JP5564704B2 - Hot finish rolling mill outlet side temperature control device and control method - Google Patents

Hot finish rolling mill outlet side temperature control device and control method Download PDF

Info

Publication number
JP5564704B2
JP5564704B2 JP2010120880A JP2010120880A JP5564704B2 JP 5564704 B2 JP5564704 B2 JP 5564704B2 JP 2010120880 A JP2010120880 A JP 2010120880A JP 2010120880 A JP2010120880 A JP 2010120880A JP 5564704 B2 JP5564704 B2 JP 5564704B2
Authority
JP
Japan
Prior art keywords
steel plate
amount
temperature
rolling mill
hot finish
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2010120880A
Other languages
Japanese (ja)
Other versions
JP2011073058A (en
Inventor
昌宏 鹿山
健 栗林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2010120880A priority Critical patent/JP5564704B2/en
Priority to CN 201010264990 priority patent/CN102000703B/en
Publication of JP2011073058A publication Critical patent/JP2011073058A/en
Application granted granted Critical
Publication of JP5564704B2 publication Critical patent/JP5564704B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control Of Metal Rolling (AREA)

Description

本発明は、熱間仕上げ圧延機の出側温度を管理して鋼板の圧延を適切に行うための熱間仕上げ圧延機出側温度制御装置および制御方法に関する。   The present invention relates to a hot finish rolling mill outlet temperature control device and a control method for appropriately controlling rolling of a steel sheet by managing the outlet temperature of the hot finish rolling mill.

従来、複数のスタンドを備えた熱間仕上げ圧延機出側温度(仕上げミル出側温度)を制御する方法として、例えば、圧延開始から終了までの鋼板の速度パターンを決定した上で、冷却開始前に予め設定したストリップクーラント装置の噴射数nに対して、圧延中の鋼板について測定された熱間仕上げ圧延機出側温度(Finisher Delivery Temperature:FDT)に従い、FDTが目標温度になるように噴射数をΔn個変更して、(n+Δn)個の噴射数で冷却制御を行う手法がある(例えば、特許文献1を参照)。   Conventionally, as a method of controlling a hot finish rolling mill exit temperature (finishing mill exit temperature) equipped with a plurality of stands, for example, after determining a speed pattern of a steel plate from the start to the end of rolling, before starting cooling The number of injections so that the FDT reaches the target temperature in accordance with the finisher delivery temperature (FDT) measured for the steel sheet being rolled against the number of injections n of the strip coolant device set in advance. There is a method of performing cooling control with (n + Δn) number of injections by changing Δn (see, for example, Patent Document 1).

特開平10−43811号公報Japanese Patent Laid-Open No. 10-43811

しかしながら、特許文献1に記載された手法には以下のような問題があった。
特許文献1に記載された制御方法では、計測した熱間仕上げ圧延機出側温度(FDT)と目標温度の偏差を冷却水量(噴射数)で補償するため、計測FDTが高い場合は冷却水量を増加させ、低い場合には冷却水量が減じられる。ここで、計測FDTが低い場合、鋼板の圧延速度を増加させることでも計測FDTを増加させることができ、このとき並行して鋼板の生産性を高めることができる。特許文献1に記載の制御方法ではこの点に配慮されていないため、計測FDTが目標温度より低い場合に、鋼板の生産量を高める機会を失っているという問題があった。
However, the method described in Patent Document 1 has the following problems.
In the control method described in Patent Document 1, in order to compensate the deviation between the measured hot finish rolling mill outlet temperature (FDT) and the target temperature by the cooling water amount (number of injections), the cooling water amount is reduced when the measured FDT is high. If it is increased, the amount of cooling water is reduced if it is lower. Here, when the measurement FDT is low, the measurement FDT can also be increased by increasing the rolling speed of the steel sheet, and at this time, the productivity of the steel sheet can be increased. Since the control method described in Patent Document 1 does not take this point into consideration, there is a problem in that when the measured FDT is lower than the target temperature, the opportunity to increase the production amount of the steel sheet is lost.

なお、計測した熱間仕上げ圧延機出側温度(FDT)と目標温度の偏差を冷却水量(噴射数)で補償するときに、一度の補償でFDTが目標温度にならない場合、再度の補償が必要となるが、再度の補償を行うタイミングについては特許文献1に記載されていない。フィードバック制御を高応答化かつ安定化させるためには、噴射数を変更したストリップクーラント装置の位置に依存して次回の補償を行うタイミングを変更する必要がある。またFDTをフィードバック制御するために圧延速度を変更する場合についての配慮もなく、このときに次回の補償を行うタイミングについても、特許文献1に記載されていない。   When compensating the deviation between the measured hot finish rolling mill outlet temperature (FDT) and the target temperature with the amount of cooling water (number of injections), if the FDT does not reach the target temperature with a single compensation, recompensation is required. However, the timing for performing the re-compensation is not described in Patent Document 1. In order to make the feedback control highly responsive and stable, it is necessary to change the timing of the next compensation depending on the position of the strip coolant device in which the number of injections is changed. Further, there is no consideration for changing the rolling speed for feedback control of FDT, and the timing for performing the next compensation at this time is not described in Patent Document 1.

本発明は、このような状況に鑑みてなされたものであり、計測した熱間仕上げ圧延機出側温度(FDT)と目標温度が偏差を有していたときに、熱間仕上げ圧延機の出側温度精度を犠牲にすることなく圧延設備の生産量を高めるものである。   The present invention has been made in view of such a situation, and when the measured hot finish rolling mill outlet side temperature (FDT) and the target temperature have a deviation, the hot finish rolling mill exits. The production capacity of the rolling equipment is increased without sacrificing the side temperature accuracy.

上記の課題を解決するために、本発明の第1の側面は、冷却に先立って鋼板の圧延速度(以下、「鋼板速度」という)とスタンド間冷却の水量を算定するプリセット制御手段と、冷却制御中に計測した鋼板の熱間仕上げ圧延機出側温度の目標温度からの偏差を解消するための制御を行うフィードバック制御手段と、上記プリセット制御手段が出力した冷却水量と上記フィードバック制御手段が出力した冷却水量から最終的なスタンド間冷却指令を生成するスタンド間冷却指令生成手段と、上記プリセット制御手段が出力した鋼板速度と上記フィードバック制御手段が出力した鋼板速度から最終的な鋼板速度を算出する速度指令生成手段とを備えることを特徴とする。
ここで、上記フィードバック制御手段は、熱間仕上げ圧延機出側の鋼板温度の計測値と該目標温度の大小関係を判定し、判定結果に基づいて上記鋼板速度および上記冷却水量から変更する操作端を選択し、選択した操作端について熱間仕上げ圧延機出側温度を目標温度に近づけるための操作量の変更量を算出する。
In order to solve the above-mentioned problems, a first aspect of the present invention is a preset control means for calculating a rolling speed of a steel plate (hereinafter referred to as “steel plate speed”) and a cooling water amount between stands before cooling, and cooling. Feedback control means for performing control for eliminating deviation from the target temperature of the hot finish rolling mill delivery temperature of the steel sheet measured during control, the cooling water amount output by the preset control means, and the feedback control means output A final steel plate speed is calculated from the inter-stand cooling command generation means for generating a final inter-stand cooling command from the amount of the cooled water, the steel plate speed output from the preset control means, and the steel plate speed output from the feedback control means. And a speed command generating means.
Here, the feedback control means determines the magnitude relationship between the measured value of the steel plate temperature on the delivery side of the hot finish rolling mill and the target temperature, and changes from the steel plate speed and the cooling water amount based on the determination result. Is selected, and a change amount of the operation amount for calculating the hot finish rolling mill outlet temperature near the target temperature is calculated for the selected operation end.

さらに、第1の側面において、上記フィードバック制御手段は、熱間仕上げ圧延機出側の鋼板温度の計測値と目標値の偏差の符号を判定し、鋼板温度の計測値が目標値よりも大きいときは冷却水量を操作端に設定し、鋼板温度の計測値が目標値より小さいときは鋼板速度を操作端に設定する操作端選択手段と、設定された操作端の変更量を温度偏差の大きさに従って算出する変更量算出手段を備えることが好適である。   Furthermore, in the first aspect, the feedback control means determines the sign of the deviation between the measured value of the steel sheet temperature on the delivery side of the hot finish rolling mill and the target value, and the measured value of the steel sheet temperature is greater than the target value. Sets the amount of cooling water at the operation end, and when the measured value of the steel plate temperature is smaller than the target value, the operation end selection means for setting the steel plate speed at the operation end and the change amount of the set operation end as the magnitude of the temperature deviation It is preferable to provide a change amount calculation means for calculating according to the above.

第1の側面では、上記変更量算出手段は、鋼板速度が操作端に設定されたときは、鋼板速度を大きくする処理を行い熱間仕上げ圧延機出側の鋼板温度を上昇させるようにする。それゆえ、鋼板温度の目標値と計測値の偏差を低減しつつ、生産量を増大させることができる。一方、冷却水量が操作端に設定されたときは、冷却水量を大きくする処理を行い熱間仕上げ圧延機出側の鋼板温度を低下させるようにする。それゆえ、鋼板温度の目標値と計測値の偏差を低減しつつ、生産量を維持することができる。   In the first aspect, when the steel plate speed is set at the operation end, the change amount calculating means increases the steel plate temperature on the delivery side of the hot finish rolling mill by performing a process of increasing the steel plate speed. Therefore, the production amount can be increased while reducing the deviation between the target value of the steel plate temperature and the measured value. On the other hand, when the amount of cooling water is set at the operation end, a process for increasing the amount of cooling water is performed to lower the steel plate temperature on the hot finish rolling mill exit side. Therefore, the production amount can be maintained while reducing the deviation between the target value of the steel plate temperature and the measured value.

その結果、熱間仕上げ圧延機出側の鋼板温度の精度を犠牲にしない範囲で、圧延設備の生産量を最大化することができる。   As a result, the production capacity of the rolling equipment can be maximized without sacrificing the accuracy of the steel sheet temperature on the delivery side of the hot finish rolling mill.

本発明の第2の側面は、第1の側面に対し、さらに上記フィードバック制御手段が圧延速度か冷却水量のいずれを操作端として選択したかを判定し、判定結果に従ってフィードバック制御手段による次回のフィードバック制御の実施タイミングを決定するフィードバック制御起動タイミング生成手段と、熱間仕上げ圧延機の設備に関する情報と各スタンドにおける鋼板の圧延量とから、各スタンド間の冷却水量と鋼板速度のそれぞれを変化させたときに熱間仕上げ圧延機出側温度が変化するのに必要な鋼板のトラッキング長を算出し、トラッキング長テーブルに格納するトラッキング長算出手段とを備えることを特徴とする。
ここで、上記フィードバック制御起動タイミング生成手段は、上記フィードバック制御手段がフィードバック制御を実施した後に最終スタンドから払い出された熱間仕上げ圧延機出側の鋼板長と上記トラッキング長テーブルに記憶されたトラッキング長を比較し、払い出された鋼板長がトラッキング長より長いときは、上記フィードバック制御手段に起動信号を出力する。
According to the second aspect of the present invention, with respect to the first aspect, it is further determined whether the feedback control means has selected the rolling speed or the cooling water amount as the operation end, and the next feedback by the feedback control means according to the determination result. The amount of cooling water between each stand and the steel plate speed were changed from the feedback control start timing generation means for determining the execution timing of the control, the information about the equipment of the hot finishing mill and the rolling amount of the steel plate at each stand. And a tracking length calculating means for calculating a tracking length of a steel sheet necessary for changing the temperature at the delivery side of the hot finish rolling mill and storing it in a tracking length table.
Here, the feedback control start timing generation means includes the steel plate length on the delivery side of the hot finish rolling mill that has been paid out from the final stand after the feedback control means performs the feedback control, and the tracking stored in the tracking length table. The lengths are compared, and when the paid-out steel plate length is longer than the tracking length, an activation signal is output to the feedback control means.

さらに、第2の側面において、冷却水量を変更する場合に、どのスタンド間に対応する冷却装置の冷却水量を優先的に変更するかを示す優先順位を記憶した冷却フィードバック制御優先順位テーブル、を備えることが好適である。すなわち、冷却水量を操作端として選択した場合、上記冷却フィードバック制御優先順位テーブルに記憶された優先順位に従って冷却水量を変更する冷却装置を決定した上で、温度偏差と第1の影響係数テーブルの内容から熱間仕上げ圧延機出側温度を目標温度に近づけるための冷却水量の増加量を変更量として算出する。   Furthermore, in the second aspect, when changing the cooling water amount, a cooling feedback control priority table storing a priority order indicating which of the stands the cooling water amount of the corresponding cooling device is preferentially changed is provided. Is preferred. That is, when the cooling water amount is selected as the operation end, a cooling device that changes the cooling water amount is determined according to the priority order stored in the cooling feedback control priority order table, and then the temperature deviation and the contents of the first influence coefficient table From the above, the amount of increase in the amount of cooling water for bringing the hot finish rolling mill exit side temperature close to the target temperature is calculated as the change amount.

第2の側面では、鋼板の払い出し長がトラッキング長に到達している場合のみ、フィードバック制御手段を起動することにより、熱間仕上げ圧延機の冷却フィードバック制御において、次回の補償を行うタイミングが適切化され、高応答化かつ安定なフィードバック制御を実現できる。それゆえ、高精度な熱間仕上げ圧延機出側温度が得られる。   In the second aspect, the timing for performing the next compensation in the cooling feedback control of the hot finish rolling mill is made appropriate by activating the feedback control means only when the payout length of the steel sheet has reached the tracking length. Thus, high response and stable feedback control can be realized. Therefore, a high-precision hot finish rolling mill delivery temperature can be obtained.

本発明によると、熱間仕上げ圧延機出側の鋼板温度の精度を維持しつつ、圧延設備の生産量を高めることができる。   According to the present invention, it is possible to increase the production capacity of the rolling equipment while maintaining the accuracy of the temperature of the steel sheet on the delivery side of the hot finish rolling mill.

本発明の第1の実施の形態に係る熱間仕上げ圧延機出側温度制御装置の構成例を示したブロック図である。It is the block diagram which showed the structural example of the hot finish rolling mill delivery side temperature control apparatus which concerns on the 1st Embodiment of this invention. 図1の標準流量パターンテーブルの構成例を示した図である。It is the figure which showed the structural example of the standard flow rate pattern table of FIG. 図1の速度テーブルの構成例を示した図である。It is the figure which showed the structural example of the speed table of FIG. 図1の目標温度テーブルの構成例を示した図である。It is the figure which showed the structural example of the target temperature table of FIG. 図1のプリセット制御手段の処理を示したフローチャートである。It is the flowchart which showed the process of the preset control means of FIG. 図1のフィードバック制御起動タイミング生成手段の処理を示したフローチャートである。It is the flowchart which showed the process of the feedback control starting timing production | generation means of FIG. 図1の操作端選択手段の処理を示したフローチャートである。It is the flowchart which showed the process of the operation end selection means of FIG. 図1の変更量算出手段の処理を示したフローチャートである。It is the flowchart which showed the process of the change amount calculation means of FIG. 図1の第1の影響係数テーブルの構成例を示した図である。It is the figure which showed the structural example of the 1st influence coefficient table of FIG. 図1の第2の影響係数テーブルの構成例を示した図である。FIG. 4 is a diagram illustrating a configuration example of a second influence coefficient table in FIG. 1. 本発明の第2の実施の形態に係る熱間仕上げ圧延機の出側温度制御装置の構成例を示したブロック図である。It is the block diagram which showed the structural example of the delivery side temperature control apparatus of the hot finish rolling mill which concerns on the 2nd Embodiment of this invention. 図11のトラッキング長算出手段の処理を示したフローチャートである。12 is a flowchart showing processing of a tracking length calculation unit in FIG. 図11のドラフトスケジュールテーブルの構成例を示した図である。It is the figure which showed the structural example of the draft schedule table of FIG. 図11のトラッキング長テーブルの構成例を示した図である。It is the figure which showed the structural example of the tracking length table of FIG. 図11のフィードバック制御起動タイミング生成手段の処理を示したフローチャートである。It is the flowchart which showed the process of the feedback control starting timing production | generation means of FIG. 図11の冷却フィードバック制御優先順位テーブルの構成例を示した図である。It is the figure which showed the structural example of the cooling feedback control priority order table of FIG.

以下、本発明を実施するための形態の例について、添付図面を参照しながら説明する。説明は下記項目の順に行う。なお、各図において共通の部材には同一の符号を付している。
1.第1の実施の形態(熱間仕上げ圧延機出側温度偏差に応じて操作端を切り替える例)
2.第2の実施の形態(直近の操作端に応じてFB制御の起動タイミングを決定する例)
Hereinafter, an example of an embodiment for carrying out the present invention will be described with reference to the accompanying drawings. The description will be given in the following order. In addition, the same code | symbol is attached | subjected to the common member in each figure.
1. 1st Embodiment (example which switches an operation end according to a hot finish rolling mill delivery side temperature deviation)
2. Second Embodiment (Example in which the start timing of FB control is determined according to the latest operation end)

<1.第1の実施の形態>
図1は、本発明の第1の実施の形態に係る熱間仕上げ圧延機出側温度制御装置(スタンド間冷却制御システム)の構成例を示している。第1の実施の形態は、熱間仕上げ圧延機出側温度偏差の符号に応じて操作端の切り替えを行う例である。
<1. First Embodiment>
FIG. 1 shows a configuration example of a hot finish rolling mill outlet side temperature control device (inter-stand cooling control system) according to the first embodiment of the present invention. 1st Embodiment is an example which switches an operation end according to the code | symbol of a hot finish rolling mill delivery side temperature deviation.

図1に示す熱間仕上げ圧延機出側温度制御装置100は、製造指令を受けて複数のスタンド間冷却装置および複数の圧延ロールを含む制御対象200から種々の信号を受信し、圧延ロール210の回転速度やギャップ、スタンドF1〜F5の圧延荷重等の制御信号を制御対象200に出力するものである。まず制御対象200の構成を説明する。   The hot finish rolling mill outlet side temperature control device 100 shown in FIG. 1 receives various signals from the control target 200 including a plurality of inter-stand cooling devices and a plurality of rolling rolls in response to a manufacturing command, and Control signals such as the rotation speed, gap, and rolling load of the stands F1 to F5 are output to the control object 200. First, the configuration of the controlled object 200 will be described.

本実施の形態において、制御対象200は熱間圧延設備であり、5つのスタンドF1〜F5を備えた熱間仕上げ圧延機(「仕上げミル」とも呼ばれる)201を有している。鋼板202はスタンドF1〜F5までの各スタンドの圧延ロール210で圧延され、板厚を減じながら、所定の速度で図1に記載した熱間仕上げ圧延機201を左から右に移動していく。熱間仕上げ圧延機201の出側には、圧延後の鋼板202の温度を測定する熱間仕上げ圧延機出側温度計203を備えている。   In the present embodiment, the controlled object 200 is a hot rolling facility, and includes a hot finish rolling mill (also referred to as “finishing mill”) 201 including five stands F1 to F5. The steel plate 202 is rolled by the rolling rolls 210 of the stands F1 to F5, and the hot finish rolling mill 201 shown in FIG. 1 is moved from the left to the right at a predetermined speed while reducing the plate thickness. On the exit side of the hot finish rolling mill 201, a hot finish rolling mill exit side thermometer 203 for measuring the temperature of the rolled steel plate 202 is provided.

熱間仕上げ圧延機201は、スタンド間で鋼板202を冷却する装置として、スタンドF1−F2間、スタンドF2−F3間、スタンドF3−F4間、スタンドF4−F5間にそれぞれスタンド間冷却装置205〜208が備えられている。スタンド間冷却装置205〜208は、熱間仕上げ圧延機出側温度制御装置100からのスタンド間冷却指令に従った水量で鋼板202を冷却する。スタンド間冷却制御の目的は、熱間仕上げ圧延機出側温度計203で計測された温度を、目標温度に一致させることである。熱間仕上げ圧延機出側の目標温度は、通常は、鋼板長手方向各部位で一定であるが、各部位に応じて異なった値を設定することもできる。   The hot finish rolling mill 201 is an apparatus for cooling the steel plate 202 between the stands, as between the stands F1-F2, between the stands F2-F3, between the stands F3-F4, and between the stands F4-F5. 208 is provided. The inter-stand cooling devices 205 to 208 cool the steel plate 202 with the amount of water according to the inter-stand cooling command from the hot finish rolling mill outlet side temperature control device 100. The purpose of the inter-stand cooling control is to make the temperature measured by the hot finish rolling mill outgoing side thermometer 203 coincide with the target temperature. The target temperature on the delivery side of the hot finish rolling mill is normally constant at each part in the longitudinal direction of the steel sheet, but a different value can be set depending on each part.

[熱間仕上げ圧延機出側温度制御装置の構成]
次に、熱間仕上げ圧延機出側温度制御装置100の構成を説明する。
この熱間仕上げ圧延機出側温度制御装置100は、主に2つの処理を行う。第1の処理は、上位計算機から次回圧延される鋼板の製造指令(鋼種、板厚、板幅等)を受け取り,この鋼板に対応した圧延速度とスタンド間冷却装置205〜208の冷却水量の値を計算するプリセット制御演算である。第2の処理は、圧延中に熱間仕上げ圧延機出側温度計203で計測した鋼板温度と目標値との乖離が減少する方向に圧延速度とスタンド間冷却装置205〜208の冷却水量の値を補正するフィードバック制御演算である。この2つの処理を実行するため、熱間仕上げ圧延機出側温度制御装置100は、プリセット制御手段110、フィードバック制御手段130、フィードバック制御起動タイミング生成手段120、スタンド間冷却指令生成手段140、速度指令生成手段150を備えてなる。
[Configuration of the temperature control device for the hot finish rolling mill]
Next, a configuration of the hot finish rolling mill outlet side temperature control device 100 will be described.
The hot finish rolling mill outlet side temperature control device 100 mainly performs two processes. The first process receives a manufacturing instruction (steel type, sheet thickness, sheet width, etc.) of the steel sheet to be rolled next time from the host computer, the rolling speed corresponding to this steel sheet, and the value of the cooling water amount of the inter-stand cooling devices 205 to 208 Is a preset control calculation for calculating In the second process, the rolling speed and the value of the cooling water amount of the inter-stand cooling devices 205 to 208 are reduced in the direction in which the difference between the steel plate temperature measured by the hot finish rolling mill outlet thermometer 203 during rolling and the target value decreases. It is a feedback control calculation that corrects. In order to execute these two processes, the hot finish rolling mill outlet side temperature control device 100 includes a preset control unit 110, a feedback control unit 130, a feedback control start timing generation unit 120, an inter-stand cooling command generation unit 140, a speed command. The generation means 150 is provided.

プリセット制御手段110は、鋼板202がスタンド間冷却装置205〜208で冷却されるのに先立って、各スタンド間冷却装置の冷却水の流量(冷却水量)と鋼板の圧延速度(鋼板速度)を算出するものである。本実施の形態では、標準流量パターンテーブル112、速度テーブル113、目標温度テーブル114から情報を取り込み、板温推定モデル115を用いた演算を行い、各スタンド間冷却装置205〜208の冷却水量および/または鋼板速度を決定する。板温推定モデル115は、熱間仕上げ圧延機100で圧延される前の鋼板温度、鋼板202の圧延速度、スタンド間に設けられたスタンド間冷却装置205〜208の冷却水量を含む情報と、圧延後の鋼板温度との関係を規定している。   The preset control means 110 calculates the flow rate (cooling water amount) of the cooling water of each inter-stand cooling device and the rolling speed of the steel plate (steel plate speed) before the steel plate 202 is cooled by the inter-stand cooling devices 205-208. To do. In the present embodiment, information is taken from the standard flow rate pattern table 112, the speed table 113, and the target temperature table 114, and the calculation using the plate temperature estimation model 115 is performed. Or the steel plate speed is determined. The plate temperature estimation model 115 includes information including the steel plate temperature before being rolled by the hot finish rolling mill 100, the rolling speed of the steel plate 202, the amount of cooling water of the inter-stand cooling devices 205 to 208 provided between the stands, and rolling. It defines the relationship with the later steel plate temperature.

なお、熱間仕上げ圧延機出側温度制御装置100はフラッシュメモリ等の不揮発性の記憶手段(図示略)を備え、当該記憶手段に標準流量パターンテーブル112、速度テーブル113、目標温度テーブル114および板温推定モデル115が記憶されているものとする。   The hot finish rolling mill outlet side temperature control device 100 includes nonvolatile storage means (not shown) such as a flash memory, and the storage means includes a standard flow rate pattern table 112, a speed table 113, a target temperature table 114, and a plate. It is assumed that the temperature estimation model 115 is stored.

フィードバック制御手段130は、鋼板202が熱間仕上げ圧延機201で冷却されているときに、熱間仕上げ圧延機出側温度計203で測定された鋼板温度の実績をリアルタイム(即時)に取り込んで冷却水量と鋼板速度のいずれかもしくは両方を補正するものである。このフィードバック制御手段130は、操作端選択手段131と、変更量算出手段132と、第1の影響係数テーブル133と、第2の影響係数テーブル134を備えている。ここで第1の影響係数テーブル133には、スタンド間冷却装置の流量変化に対する熱間仕上げ圧延機出側温度の変化の割合(∂FDT/∂Q)が格納されている。また第2の影響係数テーブル134には、鋼板速度の変化に対する熱間仕上げ圧延機出側温度の変化の割合(∂FDT/∂V)が格納されている。   When the steel plate 202 is cooled by the hot finish rolling mill 201, the feedback control means 130 takes in the results of the steel plate temperature measured by the hot finish rolling mill thermometer 203 in real time (immediately) and cools it. Either or both of the water amount and the steel plate speed are corrected. The feedback control unit 130 includes an operation end selection unit 131, a change amount calculation unit 132, a first influence coefficient table 133, and a second influence coefficient table 134. Here, in the first influence coefficient table 133, the ratio (∂FDT / ∂Q) of the change in the hot finish rolling mill outlet side temperature with respect to the change in the flow rate of the inter-stand cooling device is stored. The second influence coefficient table 134 stores the rate of change in the hot finish rolling mill outlet side temperature (∂FDT / ∂V) with respect to the change in the steel plate speed.

操作端選択手段131は、熱間仕上げ圧延機出側温度計203で計測した鋼板202の温度と目標温度の大小(偏差の符号)を判定し、判定結果を元にスタンド間冷却装置205〜208の冷却水量と鋼板速度のどちらを操作端に設定して熱間仕上げ圧延機出側温度を制御するかを決定するものである。鋼板温度の計測値が目標値よりも大きいときはスタンド間冷却装置205〜208の冷却水量を操作端に設定し、目標値が計測値より大きいときは鋼板速度を操作端に設定する。また変更量算出手段132は、温度偏差の符号と大きさ、第1の影響係数テーブル133および第2の影響係数テーブル134を用いて、設定された操作端の操作量の変更量を算出する。   The operation end selection means 131 determines the temperature of the steel plate 202 measured by the hot finish rolling mill exit side thermometer 203 and the target temperature (sign of deviation), and the inter-stand cooling devices 205 to 208 based on the determination result. It determines which of the cooling water amount and the steel plate speed is set at the operation end to control the hot finish rolling mill outlet side temperature. When the measured value of the steel plate temperature is larger than the target value, the cooling water amount of the inter-stand cooling devices 205 to 208 is set at the operating end, and when the target value is larger than the measured value, the steel plate speed is set at the operating end. The change amount calculation means 132 calculates the change amount of the set operation amount of the operation end using the sign and magnitude of the temperature deviation, the first influence coefficient table 133, and the second influence coefficient table 134.

フィードバック制御起動タイミング生成手段120は、鋼板202の圧延速度を用いた演算で鋼板位置を特定した結果からフィードバック制御手段130の起動タイミングを決定し、起動指令を生成するものである。   The feedback control activation timing generation means 120 determines the activation timing of the feedback control means 130 from the result of specifying the steel plate position by calculation using the rolling speed of the steel plate 202, and generates an activation command.

スタンド間冷却指令生成手段140は、プリセット制御手段110が出力したスタンド間冷却指令とフィードバック制御手段130が出力したスタンド間冷却指令の補正量を加算して、最終的にスタンド間冷却装置205〜208へ出力するスタンド間冷却指令を算出するものである。   The inter-stand cooling command generation unit 140 adds the correction amount of the inter-stand cooling command output from the preset control unit 110 and the inter-stand cooling command output from the feedback control unit 130, and finally the inter-stand cooling devices 205 to 208. The inter-stand cooling command to be output to is calculated.

速度指令生成手段150は、プリセット制御手段110が出力した鋼板速度指令とフィードバック制御手段130が出力した鋼板速度指令の補正量を加算して、最終的な鋼板速度指令を出力するものである。   The speed command generation unit 150 adds the correction amount of the steel plate speed command output from the preset control unit 110 and the steel plate speed command output from the feedback control unit 130, and outputs a final steel plate speed command.

ここで、標準流量パターンテーブル112、速度テーブル113、目標温度テーブル114について説明する。
図2は、標準流量パターンテーブル112の構成例を示すものである。
標準流量パターンテーブル112は、鋼板202の種類(鋼種)、板厚、板幅条件の下で冷却水量を決定する演算で用いる冷却水量の初期値を、各スタンド間について蓄えている。鋼板202の鋼種、板厚、板幅の情報は、例えば製造情報を管理する上位計算機から熱間仕上げ圧延機出側温度制御装置100に送られてくる。図2では、初期値の値は最大流量に対するパーセントで与えられる例を示している。例えば鋼種がSS400(炭素鋼)、板厚3.0〜4.0mm、板幅が1200mmのときには、スタンドF1−F2間の流量が最大流量に対して80%、スタンドF2−F3間の流量が同70%、スタンドF3−F4間の流量が同50%、スタンドF4−F5間の流量が同0%であることを示している。標準流量パターンテーブル112の内容は、鋼板速度の初期値、鋼板先端で想定した仕上げ入側温度の下で、目標FDTを概ね満足でき、さらに各スタンドの圧延に伴う温度降下パターンが所望のパターンになるように、シミュレーションや実際の圧延実績から決めておく。
Here, the standard flow rate pattern table 112, the speed table 113, and the target temperature table 114 will be described.
FIG. 2 shows a configuration example of the standard flow rate pattern table 112.
The standard flow rate pattern table 112 stores the initial value of the cooling water amount used in the calculation for determining the cooling water amount under the type (steel type), plate thickness, and plate width conditions of the steel plate 202 for each stand. Information on the steel type, plate thickness, and plate width of the steel plate 202 is sent to the hot finish rolling mill outlet temperature control device 100 from, for example, a host computer that manages manufacturing information. FIG. 2 shows an example in which the initial value is given as a percentage of the maximum flow rate. For example, when the steel type is SS400 (carbon steel), the plate thickness is 3.0 to 4.0 mm, and the plate width is 1200 mm, the flow rate between the stands F1 and F2 is 80% of the maximum flow rate, and the flow rate between the stands F2 and F3 is It shows that the flow rate between 70%, the flow rate between the stands F3-F4 is 50%, and the flow rate between the stands F4-F5 is 0%. The content of the standard flow rate pattern table 112 is that the target FDT can be generally satisfied under the initial value of the steel plate speed and the finish entry side temperature assumed at the front end of the steel plate, and the temperature drop pattern accompanying the rolling of each stand becomes a desired pattern. As such, it is determined from simulations and actual rolling results.

図3は、速度テーブル113の構成を示すものである。
鋼種、板厚、板幅に対して、鋼板202の最終スタンド(本実施の形態ではスタンドF5)出側速度のうち、鋼板202の先端がスタンドF5を払い出されるときの初期速度に加えて、定常速度、鋼板202の尾端がスタンドF5を抜けるときの終期速度が層別されて格納されている。プリセット制御手段110は該当鋼板の鋼種、板厚、板幅を判定して、速度テーブル113から対応する速度情報を抽出する。例えば鋼種がSS400、板厚3.0〜4.0mm、板幅が1200mmのときには、初期速度460mpm(メートル毎分)、定常速度600mpm、終期速度600mpmが設定されることを示している。
FIG. 3 shows the configuration of the speed table 113.
In addition to the initial speed when the front end of the steel plate 202 is paid out of the stand F5 among the final stand of the steel plate 202 (stand F5 in the present embodiment) with respect to the steel type, plate thickness, and plate width, the steady state The speed and the final speed when the tail end of the steel plate 202 passes through the stand F5 are stored in layers. The preset control means 110 determines the steel type, plate thickness, and plate width of the corresponding steel plate, and extracts the corresponding speed information from the speed table 113. For example, when the steel type is SS400, the plate thickness is 3.0 to 4.0 mm, and the plate width is 1200 mm, the initial speed is 460 mpm (meters per minute), the steady speed is 600 mpm, and the final speed is 600 mpm.

初期速度から定常速度へ至る速度変化の勾配は、プリセット制御手段110がスタンド間冷却流量を決める演算の中で、同一冷却水量でFDTが一定になる値に決定する。また定常速度から終期速度へ至る勾配は、設備制約や許容する温度変化の範囲で決められる。スタンドF5出側の鋼板速度が決まると、スタンドF5の圧延ロール210の回転速度が決まり、さらにこの値から各スタンドの圧下率(入側板厚と出側板厚の比)に従って他スタンドの圧延ロール210の回転速度が決定される。   The gradient of the speed change from the initial speed to the steady speed is determined to be a value at which the FDT becomes constant with the same cooling water amount in the calculation in which the preset control unit 110 determines the inter-stand cooling flow rate. In addition, the gradient from the steady speed to the final speed is determined by the equipment constraints and the allowable temperature change range. When the steel plate speed on the exit side of the stand F5 is determined, the rotation speed of the rolling roll 210 of the stand F5 is determined. Is determined.

図4は、目標温度テーブル114の構成を示すものである。
鋼板の種類(鋼種)に対応して熱間仕上げ圧延機出側温度(FDT)の目標値が層別された例を示している。プリセット制御手段110は鋼板202の該当する鋼種を判定して、目標温度テーブル114から対応する目標温度を抽出する。例えば鋼種がSS400のとき、熱間仕上げ圧延機出側の目標温度は880℃であることを示している。目標温度は上位計算機から製造指令に含めて受信した値を使用することもできる。
FIG. 4 shows the configuration of the target temperature table 114.
The example in which the target value of the hot finish rolling mill outlet side temperature (FDT) is stratified corresponding to the type (steel type) of the steel plate is shown. The preset control unit 110 determines a corresponding steel type of the steel plate 202 and extracts a corresponding target temperature from the target temperature table 114. For example, when the steel type is SS400, the target temperature on the hot finish rolling mill outlet side is 880 ° C. As the target temperature, the value received from the host computer in the manufacturing command can be used.

[熱間仕上げ圧延機出側温度制御装置の動作]
次に、図5のフローチャートを参照して、プリセット制御手段110が実行する処理を説明する。
まず、プリセット制御手段110は、目標温度テーブル114から目標温度を、速度テーブル113から初期速度を取り込む(ステップS5−1)。またプリセット制御手段110は、標準流量パターンテーブル112から標準流量パターンを取り込む(ステップS5−2)。
[Operation of hot finish rolling mill outlet temperature controller]
Next, processing executed by the preset control unit 110 will be described with reference to the flowchart of FIG.
First, the preset control means 110 takes in the target temperature from the target temperature table 114 and the initial speed from the speed table 113 (step S5-1). The preset control means 110 takes in the standard flow rate pattern from the standard flow rate pattern table 112 (step S5-2).

そして、プリセット制御手段110は、取り込んだ条件の下で熱間仕上げ圧延機出側温度(FDT)を予測する計算を行う(ステップS5−3)。FDTをより正確に予測するためには、鋼板202が熱間仕上げ圧延機201に進入するときの温度である熱間仕上げ圧延機入側温度(Finishing Mill Entry Temperature :FET)を初期値として、鋼板202からの熱輻射、対流熱伝導、圧延の塑性変形に伴う加工発熱、鋼板202が圧延ロール210に接触中に奪われる接触伝導熱、鋼板202と圧延ロール210の摩擦による摩擦発熱、スタンド間冷却装置からの冷却水スプレーによる温度降下等、種々の要因を数式で表し、各スタンドで積算していく計算が必要になる。それぞれの計算式は従来から種々検討されており、例えば「板圧延の理論と実際」(日本鉄鋼協会編、1984)に詳しく述べられている。一例として、冷却水を吹きつけていないときの熱輻射による熱伝達係数hrの計算式を(1)式に示す。   And the preset control means 110 performs the calculation which estimates a hot finish rolling mill delivery side temperature (FDT) under the taken-in conditions (step S5-3). In order to predict the FDT more accurately, the steel plate 202 is set to the initial value of the hot finishing mill entry temperature (FET), which is the temperature when the steel plate 202 enters the hot finishing mill 201. Heat radiation from 202, convection heat conduction, processing heat generation due to plastic deformation of rolling, contact conduction heat taken away when steel plate 202 is in contact with rolling roll 210, frictional heat generation due to friction between steel plate 202 and rolling roll 210, cooling between stands Various factors such as a temperature drop due to the spray of cooling water from the device are expressed in mathematical formulas, and calculation is required to be integrated at each stand. Various calculation formulas have been studied in the past, and are described in detail, for example, in “Theory and Practice of Sheet Rolling” (edited by the Japan Iron and Steel Institute, 1984). As an example, a formula for calculating the heat transfer coefficient hr by heat radiation when cooling water is not blown is shown in Formula (1).

(数1)
hr=σ・ε[{(273+Tsu)/100}4−{(273+Ta)/100}4]/(Tsu-Ta) ・・・・(1)

ただし σ:ステファンボルツマン定数(=4.88)
ε:放射率
Ta:空気温度(℃)
Tsu:鋼板202の表面温度
(Equation 1)
hr = σ · ε [{(273 + Tsu) / 100} 4 − {(273 + Ta) / 100} 4 ] / (Tsu-Ta) (1)

Where σ: Stefan Boltzmann constant (= 4.88)
ε: Emissivity
Ta: Air temperature (℃)
Tsu: Surface temperature of the steel plate 202

鋼板202がスタンド間を移動している間、移動に伴い(1)式に従って熱が鋼板202から奪われる。また冷却されている場合は、例えば「板圧延の理論と実際」に記載の関係式に従って、冷却水量に応じた熱が奪われる。各要因により奪われたり与えられたりする熱量の総和を熱伝達係数に置き換え、一定時間Δの間に鋼板から出入りする熱量を算出する。時間がΔ経過する前の鋼板202の温度をもとに、(2)式によりΔ時間の熱量の移動を加減算する。   While the steel plate 202 is moving between the stands, heat is removed from the steel plate 202 according to the equation (1) as it moves. In the case of cooling, for example, according to the relational expression described in “Theory and practice of plate rolling”, heat corresponding to the amount of cooling water is taken away. The total amount of heat deprived or given by each factor is replaced with a heat transfer coefficient, and the amount of heat entering and exiting the steel plate during a certain time Δ is calculated. Based on the temperature of the steel plate 202 before the time Δ has elapsed, the movement of the calorie in Δ time is added or subtracted by the equation (2).

(数2)
Tn=Tn-1−(ht+hb)*Δ/(ρ*C*B) ・・・・(2)

ただし Tn:現在の鋼板温度
Tn-1:Δ前の鋼板温度
ht:鋼板表面の熱伝達係数
hb:鋼板裏面の熱伝達係数
ρ:鋼板202の密度
C:鋼板202の比熱
B:鋼板202の厚み
(Equation 2)
Tn = Tn-1− (ht + hb) * Δ / (ρ * C * B) (2)

Where Tn: Current steel plate temperature
Tn-1: Steel plate temperature before Δ
ht: Heat transfer coefficient of steel sheet surface
hb: Heat transfer coefficient on the back of the steel plate
ρ: density of the steel plate 202
C: Specific heat of steel plate 202
B: Thickness of the steel plate 202

また鋼板202の厚みが大きいなど厚み方向の熱伝導を考慮する必要がある場合には、よく知られる熱方程式を解くことで計算できる。熱方程式は(3)式で表され、時間方向に加えて厚み方向について計算機で差分計算する方法は、種々の文献で公開されている。   Further, when it is necessary to consider the heat conduction in the thickness direction such as the thickness of the steel plate 202 is large, it can be calculated by solving a well-known heat equation. The heat equation is expressed by equation (3), and methods for calculating a difference with a computer in the thickness direction in addition to the time direction are disclosed in various documents.

(数3)
∂T/∂t={λ/(ρ*C)}(∂2T/∂x2) ・・・・(3)
ただし λ:熱伝導率
T:材料温度
x:鋼板202の厚み方向の位置
(Equation 3)
∂T / ∂t = {λ / (ρ * C)} (∂ 2 T / ∂x 2 ) (3)
Where λ: thermal conductivity
T: Material temperature
x: position in the thickness direction of the steel plate 202

上記(1)式〜(3)式の計算を鋼板202の先端部について、スタンドF1に噛み込んでからスタンドF5を抜けるまでの間、時間を進ませて計算することで、鋼板202先端部のFDTが算出できる。   The calculation of the above formulas (1) to (3) is performed for the front end of the steel plate 202 by calculating the time from the time when the steel plate 202 is bitten into the stand F1 until it passes through the stand F5. FDT can be calculated.

そして、プリセット制御手段110は、FDTが目標温度(Ttarget)に対して一定範囲(±α)に入っているかどうかを判定する。FDTが目標温度より高い場合はスタンド間冷却水流量を増やす処理を行い、FDTが目標温度より低い場合はスタンド間冷却水流量を減らす処理を行う。上記以外の場合は、スタンド間冷却水流量を維持する(ステップS5−4)。流量の増減処理は、各スタンド間の冷却水量を一定割合で増減させればよいが、特定のスタンドの水量を増減させることも考えられる。   Then, the preset control unit 110 determines whether or not the FDT is within a certain range (± α) with respect to the target temperature (Ttarget). When the FDT is higher than the target temperature, a process for increasing the inter-stand cooling water flow rate is performed. When the FDT is lower than the target temperature, a process for decreasing the inter-stand cooling water flow rate is performed. In cases other than the above, the inter-stand cooling water flow rate is maintained (step S5-4). In the flow rate increase / decrease process, the amount of cooling water between the stands may be increased / decreased at a constant rate, but it is also conceivable to increase / decrease the water amount of a specific stand.

次に、プリセット制御手段110は、終了条件を判定する(ステップS5−5)。一般にはFDTが一定範囲に入ったことを終了条件とすればよいが、ステップS5−3,S5−4の計算繰り返し回数を終了条件に付加することも考えられる。   Next, the preset control unit 110 determines an end condition (step S5-5). In general, the end condition is that the FDT is within a certain range, but it is also conceivable to add the number of calculation repetitions of steps S5-3 and S5-4 to the end condition.

最後に、プリセット制御手段110は、速度テーブル113で定められた定常速度まで、鋼板202を加速するときの加速率を決定し、鋼板202の速度パターンを確定する(ステップS5−6)。加速率Vrはあらかじめ定数として定めておいてもよいが、熱間仕上げ圧延機入側における鋼板202の温度が、鋼板202の長手方向に低下することを補償する目的で、鋼板202の先端から鋼板202の長手方向の部位に対するFETの降下率FETrにしたがって、(4)式に基づいて算出することも考えられる。   Finally, the preset control means 110 determines the acceleration rate when accelerating the steel plate 202 up to the steady speed determined in the speed table 113, and determines the speed pattern of the steel plate 202 (step S5-6). Although the acceleration rate Vr may be determined in advance as a constant, for the purpose of compensating that the temperature of the steel plate 202 on the hot finish rolling mill entrance side decreases in the longitudinal direction of the steel plate 202, the steel plate 202 extends from the front end to the steel plate 202. It is also conceivable to calculate based on the equation (4) according to the FET drop rate FETr with respect to the longitudinal portion of 202.

(数4)
Vr=(∂V/∂FDT)・(∂FDT/∂FET)・ΔFETr ・・・・(4)
(Equation 4)
Vr = (∂V / ∂FDT) ・ (∂FDT / ∂FET) ・ ΔFETr (4)

(∂V/∂FDT)は鋼板速度の変化に対するFDTの変化量の逆数、(∂FDT/∂FET)はFETの変化に対するFDTの変化量である。(∂V/∂FDT)、(∂FDT/∂FET)はステップS5−1〜ステップS5−4においてFDTを算出するのと同様に、鋼板速度やFETを微小に変化させてFDTの変化量を計算することで得ることが出来る。また該当する鋼板速度やFET、冷却水量に対応した値をシミュレーション等で求めておき、あらかじめテーブルに蓄えておくことも考えられる。以上の計算により、次回圧延される鋼板202に対する各スタンド間冷却水量が決定される。   (∂V / ∂FDT) is the reciprocal of the amount of change in FDT with respect to the change in steel plate speed, and (∂FDT / ∂FET) is the amount of change in FDT with respect to the change in FET. (∂V / ∂FDT), (∂FDT / ∂FET) is the same as calculating FDT in step S5-1 to step S5-4, and changes the steel plate speed and the FET to slightly change the FDT change amount. It can be obtained by calculating. It is also conceivable that values corresponding to the relevant steel plate speed, FET, and cooling water amount are obtained by simulation or the like and stored in advance in a table. Through the above calculation, the inter-stand cooling water amount for the steel plate 202 to be rolled next time is determined.

次に、図6のフローチャートを参照して、フィードバック制御起動タイミング生成手段120が実行する処理を説明する。
フィードバック制御起動タイミング生成手段120は数百ms程度の周期で、タイマー起動される。まず、フィードバック制御起動タイミング生成手段120が、最終スタンド(F5)の圧延ロール210の回転速度Vを取り込む(ステップS6−1)。次に、この値から求めた鋼板速度を積分して、鋼板202の移動量を算出する(ステップS6−2)。ここで鋼板速度は広く知られる圧延理論(圧延ロールの前側と後側で鋼板速度が異なる)に従って、以下の式により算出できる。すなわち圧延ロール210入側の鋼板速度Vsbは後進率φを用いて(5)式で、また圧延ロール210出側の鋼板速度Vsfは先進率fを用いて(6)式で求められる。
Next, processing executed by the feedback control activation timing generation unit 120 will be described with reference to the flowchart of FIG.
The feedback control activation timing generation means 120 is activated by a timer with a period of about several hundred ms. First, the feedback control activation timing generation unit 120 takes in the rotation speed V of the rolling roll 210 of the final stand (F5) (step S6-1). Next, the moving speed of the steel plate 202 is calculated by integrating the steel plate speed obtained from this value (step S6-2). Here, the steel plate speed can be calculated by the following formula according to the widely known rolling theory (the steel plate speed is different between the front side and the rear side of the rolling roll). That is, the steel plate speed Vsb on the rolling roll 210 entry side is obtained by the equation (5) using the reverse speed φ, and the steel plate speed Vsf on the exit side of the rolling roll 210 is obtained by the equation (6) using the advanced rate f.

(数5)
Vsb=(1−φ)Vr ・・・・(5)
(Equation 5)
Vsb = (1−φ) Vr (5)

(数6)
Vsf=(1+f)Vr ・・・・(6)
(Equation 6)
Vsf = (1 + f) Vr (6)

そして、フィードバック制御起動タイミング生成手段120は、フィードバック制御でスタンド間冷却水量を変更したタイミングで、変更対象となったスタンド間冷却装置205〜208直下の鋼板部位が、熱間仕上げ圧延機出側温度計203を通過したかどうかを判定する(ステップS6−3)。通過していない場合は処理を終了する。通過している場合は、一定時間が経過したかどうかを判定する(ステップS6−4)。   And the feedback control start timing generation means 120 is the timing at which the amount of cooling water between the stands is changed by feedback control, and the steel plate portion immediately below the inter-stand cooling devices 205 to 208 which is the change target is the hot finish rolling mill outlet temperature. It is determined whether or not the total 203 has been passed (step S6-3). If not, the process is terminated. If it has passed, it is determined whether or not a certain time has passed (step S6-4).

ステップS6−4の判定処理において、スタンド間冷却装置205〜208に水量変更指令を与えた後、対応する水量が鋼板202の冷却に反映されるまでの時間(通常1〜2秒程度)に相当する時間が経過していないと判定されたときは、同様に処理を終了する。一定時間が経過した場合は、フィードバック制御起動タイミング生成手段120からフィードバック制御手段130に起動信号を出力する(ステップS6−5)。   In the determination process of step S6-4, after giving a water amount change command to the inter-stand cooling devices 205 to 208, it corresponds to the time (usually about 1 to 2 seconds) until the corresponding water amount is reflected in the cooling of the steel plate 202. When it is determined that the time to perform has not elapsed, the process is similarly terminated. When the predetermined time has elapsed, the activation signal is output from the feedback control activation timing generation unit 120 to the feedback control unit 130 (step S6-5).

最後に、フィードバック制御起動タイミング生成手段120は鋼板移動量算出用の積分値をクリア(初期化)する(ステップS6−6)。以下、タイマーによりフィードバック制御起動タイミング生成手段120が起動されることで、周期的にステップS6−1〜ステップS6−6の処理を繰り返す。   Finally, the feedback control activation timing generation means 120 clears (initializes) the integral value for calculating the steel plate movement amount (step S6-6). Thereafter, the feedback control activation timing generation unit 120 is activated by the timer, so that the processing of Step S6-1 to Step S6-6 is periodically repeated.

次に、図7のフローチャートを参照して、フィードバック制御手段130に備えられた操作端選択手段131の処理を説明する。
操作端選択手段131は、圧延中に熱間仕上げ圧延機出側温度計203を用いて鋼板202から検出されたFDT(熱間仕上げ圧延機出側温度)と目標温度との間に偏差があったとき、この偏差をスタンド間冷却水量の変化により解消するか、鋼板速度の変化により解消するかを判定し、判定結果を変更量算出手段132に出力する処理を実行する。本実施の形態では、偏差の符号に着目して、この偏差をスタンド間冷却水量の変化により解消するか、鋼板速度の変化により解消するかを決定する例としてある。
Next, processing of the operation end selection unit 131 provided in the feedback control unit 130 will be described with reference to the flowchart of FIG.
The operation end selecting means 131 has a deviation between the target temperature and the FDT (hot finish rolling mill temperature) detected from the steel plate 202 using the hot finish rolling mill delivery thermometer 203 during rolling. When this occurs, it is determined whether this deviation is eliminated by a change in the amount of cooling water between the stands or a change in the steel plate speed, and processing for outputting the determination result to the change amount calculation means 132 is executed. In this embodiment, focusing on the sign of the deviation, an example is given in which it is determined whether this deviation is eliminated by a change in the amount of cooling water between stands or a change in the steel plate speed.

まず、操作端選択手段131は、熱間仕上げ圧延機出側温度の目標値と計測値を取り込む(ステップS7−1)。次に、操作端選択手段131は、計測値から目標値を減じた値を温度偏差として算出し、温度偏差の絶対値があらかじめ定めたしきい値以上かどうかを判定する(ステップS7−2)。温度偏差の絶対値がしきい値以上のときは温度偏差の符号を判定する(ステップS7−4)。符号が正のとき、すなわち計測値が目標値にしきい値を加算した値より大きいとき、操作端選択手段131は、冷却水量を操作端に設定する(ステップS7−5)。符号が負のとき、すなわち計測値が目標値からしきい値を減算した値より小さいとき、操作端選択手段131は、鋼板速度を操作端に設定する(ステップS7−6)。   First, the operating end selection means 131 takes in the target value and measured value of the hot finish rolling mill delivery side temperature (step S7-1). Next, the operating end selection unit 131 calculates a value obtained by subtracting the target value from the measured value as a temperature deviation, and determines whether or not the absolute value of the temperature deviation is equal to or greater than a predetermined threshold value (step S7-2). . When the absolute value of the temperature deviation is equal to or greater than the threshold value, the sign of the temperature deviation is determined (step S7-4). When the sign is positive, that is, when the measured value is larger than the value obtained by adding the threshold value to the target value, the operation end selection means 131 sets the cooling water amount to the operation end (step S7-5). When the sign is negative, that is, when the measured value is smaller than the value obtained by subtracting the threshold value from the target value, the operation end selection means 131 sets the steel plate speed to the operation end (step S7-6).

ステップS7−2の判定処理において温度偏差の絶対値がしきい値以上でないと判定されたときは、操作端選択手段131は、スタンド間冷却水量と鋼板速度のいずれも変化させない(操作量ゼロ)ので、操作端の設定をなしとする(ステップS7−3)。最後に、ステップS7−5,S7−6で設定した操作端と温度偏差を変更量算出手段132に出力する(ステップS7−7)。   When it is determined in step S7-2 that the absolute value of the temperature deviation is not equal to or greater than the threshold value, the operation end selection means 131 does not change either the inter-stand cooling water amount or the steel plate speed (zero operation amount). Therefore, the operation end is not set (step S7-3). Finally, the operation end and temperature deviation set in steps S7-5 and S7-6 are output to the change amount calculation means 132 (step S7-7).

続いて、図8のフローチャートを参照して、フィードバック制御手段130に備えられた変更量算出手段132の処理を説明する。
まず、フィードバック制御手段130は、操作端選択手段131の出力に従って操作端の選定を行う(ステップS8−1)。変更量算出手段132は、冷却水量を操作端に選定したときは、温度偏差が小さくなるよう各スタンド間冷却水量の変更量ΔQを(7)式に従って算出する(ステップS8−2)。例えば、変更量ΔQのうち、Δq1で変更量全体の50%、Δq2で同30%、Δq3で同20%、Δq4は同0%などのように、スタンド間冷却装置ごとに冷却水量の変更量が適宜設定される。
Next, the processing of the change amount calculation unit 132 provided in the feedback control unit 130 will be described with reference to the flowchart of FIG.
First, the feedback control unit 130 selects an operation end according to the output of the operation end selection unit 131 (step S8-1). When the amount of cooling water 132 is selected as the operation end, the amount-of-change calculating means 132 calculates the amount of change ΔQ of the amount of cooling water between the stands according to the equation (7) so that the temperature deviation becomes small (step S8-2). For example, among the change amounts ΔQ, Δq1 is 50% of the total change amount, Δq2 is 30%, Δq3 is 20%, Δq4 is 0%, etc. Is appropriately set.

(数7)
ΔQ=(Δq1、Δq2、Δq3、Δq4) ・・・・(7)

ただし、Δq1:F1-F2間冷却水量の変更量
Δq2:F2-F3間冷却水量の変更量
Δq3:F3-F4間冷却水量の変更量
Δq4:F4-F5間冷却水量の変更量
(Equation 7)
ΔQ = (Δq1, Δq2, Δq3, Δq4) (7)

However, Δq1: Change amount of cooling water between F1 and F2
Δq2: Change amount of cooling water between F2 and F3
Δq3: Change amount of cooling water between F3 and F4
Δq4: Change amount of cooling water between F4 and F5

より具体的には、第1の影響係数テーブル133から取り込んだ現在の状態に該当した層別の影響係数(∂FDT/∂Q)とFDTの温度偏差とから、下記の演算によりスタンド間冷却水量の変更量を計算する。   More specifically, the amount of cooling water between stands is calculated by the following calculation from the influence coefficient (の FDT / ∂Q) for each layer corresponding to the current state taken from the first influence coefficient table 133 and the temperature deviation of the FDT. Calculate the amount of change.

(数8)
Δqi=Gqi・{1/(∂FDT/∂Q)i}・ΔFDT ・・・・(8)

ただし i:スタンド間番号
(1:F1-F2間、2:F2-F3間、3:F3-F4間、4:F4-F5間)
Δqi:フィードバック制御によるスタンド間iの冷却水量の変更量
Gqi:定数(冷却水量を操作端としたときのフィードバック制御ゲイン)
ΔFDT:温度偏差
(Equation 8)
Δqi = Gqi ・ {1 / (∂FDT / ∂Q) i} ・ ΔFDT ・ ・ ・ ・ (8)

I: Number between stands
(1: Between F1-F2, 2: Between F2-F3, 3: Between F3-F4, 4: Between F4-F5)
Δqi: Change amount of cooling water between stands i by feedback control
Gqi: Constant (feedback control gain when the cooling water volume is the operating end)
ΔFDT: Temperature deviation

冷却水量が操作端として選択されるのは、計測温度が目標温度より高い場合なので、ΔFDTは正である。このとき計算の結果得られる冷却水量の変更量Δqiも正となり、スタンド間冷却装置205〜208における冷却水量は、常に増加する方向に操作される。   Since the cooling water amount is selected as the operation end when the measured temperature is higher than the target temperature, ΔFDT is positive. At this time, the change amount Δqi of the cooling water amount obtained as a result of the calculation is also positive, and the cooling water amount in the inter-stand cooling devices 205 to 208 is always operated in an increasing direction.

なお、ΔFDTを解消するスタンドは、フィードバック制御の応答性および制御効果から下流スタンド(出側に近い方)を優先的に選択するのが良いが、鋼板202が薄く圧延されてから冷却すると鋼板202の形状に悪影響を与える場合もある。この点を考慮して、フィードバック制御の応答性をある程度犠牲にして、入側スタンドから優先的に選択する方法も考えられる。フィードバック制御ゲインはこのような点に配慮し、どのスタンドでどれくらい温度偏差を解消するかに従って決められる。   As the stand for eliminating ΔFDT, it is preferable to preferentially select the downstream stand (the one closer to the exit side) from the responsiveness and control effect of feedback control. However, when the steel plate 202 is cooled after being thinly rolled, the steel plate 202 is used. It may adversely affect the shape. In consideration of this point, a method of preferentially selecting from the entrance stand at the expense of the feedback control response to some extent may be considered. Considering these points, the feedback control gain is determined according to how much the temperature deviation is eliminated at which stand.

ここで、図9に第1の影響係数テーブル133の構成例を示す。
第1の影響係数テーブル133には、冷却水量を単位量変化させたときのFDTの変化量に対応した数値である∂FDT/∂Q(℃)が、鋼種、圧延後(スタンドF5出側)の板厚、スタンド間で層別され、格納されている。図9の例では、鋼種が炭素鋼(SS400)、板厚が2mm以下のとき、スタンドF1−F2間の(∂FDT/∂Q)は0.10℃であり、冷却水を単位流量で増減すると、熱間仕上げ圧延機出側温度計203で計測されるFDTが0.10℃、低下または上昇することを示している。同様にスタンドF2−F3間では0.58℃、スタンドF3−F4間では1.06℃、スタンドF4−F5間では1.52℃が設定されている。なお、層別項目として熱間仕上げ圧延機出側の鋼板速度を加えることも考えられる。この場合、第1の影響係数テーブル133に鋼板速度の項目が追加され、鋼板速度ごとに(∂FDT/∂Q)が設定される。
Here, FIG. 9 shows a configuration example of the first influence coefficient table 133.
In the first influence coefficient table 133, ∂FDT / ∂Q (° C.), which is a numerical value corresponding to the amount of change in FDT when the amount of cooling water is changed by a unit amount, is the steel type, after rolling (outside of stand F5) The thickness of the plates is stratified and stored between stands. In the example of FIG. 9, when the steel type is carbon steel (SS400) and the plate thickness is 2 mm or less, (∂FDT / ∂Q) between the stands F1 and F2 is 0.10 ° C., and the cooling water is increased or decreased by the unit flow rate. Then, the FDT measured by the hot finish rolling mill outgoing side thermometer 203 is shown to decrease or increase by 0.10 ° C. Similarly, 0.58 ° C. is set between the stands F2 and F3, 1.06 ° C. is set between the stands F3 and F4, and 1.52 ° C. is set between the stands F4 and F5. In addition, it is also conceivable to add the steel plate speed on the delivery side of the hot finish rolling mill as a stratified item. In this case, a steel plate speed item is added to the first influence coefficient table 133, and (∂FDT / ∂Q) is set for each steel plate speed.

ところで、ステップS8−2の処理で算出された各スタンド間の冷却水量の変更量を現在の冷却水量に加算した結果、各スタンド間の冷却水量(冷却能力)の上限に達した場合、冷却水量の増加だけでは温度偏差を解消することができないことも想定され、温度偏差を小さくするためのさらなる処置が必要になる。そこで、変更量算出手段132は以下の処理を行う。   By the way, as a result of adding the change amount of the cooling water amount between the stands calculated in the process of step S8-2 to the current cooling water amount, when the upper limit of the cooling water amount (cooling capacity) between the stands is reached, the cooling water amount It is assumed that the temperature deviation cannot be eliminated only by increasing the temperature, and further measures for reducing the temperature deviation are required. Therefore, the change amount calculation unit 132 performs the following processing.

まず、変更量算出手段132は、各スタンド間で冷却水量を増加させた結果、冷却水量が上限に達したかどうかを判定する(ステップS8−3)。上限に達していた場合は、冷却水量が上限に達したスタンド間冷却装置の現時点の冷却水量を基点として冷却水量が上限となる変更量(Δqimax)に固定する(ステップS8−4)。そして、第2の影響係数テーブル134から取り込んだ現在の状態に該当した層別の影響係数(∂FDT/∂V)を用いて、下式により、冷却水量を上限まで増加させてもなお未解消の温度偏差(温度偏差の残量)を解消するために、低下させる鋼板速度の変更量を算出する(ステップS8−5)。   First, the change amount calculation means 132 determines whether or not the amount of cooling water has reached the upper limit as a result of increasing the amount of cooling water between the stands (step S8-3). If the upper limit has been reached, the change amount (Δqimax) at which the cooling water amount becomes the upper limit is fixed based on the current cooling water amount of the inter-stand cooling device that has reached the upper limit (step S8-4). Then, even if the cooling water amount is increased to the upper limit by the following equation using the influence coefficient (∂FDT / ∂V) for each layer corresponding to the current state taken from the second influence coefficient table 134, it is still unresolved. In order to eliminate the temperature deviation (remaining temperature deviation), a change amount of the steel plate speed to be reduced is calculated (step S8-5).

(数9)
ΔV=ΣGv・{1/(∂FDT/∂V)}・{(∂FDT/∂Q)i }(Δqimax−Δqi) ・・・・(9)

ただし Σ:各スタンド間で計算した値の総和
Δqi:フィードバック制御によるスタンド間iの冷却水量の変更量
Gv:定数(鋼板速度を操作端としたときのフィードバック制御ゲイン)
(Equation 9)
ΔV = ΣGv {1 / (∂FDT / ∂V)} · {(∂FDT / ∂Q) i} (Δqimax−Δqi) (9)

Where Σ is the sum of the values calculated between each stand
Δqi: Change amount of cooling water between stands i by feedback control
Gv: Constant (feedback control gain when the steel plate speed is the operating end)

このように変更量算出手段132は、温度偏差の残量と第2の影響係数テーブル134の内容と(9)式に基づいて計算した鋼板速度の変更量を、速度指令生成手段150に出力する。そして、速度指令生成手段150からの各スタンドロール速度指令に基づいて、各スタンドの圧延ロール210の回転速度が減速する方向に制御され、鋼板速度が低下する。その結果、鋼板温度が低下し、目標温度との温度偏差を小さくすることができる。   In this way, the change amount calculation means 132 outputs the remaining amount of temperature deviation, the contents of the second influence coefficient table 134, and the change amount of the steel plate speed calculated based on the equation (9) to the speed command generation means 150. . Then, based on each stand roll speed command from the speed command generating means 150, the rotational speed of the rolling roll 210 of each stand is controlled in a decreasing direction, and the steel plate speed decreases. As a result, the steel plate temperature is lowered, and the temperature deviation from the target temperature can be reduced.

次に、図10に第2の影響係数テーブル134の構成例を示す。
第2の影響係数テーブル134には、鋼板202の速度を1mpm増加または減少させたときのFDTの変化量に対応した数値である∂FDT/∂Vが、鋼種、熱間仕上げ圧延機出側板速、熱間仕上げ圧延機出側板厚(目標板厚)で層別されて格納されている。図10の例では、鋼種が炭素鋼(SS400)、F5出側板速が400mpm以下、板厚が2mm以下のとき、(∂FDT/∂V)=0.42℃であり、鋼板速度の1mpmの変化に対して、熱間仕上げ圧延機出側温度計203で計測されるFDTが0.42℃変化することを示している。
Next, FIG. 10 shows a configuration example of the second influence coefficient table 134.
In the second influence coefficient table 134, ∂FDT / ∂V, which is a numerical value corresponding to the amount of change in FDT when the speed of the steel plate 202 is increased or decreased by 1 mpm, is the steel type, hot rolling mill delivery side plate speed. The hot finish rolling mill is stored by being divided into layers on the delivery side thickness (target thickness). In the example of FIG. 10, when the steel type is carbon steel (SS400), the F5 delivery side plate speed is 400 mpm or less, and the plate thickness is 2 mm or less, (∂FDT / ∂V) = 0.42 ° C. It shows that the FDT measured by the hot finish rolling mill output side thermometer 203 changes by 0.42 ° C. with respect to the change.

一方、ステップS8−1の判定処理で操作端に鋼板速度が選定されたとき、変更量算出手段132は、温度偏差が小さくなるような鋼板速度の変更量ΔVを(10)式に従って算出する(ステップS8−6)。具体的には第1の影響係数テーブル133から取り込んだ現在の状態に該当した層別の影響係数(∂FDT/∂Q)とFDTの温度偏差とから、下記の演算によりスタンド間冷却水量の変更量を計算する。   On the other hand, when the steel plate speed is selected as the operation end in the determination process of step S8-1, the change amount calculation means 132 calculates the change amount ΔV of the steel plate speed according to the equation (10) so that the temperature deviation becomes small ( Step S8-6). Specifically, the amount of cooling water between stands is changed by the following calculation from the influence coefficient (∂FDT / ∂Q) for each layer corresponding to the current state taken from the first influence coefficient table 133 and the temperature deviation of the FDT. Calculate the quantity.

(数10)
ΔV=−Gv・{1/(∂FDT/∂V)}・ΔFDT ・・・・(10)

ただし i:スタンド間番号
(1:F1-F2間、2:F2-F3間、3:F3-F4間、4:F4-F5間)
Δqi:巻取り温度FB制御によるスタンド間iの冷却水量の変更量
Gqi:定数(冷却水量を操作端としたときのフィードバック制御ゲイン)
ΔFDT:温度偏差
(Equation 10)
ΔV = −Gv · {1 / (∂FDT / ∂V)} · ΔFDT (10)

I: Number between stands
(1: Between F1-F2, 2: Between F2-F3, 3: Between F3-F4, 4: Between F4-F5)
Δqi: Change amount of cooling water amount between stands by coiling temperature FB control
Gqi: Constant (feedback control gain when the cooling water volume is the operating end)
ΔFDT: Temperature deviation

ここで鋼板速度が操作端として選択されるのは、計測温度が目標温度より低い場合なので、ΔFDTは負である。このとき計算の結果得られる鋼板速度の変更量ΔVは正となり、鋼板速度は、常に増加する方向に操作される。   Here, the steel plate speed is selected as the operating end when the measured temperature is lower than the target temperature, so ΔFDT is negative. At this time, the change amount ΔV of the steel plate speed obtained as a result of the calculation becomes positive, and the steel plate speed is always manipulated in the increasing direction.

ところで、ステップS8−6の処理で算出された鋼板速度の変更量を現在の鋼板速度に加算した結果、鋼板速度(圧延ロールの回転能力)の上限に達した場合、鋼板速度の増加だけでは温度偏差を解消することができないことも想定され、温度偏差を小さくするためのさらなる処置が必要になる。そこで、変更量算出手段132では以下の処理を行う。   By the way, as a result of adding the change amount of the steel plate speed calculated in the process of step S8-6 to the current steel plate speed, when the upper limit of the steel plate speed (rotation capability of the rolling roll) is reached, the temperature can be increased only by increasing the steel plate speed. It is assumed that the deviation cannot be eliminated, and further measures are required to reduce the temperature deviation. Therefore, the change amount calculation unit 132 performs the following processing.

まず、変更量算出手段132は、鋼板速度を増加させた結果、鋼板速度が上限に達したかどうかを判定する(ステップS8−7)。鋼板速度の上限値は各スタンドの圧延ロール210を駆動するモータのトルクや回転数の制限、鋼板202の後端が圧延ロール210から尻抜けするときの速度制限等、種々の要因を加味して決定される。上限に達していた場合は、現時点の鋼板速度を基点として鋼板速度が上限となる変更量(ΔVmax)に固定する(ステップS8−8)。   First, the change amount calculation means 132 determines whether the steel plate speed has reached the upper limit as a result of increasing the steel plate speed (step S8-7). The upper limit value of the steel plate speed takes into account various factors such as the limitation of the torque and rotation speed of the motor that drives the rolling roll 210 of each stand, and the speed limitation when the rear end of the steel plate 202 slips out of the rolling roll 210. It is determined. If the upper limit has been reached, the change rate (ΔVmax) at which the steel plate speed becomes the upper limit is fixed based on the current steel plate speed (step S8-8).

そして、第1の影響係数テーブル133から取り込んだ現在の状態に該当した層別の影響係数(∂FDT/∂Q)を用いて、下式により、鋼板速度を上限まで上昇させてもなお未解消の温度偏差(温度偏差の残量)を解消するために、低下させる各スタンド間冷却水量の変更量を算出する(ステップS8−9)。   And even if the steel plate speed is increased to the upper limit by the following formula using the influence coefficient (取 り FDT / ∂Q) for each layer corresponding to the current state taken from the first influence coefficient table 133, it is still unresolved In order to eliminate the temperature deviation (remaining temperature deviation), a change amount of the cooling water amount between the stands to be reduced is calculated (step S8-9).

(数11)
Δqi=Gqi・{1/(∂FDT/∂Q)i}・(∂FDT/∂V)・(ΔVmax-ΔV) ・・・・(11)
(Equation 11)
Δqi = Gqi ・ {1 / (∂FDT / ∂Q) i} ・ (∂FDT / ∂V) ・ (ΔVmax-ΔV) (11)

このように変更量算出手段132は、温度偏差の残量と第1の影響係数テーブル133の内容と(11)式に基づいて計算した各スタンド間冷却水量の変更量を、スタンド間冷却指令生成手段140に出力する。そして、スタンド間冷却指令生成手段140からのスタンド間冷却指令に基づいて、各スタンド間冷却装置205〜208の冷却水量が減少する方向に制御される。その結果、鋼板温度が上昇し、目標温度との温度偏差を小さくすることができる。   As described above, the change amount calculation means 132 generates the inter-stand cooling command generation amount based on the remaining amount of the temperature deviation, the contents of the first influence coefficient table 133, and the change amount of the cooling water amount between the stands calculated based on the equation (11). Output to means 140. Then, based on the inter-stand cooling command from the inter-stand cooling command generation means 140, the cooling water amount of each inter-stand cooling device 205-208 is controlled to decrease. As a result, the steel plate temperature rises and the temperature deviation from the target temperature can be reduced.

上述した実施の形態では、冷却水量の変化に対応するFDTの変化量を第1の影響係数テーブル133に、また鋼板速度の変化に対応するFDTの変化量を第2の影響係数テーブル134に蓄え、各テーブルから該当する影響係数を取り出す方式としたが、次回冷却制御される鋼板に対応した影響係数をその都度算出して、フィードバック制御に使用することもできる。例えば、以下に説明するような計算に従いプリセット制御手段110で各影響係数を算出し、算出した影響係数を該当する鋼板の冷却制御に先立ってフィードバック制御手段130に送信し、フィードバック制御手段130では、送信された影響係数を用いて冷却水量や鋼板速度の変更量を算出することもできる。影響係数は、例えば鋼板速度の変化に対応するFDTの変化量(∂FDT/∂V)の場合、下式により算出できる。   In the embodiment described above, the amount of change in FDT corresponding to the change in the amount of cooling water is stored in the first influence coefficient table 133, and the amount of change in FDT corresponding to the change in the steel plate speed is stored in the second influence coefficient table 134. Although the corresponding influence coefficient is extracted from each table, the influence coefficient corresponding to the steel sheet to be cooled next time can be calculated each time and used for feedback control. For example, each influence coefficient is calculated by the preset control means 110 according to the calculation described below, and the calculated influence coefficient is transmitted to the feedback control means 130 prior to the cooling control of the corresponding steel sheet. In the feedback control means 130, The change amount of the cooling water amount and the steel plate speed can also be calculated using the transmitted influence coefficient. For example, in the case of an FDT change amount (∂FDT / ∂V) corresponding to a change in steel plate speed, the influence coefficient can be calculated by the following equation.

(数12)
∂FDT /∂V={(FDT)1−(FDT)2}/(V1−V2) ・・・・(12)

ただし V1、V2:次回冷却制御される鋼板202の圧延速度近傍の速度
(V1≠V2)
(FDT)1:鋼板202が速度V1で圧延されたとき得られるFDT
(FDT)2:鋼板202が速度V2で圧延されたとき得られるFDT
(Equation 12)
∂FDT / ∂V = {(FDT) 1− (FDT) 2} / (V1−V2) (12)

However, V1, V2: Speeds near the rolling speed of the steel plate 202 to be cooled next time
(V1 ≠ V2)
(FDT) 1: FDT obtained when steel plate 202 is rolled at speed V1
(FDT) 2: FDT obtained when the steel plate 202 is rolled at a speed V2.

また各スタンド間の冷却水量の変化に対応するFDTの変化量に対する影響係数(∂FDT/∂Q)iも、各スタンド間について(13)式に従って算出できる。   In addition, the influence coefficient (∂FDT / ∂Q) i for the change amount of FDT corresponding to the change of the cooling water amount between the stands can be calculated according to the equation (13) between the stands.

(数13)
(∂FDT /∂Q)i={(FDT)1−(FDT)2}/{(qi)1−(qi)2} ・・・・(13)

ただし (qi)1、(qi)2:次回冷却制御される鋼板202の冷却水量近傍の水量
((qi)1≠(qi)2)
(FDT)1:鋼板202が(qi)1で冷却されたとき得られるFDT
(FDT)2:鋼板202が(qi)2で冷却されたとき得られるFDT
(スタンドi以外のスタンド間冷却水量はプリセット制御手段110が算出
した値)
i:スタンド番号
(Equation 13)
(∂FDT / ∂Q) i = {(FDT) 1− (FDT) 2} / {(qi) 1− (qi) 2} (13)

However, (qi) 1, (qi) 2: The amount of water in the vicinity of the amount of cooling water of the steel plate 202 to be cooled next time
((Qi) 1 ≠ (qi) 2)
(FDT) 1: FDT obtained when steel plate 202 is cooled at (qi) 1
(FDT) 2: FDT obtained when the steel plate 202 is cooled at (qi) 2.
(The amount of cooling water between stands other than stand i is calculated by the preset control means 110.
Value)
i: Stand number

[第1の実施の形態による効果]
以上説明したように、第1の実施の形態で表される本発明によれば、熱間仕上げ圧延機の出側温度制御において、熱間仕上げ圧延機出側温度偏差の符号に応じて操作端の切り替えを行う。それにより、鋼板の生産量を高めることに配慮しつつ、高精度な熱間仕上げ圧延機出側温度が得られる。したがって、鋼板の品質が向上する。
[Effects of First Embodiment]
As described above, according to the present invention represented in the first embodiment, in the outlet side temperature control of the hot finish rolling mill, the operation end according to the sign of the hot finish rolling mill outlet side temperature deviation. Switch. As a result, a high-precision hot finish rolling mill exit side temperature can be obtained while considering increasing the production amount of the steel sheet. Therefore, the quality of the steel plate is improved.

なお本実施の形態では、プリセット制御手段110とフィードバック制御手段130が同一の制御装置である熱間仕上げ圧延機出側温度制御装置100の中で実行するように構成したがこの例に限られない。例えば、熱間仕上げ圧延機の制御システムでよく見られる形態として、プリセット制御をプロセスコンピュータ、フィードバック制御をプラントコントローラで別々に実行する構成としてもよい。   In the present embodiment, the preset control unit 110 and the feedback control unit 130 are configured to be executed in the hot finish rolling mill outlet side temperature control device 100, which is the same control device. However, the present invention is not limited to this example. . For example, as a form often seen in a control system of a hot finish rolling mill, a configuration in which preset control is separately executed by a process computer and feedback control is separately executed by a plant controller may be employed.

また本実施の形態では、鋼板202の圧延中に操作量を補正する手段としてフィードバック制御手段130を備えるようにしたが、この他に熱間仕上げ圧延機入側に温度計を設置し、鋼板202の熱間仕上げ圧延機入側温度を検出してそのバラツキをさらに精度良く補償する手段を設ける構成も考えられる。   In the present embodiment, the feedback control means 130 is provided as a means for correcting the operation amount during rolling of the steel plate 202. In addition to this, a thermometer is installed on the inlet side of the hot finish rolling mill, and the steel plate 202 is provided. A configuration is also conceivable in which means for detecting the hot-side rolling mill entry-side temperature and compensating for the variation with higher accuracy is provided.

<2.第2の実施の形態>
第2の実施の形態は、前回の熱間仕上げ圧延機出側温度フィードバック制御の操作端が鋼板速度かスタンド間冷却水量かを判定し、判定結果に基づいて次回フィードバック制御の起動タイミングを決定するようにした例である。以下、第2の実施の形態の特徴または第1の実施の形態と異なる部分を中心に説明する。
<2. Second Embodiment>
In the second embodiment, it is determined whether the operation end of the previous hot finish rolling mill outlet temperature feedback control is the steel plate speed or the amount of cooling water between the stands, and the start timing of the next feedback control is determined based on the determination result. This is an example. The following description focuses on features of the second embodiment or parts different from the first embodiment.

図11は、本発明の第2の実施の形態に係る熱間仕上げ圧延機出側温度制御装置の構成例を示している。図11に示した熱間仕上げ圧延機出側温度制御装置100Aは、熱間仕上げ圧延機出側温度制御装置100(図1参照)と比較して、更に、ドラフトスケジュールテーブル121、トラッキング長算出手段122、トラッキング長テーブル123、フィードバック制御手段130内の冷却フィードバック(FB)制御優先順位テーブル135を備える点が異なる。各テーブルは、図示しないフラッシュメモリ等の不揮発性の記憶手段に記憶されている。   FIG. 11 shows a configuration example of a hot finish rolling mill outlet side temperature control device according to the second embodiment of the present invention. The hot finish rolling mill delivery side temperature control device 100A shown in FIG. 11 further includes a draft schedule table 121, tracking length calculation means, as compared with the hot finish rolling mill delivery side temperature control device 100 (see FIG. 1). 122, the tracking length table 123, and the cooling feedback (FB) control priority table 135 in the feedback control means 130 are provided. Each table is stored in non-volatile storage means such as a flash memory (not shown).

トラッキング長算出手段122は、熱間仕上げ圧延機の設備に関する情報と各スタンドにおける鋼板の圧延量とから、各スタンド間の冷却水量と鋼板速度のそれぞれを変化させたときに熱間仕上げ圧延機出側温度が変化するのに必要な鋼板202の移動距離(トラッキング長)を、熱間仕上げ圧延機出側の鋼板長換算で算出するものである。算出されたトラッキング長はトラッキング長テーブル123に記憶される。このトラッキング長を用いて、熱間仕上げ圧延機出側温度制御の操作端であるスタンド間冷却装置205〜208と鋼板速度のそれぞれに対して、操作量を変更後、最終スタンド(スタンドF5)出側から払い出された鋼板202の長さと比較する。   The tracking length calculation means 122 outputs the hot finish rolling mill when the amount of cooling water between the stands and the steel plate speed are changed from the information regarding the equipment of the hot finish rolling mill and the rolling amount of the steel plate at each stand. The moving distance (tracking length) of the steel plate 202 necessary for changing the side temperature is calculated in terms of the steel plate length on the delivery side of the hot finish rolling mill. The calculated tracking length is stored in the tracking length table 123. Using this tracking length, the operation amount is changed for each of the inter-stand cooling devices 205 to 208 and the steel plate speed, which are the operation ends of the hot finish rolling mill exit side temperature control, and then the final stand (stand F5) exits. The length of the steel plate 202 paid out from the side is compared.

フィードバック制御起動タイミング生成手段120は、フィードバック制御手段130で選択した操作端が圧延速度か冷却水量かを判定し、判定結果に従って次回のフィードバック制御の実施タイミングを決定する。より具体的には、フィードバック制御を実施した後に払い出された熱間仕上げ圧延機出側の鋼板長とトラッキング長テーブル123に記憶された情報とを比較した結果を基に、次回のフィードバック制御を実施するための起動信号を生成・出力する。   The feedback control activation timing generation unit 120 determines whether the operation end selected by the feedback control unit 130 is the rolling speed or the cooling water amount, and determines the next feedback control execution timing according to the determination result. More specifically, the next feedback control is performed based on a result of comparing the steel plate length on the delivery side of the hot finish rolling mill that has been paid out after the feedback control is performed and the information stored in the tracking length table 123. Generate and output an activation signal for implementation.

次に、図12のフローチャートを参照して、トラッキング長算出手段122が実行する処理を説明する。
まず、トラッキング長算出手段122は、図13に示すドラフトスケジュールテーブル121から、スタンドF1へ進入する鋼板202の厚みであるバー厚と各スタンドの圧下率の情報を取り込む(ステップS12−1)。
Next, processing executed by the tracking length calculation unit 122 will be described with reference to the flowchart of FIG.
First, the tracking length calculation means 122 takes in information on the bar thickness which is the thickness of the steel plate 202 entering the stand F1 and the rolling reduction information of each stand from the draft schedule table 121 shown in FIG. 13 (step S12-1).

ドラフトスケジュールテーブル121には、鋼板202の鋼種、板厚、板幅に対応して、スタンドF1へ進入する際の鋼板202のバー厚およびスタンドF1〜F5の各々の出側板厚(圧下率)の情報が蓄えられている。図13で一例として鋼種がSS400、板厚が2.0〜3.0mm、板幅が900mmのとき、スタンドF1〜F5でそれぞれ50%、47%、42%、39%、28%の比率で鋼板202の板厚を薄くしていくことを示している。   In the draft schedule table 121, the bar thickness of the steel plate 202 when entering the stand F1 and the exit side plate thickness (rolling rate) of each of the stands F1 to F5 corresponding to the steel type, plate thickness, and plate width of the steel plate 202 are shown. Information is stored. As an example in FIG. 13, when the steel type is SS400, the plate thickness is 2.0 to 3.0 mm, and the plate width is 900 mm, the stands F1 to F5 are 50%, 47%, 42%, 39%, and 28%, respectively. It shows that the plate thickness of the steel plate 202 is reduced.

続いて、トラッキング長算出手段122は、各スタンドの出側板厚を算出する(ステップS12−2)。各スタンドの出側板厚は、(14)式を用いて算出できる。   Subsequently, the tracking length calculation means 122 calculates the outlet side plate thickness of each stand (step S12-2). The exit side plate thickness of each stand can be calculated using equation (14).

(数14)
出側板厚=入側板厚×(1−圧下率)×(目標板厚/入側板厚)
/{下流スタンドの(1−圧下率)の積}
ただし、下流スタンドには対象スタンド自身を含む
(Equation 14)
Outlet side thickness = Incoming side thickness x (1-Reduction ratio) x (Target thickness / Incoming thickness)
/ {Product of (1-rolling rate) of downstream stand}
However, the downstream stand includes the target stand itself.

鋼種がSS400、板厚が2.0〜3.0mm、板幅が900mmで目標板厚(本実施の形態ではF5出側板厚)が2.0mmのときを例にすると、各スタンドの出側板厚Th1〜Th5はドラフトスケジュールテーブル121を参照して、上流スタンドから順に以下のように求められる。
Th1=26×(1-0.5)×(2.0/26)/{(1-0.5)×(1-0.47)×(1-0.42)×(1-0.39)×(1-0.28)}
=14.81mm
Th2=14.81×(1-0.47)×(2.0/14.81)/{(1-0.47)×(1-0.42)×(1-0.39)×(1-0.28)}
=7.85mm
Th3=7.85×(1-0.42)×(2.0/7.85)/{(1-0.42)×(1-0.39)×(1-0.28)}
=5.08m
Th4=5.08×(1-0.39)×(2.0/5.08)/{ (1-0.39)×(1-0.28)}
=2.77m
Th5=2.77×(1-0.28)×(2.0/2.77)/(1-0.28)
=2.0m
For example, when the steel grade is SS400, the plate thickness is 2.0 to 3.0 mm, the plate width is 900 mm, and the target plate thickness (F5 outlet plate thickness in this embodiment) is 2.0 mm, the outlet plate of each stand The thicknesses Th <b> 1 to Th <b> 5 are obtained as follows in order from the upstream stand with reference to the draft schedule table 121.
Th1 = 26 × (1-0.5) × (2.0 / 26) / {(1-0.5) × (1-0.47) × (1-0.42) × (1-0.39) × (1-0.28)}
= 14.81mm
Th2 = 14.81 x (1-0.47) x (2.0 / 14.81) / {(1-0.47) x (1-0.42) x (1-0.39) x (1-0.28)}
= 7.85mm
Th3 = 7.85 x (1-0.42) x (2.0 / 7.85) / {(1-0.42) x (1-0.39) x (1-0.28)}
= 5.08m
Th4 = 5.08 × (1-0.39) × (2.0 / 5.08) / {(1-0.39) × (1-0.28)}
= 2.77m
Th5 = 2.77 × (1-0.28) × (2.0 / 2.77) / (1-0.28)
= 2.0m

これら各スタンドの出側板厚から、スタンド間冷却装置205〜208のそれぞれを操作したときのトラッキング長を算出する(ステップS12−3)。トラッキング長は、(15)式を用いて計算できる。なお、各スタンド間冷却装置は該当スタンドの中央にあるとし、また最終スタンドはスタンドF5とする。   The tracking length when each of the inter-stand cooling devices 205 to 208 is operated is calculated from the exit side plate thickness of each stand (step S12-3). The tracking length can be calculated using equation (15). It is assumed that the inter-stand cooling device is in the center of the corresponding stand, and the final stand is the stand F5.

(数15)
トラッキング長=(該当スタンド間距離×スタンド間の鋼板厚み/目標板厚)/2
+下流スタンド間について
(スタンド間距離×スタンド間の鋼板厚み/目標板厚)の総和
+最終スタンドから熱間仕上げ圧延機出側温度計203までの距離
(Equation 15)
Tracking length = (distance between corresponding stands x steel plate thickness between stands / target plate thickness) / 2
+ Between downstream stands
Sum of (distance between stands x steel plate thickness between stands / target thickness)
+ Distance from the final stand to the hot finish rolling mill delivery side thermometer 203

したがって上記の圧下率の例について、スタンド間距離が5m、スタンドF5から熱間仕上げ圧延機出側温度計203までの距離が6mの場合を例にすると、第iスタンドと第(i+1)スタンドとの間のスタンド間冷却装置の冷却水量が変化したことに対応したトラッキング長Liのそれぞれは、以下のように求められる。
L1=(5×14.81/2.0)/2+5×(7.85+5.08+2.77)/2.0+6
=63.76m
L2=(5×7.85/2.0)/2+5×(5.08+2.77)/2.0+6
=35.43m
L3=(5×5.08/2.0)/2+5×2.77/2.0+6
=19.28m
L4=(5×2.77/2.0)/2+6
=9.46m
Therefore, in the example of the rolling reduction described above, when the distance between the stands is 5 m and the distance from the stand F5 to the hot finish rolling mill output side thermometer 203 is 6 m, for example, the i-th stand, the (i + 1) -th stand, Each of the tracking lengths Li corresponding to the change in the amount of cooling water in the inter-stand cooling device between is obtained as follows.
L 1 = (5 × 14.81 / 2.0) / 2 + 5 × (7.85 + 5.08 + 2.77) /2.0+6
= 63.76m
L 2 = (5 × 7.85 / 2.0) / 2 + 5 × (5.08 + 2.77) /2.0+6
= 35.43m
L 3 = (5 × 5.08 / 2.0) /2+5×2.77/2.0+6
= 19.28m
L 4 = (5 × 2.77 / 2.0) / 2 + 6
= 9.46m

そして、すべてのスタンド間についてトラッキング長の計算が終了したかを判定する(ステップS12−4)。終了していない場合はステップS12−3の処理を繰り返す。終了していた場合は、スタンド間冷却装置205〜208に対応したトラッキング長の計算は終わりなので、次に操作端が鋼板速度のときのトラッキング長を算出する(ステップS12−5)。   Then, it is determined whether the calculation of the tracking length has been completed for all the stands (step S12-4). If not completed, the process of step S12-3 is repeated. If completed, the tracking length calculation corresponding to the inter-stand cooling devices 205 to 208 is completed, and the tracking length when the operation end is the steel plate speed is calculated (step S12-5).

鋼板速度の変更は、厳密には鋼板202の尾端のFDTにまで影響を及ぼす。しかし、ここでは熱間仕上げ圧延機201の入側位置より上流の鋼板への影響は熱間仕上げ圧延機入側位置の鋼板への影響とおおむね等価とし、熱間仕上げ圧延機201の入側位置に対応したトラッキング長Lを鋼板速度変更に対応するトラッキング長とする例を示す。この場合トラッキング長は、(16)式で表される。 Strictly speaking, the change in the steel plate speed affects the FDT at the tail end of the steel plate 202. However, here, the influence on the steel sheet upstream from the entry side position of the hot finish rolling mill 201 is substantially equivalent to the influence of the hot finish rolling mill entry side position on the steel sheet, and the entry position of the hot finish rolling mill 201 is An example is shown in which the tracking length L 0 corresponding to is used as the tracking length corresponding to the steel plate speed change. In this case, the tracking length is expressed by equation (16).

(数16)
トラッキング長=(該当スタンド間距離×スタンド間の鋼板厚み/目標板厚)
+下流スタンド間について
(スタンド間距離×スタンド間の鋼板厚み/目標板厚)の総和
+最終スタンドから熱間仕上げ圧延機出側温度計203までの距離
(Equation 16)
Tracking length = (Distance between corresponding stands x Steel plate thickness between stands / Target plate thickness)
+ Between downstream stands
Sum of (distance between stands x steel plate thickness between stands / target thickness)
+ Distance from the final stand to the hot finish rolling mill delivery side thermometer 203

よって、トラッキング長L0は以下のように求められる。
L0=5×(14.81/2.0)+5×(7.85+5.08+2.77)/2.0+6
=82.28m
Therefore, the tracking length L0 is obtained as follows.
L 0 = 5 × (14.81 / 2.0) + 5 × (7.85 + 5.08 + 2.77) /2.0+6
= 82.28m

図14に、トラッキング長テーブル123の構成例を示す。トラッキング長テーブル123には、トラッキング長算出手段122が出力した値が、操作端および操作量と対応づけて格納されている。   FIG. 14 shows a configuration example of the tracking length table 123. In the tracking length table 123, the value output from the tracking length calculation unit 122 is stored in association with the operation end and the operation amount.

このように、トラッキング長算出手段122は、各スタンド間の板厚とスタンド間距離、さらに最終スタンドと熱間仕上げ圧延機出側温度計203の距離から、スタンド間冷却水量変更の影響による鋼板温度変化を熱間仕上げ圧延機出側温度計203が検出するのに必要な鋼板長さ(トラッキング長)の値を、熱間仕上げ圧延機出側板厚換算で算出し、トラッキング長テーブル123に格納する。加えて、速度変更の影響による鋼板温度変化を熱間仕上げ圧延機出側温度計203が検出するのに必要な鋼板長さ(トラッキング長)の値を、熱間仕上げ圧延機出側板厚換算で算出し、トラッキング長テーブルに格納する。   Thus, the tracking length calculation means 122 calculates the steel plate temperature due to the influence of the change in the cooling water amount between the stands from the plate thickness between the stands and the distance between the stands, and further from the distance between the final stand and the hot finish rolling mill delivery side thermometer 203. The steel plate length (tracking length) necessary for the hot finish rolling mill delivery side thermometer 203 to detect the change is calculated in terms of the hot finish rolling mill delivery side thickness and stored in the tracking length table 123. . In addition, the value of the steel plate length (tracking length) necessary for the hot finish rolling mill delivery side thermometer 203 to detect the steel plate temperature change due to the speed change is calculated in terms of the hot finish rolling mill delivery side thickness. Calculate and store in tracking length table.

次に、図15のフローチャートを参照して、フィードバック制御起動タイミング生成手段120が実行する処理を説明する。
フィードバック制御起動タイミング生成手段120は、数百ms程度の周期で、タイマー起動される。まずフィードバック制御手段130の変更量算出手段132が操作端への出力を変更したタイミングで出力の値を取り込み、操作端が鋼板速度か冷却水量かを判定する(ステップS15−1)。
Next, processing executed by the feedback control activation timing generation unit 120 will be described with reference to the flowchart of FIG.
The feedback control activation timing generation means 120 is activated by a timer with a period of about several hundred ms. First, the change value calculation means 132 of the feedback control means 130 takes in the output value at the timing when the output to the operation end is changed, and determines whether the operation end is the steel plate speed or the cooling water amount (step S15-1).

操作端が冷却水量のみであると判定した場合には、フィードバック制御起動タイミング生成手段120は、操作されたスタンド間冷却装置のうち最も上流のスタンド間冷却装置を特定する(ステップS15−2)。   When it is determined that the operation end is only the cooling water amount, the feedback control activation timing generation unit 120 identifies the most upstream inter-stand cooling device among the operated inter-stand cooling devices (step S15-2).

次に、フィードバック制御起動タイミング生成手段120は、特定されたスタンド間冷却装置に対応するスタンド間(操作部位)に対応したトラッキング長を、トラッキング長テーブル123から取り込む(ステップS15−3)。すなわち操作量を変更した最も上流のスタンド間に対応するスタンドを起点としたトラッキング長の総和を取り出す。   Next, the feedback control activation timing generation means 120 takes in the tracking length corresponding to the interval between the stands (operation part) corresponding to the identified inter-stand cooling device from the tracking length table 123 (step S15-3). That is, the sum of the tracking lengths starting from the corresponding stand between the most upstream stands whose operation amount has been changed is extracted.

一方、上記ステップS15−1の判定処理において操作端に少なくとも鋼板速度が含まれると判定した場合は、フィードバック制御起動タイミング生成手段120は、鋼板速度に対応したトラッキング長Lをトラッキング長テーブル123から取り込む(ステップS15−4)。すなわち、熱間仕上げ圧延機の入側スタンドを起点としたトラッキング長の総和を取り出す。 On the other hand, when it is determined that at least the steel sheet speed is included in the operation end in the determining process in step S15-1, the feedback control start timing generating means 120, the tracking length L 0 corresponding to the steel plate speed from the tracking length table 123 Capture (step S15-4). That is, the sum of the tracking lengths starting from the entry stand of the hot finish rolling mill is taken out.

ステップS15−3またはステップS15−4の処理が修了後、フィードバック制御起動タイミング生成手段120は、最終スタンド(F5)の圧延ロール210の回転速度Vを取り込む(ステップS15−5)。   After the processing of step S15-3 or step S15-4 is completed, the feedback control activation timing generation means 120 takes in the rotation speed V of the rolling roll 210 of the final stand (F5) (step S15-5).

そして、この値から求めた鋼板速度を積分して、鋼板202の最終スタンド(F5)からの払い出し長を算出する(ステップS15−6)。上述の(6)式を用いて、圧延ロール210の回転速度から圧延ロール出側の鋼板速度Vsfを求めることができる。   Then, the steel sheet speed obtained from this value is integrated to calculate the payout length from the final stand (F5) of the steel sheet 202 (step S15-6). The steel plate speed Vsf on the exit side of the rolling roll can be obtained from the rotational speed of the rolling roll 210 using the above-described formula (6).

ここで、フィードバック制御起動タイミング生成手段120は、鋼板202の払い出し長と、トラッキング長テーブル123から抽出した熱間仕上げ圧延機出側温度が変化するのに必要な鋼板202のトラッキング長との長短関係を比較する(ステップS15−7)。払い出し長がトラッキング長に到達していないとき、操作量変更の影響が熱間仕上げ圧延機出側温度計203での計測値に反映されていないことを意味する。したがってフィードバック制御手段130を起動するタイミングではないので、処理を終了する。   Here, the feedback control activation timing generation means 120 has a short / long relationship between the payout length of the steel plate 202 and the tracking length of the steel plate 202 necessary for the hot finish rolling mill outlet temperature extracted from the tracking length table 123 to change. Are compared (step S15-7). When the payout length does not reach the tracking length, it means that the influence of the operation amount change is not reflected in the measurement value of the hot finish rolling mill delivery side thermometer 203. Therefore, since it is not time to activate the feedback control means 130, the process is terminated.

一方、払い出し長がトラッキング長に到達しているときは、フィードバック制御起動タイミング生成手段120は、起動信号を生成し、フィードバック制御手段130に当該起動信号を出力する。そして起動信号を出力後、払い出し長算出用の鋼板速度の積分値をクリアする(ステップ15−9)。   On the other hand, when the payout length has reached the tracking length, the feedback control activation timing generation unit 120 generates an activation signal and outputs the activation signal to the feedback control unit 130. Then, after outputting the start signal, the integrated value of the steel plate speed for calculating the payout length is cleared (step 15-9).

以下、フィードバック制御起動タイミング生成手段120は、タイマーが起動されることで、周期的にステップS15−1〜S15−9の処理を繰り返す。   Hereinafter, the feedback control activation timing generation unit 120 periodically repeats the processes of steps S15-1 to S15-9 when the timer is activated.

なお、本実施の形態では払い出し長のみに着目してフィードバック制御手段130の起動信号を生成したが、この例に限られない。例えば、スタンド間冷却装置205〜258に冷却水量の変更指令を与えた後、対応する冷却水量が鋼板202の冷却に反映されるまでの時間(一般に2〜5秒)に相当する時間を加算して、フィードバック制御手段130への起動信号を生成することもできる。このようにすることで、操作後の鋼板202の状態をより反映した上でフィードバック制御手段130への起動信号を出力することができる。   In the present embodiment, the activation signal of the feedback control unit 130 is generated focusing only on the payout length, but the present invention is not limited to this example. For example, after giving a cooling water amount change command to the inter-stand cooling devices 205 to 258, a time corresponding to the time until the corresponding cooling water amount is reflected in the cooling of the steel plate 202 (generally 2 to 5 seconds) is added. Thus, an activation signal to the feedback control means 130 can be generated. By doing so, it is possible to output the activation signal to the feedback control means 130 while further reflecting the state of the steel plate 202 after the operation.

[冷却フィードバック制御の優先順位]
ところで、第1の実施の形態において、冷却水量を操作端に選定した場合、変更量算出手段132は、温度偏差が小さくなるよう各スタンド間冷却水量の変更量ΔQを(7)式に従って算出し(図8のステップS8−2参照)、スタンド間冷却装置ごとに冷却水量の変更量を適宜設定することを説明した。このとき、スタンド間に予め優先順位をつけておき、スタンド間冷却装置ごとに冷却水量の変更量を設定するにあたり、スタンド間の優先順位に基づいて冷却水量の変更量を設定するようにしてもよい。以下、スタンド間の優先順位に基づく冷却水量の変更量の設定処理について説明する。
[Priority of cooling feedback control]
By the way, in the first embodiment, when the cooling water amount is selected as the operation end, the change amount calculation means 132 calculates the change amount ΔQ of the inter-stand cooling water amount according to the equation (7) so that the temperature deviation becomes small. (See step S8-2 in FIG. 8), it has been described that the change amount of the cooling water amount is appropriately set for each inter-stand cooling device. At this time, priorities are set in advance between the stands, and the change amount of the cooling water amount may be set based on the priority order between the stands when setting the change amount of the cooling water amount for each inter-stand cooling device. Good. Hereinafter, the process of setting the change amount of the cooling water amount based on the priority between the stands will be described.

図16は、冷却フィードバック制御優先順位テーブル135の構成例を示している。冷却フィードバック制御優先順位テーブル135は、冷却制御中に計測した鋼板の熱間仕上げ圧延機出側温度と目標温度との偏差の解消をスタンド間冷却装置の冷却水量を変化させて行う場合に、どのスタンド間のスタンド間冷却装置の冷却水量を優先的に操作するかの情報を蓄えている。図16に示した例では、冷却フィードバック制御の優先順位が、鋼種、圧延後(スタンドF5出側)の板厚、スタンド間で層別され、格納されている。   FIG. 16 shows a configuration example of the cooling feedback control priority table 135. The cooling feedback control priority table 135 is used when the amount of cooling water of the inter-stand cooling device is changed to eliminate the deviation between the hot rolling mill outlet temperature measured during cooling control and the target temperature. Information on whether to preferentially operate the cooling water amount of the inter-stand cooling device between the stands is stored. In the example shown in FIG. 16, the priority order of the cooling feedback control is classified and stored by steel type, sheet thickness after rolling (exit side of stand F5), and stands.

まず、変更量算出手段132は、図12に示した冷却フィードバック制御優先順位テーブル135から圧延中の鋼板202に該当するスタンド間の優先順位を取り込む。そして優先順位の最も高いスタンド間に対応するスタンド間冷却装置から順に操作量を変更し、当該スタンド間冷却装置が飽和すると、優先順位が次位のスタンド間冷却装置の操作量を変更する。冷却フィードバック制御優先順位テーブル135では鋼板の種類、目標板厚で層別されており、それぞれ異なった順位を付与できる。   First, the change amount calculation means 132 takes in the priority order between the stands corresponding to the steel plate 202 being rolled from the cooling feedback control priority order table 135 shown in FIG. Then, the operation amount is changed in order from the inter-stand cooling device corresponding to between the stands with the highest priority, and when the inter-stand cooling device is saturated, the operation amount of the inter-stand cooling device with the next highest priority is changed. In the cooling feedback control priority table 135, the steel plates are classified according to the type of steel plate and the target plate thickness, and different ranks can be assigned to each.

例えばフィードバック制御の応答性および制御効果から下流(熱間仕上げ圧延機出側)のスタンド間を優先的に選択することが考えられるが、鋼板202が薄いとき圧延してから冷却すると鋼板202の形状に悪影響(曲げ、反り等)を与える場合もある。この点を考慮して、フィードバック制御の応答性をある程度犠牲にして、上流(熱間仕上げ圧延機入側)のスタンド間から優先的に選択する方法も考えられる。操作量の変更量は、第1の影響係数テーブル133から取り込んだ現在の状態に該当した層別の影響係数(∂FDT/∂Q)とFDTの温度偏差ΔFDTとから、(8)式の演算によりスタンド間冷却水量の変更量を計算する。   For example, it is conceivable to preferentially select between the stands on the downstream side (from the hot finish rolling mill) from the responsiveness and control effect of feedback control. However, when the steel plate 202 is thin and cooled after being rolled, the shape of the steel plate 202 is considered. May have an adverse effect (bending, warping, etc.). In consideration of this point, a method of preferentially selecting from the upstream (on the hot finishing rolling mill entrance) stand may be considered at the expense of the responsiveness of the feedback control to some extent. The manipulated variable change amount is calculated by the equation (8) from the influence coefficient (影響 FDT / ∂Q) for each layer corresponding to the current state taken from the first influence coefficient table 133 and the temperature deviation ΔFDT of the FDT. Calculate the amount of change in the amount of cooling water between stands.

図12の例では、鋼種がSS400、スタンドF5出側板厚が1.6mm以下のとき、スタンドF1−F2間の優先順位が1番、その他のスタンドF2−F3,F3−F4,F4−F5間の優先順位が10番としてある。これは、スタンドF1−F2間を操作し、その他のスタンド間の操作量は実質的に固定であることを意味する。この場合、フィードバック制御の応答性および制御効果は弱いが、鋼板202に対する悪影響は極めて少ない。   In the example of FIG. 12, when the steel type is SS400 and the stand F5 outlet side plate thickness is 1.6 mm or less, the priority between the stands F1-F2 is No. 1, and between the other stands F2-F3, F3-F4, F4-F5 The priority is No. 10. This means that the amount of operation between the stands F1 and F2 is substantially fixed while the amount of operation between the other stands is substantially fixed. In this case, the responsiveness and control effect of feedback control are weak, but the adverse effect on the steel plate 202 is extremely small.

また、鋼種がSS400、スタンドF5出側板厚が1.6〜2.6mmのとき、スタンドF1−F2間の優先順位が2番、スタンドF2−F3間の優先順位が1番、その他のスタンドF3−F4,F4−F5間の優先順位が10番としてある。これは、スタンドF2−F3間の操作を優先して行い、制御効果が現れない(上限値で飽和した)ときはスタンドF1−F2間の操作を行い、その他のスタンド間の操作量は実質的に固定であることを意味する。この場合、2つのスタンド間に対して操作可能としてあり、かつ下流側のスタンド間の優先順位が高いので、上記例と比較してフィードバック制御の応答性および制御効果が高まり、鋼板202に与える悪影響も比較的少ない。   When the steel grade is SS400 and the stand F5 outlet side thickness is 1.6 to 2.6 mm, the priority between the stands F1 and F2 is No. 2, the priority between the stands F2 and F3 is No. 1, and the other stands F3. The priority order between -F4, F4-F5 is No. 10. This is done by giving priority to the operation between the stands F2 and F3. When the control effect does not appear (saturated at the upper limit value), the operation between the stands F1 and F2 is performed, and the operation amount between the other stands is substantial. Means fixed. In this case, the operation between the two stands is operable, and the priority order between the downstream stands is high, so that the responsiveness and control effect of the feedback control are increased as compared with the above example, and the adverse effect on the steel plate 202 Is relatively small.

さらに、鋼種がSS400、スタンドF5出側板厚が2.6〜4mmのとき、スタンドF1−F2間の優先順位が3番、スタンドF2−F3間の優先順位が2番、スタンドF3−F4間の優先順位が1番、スタンドF4−F5間の優先順位が10番としてある。これは、スタンドF3−F4間,F2−F3間,F2−F1間の順で操作を行い、スタンドF4−F5間の操作量は実質的に固定であることを意味する。この場合、3つのスタンド間に対して操作可能としてあり、かつ下流側のスタンド間の優先順位が高いので、さらにフィードバック制御の応答性および制御効果の向上を図れる。   Furthermore, when the steel type is SS400 and the stand F5 outlet side plate thickness is 2.6 to 4 mm, the priority between the stands F1 and F2 is No. 3, the priority between the stands F2 and F3 is No. 2, and between the stands F3 and F4. The priority is 1 and the priority between the stands F4 and F5 is 10. This means that operations are performed in the order between the stands F3-F4, between F2-F3, and between F2-F1, and the operation amount between the stands F4-F5 is substantially fixed. In this case, it is possible to operate between the three stands, and the priority between the downstream stands is high, so that it is possible to further improve the feedback control response and the control effect.

[第2の実施の形態による効果]
以上説明したように、第2の実施の形態で表される本発明によれば、冷却水量を操作した場合と圧延速度を変更した場合のそれぞれについて、熱間仕上げ圧延機出側温度が変化するのに必要な鋼板の移動距離(トラッキング長)を、熱間仕上げ圧延機出側の鋼板長換算で算出する。そして、鋼板の払い出し長と比較対象のトラッキング長の長短とを比較し、払い出し長がトラッキング長に到達している場合のみ、フィードバック制御手段を起動する。このような構成を採用することにより、熱間仕上げ圧延機の冷却フィードバック制御において、次回の補償を行うタイミングが適切化され、高応答化かつ安定なフィードバック制御を実現できる。それゆえ、高精度な熱間仕上げ圧延機出側温度が得られる。したがって、鋼板の品質が向上する。
[Effects of Second Embodiment]
As described above, according to the present invention represented by the second embodiment, the hot finish rolling mill outlet temperature changes for each of the case where the amount of cooling water is manipulated and the case where the rolling speed is changed. The moving distance (tracking length) of the steel plate necessary for the calculation is calculated in terms of the steel plate length on the delivery side of the hot finish rolling mill. Then, the payout length of the steel sheet is compared with the length of the tracking length to be compared, and the feedback control means is activated only when the payout length has reached the tracking length. By adopting such a configuration, the timing of the next compensation is made appropriate in the cooling feedback control of the hot finish rolling mill, and high response and stable feedback control can be realized. Therefore, a high-precision hot finish rolling mill delivery temperature can be obtained. Therefore, the quality of the steel plate is improved.

本発明は、熱間仕上げ圧延機のスタンド間冷却制御に、広く適用することができる。   The present invention can be widely applied to inter-stand cooling control of a hot finish rolling mill.

なお、以上に述べた実施の形態は、本発明を実施するための好適な形態の具体例であるから、技術的に好ましい種々の限定が付されている。ただし、本発明は、以上の実施の形態の説明において特に本発明を限定する旨の記載がない限り、これらの実施の形態に限られるものではない。例えば、以上の説明で挙げた使用材料とその使用量、処理時間、処理順序および各パラメータの数値的条件等は好適例に過ぎず、また、説明に用いた各図における寸法、形状および配置関係等も実施の形態の一例を示す概略的なものである。したがって、本発明は、上述した実施の形態の例に限定されるものではなく、本発明の要旨を逸脱しない範囲において、種々の変形、変更が可能である。   The embodiment described above is a specific example of a preferred form for carrying out the present invention, and therefore various technically preferable limitations are given. However, the present invention is not limited to these embodiments unless otherwise specified in the above description of the embodiments. For example, the materials used in the above description, the amount used, the processing time, the processing order, and the numerical conditions of each parameter are only suitable examples, and the dimensions, shapes, and arrangement relationships in the drawings used for the description Etc. are also schematic drawings showing an example of the embodiment. Therefore, the present invention is not limited to the above-described embodiments, and various modifications and changes can be made without departing from the scope of the present invention.

例えば、熱間仕上げ圧延機出側温度制御装置で行われる一連の処理は、ハードウェアにより実行させることもできるし、ソフトウェアにより実行させることもできる。また、これらの処理を実行する機能はハードウェアとソフトウェアの組み合わせによっても実現できることは言うまでもない。一連の処理をソフトウェアにより実行させる場合には、そのソフトウェアを構成するプログラムが専用のハードウェアに組み込まれているコンピュータ、または、各種のプログラムをインストールすることで各種の機能を実行することが可能な、例えば汎用のコンピュータなどに、プログラム記録媒体(図示略)からインストールされる。   For example, a series of processing performed by the hot finish rolling mill outlet side temperature control device can be executed by hardware or can be executed by software. Needless to say, the function for executing these processes can also be realized by a combination of hardware and software. When a series of processing is executed by software, it is possible to execute various functions by installing a computer in which a program constituting the software is incorporated in dedicated hardware, or by installing various programs. For example, the program is installed in a general-purpose computer from a program recording medium (not shown).

また、本明細書において、プログラム記録媒体等に格納されるプログラムを記述する処理ステップは、記載された順序に沿って時系列的に行われる処理はもちろん、必ずしも時系列的に処理されなくとも、並列的あるいは個別に実行される処理(例えば、並列処理あるいはオブジェクトによる処理)をも含むものである。   Further, in this specification, the processing steps describing a program stored in a program recording medium or the like are not necessarily processed in time series, as well as processes performed in time series in the order described, This includes processing executed in parallel or individually (for example, parallel processing or processing by an object).

また、プログラムは、一つのコンピュータにより処理されるものであってもよいし、複数のコンピュータによって分散処理されるものであってもよい。さらに、プログラムは、遠方のコンピュータに転送されて実行されるものであってもよい。   Further, the program may be processed by a single computer, or may be processed in a distributed manner by a plurality of computers. Furthermore, the program may be transferred to a remote computer and executed.

100,100A…熱間仕上げ圧延機出側温度制御装置
110…プリセット制御手段
115…板温推定モデル
120…フィードバック制御起動タイミング生成手段
121…ドラフトスケジュールテーブル
122…トラッキング長算出手段
123…フィードバック制御起動タイミング生成手段
130…フィードバック制御手段
131…操作端選択手段
132…変更量算出手段
133…第1の影響係数テーブル
134…第2の影響係数テーブル
135…冷却フィードバック制御優先順位テーブル
140…スタンド間冷却指令生成手段
150…速度指令生成手段
200…制御対象
201…熱間仕上げ圧延機
202…鋼板
203…熱間仕上げ圧延機出側温度計
205〜208…スタンド間冷却装置
DESCRIPTION OF SYMBOLS 100,100A ... Hot-end rolling mill delivery side temperature control apparatus 110 ... Preset control means 115 ... Sheet temperature estimation model 120 ... Feedback control starting timing generation means 121 ... Draft schedule table 122 ... Tracking length calculation means 123 ... Feedback control starting timing Generation means 130 ... feedback control means 131 ... operation end selection means 132 ... change amount calculation means 133 ... first influence coefficient table 134 ... second influence coefficient table 135 ... cooling feedback control priority table 140 ... inter-stand cooling command generation Means 150 ... Speed command generation means 200 ... Control object 201 ... Hot finish rolling mill 202 ... Steel plate 203 ... Hot finish rolling mill delivery side thermometers 205 to 208 ... Inter-stand cooling device

Claims (6)

複数のスタンドを備えた熱間仕上げ圧延機で圧延される前の鋼板温度、鋼板の圧延速度、スタンド間に設けられた冷却装置の冷却水量を含む情報と、前記熱間仕上げ圧延機で圧延した後の鋼板温度の関係を記述した板温推定モデルを記憶する記憶手段と、
圧延に先立って前記板温推定モデルを用いて圧延後の鋼板温度を推定し、推定結果を用いて圧延後の鋼板の目標温度を実現するための前記圧延速度と前記冷却水量を算出するプリセット制御手段と、
前記熱間仕上げ圧延機の出側に設けられている熱間仕上げ圧延機出側温度計で計測された圧延後の鋼板温度と前記目標温度の偏差が小さくなる方向に前記圧延速度または前記冷却水量のどちらか一方もしくは両方の変更量を算出するフィードバック制御手段と、
前記フィードバック制御手段が前記圧延速度か前記冷却水量のいずれを操作端として選択したかを判定し、判定結果に従って前記フィードバック制御手段による次回のフィードバック制御の実施タイミングを決定するフィードバック制御起動タイミング生成手段と、
熱間仕上げ圧延機の設備に関する情報と各スタンドにおける鋼板の圧延量とから、各スタンド間の冷却水量と圧延速度のそれぞれを変化させたときに前記熱間仕上げ圧延機出側温度が変化するのに必要な鋼板のトラッキング長を算出し、トラッキング長テーブルに格納するトラッキング長算出手段と、
前記プリセット制御手段が出力した冷却水量を前記フィードバック制御手段が出力した冷却水量の変更量で補正した結果を、冷却指令として前記スタンド間に備えられた冷却装置に出力するスタンド間冷却指令生成手段と、
前記プリセット制御手段が出力した圧延速度を前記フィードバック制御手段が出力した圧延速度の変更量で補正した結果を、速度指令として前記熱間仕上げ圧延機に出力する速度指令生成手段と、を備え、
前記フィードバック制御起動タイミング生成手段は、前記フィードバック制御手段がフィードバック制御を実施した後に最終スタンドから払い出された熱間仕上げ圧延機出側の鋼板長と前記トラッキング長テーブルに記憶された前記トラッキング長を比較し、前記払い出された鋼板長が前記トラッキング長より長いときは、前記フィードバック制御手段に起動信号を出力する
ことを特徴とする熱間仕上げ圧延機出側温度制御装置。
Rolled with the hot finish rolling mill, information including the steel plate temperature before rolling in the hot finish rolling mill equipped with a plurality of stands, the rolling speed of the steel plate, the cooling water amount of the cooling device provided between the stands, and Storage means for storing a plate temperature estimation model describing the relationship between the steel plate temperatures after;
Preset control that estimates the steel plate temperature after rolling using the plate temperature estimation model prior to rolling, and calculates the rolling speed and the cooling water amount to achieve the target temperature of the steel plate after rolling using the estimation result Means,
The rolling speed or the amount of cooling water in a direction in which the deviation between the steel plate temperature after rolling measured by a hot finish rolling mill delivery thermometer provided on the delivery side of the hot finish rolling mill and the target temperature becomes smaller Feedback control means for calculating the amount of change of either or both of
A feedback control start timing generating means for determining whether the feedback control means has selected the rolling speed or the cooling water amount as an operation end, and determining a timing for performing the next feedback control by the feedback control means according to a determination result; ,
From the information about the equipment of the hot finish rolling mill and the rolling amount of the steel plate at each stand, when the amount of cooling water between each stand and the rolling speed are changed, the outlet temperature of the hot finish rolling mill changes. Tracking length calculation means for calculating the tracking length of the steel plate necessary for the storage and storing it in the tracking length table;
An inter-stand cooling command generating means for outputting a result obtained by correcting the cooling water amount output by the preset control means with a change amount of the cooling water amount output by the feedback control means to a cooling device provided between the stands as a cooling command; ,
The speed command generating means for outputting the result of correcting the rolling speed output by the preset control means with the change amount of the rolling speed output by the feedback control means to the hot finish rolling mill as a speed command, and
The feedback control activation timing generation means includes the steel plate length on the delivery side of the hot finish rolling mill that has been paid out from the final stand after the feedback control means performs the feedback control, and the tracking length stored in the tracking length table. In comparison, when the discharged steel plate length is longer than the tracking length, a start signal is output to the feedback control means.
前記フィードバック制御手段は、
前記冷却水量を変化させたときの圧延後の鋼板温度の変化の割合を格納した第1の影響係数テーブルと、
前記圧延速度を変化させたときの圧延後の鋼板温度の変化の割合を格納した第2の影響係数テーブルと、
前記熱間仕上げ圧延機出側温度計で計測した圧延後の鋼板温度と前記目標温度を取り込んでその差分である温度偏差を算出し、計測した鋼板温度が目標温度より高いときは前記冷却水量を操作端として選択し、計測した鋼板温度が目標温度より低いときは前記圧延速度を操作端として選択する操作端選択手段と、
前記操作端選択手段が冷却水量を操作端として選択した場合は、前記温度偏差と前記第1の影響係数テーブルの内容から熱間仕上げ圧延機出側温度を目標温度に近づけるための冷却水量の増加量を変更量として算出し、前記操作端選択手段が圧延速度を操作端として選択した場合は、前記温度偏差と前記第2の影響係数テーブルの内容から熱間仕上げ圧延機出側温度を目標温度に近づけるための圧延速度の増加量を変更量として算出する変更量算出手段を備える
ことを特徴とする請求項記載の熱間仕上げ圧延機出側温度制御装置。
The feedback control means includes
A first influence coefficient table storing a rate of change in steel plate temperature after rolling when the amount of cooling water is changed;
A second influence coefficient table storing a rate of change in steel plate temperature after rolling when the rolling speed is changed;
The steel plate temperature after rolling measured by the hot finish rolling mill delivery side thermometer and the target temperature are taken in, and a temperature deviation that is the difference between them is calculated, and when the measured steel plate temperature is higher than the target temperature, the cooling water amount is calculated. When selected as the operation end, when the measured steel plate temperature is lower than the target temperature, the operation end selection means for selecting the rolling speed as the operation end,
When the operation end selection means selects the amount of cooling water as the operation end, an increase in the amount of cooling water for bringing the hot finish rolling mill outlet temperature closer to the target temperature from the temperature deviation and the contents of the first influence coefficient table When the operation end selecting means selects the rolling speed as the operation end, the hot finish rolling mill outlet temperature is set as the target temperature from the temperature deviation and the contents of the second influence coefficient table. hot finish rolling mill delivery temperature control apparatus according to claim 1, further comprising a correction amount calculation means for calculating an amount of increase in the rolling rate of change amount to approximate.
前記冷却水量を変更する場合に、どのスタンド間に対応する冷却装置の冷却水量を優先的に変更するかを示す優先順位を記憶した冷却フィードバック制御優先順位テーブル、を更に備え、
前記操作端選択手段が冷却水量を操作端として選択した場合、前記変更量算出手段は、前記冷却フィードバック制御優先順位テーブルに記憶された優先順位に従って冷却水量を変更する冷却装置を決定した上で、前記温度偏差と前記第1の影響係数テーブルの内容から熱間仕上げ圧延機出側温度を目標温度に近づけるための冷却水量の増加量を変更量として算出する
ことを特徴とする請求項記載の熱間仕上げ圧延機出側温度制御装置。
A cooling feedback control priority table that stores a priority order indicating which cooling water amount of the cooling device corresponding to which stand is changed preferentially when changing the cooling water amount;
When the operation end selection unit selects the cooling water amount as the operation end, the change amount calculation unit determines a cooling device that changes the cooling water amount according to the priority order stored in the cooling feedback control priority order table, according to claim 2, wherein the calculating the amount of increase in the cooling water to approximate the content of the said temperature difference first effects coefficient table hot finishing mill delivery temperature to the target temperature as a change amount Hot finish rolling mill delivery side temperature control device.
前記フィードバック制御起動タイミング生成手段は、
前記フィードバック制御の操作端として冷却水量のみが選択されたときは、前記冷却水量を変更されたスタンド間の中で最も上流のスタンド間に対応する鋼板の前記トラッキング長を前記トラッキング長テーブルから取り出し、前回のフィードバック制御を実施した後に払い出された熱間仕上げ圧延機出側の鋼板長と前記トラッキング長を比較した結果から、次回のフィードバック制御の実施タイミングを決定し、
前記フィードバック制御の操作端として少なくとも圧延速度が選択されたときは、前記圧延速度を操作したときに対応する鋼板の前記トラッキング長を前記トラッキング長テーブルから取り出し、フィードバック制御を実施した後に払い出された熱間仕上げ圧延機出側の鋼板長と前記トラッキング長を比較した結果から、次回のフィードバック制御の実施タイミングを決定する
ことを特徴とする請求項または記載の熱間仕上げ圧延機出側温度制御装置。
The feedback control activation timing generation means includes
When only the cooling water amount is selected as the operation end of the feedback control, the tracking length of the steel plate corresponding to the most upstream stand among the stands having the changed cooling water amount is taken out from the tracking length table, From the result of comparing the tracking length with the steel plate length on the delivery side of the hot finish rolling mill that was paid out after performing the previous feedback control, the execution timing of the next feedback control was determined,
When at least the rolling speed is selected as the operation end of the feedback control, the tracking length of the steel sheet corresponding to the operation of the rolling speed is taken out from the tracking length table and paid out after performing the feedback control. The hot finish rolling mill outlet temperature according to claim 2 or 3 , wherein the execution timing of the next feedback control is determined from the result of comparing the steel sheet length on the outlet side of the hot finish rolling mill and the tracking length. Control device.
前記トラッキング長算出手段は、
各スタンド間のスタンド間距離と、該スタンド間に鋼板があるときの鋼板厚みと、熱間仕上げ圧延機出側の目標板厚とからスタンド間ごとのトラッキング長を算出し、
冷却水量を変化させたスタンド間から下流側のスタンド間ごとのトラッキング長を加算して、前記冷却水量を変化させたときに熱間仕上げ圧延機出側温度が変化するのに必要な鋼板のトラッキング長を算出する
ことを特徴とする請求項のいずれかに記載の熱間仕上げ圧延機出側温度制御装置。
The tracking length calculation means includes
Calculate the tracking length between the stands from the distance between the stands, the steel plate thickness when there is a steel plate between the stands, and the target plate thickness on the hot finish rolling mill exit side,
Tracking the steel sheet necessary for changing the outlet temperature of the hot finish rolling mill when the amount of cooling water is changed by adding the tracking length between the stands where the amount of cooling water is changed and between the stands on the downstream side The length is calculated. The hot finish rolling mill outlet side temperature control device according to any one of claims 1 to 4 .
熱間仕上げ圧延機出側温度制御装置が備えるプリセット制御手段により、複数のスタンドを備えた熱間仕上げ圧延機で圧延される前の鋼板温度、鋼板の圧延速度、スタンド間に設けられた冷却装置の冷却水量を含む情報から、前記熱間仕上げ圧延機で圧延した後の鋼板温度を推定し、
前記プリセット制御手段により、推定結果を用いて圧延後の鋼板の目標温度を実現するための圧延速度と冷却水量を算出し、
前記熱間仕上げ圧延機出側温度制御装置が備えるフィードバック制御手段により、熱間仕上げ圧延機出側の鋼板温度と前記目標温度の偏差が小さくなる方向に前記圧延速度または前記冷却水量のどちらか一方もしくは両方の変更量を算出し、
前記熱間仕上げ圧延機出側温度制御装置が備えるスタンド間冷却指令生成手段により、前記冷却水量を前記冷却水量の変更量で補正した結果を冷却指令として前記スタンド間に備えられた冷却装置に出力し、
前記熱間仕上げ圧延機出側温度制御装置が備える速度指令生成手段により、前記圧延速度を前記圧延速度の変更量で補正した結果を速度指令として前記熱間仕上げ圧延機に出力し、
前記熱間仕上げ圧延機出側温度制御装置が備えるトラッキング長算出手段により、前記熱間仕上げ圧延機の設備に関する情報と各スタンドにおける鋼板の圧延量とから、各スタンド間の冷却水量または前記圧延速度のそれぞれを変化させたときに前記熱間仕上げ圧延機出側温度が変化するのに必要な鋼板のトラッキング長を算出し、
前記熱間仕上げ圧延機出側温度制御装置が備えるフィードバック制御起動タイミング生成手段により、前記圧延速度か前記冷却水量のいずれが操作端として選択されたかを判定し、判定結果に従って最終スタンドから払い出された前記熱間仕上げ圧延機出側の鋼板長と前記トラッキング長を比較し、前記払い出された鋼板長が前記トラッキング長より長いときは、前記フィードバック制御手段に起動信号を出力する
ことを特徴とする熱間仕上げ圧延機出側温度制御方法。
The steel plate temperature before rolling by the hot finish rolling mill having a plurality of stands, the rolling speed of the steel plate, and the cooling device provided between the stands by the preset control means provided in the hot finish rolling mill outlet temperature control device From the information including the amount of cooling water of the steel sheet temperature after rolling in the hot finish rolling mill,
By the preset control means, using the estimation result, calculate the rolling speed and cooling water amount for realizing the target temperature of the steel sheet after rolling,
By the feedback control means provided in the hot finish rolling mill delivery side temperature control device, either the rolling speed or the amount of cooling water in a direction in which the deviation between the steel sheet temperature on the delivery side of the hot finish rolling mill and the target temperature decreases. Or calculate the amount of change for both,
The result of correcting the cooling water amount by the change amount of the cooling water amount by the inter-stand cooling command generation means provided in the hot finish rolling mill outlet temperature control device is output as a cooling command to the cooling device provided between the stands. And
By the speed command generating means provided in the hot finish rolling mill outlet temperature control device, the result of correcting the rolling speed by the change amount of the rolling speed is output to the hot finishing mill as a speed command,
By means of tracking length calculation means provided in the hot finish rolling mill outlet temperature control device, the amount of cooling water between the stands or the rolling speed is calculated from the information on the equipment of the hot finish rolling mill and the rolling amount of the steel plate in each stand. Calculate the tracking length of the steel sheet required for the hot finish rolling mill outlet temperature to change when each of the above is changed,
By the feedback control start timing generation means provided in the hot finish rolling mill delivery side temperature control device, it is determined which of the rolling speed or the amount of cooling water has been selected as the operation end, and paid out from the final stand according to the determination result. The steel plate length on the delivery side of the hot finish rolling mill is compared with the tracking length, and when the discharged steel plate length is longer than the tracking length, a start signal is output to the feedback control means. To control the temperature on the delivery side of the hot finish rolling mill.
JP2010120880A 2009-09-02 2010-05-26 Hot finish rolling mill outlet side temperature control device and control method Active JP5564704B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2010120880A JP5564704B2 (en) 2009-09-02 2010-05-26 Hot finish rolling mill outlet side temperature control device and control method
CN 201010264990 CN102000703B (en) 2009-09-02 2010-08-26 Hot rolling machine outlet side temperature control device and its control method

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2009202880 2009-09-02
JP2009202880 2009-09-02
JP2010120880A JP5564704B2 (en) 2009-09-02 2010-05-26 Hot finish rolling mill outlet side temperature control device and control method

Publications (2)

Publication Number Publication Date
JP2011073058A JP2011073058A (en) 2011-04-14
JP5564704B2 true JP5564704B2 (en) 2014-08-06

Family

ID=44017610

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010120880A Active JP5564704B2 (en) 2009-09-02 2010-05-26 Hot finish rolling mill outlet side temperature control device and control method

Country Status (1)

Country Link
JP (1) JP5564704B2 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5768467B2 (en) * 2011-04-22 2015-08-26 Jfeスチール株式会社 Finishing delivery temperature control method of rolled steel sheet in hot rolling line
KR101267604B1 (en) * 2011-04-27 2013-05-27 현대제철 주식회사 Method for manufacturing steel sheet
JP5861435B2 (en) * 2011-12-14 2016-02-16 Jfeスチール株式会社 Hot finish rolling method and hot rolled metal sheet manufacturing method
JP6165566B2 (en) * 2013-09-10 2017-07-19 株式会社日立製作所 Winding temperature control device and control method
CN103728958B (en) * 2014-01-16 2016-08-17 东北大学 A kind of course control method for use for heat treatment for medium plate production line and system
JP6075301B2 (en) * 2014-01-17 2017-02-08 Jfeスチール株式会社 COOLING CONTROL DEVICE AND COOLING CONTROL METHOD
JP6188606B2 (en) * 2014-03-06 2017-08-30 株式会社神戸製鋼所 Method for determining setup conditions in cold rolling
CN114417530B (en) * 2022-01-14 2023-01-20 北京科技大学 Optimized scheduling method and device for hot continuous rolling laminar cooling water supply pump station

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04197510A (en) * 1990-11-28 1992-07-17 Nkk Corp Method for controlling optimum finishing temp. of hot rolling mill
JPH10277627A (en) * 1997-04-01 1998-10-20 Mitsubishi Electric Corp Method for controlling outlet temperature of hot rolling mill and device therefor

Also Published As

Publication number Publication date
JP2011073058A (en) 2011-04-14

Similar Documents

Publication Publication Date Title
JP5564704B2 (en) Hot finish rolling mill outlet side temperature control device and control method
JP6435234B2 (en) Hot roll finishing mill outlet temperature control device and control method thereof
JP5054369B2 (en) Winding temperature control device and control method
JP4335860B2 (en) Winding temperature control device and control method
JP4648176B2 (en) Water cooling control method for rolled material
CN102000703B (en) Hot rolling machine outlet side temperature control device and its control method
JPS6121729B2 (en)
JP5565200B2 (en) Finishing temperature control device in hot rolling
JP6068146B2 (en) Set value calculation apparatus, set value calculation method, and set value calculation program
JP6438753B2 (en) Tandem rolling mill control device and tandem rolling mill control method
JP5783925B2 (en) Control device for hot tandem rolling mill and control method for hot tandem rolling mill
TWI754979B (en) Method of controlling a cooling device in a rolling train
JP2015205331A (en) Control device and control method of hot rolling mill
JP4962005B2 (en) Steel manufacturing method, steel cooling control device, and steel manufacturing device
KR101403240B1 (en) Apparatus and method of controlling coiling temperature of hot rolled steel plate using in-plate learning
JP7230880B2 (en) Rolling load prediction method, rolling method, method for manufacturing hot-rolled steel sheet, and method for generating rolling load prediction model
JP5381740B2 (en) Thickness control method of hot rolling mill
JPH01162508A (en) Cooling control method for steel material
KR101462332B1 (en) Method and device for controlling speed of rolling mill
KR101451725B1 (en) Method for controlling temperature of strip into finishing mill stand
JP2014079778A (en) Manufacturing method and manufacturing apparatus of hot rolled steel sheet
RU2783688C1 (en) Method for controlling the cooling device in the rolling mill line
JP5636714B2 (en) Winding temperature control device and winding temperature control method
JP6874730B2 (en) Hot rolling line controller
Nakagawa et al. Coiling temperature control using fountain pyrometers in a hot strip mill

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120615

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20131028

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20131112

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20131206

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140520

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140527

R150 Certificate of patent or registration of utility model

Ref document number: 5564704

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150