているので、その設定温度をT2(T2<T1)として用いる。T2は樹脂の固化温度よりも低い温度である。CSは樹脂の流動先端位置でのキャビティ55の断面積(一定)を表す。キャビティ55の断面は樹脂の伸長方向と直交する断面である。CSは記録媒体に予め記録されている値、または入力装置(例えば、キーボード)で入力された値を用いる。金型装置50内に複数のキャビティ55が存在する場合、CSは複数のキャビティ55の断面積の合計値である。なお、樹脂の流動先端位置の移動に応じてCSが変化する場合、CSは平均値であってよい。
When the pressure holding process start time t2 exceeds the predetermined time t3 (t2> t3), the flow tip extension amount ΔL1 (m) is calculated by the following equation (3).
ΔL1 = ΔW1 × v (P0, T2) / CS (3)
V (P, T) in formula (3) has the same meaning as v (P, T) in formula (2). P0 represents the pressure (MPa) applied to the resin in the cavity 55. Since the cavity 55 is open to the atmosphere, P0 = 0.1 MPa (atmospheric pressure). T2 is the temperature (° C.) of the resin in the cavity 55 and is equal to the temperature of the movable mold 51 and the fixed mold 52. Since the temperature of the movable mold 51 and the fixed mold 52 is kept at the set temperature by the temperature controller, the set temperature is used as T2 (T2 <T1). T2 is a temperature lower than the solidification temperature of the resin. CS represents the cross-sectional area (constant) of the cavity 55 at the flow front position of the resin. The cross section of the cavity 55 is a cross section orthogonal to the extending direction of the resin. The CS uses a value recorded in advance on a recording medium or a value input with an input device (for example, a keyboard). When there are a plurality of cavities 55 in the mold apparatus 50, CS is the sum of the cross-sectional areas of the plurality of cavities 55. In addition, when CS changes according to the movement of the flow front position of the resin, CS may be an average value.

一方、保圧工程開始時間t2が所定時間t3以下の場合(t2≦t3)、保圧工程開始以降にキャビティ55に樹脂が追加されうる。この場合、質量増加量ΔW2は、第2期における樹脂の比容積の増加量の他、保圧工程開始以降にスクリュ23が前進したときの前進量に基づいて、下記の式(4)で算出される。
ΔW2={1/v(P1、T1)−1/v(P3、T1)}×SV+SL×SS/v(P4、T1)・・・(4)
式(4)中のv(P、T)、P1、T1、SVは式(2)中のv(P、T)、P1、T1、SVと同じ意味、同じ値である。P3は保圧工程開始時(充填工程完了時)の充填圧力(MPa)、P4は保圧工程における充填圧力の目標値(MPa)、SLは保圧工程開始以降にスクリュ23が前進したときの移動量(m)、SSは加熱シリンダ21の断面積(m)をそれぞれ表す。加熱シリンダ21の断面はスクリュ23の前進方向と直交する断面である。
On the other hand, when the pressure holding process start time t2 is equal to or shorter than the predetermined time t3 (t2 ≦ t3), the resin can be added to the cavity 55 after the pressure holding process starts. In this case, the mass increase amount ΔW2 is calculated by the following equation (4) based on the amount of increase in the specific volume of the resin in the second period and the advance amount when the screw 23 moves forward after the pressure holding process starts. Is done.
ΔW2 = {1 / v (P1, T1) −1 / v (P3, T1)} × SV + SL × SS / v (P4, T1) (4)
V (P, T), P1, T1, and SV in the formula (4) have the same meaning and the same values as v (P, T), P1, T1, and SV in the formula (2). P3 is the filling pressure (MPa) at the start of the pressure-holding process (at the completion of the filling process), P4 is the target value (MPa) of the filling pressure in the pressure-holding process, and SL is the time when the screw 23 advances after the pressure-holding process starts. The movement amount (m) and SS represent the cross-sectional area (m 2 ) of the heating cylinder 21, respectively. The cross section of the heating cylinder 21 is a cross section orthogonal to the forward direction of the screw 23.

SLは、スクリュ23が前進したときの移動量であるので、例えばスクリュ23が一旦後退し、その後前進する場合、前進開始時からの移動量となる。スクリュ23が一旦後退する場合としては、例えばP3がP4よりも高い場合が挙げられる。この場合、充填圧力の低下によって、スクリュ23が一旦後退することがある。スクリュ23が後退する場合、キャビティ55の樹脂注入口は狭いので、樹脂注入口からの樹脂の流出はほとんどなく、ΔWはほとんど変化しない。   Since SL is the amount of movement when the screw 23 moves forward, for example, when the screw 23 moves backward once and then moves forward, it becomes the amount of movement from the start of advancement. An example of the case where the screw 23 is once retracted includes a case where P3 is higher than P4. In this case, the screw 23 may be temporarily retracted due to a decrease in the filling pressure. When the screw 23 moves backward, since the resin injection port of the cavity 55 is narrow, there is almost no resin outflow from the resin injection port, and ΔW hardly changes.

保圧工程においてスクリュ23は基本的に前進し、キャビティ55内で樹脂が冷却されて体積収縮した分の樹脂を補充し、ヒケの発生を制限する。なお、保圧工程においてスクリュ23が後退し続ける場合、あるいはスクリュ23が動かない場合、SL=0である。   In the pressure-holding step, the screw 23 basically moves forward, replenishes the resin whose volume is shrunk by cooling the resin in the cavity 55, and limits the occurrence of sink marks. Note that SL = 0 when the screw 23 continues to move backward in the pressure holding process or when the screw 23 does not move.

また、保圧工程開始時間t2が所定時間t3以下の場合(t2≦t3)、流動先端伸長量ΔL2(m)は下記の式(5)で算出される。
ΔL2=ΔW2×v(P0、T2)/CS・・・(5)
式(5)中のv(P、T)、P0、T2、CSは式(4)中のv(P、T)、P0、T2、CSと同じ意味、同じ値である。
Further, when the pressure holding process start time t2 is equal to or shorter than the predetermined time t3 (t2 ≦ t3), the flow tip extension amount ΔL2 (m) is calculated by the following equation (5).
ΔL2 = ΔW2 × v (P0, T2) / CS (5)
V (P, T), P0, T2, and CS in Formula (5) have the same meaning and the same values as v (P, T), P0, T2, and CS in Formula (4).

このように、本実施形態によれば、第2期開始以降の質量増加量ΔWや流動先端伸長量ΔLを検出するので、検出結果と、成形品の質量や伸長量(伸長量=質量×樹脂の比容積/断面積)とに基づいて、第1期完了時のキャビティ55内の樹脂の質量や伸長量などを求めることができる。よって、後述の導出部62やユーザによる成形条件の設定を支援することができる。   Thus, according to the present embodiment, since the mass increase amount ΔW and the flow tip extension amount ΔL after the start of the second period are detected, the detection result and the mass and extension amount of the molded product (elongation amount = mass × resin (Specific volume / cross-sectional area)), the mass of the resin in the cavity 55 at the time of completion of the first period, the extension amount, and the like can be obtained. Therefore, setting of molding conditions by a later-described derivation unit 62 or a user can be supported.

また、本実施形態によれば、第2期の開始以降における加熱シリンダ21内の樹脂の圧力低下による比容積の増加量に基づいて質量増加量ΔWや流動先端伸長量ΔLを検出するので、第2期がΔWやΔLに与える影響を容易に精度良く算出できる。   Further, according to the present embodiment, the mass increase amount ΔW and the flow tip extension amount ΔL are detected based on the increase amount of the specific volume due to the pressure drop of the resin in the heating cylinder 21 after the start of the second period. The influence of the second period on ΔW and ΔL can be calculated easily and accurately.

さらに、本実施形態によれば、保圧工程開始時間t2が所定時間t3以下の場合(t2≦t3)、保圧工程開始時以降のスクリュ23の前進量を加味するので、保圧工程がΔWやΔLに与える影響を容易に精度良く算出できる。   Furthermore, according to the present embodiment, when the pressure holding process start time t2 is equal to or less than the predetermined time t3 (t2 ≦ t3), the advancement amount of the screw 23 after the pressure holding process start is taken into account, so the pressure holding process is ΔW And the influence on ΔL can be calculated easily and accurately.

導出部62は、成形品に関する検出部61の検出結果と、その成形品の質量および伸長量(伸長量=質量×樹脂の比容積/断面積)とに基づいて、質量および伸長量が目標値と同じ成形品が得られる成形条件を導出する。目標値は、キャビティ55内に樹脂が完全に充填される時の値である。成形品の質量の目標値は、キャビティ55の容積と樹脂の密度との積で決まる。   Based on the detection result of the detection unit 61 relating to the molded product, and the mass and extension amount of the molded product (elongation amount = mass × specific volume of resin / cross-sectional area), the derivation unit 62 sets the mass and extension amount to the target values. The molding conditions for obtaining the same molded product are derived. The target value is a value when the resin is completely filled in the cavity 55. The target value of the mass of the molded product is determined by the product of the volume of the cavity 55 and the density of the resin.

導出部62は、例えば質量および伸長量が目標値よりも小さい成形品に関する検出部61の検出結果と、その成形品の質量および伸長量とに基づいて、上記成形条件を導出する。導出部62は、複数の成形品に関するデータ(質量、伸長量、検出部の検出結果)に基づいて最適な成形条件を導出する。   The deriving unit 62 derives the molding conditions based on, for example, the detection result of the detection unit 61 regarding the molded product whose mass and elongation amount are smaller than the target values, and the mass and the elongation amount of the molded product. The deriving unit 62 derives optimum molding conditions based on data (mass, extension amount, detection result of the detection unit) regarding a plurality of molded products.

なお、導出部62は、質量および伸長量が目標値の成形品に関するデータに基づいて最適な成形条件を導出してもよい。   Note that the deriving unit 62 may derive an optimum molding condition based on data regarding a molded product having a target value of mass and elongation.

導出部62は、成形条件の導出に用いられる成形品の質量および伸長量に関する情報を例えば入力装置から取得する。入力装置で入力される情報は、質量計やマイクロメータなどで予め測定される。   The deriving unit 62 obtains information regarding the mass and extension amount of the molded product used for deriving the molding conditions from, for example, an input device. Information input by the input device is measured in advance by a mass meter, a micrometer, or the like.

例えば、導出部62は、検出部61が式(2)または式(4)を用いて検出した質量増加量ΔWと、成形品の質量Mとに基づいて、第1期完了時のキャビティ55内の樹脂の質量N(以下、「初期質量N」という)(N=M−ΔW)を求める。その結果、導出部62は、例えば図5に示すようなデータを得る。   For example, the derivation unit 62 determines whether the inside of the cavity 55 at the completion of the first period based on the mass increase amount ΔW detected by the detection unit 61 using the formula (2) or the formula (4) and the mass M of the molded product. The mass N of the resin (hereinafter referred to as “initial mass N”) (N = M−ΔW) is obtained. As a result, the derivation unit 62 obtains data as shown in FIG. 5, for example.

図5は、成形品の質量Mと、質量増加量ΔWと、初期質量Nと、充填ピーク圧力P1との関係を示す。この成形品は、質量Mが目標値M0よりも小さく、キャビティ55内を完全に充填しないものである。図5において、Ma、Mb、Mcは、充填ピーク圧力P1をP1a、P1b、P1c(P1a>P1b、P1c)に設定したときの成形品の質量Mを示す。また、ΔWa、ΔWb、ΔWcは、充填ピーク圧力P1をP1a、P1b、P1cに設定したときの質量増加量ΔWを表す。また、Na、Nb、Ncは、充填ピーク圧力P1をP1a、P1b、P1cに設定したときの初期質量Nを示す。   FIG. 5 shows the relationship among the mass M of the molded product, the mass increase amount ΔW, the initial mass N, and the filling peak pressure P1. In this molded product, the mass M is smaller than the target value M0, and the cavity 55 is not completely filled. In FIG. 5, Ma, Mb, and Mc indicate the mass M of the molded product when the filling peak pressure P1 is set to P1a, P1b, P1c (P1a> P1b, P1c). ΔWa, ΔWb, and ΔWc represent mass increase amounts ΔW when the filling peak pressure P1 is set to P1a, P1b, and P1c. Na, Nb, and Nc indicate the initial mass N when the filling peak pressure P1 is set to P1a, P1b, and P1c.

成形条件としては、充填ピーク圧力P1が低くなるほど、金型装置50の負荷が少なくなるので、また、成形品のバリが少なくなるので好ましい。また、充填ピーク圧力P1が低くなるほど、初期質量Nが軽くなる。   As the molding conditions, the lower the filling peak pressure P1, the smaller the load on the mold apparatus 50, and the smaller the burrs of the molded product. Moreover, the initial mass N becomes light, so that the filling peak pressure P1 becomes low.

導出部62は、NとΔWとの合計値(N+ΔW)が目標値M0になり、且つNができるだけ小さくなる(即ち、充填ピーク圧力P1ができるだけ低くなる)成形条件を求める。成形条件としては、例えば充填ピーク圧力P1、保圧工程開始時間t2、保圧工程における充填圧力の目標値P4などが挙げられる。   The deriving unit 62 obtains a molding condition in which the total value of N and ΔW (N + ΔW) becomes the target value M0 and N is as small as possible (that is, the filling peak pressure P1 is as low as possible). Examples of the molding conditions include a filling peak pressure P1, a pressure keeping process start time t2, and a filling pressure target value P4 in the pressure keeping process.

また、導出部62は、検出部61が式(3)または式(5)を用いて検出した流動先端伸長量ΔLと、成形品の伸長量Lとに基づいて、第1期完了時のキャビティ55内の樹脂の伸長量K(以下、「初期伸長量K」という)(K=L−ΔL)を求める。初期伸長量Kは初期質量Nに相当する寸法である。導出部62は、例えば図6に示すようなデータを得る。   Further, the derivation unit 62 determines the cavity at the completion of the first period based on the flow tip extension amount ΔL detected by the detection unit 61 using the formula (3) or the formula (5) and the extension amount L of the molded product. The elongation amount K of the resin within 55 (hereinafter referred to as “initial elongation amount K”) (K = L−ΔL) is obtained. The initial elongation K is a dimension corresponding to the initial mass N. The deriving unit 62 obtains data as shown in FIG. 6, for example.

図6は、成形品の伸長量Lと、流動先端伸長量ΔLと、初期伸長量Kと、充填ピーク圧力P1との関係を示す。この成形品は、伸長量Lが目標値L0よりも小さく、キャビティ55内を完全に充填しないものである。図6において、La、Lb、Lcは、充填ピーク圧力P1をP1a、P1b、P1c(P1a>P1b、P1c)に設定したときの成形品の伸長量Lを示す。また、ΔLa、ΔLb、ΔLcは、充填ピーク圧力P1をP1a、P1b、P1cに設定したときの流動先端伸長量ΔLを表す。また、Ka、Kb、Kcは、充填ピーク圧力P1をP1a、P1b、P1cに設定したときの初期伸長量Kを示す。   FIG. 6 shows the relationship between the extension amount L of the molded product, the flow tip extension amount ΔL, the initial extension amount K, and the filling peak pressure P1. In this molded product, the extension amount L is smaller than the target value L0, and the cavity 55 is not completely filled. In FIG. 6, La, Lb, and Lc indicate the expansion amount L of the molded product when the filling peak pressure P1 is set to P1a, P1b, and P1c (P1a> P1b, P1c). Further, ΔLa, ΔLb, ΔLc represent the flow tip extension amount ΔL when the filling peak pressure P1 is set to P1a, P1b, P1c. Ka, Kb, and Kc indicate initial extension amounts K when the filling peak pressure P1 is set to P1a, P1b, and P1c.

成形条件としては、充填ピーク圧力P1が低くなるほど、金型装置の負荷が少なくなるので、また、成形品のバリが少なくなるので好ましい。一方で、充填ピーク圧力P1が低くなるほど、初期伸長量Kが短くなる。   As the molding conditions, the lower the filling peak pressure P1, the smaller the load on the mold apparatus, and the smaller the burrs of the molded product. On the other hand, the lower the filling peak pressure P1, the shorter the initial extension amount K.

そこで、導出部62は、KとΔLとの合計値が目標値L0になり、且つKができるだけ小さくなる(即ち、充填ピーク圧力P1ができるだけ低くなる)成形条件を求める。成形条件としては、例えば充填ピーク圧力P1、保圧工程開始時間t2、保圧工程における充填圧力の目標値P4などが挙げられる。   Therefore, the deriving unit 62 obtains a molding condition in which the total value of K and ΔL becomes the target value L0 and K is as small as possible (that is, the filling peak pressure P1 is as low as possible). Examples of the molding conditions include a filling peak pressure P1, a pressure keeping process start time t2, and a filling pressure target value P4 in the pressure keeping process.

以上、本発明の一実施形態について説明したが、本発明は、上記の実施形態に制限されることはなく、本発明の範囲を逸脱することなく、上記の実施形態に種々の変形や置換を加えることができる。   Although one embodiment of the present invention has been described above, the present invention is not limited to the above embodiment, and various modifications and substitutions can be made to the above embodiment without departing from the scope of the present invention. Can be added.

例えば、上記実施形態では、成形条件の設定を支援する設定支援装置として、制御装置60が用いられ、設定支援装置は射出成形機に組み込まれているが、本発明はこれに限定されない。設定支援装置は、射出成形機に組み込まれておらず、射出成形機(詳細には、制御装置60)と情報を送受信可能なものであってよい。この場合、設定支援装置は、射出成形機から送信される充填圧力などのデータに基づいてΔWやΔLを検出したり、最適な成形条件を導出し、検出結果や導出結果を制御装置60に送信する。制御装置60は、設定支援装置から送信される検出結果や導出結果に基づいて射出モータ29などを制御する。   For example, in the above embodiment, the control device 60 is used as a setting support device that supports the setting of molding conditions, and the setting support device is incorporated in the injection molding machine, but the present invention is not limited to this. The setting support device may not be incorporated in the injection molding machine, and may be capable of transmitting and receiving information to and from the injection molding machine (specifically, the control device 60). In this case, the setting support device detects ΔW and ΔL based on data such as the filling pressure transmitted from the injection molding machine, derives optimal molding conditions, and transmits the detection results and the derived results to the control device 60. To do. The control device 60 controls the injection motor 29 and the like based on the detection result and the derivation result transmitted from the setting support device.

また、上記実施形態の検出部61は、質量増加量ΔWおよび流動先端伸長量ΔLの両方を検出するが、いずれか一方のみを検出してもよい。同様に、上記実施形態の導出部62は、成形条件の導出のため、成形品の質量および伸長量の両方を用いるが、いずれか一方のみを用いてもよい。   In addition, the detection unit 61 of the above embodiment detects both the mass increase amount ΔW and the flow tip extension amount ΔL, but may detect only one of them. Similarly, the derivation unit 62 of the above-described embodiment uses both the mass and the elongation amount of the molded product in order to derive the molding conditions, but only one of them may be used.

10 射出成形機
21 加熱シリンダ
23 スクリュ
50 金型装置
55 キャビティ
60 制御装置(設定支援装置)
61 検出部
62 導出部
DESCRIPTION OF SYMBOLS 10 Injection molding machine 21 Heating cylinder 23 Screw 50 Mold apparatus 55 Cavity 60 Control apparatus (setting support apparatus)
61 Detection unit 62 Derivation unit

Claims (7)

溶融樹脂を収容する加熱シリンダと、該加熱シリンダ内を進退自在なスクリュとを備え、該スクリュが前進することにより、前記溶融樹脂が前記加熱シリンダから射出され金型装置内のキャビティに供給される射出成形機において、
前記スクリュの前進速度の減速開始以降における前記キャビティ内の樹脂の質量増加量および/または流動先端伸長量を樹脂の状態方程式に基づいて検出する検出部を備える射出成形機。
A heating cylinder that accommodates the molten resin and a screw that can move forward and backward in the heating cylinder are provided, and when the screw moves forward, the molten resin is injected from the heating cylinder and supplied to the cavity in the mold apparatus. In injection molding machine,
An injection molding machine comprising: a detection unit configured to detect an increase in the mass of resin in the cavity and / or a flow front end extension based on a state equation of the resin after the start of deceleration of the screw forward speed.
前記検出部は、前記減速開始以降における前記加熱シリンダ内の溶融樹脂の圧力低下による比容積の増加量に基づいて前記質量増加量および/または前記流動先端伸長量を検出する請求項1に記載の射出成形機。   The said detection part detects the said mass increase amount and / or the said flow front extension amount based on the increase amount of the specific volume by the pressure drop of the molten resin in the said heating cylinder after the said deceleration start. Injection molding machine. 前記減速開始後に前記スクリュの制御が速度制御から圧力制御に切り換えられ、
前記検出部は、
前記スクリュの前進開始時から前記圧力制御の開始時までの経過時間が、前記キャビティの樹脂の一部が固化し、前記キャビティ内への樹脂の注入が実質的に終了する時間以下の場合、
前記減速開始時と前記圧力制御の開始時との間における前記比容積の増加量と、前記圧力制御の開始以降に前記スクリュが前進したときの移動量とに基づいて前記質量増加量および/または前記流動先端伸長量を検出する請求項2に記載の射出成形機。
After the start of deceleration, the screw control is switched from speed control to pressure control,
The detector is
When the elapsed time from the start of advancement of the screw to the start of the pressure control is equal to or less than the time at which a part of the resin in the cavity is solidified and the injection of the resin into the cavity is substantially finished,
Based on the amount of increase in the specific volume between the start of deceleration and the start of the pressure control, and the amount of movement when the screw advances after the start of the pressure control, and / or The injection molding machine according to claim 2, wherein the flow tip extension amount is detected.
前記減速開始後に前記スクリュの制御が速度制御から圧力制御に切り換えられ、
前記検出部は、
前記スクリュの前進開始時から前記圧力制御の開始時までの経過時間が、前記キャビティの樹脂の一部が固化し、前記キャビティ内への樹脂の注入が実質的に終了する時間を超える場合、
前記減速開始時と、前記スクリュの前進開始時からの経過時間が、前記キャビティの樹脂の一部が固化し、前記キャビティ内への樹脂の注入が実質的に終了する時間に達する時との間における前記比容積の増加量に基づいて前記質量増加量および/または前記流動先端伸長量を検出する請求項2に記載の射出成形機。
After the start of deceleration, the screw control is switched from speed control to pressure control,
The detector is
When the elapsed time from the start of advancement of the screw to the start of the pressure control exceeds the time when a part of the resin in the cavity is solidified and the injection of the resin into the cavity is substantially finished,
Between the time when the deceleration starts and the time elapsed since the screw starts moving forward until a time when a part of the resin in the cavity is solidified and the injection of the resin into the cavity is substantially finished is reached. The injection molding machine according to claim 2, wherein the mass increase amount and / or the flow front end extension amount is detected based on an increase amount of the specific volume.
成形品に関する前記検出部の検出結果と、前記成形品の質量および/または伸長量とに基づいて、質量および/または伸長量が目標値と同じ成形品が得られる成形条件を導出する導出部をさらに備える請求項1〜4のいずれか1項に記載の射出成形機。   A deriving unit for deriving a molding condition for obtaining a molded product having the same mass and / or extension amount as a target value based on a detection result of the detection unit regarding the molded product and a mass and / or an extension amount of the molded product; The injection molding machine according to any one of claims 1 to 4, further comprising: 前記導出部は、質量および/または伸長量が目標値よりも小さい成形品に関する前記検出部の検出結果と、前記成形品の質量および/または伸長量とに基づいて、前記成形条件を導出する請求項5に記載の射出成形機。   The derivation unit derives the molding condition based on a detection result of the detection unit regarding a molded product having a mass and / or an extension amount smaller than a target value and a mass and / or an extension amount of the molded product. Item 6. The injection molding machine according to Item 5. 溶融樹脂を収容する加熱シリンダと、該加熱シリンダ内を進退自在なスクリュとを備え、該スクリュが前進することにより、前記溶融樹脂が前記加熱シリンダから射出され金型装置内のキャビティに供給される射出成形機の設定支援装置において、
前記スクリュの前進速度の減速開始以降における前記キャビティ内の樹脂の質量増加量および/または流動先端伸長量を樹脂の状態方程式に基づいて検出する検出部を備える射出成形機の設定支援装置。
A heating cylinder that accommodates the molten resin and a screw that can move forward and backward in the heating cylinder are provided, and when the screw moves forward, the molten resin is injected from the heating cylinder and supplied to the cavity in the mold apparatus. In the setting support device of an injection molding machine,
A setting support apparatus for an injection molding machine comprising a detection unit that detects an increase in mass and / or an extension amount of a flow tip in the cavity after the start of deceleration of the screw forward speed based on a state equation of the resin.
JP2011190060A 2011-08-31 2011-08-31 Injection molding machine and setting support device for injection molding machine Active JP5823210B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2011190060A JP5823210B2 (en) 2011-08-31 2011-08-31 Injection molding machine and setting support device for injection molding machine
CN201210231912.0A CN102962971B (en) 2011-08-31 2012-07-05 The set supporting device of injection (mo(u)lding) machine and injection (mo(u)lding) machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011190060A JP5823210B2 (en) 2011-08-31 2011-08-31 Injection molding machine and setting support device for injection molding machine

Publications (2)

Publication Number Publication Date
JP2013052509A JP2013052509A (en) 2013-03-21
JP5823210B2 true JP5823210B2 (en) 2015-11-25

Family

ID=47793549

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011190060A Active JP5823210B2 (en) 2011-08-31 2011-08-31 Injection molding machine and setting support device for injection molding machine

Country Status (2)

Country Link
JP (1) JP5823210B2 (en)
CN (1) CN102962971B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6058468B2 (en) * 2013-05-27 2017-01-11 住友重機械工業株式会社 Injection molding machine and setting support device for injection molding machine
JP2021102326A (en) * 2019-12-25 2021-07-15 キヤノン株式会社 Molds, manufacturing methods for articles, and valves
JP2022079220A (en) * 2020-11-16 2022-05-26 セイコーエプソン株式会社 Injection molding machine management system

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0345329A (en) * 1989-07-14 1991-02-26 Sumitomo Heavy Ind Ltd Control device of injection molder
JPH03153332A (en) * 1989-11-10 1991-07-01 Japan Steel Works Ltd:The Method and device for controlling dwelling time in injection molding
JPH03264327A (en) * 1990-03-14 1991-11-25 Komatsu Ltd Controlling method for injection speed in injection molding machine
JP2918610B2 (en) * 1990-03-14 1999-07-12 株式会社小松製作所 Injection molding machine filling detection method
JPH09262887A (en) * 1996-03-29 1997-10-07 Toray Ind Inc Simulation method of mold shrinkage process in crystalline resin molding and device thereof
JP3761429B2 (en) * 2001-03-07 2006-03-29 ファナック株式会社 Resin evaluation method and apparatus using injection molding machine
JP3917459B2 (en) * 2002-05-16 2007-05-23 住友重機械工業株式会社 Control device and control method for injection molding machine
JP4090897B2 (en) * 2003-01-17 2008-05-28 住友重機械工業株式会社 Injection molding machine and control method thereof
CN201002333Y (en) * 2007-02-01 2008-01-09 北京化工大学 Device for on-line testing pressure-specific volume-temperature relation of polymer
JP5092927B2 (en) * 2008-06-20 2012-12-05 ソニー株式会社 INJECTION MOLDING CONTROL METHOD AND INJECTION MOLDING CONTROL DEVICE
JP2010058299A (en) * 2008-09-01 2010-03-18 Sumitomo Heavy Ind Ltd Injection control device and injection control method
CN102039653A (en) * 2009-10-12 2011-05-04 北京化工大学 Method for controlling pressure-maintaining process through mould-cavity temperature
CN101698350A (en) * 2009-10-19 2010-04-28 杭州科强智能控制***有限公司 Technology for holding pressure control according to melting body temperature as injection molding machine

Also Published As

Publication number Publication date
CN102962971A (en) 2013-03-13
JP2013052509A (en) 2013-03-21
CN102962971B (en) 2016-01-20

Similar Documents

Publication Publication Date Title
JP5092927B2 (en) INJECTION MOLDING CONTROL METHOD AND INJECTION MOLDING CONTROL DEVICE
EP2644353B1 (en) Injection molding machine with a clamping force monitoring unit
JP5031867B2 (en) Injection molding method and apparatus
JP2018079485A (en) Molding machine
JP5823210B2 (en) Injection molding machine and setting support device for injection molding machine
JP6186113B2 (en) Injection molding machine
JP2007021861A (en) Method and device for controlling molding machine
EP3202549B1 (en) Injection molding machine
JP5634724B2 (en) Injection molding machine and injection molding method
JP5351307B1 (en) Pressure control device for injection molding machine
JP2010058299A (en) Injection control device and injection control method
CN107000291B (en) Mold clamping device, molding device, and molding method
JP5788353B2 (en) Injection molding machine
JP6356041B2 (en) Injection molding machine
JP6419559B2 (en) Injection molding machine
JP2018030359A (en) Injection molder
KR101160561B1 (en) A control method for injection molding machine
JP2010188563A (en) Device for controlling cores of mold
JP2017065016A (en) Injection molding machine
JP6404081B2 (en) Injection molding machine
JP6716154B2 (en) Injection molding machine
JP5714838B2 (en) Power consumption calculation device and power consumption calculation method for injection molding machine
JP2017170800A (en) Injection apparatus
JP2020142460A (en) Quality prediction system for molded products and molding machines
JPH11291307A (en) Device for manufacturing thin-walled disclike molding and manufacture thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20131216

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20141029

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20141111

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150109

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150630

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150818

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20151006

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20151007

R150 Certificate of patent or registration of utility model

Ref document number: 5823210

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150